1 Pre-Feasibility Study Report For Proposed Fly Ash Co-processing clinker grinding cement Unit of 40,000 MT/month Production capacity within our Existing Premises for M/s. SAL STEEL LTD Survey no.245/p, Village:-Bharapar, Taluka:- Gandhidham, District:-Kutch, Gujarat.

2 INDEX Sr. No. 1. EXECUTIVE SUMMARY 2. INTRODUCTION OF PROJECT Description (i) Identification of project and project proponent (ii) Need for the project and its importance to country and or region (iii) Demand supply gap (iv) Imports Vs. Indigenous production (v) Export Possibility (vi) Employment Generation 3. PROJECT DESCRIPTION (i) Type of the project (ii) Location of project (iii) Details of alternative site considered (iv) Size of magnitude of project (v) Project description with process details (vi) Raw Material requirement (vii) Raw Material sources (viii) Market area of finished products (ix) Mode of transportation of raw material and products (x) Recycle/Reuse options (xi) Quantity of waste to be generated along with mode of disposal 4. SITE ANALYSIS (i) Connectivity (ii) Land use pattern (iii) Land ownership

3 (iv) Existing infrastructure (v) Soil classification (vi) Climatic data from secondary sources (vii) Social infrastructure available 5. PLANNING CONCEPT (i) Population projection (ii) Land use planning (iii) Assessment of infrastructure demand (Physical & Social) (iv) Amenities/ facilities 6 PROPOSED INFRASTRUCTURE (i) Industrial area (processing area) (ii) Residential area (non processing area) (iii) Green belt (iv) Social infrastructure (v) Connectivity (traffic & transportation road/rail metro/water ways) (vi) Drinking water management (source and supply of water) (vii) Sewerage system (viii) Industrial waste management (ix) Power requirement and supply/source 7 REHABILITATION AND RESETTLE (R&R) PLAN 8 PROJECT SCHEDULE & COST ESTIMATION 9 ANALYSIS OF PROPOSAL (FINAL RECOMMENDATIONS)

4 1. EXECUTIVE SUMMARY: Name of the unit M/s SAL STEEL LTD Survey no.245/p, Village:- Bharapar, Location of the Taluka:-Gandhidham, factory Dist:-Kutch , Gujarat. Promoter of the M/s. SAL STEEL LTD unit Telephone number Fax number Contact Anilbhai Pandya (Director) information Mo: It may be noted that our project falls under the category 3 (b) of B as per the EIA Notification of Ministry of Environment & Forest (MOEF), dated 14/09/2006. Hence, Environmental Clearance is obligatory and required to be obtained from SEAC/SEIAA/EAC. However, the project intends to dispose off/use the Fly Ash generated from our power plant in an appropriate & environment friendly manner by co-processing the Fly ash & Readymade clinker, which will give cement as an end product. Category of industry *It will be a stand-alone clinker grinding unit for cement. *The water requirement will be only 6 Kl/day for domestic as well as cooling purposes. *No fuel will be required for the manufacturing process. *No hazardous waste will be generated due to the project. *Our existing steel plant Ball mill, Silos as well as storage ware houses will be used and no new equipment will be required to be purchased. Production details In fact, the project is to use Fly ash in an environmental friendly manner. Thus, we request consideration of the said project under B 2 category. M/s SAL Steel Ltd will be a Co-processing stand-alone clinker grinding unit for cement and is to be set up for the purpose of appropriately disposing off/using the Fly Ash generated by our power

5 Cost of the project Land area Source of water Source of power plant in an environmental friendly manner in its Existing Premises with the total production capacity of 40,000 MT/Month. Existing machineries/equipments will be utilized for the proposed Cement manufacturing unit. However, approximate cost of minor changes such as piping, conveyor etc will be to the tune of Rs. 50 Lac. Total plot/land area of the existing premises is 98,000 m 2 out of which 30,000 m 2 is allocated for proposed Co-processing of stand-alone clinker grinding unit for cement. Source of Water is Narmada Water Canal. Existing Source of Power is CPP/PGVCL. However, in case of power failure, emergency D.G. set will be used as a source of back-up power. 2. INTRODUCTION OF PROJECT (i) Identification of project and Project Proponent: M/s SAL Steel Ltd located at Survey no.245/p, Village:- Bharapar, Taluka:- Gandhidham, Dist: Kutch, Gujarat is engaged in manufacturing of Sponge iron, Ferro alloys and other steel products and having its own Captive Power plant of 40 MW capacity. M/s SAL Steel Ltd will be a Co-processing stand-alone clinker grinding unit for cement and is to be set up for the purpose of appropriately disposing off/using the Fly Ash generated by our power plant in an environmental friendly manner in its Existing unit with the use of existing machineries available of its steel plant. Brief description of nature of Project: SAL Steel proposes to set up a Co-processing stand-alone clinker grinding unit for cement for the purpose of appropriately disposing off/using the Fly Ash generated by our power plant in an environmental friendly manner in its existing unit with the use of existing machineries available. (i) Need for the project and its importance to country and or region: M/s SAL Steel Ltd is going to be a Co processing stand-alone clinker grinding unit which is to be set up for the purpose of appropriately disposing off/using the Fly Ash generated by our power plant in an environment friendly manner in the existing unit with the use of existing machineries available.

6 SAL Steel Ltd will give direct employment to local people based on qualification and requirement. In addition to the direct employment, indirect employment shall generate ancillary business to some extent for the local population. (ii) Demand supply gap: Sufficient demand Supply Gap. (iii) Imports Vs. Indigenous production: The cement which will be manufactured in said premises will meet with the applicable standards, which will have acceptability in the export as well as domestic markets. (iv) Export possibility: The cement will be of international standards and compete with the industrial majors across the globe as well as will be able to service the domestic market. (v) Employment generation The company is going to manufacture cement by grinding Readymade Clinker and Fly ash. The company will employ approximately more than 90 nos. of contractual as well as permanent employees from the local or surrounding people. 3. PROJECT DESCRIPTION: (i) Type of the project: M/s SAL Steel Ltd is engaged in manufacturing of Sponge iron, Ferro alloys and other steel products and has its own Captive Power Plant of 40 MW capacity. M/s SAL Steel Ltd now proposes to set up cement manufacturing unit for the purpose of appropriately disposing off/using the Fly Ash generated from the power plant in an environmental friendly manner in its existing Steel plant using its existing machineries. (ii) Location of project: The location of the project is at Survey no.245/p, Village:- Bharapar, Taluka:- Gandhidham, Dist:-Kutch , Gujarat. The geographical information of the project is as given below:- Latitude: 23 N and Longitude: E. It is 19 m above MSL.

