ANNEX 11 WATER SUPPLY, SANITATION AND SOLID WASTE MANAGEMENT
|
|
- Melanie Richards
- 6 years ago
- Views:
Transcription
1 ANNEX 11 WATER SUPPLY, SANITATION AND SOLID WASTE MANAGEMENT A. Introduction 1. The South Asia earthquake disaster significantly affected the water and sanitation sector in five districts of North West Frontier Province (NWFP) and four districts in Azad Jammu and Kashmir (AJK). Rural drinking water supply in these provinces is usually sourced from rivers and streams and, to a lesser extent through dug wells and tube-wells. Approximately 75% of rural water systems before the earthquake were gravity schemes, with the balance being met from well sources. Water supply networks and treatment plants in major towns were in poor condition, which has been further exacerbated by the disaster. In some cases existing infrastructure has been completely destroyed Water shortages have been reported as a result of infrastructure failure. A survey of hospitals has also indicated a rise in typhoid, hepatitis, cholera and other gastrointestinal water related disease, resulting from unavailability of water and the use of untreated surface water. Quick repair works on the damaged distribution system, provision of temporary filtration facilities and water delivery through tankers has been initiated by the Government and donors to meet daily water requirements. However, the delivery of water has been hindered due to limited access to affected areas. In the short term, priority should be given to rehabilitation of the damaged water distribution network, which can be accompanied by sanitation improvement and hygiene education programs. The need to expedite adequate solid waste management practices and structuring the sector for efficient operation are also critical at this stage. 3. The needs assessment team, consisting of ADB, the World Bank, JBIC and UNICEF, held consultations with representatives of the Tehsil municipal administrations, local and provincial Governments in NWFP, and representatives of the Local Government and Rural Development Department and Public Works Department in AJK. The information provided by these agencies, NGOs working in concerned areas 28 and affected communities, existing baseline reports, and observations recorded during reconnaissance missions and surveys have served as a base in formulating the initial damage and needs assessment report. Field visits were undertaken in Muzaffarabad, Bagh, Poonch, Abbottabad, Mansehra and Batagram. A precise assessment of the damage is not possible at this stage due to the wide spatial spread of damage, time restrictions and data logistics. B. Damage Overview and Recovery Needs 4. Water Supply and Sanitation. The assessment is based on field data provided by the District and Tehsil departments dealing with water supply and sanitation, the District Coordination Officers, local NGOs involved with implementation of water supply and sanitation projects in the sector, and field staff of projects stationed in the affected areas, and through unstructured interviews of people coming from the affected areas. The baseline information on the large water and sanitation schemes is relatively accurate in both NWFP and AJK, however information on small community-managed schemes executed by the local government departments (TMAs) is not well documented in NWFP and has been estimated by extrapolating the data on community Water and Sanitation schemes undertaken through World Bank, ADB, DFID, and IFAD-financed projects. In AJK the data on the small rural water and sanitation schemes were compiled recently under World Bank-financed CISP, and is well reported. 27 The Pakistan Integrated Household Survey (PHIS, 2002), indicates approximate 80% urban water coverage and 65% rural water coverage in AJK prior to the October, 8 earthquake. In NWFP, PHIS information indicates approximate 97% urban water coverage and 71% rural water coverage. Overall population in affected areas with latrines within the household has been computed to be 4 and 3%, respectively. 28 These include Sungi and SRSP in NWFP.
2 Annex 11 Water Supply, Sanitation and Solid Waste Management Page 2 of 7 5. NWFP. The overall estimated water supply coverage 29 is 50 % of the total population of 500,000 households in five Districts of NWFP damaged by the earthquake, covering about 250,000 households (including 180,000 households with house to house connections). As a result of the earthquake an estimated 77,500 households have only partial or no water supply. This does not include the 250,000 households that did not have a water source within a reasonable limit of their house (500 meters) before the earthquake. Overall damage to the763 large schemes (average 300 households per scheme) operated by the Water and Sanitation Department, includes 220 that are partially damaged (minor to major repair). Out of the 3323 small community or TMA operated schemes (hand pumps and small gravity schemes average 20 households per scheme) 1234 are partially damaged while 2,089 are operational. The overall estimated cost of these damages to both Public Health Engineering Department (PHED) and community schemes is Rs. 482 million. 6. Most damage is concentrated in rural areas. The small urban pockets that have been affected include Balakot, Batagram, Besham and outer fringes of Mansehra and Abbottabad city. 7. In NWFP, about % of the water supply schemes are gravity based, and the remaining 15% consist of tube-wells, dug-wells and hand-pumps. Major damage has been reported at the intake of gravity schemes. Other significant damage is to water supply due to landslides and to distribution system due to structural collapses. The damage to water reservoirs, hand pumps and tube-well schemes (ground water sources) has been minimal. 8. As many as 25,000 households may have lost their sanitation facilities in NWFP. Based on 2005 projections, Government and on-site reports, damage to drainage systems has been correlated to household damage and computed in urban areas for Balakot and Batagram (90% damage) and Besham (40% damage), and rural areas. The total replacement cost for sanitation systems is estimated to be Rs 88 million. 9. AJK. In AJK, three large urban water-supply schemes operated by PHED are providing water to the district headquarters of the three affected districts. Out of the total estimated 23,000 households living in these urban centers 16,500 households (about 80%) are provided with direct connections. After the earthquake the supply of water from the treatment plants in these cities has been reduced to about 62% of system capacity. All three large urban water-supply schemes 30 are partially damaged. The estimated cost of urban water damage, including the six other small urban centers in the affected area is Rs. 83 million. 10. Overall estimated rural water supply coverage is 65% of the population in the three Districts of AJK damaged by the earthquake, covering about 152,000 households. An estimated 11,400 households are now without access to water and another 64,600 households are getting only partial water service. It is estimated that 234 rural systems are completely destroyed, 1,334 are partly damaged (minor to major repair), and 462 are operational, out of the 3,147 medium to small schemes operated by the communities (hand-pumps and gravity) or Government (usually 1,000 households and above). The overall estimated cost is Rs. 509 million. 11. Most of the water supply schemes in AJK rural areas are gravity based, and in the urban areas source are either perennial streams or rivers, using pumping systems. In the rural areas the damage is mainly to the source, intake structures and water mains, and to a much lesser extent to the tertiary 29 Averages computed from PHIS district data for PHED schemes and community coverage (based on NGO and donor reports). 30 The cost of damage to six other minor towns is worked out on the same assumption as used for rural damage, which is based on approximate damage estimates provided by the PHED department, further adjusted based on mission field visit observations.
