1 PRE FEASIBILITY REPORT Of JOJOBERA CEMENT PLANT (STAND-ALONE CEMENT GRINDING UNIT) FOR ENVIRONMENTAL CLEARANCE FOR CHANGE IN PRODUCT MIX OF 4.6 MILLION TONNES PER ANNUM CEMENT PRODUCTION (NO INCREASE IN PRODUCTION) AT CEMENT GRINDING UNIT P.O. Rahargora, Jamshedpur (Jharkhand) By 0 Prepared By

2 Table of Contents Executive summary Introduction of the project/ Background information Project Description. Site Analysis Planning Brief. Proposed Infrastructure Rehabilitation and Resettlement (R & R) Plan. Project Schedule & Cost Estimates Analysis of Proposal (Final Recommendations). 1

3 1. EXECUTIVE SUMMARY Lafarge India Limited (LIL) is operating Jojobera Cement Plant (JCP), a State-of-the-art cement grinding unit based on latest and most ecofriendly technology adjacent to Thermal Power plant of Tata Power Station near Jamshedpur. The plant has been set up with the primary objective of utilizing the waste product of Steel manufacturing slag and Fly Ash produced by Tata Power Limited (TPL) which was earlier considered as solid waste. The present production details are; Million Tonnes Per Annum PSC (Max.) Portland Pozzolona (Max.) Cement (PPC)) However the production is limited to 4.6 Million Tonnes per annum The unit is utilizing bulk quantity of Fly Ash generated by Tata Thermal Power Station and the Slag generated from Tata Iron & Steel Co. Ltd. (TISCO) in an eco-friendly manner and thus is instrumental in abating the Pollution in the region in terms of Solid waste utilization approximate 0.35 MTPA of fly-ash and approximate 2.2 MTPA of slag. The required Clinker produced at LIL sister units Sonadih Cement Plant (SCP) and Arasmeta Cement Plant (ACP) is transported to Jamshedpur by Rail, Slag from TISCO, Fly Ash from TPL. The Environmental Clearance for this unit was issued vide letter no J11011/638/2008- IA II (I) on for producing ground cement of 4.6 Million Tonnes per annum(mtpa), with Portland Slag Cement at 3.2 MTPA and Portland Pozzolona Cement (PPC) at 1.4 MTPA. (Annexure-I) Subsequently, to meet the trend in the market, LIL obtained Amendment for Environmental Clearance from Ministry vide letter no. J-11011/638/2008.IA.II(I) dated 16th March, 2016 (Annexure-II ) for the production of Cement mix as given below Million Tonnes Per Annum PSC (Max.) PPC (Max.) However the production is limited to 4.6 Million Tonnes per annum 2

4 Now LIL proposes to produce Composite Cement, which is a blend of ground slag & fly ash cement, in addition to existing product i.e. PPC & PSC, while maintaining the total output at 4.6 Million Tonnes Per Annum. It amounts to increase in cementitious materials consumption with reduction in Clinker consumption. Now, the proposed product mix would be : Million Tonnes Per Annum Present Proposed PSC (Max.) PPC (Max.) Composite Cement (CC) 1.0 (Max.) However the production is limited to 4.6 Million Tonnes per annum Since the overall volume remains same, we don t see any increase in water requirement for the plant, which is about 1050 m3/day. The water is sourced from JUSCO (A subsidiary company of TISCO). There would not be any increase in water consumption. Present contract demand for power requirement is 30 MVA for 4.6 MTPA for PPC and PSC production. No additional power requirement will be there. Hot Air Generators is being used for drying the wet slag in the grinding mill. Presently furnace oil consumption is about 16 KL per day and coal is about 60 MT/per day on yearly average basis, which also remains unchanged. The present strength of manpower is 230. No additional manpower is required. No solid waste generation from the plant. The production and requirements of the project before and after change of product mix are given below: Parameter PSC PPC Present 4.0(Max.) 1.0(Max.) Proposed (change of product mix) 4.0 (Max.) 1.0 (Max.) Remarks No Change No Change 3

5 Parameter Present Proposed (change of product mix) Remarks CC Total, MTPA Clinker, MTPA Gypsum, MTPA Fly Ash, MTPA Slag, MTPA 4.6(Max.) (Max) 4.6(Max) 2.15 Additional No Change No Change No Change Land, Ha Manpower Water, m3/day Acres Acres Increase in consumption Increase in consumption No Change No Change No Change waste waste The present location of the plant is adjacent to premises of TPL. About acres of the area has been leased out to LIL by the TISCO for operating the grinding unit. Green belt in an area of more than 45 Acres has been developed inside the plant boundary as per statutory norms. No additional land is required for change. There is no wild life sanctuary, national park, eco-sensitive area within the 10 km radius of the project site. Existing infrastructure include railway siding and well developed roads, parking area, storm water drains with adequate storage space for clinker and fly ash. All infrastructure facilities such as education, health facilities and other social facilities are available adequately at nearest populated area i.e Jamshedpur. LIL has well-defined CSR policy to Carryout social development and welfare measures in the surrounding villages. Under CSR activity LIL has initiated community development projects, in the fields of health & safety, education and environment infrastructure & employability, in and around the plant. 4

6 2. INTRODUCTION OF THE PROJECT/ BACKGROUND INFORMATION (I) IDENTIFICATION OF PROJECT AND PROJECT PROPONENT PROJECT Lafarge India Limited is operating Jojobera Cement Plant is a State-ofthe-art cement grinding unit based on latest and most eco-friendly technology adjacent to Tata Thermal Power Station near Jamshedpur. The plant has been set up with the primary objective of utilizing industrial waste of TATA Steel & TATA Power i.e slag & Fly ash resp. and abating the Pollution in the region in terms of Solid waste utilization. The required Clinker produced at LIL sister units Sonadih Cement Plant and Arasmeta Cement Plant is transported to the plant by Rail, Slag from Tata steel by rail & road, Fly ash pneumatically conveyed through closed pipelines and Gypsum by rail, to produce cement. Jojobera Cement Plant is having automated grinding system consists of a ball mills, roller presses and vertical roller mill. PROJECT PROPONENT Lafarge India Limited in its Indian operation is producing cement as well as building materials. Its operation is spread all over the country. By focusing on the development and advancement of building materials, Lafarge places the customer at the core of its strategy and offers the construction industry and the general public innovative solutions that will bring more safety, comfort and beauty to our everyday lives. The Group s expertise in efficient industrial processes generate value, protects the environment, shows respect for societies & cultures and is sparing in its use of natural resources and energy. Lafarge entered the Indian market in 1999, through its cement business, with the acquisition of TISCO s cement business. This acquisition was followed by the purchase of the Raymond Cement facility in Lafarge currently has six cement plants in India: two plants in the state of Chhattisgarh (Sonadih and Arasmeta), One in 5

7 Rajsthan, Grinding Units in Jharkhand (Jojobera) and West Bengal (Mejia) and Blending unit in Jhajjar, Haryana. In recent years, Lafarge has significantly enlarged its operations across its three business divisions - Cement, Aggregates & Concrete. Lafarge s total cement production capacity in the Indian market currently stands at around 11 million tons and Lafarge India has plan to further expand its production capacity in existing operations. In addition to capacity changes at Sonadih and Jojobera, the Company is building on the success of its regional development models and is in the process of starting projects in Karnataka, Meghalaya and Himachal Pradesh. Lafarge has been committed to sustainable development for many years, pursuing a strategy that combines industrial knowhow with performance, value creation, respect for employees and local cultures, environmental protection and the conservation of natural resources and energy. To make advances in building materials, Lafarge places the customer at the heart of its concerns. It offers the construction industry and the general public innovative solutions bringing greater safety, comfort and quality to their everyday surroundings. Safety is the cornerstone of the Company s performance culture and longstanding people-centric tradition. All Lafarge India plants have an innate culture of safety consciousness and assured best-in-class Health & Safety standards. (II) BRIEF DESCRIPTION OF NATURE OF THE PROJECT Presently, Cement production capacity of the plant is 4.6 MTPA with 4.0 Million Ton per Annum, (max) PSC and 1.0 Million Ton per annum (max) of PPC. The required Clinker produced at LIL sister units Sonadih Cement Plant and Arasmeta Cement Plant is transported to Jamshedpur by Rail and Ground along with Slag (after drying) to produce PSC and Fly Ash to produce PPC with addition of gypsum. The proposal is now to produce of about 1.0 MTPA (max) Composite Cement by blending of Ground Slag & blendable PPC keeping the total capacity at the present level of 4.6 MTPA. For making Composite Cement, a blendable PPC bin, weighing scale and blender will be installed and same shall be stored in one of the 6

8 existing cement silos. Ground slag will be used from the existing operation. The details of production capacity with change of product mix is given below S. No in million tons per annum (MTPA) Present capacity Proposed change PSC 3.2 PPC 1.4 Composite Cement Total (Max.) 1.0 (Max.) 1.0(Max) 4.6 (III) NEED FOR THE PROJECT AND ITS IMPORTANCE TO THE COUNTRY AND OR REGION Very purpose of need of project is introduction of new ISS (Indian Standard Specification) for Composite Cement (CC) wherein, Lafarge seeing opportunity for further reduction in CO2 emission & conservation of natural resources by means reducing clinker component which requires Limestone, coal and water thereby reducing Green house gas emission. The most important raw material for these cements are blast furnace slag as a byproduct from the iron making process and fly ash as a byproduct from electricity production in coal fired power plants. These by-products earlier were seen as waste. In the developed technical world, these products were renamed from waste to by-product and are used as raw material in producing the blended cements, namely PSC and PPC. For more utilization of the industrial wastes or by products and also to minimize the Clinker consumption, there by reduction in Power requirement, better utilization of Solid waste, with out compromising on the quality of strength, Bureau of Indian Standards (BIS) has introduced Composite Cement as per IS : 2015 whose mix is about 15% - 35 % Fly ash, 20-50% Slag, more than 35% OPC (Clinker + Gypsum). Overall percentage of Slag and Fly Ash should not exceed 65 % in any case. Based on the concept of waste to by-product, and in view of the demand, LIL now proposes to produce Composite Cement to max. Quantity of 1.0 MTPA in addition to PSC and PPC, keeping total 7

