1 Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Report No.: Date ISDS Prepared/Updated: 16 January 2007 I. BASIC INFORMATION A. Basic Project Data INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Country: Pakistan Project ID: P Additional Project ID (if any): Project Name: Pakistan Community-Based Renewable Energy Development in Northern Areas and Chitral Task Team Leader: Jeremy Levin Estimated Appraisal Date: TBD Estimated Board Date: NA Managing Unit: Environment Lending Instrument: Carbon Offset Sector: SASSD Theme: Climate Change IBRD Amount (US$m.): IDA Amount (US$m.): GEF Amount (US$m.): PCF Amount (US$m.): TBD Other financing amounts by source: Local equity, in-kind and land contribution 2.99 PPAF IDA grant 6.67 Government of Pakistan (Northern Areas) 2.54 Domestic Borrowing 1.13 Royal Norwegian Embassy 1.64 Total Environmental Category: B Simplified Processing Simple [ ] Repeater [ ] Is this a transferred project Yes [ ] No [ x] B. Project Objectives: The proposed development objectives of the Carbon Offset Project are: Reduce global emissions of carbon dioxide. Increase access to modern energy from renewable energy sources. The Carbon Offset project will provide additional support for the achievement of the following objectives, namely: (a) develop hydropower potential in an environmentally and socially sustainable manner so as to help meet local electricity demand, (b) improve access of rural areas to modern electricity services, and (c) improve standards of living for the poor through provision of community level infrastructure.

2 The project will reduce infrastructure bottlenecks and will allow for increased use of modern energy sources by generating electricity at different locations in rural areas of NAs & Chitral through mini and small capacity hydroelectric projects (ranging from 0.05 MW to 0.5 MW). The project will increase opportunity for income generating activities in Pakistan s remote and underprivileged Northern Areas and Chitral through better and improved access to reliable and renewable sources of energy. The increased use of hydroelectric power will also produce local environmental and health benefits such as reduced exposure to indoor air pollution and reduced pressure on forestry resources used to meet household heating and cooking needs, reduced local air pollution from diesel-fired gensets, and economic benefits from the reduced need to transport and store fossil fuels in remote areas for power, heating and cooking. The project will also produce global environmental benefits by annually reducing GHG emissions through the substitution of hydropower for diesel and kerosene usage at the village level. C. Project Description: The electricity supply in the Federally-administered Northern Areas of Pakistan currently does not meet even half of the local demand. As a result, use of diesel-run generators is common practice, a practice which is further encouraged by government subsidies on fuel prices. With both national and regional electricity demand increasing rapidly, the likelihood of significant additional diesel-generation being installed in the area is high. This will result in additional fossil fuel consumption and increased GHG emissions, besides imposing significant additional local costs from fuel import, transportation and storage expenses. This Carbon Offset project will produce greenhouse gas emission reductions and support the development of the international market mechanism for trading Emission Reductions (ERs) developed in the framework of the Kyoto Protocol. The project will reduce greenhouse gas emissions that would otherwise be produced from the use of diesel-based generators, as these are the most ready means of meeting the current power deficit, especially during winters, in the region which is not connected to the national electricity grid due to its remoteness and mountainous terrain. The project consists of purchase of ERs generated from at least 51 run-ofriver hydroelectric plants ranging in size from.05 MW to 0.5 MW, with combined capacity of ~10 MW in different locations in Pakistan s remote Northern Areas and Chitral by the World Bank-managed Community Development Carbon Fund (CDCF). The hydroelectric plants would be managed on a community basis, with program implementation support from the Aga Khan Rural Support Program, and would include active community involvement at the identification, design, implementation and operation stages. The operation of these renewable energy systems will provide increased access to modern energy services to an estimated 150,000 people (with associated social benefits) currently depending on traditional fuels, kerosene, and diesel-fired gen-sets to meet their energy needs. Operational costs will be recovered from users through tariffs whose level shall be determined by the operator of the plant, a Maintenance Committee formed by the beneficiary community, and other stakeholders at a level which shall be sufficient to cover all maintenance, repair and depreciation expenses.

