Event and Continuous Hydrologic Modeling with HEC-HMS

Size: px
Start display at page:

Download "Event and Continuous Hydrologic Modeling with HEC-HMS"

Transcription

1 Event and Continuous Hydrologic Modeling with HEC-HMS Xuefeng Chu, A.M.ASCE 1 ; and Alan Steinman 2 Abstract: Event hydrologic modeling reveals how a basin responds to an individual rainfall event e.g., quantity of surface runoff, peak, timing of the peak, detention. In contrast, continuous hydrologic modeling synthesizes hydrologic processes and phenomena i.e., synthetic responses of the basin to a number of rain events and their cumulative effects over a longer time period that includes both wet and dry conditions. Thus, fine-scale event hydrologic modeling is particularly useful for understanding detailed hydrologic processes and identifying the relevant parameters that can be further used for coarse-scale continuous modeling, especially when long-term intensive monitoring data are not available or the data are incomplete. Joint event and continuous hydrologic modeling with the Hydrologic Engineering Center s Hydrologic Modeling System HEC-HMS is discussed in this technical note and an application to the Mona Lake watershed in west Michigan is presented. Specifically, four rainfall events were selected for calibrating/verifying the event model and identifying model parameters. The calibrated parameters were then used in the continuous hydrologic model. The Soil Conservation Service curve number and soil moisture accounting methods in HEC-HMS were used for simulating surface runoff in the event and continuous models, respectively, and the relationship between the two rainfall-runoff models was analyzed. The simulations provided hydrologic details about quantity, variability, and sources of runoff in the watershed. The model output suggests that the fine-scale 5 min time step event hydrologic modeling, supported by intensive field data, is useful for improving the coarse-scale hourly time step continuous modeling by providing more accurate and well-calibrated parameters. DOI: / ASCE :1 119 CE Database subject headings: Watersheds; Hydrologic models; Geographic information systems; Runoff. Introduction Watershed hydrologic modeling and the associated model calibration and verification require a large set of spatial and temporal data e.g., topography, land use/covers, soils, rainfall, and flow monitoring data. In practice, however, the availability and quality of these data are often an issue one needs to cope with. Sometimes, one has to compromise the overall modeling quality because of insufficient high-resolution data for developing, calibrating, and validating the model. Under these circumstances, it is critical to develop an effective modeling strategy that not only takes full advantage of the available data but also maximizes the accuracy of modeling. The goal of the current study is to develop such a strategy by combining fine-scale event and coarse-scale continuous hydrologic modeling with the Hydrologic Engineering Center s Hydrologic Modeling System HEC-HMS USACE-HEC This approach has been applied to the Mona Lake watershed, located in west Michigan. Event hydrologic modeling for a basin characterizes finer-scale hydrologic processes and reveals how the basin 1 Assistant Professor, Dept. of Civil Engineering, North Dakota State Univ., th Ave. North, Fargo, ND 58105; formerly, Annis Water Resources Institute, Grand Valley State Univ., Muskegon, MI xuefeng.chu@ndsu.edu 2 Professor and Director, Annis Water Resources Institute, Grand Valley State Univ., 740 W. Shoreline Dr., Muskegon, MI steinmaa@gvsu.edu Note. Discussion open until July 1, Separate discussions must be submitted for individual papers. The manuscript for this technical note was submitted for review and possible publication on January 31, 2007; approved on April 17, This technical note is part of the Journal of Irrigation and Drainage Engineering, Vol. 135, No. 1, February 1, ASCE, ISSN /2009/ /$ responds to an individual rainfall event e.g., quantity of surface runoff, peak, timing of the peak, and detention. Thus, event hydrologic modeling is useful for better understanding the underlying hydrologic processes and identifying the relevant parameters. Also, intensive fine-scale hydrologic monitoring data for certain rainfall events, which are essential to the calibration of the event hydrologic model, are easily obtained. In contrast, continuous hydrologic modeling synthesizes hydrologic processes and phenomena i.e., synthetic responses of the basin to a number of rain events and their cumulative effects over a longer time period that includes both wet and dry conditions. In addition, calibration and verification of a continuous hydrologic model over a long time period often require considerable monitoring data. For many small watersheds, however, such long-term monitoring data may not be available, may not be continuous, or may not have sufficient resolution small time-interval data. Thus, a combination of event and continuous hydrologic modeling takes advantage of the two modeling methods and data availability. In particular, the parameters that are well calibrated in event models will help improve the continuous hydrologic modeling. The Watershed Modeling System WMS 1999 and the latest version of HEC-HMS USACE-HEC 2006 are used in this hydrologic modeling study. The Watershed Modeling System is a comprehensive modeling environment for watershed-scale hydrologic analysis that incorporates several commonly used hydrologic models e.g., Hydrologic Engineering Center HEC-1, Technical Release TR -20, TR-55, National Flood Frequency NFF, and Hydrological Simulation Program FORTRAN HSPF and facilitates processing of various geographic information system GIS data, automated watershed delineation, computation of hydrologic parameters, and hydrologic modeling. HEC-HMS, the successor to HEC-1, is a precipitation-runoffrouting model that represents a drainage basin as an intercon- JOURNAL OF IRRIGATION AND DRAINAGE ENGINEERING ASCE / JANUARY/FEBRUARY 2009 / 119

2 Fig. 1. Location of the Mona Lake watershed nected system of hydrologic and hydraulic components and simulates the surface runoff response of the basin to precipitation USACE-HEC The Mona Lake watershed covers km 2 and is dominated by forest, residential, and agricultural cropland land-use types. The soils are mostly Rubicon and Au Gres sands RsB, AsB, and Ra Steinman et al. 2003, which possess relatively low runoff potential and high infiltration capability. Mona Lake itself covers an area of 2.65 km 2 and receives inflows from a number of tributaries and storm drains Steinman et al ; the lake connects directly to Lake Michigan via a small channel. Major tributaries include Black Creek BC, Little Black Creek LBC, Cress Creek CC, and Ellis Drain ED Fig. 1. Black Creek drains the largest area and it also receives discharge of treated wastewater from the Muskegon County Wastewater Management System WWMS. Methods and Model Development SCS-CN Event Model versus SMA Continuous Model in HEC-HMS The Soil Conservation Service curve number method SCS-CN, USDA 1986 is essentially an empirical, one-parameter CN, event rainfall-runoff model. The dimensionless curve number takes into account, in a lumped way, the effects of land use/cover, soil types, and hydrologic conditions on surface runoff, and relates direct surface runoff to rainfall. The SCS-CN method has been widely used for estimating rainfall-generated surface runoff in watershed hydrologic modeling. In spite of the popularity of the SCS-CN method, it is controversial; its limitations, application conditions, abuses, and future directions have been discussed by many researchers e.g., Ponce and Hawkins 1996; Garen and Moore The SCS-CN method is selected in this study primarily because it allows one to fully utilize the available spatially distributed GIS data for the Mona Lake watershed that also can be easily processed by using the Windows-based tools in WMS. The SCS-CN model is available in HEC-HMS for simulating direct surface runoff from a storm event i.e., event rainfall-runoff model. To facilitate continuous hydrologic modeling, a soil moisture accounting SMA model has been incorporated in HEC-HMS USACE-HEC, 2000, Basically, SMA in HEC-HMS is a lumped bucket-type model that represents a subbasin with well-linked storage layers/buckets accounting for canopy interception, surface depression storage, infiltration, evapotranspiration, as well as soil water and groundwater percolation. In this study, the SCS-CN and SMA models were used for event and continuous hydrologic modeling, respectively. The event modeling focused on understanding how the hydrologic system responded to individual storm events on a fine time scale and identifying relevant hydrologic parameters. The SMA continuous hydrologic modeling operated over a longer period, which included a series of rainfall events and dry time periods on a coarse time scale. The main purpose of implementing joint SCS-CN event and SMA continuous modeling is to strengthen the overall modeling capability. Parameters that are well calibrated in the event modeling are further used to improve the continuous hydrologic modeling. The relationship between the SCS-CN and SMA methods can be analyzed as follows: The SCS-CN model can be expressed as USDA 1986 R = P 2 e P e + S P e = P I a I a = S S = 2, SI unit system,cm 4 CN where R cumulative runoff; P cumulative rainfall; P e cumulative effective rainfall P e 0; otherwise, R=0 ; S=potential maximum retention; I a =initial abstraction all initial losses: surface depression storage, vegetation interception, and infiltration ; =initial abstraction coefficient; and CN=curve number. For a default value of =, Eq. 1 becomes P 508/CN R = 5 P /CN According to the SMA method in HEC-HMS, rainfall contributes first to the canopy interception storage S c. Then, rainwater is available for infiltration, which is determined by infiltration capacity and soil storage S s. Any excess rainwater sequentially fills the surface depression storage S sf and eventually becomes surface runoff. The potential infiltration rate is given by USACE- HEC 2000 S sd t i t = i m 6 S s max S sd t = S s max S s t where i t =potential infiltration rate at time t the actual infiltration rate also depends on the water available for infiltration at time t ; i m =maximum infiltration rate; S smax =maximum soil water storage; S s t =soil water storage at time t; and S sd t =soil water storage deficit at time t. The infiltration rate equals zero when / JOURNAL OF IRRIGATION AND DRAINAGE ENGINEERING ASCE / JANUARY/FEBRUARY 2009

