1 Natural Environment No impacts of provincial significance to the natural environment are anticipated for the rapid transit project. Other impacts and how they will be mitigated are outlined in the table below. Factor Potential Effects Mitigation Measures Aquatic Habitat & Fisheries Terrestrial Vegetation Faunal Community Storm Water Construction activities may: Disturb fish habitats near structures over watercourse crossings Introduce sediment and increase turbidity of water in creek systems Disturb creek banks Introduce fill and sediment run-off into natural heritage features Construction activities may: Damage trees, shrubs and roots where they are in close proximity to heavy machinery and the rapidway Deposit dust on vegetation Compact the soil during grading Increase edge effects because of cleared vegetation, potentially leading to the introduction and increased population of invasive species Construction activities may disturb breeding grounds for birds and other resident wildlife There may be changes to flow, flood storage, and run-off in some locations along the rapid transit corridor Sediment control measures will be used to avoid runoff Approvals will be obtained from the appropriate agencies if in-water works are needed During construction, where required: Fencing will be used to protect trees, shrubs and roots from heavy machinery Dust suppressants will be used to reduce or eliminate dust creation and deposits Root zones will be fenced off to avoid soil compaction Construction will be limited to areas outside of natural heritage features where possible The Region will comply with the existing tree replacement by-law Construction will be scheduled to limit potential impacts on endangered and protected fauna where possible Bird-nesting protective measures will be used where necessary Silt fencing will be set up and vegetation will be protected around frog breeding ponds as required Consideration will be given to adjusting the proposed alignment along rail corridors to maintain existing water drainage ditches and swales Efforts will be taken to maintain existing flood storage capacity along the spur Drainage ditches will be redesigned and relocated as necessary

2 Transportation & Utilities No impacts of provincial significance to transportation and utilities are anticipated for the rapid transit project. Other impacts and how they will be mitigated are outlined in the table below. Factor Potential Effects Mitigation Measures Roads & Traffic Transit Service Cycling & Pedestrian Facilities Utilities Traffic and access may be subject to restrictions and detours throughout the construction period Permanent changes to some vehicular accesses along the corridor will be required Some intersections along the corridor may experience greater delays during peak hours Some loss of on-street parking and loading opportunities Existing transit service may be detoured during construction Pedestrian and cycling access may be restricted in some areas during construction Construction disruption from replacement and relocation of utilities Property impacts due to widening of road allowance to accommodate utility relocations Temporary loss of utility service during construction Hydro transmission lines will be buried along the hydro corridor, between Courtland Avenue and Fairview Park Mall, with the potential to disrupt unknown archaeological resources Construction will be staged to minimize impacts to businesses and residences The Region will work with residents and business owners before and during construction to minimize construction impacts Traffic management plans will be developed for temporary road closures and detours Signalized intersections in the study area will be assessed and adjusted as required to provide better signal coordination within the network for all modes The system will be designed to minimize impacts on parking and loading opportunities The Region is committed to maintaining GRT service along impacted corridors during construction Pedestrians and cyclists will have access through construction zones where possible Local pedestrian access to residences and businesses will be maintained during construction Residents and businesses will be kept informed of utility construction activities Utility relocations and related service interruptions will be minimized On most streets along the route, utilities will be located outside of the rapidway to ensure the continuity of LRT service in the event of a utility failure or replacement Consideration will be given to encasing utilities to protect them from surface works where required Construction will be staged to minimize impacts to businesses and residences If undocumented archaeological resources are found during construction, the appropriate process set out by the Ontario Heritage Act will be followed

3 Socio-Economic Environment No impacts of provincial significance to the socio-economic environment are anticipated for the rapid transit project. Other impacts and how they will be mitigated are outlined in the table below. Factor Potential Effects Mitigation Measures Property Noise & Vibration Air Quality Less than 150 partial property purchases and less than 15 buyouts will be required along the rapid transit corridor Construction noise will be typical of road widening or extension projects Construction staging areas for assembling and storing materials will have the potential to create localized noise and vibration impacts The proposed alignment will bring transit operations closer to some properties with the potential for vibration impacts There may be noise and vibration increases around the maintenance and storage facility Construction will have the potential to increase dust emissions from noncombustion sources Construction activities, vehicles and stationary combustion sources will emit exhaust emissions (including greenhouse gases) Localized air quality may worsen at park n ride locations and rapid transit terminals because of increased bus and auto activity Detailed property requirements will be prepared in future design phases Consultation with property owners to discuss property requirements and acquisition is occurring and will continue Compensation will be provided at fair market value of the land and the remaining property will be restored to the condition it was prior to the project In the case of expropriation, the process set out in the Ontario Expropriations Act will be followed to ensure the rights of property owners are protected Construction staging areas will be designed and located to minimize impacts The rapid transit system will be designed to comply with the Ministry of Environment noise and vibration requirements. This design will require a noise barrier at the following two locations: Bearinger Road Quiet Place Pattandon Avenue The maintenance and storage facility will be located in an industrial area, away from noise-sensitive residential areas During construction: Dust suppressants will be used to reduce or eliminate dust creation and deposits during clearing, grading, earth moving, excavation, or transport of cut or fill Excavated or fill materials stored on site will be covered Street cleaning will be done to limit the tracking of materials The idling time of construction equipment will be minimized Energy efficient construction equipment will be used where possible Higher levels of transit, using newer buses and electric trains, will encourage a switch from car travel to transit resulting in an improvement of overall air quality Ottawa Street South Mill Street Sydney Street South

4 Cultural & Built Heritage No impacts of provincial significance to cultural and built heritage are anticipated for the rapid transit project. Other impacts and how they will be mitigated are outlined in the table below. Factor Potential Effects Mitigation Measures Cultural & Built Heritage Archaeology Some visual and physical changes to cultural heritage landscapes are expected from road widenings and rail realignment on the existing spurs No archaeological resources were encountered within the limits of the rapid transit alignment during Stage 1 and Stage 2 archaeological assessments Impacts to heritage resources will be minimized by maximizing the use of the existing road allowance and acquiring properties only at critical locations Where possible, consideration will be given to reducing the visual impacts of the rapid transit system in historic areas through the use of context-sensitive design Documentation of the existing rail corridor context and associated history will be provided to local archives Required archaeological licensing (Stage 1 and Stage 2) will be obtained before construction If undocumented archaeological resources are found during construction, the appropriate process set out by the Ontario Heritage Act will be followed