3 The project has a number of financiers, including; Government of Norway, Pakistan Poverty Alleviation Fund (PPAF), the Government of Pakistan, and local banks. D. Project location and salient physical characteristics relevant to the safeguard analysis (if known): The remote mountain valleys of the Northern Areas and Chitral form Pakistan s northern borders with Afghanistan, the People s Republic of China, and Indian-controlled Kashmir. The area is rugged and mountainous, located at the confluence of four of the world s highest mountain ranges, including the Himalayas, the Karakoram, the Pamirs, and the Hindukush. The region s ecology is characterized by a fragile, high mountain environment and extreme climatic conditions. The region supports over a million people, mostly living in extreme poverty in approximately 850 villages. The use of renewable energy technology through proposed hydropower project will yield net positive environmental impacts and will relieve the burden on forest in the area threatened by cutting of wood for cooking and heating in winters. E. Borrower s Institutional Capacity for Safeguard Policies: AKRSP has supported the installation of about 240 microhydel schemes in six districts of northern areas of Pakistan since The organization has recently also installed a few larger mini hydel power plants, which are operating successfully. To date, AKRSP has implemented a total of about 10 MW of micro-hydel projects in the region. These projects have been executed and maintained by the local communities, while AKRSP has provided technical and financial support and trained plant operators from within the communities. AKRSP has developed a series of environmental assessment forms starting from screening of projects to scoping of issues and their management, and environmental review form evaluating projects environmental performance. Their overall institutional capacity for safeguards review is satisfactory. AKRSP will undertake an environmental assessment using the existing environmental assessment forms and will follow the procedures laid down in the Manuel for Environmental Assessment under the environmental management framework developed for PPAF supported projects. This EMF developed by PPAF has already received clearance by the World Bank. It is understood that AKRSP will enter into MoUs with the potential benefiting communities to acquire land on voluntary basis and there will therefore be no involuntary resettlement and/or land acquisition issues. AKRSP in the past has screened and assessed a number of their community projects on environmental aspects. Some of such projects were financed by PPAF which required a complete environmental assessment of community driven schemes before the actual implementation of such schemes. The World Bank review of PPAF s environmental procedures as well as those developed by AKRSP s themselves indicate that generally these are adequate and cover a majority of the environmental issues likely to arise out of such projects. AKRSP also has the experience in using environmental assessment procedures and in ensuring environmental safeguards. Examples of such projects include micro-hydel power generation units, small irrigation channels, and other community physical infrastructure projects.

4 The project is not expected to result in any significant, long term, irreversible adverse environmental or social impacts. Since some of the power generated through these micro-hydel stations may be used for commercial purposes including running saw mills, there is a possibility of consequent increased wood cutting from the forests in the area. This aspect, along with other potential site specific environmental and Indigenous Peoples (IP) issues, specifically if the IP policy is triggered, will be further examined during project preparation. Finally, AKRSP has also won the prestigious Ashden award (Green Oscars) in 2004 for its micro-hydel projects in the area. F. Environmental and Social Safeguards Specialists on the Team: Javaid Afzal, Environment Specialist TBD, Social Development Specialist II. SAFEGUARD POLICIES THAT MIGHT APPLY Safeguard Policies Triggered (please explain why) Yes No TBD Environmental Assessment (OP/BP 4.01) Natural Habitats (OP/BP 4.04) Forests (OP/BP 4.36) Pest Management (OP 4.09) Physical Cultural Resources (OP/BP 4.11) Indigenous Peoples (OP/BP 4.10) Involuntary Resettlement (OP/BP 4.12) Safety of Dams (OP/BP 4.37) Projects on International Waterways (OP/BP 7.50) Projects in Disputed Areas (OP/BP 7.60) III. SAFEGUARD PREPARATION PLAN A. Target date for the Quality Enhancement Review (QER), at which time the PAD-stage ISDS would be prepared: N.A

