1 HALF YEARLY PROGRESS REPORT ON IMPLEMENTATION OF ENVIRONMENTAL CLEARANCE CONDITION BY MoEF (PERIOD FROM OCTOBER 13 TO MARCH 14) HINGULA OPEN CAST PROJECT HINGULA AREA MAHANADI COALFIELDS LIMITED

2 SIX MONTHLY PROGRESS REPORT ON THE IMPLEMENTATION OF ENVIRONMENTAL CLEARANCE CONDITIONS BY MoEF (FOR THE PERIOD OCTOBER 13 TO MARCH 14) Name of the Project: - Hingula Open Cast Project. No. & Date of MOEF clearance letter:-j / 39/96-IA-II, Dated:-January 06, J / 136/2007-IA-II (M), Dated:-October 31, A. SPECIFIC CONDITION: CN DETAILS OF SPECIFIC CONDITIONS No. 1 Tops soil, if any should be stacked with proper slope at earmarked site, should not be kept active, and shall be used for reclamation and development of green belt. 2 OB shall be simultaneously backfilled in the de-coaled area, No new OB dump shall be create for the OB to be generated in the balance life of mine. 3 The embankment constructed along the Singhara Jhor shall be stabilized by vegetation. 4 Monitoring and management of existing reclaimed dump sites should continue until the vegetation becomes self-sustaining. 5 Catch drains and siltation ponds of appropriate size should be constructed to arrest silt and sediment flows from soil and OB dumps. The water so collected should be utilized for watering the mine area, roads, greenbelt dev. ect. The drain should be regularly de-silted and maintained properly. Garland drains and sump capacity should be designed keeping 50% safety margin. Over and above the rainfall Sump capacity should also provided adequate retention period to allow proper settling of silt materials. STATUS OF IMPLEMENTATION OF THE CONDITION Top soil is being stacked separately as per guideline of MoEF and will be used only for reclamation & plantation. No new ext. dump is being created, all OB generated are being backfilled.. Biological reclamation of the dumps is executed through Orissa Forest Development Corporation. Constant monitoring & management of these dumps are being ensured till it become self sustaining. Catch drains and siltation ponds have been provided of appropriate size as per requirement. All the collected water is led into the mine sump, which acts as mine water reservoir. Water for all industrial uses such as watering in the mines area, for dust suppression in road, watering in plantation etc. is met from this reservoir.

3 6 Dimension of the retaining wall at the toe of the dumps and OB benches within the mine to cheek run-off and siltation should be based on the rainfall data. 7 Crushers at the CHP should be operated with high efficiency bag filters. Water sprinkling system should be provided to check fugitive emissions from crushing operations, conveyor system, haulage roads, transfer points, etc. And fixed type sprinklers are provided all along the conveyors to arrest fugitive emissions. 8 Drills should be wet operated. Roads shall be metal topped and mechanical sweepers shall be regularly deployed to clear the dust off the main approach and mineral transportation roads. Water sprinkling (fixed and mist type, mobile) shall be regularly done along the main haul roads. 9. Mining operations for the expansion project shall not involve drilling, blasting and crushing operations as a result of use of surface miner. 10 The total area brought under afforestation shall be not less than ha. which includes backfilled area (201.68ha), OB dumps (17.34ha), along ML boundary (7.43ha), infrastructure and along roads (14km). Safety zone and vacant area (173.75), area around infrastructure (30.58 ha) and area in township outside the lease (4.40 ha) by planting native species in consultation with the local DEO/Agriculture Department. The density of the trees should be around 2500 plants per ha. 11 A progressive Mine Closure Plan shall be implemented and OB generated shall be simultaneously backfilled so as to backfill and reclaim ha of de-coaled area and the balance ha being converted into a water reservoir shall be protected by peripheral fencing and the upper benches of the reservoir shall be gently sloped and stabilized with plantation. 12 Regular monitoring of ground water level & qualities should be carried out by establishing a network of existing wells and construction of new peizometers, The The retaining wall at the toe of the dump has been construction taking into consideration of rainfall data. CHP is operated with 130 nos. of mister type sprinklers and along with fixed type sprinklers provided all along the conveyor and in CHP premises to arrest the fugitive emission. As around 90% of coal is produced through surface miner. Hence the CHP is not used for crushing. Wet drilling is being done, permanent haul roads/coal transportation roads are already completed with blacktopping 4 nos 28KL mobile water sprinkler and 5 nos 8KL are engaged departmentally and contractually for water spraying in three shifts a day respectively in mines area and coal transportation road. Use of surface miner is always preferred as practicably as possible& utmost care is being taken to do 100% coal production through surface miner. In the last year ( ) more than 90% of coal production done though surface miner. Till date total area planted is Ha. and total nos. of plantation is 68,392 nos. As per proposed expansion program the existing backfilled area will be re-handled accordingly as per new schedule of backfilling the plantation will be done. For the year total plantation proposed is 9.33 Ha out of which 1.33 Ha in external dump and 4 ha in backfilled area and 4ha along the embankment of diverted nalla. The progressive mine closure plan is being implemented. The total OB generated is being simultaneously backfilled.final plan approved by ministry. Ground water level monitoring is carried out in January, April, August & November.

4 monitoring for quality should be done four times a year in pre-monsoon (May), monsoon (August), post monsoon (November) and winter (January) season and for quantity in May. Data thus collected should be submitted to the Ministry of Environment & Forests and to the Central Pollution Control Board quarterly with in one month of monitoring. 13. The company shall put up artificial groundwater recharge measures for augmentation of ground water resources. The project authority should meet water requirement of near by village(s) in case the village wells go dry due to dewatering of mine. 14. Sewage treatment plant should be installed in the existing colony.etp should also be provided for workshop and CHP wastewater. Physically. Ground water quality monitoring is done on monthly basis and report is enclosed herewith for reference. The peripheral village ponds are cleaned and deepened before monsoon. Mine sumps, where the entire mine water is collected will also accelerate the recharge of ground water. Water supply to the peripheral villages is made during summer season as per demand and requirement in consultation with the district administrations. STP is not available as no separate colony is being provided for Hingula OCP. ETP M 3 /per day capacity is existing, which is adequate as per required standard, after treatment the water is being reused for vehicle working. 15. Besides carrying out regular periodic health check up of the workers, 10% of the workers identified from work force engaged in active mining operations shall be subjected to health check up for occupational diseases and hearing impairment, if any, through an agency such as NIOH, Ahmedabad within a period of one year and the result reported to the Ministry and to DGMS. 16. For monitoring land use pattern and for post mining land use, a time series of land use Maps, based on satellite imagery (on a scale of 1:5000) of the core zone and buffer zone from the start of the project until and of mine life shall be prepared once in 3 years (for any one particular season which is consistent in the time series), and the report submitted to MoEF and Regional office at Bhubaneswar. Periodical Medical examination of every worker is done at 5 years interval. Occupational health cell is established. Well equipped dispensary with staff is also established. Workers showing abnormal symptoms are identified and subjected to test and treatment accordingly. Satellite images are being taken regularly by M/s CMPDIL. The latest satellite imagery has been submitted to the Regional office vide letter no-4313, dt

