1 JUST ADD WATER Renovation of the Filters at the Soldier Canyon Filter Plant in Fort Collins, Colorado Thomas M. Getting, P.E., DEE, Filtration Product Manager John Geibel, P.E., Chief Engineer Michael Wild, Regional Manager The F. B. Leopold Co., Inc. 227 South Division Street Zelienople, Pennsylvania Thomas F. Ullmann, P.E., Principal The Engineering Company 2310 East Prospect Road, Suite B Ft. Collins, Colorado ABSTRACT The Soldier Canyon Filter Plant in Fort Collins, Colorado has completed the renovation of the existing filtration system and construction of new filters. A total of eight filters were renovated in two stages and four new filters were constructed. Each stage has a different media configuration and backwash scheme. The new filters were constructed with a mixed media filter bed and use an air-water backwash. The existing filters were renovated with a modified dual media filter bed and use a water-only backwash scheme. This paper examines the operation and performance differences after the renovation and is a unique opportunity to compare the two types of media beds on a full-scale, side-by-side operating basis. Indications are that the dual media filters using polymer as the coagulant had substantially longer filter run times than the mixed media filters, with no difference in effluent water quality. Further investigations revealed a difference in filter performance depending upon which feed water was used from either plate or tube settlers. The plate settlers produced water that provided longer filter run times. INTRODUCTION The Soldier Canyon Filter Plant was constructed in 1963 on the west side of Fort Collins, Colorado. The plant is jointly owned by the East Larimer County, Fort Collins-Loveland, and the North Weld County Water Districts and supplies water to the rural areas of eastern Larimer County and northern Weld County. The plant has a current capacity of 30 million gallons per day (MGD) and serves a population of approximately 55,000. In 1995, the plant joined the Partnership for Safe Drinking Water program and was only the 16 th facility in the nation to receive The Director s Certificate of Recognition from the U.S. Environmental Protection Agency (EPA). However, optimization of the treatment plant has been an on-going process since 1989, when the need to improve the plant s performance was recognized by the staff and the administrators. The optimization has involved the construction of improvements to the plant, upgrading of the plant staff, changes in the plant management structure, and changes in the attitude and philosophy of the administrators and staff. This paper documents changes made to the filter system and attempts to show the improvements that have been achieved.

2 BACKGROUND Raw water for the plant is from Horsetooth Reservoir, which is a component of the Colorado Big Thompson Project. The reservoir is filled with water that originates on the Western Slope of the Colorado Rockies and is delivered via pipelines and open channels by the Northern Colorado Water Conservancy District (NCWCD). Horsetooth Reservoir was constructed in 1949 and has a 151,000-acre foot capacity. The intake to the plant from the reservoir is approximately 200 feet below the surface. The intake structure does not currently have provisions for multiple level withdrawal. Currently, Horsetooth Reservoir is the only source of raw water supplied to the Soldier Canyon Filter Plant. However, a secondary surface water source is being constructed for joint use with two local facilities. The raw water in Horsetooth Reservoir is of excellent quality and is stable. However, the plant does experience problems with fluctuating manganese levels of 0.00 to 400 ug /l during the spring and fall. The treatment plant was originally designed as a conventional treatment plant with a capacity of 4 MGD. In 1970, the plant was expanded to a capacity of 6.0 MGD, and the treatment process was changed from conventional to in-line direct filtration. Growth in the area forced another expansion in 1973 to bring the plant capacity to 10.0 MGD. In 1978, growth again forced the plant to expand from 10.0 MGD to 20.0 MGD. In 1991, improvements were made to convert the treatment process from direct in-line filtration to conventional treatment. TREATMENT PROCESS The following is a description of the current water treatment process being employed: Rapid Mix The raw water is metered through a 42-in. venturi meter and the flow rate is controlled with a 30-in. sleeve valve. The primary oxidant, chlorine dioxide (ClO 2 ) dosed at 0.3 to 0.5 mg/l, is injected immediately downstream of the sleeve valve. The ClO 2 is primarily added for manganese removal but also has been shown to assist with filtration and particle removal. 1 Either PACL or a PACL/alum combination is added to the raw water ahead of an in-line jet mixer. Streaming current monitors control the coagulant feed rate. Flocculation The flow enters four, serpentine flow, four-stage flocculation basins. Each stage contains two 12-ft-diameter, horizontal mixing paddles that have variable speed drives. Floc-aid is added as necessary, usually in the mid-point of the first stage. Depending upon flow demands and the time of year, a combination of one, two, or three basins are utilized. Sedimentation There are currently four sedimentation basins available for use. Depending on the flow demands, various combinations of basins can be utilized to supply high-quality settled water to the filters consistently below 1.0 NTU. Sedimentation Basins 1 and 2 have tube settlers and usually provide flow to Filters 1-4. The rated capacity for these basins is 10 MGD and the average flow to the basins is at the design rate of 10 MGD. Sedimentation Basins 3 and 4 have plate settlers and usually provide flow to Filters The rated 2

3 capacity of these basins is 40 MGD, though the normal flow rate is 20 MGD. All of the sedimentation basins utilize submerged sludge collectors for withdrawing accumulated solids. However, the characteristics of the particles left in the forward flow appears to be different and the effect on the filters will be shown later in this paper. Filtration The plant currently has 12 filters that have a combined surface area of 4,320 ft 2. Each filter is approved to operate at a rate of 7 gal/min/ft 2, though microscopic particulate analysis testing is required during any month in which filter rates exceed 5 gal/min/ft 2. Filters 1-8 were rehabilitated in The existing clay tile underdrain was replaced with Leopold low profile Type SL dual parallel lateral underdrain and Leopold IMS cap porous plate support in place of gravel. The media was replaced with 12 in. of 0.45 to 0.55 mm effective size (ES), <1.4 uniformity coefficient (UC) sand under 33 in. of 0.95 to 1.05 mm ES <1.4 UC anthracite. The media depth to ES ratio (l/d) calculates as 1,448 ([12 in. x 25.4 in./mm 0.5 mm ES] + [33 in. x 25.4 in./mm 1.0 mm ES]). These filters will be referred to as the dual media filters. It should be noted that Filters 1-4 receive flow only from Sedimentation Basins 1 and 2 while Filters 5-8 usually receive flow from Sedimentation Basins 3 and 4. However, Filters 5-8 are valved so that they, too, can receive flow from Sedimentation Basins 1 and 2. Filters 9-12 were constructed new in The Leopold Type S dual parallel lateral underdrain with Leopold IMS cap was used. The media consists of 4.5 in. of 0.2 to 0.3 mm ES <1.8 UC garnet sand under 9 in. of 0.45 to 0.55 mm ES <1.4 UC sand with a cap of 22.5 in. of 0.95 to 1.10 mm ES <1.4 UC anthracite. The l/d ratio calculates as 1,486 ([4.5 in. x 25.4 in./mm 0.25 mm ES] + [9 in. x 25.4 in./mm 0.5 mm ES] + [22.5 in. x 25.4 in. 1.0 mm ES]). These filters will be referred to as the mixed media filters. These filters can receive flow from any of the sedimentation basins but usually receive flow from Sedimentation Basins 3 and 4. All filters are equipped with on-line turbidimeters, monitoring filter effluent continuously. Particle counting has been incorporated into the control scheme. Corrosion Control/Disinfection/Clearwell Corrosion control is accomplished by the addition of soda and lime to the clearwell. The lime is fed as needed throughout the year while the soda ash is fed continuously to the influent of the clearwell dependent upon incoming manganese levels from the reservoir. The finished water Langlier Index goal of 1.0 has proven effective in meeting the Lead and Copper Rule. Disinfection is applied as break-point chlorination to the combined effluent. The operating range of free residual chlorine is 1.0 to 1.4 mg/l leaving the plant. Dosage is dependent upon the flow rates to the three water systems supplied and is adjusted as necessary. FILTER OPERATION Under normal operating conditions, criteria for filter operation require filters to initiate backwashing between 6 to 8 feet of headloss. Also taken into consideration before backwashing are turbidity values no higher than 0.10 NTU and particle counts, >2 microns, no higher than 15 particles/ml. Even though the filters do not have filter-to-waste 3

