1 City of Grenora, ND Municipal Infrastructure Needs Assessment August 2012 Project made possible by US Dept. of HUD Regional Substantiality Planning Grant and ND Energy Development Infrastructure and Impact Grant Fund programs

2 Summary of Needs Assessment The City of Grenora (City), located in Williams County, North Dakota, is experiencing a population increase due to energy development activities, with current proposed developments expected to increase the City s population from an estimated 350 people to 850 people by This infrastructure needs assessment is intended as a high-level analysis and concept planning effort focused on key short-term infrastructure needs necessary to accommodate the anticipated growth and development. Table 1 summarizes the recommended infrastructure improvements, and opinions of cost included within this report. DESCRIPTION TABLE 1 SUMMARY OF INFRASTRUCTURE IMPROVEMENTS AND COST OPINIONS COST OPINION Water Supply and Storage System Improvements $ 4,494,000 Wastewater System Improvements $ 6,161,000 Street System Improvements $ 6,928,000 TOTAL OPINION OF COST $ 17,583,000 Introduction The Vision West ND initiative was commenced in February 2012 to provide planning and technical assistance to a rapidly expanding 19-county area in western North Dakota. The primary goals of the Vision West ND project are to assist communities and counties in the western region of North Dakota in addressing near-term needs to meet growth management challenges, and establish a diversified economy in the future through the development of local and regional strategic plans. Rapid population growth is exerting significant pressure on existing municipal water, sewer, and street systems and, in some cases, infrastructure expansion is necessary to support current and anticipated growth. Participating communities will receive a high-level infrastructure assessment to identify needs, prioritize infrastructure improvements, and opinions of probable costs by a professional engineering team. Building Communities, Inc. is the lead strategic planner engaged in the Vision West ND initiative and has subcontracted with Advanced Engineering & Environmental Services (AE2S) to provide technical expertise regarding municipal infrastructure. This report includes brief infrastructure inventory, needs assessment, and opinions of probable costs for infrastructure improvements for the City of Grenora, North Dakota. The information used to prepare this assessment for the City was compiled by AE2S during an interview with City officials on July 18, City of Grenora Infrastructure Needs Assessment 2

3 COMMUNITY OVERVIEW The City of Grenora (City) is located in the northwest corner of Williams County, one of the heaviest impacted areas in the Bakken oil boom. The City is located 45 miles northwest of the City of Williston, the primary economic hub in the Bakken Formation oil development. It was recently reported by the Grand Forks Herald that more than half of the City of Williston's residents now work in oil-related jobs, the City's unemployment rate is less than 1 percent and there are more than 3,000 unfilled jobs. In 2010, the Census recorded the City s population 242 people. Presently, there are 140 utility accounts with 129 residential accounts and 11 commercial accounts. City officials estimate 40 utility accounts are associated with oil industry employees with this number increasing daily. The City has a 20-unit RV Park that is full and not accepting any additional names for the waiting list. The RV Park is not charged for water or metered as it is City owned. The current population is estimated at 350 people. Grenora City of Grenora Infrastructure Needs Assessment 3

4 CURRENT AND PLANNED DEVELOPMENT Presently, there are known future development plans for additional housing units as indicated below. According to City officials, known development plans include the following: 12 acres of residential single family development on the north end of town, immediately west of the school 7 to 14 acres of single family residential west of Hickman Street and north of 3 rd Avenue Conversion of the existing city-owned RV park to single family residential development 12 acres of privately owned 80-unit RV park on the east edge of town north of 3 rd Avenue The current average occupancy rate within the City is 2.5 people per housing unit. The City estimated the projected total service population will increase 240 percent from the present estimated population of 350 to 850 by There are continuous requests for housing in the community; however, there is currently no available housing. The growth pattern has increased as oil development moves into far western North Dakota and eastern Montana as well as the City s close proximity to the City of Williston. POTABLE WATER SYSTEM ASSESSMENT AND IMPROVEMENT RECOMMENDATIONS Water System Demands Based on the reported development information, and utilizing a future population estimate of 850, the average day domestic water demand is calculated as 100 gallons per day (gpd) per capita resulting in an estimated water demand of 85,000 gpd. The 100 gallons per capita per day estimate is used by Ten- State Standards (the State of North Dakota adopted standards for public water works and wastewater facilities) to predict domestic water usage in communities where no historical water meter records exist. The maximum day demand is estimated by applying a peaking factor to the average day demand. The peaking factor for small communities is estimated at 2.5. The corresponding estimated maximum day water usage is 212,500 gallons per day. Fire flows are commonly defined by the local Fire Protection Authority Having Jurisdiction or FPAHJ. When there are no local written standards, Annex H of the Uniform Fire Code indicates residential areas should have access to a 1,000 gallons per minute (gpm) flow for one hour, or 60,000 gallons of fire protection. The City is a predominately residential community with 11 commercial water accounts. Like many rural communities, the City has small diameter distribution lines that can only adequately provide 1,000 gpm fire demand. For the purpose of this assessment, a flow of 1,000 gpm with two hour duration (120,000 gallons) is assumed as the fire flow requirement for the City. City of Grenora Infrastructure Needs Assessment 4

5 Water Supply and Treatment Description The City utilizes groundwater from two wells as its water supply. Well No. 1 is the main source of water, with a depth of 45-feet and two pumps at the well. Well No. 2 is only used as needed with one pump at the well. The three pumps used by the City are a 15 horsepower (HP) submersible pump with a capacity of 110 gpm, another 15 HP submersible pump with a capacity of 105 gpm, and a 10 HP pump with a capacity of 90 gpm. Ten-State Standards require a water system to be able to meet maximum day demand with its largest well out of production. The maximum day demand is estimated at 212,500 gpd or 147 gpm. Water production from the 10 HP pump and the 15 HP pump can provide 195 gpd which is enough to provide the City with firm capacity for a population of 850. Water Treatment Description The only treatment to the water before distribution is disinfection, however City officials noted it is extremely hard water. Hardness is a secondary drinking water standard which is non-enforceable because it does not pose a health risk, however hardness is a water quality characteristic that can be a nuisance. Hardness is caused by dissolved minerals that can buildup on plumbing fixtures and interfere with soap and detergent performance. The City can safely provide water to citizens without eliminating hardness; however, if water quality or compliance with regulations becomes an issue in the future, the City should consider connecting to a rural water system such as the Western Area Water Supply Authority (WAWSA). WAWSA has included provisions to provide service to the City as part of the Phase 2 implementation plan. In order to be officially considered for the project, the City will need to notify WAWSA. Water Distribution and Storage Description The original distribution piping was installed in the 1930s and 1940s, and is comprised of cast iron pipe. Cast iron pipe has not been manufactured since the 1980s due to the material s tendency to corrode from surrounding soil, or water conveyed within the pipe. The City has not undertaken any major replacement projects, only repairing a number of water line breaks each year. The existing water tower was constructed in the 1930s and was recently inspected (with deficiencies identified). The storage capacity of the water tower is 50,000 gallons. To feasibly provide fire flow through the distribution piping most pipes to hydrants will need to be at least six inches in diameter, which is the size of the City s water pipes. With anticipated water storage requirements of 120,000 gallons for fire flows and 85,000 gallons needed for domestic use, the total storage required to serve the additional developments is approximately 205,000 gallons. Since water tower sizes are typically rounded up to the nearest nominal tank size, 250,000 gallons would be the City of Grenora Infrastructure Needs Assessment 5

