1 Comparison on the Treatment Performance of Full-scale Sewage Treatment Plants using Conventional and Modified Activated Sludge Processes FATIHAH SUJA 1, RAKMI ABDUL RAHMAN 2 AND OTHMAN JAAFAR 3 1,3 Department of Civil and Structural Engineering, 2 Department of Chemical and Process Engineering, and 1 Research Centre for Sustainable Technology (CESPRO) Universiti Kebangsaan Malaysia Bangi Selangor MALAYSIA fati@eng.ukm.my Abstract: - The objective of the study is to identify and carry out studies on the selected five (5) existing sewage treatment plants (STPs) in terms of their treatment performance. The five selected sewage treatment plants have different treatment processes, a) Sequencing Batch Reactor (SBR) b) Modified Oxidation Ditch (MOD) c) Advanced Oxidation Ditch (AOD) d) Advanced Conventional Activated Sludge System (ACAS) and e) Extended Aeration (EA) types. Assessment on the removal efficiency and sludge quality of the major pollutant parameters namely BOD, COD, TSS, O&G NH 3 -N, PO 4 of the effluent and heavy metals content of sludge were carried out based on the sampling done by an accredited laboratory. The health of the aeration tanks was also investigated. On average COD recorded highest removal for all STPs at 91% followed by TSS (88%), O&G (86%), BOD (84%) and PO 4 (71%). The removal of NH 3 -N was low, at only 72%; with a big range of removal rate between the highest of 97% for SBR type and only 17% removal for the EA type. Comparison with other sludge approved for use in agriculture as well as compost standards showed that the heavy metals contents of raw sludges comply with those approved for sewage sludges for agriculture, as can be found in the USA, Australia and Spain. Comparison with levels limited by the UK Composting Association Quality (CAQ) and European EC Compost Ecolabel (ECCE) shows that the raw sludge levels exceed most of the ECCE s levels. Key-Words: activated sludge system, sequencing batch reactor, oxidation ditch, extended aeration 1 Introduction The sewage treatment plants in Malaysia generally employ the activated sludge treatment process. The basic principle behind all activated sludge processes is that as microorganisms grow, they form particles that clump together. These particles (floc) are allowed to settle to the bottom of the tank, leaving a relatively clear liquid free of organic material and suspended solids. By analysing the different characteristics of the activated sludge or the sludge quality, plant operators are able to monitor how effective the treatment plant s process is. Efficient operation is ensured by keeping accurate, up-to-date records; routinely evaluating operating and laboratory data; and troubleshooting, to solve problems before they become serious. A wide range of laboratory and visual and physical test methods are recommended. Principally, these include floc and settleability performance using a jar test, microscopic identification of the predominant types of bacteria, and analysis of various chemical parameters. The treatment environment directly affects microorganisms. Changes in food, dissolved oxygen, temperature, ph, total dissolved solids, sludge age, presence of toxins, and other factors create a dynamic environment for the treatment organisms. The operator can change the environment (the process) to encourage or discourage the growth of specific microorganisms. 2 Sewage Treatment Plant Facilities Five (5) existing sewage treatment plants (STPs) in Malaysia indicated by A, B, C, D and E were investigated. The designs of the five selected STP is based on average sewage flows of m 3 /d per PE, with organic loads of 55 g BOD and 68 g SS per PE per day. Treated effluent is required to comply to the Environmental Quality Act (EQA), 1974, which specifies two standards ISBN:

2 for effluent discharge: Standard A for discharge upstream of any raw water intake and Standard B for discharge downstream of any raw water intake [1]. 2.1 Sewage Treatment Plant To achieve specific effluent goals of meeting the discharge standards, most of the wastewater operators in Malaysia use the different adaptations and modifications of basic activated sludge design Sequencing Batch Reactor Sewage Treatment Plant A is based on the Sequencing Batch Reactor (SBR) treatment process with a current inflow of 71,200 PE. The existing treatment plant consists of two lift stations, grit and grease chambers, two equalisation tanks, six numbers of SBR tanks over two aeration tanks and sludge treatment facilities which include sludge thickener, sludge dewatering and sludge cake storage. Secondary treatment is carried out in the SBR which is operated with prescribed programmable cycles of fill, react, settle, draw and idle according to flow conditions and effluent requirements. Air is supplied by roots blower located in the blower house and channeled to the submersible aerators installed at the bottom of the aeration tanks. The treated effluent is discharged during lowering of the decanter. The treated effluent is passed through the measuring tank which can be used as a disinfection tank when necessary. The treated effluent is discharged to the adjacent stream. Waste sludge pumps, located in sludge pump houses, remove the excess sludge for storage in the waste sludge holding tank. The thickened sludge is then transferred by pump to the sludge dewatering unit. Sludge dewatering is carried out by screw press. Polymer is added as conditioner during thickening and dewatering. The dewatered sludge is conveyed to the hoppers for offsite disposal Modified Oxidation Ditch Sewage Treatment Plant B is a mechanical plant using the Modified Oxidation Ditch (MOD) system with a current sewage flow of 58,125 PE. Treatment process includes primary and secondary screening using automatically raked mechanical screens. The screen openings for primary screens shall be less than 25mm and less than 12 mm for secondary screens. The sewage then flows to the grit and grease removal chamber for removal of grit, oil and grease. The preliminary treated sewage is then passed through the flow measurement channel before to the three concentric Orbal tanks. Aeration in the Orbal tank is via aeration discs with triangular nodules on the surface of the discs to provide mixing and aeration. The mixed liquor in the final channel is transferred to the clarifier for settling and separation of sludge. Part of the sludge is pumped back to the aeration tank as returned activated sludge and the remaining sludge is wasted to the sludge holding tank. The final effluent is discharged to the nearby river. The waste sludge produced at the plant is currently transported to other STP for treatment. 2.3 Advanced Oxidation Ditch Sewage Treatment C involved the use of Advanced Oxidation Ditch (AOD) treatment process and the current flows is only about 70,000 PE. The treatment process used in the oxidation ditches is based on the advanced oxidation ditch process. The term is used to describe the new generation of deeper (up to 5 m) extended aeration ditches using fine diffusers together with propeller mixers and designed to achieve nitrogen removal. The deeper ditches also allow for better oxygen transfer thus providing better energy efficiency. Flows to the existing sewage treatment plant is discharged to the grit and grease chamber which include an automatically raked mechanical fine screen with opening of 12mm spacing. The preliminary treated sewage is then transferred to the oxidation ditches for secondary treatment. Aeration is provided via propeller mixers and fine diffusers. The mixers are continuously operated while the blowers are designed to operate intermittently to enable anoxic condition within the reactors for nitrification and denitrification. The reactors are designed for a hydraulic retention time of 24 hours and the mixed liquor overflows at the outlet end to the ISBN:

3 clarifiers for settling and separation of sludge. Part of the sludge is pumped back to the aeration tank as returned activated sludge and the remaining sludge is wasted to the sludge holding tank. The sludge at the holding tank is then pumped to the mechanical thickener for thickening prior to mechanical dewatering. Sludge dewatering is carried out by screw press. Polymer is added as conditioner during thickening and dewatering. The dewatered sludge is conveyed to the hoppers for off site disposal Advanced Conventional Activated Sludge Sewage Treatment Plant D uses Advanced Conventional Activated Sludge (ACAS) treatment system and the current sewage flow to the overall STP is about 161,341 PE. The term ACAS is used to imply a conventional activated sludge process with the provision of anoxic zones to encourage denitrification. The reaction tank is designed for denitrification to occur through the adoption of a four compartment tank comprising anoxic, aerobic, anoxic and aerobic zones. The design incorporated a recycle from the second to the first anoxic zone to aid denitrification. The main advantages of the process include high quality effluent, reduced reactor volume and high solids concentration of sludge from primary clarifier which allows easier dewatering of sludge. Main disadvantages include larger quantities of sludge generated and the use of primary clarifiers may give rise to odour. Primary sludge collected at the primary clarifier is pumped to the gravity sludge thickener for further treatment. The primary clarified sewage overflows to the aeration tank for secondary treatment. Air is supplied by roots blower located in the blower house and channelled to the submersible aerators installed at the bottom of the aeration tanks. Submersible propeller mixers are provided at the anoxic zones to prevent settlement of suspended solids. The blowers and propeller mixers are designed for continuous operation. The reactors are designed for a hydraulic retention time of 8 hours and the mixed liquor overflow at the outlet end to the rectangular secondary clarifiers for settling and separation of sludge. Part of the sludge is pumped back to the aeration tank as returned activated sludge and the remaining sludge is wasted to the sludge holding tank. 2.5 Extended Aeration Sewage Treatment Plant E is a mechanical plant using the Extended Aeration (EA) activated sludge system. The current flow to the STP is more than 30,000 PE. The existing treatment plant consists of an internal sewage pump sump, secondary screen chamber, aerated grit and grease chamber, distribution chambers, anoxic tank, aeration tank, two circular clarifiers and sludge treatment facilities which include sludge holding tank, sludge dewatering, standby sand drying beds and dried sludge cake storage. The treatment process is a modified version of the conventional activated sludge process. The secondary biological treatment operates at extended aeration and long sludge age to produce relatively stabilised sludge. The advantage of having longer hydraulic retention times for the process allows the STP to operate effectively over widely varying flows and waste loadings. Other advantages include reduced odorous gases emission due to direct feed to aeration tank and easier to operate and maintain. Main disadvantages include large footprint and generated sludge are difficult to dewater. 3 Data Collection and Analysis Data collected for the study cover the broad scope on the current status of the five existing sewage treatment plants on aspects such as plant layout, flows, influent and effluent characteristics, sludge production, energy consumption, process designs, capital and operating expenditures. Sampling and laboratory analysis programme were carried out by an Accredited Laboratory to provide essential data on the plant operations, for the period March 2013 to 10 May Some data were also obtaine. The review in this paper has analysed both the data collected from the plant operators and the results from the Accredited Laboratory. 4 Performance Comparison 4.1 Effluent Quality ISBN:

4 Effluent quality at EA type STP shows the followings: Low nitrification, NH 3 -N reduced from about 20 mg/l in raw sewage to about 18 mg/l after clarifier; Data from the plant operator also shows similar results, with NH 3 N ranging from 7 to 30 mg/l despite the long aeration period; Very low MLSS with s range from 364 mg/l to 572 mg/l; High SVI ranging from 111 to 370 ml/g, with most s above 200 ml/g. The combination of low MLSS and high SVI, indicating possible sludge bulking, results in washout. As nitrifiers are slow growing, under such conditions there will not be enough of them to effectively lower NH 3 -N levels in the effluent. The low MLSS content is expected since the STP only receives approximately 45,000 PE inflows, much lower when compared with the original design of 100,000 PE. Very low level of BOD in the inflow is one of the main factors MLSS is not achieved since the concentration of MLSS is difficult to increase without adequate food. In addition, maintenance of sewer pipes by the developer is still in progress which may have contributed to the mixing of sewage with sludge which in turn affects the whole plant process. It was informed that there was no significant increase in MLSS eventhough some plant breeding activities have been carried out. At ACAS type STP, observations made include: Reasonable removal of NH 3 -N, being reduced from about 32 mg/l in raw sewage down to about 9 mg/l after clarifier, although there are spikes of up to about 22 mg/l. Data from the plant operator also show similar results with effluent NH 3 N ranging from 1 to 25 mg/l and concentrations of <10 mg/l were obtained in later times of the sampling periods. A one whole month sampling (March 2013) by the plant operator reported higher s of MLSS in the aerobic tank ranging from 2108 to 4333 mg/l, and an average of 3574 mg/l. High SVI ranging from about 200 to 550 ml/g and these high s could be attributable to high MLSS of fluffy sludge. Overall, the process looks stable, with good MLSS levels and reasonable SVI s. For SBR type STP, data from sample analysis show reasonable removal of NH 3 -N, being reduced from about mg/l in raw sewage down to about 7-10 mg/l after clarifier with data from the plant operator showed much lower levels of NH 3 -N in the final effluent, at s of 1 5 mg/l. High MLSS was obtained at all stages: at about 2, mg/l at 1 st 30 minutes aeration stage, about mg/l at 1 st 30 minutes nonaeration stage, about mg/l at 2 nd 30 minutes aeration stage, and about mg/l at 2 nd 30 minutes non-aeration stage. Moderate SVI ranges from about ml/g, showing good settling sludge. Data from sample analysis at MOD type STP showed the followings: Reasonable removal of NH 3 -N, being reduced from mg/l in the influent to about mg/l at the effluent, however data from the plant operator showed much higher levels, at about mg/l; MLSS data for the inner and outer orbitals obtained by the plant operator from 6 th April 2013 till 27 th June 2013 show constant readings at 3000 mg/l since the meter can only read up to a maximum of 3000 mg/l; Very high SVI ranging from 345 to >900 ml/g, showing bulking sludge. The extremely high levels of ammonia discharged by some industries into the STP influent resulted in high NH 3 -N levels shown in the plant operator s data. At MOD type STP, the followings were observed: Reasonable removal of NH 3 -N, being reduced from about 31 mg/l in the influent to about 1.0 mg/l at the effluent, data obtained by the plant operator in 2012 are also comparable; High MLSS at all stages: at about mg/l at 1 st stage with aeration, about mg/l at 1 st stage without aeration, about mg/l at 2 nd stage with aeration, and about mg/l at 2 nd stage without aeration; and reasonable SVI ranging from 128 to 358 ml/g. Table 1.1 shows the average concentration of the various parameters in the influent and effluent of the STPs. The reduction of the various parameters after being treated at the respective STPs were determined and shown in Table 1.2 and illustrated in Figure 1.1. It is apparent that the percentage reductions of the various parameters were different between the STPs. On average COD recorded highest removal for all STPs at 91% followed by TSS (88%), O&G (86%), BOD (84%) and PO 4 (71%). The removal of NH 3 -N was low, at only 72%; with a big range of removal rate ISBN:

5 between the highest of 97% at AOD type STP and only 17% removal at EA. Table 1.1: Average concentration of various parameters in the influent and effluent of the STPs Parameters Unit SBR MOD AOD ACAS EA Inf. Eff. Inf. Eff. Inf. Eff. Inf. Eff. Inf. Eff. Biochemical mg/l Oxygen 20 0 C, 5 days Chemical Oxygen mg/l Demand Total Suspended mg/l Solids Oil & Grease mg/l Ammoniacal Nitrogen (NH 3 N) mg/l Total Phosphorus mg/l Table 1.2: Removal efficiency of various water quality parameters by respective STPs STPs BOD COD TSS O&G NH 3 -N PO 4 SBR 83% 91% 70% 83% 69% 82% MOD 68% 86% 93% 98% 92% 35% AOD 88% 95% 95% 90% 97% 78% ACAS 97% 93% 96% 81% 86% 87% EA 85% 88% 87% 71% 17% 74% Average 84% 91% 88% 86% 72% 71% ISBN:

6 120% 100% Removal Efficiency 80% 60% 40% 20% BTR SBR Sg MOD Besi Damansara AOD Puchong ACAS Cyberjaya EA Average Average 0% BOD COD TSS O&G NH3-N PO4 WQ Parameter Figure 1.1: Removal efficiency of various water quality (WQ) parameters by respective STPs 4.2 Sludge Characteristics Of foremost concern on the sludge quality is its heavy metal content. Table 1.3 shows record of heavy metal contents of sludge from the various STP types. In order to gauge suitability of Malaysian STP sludges for agricultural application, the concentrations of heavy metals from the tables above are compared to the limits being adopted by; a) Limits in sewage sludge for agricultural application (available for Spain) [2]; b) Limits in UK Composting Association Quality (CAQ)Label [3]; and c) Limits in European Compost Ecolable (ECCE) ( ocuments/soil_improvers.pdf) The highest heavy metal concentration from the sampling of sludge carried out by the Accredited Laboratory is shown in Table 1.3. Comparison with other sludge approved for use in agriculture as well as compost standards showed that: a) The heavy metals contents of raw sludges comply with those approved for sewage sludges for agriculture, as can be found in Spain. b) Comparison with levels limited by the UK Composting Association Quality (CAQ) Label shows that the raw sewage levels exceed most of the CAQ s levels. c) Comparison with levels limited by the European EC Compost Ecolabel (ECCE) shows that the raw sludge levels exceed most of the ECCE s levels. The (b) and (c) exceedences above do not at all mean that the sewage sludges cannot be turned into compost. Sewage sludges can always be treated in anaerobic digesters and the digester sludges characteristics would be rather different from those of raw sludges. In the worst situation, feed mixing for composting, with wastes low in metals, such as sludges from agricultural or food industry treatment plants can be employed to adjust final compost heavy metals contents. ISBN:

7 Table 1.3: Heavy metal concentration of dried sludge from STPs record and sampled by the Accredited Laboratory mg/kg DM STP Types Cd Cr total Cr VI Cu Hg Ni Pb Zn As Data from STP operators ACAS Na na AOD Na na Data from the Accredited Laboratory ACAS < < SBR < MOD AOD < < EA No sludge 4.3 Aeration Basin Environment Table 1.4 summarizes the findings on plant operation. In the aeration basin environment, the F/M ratio is of utmost important control parameter. Four out of the five plants, ACAS, SBR, MOD and AOD fulfill the desired ratios for effective treatment for the designed type of activated sludge process. ACAS STP plant operates at low F/M levels (0.075) or low BOD. The effluent quality can be very good but the plant can actually cater for more sewage. Whilst EA STP is overloaded in high of F/M 0.22, as the desired F/M ranges from 0.05 to 0.15 for such type of extended aeration systems. Almost all STPs have sufficient aeration to maintain a dissolved oxygen of > 1.0 mg/l in the aerobic tanks. EA type STP, ACAS type STP, MOD type STP and AOD type STP successfully maintain DO concentrations above the minimum 1.0 mg/l DO. Even though the DO levels in SBR type fall slightly below 1 mg/l ( mg/l DO), the SBR system yet operates well because it is still operating within an acceptable and comparatively low F/M range. Fine bubble aeration known for a high oxygen transfer efficiency has provided excessive aeration ( mg/l DO) in the aeration tank at EA type STP for such a low MLSS range. In the aerobic tanks at ACAS type STP, SBR type STP, MOD type STP and AOD type STP, the MLSS concentrations are within the desired range for efficient operating parameters. EA type STP is operating with very low MLSS concentrations at an average of 459 mg/l. Therefore, the aerobic process in the STP is not operating efficiently and is wasting energy. The low MLSS levels at EA type STP is caused by low BOD influent. Control of Solids Retention Time (SRT) in the activated sludge process is critical for ensuring effective wastewater treatment. The SRT of all the treatment plants except for MOD type STP meet the minimum retention time required to achieve a satisfactory stabilisation of the solids. A conventional activated sludge system generally works with a hydraulic retention time in a range of 5 to14 hours and extended aeration types 20 to 40 hours. The retention time is especially important for nitrification activities and population dynamics of an activated sludge system. All of the treatment plants are operated within proper efficient HRTs. The study also reveals that only SBR type STP generates sludge with very good settling properties ( ml/g). At ACAS type ISBN:

8 STP, the SVI of the sludge becomes high (SVI ml/g) due the low F/M. High SVI in low F/M ratio is possibly caused by the present of filamentous microorganism. The relatively high DO (mixing) in the extended aeration tank at EA type STP creates turbulence condition which causes break-up of flocs and give rise to turbid effluent (SVI ml/g). High HRT condition (46.57 hours) result in pin-point floc which also contributes to high SVI s. Astoundingly high SVI of 345 to 962 ml/g were observed at MOD type STP. The system which operates under a high F/M and low SRT will typically Table 1.4: Summary of Findings on Plant Operation Specific Process at STP Aeration Basin Environment F/M DO [mg/l] ACAS EA SBR MOD AOD > > > Value > Value > MLSS [mg/l] SRT [day] HRT [hour] (3574) (459) (2888) (2440) Clarifier Conditions SVI [ml/g] Sludge Generation Dewatered sludge [tonne/day] Production rate [kg/m 3 treated influent] 20 No generation ISBN:

9 settle and compact more slowly and leave large straggler type floc and a slightly cloudy supernatant. At this elevated SVI, the sludge settles very slowly and compacts poorly in the settleability test. The SVI s at AOD type STP may sometimes increase substantially to 358 ml/g. It appears that low F/M and low aeration basin dissolved oxygen (DO) concentration for the applied organic loading (F/M) leads to filamentous bulking in the clarifier. It can be seen the extended aeration plants at SBR type STP and AOD type STP produces less sludge than a conventional activated sludge. The secondary sludge at EA type STP is basically inert so no sludge generation. The low MLSS content in the aeration tank causes less sludge generation. The amount of sludge generated depends highly on the SRT of the system. The comparatively high sludge production at ACAS type STP (0.932 kg/m 3 ) is due to the low F/M of the system. 4 Conclusion The activated sludge wastewater treatment process is capable of producing an excellent effluent quality when properly designed, constructed and operated. The five selected treatment plants for sewage treatment include conventional activated sludge system and its modifications. The various pollutant parameters of sewage can be effectively removed via the biological systems provided that the operating conditions are optimized and monitored. There are three areas of major concern for the operator of an activated sludge plant. Acknowledgements The authors wishes to extend sincere thanks to the many individuals and organisations for their kind support in the study, in particular, the staff of Jabatan Perkhidmatan Pembetungan and Indah Water Konsortium Sdn. Bhd. We wishes to acknowledge their invaluable assistance and highly appreciated cooperation provided to complete the study. References [1] Environmental Quality Act Laws of Malaysia, Regulations, Rules and Orders. Environmental Quality (Industrial Effluent) Regulations, 2009, pp [2] Mosquera-Losada M.R., Muñoz-Ferreiro N, Rigueiro-Rodríguez A. Agronomic characterisation of different types of sewage sludge: policy implications. Waste Management Vol.30, 2010, pp [3] EU (European Union) DOCE nº L /07/1986.Council Directive 86/278/EEC of 12 June 1986 on the protection of the environment and, in particular of the soil, when sewage sludge is used in agriculture. (a) The characteristics of the influent that is going to the aeration basin. (b) The environment in the aeration basin that must be maintained to ensure good treatment. (c) The operating conditions within the secondary clarifier, which affect how well solids separation will occur. All three of these areas are closely related and influence each other. ISBN:

American Water College 2010

American Water College 2010 Vocabulary Activated Sludge (Part 1) Activated Sludge Sludge particles produced in raw or settled wastewater (primary effluent) by the growth of organisms (including zoogleal bacteria) in aeration tanks

More information

TWO YEARS OF BIOLOGICAL PHOSPHORUS REMOVAL WITH AN ADVANCED MSBR SYSTEM AT THE SHENZHEN YANTIAN WASTEWATER TREATMENT PLANT

TWO YEARS OF BIOLOGICAL PHOSPHORUS REMOVAL WITH AN ADVANCED MSBR SYSTEM AT THE SHENZHEN YANTIAN WASTEWATER TREATMENT PLANT TWO YEARS OF BIOLOGICAL PHOSPHORUS REMOVAL WITH AN ADVANCED MSBR SYSTEM AT THE SHENZHEN YANTIAN WASTEWATER TREATMENT PLANT Chester Yang, Ph.D., Gaowei Gu, Baowei Li, Hongyuan Li, Wanshen Lu, Lloyd Johnson,

More information

BIOLOGICAL WASTEWATER BASICS

BIOLOGICAL WASTEWATER BASICS BIOLOGICAL WASTEWATER BASICS PRESENTATION GOALS EXPLAIN DIFFERENT TYPES OF WASTEWATER EXPLAIN THE DIFFERENT BIOLOGICAL SYSTEMS AND HOW THEY FUNCTION. COMPARE AND CONTRAST AEROBIC AND ANAEROBIC SYSTEMS

More information

Contents General Information Abbreviations and Acronyms Chapter 1 Wastewater Treatment and the Development of Activated Sludge