3 S sd t =0 i.e., S s t =S smax and reaches the maximum rate i m when S sd t =S smax i.e., S s t =0. From the definition of initial abstraction in the SCS-CN model and the computation procedures of the SMA model no evaporation during rainfall, one has I a = S c + S sf + F 0 8 F 0 = i 0 t 0 9 where F 0 =cumulative infiltration before surface runoff starts; i 0 =average infiltration rate before surface runoff starts; and t 0 =initial time. Substituting the expression of I a Eqs. 3 and 4 into Eq. 8, we have F 0 = 2,540/CN 25.4 S c S sf For =, Eq. 10 becomes 10 F 0 = 508/CN 5.08 S c S sf 11 For the entire rainfall event, total runoff can be expressed as i.e., R = P S c S sf F 0 F r R = P e F r F r = i r t r 14 where F r =cumulative infiltration after surface runoff initiates; i r =average infiltration rate after surface runoff starts; and t r =postrunoff time note that the entire time of the rainfall event T=t 0 +t r. According to Eqs. 1 and 13, one has thus, P e 2 P e + S = P e F r F r = P es P e + S Substituting Eqs. 2 and 3 into Eq. 16, one has or P S S F r = P S + S F r = RS P e Substituting = and Eq. 4 into Eq. 17, one has P 508/CN ,540/CN 25.4 F r = 19 P + 2,032/CN Thus, the cumulative infiltration over the entire rainfall event time T is given by Fig. 2. HEC-HMS conceptual model for the Mona Lake watershed F = F 0 + F r = 508/CN 5.08 S c S sf P 508/CN ,540/CN P + 2,032/CN The average infiltration rate over the entire event can be written as i = F 21 T Although SCS-CN and SMA utilize dissimilar methods for simulating surface runoff, infiltration, and other related hydrologic processes, the above-presented derivations do provide a way to better estimate the involved parameters in the SMA continuous model based on those well calibrated in the SCS-CN event model. Hydrologic Monitoring and Field Data Collection In this watershed study, eight sites Fig. 1 were selected for hydrologic monitoring three BC sites S1 S3 ; three LBC sites S4 S6 ; one CC site S7 ; and one ED site S8. The specific location of each site was determined based on a number of factors, such as shape and stability of stream channels, flow conditions, and accessibility. An Odyssey pressure and temperature recording system was installed for collecting stream water level and temperature data at each site. Streamflow also was manually measured and processed by using the Windows-based hydrologic software, HYDROL-INF Chu and Mariño Then, rating curves were developed and observed hydrographs Q t were computed for all monitoring sites, which were further utilized for model calibration. Watershed Delineation and Parameter Computation Using WMS, overland flow directions and accumulations were computed and the drainage network and subbasin boundaries were determined. The entire Mona Lake watershed was divided into thirteen subbasins: five BC subbasins Basins 1 5, five LBC subbasins Basins 6 10, one CC subbasin Basin 11, one ED subbasin Basin 12, and a subbasin adjacent to Mona Lake JOURNAL OF IRRIGATION AND DRAINAGE ENGINEERING ASCE / JANUARY/FEBRUARY 2009 / 121

4 Basin 13 Figs. 1 and 2. Further, all geometric parameters, such as subbasin area, overland flow length, basin slope, and stream channel length and slope were computed. Curve numbers were computed for all subbasins based on their land use/covers, soil types, and hydrologic soil groups. Other parameters e.g., lag time and time of concentration also were estimated by using appropriate approaches in WMS. Event Hydrologic Modeling A 5 min time step was selected in the event hydrologic modeling. The SCS-CN loss method, the Clark transform method, and the recession baseflow method were selected for all subbasins. The SCS-CN method simulates rainfall excess and losses; the Clark unit hydrograph method Clark 1945 transforms the computed rainfall excess to direct runoff at the outlet of a subbasin; and the recession method utilizes an exponential recession model Chow et al to represent baseflow from a subbasin. To better represent the distinct flow characteristics of BC and smaller tributaries LBC, CC, and ED, three reach routing methods straddle-stagger progressive average-lag method USACE 1960, Muskingum method, and lag method were utilized in the modeling. Selection of rainfall events is a critical step for event hydrologic modeling and model calibration/verification. Selection depends on many factors, such as rainfall characteristics magnitude, duration, intensity, and temporal and spatial variability, watershed properties size, land use/covers, soil types, etc., and availability and completeness of rainfall and stream monitoring data. Four rainfall events were selected for calibration and verification of the event model. Two methods normalized objective function NOF Ibbitt and O Donnell 1971 and modeling efficiency EF Nash and Sutcliffe 1970 were used to quantify the goodness of fit between the simulated and observed flows. The values of NOF and EF, respectively, are given by NOF = 1 Q obs 1 Q obs,i Q sim,i 2 n i=1 n 22 EF=1 i=1 n Q obs,i Q sim,i 2 23 n i=1 Q obs,i Q obs 2 where Q obs,i =observed discharge; Q sim,i =simulated discharge; Q obs=mean of the observed discharge; and n=number of the observed or simulated data points. Note that if all observed discharges are the same as the simulated ones, the NOF and EF values equal 0 and 1, respectively. Continuous Hydrologic Modeling In the continuous hydrologic model, the simulation time period ranged from April 6, 2005 to September 15, 2005 and an hourly time step was used. As in the event model, the Clark transform method, the recession baseflow method, as well as the straddle stagger, Muskingum, and lag routing methods were selected in the continuous model. The relevant parameters calibrated in the event model were used. The SMA loss method was utilized for continuously simulating rainfall excess in this continuous model. Initial estimates of the parameters involved in the SMA method were determined primarily based on the relationship between the SCS-CN and SMA methods and the well-calibrated SCS-CN model parameters, the actual conditions e.g., soil properties, and Table 1. Normalized Objective Function NOF and Modeling Efficiency EF for the Event Model Event Watershed Outlet/site NOF EF 8/10-8/15 BC Outlet 2 S Outlet 3 S Outlet 4 S Calibration Average /26-8/30 BC Outlet 2 S Outlet 3 S Outlet 4 S Verification Average /28-10/1 LBC CC ED the suggestions provided in the HEC-HMS User s Manual USACE-HEC As in the event modeling, the NOF and EF methods also were applied to quantify the fit of the simulated hydrographs to the observed ones at the eight sites. Analysis of Results Outlet 7 S Outlet 9 S Outlet 10 S Outlet 11 S Outlet 12 S Calibration Average /26-8/30 LBC Outlet 9 S Outlet 10 S /30-7/3 LBC Outlet 7 S Outlet 10 S Verification Average /26-8/30 CC, ED Outlet 11 S Outlet 12 S /30-7/3 CC, ED Outlet 11 S Outlet 12 S Verification Average Overall average The event hydrologic model was calibrated and verified using the observed flow data at the eight monitoring sites Sites S1 S8, Fig. 1. According to quantitative evaluation of the performance of the event hydrologic model Table 1, the overall NOF and EF averages for all rainfall events and all monitoring sites are and 0.844, respectively. The minimum NOF value is 66 for Event 8/26-8/30 at Site S3 and the highest EF value is for Event 6/30-7/3 at Site S6. Thus, good agreement between simulations and field data has been achieved in the event hydrologic modeling. The parameters calibrated in the event model were then used for continuous hydrologic modeling. Comparisons between the simulated and observed hydrographs at the three BC sites and five other sites three LBC sites, one CC site, and one ED site for the continuous hydrologic modeling are shown in Figs. 3 and 4, respectively. Similarly, performance of the continuous model was quantitatively evaluated by using the NOF and EF methods Table 2. The average NOF value for all eight monitoring sites is and the average EF value is 0.691, suggesting a fairly good agreement between the simulated and observed hydrographs. Site S4 has the highest NOF and the lowest EF because of the significant variations in the flow measurements in April Fig. 4 a, which can be attributed to various factors e.g., 122 / JOURNAL OF IRRIGATION AND DRAINAGE ENGINEERING ASCE / JANUARY/FEBRUARY 2009