6 necessary storage volume. Given the age of the existing water tower and the need for reconditioning, the City should consider installing a single 250,000 gallon elevated tower and decommissioning the existing tower. Often water towers built 50 years ago or more do not meet current Occupational Safety and Health Administration standards, and the construction, magnitude of rehabilitation, and common downtown location result in high rehabilitation costs. Because more water storage is necessary now, the best long-term solution for the City is to abandon the existing 50,000 gallon water tower and construct a new 250,000 gallon elevated tower. The City meters individual users except mobile homes and structures without basements. The current water rate is $23 per month for the first 3,500 gallons and $1.75 per 1,000 gallons thereafter. The City carries no long-term debt on the water system infrastructure. Water Supply, Storage, and Distribution Improvement Recommendations While water quality and quantity appear satisfactory, deficiencies identified in the water supply system include distribution pipelines that experience multiple breaks each year and exceed the typical useful service life, and a lack of sufficient water storage to meet future daily water demand. Recommended improvements include replacement of the water distribution system and construction of a 250,000- gallon elevated water tower. The water distribution replacement includes installation of new 6-inch and 8-inch PVC pipe, gate valves, and 6-inch hydrants. The water tower construction project would include demolition of the existing water tower and construction of the new tower, including site work, electrical and instrumentation and controls. An opinion of probable cost for the recommended improvements is presented in Table 2. WASTEWATER SYSTEM ASSESSMENT AND IMPROVEMENT RECOMMENDATIONS Existing System Description The City s wastewater system consists of a collection system that conveys wastewater to a 5.7 acre, two-cell facultative treatment lagoon located less than a half mile southwest of the City. The lagoon is permitted to discharge; however, the City has not discharged the ponds since they were constructed. System Loading Based on the known development information, the future design population is estimated at 850 people. The average domestic wastewater flows generated by the City s population in the future are estimated at 99,000 gpd (69 gpm) based on 140 gpcd for the current population on the existing collection system which has higher infiltration and inflow (I/I), and 100 gpcd for new City of Grenora Infrastructure Needs Assessment 6

7 # DESCRIPTION QTY TOTAL 1 6" PVC Watermain (Class 200 IPS) 400 $ 15, " PVC Watermain (Class 200 IPS) 17,500 $ 805, " Gate valve and box 36 $ 46, " Gate valve and box 59 $ 106, " Fire hydrant 36 $ 151,200 6 Fittings 5,200 $ 26,000 7 Temporary Water Service 1 $ 60,000 8 Connections to water service 300 $ 225, ,000 gallon water tower 1 $ 981, Water tower sitework, electrical, SCADA 1 $ 206, Water tower demolition 1 $ 45, Traffic Control 1 $ 5,000 Subtotal TABLE 2 OPINION OF PROBABLE COST GRENORA WATER SYSTEM IMPROVEMENTS WATER DISTRIBUTION AND TOWER $ 2,673,600 Mobilization/Bonding/Insurance 8% $ 213,888 Contingency 20% $ 534,720 Construction Total (2012 dollars) $ 3,422, Construction Cost % $ 3,637,674 Engineering 20% $ 684,442 Legal & Administrative 5% $ 171,110 TOTAL 2 $ 4,494,000 1 The ENR 20 year average Construction Cost Index is +3.1% (as of November 2009), so capital costs are projected to an anticipated 2 Value rounded up to nearest thousand wastewater expansions to serve the additional 500 residents. The future peak hour factor is assumed at 5.0, which is typical for small communities in this region. The peak flow is estimated to be 344 gpm. Wastewater Collection System Existing Conditions and Deficiencies The existing sewer system was installed in the 1930 s and 40 s constructed of vitrified clay pipe. City officials stated that the most common problems are tree roots intrusion and solids settling which causes blockage, as well as the need to repair several manholes. Collection system cleaning is performed on an as-needed basis. The existing wastewater pipes are eight, ten, and 12 inches in diameter, and no lift stations are presently necessary as all sewage flows can reach the lagoons by gravity. City of Grenora Infrastructure Needs Assessment 7

8 Wastewater Treatment System Existing Conditions and Deficiencies The City s lagoon is a dual-cell system located less than a half mile southwest of the City. Little documentation is available on the 5.7 acre system, but solids have never been removed and discharges have never been required. The lagoon is designed to operate in series. The 2.3 acre east cell serves as the primary cell and the 3.4 acre west cell is the secondary cell. The discharge pipe in the secondary cell discharges into a nearby wetland; however, its functionality is unknown since it has not been utilized since construction. Using an aerial photo of the lagoons and GIS software, the area of the lagoons was measured. This method cannot identify the height or slope of the lagoon dike walls, so, an assumption on dike height has been developed based upon similar lagoons built in the area around the same time. The assumed lagoon dike height is eight feet with a five foot water depth and two feet at the bottom of the pond reserved for sludge storage. Thus the assumed storage volume is 5.3 million gallons. According to a USGS Evaporation Study, evaporation in this area occurs at an average rate of approximately 28 inches per year. A weather gauging station in Minot, North Dakota indicates the average annual precipitation is 17.2 inches per year. Net evaporation is estimated as 10.8 inches per year. Therefore, the estimated annual evaporation from the lagoon is 1.67 million gallons. Note that the evaporation occurs predominately in the summer, so the lagoons do not benefit much from evaporation in the winter months. The North Dakota Department of Health (NDDH) regulations establish a seepage limit of 1/8-inch per day. Based upon the current wastewater usage, evaporation, and allowable seepage, the ponds should be full, on average, every 188 days. NDDH regulations do not allow rapid infiltration as a means of wastewater disposal, but rather, permit treated effluent to be discharged to a surface body of water or drainage. Because the ponds have never been discharged, it appears the City s wastewater system unintentionally seeps effluent to groundwater, likely into the same shallow groundwater aquifer the City utilizes for drinking water. In order to reduce discharge to within the allowable seepage limit of 1/8-inch per day, the lagoon would need to be lined. Design criteria for the lagoon system are based on five day biological oxygen demand (BOD) loading rates and a hydraulic volume requirement. NDDH standards establish a maximum BOD load of 30 pounds per day (ppd) in the primary cell, and 20 ppd for the entire lagoon system. The NDDH minimum volume standard is 180-days of storage. Based on a population of 850 with assumed flows as previously stated (99,000 gpd) and BOD of 0.18 pounds per population equivalent (PE), the existing lagoons cannot meet future population needs. City of Grenora Infrastructure Needs Assessment 8

9 With a population of 850, the existing lagoon has only 56 days of storage, and the BOD is estimated to be above the maximum loading rate at 66.5 ppd and 26.8 ppd respectively in the primary cell and total system. The existing treatment lagoon needs to be expanded to increase both size and depth with the hydraulic capacity controlling the design as shown in Table 3. The current wastewater rates are $5 per month and there is no long-term debt associated with the wastewater system. TABLE 3 WASTEWATER TREATMENT REQUIREMENTS EXISTING CAPACITY AT EXISTING SYSTEM FUTURE FLOW/LOAD DESIGN CRITERIA RECOMMENDED IMPROVEMENTS Hydraulic Capacity 56 days storage 180 days storage capacity (minimum) 124 additional days storage capacity (12.5 million gallons) Primary Cell BOD 66.5 ppd BOD per acre 30 ppd BOD per acre Minimum 5.1 acre cell Loading (maximum) Overall BOD Loading 26.8 ppd BOD per acre 20 ppd BOD per acre (maximum) Minimum 7.7 acre total system Wastewater Collection and Treatment System Recommended Improvements The existing collection system is at or beyond its useful service life. The City may consider a wastewater system lining. Wastewater system lining is an alternative to recondition the existing pipe without the need to excavate and replace the roadway above the pipe. However, with the recommended water distribution system replacement, the City should also consider replacing the wastewater collection system as a long-term solution. When the water system is replaced, street removal, excavation, and reconstruction is necessary and represents a significant portion of the project cost, which could be shared with the wastewater replacement. Wastewater collection replacement would include installation of new 8, 10, and 12-inch PVC pipe and manholes. The existing lagoon cells should be lined, and additional storage is necessary to meet proper design criteria. The proposed treatment system improvements were developed based on the primary lagoon BOD loading rate, the total system BOD loading rate, and the 180-day storage requirement. All three design criteria should be met for successful wastewater treatment; therefore, the most restrictive of these criteria controls the evaluation. The 180-day storage requirement controls the design of the expansion. The improvements required to address the wastewater treatment system deficiencies include: Remove sludge from existing system; Raise existing cell dike height to 9-feet; Install clay liner in existing cells; Construct new secondary cell; and, City of Grenora Infrastructure Needs Assessment 9