3 Annex 11 Water Supply, Sanitation and Solid Waste Management Page 3 of 7 networks. In the urban areas the damage has been mostly to the intake facilities (treatment plants) and tertiary networks due to building and structure collapse in both cases. 12. In AJK, sanitation coverage in the form of street drains is approximately 65% in urban settlements (specific Statistics coverage, 2005, for Muzaffarabad, Poonch and Bagh has been utilized in the computations), and the damage has been correlated to damage in the housing sector (to be confirmed after rubble clearing). In rural areas, the Government has reported 30% damage to drainage systems. The combined urban and rural cost estimate for damage to drainage is Rs. 86 million. 13. Solid Waste Management. Provincial statistics (2004) indicate the existence of very limited garbage collection services in affected areas, largely restricted to municipal centers (approximately 45% of households), where the balance is disposed of randomly. Where such services were in place, such as in the towns of Muzaffarabad and Mansehra, dumpsites and collection trucks have no reported damage. Table 1: Summary of Damage to Water & Sanitation Sector (Rs. million) Territory District Urban Rural Water Sanitation Water Sanitation Total Damage Cost AJK Muzaffarabad Bagh Poonch Subtotal NWFP Abbottabad Batagram Kohistan Mansehra Shangala Subtotal TOTAL Note: Damage costs have been calculated as the repair cost of partially damaged water supply and sewerage systems and replacement cost for totally damaged assets. Data sources include Government estimates and community schemes constructed under various programs and mission estimates. The damage cost of public buildings has not been included (please refer to paras. 15 and 17). Sanitation damage is based on reported housing damage. 14. Institutional issues. The NWFP water and sanitation administrative and institutional infrastructure has generally suffered only minor damages. The only Tehsil Municipal Administration office with substantial damage is Balakot, which included loss of records and staff. The cost of damage to administrative set-ups related to water supply in NWFP is approximately Rs. 35 million. 15. The AJK PWD administrative infrastructure has suffered major damage, including losses to life, property and records. Most of the buildings housing the Local Government and PHED staff in urban areas of Muzaffarabad, Bagh and Rawalakot have either collapsed or are damaged beyond repair. The estimated cost is Rs. 320 million.
4 Annex 11 Water Supply, Sanitation and Solid Waste Management Page 4 of 7 C. Reconstruction and Recovery Strategy Approach 16. The reconstruction and recovery strategy for the water supply, sanitation and solid waste management sectors will be guided by the following principles: Rebuilding and rehabilitation should be premised on locally adapted and accepted practices. Actively promote safe water, sanitation and solid waste management programs. Introduction of appropriate technical upgrades, including improved design and construction materials (e.g., use of HPD piping material). Local Government-led and Community-implemented tertiary infrastructure rehabilitation in accordance with the principle of subsidiarity, existing mandates, and recorded ownership of damaged schemes. Damage verification. A detailed damage assessment should be carried out prior to initiating the rehabilitation and reconstruction process. Critical Issues 17. Water and sanitation policy for rehabilitation and reconstruction should be developed by the Provincial authorities in consultation with TMAs, district governments, civil society and communities. The water and sanitation policy for rehabilitation and reconstruction, in coordination with the housing sector strategy, should consider delivery of services based on reviewed urban boundaries. 18. Capacity assistance. In both AJK and NWFP the number of schemes to be rehabilitated and/or reconstructed in the short and medium term represents a significant increase in implementation. Whilst rehabilitation may require fewer resources than construction of new schemes, the following are expected to be required for timely rehabilitation: (i) planning and technical support to communities for reconstruction and enhancement of damaged community schemes; (ii) technical support to local government agencies for project planning, design, implementation, contracting, supervision and monitoring; and (iii) strategic packaging of rehabilitation works based on sound geographical grouping and outsourcing. Different options to be considered include deputation from professional institutions and/or departments in other Provinces in the country, recruitment of incremental staff and active engagement of NGOs. 19. Inter-sectoral coordination is essential to adequately address the needs of the affected population and minimize implementation delays in the reconstruction process. Consistency with the housing sector strategy and overall approach is of particular relevance and shall consider the following principles: Water and sanitation services will complement predominantly in-situ rebuilding and rehabilitation of housing. In areas where population is highly dispersed or damage is extensive and cannot accommodate pre-earthquake populations, design of replacement water and sanitation schemes will be considered with land readjustment schemes. 20. Financial sustainability. In addition to geographical location, the quality of engineering design and the quality of construction, quality of facility operation and maintenance can reduce vulnerability and
5 Annex 11 Water Supply, Sanitation and Solid Waste Management Page 5 of 7 positively contribute to disaster mitigation and preparedness. Improved scheme sustainability should be considered in the medium to long term, as well as in the selection of repair and improvement measures. Short Term Priority (up to 18 months) 21. Infrastructure needs. Water and solid waste services to relief camps over the short term have not been costed in this assessment. Immediate and short term efforts 31 in this sector should focus on: (i) rehabilitation of partially damaged Government and community spring/gravity water schemes, dug-wells and hand-pump infrastructure; (ii) rehabilitation of partially damaged surface water (river) schemes and associated treatment plants, such in the case of Muzaffarabad town; 32 (iii) rehabilitation of partially damaged water distribution networks; (iv) rehabilitation of communal latrines; (v) initiating a solid waste management program for clearing and recovery of debris; 33 (vi) provision of basic buildings for AJK Government staff supporting water and sanitation related agencies; and (vii) development of water quality and source monitoring, and leakage detection programs. 22. Institutional and governance requirements. 34 Short term needs in this sector must consider: (i) formulation of a water and sanitation rehabilitation policy and strategy for NWFP and for AJK; (ii) recruitment/deputation of incremental staff to local government for planning, implementation, contracting, supervision and monitoring; (iii) provision of community awareness and technical training to undertake repairs and rehabilitation; (iv) facilitating community consultation and participation programs for reconstruction of large schemes, and water and sanitation options for selected localized land readjustment schemes and small-scale relocation schemes; 35 (v) local government capacity development; and (vi) formulation and delivery of sanitation and hygiene training and education programs, adapted to local conditions and practices. 