5 B. For simple projects that will not require a QER, the target date for preparing the PAD-stage ISDS: March 2007 C. Time frame for launching and completing the safeguard-related studies that may be needed. The specific studies and their timing 1 should be specified in the PAD-stage ISDS: May IV. APPROVALS Signed and submitted by: Task Team Leader: Jeremy Levin January Approved by: Regional Safeguards Coordinator: Afshan H. Khawaja January Comments: The Task Team will look into Indigenous Peoples (IP) issues and provide a documented explanation if the IP policy is not triggered (i.e. there are no groups in the project area which fit OP 4.10 policy criteria). Sector Manager: Adriana Jordanova Damianova January Comments: 1 Reminder: The Bank s Disclosure Policy requires that safeguard-related documents be disclosed before appraisal (i) at the InfoShop and (ii) in-country, at publicly accessible locations and in a form and language that are accessible to potentially affected persons.

6

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Report No.: AC4437. Date ISDS Prepared/Updated: 08/18/2009 I. BASIC INFORMATION. A. Basic Project Data

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Report No.: AC4437. Date ISDS Prepared/Updated: 08/18/2009 I. BASIC INFORMATION. A. Basic Project Data Date ISDS Prepared/Updated: 08/18/2009 I. BASIC INFORMATION A. Basic Project Data INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Report No.: AC4437 Country: Papua New Guinea Project ID: P116521 Project

More information

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Report No.: AC6042. Date ISDS Prepared/Updated: 01/26/2011 I. BASIC INFORMATION. A. Basic Project Data

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Report No.: AC6042. Date ISDS Prepared/Updated: 01/26/2011 I. BASIC INFORMATION. A. Basic Project Data Date ISDS Prepared/Updated: 01/26/2011 I. BASIC INFORMATION A. Basic Project Data INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Report No.: AC6042 Country: South Asia Project ID: P115767 Project Name:

More information

Project Name PROJECT INFORMATION DOCUMENT (PID) Nepal Village Micro Hydro Carbon Offset Project. South Asia SASSD P095978

Project Name PROJECT INFORMATION DOCUMENT (PID) Nepal Village Micro Hydro Carbon Offset Project. South Asia SASSD P095978 Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Name Region Sector Project ID Borrower(s) Implementing Agency PROJECT INFORMATION

More information

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Report No.: AC1974. Date ISDS Prepared/Updated: 02/06/2006 I. BASIC INFORMATION. A. Basic Project Data

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Report No.: AC1974. Date ISDS Prepared/Updated: 02/06/2006 I. BASIC INFORMATION. A. Basic Project Data Date ISDS Prepared/Updated: 02/06/2006 I. BASIC INFORMATION A. Basic Project Data INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Report No.: AC1974 Country: Africa Project ID: P094916 Project Name: WAPP

More information

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Report No.: AC3763. Date ISDS Prepared/Updated: 07/11/2008 I. BASIC INFORMATION. A. Basic Project Data

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Report No.: AC3763. Date ISDS Prepared/Updated: 07/11/2008 I. BASIC INFORMATION. A. Basic Project Data Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Date ISDS Prepared/Updated: 07/11/2008 I. BASIC INFORMATION A. Basic Project Data INTEGRATED

More information

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized I. Basic Information Date prepared/updated: 04/24/2007 INTEGRATED SAFEGUARDS DATASHEET

More information

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Report No.: 47875 INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Date ISDS Prepared/Updated: February 6, 2008 I. BASIC INFORMATION A. Basic Project Data Country: Brazil Project ID: P096337 Additional Project

More information

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE I. Basic Information Date prepared/updated:

More information

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Report No.: AC5229. Date ISDS Prepared/Updated: 04/15/2010 I. BASIC INFORMATION. A. Basic Project Data

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Report No.: AC5229. Date ISDS Prepared/Updated: 04/15/2010 I. BASIC INFORMATION. A. Basic Project Data Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Date ISDS Prepared/Updated: 04/15/2010 I. BASIC INFORMATION A. Basic Project Data INTEGRATED

More information

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized I. Basic Information Date prepared/updated: 04/03/2006 INTEGRATED SAFEGUARDS DATASHEET