9 production capacity of the plant at 4.6 MTPA for which EC was granted. (IV) DEMAND- SUPPLY GAP Market demand and projections Cement growth is expected to be above the GDP growth of the country, which is expected to be around 8% for the coming years. The Indian cement Industry is poised for a period of significant growth and the demand for cement is expected to match the current availability by the end of the current fiscal. Cement demand has registered a CAGR of about 8.5% over the last decade. In fact, at the current levels of growth, the cement industry may have to add over 90 Million Tons of cement capacity to meet the demand for cement over the next 5 years. Cement companies were operating at levels below capacity in the past but with the demand and supply reaching equilibrium; almost all plants are working at above 90% capacity. The rate of growth in cement demand is growing at a faster pace as compared to the capacity change. This will improve the realizations of the industry in the coming year. (V) IMPORTS Vs INDIGENOUS PRODUCTION India is self sufficient to meet the demands of the market with the GDP projected at 10% in the coming decades and in view of the infrastructure. (VI) EXPORT POSSIBILITY No export is proposed. (VII) DOMESTIC/EXPORT MARKETS The entire production is envisaged for the domestic market. (VIII) EMPLOYMENT GENERATION (DIRECT AND INDIRECT) DUE TO THE PROJECT No additional employment is proposed 8

10 3. PROJECT DESCRIPTION (I) TYPES OF PROJECT INCLUDING INTERLINKED AND INTERDEPENDENT PROJECT IF ANY. Required Clinker produced at LIL sister units Sonadih Cement Plant and Arasmeta Cement Plant are transported to Jamshedpur by Rail. The plant is utilizing bulk quantity of Fly Ash generated by TPL and the slag generated from TISCO. (II) LOCATION (MAP SHOWING GENERAL LOCATION, SPECIFIC LOCATION, AND PROJECT BOUNDARY & PROJECT SITE LAYOUT WITH COORDINATES The Cement Plant is located in the Jojobera area of Jamshedpur Notified Area Committee. Jamshedpur is an industrial centre of repute with industrial giants such as TISCO and TPL. It falls in District East Singbhum of Jharkhand State and is about 250 kms by road from Kolkatta. Jamshedpur city is well connected by Rail, Roads and Air. National highway 33 connects Jamshedpur to Ranchi and Kolkatta. Jamshedpur Chaibsa road and Jamshedpur Gamharia roads also fall in study area which connects Jamshedpur to Chaibasa, Adityapur Industrial Area and Gamharia. The site of Jojobera is well connected by road to all major centers of Jamshedpur city. River Subarnarekha and River Kharkai flow in NE and WNW direction of plant site and they both meet at about 12 kms in NW direction of plant site. Geographically the site is very close to the intersection of latitude N and the longitude E and 129 m above Mean Sea Level The site is well connected with communication facilities like telephone, fax, wireless and telex, railway, airport, highway and as such, no constraints are envisaged in this aspect as the tehsil and district headquarter is near to the site. The environmental setting of the unit is given in table below The location of Jojobera cement plant is shown in Fig-1 and Key Map of the plant site is shown in Fig-2. Salient features of the project site are given in Table-1. 9

11 FIG 1 10

12 FIG 2 11

13 FIG 3 12

14 TABLE-1 SALIENT FEATURES OF THE PROJECT SITE Feature Details Altitude 194 m above MSL Between to E Longitude Between to N Latitude Village, Tehsil, District, State Rahargora Village, Jamshedpur Tehsil & District,, Jharkhand Max. Temp. Min. Temp. Relative Humidity Annual rainfall Topography Soil Type Nearest River Nearest Highway Nearest Railway station & Junction Nearest Industries Nearest Village 46.6oC 5.0.oC 25-78% mm Plain Predominantly clayey River Kharkai km (ENE) River Subarnrekha 7.5 km (W) National Highway (NH-33) connecting Pardih Mohulia 7.2 km - N Tatanagar 8 km - WNW Nearest Town Nearest Air port None within 10 km radius Bari nagar 1.3 km NW Govidpur 0.6 km ENE Parsudi km W Gayatri Nagar 2.5 km NW Jamshedpur 6.5 km - NW Ranchi Nearest Forest No reserve forest in the proximity of 10 kms. Historical places None within 10 km radius *all distances mentioned in the above table are aerial distances 13

15 (III) DETAILS OF ALTERNATE SITES CONSIDERED AND THE BASIS OF SELECTING THE PROPOSED SITE, PARTICULARLY THE ENVIRONMENTAL CONSIDERATIONS GONE INTO SHOULD BE HIGHLIGHTED. No additional land or site is required or examined as the present proposal does not require any additional land except for installation Conveying air slide, bucket elevator, blender, dust collector, storage bin. (IV) SIZE OR MAGNITUDE OF OPERATION Present Cement production capacity is 4.6 MTPA. The proposal is for change of product mix as per the table given below Million Tonnes Per Annum PSC PPC COMPOSITE CEMENT - Present 4.0 (Max.) 1.0 (Max.) 4.6 (Max) Proposed (Max.) (Max.) (Max.) (Max) (V) PROJECT DESCRIPTION WITH PROCESS DETAILS (A SCHEMATIC DIAGRAM/FLOW CHART SHOWING THE PROJECT LAYOUT, COMPONENTS OF THE PROJECT ETC. SHOULD BE GIVEN. PROCESS DESCRIPTION Clinker is received from its SCP situated near Raipur in Chhattisgarh and ACP Situated near Bilaspur in Chhattisgarh. Slag is received from the TISCO, Jamshedpur and Gypsum is received from various sources from within and outside the country. Fly Ash which is an additive for manufacturing PPC is received from TPL situated adjacent to Jojobera Cement Plant. The cement production at the plant involves grinding of clinker, Slag/ash and gypsum: Handling of raw materials clinker, Slag, Fly ash, Gypsum and Coal. Slag drying in hot air generator Slag grinding in roller press grinding circuit. 14

16 4. Clinker is grinding in roller press and ball mill grinding circuit. 5. Mixing of ground clinker and ground slag by paddle mixer 6. Mixing the slag with Pozzolona cement to arrive at Composite Cement. 7. Cement storage (PSC) 8. Cement Storage (PPC) 9. Cement Storage (CC) 10. Packing and dispatch Capacity of main equipment & storage already existing are as mentioned below SL. NO. EQUIPMENT Wagon Tippler Roller Press 3. Clinker Silo CAPACITY Dry Slag Silo Ground Clinker Silo Ground Slag Silo Ball Mill Cement Silo Packer Machine Truck Loading Machine Wagon Loading Machine L D O / F.O Storage Tank L D O / F.O. Day Tank H S D Storage & Dispensing Unit Locomotive 03 Nos. 1X 500 TPH + 1 X 1200 TPH 4 X 75 TPH 2 X TON + 1 X TON 2 X 4500 TON 1X 700 TON + 1 X 3000 TON 1X 700 TON + 1 X 4000 TON 2 X 140 TPH 5 X 7000 EACH 6 X 240 TPH 4 X 90 TPH 16 X 90 TPH 2 X 22 KL + 1 X 44 KL 2 X 5 KL 2 X 20 KL 2 X 350 HP + 1 X 1200 HP Pay Loader 02 Nos. Dozer 01 No. Wet Slag Stock Pile / Storage 2 CUBIC METER 150 HP TON 19. Coal Stock Pile / Storage 4000 TON 20. Truck Tippler 21. Vertical Cement Mill Hoppers 22. Coal Mill 23. Vertical Cement Mill 24. Bulk Loaders 40 TON 350 T (SLAG) T (CLINKER) T (MINERAL GYPSUM) T (CHEMICAL GYPSUM) 15 TPH 230 TPH (SLAG) / 127 TPH (CLINKER) 1 X 230 CFM 25. Paddle Mixer 1 X 425 TPH + 1 X 225 TPH 26. Stacker 1400 TPH 27. Reclaimer 300 TPH 15

17 Additional equipment Installation of Conveying air slide, bucket elevator, blender, dust collector, storage bin. PROJECT LAYOUT The plant is located in an area of Acres. More than 33 % of the plant area is developed under greenbelt. No additional land will be required for change. The plant layout is shown in Fig 3. (VI) RAW MATERIAL REQUIRED ALONG WITH ESTIMATED QUANTITY, LIKELY SOURCE, MARKETING AREA OF FINAL PRODUCTS/S, MODE OF TRANSPORT OF RAW MATERIAL AND FINISHED PRODUCT Raw Material Requirement The total raw material required for producing clinker and total Cement after change of product mix will be: S. No Minerals Clinker Slag Fly Ash Gypsum Furnace Oil Coal RAW MATERIAL REQUIREMENT Quantity in MTPA Source Existing Additional Ultimate Lafarge s Sonadih, Arasmeta Cement Plant TISCO TPL IFFCO, PPL, Vizag Imported, etc HPCL, IOC etc Imported indigenous & 16