23. Cost estimates for immediate and short term assistance (up to 18 months). Safe drinking water is a basic necessity, and restoration of pre-earthquake coverage must be prioritized. As such, the reconstruction and recovery strategy for this sector considers that the rehabilitation of all partially damaged schemes should be completed within 18 months. The total estimated cost for the short term assistance is Rs. 1,147 million for replacement of assets and implementation. 31 Prioritization of works should consider overall effectiveness with regards to population coverage. 32 Restoration of water treatment systems, and in particular filtration and chlorination facilities, should be expedited as highlighted in water quality reports (Pakistan Council of Research in Water Resource, October 2005), which indicate microbiological contamination of water sources, particularly in AJK. 33 Recovery and reuse of material should be promoted. Based on the nature of the materials utilized, this is foreseen to be particularly viable in rural areas. In urban areas, centrally managed (TMA, NWFP or municipal corporation, AJK) sites should be designated and adequate machinery provided for crushing, cutting and safe final disposal in designated controlled dump-site. Transportation of debris to selected site locations outside highly populated areas will have to be considered. The cost of this component is presented under the environment sector assessment of this report. 34 Rehabilitation and reconstruction programs should consider (i) maximizing the opportunity for local income generation, (ii) maximizing opportunities for community-based approaches, (iii) maximizing the opportunities for better household sanitation and waste management practices, (vi) using the community s potential for operation and maintenance. 35 These activities will be combined with those undertaken by the housing sector and therefore have not be costed.
6 Annex 11 Water Supply, Sanitation and Solid Waste Management Page 6 of 7 Component Water Supply Table 2: Short Term Needs for Water Supply and Sanitation Sector (AJK+NWFP) Cost Estimation Base Rehabilitation of full rural schemes and urban source intakes Replacement Cost* Partial Upgrade Cost (Rs. million) (Rs. million) = = 1367** Sanitation Re-construction of public latrines =160*** Institutional Staff recruitment, community support and hygiene education Basic buildings Total * Since most systems are reported to be partially damaged, retrofitting of the undamaged portion has been costed through applying a flat 20% cost increase multiplier. **Calculations assume partial upgrading through a 3% annual population increase for 2 years in rural water to accommodate rise in population. *** The cost includes provision of public toilets for partial and fully affected households in urban areas, urgently required in the short term leading to the reconstruction process. Medium Term Priorities (18 months-3 years) 24. Infrastructure needs. This phase should focus on providing water and sanitation to towns where major reconstruction activities are required, namely Muzaffarabad and Bagh, in AJK, and Balakot, Battgram and, to a lesser extent, Besham, in NWFP. Medium term priorities will focus on (i) providing water distribution networks for reconstructed settlements; (ii) providing water systems for selected new settlements resulting from land readjustment and small-scale relocation schemes; 36 (iii) drainage and/or sewerage for reconstructed settlements; (v) formalization of solid waste management schemes in large towns; (vi) reconstruction of full AJK Government PWS and LGRDD offices; and (vii) upgrading sector facilities for disaster preparedness. 37 Although the computations presented do not incorporate infrastructure elements that were not present prior to the earthquake disaster, it is recommended that, as part of the reconstruction planning and development strategy of fully destroyed settlements, development needs, and in particular the construction of upgraded water and wastewater treatment systems in densely populated urban areas, be considered. 25. Institutional and governance requirements for the medium term should consider (i) improved planning and preparedness for disaster management in the water and sanitation sector; (ii) institutionalization and streamlining of successful and effective planning, implementation, supervision and monitoring practices; and (iii) independent evaluation of sector reconstruction process and financial, technical and social auditing. The total estimated cost for the medium term assistance is about Rs. 753 million (exclusively for replacement of assets and implementation). 36 In the absence of specific relocation schemes data on magnitude and scope, the cost of providing water and sanitation services cannot be costed. 37 This should include measures such as the provision of emergency generators for water pumping in the event of power failure and retrofitting towards improved disaster resistance.
7 Annex 11 Water Supply, Sanitation and Solid Waste Management Page 7 of 7 Table 3: Medium Term Needs for Needs for Water Supply and Sanitation Sector (AJK+NWFP) Component Water Supply Sanitation Solid Waste Management Institutional Cost Estimation Base Water distribution networks for reconstructed settlements Reconstruction of drainage systems in urban areas Formalization of solid waste disposal centers in selected participating urban centers (Phase I) Staff recruitment Basic buildings Replacement Cost Partial Upgrade Cost (Rs. million) * (Rs. million) = = 157** = =358*** Total * Since most systems are largely reported to be partially damaged, retrofitting of the undamaged portion has been costed through applying a flat 20% cost increase multiplier. **Calculations assume 100% water distribution networks coverage for urban centers in need of reconstruction (including Muzaffarabad, Balakot, and Bagh). ***Calculations assume 100% drainage coverage for urban centers in need of reconstruction (including Muzaffarabad, Balakot, Bagh and Batagram). D. ENVIRONMENTAL AND SOCIAL ASPECTS 26. Debris disposal. Geographical conditions and the absence of adequate waste management practices pose a severe environmental problem. Safe and controlled disposal practices and designation of waste disposal zones should be immediately identified and communicated to the communities, particularly in densely populated areas. 27. Lack of hygiene practices. In view of the loss of a large number of household latrines, appropriate communal sanitation facilities must provided in the short term. In addition, hygiene education programs should be formulated to ensure use of toilets, washing hands and cleaning of the living environment. 28. Gender and social issues. Provision of short and medium term accommodation arrangements should take into consideration gender differences. Separate arrangements and facilities should be provided for men and women. Moreover, social issues to be considered while formulating a reconstruction strategy (including water and sanitation infrastructure) comprise fair asset distribution, resettlement and livelihood options, and preserving community fabric for successful implementation and operation of new and rehabilitated schemes. 29. Community participation in the reconstruction process, especially for small schemes, networks of smaller settlements within towns should be promoted. In addition, findings derived from the implementation of projects related to natural disasters have highlighted the need for integrating recovery and long-term development planning as well as population targeting that should be identified on a needs basis
Pakistan Earthquake Reconstruction & Rehabilitation Authority.
