1 A prototype architecture for passive and plus energy building in Estonia Tõnu Mauring, Jaanus Hallik, Margus Valge, Kristo Kalbe University of Tartu, Institute of Technology Georg W. Reinberg, Architekturbüro Reinberg ZT GmbH

2

3 Site location Põlva Estonia (58 N, 27 E) Long-term average dry bulb temperature for inland part of Estonia is in: December -2,5 C, January -3,0 C, February -5,2 C. [Kalamees and Kurnitski 2006] [Kalamees and Vinha 2004] Corresponding long-term average daily minimum values are from November to March below -10,0 C, For January below -14,3 C. [Kalamees 2006] Temperature falls Occasionally below -30,0 C, Frequently below -15,0 C [Estonian Meteorological and Hydrological Institute 2002]

4 Architectural design and energy concept

5 General information Treated floor area (PHPP) 280,6 m 2 Number of rooms 6 Construction time-span Main constructions Wood and concrete Architects: Martha Enriquez Reinberg and Georg W. Reinberg

6

7

8

9

10

11 Thermal envelope Wall KLH massive wood Cellullose + C-beam Kronopol DP50 U = 0,11 W/(m 2 K) 400 mm Roof KLH massive wood EPS Silver (wedge) EPS Silver Isover OL-TOP SBS roofing U = 0,07 W/(m 2 K) (average) Underground wall Clay plaster Reinforced concrete EPS Perimeeter pluss U = 0,11 or 0,07 W/(m 2 K) 94 mm 15 mm 112 mm 170 mm 380 mm 30 mm 15 mm 30 mm 200 mm 300/500 mm Average U-value (incl. windows, doors, thermal bridges, etc) 0,146 W/(m 2 K) Floor slab Wood Cement EPS 100 Granulate Reinforced concrete XPS Reinforced concrete U = 0,09 W/(m 2 K) 20 mm 60 mm 100 mm 30 mm 300 mm 300 mm 80 mm

12 Thermal bridge free design (overall reduction by 1,9 kwh/(m 2 yr) ) LBNL THERM 6.3

13 Windows Pro Passivhausfenster Smartwin Average U-value 0,67 W/(m 2 K) Average g-value 0,51

14 Ventilation and heating Ventilation with heat recovery Paul Novus 300 Paul Sole Defroster SD m long 40 mm pipe Ground source heat pump with split solar thermal system Viessmann Vitocal 300 G BWC - 2x 80 m deep vertical boreholes - 5,9 kw, COP = 4,5 Sonnenkraft solar panels - Roof mounted (for summer) 11,6 m 2 - Wall mounted (for winter) 13,1 m 2 Wall and floor heating - 2x1000 L storage tanks - 39/33 C supply/return temperture

15 Airtight construction Average air change rate of under- and overpressure n50 = 0,36 1/h

16 The first certified passive house in Estonia

17 Heat loss and heat gains in kwh/month Building heat balance in kwh/month Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Net space heat demand Utilised internal heat gains Utilised solar gains Non-utilised internal heat gains Non-utilised solar gains Heat losses PHPP 2007, ISO 13790

18 Heat losses and gains in heating period in kwh/a Exterior Wall to Ambient Exterior Wall to Conservatory Exterior Wall to Ground Roof to Ambient Floor slab Windows (incl. thermal bridges) Exterior Door Linear thermal bridges (external dim.) Ventilation and infiltration Utilised solar heat gain Utilised internal heat gain Annual net space heat demand Building heat balance in kwh/a PHPP 2007, ISO 13790

19 Window heat balance in kwh/a Heat losses Utilised solar gains Non-utilised solar gains West South East North Heat loss and gain for the heating period in kwh/a PHPP 2007, ISO 13790

20 Whole building energy demand and production in kwh/a Calculated values: Net space heating demand Production Losses of space heat distribution (non-utilised) Demand Net energy demand for domestic hot water (DHW) production Losses of DHW storage and distribution (non-utilised) Energy demand and production (kwh/a) Energy demand covered by GSHP (vertical ground source heat pump) Useful energy production by solar-thermal system for space heating and DHW

21 Passive house is a good basis for net zero energy house

22 Electricity kwh/a Electricity demand and production in kwh/a Calculated values: Photovoltaic Domestic appliances, lighting, sauna equipment etc. Technical installations (ventilators, pumps etc.) GSHP (vertical ground source heat pump) 0 Demand Production

23 Electricity demand Heat pump household auxilliary kwh/a PV electricity production 90 m 2 SolarWorld Sunmodule Plus SW 196 Vario poly Calculated production: kwh/a Balance 0 => net zero energy building

24 Monitoring Window and door position sensors (4) for night cooling and CO 2 Indoor air temperature and humidity sensors (6) for indoor climate on all floors and different room types CO 2 (2) for indoor climate in two bedrooms Massive wall temperature sensors (12) for temperature on different sides and heigths of wall Ventilation system (including defroster) temperature and humidity sensors (5) Outside air temperture and humidity sensors Wall construction temperature and humidity sensors (5) Wall heat flux sensor Global radiation sensor

25 First results: Process of warming up the massive wall Regular temperature increase 7 K in 6,5 hr No additional heating in whole March

26

27 Thank you for you attention Parties involved in the project: Architects: Martha Enriquez Reinberg and Georg W. Reinberg, Architekturbüro Reinberg ZT GmbH, Wien, Austria. Consulters: Tõnu Mauring, Jaanus Hallik and Kristo Kalbe, University of Tartu (building physics, monitoring), Johannes Riebenbauer, Graz (static engineer), S&P Climadesign GmbH (technical systems), Margus Valge, Sense OÜ (project management and site supervision), PassiveHouse OÜ Estonia and Passive House Institute, Darmstadt (certification).

