1 1 By: Speed-Post State Level Expert Appraisal Committee (Formed as per S.O. no dated 14 th Sept 2006 of Government of India, Ministry of Environment & Forests) PARYAWARAN PARISAR, E-5, ARERA COLONY, BHOPAL 16 Phone: (0755) Fax: (0755) No. 138 /PS-MS/MPPCB/SEAC/TOR (75)/2011 Bhopal, dt. 03 /06/2011 To M/s J.J. Distillers & Beverages Pvt. Ltd, Nagendra Bhawan, Narayni Bai Ki Gali, Near Nagar Palika, Duttpura, Distt.- Morena (M.P) [Case No. 606/2010] Env. Consultant: Créative Enviro Service, Bhopal. (SN-29) Sub: Proposed Grain based Distillery: 28 KLPD of Alcohal, Grain required: MT/day,Area of Plot : 7.5 Acres, Khasra No. 148, 160, 161, 162,163, 165, 166 & 167 At Village Jafrabad, Teh.- Joura, Distt - Morena (M.P.) - Prescribing of TOR - Regarding. The present case pertains to production of Rectified Spirit from grains. Cost of the project is Crore. Location: Total 7.5 acres of land is available for the industry. The proposed site is reported to be located at Village- Jafrabad, Tehsil- Joura, District Morena. The nearest village- Jafrabad is reported at 370 meters from the site and village Bilaiya is reported to be at about 450 meters from the site. Nearest surface water is Morena Branch Canal at about 1.2 Km and River Asan is 2.35 Km from the site. NH-3 Agra Mumbai Highway is about 12 Km from the site. The state highway is reported to be 150 meters. No wild life sanctuary / National Bio-sphere Reserve, Inter-state border is located within 10 Km radius of the proposed site. It was reported that no litigation is pending against the project. Manufacturing technology: The technology is based on Multi-pressure Distillation. All machines and equipments are close looped to check any leakage / emission at any stage. Water requirement: is 426 KLD, which shall be drawn from ground water. Quantity of effluent generated from the industry shall be 304 KLD. The waste water shall be treated by Centrifuge decanter for the separation of suspended solids followed by Multi-effect Evaporator to maintain Zero Discharge. Source of electricity: Power requirement for the project is 1250 KVA. Co-generation biomass based 1.5 MW power plant shall be installed and 500 KVA DG set shall be installed as back up. Green belt development: PP has submitted that the area of the proposed site is large enough to provide 33% of the total area to be utilized as green belt. Still one acre land away from the village which belongs to the PP and is having continuity with the proposed site can be added.

2 2 It was also submitted by the PP that any other issue pertaining to public shall be judiciously sorted out during the public hearing with all needed commitments. Submission from the PP: Registration from Industries department, diversion letter in favour of Smt. Jaya Chaturvedi (One of the Directors) and NOC from Gram Panchayat Jafrabad. Permission & license form Excise department is yet to be release. The State Expert Appraisal Committee for environmental appraisal of projects considered the project during its meeting held on 06/01/2011. After the deliberations Committee has decided to issue TOR to the industry with condition that the site shall be visited before appraisal of EIA. The issued TOR can be extended/ amended or even withdrawn on the recommendation of visiting sub-committee. Following points shall be included in the TOR: I. Executive summary of the EIA to be submitted separately with detailed EIA. II. III. IV. Comparison of alternate sites considered and the reasons for selecting the proposed site. Conformity of the site with the prescribed guidelines in terms of distance of 500 m from HFL of the river, highways, railway line should also be shown. All the coordinates of the plant site on topo-sheet, showing the details of ETP and other facilities to be submitted. The study area should cover an area of 10 km radius around the proposed site. V. Land use of the study area as well as the project area shall be given. VI. Location of any National Park, Sanctuary, Elephant / Tiger Reserve (existing as well as proposed), migratory routes, if any, within 10 km of the project site shall be specified and marked on the map duly authenticated by the Chief Wildlife Warden. VII. Land requirement for the project to be optimized. Item wise break up of land requirement and its availability to be furnished. VIII. IX. Topography of the area should be given clearly indicating whether the site requires any filling. If so, details of filling, quantity of fill material required, its source, transportation etc. should be given. Impact on drainage of the area and the surroundings. X. Information regarding surface hydrology and water regime and impact of the same, if any due to the project. XI. XII. XIII. One season site-specific meteorological data shall be provided. One complete season AAQ data (except monsoon) to be given along with the dates of monitoring. The parameters to be covered shall include SPM, RSPM, SO2 NOx and Ozone (ground level). The location of the monitoring stations should be so decided so as to take into consideration the pre-dominant downwind direction, population zone and sensitive receptors including reserved forests. There should be at least one monitoring station in the upwind direction. Impact of the project on the AAQ of the area and cumulative impact due to the existing cement plants, power plant, coal washery, mining activity etc. Details of the model used and the input data used for modeling should also be provided. The air quality contours may be plotted on a location map showing the location of project site, habitation nearby, sensitive receptors, if any. The wind roses should also be shown on this map.

3 XIV. XV. XVI. XVII. XVIII. XIX. 3 Source of water and its availability. Commitment regarding availability of requisite quantity of water from the competent authority. Details of rainwater harvesting and how it will be used in the plant. Examine the feasibility of zero discharge. Details of water balance taking into account reuse and re-circulation of effluents. Details of greenbelt i.e. land with not less than 1500 trees per ha giving details of species, width of plantation, planning schedule etc. Detailed R&R plan/compensation package for the project affected people. XX. Details of flora and fauna duly authenticated should be provided. In case of any scheduled fauna, conservation plan should be provided. XXI. XXII. XXIII. XXIV. XXV. Details regarding infrastructure facilities such as sanitation, fuel, restroom etc. to be provided to the labour force during construction as well as to the casual workers including truck drivers during operation phase. Public hearing points raised and commitment of the project proponent on the same. An action plan to address the issues raised during public hearing and the necessary allocation of funds for the same should be provided. Measures of socio economic influence to the local community proposed to be provided by project proponent. As far as possible, quantitative dimension to be given. Impact of the project on local infrastructure of the area such as road network and whether any additional infrastructure would need to be constructed and the agency responsible for the same with time frame. EMP to mitigate the adverse impacts due to the project along with item wise cost of its implementation. XXVI. Risk assessment should be carried out. It should take into account the maximum inventory of storage at site at any point in time. The risk contours should be plotted on the plant layout map clearly showing which of the proposed activities would be affected in case of an accident taking place. Based on the same, proposed safeguard measures should be provided. Measures to guard against fire hazards should also be provided. XXVII. XXVIII. Any litigation pending against the project and /or any direction /order passed by any Court of Law against the project, if so, details thereof. Any direction /condition stipulated by any competent authority regarding expansion or establishment of new project in the proposed area have to be addressed in detail along with relevant documents. 4. Besides the above, the following general points will be followed:- a) All documents to be properly referenced with index, page numbers and continuous page numbering. b) Where data is presented in the report especially in table, the period in which the data was collected and the source should invariably be indicated. c) Where the documents provided are in a language other than English, an English translation should be provided. d) The Questionnaire for environmental appraisal of distillery projects as devised earlier by the Ministry shall also be filled and submitted. 6. Additional points as discussed in the meeting to be incorporated in the EIA/EMP:

4 4 Alternate sites to be explored for siting of the industry in view of proximity to the villages and highway, so as to comply with the guidelines of MoEF. Executive summary of the project to be submitted with the EIA report. Detailed breakup of the land area along with the photographs of the area. Details of the site and information related to environmental setting within 10 Km radius of the project site. Present land use based on satellite imagery. Details of site and information related to environmental setting within 10 km radius of the project site. Information regarding eco-sensitive area such as national park/ wildlife sanctuary /biosphere reserves within 10 Km radius of the project area. Source of raw material. Ambient Air Quality Monitoring for the three months except monsoon. Mathematical modeling for calculating the dispersion of air pollutants and ground level concentration along with emissions from the boiler. Details of the use of steam from boiler and use of fuel. Hydrology of the area especially down stream. Ground water quality around the compost plant and spent wash storage lagoon. Noise levels monitoring at five locations within the study area. List of flora and fauna in the study area. Number of working days of the distillery unit. Details of the spent wash treatment. Proposed effluent treatment system and scheme for the achieving zero discharge. Detailed water requirement and water balance. Water drawls permission from the Irrigation Department/ State Ground Water Board. Details of raw material. Details of Solid waste management including management of boiler ash. Green belt development as per the CPCB guidelines. Environment management plan. Rain water harvesting measures. Details of occupational health surveillance programme. Details of socio economic welfare activities. Post project environmental monitoring. Any litigation pending against the project and / or any direction / order passed by any Court of Law against project, if so, details there of. Action plan in the tabular form to the issues/suggestions made during the public hearing along with the implementation plan and allocation of funds. 7. After preparing the draft EIA (as per the generic structure prescribed in Appendix-III of the EIA Notification, 2006) covering the above mentioned issues, Contd.5

5 5 the proponent will get the public hearing conducted and take further necessary action for obtaining environmental clearance in accordance with the procedure prescribed under the EIA Notification, Sd- (R.K. Jain) Secretary No. 139 /PS-MS/MPPCB/SEAC/TOR/ (75)2011 Bhopal, dt. 03/05 /2011 Copy to:- 1. The Member Secretary, Madhya Pradesh SEIAA, EPCO, E-5 Paryavaran Parisar, Arera Colony Bhopal. 2. The Chairman, Madhya Pradesh Pollution Control Board, E-5 Paryavaran Parisar, Arera Colony Bhopal. 3. The Principal Chief Conservator of Forest, Ground floor Satpuda Bhawan, Bhopal (M.P) 4. The Chief Conservator of Forest (C), Regional Office (WZ), Ministry of Environment & Forests, Kendriya Paryavaran Bhawan, Link Road No.-3, E-5, Arera Colony, Bhopal. 5. Guard File. -Sd- (R.K. Jain) Secretary

STATE EXPERT APPRAISAL COMMITTEE, PUNJAB Ministry of Environment and Forests, Government of India

STATE EXPERT APPRAISAL COMMITTEE, PUNJAB Ministry of Environment and Forests, Government of India STATE EXPERT APPRAISAL COMMITTEE, PUNJAB Ministry of Environment and Forests, Government of India O/O PUNJAB POLLUTION CONTROL BOARD, VATAVARAN BHAWAN, NABHA ROAD, PATIALA 147 001 Telefax:- 0175-2215802

More information

.in Dated 9th August, Sharma ;

.in Dated 9th August, Sharma  ; F. No. J-11011/151/2010-IA II (I) Government of India Ministry of Environment and Forests (I.A. Division) Paryavaran Bhawan CGO Complex, Lodhi Road New Delhi -110 003.. To, Ankleshwar E-mail: pb.rastoai@nic.in

More information

M/s Hind Energy & Coal Beneficiation Pvt. Ltd. is presently operating a 2 x 1.2 MTPA

M/s Hind Energy & Coal Beneficiation Pvt. Ltd. is presently operating a 2 x 1.2 MTPA 1.0 INTRODUCTION M/s Hind Energy & Coal Beneficiation Pvt. Ltd. is presently operating a 2 x 1.2 MTPA dry type of coal washery at Village: Hindadih, Tehsil: Masturi, District: Bilaspur (C.G.) for which

More information

CHECK LIST OF DOCUMENTS / OTHER REQUISITES FOR OBTAINING VARIOUS CLEARANCES FROM THE STATE POLLUTION CONTROL BOARD, ODISHA.

CHECK LIST OF DOCUMENTS / OTHER REQUISITES FOR OBTAINING VARIOUS CLEARANCES FROM THE STATE POLLUTION CONTROL BOARD, ODISHA. CHECK LIST OF DOCUMENTS / OTHER REQUISITES FOR OBTAINING VARIOUS CLEARANCES FROM THE STATE POLLUTION CONTROL BOARD, ODISHA. A. CONSENT TO ESTABLISH UNDER THE PROVISIONS OF WATER (PREVENTION & CONTROL OF

More information

PROPOSED TERM OF REFERENCE

PROPOSED TERM OF REFERENCE PROPOSED TERM OF REFERENCE FOR ESTABLISHMENT OF PROPOSED MOLASSES/GRAIN BASED DISTILLERY HAVING CAPACITY: 160.0 KLD (MOLASSES BASED) OR 120.0 KLD (MOLASSES BASED) + 40.0 KLD (GRAIN BASED) ALONGWITH 7.0

More information

4. The ambient air quality monitoring stations We are monitoring the ambient air quality

4. The ambient air quality monitoring stations We are monitoring the ambient air quality GLOBAL CALCIUM PRIVATE LTD., 125&126, SIPCOT COMPLEX, HOSUR 635 126 Ref : No. J-11011/411/2006-IA-II(I) dated 1 st August 2007. Compliance Report for the Period ending 31.3.2015 Sl. Specific Conditions

More information

For PROPOSED IT PARK. By M/s.Balewadi Tech Park Pvt.Ltd. Submitted to State Environment Expert Appraisal Committee III, Maharashtra

For PROPOSED IT PARK. By M/s.Balewadi Tech Park Pvt.Ltd. Submitted to State Environment Expert Appraisal Committee III, Maharashtra Draft Terms of References (ToR) (Based on the model TOR given in Environmental Impact Assessment Guidance Manual for building construction projects by MoEF & CC) For PROPOSED IT PARK By M/s.Balewadi Tech

More information

Hind Energy & Coal Beneficiation (India) Ltd.