More information

C. Project Description [from section 3 of PCN] The proposed project would comprise of the following three components:

C. Project Description [from section 3 of PCN] The proposed project would comprise of the following three components: Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Date ISDS Prepared/Updated: 02/17/2012 I. BASIC INFORMATION A. Basic Project Data INTEGRATED

More information

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Date ISDS Prepared/Updated: June 10, 2004 I. BASIC INFORMATION A. Basic Project Data Country: Brazil Project Name: Brasilia Environmentally Sustainable Pro

More information

I Managing Unit: EASRE

I Managing Unit: EASRE Date ISDS PreparedNpdated: 08/06/07 I. BASIC INFORMATION INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE A. Basic Project Data I Country: Indonesia I Project ID: PI04022 Project Name: Makassar Landfill

More information

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Report No.: AC3946. Date ISDS Prepared/Updated: 01/26/2009 I. BASIC INFORMATION. A. Basic Project Data

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Report No.: AC3946. Date ISDS Prepared/Updated: 01/26/2009 I. BASIC INFORMATION. A. Basic Project Data Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Date ISDS Prepared/Updated: 01/26/2009 I. BASIC INFORMATION A. Basic Project Data INTEGRATED

More information

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized I. Basic Information Date prepared/updated: 09/26/2008 INTEGRATED SAFEGUARDS DATASHEET

More information

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Report No.: AC2668. Date ISDS Prepared/Updated: 02/09/2007 I. BASIC INFORMATION. A. Basic Project Data

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Report No.: AC2668. Date ISDS Prepared/Updated: 02/09/2007 I. BASIC INFORMATION. A. Basic Project Data Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Date ISDS Prepared/Updated: 02/09/2007 I. BASIC INFORMATION A. Basic Project Data INTEGRATED

More information

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Report No.: 89787 Date prepared/updated: July 28, 2014 I. Basic Information 1. Basic

More information

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized I. Basic Information Date prepared/updated: 05/29/2008 INTEGRATED SAFEGUARDS DATASHEET

More information

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Report No.: AC5832. Date ISDS Prepared/Updated: 12/22/2010 I. BASIC INFORMATION. A. Basic Project Data

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Report No.: AC5832. Date ISDS Prepared/Updated: 12/22/2010 I. BASIC INFORMATION. A. Basic Project Data Date ISDS Prepared/Updated: 12/22/2010 I. BASIC INFORMATION A. Basic Project Data INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Report No.: AC5832 Country: Uruguay Project ID: P110965 Project Name: Sustainable

More information

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE. Rural Electrification and Transmission Interconnection Project (RETP) Region

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE. Rural Electrification and Transmission Interconnection Project (RETP) Region Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.:47622 Project Name Rural

More information

Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized

Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Date prepared/updated: 10/09/12 I. Basic Information INTEGRATED SAFEGUARDS DATASHEET

More information

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Public Disclosure Authorized INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE,2 Date ISDS Prepared/Updated: 22-Jul-2015 Report.: ISDSC13452 Date ISDS Approved/Disclosed: 06-Aug-2015 Public Disclosure Authorized

More information

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Report No.: AC3947. Date ISDS Prepared/Updated: 04/20/2009 I. BASIC INFORMATION. A. Basic Project Data

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Report No.: AC3947. Date ISDS Prepared/Updated: 04/20/2009 I. BASIC INFORMATION. A. Basic Project Data Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Date ISDS Prepared/Updated: 04/20/2009 I. BASIC INFORMATION A. Basic Project Data INTEGRATED

More information

INTEGRATED SAFEGUARDS DATA SHEET. Costa Rica FCPF READINESS PREPARATION GRANT CONCEPT STAGE

INTEGRATED SAFEGUARDS DATA SHEET. Costa Rica FCPF READINESS PREPARATION GRANT CONCEPT STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized INTEGRATED SAFEGUARDS DATA SHEET Costa Rica FCPF READINESS PREPARATION GRANT CONCEPT