18 FLOW DIAGRAM OF RAW MATERIAL FLOW Road / Rail / Pipeline Rail CLINKER LAFARGE SONADIH, ARASMETA CEMENT PLANT 9 km SLAG, FLYASH,,TISCO, JAMSHEDPUR By Ship /Rail km IMPORTED MINERAL GYPSUM, 1900 km 4.6 MTPA PSC /PPC/CC PRODUCTION 8 km Pipe Line Rail WATER JUSCO JAMSHEDPUR CHEMICAL GYPUSM IFFCO, PPL, VIZAG MODE OF TRANSPORTATION Clinker, Gypsum, Coal, wet slag is transported by the railway wagons dry slag by road and Fly-Ash is received through dense phase conveying system from the TPL located adjacent to Jojobera Cement Plant. After packing cement bags of different types are dispatched to several depots by means of Railways and Roadways. Railways The nearest railway station is at Tata Nagar situated at a distance of 8 Km from plant. Lafarge Cement with co-operation of Railway department has extended the railway track upto the cement plant for transportation of essential raw materials and dispatching cement to domestic market. Roadways Jojobera is well connected to Jamshedpur city by road network. The NH- 33, which is connected Jamshedpur city to Ranchi and Kolkata. Katjor- Haludpukhar road, connecting Katjor and Haludpukhar 17

19 through Jamshedpur city. In addition to the main roads, there are several roads connecting Jojobera and Jamshedpur city. Lafarge Cement purchases all the additives from outside parties, and carries them by railways, trucks and trailers on roadways. Roadways are the other option through which Lafarge Cement dispatch cement to the domestic market. (VII) RESOURCES OPTIMIZATION/ RECYCLING AND REUSE ENVISAGED IN THE PROJECT, IF ANY, SHOULD BE BRIEF OUTLINED The concept of waste-minimization, recycle/reuse/recover techniques, Energy conservation, and natural resource conservation have been considered and detailed below. Waste minimization: The plant is presently using about 2.11 MTPA of Slag & 0.34 MTPA of ash of TISCO & TPL respectively which otherwise is treated as waste and needs disposal. In the proposed change - more wet slag will be consumed and more clinker will be saved. Reduction of greenhouse gas emissions - CO2 By introducing composite cement we are expecting about 15% increase in cementitious consumption over PPC. Which will bring down equivalent quantity of clinker consumption there by coal. For 1.00 MTPA of CC, about 15% Clinker is saved and there by reduction of Green house gases by means of reduction in coal consumption at clinker manufacturing unit, which is approx. 30 million Kg of CO2. (VIII) AVAILABILITY OF WATER ITS SOURCES, ENERGY /POWER REQUIREMENT AND SOURCES SHOULD BE GIVEN Utilities and Resource Requirement The major utilities for running of the cement plant are as follows: 18

20 (a) Water Requirement Present water requirement for the plant is about is 1050 KLD) The water is sourced from JUSCO. There would not be any increase in water consumption. (b) Power Requirement Present power requirement is 30 MVA. Total Power requirement after change is 30 MVA. The source of power is Tata Power Company the same will be for change also. (c) Fuel Requirement Hot Air Generators is being used for drying the wet slag in the grinding mill. Presently furnace oil consumption is about 16 KL per day and coal is about 60 Ton per day on year average basis. (d) Manpower Requirement The present strength of manpower is around 230 and no additional manpower requirement. (e) Power: The power demand is met from Tata Steel /JUSCO. (f) Water: Present water consumption is 1050 m3/day. The water is sourced from JUSCO. (IX) QUANTITY OF WASTES TO GENERATED (LIQUID AND SOLID) AND SCHEME FOR THEIR MANAGEMENT/DISPOSAL) No solid waste generation from the plant. Waste water generation is only from domestic use is treated in Sewage treatment Plant. (X) SCHEMATIC REPRESENTATIONS OF THE FEASIBILITY WHICH GIVE INFORMATION OF EIA PURPOSE Not applicable 19

21 4. SITE ANALYSIS (I) CONNECTIVITY Nearest railway line connecting Plant site Jojobera of SER. The site is located at a distance of about 0.3 km from road connecting Salgajhuri to Jojobera. The nearest main railway station is located at Jojobera which is 8 km from the site (II) LAND FORM, LAND USE AND LAND OWNERSHIP The present location of the plant is within the premises of Jojobera thermal power plant. About Acres of the area has been leased out to LIL by the TATA Steel for operating the grinding unit. (III) TOPOGRAPHY (ALONG WITH MAP) The plant is existing and is developed. radius around the plant site Fig 2 shows the 10 km (IV) EXISTING LAND USE PATTERN (AGRICULTURE, NONAGRICULTURE, FOREST, WATER BODIES (INCLUDING AREA UNDER CRZ)), SHORTEST DISTANCES FROM THE PERIPHERY OF THE PROJECT TO PERIPHERY OF THE FORESTS, NATIONAL PARK, WILD LIFE SANCTUARY, ECO SENSITIVE AREAS, WATER BODIES (DISTANCE FORM THE HFL OF THE RIVER), CRZ. IN CASE OF NOTIFIED INDUSTRIAL AREA, A COPY OF THE GAZETTE NOTIFICATION SHOULD BE GIVEN) The present location of the plant is adjacent to Jojobera Tata Power Company. About Acres of the area has been leased out to LIL by the Tata Steel for operating the grinding unit. S.No Details Plant &Machinery Roads Railway Siding Parking Area Greenbelt Vacant Land Total Extent (Acres)

22 There is no wild life sanctuary, national park, eco-sensitive area within the 10 km radius of the project site. (V) EXISTING INFRASTRUCTURE. Existing infrastructure include railway siding and well developed roads, storm water drains with adequate storage space for clinker and fly ash and parking area (VI) SOIL CLASSIFICATION Predominantly clayey soil. (VII) CLIMATIC DATA FROM THE SECONDARY SOURCES. The macro climate of the study area is characterized as dry, except in the monsoon season. The average annual rainfall is about 1300 mm. May is generally the hottest month with mean daily maximum of 46 oc and the mean daily minimum of 20oC. The relative humidity (RH) is high during the monsoon season with maximum value of 82 %. During the south-west monsoon and brief spells of a day or two in the cold season in association with passing western disturbances, heavily clouded or overcast skies prevail. In the rest of the year the skies are mostly clear or slightly clouded. Winds are mostly from the east or west during the period throughout the year. Post-monsoon, winds are light and variable in direction. Wind velocity increases post winter season, highest being in summer. VIII) SOCIAL INFRASTRUCTURE AVAILABLE. All infrastructure facilities such as education, health facilities and other social facilities are adequate at nearby commercial area. 21

23 5. PLANNING BRIEF (I) PLANNING CONCEPT (TYPES OF INDUSTRIES, FACILITIES, TRANSPORTATION ETC) TOWN AND COUNTRY PLANNING/ DEVELOPMENT AUTHORITY CLASSIFICATION The present location of the plant is within the premises of Jojobera thermal power plant. About acres of the area has been leased out to LIL by the TATA steel for operating the grinding unit The site is well connected by Rail, road and air network. (II) POPULATION PROJECTION. No increase in population is anticipated (IV) ASSESSMENT OF INFRASTRUCTURE DEMAND (PHYSICAL & SOCIAL) No additional infrastructure is required. No additional employment is required (V) AMENITIES/ FACILITIES All infrastructure facilities such as education, health facilities and other social facilities are adequate at Jamshedpur. 22

24 6. PROPOSED INFRASTRUCTURE (I) INDUSTRIAL AREA (PROCESSING AREA) No Additional processing area requirement (II) RESIDENTIAL AREA (NON PROCESSING AREA) No residential area is existing. (III) GREEN BELT Green belt in an area of more than 45 Acres has been developed inside the plant boundary as per statutory norms. (IV) SOCIAL INFRASTRUCTURE. LIL has well-defined CSR policy to Carryout social development and welfare measures in the surrounding villages. Under CSR activity LIL has initiated community development projects, in the fields of health & safety, education and environment, infrastructure & employability in and around the plant. (V) CONNECTIVITY (TRAFFIC AND TRANSPORTATION ROAD / RAIL/METRO/ WATER WAYS ETC) Adequate facilities with railway siding and roads are existing. No additional connectivity is required (VI) DRINKING WATER MANAGEMENT (SOURCE AND SUPPLY OF WATER) No additional water is required. (VII) SEWERAGE SYSTEM No additional sewerage system is required as there is no additional wastewater generation (VIII) INDUSTRIAL WASTE MANAGEMENT. No industrial wastewater generation from the process at present or in future 23

25 (IX) SOLID WASTE MANAGEMENT Dust collected from air pollution control equipment is 100% recycled in process and there are no solid wastes in cement plant. (X) POWER REQUIREMENT & SUPPLY / SOURCE Power demand remains the same. 24

26 7. REHABILITATION AND RESETTLEMENT (R & R) PLAN (I) POLICY TO BE ADOPTED (CENTRAL/ STATE) IN RESPECT OF THE PROJECT AFFECTED PERSONS INCLUDING HOME OUSTEES, LAND OUSTEES AND LANDLESS LABORERS (A BRIEF OUTLINE TO BE GIVEN). Not applicable, since the project is already existing 25

27 8. PROJECT SCHEDULE & COST ESTIMATES (I) LIKELY DATE OF START OF CONSTRUCTION AND LIKELY DATE OF COMPLETION (TIME SCHEDULE FOR THE PROJECT TO BE GIVEN) No major construction activity is required except for installation for installation of an hopper bin, air slide, bucket elevator and blender. (II) ESTIMATED PROJECT COST ALONG WITH ANALYSIS IN TERMS OF ECONOMIC VIABILITY OF THE PROJECT The estimated project cost for change of product mix is about Rs 12.0 crores. 26