5 diurnal changes in temperature and moisture. In addition, minor diurnal oscillations, induced by the varying discharge of treated wastewater from the WWMS, were observed at Sites S1 and S2 along Black Creek Figs. 3 a and b, but such oscillations were not represented in the continuous model because only daily discharge data were available for the simulation time period. Overall, the simulated hydrographs at the eight sites reflect the dominant trends and variations observed in the field flow data Figs. 3 and 4. The hydrologic modeling suggests that the overall percentage of rainfall excess for the entire Mona Lake watershed is 6.8% and the remaining portion of rainfall 93.2% is subject to various losses. The BC subbasin, which is the largest in the watershed Basins 1 5, has higher loss and lower excess percentages than the other subbasins. During the simulation period from April 6 to September 15, 2005, m 3 of water was generated from the 13 subbasins, of which 93.9% came from baseflow and 6.1% was contributed by direct runoff; baseflow was the primary source of runoff in the Mona Lake watershed. Summary and Conclusions a). Wolf-Lake Site (Outlet 2) b). Broadway Site (Outlet 3) c). US31 Site (Outlet 4) Date Simulated Observed Fig. 3. Comparison between simulated and observed hydrographs for the BC sites simulation period: April 6 September 15, 2005 In practice, long-term hydrologic monitoring data are not always available or they may not always be of sufficient frequency and duration for hydrologic modeling. How to implement effective and accurate hydrologic modeling when faced with such incomplete data is often an issue for modelers. In this study, both event and continuous hydrologic models were developed for the Mona Lake watershed in west Michigan by using WMS and the widely used HEC-HMS. However, it was found that for some small subbasins, a larger computation time scale such as an hourly time step used in the continuous model prevented the writers from 1 effectively identifying how these basins responded to a storm event and 2 accurately determining the time-related parameters e.g., time of concentration or lag time because their response time was shorter than the hourly time step. In contrast, smallscale, high-resolution storm event data 5 min time step used in Table 2. Normalized Objective Function NOF and Modeling Efficiency EF for the Continuous Model Outlet/site NOF EF Outlet 2 S Outlet 3 S Outlet 4 S Outlet 7 S Outlet 9 S Outlet 10 S Outlet 11 S Outlet 12 S Average the event model enabled the writers to refine the model calibration and identify parameters more accurately on a fine time scale, which sequentially improved the continuous hydrologic modeling over a much larger time scale. Thus, this modeling study suggests that a combination of fine-scale event and coarse-scale continuous hydrologic simulations can be an effective way that not only fully takes advantage of the characteristics of distinct modeling approaches and the availability of various data, but also enhances the overall modeling capabilities. The event hydrologic model was calibrated and validated, which was then used for improving the continuous modeling over a longer time period. The quantitative evaluation of the goodness 0.6 a). Roberts Site (Outlet 7) b). Airline Site (Outlet 9) c). Hoyt Site (Outlet 10) d). Grand-Haven Site (Outlet 11) e). Rood Site (Outlet 12) Date Simulated Observed Fig. 4. Comparison between simulated and observed hydrographs for the LBC, CC, and ED sites simulation period: April 6 September 15, 2005 JOURNAL OF IRRIGATION AND DRAINAGE ENGINEERING ASCE / JANUARY/FEBRUARY 2009 / 123

6 of fit by the NOF and EF methods indicated that good agreements between the simulated and observed flows were achieved in both event and continuous simulations. As to the practical aspect of this application study, the following conclusions can be reached: 1 the continuous hydrologic modeling suggested that only 6.8% of rainwater was available for surface runoff; % of the runoff from the 13 subbasins originated from baseflow; and 3 Black Creek had hydrologic characteristics distinct from Little Black Creek, Cress Creek, Ellis Drain, and other small tributaries flowing into Mona Lake, which can be attributed to their dissimilar sizes, land use/land covers, soil types, and other hydrologic conditions. Black Creek was supported primarily by subsurface flow and characterized by a consistent, relatively stable pattern Fig. 3 and an obvious annual hydrologic cycle. In contrast, Little Black Creek and other small subbasins were particularly sensitive to rainfall showing a number of high short-duration peaks dominated by storm events Fig. 4, which could be attributed primarily to their small size and higher percentage of impervious area. Acknowledgments This project was supported by the Michigan Department of Environmental Quality and Grand Valley State University. The writers would like to thank Annoesjka Steinman, David Fongers, David Kendrick, Vivek Singh, Rick Rediske, Kurt Thompson, Rod Denning, Patrick Womble, Eric Nemeth, and Brain Hanson for their contributions to various aspects of this research. References Chow, V. T., Maidment, D. R., and Mays, L. W Applied hydrology, McGraw-Hill, New York. Chu, X., and Mariño, M. A Simulation of infiltration and surface runoff A Windows-based hydrologic modeling system HYDROL-INF. Examining the Confluence of Environmental and Water Concerns, Proc., 2006 World Environmental and Water Resources Congress, R. Graham, ed., ASCE, New York. Clark, C. O Storage and the unit hydrograph. Trans. Am. Soc. Civ. Eng., , Garen, D. C., and Moore, D. S Curve number hydrology in water quality modeling: Uses, abuses, and future directions. J. Am. Water Resour. Assoc., 41 2, Ibbitt, R. P., and O Donnell, T Fitting methods for conceptual catchment models. J. Hydr. Div., 97 9, Nash, J. E., and Sutcliffe, J. V River flow forecasting through conceptual models. Part I A discussion of principles. J. Hydrol., 10 3, Ponce, V. M., and Hawkins, R. H Runoff curve number: Has it reached maturity? J. Hydrol. Eng., 1 1, Steinman, A. D., et al Preliminary watershed assessment: Mona Lake watershed, Annis Water Resources Institute, Muskegon, Mich., Publication No. MR Steinman, A. D., et al An environmental assessment of an impacted, urbanized watershed: The Mona Lake Watershed, Michigan. Archiv Hydrobiol., 166 1, United States Army Corps of Engineers USACE Routing of floods through river channels. Engineering manual No , Washington, D.C. United States Army Corps of Engineers, Hydrologic Engineering Center USACE-HEC Hydrologic modeling system HEC-HMS technical reference manual, Davis, Calif. United States Army Corps of Engineers, Hydrologic Engineering Center USACE-HEC Hydrologic modeling system HEC-HMS user s manual, Davis, Calif. USDA Urban Hydrology for Small Watersheds. Technical Release 55 TR-55, Natural Resources Conservation Services, Washington, D.C. Watershed Modeling System WMS WMS V6.1 tutorials. Brigham Young Univ., Environmental Modeling Research Laboratory, Provo, Utah. 124 / JOURNAL OF IRRIGATION AND DRAINAGE ENGINEERING ASCE / JANUARY/FEBRUARY 2009

Event and Continuous Hydrological Modeling with HEC- HMS: A Review Study

Event and Continuous Hydrological Modeling with HEC- HMS: A Review Study Event and Continuous Hydrological Modeling with HEC- HMS: A Review Study Sonu Duhan *, Mohit Kumar # * M.E (Water Resources Engineering) Civil Engineering Student, PEC University Of Technology, Chandigarh,

More information

RAINFALL - RUNOFF MODELING IN AN EXPERIMENTAL WATERSHED IN GREECE

RAINFALL - RUNOFF MODELING IN AN EXPERIMENTAL WATERSHED IN GREECE Proceedings of the 14 th International Conference on Environmental Science and Technology Rhodes, Greece, 3-5 September 2015 RAINFALL - RUNOFF MODELING IN AN EXPERIMENTAL WATERSHED IN GREECE KOTSIFAKIS

