LANCO ANPARA POWER PVT. LTD

Size: px
Start display at page:

Download "LANCO ANPARA POWER PVT. LTD"

Transcription

1 LANCO ANPARA POWER PVT. LTD PLOT No. 229, PHASE-I, UDYOG VIHAR, GURGAON , HARYANA Ph: , , Fax: , SUMMARY OF RAPID ENVIRONMENTAL IMPACT ASSESSMENT AND ENVIRONMENTAL MANAGEMENT PLAN FOR 2 x 600 MW COAL BASED LANCO ANPARA THERMAL POWER PLANT AT ANPARA VILLAGE, DISTRICT SONEBHADRA, UTTAR PRADESH JUNE, 2007 (ISSUE 01, REV.0) Prepared by: Estb M I N M E C C ON S U L TANCY P V T. L TD. A , P a r y av a r a n C o mp l e x, IG N O U R o a d, N e w D e l h i Ph : , , ; F a x: An ISO 9001:2000 E ma i l : mi n _ me v s n l. c o m; W e b s i t e : approved company

2 1.0 INTRODUCTION TO PROJECT This Summary of the Rapid Environmental Impact Assessment (REIA) and Environmental Management Plan (EMP) has been prepared for 2X600 MW Lanco Anpara Thermal Power Plant (TPS) to be set up at Anpara in District Sonebhadra, Uttar Pradesh by Lanco Anpara Power Pvt. Ltd. The location of the project is adjacent to the existing Anpara A & B thermal power plant of Uttar Pradesh Rajya Vidyut Utpadan Nigam Limited (UPRVNL) and is situated on the bank of Rihand Reservoir, which is also the source of water supply to the TPS. The land available for the project is 255 acres ( hectare) for the plant and 20 acres (8.1 hectare) for the colony. The estimated cost of the project is around 4200 Crores. 2.0 PROJECT DESCRIPTION 2.1 Project Site The proposed plant will be located in village Anapra, in District Sonebhadra, Uttar Pradesh. The 255 acres of land includes 9 acres of forest land required for the plant has been leased to Lanco Anpara Power Pvt. Ltd. by Forest Department. The colony for Lanco Anpara Thermal Power Plant will be located in 20 acres land adjacent to Anpara- A&B township, at a distance of about 2 km from the plant site which has also been leased from UPRVUNL. 2.2 Process Description In a coal based thermal power station, the heat of combustion is first converted into mechanical and then to electrical energy. The main units of a thermal power plant are steam generator, steam turbine and electrical generator. Steam generator is a combination of heating surfaces in which super-heated steam is generated at high pressure and temperature by utilizing the heat liberated from combustion of fuel. The steam so generated is fed into a turbine, which converts the thermal energy of steam into mechanical energy and drives the generator for producing electricity. Exhaust steam from the turbine is condensed by means of a condenser. Thus, the water evaporated in the boiler is conserved in a closed cycle. To meet the minor water shortfall of the cycle, a small quantity of demineralised water is continuously fed into the condenser hotwell. 2.3 Facility Proposed It is proposed to install 2 X 600 MW power station using coal as primary fuel. Major equipment of the power plant are as follows: 1) steam generators and accessories 2) steam turbine generator and auxiliaries 3) ash handling system 4) chimney 5) condenser cooling water system 6) water reservoir 7) water treatment system 8) coal handling and transportation 2.4 Raw material quantity and quality Coal is the primary fuel and will be obtained from the Khadia Coal Mine Expansion. Coal consumption for design coal at 100%PLF shall be about TPD. Coal consumption for worst coal at 100% PLF shall be about TPD. Annual coal consumption at 80% PLF for design coal shall be about 5.25 million tonnes. The total moisture in the coal is 12%, ash 34.1%, volatile matter 24.6%, fixed carbon 29.3% and gross calorific value 3800 Kcal/kg. Summary of REIA/EMP of 2X600 MW Lanco Anpara Thermal Power Plant at Anpara, UP 1

3 2.5 Fire Protection System An elaborate fire protection arrangement is planned for this plant. A multitude of system will be provided to combat various types of fire in the different areas of plant. 2.6 Ventilation and Air Conditioning System In order to maintain suitable space conditions as required for personnel comfort as well as equipment protection, properly designed ventilation and air conditioning system shall be provided in various areas of the plant. All air-conditioned space shall be designed for 22 C ± 1% and maximum 60% RH indoor condition. 2.7 Manpower The total permanent manpower required at plant during operation stage will be about 300 persons. The number of working days in a year will be 365 days with three-shift operation of 8 hours each. 2.8 Water requirement The water consumption of the plant will be 5100 m 3 /hr. Since recirculation and reuse of water is proposed, the total fresh water consumption can be reduced from 5100m 3 /hr after the operation of the treatment and recirculation system. The source of water shall be the Rihand or Gobind Ballabh Pant Sagar reservoir. The permission for the withdrawal of the same had been taken by UPRVUNL from Central Water Commission (CWC) 2.9 Details Of Common Facilities To Be Used For Lanco Anpara The Lanco Anpara project shall be sharing the facilities already developed for the adjacent Anpara A and B thermal power plants belonging to UPRVUNL. They include Merry-Go-Round System (MGR), Railway Siding, Ash pond and ash facilities, Raw Water Intake Channel and Auxiliary steam for start up and operating period. 3.0 PRESENT ENVIRONMENT SCENARIO The project area is referred to as core zone while the area within 10 km radius is called the buffer zone. Together the two comprise the study area. 3.1 Topography, drainage and climate The study area in general is uneven and ground is undulating. The north eastern quadrant is full of weathered rocks in the shape of small hillocks. The elevation within the study area ranges 275 m a.m.s.l around the Anpara Thermal Power Plant to 571 m a.m.s.l near Aunri in the west of the plant. The general gradient is south easterly i.e. towards Rihand Reservoir, also known as, Govind Ballabhpant reservoir. The climate of this district is characterized by a hot dry summer and a bracing winter. 3.2 Monitored micro-meteorology Micro-meteorological survey was undertaken during March to May The temperature varied between to C, RH between 20.0 to 97.0% and wind speed between 0 to 18.0 kmph. Predominant wind direction is from NE (23.32%). 3.3 Ambient Air quality and noise levels The ambient air quality was studied for ten locations. It is found that the suspended particulate matter (SPM) or air borne dust is found to vary from 47 µg/m 3 to maximum of 280 µg/m 3 while respirable particulate matter (RSPM) varied from 18 µg/m 3 to maximum of 88 µg/m 3. The concentration of NOx and SO 2 are found to be low (below 22.0 and 15.9 µg/m 3 respectively). The noise levels recorded within the study area are in the range of 43.0 to 53.0 db(a) during day and between to db(a) during night. Summary of REIA/EMP of 2X600 MW Lanco Anpara Thermal Power Plant at Anpara, UP 2

