1 Groundwater Reserve a critical review Umvoto Africa (Pty) Ltd, P.O. Box 61, Muizenberg 7950, South Africa Kornelius@umvoto.com, (work), (fax) Abstract The concept of the Groundwater Reserve is enshrined in the National Water Act that stipulates that a classification of all significant water resources must be undertaken and the Reserve requirements be determined and gazetted. The Reserve covers two different aspects, the Ecological Reserve to protect the water dependent ecosystems and the Basic Human Needs (BHN) Reserve to ensure that all people who depend on that water resource have sufficient water for their livelihood. The approach for determining and implementing the Reserve that was developed for surface water resources was adopted for groundwater resources as provided for in the GRDM Manual, inter alia. However, there is no separate Groundwater Reserve, but rather a groundwater component of or contribution to the ecological Reserve and BHN. Hence, the implementation of this methodology often results in undesirable outcomes and is one of the inhibiting factors for sustainable groundwater development, as some of the aspects and methods are not applicable to groundwater and not appropriate for implementation. The current separation of the Groundwater Reserve determination process from the ecological Reserve determination emphasizes this pitfall of the process and methodology. This paper provides a critical review of the current concept of the Groundwater Reserve and its implementation based on several case studies. It concludes with recommended changes to the standard methodology and a possible way forward for developing an appropriate methodology for addressing and protecting the groundwater contribution to both the ecological and BHN Reserve. Keywords Groundwater Reserve, Ecological Reserve, National Water Act, water resource protection, water resource classification, RQOs
2 1 Legal Requirements The National Water Act (NWA) outlines the legal requirements for the use and protection of the South African water resources, which includes a watercourse, surface water, estuary, or aquifer. There is no separation of different water resources throughout the NWA. The relevant chapters for this discussion are Chapter 3 Protection of water resources, and Chapter 4 Use of water. These are discussed below in relation to the concept of the Groundwater Reserve. 1.1 Classification Part 1 (of Chapter 3) provides for the first stage in the protection process, which is the development by the Minister of a system to classify the nation's water resources. The system provides guidelines and procedures for determining different classes of water resources. Section 12 Prescription of classification system (2) The system for classifying water resources may-- a) establish guidelines and procedures for determining different classes of water resources; b) in respect of each class of water resource-- i) establish procedures for determining the Reserve; ii) establish procedures which are designed to satisfy the water quality requirements of water users as far as is reasonably possible, without significantly altering the natural water quality characteristics of the resource; iii) set out water uses for instream or land-based activities which activities must be regulated or prohibited in order to protect the water resource; and c) provide for such other matters relating to the protection, use, development, conservation, management and control of water resources, as the Minister considers necessary. This procedure has been established and contains a 7-step process (DWA, 2010). There are three management classes; minimally used, moderately used and heavily used; which are defined by the allowed ecological condition (called category) of freshwater ecosystems or water resources within the defined area (see Table 1). Hence, the management class is determined for an area called Integrated Unit of Analysis (IUA), which usually comprises several quaternary catchments and a range of water resources. The recommended categories are then determined for water resources or parts thereof within the IUA boundary (called nodes or resource units), often based on a desired improvement of the present ecological status. Groundwater is not considered separately in the gazetted procedure and does not feature in the guidelines for water resource classification (DWA, 2010). However, some approaches in the guidelines that were developed for surface water and fresh water ecosystems, are not applicable for groundwater.
3 Table 1 Requirements for ecological condition for the Management Classes (Dollar et al. 2006) Management Class Class I: Minimally used Class II: Moderately used Class III: Heavily used Description The configuration of water resources within an IUA results in an overall water resource condition that is minimally altered from its pre-development condition. The configuration of water resources within an IUA results in an overall water resource condition that is moderately altered from its pre-development condition. The configuration of water resources within an IUA results in an overall water resource condition that is significantly altered from its pre-development condition. Configuration guidelines At least 60% of the freshwater ecosystems in a sub-basin are in an A or B category. At least 40% of the freshwater ecosystems in a sub-basin are in an A or B category. No requirement for A or B categories The aquifer classification system developed by Parsons (1995) and mapped by Conrad et al. (1999), based on relevance for water supply, does not match the emphasis on protection as stipulated in the guidelines, and hence cannot be applied without changing the classification system. The current Framework for Groundwater Classification and Protection (DWA, 2013) attempts to include groundwater into the water resource classification process, but falls short of achieving an integration, as the discrepancies between the different regulations for water resource protection; i.e. classification, Reserve, RQOs, water use authorisation; could not be resolved. 1.2 Resource Quality Objectives Under Part 2 of Chapter 3, the Minister is required to use the classification system established in Part 1 to determine the class and resource quality objectives of all or part of water resources considered to be significant. The purpose of the resource quality objectives is to establish clear goals relating to the quality of the relevant water resources. In determining resource quality objectives a balance must be sought between the need to protect and sustain water resources on the one hand, and the need to develop and use them on the other. The Guideline for the Determination of RQOs (DWA, 2011) describes a 7-step process, some of which are similar to the steps of the classification process. However, the guideline provides for different sub-steps to be followed for groundwater RQOs, which hinders the integration and promotes separation between groundwater and surface water. RQO are both descriptive statements and attendant numerical values for a range of indicators throughout the IUA (DWA 2011). The RQOs themselves are narrative and qualitative statements that describe the overall objectives for the resource unit (DWA 2011). They should be meaningful to stakeholders and responsible managers, and give direction for whatever action is necessary to achieve the vision for the resource. These RQOs are gazetted and are thus supported by law (DWA 2011).
4 The numerical limits give a quantitative measure of the RQOs that can be used for monitoring, such as an upper limit for slat concentrations or a lower population size limit for fish. Typically there is a paucity of scientific information on which to base such numerical limits, and so these numerical limits are not gazetted and thus may be more easily adjusted if found to be inaccurate. Section 13 Determination of class of water resources and resource quality objectives (1) As soon as reasonably practicable after the Minister has prescribed a system for classifying water resources the Minister must, subject to subsection (4), by notice in the Gazette, determine for all or part of every significant water resource-- a) a class in accordance with the prescribed classification system; and b) resource quality objectives based on the class determined in terms of paragraph (a). (3) The objectives determined in terms of subsection (1) may relate toa) the Reserve; b) the instream flow; c) the water level; d) the presence and concentration of particular substances in the water; e) the characteristics and quality of the water resource and the instream and riparian habitat; f) the characteristics and distribution of aquatic biota; g) the regulation or prohibition of instream or land-based activities which may affect the quantity of water in or quality of the water resource; and h) any other characteristic, of the water resource in question. 1.3 Reserve Determination Part 3 deals with the Reserve, which consists of two parts -- the basic human needs (BHN) Reserve and the ecological Reserve. The BHN Reserve provides for the essential needs of individuals served by the water resource in question and includes water for drinking, for food preparation and for personal hygiene. The ecological Reserve relates to the water required to protect the aquatic ecosystems of the water resource. The Reserve refers to both the quantity and quality of the water in the resource, and will vary depending on the class of the resource. Unless underground aquatic ecosystems within the aquifer are considered, there is no separate Groundwater Reserve, but rather a possible groundwater component of or contribution to the ecological Reserve and BHN Reserve. Hence, the groundwater component should be determined as part of the ecological Reserve determination and not as separate process, as currently happening.