Contents General Information Abbreviations and Acronyms Chapter 1 Wastewater Treatment and the Development of Activated Sludge Contents Contents General Information Abbreviations and Acronyms... 6 Chapter 1 Wastewater Treatment and the Development of Activated Sludge... 8 The Importance of Wastewater Treatment... 8 The Scope of

More information

AMPC Wastewater Management Fact Sheet Series Page 1

AMPC Wastewater Management Fact Sheet Series Page 1 Nitrogen removal Nitrogen present in meat processing wastewater are termed a nutrient, since they are essential elements for life. They largely derive from proteins dissolved into wastewater from meat

More information

AMPC Wastewater Management Fact Sheet Series Page 1

AMPC Wastewater Management Fact Sheet Series Page 1 Nitrogen removal Nitrogen present in meat processing wastewater are termed a nutrient, since they are essential elements for life. They largely derive from proteins dissolved into wastewater from meat

More information

ISAM INTEGRATED SURGE ANOXIC MIX

ISAM INTEGRATED SURGE ANOXIC MIX ISAM INTEGRATED SURGE ANOXIC MIX P r o v e n T e c h n o l o g y FLUIDYNE S ISAM IS A TOTAL TREATMENT SYSTEM incorporating BOD, TSS and nitrogen removal along with sludge reduction in an integrated system.

More information

Domestic Waste Water (Sewage): Collection, Treatment & Disposal

Domestic Waste Water (Sewage): Collection, Treatment & Disposal Domestic Waste Water (Sewage): Collection, Treatment & Disposal Sanitary sewers Storm water sewers Combined sewers Types of sewers: Types of collection system Building sewer/building connections:connected

More information

NITROGEN REMOVAL GRANT WEAVER, PE & WWTP OPERATOR PRESIDENT THE WATER PLANET COMPANY. Create Optimal Habitats

NITROGEN REMOVAL GRANT WEAVER, PE & WWTP OPERATOR PRESIDENT THE WATER PLANET COMPANY.   Create Optimal Habitats NITROGEN REMOVAL Create Optimal Habitats Recognize the Importance of People Skills Full-scale Experimentation GRANT WEAVER, PE & WWTP OPERATOR Regulatory Support Utility Support PRESIDENT THE WATER PLANET

More information

FEASIBILITY REPORT OF 250 KLD SEWAGE TREATMENT PLANT

FEASIBILITY REPORT OF 250 KLD SEWAGE TREATMENT PLANT FEASIBILITY REPORT OF 250 KLD SEWAGE TREATMENT PLANT FOR Proposed Residential Apartment project by M/s. DS-Max Properties Pvt Ltd, at Sy No. 27/2 & 27/3 at Valagerahalli Village, Kengeri Hobli, Bangalore

More information

Feasibility Report on Sewage Treatment Plant (STP)

Feasibility Report on Sewage Treatment Plant (STP) Feasibility Report on Sewage Treatment Plant (STP) FOR Proposed Commercial Building project Commercial Office Building by M/s. Bhagavath Sannidhi Estates Pvt Ltd.at Sy No 55/1 of Devarabeesanahalli Village,

More information

NEW BIOLOGICAL PHOSPHORUS REMOVAL CONCEPT SUCCESSFULLY APPLIED IN A T-DITCH PROCESS WASTEWATER TREATMENT PLANT

NEW BIOLOGICAL PHOSPHORUS REMOVAL CONCEPT SUCCESSFULLY APPLIED IN A T-DITCH PROCESS WASTEWATER TREATMENT PLANT NEW BIOLOGICAL PHOSPHORUS REMOVAL CONCEPT SUCCESSFULLY APPLIED IN A T-DITCH PROCESS WASTEWATER TREATMENT PLANT ABSTRACT C. Yang*, L. Zhou**, W. Luo***, and L. Johnson**** *Corstar International Corp. 111

More information

SBR PROCESS FOR WASTEWATER TREATMENT

SBR PROCESS FOR WASTEWATER TREATMENT SBR PROCESS FOR WASTEWATER TREATMENT IMR E&T S.r.l. Maria Vittoria Marra maria.vittoria.marra@imr.it www.imr.it Purification of wastewater A process aimed at removing organic and inorganic contaminants

More information

Duffin Creek Water Pollution Control Plant Technical Information

Duffin Creek Water Pollution Control Plant Technical Information Duffin Creek Water Pollution Control Plant Technical Information Plant History The Duffin Creek Water Pollution Control Plant (WPCP) is located on the northern shore of Lake Ontario in the City of Pickering

More information

SIMPLE and FLEXIBLE ENERGY SAVINGS And PERFORMANCE ENHANCEMENT for OXIDATION DITCH UPGRADES

SIMPLE and FLEXIBLE ENERGY SAVINGS And PERFORMANCE ENHANCEMENT for OXIDATION DITCH UPGRADES SIMPLE and FLEXIBLE ENERGY SAVINGS And PERFORMANCE ENHANCEMENT for OXIDATION DITCH UPGRADES Oxidation ditches are very popular wastewater treatment processes for small to medium sized municipalities that

More information

COMBI-TREAT IMPROVED SBR TECHNOLOGY. 2.1Process Diagram:

COMBI-TREAT IMPROVED SBR TECHNOLOGY. 2.1Process Diagram: COMBI-TREAT IMPROVED SBR TECHNOLOGY Conventional SBR is improved by introducing Combi-Treat Unit ahead of CLSBR (Constant Level SBR) Unit to generate power from Bio-gas and to reduce organic load in CLSBR

More information

ENHANCING THE PERFORMANCE OF OXIDATION DITCHES. Larry W. Moore, Ph.D., P.E., DEE Professor of Environmental Engineering The University of Memphis

ENHANCING THE PERFORMANCE OF OXIDATION DITCHES. Larry W. Moore, Ph.D., P.E., DEE Professor of Environmental Engineering The University of Memphis ENHANCING THE PERFORMANCE OF OXIDATION DITCHES Larry W. Moore, Ph.D., P.E., DEE Professor of Environmental Engineering The University of Memphis ABSTRACT Oxidation ditches are very popular wastewater treatment

More information

Sequence Batch Reactor A New Technology in Waste Water Treatment

Sequence Batch Reactor A New Technology in Waste Water Treatment Sequence Batch Reactor A New Technology in Waste Water Treatment Ashutosh Pipraiya 1, Diwan Singh 2, SK Patidar 3 1 M.Tech, Department of Civil Engineering, National Institute of Technology Kurukshetra

More information

CITY OF LONDON ENVIRONMENTAL & ENGINEERING SERVICES WASTEWATER TREATMENT OPERATIONS DIVISION

CITY OF LONDON ENVIRONMENTAL & ENGINEERING SERVICES WASTEWATER TREATMENT OPERATIONS DIVISION CITY OF LONDON ENVIRONMENTAL & ENGINEERING SERVICES WASTEWATER TREATMENT OPERATIONS DIVISION The City of London operates five Wastewater Treatment Plants namely: Adelaide, Greenway, Oxford, Pottersburg

More information

CORPORATION THE EXPERIENCED LEADER IN SEQUENCING BATCH REACTOR TECHNOLOGY

CORPORATION THE EXPERIENCED LEADER IN SEQUENCING BATCH REACTOR TECHNOLOGY ISAM SEQUENCING BATCH REACTOR PROCESS TRUST FLUIDYNE S EXPERIENCE The Fluidyne ISAM Sequencing Batch Reactor (SBR) system incorporates the latest and most innovative technology and over two decades of

More information

OPERATION AND MANAGEMENT OF WASTEWATER TREATMENT PLANTS

OPERATION AND MANAGEMENT OF WASTEWATER TREATMENT PLANTS OPERATION AND MANAGEMENT OF WASTEWATER TREATMENT PLANTS Authors: Andrea Giordano Luigi Petta ENEA, Ente per le Nuove Tecnologie, l Energia e l Ambiente Bologna, Italy Keywords: Maintenance, Wastewater,

More information

RYKI WASTEWATER TREATMENT PLANT FIRST NEREDA IN POLAND Authors: Joana Doutor, Janusz Sławiński and Bart de Bruin