5 Impact Conclusions No impacts of provincial significance are anticipated for the rapid transit project. Monitoring Process An impact monitoring plan will be developed to ensure compliance with relevant legislation. Construction Compliance Objectives: Address commitments in the Environmental Project Report and conditions of any permits and approvals Develop summary reports documenting compliance with the plan Objectives: Operational Compliance Identify problems and evaluate effectiveness of controls Confirm that technology and system operates as designed and determine any remedial improvements Report on results and take appropriate follow-up action Commitments to Further Work The Region will undertake future design phases building upon the functional design plans to further evaluate and define alignment, stations, maintenance and storage facility, park n ride, and other specifications. The Region will continue consultation with the public, agencies, stakeholders and First Nation communities. Next Steps May 2012: Completion of the TPA for Stage : Full implementation of abrt Begin construction of LRT Stage 1 Begin the planning process for the TPA for LRT Stage : Complete construction and begin operation of LRT Stage 1

6 Procurement What is a P3? P3 stands for public private partnership. The partnership is based on a negotiated contract between a public organization and a private company. They work together to complete projects. The intent of a P3 is to build on the strengths of each partner (public and private sector). Each project is different, therefore public and private sector roles adjust to provide the best outcome. What is a procurement and delivery option? Procurement is a process used to buy a product or service. Delivery is how that product or service is built and/or provided. Together, a procurement and delivery option is one way that a product or service can be completed. There can be many different options for purchasing and providing a product or service. A procurement and delivery option can include private sector involvement in any combination of designing, building, financing, operating and maintaining of a project. What does the Region of Waterloo s preliminary preferred procurement and delivery option, DBFOM, mean? DBFOM is one way that the rapid transit project can be purchased, constructed, financed and eventually operated and maintained. As noted above, this is a P3 approach that is a partnership between the public and private sector. DBFOM means: Design = the private company would complete detailed design drawings and plans of the route. Build = the private company would build the rapid transit system. Finance = the private company would have to obtain financing to pay its employees and other costs in advance of the Region s instalment payments. The Region would withhold part of the construction payment to the private company and pay it in instalments when the contract requirements are met by the private company over the term of the project. Operate = the private company would manage the day-to-day operations of the light rail transit (LRT) system. Maintain = the private company would look after the repairs and upkeep of the LRT system, including tracks and vehicles. Why is DBFOM the Region s preliminary preferred procurement and delivery option? DBFOM would provide the following benefits: Cost: LRT design and construction can proceed at the same time, with significant time savings, better coordination and more efficient construction. The private company would have to deal with competitive pressure and answer to their lenders, so they would be inclined to provide a better value and a lower total project cost ensuring that the project is on time and on budget. Experience and qualifications: The private sector has more experience and qualifications than the Region with designing and constructing an LRT system. They also have more experience with operating and maintaining an LRT system at start-up, and with providing trained and certified staff to operate the light rail vehicles.

7 Incentives: With DBFOM, payments and penalties based on performance would provide incentive for the private sector to complete the project on time and on budget. The payments and penalties would also apply to performance standards for operating and maintaining a high-quality LRT system over the long term. If the private sector does not perform to the standards set in the contract, it does not get paid. Risks: With DBFOM, the Region limits its risk by placing responsibility on the private sector. The Region monitors the service and holds back payments if the private sector does not meet the contract performance standards. DBFOM would provide better accountability where performance may be related to either maintenance or operation because the same company is responsible for both. DBFOM would also transfer lifecycle risks such as major vehicle and track maintenance to the private sector. The Region would be responsible for those risks that it is best able to manage, such as fare setting and ridership risk. With DBFOM, who would own the LRT system? The Region would own the LRT system. With DBFOM, who would be in charge of setting the fare price and scheduling of the LRT? The Region of Waterloo would set the ticket price and establish the schedule of the LRT. With DBFOM, who would get the money from the fares? The Region of Waterloo would receive the fare revenue, which would offset the cost of the Region s transit system. With DBFOM, would it cost more for a private company to look after the LRT? Over the project term, it would cost less than the other procurement and delivery options. With DBFOM, what happens after thirty years? After thirty years or the length of the project term, the contract with the private company would end. The Region of Waterloo could assume operations and maintenance, or extend the contract of the current private company, or find a new private company to operate and maintain the LRT system. With DBFOM, who would drive the trains and buses? The private company would supply the operators to drive the LRT trains, keeping to the Region s service schedule. Grand River Transit operators would drive the buses. More bus drivers will be needed because of the Region s approved plan to expand the transit network. Has the Region contracted out operations and maintenance to the private sector before? The Region has successfully contracted out operations and maintenance of garbage and recycling collection, recycling sorting, and wastewater treatment plants. The Region retains ownership of facilities, sets user rates, and is responsible for customer service and addressing customer issues.

8 Sp or Hes p ele r Waterloo Region Transit System rld o tsw a Ro d

Join the Conversation!

Join the Conversation! Stage 2 ION: Light Rail Transit (LRT) from Kitchener to Cambridge Transit Project Assessment(TPA) Process Public Consultation Centre (PCC) No.1 November 18, 2015 November 19, 2015 Join the Conversation!

More information

407 TRANSITWAY. Planning & Preliminary Design

407 TRANSITWAY. Planning & Preliminary Design FROM EAST OF HIGHWAY 400 TO KENNEDY ROAD GWP #252-96-00 Public Information Centre #2 June 24 th and 29 th, 2010 Purpose of Public Information Centre #2 The first Public Information Centre (PIC #1) was

More information

Leaside to Main Infrastructure Refurbishment Project Strengthening the transmission system in your neighbourhood

Leaside to Main Infrastructure Refurbishment Project Strengthening the transmission system in your neighbourhood Leaside to Main Infrastructure Refurbishment Project Strengthening the transmission system in your neighbourhood Purpose of this Public Information Centre Provide you with an update on Hydro One s infrastructure