10 Install outlet structure and piping. An opinion of costs for the recommended improvements is presented in Table 4. TABLE 4 OPINION OF PROBABLE COST WASTEWATER SYSTEM IMPROVEMENTS COLLECTION REPLACEMENT AND POND EXPANSION # DESCRIPTION QTY TOTAL 1 8" SDR 35 sanitary sewer 10,900 $ 523, " SDR 35 sanitary sewer 750 $ 37, " SDR 35 sanitary sewer 750 $ 41, " diameter sanitary manhole 43 $ 202,100 5 Temporary sewer service 1 $ 60,000 6 Connect to existing sanitary manhole 12 $ 30,000 7 Connect to existing sanitary sewer lateral 294 $ 220,500 8 Traffic Control 1 $ 25,000 9 Excavation 34,500 $ 517, Clay Liner imported 52,550 $ 1,313, " Riprap 9,000 $ 360, Geotextile Fabric 11,400 $ 31, Finish Grading, Seeding, Fence 1 $ 40, Access Roads 7,750 $ 193, inch gravity yard pipe 650 $ 48, inch gate valves 5 $ 9, Outfall Apron 1 $ 3,000 Subtotal $ 3,656,900 Mobilization/Bonding/Insurance 8% $ 292,552 Contingency 20% $ 731,380 Construction Total (2012 dollars) $ 4,680, Construction Cost 1 3.1% $ 4,975,542 Geotechnical Investigation $ 15,000 Engineering 20% $ 936,166 Legal & Administrative 5% $ 234,042 TOTAL 2 $ 6,161,000 1 The ENR 20 year average Construction Cost Index is +3.1% (as of November 2009), so capital costs are projected to an anticipated construction date in 2014 using an annual 3.1% inflation rate. 2 Estimate rounded up to nearest thousand City of Grenora Infrastructure Needs Assessment 10

11 STREET AND STORMWATER SYSTEM ASSESSMENT AND RECOMMENDED IMPROVEMENTS Street and Stormwater System Assessment The City streets were paved in 1979, including curb and gutter and valley gutters, but are in poor condition. Since construction, the City has not had an overlay or chip seal project. All maintenance to date has consisted of patching and crack sealing. The paved streets consist of four inches of gravel topped with two inches of pavement. The City limits truck traffic within the City as none of the streets were built to support heavy or large volume truck traffic. There is no debt on the street system. Street System Recommended Improvements Recommended improvements include full depth mill and salvage of the asphalt surface, a new street base of milled asphalt and class 5 aggregate, four inches of new asphalt pavement, and intermittent curb and gutter and valley gutter replacement. Without a full street assessment, quantities for the recommended repairs were drawn from a cost estimate provided by Ameritech Engineering Corp. Also, it is recommended that the recommended street repairs are completed simultaneously with the recommended water and wastewater pipeline replacements below the street. Completing the three infrastructure improvements simultaneously would save in overall construction costs. An opinion of costs for the recommended street improvements is presented in Table 5. CONCLUSION In conclusion, the City will likely need to implement approximately $17.6 million in water, wastewater, street and stormwater infrastructure improvements to address current deficiencies and meet pending development demands. These improvements include water main replacement, a new water tower, wastewater collection replacement, wastewater lagoon expansion and rehabilitation, and street and storm sewer reconstruction. City of Grenora Infrastructure Needs Assessment 11

12 TABLE 5 OPINION OF PROBABLE COST STREET IMPROVEMENTS STREET REPLACEMENT # DESCRIPTION QTY TOTAL 1 Milling of asphalt surface 58,000 $ 406,000 Street base - 50/50 blend millled asphalt 2 and type A3, Class 5 82,650 $ 991, " Asphalt 82,650 $ 2,644,800 4 Remove curb and gutter 510 $ 2,300 Remove concrete 475 $ 5,300 Curb and gutter 510 $ 10,200 Concrete valley gutter 620 $ 43,400 7 Traffic Control 1 $ 15,000 Subtotal $ 4,118,800 Mobilization/Bonding/Insurance 8% $ 329,504 Contingency 20% $ 823,760 Construction Total (2012 dollars) $ 5,272, Construction Cost % $ 5,603,998 Street Assessment $ 5,000 Engineering 20% $ 1,054,413 Legal & Administrative 5% $ 263,603 TOTAL 2 $ 6,928,000 1 The ENR 20 year average Construction Cost Index is +3.1% (as of November 2009), so capital costs are projected to an anticipated construction date in 2014 using an annual 3.1% inflation rate. 2 Estimate rounded up to nearest thousand The work that provided the basis for this publication was supported by funding under an award with the U.S. Department of Housing and Urban Development. The substance and findings of the work are dedicated to the public. The author and publisher are solely responsible for the accuracy of the statements and interpretations contained in this publication. Such interpretations do not necessarily reflect the views of the Government. City of Grenora Infrastructure Needs Assessment 12

City of Surrey, ND Municipal Infrastructure Needs Assessment September 2012

City of Surrey, ND Municipal Infrastructure Needs Assessment September 2012 City of Surrey, ND Municipal Infrastructure Needs Assessment September 2012 Project made possible by US Dept. of HUD Regional Substantiality Planning Grant and ND Energy Development Infrastructure and

More information

City of Crosby, ND Municipal Infrastructure Needs Assessment September 2012

City of Crosby, ND Municipal Infrastructure Needs Assessment September 2012 City of Crosby, ND Municipal Infrastructure Needs Assessment September 2012 Project made possible by US Dept. of HUD Regional Substantiality Planning Grant and ND Energy Development Infrastructure and

More information

City of Parshall, ND Municipal Infrastructure Needs Assessment August 2012

City of Parshall, ND Municipal Infrastructure Needs Assessment August 2012 City of Parshall, ND Municipal Infrastructure Needs Assessment August 2012 Project made possible by US Dept. of HUD Regional Substantiality Planning Grant and ND Energy Development Infrastructure and Impact

More information

City of Medora, ND Wastewater Infrastructure Needs Assessment November 2012

City of Medora, ND Wastewater Infrastructure Needs Assessment November 2012 City of Medora, ND Wastewater Infrastructure Needs Assessment November 2012 Project made possible by US Dept. of HUD Regional Substantiality Planning Grant and ND Energy Development Infrastructure and

More information

Permit for Construction of an Extension to a JEA Drinking Water Distribution System and/or JEA Wastewater Collection/Transmission System

Permit for Construction of an Extension to a JEA Drinking Water Distribution System and/or JEA Wastewater Collection/Transmission System Permit for Construction of an Extension to a JEA Drinking Water Distribution System and/or JEA Wastewater Collection/Transmission System INSTRUCTIONS: This form shall be completed and submitted (in duplicate)