5 17. A detailed final Mine closure plan along with details of corpus fund should be submitted to Ministry of Environment and Forest within six months of grant of this letter for approval. 18. R&R for the 663 PAF s from the villages Gopalprasad, Kusumpal, Anantagadia, Malibandha and Nuamuhin shall be prepared and implementation within a specific time frame. R&R norms shall be not less that of the national R&R policy.. The mine is again going for expansion from 12MTPA to 15MTPA with extension of mine boundary, hence the new mine closure plan including existing area, The details will be submitted to MOEF. As the mined area of existing mine will be again active in the new expansion project. 1. Employment given so far up to 31/03/14:- 777 persons (Part under 15MTY expansion). 2. Cash Compensation given in lieu of empl:- Nil. 3. Compensation package offered to family as per Odisha State Compensation Package guidelines. B. GENERAL CONDITION: Sl. DETAILS OF No. GENERAL CONDITION. 1. No change in mining technology and scope of working should be made without prior approval of the Ministry of Environment and Forest. 2. No change in the calendar plan including excavation, quantum of mineral coal and waste should be made. 3. Four ambient air quality monitoring stations should be established in the core zone as well as in the buffer zone for SPM,RPM,SO 2 and NO x monitoring location of the station should be decided based on ecologically target in consultation with the State Pollution Control Board. 4. Data on ambient air quality (SPM, RPM, SO 2 and NO x) should be regularly submitted to the Ministry including its Regional Office at Bhubaneswar and to the State Pollution Control Board and the Central Pollution Control Board once in six month. 5. Fugitive dust emissions from all the sources should be controlled regularly monitored and data recorded properly. Water spraying arrangement on haul roads, wagon loading, dumps trucks (Loading and unloading) points should be STATUS OF IMPLEMENTATION OF THE CONDITION. Because of land acquisition problem there is some change in calendar plan. Ambient air quality monitoring station have been established in consultation with OPCB, namely: Project Office. Malibandha Village. Near Gopalprasad Village. Near Bhalugadia Village. The details monitoring report enclosed herewith for reference. Ambient air quality monitoring being carried out in the above mentioned 4(four) station on fortnightly interval. Water spraying arrangement has been provided with the following arrangement;

6 provided and properly maintained. 6. Adequate measures should be taken for control of noise levels below 85 dba in the work environment. Workers engaged in blasting and drilling operations, operations of HEMM, etc should be provided with ear plugs/muffs. Mobile tanker -28KL(4nos.) Mobile Tanker - 8 KL (5 Nos.) The fugitive dust emission report is enclosed here with. Noise is found to be within limits. The details noise monitoring report is enclosed herewith for reference. The workers engaged in blasting and drilling operations of HEMM have been provided with ear muffs. 7. Industrial wastewater (workshop and wastewater from the mine) should be properly collected, treated so as to conform to the standards prescribed under GSR 422(F) dated 19 th may 1993 and 31 st December 1993 or as amended from time to time before discharge. Oil and grease trap should be installed before discharge of workshop effluents. 8. Vehicular emissions should be kept under control and regularly monitored. Vehicles used for transporting the mineral should be covered with tarpaulins and optimally loaded. Effluents treatment plant has been provided for treatment of workshop effluent & the effluent is conforming to the prescribed standard. The details report is enclosed herewith for reference. Routine monitoring of vehicles are done. Periodical maintenance done as per schedule in order to control vehicular emission. Overloading of trucks is avoided. Trucks traveling outside lease hold area/ mining area covered with tarpaulin. 9. Environmental laboratory should be established with adequate number and type of pollution monitoring and analysis equipment in consultation with the State pollution control Board. 10. Personnel working in dusty areas should wear protective reparatory devices and they should also be provided with adequate training and information on safety and health aspects. Occupation health surveillance program of the workers should be undertaken periodically to observe any constructions due to exposure to dust and to take corrective measures, if needed. 11. A separate environment al management cell with suitable qualified personnel should be set up under the control of a senior executive, who will report directly to the head of the company. 12. A funds earmarked environmental protection measures should be kept in The environmental laboratory is established centrally in the Talcher coal field and M/S CMPDIL is entrusted with the monitoring job and presently they have started the air sampling analysis at the Talcher laboratory. Protective respiratory devices have been provided to workers. Occupational health cell has been created. PME of every worker is done in 5 years interval. Mine also has a well equipped dispensary with all facilities. Doctors if identify any potential cases then necessary corrective measures are taken accordingly. A separate environment management cell headed by DT(P&P),MCL has been established in MCL and suitable qualified senior executives at all level are being posted to look after the envt. deptt. Fund earmarked for environment protection measures are kept in

7 separate account and should not be diverted for the other purpose year wise expenditure should be reported to the Ministry and Regional Officer at BBSR. 13. A copy of Environmental clearance letter shall be marked to concerned Panchayat/representation has been received while processing the proposal. 14. State Pollution Control Board should display a copy of the clearance letter at the Regional Office, District industry center and collector s office/tehsilder s office for 30 days. 15. The Project authorities should advertise at least in two local newspapers widely circulated around the project, once of which shall be in the vernacular language of the locality concerned within seven days of the clearance letter informing that the projects has been accorded environmental clearance and a copy of the clearance letter is available with the State Pollution Control Board and may also be seen at the website of the Ministry of Environment & Forest at separate account. The details of expenditure submitted to SPCB in envt statement yearly.

8

Overburden dumps are stacked separately as per the guidelines and the same will be used for backfilling in mined out area.

Overburden dumps are stacked separately as per the guidelines and the same will be used for backfilling in mined out area. ENVIRONMENT CLEARANCE COMPLIANCE STATUS ENVIRONMENT CLEARANCE No. J-11015/406/2006-IA.II(M) dt. 13/04/2007 DHANGARWADI MINES Sr. CONDITIONS COMPLIANCE No. A) Specific Conditions :- i) Top soil to be stacked

More information

Project Code: Clearance Letter No. : MoEF vide letter No: - J-11015/423/2005-IA-II (M) Dated 18 th May 2006

Project Code: Clearance Letter No. : MoEF vide letter No: - J-11015/423/2005-IA-II (M) Dated 18 th May 2006 Name of the Project: North North Naubasta Limestone Mine (ML 2) (A unit of M/s Jaiprakash Associates Limited) of Mining Capacity 1.85 MTPA at villages Naubasta, Sumeda, Atrauli and Garhwa Tehsil Huzur

More information

S.N. Condition in Environmental Clearance Compliance Status upto June (A) Specific Conditions (i)

S.N. Condition in Environmental Clearance Compliance Status upto June (A) Specific Conditions (i) Six Monthly Status of Compliance for Environmental Clearance No J-11015/108/2005- IA.II (M) dated 28.07.2006 for 2.2 MTPA Coal Mining from Utkal B-2 Coal Block by M/s. Monnet Ispat & Energy Limited S.N.

More information

Mining is being carried out keeping safe distance from seasonal nallah/ stream.

Mining is being carried out keeping safe distance from seasonal nallah/ stream. Name of the Project : Gurha East Lignite Mine Project (1MTPA) of M/s. V.S. Lignite Power Private Ltd. Located at village- Gurha, Kolayat, Bikaner, Rajasthan. Project Code : Raj-456/753/09 Clearance Letter

More information

Sl. No. Conditions Compliance

Sl. No. Conditions Compliance Annexure-I CONDITIONS TO BE COMPLIED AS PER ENVIRONMENTAL CLEARANCE APPROVAL KATHAUTIA OPEN CAST COAL MINE, DALTONGANJ EC. No. J-11015 /61//2006-IA.II(M) dated 19 th June, 2006 A. SPECIFIC CONDITIONS Sl.