Zero Energy Building Example in Estonia. Tõnu Mauring

Zero Energy Building Example in Estonia. Tõnu Mauring Zero Energy Building Example in Estonia Tõnu Mauring University of Tartu, Estonia Jan 22 2014, Riga Site location Põlva, Estonia (58 N, 27 E) Long-term average dry bulb temperature for inland part of Estonia

More information

LOW-ENERGY HOUSING ESTATE SUNDAYS

LOW-ENERGY HOUSING ESTATE SUNDAYS LOW-ENERGY HOUSING ESTATE SUNDAYS Werner Weiß Christian Fink Alexander Thür AEE - Arbeitsgemeinschaft ERNEUERBARE ENERGIE Feldgasse 19 A-8 Gleisdorf AUSTRIA Tel.: +43-311 - 5886 Fax.: +43-311 5886-18

More information

Project Description. Projected build start date 01 Mar 2010 Projected date of occupation 01 Aug Energy target.

Project Description. Projected build start date 01 Mar 2010 Projected date of occupation 01 Aug Energy target. http://lowenergybuildings.org.uk Project name Larch House, Ebbw Vale, Wales Project summary The Larch House, designed by bere:architects, is the UKs first zero carbon (code 6), low cost, Certified Passivhaus,

More information

Aalborg Universitet. CLIMA proceedings of the 12th REHVA World Congress Heiselberg, Per Kvols. Publication date: 2016

Aalborg Universitet. CLIMA proceedings of the 12th REHVA World Congress Heiselberg, Per Kvols. Publication date: 2016 Aalborg Universitet CLIMA 2016 - proceedings of the 12th REHVA World Congress Heiselberg, Per Kvols Publication date: 2016 Document Version Publisher's PDF, also known as Version of record Link to publication

More information

Assignment 3 Integrated Energy Design

Assignment 3 Integrated Energy Design Assignment 3 Integrated Energy Design AAR4926 Marco Rimensberger Shabnam Arbab Shangyi Sun May 2012 Page 0 Contents 1 Introduction... 2 2 Background... 2 3 Design Progress... 2 3.1 Available Energy Sources...

More information

Future tree planting on the two acre lot will offset remaining lifetime carbon emissions.

Future tree planting on the two acre lot will offset remaining lifetime carbon emissions. Luxury Net-Zero Home by Rockwood Custom Homes 47 Grandview Place, Calgary AB T3Z A8 by Grant Bremner A Net-Zero Emissions (NZE) home is carbon neutral where carbon credits fully offset emissions. An NZE

More information

Zero Energy House in Japan: Actual results and future target. Isamu Ohta Misawa Homes Institute of Research & Development CO., LTD.

Zero Energy House in Japan: Actual results and future target. Isamu Ohta Misawa Homes Institute of Research & Development CO., LTD. Zero Energy House in Japan: Actual results and future target Isamu Ohta Misawa Homes Institute of Research & Development CO., LTD. Energy consumption of Japanese houses Japanese government has announced

More information

PV Generation Potential 17.1 kbtu/ft2/yr 15.4

PV Generation Potential 17.1 kbtu/ft2/yr 15.4 TOWNHOME PROTOTYPE HIGH PERFORMANCE 60 kbtu/sf/yr 50 kbtu/sf/yr 40 kbtu/sf/yr 30 kbtu/sf/yr 20 kbtu/sf/yr 10 kbtu/sf/yr 0 kbtu/sf/yr 54.4 Baseline 21.8 kbtu/ 2/yr 15 MMBtu 12 MMBtu 9 MMBtu 6 MMBtu 3 MMBtu

More information

Project Description. Projected build start date 12 Apr 2010 Projected date of occupation 28 Feb

Project Description. Projected build start date 12 Apr 2010 Projected date of occupation 28 Feb http://lowenergybuildings.org.uk Project name PassivHaus Retrofit - Octavia Housing Project summary PassivHaus retrofit of a three storey solid brick Victorian terraced house in a conservation area. Produce

More information

Project name Gentoo Retrofit Bid 1 Project summary Refurbishment of 2no. Semi Detached houses using Passivhaus principles

Project name Gentoo Retrofit Bid 1 Project summary Refurbishment of 2no. Semi Detached houses using Passivhaus principles http://lowenergybuildings.org.uk Project name Gentoo Retrofit Bid 1 Project summary Refurbishment of 2no. Semi Detached houses using Passivhaus principles Project Description Projected build start date

More information

DI (FH) Dieter Herz - Herz & Lang GmbH. House of the Future

DI (FH) Dieter Herz - Herz & Lang GmbH. House of the Future DI (FH) Dieter Herz - Herz & Lang GmbH House of the Future Office Overview Overall planning old/new build Architechture + Technical planning Building measurement+ expert advice PH-Consulting + Certification

More information

MID-RISE APARTMENT BUILDING PROTOTYPE HIGH PERFORMANCE PV Genera on Poten al 10.8 kbtu/ 2/yr

MID-RISE APARTMENT BUILDING PROTOTYPE HIGH PERFORMANCE PV Genera on Poten al 10.8 kbtu/ 2/yr MID-RISE APARTMENT BUILDING PROTOTYPE HIGH PERFORMANCE 50 kbtu/sf/yr 45.1 PROJECT INFORMATION 40 kbtu/sf/yr 30 kbtu/sf/yr 20 kbtu/sf/yr 10 kbtu/sf/yr 0 kbtu/sf/yr 13.0 kbtu/ft2/yr Baseline 10.8 kbtu/ft2/yr

More information

PASSIVE HOUSE OBJECT DOCUMENTATION

PASSIVE HOUSE OBJECT DOCUMENTATION PASSIVE HOUSE OBJECT DOCUMENTATION Rua do Mar House B, single family house, Ílhavo Portugal (Passive House project database: ID 2403) 2.1 PROJECT OVERVIEW Project designer: João Marcelino, Homegrid (www.homegrid.pt)