More information

3.0 DESIGN CRITERIA FOR SANITARY SEWER FACILITIES

3.0 DESIGN CRITERIA FOR SANITARY SEWER FACILITIES 3.0 DESIGN CRITERIA FOR SANITARY SEWER FACILITIES All sanitary sewers shall be designed in accordance with these Design Standards, LBWD Rules and Regulations, and to accepted engineering principles. In

More information

CITY OF PANAMA CITY BEACH Utilities Administration & Engineering Offices 116 South Arnold Road Panama City Beach, FL 32413

CITY OF PANAMA CITY BEACH Utilities Administration & Engineering Offices 116 South Arnold Road Panama City Beach, FL 32413 Page: 1 of 5 CITY OF PANAMA CITY BEACH Utilities Administration & Engineering Offices 116 South Arnold Road Panama City Beach, FL 32413 COMMERCIAL/RESIDENTIAL UTILITY PLAN COMPLETENESS CHECK LIST Updated

More information

Page Intentionally Left Blank

Page Intentionally Left Blank Page Intentionally Left Blank Julie Avenue and Hoeschler Drive Lift Stations Evaluation City of Sparta TABLE OF CONTENTS Page CHAPTER 1 GENERAL INFORMATION... 1 1.1 Scope of Lift Station Evaluation...

More information

Feasibility Report for City of Worthington, Minnesota West Gateway Drive Area Sewer & Water Extensions November 17, 2017

Feasibility Report for City of Worthington, Minnesota West Gateway Drive Area Sewer & Water Extensions November 17, 2017 Feasibility Report for City of Worthington, Minnesota West Gateway Drive Area Sewer & Water Extensions November 17, 2017 Prepared By: Introduction The purpose of this report is to determine the feasibility

More information

City of Logan Sanitary Sewer Design Standards

City of Logan Sanitary Sewer Design Standards City of Logan Sanitary Sewer Design Standards 2011 http://www.loganutah.org/public_works/engineering/stdsspecsdesign.cfm Table of Contents PART 1. CITY OF LOGAN SANITARY SEWER SYSTEM DESIGN STANDARDS FOR

More information

CHAPTER 4 SYSTEM DESIGN CRITERIA

CHAPTER 4 SYSTEM DESIGN CRITERIA INTRODUCTION CHAPTER 4 SYSTEM DESIGN CRITERIA Adequate design of the District s wastewater conveyance facilities requires the determination of the quantity of wastewater from contributing sources. The

More information

Complex Sewage Disposal Course 2017

Complex Sewage Disposal Course 2017 Complex Sewage Disposal Course 2017 Updates to the Technical Guidance Manual This information is based on the most recent version of the TGM. Updates from previous versions can be found on DEQ s website

More information

INFRASTRUCTURE ELEMENT

INFRASTRUCTURE ELEMENT Goals, Objectives and Policies INFRASTRUCTURE ELEMENT SANITARY SEWER GOAL 4.A.1.: PROVIDE ADEQUATE CENTRAL SANITARY SEWAGE FACILITIES FOR RESIDENTIAL AND NON-RESIDENTIAL DEVELOPMENT AND REDEVELOPMENT IN

More information

PART II. - SPECIFICATIONS AND DESIGN STANDARDS TO CITY OF HEWITT, TEXAS SUBDIVISION ORDINANCE FOR PUBLIC WORKS CONSTRUCTION [TEXT]

PART II. - SPECIFICATIONS AND DESIGN STANDARDS TO CITY OF HEWITT, TEXAS SUBDIVISION ORDINANCE FOR PUBLIC WORKS CONSTRUCTION [TEXT] PART II. - SPECIFICATIONS AND DESIGN STANDARDS TO CITY OF HEWITT, TEXAS SUBDIVISION ORDINANCE FOR PUBLIC WORKS CONSTRUCTION [TEXT] A. - General. B. - Streets. C. - Stormwater drainage system. D. - Water

More information

Engineer s Report Infrastructure Improvements

Engineer s Report Infrastructure Improvements Gulfstream Polo Community Development District Engineer s Report Infrastructure Improvements Prepared for: Gulfstream Polo Community Development District Board of Supervisors Palm Beach County, Florida

More information

6.13 Utilities and Service Systems

6.13 Utilities and Service Systems 6.13 6.13.1 Introduction This section describes impacts for utilities and service systems that would result from construction and operation of the CEQA Alternatives. 6.13.2 Regulatory Setting There are

More information

1.0 Introduction / Study Area Authorization Purpose of Study Background 1

1.0 Introduction / Study Area Authorization Purpose of Study Background 1 Table of Contents 1.0 Introduction / Study Area... 1 1.1 Authorization 1 1.2 Purpose of Study 1 1.3 Background 1 2.0 Existing Wastewater Treatment Lagoon... 2 2.1 Existing Lagoon System 2 3.0 Future Wastewater

More information

TOWN OF MANCHESTER PLANNING AND ZONING COMMISSION Subdivision Application Minimum Submission Requirements

TOWN OF MANCHESTER PLANNING AND ZONING COMMISSION Subdivision Application Minimum Submission Requirements TOWN OF MANCHESTER PLANNING AND ZONING COMMISSION Subdivision Application Minimum Submission Requirements This checklist is to be completed and submitted with all Subdivision Applications. The Town reserves

More information

CHAPTER 4 WASTEWATER CHARACTERISTICS WASTEWATER FLOWS

CHAPTER 4 WASTEWATER CHARACTERISTICS WASTEWATER FLOWS CHAPTER 4 WASTEWATER CHARACTERISTICS Wastewater collection, treatment, and disposal facilities are designed to handle specific hydraulic and pollutant loads for 20 or more years after they are constructed.

More information

SECTION 12 STANDARDS FOR CONSTRUCTION PLANS AND SPECIFICATIONS

SECTION 12 STANDARDS FOR CONSTRUCTION PLANS AND SPECIFICATIONS SECTION 12 STANDARDS FOR CONSTRUCTION PLANS AND SPECIFICATIONS 12.1 The subdivider shall construct and install the improvements in accordance with the County's Standards for Construction Plans and Specifications

More information

CONSTRUCTION COSTS. The implementation of the MIP shall be consistent with the City Council Adopted Fiscal Neutrality Policy for Alameda Point.

CONSTRUCTION COSTS. The implementation of the MIP shall be consistent with the City Council Adopted Fiscal Neutrality Policy for Alameda Point. XV. CONSTRUCTION COSTS A. Backbone Infrastructure Costs The Alameda Point backbone infrastructure described in the MIP is estimated to cost approximately $550 to 575 million. These costs are based in 2013

More information

TOWN OF MOUNT PLEASANT WESTCHESTER COUNTY, NEW YORK

TOWN OF MOUNT PLEASANT WESTCHESTER COUNTY, NEW YORK TOWN OF MOUNT PLEASANT WESTCHESTER COUNTY, NEW YORK COST EVALUATION FOR ROLLING HILLS AREA WATER MAIN EXTENSION PROFESSIONAL CONSULTING, LLC. Octagon 10, Office Center 1719 Route 10, Suite 225 Parsippany,

More information

WEST GLENDIVE PUBLIC MEETING

WEST GLENDIVE PUBLIC MEETING WEST GLENDIVE PUBLIC MEETING Wastewater System Improvements February 7, 2012 Presentation by: Craig Pozega, PE Why Are We Here County has identified wastewater system needs Wastewater System Preliminary

More information

SECTION I. (Sub-Section 3) Water Systems Design Standards. 3.1 General Plans Preparation 3-1