More information

Evaluation of the effects of underlying surface change on catchment hydrological response using the HEC-HMS model

Evaluation of the effects of underlying surface change on catchment hydrological response using the HEC-HMS model Evolving Water Resources Systems: Understanding, Predicting and Managing Water Society Interactions Proceedings of ICWRS2014, Bologna, Italy, June 2014 (IAHS Publ. 364, 2014). 145 Evaluation of the effects

More information

Autumn semester of Prof. Kim, Joong Hoon

Autumn semester of Prof. Kim, Joong Hoon 1 Autumn semester of 2010 Prof. Kim, Joong Hoon Water Resources Hydrosystems System Engineering Laboratory Laboratory 2 A. HEC (Hydrologic Engineering Center) 1 Established in the U.S. Army Corps of Engineers(USACE)

More information

SECTION III: WATERSHED TECHNICAL ANALYSIS

SECTION III: WATERSHED TECHNICAL ANALYSIS Trout Creek Watershed Stormwater Management Plan SECTION III: WATERSHED TECHNICAL ANALYSIS A. Watershed Modeling An initial step this study of the Trout Creek watershed was the selection of a stormwater

More information

1 THE USGS MODULAR MODELING SYSTEM MODEL OF THE UPPER COSUMNES RIVER

1 THE USGS MODULAR MODELING SYSTEM MODEL OF THE UPPER COSUMNES RIVER 1 THE USGS MODULAR MODELING SYSTEM MODEL OF THE UPPER COSUMNES RIVER 1.1 Introduction The Hydrologic Model of the Upper Cosumnes River Basin (HMCRB) under the USGS Modular Modeling System (MMS) uses a

More information

Hydrology and Water Management. Dr. Mujahid Khan, UET Peshawar

Hydrology and Water Management. Dr. Mujahid Khan, UET Peshawar Hydrology and Water Management Dr. Mujahid Khan, UET Peshawar Course Outline Hydrologic Cycle and its Processes Water Balance Approach Estimation and Analysis of Precipitation Data Infiltration and Runoff

More information

Introduction to HEC HMS. Daene C. McKinney

Introduction to HEC HMS. Daene C. McKinney CE 374 K Hydrology Introduction to HEC HMS Daene C. McKinney Hydrologic Engineering Center U.S. Army Corps ofengineers (USACE) Hydrologic Engineering Center (HEC) Formed 1964 to institutionalize the technical

More information

Estimation of Infiltration Parameter for Tehri Garhwal Catchment

Estimation of Infiltration Parameter for Tehri Garhwal Catchment Estimation of Infiltration Parameter for Tehri Garhwal Catchment Ashish Bhatt 1 H L Yadav 2 Dilip Kumar 3 1 UG Student, Department of civil engineering, G B Pant Engineering College, Pauri, UK-246194 2,3

More information

Learning objectives. Upon successful completion of this lecture, the participants will be able to describe:

Learning objectives. Upon successful completion of this lecture, the participants will be able to describe: Solomon Seyoum Learning objectives Upon successful completion of this lecture, the participants will be able to describe: The different approaches for estimating peak runoff for urban drainage network

More information

The Texas A&M University and U.S. Bureau of Reclamation Hydrologic Modeling Inventory (HMI) Questionnaire

The Texas A&M University and U.S. Bureau of Reclamation Hydrologic Modeling Inventory (HMI) Questionnaire The Texas A&M University and U.S. Bureau of Reclamation Hydrologic Modeling Inventory (HMI) Questionnaire May 4, 2010 Name of Model, Date, Version Number Dynamic Watershed Simulation Model (DWSM) 2002

More information

CONTINUOUS RAINFALL-RUN OFF SIMULATION USING SMA ALGORITHM

CONTINUOUS RAINFALL-RUN OFF SIMULATION USING SMA ALGORITHM CONTINUOUS RAINFALL-RUN OFF SIMULATION USING SMA ALGORITHM INTRODUCTION Dr. R N Sankhua Director, NWA, CWC, Pune In this continuous rainfall-runoff simulation, we will perform a continuous or long-term

More information

UPDATE OF ARC TP108 RUN-OFF CALCULATION GUIDELINE

UPDATE OF ARC TP108 RUN-OFF CALCULATION GUIDELINE UPDATE OF ARC TP108 RUN-OFF CALCULATION GUIDELINE Bodo Hellberg, Stormwater Action Team, Auckland Regional Council Matthew Davis, Stormwater Action Team, Auckland Regional Council ABSTRACT This paper focuses

More information

Lecture 9A: Drainage Basins

Lecture 9A: Drainage Basins GEOG415 Lecture 9A: Drainage Basins 9-1 Drainage basin (watershed, catchment) -Drains surfacewater to a common outlet Drainage divide - how is it defined? Scale effects? - Represents a hydrologic cycle

More information

Distribution Restriction Statement Approved for public release; distribution is unlimited.

Distribution Restriction Statement Approved for public release; distribution is unlimited. CECW-EH-Y Regulation No. 1110-2-1464 Department of the Army U.S. Army Corps of Engineers Washington, DC 20314-1000 Engineering and Design HYDROLOGIC ANALYSIS OF WATERSHED RUNOFF Distribution Restriction

More information

A Hydrologic Study of the. Ryerson Creek Watershed

A Hydrologic Study of the. Ryerson Creek Watershed A Hydrologic Study of the Ryerson Creek Watershed Dave Fongers Hydrologic Studies Unit Land and Water Management Division Michigan Department of Environmental Quality May 8, 2002 Table of Contents Summary...2

More information

HYDROLOGIC MODELING CONSISTENCY AND SENSITIVITY TO WATERSHED SIZE

HYDROLOGIC MODELING CONSISTENCY AND SENSITIVITY TO WATERSHED SIZE HYDROLOGIC MODELING CONSISTENCY AND SENSITIVITY TO WATERSHED SIZE by James C.Y. Guo. Professor, Civil Engineering, U. Of Colorado at Denver, James.Guo@cudenver.edu.. And Eric Hsu, Project Engineer, Parson

More information

The Drainage Basin System

The Drainage Basin System The Drainage Basin System These icons indicate that teacher s notes or useful web addresses are available in the Notes Page. This icon indicates that the slide contains activities created in Flash. These

More information

Runoff Processes. Daene C. McKinney

Runoff Processes. Daene C. McKinney CE 374 K Hydrology Runoff Processes Daene C. McKinney Watershed Watershed Area draining to a stream Streamflow generated by water entering surface channels Affected by Physical, vegetative, and climatic

More information

DEVELOPMENT OF A HYDRO-GEOMORPHIC MODEL FOR THE LAGUNA CREEK WATERSHED

DEVELOPMENT OF A HYDRO-GEOMORPHIC MODEL FOR THE LAGUNA CREEK WATERSHED DEVELOPMENT OF A HYDRO-GEOMORPHIC MODEL FOR THE LAGUNA CREEK WATERSHED Agenda Background Hydro-Geomorphic Modeling Methodology HEC-HMS Modeling How is the Model Used Background Proposition 50 Grant Funding

More information

URBAN FLOODING: HEC-HMS

URBAN FLOODING: HEC-HMS 1.0 Introduction URBAN FLOODING: HEC-HMS -Sunil Kumar, Director, NWA All major ancient civilisations were developed in the river valleys because river served as source of water, food, transportation and

More information

Hydrologic Engineering Center Hydrologic Modeling System (HEC-HMS) Sunil KUMAR Director, National Water Academy

Hydrologic Engineering Center Hydrologic Modeling System (HEC-HMS) Sunil KUMAR Director, National Water Academy Hydrologic Engineering Center Hydrologic Modeling System (HEC-HMS) Sunil KUMAR Director, National Water Academy 22 April 2015 NWA, Pune Exercise Objective: To determine hydrological Response of the given

More information

SECTION IV WATERSHED TECHNICAL ANALYSIS

SECTION IV WATERSHED TECHNICAL ANALYSIS A. Watershed Modeling SECTION IV WATERSHED TECHNICAL ANALYSIS An initial step in the preparation of this stormwater management plan was the selection of a stormwater simulation model to be utilized. It

More information

Estimating the 100-year Peak Flow for Ungagged Middle Creek Watershed in Northern California, USA