5 1.4 Licensing The licensing of water use requires that a preliminary Reserve determination was undertaken (see Section 17 (1b)) and or the class and RQOs are determined (see Section 27 (1g)). This contradicts the statement under Chapter 3 that the class and resource quality objectives [are determined for] all or part of water resources considered to be significant. In recent licences, licence conditions cater for the uncertainty in establishing impacts of abstraction upfront. Hence, the need for classification and the determination of the Reserve prior to issuing a licence is questionable, at the least. Section 17 Preliminary Reserve (1) Until a system for classifying water resources has been prescribed or a class of a water resource has been determined, the Ministera) may, for all or part of a water resource; and b) must, before authorising the use of water under section 22(5), make a preliminary determination of the Reserve. Section 27 Considerations for issue of general authorisations and licences (1) In issuing a general authorisation or licence a responsible authority must take into account all relevant factors, including-- a) existing lawful water uses; b) the need to redress the results of past racial and gender discrimination; c) efficient and beneficial use of water in the public interest; d) the socio-economic impact-- i) of the water use or uses if authorised; or ii) of the failure to authorise the water use or uses; e) any catchment management strategy applicable to the relevant water resource; f) the likely effect of the water use to be authorised on the water resource and on other water users; g) the class and the resource quality objectives of the water resource; h) investments already made and to be made by the water user in respect of the water use in question; i) the strategic importance of the water use to be authorised; j) the quality of water in the water resource which may be required for the Reserve and for meeting international obligations; and k) the probable duration of any undertaking for which a water use is to be authorised.
6 2 Current Implementation Currently, groundwater Reserve studies are undertaken mostly in isolation and often without an ecological Reserve being determined prior or in parallel. The reasons for this are: The need for a Reserve determination for licence applications; The need to assess the allocable amount of groundwater at the same time; The limits of procurement processes within DWA; The split of responsibilities into different sub-directorates; The lack of scientific knowledge and understanding wrt surface water groundwater interaction; The lack of capacity for IWRM within the relevant authorities. Hence, most studies follow the concept of the Groundwater Reserve and its implementation as outlined in the Groundwater Resource Directed Measures (GRDM) Manual (Dennis et al., 2011). 2.1 Reserve determination The standard approach to Groundwater Reserve determinations aims to determine the allocable amount of groundwater within the study area and is based on the following equation: GW allocable = Re GW use GW Reserve (1) where Re = Recharge, GW use = current groundwater use, GW Reserve = groundwater contribution to the Reserve. Due to lack of other data at appropriate scale, the Groundwater Reserve is often equated to the natural baseflow or groundwater contribution to baseflow Depending upon the researcher and the school of thought, the values for baseflow per catchment varies widely without guidance which number would be appropriate to relate to groundwater contribution to baseflow. Furthermore, the natural baseflow is usually significantly higher than the low flow requirements to maintain the ecological Reserve requirements. The correct definition of the groundwater component of the Reserve is: Reserve(%) = EWRgw +BHNgw Re 100 (2) where Re = recharge, BHN gw = basic human needs derived from groundwater, and EWR gw = groundwater contribution to EWR However, there are several problems even with using the low flow requirements as guidance, as the Reserve is expressed as percentage of recharge, a highly variable and uncertain parameter, and both recharge and EWR gw are derived at catchment scale and are not aquifer specific.
7 2.2 Aquifer Stress The present status and recommended categories for groundwater are defined based on the aquifer stress concept, which is the ratio of groundwater abstraction vs. recharge, as outlined in the GRDM Manual (Dennis et al., 2011). The issues arising out of this concept are twofold: The aquifer stress does not take into account the ecological requirements nor the impact of other discharge processes. Hence, the results cannot be compared across different aquifer settings. An aquifer with significant contribution to the ecological Reserve could be over-exploited with an aquifer stress index of less than 40% (PS C), while a confined aquifer with off sea discharge could be sustainable with an aquifer stress of more than 90% (PS E). The calculation of aquifer stress uses mean annual recharge, without consideration of the natural annual fluctuations and the actual yield potential of the aquifer. This results in over-abstraction for some aquifers in the arid climate with period rainfall and recharge, and under development of confined aquifers with huge storage capacity and lag time of several years to decades. 2.3 Scale The ecological Reserve is either determined per quaternary catchment (rapid determination) or at specific points within the water body, viz. EWR sites (intermediate and comprehensive determination). The Groundwater Reserve is usually determined per quaternary catchment or even larger resource unit (see case studies in Section 3). However, both scales are not applicable to the groundwater contribution to the ecological Reserve, which is usually a discrete discharge along specific river reaches or via springs. Hence, there is no need for a Groundwater Reserve, if the next surface water body and possible discharge point is kilometers away from an abstraction point. The relevant scale differences between surface water bodies and groundwater that need to be considered during the Reserve determination process, and even more so for the classification and the development of RQOs are given below: Aquifer boundaries mostly do not coincide with surface water catchment boundaries, especially for fractured aquifers and confined aquifers; Groundwater discharge occurs at distinct areas, such as river reaches or springs, and is not homogenously distributed across the catchment or aquifer; Groundwater flow is significantly slower than surface water flow, which impacts on the seasonal pattern of groundwater discharge as well as water availability for users.