RYKI WASTEWATER TREATMENT PLANT FIRST NEREDA IN POLAND Authors: Joana Doutor, Janusz Sławiński and Bart de Bruin RYKI WASTEWATER TREATMENT PLANT FIRST NEREDA IN POLAND Authors: Joana Doutor, Janusz Sławiński and Bart de Bruin Nereda and Poland In Poland, at the city of Ryki in the Lublin Province, there is a new

More information

EPA Waste Water Discharge Licence Application

EPA Waste Water Discharge Licence Application Duleek Waste Water Treatment Works EPA Waste Water Discharge Licence Application ARTICLE 16 COMPLIANCE REQUIREMENTS Meath County Council EPA Document Ref: D0133-01 Section A: Non-Technical Summary Update

More information

CORPORATION THE EXPERIENCED LEADER IN SEQUENCING BATCH REACTOR TECHNOLOGY

CORPORATION THE EXPERIENCED LEADER IN SEQUENCING BATCH REACTOR TECHNOLOGY ISAM SEQUENCING BATCH REACTOR PROCESS TRUST FLUIDYNE S EXPERIENCE The Fluidyne ISAM Sequencing Batch Reactor (SBR) system incorporates the latest and most innovative technology and over three decades of

More information

COMPARISON OF SBR AND CONTINUOUS FLOW ACTIVATED SLUDGE FOR NUTRIENT REMOVAL

COMPARISON OF SBR AND CONTINUOUS FLOW ACTIVATED SLUDGE FOR NUTRIENT REMOVAL COMPARISON OF SBR AND CONTINUOUS FLOW ACTIVATED SLUDGE FOR NUTRIENT REMOVAL Alvin C. Firmin CDM Jefferson Mill, 670 North Commercial Street Suite 201 Manchester, New Hampshire 03101 ABSTRACT Sequencing

More information

Module 17: The Activated Sludge Process - Part III Answer Key

Module 17: The Activated Sludge Process - Part III Answer Key Module 17: The Activated Sludge Process - Part III Answer Key What other differences can you see between Complete Mix and Step Aeration? One of the features that make Complete Mix Aeration different from

More information

WASTEWATER DEPARTMENT. Bentonville Wastewater Treatment Plant Facts:

WASTEWATER DEPARTMENT. Bentonville Wastewater Treatment Plant Facts: Mission: The mission of the Bentonville Wastewater Treatment Utility and staff is to protect public health and the environment through the effective treatment of wastewater. Effective wastewater treatment

More information

Waste water treatment

Waste water treatment Waste water treatment Responsible water management means the treatment and disposal of the generated waste water, for which suitable and effective wastewater treatment plants and systems are needed. Based

More information

Wastewater Treatment. Where does wastewater go when it leaves your house?

Wastewater Treatment. Where does wastewater go when it leaves your house? Wastewater Treatment Where does wastewater go when it leaves your house? Let s s take a look The process includes: Collection of wastewater Primary Treatment Secondary Treatment Solids Handling Influent

More information

AquaPASS. Aqua MixAir System. Phase Separator. System Features and Advantages. Anaerobic. Staged Aeration. Pre-Anoxic.

AquaPASS. Aqua MixAir System. Phase Separator. System Features and Advantages. Anaerobic. Staged Aeration. Pre-Anoxic. PHASED ACTIVATED SLUDGE SYSTEM PHASED ACTIVATED SLUDGE SYSTEM Aqua-Aerobic Systems has led the industry in time-managed, biological technology since 1984. In 2004, Aqua-Aerobic applied its expertise in

More information

Sanitary and Environmental Engineering I (4 th Year Civil)

Sanitary and Environmental Engineering I (4 th Year Civil) Sanitary and Environmental Engineering I (4 th Year Civil) Prepared by Dr.Khaled Zaher Assistant Professor, Public Works Engineering Department, Faculty of Engineering, Cairo University Wastewater Flow

More information

WASTE WATER TREATMENT SYSTEM

WASTE WATER TREATMENT SYSTEM WASTE WATER TREATMENT SYSTEM Manual Coarse and Mechanical Fine Screens: We manufacture high quality screens that are widely used for removing suspended particles from the waste water. These screens are

More information

CLR Process. Vertical Loop Configuration

CLR Process. Vertical Loop Configuration CLR Process Vertical Loop Configuration Vertical Configuration System Flexibility Parallel Operation Raw wastewater and return activated sludge are introduced at a single point in each standard CLR basin.

More information

Field Trip Report to Indah Water Konsortium (IWK) Sdn. Bhd Due date : 25 / 11 / 2013 Lecturer s name : Ms. Sherina Binti Kamal

Field Trip Report to Indah Water Konsortium (IWK) Sdn. Bhd Due date : 25 / 11 / 2013 Lecturer s name : Ms. Sherina Binti Kamal Group members : Student ID : Susan Silvarajoo 112415012 Nuramelia Syahirah bt Kushaini 112415011 Nur Halimah Hamizah binti Hamdan Nick Othman Abdullah B10090051 B12090007 Field Trip Report to Indah Water

More information

FAYOUM CITY SEWAGE TREATMENT PLANT, DEVELOPMENT STAGES, CASE STUDY

FAYOUM CITY SEWAGE TREATMENT PLANT, DEVELOPMENT STAGES, CASE STUDY FAYOUM CITY SEWAGE TREATMENT PLANT, DEVELOPMENT STAGES, CASE STUDY Ahmed El-Zayat, Environmental Engineering Group, Egypt Emaill: ahmed_el_zayat@yahoo.com Introduction This case study focuses on three

More information

Palmer Wastewater Treatment Plant Environmental Impacts. A summary of the impacts of this treatment alternative are listed below:

Palmer Wastewater Treatment Plant Environmental Impacts. A summary of the impacts of this treatment alternative are listed below: 6.1.3 Environmental Impacts A summary of the impacts of this treatment alternative are listed below: 1. The Matanuska River will receive treated effluent as it currently does. 2. Effluent quality would

More information

Hybrid Sequencing Batch Reactors (SBR) Offer an Efficient Wastewater Treatment

Hybrid Sequencing Batch Reactors (SBR) Offer an Efficient Wastewater Treatment Hybrid Sequencing Batch Reactors (SBR) Offer an Efficient Wastewater Treatment CONTRIBUTING WRITERS Michael Lahlou, E.I.T. and James Matthews, P.E. Batch processes are not a new or innovative wastewater

More information

Altoona Westerly Wastewater Treatment Facility BNR Conversion with Wet Weather Accommodation

Altoona Westerly Wastewater Treatment Facility BNR Conversion with Wet Weather Accommodation Pennsylvania Water Environment Federation PennTEC Annual Technical Conference June 4, 2013 Altoona Westerly Wastewater Treatment Facility BNR Conversion with Wet Weather Accommodation Presented by: Jim

More information

Wastewater Terms for Permit Applications

Wastewater Terms for Permit Applications Wastewater Terms for Permit Applications Activated Sludge Alkalinity Anaerobic Anoxic Bacteria The term "activated sludge" refers to a brownish flocculent culture of organisms developed in aeration tanks

More information

SBR FOR LOW FLOW APPLICATIONS

SBR FOR LOW FLOW APPLICATIONS SBR FOR LOW FLOW APPLICATIONS The Dutchland Sequencing Batch Reactor uses high quality precast concrete structures to handle all of the work of a continuous flow treatment system. All processes - biological

More information

Sludge recycling (optional) Figure Aerobic lagoon

Sludge recycling (optional) Figure Aerobic lagoon 19.4 Aerated Lagoon Aerated lagoons are one of the aerobic suspended growth processes. An aerated lagoon is a basin in which wastewater is treated either on a flow through basis or with solids recycle.