Hind Energy & Coal Beneficiation (India) Ltd. SUMMARY ON ENVIRONMENTAL IMPACT ASSESSMENT REPORT OF Hind Energy & Coal Beneficiation (India) Ltd. (Change in Technology) at Hindadih Village, Masturi Tehsil Bilaspur District, Chhattisgarh Submitted to

More information

F. No. J-11011/480/2007-IA II (I) Government of India Ministry of Environment and Forests (I.A Division)

F. No. J-11011/480/2007-IA II (I) Government of India Ministry of Environment and Forests (I.A Division) To, M/s. Madras Cement Ltd. V Floor 98-A, Dr. Radhakrishnan Road Mylapore Chennai 600 004 Tamilnadu F. No. J-11011/480/2007-IA II (I) Government of India Ministry of Environment and Forests (I.A Division)

More information

Sr.No Condition Status A. SPECIFIC CONDITIONS:

Sr.No Condition Status A. SPECIFIC CONDITIONS: J.K. CEMENT WORKS, MANGROL (RAJ.) Compliance report of Mangrol Lime stone mine (For the period from April 2011 to September 2011) Sub:- Conditions of Environment Clearance from MOEF, New Delhi Letter No.

More information

Hind Energy & Coal Beneficiation (India) Ltd.

Hind Energy & Coal Beneficiation (India) Ltd. SUMMARY ON ENVIRONMENTAL IMPACT ASSESSMENT REPORT OF Hind Energy & Coal Beneficiation (India) Ltd. 0.96 MTPA Wet type Coal Washery at Birgahani Village, Baloda Tehsil Janjgir-Champa District, Chhattisgarh

More information

EXECUTIVE SUMMARY 1.0 PROJECT DESCRIPTION 1.1 INTRODUCTION

EXECUTIVE SUMMARY 1.0 PROJECT DESCRIPTION 1.1 INTRODUCTION EXECUTIVE SUMMARY 1.0 PROJECT DESCRIPTION 1.1 INTRODUCTION Jaypee Group is a leading Business House of the country with its presence in Core industries and Service Sectors like Cement, Infrastructure development,

More information

Compliance Report of EC : Compliance Status

Compliance Report of EC : Compliance Status Report of EC : S. i. Permission/recommendation shall be obtained from State Forest Department regarding Banni area, which is declared as a protected forest land ii. iii iv v GPCB vide letter no. GPCB/Unit-I/FT-

More information

HALF YEARLY COMPLIANCE REPORT OF ENVIRONMENTAL CLEARANCE CONDITIONS

HALF YEARLY COMPLIANCE REPORT OF ENVIRONMENTAL CLEARANCE CONDITIONS HALF YEARLY COMPLIANCE REPORT OF ENVIRONMENTAL CLEARANCE CONDITIONS 1. Name of the Project: M/s MCC PTA India Corp. Private Limited Haldia ( WB) Note: Company Name was change from MCC PTA India Corp.Private

More information

No.IA-J-11011/363/2017-IA-II(I) Goverment of India Minister of Enviroment,Forest and Climate Change Impact Assessment Division ***

No.IA-J-11011/363/2017-IA-II(I) Goverment of India Minister of Enviroment,Forest and Climate Change Impact Assessment Division *** No.IA-J-11011/363/2017-IA-II(I) Goverment of India Minister of Enviroment,Forest and Climate Change Impact Assessment Division *** Indira Paryavaran Bhavan, Vayu Wing,3rd Floor,Aliganj, Jor Bagh Road,New

More information

No. J-l1015/313/2010-IA.II (M) Government of India Ministry of Environment & Forests

No. J-l1015/313/2010-IA.II (M) Government of India Ministry of Environment & Forests No. J-l1015/313/2010-IA.II (M) Government of India Ministry of Environment & Forests Paryavaran Bhavan, C.G.O. Complex, Lodi Road, New Delhi-110 003. Dated the 28th June, 2013 To, M/ s Arbind Kumar Singh

More information

STANDARD OPERATING PROCEDURE

STANDARD OPERATING PROCEDURE STANDARD OPERATING PROCEDURE Consent to Established/Operate Procedural Guidelines Consent to Establish NOC Check List Consent to Operate NOC Check List Renewal to Consent to Operate Check List Time Frame

More information

SIX MONTHLY COMPLIANCE REPORT JUNE- 2015

SIX MONTHLY COMPLIANCE REPORT JUNE- 2015 SIX MONTHLY COMPLIANCE REPORT JUNE- 2015 Group Housing Complex My woods AT Plot no. GH-04, Sector -16 C, Noida Extension, Greater Noida, U.P. Being developed by M/s Mahagun India Pvt. Ltd. A-19, Sector-63,

More information

Name of Project: J.K. Cement Works (Unit: J.K. Cement Ltd.), Muddapur (Karnataka)

Name of Project: J.K. Cement Works (Unit: J.K. Cement Ltd.), Muddapur (Karnataka) J.K. Cement Works, Village- Muddapur, Taluka- Mudhol, Distt.- Bagalkot, Karnataka MoEF Letter No. F.No. J-11011/263/2009-IA II (I) dated 21-06-2010 Name of Project: J.K. Cement Works (Unit: J.K. Cement

More information

Telefax : 011: Dated 1 st November, 2011

Telefax : 011: Dated 1 st November, 2011 Drilling of Development Well (17 Nos.) and Exploratory Well (14 Nos.) at Tengakhat Kathaloni Dikom Area, District Dibrugarh, Assam by M/s Oil India Limited Environmental Clearance reg. ***********************

More information

MINUTES OF STATE EXPERT APPRAISAL COMMITTEE MINUTES

MINUTES OF STATE EXPERT APPRAISAL COMMITTEE MINUTES 1 1. Opening Remarks of the Chairman The Chairman welcomed all the members of the Committee (Annexure-1) and thereafter agenda items were taken up for deliberations. The list of participants present during

More information

Environmental Clearance Compliance Half Yearly Report

Environmental Clearance Compliance Half Yearly Report Environmental Clearance Compliance Half Yearly Report HALF YEARLY COMPLIANCE REPORT- April 2015 to September 2015 Ref: 1. MOEF, New Delhi Environment Clearance F. No. J-11011/119/2007- IA II (I) dated

More information

TERMS OF REFERENCE. Identification of the sources of pollution and assessing the impacts on the environment due to proposed project if any;

TERMS OF REFERENCE. Identification of the sources of pollution and assessing the impacts on the environment due to proposed project if any; TERMS OF REFERENCE 1.0 PROPOSED SCOPE OF WORK FOR EIA STUDY The components of the EIA study include: Determination of baseline data using primary data generation and secondary data available from various

More information

2 No. Continuous Ambient Air Quality Monitoring System (CAAQMS) installed in downwind & upwind direction and are connected to APPCB server.