28 9. ANALYSIS OF PROPOSAL (FINAL RECOMMENDATIONS) (I) FINANCIAL AND SOCIAL BENEFITS WITH SPECIAL EMPHASIS ON THE BENEFIT TO THE LOCAL PEOPLE INCLUDING TRIBAL POPULATION, IF ANY IN THE AREA Based on the growing demand in the state, the proximity of the project location to this market is an advantage with respect reduction in freight of cement to these markets. The project is environmental friendly as it is using Steel plant & power plant waste. Considering the above, LIL is planning to go ahead with the project, once it gets all the statutory approvals. 27

Pre-Feasibility Report

Pre-Feasibility Report Pre-Feasibility Report 1. Executive Summary Residential, Commercial, Retail and Hotel projects and an IT/ITES. The Project has already obtained an Environmental Clearance from Ministry of Environment &

More information

Pre-Feasibility Report For

Pre-Feasibility Report For Pre-Feasibility Report For Proposed New Project for manufacturing of Intermediates of Agro Chemicals & Synthetic Organic Chemicals. By M/s. MANBRO POLYMERS LIMITED, Plot No. D-2/CH-275, INDUSTRIAL ESTATE,

More information

STONE QUARRY Survey No. : 57/5, Village : Dhadhade, Tehsil: Vikramgad, District Thane, Maharashtra Area (2.0 Ha)

STONE QUARRY Survey No. : 57/5, Village : Dhadhade, Tehsil: Vikramgad, District Thane, Maharashtra Area (2.0 Ha) Pre Feasibility Report On STONE QUARRY Survey No. : 57/5, Village : Dhadhade, Tehsil: Vikramgad, District Thane, Maharashtra Area (2.0 Ha) Submitted to MINISTRY OF ENVIRONMENT & FOREST STATE LEVEL ENVIRONMENTAL

More information

Proposed Project of Halcyon Labs Pvt Ltd D-2/CH : 335,336,337, GIDC-Dahej-2, DIst: Bharuch, Gujarat Ramans Enviro Services Pvt Ltd Ahmedabad

Proposed Project of Halcyon Labs Pvt Ltd D-2/CH : 335,336,337, GIDC-Dahej-2, DIst: Bharuch, Gujarat Ramans Enviro Services Pvt Ltd Ahmedabad 1. EXECUTIVE SUMMARY OF THE PROJECT BRIEF SUMMARY OF THE PROJECT : TYPE OF PROJECT : Proposed Project for manufacturing of pharma intermediates by Halcyon Labs Pvt.Ltd. LOCATION : Proposed Project of Halcyon

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT PRE FEASIBILITY REPORT for PROPOSED PROJECT FOR DYES, PIGMENTS AND DYE INTERMEDIATES MANUFACTURING PLANT IN GIDC, DAHEJ-II Of M/s. SHREEJI INDUSTRIES Plot No. D2/CH/24, Dahej-II, GIDC Industrial Estate,

More information

PRE-FEASIBILITY REPORT. 1.2 MTPA (GGBS/PSC/PPC/OPC) Grinding Unit at SIPCOT, Tuticorin, Tamilnadu, India

PRE-FEASIBILITY REPORT. 1.2 MTPA (GGBS/PSC/PPC/OPC) Grinding Unit at SIPCOT, Tuticorin, Tamilnadu, India PRE-FEASIBILITY REPORT of 1.2 MTPA (GGBS/PSC/PPC/OPC) Grinding Unit at SIPCOT, Tuticorin, Tamilnadu, India By JSW CEMENT LTD.. Prepared By B.S. ENVI-TECH (P) LTD Secunderabad 500 017 Table of Contents

More information

PREFEASIBILITY REPORT

PREFEASIBILITY REPORT (B) PREFEASIBILITY REPORT OF EXISTING SAND MINING PROJECT OF RAJESHBHAI BHAGUBHAI PATEL AT VILLAGE:- Panchlai, TALUKA:- Pardi, DIST.:-Valdad. 1 CONTENTS 1.0 INTRODUCTION 1.1 PREAMBLE 2.0 EXECUTIVE SUMMARY

More information

EXISTING PROJECT FOR ORDINARY SAND MINING

EXISTING PROJECT FOR ORDINARY SAND MINING (C) PROJECT REPORT OF EXISTING PROJECT FOR ORDINARY SAND MINING OF JASHUBEN CHHAGANBHAI OAD AT VILLAGE:-TIMBA, TALUKA:- KAMREJ, DIST.:- SURAT 1 CONTENTS 1.0 INTRODUCTION 1.1 PREAMBLE 2.0 EXECUTIVE SUMMARY

More information

(B) PREFEASIBILITY REPORT OF EXISTING BLACK TRAP PROJECT OF

(B) PREFEASIBILITY REPORT OF EXISTING BLACK TRAP PROJECT OF (B) PREFEASIBILITY REPORT OF EXISTING BLACK TRAP PROJECT OF Makwana Dineshbhai Khimjibhai AT VILLAGE:- Tithava, TALUKA:- Wankaner, DIST.:- Morbi 1 CONTENTS 1.0 INTRODUCTION 1.1 PREAMBLE 2.0 EXCUTIVE SUMMARY

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT PRE FEASIBILITY REPORT For PROPOSED EXPANSION OF BAKELITE POWDER MANUFACTURING UNIT of M/S. HINDUSTAN BAKELITE COMPANY PLOT NO. J-3436, GIDC ESTATE, ANKLESHWAR, DISTRICT: BHARUCH-393002, GUJARAT 0 CONTENTS

More information

PRE-FEASIBILITY REPORT

PRE-FEASIBILITY REPORT PRE-FEASIBILITY REPORT For ToR of Proposed Project of MANUFACTURING OF SYNTHETIC ORGANIC DYES (5 f B IND II) By SHREEJI BAPA DYE CHEM PLOT NO 1319 & 1320, PHASE-III, GIDC, VATVA, AHEMADABAD-382445, GUJARAT,

More information

PRE FEASIBILITY REPORT. Company of production capacity: 14,40,000 CFT/ Year located at Khasra No near Village:

PRE FEASIBILITY REPORT. Company of production capacity: 14,40,000 CFT/ Year located at Khasra No near Village: PRE FEASIBILITY REPORT 1.0 EXECUTIVE SUMMARY In our Masonry Stone Mining Lease (M.L. No. 15/96, Area: 1.0 ha), Production capacity of masonry stone: 142920 TPA and existing Stone Crusher Unit named M/s.

More information

PRE-FEASIBILITY REPORT

PRE-FEASIBILITY REPORT PRE-FEASIBILITY REPORT 1.0 EXECUTIVE SUMMARY M/s Arti Chemical Industries is a project located at Plot No. E-22, Vilayat G.I.D.C. Tal: Vagra area of Bharuch district in Gujarat. M/s Arti Chemical Industries

More information

PRE-FEASIBILITY REPORT

PRE-FEASIBILITY REPORT PRE-FEASIBILITY REPORT 1.0 EXECUTIVE SUMMARY Star Cement Ltd. (formerly Cement Manufacturing Company Ltd.), has an existing Cement Plant having Clinker/Cement production capacity of 0.792 MTPA as per EC

More information

PRE-FEASIBILITY REPORT. 1. SUMMARY Kudeli Brick Earth Quarry Name of Company / Mine Owner Smt. Premawati Location 744, 760/1, 760/4, 750/1, 750/2

PRE-FEASIBILITY REPORT. 1. SUMMARY Kudeli Brick Earth Quarry Name of Company / Mine Owner Smt. Premawati Location 744, 760/1, 760/4, 750/1, 750/2 PRE-FEASIBILITY REPORT 1. SUMMARY Project Kudeli Brick Earth Quarry Name of Company / Mine Owner Smt. Premawati Location 744, 760/1, 760/4, 750/1, 750/2 Village Kudeli Taluka Baikunthpur District Koriya

More information

M/s. SAL STEEL LTD Survey no.245/p, Village:-Bharapar, Taluka:- Gandhidham, District:-Kutch, Gujarat.

M/s. SAL STEEL LTD Survey no.245/p, Village:-Bharapar, Taluka:- Gandhidham, District:-Kutch, Gujarat. Pre-Feasibility Study Report For Proposed Fly Ash Co-processing clinker grinding cement Unit of 40,000 MT/month Production capacity within our Existing Premises for M/s. SAL STEEL LTD Survey no.245/p,

More information

PRE-FEASIBILITY REPORT OF SAND QUARRY

PRE-FEASIBILITY REPORT OF SAND QUARRY PRE-FEASIBILITY REPORT OF SAND QUARRY Survey No Village Taluka District Lease area : 1 Paiki : Marigana : Anjar, : Kutch, Gujarat, : 2.00 Ha. Submitted to MINISTRY OF ENVIRONMENT & FORESTS STATE LEVEL

More information

M/S. Dain Colour Chem

M/S. Dain Colour Chem PRE FEASIBILITY REPORT For PROPOSED EXPANSION IN EXISTING MANUFACTURING PLANT Of M/S. Dain Colour Chem Plot No.: 5, Nilkanth Estate, Village: Dhanot, Ta.: Kalol, Dist.: Gandhinagar-382729, Gujarat 1 CONTENTS

More information

Limestone Mining Project (Area: ha) at Near Village: Bhod, Taluka Ranavav, District Porbandar (Gujarat) Pre-feasibility Report