4 3.4 Water Resources and quality The study area represents hilly and rolling topography and is drained by large number of streams which are seasonal. All the streams drain out the storm water during monsoon season, into the Govind Ballabh Pant reservoir. The reservoir covers 468 sq. m. and has a gross storage capacity of 10.6 X 10 9 m 3. The ground water table varies from less than 10 m below ground level (bgl) near the reservoir to as much as 27.5 m bgl in the hills. The level of ground water development is 18.5%. Quality of ground water in general is good and suitable for domestic and irrigation purposes which was confirmed by water quality sampling and testing. 3.5 Land use pattern and Soil Quality In the study area, more than 33.84% of the land not available for cultivation. About 11.83% of land in the study area is under cultivation, most of which is unirrigated Forests cover 51.67% of the study area. The soil sample was found to be sandy in nature with poor organic content, neutral and having low conductivity. 3.6 Ecology In the buffer zone, the reserve/protected/ village forest cover is Ha. i.e. about 51.67% of the total area. The forests in the study area are mainly Sal forests. There are 9 protected forests in the study area. The flora in the buffer zone consists of mostly Khair, Riunja, Kalmi, Bel, Safed Siras, Siras, and neem, small trees are Kikar, Amaltas, Bhiimla, Tilwan and Ber, herbs and shrubs include Gekharu, Bireta, Tulsi and Pawar etc. Climbers, grasses and bamboos also present in the buffer zone. The buffer zone has mammals like Langur or Hanuman Monkey, Rhesus Macaque, Short-Nosed Fruit Bat, Sloth Bear, Leopard or Panther, Indian Fox, Nilgai or Blue Bull, Indian Wild Boar (Wild Pig), Muntjac or Barking Deer, etc. The Schedule I animals are sloth bear, leopard, honey badger and peafowl. 3.7 Socio-economic Conditions About % of the population in the area are categorised as non workers, while literacy is only about 58.02%. The composition of SC and ST in the study area is 21.05% and 5.92%, respectively. The major source of income of the local population is nonagricultural. 3.8 Industries and other places of archaeological/historical/tourist/ religious importance There are several thermal power stations within 25 kms such as Singrauli, Vindhyachal, Rihand, Renusagar, Anpara A & B. There are plants of Hindalco, Kanoria and Hi Tech carbon in Renukut while several mines are also operational. There are no places of historical/tourist/religious or archaeological importance in either core zone or study area. There are local places of worship at some villages. 4.0 ENVIRONMENTAL IMPACT ASSESSMENT AND MITIGATION MEASURES 4.1 Impact on Climate and mitigation During construction no effect on climate and meteorology of area is expected, except contribution of CO 2 to the atmosphere on consumption of fossil fuels such as diesel on operation of heavy construction machinery, etc. During operation, the thermal pollution will be restricted to an atmospheric zone higher than 250 m from ground level and not cause any impact on the surrounding ground dwelling biota. Moreover, the climate is controlled by the pressure depression in the Bay of Bengal and this project cannot affect any large scale climatic changes. Hence no, mitigation measures are being taken. Summary of REIA/EMP of 2X600 MW Lanco Anpara Thermal Power Plant at Anpara, UP 3

5 4.2 Impact on Air Quality and mitigation During construction phase, large quantities of sand, cement, bricks, stone, steel, etc. will be transported and handled at the site creating dust in the air. During operation phase, the air pollution shall be due to emission from the stack. Ground level concentration (GLC) predictions have been performed for the emission source in three predominant directions. The results of modelled incremental GLC s due to stack have been calculated based on hourly average wind speed in each direction. The maximum values have been observed at 5 km from the stack in ENE direction. The anticipated 24 hours average GLC s will be maximum 0.30 µg/m 3 SPM, 9.94 µg/m 3 SO 2 and 7.45 µg/m 3 NOx at a distance of 5 km from the stack towards the most second predominant wind direction (towards ESE with 8.20% of the time). During operation, various mitigation measures shall be taken which include installation of an electrostatic precipitator with an efficiency of 99.8%, dispersal of pollutants through 275 m high stack, water spraying provided in coal yard to suppress dust at suitable location including transfer points, loading and unloading points and installation of continuous type particulate and gases (SO 2, NOx and CO) monitors (online analysers). 4.3 Land Degradation and management The total land area requirement is 275 acres for installation of power plant including the land requirement for colony. Ash will be disposed in the existing ash pond. The construction activities will contribute to the deterioration of environment but this will be for limited time and reversible. During operation phase, a green belt will be developed. This green belt will help in preventing fugitive dust from spreading beyond the plant boundary. 4.4 Impact on Water Resources and mitigation Water requirement will be for construction purposes as well as for the consumption of labourers will be met from surface and ground water. Since there is no withdrawal of ground water during operation phase for plant and colony, there shall not be any long term impact on ground water. The estimated consumptive water requirement is 5100 m3/hr without ash water recycling and 4300 m3/hr with ash water recycling. This shall be sourced from the Rihand reservoir. The waste water generated in the colony shall be treated through a sewage treatment plant while the waste water generated in the plant shall be treated through an effluent treatment plant. The waste water after treatment shall be reutilised in green belt watering and similar activities. The maximum quantity of effluent expected to be dischrged is 180 CuM/H, which will be further reduced based on the usage for Green belt. 4.5 Impact on Noise Level and Traffic Noise levels in the vicinity of construction activity will increase but will only be for a limited period. During construction phase, increase in traffic due to movement of truck shall be there. During operation, noise level will increase, to a limited extent. As noise-generating equipment will be placed within enclosures, their impact on ambient noise level will be negligible. The impact on traffic shall be low because the transportation of coal shall be done through merry-go-round railway system. In order to maintain low noise levels, there shall be green belt, regular maintenance, air silencers on machines, equipments and vehicles. Workers shall be protected against noise and their exposure controlled as per OSHA and CPCB standards 4.6 Ecological impacts and management Before construction, vegetation will be cleared for accommodating the different facilities. There are no wildlife sanctuaries or fragile ecosystems within the study area. Green belt shall be planted over 20 ha. Treated sewage, in adequate quantity and suitable quality, will be available for survival and healthy growth of plantation. Trees, grasses, flowers and Summary of REIA/EMP of 2X600 MW Lanco Anpara Thermal Power Plant at Anpara, UP 4

6 vegetables developed and grown in the open spaces as mentioned above will provide food and habitat for fauna. Thus, the project will have positive impact on the ecology. 4.7 Impact due to Solid Waste and management The ash content of coal fuel will be %. About 17% of ash would be collected as bottom and coarse ash and the balance 83% would be collected as fly ash.this will be largest source of solid waste. Hence, at 90% PLF, 1.67 MTPA of fly ash and 0.35 MTPA of bottom ash shall get generated. Fly ash shall be utilized in dry form for commercial uses such as bricks & cement manufacturing, construction activities and land filling. Remaining ash shall be dumped in existing ash pond. An ash disposal scheme has been worked out as per the MoEF guidelines. 4.8 Impact on Socio-Economic Conditions During construction phase there will be direct and indirect employment generation to local people, therefore, having a positive impact. During operation 300 persons will get employment. There is no plan for displacement of the villagers. Social welfare measures shall be undertaken in the surrounding villages by the LANCO Institute of General Humanitatrian Trust (LIGHT). 4.9 Impact on topography and drainage and their management The elevation of the plot is approximately 275 m a.m.s.l. It does not require any filling or cutting. Hence no impact shall be there except the permanent building of structures. The nearest nala is the Marghatiya which is passing through the north east corner of the plot. The nala shall remain undisturbed and for installing an overhead power line above it, the support for shall be given by installing towers on either bank if the nala. Storm water drainage will be laid out to collect the rain water and drain it to Rihand reservoir. 5.0 ANALYSIS OF ALTERNATIVES The location for the power plant was selected by UPRVUNL mainly based on availability of coal, which shall be from the Singrauli coal field s Khadia mine expansion. The second important aspect is the availability of water from Rihand reservoir. The third important aspect is the land is next to Anpara A & B resulting in usage of common facilities such as intake channel, ash pond, coal transportation system, transmission system etc. which had been designed keeping in view the demand from Lanco Anpara TPP. Based on the fuel quality and to adopt reliable and proven technology, sub-critical two pass boiler with tandem compound single reheat turbine generator has been adopted. For conservation of water, closed cycle cooling water system with induced draft cooling tower has been adopted. 6.0 ENVIRONMENTAL CONTROL AND MONITORING ORGANISATION A maintenance team has been proposed to take care of pollution monitoring aspects and implementation of control measures. A schedule has been spelt out in EIA for periodical monitoring. The total capital investment on environmental improvement work is envisaged as Rs lakhs which is 7.39% of the estimated cost of the project (Rs lakhs). The cost of existing ash pond common with Anpara A&B TPP is not included in the above cost estimate. The recurring expenditure estimated during the power generation is Rs lakhs/year. Summary of REIA/EMP of 2X600 MW Lanco Anpara Thermal Power Plant at Anpara, UP 5

Dheeru Powergen Private Limited.