4 capabilities, turbidity spikes to the clearwell after backwashing are consistently below 0.10 NTU. Part of this performance is due to filling the filter headspace with backwash water at the end of the backwash cycle and spiking the incoming raw water with 500 ml of a cationic polymer immediately after a backwash. Although automatic backwashing equipment has been installed, the plant operators believe that manual washing has proven more effective with changing raw water conditions. The dual media filters use a standard water-only hydraulic backwash. Rotary agitators are used to break up surface particle build-up. The mixed media filters have both rotary agitators and air scour capabilities for backwash. These filters are usually hydraulically backwashed, with air scour used every third backwash. The plant has an extensive SCADA system that monitors, acquires, and stores the operation parameters of the various treatment plant unit operations. The parameters monitored in the operation of filters are headloss, filter run time, and effluent turbidity. Figure 1 presents typical data from Filter 10 (mixed media) and Filter 6 (dual media) on June 10, A direct comparison is made between the initial filter runs. The settled water for both filters was fed from the plate settlers. The effluent turbidity was the same as shown on the bottom of the graph. Note that the dual media filter had an additional 20 hours of run time. For this time period, the major coagulant was 7 mg/l of polymer. Flow to the filters was between 3.7 and 4.3 gal/min/ft /10/01 ( gpm/sq ft) Hrs. Additional 0.1 HEADLOSS (Ft.) Mixed Media Dual Media EFFLUENT TURBIDITY (NTU) TIME (Hrs.) 7.28 mg/l Summit 820B Filt 6 Filt 10 Filt 6 Turb Filt 10 Turb Figure 1 4

5 Figure 2 presents typical data from Filter 10 (mixed media) and Filter 6 (dual media) on July 5, A direct comparison is made between the initial filter runs. As shown on the bottom of the graph the effluent turbidity was the same. Again, the settled water for both filters was fed from the plate settlers. The dual media filter had an additional 11 hours of run time. For this time period, the major coagulant was 8 mg/l of polymer and the flow to the filters was between 4 and 4.5 gal/min/ft 2. 7/5/01 ( gpm/sq ft) Hrs. Additional HEADLOSS (Ft.) Mixed Media Dual Media EFFLUENT TURBIDITY (NTU) TIME (Hrs.) 8.0 mg/l Summit 820B Filt 6 LOH Filt 10 LOH Filt 6 Turb Filt 10 Turb Figure 2 Figure 3 presents the data comparing Filter 6 (dual media) to Filter 10 (mixed media) on July 29, During this time period alum was added in addition to polymer for coagulation. Alum is added during peak periods when the flow rate to the filters is increased and influent water quality changes are detected. During this time period the flow rate to the filters was increased to about 5 gal/min/ft 2. With effluent turbidities the same, the dual media filter run time was an additional 16 hours using the plate settled influent water. 5

6 /29/01 ( gpm/sq ft) 16 Hrs. Additional HEADLOSS (Ft.) Mixed Media Dual Media EFFLUENT TURBIDITY (NTU) TIME (Hrs.) 7.2 mg/l Summit 820B, 5.2 mg/l Alum Filt 6 LOH Filt 10 LOH Filt. 6 Turb Filt 10 Turb Figure 3 EFFECT OF DIFFERENT SETTLERS As mentioned above, the plant has two sedimentation trains that employ tube settlers in one train and plate settlers in the other. The tube settlers usually provide flow to the dual media filters, Filters 1-4, while the plate settlers usually provide flow to the remaining dual media and mixed media filters. The above data reflects that usual condition. However, it is possible to divert flow so that the tube settler basins can feed the mixed media filters. Because of this dual train condition and to quantify any effect that it has on the filters, data acquired from the sedimentation process units was investigated. Also, it was noticed that there was a run time difference between dual media Filters 1-4 and dual media Filters 5-9. Figure 4 presents the 2001 settling performance for the first seven months comparing the settled turbidity of the tube settlers to the plate settlers. On average, the settled turbidity of the plate settlers is relatively the same as that of the tube settlers. Since it was determined that there was no difference in the settled turbidity performance between the sedimentation trains, it was decided to try to compare the performance of the filters on alternate settled water. Figure 5 presents filter performance using alternate feeds. While Filter 2 (dual media/tube feed) and Filter 10 (mixed media/plate feed) were maintained with their normal settled water feed, Filters 5 and 6 (dual media) were switched 6

7 1.60 SCFP 2001 SETTLING PERFORMANCE 1.40 Plates Tubes 1.20 SETTLED WATER TURBIDITY (NTU) /1 1/31 3/2 4/1 5/1 5/31 6/30 7/30 8/29 9/28 10/28 11/27 12/27 Figure /29/01 ( gpm/sq ft) Mixed Media/Plates Dual Media/Tubes Dual Media/Plates 8.0 HEADLOSS (Ft.) TIME (Hrs.) 7.2 mg/l Summit 820B, 5.2 mg/l Alum Filt 2 Filt 10 Filt 6 Filt 5 Figure 5 7

8 from tube settled water to plate settled water. Note that the dual media/tube fed filter tracks the same as the mixed media/plate fed filter. The dual media filters switched to plate settled water had an additional 18 hours of run time. This is double the run time of the dual media filter fed by tube settled water and the mixed media filter fed by plate settled water. To confirm the results in the above test using the mixed media filters, another comparison of the effect that the settled water difference has on the filters was performed. Filter 10 (mixed media) was fed with tube settler effluent while Filter 9 (mixed media) was fed with plate settler effluent. As shown in Figure 6, the difference in run times was an additional 4 hours for Filter 10 being fed the plate settler effluent or a decrease in run time for a mixed media filter that is normally fed plate settled water. After another filter run with tube settled water with a similar run time to the initial tube settled effluent (approximately 11 hours to reach 8 feet of headloss), Filter 9 was returned to plate settler effluent. The run time of Filter 9 returned immediately to match the run time of Filter 10, as shown in Figure 6. The only explanation of the filter performance difference offered to date comes from the plant operators. They feel that the particle size in the tube settled water is slightly larger than the particle size of the plate settled water. The larger particle size may contribute to higher solids loading in the top of the media and thereby cause shorter filter runs. Part of the reason for the particle size difference could be that the tube settlers are operated at capacity, while the plate settlers are operated at approximately one-half capacity Hrs Additional FILTERABILITY (Plate vs. Tube Effluent) Tube Settler Effluent Plate Settler Effluent 8.00 LOSS OF HEAD (FT) Plate Settler Effluent mg/l Summit 820B Filt 10 Filt 9 Mixed Media Figure 6 8