Pakistan Earthquake Reconstruction & Rehabilitation Authority www.erra.gov.pk NWFP Azad Kashmir Losses / Damages of Earthquake 8 October 2005 Deaths : 73,338 Injured : 128, 304 Population affected Area
More informationPakistan earthquake - WatSan reconstruction strategy
Loughborough University Institutional Repository Pakistan earthquake - WatSan reconstruction strategy This item was submitted to Loughborough University's Institutional Repository by the/an author. Citation:
More informationWATER INFRASTRUCTURE. Pakistan Poverty Alleviation Fund
WATER INFRASTRUCTURE Pakistan Poverty Alleviation Fund June 13, 2017 PPAF FACT FILE STRATEGIC FRAMEWORK Eradicate poverty, reduce vulnerability and improve food security, through sustainable rural development,
More informationSECTOR ASSESSMENT (SUMMARY): WATER AND OTHER URBAN INFRASTRUCTURE AND SERVICES 1
Country Partnership Strategy: Pakistan, 2015 2019 SECTOR ASSESSMENT (SUMMARY): WATER AND OTHER URBAN INFRASTRUCTURE AND SERVICES 1 Sector Road Map 1. Sector Performance, Problems, and Opportunities 1.
More informationAnnex 7 - Water Supply, Sanitation and Solid Waste Management Sectors
- Water Supply, Sanitation and Solid Waste Management Sectors I. Introduction 1. Impacts resulting from the absence of basic infrastructure and environmental services in the atolls have been further exacerbated
More informationSECTOR ASSESSMENT: WATER SUPPLY AND OTHER MUNICIPAL INFRASTRUCTURE AND SERVICES. 1. Sector Performance, Problems, and Opportunities
Dhaka Environmentally Sustainable Water Supply Project (RRP BAN 42173) SECTOR ASSESSMENT: WATER SUPPLY AND OTHER MUNICIPAL INFRASTRUCTURE AND SERVICES Sector Road Map 1. Sector Performance, Problems, and
More informationNepal Earthquake Building Back Better, Safer and Greener for a More Resilient Nepal
Nepal Earthquake 2015 Building Back Better, Safer and Greener for a More Resilient Nepal The Nepal earthquake in April 2015 and its aftershocks resulted in huge loss of life, injury, and economic damage.
More informationPlanning for Rehabilitation and Reconstruction : Key Considerations
Planning for Rehabilitation and Reconstruction : Key Considerations Disaster and Development Development Realm Negative Realm Development can increase vulnerability Development can reduce vulnerability
More informationAnnex IX: RURAL AND MUNICIPAL INFRASTRUCTURE
A. Introduction Annex IX: RURAL AND MUNICIPAL INFRASTRUCTURE 1. This section includes damage and needs assessment of basic infrastructure under the control of local governments, whether in towns, villages
More informationTechnical Assistance Consultant s Report
Technical Assistance Consultant s Report Project Number: 40563-013 June 2010 PAKISTAN: Capacity Building for Institutions Related to Earthquake Reconstruction and Rehabilitation Financed by Pakistan Earthquake
More informationIn the name of Allah, the most Beneficent, the most Merciful
In the name of Allah, the most Beneficent, the most Merciful Pakistan Earthquake 8 th October 2005 Turning Adversity Into An Opportunity Build Back Better NWFP Azad Kashmir Pakistan Earthquake - Oct 2005
More informationE767 May 2003 ISLAMIC REPUBLIC OF IRAN EARTHQUAKE EMERGENCY RECOVERY PROJECT. Objectives
Objectives ENVIRONMlENT AND SOCIAL SAFEGUARD FRAMEWORK ISLAMIC REPUBLIC OF IRAN EARTHQUAKE EMERGENCY RECOVERY PROJECT E767 May 2003 The environmental and social safeguards framework provides general policies,
More informationSECTOR ASSESSMENT (SUMMARY): WATER AND OTHER URBAN INFRASTRUCTURE AND SERVICES
Country Partnership Strategy: Bhutan, 2014 2018 SECTOR ASSESSMENT (SUMMARY): WATER AND OTHER URBAN INFRASTRUCTURE AND SERVICES Sector Road Map 1. Sector Performance, Problems, and Opportunities 1. The
More informationSECTOR ASSESSMENT (SUMMARY): WATER SUPPLY AND OTHER MUNICIPAL INFRASTRUCTURE AND SERVICES
Additional Financing for Melamchi Water Supply Project (RRP NEP 31624) SECTOR ASSESSMENT (SUMMARY): WATER SUPPLY AND OTHER MUNICIPAL INFRASTRUCTURE AND SERVICES Sector Road Map 1. Sector Performance, Problems,
More informationSCOPE OF SERVICES. Multi-Hazard Vulnerability and Geological Hazard Assessment: Hazardbased land use management,
We cannot stop natural disasters but we can arm ourselves with knowledge: so many lives wouldn't have to be lost if there was enough disaster preparedness. Disaster Management & Reconstruction Sector Petra
More informationIncentivising Sustainability Through Performance Awards
Government of Punjab Pakistan Sustainable Rural Water Supplies Incentivising Sustainability Through Performance Awards Housing Urban Development & Public Health Engineering Department Sequence of Presentation
More informationRapid Environmental Impact Assessment - South Asia Earthquake - Pakistan
Rapid Environmental Impact Assessment - South Asia Earthquake - Pakistan Funded under Award DFD-A-00-04-00122-00, Office of Foreign Disaster Assistance, U. S. Agency for International Development and CARE
More informationLOCAL AUTHORITY AND SUBPROJECT SELECTION CRITERIA
Additional Financing of Local Government Enhancement Sector Project (RRP SRI 42759) LOCAL AUTHORITY AND SUBPROJECT SELECTION CRITERIA A. Eligible Local Authority and Subprojects 1. Unless otherwise agreed
More informationAfghanistan Overview: Water, sanitation and hygiene
Afghanistan Overview: Water, sanitation and hygiene Summary Afghanistan aims to achieve universal access to basic drinking water supplies by 2026 by fulfilling the ambitions of the Citizen s Charter National
More informationSECTOR ASSESSMENT (SUMMARY): WATER SUPPLY AND OTHER MUNICIPAL INFRASTRUCTURE AND SERVICES