Limestone Mining Project (Area: ha) at Near Village: Bhod, Taluka Ranavav, District Porbandar (Gujarat) Pre-feasibility Report Limestone Mining Project (Area: 16.18 ha) at Near Village: Bhod, Taluka Ranavav, District Porbandar PRE - FEASIBILITY REPORT FOR OBTAINING PRIOR ENVIRONMENT CLEARANCE For MINING ACTIVITY CATEGORY B2 UNDER

More information

Pre- Feasibility RepoRt

Pre- Feasibility RepoRt Pre- Feasibility RepoRt AREA- 59.28 ACRE (24.0 HA) FOR KEN RIVER SAND/MORRUM MINING AT BLOCK NO-09 KHAND NO-03 GATA NO-337 VILLAGE- KANWARA TEHSIL-BANDA, DISTRICT- BANDA(U.P) SHRI RAVINDRA NATH SINGH JULY

More information

PRE-FEASIBILITY REPORT. Name of Company / Mine Owner Shri Jayant Kumar Choudhary Location

PRE-FEASIBILITY REPORT. Name of Company / Mine Owner Shri Jayant Kumar Choudhary Location 1. SUMMARY PRE-FEASIBILITY REPORT Project Stone Quarry Name of Company / Mine Owner Shri Jayant Kumar Choudhary Location Village Taluka District State Rupapali Basna Mahasamund Chhattisgarh 1 Mining Lease

More information

PRE-FEASIBILITY REPORT

PRE-FEASIBILITY REPORT PRE-FEASIBILITY REPORT 0.0 EXECUTIVE SUMMARY Shri Ashok Patel Partner of M/s. Patel Polymers is planning to manufacture organic chemical Different Types of Resins, for proposed expansion project at Plot

More information

EXECUTIVE SUMMARY. Kumardeipur Sand Quarry Cum ' 13.3" N to 20 44' 20.7"N Longitude " E to 85 35'27.5 "E

EXECUTIVE SUMMARY. Kumardeipur Sand Quarry Cum ' 13.3 N to 20 44' 20.7N Longitude  E to 85 35'27.5 E EXECUTIVE SUMMARY 1.0 INTRODUCTION Sri Mahesh Prasad Mishra proposes to mine Sand Quarry from an approved Mining Lease over an area of 14.85 Ac or 6.01 hectares (Non-Forest Land) which is located in at

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT Page1 PRE FEASIBILITY REPORT KALDA FLAG STONE QUARRY AREA OF -1.55 HACTARE STRICTLY AS PER MOEF GUIDELINE DATE 30/12/2006 IN TERMS OF PROVISIONS OF EIA NOTIFICATION 2006 VILLAGE KALDA TEHSIL PAWAI DISTRICT

More information

PRE-FEASIBILITY REPORT FOR ORDINARY SAND

PRE-FEASIBILITY REPORT FOR ORDINARY SAND PRE-FEASIBILITY REPORT FOR ORDINARY SAND Proponent NISANT TRADERS At- Opp. Survey No.- 3 Panam River Area-2.50.00 Hectare Village-Ramji-ni-Nal, Taluka- Shahera Dist.- Panchmahal Mob.- +91924040782 CONTENTS

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT PRE FEASIBILITY REPORT 1. Introduction 1. Identification of project and project proponent The Pahanbarri Sand Quarry area is located in the Tawa River at Village- Pahanbarri, Tehsil- Itarsi & District-

More information

PRE-FEASIBILITY REPORT

PRE-FEASIBILITY REPORT M/S. VANAS INFRA PROJECTS PVT. LTD SURVEY NO. 598, CHINTALAPALLY VILLAGE, KOLLAPUR MANDAL, NAGARKURNOOL DISTRICT, TELANGANA PRE-FEASIBILITY REPORT SUBMITTED BY M/s. Sri Soma Jitendra H. No. 7-1-397/150,

More information

PROPOSED BULK DRUG & BULK DRUG INTERMEDIATES MANUFACTURING UNIT

PROPOSED BULK DRUG & BULK DRUG INTERMEDIATES MANUFACTURING UNIT PRE - FEASIBILITY REPORT For PROPOSED BULK DRUG & BULK DRUG INTERMEDIATES MANUFACTURING UNIT Of M/s. SHREE RAM INDUSTRIES PLOT NO.5117, GIDC-ANKLESHWAR, PIN-393002 TAL: ANKLESHWAR, DIST: BHARUCH, GUJARAT

More information

PREFEASIBILITY REPORT OF EXISTING SILICA SAND MINING PROJECT OF MANGUBEN KANTILAL THAKKAR

PREFEASIBILITY REPORT OF EXISTING SILICA SAND MINING PROJECT OF MANGUBEN KANTILAL THAKKAR PREFEASIBILITY REPORT OF EXISTING SILICA SAND MINING PROJECT OF MANGUBEN KANTILAL THAKKAR AT VILLAGE:- BRAHMPURI, TALUKA:- Sayla, DIST.:-Surendranagar 1 CONTENTS 1.0 INTRODUCTION 1.1 PREAMBLE 2.0 EXECUTIVE

More information

MODIFIED QUARRYING PLAN FOR "SHINGATALOOR SAND MINING BLOCK-2" EXTENT Acres (4.86 Ha) IN TUNGABHADRA RIVER BED ADJ ACENT TO SY.

MODIFIED QUARRYING PLAN FOR SHINGATALOOR SAND MINING BLOCK-2 EXTENT Acres (4.86 Ha) IN TUNGABHADRA RIVER BED ADJ ACENT TO SY. MODIFIED QUARRYING PLAN FOR "SHINGATALOOR SAND MINING BLOCK-2" EXTENT -12.00 Acres (4.86 Ha) IN TUNGABHADRA RIVER BED ADJ ACENT TO SY.NO - 129 & 131OF SHINGATALOOR - VILLAGE MUNDARGI - TALUK GADAG - DISTRICT

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT PRE FEASIBILITY REPORT Of Shri Upendra Suryawanshi At Khasra No. 413/1, 413/3 Vill.-Ambada, Tehsil-Amla, District-Betul (M.P.) Production Capacity: Max 6,320 Cu.mt/year Area 1.00Hectare Proponent Name

More information

PRE FEASIBILITY REPORT OF KUMHARI STONE MINE, LESSEE M/s VINOD KUMAR JAIN VILLAGE KUMHARI, P.O. BASIA, P.S. BASIA, DIST. - GUMLA, JHARKHAND

PRE FEASIBILITY REPORT OF KUMHARI STONE MINE, LESSEE M/s VINOD KUMAR JAIN VILLAGE KUMHARI, P.O. BASIA, P.S. BASIA, DIST. - GUMLA, JHARKHAND EXECUTIVE SUMMARY Kumhari Stone Mine is situated in Village - Kumhari, P.O. Basia, P.S. - Basia, District : Gumla, Jharkhand over an area of 2.02 Hectares or 5.00 Acres [ Plot no. 2085(P)]. Kumhari Stone

More information

PRE FEASIBILITY REPORT FOR. Silica Sand Beneficiation Plant

PRE FEASIBILITY REPORT FOR. Silica Sand Beneficiation Plant PRE FEASIBILITY REPORT FOR Silica Sand Beneficiation Plant BY Shree Silicaam Minerals LLP VILLAGE : CHOKI TALUKA : JAGADIA DIST : BHARUCH GUJARAT (INDIA) PRE-FEASIBILITY REPORT: SILICA SAND BENIFICIATION

More information

CONTENT LIST 3.0 PROJECT DESCRIPTION 7 TYPE OF PROJECT INCLUDING INTERLINKED AND INDEPENDENT PROJECTS, IF ANY

CONTENT LIST 3.0 PROJECT DESCRIPTION 7 TYPE OF PROJECT INCLUDING INTERLINKED AND INDEPENDENT PROJECTS, IF ANY CONTENT LIST S. NO. CONTENTS PAGE NO. 1.0 EXECUTIVE SUMMARY 1 2.0 INTRODUCTION OF THE PROJECT/ BACKGROUND INFORMATION 3 (i) IDENTIFICATION OF PROJECT & PROJECT PROPONENT 3 (ii) BRIEF DESCRIPTION OF NATURE

More information

PRE FEASIBILITY REPORT. For EXPANSION OF CEMENT PLANT. With

PRE FEASIBILITY REPORT. For EXPANSION OF CEMENT PLANT. With PRE FEASIBILITY REPORT For EXPANSION OF CEMENT PLANT With INCREASE OF PRODUCTION CLINKER: 0.66 to 3.00 MTPA CEMENT: 0.95 to 2.50 MTPA INSTALLATION OF WASTE HEAT RECOVERY BOILER: 15 MW By SAGAR CEMENTS

More information

SRI K. RAVI SHANKAR SURVEY NO.100, ODULAPALLI VILLAGE, TALPULA MANDAL, ANANTHAPURAMU DISTRICT, ANDHRA PRADESH

SRI K. RAVI SHANKAR SURVEY NO.100, ODULAPALLI VILLAGE, TALPULA MANDAL, ANANTHAPURAMU DISTRICT, ANDHRA PRADESH SRI K. RAVI SHANKAR SURVEY NO.100, ODULAPALLI VILLAGE, TALPULA MANDAL, ANANTHAPURAMU DISTRICT, ANDHRA PRADESH PRE FEASIBILITY REPORT (OPENCAST QUARTZ MINE 40.313 ha) SUBMITTED BY Sri Door No. 39/49/39,

More information

Environment Consultant:

Environment Consultant: MODERNIZATION CUM EXPANSION OF INDUCTION FURNACE PRODUCTION(2,05,000 TPA TO 6,00,000 TPA) AND ROLLING MILL PRODUCTION (3, 69,000 TPA TO 6,00,000 TPA) at Sy. No. 158 (part) 159 (part), 166 170, village