More information

Project Code: Clearance Letter No. : MoEF vide letter No:- J-11016/202/2003-IA-II(M) Dated 6 th Jan 2005

Project Code: Clearance Letter No. : MoEF vide letter No:- J-11016/202/2003-IA-II(M) Dated 6 th Jan 2005 Name of the Project: Naubasta Limestone Mine ( A Unit of M/s Jaiprakash Associates Limited ) for Expansion of Mining Capacity from 3.3 MTPA to 4.0 MTPA at villages Atrauli, Gadhwa, Kachoor, Naubasta, Kauadhan,

More information

J.K. Cement WORKS, NIMBAHERA (RAJ)

J.K. Cement WORKS, NIMBAHERA (RAJ) A. SPECIFIC CONDITIONS : J.K. Cement WORKS, NIMBAHERA (RAJ) Compliance report of Environment Clearance for Nimbahera - Ahirpura Lime Stone Mine (For the Period from April 2013 to September 2013) Reference

More information

Scanned by CamScanner

Scanned by CamScanner Scanned by CamScanner Six Monthly COMPLIANCE REPORT OF ENVIRONMENTAL CLEARANCE CONDITIONS (Grant Order no. J-11015/236/2006-IA (M) dated 11.01.2007 to prior allottee, M/s Electrosteel Castings Limited

More information

Period of Compliance Report : April, 2017 to September, 2017

Period of Compliance Report : April, 2017 to September, 2017 Name of the Project Project Code Clearance Letter No. with date : OSTAPAL CHROMITE MINES, M/S. FACOR LTD. : Mining (Non-Coal) : No. J-11015/183/2007-IA-II (M) dt.13-05-09 Period of Compliance Report :

More information

Deccan Cements Limited, Bhavanipuram Lime stone Mine -2, Mahankaligudam Palakeedu, Suryapet(Dist). Telangana MoEF No: J-11015/497/2007-IA II

Deccan Cements Limited, Bhavanipuram Lime stone Mine -2, Mahankaligudam Palakeedu, Suryapet(Dist). Telangana MoEF No: J-11015/497/2007-IA II Status of Environmental Clearances received from MOEF vide MoEF No.J- 11015/497/2007-IA II(M) dated 18.10.2007-Bhavanipuram Limestone Mine 2(73.93.11 Ha), as on March 2017 1. Compliance reports are enclosed

More information

HALF YEARLY PROGRESS REPORT ON IMPLEMENTATION OF ENVIRONMENTAL CLEARANCE CONDITION. BY MoEF (PERIOD FROM APRIL 15 TO SEPTEMBER 15)

HALF YEARLY PROGRESS REPORT ON IMPLEMENTATION OF ENVIRONMENTAL CLEARANCE CONDITION. BY MoEF (PERIOD FROM APRIL 15 TO SEPTEMBER 15) HALF YEARLY PROGRESS REPORT ON IMPLEMENTATION OF ENVIRONMENTAL CLEARANCE CONDITION BY MoEF (PERIOD FROM APRIL 15 TO SEPTEMBER 15) HINGULA OPEN CAST PROJECT HINGULA AREA MAHANADI COALFIELDS LIMITED SIX

More information

NOC GRANTED FOR THE EXPANSION OF KASHLOG LIMESTONE MINES OF AMBUJA CEMENTS TIMITED

NOC GRANTED FOR THE EXPANSION OF KASHLOG LIMESTONE MINES OF AMBUJA CEMENTS TIMITED Sr. STIPULATION ACTION No. 2A. Specific Conditions (i) (ii) All the conditions stipulated by the State Pollution Control Board in their Consent should be effectively implemented. The project proponent

More information

1 Name of the Project Gonua Iron & Mn. Mine of Sri Pawan Kumar Ahluwalia

1 Name of the Project Gonua Iron & Mn. Mine of Sri Pawan Kumar Ahluwalia HALF YEARLY PROGRESSIVE CLEARANCE ACCORDED BY THE MINISTRY OF ENVIRONMENT & FOREST, GOVT. OF INDIA, TO THE PROJECT EXPANSION OF GANUA IRON & MN. MINE OF SHRI PAWAN KUMAR AHLUWALIA (FROM 0.140 MTPA TO 0.36

More information

A. SPECIFIC CONDITIONS. No. Conditions Status of Compliance. Noted and Agreed

A. SPECIFIC CONDITIONS. No. Conditions Status of Compliance. Noted and Agreed Status of compliance as on 1 st March, 2015 (Period :, 2014 March 2015) to the conditions stipulated in Environmental clearance granted by MoEF vide letter No:- J- 11015/42/2005-IA-II(M) Dated 18 th May

More information

Deccan Cements Limited, Bhavanipuram Lime stone Mine -2, Mahankaligudam Palakeedu, Suryapet(Dist). Telangana MoEF No: J-11015/497/2007-IA II

Deccan Cements Limited, Bhavanipuram Lime stone Mine -2, Mahankaligudam Palakeedu, Suryapet(Dist). Telangana MoEF No: J-11015/497/2007-IA II Status of Environmental Clearances received from MOEF vide MoEF No.J- 11015/497/2007-IA II(M) dated 18.10.2007-Bhavanipuram Limestone Mine 2 (73.93.11 Ha), as on September 2018 1. Compliance reports are

More information

Agreed. 8 The project proponent shall ensure that no natural watercourse and/or water resources shall Shall be complied with.

Agreed. 8 The project proponent shall ensure that no natural watercourse and/or water resources shall Shall be complied with. Compliance Report for the period June 2012 - November 2012, to the conditions specified in the Environmental Clearance (EC), granted by MOEF, vide letter No. J-11015/889/2007 - IA.II (M) dated 22nd Feb,

More information

THE RAMCO CEMENTS LIMITED

THE RAMCO CEMENTS LIMITED 1 P a g e 2 P a g e THE RAMCO CEMENTS LIMITED (Formerly Madras Cements Ltd.) COMPLIANCE REPORT FOR ENVIRONMENTAL CLEARANCE JAYANTHIPURAM NORTH BAND MINING LEASE 2.0 MILLION TPA CAPACITY EC Lr. No. : J-11015/377/2006-IA.II

More information

NMDC Limited Arki Limestone Project, Post: Arki, Tehsil: Arki, District: Solan, H.P.

NMDC Limited Arki Limestone Project, Post: Arki, Tehsil: Arki, District: Solan, H.P. NMDC Limited Arki Limestone Project, Post: Arki, Tehsil: Arki, District: Solan, H.P. Sub: Ref: Period: Six Monthly Environmental Progress Report Environmental clearance no: No.J-11015/82/2009-IA.II(M),

More information

PKA/Gonua/MoEF/ Date:

PKA/Gonua/MoEF/ Date: PKA/Gonua/MoEF/ Date: -18.06.2018 To The Director, Ministry of Environment & Forests (Central) Eastern Regional Office A/3 - Chandrasekharpur Bhubaneswar-751023 Sub:- Sir, Half Yearly Progressive Compliance

More information

Sr.No Condition Status A. SPECIFIC CONDITIONS:

Sr.No Condition Status A. SPECIFIC CONDITIONS: J.K. CEMENT WORKS, MANGROL (RAJ.) Compliance report of Mangrol Lime stone mine (For the period from April 2011 to September 2011) Sub:- Conditions of Environment Clearance from MOEF, New Delhi Letter No.

More information

Name of Project: Panchagavi Laterite Mine, M/s J.K. Cement Works, Muddapur (Karnataka)

Name of Project: Panchagavi Laterite Mine, M/s J.K. Cement Works, Muddapur (Karnataka) Panchagavi Laterite Mine, Village- Panchagavi, Taluka-Ramdurg, District- Belgaum, Karnataka Ref: - MoEF Letter No. SEIAA 107 MIN 2014 dtd. 24th December 2014 Compliance Report for the period from October

More information

The project proponent shall develop fodder plots in the non-mineralized area in lieu of use of grazing land.