2 No. Continuous Ambient Air Quality Monitoring System (CAAQMS) installed in downwind & upwind direction and are connected to APPCB server. Environmental Clearance Point Wise Half Yearly Compliance Report (October 2014 to March 2015) Cement Plant - EC No: F.No. J-11011/450/2007-IA II(I) Dated: 24 th March 2008 A. SPECIFIC CONDITIONS : S.NO.

More information

Subject: Environmental and CRZ clearance for expansion of Karaikal Port (Phase-II) at Puducherry by MIs. Karaikal Port Pvt. Ltd. - Reg.

Subject: Environmental and CRZ clearance for expansion of Karaikal Port (Phase-II) at Puducherry by MIs. Karaikal Port Pvt. Ltd. - Reg. No. 10-42/2009-IA.III Government of India Ministry of Environment & Forests (IA Division) Paryavaran Bhawan, CGO Complex, Lodhi Road, New Delhi - 110003. I i I I I Dated: 22 nd September, 2009. To MIs.

More information

Ministry of Environment and Forests Telefax : 011: M/s Posco India Private Limited

Ministry of Environment and Forests   Telefax : 011: M/s Posco India Private Limited F. No. J-11011/285/2007- IA II (I) Government of India Ministry of Environment and Forests Paryavaran Bhawan CGO Complex, Lodhi Road New Delhi 110 003 E-mail : tchand2003@yahoo.co.uk Telefax : 011: 24363963

More information

Telefax : 011: Dated 1 st March, 2013

Telefax : 011: Dated 1 st March, 2013 F. No. J-11011/263/2012- IA II (I) Government of India Ministry of Environment and Forests (I.A. Division) Paryavaran Bhawan CGO Complex, Lodhi Road New Delhi 110 003 To, Shri Jigar Shah, Director M/s

More information

Mangalam Cement Ltd.

Mangalam Cement Ltd. Mangalam Cement Ltd. Name of the Project :- New Cement Plant Unit - III and 17.5 mw CPP-II Project Code :- Raj- 80-600 - 2008 Clearance Letter No. :-F NO. J - 11011 / 30/2006 - IA II (I), dtd 17/07/2007

More information

PRE-FEASIBILITY REPORT

PRE-FEASIBILITY REPORT PRE-FEASIBILITY REPORT For ToR of Proposed Project of MANUFACTURING OF SYNTHETIC ORGANIC DYES (5 f B IND II) By SHREEJI BAPA DYE CHEM PLOT NO 1319 & 1320, PHASE-III, GIDC, VATVA, AHEMADABAD-382445, GUJARAT,

More information

Mangalam Cement Ltd.(Unit I)

Mangalam Cement Ltd.(Unit I) Mangalam Cement Ltd.(Unit I) Name of the Project :- Expansion of cement Project Code :- grinding capacity from 1.3 MTPA to 1.7 MTPA Clearance Letter No. : - F NO. J - 11011 /119 /2012 - IA II (I), dtd

More information

Mangalam Cement Ltd. (Unit-II) Stack No.

Mangalam Cement Ltd. (Unit-II) Stack No. Mangalam Cement Ltd. (Unit-II) Name of the Project :- Expansion of cement grinding capacity from 1.7 MTPA to 2.3 MTPA Project Code :- Clearance Letter No. : - F NO. J - 11011 /110 /2012 - IA II (I), dtd

More information

Torrent Pharmaceuticals Ltd. Indrad EC Compliance Report

Torrent Pharmaceuticals Ltd. Indrad EC Compliance Report Status of Compliance of stipulated conditions of the Environment Clearance J- 01 It is noted that total water consumption will increase from 1000-1200 m 3 /day to 1200-1300 m 3 /day. Fresh water requirement

More information

SUMMARY ENVIRONMENTAL IMPACT ASSESSMENT REPORT. 380 MW Gas Based Combined Cycle Power Plant at

SUMMARY ENVIRONMENTAL IMPACT ASSESSMENT REPORT. 380 MW Gas Based Combined Cycle Power Plant at SUMMARY ENVIRONMENTAL IMPACT ASSESSMENT REPORT for 380 MW Gas Based Combined Cycle Power Plant at Vijaipur, District: Guna MADHYA PRADESH NOVEMBER 2011 1 CONTENTS 1.0 Project Description Page 3 2.0 Description

More information

Chemplast Sanmar Limited Marine Terminal Facility, Chitrapettai Village Cuddalore District, Tamil Nadu

Chemplast Sanmar Limited Marine Terminal Facility, Chitrapettai Village Cuddalore District, Tamil Nadu Chemplast Sanmar Limited Marine Terminal Facility, Chitrapettai Village Cuddalore District, Tamil Nadu Compliance Report for Environmental Clearance No.11.63/2005.1A.III dated 19.12.2005 Specific Conditions

More information

V.S LIGNITE POWER Pvt. Ltd AT VILLAGE-GURHA, KOLAYAT, BIKANER, RAJASTHAN

V.S LIGNITE POWER Pvt. Ltd AT VILLAGE-GURHA, KOLAYAT, BIKANER, RAJASTHAN V.S LIGNITE POWER Pvt. Ltd AT VILLAGE-GURHA, KOLAYAT, BIKANER, RAJASTHAN HALF YEARLY REPORT FOR THE PERIOD OCTOBER, 2011 to MARCH 2012 V. S. Lignite Power Pvt. Ltd. Name of the Project : 1x 135 MW Lignite

More information

Infrastructure Development and Environment

Infrastructure Development and Environment Infrastructure Development and Environment Few Stories Lift irrigation from Chambal River No Development Zone around Numaligarh Refinery NH - 31 C passing through Jaldapara, Mahananda and Buxa Nh-72 cutting

More information

MIDC, Nagpur Expansion of Existing Butibori Industrial Area (BIA Phase II) - Form-1

MIDC, Nagpur Expansion of Existing Butibori Industrial Area (BIA Phase II) - Form-1 ANNEXURE I SITE LOCATION MAP Building Environment (India) Pvt. Ltd 1 ANNEXURE II LAYOUT PLAN Building Environment (India) Pvt. Ltd 2 ANNEXURE III LAND DETAILS Sr. No. LAND DETAILS (In Ha.) 1. LARGE SIZE

More information

Clearance Letter no. : MoEF Vide Letter no. J-11011/79/2003-IA-II (I) dated April 21, 2004

Clearance Letter no. : MoEF Vide Letter no. J-11011/79/2003-IA-II (I) dated April 21, 2004 Name of the Project: Jaypee Rewa Plant, Unit of M/s Jaiprakash Associates Limited for expansion Of cement production from 2.5 MTPA to 3.5 MTPA at Jaypee Nagar, District Rewa, Madhya Pradesh Project Code:

More information

PRESENTATION ON DEVELOPMENT OF NEW POWER PROJECTS APPROACH & WAY FORWARD

PRESENTATION ON DEVELOPMENT OF NEW POWER PROJECTS APPROACH & WAY FORWARD PRESENTATION ON DEVELOPMENT OF NEW POWER PROJECTS APPROACH & WAY FORWARD Presentation By N.K.Srivastava General Manager (Engg. Services & R&M) 20.04.2012 PROJECT DEVELOPMENT AT NTPC PROJECT IS DEVELOPED

More information

(A) Cases recommended by SEAC for Prior Environmental Clearance

(A) Cases recommended by SEAC for Prior Environmental Clearance Minutes of the 33 rd SEIAA Meeting held on 10 th May, 2010 The 33 rd meeting of the State Level Environment Impact Assessment Authority was convened on 10 th May, 2010 at 3.00 P M at the Authority's office

More information

Environmental Clearance Compliance Half Yearly Report

Environmental Clearance Compliance Half Yearly Report Environmental Clearance Compliance Half Yearly Report HALF YEARLY COMPLIANCE REPORT- Oct. 2015 to March 2016 Ref: MOEF, New Delhi Environment Clearance F. No. J-11011/118/2007- IA II (I) dated 25 th August,

More information

Registered. M/s Baba Jiwan Singh Baba Dalip Singh Educational Trust, Goindwal Sahib Road, Tarn Taran.

Registered. M/s Baba Jiwan Singh Baba Dalip Singh Educational Trust, Goindwal Sahib Road, Tarn Taran. No. SEIAA/ 2309 To STATE LEVEL ENVIRONMENT IMPACT ASSESSMENT AUTHORITY PUNJAB Ministry of Environment and Forests, Government of India O/O Punjab Pollution Control Board, Vatavaran Bhawan, Nabha Road,

More information

THE RAMCO CEMENTS LIMITED

THE RAMCO CEMENTS LIMITED 1 P a g e 2 P a g e THE RAMCO CEMENTS LIMITED (Formerly Madras Cements Ltd.) COMPLIANCE REPORT FOR ENVIRONMENTAL CLEARANCE JAYANTHIPURAM NORTH BAND MINING LEASE 2.0 MILLION TPA CAPACITY EC Lr. No. : J-11015/377/2006-IA.II

More information

STATE OF ENVIRONMENT ATLAS OF INDIA-OUTLINE

STATE OF ENVIRONMENT ATLAS OF INDIA-OUTLINE STATE OF ENVIRONMENT ATLAS OF INDIA-OUTLINE Sl. No. Maps Themes Features Data Source I: GENERAL CHARACTERISTICS I. Administrative Divisions International, States, Districts Survey of Boundaries with State

More information

The mine is opened on The reasons for delay for starting mining operations are:

The mine is opened on The reasons for delay for starting mining operations are: 1 P a g e 2 P a g e THE RAMCO CEMENTS LIMITED (Formerly known as Madras Cements Ltd.) COMPLIANCE REPORT FOR ENVIRONMENTAL CLEARANCE BUDAWADA LIMESTONE MINE - 1.10 MILLION TPA CAPACITY EC Lr. No : J-11015/150/2008-IA.II

More information

*** Dated: May 2,2014

*** Dated: May 2,2014 F. No.II-43/2013-IA.III Government of India Ministry of Environment & Forests (la-iii Section) Room No. 143, Paryavaran Bhawan, CGO Complex, Lodhi Road, New Delhi - 110003, To The Head-Technical Services

More information

Rajasthan State Pollution Control Board

Rajasthan State Pollution Control Board M/s Raj West Power Private Limited Village- Bhadresh, Tehsil:Barmer District:Barmer Sub: Ref: Sir, Consent to Operate under section 25/26 of the Water (Prevention & Control of Pollution) Act, 1974 and

More information

AMDAL Procedure. Flowchart of Indonesian Environmental Clearance 1

AMDAL Procedure. Flowchart of Indonesian Environmental Clearance 1 AMDAL Procedure (This is only indicative and for reference purposes. This is not exhaustive and therefore, the Consultants are requested to familiarize themselves with all the laws, rules, regulations,

More information

Mine at Village: Kubri,Tahsil: Maihar, Dist: Satna(M.P)

Mine at Village: Kubri,Tahsil: Maihar, Dist: Satna(M.P) i i ii CENTRAL INSTITUTE OF MINING RESEARCH, DHANBAD (Council of Scientific & Industrial Research) PROJECT REPORT ON EIA/EMP OF Lime Stone, Bauxite and Clay Mine at Village: Kubri,Tahsil: Maihar, Dist:

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT VENSUB LABORATORIES PRIVATE LIMITED SY. NO. 29, TUPAKULAGUDEM VILLAGE, TALLAPUDI MANDAL, WEST GODAVARI DISTRICT, ANDHRA PRADESH PRE FEASIBILITY REPORT VENSUB LABORATORIES PRIVATE LIMITED Duplex No. 12,

More information

Sustainability Roadmap for Myanmar (Environment Perspective) Dr. San Oo Director Environmental Conservation Department 20 January 2015

Sustainability Roadmap for Myanmar (Environment Perspective) Dr. San Oo Director Environmental Conservation Department 20 January 2015 Sustainability Roadmap for Myanmar (Environment Perspective) Dr. San Oo Director Environmental Conservation Department 20 January 2015 1 Ministry of Environmental Conservation and Forestry (MOECAF) Environmental

More information

Forest (Conservation) Rules, 1981

Forest (Conservation) Rules, 1981 Forest (Conservation) Rules, 1981 (as amended up to May 1992) G.S.R. 719... in exercise of the powers conferred by sub-section (i) of section 4 of the Forest (Conservation) Act, 1980 (69 of 1980), the

More information

ELDORADO GOLD CORPORATION BOARD OF DIRECTORS TERMS OF REFERENCE

ELDORADO GOLD CORPORATION BOARD OF DIRECTORS TERMS OF REFERENCE ELDORADO GOLD CORPORATION BOARD OF DIRECTORS TERMS OF REFERENCE I. ROLES AND RESPONSIBILITIES The principal role of the Board of Directors ( Board ) is stewardship of Eldorado Gold Corporation (the Company

More information

COMPLIANCE OF ENVIRONMENTAL CLEARANCE MINISTRY S LETTER NO.: J-11011/1048/2007-IA II (I), DATED: 07/04/2008 OCTOBER 2013 MARCH 2014