Estimating the 100-year Peak Flow for Ungagged Middle Creek Watershed in Northern California, USA American Journal of Water Resources, 2014, Vol. 2, No. 4, 99-105 Available online at http://pubs.sciepub.com/ajwr/2/4/3 Science and Education Publishing DOI:10.12691/ajwr-2-4-3 Estimating the 100-year

More information

RAINFALL-RUNOFF STUDY FOR SINGAPORE RIVER CATCHMENT

RAINFALL-RUNOFF STUDY FOR SINGAPORE RIVER CATCHMENT 10 th International Conference on Hydroinformatics HIC 2012, Hamburg, GERMANY RAINFALL-RUNOFF STUDY FOR SINGAPORE RIVER CATCHMENT CHI DUNG DOAN (1)(3), JIANDONG LIU (1), SHIE-YUI LIONG (1), ADRI VERWEY

More information

Uncertainty in Hydrologic Modelling for PMF Estimation

Uncertainty in Hydrologic Modelling for PMF Estimation Uncertainty in Hydrologic Modelling for PMF Estimation Introduction Estimation of the Probable Maximum Flood (PMF) has become a core component of the hydrotechnical design of dam structures 1. There is

More information

Introduction. Keywords: Oil Palm, hydrology, HEC-HMS, HEC-RAS. a * b*

Introduction. Keywords: Oil Palm, hydrology, HEC-HMS, HEC-RAS. a * b* The Effect of Land Changes Towards in Sg. Pandan Perwira Bin Khusairi Rahman 1,a* and Kamarul Azlan bin Mohd Nasir 1,b 1 Faculty of Civil Engineering, Universiti Teknologi Malaysia, Malaysia a * wirakhusairirahman@gmail.com,

More information

1 n. Flow direction Raster DEM. Spatial analyst slope DEM (%) slope DEM / 100 (actual slope) Flow accumulation

1 n. Flow direction Raster DEM. Spatial analyst slope DEM (%) slope DEM / 100 (actual slope) Flow accumulation 1 v= R S n 2/3 1/2 DEM Flow direction Raster Spatial analyst slope DEM (%) Flow accumulation slope DEM / 100 (actual slope) 0 = no cell contributing 215 = 215 cell contributing towards that cell sqrt (actual

More information

Texas A & M University and U.S. Bureau of Reclamation Hydrologic Modeling Inventory Model Description Form

Texas A & M University and U.S. Bureau of Reclamation Hydrologic Modeling Inventory Model Description Form Texas A & M University and U.S. Bureau of Reclamation Hydrologic Modeling Inventory Model Description Form JUNE 18, 1999 Name of Model: MIKE 11 RR (Rainfall Runoff) Model Type: The MIKE 11 RR model is

More information

International Journal of Scientific & Engineering Research, Volume 5, Issue 7, July-2014 ISSN Sruthy Nattuvetty Manoharan

International Journal of Scientific & Engineering Research, Volume 5, Issue 7, July-2014 ISSN Sruthy Nattuvetty Manoharan ISSN 2229-5518 210 Sruthy Nattuvetty Manoharan Department of Civil Engineering Government Engineering College, Thrissur Thrissur, 680009 sruthy.n.m@gmail.com a spatially distributed excess rainfall. It

More information

HYDROLOGY WORKSHEET 1 PRECIPITATION

HYDROLOGY WORKSHEET 1 PRECIPITATION HYDROLOGY WORKSHEET 1 PRECIPITATION A watershed is an area of land that captures rainfall and other precipitation and funnels it to a lake or stream or wetland. The area within the watershed where the

More information

6.0 Runoff. 6.1 Introduction. 6.2 Flood Control Design Runoff

6.0 Runoff. 6.1 Introduction. 6.2 Flood Control Design Runoff October 2003, Revised February 2005 Chapter 6.0, Runoff Page 1 6.1 Introduction 6.0 Runoff The timing, peak rates of discharge, and volume of stormwater runoff are the primary considerations in the design

More information

San Luis Obispo Creek Watershed Hydrologic Model Inputs

San Luis Obispo Creek Watershed Hydrologic Model Inputs Jeff Werst San Luis Obispo County Department of Public Works 1050 Monterey Street San Luis Obispo CA 93408 December 14, 2007 Subject: San Luis Obispo Creek Watershed Hydrology and Hydraulic Model Dear

More information

Estimation of Hydrological Outputs using HEC-HMS and GIS

Estimation of Hydrological Outputs using HEC-HMS and GIS Nigerian Journal of Environmental Sciences and Technology (NIJEST) www.nijest.com ISSN (Print): 2616-051X ISSN (electronic): 2616-0501 Vol 1, No. 2 July 2017, pp 390-402 Estimation of Hydrological Outputs

More information

Effects of initial abstraction ratio in SCS-CN method on modeling the impacts of urbanization on peak flows

Effects of initial abstraction ratio in SCS-CN method on modeling the impacts of urbanization on peak flows Effects of initial abstraction ratio in SCS-CN method on modeling the impacts of urbanization on peak flows Navideh Noori, Latif Kalin, Puneet Srivastava, Charlene LeBleu Proceedings ASCE World Environmental

More information

APPENDIX IV. APPROVED METHODS FOR QUANTIFYING HYDROLOGIC CONDITIONS OF CONCERN (NORTH ORANGE COUNTY)

APPENDIX IV. APPROVED METHODS FOR QUANTIFYING HYDROLOGIC CONDITIONS OF CONCERN (NORTH ORANGE COUNTY) APPENDIX IV. APPROVED METHODS FOR QUANTIFYING HYDROLOGIC CONDITIONS OF CONCERN (NORTH ORANGE COUNTY) Hydromodification design criteria for the North Orange County permit area are based on the 2- yr, 24-hr

More information

HYDROLOGICAL MODELING OF AN AGRICULTURAL WATERSHED USING HEC-HMS HYDROLOGICAL MODEL, REMOTE SENSING AND GEOGRAPHICAL INFORMATION SYSTEM

HYDROLOGICAL MODELING OF AN AGRICULTURAL WATERSHED USING HEC-HMS HYDROLOGICAL MODEL, REMOTE SENSING AND GEOGRAPHICAL INFORMATION SYSTEM HYDROLOGICAL MODELING OF AN AGRICULTURAL WATERSHED USING HEC-HMS HYDROLOGICAL MODEL, REMOTE SENSING AND GEOGRAPHICAL INFORMATION SYSTEM Niravkumar K. Pampaniya 1, Mukesh K. Tiwari 2, M. L. Gaur 3 1 M.Tech.

More information

Hydrologic Calibration:

Hydrologic Calibration: Hydrologic Calibration: UPDATE OF EFFECTIVE HYDROLOGY FOR MARYS CREEK October 2010 Agenda Background Hydrologic model Calibrated rainfall Hydrologic calibration 100 year discharges, Existing Conditions

More information

Comparison and Assessment of Success of Models in Watershed Simulation and Management

Comparison and Assessment of Success of Models in Watershed Simulation and Management Journal of Water Resource and Protection, 2014, 6, 599-608 Published Online April 2014 in SciRes. http://www.scirp.org/journal/jwarp http://dx.doi.org/10.4236/jwarp.2014.66058 Comparison and Assessment

More information

STUDY OF RAINFALL-RUNOFF RESPONSE OF A CATCHMENT USING SCS CURVE NUMBER COMBINED WITH MUSKINGUM ROUTING TECHNIQUES

STUDY OF RAINFALL-RUNOFF RESPONSE OF A CATCHMENT USING SCS CURVE NUMBER COMBINED WITH MUSKINGUM ROUTING TECHNIQUES Int. J. Struct. & Civil Engg. Res. 214 Ratul Das, 214 Research Paper ISSN 2319 69 www.ijscer.com Vol. 3, No. 3, August 214 214 IJSCER. All Rights Reserved STUDY OF RAINFALL-RUNOFF RESPONSE OF A CATCHMENT

More information

MIDAS CREEK PROJECT. FINAL DESIGN REPORT SKR Hydrotech 4/11/2012

MIDAS CREEK PROJECT. FINAL DESIGN REPORT SKR Hydrotech 4/11/2012 2012 MIDAS CREEK PROJECT FINAL DESIGN REPORT SKR Hydrotech 4/11/2012 Executive Summary... 1 Section 1 Introduction... 1 Background Information... 1 Purpose of Study... 1 Scope of Work... 1 Section 2 Description