The project proponent shall develop fodder plots in the non-mineralized area in lieu of use of grazing land. J.K. Cement WORKS, MANGROL (RAJ) Dated 29.05.2018 Compliance report of Environment Clearance for Mangrol Lime Stone Mine (For the Period from October 2017 to March 2018) Reference Letter from MOEF, New

More information

Compliance Status of Environmental Clearance of West Bokaro Opencast Coal Mine

Compliance Status of Environmental Clearance of West Bokaro Opencast Coal Mine Compliance Status of Environmental Clearance of West Bokaro Opencast Coal Mine Tata Steel Ltd. 1 A. Specific Conditions (i) No mining operations shall be undertaken in the forestland until clearance has

More information

[FORM-V] PART-A PART-B

[FORM-V] PART-A PART-B [FORM-V] (See Rule 14) Environment Statement for the financial year ending the 31 st March 2015 PART-A (1) Name and address of the owner - M/s. Serajuddin and Co. / Occupier of the industry, Balda Block

More information

State Level Environment Impact Assessment Authority Madhya Pradesh Government of India Ministry of Environment & Forests

State Level Environment Impact Assessment Authority Madhya Pradesh Government of India Ministry of Environment & Forests State Level Environment Impact Assessment Authority Madhya Pradesh Government of India Ministry of Environment & Forests Madhya Pradesh Pollution Control Board E 5. Arera Colony Bhopal 4620 16 visit us

More information

COMPLIANCE STATUS OF THE CONDITIONS OF MOEF

COMPLIANCE STATUS OF THE CONDITIONS OF MOEF COMPLIANCE STATUS OF THE CONDITIONS OF MOEF Name of the Project : Ananta Expansion Project No Date of MOEF : NoJ-11015/83/2005-IAII(M) dated 14072006 Period : April 2014 to Sept 2014 A SPECIFIC CONDITIONS

More information

State Environment Impact Assessment Authority, M.P. (Government of India, Ministry of Environment & Forests)

State Environment Impact Assessment Authority, M.P. (Government of India, Ministry of Environment & Forests) State Environment Impact Assessment Authority, M.P. (Government of India, Ministry of Environment & Forests) To, Shri Pradeep Jain C/o Jain Medical store, Main Market,Tendukheda, District Narsingpur M.P.

More information

V.S LIGNITE POWER Pvt. Ltd. [Gurha East Lignite Mine (1 MPTA)] AT VILLAGE-GURHA, KOLAYAT, BIKANER, RAJASTHAN

V.S LIGNITE POWER Pvt. Ltd. [Gurha East Lignite Mine (1 MPTA)] AT VILLAGE-GURHA, KOLAYAT, BIKANER, RAJASTHAN V.S LIGNITE POWER Pvt. Ltd [Gurha East Lignite Mine (1 MPTA)] AT VILLAGE-GURHA, KOLAYAT, BIKANER, RAJASTHAN HALF YEARLY REPORT FOR THE PERIOD OCTOBER, 2011 to MARCH 2012 Name of the Project : Gurha East

More information

J-11011/45/2009- IA II (I)

J-11011/45/2009- IA II (I) SL SPECIFIC CONDITIONS STATUS 1 Continuous stack monitoring facilities to monitor gaseous emissions from all the stacks shall be provided. The particulate emissions shall be controlled within 50 mg/nm

More information

J-11015/248/2007-IA.I(M) ) 13, MTPA ( ML

J-11015/248/2007-IA.I(M) ) 13, MTPA ( ML Status of Compliance (Period: October 2012 to March 2013) to the conditions stipulated in the Environment Clearance granted by MoEF vide letter No.- J-11015/248/2007-IA.I(M) dated May 13, 2009 for 0.27

More information

PROJECT NAME: UTKAL ALUMINA INTERNATIONAL LTD. PERIOD OF COMPLIANCE: APRIL, 2013 TO SEPTEMBER, 2013.

PROJECT NAME: UTKAL ALUMINA INTERNATIONAL LTD. PERIOD OF COMPLIANCE: APRIL, 2013 TO SEPTEMBER, 2013. STATUS OF CONDITIONS IMPOSED IN ENVIRONMENTAL CLEARANCE FOR 3 MTPA REFINERY & 3X30 MW CO-GENERATION POWER PLANT VIDE LETTER NO. J-11011/753/2007-IA II (I), DATED 29.01.2008. PROJECT NAME: UTKAL ALUMINA

More information

Noted please. Noted please. Noted please.

Noted please. Noted please. Noted please. Compliance Report on Environment Clearance for Gare-Pelma IV/4 coal mining project given by Ministry of Environment Forests & Climate Change vide letter No. J 11011/183/2010- IA.II (M) Dated: - 16th April

More information

By Speed Post. Dated: 30 th September, 2013

By Speed Post. Dated: 30 th September, 2013 By Speed Post No. J-11015/349/2009-IA.II (M) Government of India Ministry of Environment and Forests Impact Assessment Division *** Paryavaran Bhavan, C.G.O. Complex, Lodi Road, New Delhi-110 003 Dated:

More information

Six Monthly EC Compliance Report

Six Monthly EC Compliance Report Six Monthly EC Compliance Report Period: October, 2016 to March, 2017 JORURI IRON & MN MINES (54.754 HA) M/s. KALINGA MINING CORPORATION At Joruri, PO Jajnag, Dist. Keonjhar, Odisha 758 052 A. SPECIFIC

More information

Implementation of the Conservation Plan for Schedule I species report in the study area namely Pavo cristatus (Indian peafowl).

Implementation of the Conservation Plan for Schedule I species report in the study area namely Pavo cristatus (Indian peafowl). J.K. Cement WORKS, MANGROL (RAJ) Compliance report of Environment Clearance for Mangrol Tilakhera Lime Stone Mine Reference Letter from MOEF, New Delhi - J-11015/25/2011-1A. II (M) dated 23.01.2014 (For

More information

Environmental Clearance Maliparbat Bauxite Mines-Compliance Report Page 2

Environmental Clearance Maliparbat Bauxite Mines-Compliance Report Page 2 A. Specific Conditions: (i) All the conditions stipulated by the State Pollution Control Board in their consent to establish should be effectively implemented. Submission: Implementation is ongoing. (ii)

More information

No. J-l1015/313/2010-IA.II (M) Government of India Ministry of Environment & Forests

No. J-l1015/313/2010-IA.II (M) Government of India Ministry of Environment & Forests No. J-l1015/313/2010-IA.II (M) Government of India Ministry of Environment & Forests Paryavaran Bhavan, C.G.O. Complex, Lodi Road, New Delhi-110 003. Dated the 28th June, 2013 To, M/ s Arbind Kumar Singh

More information

PROJECT NAME: UTKAL ALUMINA INTERNATIONAL LTD. PERIOD OF COMPLIANCE: OCTOBER 2014 TO MARCH 2015.

PROJECT NAME: UTKAL ALUMINA INTERNATIONAL LTD. PERIOD OF COMPLIANCE: OCTOBER 2014 TO MARCH 2015. STATUS OF CONDITIONS IMPOSED IN ENVIRONMENTAL CLEARANCE FOR 3 MTPA REFINERY& 3X30 MW CO-GENERATION POWER PLANT VIDE LETTER NO. J-11011/753/2007- IA II (I), DATED 29.01.2008. PROJECT NAME: UTKAL ALUMINA

More information

COMPLIANCE STATUS OF CONDITIONS IMPOSED IN ENVIRONMENTAL CLEARANCE FOR 8.5 MTPA BAUXITE MINING VIDE LETTER NO J-11015/650/2007-IA.II (M), DTD

COMPLIANCE STATUS OF CONDITIONS IMPOSED IN ENVIRONMENTAL CLEARANCE FOR 8.5 MTPA BAUXITE MINING VIDE LETTER NO J-11015/650/2007-IA.II (M), DTD COMPLIANCE STATUS OF CONDITIONS IMPOSED IN ENVIRONMENTAL CLEARANCE FOR 8.5 MTPA BAUXITE MINING VIDE LETTER NO J-11015/650/2007-IA.II (M), DTD.19.02.09. PROJECT NAME: UTKAL ALUMINA INTERNATIOAL LIMITED.