7 Google image Showing Project Site (iii) Details of alternative site considered: No any alternative site has been examined because of the fact that we want to use our own Fly Ash for the manufacturing of cement and transportation of ash is desired to be avoided with respect to the environmental concerns. Salient features of selected site: The proposed cement manufacturing out of Clinker Grinding will be carried out in our existing premises where all resources, communication facilities, infrastructure i.e. road, sea-port, air port etc is available. (iv) Size or magnitude of project: The production capacity of the proposed cement manufacturing (clinker Grinding) unit will be 40,000 MT/month. (v) Project description with process details: The proposed cement manufacturing (Clinker Grinding) will be carried out within our existing premises. The manufacturing process is described as under:in the process, first of all the raw materials will be fed in to the chambers called silos. In one silo clinker will be filled and in another chamber fly ash & Gypsum will be filled. After loading raw materials in to the respected

8 chambers, the mixing of the same will take place. Then, the mixture will be passed through the grinding unit. Now, the properly grinded mixture will be passed through elevator and will be blended by blower. The final product will be packed and sold in the market. (vi) Raw material requirement: The details of raw materials required for the manufacturing of cement is given below:- [Table No. 1: Product wise raw material requirement] Sr. Product Raw Material MT/month no. 1 PPC Cement Readymade Clinker 24,000 Fly Ash 14,000 Gypsum 2,000 (vii) Raw material sources: The company will purchase raw materials from local market and /or import, depending on the availability and market value. (viii) Market area of finished products: The proposed production of the cement is to be done for the purpose of appropriately disposing off/using the Fly Ash generated by our power plant in an environmental friendly manner. The cement will be consumed at domestic level as well as exported to various countries as per market demand. (ix) Mode of transportation of raw material and products:- The required raw material for the manufacturing of cement would be transported by Sea, Railway or Road, depending on the availability/comfort ability. (x) Recycle/Reuse options: Fly ash from the power plant will be utilized for cement manufacturing. The solid waste collected in the different Air Pollution Control Measures and the other collection systems will be reutilized in the plant itself.

9 (xi) Quantity of waste to be generated along with its mode of disposal: There will be no generation of hazardous and /or solid waste from the proposed manufacturing activities. However, the solid waste collected in the different Air Pollution Control Measures and the other collection systems will be reutilized in the plant itself. 4. SITE ANALYSIS: Salient features of the site are as below: Connectivity Point Land use pattern Land ownership Description The proposed plant is in industrial area. Exiting roads and rails will be used for the proposed project. No new roads or rails are envisaged outside the boundary of the plant. The proposed cement manufacturing (Clinker Grinding) unit will be set up in existing steel plant with existing machineries available, so no change in land use pattern is envisaged. Owned by company. Land: Proposed project will be developed within the existing premises with existing machineries/equipments. Power :- Source of Power will be from CPP/PGVCL. However, in case of power failure, Emergency D.G. set will be used as back-up. Existing infrastructure Water:- Source of water is Narmada water canal. Fuel:- Fuel requirement for the proposed manufacturing process is Nil. Transport:- Rail:-The nearest Railway Station is Gandhidham, 8 km away from project site.

10 Soil classification Climatic data from secondary sources Social infrastructure available. Road:- The proposed plant is connected to State and National highway by 8 to 10 km. The distance from the plant to Gandhidham is about 20 km and Bhuj is 70 km. Kandla port is about 8 km away from the proposed site. Air:-The nearest domestic airport is available at Kanda port at 10 Km and other is at Bhuj at 75 Km. The nearest international airport is at Ahmedabad at 251 Km away from project site. Communication:- All facilities are available at the project site i.e. Telephone, Fax, Internet, courier, post services, transportation etc. The characteristic of soil of the proposed location is hard soil with slight erosion and strong salinity. Temperature: Maximum: 39 deg. (March to May) Minimum: 21 deg. (March to May) Rainfall: Average (Annual): 120 (July-August) Maximum rainfall:160 mm Minimum rainfall: 80 mm Relative Humidity (%): Maximum: 76% (March to May) Minimum: 39% (March to May) Wind Speed:- Avg. wind speed :- 15 kmph Corrosive intensity of the area: Very high. For structural steel, special treatment is required. Piling to be done for heavily loaded structures. Education: Bhuj has a literacy rate of %. There are 12 primary and secondary and schools, The university has 41 colleges affiliated, nineteen of which are in Bhuj. The university gives degrees in Arts, Science, Commerce, Law Education, Management, Pharmacy, Social Welfare, Medicine and Engineering. As well ITIS offer several industrial training programs in

11 cutting and sewing, Fitting, Diesel Engine Mechanic, Information Technology and electronic system management. There is engineering as well as other education center for learning in various disciplines. There are 40 approved primary health centers (PHC), 11 approved community health centers (CHC) and one civil hospital present in Bhuj. The district has a presence of private specialized hospitals to provide a comprehensive range of tertiary and secondary care services backed by state-of the-art technology and trained medical practitioners. Health:- The company is having separate OHC and providing first aid facility and appointed a qualified part time Doctor of medical inspection. Also company is conducting the six month medical checkup of all employees and the records are maintaining. The company has also providing antidote kits. In case of emergency or major accidents the company is having its own transport facility to shift the injured employees to outside Hospital for further treatment. There are 40 primary health centers (PHC), 8 community health centers (CHC) and 1 civil hospital present in Bhuj. The district has a presence of private specialized hospitals to provide a comprehensive range of tertiary and secondary care services backed by state-of-the-art technology and trained medicos. 5. PLANNING CONCEPT: Point Planning Concept Population projection Land use planning Description Not applicable since proposed project is to be set up within the premises of existing unit.

12 Assessment of infrastructure demand (Physical & social) Amenities/facilities 6. PROPOSED INFRASTRUCTURE: Point Description Land area Total Land area is 90,000 m 2 out of which 30,000 m 2 area is allocated for the stand alone Clinker Grinding Unit. Residential area Green belt area Social infrastructure Connectivity (traffic & transportation road/rail metro/water ways) Drinking water management Sewerage system Not applicable Green belt area is developed in accordance with earlier Environmental Clearance. More ever further green belt will be developed in and around the premises. The proposed project will be set up within existing premises. No new road, rail, air/waterborne or other transport infrastructure including new or altered routes and stations are envisaged for the proposed plant. Existing transportation facilities available within the industrial area are enough to take care of the increasing traffic. Source of water supply is Narmada water canal. Domestic wastewater will be discharged in to soak pit through septic tank.

13 Industrial management waste Water Pollution: The only source of wastewater generation from the proposed project will be domestic activities and it will be discharged in soak pit through septic tank. There will be no effluent generation from the manufacturing of cement. The water required for cooling activity will be recycled. Air Pollution: Flue gas emission:- No flue gas emissions will take place from the proposed activity. Process gas emission:- There will be process emission from the proposed cement manufacturing project. Unit will install required pollution control equipments as shown in under Table. Sr. No Section/Source 1 Clinker Crushing and Raw Materials Proportioning 2 Feed Hopper/ Ground Hopper 3 Cement Mill and discharge tube 4 Cement Blending Silos 5 Packing House Hazardous and /or Solid Waste: Type of APCM Proposed Bag Filter (with proper metallic casing, adequate stack height and stack monitoring requirement facility) There will be no generation of hazardous and /or solid waste from the proposed manufacturing activities. However, the solid waste collected in the different Air Pollution Control Measures and the other collection systems will be utilized in the plant itself.

14 Power requirement & supply/source Source of power supply is own CPP/PGVCL. However, in case of power failure, D.G. set will be used for backup power. 7. REHABILITATION AND RESETTLE (R&R) PLAN: Not applicable, since proposed project is to be established within existing plant premises. 8. PROJECT SCHEDULE & COST ESTIMATION: Proposed date of start production: After getting the statutory required Consent & Authorization from the GPCB. Estimated project cost along with analysis in terms of economic viability of the project. Estimated project cost:- Existing steel production plant with existing available machineries/equipments will be utilized for the proposed Cement manufacturing out of Clinker Grinding. The cost estimation is as under: Sr. No. Particulars 1. Factory Building & Other Civil Construction 2. Plant & Machinery 3. Pre-Operative Expenses Total Total Project Cost already incurred in steel production plant to be used for cement manufacturing (In Cr.) Existing machineries/equipments will be utilized for the proposed Cement manufacturing unit. However, approximate cost of minor changes such as piping, conveyor etc will be to the tune of Rs. 50 Lac. Rs. 50 Lac.