Dheeru Powergen Private Limited. Executive Summary Of The Proposed 2 x 300 MW Dhanras Thermal Power Station At Dhanras Village Katgora Taluk, Korba District, Chhattisgarh. Implemented By Dheeru Powergen Private Limited. Submitted to CHHATTISGARH

More information

Accord Energy Corporation India Pvt. Ltd.

Accord Energy Corporation India Pvt. Ltd. Accord Energy Corporation India Pvt. Ltd. PRE-FEASIBILITY REPORT ON ENVIRONMENTAL ASPECTS OF PROPOSED INCREASE IN CAPACITY 2 x 150 MW to 2 x 180 MW OF EXISTING ENVIRONMENTAL CLEARANCE ( J-13012/107/ 2009-IA-II

More information

M/s Hind Energy & Coal Beneficiation Pvt. Ltd. is presently operating a 2 x 1.2 MTPA

M/s Hind Energy & Coal Beneficiation Pvt. Ltd. is presently operating a 2 x 1.2 MTPA 1.0 INTRODUCTION M/s Hind Energy & Coal Beneficiation Pvt. Ltd. is presently operating a 2 x 1.2 MTPA dry type of coal washery at Village: Hindadih, Tehsil: Masturi, District: Bilaspur (C.G.) for which

More information

EIA SUMMARY FOR PROPOSED 15 MW AND 33 MW CAPACITY CAPTIVE POWER PLANT FOR M/S AMBUJA CEMENT EASTERN LTD. RAWAN, BHATAPARA (C.G.)

EIA SUMMARY FOR PROPOSED 15 MW AND 33 MW CAPACITY CAPTIVE POWER PLANT FOR M/S AMBUJA CEMENT EASTERN LTD. RAWAN, BHATAPARA (C.G.) EIA SUMMARY FOR PROPOSED 15 MW AND 33 MW CAPACITY CAPTIVE POWER PLANT FOR M/S AMBUJA CEMENT EASTERN LTD. RAWAN, BHATAPARA (C.G.) 1. PROJECT DESCRIPTION: Ambuja Cement Eastern Ltd. (ACEL) has the cement

More information

V: PROJECT SCOPING & METHODOLOGY

V: PROJECT SCOPING & METHODOLOGY V: PROJECT SCOPING & METHODOLOGY 5.0 INTRODUCTION The scoping exercise is carried out to define the focus and scope of the EIA Study. The scoping exercise is required to understand the type of activities

More information

Hind Energy & Coal Beneficiation (India) Ltd.

Hind Energy & Coal Beneficiation (India) Ltd. SUMMARY ON ENVIRONMENTAL IMPACT ASSESSMENT REPORT OF Hind Energy & Coal Beneficiation (India) Ltd. (Change in Technology) at Hindadih Village, Masturi Tehsil Bilaspur District, Chhattisgarh Submitted to

More information

Proposed Terms of Reference for EIA studies

Proposed Terms of Reference for EIA studies Proposed Terms of Reference for EIA studies M/s Maithan Steel and Power Ltd. is located at: At/PO- Bonra, PS- Neturia in Purulia district of WB with latitude:23 0 37 53.85 Nand longitude 86 0 50 08.10

More information

Hind Energy & Coal Beneficiation (India) Ltd.

Hind Energy & Coal Beneficiation (India) Ltd. SUMMARY ON ENVIRONMENTAL IMPACT ASSESSMENT REPORT OF Hind Energy & Coal Beneficiation (India) Ltd. 0.96 MTPA Wet type Coal Washery at Birgahani Village, Baloda Tehsil Janjgir-Champa District, Chhattisgarh

More information

EXECUTIVE SUMMARY 1.0 PROJECT DESCRIPTION 1.1 INTRODUCTION

EXECUTIVE SUMMARY 1.0 PROJECT DESCRIPTION 1.1 INTRODUCTION EXECUTIVE SUMMARY 1.0 PROJECT DESCRIPTION 1.1 INTRODUCTION Jaypee Group is a leading Business House of the country with its presence in Core industries and Service Sectors like Cement, Infrastructure development,

More information

2 NECESSITY OF THE PROPOSED PROJECT

2 NECESSITY OF THE PROPOSED PROJECT Executive Summary 1 INTRODUCTION M/s. Prosperous Energy Private Limited (PEPL), a wholly owned subsidiary of Videocon Industries Limited has proposed the 2X660MW Coal based supercritical Thermal Power

More information

Proposed Terms of Reference for EIA studies

Proposed Terms of Reference for EIA studies 1 Proposed Terms of Reference for EIA studies Collection of Base line data in any season other than Monsoon season in study area of 10 kms radius from Lease Area. Based on the Meteorological data from

More information

For PROPOSED IT PARK. By M/s.Balewadi Tech Park Pvt.Ltd. Submitted to State Environment Expert Appraisal Committee III, Maharashtra

For PROPOSED IT PARK. By M/s.Balewadi Tech Park Pvt.Ltd. Submitted to State Environment Expert Appraisal Committee III, Maharashtra Draft Terms of References (ToR) (Based on the model TOR given in Environmental Impact Assessment Guidance Manual for building construction projects by MoEF & CC) For PROPOSED IT PARK By M/s.Balewadi Tech

More information

M/s. Jindal Electricity Generation (P) Limited was promoted by Sri Omprakash Agrawal & Associates having other business in the area.

M/s. Jindal Electricity Generation (P) Limited was promoted by Sri Omprakash Agrawal & Associates having other business in the area. 1. INTRODUCTION Executive Summary 1.1 Background: M/s. Jindal Electricity Generation (P) Limited was promoted by Sri Omprakash Agrawal & Associates having other business in the area. 1.2 Proposed Project:

More information

EXECUTIVE SUMMARY ON ENVIRONMENTAL IMPACT ASSESSMENT REPORT

EXECUTIVE SUMMARY ON ENVIRONMENTAL IMPACT ASSESSMENT REPORT EXECUTIVE SUMMARY ON ENVIRONMENTAL IMPACT ASSESSMENT REPORT For CHHATTISGARH ENVIRONMENT CONSERVATION BOARD CHHATTISGARH 0 P a g e 1.0 INTRODUCTION SUMIT ISPAT PVT. LTD. has proposed to establish Submerged

More information

EXECUTIVE SUMMARY. (Approved Consultant)

EXECUTIVE SUMMARY. (Approved Consultant) ENVIRONMENTAL IMPACT ASSESSMENT FOR THE PROPOSED CAPTIVE RESIN PLANT OF 100000 TPA PRODUCTION CAPACITY AT ROUTHUSURAMALA VILLAGE, THOTTAMBEDU MANDAL, CHITTOOR DISTRICT, ANDHRA PRADESH EXECUTIVE SUMMARY

More information

Mars Power & Steel Ltd.