More information

Town of Whitchurch-Stouffville Bethesda Side Road Reconstruction

Town of Whitchurch-Stouffville Bethesda Side Road Reconstruction Town of Whitchurch-Stouffville Bethesda Side Road Reconstruction Date: Wednesday, April 26, 2017 Time: 3:00 pm to 5:00 pm and 7:00 pm to 8:00 pm 1 Your input is appreciated. You are encouraged to review

More information

Torbram Road Improvements From Queen Street East to Bovaird Drive

Torbram Road Improvements From Queen Street East to Bovaird Drive Torbram Road Improvements From Queen Street East to Bovaird Drive Municipal Class EA Study Public Information Centre No. 1 November 16 2017 6:30 pm 8:30 pm Please sign in so we can keep you updated on

More information

New. Stations. Public Information Centre

New. Stations. Public Information Centre New I Stations Public Information Centre King-Liberty SmartTrack Station St. Clair-Old Weston SmartTrack Station Spadina-Front GO Station Bloor-Lansdowne GO Station March 1, 2018 Today s Meeting Agenda

More information

Public Information Centre

Public Information Centre Vineland West Private Water System Municipal Class Environmental Assessment Public Information Centre Tuesday, July 12, 2016, 6 to 8 p.m. Vineland Research and Innovation Centre, Rittenhouse Hall Welcome!

More information

Region of Waterloo Stage 1 Light Rail Transit Project. Definitions, Acronyms, Cited References Article 1 Definitions.

Region of Waterloo Stage 1 Light Rail Transit Project. Definitions, Acronyms, Cited References Article 1 Definitions. Region of Waterloo Stage 1 Light Rail Transit Project Definitions, Acronyms, Cited References Article 1 Definitions Table of Contents 1.0 Definitions... 1-1 ARTICLE 1 DEFINITIONS 1.0. Definitions. In the

More information

Appendix M. Criteria, Measures and Indicators for Effects Assessment

Appendix M. Criteria, Measures and Indicators for Effects Assessment Appendix M Criteria, Measures and Indicators for Effects Assessment Appendix M. Criteria, Measures and Indicators for Effects Assessment Objective 1: Naturalization Changes to Aquatic Habitat Disruption,

More information

Design-Build for Improvements to the Amherst Island Ferry Docks Public Information Centre April 2017 Please Sign In

Design-Build for Improvements to the Amherst Island Ferry Docks Public Information Centre April 2017 Please Sign In WELCOME Design-Build for Improvements to the Amherst Island Ferry Docks Public Information Centre April 2017 Please Sign In PURPOSE OF THIS MEETING Rankin Construction Inc. (RCI) and their design consultant

More information

Assessment of Landfill Footprint Alternatives West Carleton Environmental Centre. Option #4 Impact on Agriculture

Assessment of Landfill Footprint Alternatives West Carleton Environmental Centre. Option #4 Impact on Agriculture Assessment of Landfill Footprint Alternatives Figure 422 99 Option #4 Impact on Agriculture The net effects with respect to continued service to customers, the optimized site life/ capacity is 65 million

More information

Date: Time: Location: Thursday, March 15, :00 p.m. to 8:00 p.m. Nobleton Arena Programs Room 15 Old King Road Nobleton, ON

Date: Time: Location: Thursday, March 15, :00 p.m. to 8:00 p.m. Nobleton Arena Programs Room 15 Old King Road Nobleton, ON TOWNSHIP OF KING TH 15 SIDEROAD RECONSTRUCTION From Highway 27 To Concession 8 Municipal Class Environmental Assessment Schedule B Project Information Session Date: Time: Location: Thursday, March 15,

More information

Table of Contents. List of Tables. 11. Advantages and Disadvantages

Table of Contents. List of Tables. 11. Advantages and Disadvantages Table of Contents 11. Advantages and Disadvantages... 11-1 page List of Tables... 11-1 11. Advantages and Disadvantages The overall advantages and disadvantages of the DMNP are articulated, summarized

More information

WELCOME. QEW Credit River Bridge Detail Design Assignment from Mississauga Road to Hurontario Street. Public Information Centre Round #1 October 2017

WELCOME. QEW Credit River Bridge Detail Design Assignment from Mississauga Road to Hurontario Street. Public Information Centre Round #1 October 2017 WELCOME QEW Credit River Bridge Detail Design Assignment from Mississauga Road to Hurontario Street Public Information Centre Round #1 October 2017 Please Sign In PURPOSE OF THIS MEETING The Ontario Ministry

More information

Appendix H Mitigation Monitoring Plan

Appendix H Mitigation Monitoring Plan Appendix H Mitigation Monitoring Plan Appendix H No. Impact/Mitigation Measure Implementation & Monitoring 1. Traffic and Transportation Impacts All traffic control plans and mitigation measures, prepared

More information

Lynnwood Link Extension 2013 Draft EIS Comments and Responses

Lynnwood Link Extension 2013 Draft EIS Comments and Responses Page 157 C-001-001 Sound Transit acknowledges your opposition to Alternative C1 due to its residential impacts and impacts to Scriber Creek Park and wetlands. Page 158 C-002-001 Following the Draft EIS,

More information

Welcome. Public Information Event. Dufferin Sanitary Trunk Sewer (STS) System Improvements Municipal Class Environmental Assessment Study

Welcome. Public Information Event. Dufferin Sanitary Trunk Sewer (STS) System Improvements Municipal Class Environmental Assessment Study Welcome Public Information Event Dufferin Sanitary Trunk Sewer (STS) System Improvements Municipal Class Environmental Assessment Study Please sign in to be added to the study mailing list and receive

More information

WELCOME! Please sign in so we can keep you updated on the study

WELCOME! Please sign in so we can keep you updated on the study The City of Peterborough Chemong Road/Reid Street Widening Class Environmental Assessment (Schedule C) Public Information Centre #2 March 20, 2012 Northminster United Church WELCOME! Please sign in so

More information

Draft Code of Construction Practice

Draft Code of Construction Practice Draft Code of Construction Practice This factsheet outlines how it is expected the nominated undertaker will manage the effects of the construction of the Proposed Scheme on communities and the environment

More information

10 Summary and Conclusion

10 Summary and Conclusion 10 Summary and Conclusion 10.1 Introduction TransLink and the City of Surrey are proposing to develop the Surrey Newton-Guildford (SNG) Light Rail Transit (LRT) (the Project), which will connect the communities

More information

SEARs project justification and conclusion

SEARs project justification and conclusion 31 Project justification and conclusion This chapter presents a justification for the project and a conclusion to the environmental impact statement (EIS). The justification is based on the strategic need

More information

What is the Terms of Reference?