More information

State Level Environment Impact Assessment Authority

State Level Environment Impact Assessment Authority State Level Environment Impact Assessment Authority Madhya Pradesh Government of India Ministry of Environment & Forests Research and Development Wing Madhya Pradesh Pollution Control Board Paryavaran

More information

MAHAGIRI MINES (CHROMITE) M/S INDIAN METALS & FERRO ALLOYS LTD.

MAHAGIRI MINES (CHROMITE) M/S INDIAN METALS & FERRO ALLOYS LTD. MAHAGIRI MINES (CHROMITE) M/S INDIAN METALS & FERRO ALLOYS LTD. Conditions of MoEF, Govt. of India, New Delhi vide MoEF letter No. J-11015/345/2007-IA.II(M) dated 10 th Dec. 2008 issued with Environmental

More information

Six monthly EC Compliance report of Nuagaon Iron Ore Beneficiation Plant project of M/s. KJS Ahluwalia for the period October, 2013 to March, 2014.

Six monthly EC Compliance report of Nuagaon Iron Ore Beneficiation Plant project of M/s. KJS Ahluwalia for the period October, 2013 to March, 2014. Six monthly EC Compliance report of Nuagaon Iron Ore Beneficiation Plant project of M/s. KJS Ahluwalia for the period October, 2013 to March, 2014. Status of Environmental Clearance Conditions Nuagaon

More information

THE RAMCO CEMENTS LIMITED, KSR NAGAR COMPLIANCE REPORT - ENVIRONMENTAL CLEARANCE CEMENT PLANT 2.5 MILLION TPA CLINKER, 2

THE RAMCO CEMENTS LIMITED, KSR NAGAR COMPLIANCE REPORT - ENVIRONMENTAL CLEARANCE CEMENT PLANT 2.5 MILLION TPA CLINKER, 2 THE RAMCO CEMENTS LIMITED, KSR NAGAR COMPLIANCE REPORT - ENVIRONMENTAL CLEARANCE CEMENT PLANT 2.5 MILLION TPA CLINKER, 2.6 MILLION TPA CEMENT & THERMAL POWER PLANT 36 MW EC Lr. No. : J-11011/403/2006-IA-II

More information

Environmental clearance is subject to obtaining clearance under the Wild life (Protection) Act, 1972 from the competent authority.

Environmental clearance is subject to obtaining clearance under the Wild life (Protection) Act, 1972 from the competent authority. Compliance Status of Environmental Clearance Conditions Balda Block Iron Ore Mining Project of M/s Serajuddin and Co. located in village(s) Balda, Bada kalimati and Nayagarh, Sub-division Champua, District

More information

HALF YEARLY COMPLIANCE REPORT OF ENVIRONMENTAL CLEARANCE CONDITIONS

HALF YEARLY COMPLIANCE REPORT OF ENVIRONMENTAL CLEARANCE CONDITIONS HALF YEARLY COMPLIANCE REPORT OF ENVIRONMENTAL CLEARANCE CONDITIONS 01. Name of the Project: Koira Iron Mine of M/S. Essel Mining & Industries Limited, Barbil, Keonjhar, Odisha 02. MoEF Clearance No. &

More information

HALF YEARLY COMPLIANCE REPORT OF ENVIRONMENTAL CLEARANCE CONDITIONS

HALF YEARLY COMPLIANCE REPORT OF ENVIRONMENTAL CLEARANCE CONDITIONS HALF YEARLY COMPLIANCE REPORT OF ENVIRONMENTAL CLEARANCE CONDITIONS 01. Name of the Project: Koira Iron Mine of M/S. Essel Mining & Industries Limited, Barbil, Keonjhar, Odisha 02. MoEF Clearance No. &

More information

HALF YEARLY COMPLIANCE REPORT OF ENVIRONMENTAL CLEARANCE CONDITIONS

HALF YEARLY COMPLIANCE REPORT OF ENVIRONMENTAL CLEARANCE CONDITIONS HALF YEARLY COMPLIANCE REPORT OF ENVIRONMENTAL CLEARANCE CONDITIONS 01. Name of the Project: Koira Iron Mine of M/S. Essel Mining & Industries Limited, Barbil, Keonjhar, Odisha 02. MoEF Clearance No. &

More information

FORM V ENVIRONMENTAL STATEMENT REPORT FOR THE FINANCIAL YEAR M/s Halki Lime Stone Mine (Unit: J. K. Cement Limited) PART A

FORM V ENVIRONMENTAL STATEMENT REPORT FOR THE FINANCIAL YEAR M/s Halki Lime Stone Mine (Unit: J. K. Cement Limited) PART A (I) FORM V ENVIRONMENTAL STATEMENT REPORT FOR THE FINANCIAL YEAR 2013-14 M/s Halki Lime Stone Mine (Unit: J. K. Cement Limited) Name & Address of the Owner / Occupier of the Industry Operation or Process

More information

Sl. No PRESENT STATUS SPECIFIC CONDITIONS

Sl. No PRESENT STATUS SPECIFIC CONDITIONS Compliance Status of Environmental Clearance Conditions Balda Block Iron Ore Mining Project of M/s Serajuddin and Co. located in village(s) Balda, Bada Kalimati and Nayagarh, Sub-division Champua, District

More information

Scanned by CamScanner

Scanned by CamScanner Scanned by CamScanner ENVIRONMENT STATEMENT (FORM V) Udaipur Cement Works Limited Daroli Limestone Mine-1 YEAR 2017-18 Udaipur Cement Works Limited SHRIPATINAGAR, P.O. CFA: DABOK, DISTRICT UDAIPUR (RAJASTHAN)-313021

More information

HALF YEARLY COMPLIANCE REPORT OF ENVIRONMENTAL CLEARANCE CONDITIONS

HALF YEARLY COMPLIANCE REPORT OF ENVIRONMENTAL CLEARANCE CONDITIONS HALF YEARLY COMPLIANCE REPORT OF ENVIRONMENTAL CLEARANCE CONDITIONS 01. Name of the Project: Koira Iron Mine of M/S. Essel Mining & Industries Limited, Barbil, Keonjhar, Odisha 02. MoEF Clearance No. &

More information

[LOGO] Ministry of Environment & Forests (MOEF) BY SPEED POST. No.J-11015/44/2009-IA.II (M) Paryavaran Bhawan, C.G.O.Complex, New Delhi

[LOGO] Ministry of Environment & Forests (MOEF) BY SPEED POST. No.J-11015/44/2009-IA.II (M) Paryavaran Bhawan, C.G.O.Complex, New Delhi [LOGO] No.J-11015/44/2009-IA.II (M) To General Manager (E&F), M/s South Eastern Coalfields Ltd., Bilaspur, Chhattisgarh. Ministry of Environment & Forests (MOEF) BY SPEED POST Paryavaran Bhawan, C.G.O.Complex,

More information

HALF YEARLY COMPLIANCE REPORT ON CONDITIONS STIPULATED IN ENVIRONMENTAL CLEARANCE

HALF YEARLY COMPLIANCE REPORT ON CONDITIONS STIPULATED IN ENVIRONMENTAL CLEARANCE HALF YEARLY COMPLIANCE REPORT ON CONDITIONS STIPULATED IN ENVIRONMENTAL CLEARANCE 01. Name of the Project: JILLING LANGALOTA IRON & MANGANESE MINES of M/s. ESSEL MINING & INDUSTRIES LIMITED, Barbil, Keonjhar,