COMPLIANCE OF ENVIRONMENTAL CLEARANCE MINISTRY S LETTER NO.: J-11011/1048/2007-IA II (I), DATED: 07/04/2008 OCTOBER 2013 MARCH 2014 COMPLIANCE OF ENVIRONMENTAL CLEARANCE MINISTRY S LETTER NO.: J-11011/1048/2007-IA II (I), DATED: 07/04/2008 OCTOBER 2013 MARCH 2014 S. N. Conditions Remarks 2 The Ministry of Environment and Forests has

More information

Section 9A 9A Purpose of the Hazardous Substances Provisions

Section 9A 9A Purpose of the Hazardous Substances Provisions Section 9A 9A Purpose of the Hazardous Substances Provisions The Council has a function under section 31 of the RMA to control any actual or potential effects of the use, development or protection of land

More information

North East Roofing Pvt. Ltd. Expansion of Asbestos Cement Sheets & Accessories Manufacturing Unit (50,000 TPA to 70,000 TPA)

North East Roofing Pvt. Ltd. Expansion of Asbestos Cement Sheets & Accessories Manufacturing Unit (50,000 TPA to 70,000 TPA) SUMMARY ON ENVIRONMENTAL IMPACT ASSESSMENT REPORT OF North East Roofing Pvt. Ltd. Expansion of Asbestos Cement Sheets & Accessories Manufacturing Unit (50,000 TPA to 70,000 TPA) Proposed at: Bonda Industrial

More information

Rajasthan State Pollution Control Board

Rajasthan State Pollution Control Board M/s Raj West Power Private Limited Village- Bhadresh, Tehsil:Barmer District:Barmer Sub: Ref: Consent to Operate under section 25/26 of the Water (Prevention & Control of Pollution) Act, 1974 and under

More information

ENVIRONMENTAL IMPACT ASSESSMENT AND YOU

ENVIRONMENTAL IMPACT ASSESSMENT AND YOU ENVIRONMENTAL IMPACT ASSESSMENT AND YOU PARTICIPATING IN PUBLIC CONSULTATIONS FOR: COAL FUELED THERMAL POWER PLANTS C A G Citizen consumer and civic Action Group 1. What are Thermal Power Plants? Electricity

More information

CITY OF TORONTO. BY-LAW No (OMB)

CITY OF TORONTO. BY-LAW No (OMB) CITY OF TORONTO BY-LAW No. 364-2010(OMB) To amend the General Zoning By-law No. 438-86 of the former City of Toronto with respect to the lands municipally known as 1201 Dundas Street East. WHEREAS the

More information

Environment Impact Assessment (EIA) Notification 2006

Environment Impact Assessment (EIA) Notification 2006 Environment Impact Assessment (EIA) Notification 2006 Information Sources: 1.) Environment Impact Notification 2006; Gazette of India, 14th September, 2006 2.) Green Tapism; Environment Support Group;

More information

Monitoring the Implementation of Environmental Safeguards

Monitoring the Implementation of Environmental Safeguards Monitoring the Implementation of Environmental Safeguards Ministry of Environment & Forest Western Region, Regional Office, Bhopal MONITORING REPORT PART I DATA SHEET RASHTRIYA CHEMICAS AND FERTILISERS

More information

SINGLE STAGE TWO ENVELOPE SYSTEM

SINGLE STAGE TWO ENVELOPE SYSTEM TENDER FOR SUPPLYING, INSTALLATION & COMMISSIONING OF GODREJ SINGLE BED FIONA FOR DOUBLE OCCUPANCY ROOM ALONG WITH GODREJ MATTRESSES IN HOSTEL ROOMS AT STATE BANK ACADEMY, "GURUKUL", GURGAON To, M/S INVITATION

More information

ENVIRONMENTAL CLEARANCE COMPLIANCE OF CLUSTER-II (GRANTED VIDE: J-11015/35/2011-IA II CM), dated ( to )

ENVIRONMENTAL CLEARANCE COMPLIANCE OF CLUSTER-II (GRANTED VIDE: J-11015/35/2011-IA II CM), dated ( to ) ENVIRONMENTAL CLEARANCE COMPLIANCE OF CLUSTER-II (GRANTED VIDE: J-11015/35/2011-IA II CM), dated 06.02.13 (01.10.13 to 31.03.14) Sl. no. A. Specific Conditions by MOEF: Compliance i The maximum production

More information

PROJECT FEASIBILITY REPORT

PROJECT FEASIBILITY REPORT PROJECT FEASIBILITY REPORT FOR OBTAINING PRIOR ENVIRONMENT CLEARANCE For PROPOSED CHEMICAL MANUFACTURING UNIT From M/s. MORADIA BROTHERS CHEM PVT LTD LOCATED AT: Block No.: 45, JalBhumi Industrial Estate,

More information

- 1 S. NO. PARTICULARS DETAILS

- 1 S. NO. PARTICULARS DETAILS 1.0 INTRODUCTION EXECUTIVE SUMMARY M/s. Lafarge India Private Ltd. (LIPL) is a subsidiary of French building materials major Lafarge. Lafarge entered in the Indian market in 1999 with acquisition of cement

More information

Information on the focal point for the Convention. Information on the point of contact for the Convention

Information on the focal point for the Convention. Information on the point of contact for the Convention Questionnaire for the REPORT OF MONTENEGRO ON THE IMPLEMENTATION OF THE CONVENTION ON ENVIRONMENTAL IMPACT ASSESSMENT IN A TRANSBOUNDARY CONTEXT in the period 2006 2009 Information on the focal point for

More information

RED CATEGORY CONSENT & AUTHORIZATION ORDER BY REGISTERED POST WITH ACKNOWLEDGEMENT DUE

RED CATEGORY CONSENT & AUTHORIZATION ORDER BY REGISTERED POST WITH ACKNOWLEDGEMENT DUE ANDHRA PRADESH POLLUTION CONTROL BOARD Paryavarana Bhavan, A-III, Industrial Estate, Sanathnagar, Hyderabad-500 018 Phone : 040-23887500, Website : www.appcb.ap.nic.in RED CATEGORY CONSENT & AUTHORIZATION

More information

PROJECT BRIEF. Noise environment: No Entrant noise generation sources exist in and around project area.

PROJECT BRIEF. Noise environment: No Entrant noise generation sources exist in and around project area. PROJECT BRIEF PROJECT LOCATION: - Pahar Kua Marble Range Mining Project Q L No 235 is located near village Pahar Kua, Tehsil Makrana., District Nagaur Rajasthan. Project is approachable from national highway.

