1 APPENDIX II (See paragraph 6) FORM-1 A (only for construction projects listed under item 8 of the Schedule) CHECK LIST OF ENVIRONMENTAL IMPACTS 1. LAND ENVIRONMENT (Attach panoramic view of the project site and the vicinity) 1.1. Will the existing land use get significantly altered from the project that is not consistent with the surroundings? (Proposed land use must conform to the approved Master Plan / Development Plan of the area. Change of land use if any and the statutory approval from the competent authority are submitted). Attach Maps of (i) site location, (ii) surrounding features of the proposed site (within 500 meters) and (iii) the site (indicating levels & contours) to appropriate scales. If not available attach only conceptual plans. The proposed land use is in conformity with the Development Plan (DP) of the area. REFER ANNEXURE I: AERIAL VIEW REFER ANNEXURE II: SITE LOCATION PLAN & DP PLAN REFER ANNEXURE III: CONTOUR LEVELS PLAN REFER ANNEXURE IV: MASTER LAYOUT PLAN REFER ANNEXURE VI: PARKING & TRAFFIC MANAGEMENT PLAN 1.2. List out all the major project requirements in terms of the land area, built up area, water consumption, power requirement, connectivity, community facilities, parking needs etc. Details are as follows: Total Plot Area: m 2 Total Built up Area (FSI): m 2 Total Built up Area (NON FSI): m 2 Total Construction Area: m 2
2 Area Statement 1. Area of Plot Deductions for a) Road Widening 0.00 b) Proposed Road (DP) 0.00 c) Green Belt d) NDZ Area 0.00 e) Nalla Area f) Other 0.00 Total (a + b + c + d + e + f ) Net Area of Plot (1-2) Deductions for a) Amenity Space 0.00 b) 10 % Open Space c) Internal Road Total Net Balance Plot Area of Plot (3-4) Addition for FSI a) Open Space (Notional) 0.00 b) Internal Road c) other 0.00 Total Net Area Floor Space Index Permissible 1 9. Perm. Floor Area (7 x 8) TDR Area Statement 11. Area Under BRT TDR Area Outside BRT TDR 13. Total TDR Total Perm. Built Up Area ( ) Proposed Areas a) Proposed Residential Area b) Proposed Commercial Area c) Proposed Industrial Area 0.00 d) Proposed Special Use Area Excess Balcony Area Taken in FSI Total Built Up Area Proposed ( ) coverage Calculations Below Stilt 50 % Proposed Exc. Gr. Coverage Perm. Above Stilt 20 %
3 Proposed Exc. Gr. Coverage TENEMENT STATEMENT Sr. No. WINGS Floors Flat Unit 1 RK 1 BHK 2 BHK 3 BHK Tenement (Nos.) Population 1 A Building (P + 12) B Building (P + 12) C Building (P + 12) D Building (P + 12) E Building (P + 12) F Building (P + 12) G Building (P + 12) H Building (P + 12) Total Commercial (A Building) Shops-12 Nos. Area m Total 5118
4 WATER CONSUMPTION: During Construction Phase: 30m 3 /day. Source: Tanker/Bore well During Operation Phase: Water Source: PCMC Water Demand: Dry Season Total Water demand is m 3 /day Domestic for residence is m 3 /day Flushing for residence is m 3 /day Domestic for Commercial is 2.36 m 3 /day Flushing for Commercial is m 3 /day Landscaping is m 3 /day Club House m 3 /day Sr. No Description Water Requirement (Cum/day) Loss (Cum/day) Sewage Generation (Cum/day) Water Use(Cum/day) Fresh Recycled 1 2 Domestic for residential building (@ 90 LPCD) no. of. Person 5000 Flushing for residential building (@ 45 LPCD) no. of. Person Domestic for Commercial Building (@ 20 LPCD) No. of. Persons 118 Flushing for Commercial Building (@ 25 LPCD) No. of. Persons Landscaping Club House TOTAL STP Capacity 625 m 3 /day
5 POWER REQUIREMENT: (ANNEXURE VIII WATER BALANCE STATEMENT) SOURCE Maharashtra State Electricity Distribution Company Limited (MSEDCL) During Construction Phase: Total Load 30 KW Source MSEDCL During Operation Phase: Total Connected Load 4266 KW Maximum Demand 3792 KW Transformer 630 KVA- 4 No DG Set 250 KVA- 1 No & 200 KVA- 1 No Total Fuel Consumption- 250 KVA 53.6 lit/hr. (100% load) 200 KVA 43 lit/hr. (100% load) (ANNEXURE XIII ELETRICAL CALCULATION, D.G. CHART & LOCATION) PARKING STATEMENT: Approximately 510 Nos. of four wheelers, 2030Nos. of two wheelers & 2010Nos. cycles are proposed in the residential complex. Internal circulation pattern will be so as to avoid any congestion within the complex. Parking space will be allotted within the campus. (REFER ANNEXURE VI PARKING AND TRAFFIC MANAGEMENT PLAN) 1.3.What are the likely impacts of the proposed activity on the existing facilities adjacent to the proposed site? (Such as open spaces, community facilities, details of the existing land use and disturbance to the local ecology). Although it is a construction activity, its impact on air quality, water quality, noise and soil will not be notable. As a matter of fact this activity will have positive impact, on socioeconomic culture of people residing in the vicinity of the proposed area. There will not be any disturbance to the local ecology as the selected site for the construction is a barren land. The project site and the surrounding area are not developed. The plantations, which would be grown in the residential area, will be helpful in increasing green cover of the area. This would also increase avifauna in the area. 1.4.Will there be any significant land disturbance resulting in erosion, subsidence & instability? (Details of soil type, slope analysis, vulnerability to subsidence, seismicity, etc may be given). Generally, soil types found in Pune district are black, copper, red, & paddy soil. Soil blends of variable properties are modified by sand, gravel, lime salts, & other ingredients. (REFER ANNEXURE III - CONTOUR PLAN)
6 1.5.Will the proposal involve alteration of natural drainage systems? (Give details on a contour map showing the natural drainage near the proposed project site) Not Applicable (REFER ANNEXURE III - CONTOUR PLAN) 1.6. What are the quantities of earthwork involved in the construction activity cutting, filling, reclamation etc. (Give details of the quantities of earthwork involved, transport of fill materials from outside the site etc.)? The debris will not be generated at the project site as the excavated material will be utilized on site for filling Give details regarding water supply, waste handling etc. during the construction period. Total water requirement during construction phase will be approximately 30m 3 /day for domestic use for the workers working/dwelling on the site. The construction water requirement will be in addition to this. The source will be Tankers. The non biodegradable solid waste will be segregated and will send to kabadi. The wet waste will be treated by Organic Waste Convertor. A septic tank and soak pit will be constructed for temporary shelters of construction workers. The construction debris and cut and fill waste will be recycled for road construction 1.8. Will the low-lying areas & wetlands get altered? (Provide details of how low lying and Wetland are getting modified from the proposed activity) Not Applicable 1.9. Whether construction debris & waste during construction cause health hazard? (Give quantities of various types of wastes generated during construction including the construction labor and the means of disposal) Construction debris and waste during construction will not cause health hazard. The natural depression on site will be lined and converted into water bodies which would add to passive cooling and will act as Rainwater Harvesting devices. Construction debris generated will be used for development of landscape. 2. WATER ENVIRONMENT 2.1. Give the total quantity of water requirement for the proposed project with the breakup of requirements for various uses. How will the water requirement be met? State the sources & quantities and furnish a water balance statement. During Construction Phase: 30m 3 /day. Source: Tanker/Bore well During Operation Phase: Water Source: PCMC Water Demand: Dry Season Total Water demand is m 3 /day
7 Domestic for residence is Flushing for residence is Domestic for Commercial is Flushing for Commercial is Landscaping is Club House m 3 /day m 3 /day 2.36 m 3 /day m 3 /day m 3 /day m 3 /day STP Capacity 625 m 3 /day (ANNEXURE VIII WATER BALANCE STATEMENT) 2.2 What is the capacity (dependable flow or yield) of the proposed Source of water? The source of water during operation is PCMC 2.3. What is the quality of water required, in case, the supply is not from a municipal source? (Provide physical, chemical, biological characteristics with class of water quality) The water will be available from PCMC which will accomplish the water requirement for this residential complex How much of the water requirement can be met from the recycling of treated wastewater? (Give the details of quantities, sources and usage) About m 3 /day of water will be recycled for flushing at residential building & landscaping Will there be diversion of water from other users? (Please assess the impacts of the project on other existing uses and quantities of consumption) Not Applicable 2.6. What is the incremental pollution load from wastewater generated from the proposed activity? (Give details of the quantities and composition of wastewater generated from the proposed activity) There will not be any incremental pollution load from the proposed activity. The Quantity of sewage is about % of domestic water consumption. The wastewater-generated from the proposed activity shall be domestic. Total water will be treated and recycled within the site to the extent possible Give details of the water requirements met from water harvesting? Furnish details of the facilities created.