9 CONCLUSION Over the years, the staff at the Soldier Canyon Filter Plant has endeavored to optimize their water treatment system through several upgrades and expansions. During the most recent upgrade, a difference in run times was noticed in the operation of the filters producing the same effluent water quality. The dual media filters had longer run times, up to double the mixed media filters, producing the same effluent turbidity and utilizing the same settled water. During the study an investigation was made to determine if the different sedimentation equipment affected the operation of the filters. It was found that even though the tube settled effluent had the same turbidity as the plate settled effluent, the filters operating on the plate settled effluent had longer run times. This could be due to the plate settlers being operated at one-half of their capacity. REFERENCES ¹ Ullmann, Turner, and Reed. Optimization of a Medium-Sized Water Treatment Plant: The Evolution of the Soldier Canyon Filter Plant. Presented at the American Water Works Association 1998 Water Quality Technology Conference, San Diego, California 9

Comparing the Leopold Clari-DAF System to Upflow Contact Clarification

Comparing the Leopold Clari-DAF System to Upflow Contact Clarification JUST ADD WATER Comparing the Leopold Clari-DAF System to Upflow Contact Clarification James E. Farmerie Product Manager The F. B. Leopold Co., Inc. 227 South Division Street Zelienople, Pennsylvania 16063

More information

Lake County WTP Improvements and Capacity Increase. OTCO 9 th Annual Water and Wastewater Workshop. Nick Pizzi Aqua Serv

Lake County WTP Improvements and Capacity Increase. OTCO 9 th Annual Water and Wastewater Workshop. Nick Pizzi Aqua Serv 1 Lake County WTP Improvements and Capacity Increase OTCO 9 th Annual Water and Wastewater Workshop 7.31.2013 Nick Pizzi Aqua Serv Rick Douglas Lake County Presentation Agenda Some topics we will cover:

More information

Overcoming Challenges to Achieve Optimization at the Crown Water Treatment Plant. Barbara Martin AWWA Mark Petrie Cleveland Water

Overcoming Challenges to Achieve Optimization at the Crown Water Treatment Plant. Barbara Martin AWWA Mark Petrie Cleveland Water Overcoming Challenges to Achieve Optimization at the Crown Water Treatment Plant Barbara Martin AWWA Mark Petrie Cleveland Water Outline Partnership for Safe Water Background Program Phases Crown Water

More information

Government Center Water Treatment Plant Kamphaeng Phet Province, Thailand

Government Center Water Treatment Plant Kamphaeng Phet Province, Thailand Government Center Water Treatment Plant Kamphaeng Phet Province, Thailand 1. Background information Kamphaeng Phet is a province in the lower north of Thailand. The Ping River (main tributary of the Chao

More information

Trident. Package Water Treatment System

Trident. Package Water Treatment System Trident Package Treatment System The Trident Package Treatment System When Microfloc products first introduced the Trident technology, it represented a significant advancement in water and wastewater treatment

More information

Innovative Improvements to a 53-Year Old Water Plant for HABs, Crypto, and Whatever Else the Maumee River Brings

Innovative Improvements to a 53-Year Old Water Plant for HABs, Crypto, and Whatever Else the Maumee River Brings Innovative Improvements to a 53-Year Old Water Plant for HABs, Crypto, and Whatever Else the Maumee River Brings Robert T. Shoaf, P.E., BCEE AECOM (Columbus, Ohio) Scott Hoover, Plant Superintendent Napoleon,

More information

CE 370. Filtration. Overview of the Process Location in the Treatment Plant

CE 370. Filtration. Overview of the Process Location in the Treatment Plant CE 370 Filtration 1 Overview of the Process Location in the Treatment Plant After the water has been settled, some fine solids/flocs may still be in suspension, therefore, removal of these fine solids

More information

City of Enderby Water Treatment Plant

City of Enderby Water Treatment Plant City of Enderby Water Treatment Plant The City of Enderby is located in the beautiful NorthOkanagan with a population of 3200 residents. The central location between Vernon and Salmon Arm allows easy access

More information

Filter Inspection and Optimization Case Studies

Filter Inspection and Optimization Case Studies Filter Inspection and Optimization Case Studies Marvin Gnagy, P.E., President PMG Consulting, Inc. OTCO Class 3&4 Workshop August 5, 2015 Agenda Filtration inspection and maintenance basics Filter performance

More information

City of Topeka Utilities Department

City of Topeka Utilities Department City of Topeka Utilities Department A Tour of Topeka s Water Treatment Facility The Topeka Water Treatment Facility uses various chemical and mechanical processes to transform raw water from the Kansas

More information

There is no sludge treatment process at NWTP. Sludge generated from sedimentation and backwashing is drained directly to the Khan River.

There is no sludge treatment process at NWTP. Sludge generated from sedimentation and backwashing is drained directly to the Khan River. Namkhan Water Treatment Plant Luang Prabang City, Lao PDR 1. Background information Luang Prabang is a touristic city situated in northern part of Lao PDR and was declared a World Heritage City by UNESCO

More information

Utility Partner Data Report

Utility Partner Data Report Utility Partner Data Report Project Title: Studying Distribution System Hydraulics and Flow Dynamics to Improve Water Utility Operational Decision Making Water Distribution System: Paris, Kentucky Project

More information

Ready, Set, and Go: Deer Valley WTP East Basins Performance Testing, Start-Up, and Commissioning Toby Teegerstrom Brian Watson

Ready, Set, and Go: Deer Valley WTP East Basins Performance Testing, Start-Up, and Commissioning Toby Teegerstrom Brian Watson Ready, Set, and Go: Deer Valley WTP East Basins Performance Testing, Start-Up, and Commissioning Toby Teegerstrom Brian Watson January 25, 2011 Presentation Outline Background Process Overview Start-Up

More information

SYSTEMATIC APPROACH TO WATER TREATMENT PLANT PROCESS OPTIMIZATION

SYSTEMATIC APPROACH TO WATER TREATMENT PLANT PROCESS OPTIMIZATION SYSTEMATIC APPROACH TO WATER TREATMENT PLANT PROCESS OPTIMIZATION Alex Yavich, Ph.D., P.E. Optimization Solutions Environmental, LLC WATERCON 2012 Optimization Solutions Environmental, LLC Water Treatment

More information

Rectangular Basin = Volume, gal (Length, ft) x (Width, ft) x (Height, ft) x7.48 gal/cu.ft.