8 3 Case studies The issues around the current implications of the Groundwater Reserve concept are discussed on three case studies with different climatic and aquifer settings. 3.1 Artesian, confined aquifer A Reserve determination was required for the licence application by the Oudtshoorn municipality to abstract water from the artesian, confined Peninsula Aquifer south of Oudtshoorn. A slightly modified methodology was developed and implemented for this study due to the fact that the standard methodology only applies to unconfined aquifers that are in direct contact with the surface water body. Based on the results of that study, the following considerations for the Reserve determination of the groundwater contribution to the Reserve in artesian basins need to be taken into account (Riemann and Blake, 2011): Basic Human Needs component can be neglected for the artesian aquifer as this need is usually provided from shallower unconfined aquifers or rivers. Rejected recharge and overspill in the aquifer outcrop area (i.e., unconfined portion) contributes to river flow, which might be impacted by abstraction if the zone of influence reaches the unconfined portion of the aquifer. Discharge zones from the deep artesian basin are limited to hot springs (where flow paths can be mapped) along with possible diffuse discharge along fault-bounded boundaries of the artesian basin. The storage capacity for the confined aquifer is sufficient for managing the aquifer over a longer time period than 1 or 2 years, as usual for unconfined aquifers and dams, without impacting on the environment. It is suggested that the licensing and Groundwater Reserve determination process in artesian basins focuses on the development of site specific and enforceable RQOs, rather the determination of an annual value of permissible abstraction and volumes to be reserved in the aquifer. 3.2 Letaba, Umzimvubu to Keiskamma The DWA initiated Groundwater Reserve studies for selected Water Management Areas. Due to the scale of the areas under investigation, the level of Reserve determination was usually a desktop level. For the Letaba catchment, some information on surface water ecological requirements was available for selected sites, while for most of the catchments no information was available. Most of the rivers in the Letaba catchment are seasonal or ephemeral rivers and baseflow is usually set to zero. Hence, assumptions on low flow requirements had to be made.
9 The groundwater Reserve determination and GRDM assessment for the Mzimvubu to Keiskamma WMA was undertaken at an intermediate level, as the spatial scale does not allow for a comprehensive level. Most of the delineated resource units comprise several catchments of similar geological / hydrogeological and land use characteristics. Hence, the results of this Reserve determination provide a guideline for groundwater management on a regional scale, but do not allow for local and site specific differences. The Reserve determination with respect to the groundwater component of the ecological Reserve and Basic Human Needs Reserve was based on the maintenance low flow requirements per quaternary catchment and the total population living in the area. This resulted in a range of the Reserve requirements between 3% and 71% of recharge for the different resource units with an average of 21% of recharge for the study area, confirming the problem with using the standard aquifer stress as index for the present status. 3.3 Olifants Doorn A water resource classification study was recently completed in the Olifants-Doorn WMA (DWA, 2012) with a subsequent study to determine RQOs near completion (DWA, 2013). Groundwater input into the classification process was prepared on a quaternary catchment scale and not further considered in the classification scenarios. The outcome of the process was not suitable to be used in the determination of RQOs due to the difference in scale and inadequate data. The RQO study provided meaningful RQOs for groundwater in selected priority areas, where sufficient information about the aquifer status, current and future users, and the receiving environment was available. It was decided to only gazette the RQOS and not to gazette the recommended categories for groundwater, as The Recommended Category (RC) for most catchments requires a decrease in abstraction, as it constitutes an improvement from the Present Status; e.g. from a PS of B to a RC of A. This would require a curtailment of current allocation and abstraction with significant impacts on the agricultural sector and domestic supply. The water supply for a number of towns depends upon the abstraction of groundwater, which is not taken into account in the assignment of the RC The potential of future groundwater development within the WMA, as outlined in several previous reports (e.g. Olifants River Basin Study, WODRIS, Clanwilliam Dam Raising Study, All Towns Reconciliation Strategy Study), was not taken into account. The gazetting of the current RCs would foreclose these identified options for groundwater development and negate the strategic intent by the Department of promoting groundwater as future water supply option.
10 4 Implications for groundwater management The implementation of the standard methodology for classification and Reserve determination to groundwater resources often results in undesirable outcomes and is one of the inhibiting factors for sustainable groundwater development, as some of the aspects and current methods are not applicable to groundwater and not appropriate for implementation. The current separation of the Groundwater Reserve determination process from the ecological Reserve determination emphasizes this pitfall of the process and methodology. The slow implementation of the NWA and the discrepancies between the different regulations and guidelines with respect to groundwater and surface water provisions limit the potential groundwater development and unduly delay licences, urgently needed to eradicate water supply backlogs. 5 Proposed way forward The following steps can be undertaken immediately for all future Groundwater Reserve studies and licence applications: Integrate groundwater into ecological Reserve determination studies Utilise minimum low flow or maintenance low flow conditions as determined by ecological Reserve determination studies for calculating the groundwater component Waive the requirement for a preliminary Reserve determination for licences that have clearly no impact on surface water bodies Focus studies on the preliminary determination of resource quality objectives to guide catchment management and licence conditions The focus of groundwater RQOs in this context is twofold; i.e. to support the ecological requirements of the receiving surface water bodies, as determined by the surface water RQOs, and to ensure adequate water quantity and quality for the direct and indirect users of the groundwater resource.