8 Run-off Calculation Type Area (m 2 ) Co-efficient of Runoff Maximum Intensity of rainfall (m/hr) Rain Water collection (m 3 /hr) Roof Top Hardscape area Garden area TOTAL DETAILS OF STORM WATER DRAINAGE SYSTEM INTENSITY OF PRECIPITATION Maximum Intensity of rainfall in Pune is 700 mm/year. Total No. harvesting pits: 09 Nos. (ANNEXURE XV: RAIN WATER HARVESTING & STORM WATER MANAGEMENT PLAN) 2.8. What would be the impact of the land use changes occurring due to the proposed project on the runoff characteristics (quantitative as well as qualitative) of the area in the post construction phase on a long term basis? Would it aggravate the problems of flooding or water logging in any way? The proposed land use is in conformity with the DP so there will not be any land use change. The runoff from the project site will be used for the aquifers. The storm water drains of the area are proposed to be connected to the future drain line which is future development along the project What are the impacts of the proposal on the ground water? (Will there be tapping of ground water; give the details of ground water table, recharging capacity, and approvals obtained from competent authority, if any) A comprehensive Rainwater Harvesting System will be implemented in the form of aquifer recharge. The water table in the area is likely to increase due to the proposed system with no adverse effects envisage What precautions/measures are taken to prevent the run-off from construction activities polluting land & aquifers? (Give details of quantities and the measures taken to avoid the adverse impacts)
9 The runoff from the site will be filtered mechanically and present rate of discharge will be retained without any incremental pollution load from the site How is the storm water from within the site managed?(state the provisions made to avoid flooding of the area, details of the drainage facilities provided along with a site layout indication contour levels) Run-off Calculation: Type Area (m 2 ) Co-efficient of Runoff Maximum Intensity of rainfall (m/hr) Rain Water collection (m 3 /hr) Roof Top Hardscape area Garden area TOTAL DETAILS OF STORM WATER DRAINAGE SYSTEM INTENSITY OF PRECIPITATION Maximum Intensity of rainfall in Pune is 700 mm/year Total no. harvesting pits: 09 Nos. (REFER ANNEXURE XV: RAIN WATER HARVESTING & STORM WATER MANAGEMENT PLAN) Will the deployment of construction laborers particularly in the peak period lead to unsanitary conditions around the project site (Justify with proper explanation) During construction phase numbers of workers will be 50. Municipal solid waste generated during construction will be composted at site. Temporary Toilets, Septic tank and soak pits are provided during construction phase. This will not lead unsanitary conditions at the site What on-site facilities are provided for the collection, treatment & safe disposal of sewage? (Give details of the quantities of wastewater generation, treatment capacities with technology & facilities for recycling and disposal)
10 The sewage will be collected from 1000 Nos. tenements & m 2 commercial areas. The quantity of sewage is about % of domestic water consumption. The waste water generated from the proposed activity shall be domestic. Sewage will be treated in the sewage treatment plants of 625m 3 /day. The treated sewage will be recycled for flushing and gardening and surplus will be connected to pond. (REFER ANNEXURE IX SEWAGE TREATMENT PLANT- SCHEMATIC PLAN & PLAN) DESIGN BASIS This Sewage treatment plant has been designed to treat the domestic wastewater generated in the project of Kesar Tree Town at Moshi, Pune having following characteristics: Design Basis: a) Plant Capacity: 625m 3 /day b) Technology: MBBR DESIGN PARAMETERS: (REFER ANNEXURE IX SEWAGE TREATMENT PLANT- SCHEMATIC PLAN) 2.14 Give details of dual plumbing system if treated waste is used for flushing of toilets or any other use. The sewage will be collected from 1000 tenements m 2 commercial area. The quantity of sewage is about 84.35% of domestic water consumption. The waste water generated from the proposed activity shall be domestics. Sewage will be treated in the sewage treatment plant
11 of 625m 3 /day. The treated sewage partly recycled for flushing & partly connected to Municipal Sewer line. 3. VEGETATION 3.1. Is there any threat of the project to the biodiversity? (Give a description of the local ecosystem with its unique features, if any) There will not be any threat of the project to the biodiversity. The selected site for project is a barren land. The project proponents have proposed a landscape development plan, which includes planting of flowering and shady trees, shrubs and lawn within the plot Will the construction involve extensive clearing or modification of vegetation? (Provide a detailed account of the trees & vegetation affected by the project) No. Selected site is a barren land. However, the project site will cover the flowering plants, lawns. The open spaces inside the plot will be suitably landscaped and covered with vegetation What are the measures proposed to be taken to minimize the likely impacts on important site features (Give details of proposal for tree plantation, landscaping, creation of water bodies etc along with a layout plan to an appropriate scale) The site presently is a barren land with no important site features. All the existing drain lines and trees will be retained and conserved. Landscaping and Tree Plantation Landscape area m 2 Total no. of trees to be planted 266 Nos. (REFER ANNEXURE XII - LANDSCAPE PLAN & LIST OF TREES) 4. FAUNA 4.1. Is there likely to be any displacement of fauna- both terrestrial and aquatic or creation of barriers for their movement? Provide the details. No 4.2. Any direct or indirect impacts on the avifauna of the area? Provide details. No 4.3. Prescribe measures such as corridors, fish ladders etc to mitigate adverse impacts on fauna The proposed project will not have any adverse impact on the flora or fauna. 5. AIR ENVIRONMENT 5.1. Will the project increase atmospheric concentration of gases & result in heat islands? (Give details of background air quality levels with predicted values based on
12 dispersion models taking into account the increased traffic generation as a result of the proposed constructions) As this will be a Residential & Commercial complex, air pollution is not expected to be a major concern What are the impacts on generation of dust, smoke, odorous fumes or other hazardous gases? Give details in relation to all the meteorological parameters. During construction phase, suspended particulate matter, dust, will be the main pollutant, which could be generated from site development activities and movement of vehicles. Odorous fumes or hazardous gases generation is not expected. Concentration of SO 2, NO 2 and CO may rise a little due to traffic. Proper upkeep and maintenance of vehicles, sprinkling of water on roads and construction site and providing sufficient vegetation all around the plant site are some of the measures that would reduce the impact during construction phase Will the proposal create shortage of parking space for vehicles? Furnish details of the present level of transport infrastructure and measures proposed for improvement including the traffic management at the entry & exit to the project site. Approximately 510 Nos. of four wheeler, 3010Nos. of two wheelers & 2010Nos. of cycle proposed within the complex will ensure no traffic congestion outside the campus. Measures proposed for traffic management at the entry and exit to the project site are: Maintaining flow of traffic for approach roads Entry and Exit points carefully placed so as not to disturb this flow. Easy fire tender movement and around the complex ensuring accessibility to every building. (REFER ANNEXURE VI PARKING AND TRAFFIC MANAGEMENT PLAN) 5.4. Provide details of the movement patterns with internal roads, bicycle tracks, pedestrian pathways, footpaths etc., with areas under each category. Area of drive way will be 6 m wide Will there be significant increase in traffic noise & vibrations? Give details of the sources and the measures proposed for mitigation of the above. The proposed activity being of residential type will not cause a notable increase in the noise and vibration during operation. Sources of noise Pollution during construction phase are machinery like compressor, Compactors, Concrete Plant, Cranes and transportation materials. Mitigation measures: The project proponents have agreed to take precautions to control noise pollution as mentioned under: Use of equipment generating noise of not greater than 90 db (A). High noise generating construction activities would be carried out only during daytime. Also, adequate parking space will be provided to avoid crowding and noise pollution Installation, use and maintenance of mufflers on equipment. Workers working near high noise construction machinery would be supplied with ear muffs/ear plugs.