More information

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Date ISDS Prepared/Updated: October 21, 2004 I. BASIC INFORMATION A. Basic Project Data Country: Western Africa Project Name: Africa Emergency Locust Project

More information

INTEGRATED SAFEGUARDS DATA SHEET APPRAISAL STAGE. Project ID:

INTEGRATED SAFEGUARDS DATA SHEET APPRAISAL STAGE. Project ID: Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Copy Public Disclosure Copy Date ISDS Prepared/Updated: 05-Mar-2014

More information

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized I. Basic Information Date prepared/updated: 07/27/2011 1. Basic Project Data Original

More information

INTEGRATED SAFEGUARDS DATA SHEET APPRAISAL STAGE. Date prepared/updated: January 13, 2017 Report No.:

INTEGRATED SAFEGUARDS DATA SHEET APPRAISAL STAGE. Date prepared/updated: January 13, 2017 Report No.: INTEGRATED SAFEGUARDS DATA SHEET APPRAISAL STAGE Date prepared/updated: January 13, 2017 Report No.: 112247 I. Basic Information 1. Basic Project Data Country: Republic of Zambia Project ID: P157943 Additional

More information

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Date ISDS Prepared/Updated: November 14, 2003 I. BASIC INFORMATION A. Basic Project Data Country: China Project Name: LIUZHOU ENVIRONMENT MANAGEMENT PROJECT

More information

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Public Disclosure Authorized INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE,2 Date ISDS Prepared/Updated: 03-Sep-2015 Report No.: ISDSC14552 Date ISDS Approved/Disclosed: 04-Sep-2015 Public Disclosure

More information

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized I. Basic Information Date PreparedlUpdated: July 272009 A. Basic Project Data INTEGRATED

More information

Report No.: ISDSA15329

Report No.: ISDSA15329 Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized 0 o Date ISDS Prepared/Updated: 18-v-2015 INTEGRATED SAFEGUARDS DATA SHEET APPRAISAL

More information

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE I. Basic Information Date prepared/updated: 04/13/2006 INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE Report No.: AC2194 1. Basic Project Data Country: Burkina Faso Project ID: P098956 Project Name: Post-Primary

More information

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized I. Basic Information Date prepared/updated: 06/05/2006 INTEGRATED SAFEGUARDS DATASHEET

More information

INTEGRATED SAFEGUARDS DATA SHEET INITIATION/CONCEPT STAGE

INTEGRATED SAFEGUARDS DATA SHEET INITIATION/CONCEPT STAGE Public Disclosure Authorized INTEGRATED SAFEGUARDS DATA SHEET INITIATION/CONCEPT STAGE Report.: 121880 Date ISDS Prepared/Updated: 4 December 2017 Public Disclosure Authorized Public Disclosure Authorized

More information

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized I. Basic Information Date prepared/updated: 07/15/2015 INTEGRATED SAFEGUARDS DATASHEET

More information

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE. 10-Oct-2014

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE. 10-Oct-2014 Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Date ISDS Prepared/Updated: I BASIC INFORMATION A Basic Project Data INTEGRATED SAFEGUARDS

More information

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Date ISDS Prepared/Updated: August 2, 2003 I. BASIC INFORMATION A. Basic Project Data Country: Peru Project ID: P082625 Project Name: Vilcanota Valley Task

More information

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Report No.: AC6530. Date ISDS Prepared/Updated: 03/14/2012 I. BASIC INFORMATION. A. Basic Project Data

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Report No.: AC6530. Date ISDS Prepared/Updated: 03/14/2012 I. BASIC INFORMATION. A. Basic Project Data Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Date ISDS Prepared/Updated: 03/14/2012 I. BASIC INFORMATION A. Basic Project Data INTEGRATED

More information

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Report No.: AC5623. Date ISDS Prepared/Updated: 09/22/2010 I. BASIC INFORMATION. A. Basic Project Data

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Report No.: AC5623. Date ISDS Prepared/Updated: 09/22/2010 I. BASIC INFORMATION. A. Basic Project Data Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Date ISDS Prepared/Updated: 09/22/2010 I. BASIC INFORMATION A. Basic Project Data INTEGRATED