What is the Terms of Reference? What is the Terms of Reference? Framework for content of the Environmental Assessment Certificate Application Provides the scope of technical studies and consultation processes with the public and First

More information

The Norwich Street Bridge

The Norwich Street Bridge The Norwich Street Bridge Class Environmental Assessment Open House May 17, 2017 6:30-8 p.m. Guelph City Hall Phase 1 Phase 2 Project File Our Study Process: This study is being undertaken as a Schedule

More information

Facilities Environmental Protection Plan: Burnaby Terminal

Facilities Environmental Protection Plan: Burnaby Terminal Facilities Environmental Protection Plan: Burnaby Terminal 1 Facilities Environmental Protection Plan: Overview What The Environmental Protection Plan (EPP) communicates environmental procedures and mitigation

More information

BACKGROUND INFORMATION

BACKGROUND INFORMATION BACKGROUND INFORMATION Preliminary Design & Class Environmental Assessment Study G.W.P. 30-95-00 The following information was included in the Transportation Environmental Study Report (TESR) that was

More information

Order of road works and servicing construction to be carried out in accordance with the staged contract construction sequence specified below.

Order of road works and servicing construction to be carried out in accordance with the staged contract construction sequence specified below. SEDIMENT CONTROL NOTES 1.0 GENERAL 1.1 The Developer and Contractor shall comply with the requirements of all regulatory authorities, federal, provincial and municipal government departments including

More information

Public Information Centre September 19 th, 2017

Public Information Centre September 19 th, 2017 Public Information Centre September 19 th, 2017 WELCOME! Public Information Centre for the Maple Hill Creek Rehabilitation Class Environmental Assessment Please take the time to sign our sign in sheet

More information

Bonnie Doon Grade Separation

Bonnie Doon Grade Separation 6. 2 Bonnie Doon Grade Separation Recommendation: That the April 18, 2017, Integrated Infrastructure Services report CR_4461, be received for information. Report Summary This report provides information

More information

Sustainability Statement

Sustainability Statement Thames Tideway Tunnel Thames Water Utilities Limited Application for Development Consent Application Reference Number: WWO10001 Sustainability Statement Doc Ref: 7.07 Appendix B.21 Greenwich Pumping Station

More information

Works, services and infrastructure code

Works, services and infrastructure code 9.4.11 Works, services infrastructure code 9.4.11.1 Application (1) This code applies to assessable development identified as requiring assessment against the Works, services infrastructure code by the

More information

Constructability Guidelines

Constructability Guidelines Constructability Guidelines The Constructability Guidelines offer a list of items that should be considered by Constructability function personnel during the Concept Development Phase through the Final

More information

TOWN OF INNISFIL 7 TH Line Improvements Municipal Class Environmental Assessment Schedule C PUBLIC OPEN HOUSE NO. 2

TOWN OF INNISFIL 7 TH Line Improvements Municipal Class Environmental Assessment Schedule C PUBLIC OPEN HOUSE NO. 2 TOWN OF INNISFIL 7 TH Line Improvements Municipal Class Environmental Assessment Schedule C PUBLIC OPEN HOUSE NO. 2 Date: Wednesday, March 28, 2018. Time: 4:00 p.m. to 7:00 p.m. Location: Town Hall Community

More information

Public Open House. Proposed Liberty Village Natural Gas Pipeline Project. Please sign-in at the registration table upon arrival

Public Open House. Proposed Liberty Village Natural Gas Pipeline Project. Please sign-in at the registration table upon arrival Proposed Liberty Village Natural Gas Pipeline Project Public Open House Please sign-in at the registration table upon arrival Feel free to approach any team member to discuss the project Share your thoughts

More information

Public Information Centre #1. March 2010

Public Information Centre #1. March 2010 Public Information Centre #1 March 2010 Purpose of Public Information Centre Halton Region is initiating a Transportation Master Plan (2031) The Road to Change The Plan will develop a sustainable, integrated

More information

Town of Perth Landfill Expansion Environmental Screening

Town of Perth Landfill Expansion Environmental Screening Town of Perth Landfill Expansion Environmental Screening Public Information Centre Thursday September 29, 2016 4:00 to 6:00 p.m. and 7:00 to 9:00 p.m. Perth Town Hall Main Floor Welcome to the Public Information

More information

Golf Course and Recreational Facilities Best Management Guidelines. Regional Official Plan Guidelines

Golf Course and Recreational Facilities Best Management Guidelines. Regional Official Plan Guidelines Golf Course and Recreational Facilities Best Management Guidelines Regional Official Plan Guidelines Halton Region Official Plan Guidelines The Regional Official Plan (ROP) is Halton s guiding document

More information

Airport Road from 1 km North of Mayfield Road to 0.6 km North of King Street Public Information Centre #1

Airport Road from 1 km North of Mayfield Road to 0.6 km North of King Street Public Information Centre #1 Municipal Class Environmental Assessment Airport Road from 1 km North of Mayfield Road to 0.6 km North of King Street Public Information Centre #1 Date: Thursday, June 20, 2013 Time: 6:30 p.m. 8:30 p.m.

More information

CEAA ENVIRONMENTAL ENVIRONMENTAL IMPACT ASSESSMENT AMBASSADOR BRIDGE ENHANCEMENT PROJECT. Replacement Span and Plaza Expansion APPENDIX E

CEAA ENVIRONMENTAL ENVIRONMENTAL IMPACT ASSESSMENT AMBASSADOR BRIDGE ENHANCEMENT PROJECT. Replacement Span and Plaza Expansion APPENDIX E Ambassador Bridge Enhancement Project CEAA ENVIRONMENTAL ENVIRONMENTAL IMPACT ASSESSMENT AMBASSADOR BRIDGE ENHANCEMENT PROJECT Replacement Span and Plaza Expansion APPENDIX E DRAFT EROSION AND SEDIMENT

More information

A684 Bedale, Aiskew and Leeming Bar Bypass Environmental Statement. Non Technical Summary. Business and Environmental Services