More information

GOVERNMENT OF INDIA MINISTRY OF ENVIRONMENT, FOREST AND CLIMATE CHANGE. LOK SABHA STARRED QUESTION No. 334 TO BE ANSWERED ON

GOVERNMENT OF INDIA MINISTRY OF ENVIRONMENT, FOREST AND CLIMATE CHANGE. LOK SABHA STARRED QUESTION No. 334 TO BE ANSWERED ON GOVERNMENT OF INDIA MINISTRY OF ENVIRONMENT, FOREST AND CLIMATE CHANGE LOK SABHA STARRED QUESTION No. 334 TO BE ANSWERED ON 09.08.2016 Ecological Impact of Mining *334. SHRI JANARDAN SINGH SIGRIWAL state:

More information

IMPLEMENTATION PROTOCOL FOR DETERMINATION AND NOTIFICATION OF CRITICAL WILDLIFE HABITATS IN NATIONAL PARKS AND WILDLIFE SANCTUARIES

IMPLEMENTATION PROTOCOL FOR DETERMINATION AND NOTIFICATION OF CRITICAL WILDLIFE HABITATS IN NATIONAL PARKS AND WILDLIFE SANCTUARIES IMPLEMENTATION PROTOCOL FOR DETERMINATION AND NOTIFICATION OF CRITICAL WILDLIFE HABITATS IN NATIONAL PARKS AND WILDLIFE SANCTUARIES PREAMBLE: The purpose of this Implementation Protocol is to detail the

More information

JAYPEE NIGRIE SUPER THERMAL POWER PROJECT

JAYPEE NIGRIE SUPER THERMAL POWER PROJECT JAYPEE NIGRIE SUPER THERMAL POWER PROJECT (A Unit of M/s Jaiprakash Power Ventures Limited) Villages: Nigrie, Tehsil :Sarai District: Singrauli 2014 2015 SUBMITTED M.P. POLLUTION CONTROL BOARD BHOPAL (M.P.)

More information

ENVIRONMENTAL IMPACT ASSESSMENT & ENVIRONMENTAL MANAGEMENT PLAN. Report Upgraded after Public Hearing ROWALE BAUXITE MINE

ENVIRONMENTAL IMPACT ASSESSMENT & ENVIRONMENTAL MANAGEMENT PLAN. Report Upgraded after Public Hearing ROWALE BAUXITE MINE ENVIRONMENTAL IMPACT ASSESSMENT & ENVIRONMENTAL MANAGEMENT PLAN Report Upgraded after Public Hearing ROWALE BAUXITE MINE Area: 218.285ha (Non-Forest, Revenue Waste Land) Village: Rowale, Taluka: Dapoli,

More information

PRE-FEASIBILITY REPORT

PRE-FEASIBILITY REPORT PRE-FEASIBILITY REPORT For PRIOR ENVIRONMENTAL CLEARANCE STORAGE CAPACITY ENHANCEMENT OF HPCL, LPG BOTTLING PLANT Capacity: 3 X 500 MT At Plot No.499 Kota-Jhalawar Road (NH-12) Village- Mandana, Tehsil-

More information

ENVIRONMENTAL IMPACT ASSESSMENT AND YOU

ENVIRONMENTAL IMPACT ASSESSMENT AND YOU ENVIRONMENTAL IMPACT ASSESSMENT AND YOU PETROCHEMICAL PLANTS C A G Citizen consumer and civic Action Group 1. What are the pollution problems associated with petrochemical plants? Petrochemical plants

More information

I Env. Sector a) Regulatory (i) (i) GEAC (CS-II Div.)

I Env. Sector a) Regulatory (i) (i) GEAC (CS-II Div.) Statement No.I Item at Sl. No. 4 of the RTI Act.,2005;- Norms set by it for discharge of its functions. I- Norms for Regulatory Functions of the Ministry: Sl.No. Name of Div. Functions Time Limit for disposal

More information

ENVIRONMENTAL IMPACT ASSESSMENT FOR PROPOSED CONSTRUCTION OF SEWAGE PUMPING STATION & SEWAGE TREATMENT PLANT

ENVIRONMENTAL IMPACT ASSESSMENT FOR PROPOSED CONSTRUCTION OF SEWAGE PUMPING STATION & SEWAGE TREATMENT PLANT ENVIRONMENTAL IMPACT ASSESSMENT FOR PROPOSED CONSTRUCTION OF SEWAGE PUMPING STATION & SEWAGE TREATMENT PLANT EXECUTIVE SUMMARY NAGERCOIL MUNICIPALITY, KANYAKUMARI DISTRICT TWAD BOARD,SEWERAGE DIVISION,NAGERCOIL

More information

EXECUTIVE SUMMARY TABLE - 1

EXECUTIVE SUMMARY TABLE - 1 EXECUTIVE SUMMARY 1.0 PROJECT DESCRIPTION 1.1 INTRODUCTION Dwarkesh Energy Limited (DEL) proposes to set up a 1320 MW (2 x 660 MW) Super Critical Coal Based Thermal Power Plant at Villages Torniya, Chhippipura

More information

Environment Clearance for Proposed Inland Water Transport along East Coast of Mumbai.

Environment Clearance for Proposed Inland Water Transport along East Coast of Mumbai. To, Maharashtra Maritime Board at Ferry Wharf (Bhaucha Dhakka), Nerul and Mandwa Environment department, Room No. 217, 2nd floor, Mantralaya, Annexe, Mumbai- 400 032. Date:April 10, 2017 Subject: Sir,

More information

DELHI METRO RAIL CORPORATION LTD. Contract No: - AMCC-02

DELHI METRO RAIL CORPORATION LTD. Contract No: - AMCC-02 DELHI METRO RAIL CORPORATION LTD. Contract No: - AMCC-02 Contract: AMCC-02: Part design and construction of elevated viaduct (chainage km 1.338 1.458 to km 6.577 6.546) and five elevated stations viz.,

More information

CONVENTION ON MIGRATORY SPECIES

CONVENTION ON MIGRATORY SPECIES CMS CONVENTION ON MIGRATORY SPECIES Distribution: General UNEP/CMS/COP12/Doc.19.2 25 July 2017 Original: English 12 th MEETING OF THE CONFERENCE OF THE PARTIES Manila, Philippines, 23-28 October 2017 Agenda

More information

Scania Steels and Powers Ltd.