Rectangular Basin = Volume, gal (Length, ft) x (Width, ft) x (Height, ft) x7.48 gal/cu.ft. Units and Conversion Factors 1 cubic foot of water weighs 62.3832 lb 1 gallon of water weighs 8.34 lb 1 liter of water weighs 1,000 gm 1 mg/l = 1 part per million (ppm) 1% = 10,000 ppm ft 2 = square feet

More information

W H I T E P A P E R. The Effect of Low Uniformity Coefficient Anthracite on Dual Media Filtration

W H I T E P A P E R. The Effect of Low Uniformity Coefficient Anthracite on Dual Media Filtration JUST ADD WATER The Effect of Low Uniformity Coefficient Anthracite on Dual Media Filtration Thomas L. Yohe, Ph.D., Vice President, Water Quality John Heichel, Manager of Process Control Bernard Stromberg,

More information

Utility Partner Data Report

Utility Partner Data Report Utility Partner Data Report Project Title: Studying Distribution System Hydraulics and Flow Dynamics to Improve Water Utility Operational Decision Making Water Distribution System: Nicholasville, Kentucky

More information

Greater Kegalle Water Treatment Plant Kegalle, Sri Lanka

Greater Kegalle Water Treatment Plant Kegalle, Sri Lanka Greater Kegalle Water Treatment Plant Kegalle, Sri Lanka 1. Background information of the water treatment plant Kegalle is located about 80 Km East of Colombo and the Greater Kegalle water treatment plant

More information

Optimizing Dual Media Filtration for Particulate Removal

Optimizing Dual Media Filtration for Particulate Removal Leopold, a Xylem Brand White Paper Optimizing Dual Media Filtration for Particulate Removal Thomas L. Yohe, Ph.D.,Vice President, Water Quality John Heichel, Manager of Process Control Bernard Stromberg,

More information

THIS POLICY DOES NOT HAVE THE FORCE OF LAW

THIS POLICY DOES NOT HAVE THE FORCE OF LAW THIS POLICY DOES NOT HAVE THE FORCE OF LAW GUIDELINES FOR TREATMENT PROCESS Division: DDAGW RATINGS AT PRECIPITATIVE (e.g.,lime) Number: ENG-02-001 SOFTENING GROUND WATER Category: Final TREATMENT PLANTS

More information

Rinconada Water Treatment Plant Reliability Improvement Project (RIP) Filter Pilot Study

Rinconada Water Treatment Plant Reliability Improvement Project (RIP) Filter Pilot Study Rinconada Water Treatment Plant Reliability Improvement Project (RIP) Filter Pilot Study AWWA 2014 Fall Conference Lei Hong, Ph.D., P.E. Lale Guven, Environmental Engineer October 23, 2014 Presentation

More information

Optimizing the Operation of Gravity Media Filters

Optimizing the Operation of Gravity Media Filters Optimizing the Operation of Gravity Media Filters Thomas M. Getting, P.E., BCEE Principal Engineer-Filtration Leopold, a xylem brand Tom.Getting@xyleminc.com 724-453-2058 Website: www.fbleopold.com Presentation

More information

Optimizing the Ballasted Sedimentation Process at the Anacortes Water Treatment Plant Jeff Marrs Plant Manager Greg Pierson - HDR

Optimizing the Ballasted Sedimentation Process at the Anacortes Water Treatment Plant Jeff Marrs Plant Manager Greg Pierson - HDR Optimizing the Ballasted Sedimentation Process at the Anacortes Water Treatment Plant Jeff Marrs Plant Manager Greg Pierson - HDR 2014 HDR, Inc., all rights reserved. Presentation Overview Project drivers

More information

Side by Side Piloting of Process Alternatives Yields Direct Performance Comparison

Side by Side Piloting of Process Alternatives Yields Direct Performance Comparison OBG PRESENTS: OBG PRESENTS: Side by Side Piloting of Process Alternatives Yields Direct Performance Comparison LORI W. REID, P.E. New York State AWWA Spring Meeting, April 26, 2017 Outline Background Project

More information

Leopold Desalination Pretreatment Systems

Leopold Desalination Pretreatment Systems Leopold Desalination Pretreatment Systems Reliable Protection from Membrane-Fouling, Performance-Inhibiting Seawater Contaminants Why Leopold for Your Desalination Pretreatment Solution? Leopold desalination

More information

Hetch Hetchy Treatability at the Sunol Valley Water Treatment Plant

Hetch Hetchy Treatability at the Sunol Valley Water Treatment Plant Operated by the San Francisco Public Utilities Commission Hetch Hetchy Treatability at the Sunol Valley Water Treatment Plant Annual Technology Transfer Workshop November 13, 2013 Enio Sebastiani, P.E.,

More information

The city of Venice hired Camp

The city of Venice hired Camp Concentrate Post-Treatment For Hydrogen Sulfide And Dissolved Oxygen Vipin Pangasa, Laura Andrews, and William Green The city of Venice hired Camp Dresser & McKee, Inc., to design an effective concentrate

More information

Using Zeta Potential To Optimize Coagulation For Direct Filtration & Conventional Treatment: The Green River Filtration Facility Experience

Using Zeta Potential To Optimize Coagulation For Direct Filtration & Conventional Treatment: The Green River Filtration Facility Experience Using Zeta Potential To Optimize Coagulation For Direct Filtration & Conventional Treatment: The Green River Filtration Facility Experience May 6, 2016 Dan McCormick Gary Fox Peter Kreft AGENDA GRFF Background

More information

Water Treatment. Water Treatment. Water Treatment. Water Treatment. CIVL 1101 Introduction to Filtration 1/15

Water Treatment. Water Treatment. Water Treatment. Water Treatment. CIVL 1101 Introduction to Filtration 1/15 CIVL 1101 Introduction to 1/15 Water treatment describes those industrial-scale processes used to make water more acceptable for a desired end-use. These can include use for drinking water, industry, medical

More information

THE BOSSIER CITY WATER TREATMENT PLANT (Background and Current Process Layout )

THE BOSSIER CITY WATER TREATMENT PLANT (Background and Current Process Layout ) THE BOSSIER CITY WATER TREATMENT PLANT (Background and Current Process Layout - 2018) PLANT HISTORY The Bossier City Water Treatment Plant was built in 1958. The original plant had a treatment capacity

More information

Iron/Manganese Package Plant Pre-Engineered Ground Water Treatment. Village of Bolivar, NY

Iron/Manganese Package Plant Pre-Engineered Ground Water Treatment. Village of Bolivar, NY Iron/Manganese Package Plant Pre-Engineered Ground Water Treatment Village of Bolivar, NY Fe/Mn Removal/Village of Bolivar, NY Presentation Outline Fe/Mn Overview Treatment Options Village of Bolivar Challenge

More information

Purpose of this course. Optimization of Water Treatment Plant Operations

Purpose of this course. Optimization of Water Treatment Plant Operations Optimization of Water Treatment Plant Operations Purpose of this course Discuss cause and effect relationships between unit processes and operations Alex Yavich, Ph.D., P.E. Optimization Solutions Environmental,

More information

Water Treatment Plant Startup Issues and Considerations

Water Treatment Plant Startup Issues and Considerations Water Treatment Plant Startup Issues and Considerations Joe Guistino, Coastside County Water District Aileen Kondo, Kennedy/Jenks Consultants California-Nevada Section AWWA Annual Fall Conference 2 October