SECTION I. (Sub-Section 3) Water Systems Design Standards. 3.1 General Plans Preparation 3-1 SECTION I (Sub-Section 3) Water Systems Design Standards Article Page 3.1 General 3-1 3.2 Plans Preparation 3-1 3.3 Design and Construction Standards 3-1 thru 3-2 3.4 Protection of Water Supply 3-4 3.5

More information

Pavement Management Plan

Pavement Management Plan Planning Report February 12, 2010 Pavement Management Plan Prepared for: WSB Project 1140-61 City of Excelsior 339 3rd Street Excelsior, MN 55331 Prepared by: 701 Xenia Avenue South, Suite 300 Minneapolis,

More information

STORM DRAINAGE CHAPTER 11

STORM DRAINAGE CHAPTER 11 CHAPTER 11 STORM DRAINAGE SECTION 11 GENERAL 11.1 Scope. The provisions of this chapter shall govern the materials, design, construction and installation of storm drainage. 11.2 Where required. All roofs,

More information

CHAPTER 8: SANITARY SEWER

CHAPTER 8: SANITARY SEWER CHAPTER 8: SANITARY SEWER 8.1 EXECUTIVE SUMMARY The Metropolitan Land Planning Act (amended 1995) requires local governments to prepare comprehensive plans and submit them to the Metropolitan Council (MCES)

More information

VILLAGE OF ALGONQUIN 2014 WASTEWATER FACILITY PLAN UPDATE EXECUTIVE SUMMARY

VILLAGE OF ALGONQUIN 2014 WASTEWATER FACILITY PLAN UPDATE EXECUTIVE SUMMARY EXECUTIVE SUMMARY EXECUTIVE SUMMARY INTRODUCTION AND BACKGROUND The Village of Algonquin, located along the Fox River in McHenry County, provides wastewater collection and treatment services to the entire

More information

PUBLIC UTILITIES. This portion of the Comprehensive Plan includes a planning-level review of the:

PUBLIC UTILITIES. This portion of the Comprehensive Plan includes a planning-level review of the: PUBLIC UTILITIES I. INTRODUCTION This portion of the Comprehensive Plan includes a planning-level review of the: Municipal Wastewater Treatment/Sanitary Sewer System Municipal Water System Municipal Storm

More information

Wastewater Master Facility Report. (Project Name) (Project Basin Location)

Wastewater Master Facility Report. (Project Name) (Project Basin Location) Wastewater Master Facility Report For (Project Name) (Project Basin Location) The Wastewater Master Facility Report for (Project name) dated (Date); located in the (Basin Name) Basin has been completed

More information

401 Sanitary Sewer System Design Criteria. The following additional design requirements shall also apply:

401 Sanitary Sewer System Design Criteria. The following additional design requirements shall also apply: SECTION 400 SANITARY SEWER SYSTEM The design of sanitary sewers shall be in conformance with the applicable sections of the State of Washington, Department of Ecology manual, Criteria for Sewage Works

More information

INFRASTRUCTURE ELEMENT Goal, Objectives and Policies

INFRASTRUCTURE ELEMENT Goal, Objectives and Policies INFRASTRUCTURE ELEMENT Goal, Objectives and Policies City of Bartow Comprehensive Plan Adopted August 5, 1991 Amended August 2, 1993, Amended 1996 & 1999 Adopted Changes January 16, 2001, Amended April

More information

UNIFORM DESIGN AND CONSTRUCTION STANDARDS FOR EXTENDING WATER DISTRIBUTION SYSTEMS SECTION 2 DESIGN STANDARDS

UNIFORM DESIGN AND CONSTRUCTION STANDARDS FOR EXTENDING WATER DISTRIBUTION SYSTEMS SECTION 2 DESIGN STANDARDS UNIFORM DESIGN AND CONSTRUCTION STANDARDS FOR EXTENDING WATER DISTRIBUTION SYSTEMS SECTION 2 DESIGN STANDARDS DESIGN STANDARDS SECTION 2 INDEX ITEM DESCRIPTION 2.00 GENERAL STATEMENT 2.01 WATER DISTRIBUTION

More information

Town of New Castle, New Hampshire Sewer Infrastructure Evaluation

Town of New Castle, New Hampshire Sewer Infrastructure Evaluation Town of New Castle, New Hampshire Sewer Infrastructure Evaluation March 2016 EXECUTIVE SUMMARY The Town of New Castle (Town) is working collaboratively with the City of Portsmouth (City) to consider options

More information

CHAPTER SEVEN: UTILITIES

CHAPTER SEVEN: UTILITIES CHAPTER SEVEN: UTILITIES 7.0 Introduction T he Water Works Board of the City of Auburn (AWWB) is the primary potable water service provider for the City of Auburn (City) and Auburn University. There are

More information

Environmental Task Force SSSMP Summary, September 18, 2011 Scheduled for City Council Approval September 26, 2017

Environmental Task Force SSSMP Summary, September 18, 2011 Scheduled for City Council Approval September 26, 2017 Attachment 1 Environmental Task Force SSSMP Summary, September 18, 2011 Scheduled for City Council Approval September 26, 2017 Sanitary Sewer System Master Plan Summary Points - City s sanitary system

More information

Today s Date: April 15, 2015 Bid Opening Date: April 22, 2015

Today s Date: April 15, 2015 Bid Opening Date: April 22, 2015 ADDENDUM NO. 1 FOR CONSTRUCTION OF COMMUNITY SEWAGE LIFT STATIONS & WASTEWATER TREATMENT LAGOONS FOR THE WHITE SHIELD COMMUNITY FORT BERTHOLD RESERVATION McLEAN COUNTY, NORTH DAKOTA Project AB-14-S59,

More information

3.9 times the average 3.8 times the average 3.6 times the average

3.9 times the average 3.8 times the average 3.6 times the average ARTICLE VI DESIGN OF SANITARY SEWERS M'RSMIN. VOL.281 JA 2 4 2001 IMAGE; Section 601 Determination of the Amount of Sewage for Sanitary Sewers A. MSD Design Standards for estimating sanitary sewage flow

More information

CHAPTER SEVEN: UTILITIES

CHAPTER SEVEN: UTILITIES CHAPTER SEVEN: UTILITIES 7.1 Introduction The Water Works Board of the City of Auburn (AWWB) is the primary potable water service provider for the City of Auburn (City) and Auburn University. There are

More information

CHAPTER 8 CAPITAL IMPROVEMENT PLAN

CHAPTER 8 CAPITAL IMPROVEMENT PLAN INTRODUCTION CHAPTER 8 CAPITAL IMPROVEMENT PLAN This chapter presents a 10-year Capital Improvement Plan (CIP). Wastewater capital improvements have been scheduled and prioritized on the basis of growth,

More information

This is a digital document from the collections of the Wyoming Water Resources Data System (WRDS) Library.