15 Economic viability/payback period calculation: Expected payback period/turnover is 5 years, details are as summarized under:- Year Expected turnover (Rupees in Crore) ANALYSIS OF PROPOSAL (FINAL RECOMMENDATIONS): Financial and social benefits with special emphasis on the benefits to the local people including tribal population (if any, in the area) are summarized under: The proposed budget for activities under Enterprise Social Commitment (ESC)/Corporate Social Responsibility (CSR) is about 2.5 % of the total proposed project cost. Proposed budget for activities under Enterprise Social commitment (ESC)/Corporate Social Responsibility (CSR) are as under:- Activities* Budgetary cost (Rs.) Implementation schedule Road repairing work 9,50, Vocational and skill 4,50, development training for youth, promotion of sports activities in the area. Education of economical 6,00, weaker children, scholarships to meritorious students & distribution of education materials to the needy children etc. Tree plantation/rainwater 7,00, harvesting Medical camps for local villages 3,50,

16 Drinking water facility, 5,00, sanitation etc. Total 35,50, *It may be noted that the above stated may also include other activities which is required for social development within the study area.

PRE-FEASIBILITY REPORT

PRE-FEASIBILITY REPORT PRE-FEASIBILITY REPORT For Polyurethane Foam Manufacturing Facility Of M/s. KRISHNA MARUTI LTD. At Plot No-13, SMG JV Park, Block No- 334,335 Vill- Hansalpur, Tal - Mandal Dist.: Ahmedabad, Gujarat INDEX

More information

PRE-FEASIBILITY REPORT

PRE-FEASIBILITY REPORT PRE-FEASIBILITY REPORT For ToR of Proposed Project of MANUFACTURING OF SYNTHETIC ORGANIC DYES (5 f B IND II) By SHREEJI BAPA DYE CHEM PLOT NO 1319 & 1320, PHASE-III, GIDC, VATVA, AHEMADABAD-382445, GUJARAT,

More information

PROJECT FEASIBILITY REPORT

PROJECT FEASIBILITY REPORT PROJECT FEASIBILITY REPORT FOR OBTAINING PRIOR ENVIRONMENT CLEARANCE For PROPOSED CHEMICAL MANUFACTURING UNIT From M/s. MORADIA BROTHERS CHEM PVT LTD LOCATED AT: Block No.: 45, JalBhumi Industrial Estate,

More information

PRE-FEASIBILITY REPORT. for

PRE-FEASIBILITY REPORT. for PRE-FEASIBILITY REPORT for PROPOSED COMMON EFFLUENT TREATMETN PLANT (CETP) of M/s. VIKASHTEX ENVIROTECH CETP PVT. LTD. Block No. 523, Village: Hathoda, Taluka: Mangrol, Dist: Surat - 394 405 (Guj.) Prepared

More information

PART A. M/s Shree Cement Ltd, (Grinding Unit) village - Udepur, Tehsil- Suratgarh, District -Shri Ganganagar, Rajasthan

PART A. M/s Shree Cement Ltd, (Grinding Unit) village - Udepur, Tehsil- Suratgarh, District -Shri Ganganagar, Rajasthan Page 1 of 9 Environmental Statement for Clinker Grinding Unit of M/s Shree Cement Limited, situated at village - Udepur, Tehsil- Suratgarh, District -Shri Ganganagar, Rajasthan for the Period from: 10

More information

PRE- FEASIBILITY REPORT

PRE- FEASIBILITY REPORT PRE- FEASIBILITY REPORT PREPARED FOR SHIV SHANTHI CEMENT PRIVATE LIMITED Sy. Nos. 92, 93 & 94, Tatiguda Village, Garividi Mandal, Vizianagaram District, Andhra Pradesh. PREPARED BY ISO 9001: 2008 Certified

More information

Shri Hari Dyes & Chemicals Plot No.: 439/1,417, Phase No. II, GIDC Estate, Vatva , Ahmedabad

Shri Hari Dyes & Chemicals Plot No.: 439/1,417, Phase No. II, GIDC Estate, Vatva , Ahmedabad Annexure Prefeasibility Report (PFR) File PRE FEASIBILITY REPORT For PROPOSED EXPANSION IN EXISTING MANUFACTURING PLANT Of Shri Hari Dyes & Chemicals Work & Regd. Office: CONTENTS Sr. No. Description 1.

More information

Hind Energy & Coal Beneficiation (India) Ltd.

Hind Energy & Coal Beneficiation (India) Ltd. SUMMARY ON ENVIRONMENTAL IMPACT ASSESSMENT REPORT OF Hind Energy & Coal Beneficiation (India) Ltd. 0.96 MTPA Wet type Coal Washery at Birgahani Village, Baloda Tehsil Janjgir-Champa District, Chhattisgarh

More information

Mangalam Cement Ltd.(Unit I)

Mangalam Cement Ltd.(Unit I) Mangalam Cement Ltd.(Unit I) Name of the Project :- Expansion of cement Project Code :- grinding capacity from 1.3 MTPA to 1.7 MTPA Clearance Letter No. : - F NO. J - 11011 /119 /2012 - IA II (I), dtd

More information

Table 1.1: The Salient Features of the Project. Proposed Quartz Mine Of Sri. Syed Masthan Basha

Table 1.1: The Salient Features of the Project. Proposed Quartz Mine Of Sri. Syed Masthan Basha 1. EXECUTIVE SUMMARY 1.1 Introduction The Eknampuram Quartz mine of 89.80 Acres/ 36.34 ha is located in Sy. No. 60, Eknampuram Village, C.S. Puram Mandal, Prakasam District, Andhra Pradesh has been allotted

More information

Environmental Clearance Compliance Half Yearly Report

Environmental Clearance Compliance Half Yearly Report Environmental Clearance Compliance Half Yearly Report HALF YEARLY COMPLIANCE REPORT- April 2015 to September 2015 Ref: 1. MOEF, New Delhi Environment Clearance F. No. J-11011/119/2007- IA II (I) dated

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT VENSUB LABORATORIES PRIVATE LIMITED SY. NO. 29, TUPAKULAGUDEM VILLAGE, TALLAPUDI MANDAL, WEST GODAVARI DISTRICT, ANDHRA PRADESH PRE FEASIBILITY REPORT VENSUB LABORATORIES PRIVATE LIMITED Duplex No. 12,

More information

Details of the proposed project as presented before the committee are tabulated below:

Details of the proposed project as presented before the committee are tabulated below: Shrungal Homes Block No. 141, F.P.No.42, O.P.No.42, T.P.S.No.58 (Bamroli), Choryasi, Surat. Screening & scoping / appraisal. Details of the proposed project as presented before the committee are tabulated

More information

F. No. J-11011/480/2007-IA II (I) Government of India Ministry of Environment and Forests (I.A Division)

F. No. J-11011/480/2007-IA II (I) Government of India Ministry of Environment and Forests (I.A Division) To, M/s. Madras Cement Ltd. V Floor 98-A, Dr. Radhakrishnan Road Mylapore Chennai 600 004 Tamilnadu F. No. J-11011/480/2007-IA II (I) Government of India Ministry of Environment and Forests (I.A Division)

More information

F.P.No.52, S.No.53/B, 54/2/B, D.T.P.S.No.80, Village: Bhat, Dist: Gandhinagar.

F.P.No.52, S.No.53/B, 54/2/B, D.T.P.S.No.80, Village: Bhat, Dist: Gandhinagar. 20. Karnavati Premier Living F.P.No.52, S.No.53/B, 54/2/B, D.T.P.S.No.80, Village: Bhat, Dist: Gandhinagar. Screening & scoping / appraisal Details of the proposed project as presented before the committee

More information

Mangalam Cement Ltd. (Unit-II) Stack No.