More information

ECO Smart Aerobic Waste Water Treatment System. Optimising the re-use and recycling of waste water

ECO Smart Aerobic Waste Water Treatment System. Optimising the re-use and recycling of waste water Optimising the re-use and recycling of waste water The ECO Smart aerobic wastewater treatment system is a selfcontained wastewater treatment system that utilizes a combination of anaerobic as well as aerobic

More information

CITY OF LONDON ENVIRONMENTAL & ENGINEERING SERVICES WASTEWATER TREATMENT OPERATIONS DIVISION

CITY OF LONDON ENVIRONMENTAL & ENGINEERING SERVICES WASTEWATER TREATMENT OPERATIONS DIVISION CITY OF LONDON ENVIRONMENTAL & ENGINEERING SERVICES WASTEWATER TREATMENT OPERATIONS DIVISION The City of London operates six Wastewater Treatment Plants namely: Greenway, Pottersburg, Vauxhall, Adelaide,

More information

Activated Sludge Base Notes: for student. Activated Sludge Intro. What is Activated Sludge? 3/12/2012

Activated Sludge Base Notes: for student. Activated Sludge Intro. What is Activated Sludge? 3/12/2012 Activated Sludge Base Notes: for student DMACC 2012 WAT307 Activated Sludge Intro A brief introduction designed to provide basic knowledge of Activated Sludge including some process control basics What

More information

Aqua MSBR MODIFIED SEQUENCING BATCH REACTOR

Aqua MSBR MODIFIED SEQUENCING BATCH REACTOR MODIFIED SEQUENCING BATCH REACTOR MODIFIED SEQUENCING BATCH REACTOR For over three decades, Aqua-Aerobic Systems has led the industry in sequencing batch reactor technology with performance proven and

More information

Proposal by Russia to delete hot sub-spot Hot sub-spot name South-West Wastewater Treatment Plant

Proposal by Russia to delete hot sub-spot Hot sub-spot name South-West Wastewater Treatment Plant Proposal by Russia to delete hot sub-spot 18.4 LAND 14/2009, Document 6/3/Rev.1 ATTACHMENT 1. Hot sub-spot name South-West Wastewater Treatment Plant 2. Location Block 2, 123, Volkhonskoye shosse, St.

More information

DISCUSSION PAPER. 1 Objective. 2 Design Flows and Loads. Capital Regional District Core Area Wastewater Management Program

DISCUSSION PAPER. 1 Objective. 2 Design Flows and Loads. Capital Regional District Core Area Wastewater Management Program DISCUSSION PAPER Capital Regional District Core Area Wastewater Management Program Macaulay/McLoughlin Point Wastewater Treatment Plant Discussion Paper Liquid Process Alternatives Evaluation 034-DP-1

More information

6.2 Umgeni Water Owned Wastewater Works

6.2 Umgeni Water Owned Wastewater Works 6. WASTEWATER 6.1 Overview Umgeni Water owns and operates the Darvill and Ixopo Wastewater Works (WWW), but manages a number of other WWW on behalf of Municipalities. Management contracts are in place

More information

Advanced Wastewater Treatment and Disposal Systems. Wastewater Utility Operation and Management for Small Communities

Advanced Wastewater Treatment and Disposal Systems. Wastewater Utility Operation and Management for Small Communities Advanced Wastewater Treatment and Disposal Systems Wastewater Utility Operation and Management for Small Communities Preliminary Treatment Primary Treatment Secondary Treatment Tertiary Treatment Disinfection

More information

RE ENGINEERING O&M PRACTICES TO GET NITROGEN & PHOSPHORUS REMOVAL WITHOUT FACILITY UPGRADES

RE ENGINEERING O&M PRACTICES TO GET NITROGEN & PHOSPHORUS REMOVAL WITHOUT FACILITY UPGRADES RE ENGINEERING O&M PRACTICES TO GET NITROGEN & PHOSPHORUS REMOVAL WITHOUT FACILITY UPGRADES GRANT WEAVER, PE & WASTEWATER OPERATOR WISCONSIN WASTEWATER OPERATORS ASSOCIATION WISCONSIN DELLS, WI OCTOBER

More information

2017 Annual Performance Report

2017 Annual Performance Report Newcastle Water Pollution Control Plant The Regional Municipality of Durham Newcastle Water Pollution Control Plant Environmental Compliance Approval (ECA): 3-2189-87-946 Dated July 26, 1994 Amendments:

More information

Choices to Address Filamentous Growth

Choices to Address Filamentous Growth Michigan Water Environment Association Process Seminar November 12, 2015 Choices to Address Filamentous Growth Richard Beardslee City of Battle Creek Nathan Cassity Donohue & Associates Outline Battle

More information

operation of continuous and batch reactors. Contrary to what happens in the batch reactor, the substrate (BOD) of the wastewater in the continuous rea

operation of continuous and batch reactors. Contrary to what happens in the batch reactor, the substrate (BOD) of the wastewater in the continuous rea The Effect of Ammonia Loading on the Nitrification Kinetic of Aerobic Baffled Continuous Biological Reactor S.R.M. Kutty, M.H. Isa and L.C. Leong Abstract - The purpose of this study is to determine the

More information

Best Practice in Sewage and Effluent Treatment Technologies

Best Practice in Sewage and Effluent Treatment Technologies Best Practice in Sewage and Effluent Treatment Technologies Contents 1 Wastewater - Introduction 1 1.1 Earth s ecological system 1 1.1.1 Water effect on ecology 2 1.1.2 Wastewater generation 3 1.2 Wastewater

More information

USE OF GRANULAR SLUDGE TO INCREASE THE CAPACITY OF SEQUENCING BATCH REACTORS

USE OF GRANULAR SLUDGE TO INCREASE THE CAPACITY OF SEQUENCING BATCH REACTORS USE OF GRANULAR SLUDGE TO INCREASE THE CAPACITY OF SEQUENCING BATCH REACTORS Ben van den Akker 1, Kyra Middlemiss 1, Katherine Reid 1, Joerg Krampe 2, Nirmala Dinesh 1 1. SA Water, Adelaide, SA, Australia

More information

CASE STUDY: ROYAL AUSTRALIAN AIR FORCE BASE, AMBERLEY SEWAGE TREATMENT PLANT

CASE STUDY: ROYAL AUSTRALIAN AIR FORCE BASE, AMBERLEY SEWAGE TREATMENT PLANT 2007 Virotec International plc All rights reserved. A COMMERCIAL APPLICATION OF VIROSEWAGE TECHNOLOGY CASE STUDY: ROYAL AUSTRALIAN AIR FORCE BASE, AMBERLEY SEWAGE TREATMENT PLANT The ViroSewage Technology

More information

SEWAGE TREATMENT PLANT TECHNOLOGY BY COMPLETE WATER SOLUTION BHALERAO HEIGHTS, AKURDI, PUNE

SEWAGE TREATMENT PLANT TECHNOLOGY BY COMPLETE WATER SOLUTION BHALERAO HEIGHTS, AKURDI, PUNE SEWAGE TREATMENT PLANT TECHNOLOGY BY COMPLETE WATER SOLUTION BHALERAO HEIGHTS, AKURDI, PUNE 411 033. INTRODUCTION SEWAGE TREATMENT FACILITIES ARE LIMITED IN OUR COUNTRY AND MANY OF THE TREATMENT FACILITIES

More information

Treatment of palm oil mill effluent using biological sequencing batch reactor system

Treatment of palm oil mill effluent using biological sequencing batch reactor system River Basin Management IV 511 Treatment of palm oil mill effluent using biological sequencing batch reactor system C. W. Fun, M. R. U. Haq & S. R. M. Kutty Department of Civil Engineering, Universiti Teknologi

More information

Increasing Denitrification in Sequencing Batch Reactors with Continuous Influent Feed

Increasing Denitrification in Sequencing Batch Reactors with Continuous Influent Feed Increasing Denitrification in Sequencing Batch Reactors with Continuous Influent Feed ABSTRACT In this study, the denitrification capacity of a continuous influent feed sequencing batch reactor (SBR) was

More information

Performance Evaluation of the Moores Creek Advanced Water Resource Recovery Facility

Performance Evaluation of the Moores Creek Advanced Water Resource Recovery Facility Performance Evaluation of the Moores Creek Advanced Water Resource Recovery Facility Richard W. Gullick, Ph.D. Director of Operations Timothy Castillo Wastewater Manager Presented to the Albemarle County