More information

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE. Rural Electrification and Transmission Interconnection Project (RETP) Region

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE. Rural Electrification and Transmission Interconnection Project (RETP) Region PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.:45460 Project Name Rural Electrification and Transmission Interconnection Project (RETP) Region EAST ASIA AND PACIFIC Sector Energy Project ID

More information

Report No.: ISDSA1037

Report No.: ISDSA1037 Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized 0 o INTEGRATED SAFEGUARDS DATA SHEET APPRAISAL STAGE Date ISDS Prepared/Updated: 07-May-2015

More information

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE I. Basic Information Date prepared/updated: 03/08/2007 INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE Report No.: AC2566 1. Basic Project Data Country: Lesotho Project ID: P088544 Project Name: Private

More information

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Date ISDS Prepared/Updated: September 13, 2004 I. BASIC INFORMATION A. Basic Project Data Country: Mali Project Name: Second Transport Sector Project Estimated

More information

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Report No.: ISDSC13230 Date ISDS Prepared/Updated: 13-Jul-2015 Date ISDS Approved/Disclosed: 14-Jul-2015 I. BASIC INFORMATION A. Basic Project Data Country:

More information

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized I. Basic Information Date prepared/updated: April 12, 2006 1. Basic Project Data INTEGRATED

More information

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Date ISDS Prepared/Updated: 30-May-2013

More information

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE I. Basic Information Date prepared/updated: 11/14/2009 Report.: AC4826 1. Basic Project Data Country: Sudan Project ID: P111061 Project Name: Southern Sudan

More information

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized I. Basic Information Date prepared/updated: 10/28/2009 INTEGRATED SAFEGUARDS DATASHEET

More information

Integrated Safeguards Data Sheet (Initial)

Integrated Safeguards Data Sheet (Initial) Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Integrated Safeguards Data Sheet (Initial) Report No: AC124 Section I - Basic Information

More information

Financing (In USD Million) Financing Source

Financing (In USD Million) Financing Source Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Date ISDS Prepared/Updated: 05-Aug-2012 I. BASIC INFORMATION 1. Basic Project Data INTEGRATED

More information

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized I. Basic Information Date prepared/updated: 04/25/2010 INTEGRATED SAFEGUARDS DATASHEET

More information

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Public Disclosure Authorized INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Date ISDS Prepared/Updated: 23-Mar-2015 Report No.: ISDSC 12226 Date ISDS Approved/Disclosed: 06-Apr-2015 Public Disclosure Authorized

More information

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Date ISDS Prepared/Updated: 04-Dec-2014

More information

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: PIDA982. Project Name. Region. Country

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: PIDA982. Project Name. Region. Country Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: PIDA982 Project Name Electric

More information

Project ID: P Sector: Construction, Other Lending Instruments: NA Is this project processed under OP 8.50 (Emergency recovery)?

Project ID: P Sector: Construction, Other Lending Instruments: NA Is this project processed under OP 8.50 (Emergency recovery)? Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Integrated Safeguards Data Sheet (ISDS) 36933 Section I Basic Information Date ISDS Prepared/Updated:

More information

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE. Lahendong II Geothermal Power Project

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE. Lahendong II Geothermal Power Project Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Name PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Lahendong II Geothermal

More information

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Report No.: Date prepared/updated: April 29, 2013 I. Basic Information 1. Basic Project

More information

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized I. Basic Information Date prepared/updated: 05/18/2006 INTEGRATED SAFEGUARDS DATASHEET

More information

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized I. Basic Information Date prepared/updated: 04/14/2011 1. Basic Project Data Original

More information

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Date ISDS Prepared/Updated: 23-Jul-2012

More information

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Date ISDS Prepared/Updated: 13-Dec-2012

More information

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Public Disclosure Authorized INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Date ISDS Prepared/Updated: 10-Feb-2015 Report No.: ISDSC 141 Date ISDS Approved/Disclosed: 18-Feb-2015 Public Disclosure Authorized