Mangalam Cement Ltd. (Unit-II) Stack No. Mangalam Cement Ltd. (Unit-II) Name of the Project :- Expansion of cement grinding capacity from 1.7 MTPA to 2.3 MTPA Project Code :- Clearance Letter No. : - F NO. J - 11011 /110 /2012 - IA II (I), dtd

More information

EXECUTIVE SUMMARY 1.0 PROJECT DESCRIPTION 1.1 INTRODUCTION

EXECUTIVE SUMMARY 1.0 PROJECT DESCRIPTION 1.1 INTRODUCTION EXECUTIVE SUMMARY 1.0 PROJECT DESCRIPTION 1.1 INTRODUCTION Jaypee Group is a leading Business House of the country with its presence in Core industries and Service Sectors like Cement, Infrastructure development,

More information

Hind Energy & Coal Beneficiation (India) Ltd.

Hind Energy & Coal Beneficiation (India) Ltd. SUMMARY ON ENVIRONMENTAL IMPACT ASSESSMENT REPORT OF Hind Energy & Coal Beneficiation (India) Ltd. (Change in Technology) at Hindadih Village, Masturi Tehsil Bilaspur District, Chhattisgarh Submitted to

More information

M/s Hind Energy & Coal Beneficiation Pvt. Ltd. is presently operating a 2 x 1.2 MTPA

M/s Hind Energy & Coal Beneficiation Pvt. Ltd. is presently operating a 2 x 1.2 MTPA 1.0 INTRODUCTION M/s Hind Energy & Coal Beneficiation Pvt. Ltd. is presently operating a 2 x 1.2 MTPA dry type of coal washery at Village: Hindadih, Tehsil: Masturi, District: Bilaspur (C.G.) for which

More information

PRE-FEASIBILITY REPORT FOR OM SAIRAM STEEL AND ALLOYS PVT LTD

PRE-FEASIBILITY REPORT FOR OM SAIRAM STEEL AND ALLOYS PVT LTD PRE-FEASIBILITY REPORT FOR OM SAIRAM STEEL AND ALLOYS PVT LTD PLOT No. F-1,2,3,8,9,10, ADDL. MIDC, PHASE II, AND GUT NO. 46 & 63, VILLAGE DAREGAON, TEHSIL: JALNA DIST: JALNA, MAHARASHTRA 2014-15 1. Executive

More information

Max. building height (m)

Max. building height (m) Environmental Management Plan (EMP) for Himalaya Falaknuma by Himalaya Developers Ahmedabad No. Particulars Details 1. Proposal for New Project 2. Type of Project and Commercial Building Construction Project

More information

Name of Project: J.K. Cement Works (Unit: J.K. Cement Ltd.), Muddapur (Karnataka)

Name of Project: J.K. Cement Works (Unit: J.K. Cement Ltd.), Muddapur (Karnataka) J.K. Cement Works, Village- Muddapur, Taluka- Mudhol, Distt.- Bagalkot, Karnataka MoEF Letter No. F.No. J-11011/263/2009-IA II (I) dated 21-06-2010 Name of Project: J.K. Cement Works (Unit: J.K. Cement

More information

North East Roofing Pvt. Ltd. Expansion of Asbestos Cement Sheets & Accessories Manufacturing Unit (50,000 TPA to 70,000 TPA)

North East Roofing Pvt. Ltd. Expansion of Asbestos Cement Sheets & Accessories Manufacturing Unit (50,000 TPA to 70,000 TPA) SUMMARY ON ENVIRONMENTAL IMPACT ASSESSMENT REPORT OF North East Roofing Pvt. Ltd. Expansion of Asbestos Cement Sheets & Accessories Manufacturing Unit (50,000 TPA to 70,000 TPA) Proposed at: Bonda Industrial

More information

31. POLLUTION CONTROL COMMITTEE

31. POLLUTION CONTROL COMMITTEE 31. POLLUTION CONTROL COMMITTEE 90 31.1 Consent to A Duly filled in application Form Establish XIII under Water Act. * days an Industry B Duly filled in application FORM 1 under Air Act * C Consent fee

More information

Mangalam Cement Ltd.

Mangalam Cement Ltd. Mangalam Cement Ltd. Name of the Project :- New Cement Plant Unit - III and 17.5 mw CPP-II Project Code :- Raj- 80-600 - 2008 Clearance Letter No. :-F NO. J - 11011 / 30/2006 - IA II (I), dtd 17/07/2007

More information

Sr. No. Date of starting the project and completion schedule. January 2012 January 2017 (Tentative)

Sr. No. Date of starting the project and completion schedule. January 2012 January 2017 (Tentative) Six Monthly Progress Report reg. Construction of Group Housing Colony at village Sarai Aurangabad in Sector 3-A, Bahadurgarh (Distt. Jhajjar), Haryana by M/s Prabhu Shanti Real Estate Pvt. Ltd., due in

More information

SIX MONTHLY COMPLIANCE REPORT JUNE- 2015

SIX MONTHLY COMPLIANCE REPORT JUNE- 2015 SIX MONTHLY COMPLIANCE REPORT JUNE- 2015 Group Housing Complex My woods AT Plot no. GH-04, Sector -16 C, Noida Extension, Greater Noida, U.P. Being developed by M/s Mahagun India Pvt. Ltd. A-19, Sector-63,

More information

PRE FEASIBILITY REPORT. For PROPOSED BULK DRUG PRODUCTS MANUFACTURING UNITS. M/s. M.K. DRUGS. F-10, Industrial Area, Focal Point, Tehsil: Derabassi

PRE FEASIBILITY REPORT. For PROPOSED BULK DRUG PRODUCTS MANUFACTURING UNITS. M/s. M.K. DRUGS. F-10, Industrial Area, Focal Point, Tehsil: Derabassi PRE FEASIBILITY REPORT For PROPOSED BULK DRUG PRODUCTS MANUFACTURING UNITS Of M/s. M.K. DRUGS F-10, Industrial Area, Focal Point, Tehsil: Derabassi Dist: Mohali, Punjab INTRODUCTION M/s. M.K. Drugs is

More information

PRE-FEASIBILITY REPORT

PRE-FEASIBILITY REPORT PRE-FEASIBILITY REPORT For PRIOR ENVIRONMENTAL CLEARANCE STORAGE CAPACITY ENHANCEMENT OF HPCL, LPG BOTTLING PLANT Capacity: 3 X 500 MT At Plot No.499 Kota-Jhalawar Road (NH-12) Village- Mandana, Tehsil-

More information

PRE - FEASIBILITY REPORT

PRE - FEASIBILITY REPORT PRE - FEASIBILITY REPORT FOR PROPOSED EXPANSION OF CEMENT PLANT FROM 1.0 MTPA TO 1.15 MTPA OF M/S KALYANPUR CEMENTS LTD. & INSTALLTION OF 15 MW CAPTIVE THERMAL POWER PLANT OF M/S SONE OJAS LTD. (A WHOLLY

More information

4. The ambient air quality monitoring stations We are monitoring the ambient air quality

4. The ambient air quality monitoring stations We are monitoring the ambient air quality GLOBAL CALCIUM PRIVATE LTD., 125&126, SIPCOT COMPLEX, HOSUR 635 126 Ref : No. J-11011/411/2006-IA-II(I) dated 1 st August 2007. Compliance Report for the Period ending 31.3.2015 Sl. Specific Conditions

More information

JAYPEE NIGRIE SUPER THERMAL POWER PROJECT

JAYPEE NIGRIE SUPER THERMAL POWER PROJECT JAYPEE NIGRIE SUPER THERMAL POWER PROJECT (A Unit of M/s Jaiprakash Power Ventures Limited) Villages: Nigrie, Tehsil :Sarai District: Singrauli 2014 2015 SUBMITTED M.P. POLLUTION CONTROL BOARD BHOPAL (M.P.)