13 5.6.What will be the impact of DG sets & other equipment on noise levels & vibration in & ambient air quality around the project site? Provide details. Source Maharashtra State Electricity Distribution Company Limited (MSEDCL) During Construction Phase: Sources of noise pollution during construction phase are machinery like Earthmoving Machinery, Mini Hoist Crane, Mixer, Lift lade, JCB, Dumpers, Compressors and transportation materials These machineries will be used only day time. Canopies will be provided to these mechanical devices to reduce noise & vibration. Maximum mitigation measures such as regular maintenance or overhauling etc. During Operation Phase: There will not be any considerable impact on the ambient air quality around the project site as CPCB approved DG sets along with acoustic room will be developed and plantation will be provided. 6. AESTHETICS 6.1 Will the proposed constructions in any way result in the obstruction of a view, scenic amenity or landscapes? Are these considerations taken into account by the proponents? No. Proposed construction will not result in obstruction of a view, scenic amenity or landscapes Will there be any adverse impacts from new constructions on the existing structures? What are the considerations taken into account? Not Applicable Whether there are any local considerations of urban form & urban design influencing the design criteria? They may be explicitly spelt out. No 6.4. Are there any anthropological or archaeological sites or artifacts nearby? State if any other significant features in the vicinity of the proposed site have been considered No 7. SOCIO-ECONOMIC ASPECTS 7.1 Will the proposal result in any changes to the demographic structure of local population? Provide the details. Critically analyzing the socio-economic baseline in the context of the proposed project, the impacts of the project could be variable in nature. The proposed project does not involve any displacement of inhabitants.
14 During construction 50 workers will be provided temporary shelters at the site. After completion of the project, there will be influx of 5000 Residential population and 118 Commercial population people in the area. The population of the area is likely to increase Give details of the existing social infrastructure around the proposed project. This project has proposes of Residential and Commercial Complex by M/s Kesar Vighnaharta Group coming up at Moshi, Pune. This area is rapidly developing Will the project cause adverse effects on local communities, disturbance to sacred sites or other cultural values? What are the safeguards proposed? It could be seen that the overall impact on Socio-Economic Environment is positive and permanent in nature. The impacts on socio-economic environment due to the proposed Projects are as follows, Possible source of income for this community are direct like Construction and various job works in complex Improvement in transport, communication facilities. Improvement in lifestyle & social status etc. Increase in revenue generation Due to the proposed project, facilities are likely to grow in line with the development. 8. BUILDING MATERIALS 8.1. May involve the use of building materials with high-embodied energy. Are the construction materials produced with energy efficient processes? (Give details of energy conservation measures in the selection of building materials and their energy efficiency) Conventional construction materials used from nearest source to minimize energy consumption for transportation Transport and handling of materials during construction may result in pollution, noise & public nuisance. What measures are taken to minimize the impacts? During construction phase, sources of noise pollution will be due to operation of machinery like compressors, compactors, concrete plant, cranes etc. as well as transportation vehicles. This will cause nuisance to the occupants of the nearby area. The project proponents have agreed to take precautions to control noise pollution as mentioned under: i) Use of equipment generating noise of not greater than 90 db (A). ii) High noise generating construction activities would be carried out only during day time. iii) Installation, use and maintenance of mufflers on equipment. iv)workers working near high noise construction machinery would be supplied with ear muffs/ear plugs Are recycled materials used in roads and structures? State the extent of savings achieved?
15 Solid waste that would be generated due to excavation will be in the form of rubble and soil. This soil and rubble would be used for development of landscaping. Construction debris will be reused for backfilling of roads and other construction Give details of the methods of collection, segregation & disposal of the garbage generated during the operation phases of the project. Solid waste generated in the campus is domestic type having source separated dry and wet components. As far as possible the dry waste like paper, cardboard boxes, thermocol packing, plastics etc. shall be sent for recycling purpose. However, wet waste, which is biodegradable, shall be converted to bio-compost adopting following aerobic composting method. The quantity of biodegradable waste generated is about 1512 Kg/Day. The Organic Waste Composter will be used for composting of solid waste. A) For Residential + Commercial B) Quantity of the solid waste Kg/Day C) Quantity of the wet waste 1512 Kg/Day D) Quantity of the dry waste 1018 Kg/Day Biodegradable and non biodegradable waste will be generated. Dry waste will be sent for recycling and wet waste will be treated by Organic Waste Converter. Process:- 1. Large volumes of food waste from pre-cooking, leftover after meal are dumped in community bins, which is responsible for foul odor & health hazards. 2. Organic Waste Converter homogenizes organic waste with appropriate additive & bio culture. 3. The output from device is uniform colored coarse powder in appearance and is without any bad smell. 4. Thus treated material over-come major cause of nuisance to resident community related to eye & nose sense. 5. It can be composted into good quality organic manure in 2 weeks. Benefits of OWC The total MSW arriving on the site is cleared on the same day. Provides a scientific method for the production of organic compost. Elimination of foul odor. Elimination of Pathogens and weed seeds. Problem of rodents and insect pests is avoided. Aesthetically acceptable. Treatment time is substantially reduced. Eco-friendly & Economical Requires less space for the treatment. Load on the landfill is reduced, thus requires less land for disposal. (ANNEXURE X: SOLID WASTE MANAGEMENT: ORGANIC WASTE CONVERTOR PROCESS) 9. ENERGY CONSERVATION
16 9.1. Give details of the power requirements, source of supply, backup source etc. What is the energy consumption assumed per square foot of built-up area? POWER REQUIREMENT: SOURCE Maharashtra State Electricity Distribution Company Limited (MSEDCL) During Construction Phase: Total Load 30 KW Source MSEDCL During Operation Phase: Total Connected Load 4266 KW Maximum Demand 3792 KW Transformer 630 KVA- 4 No DG Set 250 KVA- 1 No & 200 KVA- 1 No Total Fuel Consumption- 250 KVA 53.6 lit/hr. (100% load) 200 KVA 43 lit/hr. (100% load) (ANNEXURE XIII ELETRICAL CALCULATION, D.G. CHART & LOCATION) 9.2. What type of, and capacity of, power back-up do you plan to provide? During Operation Phase: Total Connected Load 4266 KW Maximum Demand 3792 KW Transformer 630 KVA- 4 No DG Set 250 KVA- 1 No & 200 KVA- 1 No Total Fuel Consumption- 250 KVA 53.6 lit/hr. (100% load) 200 KVA 43 lit/hr. (100% load) 9.3. What are the characteristics of the glass you plan to use? Provide specifications of its characteristics related to both short wave and long wave radiation? Normal 5 mm clear float glass is used. The glass will allow short as well as long wave radiations to pass through. However, use of shading devices on window panes will reduce heating inside the buildings What passive solar architectural features are being used in the building? Illustrate the applications made in the proposed project. Solar architectural features have been planned in order to reduce cooling loads of the structure. They are: 1. Longer side facing dominant wind direction 2. Water bodies ample adding to passive cooling 3. Proper shading devices for windows. (Not Applicable) 9.5. Does the layout of streets & buildings maximize the potential for solar energy devices? Have you considered the use of street lighting, emergency lighting and solar hot water systems for use in the building complex? Substantiate with details.