11 6 References Conrad, J, A Matoti & S Jones (1999). Aquifer Classification Map of South Africa DWA (2007). The Development of the Water Resource Classification System (WRCS). Department of Water Affairs, South Africa, Chief Directorate : Resource Directed Measures. DWA (2010). Regulations for the Establishment of a Water Resource Classification System. Regulation 810, published in Government Gazette No , 17 September 2010 DWA (2011). Procedures to Develop and Implement Resource Quality Objectives. Prepared by Institute of Natural Resources on behalf of the Department of Water Affairs of South Africa. Directorate : RDM Compliance DWA (2011). Determination of the Groundwater Component of the Reserve: Mzimvubu to Keiskamma WMA Final Report: Western Portion. Prepared by Umvoto Africa (Pty) Ltd on behalf of the Department of Water Affairs, South Africa. Directorate : Reserve Requirements. DWA Report No. RDM/WMA12/02/CON/INT/0312 DWA (2012). The Classification of significant Water Resources in the Olifants-Doorn WMA Final Project Report. Prepared by BlueScience Consulting cc on behalf of the Department of Water Affairs, South Africa, Chief Directorate : Resource Directed Measures. DWA Report No. DWA (2013). Development of RQOs in the Olifants-Doorn WMA. Prepared by Umvoto Africa (Pty) Ltd in association with Southern Water Ecological Research and Consulting cc on behalf of the Department of Water Affairs, South Africa. Directorate : RDM Compliance. DWA Report No. DWA (2013), A Framework for the Amendment of Groundwater Classification Guidelines (2007). Department of Water Affairs, South Africa. Directorate : Water Resource Classification; June 2013 Mavurayi, A (2011). Unpacking the Groundwater Reserve. In: Proceedings Groundwater: Our Source of Security in an uncertain Future. Biennial Conference of the Ground Water Division (GWD) of the Geological Society of South Africa (GSSA), organised in association with the International Association of Hydrogeologists (IAH), September 2011, Pretoria Parsons, R (1995). A South African Aquifer System Management Classification. Report to the Water Research Commission of South Africa. WRC Report KV 77/95 Riemann, K. and D Blake (2009). Groundwater Reserve Determination for current and potential Wellfield Development of TMG Aquifers The undertaking of the Rapid Reserve Determination for the Oudtshoorn Municipality. WRC Report K8/871/1, Water Research Commission, Pretoria, December 2009 Riemann, K. (2011). Groundwater Reserve Determination for a confined, artesian Aquifer An Oxymoron? In: Proceedings Groundwater: Our Source of Security in an uncertain Future. Biennial Conference of the Ground Water Division (GWD) of the Geological Society of South Africa (GSSA), organised in association with the International Association of Hydrogeologists (IAH), September 2011, Pretoria
Inkomati Rivers Classification
water affairs Department: Water Affairs REPUBLIC OF SOUTH AFRICA Inkomati Rivers Classification Determination of Water Resource Classes and Associated Resource Quality Objectives in the Inkomati Water
More informationTERMS OF REFERENCE. Chief Directorate: Resource Directed Measures Directorate: Resource Quality Services
TERMS OF REFERENCE REVIEW AND UPDATE OF THE 1999 ECOLOGICAL IMPORTANCE-SENSITIVITY AND THE PRESENT ECOLOGICAL STATE (EIS/PES) OF SOUTH AFRICAN RIVERS INCLUDING EXPANSION TO PRIORITY TRIBUTARIES AND WETLANDS
More informationTongaat WWTW Water Use Licence Application. Draft Report Meeting 1 October 2015
Tongaat WWTW Water Use Licence Application Draft Report Meeting 1 October 2015 Agenda Welcome and purpose Public Participation Process Introduction ethekwini W&S Tongaat Waste Water Treatment Works A Water
More informationWATER MANAGEMENT INSTITUTIONS (WMI) IN SOUTH AFRICA
WATER MANAGEMENT INSTITUTIONS (WMI) IN SOUTH AFRICA 3 rd November, 2004 E KARAR DIRECTOR: WMI GOVERNANCE Karare@dwaf.gov.za DEPARTMENT OF WATER AFFAIRS AND FORESTRY CONTENTS The National Water Act Water
More informationGUIDELINES FOR FINANCING CATCHMENT MANAGEMENT AGENCIES IN SOUTH AFRICA by. Guy Pegram and Ian Palmer
GUIDELINES FOR FINANCING CATCHMENT MANAGEMENT AGENCIES IN SOUTH AFRICA by Guy Pegram and Ian Palmer Report to the Water Research Commission on the project: Development of guidelines for the financing of
More informationClimate change, groundwater and the law exploring the connections in South Africa UKZN INSPIRING GREATNESS
Climate change, groundwater and the law exploring the connections in South Africa SA s groundwater The total volume of available, renewable groundwater in South Africa (the Utilisable Groundwater Exploitation
More informationGroundwater resource-directed measures software
Groundwater resource-directed measures software Ingrid Dennis 1 * and Johan Wentzel 2 1 Institute for Groundwater Studies, University of the Free State, PO Box 339, Bloemfontein, 9300, South Africa 2 Department
More informationGROUNDWATER QUANTITY PRESENTATION OUTLINE INTRODUCTION (CONT D) WHAT IS A RESERVE INTRODUCTION INTRODUCTION OBJECTIVES METHODS CONCLUSION
THE USE OF RESERVE DETERMINATION IN ASSESSING GROUNDWATER QUANTITY INTRODUCTION OBJECTIVES PRESENTATION OUTLINE METHODS CONCLUSION Adaora Okonkwo and Nancy Motebe INTRODUCTION South Africa is a water Scare
More informationWater Resource (Burnett Basin) Plan 2000
Queensland Water Act 2000 Water Resource (Burnett Basin) Plan 2000 Reprinted as in force on 18 December 2009 Reprint No. 2A This reprint is prepared by the Office of the Queensland Parliamentary Counsel
More informationPRO-POOR WATER RESOURCES REGULATION IN DEVELOPING COUNTRIES: LESSONS FROM SOUTH AFRICA AND ZAMBIA
PRO-POOR WATER RESOURCES REGULATION IN DEVELOPING COUNTRIES: LESSONS FROM SOUTH AFRICA AND ZAMBIA B Schreiner 1, B van Koppen 2 and K Laing 3 ABSTRACT Water resources regulation is an increasingly critical
More informationEcosystem Accounting in South Africa
Ecosystem Accounting in South Africa Mandy Driver South African National Biodiversity Institute 20 th London Group Meeting New Delhi, 16 October 2014 South African National Biodiversity Institute Government
More informationNON-RENEWABLE GROUNDWATER RESOURCES
UNESCO IHP VI NON-RENEWABLE GROUNDWATER RESOURCES basic concepts & management approaches DR STEPHEN FOSTER GW-MATE Director (IAH President) a GWP Associate Program NON-RENEWABLE GROUNDWATER RESOURCES relative
More informationDEPARTMENT OF ENVIRONMENTAL AFFAIRS NATIONAL ENVIRONMENTAL MANAGEMENT INTEGRATED COASTAL MANAGEMENT ACT, 2008 (ACT NO. 24 OF 2008)
DEPARTMENT OF ENVIRONMENTAL AFFAIRS No. 336 4 May 2012 NATIONAL ENVIRONMENTAL MANAGEMENT INTEGRATED COASTAL MANAGEMENT ACT, 2008 (ACT NO. 24 OF 2008) INVITATION TO COMMENT ON THE DRAFT NATIONAL ESTUARINE
More informationFigure 4. The proposed location of the Zalu Dam a) basin and b) wall.
A B Figure 4. The proposed location of the Zalu Dam a) basin and b) wall. Figure 5. Detailed layout of the proposed Zalu Dam (Source: Feasibility Study for the Augmentation of the Lusikisiki Regional Water
More informationDischarge of water containing waste emanating from land to the marine environment: A water quality management perspective
Discharge of water containing waste emanating from land to the marine environment: A water quality management perspective SHH Oelofse 1, P Viljoen 1, S Taljaard 2 and WAM Botes 3 1 Department of Water
More informationINTEGRATED WATER RESOURCES MANAGEMENT
DEPARTMENT OF WATER AFFAIRS AND FORESTRY INTEGRATED WATER RESOURCES MANAGEMENT GUIDELINES FOR GROUNDWATER MANAGEMENT IN WATER MANAGEMENT AREAS, SOUTH AFRICA INTEGRATED WATER RESOURCE MANAGEMENT STRATEGIES,
More informationPhD Program Water Technology Groundwater Hydrology (WTEC 9309)
PhD Program Water Technology Groundwater Hydrology (WTEC 9309) Topic 1: Introduction and Occurrence of Groundwater Instructor: Prof. Dr. Yunes Mogheir 2018 1 1. Introduction Definitions and General Groundwater
More informationVAAL RIVER EWR STUDIES...