More information

Project Description. Projected build start date 02 Aug 2010 Projected date of occupation 03 Dec

Project Description. Projected build start date 02 Aug 2010 Projected date of occupation 03 Dec http://lowenergybuildings.org.uk Project name Hounslow Council Passivhaus Retrofit - and the development of a decision making matrix Project summary The house is a 3-bedroom semi-detached single-family

More information

Verified net Zero Energy Building with air source heat pumps for SME

Verified net Zero Energy Building with air source heat pumps for SME Verified net Zero Energy Building with air source heat pumps for SME Field measurements were conducted on a net zero energy building designed for small to medium enterprises (SMEs). Energy flow and comfort

More information

SOLCER HOUSE ENERGY POSITIVE - LOW CARBON - LOW COST

SOLCER HOUSE ENERGY POSITIVE - LOW CARBON - LOW COST SOLCER HOUSE ENERGY POSITIVE - LOW CARBON - LOW COST BACKGROUND The Welsh School of Architecture has designed and built Wales first low cost energy positive house. The Solcer House is capable of exporting

More information

PassivHaus/ EnerPHit Introduction. Maiia Guermanova behalf of

PassivHaus/ EnerPHit Introduction. Maiia Guermanova behalf of PassivHaus/ EnerPHit Introduction Maiia Guermanova behalf of Email: maiia.guermanova@sturgis.co.uk PassivHaus/ EnerPHit What is a PassivHaus/ Passive House? Passivhaus is not a brand name but a building

More information

LOW-RISE APARTMENT BUILDING PROTOTYPE HIGH PERFORMANCE PV Genera on Poten al 17.9 kbtu/ 2/yr

LOW-RISE APARTMENT BUILDING PROTOTYPE HIGH PERFORMANCE PV Genera on Poten al 17.9 kbtu/ 2/yr LOW-RISE APARTMENT BUILDING PROTOTYPE HIGH PERFORMANCE 40 kbtu/sf/yr 35 kbtu/sf/yr 30 kbtu/sf/yr 25 kbtu/sf/yr 20 kbtu/sf/yr 15 kbtu/sf/yr 10 kbtu/sf/yr 5 kbtu/sf/yr 0 kbtu/sf/yr 11.9 kbtu/ft2/yr 36.0

More information

Heat Pump Field Trials and Implications for Design

Heat Pump Field Trials and Implications for Design Heat Pump Field Trials and Implications for Design GSHPA 26 th June 2012 Chris Laughton Managing Director The Solar Design Company 1 Contents German Fraunhofer trials 2011 Comparison with UK Heat Pump

More information

Project Description. Projected build start date 19 Apr 2010 Projected date of occupation 30 Sep

Project Description. Projected build start date 19 Apr 2010 Projected date of occupation 30 Sep http://lowenergybuildings.org.uk Project name LB Greenwich - How low can we go? Project summary Our project has sought to produce a retrofit solution which is practical to build, easy to run and maintain,

More information

PV Generation Potential 17.1 kbtu/ft2/yr 15.4

PV Generation Potential 17.1 kbtu/ft2/yr 15.4 TOWNHOME PROTOTYPE BASELINE 60 kbtu/sf/yr 50 kbtu/sf/yr 40 kbtu/sf/yr 30 kbtu/sf/yr 20 kbtu/sf/yr 10 kbtu/sf/yr 0 kbtu/sf/yr 54.4 Baseline 54.4 kbtu/ 2/yr 21.8 High Performance 18.2 PHIUS - IES 60 MMBtu

More information

Project Description. Projected build start date 15 Aug 2011 Projected date of occupation 19 Dec Existing external wall construction

Project Description. Projected build start date 15 Aug 2011 Projected date of occupation 19 Dec Existing external wall construction http://lowenergybuildings.org.uk Project name Redlands Project summary Deep retrofit of 1955 brick house in Devon based on EnerPHit standard. House had old gas boiler, double glazing, cavity wall insulation

More information

THE SOLAR AKTIVHAUS A BUILDING EXAMPLE

THE SOLAR AKTIVHAUS A BUILDING EXAMPLE THE SOLAR AKTIVHAUS A BUILDING EXAMPLE Georg W. Reinberg (author and architect) Architekturbüro Reinberg ZT GmbH, www.reinberg.net Summary On behalf of the solar power company Sonnenkraft a new type of

More information

Project name SOLAR HOUSE 80/50 Project summary

Project name SOLAR HOUSE 80/50 Project summary http://lowenergybuildings.org.uk Project name SOLAR HOUSE 80/50 Project summary Project Description Projected build start date 01 Mar 2010 Projected date of occupation 19 Jul 2010 Project stage Under construction

More information

Strategies for energy efficiency improvement in residential and office buildings: their role at building and country scale

Strategies for energy efficiency improvement in residential and office buildings: their role at building and country scale The Future Role of Energy Storage in South Eastern Europe Enlargement and Integration Action Workshop Strategies for energy efficiency improvement in residential and office buildings: their role at building

More information

Passive House Project documentation

Passive House Project documentation Passive House Project documentation Architecture: CadViz: Building physics: ehaus, Cyril Vibert Building Services: ehaus, Cyril Vibert Craftsperson: ehaus A compact two level family home with 4 bedrooms

More information

Solar Energy Technologies

Solar Energy Technologies 1 Solar Energy Technologies ME 430 Queen s University The Solar Energy Resource Varies over day and year, (i.e., intermittent) Generally non-dispatchable Ottawa average for year ~4 kwh/m 2 per day e.g.,

More information

NYSERDA High Performance Development Challenge Energy Monitoring Report Hudson Passive Project

NYSERDA High Performance Development Challenge Energy Monitoring Report Hudson Passive Project NYSERDA High Performance Development Challenge Energy Monitoring Report Hudson Passive Project The participating home is a single family detached home in Hudson, NY. The house was completed and occupied