More information

SECTION 8.0 NEWPCC SECOND PRIORITY CONTROL ALTERNATIVES

SECTION 8.0 NEWPCC SECOND PRIORITY CONTROL ALTERNATIVES SECTION 8.0 NEWPCC SECOND PRIORITY CONTROL ALTERNATIVES 8.1 PREAMBLE Table 8.1 below indicates the target ammonia concentrations for the Best Practicable and the Second Priority Levels of Control for the

More information

Tour of Regional Water Reclamation Facility

Tour of Regional Water Reclamation Facility Name: Date: Tour of Regional Water Reclamation Facility High School Physical Science Fall Module 3 Regional Water Reclamation Facility NGSSS Big Idea: Standard 17 Interdependence Benchmark Code & Description:

More information

Activated Sludge Process Control: Nitrification

Activated Sludge Process Control: Nitrification Activated Sludge Process Control: Nitrification 60 th Annual KWWOA Conference, Session 1: April 11, 2017 Dan Miklos, Senior Associate, Midwest Region, Hazen and Sawyer Agenda Overview of the Utopia Plant

More information

Secondary Treatment Process Control

Secondary Treatment Process Control SARBS One-Day Training Seminar Phoenix Club, Anaheim Secondary Treatment Process Control Graham Juby June 5, 2013 Objectives Provide an understanding of nitrogen removal process interactions to support

More information

Presentation Outline

Presentation Outline Presentation Outline Nitrification/denitrification refresher Treatment technologies available for nitrification and BNR/ENR What is the problem? BNR/ENR VPDES permitting Causes of reduced BNR performance

More information

Review of WEFTEC 2016 Challenge & Overview of 2017 Event. Malcolm Fabiyi, PhD, MBA Spencer Snowling, PhD. P.Eng

Review of WEFTEC 2016 Challenge & Overview of 2017 Event. Malcolm Fabiyi, PhD, MBA Spencer Snowling, PhD. P.Eng Review of WEFTEC 2016 Challenge & Overview of 2017 Event Malcolm Fabiyi, PhD, MBA Spencer Snowling, PhD. P.Eng Agenda Review 2016 Challenge Provide overview of updates to 2017 event Frequency WEFTEC Scores

More information

Global Leaders in Biological Wastewater Treatment

Global Leaders in Biological Wastewater Treatment Global Leaders in Biological Wastewater Treatment OVERVIEW OF ANOXKALDNES AnoxKaldnes is a global provider of leading-edge biological processes for wastewater treatment. The head-office is in Sweden. There

More information

Evaluation of Conventional Activated Sludge Compared to Membrane Bioreactors

Evaluation of Conventional Activated Sludge Compared to Membrane Bioreactors Evaluation of Conventional Activated Sludge Compared to Membrane Bioreactors Short Course on Membrane Bioreactors 3/22/06 R. Shane Trussell, Ph.D., P.E. shane@trusselltech.com Outline Introduction Process

More information

Coupling Trickling Filter or RBC s with Activated Sludge

Coupling Trickling Filter or RBC s with Activated Sludge Coupling Trickling Filter or RBC s with Activated Sludge By John R. Harrison, P.E. Kennedy/Jenks Consultants 503-295-4911 or JohnHarrison@KennedyJenks.com 1. What are Combined or Coupled Plants? Most coupled

More information

Appendix B-1. Design Calculations for Sewage Treatment Plant

Appendix B-1. Design Calculations for Sewage Treatment Plant APPENDIX B SEWERAGE FACILITIES Appendix B-1 Design Calculations for Sewage Treatment Plant Appendix. B.1 CAPACITY CALCULATION OF SEWAGE TREATMENT PLANT 1 BASIC CONDITIONS 1.1 BASIC S (1) Name : Astana

More information

FEASIBILITY REPORT ON SEWAGE TREATMENT PLANT ARCHITECTS PHE CONSULTANTS

FEASIBILITY REPORT ON SEWAGE TREATMENT PLANT ARCHITECTS PHE CONSULTANTS Uttarahalli village, FEASIBILITY REPORT ON SEWAGE TREATMENT PLANT FOR M/s. PRESTIGE ESTATES PROJECTS LTD, BENGALURU PROJECT : DEVELOPMENT OF RESIDENTIAL APARTMENT BEARING SY. Nos. 115,116 & 117 AT UTTARAHALLI

More information

Full Scale Testing to Demonstrate Anaerobic Selector Effect for Low Strength Wastewater

Full Scale Testing to Demonstrate Anaerobic Selector Effect for Low Strength Wastewater OWEA State Conference June 20, 2012 Full Scale Testing to Demonstrate Anaerobic Selector Effect for Low Strength Wastewater Presenters Bill Donohue NEORSD Bob Hrusovsky MWH Don Esping BC Easterly Plant

More information

Ditches for Energy Efficiency and Improved Nitrogen Removal

Ditches for Energy Efficiency and Improved Nitrogen Removal Upgrade of the Big Gulch WWTP Oxidation Ditches for Energy Efficiency and Improved Nitrogen Removal Thomas G. Authors: Thomas E. Coleman, dtec Systems Bridges, Mukilteo Water & Wastewater District Bend,

More information

EHS SMART-Treat Onsite Moving Media Treatment System

EHS SMART-Treat Onsite Moving Media Treatment System EHS SMART-Treat Onsite Moving Media Treatment System Sampling &Testing Protocol for SMART-Treat Wastewater Treatment System SAMPLING DURING OPERATION OF THE TREATMENT SYSTEM-IF DESIRED Sampling and analytical

More information

City of Elk River Wastewater Treatment Facility Improvements. Achieving Wastewater Treatment Goals

City of Elk River Wastewater Treatment Facility Improvements. Achieving Wastewater Treatment Goals City of Elk River Wastewater Treatment Facility Improvements Achieving Wastewater Treatment Goals By Tejpal Bala, P.E. Bolton & Menk, Inc. The City of Elk River received a new NPDES permit and the existing

More information

Wastewater Treatment Processes

Wastewater Treatment Processes Wastewater Treatment Processes CEL212 Environmental Engineering (2 nd Semester 2010-2011) Dr. Arun Kumar (arunku@civil.iitd.ac.in) Department of Civil Engineering Indian Institute of Technology (Delhi)

More information

ISAM SBR with Blower Assisted Jet Aeration Design Calculations For Lyons, CO WWTP Upgrade

ISAM SBR with Blower Assisted Jet Aeration Design Calculations For Lyons, CO WWTP Upgrade ISAM SBR with Blower Assisted Jet Aeration Design Calculations For Lyons, CO WWTP Upgrade May. 28, 2013 A. Site Conditions 1. Site elevation = 5,322 ft MSL 2. Average barometric pressure = 12.07 psia 3.

More information

BIO-BATCH TM. Sequencing Batch Reactor (SBR) Water & Wastewater Treatment

BIO-BATCH TM. Sequencing Batch Reactor (SBR) Water & Wastewater Treatment BIO-BATCH Sequencing Batch Reactor (SBR) Napier-Reid s Bio-Batch SBR is an effective aerobic biological system to remove pollutants i.e. BOD, COD, Suspended Solids, Nitrogen and Phosphorous from municipal

More information

Center Sanitation District

Center Sanitation District EHLS Center Sanitation District EHLS Engineering Erik Jorgensen Suzanne Givler Heath Anderson Leryn Gorlitsky Outline of Presentation Background Current and Future Conditions Decision Matrix Description

More information

WASTEWATER TREATMENT

WASTEWATER TREATMENT WASTEWATER TREATMENT Every community produces both liquid and solid wastes. The liquid portion-wastewater-is essentially the water supply of the community after it has been fouled by a variety of uses.