This is a digital document from the collections of the Wyoming Water Resources Data System (WRDS) Library. This is a digital document from the collections of the Wyoming Water Resources Data System (WRDS) Library. For additional information about this document and the document conversion process, please contact

More information

CITY OF ALBANY Public Works Department ADDENDUM #1 ST , MAIN STREET REHABILITATION

CITY OF ALBANY Public Works Department ADDENDUM #1 ST , MAIN STREET REHABILITATION CITY OF ALBANY Public Works Department ADDENDUM #1 ST-13-04-2014, MAIN STREET REHABILITATION In order to clarify the intent of the Specifications and Drawings, the following provisions are provided and

More information

FLORIDA STATE UNIVERSITY MASTER PLAN 9 General Infrastructure

FLORIDA STATE UNIVERSITY MASTER PLAN 9 General Infrastructure GENERAL INFRASTRUCTURE ELEMENT NOTE: Unless otherwise noted, the goals, objectives and policies contained in this element shall guide development of the Main Campus and Southwest Campus in Tallahassee

More information

Infiltration and Inflow. Michael Sassaman Phone

Infiltration and Inflow. Michael Sassaman Phone Infiltration and Inflow Michael Sassaman msassaman@entecheng.com Phone 610-373-3345 Inflow and Infiltration PA DEP Learning Objectives Do you have Excessive I/I? Sources of Inflow and Infiltration I/I

More information

APPENDIX B STANDARD CONSTRUCTION DRAWING NOTES

APPENDIX B STANDARD CONSTRUCTION DRAWING NOTES APPENDIX B STANDARD CONSTRUCTION DRAWING NOTES B-1 General Notes: SACWSD Standard Construction Drawing Notes 1. No work shall begin on any water or wastewater construction project until the construction

More information

Chapter 9 Sanitary Sewers

Chapter 9 Sanitary Sewers Chapter 9 Sanitary Sewers I:\AD\030\U30\U30009.docx 4-8-16 Section 9.1 Topic General Requirements Chapter 9 Sanitary Sewers Page 9-1 9.2 Plan Submittals 9-1 9.3 Determination of Flow 9-1 9.4 Facility Design

More information

Lynn Township Sewer Authority. Corrective Action Plan. March 2007

Lynn Township Sewer Authority. Corrective Action Plan. March 2007 Lynn Township Sewer Authority Corrective Action Plan March 2007 4130.00 Prepared By: ARRO Consulting, Inc. 400 Washington Street, Suite 602 Reading, Pennsylvania 19610 610 374 5285 Corrective Action Plan

More information

West Bountiful City. Water System Capital Facilities Plan

West Bountiful City. Water System Capital Facilities Plan Water System Capital Facilities Plan August 2008 TABLE OF CONTENTS 1.0 Executive Summary... 1 2.0 Definition of Terms and Abbreviations... 2 3.0 Introduction... 3 3.1 Background...3 3.2 Scope of Investigation...3

More information

APPENDIX 1. Stephenfield Provincial Park Wastewater Lagoon Upgrading Study

APPENDIX 1. Stephenfield Provincial Park Wastewater Lagoon Upgrading Study APPENDIX 1 Stephenfield Provincial Park Wastewater Lagoon Upgrading Study STEPHENFIELD PROVINCIAL PARK WASTEWATER LAGOON UPGRADING STUDY FINAL REPORT Table of Contents EXECUTIVE SUMMARY... E.1 1.0 INTRODUCTION...

More information

PRELIMINARY WASTEWATER CAPACITY STUDY

PRELIMINARY WASTEWATER CAPACITY STUDY PRELIMINARY WASTEWATER CAPACITY STUDY Tentative Tract Map No. 18955 CITY OF HESPERIA Prepared for: HESPERIA VENTURES I, LLC 10410 Roberts Road Calimesa, CA 92320 Tel (714) 785 2381 Mr. John Ohanian Prepared

More information

I. STREET CONSTRUCTION AND RECONSTRUCTION

I. STREET CONSTRUCTION AND RECONSTRUCTION CITY OF OSHKOSH POLICY FOR SPECIAL ASSESSMENTS A. GENERAL I. STREET CONSTRUCTION AND RECONSTRUCTION 1. Assessments shall be levied according to the front foot dimensions of the abutting property to the

More information

Project Type: Drainage and Storm Systems

Project Type: Drainage and Storm Systems 580 Dakin Avenue Box Culvert & Utility Improvements Project $944,952 Improvements to approx. 3,000 lf of existing 4'x5' concrete box culvert; clean interior, patch surface, fill joints/cracks; install

More information

GOALS, OBJECTIVES, & POLICIES

GOALS, OBJECTIVES, & POLICIES ELEMENT 9 INFRASTRUCTURE ELEMENT STORM WATER MANAGEMENT SUB-ELEMENT Goal 1 To provide adequate stormwater management facilities and services to meet the present and future needs of the University and to

More information

NOTICE OF OPPORTUNITY FOR PUBLIC COMMENT RELATED TO PASSENGER FACILITY CHARGE Posted June 21, 2018

NOTICE OF OPPORTUNITY FOR PUBLIC COMMENT RELATED TO PASSENGER FACILITY CHARGE Posted June 21, 2018 NOTICE OF OPPORTUNITY FOR PUBLIC COMMENT RELATED TO PASSENGER FACILITY CHARGE Posted June 21, 2018 The City of Atlanta is providing an opportunity for public comment until July 23, 2018 related to the

More information

East Manawa Porous Paving Project Council Bluffs, Iowa. Project Location. Phase 1 Project Location 9/2/2011

East Manawa Porous Paving Project Council Bluffs, Iowa. Project Location. Phase 1 Project Location 9/2/2011 East Manawa Porous Paving Project Council Bluffs, Iowa International Public Works Congress & Exposition APWA September 19, 2011 Presented by Scott Renaud, P.E., FOX Engineering Project Location Phase 1

More information

Sanitary Sewer 101. Jan. 12, 2016 Keith Fisher, P.E. Director of Public Works

Sanitary Sewer 101. Jan. 12, 2016 Keith Fisher, P.E. Director of Public Works Sanitary Sewer 101 Jan. 12, 2016 Keith Fisher, P.E. Director of Public Works What We Will Cover -What is Sanitary Sewer? -Components -History -What types of systems are there? -What types of materials

More information

SANITARY SEWER BACKUP

SANITARY SEWER BACKUP SANITARY SEWER BACKUP Causes & Prevention A. PURPOSE The purpose of this publication is twofold: 1. It provides homeowners with basic information on the causes of sanitary sewer backups. 2. It provides

More information

Capital Improvements

Capital Improvements Capital Improvements CITY OF WINTER PARK CHAPTER 7: CAPTIAL IMPROVEMENTS ELEMENT CAPITAL IMPROVEMENTS ELEMENT DATA, INVENTORY & ANALYSIS Introduction The Capital Improvements Element (CIE) is required

More information

PROJECT SCOPE OF WORK CITY OF TOWN AND COUNTRY STORMWATER PROGRAM

PROJECT SCOPE OF WORK CITY OF TOWN AND COUNTRY STORMWATER PROGRAM PROJECT SCOPE OF WORK CITY OF TOWN AND COUNTRY STORMWATER PROGRAM Project Name: 194 Muir Woods Ln Project ID Number: 216-2 Problem: At 194 Muir Woods Lane, nearly two acres of watershed flow through the

More information

SECTION IV. PIPELINE EXCAVATION AND BACKFILL

SECTION IV. PIPELINE EXCAVATION AND BACKFILL SECTION IV. PIPELINE EXCAVATION AND BACKFILL A. Description of Work B. Surface Types C. Backfill D. Surface Restoration A. DESCRIPTION OF WORK 1. Extent: Excavation of trenches for pipelines shall include

More information

Chapter 8: Water Supply & Sanitary Systems

Chapter 8: Water Supply & Sanitary Systems Chapter 8: Water Supply & Sanitary Systems Manage, Treat & Reserve Comprehensive Plan 2040 2 8. WATER SUPPLY & SANITARY SYSTEM INTRODUCTION This chapter of the City of Lauderdale s 2040 Comprehensive Plan

More information

17. WATER SUPPLY. TABLE 17.1 Average Daily Potable Water Demand

17. WATER SUPPLY. TABLE 17.1 Average Daily Potable Water Demand 17. WATER SUPPLY A. 1. Provide a projection of the average daily potable and non-potable water demands at the end of each phase of development. If significant seasonal demand variations will occur, discuss

More information

This is a digital document from the collections of the Wyoming Water Resources Data System (WRDS) Library.