CONTENTS 1 INTRODUCTION... 1-1 2 LESOTHO... 2-1 2.1 COMPREHENSIVE AND INTERMEDIATE ASSESSMENTS... 2-1 2.2 DESKTOP RESERVE STUDIES... 2-1 2.3 CONCLUSIONS... 2-2 3 VAAL RIVER EWR STUDIES... 3-1 3.1 COMPREHENSIVE
More informationWater Resource (Fitzroy Basin) Plan 1999
Queensland Water Act 2000 Water Resource (Fitzroy Basin) Plan 1999 Reprinted as in force on 18 December 2009 Reprint No. 1D This reprint is prepared by the Office of the Queensland Parliamentary Counsel
More informationTechnical Rules: Assessment Report. Clean Water Act, 2006
Technical Rules: Assessment Report Clean Water Act, 2006 November 20, 2008 Amended on: December 12, 2008 (administrative amendments) November 16, 2009 (EBR Posting Number EBRO10-7573) Clean Water Act,
More informationIWRM And Water Planning in Gurara River Basin Engr. Abdul-Qadir D. Aliyu
IWRM And Water Planning in Gurara River Basin Engr. Abdul-Qadir D. Aliyu National Water Resources Institute, Kaduna Nigeria. Outline Introduction IWRM Water Planning and Allocation Background Study Area
More informationAdvice to decision maker on coal mining project
. Advice to decision maker on coal mining project IESC 2015-063: West Muswellbrook Project New Development Requesting agency The New South Wales Mining and Petroleum Gateway Panel Date of request 27 January
More informationUK Technical Advisory Group on the Water Framework Directive
UK Technical Advisory Group on the Water Framework Directive Paper 11b(i) Groundwater Chemical Classification for the purposes of the Water Framework Directive and the Groundwater Daughter Directive. This
More informationALL TOWNS WATER RECONCILIATION STRATEGIES IN THE WESTERN AND EASTERN CAPE ACHIEVEMENTS AND CHALLENGES
ALL TOWNS WATER RECONCILIATION STRATEGIES IN THE WESTERN AND EASTERN CAPE ACHIEVEMENTS AND CHALLENGES Isa Thompson 1), Kornelius Riemann 2) and Rowena Hay 2) 1) Department of Water and Sanitation, Directorate:
More informationINTEGRATED WATER RESOURCES MANAGEMENT
DEPARTMENT OF WATER AFFAIRS AND FORESTRY INTEGRATED WATER RESOURCES MANAGEMENT GROUNDWATER MANAGEMENT STRATEGY EXECUTIVE SUMMARY INTEGRATED WATER RESOURCE MANAGEMENT STRATEGIES, GUIDELINES AND PILOT IMPLEMENTATION
More informationPROPOSED VOLSPRUIT MINE, MOKOPANE DISTRICT, LIMPOPO PROVINCE. Background Information Document (BID) ESCIENCE ASSOCIATES (PTY) LTD.
ENVIRONMENTAL IMPACT ASSESSMENT (EIA), MINING RIGHT APPLICATION AND OTHER ANCILLARY LICENSING PROCESSES: PROPOSED PLATINUM GROUP METALS MINE & ASSOCIATED INFRASTRUCTURE PROPOSED VOLSPRUIT MINE, MOKOPANE
More informationVLAKVARKFONTEIN COAL MINE
VLAKVARKFONTEIN COAL MINE PURPOSE OF THIS DOCUMENT: This Background Information Document (BID) provides you, as an Interested and Affected Party (I&AP), an overview of the proposed project. The BID invites
More informationGOVERNMENTAL DECREE NO. 219/2004 (VII. 21.) ON THE PROTECTION OF GROUNDWATER
GOVERNMENTAL DECREE NO. 219/2004 (VII. 21.) ON THE PROTECTION OF GROUNDWATER Authorised by the provisions set forth in Articles 7 and 36 and in clause f) of Paragraph (7) of Article 110 of Act LIII of
More informationPROGRESS OF WATER ENVIRONMENTAL GOVERNANCE/MANAGEMENT AND FUTURE CHALLENGES IN MALAYSIA
PROGRESS OF WATER ENVIRONMENTAL GOVERNANCE/MANAGEMENT AND FUTURE CHALLENGES IN MALAYSIA BY SYAZRIN SYIMA SHARIFUDDIN NATIONAL HYDRAULIC RESEARCH INSTITUTE OF MALAYSIA (NAHRIM) PRESENTATION OUTLINE Introduction
More informationOperational Policy: Using Water for Recreational Purposes
Operational Policy: Using Water for Recreational Purposes VERSION 1.1 Prepared by Directorate Water Abstraction and Instream Use, Sub-directorate Environment and Recreation Copyright 2004 DEPARTMENT OF
More informationAttached please find our submission in response to the discussion paper, entitled British Columbia's Water Act Modernization.
From: Sent: To: Subject: Attachments: Follow Up Flag: Flag Status: Elizabeth Salomon-de-Friedberg April-29-10 10:19 AM Living Water Smart ENV:EX BC Water Act Modernization - Submission from NWUMP Nicola
More informationINTEGRATED CATCHMENT MANAGEMENT
URBAN HYDROLOGY: WATER IN THE CITY OF TSHWANE High Performance Centre, University of Pretoria 23 24 January 2014 INTEGRATED CATCHMENT MANAGEMENT FRED VAN ZYL DEPARTMENT OF WATER AFFAIRS 23 JANUARY 2014
More informationSouth African Wetland Society - wetland delineation working group Position Statement on Wetland Delineation August page overview statement
South African Wetland Society - wetland delineation working group Position Statement on Wetland Delineation August 2014-2 page overview statement 1. Wide variation exists within wetland ecosystems, but
More informationADDRESS FOR SERVICE: Ballance Agri-Nutrients Limited Hewletts Road, Mt Maunganui Private Bag Tauranga Mail Centre TAURANGA 3143
SUBMISSION TO PLAN CHANGE 9 OF THE BAY OF PLENTY REGIONAL WATER AND LAND PLAN TO: Bay of Plenty Regional Council PO Box 364, Whakatane 3158 BY E-MAIL: waterquantity@boprc.govt.nz SUBMISSION ON: Plan Change
More informationChapter 2: Aquifers and groundwater
Chapter 2: Aquifers and groundwater Groundwater movement through aquifers is driven by differences in groundwater levels or pressure and is controlled by how porous the material is that it passes through.