More information

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized I. Basic Information Date prepared/updated: 05/29/2007 INTEGRATED SAFEGUARDS DATASHEET

More information

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: Project Name Region EAP

More information

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Public Disclosure Authorized INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Date ISDS Prepared/Updated: 11-Jun-2014 Report No.: ISDSC9465 Date ISDS Approved/Disclosed: 09-Dec-2014 Public Disclosure Authorized

More information

Safeguard Requirements And the Framework Process

Safeguard Requirements And the Framework Process Safeguard Requirements And the Framework Process The World Bank Europe & Central Asia Region Biskek,Tblisi March/April 2008 1 Role of Bank and Borrower Bank Screens and Sets EA Category Advises Borrower

More information

INTEGRATED SAFEGUARDS DATA SHEET ADDITIONAL FINANCING

INTEGRATED SAFEGUARDS DATA SHEET ADDITIONAL FINANCING Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized INTEGRATED SAFEGUARDS DATA SHEET ADDITIONAL FINANCING Date ISDS Prepared/Updated: 28-May-2015

More information

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB5136 Project Name

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB5136 Project Name PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB5136 Project Name Luhri Hydro Electric Project Region SOUTH ASIA Sector Power (50%); Renewable energy (50%) Project ID P102843 Borrower(s)

More information

INTEGRATED SAFEGUARDS DATA SHEET APPRAISAL STAGE

INTEGRATED SAFEGUARDS DATA SHEET APPRAISAL STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Copy Public Disclosure Copy Date ISDS Prepared/Updated: 06-Feb-2013

More information

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Public Disclosure Authorized INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Date ISDS Prepared/Updated: 29-Sep-2015 Report No.: ISDSC14538 Date ISDS Approved/Disclosed: 15-Oct-2015 Public Disclosure Authorized

More information

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized I. Basic Information Date prepared/updated: 10/14/2010 INTEGRATED SAFEGUARDS DATASHEET

More information

INTEGRATED SAFEGUARDS DATA SHEET APPRAISAL STAGE

INTEGRATED SAFEGUARDS DATA SHEET APPRAISAL STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Date ISDS Prepared/Updated: 23-Mar-2014 INTEGRATED SAFEGUARDS DATA SHEET APPRAISAL STAGE

More information

INTEGRATED SAFEGUARDS DATA SHEET APPRAISAL STAGE

INTEGRATED SAFEGUARDS DATA SHEET APPRAISAL STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized b Date ISDS Prepared/Updated: 13-Feb-212 1. BASIC INFORMATION INTEGRATED SAFEGUARDS DATA

More information

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: PIDA638 Project Name Kali Gandaki A Hydropower Plant Rehabilitation Project (KGAHPRP) (P132289) Region SOUTH ASIA Country Nepal Sector(s)

More information

INTEGRATED SAFEGUARDS DATA SHEET APPRAISAL STAGE

INTEGRATED SAFEGUARDS DATA SHEET APPRAISAL STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Copy Public Disclosure Copy Date ISDS Prepared/Updated: 14-Apr-2014

More information

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized I. Basic Information Date prepared/updated: 11/15/2010 INTEGRATED SAFEGUARDS DATASHEET

More information

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Date ISDS Prepared/Updated: 12-Feb-2014

More information

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Report No.: AC2501. Date ISDS Prepared/Updated: 03/01/2007 I. BASIC INFORMATION. A. Basic Project Data

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Report No.: AC2501. Date ISDS Prepared/Updated: 03/01/2007 I. BASIC INFORMATION. A. Basic Project Data Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Date ISDS Prepared/Updated: 03/01/2007 I. BASIC INFORMATION A. Basic Project Data INTEGRATED

More information

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Project Name CBF Sidi Daoud Wind Farm

More information

INTEGRATED SAFEGUARDS DATA SHEET APPRAISAL STAGE

INTEGRATED SAFEGUARDS DATA SHEET APPRAISAL STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Date ISDS Prepared/Updated: 16-October-2012 I. BASIC INFORMATION 1. Basic Project Data