More information

PRE-FEASIBILITY REPORT

PRE-FEASIBILITY REPORT PRE-FEASIBILITY REPORT For Excavation of Brick Earth (Total Mining Area 1.112Ha.) (For Manufacturing of Bricks) Submitted By M/s New Kaptan Brick Field Shri Krishna Kr. Singh S/o Shri Brahma DevSingh Pure

More information

PRE-FEASIBILITY REPORT FOR M/s FIXEM CEMENT PRIVATE LIMITED

PRE-FEASIBILITY REPORT FOR M/s FIXEM CEMENT PRIVATE LIMITED PRE-FEASIBILITY REPORT FOR M/s FIXEM CEMENT PRIVATE LIMITED 1. SUMMARY Kacari Silica Sand,Khanda,Geeti And Moram Project at Khasra No.-10,11,12,13,101, 102,122, 126, 127,128,129,130,131, 167,568,570,571,572,

More information

EXECUTIVE SUMMARY 1.0 PROJECT DESCRIPTION 1.1 INTRODUCTION

EXECUTIVE SUMMARY 1.0 PROJECT DESCRIPTION 1.1 INTRODUCTION EXECUTIVE SUMMARY 1.0 PROJECT DESCRIPTION 1.1 INTRODUCTION Jaypee Group is a leading Business House of the country with its presence in Core industries and Service Sectors like Cement, Infrastructure development,

More information

PRE-FEASIBILITY REPORT FOR M/s FIXEM CEMENT PRIVATE LIMITED

PRE-FEASIBILITY REPORT FOR M/s FIXEM CEMENT PRIVATE LIMITED PRE-FEASIBILITY REPORT FOR M/s FIXEM CEMENT PRIVATE LIMITED 1. SUMMARY Kacari Silica Sand,Khanda,Stone And Moram Project at Khsara No.-144,145,146,147, 148,150, 309, 310, 311,312,313,314,315,316,317,318,320,399,403,404,405,

More information

ANDHRA PRADESH POLLUTION CONTROL BOARD, REGIONAL OFFICE, TIRUPATI

ANDHRA PRADESH POLLUTION CONTROL BOARD, REGIONAL OFFICE, TIRUPATI M/s. JANANY CEMENT INDUSTRIES PRIVATE LIMITED SURVEY NO 462, INDUSTRIAL PARK, GUNTAKINDAPALLI VILLAGE, SRIKALAHASTI MANDAL, CHITTOOR DISTRICT, ANDHRA PRADESH EXECUTIVE SUMMARY SUBMITTED BY M/s.Janany Cement

More information

M/s. LAKSHMANAN CEMENTS PVT LTD, Survey Number 69-3, 69-4, Pachanapalli Village, Chittoor Mandal and District, Andhra Pradesh

M/s. LAKSHMANAN CEMENTS PVT LTD, Survey Number 69-3, 69-4, Pachanapalli Village, Chittoor Mandal and District, Andhra Pradesh M/s. LAKSHMANAN CEMENTS PVT LTD, Survey Number 69-3, 69-4, Pachanapalli Village, Chittoor Mandal and District, Andhra Pradesh EXECUTIVE SUMMARY SUBMITTED BY M/s. Lakshmanan Cements Pvt Ltd No. 58-A, 25

More information

PROJECT FEASIBILITY REPORT

PROJECT FEASIBILITY REPORT PROJECT FEASIBILITY REPORT FOR OBTAINING PRIOR ENVIRONMENT CLEARANCE For PROPOSED CHEMICAL MANUFACTURING UNIT From M/s. MORADIA BROTHERS CHEM PVT LTD LOCATED AT: Block No.: 45, JalBhumi Industrial Estate,

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT PRE FEASIBILITY REPORT For NEW PROJECT (PIGMENT MANUFACTURING PLANT) Of M/s. SHREY INDUSTRIES Survey No. 111 & 112, Plot No. 7 & 8, Village: Dhanot, Ta: Kalol, Dist: Gandhinagar (Gujarat) CONTENTS Sr.

More information

2. PRE-FEASIBILITY REPORT

2. PRE-FEASIBILITY REPORT 2. PRE-FEASIBILITY REPORT 2.1 Executive Summary Sri D. Ujjinappa has applied for quarry lease for extracting of Building stone in Sy No. 19/2, Chatnihalli Village, Harpanahalli Taluk, Davangere District,

More information

Pre-Feasibility Report [Application submitted for obtaining Terms of Reference for Prior Environment Clearance]

Pre-Feasibility Report [Application submitted for obtaining Terms of Reference for Prior Environment Clearance] Pre-Feasibility Report [Application submitted for obtaining Terms of Reference for Prior Environment Clearance] Project Proposal: Expansion of Cement Plant capacity from 1.5 to 2.20 MTPA of Clinker and

More information

ENVIRONMENTAL MANAGEMENT PLAN

ENVIRONMENTAL MANAGEMENT PLAN ENVIRONMENTAL MANAGEMENT PLAN Of 0.66 MTPA CEMENT GRINDING UNIT At BHUPDEOPUR VILLAGE, KHARSIA TAHSIL, RAIGARH DISTRICT, CHHATTISGARH STATE. By M/s. CALCAR PRODUCTS PVT., LTD Prepared By B.S. ENVI-TECH

More information

L26942OR1949PLC000185

L26942OR1949PLC000185 OCL INDIA LIMITED Regd. Office: At/Po/Ps: Rajgangpur, Dist: Sundargarh, Odisha-770017 CIN: L26942OR1949PLC000185 Tel. No. :(06624)221212, 220121 Website: www.ocl.in / www.oclindialtd.in, E-mail: ocl_rajgangpur@ocl.in

More information

- 1 S. NO. PARTICULARS DETAILS

- 1 S. NO. PARTICULARS DETAILS 1.0 INTRODUCTION EXECUTIVE SUMMARY M/s. Lafarge India Private Ltd. (LIPL) is a subsidiary of French building materials major Lafarge. Lafarge entered in the Indian market in 1999 with acquisition of cement

More information

IMS (Integrated Milling System)

IMS (Integrated Milling System) IMS (Integrated Milling System) PORTABLE CEMENT GRINDING PLANT IMSATEC GmbH Grinding Plant IMS (Integrated Milling System) CONCEPT Mini Cement grinding plants with greater efficiency in the cement market.

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT VENSUB LABORATORIES PRIVATE LIMITED SY. NO. 29, TUPAKULAGUDEM VILLAGE, TALLAPUDI MANDAL, WEST GODAVARI DISTRICT, ANDHRA PRADESH PRE FEASIBILITY REPORT VENSUB LABORATORIES PRIVATE LIMITED Duplex No. 12,

More information

Pre-Feasibility Report for Girgita Limestone Mine of M/s KJS Cements Ltd.)

Pre-Feasibility Report for Girgita Limestone Mine of M/s KJS Cements Ltd.) Pre-Feasibility Report for Girgita Limestone Mine of M/s KJS Cements Ltd.) 1) Executive Summary Project Name of Company / Mine Owner Location Village Taluka District State Girgita Limestone Mine M/s KJS

More information

PRE-FEASIBILITY REPORT. for

PRE-FEASIBILITY REPORT. for PRE-FEASIBILITY REPORT for PROPOSED COMMON EFFLUENT TREATMETN PLANT (CETP) of M/s. VIKASHTEX ENVIROTECH CETP PVT. LTD. Block No. 523, Village: Hathoda, Taluka: Mangrol, Dist: Surat - 394 405 (Guj.) Prepared

More information

PRE-FEASIBILITY REPORT

PRE-FEASIBILITY REPORT PRE-FEASIBILITY REPORT For ToR of Proposed Project of MANUFACTURING OF SYNTHETIC ORGANICCHEMICALS (RESINS) (5 f B IND II) By M/s M R INDUSTRIES SURVEY NO. 58/1 & 58/3 OPPOSITE WHOLESOME FOOD PVT. LTD.,

More information

2. PRE-FEASIBILITY REPORT

2. PRE-FEASIBILITY REPORT 2. PRE-FEASIBILITY REPORT 2.1 Executive Summary Smt. J N Rukmini, has applied for extracting of Building stone in Sy No. 40, Kuroda Bore Kavala village, Hassan Taluk & District, Karnataka over an extent

More information

PRE-FEASIBILITY REPORT

PRE-FEASIBILITY REPORT PRE-FEASIBILITY REPORT For Polyurethane Foam Manufacturing Facility Of M/s. KRISHNA MARUTI LTD. At Plot No-13, SMG JV Park, Block No- 334,335 Vill- Hansalpur, Tal - Mandal Dist.: Ahmedabad, Gujarat INDEX

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT PRE FEASIBILITY REPORT For EXPANSION IN EXISTING MANUFACTURING PLANT Of M/s. SHIVA DYE STUFF PVT. LTD Plot no. A2-11/6104,G.I.D.C. Industrial Estate, Ankleshwar-393002, Gujarat. 1 CONTENTS Sr. No. Description

More information

Table 1.1: The Salient Features of the Project Proposed Quartz Mine Of M/s. Viswanadha Stone Crusher & 16 others

Table 1.1: The Salient Features of the Project Proposed Quartz Mine Of M/s. Viswanadha Stone Crusher & 16 others 1. EXECUTIVE SUMMARY 1.1 Introduction The Road Metal Quarries was granted in Guntur District, Andhra Pradesh has been allotted to M/s. Viswanadha Stone Crusher & 16 others by Assistant Director of Mines