Mars Power & Steel Ltd. SUMMARY ON ENVIRONMENTAL IMPACT ASSESSMENT REPORT OF Mars Power & Steel Ltd. Village : Baihamura Tehsil : Ghargoda District : Raigarh Submitted to: Page 1 CHHATTISGARH ENVIRONMENT CONSERVATION BOARD Executive

More information

JANUARY Prepared by:

JANUARY Prepared by: ARYAN COAL BENEFICATION PVT. LTD. EXECUTIVE SUMMARY OF RAPID ENVIRONMENTAL IMPACT ASSESSMENT AND ENVIRONMENTAL MANAGEMENT PLAN FOR BINJHRI WASHERY EXPANSION PLANT AT KORBA, CHATTISGHARH (0.96 MTPA 4.8

More information

Executive Summary for R-EIA Report for 60

Executive Summary for R-EIA Report for 60 Executive Summary 1. INTRODUCTION Maihar Cement is a unit of M/s Century Textiles and Industries Ltd. located at Sarla Nagar near Maihar in district Satna (M.P). Maihar Cement Unit has come into operation

More information

INSPIRE INDUSTRIES PVT. LTD.

INSPIRE INDUSTRIES PVT. LTD. For Proposed 0.999 MTPA Coal Washery At Village: Bhelai, Tehsil: Baloda, District: Janjgir-Champa, Chhattisgarh Envirotech East (P) Limited An ISO 9001:2008, 14001:2004 & OHSAS:18001:2007 Company Laboratory

More information

District: Chhindwara (MP)

District: Chhindwara (MP) Executive Summary 1. INTRODUCTION 1.1 Background: Pandhurna industrial area consist of nearly 34 small and large units which basically consist of Cotton ginning & Processing, Food Processing, Copper Wire,

More information

M/s. MID India Power & Steel Pvt. Ltd. has proposed to establish Steel Plant at Dongartola

M/s. MID India Power & Steel Pvt. Ltd. has proposed to establish Steel Plant at Dongartola 0 1.0 INTRODUCTION M/s. MID India Power & Steel Pvt. Ltd. has proposed to establish Steel Plant at Dongartola Village, Kotma Tehsil, Annupur District, Madhya Pradesh. 10.29 Acres of land is envisaged for

More information

HINDUSTAN ZINC LIMITED Maton Rock Phosphate Mine (Maton Mine), Tehsil: Girwa District: Udaipur (Rajasthan) PROPOSED TERMS OF REFERENCE FOR EIA STUDIES

HINDUSTAN ZINC LIMITED Maton Rock Phosphate Mine (Maton Mine), Tehsil: Girwa District: Udaipur (Rajasthan) PROPOSED TERMS OF REFERENCE FOR EIA STUDIES HINDUSTAN ZINC LIMITED Maton Rock Phosphate Mine (Maton Mine), Tehsil: Girwa District: Udaipur (Rajasthan) PROPOSED TERMS OF REFERENCE FOR EIA STUDIES Maton Rock Phosphate Mine of M/s HZL is proposing

More information

Environmental Impact Assessment

Environmental Impact Assessment Environmental Impact Assessment A brief discussion Presented by: Apekshit Solanki Kirti Neetu Yadav Sameera Vishakha Shankar Introduction EIA is a formal process to predict the environmental consequences

More information

M/s. LAKSHMANAN CEMENTS PVT LTD, Survey Number 69-3, 69-4, Pachanapalli Village, Chittoor Mandal and District, Andhra Pradesh

M/s. LAKSHMANAN CEMENTS PVT LTD, Survey Number 69-3, 69-4, Pachanapalli Village, Chittoor Mandal and District, Andhra Pradesh M/s. LAKSHMANAN CEMENTS PVT LTD, Survey Number 69-3, 69-4, Pachanapalli Village, Chittoor Mandal and District, Andhra Pradesh EXECUTIVE SUMMARY SUBMITTED BY M/s. Lakshmanan Cements Pvt Ltd No. 58-A, 25

More information

PROPOSED TERM OF REFERENCE

PROPOSED TERM OF REFERENCE PROPOSED TERM OF REFERENCE FOR ESTABLISHMENT OF PROPOSED MOLASSES/GRAIN BASED DISTILLERY HAVING CAPACITY: 160.0 KLD (MOLASSES BASED) OR 120.0 KLD (MOLASSES BASED) + 40.0 KLD (GRAIN BASED) ALONGWITH 7.0

More information

STATE EXPERT APPRAISAL COMMITTEE, PUNJAB Ministry of Environment and Forests, Government of India

STATE EXPERT APPRAISAL COMMITTEE, PUNJAB Ministry of Environment and Forests, Government of India STATE EXPERT APPRAISAL COMMITTEE, PUNJAB Ministry of Environment and Forests, Government of India O/O Punjab Pollution Control Board, Vatavaran Bhawan, Nabha Road, Patiala 147 001 Telefax:- 0175-2215802

More information

STATE EXPERT APPRAISAL COMMITTEE GOVERNMENT OF PUNJAB (Office of the Secretary) Vatavaran Bhawan, Nabha Road, Patiala

STATE EXPERT APPRAISAL COMMITTEE GOVERNMENT OF PUNJAB (Office of the Secretary) Vatavaran Bhawan, Nabha Road, Patiala STATE EXPERT APPRAISAL COMMITTEE GOVERNMENT OF PUNJAB (Office of the Secretary) Vatavaran Bhawan, Nabha Road, Patiala-147001. No. SEAC/80/37967 Dated 15/10/2008 Speed Post To M/s Green Planet Energy Pvt.

More information

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN EMP 1 INTRODUCTION In each of the areas of impact, measures have to be taken to reduce potentially significant adverse impacts and where these are beneficial in nature, such impacts are to be enhanced/

More information

EIA-EMP REPORT GRAVEL QUARRY (Category-B2)

EIA-EMP REPORT GRAVEL QUARRY (Category-B2) EIA-EMP REPORT GRAVEL QUARRY (Category-B2) EXTENT : 4.00.0 Hectares S. F. No : 436/1A (P) VILLAGE TALUK DISTRICT STATE : IYANPAPPAKKUDI : MADURAI : MADURAI : TAMIL NADU PROJECT PROPONENT Thiru P. Ayyanar

More information

GREENCINDIA Consulting Pvt. Limited

GREENCINDIA Consulting Pvt. Limited Expansion of Tamar Bauxite Mine from 10,000 TPA to 40,000 TPA in Tamar & Kirkiran Villages, Majhgawan Tehsil, Satna District, Madhya Pradesh : The M.P. State Mining : GREENCINDIA Consulting Pvt. Limited

More information

Environmental Clearance Compliance Half Yearly Report

Environmental Clearance Compliance Half Yearly Report Environmental Clearance Compliance Half Yearly Report HALF YEARLY COMPLIANCE REPORT- Oct. 2017 March 2018 Ref: MOEF, New Delhi Environment Clearance F. No. J-11011/118/2007- IA II (I) dated 25 th August,

More information

EXECUTIVE SUMMARY RAPID ENVIRONMENTAL IMPACT ASSESSMENT AND ENVIRONMENTAL MANAGEMENT PLAN

EXECUTIVE SUMMARY RAPID ENVIRONMENTAL IMPACT ASSESSMENT AND ENVIRONMENTAL MANAGEMENT PLAN MARUTI CLEAN COAL & POWER LTD. EXECUTIVE SUMMARY OF RAPID ENVIRONMENTAL IMPACT ASSESSMENT AND ENVIRONMENTAL MANAGEMENT PLAN FOR 2 x 135 MW WASHERY REJECTS AND COAL BASED THERMAL POWER PLANT AT VILLAGE

More information

Environmental Management Plan

Environmental Management Plan Environmental Management Plan Building Stone (Granite), Khandas & Gitti, Boulder Mining Project Gata No. 989, Khand No. 10 Area 1.61 Ha.(4.0 Acre) Village Makrbai, Tehsil Mahoba, District Mahoba, Uttar