More informationFigure 1.1: Location of Majuba Power Station within the Pixley Ka Seme Local Municipality
1 INTRODUCTION Majuba Power Station is located near Amersfoort in the Mpumalanga Province and falls within the Pixley Ka Seme Local Municipality (Figure 1.1) which falls within the Gert Sibande District
More informationScope of Decree. Designation of water bodies
Ministry for Environmental Protection and Water (KvVM) Decree 30/2004. (XII. 30.) on rules for investigation of groundwaters Authorised by the provisions set forth in clause m), paragraph (8), Article
More informationPredicting Unmet Irrigation Demands due to Climate Change An integrated Approach in WEAP
Predicting Unmet Irrigation Demands due to Climate Change An integrated Approach in WEAP Marc Haering Emad Al-Karablieh, Amer Salman University of Jordan G-Wadi International Session 5: Risks Assessment
More informationUpdate on Cuyama Basin Groundwater Modeling
Cuyama Basin Groundwater Sustainability Agency Update on Cuyama Basin Groundwater Modeling December 3, 2018 Approach for Cuyama Basin Model Development Develop a Robust and Defensible Integrated Water
More informationGroundwater Classification Methodology Surface Water Chemical
River Basin Management Plans Groundwater Classification Methodology Surface Water Chemical December 2014 Groundwater Classification Methodology Surface Water Chemical December 2014 Introduction All groundwater
More informationCROCODILE (WEST) RIVER RETURN FLOW ANALYSIS STUDY
CROCODILE (WEST) RIVER RETURN FLOW ANALYSIS STUDY LIST OF REPORTS Main Report Inception Report Current and Projected Population for the Study Area Primary Water Requirements Infrastructure, Land use and
More informationGuide. Preparing a resource consent application to take surface water, including replacing a deemed permit
Guide Preparing a resource consent application to take surface water, including replacing a deemed permit August 2015 Contents 1. Purpose and structure of the guide... 1 2. Preparing a resource consent
More informationMaking African groundwater information more available
Africa Groundwater Atlas Making African groundwater information more available http://www.bgs.ac.uk/africagroundwateratlas/index.cfm What is the Africa Groundwater Atlas? A starting point for understanding
More informationNAMIBIA: Assessing Recharge to the Southeast Kalahari Artesian Basin
Overall Goal NAMIBIA: Assessing Recharge to the Southeast Kalahari Artesian Basin To quantify the modern recharge to the aquifers of the Southeast Kalahari Artesian Basin, also known as the Stampriet Artesian
More informationAPPENDIX E PERMITS/LICENCES
APPENDIX E PERMITS/LICENCES APPENDIX E1: HERITAGE WESTERN CAPE COMMENTS APPENDIX E2: PROOF OF SUBMISSION OF WATER USE LICENCE APPLICATION WATER USE AUTHORISATION REPORT CONSTANTIA UITSIG ESTATE Report
More informationWater Resource Long Term Planning
Limpopo Coalfields Conference II ProteaHotel Ranch Resort, Polokwane, Limpopo 18 October 2013 Water Resource Long Term Planning Presented by: Tendani Nditwani Structure of the presentation National Water
More informationThe Victorian environmental water management framework
The Victorian environmental water management framework Trent Wallis Co-Executive Officer Victorian Environmental Water Holder Legal Status of Rivers Summit, Melbourne Law School, 11 August 2017 Insert
More informationThe Use of Minewater to meet Future Urban Water Requirements in the Witbank Dam Catchment
The Use of Minewater to meet Future Urban Water Requirements in the Witbank Dam Catchment T Coleman 1, P van Rooyen 2, P Gunther 3 and W Mey 4 1 Golder Associates Africa 2 WRP Consulting Engineers 3 Anglo
More informationWater - policy and government regulation for heavy oil and oilsands development
Water - policy and government regulation for heavy oil and oilsands development Robert George, Alberta Environment and Sustainable Resource Development, Edmonton, Alberta Summary This presentation outlines
More informationThe South African IWRM Scorecard
The South African IWRM Scorecard International Conference on IWRM: Lessons from Implementation in Developing Countries Cape Town International Convention Centre 10-12 March 2008 Ashwin Seetal Zitholele
More informationGroundwater in the Santa Rosa Plain
. Groundwater in the Santa Rosa Plain Marcus Trotta, PG, CHg Principal Hydrogeologist Sonoma County Water Agency Santa Rosa Plain Groundwater Sustainability Agency October 12, 2017 www.sonomacountywater.org
More informationGUIDELINES FOR THE PREPARATION OF CATCHMENT OUTLINE PLANS IN ZIMBABWE
Government of the Republic of Mozambique Government of the Republic of Zimbabwe Swedish International Development Co-operation Agency (Sida) DEVELOPMENT OF JOINT INTEGRATED WATER RESOURCES MANAGEMENT STRATEGY
More informationUnify efforts to address water resources for the Big Sky area and surrounding zone of influence in three co-equal water resources focus areas:
EXECUTIVE SUMMARY The Big Sky Sustainable Water Solutions Forum (Water Forum) is a community-based, collaborative approach building a unified vision for future Big Sky water resources management to maintain
More informationGROUNDWATER RESOURCES MANAGEMENT IN TANZANIA BY MR. LISTER R.E. KONGOLA ASSISTANT DIRECTOR WATER RESOURCES DIVISION
GROUNDWATER RESOURCES MANAGEMENT IN TANZANIA BY MR. LISTER R.E. KONGOLA ASSISTANT DIRECTOR WATER RESOURCES DIVISION BACKGROUND Basic facts Location: Tanzania is located on the east coast of Africa and
More informationWorking for Better Water Quality The State of Water Quality Management in WEPA Partner Countries
Water Environment Partnership in Asia Policy Brief Series 6 March 2013 Working for Better Water Quality The State of Water Quality Management in WEPA Partner Countries Low water quality is one of the most
More informationASSESSMENT OF THE WATER SITUATION ASSESSMENT MODEL (WSAM)
ASSESSMENT OF THE WATER SITUATION ASSESSMENT MODEL () F.G.B de Jager 1, C.J Strydom 2, P van Rooyen 3, M.D Watson 4, B Havenga 5 1 WRP Consulting (Pty) Ltd, South Africa. 2 Innovative Solutions (Pty) Ltd,
More informationGOVERNANCE of GROUNDWATER RESOURCES IN TRANSBOUNDARY AQUIFERS (GGRETA ) Stampriet - Kalahari/Karoo Aquifer Case Study
GOVERNANCE of GROUNDWATER RESOURCES IN TRANSBOUNDARY AQUIFERS (GGRETA ) Stampriet - Kalahari/Karoo Aquifer Case Study OUTLINE Background Project outputs and activites Partners and existing initiatives
More informationIntroduction to Groundwater Environmental Level Setting
Introduction to Groundwater Environmental Level Setting 1.0 Introduction As part of work towards a Rangitāiki Water Management Area (WMA) plan change process for water quality and quantity, we will consider
More informationCHAPTER ONE : INTRODUCTION
CHAPTER ONE : INTRODUCTION WHAT IS THE HYDROLOGY? The Hydrology means the science of water. It is the science that deals with the occurrence, circulation and distribution of water of the earth and earth
More informationManagement Plan for the Koeberg Nature Reserve
Management Plan for the Koeberg Nature Reserve Western Cape South Africa Prepared by: Eskom Holdings SOC Limited Citation Koeberg Nature Reserve Management Plan. Revision 1, (November 2015), Koeberg Management
More informationCoachella Valley Regional Water Management Group (CVRWMG)
April 13, 2015 SNMP Overview Introduction Regulatory Framework Water Quality Objectives Basin Characterization Ambient Water Quality and Assimilative Capacity Estimate of Future Water Quality Salt and
More informationWATER USE AND WATER TRANSFERS PART 2
WATER USE AND WATER TRANSFERS PART 2 By Francois van der Merwe: Chief Engineer, Directorate Water Abstraction and Instream Use, Department of Water Affairs This second article in a series of two about
More informationGroundwater supply for Cape Town: Low hanging fruit? What else are we missing?