More information

HALF YEARLY COMPLIANCE REPORT ON CONDITIONS STIPULATED IN ENVIRONMENTAL CLEARANCE

HALF YEARLY COMPLIANCE REPORT ON CONDITIONS STIPULATED IN ENVIRONMENTAL CLEARANCE HALF YEARLY COMPLIANCE REPORT ON CONDITIONS STIPULATED IN ENVIRONMENTAL CLEARANCE 01. Name of the Project: Enhancement of Production of Iron Ore from 4.2 million TPA to 6.28 million TPA and installation

More information

ENVIRONMENTAL CLEARANCE COMPLIANCE OF CLUSTER-II (GRANTED VIDE: J-11015/35/2011-IA II CM), dated ( to )

ENVIRONMENTAL CLEARANCE COMPLIANCE OF CLUSTER-II (GRANTED VIDE: J-11015/35/2011-IA II CM), dated ( to ) ENVIRONMENTAL CLEARANCE COMPLIANCE OF CLUSTER-II (GRANTED VIDE: J-11015/35/2011-IA II CM), dated 06.02.13 (01.10.13 to 31.03.14) Sl. no. A. Specific Conditions by MOEF: Compliance i The maximum production

More information

The mine is opened on The reasons for delay for starting mining operations are:

The mine is opened on The reasons for delay for starting mining operations are: 1 P a g e 2 P a g e THE RAMCO CEMENTS LIMITED (Formerly known as Madras Cements Ltd.) COMPLIANCE REPORT FOR ENVIRONMENTAL CLEARANCE BUDAWADA LIMESTONE MINE - 1.10 MILLION TPA CAPACITY EC Lr. No : J-11015/150/2008-IA.II

More information

LIMESTONE MINE (BLOCK-V)

LIMESTONE MINE (BLOCK-V) LIMESTONE MINE (BLOCK-V) 128.52 ha Mining lease and 19.33 ha outside dump, Production of 2.0 MTPA of M/S. ADHUNIK CEMENT LIMITED (Subsidiary of DALMIA CEMENT (BHARAT) LIMITED) Umsoo Mootang, Vill- Thangskai,P.O.

More information

No.J-11015/42/2006-IA.II (M) Government of India Ministry of Environment & Forests Paryavaran Bhawan, C.G.O. Complex, Lodi Road, New Delhi

No.J-11015/42/2006-IA.II (M) Government of India Ministry of Environment & Forests Paryavaran Bhawan, C.G.O. Complex, Lodi Road, New Delhi No.J-11015/42/2006-IA.II (M) Government of India Ministry of Environment & Forests Paryavaran Bhawan, C.G.O. Complex, Lodi Road, New Delhi 110 003 To, M/s Rajasthan State Mines and Minerals Ltd. SBU&PC-Limestone,

More information

Calcom Cement India Limited

Calcom Cement India Limited Calcom Cement India Limited (Subsidiary of DALMIA BHARAT CEMENT LIMITED) 2 No. Pipalpukhuri, Lanka, Dist. Nagaon, Assam 782446 Ref: MOEF, New Delhi Environment Clearance F. No. J-1101/312/2006-IA.II (I)

More information

Name of the Project:- J&K Mineral Development Corporation Limited.

Name of the Project:- J&K Mineral Development Corporation Limited. Name of the Project:- J&K Mineral Development Corporation Limited. Sub:- Six Monthly report of the status of the compliance of the stipulated environment condition of Environment clearance granted vide

More information

Environment protection measures / technology

Environment protection measures / technology Sr. No. Conditions A. Specific Conditions: i. The gaseous and particulate matter emissions from various units should conform to the standards prescribed by the State Pollution Control Board. At no time,

More information

(See Rule 14) Environment Statement for the financial year ending the 31 st March PART-A

(See Rule 14) Environment Statement for the financial year ending the 31 st March PART-A 1 [FORM-V] (See Rule 14) Environment Statement for the ending the 31 st March 2012. PART-A (i) Name and address of the owner / occupier of the industry, operation or process: Guali Iron Ore Mines Shri

More information

STATUS OF CONDITIONS OF ENVIRONMENTAL CLEARANCE FOR KIRIBURU -MEGHAHATUBURU IRON ORE MINES, STEEL AUTHORITY OF INDIA LIMITED

STATUS OF CONDITIONS OF ENVIRONMENTAL CLEARANCE FOR KIRIBURU -MEGHAHATUBURU IRON ORE MINES, STEEL AUTHORITY OF INDIA LIMITED STATUS OF CONDITIONS OF ENVIRONMENTAL CLEARANCE FOR KIRIBURU -MEGHAHATUBURU IRON ORE MINES, STEEL AUTHORITY OF INDIA LIMITED Ref. : Env. Clearance No. J-11015/5/2006-IA.II (M) dated 27.12.2006 A. Specific

More information

COMPLIANCE REPORT PERIOD: APRIL SEPTEMBER 2016

COMPLIANCE REPORT PERIOD: APRIL SEPTEMBER 2016 COMPLIANCE REPORT PERIOD: APRIL 2016 - SEPTEMBER 2016 ENVIRONMENTAL CLEARANCE TO JODA EAST IRON MINE OF TATA STEEL LIMITED VIDE MoEF s LETTER NO. J-11015/215/2008-IA.II(M), DATED: 11.03.2013 FOR PRODUCTION

More information

NMDC Limited Arid Limestone Project, Arid, District: Solan ill.p.)

NMDC Limited Arid Limestone Project, Arid, District: Solan ill.p.) NMDC Limited Arid Limestone Project, Arid, District: Solan ill.p.) Sub: Six Monthly EC Progress Report for the period from Apr 2016 to Sept 2016. Ref:Environmental Clearance no: No.J-11015/82/2009-IA.II(M),

More information

STEEL AUTHORITY OF INDIA LTD.

STEEL AUTHORITY OF INDIA LTD. STEEL AUTHORITY OF INDIA LTD. RAW MATERIALS DIVISION (A Govt. of India Enterprise) Kiriburu Iron ore Mines Regd. Office: Ispat Bhawan, Lodi Road, P.O. : Kiriburu - 833 222 New Delhi- 110 003 Dist. : Singhbhum

More information

S.N SPECIFIC CONDITION COMPLIANCE STATUS

S.N SPECIFIC CONDITION COMPLIANCE STATUS S.N SPECIFIC CONDITION COMPLIANCE STATUS i. Environmental clearance is subject to obtaining clearance under the Wildlife (Protection) Act, 1972 from the competent authority, as may be applicable to this

More information

SreeJayajothi Cements Limited (100% Subsidiary of M/s. My Home Industries Private Limited), Srinagar, Yanakandla , Kurnool Dist, Andhra

SreeJayajothi Cements Limited (100% Subsidiary of M/s. My Home Industries Private Limited), Srinagar, Yanakandla , Kurnool Dist, Andhra 1 Environmental Clearance Point Wise Half Yearly Compliance Report (April- 2015 to September- 2015) Lime Stone Mines: Ref: No. J-11015/338/2009-IA-II(M)) Dated: 13 th July 2011 S.NO CONDITION COMPLIANCE

More information

ENVIRONMENTAL CLEARANCE COMPLIANCE OF CLUSTER-XIII (GRANTED VIDE LETTER NO.J-11015/10/2010-IA.II(M) DATED

ENVIRONMENTAL CLEARANCE COMPLIANCE OF CLUSTER-XIII (GRANTED VIDE LETTER NO.J-11015/10/2010-IA.II(M) DATED ENVIRONMENTAL CLEARANCE COMPLIANCE OF CLUSTER-XIII (GRANTED VIDE LETTER NO.J-11015/10/2010-IA.II(M) DATED 06.06.2013 (Oct.,2013 to March,2014) Sl. No. A. Specific Conditions by MOEF: Compliance i. ii No