More information

Chapter 6. Hydrology. 6.0 Introduction. 6.1 Design Rainfall

Chapter 6. Hydrology. 6.0 Introduction. 6.1 Design Rainfall 6.0 Introduction This chapter summarizes methodology for determining rainfall and runoff information for the design of stormwater management facilities in the City. The methodology is based on the procedures

More information

Rainfall - runoff: Unit Hydrograph. Manuel Gómez Valentín E.T.S. Ing. Caminos, Canales y Puertos de Barcelona

Rainfall - runoff: Unit Hydrograph. Manuel Gómez Valentín E.T.S. Ing. Caminos, Canales y Puertos de Barcelona Rainfall - runoff: Unit Hydrograph Manuel Gómez Valentín E.T.S. ng. Caminos, Canales y Puertos de Barcelona Options in many commercial codes,, HMS and others HMS Menu Transform method, User specified,

More information

What is runoff? Runoff. Runoff is often defined as the portion of rainfall, that runs over and under the soil surface toward the stream

What is runoff? Runoff. Runoff is often defined as the portion of rainfall, that runs over and under the soil surface toward the stream What is runoff? Runoff Runoff is often defined as the portion of rainfall, that runs over and under the soil surface toward the stream 1 COMPONENTS OF Runoff or STREAM FLOW 2 Cont. The types of runoff

More information

2

2 1 2 3 4 5 6 The program is designed for surface water hydrology simulation. It includes components for representing precipitation, evaporation, and snowmelt; the atmospheric conditions over a watershed.

More information

5/25/2017. Overview. Flood Risk Study Components HYDROLOGIC MODEL (HEC-HMS) CALIBRATION FOR FLOOD RISK STUDIES. Hydraulics. Outcome or Impacts

5/25/2017. Overview. Flood Risk Study Components HYDROLOGIC MODEL (HEC-HMS) CALIBRATION FOR FLOOD RISK STUDIES. Hydraulics. Outcome or Impacts HYDROLOGIC MODEL (HEC-HMS) CALIBRATION FOR FLOOD RISK STUDIES C. Landon Erickson, P.E.,CFM Water Resources Engineer USACE, Fort Worth District April 27 th, 2017 US Army Corps of Engineers Overview Flood

More information

The Effect of Surface Texture on Evaporation, Infiltration and Storage Properties of Paved Surfaces

The Effect of Surface Texture on Evaporation, Infiltration and Storage Properties of Paved Surfaces The Effect of Surface Texture on Evaporation, Infiltration and Storage Properties of Paved Surfaces M. Mansell* and F. Rollet School of Engineering and Science, University of the West of Scotland, Paisley

More information

Chapter 1 Introduction

Chapter 1 Introduction Engineering Hydrology Chapter 1 Introduction 2016-2017 Hydrologic Cycle Hydrologic Cycle Processes Processes Precipitation Atmospheric water Evaporation Infiltration Surface Runoff Land Surface Soil water

More information

IJSER. within the watershed during a specific period. It is constructed

IJSER. within the watershed during a specific period. It is constructed International Journal of Scientific & Engineering Research, Volume 5, Issue 7, July-014 ISSN 9-5518 306 within the watershed during a specific period. It is constructed I. INTRODUCTION In many instances,

More information

JOURNAL OF APPLIED SCIENCES RESEARCH

JOURNAL OF APPLIED SCIENCES RESEARCH Copyright 2015, American-Eurasian Network for Scientific Information publisher JOURNAL OF APPLIED SCIENCES RESEARCH ISSN: 1819-544X EISSN: 1816-157X JOURNAL home page: http://www.aensiweb.com/jasr Published

More information

Computation of excess stormflow at the basin scale. Prof. Pierluigi Claps. Dept. DIATI, Politecnico di Torino

Computation of excess stormflow at the basin scale. Prof. Pierluigi Claps. Dept. DIATI, Politecnico di Torino Computation of excess stormflow at the basin scale Prof. Pierluigi Claps Dept. DIATI, Politecnico di Torino Pierluigi.claps@polito.it losses include: interception, evapotranspiration, storage infiltration,

More information

1. Stream Network. The most common approach to quantitatively describing stream networks was postulated by Strahler (1952).

1. Stream Network. The most common approach to quantitatively describing stream networks was postulated by Strahler (1952). 1. Stream Network The most common approach to quantitatively describing stream networks was postulated by Strahler (1952). First Order Streams streams with no tributaries. Second Order Streams begin at

More information

Application of HEC-HMS for Flood Forecasting in Kabkian Basin and Delibajak Subbasin in Iran

Application of HEC-HMS for Flood Forecasting in Kabkian Basin and Delibajak Subbasin in Iran IOSR Journal of Engineering (IOSRJE) e-iss: 2250-3021, p-iss: 2278-8719 Vol. 3, Issue 9 (September. 2013), V3 PP 10-16 Application of HEC-HMS for Flood Forecasting in Kabkian Basin and Delibajak Subbasin

More information

Computation of Hydrographs in Evros River Basin

Computation of Hydrographs in Evros River Basin European Water 31: 33-42, 2010. 2010 E.W. Publications Computation of Hydrographs in Evros River Basin P. Angelidis 1, G. Mystakidis 2, S. Lalikidou 2, V. Hrissanthou 2 and N. Kotsovinos 3 Department of

More information

Stormwater, Climate Change, and Michigan: Part II. Alan Steinman Director, Annis Water Resources Institute Grand Valley State University

Stormwater, Climate Change, and Michigan: Part II. Alan Steinman Director, Annis Water Resources Institute Grand Valley State University Stormwater, Climate Change, and Michigan: Part II Alan Steinman Director, Annis Water Resources Institute Grand Valley State University Point vs. Nonpoint Source Pollution Point sources: Nutrients come

More information

UNIT HYDROGRAPH AND EFFECTIVE RAINFALL S INFLUENCE OVER THE STORM RUNOFF HYDROGRAPH

UNIT HYDROGRAPH AND EFFECTIVE RAINFALL S INFLUENCE OVER THE STORM RUNOFF HYDROGRAPH UNIT HYDROGRAPH AND EFFECTIVE RAINFALL S INFLUENCE OVER THE STORM RUNOFF HYDROGRAPH INTRODUCTION Water is a common chemical substance essential for the existence of life and exhibits many notable and unique

More information

Hydrologic Study Report for Single Lot Detention Basin Analysis

Hydrologic Study Report for Single Lot Detention Basin Analysis Hydrologic Study Report for Single Lot Detention Basin Analysis Prepared for: City of Vista, California August 18, 2006 Tory R. Walker, R.C.E. 45005 President W.O. 116-01 01/23/2007 Table of Contents Page

More information

MODULE 1 RUNOFF HYDROGRAPHS WORKSHEET 1. Precipitation

MODULE 1 RUNOFF HYDROGRAPHS WORKSHEET 1. Precipitation Watershed MODULE 1 RUNOFF HYDROGRAPHS WORKSHEET 1 A watershed is an area of land thaaptures rainfall and other precipitation and funnels it to a lake or stream or wetland. The area within the watershed

More information

CHAPTER FIVE Runoff. Engineering Hydrology (ECIV 4323) Instructors: Dr. Yunes Mogheir Dr. Ramadan Al Khatib. Overland flow interflow

CHAPTER FIVE Runoff. Engineering Hydrology (ECIV 4323) Instructors: Dr. Yunes Mogheir Dr. Ramadan Al Khatib. Overland flow interflow Engineering Hydrology (ECIV 4323) CHAPTER FIVE Runoff Instructors: Dr. Yunes Mogheir Dr. Ramadan Al Khatib Overland flow interflow Base flow Saturated overland flow ١ ٢ 5.1 Introduction To Runoff Runoff

More information

Module 3. Lecture 6: Synthetic unit hydrograph

Module 3. Lecture 6: Synthetic unit hydrograph Lecture 6: Synthetic unit hydrograph Synthetic Unit Hydrograph In India, only a small number of streams are gauged (i.e., stream flows due to single and multiple storms, are measured) There are many drainage

More information

ASSESSMENT OF DRAINAGE CAPACITY OF CHAKTAI AND RAJAKHALI KHAL IN CHITTAGONG CITY AND INUNDATION ADJACENT OF URBAN AREAS

ASSESSMENT OF DRAINAGE CAPACITY OF CHAKTAI AND RAJAKHALI KHAL IN CHITTAGONG CITY AND INUNDATION ADJACENT OF URBAN AREAS Proceedings of the 4 th International Conference on Civil Engineering for Sustainable Development (ICCESD 2018), 9~11 February 2018, KUET, Khulna, Bangladesh (ISBN-978-984-34-3502-6) ASSESSMENT OF DRAINAGE

More information

Forecast Informed Reservoir Operations (FIRO) ERDC Hydrologic Investigations

Forecast Informed Reservoir Operations (FIRO) ERDC Hydrologic Investigations Forecast Informed Reservoir Operations (FIRO) ERDC Hydrologic Investigations Briefing, May 31, 2017 Background The US Army Corps of Engineers (USACE) operates reservoirs primarily for flood control, with

More information

Introduction to Hydrology, Part 2. Notes, Handouts

Introduction to Hydrology, Part 2. Notes, Handouts Introduction to Hydrology, Part 2 Notes, Handouts Precipitation Much of hydrology deals with precipitation How much? How frequently/infrequently? What form? How quickly? Seasonal variation? Drought frequency?