More information

F. No. J-11011/480/2007-IA II (I) Government of India Ministry of Environment and Forests (I.A Division)

F. No. J-11011/480/2007-IA II (I) Government of India Ministry of Environment and Forests (I.A Division) To, M/s. Madras Cement Ltd. V Floor 98-A, Dr. Radhakrishnan Road Mylapore Chennai 600 004 Tamilnadu F. No. J-11011/480/2007-IA II (I) Government of India Ministry of Environment and Forests (I.A Division)

More information

PRE FEASIBILITY REPORT OF KANIYAKULAM EARTH QUARRY

PRE FEASIBILITY REPORT OF KANIYAKULAM EARTH QUARRY PRE FEASIBILITY REPORT OF AZHAGAPPAPURAM EARTH FOR OVER AN EXTENT OF 0.61.0HA IN AZHAGAPPAPURAM VILLAGE, AGASTEESWARAM TALUK, KANNIYAKUMARI DISTRICT, TAMIL NADU OF, (Under the Guidelines of Ministry of

More information

1. PRE-FEASIBILITY REPORT

1. PRE-FEASIBILITY REPORT 1. PRE-FEASIBILITY REPORT 1.1 Executive Summary Sri. T. Thimmegowda, has applies quarry lisence for extracting of Building Stone Quarry in Sy No. 33/2, Kurodbore Kaval village, Hassan Taluk, Hassan District,

More information

1.1 SALIENT FEATURES OF THE PROJECT Pipeline extension from VVSPL Vijayawada to the proposed Dharmapuri Storage Terminal

1.1 SALIENT FEATURES OF THE PROJECT Pipeline extension from VVSPL Vijayawada to the proposed Dharmapuri Storage Terminal 1.0 EXECUTIVE SUMMARY Hindustan Petroleum Corporation Limited (HPCL) is one of the major Public Sector Navratna Oil Company engaged in refining, marketing and distribution of Petroleum Products in India.

More information

LG POLYMERS INDIA PVT. LTD. SY. NO.S 29 TO 45, 83/1 AND 83/3, RR VENKATAPURAM VILLAGE, PENDURTI MANDAL, VISAKHAPATNAM DISTRICT, ANDHRA PRADESH

LG POLYMERS INDIA PVT. LTD. SY. NO.S 29 TO 45, 83/1 AND 83/3, RR VENKATAPURAM VILLAGE, PENDURTI MANDAL, VISAKHAPATNAM DISTRICT, ANDHRA PRADESH LG POLYMERS INDIA PVT. LTD. SY. NO.S 29 TO 45, 83/1 AND 83/3, RR VENKATAPURAM VILLAGE, PENDURTI MANDAL, VISAKHAPATNAM DISTRICT, ANDHRA PRADESH PRE FEASIBILITY REPORT LG Polymers India Pvt. Ltd. Sy. No.s

More information

PRE- FEASIBILITY REPORT FOR PROPOSED ORDINARY EARTH EXCAVATION PROJECT (94.59 ARES) of Shri Saji Sebastian, Madeckal House, Kizhakambalam P.

PRE- FEASIBILITY REPORT FOR PROPOSED ORDINARY EARTH EXCAVATION PROJECT (94.59 ARES) of Shri Saji Sebastian, Madeckal House, Kizhakambalam P. PRE- FEASIBILITY REPORT FOR PROPOSED ORDINARY EARTH EXCAVATION PROJECT (94.59 ARES) of Shri Saji Sebastian, Madeckal House, Kizhakambalam P.O, Ernakulam (Dist.) Survey No. 129/1-4,129/2-1, Arakuzha Village,

More information

PREFEASIBILITY REPORT FOR BRICK EARTH MINE

PREFEASIBILITY REPORT FOR BRICK EARTH MINE Page 1 PREFEASIBILITY REPORT FOR BRICK EARTH MINE Developed By- Village-Chandauhan, Tehsil-Phulpur, District-Allhabaad, Uttar Pradesh. RAI ENVIROMENTAL SERVICES PVT. LTD. Website: www.raienviro.com Email

More information

Hind Energy & Coal Beneficiation (India) Ltd.

Hind Energy & Coal Beneficiation (India) Ltd. SUMMARY ON ENVIRONMENTAL IMPACT ASSESSMENT REPORT OF Hind Energy & Coal Beneficiation (India) Ltd. (Change in Technology) at Hindadih Village, Masturi Tehsil Bilaspur District, Chhattisgarh Submitted to

More information

Shri Hari Dyes & Chemicals Plot No.: 439/1,417, Phase No. II, GIDC Estate, Vatva , Ahmedabad

Shri Hari Dyes & Chemicals Plot No.: 439/1,417, Phase No. II, GIDC Estate, Vatva , Ahmedabad Annexure Prefeasibility Report (PFR) File PRE FEASIBILITY REPORT For PROPOSED EXPANSION IN EXISTING MANUFACTURING PLANT Of Shri Hari Dyes & Chemicals Work & Regd. Office: CONTENTS Sr. No. Description 1.

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT PRE FEASIBILITY REPORT FOR OBTAINING PRIOR ENVIRONMENT CLEARANCE FOR MANUFACTURING OF SYNTHETIC ORGANIC CHEMICALS OF M/s. MAYUR COLOUR AND CHEMICALS LOCATED AT Plot No. 5148, GIDC Industrial Estate, Ankleshwar

More information

Accord Energy Corporation India Pvt. Ltd.

Accord Energy Corporation India Pvt. Ltd. Accord Energy Corporation India Pvt. Ltd. PRE-FEASIBILITY REPORT ON ENVIRONMENTAL ASPECTS OF PROPOSED INCREASE IN CAPACITY 2 x 150 MW to 2 x 180 MW OF EXISTING ENVIRONMENTAL CLEARANCE ( J-13012/107/ 2009-IA-II

More information

PRE-FEASIBILITY REPORT FOR 0.99 LAKH TON PER ANNUM (300 TPD) CEMENT GRINDING PLANT CHARIOT CEMENT COMPANY

PRE-FEASIBILITY REPORT FOR 0.99 LAKH TON PER ANNUM (300 TPD) CEMENT GRINDING PLANT CHARIOT CEMENT COMPANY PRE-FEASIBILITY REPORT FOR 0.99 LAKH TON PER ANNUM (300 TPD) CEMENT GRINDING PLANT of CHARIOT CEMENT COMPANY (A UNIT OF M/s CHARIOT STEEL & POWER (P) LTD.) PROPOSED AT KALUNGA INDUSTRIAL ESTATE, TEHSIL-LATHIKATA,

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT PRE FEASIBILITY REPORT BANDOL CRUSHER STONE QUARRY OF SHRI TULSIRAM SAHU AT Khasra No. 15/2,23/2 Village Bandol Tehsil District State Madhya Pradesh Production Capacity 45030 M3/Year Area 3.150 Hectare

More information

LIST OF TABLES LIST OF FIGURES ANNEXURES LIST

LIST OF TABLES LIST OF FIGURES ANNEXURES LIST CONTENT LIST S. NO. CONTENTS PAGE NO. 1.0 EXECUTIVE SUMMARY 1 2.0 INTRODUCTION OF THE PROJECT/ BACKGROUND INFORMATION 3 (i) IDENTIFICATION OF PROJECT & PROJECT PROPONENT 3 (ii) BRIEF DESCRIPTION OF NATURE

More information

(Vizag Cement Grinding Unit)

(Vizag Cement Grinding Unit) PRE-FEASIBILITY REPORT OF GREEN FIELD STANDALONE CEMENT GRINDING UNIT OF 2 X 1.0 MILLION TONS PER ANNUM CAPACITY Proposed At Gaithulapalem, Tallapalem & Narasapuram Villages Kasimkota Mandal Visakhapatnam

More information

PRE-FEASIBILTY REPORT

PRE-FEASIBILTY REPORT Aug 2018 PRE-FEASIBILTY REPORT OF M/S. J.M.R.MINES (MINING OF FELDSPAR, QUARTZ & MICA MINE) Lease Area : 5.78 Hectares(14.29 Acres) Sy.No.941,942,943 &947 Giddalur (V), Sydapuram (M), SPSR Nellore District

More information

PRE-FEASIBILITY REPORT GHODACH SOAPSTONE & DOLOMITE MINES (APPLICANT: M/S KASTURI MINERALS)

PRE-FEASIBILITY REPORT GHODACH SOAPSTONE & DOLOMITE MINES (APPLICANT: M/S KASTURI MINERALS) 20 PRE-FEASIBILITY REPORT OF GHODACH SOAPSTONE & DOLOMITE MINES (APPLICANT: M/S KASTURI MINERALS) 1. EXECUTIVE SUMMARY: The project is for mining of Ghodach soapstone & Dolomite Mine M.L. No. 69/2010 Near

More information

Pre- FEASIBILITY REPORT

Pre- FEASIBILITY REPORT Pre- FEASIBILITY REPORT In Respect Of KATIKELA RIVER SAND BED OVER 15.00 ACRES OR 6.070 HA IN VILLAGE KATIKELA, JHARSUGUDA TAHASIL OF JHARSUGUDA DISTRICT, ODISHA (For the Financial Year-2015-16 to 2019-20)

More information

S. No Parameter Details 1 Name & Address of the Applicant

S. No Parameter Details 1 Name & Address of the Applicant 1. EXECUTIVE SUMMARY S. No Parameter Details 1 Name & Address of the Applicant M/s AMULYA GRANITES Prop: Smt CH.SARALA H. No. FLAT NO.207 Roja Kishore Residency, Chenchupet, Tenali, AP-522 202 Guntur District,

More information

Plot No. 2-D1, Obadenahalli, 3 rd Phase KIADB Industrial Area, Doddaballapur taluk, Bangalore Rural District , Karnataka State.