More information

COMPLIANCE REPORT PERIOD: APRIL 2015-SEPTEMBER 2015

COMPLIANCE REPORT PERIOD: APRIL 2015-SEPTEMBER 2015 COMPLIANCE REPORT PERIOD: APRIL 2015-SEPTEMBER 2015 ENVIRONMENTAL CLEARANCE TO JODA EAST IRON MINE OF TATA STEEL LIMITED VIDE MoEF s LETTER NO. J-11015/215/2008-IA.II(M), DATED: 11.03.2013 FOR PRODUCTION

More information

Environment Management Plan

Environment Management Plan Environment Management Plan Environmental Impact Assessment Statement describing the impact of mining and beneficiation on environment on the following: i) Land area indicating the area likely to be degraded

More information

V.S LIGNITE POWER Pvt. Ltd AT VILLAGE-GURHA, KOLAYAT, BIKANER, RAJASTHAN

V.S LIGNITE POWER Pvt. Ltd AT VILLAGE-GURHA, KOLAYAT, BIKANER, RAJASTHAN V.S LIGNITE POWER Pvt. Ltd AT VILLAGE-GURHA, KOLAYAT, BIKANER, RAJASTHAN HALF YEARLY REPORT FOR THE PERIOD OCTOBER, 2011 to MARCH 2012 V. S. Lignite Power Pvt. Ltd. Name of the Project : 1x 135 MW Lignite

More information

ENVIRONMENTAL MANAGEMENT PLAN FOR DALPATPUR STONE QUARRY AT VILLAGE DALPUTPUR TEHSIL KHURAI AND DISTRICT SAGAR [MP], AREA (0.

ENVIRONMENTAL MANAGEMENT PLAN FOR DALPATPUR STONE QUARRY AT VILLAGE DALPUTPUR TEHSIL KHURAI AND DISTRICT SAGAR [MP], AREA (0. ENVIRONMENTAL MANAGEMENT PLAN FOR DALPATPUR STONE QUARRY AT VILLAGE DALPUTPUR TEHSIL KHURAI AND DISTRICT SAGAR [MP], AREA (0.920ha) 1.1 Introduction The subject quarry is proposed for metal stone on 0.920

More information

Clearance Letter no. : MoEF Vide Letter no. J-11011/79/2003-IA-II (I) dated April 21, 2004

Clearance Letter no. : MoEF Vide Letter no. J-11011/79/2003-IA-II (I) dated April 21, 2004 Name of the Project: Jaypee Rewa Plant, Unit of M/s Jaiprakash Associates Limited for expansion Of cement production from 2.5 MTPA to 3.5 MTPA at Jaypee Nagar, District Rewa, Madhya Pradesh Project Code:

More information

Environmental Clearance Compliance Half Yearly Report

Environmental Clearance Compliance Half Yearly Report Environmental Clearance Compliance Half Yearly Report HALF YEARLY COMPLIANCE REPORT- April 2015 to September 2015 Ref: 1. MOEF, New Delhi Environment Clearance F. No. J-11011/119/2007- IA II (I) dated

More information

Compliance of Conditions laid down by MoEF for Expansion of Cement Plant (2.0 MTPA to 2.6 MTPA Clinker) at Village Suli April 2017 to September 2017

Compliance of Conditions laid down by MoEF for Expansion of Cement Plant (2.0 MTPA to 2.6 MTPA Clinker) at Village Suli April 2017 to September 2017 A. SPECIFIC CONDITIONS Sl. No. i ii Condition Continuous stack monitoring facilities for all stacks and adequate air pollution control systems e.g. electrostatic precipitators (ESP) to clinker cooler and

More information

Mangalam Cement Ltd. (Unit-II) Stack No.

Mangalam Cement Ltd. (Unit-II) Stack No. Mangalam Cement Ltd. (Unit-II) Name of the Project :- Expansion of cement grinding capacity from 1.7 MTPA to 2.3 MTPA Project Code :- Clearance Letter No. : - F NO. J - 11011 /110 /2012 - IA II (I), dtd

More information

ADITYA BIRLA. EMil. Please find enclosed herewith the environmental statement report duly filled-in Form-V

ADITYA BIRLA. EMil. Please find enclosed herewith the environmental statement report duly filled-in Form-V / ADITYA BIRLA EMil Ref. No. EMILIGEOLI '35, 12017-18 Date-07.09.2017 0V The Member Secretary, State Pollution Control Board, Odisha Department of Forests ft Environment, Govt. of Odisha, Paribesh Bhawan,

More information

Name of Project: J.K. Cement Works (Unit: J.K. Cement Ltd.), Muddapur (Karnataka)

Name of Project: J.K. Cement Works (Unit: J.K. Cement Ltd.), Muddapur (Karnataka) J.K. Cement Works, Village- Muddapur, Taluka- Mudhol, Distt.- Bagalkot, Karnataka MoEF Letter No. F.No. J-11011/263/2009-IA II (I) dated 21-06-2010 Name of Project: J.K. Cement Works (Unit: J.K. Cement

More information

BHILAI JAYPEE CEMENT LIMITED

BHILAI JAYPEE CEMENT LIMITED BHILAI JAYPEE CEMENT LIMITED BABUPUR (SATNA) MP-485112 Environmental Compliance Half yearly report for the period October-2013 to March -2014 Compliance report for the period Oct-2013 to March-2014 to

More information

HALF YEARLY COMPLIANCE REPORT ON CONDITIONS STIPULATED IN ENVIRONMENTAL CLEARANCE

HALF YEARLY COMPLIANCE REPORT ON CONDITIONS STIPULATED IN ENVIRONMENTAL CLEARANCE HALF YEARLY COMPLIANCE REPORT ON CONDITIONS STIPULATED IN ENVIRONMENTAL CLEARANCE 01. Name of the Project:JILLING LANGALOTA IRON & MANGANESE MINES of M/s. ESSEL MINING & INDUSTRIES LIMITED, Barbil, Keonjhar,

More information

Environmental Clearance Compliance Half Yearly Report

Environmental Clearance Compliance Half Yearly Report Environmental Clearance Compliance Half Yearly Report HALF YEARLY COMPLIANCE REPORT- Oct. 2017 March 2018 Ref: MOEF, New Delhi Environment Clearance F. No. J-11011/118/2007- IA II (I) dated 25 th August,

More information

ENVIRONMENTAL MANAGEMENT PLAN

ENVIRONMENTAL MANAGEMENT PLAN ENVIRONMENTAL MANAGEMENT PLAN INTRODUCTION An Environmental Management Plan (EMP) is a site-specific plan developed to ensure that all necessary measures are identified and implemented in order to protect

More information

EMP CLEARANCE [J-11015/227/2007-IA.II(M)]

EMP CLEARANCE [J-11015/227/2007-IA.II(M)] SIX MONTHLY REPORT OF EMP CLEARANCE [J-11015/227/2007-IA.II(M)] for the period October 14 March 15 (1 st June 2015) ROHINI OPENCAST EXPANSION PROJECT N K AREA CENTRAL COALFIELDS LIMITED (A Miniratna Company)

More information

HINAUTI LIMESTONE MINE Mine Lease area ha. (A UNIT OF JAIPRAKASH ASSOCIATES LIMITED) JAYPEE VIHAR, SIDHI (M.P)

HINAUTI LIMESTONE MINE Mine Lease area ha. (A UNIT OF JAIPRAKASH ASSOCIATES LIMITED) JAYPEE VIHAR, SIDHI (M.P) HINAUTI LIMESTONE MINE Mine Lease area 378.261 ha. (A UNIT OF JAIPRAKASH ASSOCIATES LIMITED) JAYPEE VIHAR, SIDHI (M.P) 2012-2013 SUBMITTED TO M.P.POLLUTION CONTROL BOARD BHOPAL (M.P.) Jaypee Sidhi Cement

More information

PRE FEASIBILITY REPORT. Company of production capacity: 14,40,000 CFT/ Year located at Khasra No near Village:

PRE FEASIBILITY REPORT. Company of production capacity: 14,40,000 CFT/ Year located at Khasra No near Village: PRE FEASIBILITY REPORT 1.0 EXECUTIVE SUMMARY In our Masonry Stone Mining Lease (M.L. No. 15/96, Area: 1.0 ha), Production capacity of masonry stone: 142920 TPA and existing Stone Crusher Unit named M/s.