More information

Energy-Efficient Passive House using thermal mass to achieve high thermal comfort

Energy-Efficient Passive House using thermal mass to achieve high thermal comfort Energy-Efficient Passive House using thermal mass to achieve high thermal comfort Loa Andersson Managing Director RLI Byggdata AB rli@termodeck.com Alexander Engström Technical Director RLI Byggdata AB

More information

Project Description. Projected build start date 23 May 2016 Projected date of occupation 27 Feb 2017

Project Description. Projected build start date 23 May 2016 Projected date of occupation 27 Feb 2017 http://lowenergybuildings.org.uk Project name Loudon Buildings, Godinton Estate Project summary Conversion of a modern concrete framed straw barn into low energy 4 bedroom house, approved under Class Q

More information

Experimental Study to Evaluate the Performance of Iraqi Passive House in Summer Season

Experimental Study to Evaluate the Performance of Iraqi Passive House in Summer Season Journal of Energy and Power Engineering 9 (2015) 386-392 doi: 10.17265/1934-8975/2015.04.008 D DAVID PUBLISHING Experimental Study to Evaluate the Performance of Iraqi Passive House in Summer Season Ghanim

More information

Project Description. Projected build start date Projected date of occupation. Dungannon, County Tyrone, Northern Ireland

Project Description. Projected build start date Projected date of occupation. Dungannon, County Tyrone, Northern Ireland http://lowenergybuildings.org.uk Project name Lisnahull Project summary The terrace of 5 two storey houses have been developed as the first certified social housing project in Ireland for Oaklee Homes

More information

D3.9_Overall Refurbishment Plan DRAFT CS03. Hotel Restaurant Valcanover

D3.9_Overall Refurbishment Plan DRAFT CS03. Hotel Restaurant Valcanover D3.9_Overall Refurbishment Plan DRAFT CS03 Hotel Restaurant Valcanover INTELLIGENT ENERGY EUROPE II Energy efficiency and renewable energy in buildings IEE/12/070 EuroPHit [Improving the energy performance

More information

Bruck an der Mur. Project summary. Energy concept: Background for the renovation reasons

Bruck an der Mur. Project summary. Energy concept: Background for the renovation reasons Bruck an der Mur Project summary Energy concept: Background for the renovation reasons The aim of this project was to gather information and experiences of the pilot project and the research, so that those

More information

Achieving the nearly zero energy building concept - A study based on practical experience

Achieving the nearly zero energy building concept - A study based on practical experience Achieving the nearly zero energy building concept - A study based on practical experience SIMON PESCARI, VALERIU STOIAN, DANIEL DAN, DAN STOIAN Department of Civil Engineering and Equipment, Faculty of

More information

Energy consumption and thermal comfort in a passive house built in Romania

Energy consumption and thermal comfort in a passive house built in Romania Chapter 3 - High Performance Sustainable Building Solutions Energy consumption and thermal comfort in a passive house built in Romania Cristina Tanasa, Cristian Sabau, Daniel Dan & Valeriu Stoian Polytechnic

More information

Passivhaus Project Documentation Wrexham Passivhaus

Passivhaus Project Documentation Wrexham Passivhaus Passivhaus Project Documentation Wrexham Passivhaus Design/Architecture: Simmonds Mills Architects Structural ngineer: Bob Johnson Structural ngineers, Shrewsbury Building Services: Alan Clarke Passivhaus

More information

Nearly Zero Energy Building in Lecco Modern technological building compared to an ancient Villa

Nearly Zero Energy Building in Lecco Modern technological building compared to an ancient Villa Nearly Zero Energy Building in Lecco Modern technological building compared to an ancient Villa Matteo BRASCA *, Oscar Luigi PAGANI **, Kanza RAUF*** * partner - AIACE S.r.l. società di ingegneria, contract

More information

Passive houses for the Northern climate

Passive houses for the Northern climate Passive houses for the Northern climate Jyri Nieminen Customer Manager VTT Technical Research Centre of Finland Finland Jyri.Nieminen@vtt.fi Jouko Knuutinen Regional Director TA Yhtymä Finland Jouko.Knuutinen@TA.fi

More information

Project name Old Dover Road Project summary Whole house retrofit and formation of new habitable roof structure

Project name Old Dover Road Project summary Whole house retrofit and formation of new habitable roof structure http://lowenergybuildings.org.uk Project name Old Dover Road Project summary Whole house retrofit and formation of new habitable roof structure Project Description Projected build start date Projected

More information

Next Generation District Heating

Next Generation District Heating Next Generation District Heating FVB: Ulrika Ottosson, Heimo Zinko Lund University: Janusz Wollerstrand, Patrick Lauenburg, Marek Brand (DTU) a project The Swedish District Heating Association s R&D programme

More information

Project Description. Projected build start date Projected date of occupation. Existing external wall construction.

Project Description. Projected build start date Projected date of occupation. Existing external wall construction. http://lowenergybuildings.org.uk Project name Admirals Hard Project summary FINALIST of the UK Passivhaus Awards 2015 - Situated on the Stonehouse peninsula, by the banks of the River Tamar, Number 3 Admirals

More information

Here Comes The Sun Applications of Solar Energy. Marc Rosenbaum, P.E. South Mountain Company West Tisbury, MA

Here Comes The Sun Applications of Solar Energy. Marc Rosenbaum, P.E. South Mountain Company West Tisbury, MA Here Comes The Sun Applications of Solar Energy Marc Rosenbaum, P.E. South Mountain Company West Tisbury, MA Learning objectives 1 Participants will learn how to quantify the amount of sun reaching a surface