17 Solar System is being used for Hot water/ Streetlights 9.6. Is shading effectively used to reduce cooling/heating loads? What principles have been used to maximize the shading of Walls on the East and the West and the Roof? How much energy saving has been effected? The construction is designed in order to assure maximum of the natural light and ventilation in the structure. Light shades will be used to color the walls so that heat gain is reduced Do the structures use energy-efficient space conditioning, lighting and mechanical systems? Provide technical details. Provide details of the transformers and motor efficiencies, lighting intensity and air-conditioning load assumptions? Are you using CFC and HCFC free chillers? Provide specifications. As it is a residential complex with no built provision for space cooling. Energy efficiency in lighting and mechanical systems will be achieved by: CFL & LED based lighting will be done in the common areas, landscape areas, Solar lights will be provided for common amenities like Street lighting, & Garden lighting. Use of Solar Panel for Hot water What are the likely effects of the building activity in altering the micro-climates? Provide a self-assessment on the likely impacts of the proposed construction on creation of heat island & inversion effects? The proposed project is of residential type and will not have space conditioners or glass wall. Alteration of microclimate is not notable in this case. Systematic design of buildings in order to assure maximum natural ventilation and light will be considered to reduce the effect of creation of heat island What are the thermal characteristics of the building envelope? (a) roof; (b) external walls; and (c) fenestration? Give details of the material used and the U-values or the R values of the individual components. Fenestration area is most vulnerable to heat gain or loss. Thermal characteristics of the envelope are as follows: The U and R values of the construction parameters shall comply with ECBC What precautions & safety measures are proposed against fire hazards? Furnish details of emergency plans. The project proponents shall follow all the safety rules and regulations as prescribed by regulatory authority If you are using glass as wall material provides details and specifications including emissivity and thermal characteristics. The entire building is designed with appropriate opening to reduce heat energy inside the building. No use of glass as well material What is the rate of air infiltration into the building? Provide details of how you are mitigating the effects of infiltration.
18 Not applicable. As the ground surfaces are covered with green patches to have dust control. These openings too habitable spaces are adequate just to be functional. The openings are covered with dust proof, air and water light aluminum glazing To what extent the non-conventional energy technologies are utilized in the overall energy consumption? Provide details of the renewable energy technologies used. Use of solar energy. 10. Environment Management Plan The Environment Management Plan would consist of all mitigation measures for each item wise activity to be undertaken during the construction, operation and the entire life cycle to minimize adverse environmental impacts as a result of the activities of the project. It would also delineate the environmental monitoring plan for compliance of various environmental regulations. It will state the steps to be taken in case of emergency such as accidents at the site including fire. (ANNEXURE XVI- ENVIRONMENT MANAGEMENT PLAN)
19
(1) LAND ENVIRONMENT (Attach panoramic view of the project site and the vicinity)
[Vide Paragraph - 6 of Notification dated 14 th September 2006, only for construction projects listed under item 8 of the Schedule] (1) LAND ENVIRONMENT (Attach panoramic view of the project site and the
More informationFORM - I-A CHECK LIST OF ENVIRONMENTAL IMPACTS
FORM - I-A CHECK LIST OF ENVIRONMENTAL IMPACTS 1. LAND ENVIRONMENT QUERY 1.1 Will the existing land use get significantly altered from the project that is not consistent with the surroundings? Attach Maps
More informationExpansion of Info Technology Park at Manapakkam Village, Kancheepuram District Chennai, Tamil Nadu
FORM 1A CHECK LIST OF ENVIRONMENTAL IMPACTS (Project proponents are required to provide full information and wherever necessary attach explanatory notes with the Form and submit along with proposed environmental
More informationENVIRONMENT MANAGEMENT PLAN CONSTRUCTION PHASE. suppression instead of water wherever possible. Cell)
ENVIRONMENT MANAGEMENT PLAN No. 1. Increase in water demand due to water usage for, dust suppression and for domestic purpose of workers 2. Sewage generation (9 KLD) and disposal 3. Solid waste generation
More informationMax. building height (m)
Environmental Management Plan (EMP) for Himalaya Falaknuma by Himalaya Developers Ahmedabad No. Particulars Details 1. Proposal for New Project 2. Type of Project and Commercial Building Construction Project
More informationPROPOSED EXPANSION OF RESIDENTIAL COMPLEX MANI TRIBHUVAN (FORMERLY KNOWN AS MANI TIRUMALA )
for PROPOSED EXPANSION OF RESIDENTIAL COMPLEX MANI TRIBHUVAN (FORMERLY KNOWN AS MANI TIRUMALA ) at Plot Nos.13, 15, 21 To 31, 33, 36, 37, 38, 28/2573, 40 To 49, 58, 59 & 125 (Part), Mouza: Kalarahanga,
More informationFORM I A GROUP HOUSING PROJECT GH-03C, SECTOR-144 NOIDA, UP. For. M/s GULSHAN HOMES and INFRASTRUCTURE PVT.LTD. En-vision Enviro Technologies Pvt.
GROUP HOUSING PROJECT AT GH-03C, SECTOR-144 NOIDA, UP For M/s GULSHAN HOMES and INFRASTRUCTURE PVT.LTD ENVIRONMENT CONSULTANT En-vision Enviro Technologies Pvt. Ltd (NABET/EIA/364/IA-018(Rev. 1) dated
More informationENVIRONMENTAL MANAGEMENT PLAN. CONSTRUCTION PHASE 1.Construction Contractors
1. Increased water demand (12 KLD) due water usage for, dust suppression and for workers 2. Sewage generation (11 KLD) and disposal 3. Municipal solid waste generation (15 kg/day) by workers 4. Construction
More informationEnvironmental Management Plan during Construction Phase
Management Plan during Phase Sr 1 Ambient Air Quity Negative inside site premises outside site 2 ise Negative near noise generation sources inside premises on ambient noise levels in the Surrounding area
More informationFor PROPOSED IT PARK. By M/s.Balewadi Tech Park Pvt.Ltd. Submitted to State Environment Expert Appraisal Committee III, Maharashtra
Draft Terms of References (ToR) (Based on the model TOR given in Environmental Impact Assessment Guidance Manual for building construction projects by MoEF & CC) For PROPOSED IT PARK By M/s.Balewadi Tech
More informationNo construction activity started
Sr. Particulars Details No. 1. Proposal is for New Project 2. Type of Project Residential Flats and Shops 3. Project / Activity No. 8(a) [8(a) or 8(b)] 4. Name of the project Kaveri Soham Vistara 5. Name
More informationApplication Forms for Prior Environmental Clearance as per Environmental Impact Assessment Notification dtd &
Application Forms for Prior Environmental Clearance as per Environmental Impact Assessment Notification dtd 14-09-2006 & 01-12-09 To be submitted By Project Proponent To Madhya Pradesh State Environmental
More informationResidential & Commercial Project with PTC Tenements (SRA Scheme) M/S Darshan Developers Pvt. Ltd FORM-1
FORM-1 (I) Basic Information Item Details. 1 Name of the Project Residential & Commercial Project with PTC Tenements Under SRA Scheme 2 S.. in the Schedule 8 (b) Proposed capacity/area Total plot area:
More informationExisting vegetation with each tree detail like species, girth, canopy etc. Contours with levels Natural features like water body, stream etc.