This is a digital document from the collections of the Wyoming Water Resources Data System (WRDS) Library. This is a digital document from the collections of the Wyoming Water Resources Data System (WRDS) Library. For additional information about this document and the document conversion process, please contact

More information

Chapter 8: Water Supply & Sanitary Systems

Chapter 8: Water Supply & Sanitary Systems Chapter 8: Water Supply & Sanitary Systems Manage, Treat & Reserve Comprehensive Plan 2040 2 8. WATER SUPPLY & SANITARY SYSTEM INTRODUCTION This chapter of the City of Lauderdale s 2040 Comprehensive Plan

More information

Terra cotta pipe segments 2 feet long. Joints made with Jute Rope Cast iron force main w/ lead joints Brick manholes w/ 24 diameter castings

Terra cotta pipe segments 2 feet long. Joints made with Jute Rope Cast iron force main w/ lead joints Brick manholes w/ 24 diameter castings SANITARY SEWER SYSTEM How the system was designed Terra cotta pipe segments 2 feet long. Joints made with Jute Rope Cast iron force main w/ lead joints Brick manholes w/ 24 diameter castings What age has

More information

To: From: Date: Subject: Sherwood Lakes Drainage Alternatives Analysis 1

To: From: Date: Subject: Sherwood Lakes Drainage Alternatives Analysis 1 To: From: The City of Virginia Beach Lewis White and Rachael Johnson on behalf of WSP Date: June 6, 2017 Subject: s Drainage Alternatives Analysis This memorandum represents the summary of findings from

More information

CUYAHOGA COUNTY ENGINEER

CUYAHOGA COUNTY ENGINEER CUYAHOGA COUNTY ENGINEER DRAINAGE MANUAL Supplement to O.D.O.T. LOCATION and DESIGN MANUAL, Volume 2, Drainage Design, Section 1000 and 1100 May 28, 2010 Revisions to the July 29, 2009 edition are noted

More information

Quonset Business Park Infrastructure Assets Water / Wastewater May 17, 2016

Quonset Business Park Infrastructure Assets Water / Wastewater May 17, 2016 Quonset Business Park Infrastructure Assets Water / Wastewater May 17, 2016 Quonset Development Corporation As the management and development entity of the Quonset Business Park, QDC maintained Capital

More information

VICINITY MAP AND SITE MAP. Page 1 of 9

VICINITY MAP AND SITE MAP. Page 1 of 9 INTRODUCTION... 2 1. Background Information of West Bottom Ash Pond (BAP)... 2 1.1 Facility Location Description...2 1.2 Description of West BAP CCR Unit...2 1.2.1 Embankment Configuration...2 1.2.2 Construction

More information

GRAVITY SEWERS. Performance & Cost for Decentralized Unit Processes. Fact Sheet C1 COLLECTION SERIES. Wastewater source. Road

GRAVITY SEWERS. Performance & Cost for Decentralized Unit Processes. Fact Sheet C1 COLLECTION SERIES. Wastewater source. Road Fact Sheet C1 Performance & Cost for Decentralized Unit Processes COLLECTION SERIES DECENTRALIZED WASTEWATER SYSTEMS What is a Gravity Sewer System? A gravity sewer system is used to collect wastewater

More information

STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY

STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY In the Matter of the Decision on the Need for an Environmental Impact Statement for the Proposed Remer Wastewater Treatment Facility Expansion FINDINGS

More information

Decentralized Wastewater Systems

Decentralized Wastewater Systems Decentralized Wastewater Systems Decentralized and Traditional Wastewater Treatment Systems Mark Gross, Ph.D., P.E. Training Manager Orenco Systems, Inc. Decentralized Overview 3/3/2010 #1 Some Aspects

More information

Mr. Michael Malone CPS Energy 145 Navarro Street San Antonio, Texas Project No

Mr. Michael Malone CPS Energy 145 Navarro Street San Antonio, Texas Project No Environmental Resources Management January 13, 2017 Mr. Michael Malone 145 Navarro Street San Antonio, Texas 78205 Project No. 0352436 CityCentre Four 840 West Sam Houston Parkway North, Suite 600 Houston,

More information

SOUTHSIDE TOWNSHIP ROADWAY STANDARDS POLICY Adopted September 7, 2004

SOUTHSIDE TOWNSHIP ROADWAY STANDARDS POLICY Adopted September 7, 2004 SOUTHSIDE TOWNSHIP ROADWAY STANDARDS POLICY Adopted September 7, 2004 General: Sections of the Minnesota Department of Transportation (Mn/DOT), Standard Specification for Construction, 2000 or Current

More information

2018 Street Reconstruction Project Woodside/Huron Neighborhood Street Improvements. December 11, 2017 Public Improvement Hearing

2018 Street Reconstruction Project Woodside/Huron Neighborhood Street Improvements. December 11, 2017 Public Improvement Hearing 2018 Street Reconstruction Project Woodside/Huron Neighborhood Street Improvements December 11, 2017 Public Improvement Hearing Project Objectives Reconstruct Deteriorated Streets Upgrade City Underground

More information

SEWER SYSTEM DESIGN GUIDELINES

SEWER SYSTEM DESIGN GUIDELINES SEWER SYSTEM DESIGN GUIDELINES PART 1 GENERAL 1.1 GENERAL GUIDELINES A. The following sewer system design guidelines are based on Federal, State and Local health requirements, and the Berkeley County Water

More information

Chapter 7: Sanitary Sewer Plan. Introduction. Metropolitan Council Coordination

Chapter 7: Sanitary Sewer Plan. Introduction. Metropolitan Council Coordination Chapter 7: Sanitary Sewer Plan Introduction The 2030 Sanitary Sewer Plan was prepared for two primary reasons. The first purpose is to provide recommendations and guidance to the City of Lino Lakes by

More information

Municipal Service Review

Municipal Service Review Redway Community Services District Municipal Service Review July 2008 Prepared by: For the District Sphere of Influence Report TABLE OF CONTENTS Page Local Agency Formation Commission Authority... 1 Agency

More information

Wilmette - Background

Wilmette - Background Reducing Basement Backups through Intergovernmental Cooperation and Design-Build Presented By Michael N. Young, P.E. Brigitte Ann Berger, P.E. Wilmette - Background North Shore Suburb of Chicago 5 Square

More information

Memorandum. Andy Brotzler, PE WSB & Associates, Inc. Greg Johnson, PE WSB & Associates, Inc. Ray Theiler, EIT WSB & Associates, Inc.

Memorandum. Andy Brotzler, PE WSB & Associates, Inc. Greg Johnson, PE WSB & Associates, Inc. Ray Theiler, EIT WSB & Associates, Inc. 477 Temperance Street St. Paul, MN 55101 (651) 286-8450 Memorandum To: From: Andy Brotzler, PE WSB & Associates, Inc. Greg Johnson, PE WSB & Associates, Inc. Ray Theiler, EIT WSB & Associates, Inc. Date:

More information

OAK MARSH PHASE II FEASIBILITY REPORT CITY OF MANKATO MINNEOSTA. January 20, 2015 Project No

OAK MARSH PHASE II FEASIBILITY REPORT CITY OF MANKATO MINNEOSTA. January 20, 2015 Project No PHASE II FEASIBILITY REPORT CITY MINNEOSTA January 20, 20 Project No. 14 I. INTRODUCTION Oak Marsh Phase II is a residential development on a parcel of land located in the Southern portion of the City

More information

CHAPTER SEVEN: UTILITIES

CHAPTER SEVEN: UTILITIES CHAPTER SEVEN: UTILITIES 7.1 Introduction T he Water Works Board of the City of Auburn (AWWB) is the primary potable water service provider for the City of Auburn (City) and Auburn University. There are