More information

Deep Energy Retrofit of a HighRise MURB

Deep Energy Retrofit of a HighRise MURB Deep Energy Retrofit of a HighRise MURB COLIN SHANE M.Eng., P.Eng. RDH BUILDING SCIENCES INC. SAN FRANCISCO, CA AIA Credits National Institute of Building Sciences Provider #G168 Credit(s) earned on completion

More information

Passive House Object Documentation

Passive House Object Documentation Passive House Object Documentation Detached house with 4no. Bedrooms in Crawsfordsburn, Northern Ireland. Project Designer Mr Paul McAlister Paul McAlister Architects Ltd Year of construction 2012/2013

More information

Built examples and project certification. Zeno Bastian, Passive House Institute

Built examples and project certification. Zeno Bastian, Passive House Institute Built examples and project certification Zeno Bastian, Passive House Institute Passive House Standard for Retrofits? Photo Passive House Institute Shape Graphic Passive House Institute Thermal Bridges

More information

Balta Eco-Project crit3

Balta Eco-Project crit3 Balta Eco-Project crit3 Maxime Bergé Mathieu Bicego Aurélie Charton Astrid Hanrot 1 hourly heating requirements : Hourly solar energy available When summing hourly energy for one day in each month: 3000

More information

Potential of ventilative cooling in German residential buildings

Potential of ventilative cooling in German residential buildings Potential of ventilative cooling in German residential buildings QUALICHeCK-Webinar, 2016-12-01 Auf Wissen bauen Fraunhofer IBP Introduction Background Highly insulated buildings with almost completely

More information

2 x BPE studies of Passivhaus domestic projects

2 x BPE studies of Passivhaus domestic projects bere:architects 73 The Poets MuseRoad London 54A Newington N5 2SH Green T London +44(0)20 N16 7359 9PX 4503 www.bere.co.uk T +44 (0)20 7241 1064 www.bere.co.uk Building Better Buildings / UCL / Technology

More information

Project Description. Projected build start date 03 May 2010 Projected date of occupation 06 Aug

Project Description. Projected build start date 03 May 2010 Projected date of occupation 06 Aug http://lowenergybuildings.org.uk Project name Retrofit - Appledore, Ashford Project summary The key project approach is to develop a solution that uses complementary technologies and techniques, and primarily

More information

http://lowenergybuildings.org.uk Project name Grove Cottage Project summary Extension & Refurbishment of Victorian Townhouse using Passivhaus methodology and CarbonLite guidance. Certified to the Passivhaus

More information

Dienstleistung. Certification as "Quality Approved Passive House" Criteria for Residential-Use Passive Houses

Dienstleistung. Certification as Quality Approved Passive House Criteria for Residential-Use Passive Houses Passiv Haus Institut Passivhaus Dienstleistung GmbH Dr. Wolfgang Feist Rheinstr. 44/46 Rheinstr. 44/46 D-64283 Darmstadt D-64283 Darmstadt www.passiv.de www.passivhaus-info.de Certification as "Quality

More information

Passiv Haus Institut. Certification as "Quality Approved Passive House" Criteria for Non-Residential Passive House Buildings

Passiv Haus Institut. Certification as Quality Approved Passive House Criteria for Non-Residential Passive House Buildings Passiv Haus Institut Dr. Wolfgang Feist Rheinstr. 44/46 D-64283 Darmstadt www.passiv.de Certification as "Quality Approved Passive House" Criteria for Non-Residential Passive House Buildings Passive Houses

More information

Apartment building Sodastraße 40 in Ludwigshafen, DE

Apartment building Sodastraße 40 in Ludwigshafen, DE Apartment building Sodastraße 40 in Ludwigshafen, DE PROJECT SUMMARY Renovation of an apartment building with exposed brickwork, built in 1892. 78% reduction of annual heat energy demand with interior

More information

Holistic Design Approach For Energy Efficiency ASHRAE TECHNOLOGY AWARD CASE STUDIES

Holistic Design Approach For Energy Efficiency ASHRAE TECHNOLOGY AWARD CASE STUDIES ASHRAE TECHNOLOGY AWARD CASE STUDIES This article was published in ASHRAE Journal, June 2018. Copyright 2018 ASHRAE. Posted at www.ashrae.org. This article may not be copied and/or distributed electronically

More information

Project Description. Projected build start date 02 Aug 2010 Projected date of occupation 03 Dec Existing external wall construction

Project Description. Projected build start date 02 Aug 2010 Projected date of occupation 03 Dec Existing external wall construction http://lowenergybuildings.org.uk Project name Tower Hamlets - naturally ventilated Passivhaus Retrofit Project summary The property is a 3 bedroom mid terrace single family residence built in the 1960

More information

ENERGETIC MONITORING AND OPTIMIZATION OF A SOLAR HOUSE

ENERGETIC MONITORING AND OPTIMIZATION OF A SOLAR HOUSE Bulletin of the Transilvania University of Braşov Vol. 3 (52) - 2010 Series I: Engineering Sciences ENERGETIC MONITORING AND OPTIMIZATION OF A SOLAR HOUSE M. MOLDOVAN 1 I. VIŞA 1 A. DUŢĂ 1 Abstract: Into

More information

Healthy Buildings 2017 Europe July 2-5, 2017, Lublin, Poland

Healthy Buildings 2017 Europe July 2-5, 2017, Lublin, Poland Healthy Buildings 217 Europe July 2-5, 217, Lublin, Poland Paper ID 89 ISBN: 978-83-7947-232-1 THERMAL RETROFIT OF A RESIDENTIAL BUILDING IN ROMANIA TO REACH LOW-CONSUMPTION ENERGY TARGETS Andrei DAMIAN

More information

Sustainable Building Façade and Advanced Fenestration Systems

Sustainable Building Façade and Advanced Fenestration Systems Workshop on Potential Technological Developments for Zero Carbon Buildings 16-17 Oct 2013 Sustainable Building Façade and Advanced Fenestration Systems Tin-Tai Chow Building Energy & Environmental Technology