More information

Environmental Clearance Compliance Half Yearly Report

Environmental Clearance Compliance Half Yearly Report Environmental Clearance Compliance Half Yearly Report HALF YEARLY COMPLIANCE REPORT- Oct. 2015 to March 2016 Ref: MOEF, New Delhi Environment Clearance F. No. J-11011/118/2007- IA II (I) dated 25 th August,

More information

2 No. Continuous Ambient Air Quality Monitoring System (CAAQMS) installed in downwind & upwind direction and are connected to APPCB server.

2 No. Continuous Ambient Air Quality Monitoring System (CAAQMS) installed in downwind & upwind direction and are connected to APPCB server. Environmental Clearance Point Wise Half Yearly Compliance Report (October 2014 to March 2015) Cement Plant - EC No: F.No. J-11011/450/2007-IA II(I) Dated: 24 th March 2008 A. SPECIFIC CONDITIONS : S.NO.

More information

PRE FEASIBILITY REPORT PROPOSED CONSCTRUCTION BUILDING PROJECT

PRE FEASIBILITY REPORT PROPOSED CONSCTRUCTION BUILDING PROJECT PRE FEASIBILITY REPORT FOR PROPOSED CONSCTRUCTION BUILDING PROJECT (BUILT UP AREA: 77420.15 SQ. M) BY AMC EWS HOUSING PROJECT RESIDENTIAL BUILDING & COMMERCIAL PROJECT F. P. NO. 174, T.P. NO. 32, GOTA,

More information

EIA REPORT FOR PROPOSED EXPANSION OF STEEL PLANT FROM 1.0 MTPA TO 2.0 MTPA 0F UTTAM VALUE STEELS LIMITED

EIA REPORT FOR PROPOSED EXPANSION OF STEEL PLANT FROM 1.0 MTPA TO 2.0 MTPA 0F UTTAM VALUE STEELS LIMITED COMMENTS OF THE PROJECT PROPONENT ON THE VARIOUS CONCERNS RAISED IN THE PUBLIC CONSULTATION PROCESS The public hearing of the proposed expansion of steel plant from 1.0 MTPA to 2.0 MTPA at Village - Barbadi,

More information

Policy Resolution for Promotion of. Petroleum, Chemicals and Petrochemical Investment Regions (PCPIRs)

Policy Resolution for Promotion of. Petroleum, Chemicals and Petrochemical Investment Regions (PCPIRs) Policy Resolution for Promotion of Petroleum, Chemicals and Petrochemical Investment Regions (PCPIRs) POLICY OBJECTIVES 1. The Petroleum, Chemicals and Petrochemical industry in India is well established

More information

Rajasthan State Pollution Control Board

Rajasthan State Pollution Control Board M/s Raj West Power Private Limited Village- Bhadresh, Tehsil:Barmer District:Barmer Sub: Ref: Consent to Operate under section 25/26 of the Water (Prevention & Control of Pollution) Act, 1974 and under

More information

IMS (Integrated Milling System)

IMS (Integrated Milling System) IMS (Integrated Milling System) PORTABLE CEMENT GRINDING PLANT IMSATEC GmbH Grinding Plant IMS (Integrated Milling System) CONCEPT Mini Cement grinding plants with greater efficiency in the cement market.

More information

Kana Aroma Industries. Pre-Feasibility Report

Kana Aroma Industries. Pre-Feasibility Report Pre-Feasibility Report 1. INTRODUCTION M/s. is a proposed unit to be located at Shed no. C1-41/B/1 & 2, GIDC Industrial Estate, Nandesari, Vadodara, Gujarat and proposes to manufacture Allyl Iso Thiocynate,

More information

Rajasthan State Pollution Control Board

Rajasthan State Pollution Control Board M/s Raj West Power Private Limited Village- Bhadresh, Tehsil:Barmer District:Barmer Sub: Ref: Sir, Consent to Operate under section 25/26 of the Water (Prevention & Control of Pollution) Act, 1974 and

More information

PRE-FEASIBILITY REPORT

PRE-FEASIBILITY REPORT PRE-FEASIBILITY REPORT By Agrawal Iron & Industries (Unit # 2) [Regularisation of Pellet plant 90,000 MTPA along with Coal Gasifier 5000 Nm3/Hr] at Kh.No.219, 220, 221, P.H.No.54, Village Billory, Tehsil

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT PRE FEASIBILITY REPORT for PROPOSED EXPANSION OF DISTILLERY of M/s. SHREE GANESH KHAND UDYOG SAHKARI MANDLI LTD. Shri Harisinhji Mahida Bhavan, At & Po: Vataria, Tal: Valia, Dist: Bharuch, Gujarat-393001

More information

SANGHI INDUSTRIES LIMITED

SANGHI INDUSTRIES LIMITED SANGHI INDUSTRIES LIMITED PRE FEASIBILITY REPORT For EXPANSION OF CEMENT PLANT With INCREASE OF PRODUCTION CLINKER FROM 3.5 MTPA TO 7.5 MTPA CEMENT FROM 4.0 MTPA TO 8.6 MTPA AT SANGHIPURAM KUTCH,GUJARAT

More information

M/s. Jindal Electricity Generation (P) Limited was promoted by Sri Omprakash Agrawal & Associates having other business in the area.

M/s. Jindal Electricity Generation (P) Limited was promoted by Sri Omprakash Agrawal & Associates having other business in the area. 1. INTRODUCTION Executive Summary 1.1 Background: M/s. Jindal Electricity Generation (P) Limited was promoted by Sri Omprakash Agrawal & Associates having other business in the area. 1.2 Proposed Project:

More information

FORM V (See rule 14) Environmental Statement for the financial year ending 31 st March 2014 PART A

FORM V (See rule 14) Environmental Statement for the financial year ending 31 st March 2014 PART A FORM V (See rule 14) Environmental Statement for the financial year ending 31 st March 2014 i) Name and address of the owner / Occupier ii) Industry category Primary (STC Code) Secondary (SIC Code) PART

More information

PRE - FEASIBILITY REPORT

PRE - FEASIBILITY REPORT PRE - FEASIBILITY REPORT FOR OBTAINING PRIOR ENVIRONMENT CLEARANCE For EXISTING MINING ACTIVITY CATEGARY B2 UNDER THE EIA NOTIFICATION 2006 AMENDED ON 31/05/2012 TO PIRABHAI VALABHAI NANDASANIYA LOCATED

More information

IDA, JEEDIMETLA, QUTUBULLAPUR MANDAL, RANGAREDDY DISTRICT, TELANGANA

IDA, JEEDIMETLA, QUTUBULLAPUR MANDAL, RANGAREDDY DISTRICT, TELANGANA M/s. ARTEMIS BIO TECH LTD., (A Division of Themis Medicare Ltd.,) PLOT NO. 1 & 5, Phase I, IDA, JEEDIMETLA, QUTUBULLAPUR MANDAL, RANGAREDDY DISTRICT, TELANGANA PRE FEASIBILITY REPORT Artemis Bio tech Ltd.,

More information

JANUARY Prepared by:

JANUARY Prepared by: ARYAN COAL BENEFICATION PVT. LTD. EXECUTIVE SUMMARY OF RAPID ENVIRONMENTAL IMPACT ASSESSMENT AND ENVIRONMENTAL MANAGEMENT PLAN FOR BINJHRI WASHERY EXPANSION PLANT AT KORBA, CHATTISGHARH (0.96 MTPA 4.8

More information

Health and safety norms of CPWD should be followed during construction.