More information

PRE-FEASIBILITY REPORT. Name of Company / Mine Owner Shri Jayant Kumar Choudhary Location

PRE-FEASIBILITY REPORT. Name of Company / Mine Owner Shri Jayant Kumar Choudhary Location 1. SUMMARY PRE-FEASIBILITY REPORT Project Stone Quarry Name of Company / Mine Owner Shri Jayant Kumar Choudhary Location Village Taluka District State Rupapali Basna Mahasamund Chhattisgarh 1 Mining Lease

More information

ANDHRA PRADESH POLLUTION CONTROL BOARD, REGIONAL OFFICE, TIRUPATI

ANDHRA PRADESH POLLUTION CONTROL BOARD, REGIONAL OFFICE, TIRUPATI M/s. JANANY CEMENT INDUSTRIES PRIVATE LIMITED SURVEY NO 462, INDUSTRIAL PARK, GUNTAKINDAPALLI VILLAGE, SRIKALAHASTI MANDAL, CHITTOOR DISTRICT, ANDHRA PRADESH EXECUTIVE SUMMARY SUBMITTED BY M/s.Janany Cement

More information

Environmental Clearance Compliance Half Yearly Report

Environmental Clearance Compliance Half Yearly Report Environmental Clearance Compliance Half Yearly Report HALF YEARLY COMPLIANCE REPORT- April 2015 to September 2015 Ref: 1. MOEF, New Delhi Environment Clearance F. No. J-11011/119/2007- IA II (I) dated

More information

STATE EXPERT APPRAISAL COMMITTEE, PUNJAB MINISTRY OF ENVIRONMENT AND FORESTS, GOVERNMENT OF INDIA

STATE EXPERT APPRAISAL COMMITTEE, PUNJAB MINISTRY OF ENVIRONMENT AND FORESTS, GOVERNMENT OF INDIA STATE EXPERT APPRAISAL COMMITTEE, PUNJAB MINISTRY OF ENVIRONMENT AND FORESTS, GOVERNMENT OF INDIA O/O PUNJAB POLLUTION CONTROL BOARD, VATAVARAN BHAWAN, NABHA ROAD, PATIALA 147 001 Telefax:- 0175-2215802

More information

EIA STUDY for 2x600MW Coal Based Thermal Power Plant at Anuppur, Madhya Pradesh

EIA STUDY for 2x600MW Coal Based Thermal Power Plant at Anuppur, Madhya Pradesh INTRODUCTION Moser Baer Power & Infrastructures Ltd. (MBPIL) proposes to establish a 1200 MW (2 x 600 MW) coal fired thermal power plant in Anuppur district, Madhya Pradesh. MBPIL has appointed GIS Enabled

More information

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN ENVIRONMENT MANAGEMENT PLAN VILLAGE - KUNDLA TEHSIL - NAGDA DISTRICT - UJJAIN STATE - MADHYA PRADESH KHASRA NO. - 574 AREA - 8.00 Hectare PRODUCTION - 98800 cu.m/ Year PREPARED UNDER RULE 42 C OF MP MINOR

More information

ENVIRONMENT MANAGMENT PLAN

ENVIRONMENT MANAGMENT PLAN ENVIRONMENT MANAGMENT PLAN DETAIL OF MINE- NAME OF MINERAL SANDSTONE (FURSHI PATTHAR) MINING LEASE FOR FINISHED SANDSTONE VILLAGE PARASWAHA, TEHSEEL JABERA DISTRICT - DAMOH KHASRA NO. 22/1, AREA 1.0 HECTARE

More information

Summary of DPR. ETPS Expansion Thermal Power Project 1x660 MW

Summary of DPR. ETPS Expansion Thermal Power Project 1x660 MW Summary of DPR ETPS Expansion Thermal Power Project 1x660 MW 1 X 660 MW SUPERCRITICAL ENNORE TPS EXPANSION PROJECT Sheet - 1 PROJECT HIGHLIGHTS 1. Project : 1x660 MW Supercritical Ennore Thermal Power

More information

BHORER ALO ECO TOURISM PROJECT AT GAJALDOBA, JALPAIGURI

BHORER ALO ECO TOURISM PROJECT AT GAJALDOBA, JALPAIGURI TERMS OF REFERENCE (TOR) FOR AN ENVIRONMENTAL IMPACT ASSESSMENT (EIA) FOR BHORER ALO ECO TOURISM PROJECT AT GAJALDOBA, JALPAIGURI AT PLOT NO.: 63, 67-70, 72-101 AND 105, MOUZA-JUNGLE MOHAL, JL. NO. 01,

More information

Overburden dumps are stacked separately as per the guidelines and the same will be used for backfilling in mined out area.

Overburden dumps are stacked separately as per the guidelines and the same will be used for backfilling in mined out area. ENVIRONMENT CLEARANCE COMPLIANCE STATUS ENVIRONMENT CLEARANCE No. J-11015/406/2006-IA.II(M) dt. 13/04/2007 DHANGARWADI MINES Sr. CONDITIONS COMPLIANCE No. A) Specific Conditions :- i) Top soil to be stacked

More information

EXECUTIVE SUMMARY 1. INTRODUCTION

EXECUTIVE SUMMARY 1. INTRODUCTION EXECUTIVE SUMMARY 1. INTRODUCTION M/s. Indsil Energy & Electro Chemical Ltd plant is situated in Urla Industrial Estate, Raipur, Chhattisgarh. The company is manufacturing Ferro Alloys. Due to massive

More information

DHANWADA CRUSHER STONE QUARRY

DHANWADA CRUSHER STONE QUARRY ENVIRONMENT MANAGEMENT PLAN FOR Mining of Crusher Stone Area 1.910 Hect, Kh. No. 95 AT Village: Dhanwada, Tehsil: Khirkiya, Dist: Harda (MP) Proponent Shri Atul Kumar Agrawal S/o- Shri Ashok Agrawal Resi-

More information

ENVIRONMENTAL MANAGEMENT PLAN

ENVIRONMENTAL MANAGEMENT PLAN INTRODUCTION ENVIRONMENTAL MANAGEMENT PLAN An environmental management plan (EMP) has been prepared for the proposed construction of commercial project to minimize negative impacts and is formed on the

More information

DESCRIPTIVE REPORT ON STATUS OF COMPLIANCE TO THE CONDITIONS OF ENVIRONMENTAL CLEARANCE AND ENVIRONMENTAL MANAGEMENT

DESCRIPTIVE REPORT ON STATUS OF COMPLIANCE TO THE CONDITIONS OF ENVIRONMENTAL CLEARANCE AND ENVIRONMENTAL MANAGEMENT DESCRIPTIVE REPORT ON STATUS OF COMPLIANCE TO THE CONDITIONS OF ENVIRONMENTAL CLEARANCE AND ENVIRONMENTAL MANAGEMENT Subject: Compliance report of Environmental Clearance for CDR & Revamp Reference: J-11011/272/2007-IA,

More information

Environment Management Plan For B 2 Category Project

Environment Management Plan For B 2 Category Project Environment Management Plan For B 2 Category Project Project Proponent - Kirtikumar Nathubhai Shah Address - N/V Damlai, Taluka- Jhagadia District - Bharuch Near Village Taluka District Area Survey No.