A684 Bedale, Aiskew and Leeming Bar Bypass Environmental Statement. Non Technical Summary. Business and Environmental Services A684 Bedale, Aiskew and Leeming Bar Bypass Environmental Statement Non Technical Summary Business and Environmental Services A responsive County Council providing excellent and efficient local services

More information

Appendix C - Highway 400 Widening and Interchange Evaluation Summary Tables

Appendix C - Highway 400 Widening and Interchange Evaluation Summary Tables Highway 400 Improvements from 1 km South of Highway 89 to the Junction of Highway 11 Appendix C - Highway 400 Widening and Interchange Tables Prepared for: Ontario Ministry of Transportation Four General

More information

Comparative Evaluation Option #1 & Option #2

Comparative Evaluation Option #1 & Option #2 Comparative Evaluation Option #1 & Option #2 Option #1 Existing Landfill Approx. 47 metres/14 stories Proposed Layout Approx. 31 metres/9.5 stories Option #2 Existing Landfill Approx. 47 metres/14 stories

More information

PUBLIC INFORMATION CENTRE

PUBLIC INFORMATION CENTRE June 24, 2014 PUBLIC INFORMATION CENTRE MUNICIPAL CLASS ENVIRONMENTAL ASSESSMENT SCHEDULE B MUNICIPAL SERVICES FOR THE MARY LAKE ESTATES SUBDIVISION Buildings Municipal Infrastructure Transportation Industrial

More information

FEDERAL HIGHWAY ADMINISTRATION RECORD OF DECISION FOR THE LYNNWOOD LINK EXTENSION

FEDERAL HIGHWAY ADMINISTRATION RECORD OF DECISION FOR THE LYNNWOOD LINK EXTENSION FEDERAL HIGHWAY ADMINISTRATION RECORD OF DECISION FOR THE LYNNWOOD LINK EXTENSION AUGUST 2015 Table of Contents 1 Decision... 1 1.1 Project Description... 2 1.2 Basis for the FHWA Decision... 7 1.2.1

More information

Option #2 Impact on Agriculture

Option #2 Impact on Agriculture Environmental Assessment Figure 5-27 5-81 Option #2 Impact on Agriculture Socio-Economic The ratio of air space achieved to volume of soil handled has a ratio of 6.5 million m 3 to 2.2 million m 3. There

More information

Warren Wagon Road Improvement Project McCall Ranger District, Payette National Forest Project Description

Warren Wagon Road Improvement Project McCall Ranger District, Payette National Forest Project Description Warren Wagon Road Improvement Project McCall Ranger District, Payette National Forest Project Description Introduction The analysis of the Warren Wagon Road Improvement Project is tiered to the 2003 Environmental

More information

South Landfill Annual Cover Rate Screening Criteria Checklist

South Landfill Annual Cover Rate Screening Criteria Checklist South Landfill Annual Cover Rate Screening Criteria Checklist The following checklist is taken from the Guide to Environmental Assessments for Waste Management Projects, Part B Environmental Screening

More information

MOSLEY STREET URBANIZATION TH

MOSLEY STREET URBANIZATION TH Public Information Centre 1 (PIC 1) MOSLEY STREET URBANIZATION TH 45 BEACHWOOD ROAD TO STREET Class Environmental Assessment November 29, 2016 Welcome 2 This Public Information Centre will: establish channels

More information

12 Oct Virama Karya presentation on South Coast Highway. Therefore require a new route expressway

12 Oct Virama Karya presentation on South Coast Highway. Therefore require a new route expressway in association with Design 151.66 Km (Existing Road Apr. 180 km) 2 OBJECTIVE: The Government of Timor Lestewishes to Engage Consultant to carry out the Preliminary, Detailed Engineering Design and Environment

More information

Preferred Elevated Tank Site

Preferred Elevated Tank Site Preferred Elevated Tank Site Preferred Site No. 3 is on private property owned by Hopewell Developments. Approximately 5 acres of land will be required, including lands required for a permanent access

More information

Ottawa-Trussler Area Sewage Facility Class Environmental Assessment

Ottawa-Trussler Area Sewage Facility Class Environmental Assessment Welcome to the Ottawa-Trussler Area Sewage Facility Class Environmental Assessment Public Open House May 7, 2013 September 25, 2013 Welcome The purpose of this second Public Open House is to: Present the

More information

5 SCOPE OF THE ENVIRONMENTAL IMPACT ASSESSMENT. The scope of the EIA falls under three broad categories:

5 SCOPE OF THE ENVIRONMENTAL IMPACT ASSESSMENT. The scope of the EIA falls under three broad categories: 5 SCOPE OF THE ENVIRONMENTAL IMPACT ASSESSMENT 5.1 INTRODUCTION The scope of the EIA falls under three broad categories: technical scope; spatial scope; and temporal scope. The scoping process for the

More information

TRANSPORTATION AND ENVIRONMENTAL SERVICES Rapid Transit

TRANSPORTATION AND ENVIRONMENTAL SERVICES Rapid Transit REGION OF WATERLOO TRANSPORTATION AND ENVIRONMENTAL SERVICES Rapid Transit TO: Chair Jim Wideman and Members of the Planning and Works Committee DATE: June 19, 2012 FILE CODE: A02-30/PW SUBJECT: STAGE

More information

ENVIRONMENT ACT TERMS OF REFERENCE NOVA SCOTIA DEPARTMENT OF TRANSPORTATION AND PUBLIC WORKS. Beaver Bank Bypass

ENVIRONMENT ACT TERMS OF REFERENCE NOVA SCOTIA DEPARTMENT OF TRANSPORTATION AND PUBLIC WORKS. Beaver Bank Bypass ENVIRONMENT ACT TERMS OF REFERENCE NOVA SCOTIA DEPARTMENT OF TRANSPORTATION AND PUBLIC WORKS Beaver Bank Bypass Highway 101 to the Beaver Bank Road Halifax County, NS NOVA SCOTIA DEPARTMENT OF THE ENVIRONMENT

More information

SUBURBAN EDGE COMMUNITY ROLE COUNCIL ROLE ALL COMMUNITIES SUBURBAN EDGE

SUBURBAN EDGE COMMUNITY ROLE COUNCIL ROLE ALL COMMUNITIES SUBURBAN EDGE Orderly and Efficient Land Use Align land use, development patterns, and infrastructure to make the best use of public and private investment. Plan and stage development for forecasted growth through 2040