Scania Steels and Powers Ltd. Scania Steels and Powers Ltd. Environmental Impact Assessment for Expansion of Steel Plant & Installation of Captive Power Plant At Village: Punjipatra, Tehsil Tamnar, District Raigarh (Chhattisgarh) Envirotech

More information

------------------------------------------------------------------------------------------------------------ Standard Operating Procedure for Processing the Proposals for Utilization of Hazardous Waste

More information

List of Tables -2012

List of Tables -2012 List of Tables -2012 Chapter No. Table No. Subject 1. Environment and Environment Degradation 1.3.1 Framework for Development of Environment Statistics (FDES) Information categories 1.3.2 Some impacts

More information

PRE-FEASIBILITY REPORT

PRE-FEASIBILITY REPORT PRE-FEASIBILITY REPORT FOR INSTALLATION OF 2G ETHANOL PLANT AT BATHINDA, PUNJAB BY M/S HINDUSTAN PETROLEUM CORPORATION LIMITED PREPARED BY M/s. ULTRA-TECH ENVIRONMENTAL LABORATORY AND CONSULTANCY (Gazzeted

More information

Prefeasibility Report. 30,000 KLPY Anhydrous (Absolute) Alcohol Manufacturing Plant at Patalganga MIDC

Prefeasibility Report. 30,000 KLPY Anhydrous (Absolute) Alcohol Manufacturing Plant at Patalganga MIDC Prefeasibility Report For 30,000 KLPY Anhydrous (Absolute) Alcohol Manufacturing Plant at Patalganga MIDC of Alkyl Amines Chemicals Limited 401-407 Nirman Vyapar Kendra, Plot No. 10, Sector 17, Vashi,

More information

AGENDA ITEM NO. F. No. 8-20/2015-FC

AGENDA ITEM NO. F. No. 8-20/2015-FC AGENDA ITEM NO. F. 8-20/2015-FC Sub: Proposal for according permission for use of 2.0001 ha of forest land within total forest land of 400 ha (out of total prospecting lease area of 816 ha) in Meenakshi

More information

Summary of Preparatory Study

Summary of Preparatory Study Summary of Preparatory Study 1. Title of the Cooperation Project, Relevant Project Report Preparatory Survey on the Project for the Establishment of Rural Water Supply System in Kambia Town in the Republic

More information

Policy Resolution for Promotion of. Petroleum, Chemicals and Petrochemical Investment Regions (PCPIRs)

Policy Resolution for Promotion of. Petroleum, Chemicals and Petrochemical Investment Regions (PCPIRs) Policy Resolution for Promotion of Petroleum, Chemicals and Petrochemical Investment Regions (PCPIRs) POLICY OBJECTIVES 1. The Petroleum, Chemicals and Petrochemical industry in India is well established

More information

PRE-FEASIBILITY REPORT. for

PRE-FEASIBILITY REPORT. for PRE-FEASIBILITY REPORT for PROPOSED COMMON EFFLUENT TREATMETN PLANT (CETP) of M/s. VIKASHTEX ENVIROTECH CETP PVT. LTD. Block No. 523, Village: Hathoda, Taluka: Mangrol, Dist: Surat - 394 405 (Guj.) Prepared

More information

TABLE OF CONTENTS. Title page Table of contents List of tables List of figures Non- technical summary

TABLE OF CONTENTS. Title page Table of contents List of tables List of figures Non- technical summary TABLE OF CONTENTS Title page Table of contents List of tables List of figures Non- technical summary Page i ii vii viii ix CHAPTER 1: INTRODUCTION 1 1.1 Project Background 1 1.2 Aims and Objectives 3 1.3

More information

Informal note by the co chairs

Informal note by the co chairs Draft elements for SBSTA agenda item 11 (c) Draft decision on the work programme under the framework for non market approaches referred to in Article 6, paragraph 8, of the Paris Agreement Informal note

More information

APPENDIX VIII. Form 1 M APPLICATION FOR MINING OF MINOR MINERALS UNDER CATEGORY B2 FOR LESS THAN AND EQUAL TO FIVE HECTARE

APPENDIX VIII. Form 1 M APPLICATION FOR MINING OF MINOR MINERALS UNDER CATEGORY B2 FOR LESS THAN AND EQUAL TO FIVE HECTARE APPENDIX VIII Form 1 M APPLICATION FOR MINING OF MINOR MINERALS UNDER CATEGORY B2 FOR LESS THAN AND EQUAL TO FIVE HECTARE (I) Basic Information S.No. Particulates Details 1. Name of the Mining Lease site

More information

Caterpillar Global Mining. John T. Disharoon February 26, 2013

Caterpillar Global Mining. John T. Disharoon February 26, 2013 Caterpillar Global Mining John T. Disharoon February 26, 2013 Forward-Looking Statement Certain statements in this presentation relate to future events and expectations and are forward-looking statements

More information

CMPDI. 4.6 Mine Closure Plan

CMPDI. 4.6 Mine Closure Plan 4.6 Mine Closure Plan Post-mining Land Use Planning The mine closure planning with regard to for Lekhapani OCP will broadly involve the following aspects: 1. Technical Aspects 2 Environmental Aspects 2.

More information

PRE-FEASIBILITY REPORT FOR OM SAIRAM STEEL AND ALLOYS PVT LTD

PRE-FEASIBILITY REPORT FOR OM SAIRAM STEEL AND ALLOYS PVT LTD PRE-FEASIBILITY REPORT FOR OM SAIRAM STEEL AND ALLOYS PVT LTD PLOT No. F-1,2,3,8,9,10, ADDL. MIDC, PHASE II, AND GUT NO. 46 & 63, VILLAGE DAREGAON, TEHSIL: JALNA DIST: JALNA, MAHARASHTRA 2014-15 1. Executive

More information

DELHI METRO RAIL CORPORATION LTD. Contract No: - AMCC-01

DELHI METRO RAIL CORPORATION LTD. Contract No: - AMCC-01 DELHI METRO RAIL CORPORATION LTD. Contract No: - AMCC-01 Contract: AMCC-01: Part design and construction of elevated viaduct (chainage km 6.577 6.546 to km 12.689), depot connection and six elevated stations

More information

GUIDELINES RESPONSIBILITY FOR ENTERPRISES MARCH 2010

GUIDELINES RESPONSIBILITY FOR ENTERPRISES MARCH 2010 15(3)/2007 -OPE (GM) Government of India Department of Public Enterprises Ministry of Heavy Industries & Public Enterprises > New Delhi GUIDELINES ON CORPORATE SOCIAL RESPONSIBILITY FOR CENTRAL PUBLIC

More information

DISTRICT RURAL DEVELOPMENT AGENCY (DRDA)

DISTRICT RURAL DEVELOPMENT AGENCY (DRDA) DISTRICT RURAL DEVELOPMENT AGENCY (DRDA) I. Objective / purpose The DRDA Admin. Section is the office incharge of implementing the DRDA Admin. Scheme through which the Central share of fund is directly

More information

Request for Proposal Corrigendum 02. Selection of Service Provider for User Acceptance Test (UAT) & Automation Testing

Request for Proposal Corrigendum 02. Selection of Service Provider for User Acceptance Test (UAT) & Automation Testing Request for Proposal Corrigendum 02 Dated: 07 th November, 2015 Selection of Service Provider for User Acceptance Test (UAT) & Automation Testing RFP Tender Number: 05-2015/16 Dated: 15 th October, 2015

More information

Environmental Impact Assessment

Environmental Impact Assessment Environmental Impact Assessment A brief discussion Presented by: Apekshit Solanki Kirti Neetu Yadav Sameera Vishakha Shankar Introduction EIA is a formal process to predict the environmental consequences

More information