More information

DISCOVERIES AT NET ZERO. Michael Leckman Diamond Schmitt Architects Chris Piche Integral Group

DISCOVERIES AT NET ZERO. Michael Leckman Diamond Schmitt Architects Chris Piche Integral Group DISCOVERIES AT NET ZERO Michael Leckman Diamond Schmitt Architects Chris Piche Integral Group DISCOVERIES AT NET ZERO So, what is a Net Zero Energy building? A building achieves Net Zero Energy when it

More information

Project Description. Projected build start date 24 Dec 2004 Projected date of occupation. Energy target. Existing external wall construction

Project Description. Projected build start date 24 Dec 2004 Projected date of occupation. Energy target. Existing external wall construction http://lowenergybuildings.org.uk Project name Withy Cottage Project summary Timber Frame & Straw Bale self build with thermal bridge free construction (other than door and window frames). Simple flat raft

More information

Project Description. Projected build start date 18 Mar 2013 Projected date of occupation 11 Nov 2013

Project Description. Projected build start date 18 Mar 2013 Projected date of occupation 11 Nov 2013 http://lowenergybuildings.org.uk Project name Coventry Eco House Project summary A project vision for Coventry & Warwickshire FORCE Group to design and build two 3 bedroom detached houses for Orbit Homes

More information

Press Release. Zero Energy Building for Seoul. Fraunhofer ISE Leads Interdisciplinary Team and Develops Energy Concept

Press Release. Zero Energy Building for Seoul. Fraunhofer ISE Leads Interdisciplinary Team and Develops Energy Concept Page 1 Zero Energy Building for Seoul Fraunhofer ISE Leads Interdisciplinary Team and Develops Energy Concept With the Energy Dream Center, the Seoul metropolitan government realizes its goal to construct

More information

Passive Design Solutions. Passive House The Road to Net-Zero

Passive Design Solutions. Passive House The Road to Net-Zero Passive House The Road to Net-Zero Net-Zero into the Future Net-Zero defined as producing as much energy onsite as the building uses annually. Using net-metering with the grid, so grid is acting as 100%

More information

Passive House: Overview

Passive House: Overview Passive House: Overview Wexford Local Development Maurice Falvey MosArt Passive House Academy 3,000 BC Increasing energy standards... Conventional energy standard (65kWh/m 2 /year for space heating) Low

More information

Project Description. Projected build start date 01 May 2010 Projected date of occupation 01 Nov Belfast, County Antrim, Northern Ireland

Project Description. Projected build start date 01 May 2010 Projected date of occupation 01 Nov Belfast, County Antrim, Northern Ireland http://lowenergybuildings.org.uk Project name Eco-Energy Retrofit, Grove Housing Association, Belfast Project summary The mid terrace solid wall house built in 1896, is located in North Belfast and owned

More information

Passive House: Overview

Passive House: Overview Passive House: Overview Wexford Local Development Maurice Falvey MosArt Passive House Academy 3,000 BC Increasing energy standards... Conventional energy standard (65kWh/m 2 /year for space heating) Low

More information

Project Description. Projected build start date 11 Feb 2013 Projected date of occupation 14 Nov

Project Description. Projected build start date 11 Feb 2013 Projected date of occupation 14 Nov http://lowenergybuildings.org.uk Project name Clapham Retrofit Project summary This 4-storey semi-detached Grade II listed Victorian townhouse has been eco retrofitted to a high standard of airtightness

More information

AUTARKIC COOLING VIA BUILDING SKINS - RESULTS FROM COOLSKIN-PROJECT COOSLKIN This project is funded by the Austrian Klima- und Energiefonds

AUTARKIC COOLING VIA BUILDING SKINS - RESULTS FROM COOLSKIN-PROJECT COOSLKIN This project is funded by the Austrian Klima- und Energiefonds AUTARKIC COOLING VIA BUILDING SKINS - RESULTS FROM COOLSKIN-PROJECT COOSLKIN This project is funded by the Austrian Klima- und Energiefonds within the programme e!mission 1st Call 2014 Tim Selke Solar

More information

COMPARISON OF ENERGY USE INDICATORS OF A NON-RESIDENTIAL PASSIVE HOUSE WITH ASHRAE 90.1 BUDGET BUILDING

COMPARISON OF ENERGY USE INDICATORS OF A NON-RESIDENTIAL PASSIVE HOUSE WITH ASHRAE 90.1 BUDGET BUILDING COMPARISON OF ENERGY USE INDICATORS OF A NON-RESIDENTIAL PASSIVE HOUSE WITH ASHRAE 90.1 BUDGET BUILDING ABSTRACT F. Bagheri 1, M. Fakoor 1, B. Young 1, C. Cranswick 1 1 BC Building Science Ltd. 611 Bent

More information

14.8 kwh/(m²a) Project Documentation. 1 Abstract. R-951 Residence: Three Family Passive House Building. 1.1 Data of building. Year of construction

14.8 kwh/(m²a) Project Documentation. 1 Abstract. R-951 Residence: Three Family Passive House Building. 1.1 Data of building. Year of construction Project Documentation 1 Abstract R-951 Residence: Three Family Passive House Building 1.1 Data of building Year of construction U-value external wall/ U-Wert Außenwand 2013 0.112 W/(m²K) Space heating

More information

Energy Audit. Project: ENergy Efficiency and Renewables SUPporting Policies in Local level for EnergY (ENER-SUPPLY) Work Package 4

Energy Audit. Project: ENergy Efficiency and Renewables SUPporting Policies in Local level for EnergY (ENER-SUPPLY) Work Package 4 Project: ENergy Efficiency and Renewables SUPporting Policies in Local level for EnergY (ENER-SUPPLY) Work Package 4 Energy Audit Date: Country: SERBIA Partner: University of Novi Sad (UNS) Building: Health

More information

Project Description. Projected build start date 01 Mar 2010 Projected date of occupation 31 May Aberdare, Rhondda Cynon Taff, Wales

Project Description. Projected build start date 01 Mar 2010 Projected date of occupation 31 May Aberdare, Rhondda Cynon Taff, Wales http://lowenergybuildings.org.uk Project name Self Heating Social Housing- the zero carbon retrofit Project summary The target for this project is to create the first UK PassivHaus retrofit using low/zero

More information

Building Sustainability Why Passive House?