More information

Hydrologic Modeling Overview

Hydrologic Modeling Overview Hydrologic Modeling Overview Chuck Downer, PhD, PE Hydrologic Systems Branch Coastal and Hydraulics Laboratory Engineer Research and Development Center Vicksburg, Mississippi Hydrologic processes Hydrologic

More information

HEC-HMS Modeling Summary: Cherry Creek Basin Tributary to Cherry Creek Dam

HEC-HMS Modeling Summary: Cherry Creek Basin Tributary to Cherry Creek Dam HEC-HMS Modeling Summary: Cherry Creek Basin Tributary to Cherry Creek Dam October 2008 Prepared by: U.S. Army Corps of Engineers, Omaha District Hydrology Section - Hydrologic Engineering Branch 66 Capitol

More information

Generalization of parameters in the storage discharge relation for a low flow based on the hydrological analysis of sensitivity

Generalization of parameters in the storage discharge relation for a low flow based on the hydrological analysis of sensitivity Proc. IAHS, 371, 69 73, 2015 doi:10.5194/piahs-371-69-2015 Author(s) 2015. CC Attribution 3.0 License. Generalization of parameters in the storage discharge relation for a low flow based on the hydrological

More information

RUNOFF CALCULATIONS RATIONAL METHOD. To estimate the magnitude of a flood peak the following alternative methods are available:

RUNOFF CALCULATIONS RATIONAL METHOD. To estimate the magnitude of a flood peak the following alternative methods are available: RUNOFF CALCULATIONS To estimate the magnitude of a flood peak the following alternative methods are available: 1. Unit-hydrograph technique 2. Empirical method 3. Semi-Empirical method (such rational method).

More information

Comparison of Rational Formula Alternatives for Streamflow Generation for Small Ungauged Catchments

Comparison of Rational Formula Alternatives for Streamflow Generation for Small Ungauged Catchments ENGINEER - Vol. XXXXIV, No. 04, pp, [29-36], 2011 The Institution of Engineers, Sri Lanka Comparison of Rational Formula Alternatives for Streamflow Generation for Small Ungauged s W.M.D.Wijesinghe and

More information

Control and mitigation of floods along transbasin diversion channel of Mekong tributaries and Nan river, Thailand

Control and mitigation of floods along transbasin diversion channel of Mekong tributaries and Nan river, Thailand Control and mitigation of floods along transbasin diversion channel of Mekong tributaries and Nan river, Thailand Tawatchai Tingsanchali* School of Civil Engineering, Asian Institute of Technology, P.O.Box

More information

GreenPlan Modeling Tool User Guidance

GreenPlan Modeling Tool User Guidance GreenPlan Modeling Tool User Guidance Prepared by SAN FRANCISCO ESTUARY INSTITUTE 4911 Central Avenue, Richmond, CA 94804 Phone: 510-746-7334 (SFEI) Fax: 510-746-7300 www.sfei.org Table of Contents 1.

More information

A&M WATERSHED MODEL USERS MANUAL WATER RESOURCES ENGINEERING

A&M WATERSHED MODEL USERS MANUAL WATER RESOURCES ENGINEERING TWRI Special Report 90-1 A&M WATERSHED MODEL USERS MANUAL by: Wesley P. James Phillip W. Winsor, John F. Bell Melvin G. Spinks, Alfred J. Garcia Dan Pridal, John Warinner Kelly Kaatz, Veronica Morgan Mike

More information

APPENDIX E APPENDIX E ESTIMATING RUNOFF FOR SMALL WATERSHEDS

APPENDIX E APPENDIX E ESTIMATING RUNOFF FOR SMALL WATERSHEDS APPENDIX E ESTIMATING RUNOFF FOR SMALL WATERSHEDS March 18, 2003 This page left blank intentionally. March 18, 2003 TABLES Table E.1 Table E.2 Return Frequencies for Roadway Drainage Design Rational Method

More information

APPENDIX E ESTIMATING RUNOFF FROM SMALL WATERSHEDS

APPENDIX E ESTIMATING RUNOFF FROM SMALL WATERSHEDS ESTIMATING RUNOFF FROM SMALL WATERSHEDS June 2011 THIS PAGE LEFT BLANK INTENTIONALLY. June 2011 TABLES Table E.1 Table E.2 Return Frequencies for Roadway Drainage Design Rational Method Values June 2011

More information

Calibration of Hydrologic Design Inputs for a Small Urban Watershed

Calibration of Hydrologic Design Inputs for a Small Urban Watershed Research Project Proposal for Johnson County Stormwater Management Program and City of Overland Park, Kansas Calibration of Hydrologic Design Inputs for a Small Urban Watershed Bruce M. McEnroe & C. Bryan

More information

WMS Tools For Computing Hydrologic Modeling Parameters

WMS Tools For Computing Hydrologic Modeling Parameters WMS Tools For Computing Hydrologic Modeling Parameters Lesson 9 9-1 Objectives Use the drainage coverage as a basis for geometric parameters as well as overlaying coverages to compute important hydrologic

More information

Modeling catchment scale infiltration

Modeling catchment scale infiltration Modeling catchment scale infiltration Serena Ceola, DICAM, University of Bologna Advanced Hydrology & Water Resources Management INTRODUCTION OBJECTIVE: Understanding the processes and the methods for

More information

River Flood Forecasting Using Complementary Muskingum Rating Equations

River Flood Forecasting Using Complementary Muskingum Rating Equations River Flood Forecasting Using Complementary Muskingum Rating Equations Parthasarathi Choudhury 1 and A. Sankarasubramanian 2 Abstract: A model for real-time flood forecasting in river systems with large

More information

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN 40 C.F.R. PART PLANT YATES ASH POND 3 (AP-3) GEORGIA POWER COMPANY

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN 40 C.F.R. PART PLANT YATES ASH POND 3 (AP-3) GEORGIA POWER COMPANY INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN 40 C.F.R. PART 257.82 PLANT YATES ASH POND 3 (AP-3) GEORGIA POWER COMPANY EPA s Disposal of Coal Combustion Residuals from Electric Utilities Final Rule (40 C.F.R.