More information

D EROSION AND SEDIMENT CONTROL. Table of Contents

D EROSION AND SEDIMENT CONTROL. Table of Contents Table of Contents D1. GENERAL... 1 D2. OBJECTIVE... 1 D3. REFERENCE MATERIAL... 1 D4. REGULATORY REQUIREMENTS... 1 D5. EROSION AND SEDIMENT CONTROL (ESC) PLANS... 2 D5.1 Goals and Objectives:... 2 D5.2

More information

RESOLUTION NO:

RESOLUTION NO: RESOLUTION NO: 11-031 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF PASO ROBLES CERTIFYING THE FINAL ENVIRONMENTAL IMPACT REPORT FOR THE 2011 CIRCULATION ELEMENT OF THE GENERAL PLAN AND ADOPTING FINDINGS,

More information

PROGRAMMATIC AGREEMENT

PROGRAMMATIC AGREEMENT PROGRAMMATIC AGREEMENT CATEGORICAL EXCLUSION APPROVALS NEW HAMPSHIRE DEPARTMENT OF TRANSPORTATION & FEDERAL HIGHWAY ADMINISTRATION FEBRUARY 2000 PREAMBLE This Agreement establishes the procedures of the

More information

Environmental Impact Statement for the Slave Falls Tramway Conversion Project

Environmental Impact Statement for the Slave Falls Tramway Conversion Project Environmental Impact Statement for the Slave Falls Tramway Conversion Project Prepared for Submitted by 41844.101 March 2008 ENVIRONMENTAL IMPACT STATEMENT FOR THE SLAVE FALLS TRAMWAY CONVERSION PROJECT

More information

12 Evaluation of Alternatives

12 Evaluation of Alternatives 12 Evaluation of Alternatives This chapter evaluates the effectiveness of the No-Build Alternative and the proposed METRO Blue Line Light Rail Transit (BLRT) Extension project based on the information

More information

Transportation Report to SPC on Transportation and Transit 2017 March 15. ISC: UNRESTRICTED TT Page 1 of 7 ROUTEAHEAD UPDATE

Transportation Report to SPC on Transportation and Transit 2017 March 15. ISC: UNRESTRICTED TT Page 1 of 7 ROUTEAHEAD UPDATE Page 1 of 7 EXECUTIVE SUMMARY This report provides Council with an update on the status of implementation of RouteAhead, a 30-year strategic plan for public transit in Calgary. The report also highlights

More information

Welcome to our Information Centre

Welcome to our Information Centre Welcome to our Information Centre Overbrook to Riverview Transmission Line Upgrade September 21 and 22, 2016 Purpose of the Information Centre Meet our project team and learn more about: The proposed project

More information

Greater Cambridge City Deal Executive Board. A428/A1303 Better Bus Journeys Scheme Public Consultation Outcomes and Next Steps

Greater Cambridge City Deal Executive Board. A428/A1303 Better Bus Journeys Scheme Public Consultation Outcomes and Next Steps Report To: Greater Cambridge City Deal Executive Board 3 rd March 2016 Lead Officer: Graham Hughes, Executive Director of Economy, Transport and Environment, Cambridgeshire County Council A428/A1303 Better

More information

MIXED ACTIVITY ZONE. Chapter 4. Mixed Activity Zone

MIXED ACTIVITY ZONE. Chapter 4. Mixed Activity Zone Chapter 4 Mixed Activity Zone 4. MIXED ACTIVITY ZONE 4.1 RESOURCE MANAGEMENT ISSUES 1. Activities adjoining main arterial roads can adversely affect the safety, sustainability and efficiency of the network.

More information

Preliminary Project Assessment

Preliminary Project Assessment DISCLAIMERS: Date: March 14, 2014 Case No.: 2014.0097U Project Address: Third Street Crossing of Islais Creek Block/Lot: Public Right-of-Way Zoning: Not Applicable Area Plan: Not Applicable Project Sponsor:

More information

subdivision WORKING ENVIRONMENT AND COMMUNITY ENVIRONMENT RULES ASSESSMENT CRITERIA

subdivision WORKING ENVIRONMENT AND COMMUNITY ENVIRONMENT RULES ASSESSMENT CRITERIA Character, Mauri, Amenity Values, Neighbourhood Character, Health & Safety and Heritage RULES ASSESSMENT CRITERIA 5.0 General The following rules shall apply to the of land situated in the Community Environment

More information

KALIA-FORT DERUSSY WASTEWATER SYSTEM IMPROVEMENTS FINAL ENVIRONMENTAL ASSESSMENT EXECUTIVE SUMMARY

KALIA-FORT DERUSSY WASTEWATER SYSTEM IMPROVEMENTS FINAL ENVIRONMENTAL ASSESSMENT EXECUTIVE SUMMARY EXECUTIVE SUMMARY This Environmental Assessment (EA) addresses the environmental impacts of the Proposed Action to construct certain improvements to the City and County of Honolulu (City) wastewater collection

More information

Schedule A DISTRICT OF MAPLE RIDGE Watercourse Protection Bylaw

Schedule A DISTRICT OF MAPLE RIDGE Watercourse Protection Bylaw Schedule A DISTRICT OF MAPLE RIDGE Watercourse Protection Bylaw 6410 2006 The Erosion and Sediment Control plan should seek (i) to protect the soil surface from erosion where possible and (ii) capture

More information

New Stadium Project. Construction Activity Mitigation Program. January 22, 2014

New Stadium Project. Construction Activity Mitigation Program. January 22, 2014 New Stadium Project Construction Activity Mitigation Program January 22, 2014 Construction Mitigation Plan Introduction It is the primary goal of HHRM, JV to minimize negative effects on traffic and the

More information

T a b l e o f C o n t e n t s

T a b l e o f C o n t e n t s T a b l e o f C o n t e n t s Executive Summary English Executive Summary French page 1. Introduction and Background... 1-1 1.1 Introduction...1-1 1.2 The Proponent Waste Management of Canada Corporation...1-2

More information

5.0 PRELIMINARY ENVIRONMENTAL REVIEW

5.0 PRELIMINARY ENVIRONMENTAL REVIEW 5.0 PRELIMINARY ENVIRONMENTAL REVIEW 5.1 INTRODUCTION A preliminary environmental review was performed on the proposed freeway improvements that form Concept C, which encompasses the three freeway corridors