More information

Environmental impact assessment of a 1600 MW thermal power plant project in Karimnagar district of Telangana

Environmental impact assessment of a 1600 MW thermal power plant project in Karimnagar district of Telangana Environmental impact assessment of a 1600 MW thermal power plant project in Karimnagar district of Telangana 1 D.V.S. Praneeth, 2 Arghajeet Saha 1,2 M.Tech. Scholar 1 Environmental Engineering, Department

More information

SUMMARY ENVIRONMENTAL IMPACT ASSESSMENT REPORT. 380 MW Gas Based Combined Cycle Power Plant at

SUMMARY ENVIRONMENTAL IMPACT ASSESSMENT REPORT. 380 MW Gas Based Combined Cycle Power Plant at SUMMARY ENVIRONMENTAL IMPACT ASSESSMENT REPORT for 380 MW Gas Based Combined Cycle Power Plant at Vijaipur, District: Guna MADHYA PRADESH NOVEMBER 2011 1 CONTENTS 1.0 Project Description Page 3 2.0 Description

More information

Environment protection measures / technology

Environment protection measures / technology Sr. No. Conditions A. Specific Conditions: i. The gaseous and particulate matter emissions from various units should conform to the standards prescribed by the State Pollution Control Board. At no time,

More information

Environment Management Plan For B 2 Category Project

Environment Management Plan For B 2 Category Project Environment Management Plan For B 2 Category Project Project Proponent Shri Alihusen Haji Mohammadali Alirajpurwala Address - N/V Kanawant, Taluka & District - Chhotaudepur Near Taluka District Area Survey

More information

OPTIMISATION OF WATER USAGES IN THERMAL POWER PLANTS AND A STUDY ON DRY COOLING SYSTEM

OPTIMISATION OF WATER USAGES IN THERMAL POWER PLANTS AND A STUDY ON DRY COOLING SYSTEM CONFERENCE ON WATER OPTIMISATION IN THERMAL POWER PLANTS OPTIMISATION OF WATER USAGES IN THERMAL POWER PLANTS AND A STUDY ON DRY COOLING SYSTEM S. K. Thakur, Dr. L. D. Papney, Chief Engineer (I/C), TE&TD

More information

Salient Features of Mining Mining is proposed by opencast manual method. Estimated Mineable Reserves: Hard/Lumps Iron ore = 5, 33,940 tonnes.

Salient Features of Mining Mining is proposed by opencast manual method. Estimated Mineable Reserves: Hard/Lumps Iron ore = 5, 33,940 tonnes. EXECUTIVE SUMMARY INTRODUCTION Agaria Iron Ore mine is situated in village Agaria, Tehsil- Sihora, District Jabalpur of Madhya Pradesh State. The mining lease period was for 20 years w.e.f 06.03.1987 to

More information

Environmental Clearance Compliance Half Yearly Report

Environmental Clearance Compliance Half Yearly Report Environmental Clearance Compliance Half Yearly Report HALF YEARLY COMPLIANCE REPORT- April 2017 - Sept 2017 Ref: MOEF, New Delhi Environment Clearance F. No. J-11011/118/2007- IA II (I) dated 25 th August,

More information

Simran Industries Pvt. Ltd.

Simran Industries Pvt. Ltd. SUMMARY ON ENVIRONMENTAL IMPACT ASSESSMENT REPORT OF Patharra Village Bemetara Tehsil Durg District Chhattisgarh Submitted to: CHHATTISGARH ENVIRONMENT CONSERVATION BOARD Raipur, Chhattisgarh 1.0 INTRODUCTION

More information

Clearance Letter no. : MoEF Vide Letter no. J-11011/79/2003-IA-II (I) dated April 21, 2004

Clearance Letter no. : MoEF Vide Letter no. J-11011/79/2003-IA-II (I) dated April 21, 2004 Name of the Project: Jaypee Rewa Plant, Unit of M/s Jaiprakash Associates Limited for expansion Of cement production from 2.5 MTPA to 3.5 MTPA at Jaypee Nagar, District Rewa, Madhya Pradesh Project Code:

More information

Cement Manufacturing Company Ltd. Page 1

Cement Manufacturing Company Ltd. Page 1 Six Monthly Compliance status of Environment Clearance for Cement Plant (2400 TPD) at Village Lumshnong, Meghalaya July to December 2013 Ref.: Environmental Clearance no. SEIAA/Project-6/2008/23 dtd. 16.03.10.

More information

Your letter ref. no. J-11011/131/2005-IA.II (I) dated A. SPECIFIC CONDITIONS

Your letter ref. no. J-11011/131/2005-IA.II (I) dated A. SPECIFIC CONDITIONS The status of Environmental Clearance accorded by Ministry of Environment and Forests, I.A. Division, New Delhi to M/s HINDALCO INDUSTRIES LIMITED, CHOTAMURI, Jharkhand for expansion of Alumina Refinery

More information

Map 1. Trijuga forest

Map 1. Trijuga forest Project update: September 2018 Project title: Habitat Suitability Assessment for Tiger in Trijuga Forest, East Nepal Project Location: Udayapur and Saptari district, East Nepal Introduction: As a part

More information

PART A. M/s Shree Cement Ltd, (Grinding Unit) village - Udepur, Tehsil- Suratgarh, District -Shri Ganganagar, Rajasthan

PART A. M/s Shree Cement Ltd, (Grinding Unit) village - Udepur, Tehsil- Suratgarh, District -Shri Ganganagar, Rajasthan Page 1 of 9 Environmental Statement for Clinker Grinding Unit of M/s Shree Cement Limited, situated at village - Udepur, Tehsil- Suratgarh, District -Shri Ganganagar, Rajasthan for the Period from: 10

More information

Six Monthly Compliance status of Environment Clearance for Cement Plant (5300 TPD Clinker) at Village Lumshnong, Meghalaya January to June 2013

Six Monthly Compliance status of Environment Clearance for Cement Plant (5300 TPD Clinker) at Village Lumshnong, Meghalaya January to June 2013 Six Monthly Compliance status of Environment Clearance for Cement Plant (5300 TPD Clinker) at Village Lumshnong, Meghalaya January to June 2013 Ref.: Environmental Clearance no. J-11011/754/2007-IA II

More information

PROPOSED TERMS OF REFERENCE

PROPOSED TERMS OF REFERENCE ENVIRONMENTAL IMPACT ASSESSMENT FOR RESIDENTIAL TOWNSHIP WITH VACATION RESORTS PROJECT AT ALIBAUG, RAIGAD, MAHARASHTRA PROPOSED TERMS OF REFERENCE Submitted to State Level Environment Impact Assessment

More information

Environmental Clearance Compliance Half Yearly Report

Environmental Clearance Compliance Half Yearly Report Environmental Clearance Compliance Half Yearly Report HALF YEARLY COMPLIANCE REPORT- April 2015 to Sept. 2015 Ref: MOEF, New Delhi Environment Clearance F. No. J-11011/118/2007- IA II (I) dated 25 th August,

More information

Scanned by CamScanner

Scanned by CamScanner Scanned by CamScanner ENVIRONMENT STATEMENT (FORM V) Udaipur Cement Works Limited Daroli Limestone Mine-1 YEAR 2017-18 Udaipur Cement Works Limited SHRIPATINAGAR, P.O. CFA: DABOK, DISTRICT UDAIPUR (RAJASTHAN)-313021

More information

ENVIRONMENTAL MONITORING REPORT

ENVIRONMENTAL MONITORING REPORT ENVIRONMENTAL MONITORING REPORT BASED ON DATA GENERATED FROM APRIL 2018 SEPTEMBER 2018 FOR OCL INDIA LIMITED At/Po: RAJGANGPUR, District: SUNDARGARH, ODISHA AT LANJIBERNA LIMESTONE & DOLOMITE MINES PROJECT

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT PRE FEASIBILITY REPORT 1. Introduction 1. Identification of project and project proponent The Pahanbarri Sand Quarry area is located in the Tawa River at Village- Pahanbarri, Tehsil- Itarsi & District-

More information

J-11011/45/2009- IA II (I)