More information

Integrated Safeguards Data Sheet Identification / Concept Stage (ISDS)

Integrated Safeguards Data Sheet Identification / Concept Stage (ISDS) Public Disclosure Authorized The World Bank Public Disclosure Authorized Public Disclosure Authorized Integrated Safeguards Data Sheet Identification / Concept Stage (ISDS) Concept Stage Date ISDS Prepared/Updated:

More information

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.:51272 Project Name

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.:51272 Project Name Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report.:51272 Project Name CBF Sidi

More information

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: PIDA Project Name. Region. Country

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: PIDA Project Name. Region. Country Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: PIDA46701 Project Name

More information

INTEGRATED SAFEGUARDS DATA SHEET APPRAISAL STAGE

INTEGRATED SAFEGUARDS DATA SHEET APPRAISAL STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Copy Public Disclosure Copy Date ISDS Prepared/Updated: 08-Jul-2013

More information

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: PIDC32071 Project Name 24x7

More information

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized I. Basic Information Date prepared/updated: 01/21/2011 INTEGRATED SAFEGUARDS DATASHEET

More information

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE Date prepared/updated: 09/10/2013 / 10/05/2013

More information

INTEGRATED SAFEGUARDS DATA SHEET APPRAISAL STAGE. Report No.: ISDSA3140

INTEGRATED SAFEGUARDS DATA SHEET APPRAISAL STAGE. Report No.: ISDSA3140 Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized INTEGRATED SAFEGUARDS DATA SHEET Date ISDS Prepared/Updated: July 30, 2013 I. BASIC INFORMATION

More information

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized I. Basic Information Date prepared/updated: 03/10/2006 INTEGRATED SAFEGUARDS DATASHEET

More information

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Date ISDS Prepared/Updated: 28-Jul-2013

More information

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE. Peru Second Rural Electrification

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE. Peru Second Rural Electrification Project Name Region Sector Project ID GEF Focal Area Global Supplemental ID Borrower(s) Implementing Agency PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Peru Second Rural Electrification Latin America

More information

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Name Region Country Sector(s) Theme(s) Lending Instrument Project ID Borrower(s)

More information

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized I. Basic Information Date prepared/updated: 06/03/2008 INTEGRATED SAFEGUARDS DATASHEET

More information

AF Rural Enterprise Development Program Region

AF Rural Enterprise Development Program Region PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB4057 Project Name AF Rural Enterprise Development Program Region South Asia Sector Crops (20%);Other social services (20%);Micro- and SME

More information

Report No.: ISDSA14479

Report No.: ISDSA14479 Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized 0 o O Date ISDS Prepared/Updated: 16-Nov-2015 INTEGRATED SAFEGUARDS DATA SHEET APPRAISAL

More information

Integrated Safeguards Data Sheet (Initial)

Integrated Safeguards Data Sheet (Initial) THE WORLD BANK GROUP U---- _ InfoShop Date Prepared/Updated: 02/24/2003 Section I - Basic Information A. Basic Project Data Country: BRAZIL Project: RF Support of Scientific Research for the Amazon II

More information

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE. Shandong Provincial Biogas CDM Program EAST ASIA AND PACIFIC Rural Development P115878

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE. Shandong Provincial Biogas CDM Program EAST ASIA AND PACIFIC Rural Development P115878 Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Name Region Sector Project ID Borrower(s) Implementing Agency PROJECT INFORMATION

More information

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized I. Basic Information Date prepared/updated: 03/21/2011 INTEGRATED SAFEGUARDS DATASHEET

More information

Brazil: N2O Emission Reduction Project Region. Latin America and the Caribbean Country. Trust Fund / Carbon Finance Project ID

Brazil: N2O Emission Reduction Project Region. Latin America and the Caribbean Country. Trust Fund / Carbon Finance Project ID PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.:59292 (The report # is automatically generated by IDU and should not be changed) Project Name Brazil: N2O Emission Reduction Project Region Latin

More information