More information

Water Treatment Overview. Gabe Sasser December 2016

Water Treatment Overview. Gabe Sasser December 2016 Water Treatment Overview Gabe Sasser December 2016 Topics of Discussion Source Water Information Treatment Plants (History and Capacity) Water Quality Water Treatment Process Distribution System Conservation

More information

Filter Surveillance PSW Rocky Mountain Summit April 5, Advanced Process Control and Optimization

Filter Surveillance PSW Rocky Mountain Summit April 5, Advanced Process Control and Optimization Filter Surveillance PSW Rocky Mountain Summit April 5, 2016 Advanced Process Control and Optimization Partnership for Safe Water Partnership for Safe Water mission: To improve the quality of drinking water

More information

Rapid Sand Filtration: Laboratory Analysis and Profiling

Rapid Sand Filtration: Laboratory Analysis and Profiling Rapid Sand Filtration: Laboratory Analysis and Profiling Rachel Easter & Rachael Osborne Water Bacteriologist-Chemist Division of Water Supply & Treatment City of Dayton Background Water Bacteriologist-Chemist

More information

Approaches to Filter Condition Assessment and Optimization

Approaches to Filter Condition Assessment and Optimization 2014 NC AWWA-WEA Conference Winston Salem, NC Approaches to Filter Condition Assessment and Optimization Vinod Korategere, P.E. Principal Engineer, Brown and Caldwell Barry Parsons Water Supply Division

More information

Submerged Membranes to Replace Media Filters to Increase Capacity 4X for a Small Community. Richard Stratton, PE HDR Engineering, Inc.

Submerged Membranes to Replace Media Filters to Increase Capacity 4X for a Small Community. Richard Stratton, PE HDR Engineering, Inc. Submerged Membranes to Replace Media Filters to Increase Capacity 4X for a Small Community Richard Stratton, PE HDR Engineering, Inc. Main Points of this Presentation Membranes can provide 4 times the

More information

MONTHLY OPERATION REPORT (MOR)--ALL WATER SYSTEMS

MONTHLY OPERATION REPORT (MOR)--ALL WATER SYSTEMS KENTUCKY DIVISION OF WATER DRINKING WATER BRANCH Revised //0 MONTHLY OPERATION REPORT (MOR)--ALL WATER SYSTEMS MONTH & YEAR OF: DEP Form 0--Revised 0/00 PLANT NAME: PWS NAME: PLANT CLASS: DIST. CLASS:

More information

Seasonal Source Water Quality and Treatment Challenges Town of Newburgh s Chadwick Lake Filtration Plant

Seasonal Source Water Quality and Treatment Challenges Town of Newburgh s Chadwick Lake Filtration Plant Seasonal Source Water Quality and Treatment Challenges Town of Newburgh s Chadwick Lake Filtration Plant Clayton Johnson GHD Kevin Castro GHD James Osborne Town of Newburgh Image placeholder Outline Introduction

More information

A. Turner, Chemist Project 7 Water Authority P.O. Box 1185 Montrose, CO Phone: Fax:

A. Turner, Chemist Project 7 Water Authority P.O. Box 1185 Montrose, CO Phone: Fax: Pressing Particle Counter Sensitivity Lower for Improved Response T. L. Engelhardt, Drinking Water Specialist Corresponding author Pacific Scientific Instruments 19 Old Town Square, Suite 238 Fort Collins,

More information

Expanding Capacity and Treatment. Treatment Plant

Expanding Capacity and Treatment. Treatment Plant Dublin Road Water Plant Treatment Capacity Increase Project Expanding Capacity and Treatment at an 80 MGD Surface Water Treatment Plant Enoch Nicholson, P.E. S. Dean Ramsey, P.E. CH2M HILL Mark Eppich,

More information

Fuzzy Filter: The Right Path for Graton Community Services District

Fuzzy Filter: The Right Path for Graton Community Services District WWD Article Application in Action: Water Reuse Fuzzy Filter: The Right Path for Graton Community Services District First Lagoon Effluent Filtration with Compressible Media Filter for Water Reuse Application

More information

Nakhon Sawan Water Treatment Plant Nakhon Sawan, Thailand

Nakhon Sawan Water Treatment Plant Nakhon Sawan, Thailand Nakhon Sawan Water Treatment Plant Nakhon Sawan, Thailand 1. Background Information Nakhon Sawan is located about 250 km north of Bangkok and marks the point of confluence of two of major Thai rivers,

More information

WEFTEC.06. Lake Okeechobee, Actiflo, peroxone, surface water, Cyanobacteria

WEFTEC.06. Lake Okeechobee, Actiflo, peroxone, surface water, Cyanobacteria FRESH IDEAS FOR FRESH WATER: OKEECHOBEE UTILITY AUTHORITY S SURFACE WATER TREATMENT PLANT USES INNOVATIVE TECHNOLOGY TO ACHIEVE HIGH QUALITY DRINKING WATER FROM LAKE OKEECHOBEE By: Curtis Robinson, E.I.

More information

Public Utilities Department City of Bossier City, Louisiana

Public Utilities Department City of Bossier City, Louisiana Public Utilities Department City of Bossier City, Louisiana Water System Improvement Plan April 16, 2008 Contents Section 1 Project Definition, Purpose and Scope 1.1 Project Definitions...1-1 1.2 Planning

More information

Dipti Shah, Town of Gilbert Tuesday, January 25, 2011

Dipti Shah, Town of Gilbert Tuesday, January 25, 2011 Dipti Shah, Town of Gilbert Tuesday, January 25, 2011 Background Treatment Plant Water Treatment Process Filter types Experiments Results Review Historical BAF /Non- BAF data Conclusion Recommendation

More information

FilterWorx Performance Filters EFFICIENCY AND INNOVATION BUILT INTO EVERY COMPLETE SYSTEM

FilterWorx Performance Filters EFFICIENCY AND INNOVATION BUILT INTO EVERY COMPLETE SYSTEM FilterWorx Performance Filters EFFICIENCY AND INNOVATION BUILT INTO EVERY COMPLETE SYSTEM Water filtration is more than the sum of its parts. And no one knows more about filtration than Leopold, the leader

More information

Ohio Section AWWA NW District Fall Meeting April 20, City of Delaware Water Plant Improvements

Ohio Section AWWA NW District Fall Meeting April 20, City of Delaware Water Plant Improvements April 20, 2016 City of Delaware Water Plant Improvements 1 NW District Fall Meeting April 20, 2016 Delaware Water Plant Project Overview Converted 6.0 MGD Lime Softening Plant to 7.2 MGD Ultrafiltration

More information

FUNDAMENTALS OF GRANULAR MEDIA FILTRATION. Gordon Williams, PhD, PE East Bay Municipal Utility District

FUNDAMENTALS OF GRANULAR MEDIA FILTRATION. Gordon Williams, PhD, PE East Bay Municipal Utility District FUNDAMENTALS OF GRANULAR MEDIA FILTRATION Gordon Williams, PhD, PE East Bay Municipal Utility District 1 OVERVIEW Filtration basics Filtration theory Filter media selection and design Monitoring and Troubleshooting