Jaffna and Kilinochchi Water Supply and Sanitation Project (RRP SRI 37378) SECTOR ASSESSMENT (SUMMARY): WATER SUPPLY AND OTHER MUNICIPAL INFRASTRUCTURE AND SERVICES A. Sector Road Map 1. Sector Performance,
More informationPakistan 2005 Earthquake
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Pakistan 2005 Earthquake Preliminary Damage and Needs Assessment Prepared By Asian Development
More informationFAO s Earthquake Recovery and Rehabilitation Programme
Food and Agriculture Organization (FAO) of the United Nations FAO s Earthquake Recovery and Rehabilitation Programme List of Contents: Growing back Better -Maize seed distribution Starting Over - beneficiary
More informationIUCN Pakistan. IUCN s Earthquake Response and Strategy for Long Term Recovery
IUCN Pakistan IUCN s Earthquake Response and Strategy for Long Term Recovery January 2006 Contents 1. Introduction and Background...2 2. IUCN s Earthquake Response and its Objectives...2 3. Environmental
More informationH umanitarian R esponse in P akistan
H umanitarian R esponse in P akistan www.pakresponse.info 140 C- Block II, PECHS, Karachi, Pakistan Tel: 021-34532804, 021-34527698, Fax: 021-34559252 Email: info@hands.org.pk,website: www.hands.org.pk
More informationInter-Agency Rapid Health Assessment. The West Aceh Picture
Inter-Agency Rapid Health Assessment The West Aceh Picture Michel Roulet SDC (Swiss Agency for Development & Cooperation) & WHO Indonesian MoH and Army (TNI) WHO, WFP, UNICEF, UNHCR AusAid, USAID IRC,
More informationSustainability of WASH services Wukro, Tigray
Sustainability of WASH services Wukro, Tigray 2016 Town audit statement Within the framework of the ONEWASH Plus Programme, sustainability checks are executed to assess WASH service levels and the conditions
More informationJapanese ODA Loan. Ex-Ante Evaluation
Japanese ODA Loan Ex-Ante Evaluation 1. Project Country: People's Republic of Bangladesh Name of the Project: Haor Flood Management and Livelihood Improvement Project Loan Agreement: June 16, 2014 Loan
More informationSECTOR ASSESSMENT (SUMMARY): URBAN DEVELOPMENT AND WATER SECTOR 1
Interim Country Partnership Strategy: Myanmar, 2012-2014 Sector Road Map SECTOR ASSESSMENT (SUMMARY): URBAN DEVELOPMENT AND WATER SECTOR 1 1. Sector Performance, Problems, and Opportunities 1. Urbanization.
More informationInitiative for Disaster Reduction through ODA
Initiative for Disaster Reduction through ODA January 18, 2005 Government of Japan Ⅰ Japan s basic position on disaster reduction The disaster caused by the major earthquake off the coast of Sumatra and
More informationUSAID FROM THE AMERICAN PEOPLE
USAID FROM THE AMERICAN PEOPLE I. Executive Summary USAID Water and Development Country Plan for South Sudan In alignment with the Global Water Strategy and the USAID Agency Plan, USAID/South Sudan is
More informationCSP Baseline Assessment
CSP Baseline Assessment The CSP should include baseline information related to sanitation and sanitation related services in the city. It is required that all information cited will refer to the source
More informationEx-ante Evaluation - 1 -
Ex-ante Evaluation 1. Name of the Project Country: India Project: Orissa Integrated Sanitation Improvement Project (Loan Agreement: 03/30/2007; Loan Amount: 19,061 million yen; Borrower: The President
More informationWater and Sanitation Situation in Pakistan
Water and Sanitation Situation in Pakistan Mr. Abid Hussain Shah Hussainy, Senior Specialist - Strategic Management, Urban Sector Planning & Management Service Unit (Pvt.) Ltd. (the Urban Unit) Government
More informationSan Paolo Albanese, Italy
San Paolo Albanese, Italy Local progress report on the implementation of the 10 Essentials for Making Cities Resilient (2013-2014) Mayor: Anna Santamaria Name of focal point: Mose' Antonio Troiano Organization:
More informationFIJI NATIONAL DISASTER MANAGEMENT OFFICE CSO DRM NADI WORKSHOP 13 TH NOVEMBER,2013
FIJI NATIONAL DISASTER MANAGEMENT OFFICE CSO DRM NADI WORKSHOP 13 TH NOVEMBER,2013 FIJI Once known as the Cannibal Isles, because of its ferocious natives. Fiji comprises of about 322 islands and only
More informationInvesting in Sustainable cities. Water Management in urban areas: Yangon s case
Investing in Sustainable cities Water Management in urban areas: Yangon s case I. Water management: general perspective The main goals of urban water and waste water management are : provide clean water
More informationProvincial Disaster Risk Management Planning Guidelines
Provincial Disaster Risk Management Planning GUIDELINES JULY 2007 Sindh AJK NWFP Balochistan Northern Area Punjab National Disaster Management Authority 1. Introduction The Provincial Disaster Management
More informationCOMMUNITY PARTICIPATION IN DEVELOPMENT, OPERATION AND MAINTENANCE OF WATER SUPPLY AND SEWERAGE SERVICES
World Water Day April-2011 73 COMMUNITY PARTICIPATION IN DEVELOPMENT, OPERATION AND MAINTENANCE OF WATER SUPPLY AND SEWERAGE SERVICES By Dr. Javed Iqbal and Abdul Qadeer Khan Abstract Access to safe drinking
More informationVaglio di Basilicata, Italy
Vaglio di Basilicata, Italy Local progress report on the implementation of the Hyogo Framework for Action (2013-2014) Mayor: Giancarlo Tamburrino Name of focal point: Giancarlo Tamburrino Organization:
More informationEx-ante Evaluation. Indonesia have one of the important strategic programs of increasing stable water supply and
Ex-ante Evaluation 1. Name of the Project Country: The Republic of Indonesia Project: Integrated Water Resources and Flood Management Project for Semarang (Loan Agreement: March 29, 2006; Loan Amount:
More informationRuoti, Italy. Local progress report on the implementation of the Hyogo Framework for Action ( )