Groundwater supply for Cape Town: Low hanging fruit? What else are we missing? Dr Kevin Winter Environmental & Geographical Science kevin.winter@uct.ac.za Huge effort. Large investment. Takes time to get
More informationDecision-making under Deep Uncertainty Conference 2017
Decision-making under Deep Uncertainty Conference 2017 BANGLADESH DELTA PLAN 2100 A challenge in meeting the uncertainties of long-term planning Giasuddin Choudhury Oxford, 15 November, 2017 Background
More informationHydrogeological Investigation and Analyzing Groundwater Scenario in Haringhata Block, West Bengal
Hydrogeological Investigation and Analyzing Groundwater Scenario in Haringhata Block, West Bengal Alivia Chowdhury Department of Soil and Water Engineering Faculty of Agricultural Engineering Bidhan Chandra
More informationWhy Environmental Flows? Why Environmental Flows?
Environmental Flows and Institutional Provisions for Management in Semi Arid South Western Zimbabwe The Mzingwane Case Study Tabeth Matiza Chiuta and Cathrine Mutambirwa IUCN Regional Office for Southern
More informationAppendix X.6 Queensland Government CSG Water Management Policy
Appendix X.6 Queensland Government CSG Water Management Policy Coal Seam Gas Water Management Policy June 2010 Tomorrow s Queensland: strong, green, smart, healthy and fair Purpose The purpose of this
More informationSpring Flow Estimation After Mine Flooding in a Dolomitic Compartment
Spring Flow Estimation After Mine Flooding in a Dolomitic Compartment Rainier Dennis, Ingrid Dennis Centre for Water Sciences and Management, North-West University (NWU), Private Bag X6001, Noordbrug 2520,
More informationThe Forgotten Resource: Groundwater in Australia 1
B 12 9 th February 2016 The Forgotten Resource: Groundwater in Australia 1 Christopher Johns Research Manager Northern Australia and Land Care Key Points Water that is found below the earth s surface is
More informationTHE NATIONAL LAND TRANSPORT TRANSITION ACT, (2000): HOW LONG IS THE TRANSITION?
THE NATIONAL LAND TRANSPORT TRANSITION ACT, (2000): HOW LONG IS THE TRANSITION? M WOSIYANA Department of Transport, Private Bag X193, Pretoria, 0001. Tel: +27 (0)12 309 3863. Fax: +27 (0)12 309 3325. Cell:
More informationThis document also includes proposed permit requirements, including response actions, when excursions occur.
Discussion of Zone of Influence, Area of Review, and the Aquifer Exemption Boundary for Class III Injection Wells used for the In-Situ Leaching (ISL) of Uranium Introduction: The purpose of this discussion
More informationterms of sections 24(2), 24(5), 24D and 44, read with section 47A(1)(b) of the
325 National Environmental Management Act (107/1998): Amendment of the Environmental Impact Assessment Regulations Listing Notice 2 of 2014 40772 194 No. 40772 GOVERNMENT GAZETTE, 7 APRIL 2017 DEPARTMENT
More informationReproduced by Sabinet Online in terms of Government Printer s Copyright Authority No dated 02 February 1998
JJJ Water and Sanitation, Department of/ Water en Sanitasie, Departement van 1180 National Water Act (36/1998): Call for comments for proposed revision of general authorisation in terms of section 39 of
More informationClosure Water Balance Model to Support Closure Designs for a Mine in Laos
Page 1 Closure Water Balance Model to Support Closure Designs for a Mine in Laos BR Luinstra SRK Consulting (Australasia) JT Chapman SRK Consulting (Australasia) A Hendry SRK Consulting (Australasia) A
More information1 INTRODUCTION 1.1 TERMS OF REFERENCE FOR THIS ENVIRONMENTAL IMPACT ASSESSMENT REPORT
1 INTRODUCTION 1.1 TERMS OF REFERENCE FOR THIS ENVIRONMENTAL IMPACT ASSESSMENT REPORT This Environmental Impact Assessment Report (EIA Report) has been prepared by Environmental Resources Management Ltd
More informationDe Beers Family of Companies. Water Engagement
De Beers Family of Companies Water Engagement Patti Wickens Environmental Principal UN CEO Water Mandate Working Conference 16 November 2010 De Beers Context Key mines in developing countries in southern
More informationA. OWENS 1 and J. BURKE 2
A CONSOLIDATED APPROACH TO IMPLEMENTING BEST PRACTICE GUIDELINES, WATER USE LICENCE CONDITIONS AND INTEGRATED WATER AND WASTE MANAGEMENT PLANS IN THE MINING ENVIRONMENT OPPORTUNITIES AND CHALLENGES ABSTRACT
More informationLAW OF THE REPUBLIC OF INDONESIA NUMBER 7 OF 2004 REGARDING WATER RESOURCES
LAW OF NUMBER 7 OF 2004 REGARDING WATER RESOURCES BY THE GRACE OF THE ALMIGHTY GOD, THE PRESIDENT OF Considering : a. that water resources is the gift of the Almighty God which gives benefits for the realization
More informationOperating Rules for Dams with High Evaporation Losses
Operating Rules for Dams with High Evaporation Losses H. S. Swart 1, P.G. van Rooyen 2, B. Mwaka 3, C. Ntuli 4 1 WRP Consulting Engineers (Pty) Ltd, H.S. Swart 2 WRP Consulting Engineers (Pty) Ltd, P.G.