Building Sustainability Why Passive House? Building Sustainability Why Passive House? Paul McAlister RIBA Northern Ireland s First Certified Passive House Designer Agenda Timeline to Carbon Zero Features of a Passive House How it works Benefits

More information

PASSIVE HOUSE. is a building, which doesn t need an active type of heating. Dr. Ing Mihail Stancu

PASSIVE HOUSE. is a building, which doesn t need an active type of heating. Dr. Ing Mihail Stancu PASSIVE HOUSE is a building, which doesn t need an active type of heating Dr. Ing Mihail Stancu PASSIVE HOUSE 1991 Darmstadt, dr. Wolfgang Feist THERMAL BILANCE THERMAL LOSES - Transmission thermal losses

More information

ANNUAL ENERGY PERFORMANCE OF SOLAR THERMAL SYSTEMS IN BRAŞOV, ROMANIA

ANNUAL ENERGY PERFORMANCE OF SOLAR THERMAL SYSTEMS IN BRAŞOV, ROMANIA Bulletin of the Transilvania University of Braşov Series I: Engineering Sciences Vol. 5 (54) No. 2-212 ANNUAL ENERGY PERFORMANCE OF SOLAR THERMAL SYSTEMS IN BRAŞOV, ROMANIA C. ŞERBAN 1 E. EFTIMIE 1 Abstract:

More information

4.2.3 MINERGIE ORIGIN AND ORGANISATION

4.2.3 MINERGIE ORIGIN AND ORGANISATION As described earlier, the energy performance of a building is calculated and compared with the requirements for the chosen Minergie system. The calculations are then sent to a Minergie administrator who

More information

Project Report: SunMaxx Commercial Case Studies

Project Report: SunMaxx Commercial Case Studies Project Report: 7 x ThermoPower-VHP30 Total Gross Surface Area: 369.25 sq.ft Azimuth: 10 Incl.: 37 1200 gal/day 120 F Gas Boiler - 9 150 kbtu/hr StorMaxx NP Vol:1500 gal Existing Hot Water Heater Vol:600

More information

Learnings from residential PH design and procurement in Australia. Luc Plowman

Learnings from residential PH design and procurement in Australia. Luc Plowman Learnings from residential PH design and procurement in Australia Luc Plowman Summary Stakeholder education Expectations Materials & documentation Heating & cooling Costs Documentation requirements The

More information

MID-RISE APARTMENT BUILDING PROTOTYPE PHIUS - WUFI PASSIVE

MID-RISE APARTMENT BUILDING PROTOTYPE PHIUS - WUFI PASSIVE MID-RISE APARTMENT BUILDING PROTOTYPE PHIUS - WUFI PASSIVE 50 kbtu/sf/yr 40 kbtu/sf/yr 30 kbtu/sf/yr 20 kbtu/sf/yr 10 kbtu/sf/yr 0 kbtu/sf/yr 45.1 Baseline 13.0 High Performance 15.5 PHIUS - IES 25.2 PHIUS

More information

Project Report: SunMaxx Commercial Case Studies

Project Report: SunMaxx Commercial Case Studies Project Report: 14 x ThermoPower-VHP30 Total Gross Surface Area: 738.50 sq.ft Azimuth: 10 Incl.: 37 2100 gal/day 130 F Gas Boiler - 9 150 kbtu/hr StorMaxx NP Vol:2500 gal Existing Hot Water Heater Vol:1000

More information

Holistic Design Approach For Energy Efficiency ASHRAE TECHNOLOGY AWARD CASE STUDIES

Holistic Design Approach For Energy Efficiency ASHRAE TECHNOLOGY AWARD CASE STUDIES 2018 ASHRAE TECHNOLOGY AWARD CASE STUDIES Holistic Design Approach For Energy Efficiency Using LED and fluorescent lighting, the lighting design was modeled to maximize lighting effect while reducing energy

More information

Project Report: SunMaxx Commercial Case Studies

Project Report: SunMaxx Commercial Case Studies Project Report: 5 x ThermoPower-VHP30 Total Gross Surface Area: 263.75 sq.ft Azimuth: 10 Incl.: 37 900 gal/day 120 F Gas Boiler - 9 100 kbtu/hr StorMaxx NP Vol:1200 gal Existing Hot Water Heater Vol:400

More information

Single Family Homes - over 3,000 sqft. Parfitt Residence

Single Family Homes - over 3,000 sqft. Parfitt Residence Participant information Zero-Energy Plan LLC/Clifton View Homes Ted L. Clifton 107 S. Main St. Ste. G201 Coupeville, WA 98239 Phone: 360-969-2363 Email Address: ted@zero-energyplans.com Website: www.zero-energyplans.com

More information

Principles of Green Architecture

Principles of Green Architecture Principles of Green Architecture Administration of Building and installation By Dr. Arash Ghandchi December 12-13, 2017 1 Sustainable Architecture Sustainable Architecture is Architecture that seeks to

More information

Impact of Distributed Solar Generation in Low Energy Housing on the Electrical Grid

Impact of Distributed Solar Generation in Low Energy Housing on the Electrical Grid Impact of Distributed Solar Generation in Low Energy Housing on the Electrical Grid Wasim Saman, David Whaley and Lachlan Mudge Barbara Hardy Institute University of South Australia - Mawson Lakes SA,