J-11011/45/2009- IA II (I) SL SPECIFIC CONDITIONS STATUS 1 Continuous stack monitoring facilities to monitor gaseous emissions from all the stacks shall be provided. The particulate emissions shall be controlled within 50 mg/nm

More information

EXECUTIVE SUMMARY 1.0 INTRODUCTION

EXECUTIVE SUMMARY 1.0 INTRODUCTION 1.0 INTRODUCTION NTPC Ltd is proposing to setup Khargone Super Thermal Power Project (2x660 MW) in Khargone district of Madhya Pradesh. The project is being implemented as regional Mega power project for

More information

VIRIDOR WASTE MANAGEMENT ARDLEY EFW PLANT EP APPLICATION - NON TECHNICAL SUMMARY

VIRIDOR WASTE MANAGEMENT ARDLEY EFW PLANT EP APPLICATION - NON TECHNICAL SUMMARY VIRIDOR WASTE MANAGEMENT ARDLEY EFW PLANT EP APPLICATION - NON TECHNICAL SUMMARY S1014-0340-0008MPW NTS Rev1.doc Print Date 19 February 2009 ISSUE NUMBER 1 DATE 19/02/09 AUTHOR CHECKED MPW SMO Title Page

More information

ENVIRONMENTAL MONITORING PROGRAMME

ENVIRONMENTAL MONITORING PROGRAMME Stage-I (2x800 MW) Page 1 5 CHAPTER - VI ENVIRONMENTAL MONITORING PROGRAMME 6.0 OBJECTIVES Regular monitoring program the environmental parameters is essential to take into account the changes in the environment.

More information

Environmental Clearance Compliance Half Yearly Report

Environmental Clearance Compliance Half Yearly Report Environmental Clearance Compliance Half Yearly Report HALF YEARLY COMPLIANCE REPORT- Oct. 2015 to March 2016 Ref: MOEF, New Delhi Environment Clearance F. No. J-11011/118/2007- IA II (I) dated 25 th August,

More information

V.S LIGNITE POWER Pvt. Ltd AT VILLAGE-GURHA, KOLAYAT, BIKANER, RAJASTHAN

V.S LIGNITE POWER Pvt. Ltd AT VILLAGE-GURHA, KOLAYAT, BIKANER, RAJASTHAN V.S LIGNITE POWER Pvt. Ltd AT VILLAGE-GURHA, KOLAYAT, BIKANER, RAJASTHAN HALF YEARLY REPORT FOR THE PERIOD OCTOBER, 2011 to MARCH 2012 V. S. Lignite Power Pvt. Ltd. Name of the Project : 1x 135 MW Lignite

More information

Environmental Clearance Compliance Half Yearly Report

Environmental Clearance Compliance Half Yearly Report Environmental Clearance Compliance Half Yearly Report HALF YEARLY COMPLIANCE REPORT- April 2016 Sept. 2016 Ref: MOEF, New Delhi Environment Clearance F. No. J-11011/118/2007- IA II (I) dated 25 th August,

More information

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN ENVIRONMENT MANAGEMENT PLAN ENVIRONMENT MANAGEMENT PLAN 1.0. INTRODUCTION: The proposed M/s. Ordinary sand Mine of Shree Ramjibhai samjibhai Gujarati Area at near village Survey No.Bhadar River Bed, Vill.

More information

SHREE CEMENT LIMITED, Compliance Status of 300 MW (2x150 MW) Thermal Power Plant. At Village Andheri Deori, Tehsil-Masuda, District Ajmer (Rajasthan)

SHREE CEMENT LIMITED, Compliance Status of 300 MW (2x150 MW) Thermal Power Plant. At Village Andheri Deori, Tehsil-Masuda, District Ajmer (Rajasthan) (i) (ii) (iii) (iv) (v) SHREE CEMENT LIMITED, Compliance Status of 300 MW (2x150 MW) Thermal Power Plant At Village Andheri Deori, Tehsil-Masuda, District Ajmer (Rajasthan) ENVIRONMENT CLEARANCE LETTER

More information

EXECUTIVE SUMMARY TABLE - 1

EXECUTIVE SUMMARY TABLE - 1 EXECUTIVE SUMMARY 1.0 PROJECT DESCRIPTION 1.1 INTRODUCTION Dwarkesh Energy Limited (DEL) proposes to set up a 1320 MW (2 x 660 MW) Super Critical Coal Based Thermal Power Plant at Villages Torniya, Chhippipura

More information

PRE-FEASIBILITY REPORT. 1. SUMMARY Kudeli Brick Earth Quarry Name of Company / Mine Owner Smt. Premawati Location 744, 760/1, 760/4, 750/1, 750/2

PRE-FEASIBILITY REPORT. 1. SUMMARY Kudeli Brick Earth Quarry Name of Company / Mine Owner Smt. Premawati Location 744, 760/1, 760/4, 750/1, 750/2 PRE-FEASIBILITY REPORT 1. SUMMARY Project Kudeli Brick Earth Quarry Name of Company / Mine Owner Smt. Premawati Location 744, 760/1, 760/4, 750/1, 750/2 Village Kudeli Taluka Baikunthpur District Koriya

More information

Pre-Feasibility Report [Application submitted for obtaining Terms of Reference for Prior Environment Clearance]

Pre-Feasibility Report [Application submitted for obtaining Terms of Reference for Prior Environment Clearance] Pre-Feasibility Report [Application submitted for obtaining Terms of Reference for Prior Environment Clearance] Project Proposal: Expansion of Cement Plant capacity from 1.5 to 2.20 MTPA of Clinker and

More information

2) A copy of the document in support of the fact that the Proponent is the rightful lessee of the mine should be given.

2) A copy of the document in support of the fact that the Proponent is the rightful lessee of the mine should be given. PROPOSED TERMS OF REFERENCES (A) Suggested by the Applicant 1(a): STANDARD TERMS OF REFERENCE FOR CONDUCTING ENVIRONMENT IMPACT ASSESSMENT STUDY FOR NON-COAL MINING PROJECTS AND INFORMATION TO BE INCLUDED

More information

TERMS OF REFERENCE. Identification of the sources of pollution and assessing the impacts on the environment due to proposed project if any;

TERMS OF REFERENCE. Identification of the sources of pollution and assessing the impacts on the environment due to proposed project if any; TERMS OF REFERENCE 1.0 PROPOSED SCOPE OF WORK FOR EIA STUDY The components of the EIA study include: Determination of baseline data using primary data generation and secondary data available from various

More information

JAYPEE NIGRIE SUPER THERMAL POWER PROJECT

JAYPEE NIGRIE SUPER THERMAL POWER PROJECT JAYPEE NIGRIE SUPER THERMAL POWER PROJECT (A Unit of M/s Jaiprakash Power Ventures Limited) Villages: Nigrie, Tehsil :Sarai District: Singrauli 2014 2015 SUBMITTED M.P. POLLUTION CONTROL BOARD BHOPAL (M.P.)

More information

Environmental Impact Assessment for Proposed Relocation and Installation of 1 x 100 Ton per day / 30,000 TPA Sponge Iron manufacturing industry from Village Nayapara-Bodri, PO- Chakrabhata Camp, Bilaspur

More information

- 1 S. NO. PARTICULARS DETAILS

- 1 S. NO. PARTICULARS DETAILS 1.0 INTRODUCTION EXECUTIVE SUMMARY M/s. Lafarge India Private Ltd. (LIPL) is a subsidiary of French building materials major Lafarge. Lafarge entered in the Indian market in 1999 with acquisition of cement

More information

PROJECT BRIEF. Noise environment: No Entrant noise generation sources exist in and around project area.