More information

Anderson Water Pollution Control Plant

Anderson Water Pollution Control Plant City of Anderson Wastewater Division Public Works Director Jeff Kiser Chief Plant Operator Plant Supervisor Operator III Operator I Phil DeBlasio Mike Hansen Tony Hinchliff Vacant Collections Supervisor

More information

INFRASTRUCTURE & OPERATION

INFRASTRUCTURE & OPERATION SECTION C: INFRASTRUCTURE & OPERATION Advice on completing this section is provided in the accompanying Guidance Note. C.1 Operational Information Requirements Provide a description of the plant, process

More information

Attachment N o F Control & Monitoring

Attachment N o F Control & Monitoring Attachment N o F Control & Monitoring Attachment F1: Treatment, Abatement and Control Systems Air There is no treatment or abatement systems required for the minor air emission points or the potential

More information

Performance Evaluation of 137 MLD Sewage Treatment Plant at Kasna U.P., INDIA Faheem Khan, Nitin Sharma, Avneet Kr.

Performance Evaluation of 137 MLD Sewage Treatment Plant at Kasna U.P., INDIA Faheem Khan, Nitin Sharma, Avneet Kr. Performance Evaluation of 137 MLD Sewage Treatment Plant at Kasna U.P., INDIA Faheem Khan, Nitin Sharma, Avneet Kr. Singh, Shobha Ram Abstract These The present study has been undertaken to assess the

More information

Nutrient Removal Optimization at the Fairview WWTP

Nutrient Removal Optimization at the Fairview WWTP Alyssa Mayer, PE Principal Engineer Nutrient Removal Optimization at the Fairview WWTP Mark Strahota, PE Associate Presentation Overview Project Background Process Model Development BNR Design Considerations

More information

Compact Waste Water Treatment MBR /MBBR Technology

Compact Waste Water Treatment MBR /MBBR Technology Compact Waste Water Treatment MBR /MBBR Technology 1 Minimal Operation and Maintenance Costs and use of Chemicals 2 Recycle and Reuse water for Irrigation and Recreation 3 Save Water, Energy, Money and

More information

19. AEROBIC SECONDARY TREATMENT OF WASTEWATER

19. AEROBIC SECONDARY TREATMENT OF WASTEWATER Industrial Water Pollution Control 19. AEROBIC SECONDARY TREATMENT OF WASTEWATER 19.1 Activated Sludge Process Conventional biological treatment of wastewater under aerobic conditions includes activated

More information

PILOT SCALE TESTS OF A UNIQUE APPROACH FOR BNR UPGRADE OF A SHORT SRT HIGH PURITY OXYGEN SYSTEM AT PIMA COUNTY, AZ

PILOT SCALE TESTS OF A UNIQUE APPROACH FOR BNR UPGRADE OF A SHORT SRT HIGH PURITY OXYGEN SYSTEM AT PIMA COUNTY, AZ PILOT SCALE TESTS OF A UNIQUE APPROACH FOR BNR UPGRADE OF A SHORT SRT HIGH PURITY OXYGEN SYSTEM AT PIMA COUNTY, AZ ABSTRACT Ron Riska,: Pima County Wastewater Management Division Joseph A. Husband, P.E.,

More information

WWTF Capacity Assessment Project

WWTF Capacity Assessment Project Wastewater Treatment Facility Evaluation The Richland WWTF was constructed in 1985 to provide primary and secondary treatment for the City's wastewater. Section 3 includes a general description of the

More information

Feasibility Report of Proposed ETP cum STP. M/s. Zakiya Healthcare Plot No.39, Pharmacity Selaqui, Dehradun (Uttarakhand)

Feasibility Report of Proposed ETP cum STP. M/s. Zakiya Healthcare Plot No.39, Pharmacity Selaqui, Dehradun (Uttarakhand) Feasibility Report of Proposed ETP cum STP M/s. Zakiya Healthcare Plot No.39, Pharmacity Selaqui, Dehradun (Uttarakhand) 1.0 Introduction M/S Zakiya Healthcare is planning to install an Effluent cum Sewage

More information

Biological Phosphorus Removal Technology. Presented by: Eugene Laschinger, P.E.

Biological Phosphorus Removal Technology. Presented by: Eugene Laschinger, P.E. Biological Phosphorus Removal Technology Presented by: Eugene Laschinger, P.E. Overview What is phosphorus and why do we care? How can you remove phosphorus? Biological phosphorus removal Biological phosphorus

More information

NC-PC Industry Day Pretreatment 101. Industrial Waste Impacts on POTW Treatment Processes. Dawn Padgett Operations Manager Charlotte Water

NC-PC Industry Day Pretreatment 101. Industrial Waste Impacts on POTW Treatment Processes. Dawn Padgett Operations Manager Charlotte Water NC-PC Industry Day Pretreatment 101 Industrial Waste Impacts on POTW Treatment Processes Dawn Padgett Operations Manager Charlotte Water NC-PC Industry Day Definitions BOD Amount of oxygen consumed by

More information

COLD WEATHER NITRIFICATION OF LAGOON EFFLUENT USING A MOVING BED BIOFILM REACTOR (MBBR) TREATMENT PROCESS

COLD WEATHER NITRIFICATION OF LAGOON EFFLUENT USING A MOVING BED BIOFILM REACTOR (MBBR) TREATMENT PROCESS ABSTRACT COLD WEATHER NITRIFICATION OF LAGOON EFFLUENT USING A MOVING BED BIOFILM REACTOR (MBBR) TREATMENT PROCESS Mr. Flemming G. Wessman 1 and Mr. Chandler H. Johnson 1 AnoxKaldnes, Inc., 58 Weybosset

More information

Activated Sludge Treatment Extended Aeration (EA) and Sequencing Batch Reactor (SBR) Systems

Activated Sludge Treatment Extended Aeration (EA) and Sequencing Batch Reactor (SBR) Systems 1 Activated Sludge Treatment Extended Aeration (EA) and Sequencing Batch Reactor (SBR) Systems General Features KEE Process packaged and purpose-built activated sludge process systems are suitable for

More information

HELCOM Programme Implementation Task Force (HELCOM PITF) PITF 18/ th Meeting 6.2/5. Tallinn, Estonia 30 October November 2001

HELCOM Programme Implementation Task Force (HELCOM PITF) PITF 18/ th Meeting 6.2/5. Tallinn, Estonia 30 October November 2001 HELSINKI COMMISSION - Baltic Marine Environment Protection Commission HELCOM Programme Implementation Task Force (HELCOM PITF) PITF 18/2001 18th Meeting 6.2/5 Tallinn, Estonia 30 October 2001 15-16 November

More information

EVALUATION OF A WASTEWATER TREATMENT FACILITY USING A ROTATING LOW-ENERGY NON-BLOWER AERATOR

EVALUATION OF A WASTEWATER TREATMENT FACILITY USING A ROTATING LOW-ENERGY NON-BLOWER AERATOR EVALUATION OF A WASTEWATER TREATMENT FACILITY USING A ROTATING LOW-ENERGY NON-BLOWER AERATOR Rob Richardson, Ege Richardson, Adrian Hanson, Kurt Moffatt * ABSTRACT The Rincon Wastewater Treatment Facility

More information

Proprietary AquaTron technology incorporates three (3) innovative features that increase its efficiency and reduces cost:

Proprietary AquaTron technology incorporates three (3) innovative features that increase its efficiency and reduces cost: THE AQUATRON The Technology The AquaTron is the result of over twenty years of research, development, testing and practical experience. Using the principles of the activated sludge biological process,

More information

CEDAR CREEK Wastewater Treatment Facility

CEDAR CREEK Wastewater Treatment Facility CEDAR CREEK Wastewater Treatment Facility Where does the waste originate Private homes Businesses from? Condominium complexes Nursing homes Apartments ANY DWELING THAT USES WATER AND IS CONNECTED TO THE

More information

Advanced Oxidation Ditch Process and Screw Press Dewatering

Advanced Oxidation Ditch Process and Screw Press Dewatering Advanced Oxidation Ditch Process and Screw Press Dewatering 24 th Aug. 2012 Takashi Ishida Director of the Resources Recycling Research Division Japan Institute of Wastewater Engineering and Technology

More information

ADVENT INTEGRAL SYSTEM

ADVENT INTEGRAL SYSTEM ADVENT INTEGRAL SYSTEM OPERATOR-FRIENDLY ACTIVATED SLUDGE SYSTEM WITH NO MOVING PARTS A revolutionary new configuration of activated sludge process with integral clarifier and self contained sludge recycle

More information