Ruoti, Italy Local progress report on the implementation of the Hyogo Framework for Action (2013-2014) Mayor: Angelo Salinardi Name of focal point: Rosario Famularo Organization: Municipality of Ruoti
More informationMonitoring and Evaluating Social Protection Programs Efforts to Respond to Natural Disasters and Climate Change-Related Shocks
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Why Is It Important to Monitor and Evaluate Disaster- and Climate Shock-sensitive Components
More informationUtilizing Integrated Regional Development Planning (IDRP) in Supporting Resilience
Utilizing Integrated Regional Development Planning (IDRP) in Supporting Resilience High-Level Symposium on Sustainable Cities: Connecting People, Environment and Technology Co-convened by the United Nations
More informationLAW OF THE REPUBLIC OF INDONESIA NUMBER 7 OF 2004 REGARDING WATER RESOURCES
LAW OF NUMBER 7 OF 2004 REGARDING WATER RESOURCES BY THE GRACE OF THE ALMIGHTY GOD, THE PRESIDENT OF Considering : a. that water resources is the gift of the Almighty God which gives benefits for the realization
More informationProgress on Drinking Water, Sanitation and Hygiene Update and SDG Baselines
Progress on Drinking Water, Sanitation and Hygiene 217 Update and SDG Baselines 1. Highlights PROGRESS ON DRINKING WATER, SANITATION AND HYGIENE HIGHLIGHTS 2 The WHO/UNICEF Joint Monitoring Programme for
More informationUSAID FROM THE AMERICAN PEOPLE
USAID FROM THE AMERICAN PEOPLE I. Executive Summary: USAID Water and Development Country Plan for Haiti Despite the considerable increase in investments in water, sanitation, and hygiene (WASH) since 2010,
More informationRural Water Supply. This assessment is based on the following consultations, reports and field visits.
Annex 6 Rural Water Supply Consultations and field Visits This assessment is based on the following consultations, reports and field visits. (a) Consultations: (i) a sectoral briefing on Rural Water Supply
More informationGuidelines for the Environmental and Social Screening of Activities Proposed under the Simplified Approval Process
Guidelines for the Environmental and Social Screening of Activities Proposed under the Simplified Approval Process 10 January 2018 Introduction 1. Environmental and social screening is an essential and
More informationRuoti, Italy. Local progress report on the implementation of the 10 Essentials for Making Cities Resilient ( )
Ruoti, Italy Local progress report on the implementation of the 10 Essentials for Making Cities Resilient (2013-2014) Mayor: Angelo Salinardi Name of focal point: Rosario Famularo Organization: Municipality
More informationConstruction of first wastewater treatment plant in Kosovo: an EU pilot project
Water Utility Journal 14: 41-46, 2016. 2016 E.W. Publications Construction of first wastewater treatment plant in Kosovo: an EU pilot project B.Sh. Kajtazi European Union Office in Kosovo, Kosovo Street
More informationSECTOR ASSESSMENT (SUMMARY): WATER SUPPLY AND OTHER MUNICIPAL INFRASTRUCTURE AND SERVICES (WATER AND WASTEWATER)
Greater Colombo Water and Wastewater Management Improvement Investment Program (RRP SRI 45148) SECTOR ASSESSMENT (SUMMARY): WATER SUPPLY AND OTHER MUNICIPAL INFRASTRUCTURE AND SERVICES (WATER AND WASTEWATER)
More informationAquatic Ecosystem Restoration:
Aquatic Ecosystem Restoration: Lessons Learned from ADB 13 September 2016 Qingfeng Zhang Director, Environment and Natural Resources Division, East Asia Department Concurrently Chair, Water Sector Group
More informationProgramming Guide for Strategy Papers
EUROPEAN COMMISSION Programming Guide for Strategy Papers Programming Fiche Urban development Date: November 2008 Programming guidelines The programming exercise will serve to assess whether and in what
More informationGender-Inclusive Approaches. in Urban Development
Tip Sheet Gender-Inclusive Approaches in Urban Development Urban Development Planning and Design Gender-responsive urban planning can contribute to ways through the provision of (i) accessible and affordable
More informationQuetta, Pakistan. Local progress report on the implementation of the 10 Essentials for Making Cities Resilient (First Cycle)
Quetta, Pakistan Local progress report on the implementation of the 10 Essentials for Making Cities Resilient (First Cycle) Name of focal point: Habib Mughal Organization: UN-HABITAT - Pakistan Title/Position:
More informationWATER SANITATION, HEALTH AND HYGIENE PROGRAM LOCATION: IBADAN, S.W NIGERIA
WATER SANITATION, HEALTH AND HYGIENE PROGRAM LOCATION: IBADAN, S.W NIGERIA Abstract :Current outbreaks of cholera and other water related diseases in some parts of Nigeria has again bring to the forefront
More informationVI. WATER SUPPLY AND SANITATION:
VI. WATER SUPPLY AND SANITATION: PROTECTING SOURCES AND SAFEGUARDING SUPPLIES 1. Water Supply and Sanitation in the Context of Water Resource Management 146. Water is central to many critical environmental
More informationWater Quality Status and Challenges. in the SDG Era
Conference on Green Growth Solutions April 26, 2017 Dhaka, Bangladesh Water Quality Status and Challenges in Bangladesh in the SDG Era Tanvir Ahmed, PhD Department of Civil Engineering, BUET Dhaka, Bangladesh
More informationEnvironmental Protection
Environmental Protection This page intentionally left blank. T a b l e o f C o n t e n t s ENVIRONMENTAL PROTECTION... 1 Hazardous Material Response...1 Water and Wastewater...1 Purpose, Goals, and Objectives...1
More informationBrief description, overall objective and project objectives with indicators
India: Rural water supply, Rajasthan Ex post evaluation report OECD sector BMZ project ID 1993 65 420 Project executing agency Consultant Year of ex post evaluation 1402000 / Water supply, sanitation und