Project name:- Project Code :- Registration Category :- General Comments :- Drawings Feedback:- 1st feedback No Dwg Name Dwg Description Recommendation 1 Site survey plan Site plan showing following in
More informationCheck list for construction Project of EC [Category 8(a)]:
Check list for construction Project of EC [Category 8(a)]: Provide authenticated (with stamp & Signature) hard copy of this check-list during submission of hard copy of ToR application. Sr. no. Checklist
More informationSIX MONTHLY COMPLIANCE REPORT JUNE- 2015
SIX MONTHLY COMPLIANCE REPORT JUNE- 2015 Group Housing Complex My woods AT Plot no. GH-04, Sector -16 C, Noida Extension, Greater Noida, U.P. Being developed by M/s Mahagun India Pvt. Ltd. A-19, Sector-63,
More informationSIX MONTHLY COMPLIANCE REPORT JUNE- 2015
Six Monthly Compliance Report June-2015 M/s Mahagun Real Estate Pvt. Ltd SIX MONTHLY COMPLIANCE REPORT JUNE- 2015 Group Housing Complex Mahagunpuram AT VILLAGE Mehrauli, Dasna, Ghaziabad, U.P. Being developed
More informationMunicipal solid / hazardous waste
(10) ENVIRONMENTAL MANAGEMENT PLAN The mitigation measures for reducing the adverse environmental impacts together constitute a part of EMP. The environmental issues, which need management, plan for the
More informationENVIRONMENTAL MANAGEMENT PLAN
INTRODUCTION ENVIRONMENTAL MANAGEMENT PLAN An environmental management plan (EMP) has been prepared for the proposed construction of commercial project to minimize negative impacts and is formed on the
More informationIndicative Checklist for construction projects of EC [Category 8(a)]:
Indicative Checklist for construction projects of EC [Category 8(a)]: Sr. Checklist point Remark Yes/No Pg. no./ annexure 1. Covering letter signed by the applicant Yes Form-1 Page 1 page 13 2. Completed
More informationReport on Damage Assessment and. Remediation Plan and Natural & Community Augmentation Plan
Report on 1. PROJECT LOCATION & LAND USE The Ganesh Park 3 is a residential building project constructed on plot 608 to 613/5 Vil: GIDC Ankleshwar in Bharuch district of Gujarat state. The project land
More informationFORM-1 A (only for construction projects listed under item 8 of the Schedule)
FORM-1 A (only for construction projects listed under item 8 of the Schedule) CHECK LIST OF ENVIRONMENTAL IMPACTS (Project proponents are required to provide full information and wherever necessary attach
More information4.0 ENVIRONMENTAL IMPACTS AND MITIGATION MEASURES. Negative or adverse impacts during the construction phase are:
4.0 ENVIRONMENTAL IMPACTS AND MITIGATION MEASURES 4.1 POTENTIAL ENVIRONMENTAL IMPACTS 4.1.1 Impacts during Construction Phase Negative or adverse impacts during the construction phase are: Land environment:
More informationGENERAL CONDITIONS. 7. The Applicant will adopt the prescribed norms, and standards provided in the national Building Code of India 2005.
GENERAL CONDITIONS 1. The Project Proponent shall comply with all the conditions stipulated in the building approval letter. 2. The applicant (Project proponent) will take necessary measures for preventions,
More informationProposed Terms of Reference for EIA studies
1 Proposed Terms of Reference for EIA studies Collection of Base line data in any season other than Monsoon season in study area of 10 kms radius from Lease Area. Based on the Meteorological data from
More informationDetails of the proposed project as presented before the committee are tabulated below:
Shrungal Homes Block No. 141, F.P.No.42, O.P.No.42, T.P.S.No.58 (Bamroli), Choryasi, Surat. Screening & scoping / appraisal. Details of the proposed project as presented before the committee are tabulated
More informationEnvironment Impact Assessment (EIA) The proposed project falls in category 8 (a) B2 as per schedule of EIA Notification, 2006.
Environment Impact Assessment (EIA) The proposed project falls in category 8 (a) B2 as per schedule of EIA Notification, 2006. Thus, EIA is not applicable for proposed project. We have derived project
More information5. ENVIRONMENT MANAGEMENT PLAN
5. ENVIRONMENT MANAGEMENT PLAN The environmental management plan consist of the set of mitigation measures, management and, monitoring measures to be taken during construction and operation phase to eliminate
More informationNo.D.12/30/2009-SEZ Government of India Ministry of Commerce & Industry Department of Commerce
No.D.12/30/2009-SEZ Government of India Ministry of Commerce & Industry Department of Commerce Udyog Bhawan, New Delhi Dated the 11 th December, 2009 To 1. All Development Commissioners 2. DG, EPCES Subject:
More informationF.P.No.52, S.No.53/B, 54/2/B, D.T.P.S.No.80, Village: Bhat, Dist: Gandhinagar.
20. Karnavati Premier Living F.P.No.52, S.No.53/B, 54/2/B, D.T.P.S.No.80, Village: Bhat, Dist: Gandhinagar. Screening & scoping / appraisal Details of the proposed project as presented before the committee
More informationCORPORATE OFFICE BUILDING, C-11, URBAN ESTATE-II CITY CENTRE SECTOR 29, GURUGRAM, HARYANA
ENVIRONMENT MANAGEMENT PLAN The Environment Management Plan () would consist of all mitigation measures for each component of the environment due to the activities increased during the, operation and the
More informationCONCEPTUAL PLAN PROJECT LAYOUT AND DEVELOPMENT CONTEXT
CONCEPTUAL PLAN PROJECT LAYOUT AND DEVELOPMENT CONTEXT ABOUT PROJECT M/s. DAR Housing Ltd. Proposed Group Housing Project ATS Rhapsody, At Plot No. GH-12/1, Sector-01, Greater Noida (U.P.), having Plot
More informationCHECKLIST A : DOCUMENTS TO BE SUBMITTED ALONGWITH FORM 1 AND FORM 1A FOR OBTAINING ENVIRONMENTAL CLEARANCE
CHECKLIST A : DOCUMENTS TO BE SUBMITTED ALONGWITH FORM 1 AND FORM 1A FOR OBTAINING ENVIRONMENTAL CLEARANCE Name of the project: EXPANSION OF KPC MEDICAL COLLEGE AND HOSPITAL Location: 1F, RAJA S.C. MULLICK
More informationPROPOSED TERMS OF REFERENCE
ENVIRONMENTAL IMPACT ASSESSMENT FOR RESIDENTIAL TOWNSHIP WITH VACATION RESORTS PROJECT AT ALIBAUG, RAIGAD, MAHARASHTRA PROPOSED TERMS OF REFERENCE Submitted to State Level Environment Impact Assessment
More informationTABLE OF CONTENTS. Para No. Contents Page No
TABLE OF CONTENTS Para No. Contents Page No Chapter-1 Introduction 1.0 Preamble 1 1.1 Location of the project 1 1.2 Objectives of the EIA study 3 1.3 Methodology of study 3 1.4 Structure of EIA report
More informationENVIRONMENT MANAGEMENT PLAN
ENVIRONMENT MANAGEMENT PLAN The Environment Management Plan () would consist of all mitigation measures for each component of the environment due to the activities increased during the construction and
More informationAPPENDIX II (See paragraph 6)