More information

Environmental Analysis, Chapter 4 Consequences, and Mitigation

Environmental Analysis, Chapter 4 Consequences, and Mitigation Environmental Analysis, Chapter 4 Table 4.17-3. Summary of Adverse Environmental Justice Impacts Topic No Build TSM At-Grade Emphasis LRT Underground Emphasis LRT Locally Preferred Alternative Transit

More information

Proposed G3 Terminal Vancouver Project Update. Presented to North Shore Waterfront Liaison Committee January 14, 2016

Proposed G3 Terminal Vancouver Project Update. Presented to North Shore Waterfront Liaison Committee January 14, 2016 Proposed G3 Terminal Vancouver Project Update Presented to North Shore Waterfront Liaison Committee January 14, 2016 G3 & G3 Terminal Vancouver G3 formed to invest in Canada s grain sector by establishing

More information

Introduction. 1.3 Study Overview and Purpose. 1.1 Overview of Environmental Project Report. 1.2 Overview of Environmental Project Report

Introduction. 1.3 Study Overview and Purpose. 1.1 Overview of Environmental Project Report. 1.2 Overview of Environmental Project Report 1. Introduction The Toronto Transit Commission (TTC) and the City of Toronto are undertaking an Environmental Assessment (EA) for the new Ashbridges Bay Maintenance and Storage Facility (MSF) for Light

More information

Welcome to the Boulevard Lake Dam Class Environmental Assessment. Public Information Session #1. June 14, 2016

Welcome to the Boulevard Lake Dam Class Environmental Assessment. Public Information Session #1. June 14, 2016 Welcome to the Boulevard Lake Dam Class Environmental Assessment Public Information Session #1 June 14, 2016 Boulevard Dam - Overview Built approximately 100 years ago Owned and operated by the City of

More information

West Village, 70 Mississauga Road South, Mississauga. Construction Management Plan Phase I: Demolition & Remediation

West Village, 70 Mississauga Road South, Mississauga. Construction Management Plan Phase I: Demolition & Remediation West Village, 70 Mississauga Road South, Mississauga Construction Management Plan Phase I: Demolition & Remediation FINAL, revision 1 January 26, 2018 Table of Contents 1.0 INTRODUCTION... 2 2.0 HOARDING

More information

KELLY SCHERR, P.ENG., MBA, FEC MANAGING DIRECTOR - ENVIRONMENTAL & ENGINEERING SERVICES & CITY ENGINEER RECOMMENDATION

KELLY SCHERR, P.ENG., MBA, FEC MANAGING DIRECTOR - ENVIRONMENTAL & ENGINEERING SERVICES & CITY ENGINEER RECOMMENDATION 1 TO: FROM: SUBJECT CHAIR AND MEMBERS CIVIC WORKS COMMITTEE MEETING ON JULY 17, 2017 KELLY SCHERR, P.ENG., MBA, FEC MANAGING DIRECTOR - ENVIRONMENTAL & ENGINEERING SERVICES & CITY ENGINEER APPOINTMENT

More information

Option #1 Impact on Wildlife and Aquatic Features

Option #1 Impact on Wildlife and Aquatic Features Environmental Assessment Figure 5-13 5-43 Option #1 Impact on Wildlife and Aquatic Features The wetland that would be removed with Option #1 were found to be deciduous swamp with shallow ponding that mostly

More information

STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY FINDINGS OF FACT

STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY FINDINGS OF FACT STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY IN THE MATTER OF THE DECISION ON THE NEED FOR AN ENVIRONMENTAL IMPACT STATEMENT FOR THE PROPOSED METROPOLITAN COUNCIL ENVIRONMENTAL SERVICES ST. LOUIS

More information

Overview of City of Dallas and DART Interlocal Agreements

Overview of City of Dallas and DART Interlocal Agreements Overview of City of Dallas and DART Interlocal Agreements Council Transportation and Environment Committee Prepared by Transportation Programs Public Works and Transportation March 24, 2008 Purpose of

More information

Lynnwood Link Extension 2013 Draft EIS Comments and Responses. Page 216

Lynnwood Link Extension 2013 Draft EIS Comments and Responses. Page 216 C-013-001 Thank you for your comments describing the cultural importance of the Latvian Evangelical Lutheran Church to the Latvian community in western Canada. See Section 2.5.1 for a description of the

More information

Northern Branch Corridor CLC Meeting. June 30, 2008

Northern Branch Corridor CLC Meeting. June 30, 2008 Northern Branch Corridor CLC Meeting June 30, 2008 Agenda Introductions Project Status Environmental Process Technical Findings Capital Costs Next Steps Break Out Areas Introductions Project Status Preliminary

More information

SITE ALTERATION PERMIT INFORMATION PACKAGE FOR LAND OWNERS

SITE ALTERATION PERMIT INFORMATION PACKAGE FOR LAND OWNERS SITE ALTERATION PERMIT INFORMATION PACKAGE FOR LAND OWNERS Revised: June 4, 2014 Requirements for obtaining a site alteration permit vary depending on the type of project being proposed. This information

More information

ENVIRONMENTAL ASSESSMENT

ENVIRONMENTAL ASSESSMENT ENVIRONMENTAL ASSESSMENT Project Identification Project: Cleveland E. 185 th Street & Marcella Road Relief Sewer (Phase 1) Applicant: Robert L Davis, Director of Public Utilities City of Cleveland 12302

More information

Design Specifications & Requirements Manual

Design Specifications & Requirements Manual Design Specifications & Requirements Manual 10 SEDIMENT AND EROSION CONTROL 10.1 INTRODUCTION... 1 10.2 REFERENCE... 1 10.3 GENERAL INFORMATION REQUIREMENTS... 1 10.3.1 ESC Plan... 1 10.3.2 Servicing Drawings...