More informationAssessing Ecological Condition: Overview of DWS EcoStatus System for Rivers
Assessing Ecological Condition: Overview of DWS EcoStatus System for Rivers Mandy Driver with input from Jeanne Nel & Neels Kleynhans m.driver@sanbi.org.za Overview DWS Ecological Categories Early days:
More informationInformation on the focal point for the Convention. Information on the point of contact for the Convention
Questionnaire for the REPORT OF MONTENEGRO ON THE IMPLEMENTATION OF THE CONVENTION ON ENVIRONMENTAL IMPACT ASSESSMENT IN A TRANSBOUNDARY CONTEXT in the period 2006 2009 Information on the focal point for
More informationResolving uncertainties in the source of low flows in South African rivers using conceptual and modelling studies
Conceptual and Modelling Studies of Integrated Groundwater, Surface Water, and Ecological Systems 127 (Proceedings of Symposium H1 held during IUGG211 in Melbourne, Australia, July 211) (IAHS Publ. 345,
More informationAMENDED Memorandum of Understanding for Integrated Regional Water Management in the Monterey Peninsula, Carmel Bay, and South Monterey Bay Region
AMENDED Memorandum of Understanding for Integrated Regional Water Management in the Monterey Peninsula, Carmel Bay, and South Monterey Bay Region 1. PURPOSE The purpose of this Memorandum of Understanding
More informationFebruary 2010 FINAL SURFACE WATER
February 2010 SURFACE WATER PROPOSED TUTUKA GENERAL WASTE DISPOSAL SITE: SURFACE WATER REVIEW Proponent: Eskom Holdings Limited Produced by: Zitholele Consulting FINAL SURFACE WATER REVIEW REPORT Project
More informationELECTRICITY DISTRIBUTION INDUSTRY RESTRUCTURING
ELECTRICITY DISTRIBUTION INDUSTRY RESTRUCTURING 1. BACKGROUND On the 25 th of October 2006 Cabinet, having considered the results of the modelling exercise, approved the proposal to create six wall-to-wall
More informationDEFINITION OF TERMS AND ACRONYMS 31 TAC EFFECTIVE DECEMBER 8, 2016
DEFINITION OF TERMS AND ACRONYMS 31 TAC 357.10 EFFECTIVE DECEMBER 8, 2016 The terms and acronyms used in this guidance document as defined in 31 TAC 357.10 have the following meanings: 1. Agricultural
More informationUK Technical Advisory Group on the Water Framework Directive
UK Technical Advisory roup on the Water Framework Directive aper 11b(ii) : roundwater Quantitative Classification for the purposes of the Water Framework Directive. This uidance aper documents the principles
More informationCatchment Management Strategy for the Breede-Gouritz Water Management Area
vgf Catchment Management Strategy for the Breede-Gouritz Water Management Area -p0 July 2017 Executive Summary Introduction This Catchment Management Strategy (CMS) has been developed taking into consideration
More informationIt is hereby notified that the President has assented to the following Act, which is hereby published for general information:
THE PRESIDENCY No 17 9 January 2004 It is hereby notified that the President has assented to the following Act, which is hereby published for general information: No. 53 of 2003: Broad-Based Black Economic
More informationThe EU Water Framework Directive A brief overview.
The EU Water Framework Directive A brief overview. The Water Framework Directive defines water as being: not a commercial product like any other but, rather, a heritage which must be protected, defended
More informationPrediction for Natural Recharging In Langat Basin and Ukm Campus as Case Study
Prediction for Natural Recharging In Langat Basin and Ukm Campus as Case Study 1 Mohaad Fawzi Al Ajlouni, 2 Rakmi Abd Rahman, 3 Abdul Ghani Rafek, 4 Mazlin Mokhtar, 5 Noor Ezlin Ahmad Basri 1, 5 Department
More informationMining in Sensitive Areas: Balancing Conservation & Development. Portfolio Committee for Environmental Affairs
Mining in Sensitive Areas: Balancing Conservation & Development Portfolio Committee for Environmental Affairs 1 Overview of presentation 1. Background 2. Legislative context 3. Efforts to balance conservation
More informationThis document is meant purely as a documentation tool and the institutions do not assume any liability for its contents
2000L0060 EN 20.11.2014 007.001 1 This document is meant purely as a documentation tool and the institutions do not assume any liability for its contents B DIRECTIVE 2000/60/EC OF THE EUROPEAN PARLIAMENT
More informationC. Seago 1, L.C. Hattingh 1, B. Mwaka 2, R. Cai 2, F. Botha 2. 1 Introduction. Abstract
Surface/groundwater interaction: Using water balancing, hydraulic modeling and real-time monitoring to develop a truly Integrated Decision Support System (IDSS) C. Seago 1, L.C. Hattingh 1, B. Mwaka 2,
More informationDEVELOPMENT OF AQUIFER TESTING PLANS. Brent Bauman, P.G. / Erin Lynam, Aquatic Biologist
DEVELOPMENT OF AQUIFER TESTING PLANS Brent Bauman, P.G. / Erin Lynam, Aquatic Biologist DEVELOPMENT OF AQUIFER TESTING PLANS Goals of Aquifer Testing What questions are we trying to answer Staff review
More informationA systems approach to urban water services in the context of integrated energy and water planning: a City of Cape Town case study.
A systems approach to urban water services in the context of integrated energy and water planning: a City of Cape Town case study. An exploration of the energy consumption for water and sanitation services
More informationEuropean Commission - DG Environment Unit B.1: Water, the Marine and Soil EC Perspective on the WFD and Daughter Directive Groundwater
EC Perspective on the WFD and Daughter Directive Groundwater Andreas SCHEIDLEDER Umweltbundesamt, Austria Philippe QUEVAUVILLER European Commission, DG ENV Contents of the Presentation Objectives of the
More informationThe role of dams in securing the surface water in the northern and eastern parts of the United Arab Emirates (UAE)
Changes in Water Resources Systems: Methodologies to Maintain Water Security and Ensure Integrated Management (Proceedings of Symposium HS at IUGG, Perugia, July ). IAHS Publ.,. The role of dams in securing
More informationGROUNDWATER Dr. DEEPAK KHARE GENERAL HYDROLOGY CYCLE FORMATIONS
GROUNDWATER By Dr. DEEPAK KHARE Associate Professor Department of Water Resources Development & Management Indian Institute of Technology Roorkee, ROORKEE (Uttaranchal) 247 667, India E-mail: kharefwt@iitr.ernet.in
More informationThe Impact of the Section 24G Process on Small Recycling Businesses
The Impact of the Section 24G Process on Small Recycling Businesses Q.J. Williams. Jeffares & Green (Pty) Ltd, South Africa. wiiliamsq@jgi.co.za ABSTRACT This paper aims to assess the impact of the NEMA
More information