More information

DESCRIPTIVE REPORT ON STATUS OF COMPLIANCE TO THE CONDITIONS OF ENVIRONMENTAL CLEARANCE AND ENVIRONMENTAL MANAGEMENT

DESCRIPTIVE REPORT ON STATUS OF COMPLIANCE TO THE CONDITIONS OF ENVIRONMENTAL CLEARANCE AND ENVIRONMENTAL MANAGEMENT DESCRIPTIVE REPORT ON STATUS OF COMPLIANCE TO THE CONDITIONS OF ENVIRONMENTAL CLEARANCE AND ENVIRONMENTAL MANAGEMENT Subject: Compliance report of Environmental Clearance for Plant 3 Reference: J-11011/603/2010-IA,

More information

ENVIRONMENTAL STATEMENT

ENVIRONMENTAL STATEMENT ENVIRONMENTAL STATEMENT 2015-16 MAGADH OPENCAST PROJECT M-A AREA, DAKRA SEPTEMBER 15 CENTRAL COALFIELDS LIMITED ENVIRONMENT DIVISION Ranchi EXECUTIVE SUMMARY E-1 This Annual Environmental Statement has

More information

Environmental Clearance Compliance Half Yearly Report

Environmental Clearance Compliance Half Yearly Report Environmental Clearance Compliance Half Yearly Report HALF YEARLY COMPLIANCE REPORT- Oct, 2016 to March 2017 Ref: MOEF, New Delhi Environment Clearance F. No. J-11015/384/2013- IA II (M) dated 11 th Feb,

More information

HALF YEARLY COMPLIANCE REPORT OF ENVIRONMENTAL CLEARANCE CONDITIONS

HALF YEARLY COMPLIANCE REPORT OF ENVIRONMENTAL CLEARANCE CONDITIONS HALF YEARLY COMPLIANCE REPORT OF ENVIRONMENTAL CLEARANCE CONDITIONS 01. Name of the Project: Kasia Iron & Dolomite Mines of M/s. ESSEL MINING & INDUSTRIES LIMITED, Barbil, Keonjhar, Odisha. 02. MoEF Clearance

More information

High efficient ESP s has been provided to maintain an emission level below 100mg/Nm 3 in CPP. Modification of ESPs and.

High efficient ESP s has been provided to maintain an emission level below 100mg/Nm 3 in CPP. Modification of ESPs and. Sl. No. CONDITIONS COMPLIANCE STATUS SPECIFIC CONDITIONS i The gaseous emissions (PM, SO 2, NO X, PAH, HC, VOCs and Fluoride) from various process units shall conform to the standards prescribed by the

More information

Environmental Policy Statement:

Environmental Policy Statement: 1 Environmental Policy Statement: Coal India Limited (CIL) is committed to protect the environment through prevention, mitigation of pollution, proper disposal and recycling of wastes, conservation of

More information

Six Monthly EC Compliance Reports. Murgabeda Iron Ore Mine of M/s. D. R. Patnaik. For the Period. October, 2015 to March, 2016

Six Monthly EC Compliance Reports. Murgabeda Iron Ore Mine of M/s. D. R. Patnaik. For the Period. October, 2015 to March, 2016 Six Monthly EC Compliance Reports Of Murgabeda Iron Ore Mine of M/s. D. R. Patnaik For the Period October, 2015 to March, 2016 SPECIFIC CONDITIONS i. The applicant (Project Proponent) will take necessary

More information

2 No. Continuous Ambient Air Quality Monitoring System (CAAQMS) installed in downwind & upwind direction and are connected to APPCB server.

2 No. Continuous Ambient Air Quality Monitoring System (CAAQMS) installed in downwind & upwind direction and are connected to APPCB server. Environmental Clearance Point Wise Half Yearly Compliance Report (October 2014 to March 2015) Cement Plant - EC No: F.No. J-11011/450/2007-IA II(I) Dated: 24 th March 2008 A. SPECIFIC CONDITIONS : S.NO.

More information

Environmental Clearance Compliance Half Yearly Report

Environmental Clearance Compliance Half Yearly Report Environmental Clearance Compliance Half Yearly Report HALF YEARLY COMPLIANCE REPORT- April 2017 - Sept 2017 Ref: MOEF, New Delhi Environment Clearance F. No. J-11011/118/2007- IA II (I) dated 25 th August,

More information

Half Yearly EC Compliance Report, Manderboni UGP, Pandaveswar Area (Cluster 12), Eastern Coalfields Limited Period: April September 2015

Half Yearly EC Compliance Report, Manderboni UGP, Pandaveswar Area (Cluster 12), Eastern Coalfields Limited Period: April September 2015 Half Yearly EC Compliance Report,, Pandaveswar Area (Cluster 12), (Cluster 12) EC Ref. No: J-l1015nO12011-1A-ll.(M) Dated: gth February,2015 Period: April, 2015 - September, 2015 s. No. General Condition

More information

DESCRIPTIVE REPORT ON STATUS OF COMPLIANCE TO THE CONDITIONS OF ENVIRONMENTAL CLEARANCE AND ENVIRONMENTAL MANAGEMENT

DESCRIPTIVE REPORT ON STATUS OF COMPLIANCE TO THE CONDITIONS OF ENVIRONMENTAL CLEARANCE AND ENVIRONMENTAL MANAGEMENT DESCRIPTIVE REPORT ON STATUS OF COMPLIANCE TO THE CONDITIONS OF ENVIRONMENTAL CLEARANCE AND ENVIRONMENTAL MANAGEMENT Subject: Compliance report of Environmental Clearance for CDR & Revamp Reference: J-11011/272/2007-IA,

More information

Mangalam Cement Ltd.(Unit I)

Mangalam Cement Ltd.(Unit I) Mangalam Cement Ltd.(Unit I) Name of the Project :- Expansion of cement Project Code :- grinding capacity from 1.3 MTPA to 1.7 MTPA Clearance Letter No. : - F NO. J - 11011 /119 /2012 - IA II (I), dtd

More information

Six Monthly Compliance status of Environment Clearance for Cement Plant (5300 TPD Clinker) at Village Lumshnong, Meghalaya January to June 2013

Six Monthly Compliance status of Environment Clearance for Cement Plant (5300 TPD Clinker) at Village Lumshnong, Meghalaya January to June 2013 Six Monthly Compliance status of Environment Clearance for Cement Plant (5300 TPD Clinker) at Village Lumshnong, Meghalaya January to June 2013 Ref.: Environmental Clearance no. J-11011/754/2007-IA II

More information

EXECUTIVE SUMMARY 1.0 MADHYA PRADESH STATE MINING CORPORATION LTD

EXECUTIVE SUMMARY 1.0 MADHYA PRADESH STATE MINING CORPORATION LTD EXECUTIVE SUMMARY 1.0 MADHYA PRADESH STATE MINING CORPORATION LTD Madhya Pradesh State Mining Corporation Ltd (MPSMCL), a company of Government of Madhya Pradesh has been allotted Amelia (North) Coal Mining

More information