APPENDIX II (See paragraph 6) FORM-1 A (only for construction projects listed under item 8 of the Schedule) CHECK LIST OF ENVIRONMENTAL IMPACTS (Project proponents are required to provide full information
More informationTATA STEEL LIMITED. Environment Compliance Report (Oct 2017 to Mar 2018)
TATA STEEL LIMITED Construction of Residential Complex For Tata Steel Plant located at Kalinganagar Industrial Complex, at Environment Compliance Report (Oct 2017 to Mar 2018) Environment Department Tata
More informationGUIDELINES ON ENERGY CONSERVATION IN SEZs
1 GUIDELINES ON ENERGY CONSERVATION IN SEZs SEZs are special enclaves aimed at creating world class infrastructure. The guidelines and certification for SEZs is to be implemented as follows: Entire SEZ
More informationPROPOSED TERMS OF REFERENCE
PROPOSED TERMS OF REFERENCE For PROPOSED RESIDENTIAL AND COMMERCIAL DEVELOPMENT AT Plot bearing survey no. 86/1, 86/2, 86/3 (pt), 86/4 (pt), 86/5 (pt), 115/1 (pt), 115/2 (pt), 115/3 (pt), 115/4 (pt), 115/5
More informationENVIRONMENTAL MANAGEMENT PLAN. Hotel Project for Mohamed Ilyas & Ms. Alamzahan
ENVIRONMENTAL MANAGEMENT PLAN Of Hotel Project for Mohamed Ilyas & Ms. Alamzahan at Khasra No. 269Ga, 269Kh, 266Kh & 270 Village Majra, Tehsil Central Doon, District Dehradun (Uttarakhand) GENERAL ENVIRONMENTAL
More informationCONECPTUAL PLAN. w.r.t. Amendment (Expansion) Project of Kalpataru Solitaire. M/s Kalpataru Limited December, 2016
CONECPTUAL PLAN w.r.t. Amendment (Expansion) Project of Kalpataru Solitaire at of J.V.P.D scheme of Vile Parle (W), by December, 2016 GRASS ROOTS RESEARCH & CREATION INDIA (P) LTD. (An ISO 9001:2008 Certified
More informationExpansion of Group Housing Colony M/s Sarv Realtors Pvt Ltd Village Badshapur, Sector 68, Distt.-Gurgaon Haryana
Form 1 A FORM IA CHECK LIST OF ENVIRONMENTAL IMPACTS (Project proponents are required to provide full information and wherever necessary attach explanatory notes with the Form and submit along with proposed
More informationEnvironment Compliance Report (Apr 2017 to Sep 2017)
TATA STEEL LIMITED Construction of Residential Complex For Tata Steel Plant located at Kalinganagar Industrial Complex, at Environment Compliance Report (Apr 2017 to Sep 2017) Environment Department Tata
More informationThe Proposed Expansion of Existing ARTEMIS HOSPITAL at Sector-51, Gurgaon (Haryana). In CONCEPTUAL PLAN PROJECT LAYOUT AND DEVELOPMENT CONTEXT
CONCEPTUAL PLAN PROJECT LAYOUT AND DEVELOPMENT CONTEXT ABOUT PROJECT The Proposed Expansion of Existing ARTEMIS HOSPITAL at Sector-51, Gurgaon (Haryana). In earlier project planning the total plot area
More informationMATRIX 1: ENVIRONMENTAL MANAGEMENT PLAN TO BE IMPLEMENTED DURING THE SITE PREPARATION AND CONSTRUCTION PHASES
MATRIX 1: ENVIRONMENTAL MANAGEMENT PLAN TO BE IMPLEMENTED DURING THE SITE PREPARATION AND CONSTRUCTION PHASES Environmental / Social issue/ aspect/ activity Anticipated negative impact Management and mitigation
More informationThis project does not attract EIA Notification and provisions in CRZ Notification [Clause no. 4.2 (i) (b)] also exempt preparation of EIA report.
The proposal under consideration, Regularization of Existing Resort at Sidheshwarwadi, Village Ubhadanda, Taluka Vengurla, Dist. Sindhudurg is located in CRZ III area having total plot area of 4000 m 2,
More informationDilipbhai D. Patel. BLOCK NO. 43, F.P. NO. 45,O.P NO. 40 T.P.S. No- 17 (PUNA), Ta: SURAT CITY, DIST: SURAT
Annexure B Land Possession letters & N.A. permission letters Annexure C Photograph of the Site Annexure D Details of Buildings Area Calculation Annexure 1 Topo Sheet Annexure 2 Soil Analysis Report Annexure
More informationObjective A: Transportation facilities and services should be designed to conform with other policies contained herein.
CHAPTER ONE GOALS & OBJECTIVES INTRODUCTION KRS 100.193 mandates that a Planning Commission adopt statements of goals and objectives that will act as guides to the preparation of the plan. The update has
More informationPRE FEASIBILITY REPORT PROPOSED CONSCTRUCTION BUILDING PROJECT GUJARAT HOUSING BOARD
PRE FEASIBILITY REPORT FOR PROPOSED CONSCTRUCTION BUILDING PROJECT (66460.23 SQ. M) BY GUJARAT HOUSING BOARD AFFORDABLE RESIDENTIAL BUILDING & COMMERCIAL PROJECT PACKAGE 23, PLOT NO. 61/1, 63/1 & 64, TARSAMIYA,
More informationEnvironmental Guideline on Stone crushing plant set up temporarily for the purpose of a project by a public department
2017 [Type a quote from the document or the summary of an interesting point. You can position the text box anywhere in the document. Use the Drawing Tools tab to change the formatting of the pull quote
More informationCity of Bishop. Environmental Checklist Form
City of Bishop Environmental Checklist Form 1. Project title: Environmental Review / 2007 California Building Codes 2. Lead agency name and address: City of Bishop 377 W. Line Street Bishop, Ca 93514 3.
More informationLEED Credits. How FieldTurf Can Contribute To Obtaining
How FieldTurf Can Contribute To Obtaining LEED Credits AlternaScapes, Inc. 2231 Whitfield Park Ave Sarasota, FL 34243 Phone: 941-753-3312 Toll Free: 800-445-2944 Fax: 941-753-3314 Email: info@justlikegrass.com
More informationThe emphasis on the EMP development is on the following;
ENVIRONMENTAL MANAGEMENT PLAN 1.1 INTRODUCTION The Environmental Management Plan (EMP) is aimed at mitigating the possible adverse impact of a project and ensuring the existing environmental quality. The
More informationENVIRONMENTAL MANAGEMENT PLAN 1.1 INTRODUCTION 1.2 EMP DURING CONSTRUCTION PHASE
ENVIRONMENTAL MANAGEMENT PLAN 1.1 INTRODUCTION The Environmental Management Plan (EMP) is aimed at mitigating the possible adverse impact of a project and ensuring the existing environmental quality. The
More informationFORD GLOBAL TECHNOLOGY AND BUSINESS CENTRE FORD MOTOR PRIVATE LIMITED
FORD GLOBAL TECHNOLOGY AND BUSINESS CENTRE FORD MOTOR PRIVATE LIMITED Ford Motor Private Limited- Conceptual Plan 1 Contents 1 INTRODUCTION 3 1.1 BACKGROUND 3 1.2 PROJECT LOCATION 3 1.3 PROJECT FEATURES
More informationEXECUTIVE SUMMARY ON ENVIRONMENTAL IMPACT ASSESSMENT REPORT
EXECUTIVE SUMMARY ON ENVIRONMENTAL IMPACT ASSESSMENT REPORT For CHHATTISGARH ENVIRONMENT CONSERVATION BOARD CHHATTISGARH 0 P a g e 1.0 INTRODUCTION SUMIT ISPAT PVT. LTD. has proposed to establish Submerged
More informationThe emphasis on the EMP development is on the following;
ENVIRONMENTAL MANAGEMENT PLAN 1.1 INTRODUCTION The Environmental Management Plan (EMP) is aimed at mitigating the possible adverse impact of a project and ensuring the existing environmental quality. The
More informationOverburden dumps are stacked separately as per the guidelines and the same will be used for backfilling in mined out area.