More information

Improvement of Drinking Water Plant Treatment

Improvement of Drinking Water Plant Treatment Improvement of Drinking Water Plant Treatment A. ZOUBOULIS 1, *, G. TRASKAS 1 AND P. SAMARAS 2 1 Department of Chemistry, Division of Chemical Technology Aristotle University, Thessaloniki GR-541 24, Greece

More information

Meeting Manganese Removal Goals: A Pilot Study

Meeting Manganese Removal Goals: A Pilot Study Meeting Manganese Removal Goals: A Pilot Study Amy Gao, Russell Ford, David Best and Manthos Tsotsos PA AWWA Annual Conference Thursday, May 12, 2016 Background Oswestry WTW Owned and Operated by United

More information

Filter Self-Assessment. Example Report

Filter Self-Assessment. Example Report Filter Self-Assessment Example Report Purpose EPA's Interim Enhanced Surface Water Treatment Rule (IESWTR) and Long Term 1 Enhanced Surface Water Treatment Rule (LT1ESWTR) may require certain water systems

More information

A Comprehensive Performance Evaluation (CPE) Approach to Addressing HABs

A Comprehensive Performance Evaluation (CPE) Approach to Addressing HABs A Comprehensive Performance Evaluation (CPE) Approach to Addressing HABs CPE Participants U.S. EPA: Alison Dugan, Tom Waters, Rich Lieberman, Craig Patterson, Val Bosscher Process Applications, Inc.: Larry

More information

AIR SCOUR DEMONSTRATES FILTER PERFORMANCE AND ECONOMIC BENEFITS IN QUEEN LANE WATER TREATMENT PLANT

AIR SCOUR DEMONSTRATES FILTER PERFORMANCE AND ECONOMIC BENEFITS IN QUEEN LANE WATER TREATMENT PLANT AIR SCOUR DEMONSTRATES FILTER PERFORMANCE AND ECONOMIC BENEFITS IN QUEEN LANE WATER TREATMENT PLANT Jamie Shambaugh, Lori Kappen (GF) Jerry Kuziw, Shiju Kuriakose, Kate Guest, Ya-Chi Tsao (PWD) Acknowledgement

More information

WEFTEC.06. **Cobb County Water System, Marietta, Georgia

WEFTEC.06. **Cobb County Water System, Marietta, Georgia CHEMICALLY ENHANCED PRIMARY TREATMENT FOR A LARGE WATER RECLAMATION FACILITY ON A CONSTRICTED SITE - CONSIDERATIONS FOR DESIGN, START-UP, AND OPERATION ABSTRACT Jeffrey A. Mills, P.E., BCEE,* Roderick

More information

PRIMARY DRINKING WATER FROM WASTEWATER EFFLUENT: PILOT TEST EXPERIENCE AT THE MIAMI DADE SOUTH DISTRICT WWTP

PRIMARY DRINKING WATER FROM WASTEWATER EFFLUENT: PILOT TEST EXPERIENCE AT THE MIAMI DADE SOUTH DISTRICT WWTP PRIMARY DRINKING WATER FROM WASTEWATER EFFLUENT: PILOT TEST EXPERIENCE AT THE MIAMI DADE SOUTH DISTRICT WWTP Paul J. Vinci, P.E. 1, Richard Cisterna, P.E. 1, Robert Harris 1, John Chorlog, P.E. 2, Joseph

More information

CGN 6933: Drinking Water Treatment Processes Department of Civil & Environmental Engineering University of South Florida Cunningham Spring 2013

CGN 6933: Drinking Water Treatment Processes Department of Civil & Environmental Engineering University of South Florida Cunningham Spring 2013 Homework #5 Due Thurs., March 28 Topic: Filtration 1. (2 pts) When estimating the effectiveness of a granular-media filter, we usually estimate the single-collector efficiency,. If we account for three

More information

Drinking Water Production Using Moving Bed Filtration

Drinking Water Production Using Moving Bed Filtration Drinking Water Production Using Moving Bed Filtration Small to medium sized package units for surface water treatment Author: J.W. Wouters KEY WORDS Surface water; moving bed filtration; drinking water

More information

6.5 Filtration General

6.5 Filtration General 6.5 Filtration 6.5.1 General Turbidity and algae are removed from raw waters by screens, gravel filters and slow sand or rapid gravity filters. The difference between slow and rapid sand filtration is

More information

Integrating Ozone and Ion Exchange into a 40 Year Old Lime Softening Plant

Integrating Ozone and Ion Exchange into a 40 Year Old Lime Softening Plant Integrating Ozone and Ion Exchange into a 40 Year Old Lime Softening Plant City of Columbus Division of Water: Matt Steele CH2M HILL: Enoch Nicholson DRWP Source Water and Treatment DRWP Overview Current

More information

FROM RAW WATER INTAKE TO DISTRIBUTION NETWORK: THE JOURNEY OF DBP CONTROL

FROM RAW WATER INTAKE TO DISTRIBUTION NETWORK: THE JOURNEY OF DBP CONTROL FROM RAW WATER INTAKE TO DISTRIBUTION NETWORK: THE JOURNEY OF DBP CONTROL Jane Xiaojie Gan, E.I.T., Porter Rivers, P.E. URS, 101 Research Drive, Columbia, SC 29203 ABSTRACT The Chester Metropolitan District

More information

Green River Filtration Facility Plant Overview

Green River Filtration Facility Plant Overview Green River Filtration Facility Plant Overview PNWS-AWWA Conference Bellevue, WA Gary Fox & Hilary Lorenz April 29, 2015 2 IN THE BEGINNING 3 PILOT PLANT OWNED AND OPERATED BY TACOMA WATER STAFF ALL THAT

More information

Innovative Approach to Expanding the Olentangy WTP

Innovative Approach to Expanding the Olentangy WTP Innovative Approach to Expanding the Olentangy WTP September 28, 2017 Spencer Sheldon, WTP Superintendent Bret M. Casey, P.E., BCEE Who is Del-Co Water? Member owned 501-(c) Non-Profit Corporation Governed

More information

Case Study: Parkson DynaSand D2 Filtration and Compliance Jessy Matthew John, The Probst Group

Case Study: Parkson DynaSand D2 Filtration and Compliance Jessy Matthew John, The Probst Group Case Study: Parkson DynaSand D2 Filtration and Compliance Jessy Matthew John, The Probst Group Primarily we will be discussing DynaSand D2 Sand Filters and performance, a method of advanced tertiary filtration.