More information

STANDARD SPECIFICATIONS

STANDARD SPECIFICATIONS TOWN OF COLONIE DEPARTMENT OF PUBLIC WORKS DIVISION OF PURE WATERS STANDARD SPECIFICATIONS for RESIDENTIAL SANITARY SEWER CONNECTIONS Latest Revision Date: November 2017 TABLE OF CONTENTS Section Page

More information

GENERAL INFORMATION AND REQUIREMENTS

GENERAL INFORMATION AND REQUIREMENTS GENERAL INFORMATION AND REQUIREMENTS 1.0 BOARD S STANDARD SPECIFICATIONS: Copies of these Standard Specifications for Water Mains, Sanitary Sewers and Sewage Pumping Stations may be purchased from the

More information

City of Brookings. Sanitary Sewer Collection Design Standards

City of Brookings. Sanitary Sewer Collection Design Standards City of Brookings (Brookings Municipal Utilities - BMU) Revision Date: September 6, 2016 Brookings Municipal Utilities 525 Western Avenue P.O. Box 588 Brookings, SD 57006-0588 (605) 692-6325 i Table of

More information

CITY OF ASTORIA PUBLIC WORKS ENGINEERING DIVISION ENGINEERING DESIGN STANDARDS FOR IN-FILL DEVELOPMENT

CITY OF ASTORIA PUBLIC WORKS ENGINEERING DIVISION ENGINEERING DESIGN STANDARDS FOR IN-FILL DEVELOPMENT CITY OF ASTORIA PUBLIC WORKS ENGINEERING DIVISION ENGINEERING DESIGN STANDARDS FOR IN-FILL DEVELOPMENT Adopted by City Council: May 21, 2007 X:\General Eng\DESIGN STANDARDS\Engineering Design Standards

More information

Index to Technical Specifications

Index to Technical Specifications Index to Technical Specifications Item Number Subject I II EXCAVATION 1.01 Trenching and Excavation Regulations 1.02 Site Grading or General Excavation 1.03 Structural Excavation 1.04 Trench Excavation

More information

Report. Inflow Design Flood Control System Plan Belle River Power Plant East China, Michigan. DTE Energy Company One Energy Plaza, Detroit, MI

Report. Inflow Design Flood Control System Plan Belle River Power Plant East China, Michigan. DTE Energy Company One Energy Plaza, Detroit, MI Report Inflow Design Flood Control System Plan Belle River Power Plant East China, Michigan DTE Energy Company One Energy Plaza, Detroit, MI October 14, 2016 NTH Project No. 62-160047-04 NTH Consultants,

More information

Improvement Plan Cost Estimate

Improvement Plan Cost Estimate Building and Engineering Division Development Services Department 214 S. C Street, Oxnard CA 93030 ph: 805.385.7925 fax 805.385.7854 Improvement Plan Cost Estimate Land Development Permit No. (Tract or

More information

Drainage structure refers to manholes, catch basins, leaching basins, inlets and drop inlets. Drainage structures are designated as follows.

Drainage structure refers to manholes, catch basins, leaching basins, inlets and drop inlets. Drainage structures are designated as follows. 403.01 Section 403. DRAINAGE STRUCTURES 403.01 Description. Adjust, construct, or temporarily lower drainage structures. Clean existing drainage structures and leads as directed by the Engineer. Drainage

More information

INFRASTRUCTURE FINANCING PLAN FOR THE WOODGLEN SPECIFIC PLAN

INFRASTRUCTURE FINANCING PLAN FOR THE WOODGLEN SPECIFIC PLAN FINAL REPORT INFRASTRUCTURE FINANCING PLAN FOR THE WOODGLEN SPECIFIC PLAN Prepared for: City of Modesto Prepared by: Willdan Financial Services Approved by Modesto City Council on July 9, 2013 Resolution

More information

A. Introduction 7 1. Purpose 7 2. Authority 7 3. Contact 8 4. Plan Submittal Process 8 B. Design Standards General 11 a. Future Extensions 11

A. Introduction 7 1. Purpose 7 2. Authority 7 3. Contact 8 4. Plan Submittal Process 8 B. Design Standards General 11 a. Future Extensions 11 A. Introduction 7 1. Purpose 7 2. Authority 7 3. Contact 8 4. Plan Submittal Process 8 B. Design Standards 11 1. General 11 a. Future Extensions 11 b. Design Calculations 11 c. Easements and Property 12

More information

TABLE OF CONTENTS 4.17 UTILITIES AND SERVICE SYSTEMS...

TABLE OF CONTENTS 4.17 UTILITIES AND SERVICE SYSTEMS... TABLE OF CONTENTS 4.17 UTILITIES AND SERVICE SYSTEMS... 4.17-1 4.17.0 Introduction... 4.17-1 4.17.1 Methodology... 4.17-2 4.17.2 Existing Conditions... 4.17-2 4.17.3 Impacts... 4.17-4 4.17.4 Applicant-Proposed

More information

Klickitat County. On-Site Sewage System. Construction Manual

Klickitat County. On-Site Sewage System. Construction Manual Homeowner OSS Design and Construction Guide Klickitat County On-Site Sewage System Construction Manual Minimum standards and recommendations expected for the construction of on-site wastewater treatment

More information

Functional Servicing Report. Winston Park West Proposed Business Park Development Project. Infrastructure Ontario (IO) September MU1

Functional Servicing Report. Winston Park West Proposed Business Park Development Project. Infrastructure Ontario (IO) September MU1 Functional Servicing Report Winston Park West Proposed Business Park Development Project (IO) September 2011 14-11208-001-MU1 Winston Park West 2 TABLE OF CONTENTS Page 1.0 INTRODUCTION... 3 1.1 SITE DESCRIPTION...

More information

MBARI Sanitary Sewer Analysis Report

MBARI Sanitary Sewer Analysis Report Revised 9-10-08 MBARI Sanitary Sewer Analysis Report Executive Summary: This Sanitary Sewer Analysis Report has been prepared for the Monterey Bay Aquarium Research Institute (MBARI) located on Moss Landing

More information

General Rules and Regulations

General Rules and Regulations General Rules and Regulations City of Hamilton, Ohio Sanitary Sewer Collection and Treatment Revised December 23, 2016 Page 1 of 13 To Our Customers, Sanitary Sewer Collection and Treatment Department

More information

SECTION 39 - MANHOLES TABLE OF CONTENTS 39-1 GENERAL PRECAST CONCRETE MANHOLES

SECTION 39 - MANHOLES TABLE OF CONTENTS 39-1 GENERAL PRECAST CONCRETE MANHOLES Section SECTION 39 - MANHOLES TABLE OF CONTENTS 39-1 GENERAL... 39-1 39-2 PRECAST CONCRETE MANHOLES... 39-1 39-2.01 Precast Concrete Storm Drain Manholes... 39-1 39-3 SADDLE MANHOLES... 39-2 39-3.01 Saddle

More information

GRADING, EROSION AND SEDIMENTATION CONTROL

GRADING, EROSION AND SEDIMENTATION CONTROL SECTION 500 GRADING, EROSION AND SEDIMENTATION CONTROL 501 Erosion and Sedimentation Control Plan All engineering plans for projects that propose to construct new, or modify existing drainage facilities,

More information

STORM DRAINAGE CHAPTER 11

STORM DRAINAGE CHAPTER 11 CHAPTER STORM DRAINAGE SECTION 0 GENERAL 0. Scope. The provisions of this chapter shall govern the materials, design, construction and installation of storm drainage, except in one- and two-family dwellings.