Plot No. 2-D1, Obadenahalli, 3 rd Phase KIADB Industrial Area, Doddaballapur taluk, Bangalore Rural District , Karnataka State. ON Plot No. 2-D1, Obadenahalli, 3 rd Phase KIADB Industrial Area, Doddaballapur taluk, Bangalore Rural District 561 205, Karnataka State. Table of Contents 1. EXECUTIVE SUMMARY 2. INTRODUCTION OF THE PROJECT/

More information

Damodhar Cement Works

Damodhar Cement Works Excellence Through Teamwork Water conservation through recycle and reuse Presented By ACC Limited Damodhar at a glance. DCSL commenced commercial production in October 199 as a joint venture project of

More information

PRE FEASIBILTY REPORT

PRE FEASIBILTY REPORT PRE FEASIBILTY REPORT FOR ENVIRONMENT CLEARANCE OF PROPOSED NEW PROJECT S. O. CHEMICALS (5 f Category) Proposed By: COREL PHARMA CHEM PVT. LTD. SURVEY NO. 473 & 481, BORISANA, KADI THOL ROAD, KADI, DIST

More information

Environmental Clearance Compliance Half Yearly Report

Environmental Clearance Compliance Half Yearly Report Environmental Clearance Compliance Half Yearly Report HALF YEARLY COMPLIANCE REPORT- Oct. 2015 to March 2016 Ref: MOEF, New Delhi Environment Clearance F. No. J-11011/118/2007- IA II (I) dated 25 th August,

More information

PRE- FEASIBILITY REPORT

PRE- FEASIBILITY REPORT PRE- FEASIBILITY REPORT PREPARED FOR SHIV SHANTHI CEMENT PRIVATE LIMITED Sy. Nos. 92, 93 & 94, Tatiguda Village, Garividi Mandal, Vizianagaram District, Andhra Pradesh. PREPARED BY ISO 9001: 2008 Certified

More information

Environmental Clearance Compliance Half Yearly Report

Environmental Clearance Compliance Half Yearly Report Environmental Clearance Compliance Half Yearly Report HALF YEARLY COMPLIANCE REPORT- April 2016 Sept. 2016 Ref: MOEF, New Delhi Environment Clearance F. No. J-11011/118/2007- IA II (I) dated 25 th August,

More information

PRE-FEASIBILTY REPORT SUNATHAR STONE QUARRY. VILLAGE: Sunathar. TAHASIL: Purushottampur. DIST: Ganjam LESSEE SRI KAPILA CHANDRA SAHU

PRE-FEASIBILTY REPORT SUNATHAR STONE QUARRY. VILLAGE: Sunathar. TAHASIL: Purushottampur. DIST: Ganjam LESSEE SRI KAPILA CHANDRA SAHU PRE-FEASIBILTY REPORT OF SUNATHAR STONE QUARRY VILLAGE: Sunathar TAHASIL: Purushottampur DIST: Ganjam LESSEE SRI KAPILA CHANDRA SAHU Vill/Po- Gandala, P.S.- Hinjili, Dist.-Ganjam Odisha. CONTENTS CHAPTER

More information

PRE-FEASIBILIY REPORT

PRE-FEASIBILIY REPORT BENDRI LIMESTONE QUARRY NO. - 4 3 (Quarry No. 1) (Quarry No. 1)MINERALS - DOLOMITE (LEASE PERIOD 20.05.2002 TO 19. 05.2022) LEASE AREA - 42.754 HECTARES MINING PROJECT - CATEGORY- B PRE-FEASIBILIY REPORT

More information

Environmental Clearance Compliance Half Yearly Report

Environmental Clearance Compliance Half Yearly Report Environmental Clearance Compliance Half Yearly Report HALF YEARLY COMPLIANCE REPORT- April 2017 - Sept 2017 Ref: MOEF, New Delhi Environment Clearance F. No. J-11011/118/2007- IA II (I) dated 25 th August,

More information

SUMMARY. for New Standalone Cement Grinding Unit. proposed at

SUMMARY. for New Standalone Cement Grinding Unit. proposed at SUMMARY of ENVIRONMENT IMPACT ASSESSMENT REPORT for New Standalone Cement Grinding Unit ( 2 x 1.0 million tons per annum) proposed at Gaithulapalem, Tallapalem & Narasapuram Villages, Kasimkota Mandal,

More information

CHAPTER REHABILITATION AND RESETTLEMENT (R&R) PLAN (I) POLICY TO BE ADOPTED (CENTRAL / STATE)... 32

CHAPTER REHABILITATION AND RESETTLEMENT (R&R) PLAN (I) POLICY TO BE ADOPTED (CENTRAL / STATE)... 32 CONTENTS CHAPTER 1... 1 1.0 PROJECT SUMMARY... 1 CHAPTER 2... 2 2.0 INTRODUCTION... 2 (I) IDENTIFICATION OF PROJECT AND PROJECT PROPONENT... 2 (II) BRIEF DESCRIPTION OF NATURE OF THE PROJECT... 2 (III)

More information

M/s. Lakeland Chemicals (India) Ltd.

M/s. Lakeland Chemicals (India) Ltd. FOR THE PROPOSED EXPANSION PROJECT FOR MANUFACTURING OF SPECALITY CHEMICALS Category: 5(f) A OF Located at: Plot no 63,6A,6B, Rasayani Road, Vill. Madap, Tq. Khalapur, Dist. Raigad.( Maharashtra) 1 Project

More information

INDEX. S. No. Item Page No. 1 EXECUTIVE SUMMARY 3 2 INTRODUCTION OF THE PROJECT / BACKGROUND

INDEX. S. No. Item Page No. 1 EXECUTIVE SUMMARY 3 2 INTRODUCTION OF THE PROJECT / BACKGROUND PRE-FEASIBILITY REPORT PREPARED FOR D. SESHA REDDY [Mine Lease Area 3.253 Ha.] Sy. No. 12/D Nagarur Village, Yadiki Mandal, Ananthapur District, Andhra Pradesh. PREPARED BY ISO 9001: 2008 Certified Accredited

More information

PREFEASIBILITY REPORT

PREFEASIBILITY REPORT PREFEASIBILITY REPORT For ToR Application of Expansion Project For MANUFACTURING OF SYNTHETIC ORGANIC CHEMICALS (Dyes Intermediates) Proposed By: M/s. Plot No. C/1/B-145-3 Phase-II, GIDC Estate, Naroda,

More information

INSPIRE INDUSTRIES PVT. LTD.

INSPIRE INDUSTRIES PVT. LTD. For Proposed 0.999 MTPA Coal Washery At Village: Bhelai, Tehsil: Baloda, District: Janjgir-Champa, Chhattisgarh Envirotech East (P) Limited An ISO 9001:2008, 14001:2004 & OHSAS:18001:2007 Company Laboratory

More information

Check list for construction Project of EC [Category 8(a)]:

Check list for construction Project of EC [Category 8(a)]: Check list for construction Project of EC [Category 8(a)]: Provide authenticated (with stamp & Signature) hard copy of this check-list during submission of hard copy of ToR application. Sr. no. Checklist

More information

Cement Grinding Plant, Madhukunda P.O. Sunuri Dist. - Purulia West Bengal

Cement Grinding Plant, Madhukunda P.O. Sunuri Dist. - Purulia West Bengal ENVIIRONMENTAL AUDIIT STATEMENT M//s.. ACC LIIMIITED Damodhar Cement Works Cement Grinding Plant, Madhukunda P.O. Sunuri 723 121 Dist. - Purulia West Bengal FOR THE YEAR 2015-2016 1 L I S T O F C O N T

More information

PRE-FEASIBILITY REPORT FOR M/s FIXEM CEMENT PRIVATE LIMITED

PRE-FEASIBILITY REPORT FOR M/s FIXEM CEMENT PRIVATE LIMITED PRE-FEASIBILITY REPORT FOR M/s FIXEM CEMENT PRIVATE LIMITED 1. SUMMARY M/s FIXEM CEMENT PRIVATE LIMITED is a body corporate incorporated under the provisions of the Companies Act, 1956 and registered with

More information

The Ramco Cements Limited

The Ramco Cements Limited PRE FEASIBILITY REPORT of KOLIMIGUNDLA LIMESTONE MINE Mining lease area: 255.00 Ha (Non-forest land) Kolimigundla, Itikyala & Kalvatala Villages Kolimigundla Mandal, Kurnool Dist., Andhra Pradesh. for

More information

PRE-FEASIBILITY REPORT

PRE-FEASIBILITY REPORT PRE-FEASIBILITY REPORT FOR Conversion of Existing Product Storage Tanks TK-16(HSD) of 6000 KL to MS and TK-6(MS) of 1000 KL to Ethanol AT HPCL Bulk POL Depot, Mansa Road, Phoos Mandi, Bhatinda-151001.

More information

PRE-FEASIBILITY REPORT

PRE-FEASIBILITY REPORT PRE-FEASIBILITY REPORT FOR INCREASING THE PRODUCTION CAPACITY of EXISTING BLAST FURNACES From 2,92,000 TPA to 3,50,000 TPA (Increase by 58000 TPA) BY Process Optimization & Efficiency Improvement LOCATION

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT PRE FEASIBILITY REPORT For PROPOSED EXPANSION OF CARBON BLACK (10950 TPM TO 15750 TPM ) AND CO-GENERATION POWER PLANT (22 MW TO 32 MW) IN EXISTING PREMISES of M/s. PHILLIPS CARBON BLACK LTD. Survey No.

More information