Health and safety norms of CPWD should be followed during construction. Status of Compliance of Conditions of the Environmental Clearance Issued to Riveria Commercial Developers Ltd. DLF Center, Sansad Marg, New Delhi 110001- Construction of "YASHWANT PLACE COMMUNITY CENTRE"

More information

ppt on Ash Management By :J.N. Dave (G.M.-Power) & D.S.Makwana (I/c. G.M.-PP)

ppt on Ash Management By :J.N. Dave (G.M.-Power) & D.S.Makwana (I/c. G.M.-PP) ppt on Ash Management By :J.N. Dave (G.M.-Power) & D.S.Makwana (I/c. G.M.-PP) Salient Features of Lignite Project Panandhro Village Panandhro, Fulra & Khanot Total Meter age of Exploration 10,757 m Total

More information

National Symposium on Best Practices to improve the Business Environment

National Symposium on Best Practices to improve the Business Environment Government of Gujarat National Symposium on Best Practices to improve the Business Environment 23 rd August 2014 Gujarat Industrial Development Corporation (A Government of Gujarat Undertaking) Industrial

More information

ANNEXURE I LIST OF PRODUCTS

ANNEXURE I LIST OF PRODUCTS Sr. No. ANNEXURE I LIST OF PRODUCTS Name of Products Proposed (MT/Month) 1 Dibasic Lead Phthalate 100 100 2 Lead Stearate 200 200 3 Dibasic Lead Stearate 100 100 4 Calcium Stearate 500 500 5 Zinc Stearate

More information

ACC Limited CHAIBASA CEMENT WORKS

ACC Limited CHAIBASA CEMENT WORKS ACC Limited CHAIBASA CEMENT WORKS ENVIRONMENTAL STATEMENT (FINANCIAL YEAR ENDING MARCH 31st, 2016) PREPARED BY ACC Limited CHAIBASA CEMENT WORKS P.O. JHINKAPNI -833 215 DIST. WEST SINGHBHUM, JHARKHAND

More information

D:\My Documents\Legislative\Legislation BS\Consents\Six monthly compliance\cement\june 2017\COMPLIANCE STATUS.docx.docx

D:\My Documents\Legislative\Legislation BS\Consents\Six monthly compliance\cement\june 2017\COMPLIANCE STATUS.docx.docx COMPLIANCE STATUS OF ENVIRONMENT CLEARANCE EC letter no. J-11011/79/2007-IA II (I) Dated 16.04.2009 A. Specific Conditions : SN Condition Compliance 1. Continuous stack monitoring facilities to monitor

More information

Clearance Letter no. : MoEF Vide Letter no. J-11011/79/2003-IA-II (I) dated April 21, 2004

Clearance Letter no. : MoEF Vide Letter no. J-11011/79/2003-IA-II (I) dated April 21, 2004 Name of the Project: Jaypee Rewa Plant, Unit of M/s Jaiprakash Associates Limited for expansion Of cement production from 2.5 MTPA to 3.5 MTPA at Jaypee Nagar, District Rewa, Madhya Pradesh Project Code:

More information

General Information. How to apply:

General Information. How to apply: General Information Adani Power Maharashtra Limited s (APML) Thermal Power Plant of 3300 MW Capacity (5 x 660 MW) is located in the state of Maharashtra at Tirora near Gondia. All units are with Supercritical

More information

Prefeasibility Report. 30,000 KLPY Anhydrous (Absolute) Alcohol Manufacturing Plant at Patalganga MIDC

Prefeasibility Report. 30,000 KLPY Anhydrous (Absolute) Alcohol Manufacturing Plant at Patalganga MIDC Prefeasibility Report For 30,000 KLPY Anhydrous (Absolute) Alcohol Manufacturing Plant at Patalganga MIDC of Alkyl Amines Chemicals Limited 401-407 Nirman Vyapar Kendra, Plot No. 10, Sector 17, Vashi,

More information

PREFEASIBILITY REPORT OF PROPOSED BUILDING LIMESTONE PROJECT OF

PREFEASIBILITY REPORT OF PROPOSED BUILDING LIMESTONE PROJECT OF PREFEASIBILITY REPORT OF PROPOSED BUILDING LIMESTONE PROJECT OF Indulal C. Vora AT VILLAGE:- Palakhda, TALUKA:- Porbandar, DIST.:-Porbandar 1 (B) CONTENTS 1.0 INTRODUCTION 1.1 PREAMBLE 2.0 EXECUTIVE SUMMARY

More information

Executive Summary in English

Executive Summary in English for Proposed Cement Plant with a capacity of Clinker 3 MTPA, Cement 7 MTPA (0.70 MTPA OPC, 3.50 MTPA PSC & 2.80 MTPA PPC) at Bhimnagar village, Sedam taluka, Gulbarga district, Karnataka in English Project

More information

HALF YEARLY COMPLIANCE REPORT OF ENVIRONMENTAL CLEARANCE CONDITIONS

HALF YEARLY COMPLIANCE REPORT OF ENVIRONMENTAL CLEARANCE CONDITIONS HALF YEARLY COMPLIANCE REPORT OF ENVIRONMENTAL CLEARANCE CONDITIONS 1. Name of the Project: M/s MCC PTA India Corp. Private Limited Haldia ( WB) Note: Company Name was change from MCC PTA India Corp.Private

More information

- 1 S. NO. PARTICULARS DETAILS

- 1 S. NO. PARTICULARS DETAILS 1.0 INTRODUCTION EXECUTIVE SUMMARY M/s. Lafarge India Private Ltd. (LIPL) is a subsidiary of French building materials major Lafarge. Lafarge entered in the Indian market in 1999 with acquisition of cement

More information

Capacity Enhancement and Energy Conservation in Cement Plant

Capacity Enhancement and Energy Conservation in Cement Plant Capacity Enhancement and Energy Conservation in Cement Plant V.K. Batra*, P.N. Chhangani**, Dinesh Satija*** and R. B. Garg**** Holtec Consulting Private Limited, Gurgaon ABSTRACT The cement industry continues

More information

PRE FEASIBILITY REPORT JOJOBERA CEMENT PLANT

PRE FEASIBILITY REPORT JOJOBERA CEMENT PLANT PRE FEASIBILITY REPORT Of JOJOBERA CEMENT PLANT (STAND-ALONE CEMENT GRINDING UNIT) FOR ENVIRONMENTAL CLEARANCE FOR CHANGE IN PRODUCT MIX OF 4.6 MILLION TONNES PER ANNUM CEMENT PRODUCTION (NO INCREASE IN

More information

Research Compendium. Coal Sector in India 2013 A comprehensive data and information update

Research Compendium. Coal Sector in India 2013 A comprehensive data and information update Research Compendium Coal Sector in India 2013 A comprehensive data and information update Release Date : August 2013 Background About the report Coal is the only major conventional source of energy that

More information

V.S LIGNITE POWER Pvt. Ltd AT VILLAGE-GURHA, KOLAYAT, BIKANER, RAJASTHAN

V.S LIGNITE POWER Pvt. Ltd AT VILLAGE-GURHA, KOLAYAT, BIKANER, RAJASTHAN V.S LIGNITE POWER Pvt. Ltd AT VILLAGE-GURHA, KOLAYAT, BIKANER, RAJASTHAN HALF YEARLY REPORT FOR THE PERIOD OCTOBER, 2011 to MARCH 2012 V. S. Lignite Power Pvt. Ltd. Name of the Project : 1x 135 MW Lignite

More information

The Ramco Cements Limited RR Nagar. P.M.RAMASUBRAMANIAN GM Process & QC Sr. Manager - Process S.V.Veeraraghavan Asst.