More information

2000 Antwerp, terraced house

2000 Antwerp, terraced house 2000 Antwerp, terraced house 1. INTRODUCTION PROJECT SUMMARY - First phase energy renovation: 1999 - Second phase energy renovation: 2007 SPECIAL FEATURES - Two phased energy renovation - The owners stayed

More information

COMPARATIVE SUMMER THERMAL AND COOLING LOAD PERFORMANCE OF NATURAL VENTILATION OF CAVITY ROOF UNDER THREE DIFFERENT CLIMATE ZONES

COMPARATIVE SUMMER THERMAL AND COOLING LOAD PERFORMANCE OF NATURAL VENTILATION OF CAVITY ROOF UNDER THREE DIFFERENT CLIMATE ZONES COMPARATIVE SUMMER THERMAL AND COOLING LOAD PERFORMANCE OF NATURAL VENTILATION OF CAVITY ROOF UNDER THREE DIFFERENT CLIMATE ZONES Lusi Susanti 1, Hiroshi Matsumoto 2, and Hiroshi Homma 2 1 Department of

More information

Project name Fulford Passivhaus, York Project summary New-build singe-family detached house for individual clients. Certified as Passivhaus Plus.

Project name Fulford Passivhaus, York Project summary New-build singe-family detached house for individual clients. Certified as Passivhaus Plus. http://lowenergybuildings.org.uk Project name Fulford Passivhaus, York Project summary New-build singe-family detached house for individual clients. Certified as Passivhaus Plus. Project Description Projected

More information

German American Chamber of Commerce PRESENTATION ON NOVEMBER 6th, 2008 Axel Popp

German American Chamber of Commerce PRESENTATION ON NOVEMBER 6th, 2008 Axel Popp German American Chamber of Commerce PRESENTATION ON NOVEMBER 6th, 2008 Axel Popp www.rehau.de Constructcion Automotive Industry WHO IS REHAU UNLIMITED POLYMER SOLUTIONS We are daily redefining the limits

More information

Project Description. Projected build start date 05 Jul 2010 Projected date of occupation 25 Sep

Project Description. Projected build start date 05 Jul 2010 Projected date of occupation 25 Sep http://lowenergybuildings.org.uk Project name Bringing Wates homes into the Future Project summary Wates property structural and low energy refurbishment based on an optimised structural insulated render

More information

Progress of Nordic Built project_nb13339 Low temperature heating and high temperature cooling in refurbishments and new construction of buildings

Progress of Nordic Built project_nb13339 Low temperature heating and high temperature cooling in refurbishments and new construction of buildings Progress of Nordic Built project_nb13339 Low temperature heating and high temperature cooling in refurbishments and new construction of buildings Low temperature heating (LTH) group: Sture Holmberg, Professor,

More information

nzeb progress including energy efficient HVAC solutions in Central and North Europe

nzeb progress including energy efficient HVAC solutions in Central and North Europe WS 11: CCHVAC REHVA, 24 May 2016, Aalborg nzeb progress including energy efficient HVAC solutions in Central and North Europe Jarek Kurnitski Professor, Vice-president REHVA Tallinn University of Technology

More information

Building performance based on measured data

Building performance based on measured data Building performance based on measured data S. Andersson 1,*, J-U Sjögren 2, R. Östin 1 and T.Olofsson 1 1. Department of applied physics and electronics, Umeå, Sweden 2. NCC Ltd, Stockholm, Sweden * Corresponding

More information

Welsh Future Homes. Developer: United Welsh Housing Association. Project Description. Architect: bere:architects. Location: Ebbw Vale, Wales

Welsh Future Homes. Developer: United Welsh Housing Association. Project Description. Architect: bere:architects. Location: Ebbw Vale, Wales Case Study 03 Welsh Future Homes Developer: United Welsh Housing Association Architect: bere:architects Location: Ebbw Vale, Wales Building Types: Residential Community Renewable & Low Carbon Technologies

More information

Project Description. Projected build start date Projected date of occupation 01 Jun Low Energy Buildings

Project Description. Projected build start date Projected date of occupation 01 Jun Low Energy Buildings http://lowenergybuildings.org.uk Project name Knights Place Project summary When the client, Exeter City Council, was offered a funding opportunity by the HCA to develop the first council housing in Exeter

More information

EuroPHit. Outlines for training modules for designer

EuroPHit. Outlines for training modules for designer EuroPHit Outlines for training modules for designer Zeno Bastian Passive House Institute Darmstadt, Germany www.europhit.eu The EuroPHit Project With the EnerPHit Standard as the goal and Passive House

More information

COMPARISON OF TWO PASSIVE HOUSE SCHOOLS IN NORWAY AND GERMANY

COMPARISON OF TWO PASSIVE HOUSE SCHOOLS IN NORWAY AND GERMANY COMPARISON OF TWO PASSIVE HOUSE SCHOOLS IN NORWAY AND GERMANY CIB W070, DTU Copenhagen, 21-23 May 2014 Professor Dr.-Ing. Antje Junghans, Professor Thomas Berker Agenda 1. Introduction energy efficiency

More information

The SOLCER Energy Positive House: Whole System Simulation. Phillip Jones, Xiaojun Li, Ester Coma and Jo Patterson

The SOLCER Energy Positive House: Whole System Simulation. Phillip Jones, Xiaojun Li, Ester Coma and Jo Patterson The SOLCER Energy Positive House: Whole System Simulation Phillip Jones, Xiaojun Li, Ester Coma and Jo Patterson Welsh School of Architecture, Cardiff University, Cardiff, United Kingdom Abstract There

More information

Passive House Object Documentation

Passive House Object Documentation Passive House Object Documentation 3 stores, 9 units multifamily building in Lonato, Brescia, Italy Project team Architecture: Arch. Angiolino Imperadori Structures and tech. services: Ing. Giovanni Ziletti