More information3. PUBLIC FACILITIES ELEMENT
3. PUBLIC FACILITIES ELEMENT A. Purpose This Element is intended to identify essential public facilities, buildings, and services and to describe policies and programs that will ensure that the existing
More informationBERGRIVIER municipality
BERGRIVIER municipality ANNUAL WSDP PERFORMANCE AND WATER SERVICES AUDIT REPORT FOR 2015/2016 EXECUTIVE SUMMARY Bergrivier Municipality is required in terms of Section 18 of the Water Services Act, 1997
More informationCAWSA. Commercialization of Afghanistan Water and Sanitation Activity
Commercialization of Afghanistan Water and Sanitation Activity CAWSA Corporatizing Municipal Water Supply Departments as Strategic Business Units (SBUs) Presenter: Rohullah Aminzai Chief of Party, ICMA/CAWSA
More informationEx post evaluation India
Ex post evaluation India Sector: Provision of basic needs drinking water (CRS code 14031) Project Rural water supply, Maharashtra BMZ no. 1999 65 815* (investition) 2000 70 037 (complementary measure)
More informationClimate change impacts on WASH and slum community based adaptation measures
37th WEDC International Conference, Hanoi, Vietnam, 2014 SUSTAINABLE WATER AND SANITATION SERVICES FOR ALL IN A FAST CHANGING WORLD Climate change impacts on WASH and slum community based adaptation measures
More informationEx-ante Evaluation - 1 -
Ex-ante Evaluation 1. Name of the Project Country: The Socialist Republic of Vietnam Project: Hue City Water Environment Improvement Project (Loan Agreement: March 31, 2008; Loan Amount: 20,883 million
More informationViggiano, Italy. Local progress report on the implementation of the 10 Essentials for Making Cities Resilient ( )
Viggiano, Italy Local progress report on the implementation of the 10 Essentials for Making Cities Resilient (2013-2014) Mayor: Amedeo Cicala Name of focal point: Amedeo Cicala Organization: Municipality
More informationPro-Poor Sanitation and Water Initiative in Kathmandu Valley
Pro-Poor Sanitation and Water Initiative in Kathmandu Valley Roshan Raj Shrestha, Andre Dzikus, Anjali Manandhar Sherpa and Rajesh Manandhar Water for Asian Cities Programme UN HABITAT Nepal Water for
More information4. WASH and Emergency Shelter
4. WASH and Emergency Shelter Proposed Responsibilities and Accountabilities Matrix This matrix defines the proposed responsibilities and accountabilities of the Emergency Shelter and WASH Clusters at
More informationTerms of Reference. Innovative Models of Livelihood Interventions in Diyala and KRI
Terms of Reference Household Economy Analysis (HEA) and Baseline Assessment for Building Resilience through Innovative Models of Livelihoods and Market Interventions in Iraq Organization Oxfam GB Country
More informationRepublic of Fiji: Urban Development Planning and Institutional Capacity Building
Technical Assistance Report Project Number: 47237-001 Capacity Development Technical Assistance (CDTA) December 2013 Republic of Fiji: Urban Development Planning and Institutional Capacity Building (Cofinanced
More informationECONOMIC ANALYSIS. A. Introduction
Shanxi Urban Rural Water Source Protection and Environmental Demonstration Project (RRP PRC 48274) ECONOMIC ANALYSIS A. Introduction 1. The economic analysis was conducted to assess the economic viability
More informationPROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE. Afghanistan Urban Water Sector Project
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Name PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Afghanistan Urban Water
More informationDevelopment and application of a methodology for Participatory Rapid Sanitation System Risk Assessment (PRSSRA) and its application in Maputo
14 October 2015 Development and application of a methodology for Participatory Rapid Sanitation System Risk Assessment (PRSSRA) and its application in Maputo Moises Mabote Presentation Outline About Splash
More informationSanitation law in India: Towards a comprehensive conceptual framework
Sanitation law in India: Towards a comprehensive conceptual framework Philippe Cullet Professor of Environmental Law, SOAS & Senior Visiting Fellow, Centre for Policy Research, Delhi pcullet@soas.ac.uk
More informationA 25 Year Strategic Plan
A 25 Year Strategic Plan The challenges which face the provision of water services are identified as: Meeting Customer Needs at an Affordable Cost Providing Safe Water Supplies Managing Wastewater Protecting
More information"DRAFT" FINAL REPORT EVALUATION OF THE GOP-UNICEF WATER SUPPLY AND ENVIRONMENTAL SANITATION PROGRAMME Submitted to: UNICEF, Islamabad
FINAL REPORT "DRAFT" EVALUATION OF THE GOP-UNICEF WATER SUPPLY AND ENVIRONMENTAL SANITATION PROGRAMME 1992-1998 Submitted to: UNICEF, Islamabad November, 1999 EDC ENTERPRISE FINAL REPORT "DRAFT 1 EVALUATION
More informationRAPID ASSESSMENT REPORT
RAPID ASSESSMENT REPORT Indonesia: West Sumatra Earthquake Response October 2009 CHF International s integrated emergency response includes: - Shelter - Livelihoods - Risk reduction - Water, sanitation
More informationA Summary Report on Muzaffarabad Earthquake, Pakistan
A Summary Report on Muzaffarabad Earthquake, Pakistan by Dr. A. Naeem, Dr. Qaisar Ali, Muhammad Javed, Zakir Hussain, Amjad Naseer, Syed Muhammad Ali, Irshad Ahmed, and Muhammad Ashraf Earthquake Engineering
More informationSummary - Project/Program Concept Note for the Use of Additional PPCR Resources. XPCRTJ040A SPCR endorsement date: 10 November 2010
PILOT PROGRAM FOR CLIMATE RESILIENCE Summary - Project/Program Concept Note for the Use of Additional PPCR Resources 1. Country/Region: Tajikistan 2. CIF Project ID#: XPCRTJ040A ---- -- 3. SPCR endorsement
More informationEx-ante Project Evaluation