The Ramco Cements Limited RR Nagar. P.M.RAMASUBRAMANIAN GM Process & QC Sr. Manager - Process S.V.Veeraraghavan Asst. The Ramco Cements Limited RR Nagar P.M.RAMASUBRAMANIAN GM Process & QC V.SURESH Sr. Manager - Process S.V.Veeraraghavan Asst.Manager-Electrical Salient Futures of Ramasamy Raja Nagar Unit A flagship company

More information

TABLE OF CONTENTS. Title page Table of contents List of tables List of figures Non- technical summary

TABLE OF CONTENTS. Title page Table of contents List of tables List of figures Non- technical summary TABLE OF CONTENTS Title page Table of contents List of tables List of figures Non- technical summary Page i ii vii viii ix CHAPTER 1: INTRODUCTION 1 1.1 Project Background 1 1.2 Aims and Objectives 3 1.3

More information

.in Dated 9th August, Sharma ;

.in Dated 9th August, Sharma  ; F. No. J-11011/151/2010-IA II (I) Government of India Ministry of Environment and Forests (I.A. Division) Paryavaran Bhawan CGO Complex, Lodhi Road New Delhi -110 003.. To, Ankleshwar E-mail: pb.rastoai@nic.in

More information

ENVIRONMENTAL IMPACT ASSESSMENT AND YOU

ENVIRONMENTAL IMPACT ASSESSMENT AND YOU ENVIRONMENTAL IMPACT ASSESSMENT AND YOU PARTICIPATING IN PUBLIC CONSULTATIONS FOR: COAL FUELED THERMAL POWER PLANTS C A G Citizen consumer and civic Action Group 1. What are Thermal Power Plants? Electricity

More information

REQUEST FOR PROPOSALS (RFP) Design Services for District Heat Distribution System

REQUEST FOR PROPOSALS (RFP) Design Services for District Heat Distribution System REQUEST FOR PROPOSALS (RFP) Design Services for District Heat Distribution System Issued by the City of Montpelier, Vermont Department of Planning and Community Development Responses Due: August 12, 2011,

More information

Pre-Feasibility Report. for. Proposed Construction project of Santnagari

Pre-Feasibility Report. for. Proposed Construction project of Santnagari Pre-Feasibility Report for Proposed Construction project of Santnagari at Survey No. 1439, Near Dharoi Dam, Village Mahor, Taluka Vadali, District Sabarkantha, Gujarat By Gujarat Pavitra Yatradham Vikas

More information

COMPLIANCE REPORT TO YOUR ORDER DT. 16 TH NOVEMBER 2010

COMPLIANCE REPORT TO YOUR ORDER DT. 16 TH NOVEMBER 2010 SPECIFIC CONDITIONS: COMPLIANCE REPORT TO YOUR ORDER DT. 16 TH NOVEMBER 2010 i. The total quantity of the dredged material of 35,00,000 cu.m shall be dumped at the specified offshore dumping site of Cochin

More information

PROJECT BRIEF. Noise environment: No Entrant noise generation sources exist in and around project area.

PROJECT BRIEF. Noise environment: No Entrant noise generation sources exist in and around project area. PROJECT BRIEF PROJECT LOCATION: - Pahar Kua Marble Range Mining Project Q L No 235 is located near village Pahar Kua, Tehsil Makrana., District Nagaur Rajasthan. Project is approachable from national highway.

More information

Rapid Environmental Impact Assessment Study for the Proposed Cement Plant at Majhgawan, District Sidhi, Madhya Pradesh

Rapid Environmental Impact Assessment Study for the Proposed Cement Plant at Majhgawan, District Sidhi, Madhya Pradesh 1.0 Project Description 1.1 Background Jaiprakash Associates Limited (JAL) formerly known as Jaypee Cement Limited is the well diversified conglomerate of Jaypee Group. Its cement division has 3 modern,

More information

ENVIRONMENTAL MONITORING PROGRAMME

ENVIRONMENTAL MONITORING PROGRAMME Stage-I (2x800 MW) Page 1 5 CHAPTER - VI ENVIRONMENTAL MONITORING PROGRAMME 6.0 OBJECTIVES Regular monitoring program the environmental parameters is essential to take into account the changes in the environment.

More information

For PROPOSED IT PARK. By M/s.Balewadi Tech Park Pvt.Ltd. Submitted to State Environment Expert Appraisal Committee III, Maharashtra

For PROPOSED IT PARK. By M/s.Balewadi Tech Park Pvt.Ltd. Submitted to State Environment Expert Appraisal Committee III, Maharashtra Draft Terms of References (ToR) (Based on the model TOR given in Environmental Impact Assessment Guidance Manual for building construction projects by MoEF & CC) For PROPOSED IT PARK By M/s.Balewadi Tech

More information

SUBMITTED TO M.P. POLLUTION CONTROL BOARD BHOPAL (M.P.)

SUBMITTED TO M.P. POLLUTION CONTROL BOARD BHOPAL (M.P.) JAYPEE REWA PLANT (A Unit of Jaiprakash Associates Limited) JAYPEE NAGAR REWA (M.P.) 2012 2013 SUBMITTED TO M.P. POLLUTION CONTROL BOARD BHOPAL (M.P.) Jaypee Rewa Plant (A unit of Jaiprakash Associates

More information

For. Coal Washery. Promoter. : Budbud & Kerajharia. Plot No.29, Transport Nagar, Indira Complex, Korba [C.G.] May 2012

For. Coal Washery. Promoter. : Budbud & Kerajharia. Plot No.29, Transport Nagar, Indira Complex, Korba [C.G.] May 2012 Pre-feasibility Report For Coal Washery at Village Tehsil District : Budbud & Kerajharia : Pali : Korba [C.G.] Promoter Plot No.29, Transport Nagar, Indira Complex, Korba [C.G.] May 2012 Contents 1.0 Executive

More information

Environmental Clearance Compliance Half Yearly Report

Environmental Clearance Compliance Half Yearly Report Environmental Clearance Compliance Half Yearly Report HALF YEARLY COMPLIANCE REPORT- Oct 2016 to March 2017 Ref: MOEF, New Delhi Environment Clearance F. No. J-11011/472/2010- IA II (I) dated 11 th September,

More information

PRE FEASIBILITY REPORT (PFR)

PRE FEASIBILITY REPORT (PFR) APPLICANT : M/s PLANTERS AGGREGATES 27 PRE FEASIBILITY REPORT (PFR) APPLICANT : M/s PLANTERS AGGREGATES 28 INDEX S. No. Contents Page No. 1.0 EXECUTIVE SUMMARY 30 2.0 INTRODUCTION OF THE PROJECT / BACKGROUND

More information

Spillage and Material Handling Systems. By Hugros Inc.