More information

How Far Can You Push Your Filters? Optimization Lessons

How Far Can You Push Your Filters? Optimization Lessons How Far Can You Push Your Filters? Optimization Lessons Marvin Gnagy, P.E. President PMG Consulting, Inc. 51 st OTCO Water Workshop March 6, 2013 Agenda Two recent filter optimization projects Initial

More information

W O C H H O L Z R E G I O N A L W A T E R R E C L A M A T I O N F A C I L I T Y O V E R V I E W

W O C H H O L Z R E G I O N A L W A T E R R E C L A M A T I O N F A C I L I T Y O V E R V I E W Facility Overview The recently upgraded and expanded Henry N. Wochholz Regional Water Reclamation Facility (WRWRF) treats domestic wastewater generated from the Yucaipa-Calimesa service area. The WRWRF

More information

Breaking a Paradigm: Benefits of Chlorine and other Oxidants on Biofiltration Pete D Adamo, PE, PhD Chance Lauderdale, PE, PhD

Breaking a Paradigm: Benefits of Chlorine and other Oxidants on Biofiltration Pete D Adamo, PE, PhD Chance Lauderdale, PE, PhD Breaking a Paradigm: Benefits of Chlorine and other Oxidants on Biofiltration Pete D Adamo, PE, PhD Chance Lauderdale, PE, PhD 2014 HDR, Inc., all rights reserved. Where we are heading 1. Background and

More information

OPTIMISATION OF IMAGE FLAT WATER TREATMENT PLANT. Tony Humphries. Tony Humphries, Operator, SEQ Water

OPTIMISATION OF IMAGE FLAT WATER TREATMENT PLANT. Tony Humphries. Tony Humphries, Operator, SEQ Water OPTIMISATION OF IMAGE FLAT WATER TREATMENT PLANT Paper Presented by: Tony Humphries Author: Tony Humphries, Operator, SEQ Water 34th Annual Qld Water Industry Operations Workshop Indoor Sports Stadium,

More information

INNOVATIVE TECHNOLOGY TO IMPLEMENT A REUSE WATER PROGRAM. Stefan Haecker*, John Healy** 9311 College Parkway, Suite 1 Fort Myers Florida 33919

INNOVATIVE TECHNOLOGY TO IMPLEMENT A REUSE WATER PROGRAM. Stefan Haecker*, John Healy** 9311 College Parkway, Suite 1 Fort Myers Florida 33919 INNOVATIVE TECHNOLOGY TO IMPLEMENT A REUSE WATER PROGRAM Stefan Haecker*, John Healy** 9311 College Parkway, Suite 1 Fort Myers Florida 33919 ABSTRACT *CDM, **Piton Environmental, LLC The city of Fort

More information

Overview Increased Increased federal emphasis emphasis on on filter filter performance Virginia s emphasis emphasis on

Overview Increased Increased federal emphasis emphasis on on filter filter performance Virginia s emphasis emphasis on Overview Increased federal emphasis on filter performance Virginia s emphasis on filter performance Media filter optimization Challenges to good filtration Finding solutions Federal Emphasis on Filter

More information

Tampa Bay Water (TBW) is a regional

Tampa Bay Water (TBW) is a regional FWRJ Enhanced Residuals Treatment Helps Tampa Bay Water Regional Surface Water Treatment Plant Achieve Total Recycling Tony Pevec and Richard D. Moore Tampa Bay Water (TBW) is a regional water supply authority

More information

Optimisation of granular media filtration: impact of chemical conditioning Con Pelekani & Loreline Kerlidou SA Water & Allwater

Optimisation of granular media filtration: impact of chemical conditioning Con Pelekani & Loreline Kerlidou SA Water & Allwater Optimisation of granular media filtration: impact of chemical conditioning Con Pelekani & Loreline Kerlidou SA Water & Allwater Wednesday, 27 May 2015 PRESENTATION OUTLINE CONTEXT & OBJECTIVES TEST METHODOLOGY

More information

OPTIMISING FILTRATION AT DUNGOG WTP. David Turner. Hunter Water Australia

OPTIMISING FILTRATION AT DUNGOG WTP. David Turner. Hunter Water Australia OPTIMISING FILTRATION AT DUNGOG WTP Paper Presented by: David Turner Author: David Turner, Operations Support Manager, Darren Bailey, Treatment Operations Manager, Hunter Water Australia 7 th Annual WIOA

More information

75 th STREET WASTEWATER TREATMENT PLANT UPGRADES PROJECT

75 th STREET WASTEWATER TREATMENT PLANT UPGRADES PROJECT 75 th STREET WASTEWATER TREATMENT PLANT UPGRADES PROJECT Basis of Design Memorandum Design Memo No.: DM-7 (REVISED) Date: February 2005 Project/Task: 124487.001.420 Subject: Prepared by: Reviewed by: Hydraulic

More information

PNW AWWA Conference 2009 Todd Reynolds, PE, BCEE

PNW AWWA Conference 2009 Todd Reynolds, PE, BCEE Startup and 1 st Year of Operation at the Ventura Avenue UF WTP PNW AWWA Conference 2009 Todd Reynolds, PE, BCEE Acknowledgements Aileen Kondo, Kennedy/Jenks Consultants Jim Passanisi and Mike Oakley,

More information

Understanding Pretreatment. WesTech Engineering, Inc. Salt Lake City, Utah, USA

Understanding Pretreatment. WesTech Engineering, Inc. Salt Lake City, Utah, USA Understanding Pretreatment WesTech Engineering, Inc. Salt Lake City, Utah, USA Industrial Water Usage Water is required in almost every industry For: Cooling Boiler feed Process Drinking Cleaning In 2005

More information

How are My Filters Doing? Filter Profiling Reveals All

How are My Filters Doing? Filter Profiling Reveals All How are My Filters Doing? Filter Profiling Reveals All Laurel Passantino and Jacqueline Rhoades Water Treatment Seminar AZ Water February 18, 2014 Statements of fact and opinion expressed are those of

More information

TITLE 252. DEPARTMENT OF ENVIRONMENTAL QUALITY CHAPTER 626. PUBLIC WATER SUPPLY CONSTRUCTION STANDARDS SUBCHAPTER 9. TREATMENT

TITLE 252. DEPARTMENT OF ENVIRONMENTAL QUALITY CHAPTER 626. PUBLIC WATER SUPPLY CONSTRUCTION STANDARDS SUBCHAPTER 9. TREATMENT TITLE 5. DEPARTMENT OF ENVIRONMENTAL QUALITY CHAPTER 66. PUBLIC WATER SUPPLY CONSTRUCTION STANDARDS SUBCHAPTER 9. TREATMENT 5:66-9-. Pretreatment (a) Provide pre-sedimentation basins for package and slow

More information

WRF Webcast Biofilter Conversion Guidance Manual

WRF Webcast Biofilter Conversion Guidance Manual No part of this presentation may be copied, reproduced, or otherwise utilized without permission. WRF Webcast Biofilter Conversion Guidance Manual March 28, 2017 Biofiltration: Defining Benefits and Developing

More information

Lowering The Total Cost Of Operation

Lowering The Total Cost Of Operation Lowering The Total Cost Of Operation The system removes more solids than conventional clarification, so filters can run longer between backwash cycles. Fewer backwash cycles means less backwash water,

More information

Zero Liquid Discharge Project Extends Potable Water Supplies

Zero Liquid Discharge Project Extends Potable Water Supplies http://dx.doi.org/10.5991/opf.2014.40.0078 Ryan R. Popko, PE, and Phillip J. Locke, PE, are with McKim & Creed (www.mckimcreed.com), Clearwater, Fla. Fred J. Greiner is with the city of Palm Coast, Fla.