More information

IMPROVED MODELING OF THE GREAT PEE DEE RIVER: DOCUMENTATION IN SUPPORT OF FEMA APPEAL. Horry County, South Carolina

IMPROVED MODELING OF THE GREAT PEE DEE RIVER: DOCUMENTATION IN SUPPORT OF FEMA APPEAL. Horry County, South Carolina IMPROVED MODELING OF THE GREAT PEE DEE RIVER: DOCUMENTATION IN SUPPORT OF FEMA APPEAL Horry County, South Carolina July 15, 2016 CONTENTS 1 Introduction... 2 2 Hydrology... 3 3 HEC-RAS Model... 7 3.1 Cross

More information

FAST WATER / SLOW WATER AN EVALUATION OF ESTIMATING TIME FOR STORMWATER RUNOFF

FAST WATER / SLOW WATER AN EVALUATION OF ESTIMATING TIME FOR STORMWATER RUNOFF FAST WATER / SLOW WATER AN EVALUATION OF ESTIMATING TIME FOR STORMWATER RUNOFF Factors Affecting Stormwater Runoff: Rainfall intensity % Impervious surfaces Watershed size Slope Soil type, soil compaction

More information

CHELTENHAM TOWNSHIP Chapter 290: WATERSHED STORMWATER MANAGEMENT Article IV: Stormwater Management

CHELTENHAM TOWNSHIP Chapter 290: WATERSHED STORMWATER MANAGEMENT Article IV: Stormwater Management CHELTENHAM TOWNSHIP Chapter 290: WATERSHED STORMWATER MANAGEMENT Article IV: Stormwater Management Online ECode Available on Cheltenham Township Website at: http://ecode360.com/14477578 For all regulated

More information

Effect of Land Surface on Runoff Generation

Effect of Land Surface on Runoff Generation Effect of Land Surface on Runoff Generation Context: Hydrologic Cycle Runoff vs Infiltration Infiltration: Process by which water on the ground surface enters the soil Runoff: Water (from rain, snowmelt,

More information

1 Introduction 1.1 HYDROLOGIC MODELS

1 Introduction 1.1 HYDROLOGIC MODELS 1 Introduction Adequate scientific evidence (e.g., IPCC, 2007) exists now to show that the global climate is changing. The three prominent signals of climate change, namely, increase in global average

More information

Appendix F. Flow Duration Basin Design Guidance

Appendix F. Flow Duration Basin Design Guidance Appendix F Flow Duration Basin Design Guidance Appendix F FINAL REPORT F:\SC46\SC46.31\HMP Mar 05\Appendices\Appendix F FLY_HMP.doc MARCH 2005 Appendix F Flow Duration Basin Design Guidance Prepared by

More information

Alberta Rainfall Runoff Response

Alberta Rainfall Runoff Response Alberta Rainfall Runoff Response Introduction The runoff response to a rainfall event is a function of many complex hydrologic processes. Some of the major factors in the rainfall-runoff process are basin

More information

Insights from editing the ARR Urban Book. Peter J Coombes

Insights from editing the ARR Urban Book. Peter J Coombes Insights from editing the ARR Urban Book Peter J Coombes Motivation for revision of ARR Many practices and data in ARR 1987 are outdated More rainfall and streamflow data Improved understanding of climate

More information

Impacts of Rainfall Event Pattern and Land-Use Change on River Basin Hydrological Response: a Case in Malaysia

Impacts of Rainfall Event Pattern and Land-Use Change on River Basin Hydrological Response: a Case in Malaysia International Proceedings of Chemical, Biological and Environmental Engineering, Vol. 93 (2016) DOI: 10.7763/IPCBEE. 2016. V93. 23 Impacts of Rainfall Event Pattern and Land-Use Change on River Basin Hydrological

More information

Models Overview: Purposes and Limitations

Models Overview: Purposes and Limitations Models Overview: Purposes and Limitations Pollutant load originates from: Point-source discharges (NPDES facilities) Info is available on the discharges (DMRs, etc.) Some are steady-flow, others are precip-driven

More information

SCS-CN HYDROLOGIC MODELING OF THE GREAT DISMAL SWAMP WITH HEC-HMS

SCS-CN HYDROLOGIC MODELING OF THE GREAT DISMAL SWAMP WITH HEC-HMS SCS-CN HYDROLOGIC MODELING OF THE GREAT DISMAL SWAMP WITH HEC-HMS Committee: by Timothy R. Larson A Thesis Submitted to the Graduate Faculty of George Mason University in Partial Fulfillment of The Requirements

More information

Distribution Restriction Statement Approved for public release; distribution is unlimited.

Distribution Restriction Statement Approved for public release; distribution is unlimited. CECW-EH Engineer Manual 1110-2-1417 Department of the Army U.S. Army Corps of Engineers Washington, DC 20314-1000 Engineering and Design FLOOD-RUNOFF ANALYSIS Distribution Restriction Statement Approved

More information

Unit 2: Geomorphologic and Hydrologic Characteristics of Watersheds. ENVS 435: Watershed Management INSTR.: Dr. R.M. Bajracharya

Unit 2: Geomorphologic and Hydrologic Characteristics of Watersheds. ENVS 435: Watershed Management INSTR.: Dr. R.M. Bajracharya Unit 2: Geomorphologic and Hydrologic Characteristics of Watersheds ENVS 435: Watershed Management INSTR.: Dr. R.M. Bajracharya Watersheds are hydro-geologic units Water flow and cycling are basic and

More information

Project Summary: - Hydrologic Models. - LiDAR Based - 10 Synthetic Events - No Historic Events - 100yr Runoff is Largest - Assumes Even Rainfall

Project Summary: - Hydrologic Models. - LiDAR Based - 10 Synthetic Events - No Historic Events - 100yr Runoff is Largest - Assumes Even Rainfall Project Summary: - Hydrologic Models Phase 2 Underway Nearly Completed (Park/Pembina EOY) - LiDAR Based - 10 Synthetic Events - No Historic Events - 100yr Runoff is Largest - Assumes Even Rainfall Phase

More information

CIVE 641 Advanced Surface Water Hydrology. Term Project Report. Continuous Simulation of DPHM-RS for Blue River Basin

CIVE 641 Advanced Surface Water Hydrology. Term Project Report. Continuous Simulation of DPHM-RS for Blue River Basin CIVE 641 Advanced Surface Water Hydrology Term Project Report Continuous Simulation of DPHM-RS for Blue River Basin Submitted to T.Y. Gan, PhD, FASCE Professor, Dept. of Civil and Environmental Engineering

More information

Radar-based flood forecasting: Quantifying hydrologic prediction uncertainty

Radar-based flood forecasting: Quantifying hydrologic prediction uncertainty Severe Storms Prediction and Global Climate Impact on the Gulf Coast, Rice University, October 29 31, 2008 Radar-based flood forecasting: Quantifying hydrologic prediction uncertainty Baxter E. Vieux,

More information

Adjusting NRCS Curve Number for Rainfall Durations Less Than 24 Hours

Adjusting NRCS Curve Number for Rainfall Durations Less Than 24 Hours Journal of South Carolina Water Resources Volume 3, Issue 1, Pages 43-47, 2016 Adjusting NRCS Curve Number for Rainfall Durations Less Than 24 Hours Michael E. Meadows AUTHOR: Associate Professor, Department

More information

Watershed Management And Modeling. Gridded Surface Subsurface Hydrologic

Watershed Management And Modeling. Gridded Surface Subsurface Hydrologic Gridded Surface Subsurface Hydrologic Analysis What is GSSHA? GSSHA is a complete watershed simulation and management model used for hydrologic, hydraulic, sediment and quality simulation and management.

More information

Prairie Hydrological Model Study Progress Report, April 2008

Prairie Hydrological Model Study Progress Report, April 2008 Prairie Hydrological Model Study Progress Report, April 2008 Centre for Hydrology Report No. 3. J. Pomeroy, C. Westbrook, X. Fang, A. Minke, X. Guo, Centre for Hydrology University of Saskatchewan 117

More information

SPATIAL-TEMPORAL ADJUSTMENTS OF TIME OF CONCENTRATION

SPATIAL-TEMPORAL ADJUSTMENTS OF TIME OF CONCENTRATION JOURNAL O LOOD ENGINEERING J E 1(1) January June 2009; pp. 21 28 SPATIAL-TEMPORAL ADJUSTMENTS OF TIME OF CONCENTRATION Kristin L. Gilroy & Richard H. McCuen Dept. of Civil and Environmental Engineering,

More information

A GSSHA Model of the Perris Basin of the San Jacinto River Watershed, Riverside County, California

A GSSHA Model of the Perris Basin of the San Jacinto River Watershed, Riverside County, California A GSSHA Model of the Perris Basin of the San Jacinto River Watershed, Riverside County, California by Moira T. Fong, Charles W. Downer, and Aaron R. Byrd INTRODUCTION: This Coastal and Hydraulics Engineering

More information

I(n)Kn. A Qp = (PRF) --- (8) tp Where A is the watershed area in square miles and PRF is the unit hydrograph peak rate factor.

I(n)Kn. A Qp = (PRF) --- (8) tp Where A is the watershed area in square miles and PRF is the unit hydrograph peak rate factor. AN ALTERNATE APPROACH FOR ESTIMATING SCS UNIT HYDROGRAPH PEAK RATE FACTORS (PRFS) IN SOUTHWEST FLORIDA Himat Solanki Southwest Florida Water Management District 115 Corporation Way, Venice, Florida 34292

More information