Spillage and Material Handling Systems. By Hugros Inc. Spillage and Material Handling Systems By Hugros Inc. Our Profile is a technology solution provider for industries for all their requirements to keep a safer and green work environment. We offer engineering

More information

Corporate Social Responsibility (CSR) Policy

Corporate Social Responsibility (CSR) Policy Corporate Social Responsibility (CSR) Policy RAJASTHAN ELECTRONICS & INSTRUMENTS LIMITED JAIPUR Page 1 of 11 CONTENTS S. No. Section Page No. 1. CSR OVERVIEWS, OBJECTIVES AND SCOPE 3-4 2. CSR POLICY STATEMENT

More information

For personal use only

For personal use only BALAMA PROJECT UPDATE AS AT MID MARCH 2017 BALAMA GRAPHITE PROJECT (100%) OPERATIONS UPDATE Commissioning remains on schedule for Q2 2017 Capital budget remains unchanged at US$193 million (plus US$7 million

More information

STANDARD OPERATING PROCEDURE

STANDARD OPERATING PROCEDURE STANDARD OPERATING PROCEDURE Consent to Established/Operate Procedural Guidelines Consent to Establish NOC Check List Consent to Operate NOC Check List Renewal to Consent to Operate Check List Time Frame

More information

STATE OF ENVIRONMENT ATLAS OF INDIA-OUTLINE

STATE OF ENVIRONMENT ATLAS OF INDIA-OUTLINE STATE OF ENVIRONMENT ATLAS OF INDIA-OUTLINE Sl. No. Maps Themes Features Data Source I: GENERAL CHARACTERISTICS I. Administrative Divisions International, States, Districts Survey of Boundaries with State

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT DR. REDDY S LABORATORIES LTD. CHEMICAL TECHOPS III PLOT NO.116, 116A, 116B & 126C, S.V. CO OP. IND. ESTATE, BOLLARAM VILLAGE, JINNARAM MANDAL, MEDAK DISTRICT, TELANGANA PRE FEASIBILITY REPORT DR. REDDY

More information

HINDUJA NATIONAL POWER CORPORATION LIMITED. HNPCL, (2X520 MW). VIZAG Technical Enquiry Specification for PU Coated Pipe For Ash Water Recovery System

HINDUJA NATIONAL POWER CORPORATION LIMITED. HNPCL, (2X520 MW). VIZAG Technical Enquiry Specification for PU Coated Pipe For Ash Water Recovery System HNPCL, (2X520 MW). VIZAG THERMAL POWER PROJECT TECHNICAL ENQUIRY SPECIFICATION FOR MS ERW 45O NB POLYURETHANE COATED PIPE FOR ASH WATER RECOVERY SYSTEM Prepared By Checked by Approved by Ashok Kumar Ashok

More information

Naubasta Lime Stone Mine ML - I Jaypee Rewa Plant Jaiprakash Associates Limited

Naubasta Lime Stone Mine ML - I Jaypee Rewa Plant Jaiprakash Associates Limited Naubasta Lime Stone Mine ML - I Jaypee Rewa Plant Jaiprakash Associates Limited Introduction: Jaypee Group is the 3 rd largest cement producer in the country. The Groups cement facilities are located in

More information

Chemplast Sanmar Limited Marine Terminal Facility, Chitrapettai Village Cuddalore District, Tamil Nadu

Chemplast Sanmar Limited Marine Terminal Facility, Chitrapettai Village Cuddalore District, Tamil Nadu Chemplast Sanmar Limited Marine Terminal Facility, Chitrapettai Village Cuddalore District, Tamil Nadu Compliance Report for Environmental Clearance No.11.63/2005.1A.III dated 19.12.2005 Specific Conditions

More information

PROPOSED TERM OF REFERENCE

PROPOSED TERM OF REFERENCE PROPOSED TERM OF REFERENCE FOR ESTABLISHMENT OF PROPOSED MOLASSES/GRAIN BASED DISTILLERY HAVING CAPACITY: 160.0 KLD (MOLASSES BASED) OR 120.0 KLD (MOLASSES BASED) + 40.0 KLD (GRAIN BASED) ALONGWITH 7.0

More information

You have applied in accordance with Section 9 of the Environmental Protection Act for approval of:

You have applied in accordance with Section 9 of the Environmental Protection Act for approval of: Ministry of the Environment Ministère de l Environnement CERTIFICATE OF APPROVAL AIR NUMBER 7970-7QNRDJ Issue Date: April 2, 2009 William Day Construction Limited 2500 Elm Street, P.O. Box 700 Copper Cliff,

More information

Environmental Impact Assessment

Environmental Impact Assessment Environmental Impact Assessment A brief discussion Presented by: Apekshit Solanki Kirti Neetu Yadav Sameera Vishakha Shankar Introduction EIA is a formal process to predict the environmental consequences

More information

The unit obtained NOC (CFE) of A.P. Pollution control Board in the year 1988 and started operations.

The unit obtained NOC (CFE) of A.P. Pollution control Board in the year 1988 and started operations. 1. Introduction M/s. Sri Krishna Pharmaceuticals Limited, Unit-III (Formerly Sri Krishna Drugs Limited) was established in the year 1988. It is located at Sy. No. 57, Golkonda kalan, Raikunta (V), shamshabad

More information

CLEANER PRODUCTION IN FOUNDRY INDUSTRIES

CLEANER PRODUCTION IN FOUNDRY INDUSTRIES CLEANER PRODUCTION IN FOUNDRY INDUSTRIES INTRODUCTION Foundry is one of the most energy intensive metallurgical industries. Various sections of Foundry namely Pattern making, molding, melting, core making,

More information

OIL INDIA LIMITED KG BASIN PROJECT KAKINADA GLOBAL EXPRESSION OF INTEREST NO. OIL/KGB/EOI-22

OIL INDIA LIMITED KG BASIN PROJECT KAKINADA GLOBAL EXPRESSION OF INTEREST NO. OIL/KGB/EOI-22 OIL INDIA LIMITED KG BASIN PROJECT KAKINADA GLOBAL EXPRESSION OF INTEREST NO. OIL/KGB/EOI-22 Oil India Limited, KG Basin Project, Door No. 11-4-7, Nookalamma Temple Street, Ramarao Peta, Kakinada-533004,

More information

Compliance of Environmental Clearance SEIAA/GUJ/EC/8(a)/251/2012 Dated (Period April 2016 to September 2016)

Compliance of Environmental Clearance SEIAA/GUJ/EC/8(a)/251/2012 Dated (Period April 2016 to September 2016) Compliance of Environmental Clearance SEIAA/GUJ/EC/8(a)/251/2012 Dated 06.09.2012 (Period April 2016 to September 2016) Sr. No. Conditions Compliance status A. Specific Conditions A.1 Water 1. The fresh

More information

Corporate Social Responsibility Policy

Corporate Social Responsibility Policy Corporate Social Responsibility Policy INDEX OF CONTENTS SL.NO. INDEX PAGE NO. 1 BACKGROUND 3-4 2 OBJECTIVE 5 3 DEFINATIONS 5-6 4 CSR ALLOCATION 6 5 CSR BUDGET 6 6 CSR PROGRAMMES AREAS 6-7 7 CSR IMPLEMENTATION

More information

MM Despro Engineering Pvt. Ltd.

MM Despro Engineering Pvt. Ltd. MM Despro Engineering Pvt. Ltd. (AN ENGINEERING SOLUTION FOR CEMENT, STEEL & POWER PLANT MACHINARY) ISO 9001:2008 CERTIFIED COMPANY 303, Guru Ram Das Bhawan, Ranjit Nagar Commercial Complex, New Delhi-8

More information

ADDITIONAL ATTACHMENTS TO FORM-1 M/S. SDB DIAMOND BOURSE

ADDITIONAL ATTACHMENTS TO FORM-1 M/S. SDB DIAMOND BOURSE ADDITIONAL ATTACHMENTS TO FORM-1 FOR OBTAINING ENVIRONMENT CLEARANCE For Proposed Commercial Complex Surat Diamond Bourse M/S. SDB DIAMOND BOURSE Block No. 177/P, Moje- Khajod, Taluka- Surat City, District

More information