ENVIRONMENT CLEARANCE COMPLIANCE STATUS ENVIRONMENT CLEARANCE No. J-11015/406/2006-IA.II(M) dt. 13/04/2007 DHANGARWADI MINES Sr. CONDITIONS COMPLIANCE No. A) Specific Conditions :- i) Top soil to be stacked
More informationCOMPLIANCE REPORT OF ENVIRONMENTAL CLEARANCE FOR THE PERIOD OF OCTOBER TO MARCH-2017
COMPLIANCE REPORT OF ENVIRONMENTAL CLEARANCE FOR THE PERIOD OF OCTOBER - 2016 TO MARCH-2017 F.No. SEIAA 281/2014/EC/110 SUBMITTED BY- M/S. TERON CONSTRUCTION PVT. LTD MAA PADMA COMMERCIAL COMPLEX, H/N-
More informationFORM 1. 4 New/expansion/modernization New 5 Existing capacity/area etc Category of project i.e. A or B B 7
FORM 1 (I) Basic Information Item Details 1 Name of the Project Govindji Recidency 2 S. number in schedule 8 (a) 3 Proposed capacity/ area/ length/ tonnage to be handled/command area/lease area/number
More informationADDITIONAL ATTACHMENTS TO FORM-1 M/S. SDB DIAMOND BOURSE
ADDITIONAL ATTACHMENTS TO FORM-1 FOR OBTAINING ENVIRONMENT CLEARANCE For Proposed Commercial Complex Surat Diamond Bourse M/S. SDB DIAMOND BOURSE Block No. 177/P, Moje- Khajod, Taluka- Surat City, District
More informationHealth and safety norms of CPWD should be followed during construction.
Status of Compliance of Conditions of the Environmental Clearance Issued to Riveria Commercial Developers Ltd. DLF Center, Sansad Marg, New Delhi 110001- Construction of "YASHWANT PLACE COMMUNITY CENTRE"
More informationsqm. 123 kld (Landscaping - 31 kld, Dual Flushing 73 kld Car Washing - 19 kld) Quantity Of Wastewater Discharge
DETAILS OF PROJECT The project proponent wants to develop a Residential Building with all modern amenities Premises No. 116, Roy Bahadur Road (previously known as 352, Roy Bahadur Road), Kolkata - 700053
More informationBHORER ALO ECO TOURISM PROJECT AT GAJALDOBA, JALPAIGURI
TERMS OF REFERENCE (TOR) FOR AN ENVIRONMENTAL IMPACT ASSESSMENT (EIA) FOR BHORER ALO ECO TOURISM PROJECT AT GAJALDOBA, JALPAIGURI AT PLOT NO.: 63, 67-70, 72-101 AND 105, MOUZA-JUNGLE MOHAL, JL. NO. 01,
More informationCOMPLIANCE TO THE CONDITIONS LAID BY MoEF VIDE CRZ CLEARANCE No.11/32/2009-IA.III dated
COMPLIANCE TO THE CONDITIONS LAID BY MoEF VIDE CRZ CLEARANCE No.11/32/2009-IA.III dated 10.08.2009 Period : January 2018 to June 2018 Sl.No. CONDITIONS STIPULATED BY MoEF COMPLIENCE Specific Conditions
More informationLIST OF ANNEXURES S.No Description Annexure
LIST OF ANNEXURES S.No Description Annexure 1. EC Letter Annexure 1(a) 2. MoEF Letter Annexure 1(b) 3. CLU Annexure 2 4. BOR Annexure 3 5. MOA Annexure 4(a) 6. List of Directors Annexure 4(b) 7. Undertaking
More informationEnvironmental Guideline on livestock rearing including cattle, goat and sheep (up to 20 cattle heads, 50 goat heads and 50 sheep heads)
2018 No.29 Environmental Guideline on livestock rearing including cattle, goat and sheep (up to 20 cattle heads, 50 goat heads and 50 sheep heads) Department of Environment The purpose of this environmental
More informationApproval of Terms of Reference (TOR) For Development of Smart City Project, Ranchi, Jharkhand. M/s Ranchi Smart City Corporation Limited.
1. INTRODUCTION The proposed Development of Smart City Project is at Ranchi, Jharkhand. The developer of the project is M/s Ranchi Smart City The Land use of the project site is as per master plan of the
More informationEnvironmental Management Plan
Environmental Management Plan 1. OBJECTIVE The objective of Environmental Management Plan (EMP) is to formulate which will: Mitigate adverse impacts on various environmental components, which have been
More informationFORM 1 & 1A REDEVELOPMENT OF BOMBAY DEVELOPMENT DIRECTORATE (BDD) CHAWLS. At Naigaon, Dadar-Mumbai, Maharashtra
FORM 1 & 1A REDEVELOPMENT OF BOMBAY DEVELOPMENT DIRECTORATE (BDD) CHAWLS At Naigaon, Dadar-Mumbai, Maharashtra By MUMBAI HOUSING AND AREA DEVELOPMENT BOARD (A regional unit of MHADA) Griha Nirman Bhavan,
More informationDetails of Project. Underground source
Details of Project The project proponent wants to develop a Residential complex with all modern amenities at R.S./L.R. Dag No - (442,447,453,454, 443,444), J.LNo-29 Of Khamar Mouja & R.S./L.R. Dag No-(99(P),101,102(P),103,105,106,107,108,109,110,111,112,113(P),114(P),115,125,126,
More informationConceptual plan. Table 1:Area Statement for proposed Corporate Office Complex AREA STATEMENT: -
Conceptual plan Table 1:Area Statement for proposed Corporate Office Complex AREA STATEMENT: - Area of plot= 5293SQM, Sanctioned FAR = 10586SQM as per earlier sanctioned.(2) Sanctioned Built up Area=19480.63
More informationThe emphasis on the EMP development is on the following;
ENVIRONMENTAL MANAGEMENT PLAN 1.1 INTRODUCTION The Environmental Management Plan (EMP) is aimed at mitigating the possible adverse impact of a project and ensuring the existing environmental quality. The
More informationFORM 1 & 1 A GRACE LAND RESIDENTIAL & COMMERCIAL DEVELOPMENT WITH AMENITY. Village- Bhugaon, Parde No.4, Taluka- Mulshi, Dist.
FORM 1 & 1 A GRACE LAND RESIDENTIAL & COMMERCIAL DEVELOPMENT WITH AMENITY At Village- Bhugaon, Parde.4, Taluka- Mulshi, Dist. Pune, Maharashtra By Ms. MOHOL CONSTURCTION PVT. LTD. FORM 1 GRACE LAND RESIDENTIAL
More informationFORM-1 A CHECK LIST OF ENVIRONMENTAL IMPACTS
San Envirotech Pvt. Ltd. FORM-1 A CHECK LIST OF ENVIRONMENTAL IMPACTS 1. LAND ENVIRONMENT 1.1. Will the existing land-use get significantly altered from the project that is not consistent with the surroundings?
More informationRAJASTHAN REFINERY TOWNSHIP PROJECT, RAJASTHAN
Page 1 of 10 PRE-FEASIBILITY REPORT FOR Page 2 of 10 Contents 1.0 Introduction... 3 2.0 Approach... 3 3.0 Environmental Sustainability Measures... 4 3.1 Environmental Measures... 4 3.2 Social measures...
More informationFORM 1 & 1 A. Proposed Residential Project. Sr. No. 25/2/2A Kondhwa Bk. Tal. Haveli Dist. Pune. M/s. ANISHKA DEVELOPERS PVT. LTD.