Ex-ante Project Evaluation 1. Name of project Country: Socialist Republic of Vietnam Name of project: Hai Phong City Environmental Improvement Project (II) L/A signing date: March 31, 2009 Loan amount:
More informationHydra, Tunisia. Local progress report on the implementation of the 10 Essentials for Making Cities Resilient ( )
Hydra, Tunisia Local progress report on the implementation of the 10 Essentials for Making Cities Resilient (2013-2014) Name of focal point: Fathi M Organization: La ville de hydra Title/Position: Employee
More informationNational Water Policy for Palestine
Palestinian National Authority Palestinian Water Authority National Water Policy for Palestine Final Draft Water Policy 2013-2032 1 1. Background 1.1 National Water Policy The purpose of this document
More informationGender and social inclusive WASH planning and policy in Nepal
38th WEDC International Conference, Loughborough University, UK, 2015 WATER, SANITATION AND HYGIENE SERVICES BEYOND 2015: IMPROVING ACCESS AND SUSTAINABILITY Gender and social inclusive WASH planning and
More informationByblos, Lebanon. Local progress report on the implementation of the Hyogo Framework for Action (First Cycle)
Byblos, Lebanon Local progress report on the implementation of the Hyogo Framework for Action (First Cycle) Name of focal point: Organization: Title/Position: Tony Sfeir Byblos Municipality Municipal member
More information1. Programme, Policy and Strategy
1. Programme, Policy and Strategy 1 1.1 Programme Goal The overall goal in Urban Management Sector is to invest in a balanced urban development programme across the country to create cities that are economically
More information14. Sewerage / Urban Drainage Sub-sector. Guideline:
Sub-sector Guideline: (1) Sewerage (Adaptation Project) (2) Sewerage (BAU Development with Adaptation Options) (3) Urban Drainage (Adaptation Project) (4) Urban Drainage (BAU Development with Adaptation
More informationSyrian Arab Republic. National progress report on the implementation of the Hyogo Framework for Action. Name of focal point : Engineer Erfan Ali
Syrian Arab Republic National progress report on the implementation of the Hyogo Framework for Action Name of focal point : Engineer Erfan Ali Organization : Ministry of Local Administration and Environment
More informationValue for Money analysis of UNICEF Mozambique s One Million Initiative programme ( )
Value for Money analysis of UNICEF Mozambique s One Million Initiative programme (2007-2013) Marie-Alix Prat and Fabien Rabouille, 7 th July 2015 This note presents the VFM indicators calculated for UNICEF
More informationSolid waste management in Jijiga, Somali Region
Solid waste management in Jijiga, Somali Region Baseline survey factsheet In January 2016, a baseline survey for the ONE WASH Plus programme was undertaken in Jijiga, Somali Region. This factsheet presents
More informationSan Martino d'agri, Italy
San Martino d'agri, Italy Local progress report on the implementation of the Hyogo Framework for Action (2013-2014) Name of focal point: Filomena Russo Organization: Municipality of San Martino D'Agri
More informationNATIONAL SANITATION POLICY
NATIONAL SANITATION POLICY (Revised Draft, 06 March 2006) 1. PREAMBLE The National Sanitation Policy, framed by the government of Pakistan, is intended to guide and support the provincial and district
More information2. Irrigation and Drainage Sub-sector. Guideline:
Sub-sector Guideline: (1) Irrigation (Adaptation Project) (2) Irrigation (BAU Development with Adaptation Options) (3) Drainage (Adaptation Project) (4) Drainage (BAU Development with Adaptation Options)
More informationKirtipur Municipality, Nepal
Kirtipur Municipality, Nepal Local progress report on the implementation of the Hyogo Framework for Action (2013-2014) Name of focal point: - - Organization: - Title/Position: - E-mail address: info@kirtipur.gov.np
More informationMissouri River Flood Response Activity
For the purpose of compliance with the National Environmental Policy Act (NEPA), the categorical exclusions identified in this table are potentially applicable to flood recovery efforts. The following
More informationSECTOR ASSESSMENT (SUMMARY): 1 WATER AND OTHER URBAN INFRASTRUCTURE AND SERVICES
Country Partnership Strategy: Fiji, 2014 2018 SECTOR ASSESSMENT (SUMMARY): 1 WATER AND OTHER URBAN INFRASTRUCTURE AND SERVICES 1. Sector Performance, Problems, and Opportunities 1. Fiji s urban centers
More informationCARE s Emergency Response to the Flood Disaster in Bolivia
CARE s Emergency Response to the Flood Disaster in Bolivia Introduction Andrea, who lost her home during the ongoing floods in Bolivia, lives in a shelter in San Julian. Like many men in the community,
More informationAssessment Report. WASH Situation in Ubari Municipality, Southern Libya July 2016
Assessment Report WASH Situation in Ubari Municipality, Southern Libya July 216 Introduction During June and July 216 the Danish Refugee Council conducted a water, sanitation and hygiene (WASH) assessment
More informationNATIONAL STRATEGIES. 5 th Regional Workshop, Southeast and Eastern Asia Safe and Productive use of Wastewater in Agriculture,
NATIONAL STRATEGIES 5 th Regional Workshop, Southeast and Eastern Asia Safe and Productive use of Wastewater in Agriculture, 5-7 March, 2013, BALI, Indonesia Under the Auspices of UN-Water Partners: UNW-DPC,
More informationINTRODUCTION IMPROVING SANITATION AND WATER QUALITY IN LOKO TOWN
IMPROVING SANITATION AND WATER QUALITY IN LOKO TOWN INTRODUCTION The Loko Town area Figure: 001 Struggle for Pipe borne water in Loko Town This document is about raising awareness for the proper use of
More information