More information

GENERAL SPECIFICATION FOR ENVIRONMENTAL PROTECTION FOR CONSTRUCTION IN WATERBODIES AND ON WATERBODY BANKS

GENERAL SPECIFICATION FOR ENVIRONMENTAL PROTECTION FOR CONSTRUCTION IN WATERBODIES AND ON WATERBODY BANKS ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS.PROV 182 NOVEMBER 2012 GENERAL SPECIFICATION FOR ENVIRONMENTAL PROTECTION FOR CONSTRUCTION IN WATERBODIES AND ON WATERBODY BANKS TABLE OF CONTENTS

More information

Welcome and thank you for spending time with us today to talk about the 75 th Street Corridor Improvement Project.

Welcome and thank you for spending time with us today to talk about the 75 th Street Corridor Improvement Project. 1 Welcome and thank you for spending time with us today to talk about the 75 th Street Corridor Improvement Project. 2 During this public meeting, we will explain the 75 th Street Corridor Improvement

More information

In July 2000, City Council adopted an. Environmental Protection Program for. the City of North Vancouver.

In July 2000, City Council adopted an. Environmental Protection Program for. the City of North Vancouver. In July 2000, City Council adopted an Environmental Protection Program for the City of North Vancouver. Chapter 8 Environment 8.1 RELATIONSHIP TO OUR VISION The Environment is core to our vision of a sustainable

More information

Kitchener Drain Depollution Project: Drain Rehabilitation Solid Waste. Non-Technical Summary

Kitchener Drain Depollution Project: Drain Rehabilitation Solid Waste. Non-Technical Summary Kitchener Drain Depollution Project: Drain Rehabilitation Solid Waste Non-Technical Summary Date: October 2018 Contents 1 INTRODUCTION 1 2 WHAT DOES THIS PROJECT INCLUDE? 2 2.1 Rehabilitation of the Kitchener

More information

OPTIONAL STATIONAVIATION/MANCHESTER

OPTIONAL STATIONAVIATION/MANCHESTER CRENSHAW/LAX TRANSIT CORRIDOR PROJECT FEIS/FEIR OPTIONAL STATIONAVIATION/MANCHESTER Aviation and Manchester, Looking East Aviation/Manchester Station (Optional) The Optional Aviation/Manchester Station

More information

DRAFT ENVIRONMENTAL IMPACT STATEMENT AND DRAFT SECTION

DRAFT ENVIRONMENTAL IMPACT STATEMENT AND DRAFT SECTION DRAFT ENVIRONMENTAL IMPACT STATEMENT AND DRAFT SECTION 4(f) EVALUATION APPENDIX 4 Analysis Framework 4-1: CEQR Technical Area Guide DRAFT ENVIRONMENTAL IMPACT STATEMENT AND DRAFT SECTION 4(f) EVALUATION

More information

RECOMMENDATION. (b) that the Shift Communications Plan, attached hereto as Appendix B, BE RECEIVED;

RECOMMENDATION. (b) that the Shift Communications Plan, attached hereto as Appendix B, BE RECEIVED; TO: FROM: SUBJECT: CHAIR AND MEMBERS STRATEGIC PRIORITIES AND POLICIES COMMITTEE MEETING ON SEPTEMBER 18, 2017 KELLY SCHERR, P.ENG., MBA, FEC MANAGING DIRECTOR ENVIRONMENTAL & ENGINEERING SERVICES AND

More information

Appendix H Mitigation Plan

Appendix H Mitigation Plan Appendix H Appendix H The mitigation plan for Federal Way Link Extension (FWLE) describes Sound Transit s mitigation commitments that will be implemented to avoid or minimize the impacts of the Preferred

More information

Noront Ferrochrome Production Facility (FPF) Environmental Issues and Approach. October 2017

Noront Ferrochrome Production Facility (FPF) Environmental Issues and Approach. October 2017 Noront Ferrochrome Production Facility (FPF) Environmental Issues and Approach October 2017 (Simulated FPF) INTRODUCTION Noront is proposing to develop a Ferrochrome Production Facility (FPF) in Northern

More information

GO RAIL NIAGARA SERVICE EXTENSION

GO RAIL NIAGARA SERVICE EXTENSION Business Case: Finch Avenue West Rapid Transit GO RAIL NIAGARA SERVICE EXTENSION INITIAL BUSINESS CASE Date: November, 2014 NOVEMBER 2015 Page 1 TABLE OF CONTENTS 1.0 Executive Summary...p.5 2.0 Introduction....p.6

More information

Short-term (Construction) Impacts and Potential Mitigation

Short-term (Construction) Impacts and Potential Mitigation 4 Short-term (Construction) Impacts and Potential Mitigation CHAPTER 4. SHORT-TERM (CONSTRUCTION) IMPACTS AND POTENTIAL MITIGATION This chapter describes short-term (construction) impacts that could result

More information

Environmental Risk Analysis

Environmental Risk Analysis Appendix 10 11 12 13 14 15 16 17 18 191 Groundwater Controlled UHSA Air Agricultural Historic EIS Preliminary Environmental Blasting Quality Surface Secretary s Noise Statement Aboriginal Economic Action

More information

Annex F Scoping Checklist

Annex F Scoping Checklist Scoping Checklist Table F1: Scoping Checklist Table. Questions to be considered in Scoping /? Which Characteristics of the Project 1. Will construction, operation or decommissioning of the Project involve

More information

Chapter 4. Airport Authority Governance, Statutes and Policies

Chapter 4. Airport Authority Governance, Statutes and Policies Chapter 4 Airport Authority Governance, Statutes and Policies Table of Contents 4. Airport Authority Governance, Statutes and Policies... 4-1 4.1 The Federal Government and Airport Authorities... 4-1 4.2

More information

Lynnwood Link Extension 2013 Draft EIS Comments and Responses. Page 945

Lynnwood Link Extension 2013 Draft EIS Comments and Responses. Page 945 I-441-001 Thank you for your comments about the importance of the Latvian Center to the Latvian community. Following the Draft EIS, the Sound Transit Board directed Sound Transit to develop a Preferred

More information

TRANSPORTATION AND ENVIRONMENTAL SERVICES Rapid Transit Initiative

TRANSPORTATION AND ENVIRONMENTAL SERVICES Rapid Transit Initiative REGION OF WATERLOO TRANSPORTATION AND ENVIRONMENTAL SERVICES Rapid Transit Initiative TO: Chair Jim Wideman and Members of the Planning and Works Committee DATE: FILE CODE: D10-20/RT SUBJECT: PROPOSED

More information