FORM 1 & 1 A Proposed Residential Project At Sr. 25/2/2A Kondhwa Bk. Tal. Haveli Dist. Pune By M/s. ANISHKA DEVELOPERS PVT. LTD. FORM 1 M/s. Anishka Developers Pvt. Ltd. 1 FORM 1 Proposed Residential Project
More informationSIX MONTHLY COMPLIANCE REPORT DECEMBER- 2016
SIX MONTHLY COMPLIANCE REPORT DECEMBER- 2016 GROUP HOUSING COMPLEX MAHAGUN MANTRA - II AT GH-01, Sector-10, Greater Noida, U.P. Being developed by. The Corenthum Tower-B, Office no. B-44, Plot no.-a-41,
More informationBRIEF SUMMARY OF THE PROJECT
BRIEF SUMMARY OF THE PROJECT Office Complex at Plot No. 5A & 5B, Shopping Mall, Vasant Kunj Phase - II, New Delhi Developed by M/s Oil and Natural Gas Corporation Limited BRIEF DESCRIPTION OF THE PROJECT
More informationS. No. 69 A, 69 B/1, 69 B/2, 69 C, Manjari Budruk, Pune, State - Maharashtra.
FORM 1 & 1 A DREAMS NANDINI At S. 69 A, 69 B/1, 69 B/2, 69 C, Manjari Budruk, Pune, State - Maharashtra. By M/s. Dreams Corporation Pvt. Ltd Form 1 Dreams Nandini, Manjari Bk, Pune. 0 FORM 1 DREAMS NANDINI
More informationSample Questions for Paper 4 Building Services & Environmental Controls
Basic Principle 1. Which of the following is fundamental in preventing the spread of legionnaires disease in building services installations? A. Using CFC refrigerants for chiller plants B. Using single-stack
More informationGUIDE TO THE DEVELOPMENT OF A MINING AND RECLAMATION PLAN IN NEW BRUNSWICK
PROVINCE OF NEW BRUNSWICK DEPARTMENT OF ENERGY AND RESOURCE DEVELOPMENT Minerals and Petroleum Development Branch GUIDE TO THE DEVELOPMENT OF A MINING AND RECLAMATION PLAN IN NEW BRUNSWICK Guide to the
More informationFORM 1 & 1 A AMRUT MANTHAN, MAHALAXMI + SYNERGY 3
FORM 1 & 1 A AMRUT MANTHAN, MAHALAXMI + SYNERGY 3 At C.T.S.. 4091, 4091/1 to 37, 4097, 4097/1 to 5, 4090B & 4090A/2 to 19 of Village Kolekalyan, Vakola pipeline Santacruz (E), Mumbai, Maharashtra. By M/s.
More informationAPPENDIX M CEQA Initial Study Checklist
APPENDIX M CEQA Initial Study Checklist Appendix G ENVIRONMENTAL CHECKLIST FORM (To be Completed by Applicant) 1. Project title: 2. Lead agency name and address: 3. Contact person and phone number: 4.
More informationIGBC certification in multi dwelling residential developments S I M P L I F I E D. Arpan Johari Principal architect AW design.
IGBC certification in multi dwelling residential developments S I M P L I F I E D Arpan Johari Principal architect AW design. India Energy efficiency division of ENERGY EFFICIENCY, ARCHITECTURE, INTERIORS,
More informationApplication of Low and Non Waste Technology in the production process;
9.0 ENVIRONMENT MANAGEMENT PLAN (EMP) 9.1 INTRODUCTION Environment Management Plan is required for ensuring sustainable development. It should not affect the surrounding environment adversely. The management
More informationPre-Feasibility Report For
Pre-Feasibility Report For Proposed New Project for manufacturing of Intermediates of Agro Chemicals & Synthetic Organic Chemicals. By M/s. MANBRO POLYMERS LIMITED, Plot No. D-2/CH-275, INDUSTRIAL ESTATE,
More informationEnvironmental Guideline on Food Canning Industry
2017 [Type a quote from the document or the summary of an interesting point. You can position the text box anywhere in the document. Use the Drawing Tools tab to change the formatting of the pull No. quote
More informationAmrut Manthan + Shree Mahalaxmi & Primus Residences by M/s Gurukrupa Developers ENVIRONMENTAL MANAGEMENT PLAN Introduction M/s Gurukrupa Developers pr
ENVIRONMENTAL MANAGEMENT PLAN Introduction M/s Gurukrupa Developers proposes a Slum Rehabilitation project Amrut Manthan + Shree Mahalaxmi & Primus Residences located at C.T.S. No. 4091, 4091/1 to 37,
More informationCharter Township of Garfield Grand Traverse County
Charter Township of Garfield Grand Traverse County 3848 VETERANS DRIVE TRAVERSE CITY, MICHIGAN 49684 PH: (231) 941-1620 FAX: (231) 941-1588 SPECIAL USE PERMIT APPLICATION APPLICANT INFORMATION Name: Address:
More informationEXECUTIVE SUMMARY SLUM AREA REDEVELOPMENT
EXECUTIVE SUMMARY SLUM AREA REDEVELOPMENT AT C.T.S. NO. 8 (PT) OF VILLAGE PARIGHAKHADI, TAL ANDHERI & C.T.S. NO. 577 (PT), 578, 579, 580 & 581 (PT) OF VILLAGE KURLA, NEAR KURLA COURT, L.B.S. MARG, KURLA
More informationFORM I. [Vide M.o.E.F & C.C Notification dated 14 th September, 2006] For Proposed Residential & Commercial Project ALCOVE. M/s.
FORM I [Vide M.o.E.F & C.C tification dated 14 th September, 2006] For Proposed Residential & Commercial Project ALCOVE At. 100/1, 100/2, 100/3, 100/4, 100/5, 100/6B, 101/1, 101/2, 101/3, 101/4, 101/5B,
More informationPre-Feasibility Report
Pre-Feasibility Report 1. Executive Summary Residential, Commercial, Retail and Hotel projects and an IT/ITES. The Project has already obtained an Environmental Clearance from Ministry of Environment &
More informationSEPA Environmental Checklist
Purpose of the Checklist: The State Environmental Policy Act (SEPA), chapter 43.21 RCW, requires all governmental agencies, including the City of Ferndale to consider the environmental impacts of a proposal
More informationSr. No. Date of starting the project and completion schedule. January 2012 January 2017 (Tentative)
Six Monthly Progress Report reg. Construction of Group Housing Colony at village Sarai Aurangabad in Sector 3-A, Bahadurgarh (Distt. Jhajjar), Haryana by M/s Prabhu Shanti Real Estate Pvt. Ltd., due in
More informationEnvironmental Clearance Application For Proposed Residential Project. "Aarohi"
Environmental Clearance Application For Proposed Residential Project "Aarohi" At Plot bearing survey no. 123/1, 123/2, 123/3, 123/3/2(P), 123/4/2(P), 123/6/2, At - Sus, Tal. Mulshi, Pune Of M/s Teeth Developers
More informationEnvironmental Clearance for Proposed development at Kandivali (E), Mumbai ANNEXURES
ANNEXURES 35 LIST OF ANNEXURES Annexure I : Solid Waste Management Annexure II : Water Supply & Wastewater Management Annexure III : Proposed Area Statement Annexure IV : Environmental Management Plan
More informationAPPENDIX I (See paragraph 6) Form 1 (I) Basic Information
APPENDIX I (See paragraph 6) Form 1 (I) Basic Information Sr.. Item Details 1 Name of the Project/s Proposed expansion in Environment Clearance for Residential and Commercial project by Manikchand Kumar
More informationAPPENDIX I. Yelahanka Hobli District
APPENDIX I (See paragraph 6) FORM 1 (I) Basic Information 1 Name of the Project H M rth City 2 S.. in the schedule Serial. 8 (a) of schedule 3 Proposed capacity/area/ length/tonnage to be handles/command
More information