PROJECT BRIEF. Noise environment: No Entrant noise generation sources exist in and around project area. PROJECT BRIEF PROJECT LOCATION: - Pahar Kua Marble Range Mining Project Q L No 235 is located near village Pahar Kua, Tehsil Makrana., District Nagaur Rajasthan. Project is approachable from national highway.

More information

Calcom Cement India Limited

Calcom Cement India Limited Calcom Cement India Limited (Subsidiary of DALMIA BHARAT CEMENT LIMITED) 2 No. Pipalpukhuri, Lanka, Dist. Nagaon, Assam 782446 Ref: MOEF, New Delhi Environment Clearance F. No. J-1101/312/2006-IA.II (I)

More information

The following were present to supervise the proceedings:- 1. Sh. Varun Roojam, IAS. Additional Deputy Commissioner. Muktsar. 2. Er. G.S.

The following were present to supervise the proceedings:- 1. Sh. Varun Roojam, IAS. Additional Deputy Commissioner. Muktsar. 2. Er. G.S. Proceeding of the Public Hearing conducted on 27.01.2009 for grant of environmental clearance to M/s Universal Bio-Mass Energy Pvt. Ltd. for setting up of 14.5 MW capacity Biomass based Independent power

More information

ppt on Ash Management By :J.N. Dave (G.M.-Power) & D.S.Makwana (I/c. G.M.-PP)

ppt on Ash Management By :J.N. Dave (G.M.-Power) & D.S.Makwana (I/c. G.M.-PP) ppt on Ash Management By :J.N. Dave (G.M.-Power) & D.S.Makwana (I/c. G.M.-PP) Salient Features of Lignite Project Panandhro Village Panandhro, Fulra & Khanot Total Meter age of Exploration 10,757 m Total

More information

WELCOM TO THE STATE LEVEL ENVIRONMENT IMPACT ASSESSMENT APPRAISAL COMMITTEE,A.P. For the Presentation proposed Granite Mine 7.50 Acres M/S N.R.

WELCOM TO THE STATE LEVEL ENVIRONMENT IMPACT ASSESSMENT APPRAISAL COMMITTEE,A.P. For the Presentation proposed Granite Mine 7.50 Acres M/S N.R. WELCOM TO THE STATE LEVEL ENVIRONMENT IMPACT ASSESSMENT APPRAISAL COMMITTEE,A.P. For the Presentation proposed Granite Mine 7.50 Acres M/S N.R.Global Granites Production Granite Black Granits At Survey

More information

Pramod S. Kambli. Page 1

Pramod S. Kambli. Page 1 PREFEASIBILITY STUDY FOR SHREE. PRAMOD S. KAMBLI Page 1 Executive summary Shree.., has laterite stone quarry in an area 2.61 Ha in the survey No. 1091 With quarrying capacity of 10259.31 TPA. The major

More information

INTRODUCTION ENVIRONMENTAL STATEMENT

INTRODUCTION ENVIRONMENTAL STATEMENT INTRODUCTION MB Power (Madhya Pradesh) Limited (MBPMPL) is a 100% owned subsidiary of Moser Baer Power & Infrastructure Limited (MBPIL). Moser Baer group headquartered in New Delhi, is leading global technology

More information

A proposed new gas-fired power station on the Wilton International site

A proposed new gas-fired power station on the Wilton International site TEES CCPP PROJECT A proposed new gas-fired power station on the Wilton International site Welcome This event is intended to provide you with information about the proposed Tees Combined Cycle Power Plant

More information

THE RAMCO CEMENTS LIMITED, KSR NAGAR COMPLIANCE REPORT - ENVIRONMENTAL CLEARANCE CEMENT PLANT 2.5 MILLION TPA CLINKER, 2

THE RAMCO CEMENTS LIMITED, KSR NAGAR COMPLIANCE REPORT - ENVIRONMENTAL CLEARANCE CEMENT PLANT 2.5 MILLION TPA CLINKER, 2 THE RAMCO CEMENTS LIMITED, KSR NAGAR COMPLIANCE REPORT - ENVIRONMENTAL CLEARANCE CEMENT PLANT 2.5 MILLION TPA CLINKER, 2.6 MILLION TPA CEMENT & THERMAL POWER PLANT 36 MW EC Lr. No. : J-11011/403/2006-IA-II

More information

GRAVEL & ROUGH STONE QUARRY

GRAVEL & ROUGH STONE QUARRY ENVIRONMENTAL MANAGEMENT REPORT Of GRAVEL & ROUGH STONE QUARRY Sy. No. 211 (Carved out of Sy.No.1) Tarluwada Village & Anandapuram Mandal, Visakhapatnam District, Andhra Pradesh. AREA OF MINING LEASE 23.760

More information

EXECUTIVE SUMMARY. As per the requirement of TOR, the following studies were conducted and the reports are prepared.

EXECUTIVE SUMMARY. As per the requirement of TOR, the following studies were conducted and the reports are prepared. 1. INTRODUCTION EXECUTIVE SUMMARY TANGEDCO established 3 x 210 MW North Chennai Thermal Power Station Stage-I and 2 x 600 MW Stage-II in NCTPS Complex at Ennore and Puzhudivakkam Villages, Ponneri Taluk,

More information

SUMMARY ON ENVIRONMENTAL IMPACT ASSESSMENT REPORT. Chandu Cattle Feeds

SUMMARY ON ENVIRONMENTAL IMPACT ASSESSMENT REPORT. Chandu Cattle Feeds SUMMARY ON ENVIRONMENTAL IMPACT ASSESSMENT REPORT OF Chandu Cattle Feeds 10 KLPD Ethanol & 50 TPD Cattle Feed Unit Plot no. 31 & 30 B of Sy. No. 432/2 P, APIIC Industrial park, Kakuturu village, Venkatachalam

More information

PROPOSED TERMS OF REFERENCE

PROPOSED TERMS OF REFERENCE PROPOSED TERMS OF REFERENCE For PROPOSED RESIDENTIAL AND COMMERCIAL DEVELOPMENT AT Plot bearing survey no. 86/1, 86/2, 86/3 (pt), 86/4 (pt), 86/5 (pt), 115/1 (pt), 115/2 (pt), 115/3 (pt), 115/4 (pt), 115/5

More information

PRE FEASIBILITY REPORT. Company of production capacity: 14,40,000 CFT/ Year located at Khasra No near Village:

PRE FEASIBILITY REPORT. Company of production capacity: 14,40,000 CFT/ Year located at Khasra No near Village: PRE FEASIBILITY REPORT 1.0 EXECUTIVE SUMMARY In our Masonry Stone Mining Lease (M.L. No. 15/96, Area: 1.0 ha), Production capacity of masonry stone: 142920 TPA and existing Stone Crusher Unit named M/s.

More information

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN ENVIRONMENT MANAGEMENT PLAN OF ALAMPUR THIKARIYA SAND DEPOSIT QUARRY KHASRA NO. 149, TOTAL AREA- 8.0 Hect. (MALENI RIVER) AT VILLAGE- ALAMPUR THIKARIYA, TEHSIL-JAORA, DISTRICT- RATLAM, STATE-MADHYA PRADESH

More information

STONE QUARRY Survey No. : 57/5, Village : Dhadhade, Tehsil: Vikramgad, District Thane, Maharashtra Area (2.0 Ha)

STONE QUARRY Survey No. : 57/5, Village : Dhadhade, Tehsil: Vikramgad, District Thane, Maharashtra Area (2.0 Ha) Pre Feasibility Report On STONE QUARRY Survey No. : 57/5, Village : Dhadhade, Tehsil: Vikramgad, District Thane, Maharashtra Area (2.0 Ha) Submitted to MINISTRY OF ENVIRONMENT & FOREST STATE LEVEL ENVIRONMENTAL

More information