More information

INDUSTRIAL FILTRATION EQUIPMENT LWS Filter Series

INDUSTRIAL FILTRATION EQUIPMENT LWS Filter Series INDUSTRIAL FILTRATION EQUIPMENT LWS Filter Series (Single, Twin, Triple or Quadruple Demand Systems) 1 P age filtration equipment can be engineered to solve complex commercial and industrial water treatment

More information

CLEAR-WATER AND SEDIMENT-LADEN-FLOW TESTING OF THE E-TUBE SEDIMENT RETENTION DEVICE

CLEAR-WATER AND SEDIMENT-LADEN-FLOW TESTING OF THE E-TUBE SEDIMENT RETENTION DEVICE CLEAR-WATER AND SEDIMENT-LADEN-FLOW TESTING OF THE E-TUBE SEDIMENT RETENTION DEVICE Prepared for North American Tube Products, Inc. Prepared by Amanda L. Cox Christopher I. Thornton Michael D. Turner October

More information

Rawal Lake Water Treatment Plant Rawalpindi, Pakistan

Rawal Lake Water Treatment Plant Rawalpindi, Pakistan Rawal Lake Water Treatment Plant Rawalpindi, Pakistan 1. Background Information Rawal Lake Water Treatment Plant is managed by the Water & Sanitation Agency (WASA) under the Rawalpindi Development Authority

More information

ATTACHMENT 1 GENERAL FACILITY INFORMATION. BOD5 mg/l mg/l TSS mg/l mg/l NH3-N mg/l mg/l

ATTACHMENT 1 GENERAL FACILITY INFORMATION. BOD5 mg/l mg/l TSS mg/l mg/l NH3-N mg/l mg/l ATTACHMENT 1 GENERAL FACILITY INFORMATION 1. Facility Name: 2. Type of Facility: 3. Population Served: Present: Design: 4. Flow: Average Maximum Peak 5. Water Quality: Present Design Assumed Actual Source:

More information

NELSONVILLE WATER TREATMENT PLANT IMPROVEMENTS

NELSONVILLE WATER TREATMENT PLANT IMPROVEMENTS Location City of Nelsonville, Ohio Environmental Engineering, Design and Bidding, Construction Administration and Observation, Start-up Services Cost $4.25 million Size 1,000 gallon per minute Professional

More information

13. High Rate Filtration Process

13. High Rate Filtration Process 13.High Rate Filtration Process N. Horie 1, M.Kabata 2, K.Sano 3, S.Kanamori 4 Director, Chief Researcher,Senior Researcher 3, Researcher 4 First Research Department Japan Institute of Wastewater Engineering

More information

OPERATIONAL CHALLENGES AT THE KOORLONG WASTEWATER TREATMENT PLANT. Derek de Waal Kevin Murphy

OPERATIONAL CHALLENGES AT THE KOORLONG WASTEWATER TREATMENT PLANT. Derek de Waal Kevin Murphy OPERATIONAL CHALLENGES AT THE KOORLONG WASTEWATER TREATMENT PLANT Paper Presented by : Derek de Waal Kevin Murphy Authors: Derek de Waal, Operations Manager, Gutteridge Haskins & Davey Pty Ltd Kevin Murphy,

More information

Reclamation of Sand Filter Backwash Effluent using HYDRAcap LD Capillary UF Membrane Technology

Reclamation of Sand Filter Backwash Effluent using HYDRAcap LD Capillary UF Membrane Technology Reclamation of Sand Filter Backwash Effluent using HYDRAcap LD Capillary UF Membrane Technology By Mark Wilf, Ph. D., Graeme Pearce Ph. D., of Hydranautics, Oceanside, CA, and Julie Allam MSc., Javier

More information

Georgia Power Plant Bowen NPDES Permit No. GA Ash Pond Dewatering Plan. Revised December 2017

Georgia Power Plant Bowen NPDES Permit No. GA Ash Pond Dewatering Plan. Revised December 2017 Georgia Power Plant Bowen NPDES Permit No. GA0001449 Revised December 2017 Purpose This (Plan) describes the additional procedures, safeguards and enhanced wastewater treatment measures that Georgia Power

More information

Validation Testing of a High Rate Disk Filter For Water Recycling Applications

Validation Testing of a High Rate Disk Filter For Water Recycling Applications Validation Testing of a High Rate Disk Filter For Water Recycling Applications PNCWA 2010 Keith Bourgeous, Nicola Fontaine, and Kathy Marks Testing Designed to Demonstrate Filtration Performance According

More information

In Florida, the requirements for both highlevel

In Florida, the requirements for both highlevel Do You Need Tertiary Filters at Your Wastewater Plant? Which Technology Should You Pick & Why? Sudhanva Paranjape, Erica Stone, Rod Reardon, Chris Wall, Frank Van Pelt, and Jay Thurrott In Florida, the

More information

Georgia Power Plant McManus NPDES Permit No. GA Ash Pond Dewatering Plan. Revised April 2018

Georgia Power Plant McManus NPDES Permit No. GA Ash Pond Dewatering Plan. Revised April 2018 Georgia Power Plant McManus NPDES Permit No. GA0003794 Revised April 2018 Purpose This (Plan) describes the procedures, safeguards and enhanced wastewater treatment measures that Georgia Power Company

More information

OPERATORS FRIEND, STREAMING CURRENT DETECTOR. Shane Dunne. Cassowary Coast Regional Council

OPERATORS FRIEND, STREAMING CURRENT DETECTOR. Shane Dunne. Cassowary Coast Regional Council OPERATORS FRIEND, STREAMING CURRENT DETECTOR Paper Presented by: Shane Dunne Authors: Shane Dunne, Senior Operator, Water / Sewerage Treatment, Shane Bandiera, Coordinator Treatment, Water / Sewerage,

More information

Construction of Rapid Sand Filters i) Media

Construction of Rapid Sand Filters i) Media Filtration Process The flow of clarified water through a bed of granular media Purpose is to remove any particulate matter left over after flocculation and sedimentation Process operates based on 2 principles

More information

WAT-E Physical and Chemical Treatment of Water and Waste Filtration. Adjunct Prof. Riina Liikanen

WAT-E Physical and Chemical Treatment of Water and Waste Filtration. Adjunct Prof. Riina Liikanen WAT-E2120 - Physical and Chemical Treatment of Water and Waste Filtration Adjunct Prof. Riina Liikanen Content / Learning outcomes Overview of granular media filtration Removal and transport mechanisms

More information

Approved Capacity. March 2010

Approved Capacity. March 2010 March 2010 Approved Capacity Planning and Design Criteria for Establishing Approved Capacity for: 1) Surface Water And Ground Water Supply Sources, 2) Drinking Water Treatment Plants (WTPs), and 3) Source/WTP

More information

2017 HDR, Inc., all rights reserved.

2017 HDR, Inc., all rights reserved. Evaluating Operational Factors that Influence Biofiltration Performance in Various Source Waters Samantha Black, EIT, PhD HDR Pete D Adamo, PE, PhD HDR Mike Hughes City of Raleigh 2017 HDR, Inc., all rights

More information

DW Module 22 Inorganic Removal Basics Answer Key

DW Module 22 Inorganic Removal Basics Answer Key DW Module 22 Inorganic Removal Basics Answer Key Appendix E: Inorganic Removal Pre-Test 1. Solve the following equation: 385 + (21/7) (5 x 13 x 4) = 17 + 11 (6 x 4) a. 9 b. 7 c. 31 d. 32 Answer: d. 32

More information