1 Pre - feasibility Report For Adima Organics (I) Pvt. Ltd. Plot No. 103 & 104, Phase-IV, STICE, Musalgaon, Tal. Sinnar, Dist. Nashik Consultant: M/s. SADEKAR ENVIRO ENGINEERS PVT. LTD. Accredited by QCI NABET Lab. Recognized by MoEF, Govt. of India NABL Accredited Certificate No. T- 2190, Certified by ISO 9001:2008 Certified by BS OHSAS 18001:2007 Plot No. A-95, Road No. 16, Kisan Nagar Road, MIDC Wagle Industrial Area, Thane (W) Telephone : /22/23/24 psadekar@yahoo.com / prs@sadekarenviro.com Web site:- January, Executive Summary Name of the Project Proponent : Mr. Mathew Kavalam

2 Summary of the project Salient Features of Project Name & Address of M/s Adima Organics (I) Pvt. Ltd. Company Plot No. 103 & 104, Phase - IV, STICE, Musalgaon, Tal. Sinnar, Dist. Schedule of project as per EIA Notification, 2006 Category of Project Plot Area Production details Water Requirement of Project Effluent generation Hazardous generation waste Nashik (f) 'A' Particulars Existing (sq. m.) Proposed (sq. m.) (sq. m.) Plot area 4, , Ground 2, , , Coverage area Parking area Green belt area Existing: MT/A Proposed: 6, : (Note: Manufacturing of 2 existing products with consented value of 24.0 MT/A viz MT/A will be stopped) Bi - products: MT/A Existing water requirement : 4.0 CMD Proposed water requirement: CMD water requirement (after expansion): 37.91CMD Source of water: STICE (Sinnar Taluka Industrial Co-Operative Estate) quantity of effluent to be generated after expansion: CMD quantity of effluent to be recycled after expansion: 21.6 Sr. No. Hazardous Solid Waste quantity (Existing) quantity (Proposed) Disposal 1 Spent Solvent 2 Distillation Residue 50.0 kg/m 10.0 T/M 10.5 T/M 0.1 T/M 1.0 T/M 1.1 T/M CHWTSDF 3 Discarded Containers 100 Nos./M 200 Nos./M 300 Nos./M Sale after decontamination 4 ETP Sludge 5 MEE Residue 25 kg/m 3.0 T/M T/M T/M T/M CHWTSDF Page 2

3 Effluent treatment The sewage generation will be around 2.3 CMD and the industrial effluent generation will be CMD, thus total quantity of effluent generated will be CMD The effluent generated from manufacturing process will be CMD, Boiler blow down will be 0.5 CMD, Cooling tower blow down will be 2.34 CMD. A total of CMD HCOD - HTDS effluent from stripper column & RO reject will be subjected to MEE of 12 CMD capacity. A total of CMD effluents comprising of Domestic sewage, LCOD-LTDS effluent from manufacturing process & RO reject (followed by MEE) will be subjected to Secondary treatment. A total of CMD will be subjected to Tertiary treatment A total of CMD will be subjected to RO of 24 CMD from which 18.5 CMD RO permeate & 3.9 CMD RO reject will be generated. ETP Details Power Requirement The 18.5 CMD RO reject along with 3.1 CMD recovered boiler condensate thus a total of 21.6 CMD will be reused & recycled for Cooling Tower makeup water (11 CMD), Boiler feed water (6.2), Gardening (1.5) & Domestic (2.5) activities and 0.4 CMD in process. LCOD-LTDS effluent: Will be treated in ETP of 22 CMD capacity comprising of primary, secondary & tertiary treatment scheme. HCOD-HTDS effluent: Will be subjected to Stripper followed by MEE of 12 CMD capacity followed by RO of 25 CMD capacity. Existing connected load: 200 kw, Existing maximum demand: 250 kva Proposed connected load: 400 kw, Proposed additional demand: 500 kva connected load (after expansion): 600 kw, demand after expansion: 750 kva Boiler Details Fuel requirement Source: MSEDCL Existing: 1 x 1.1 TPH steam boiler Proposed: 1 x 1.1 TPH steam boiler after expansion: 2 x 1.1 TPH steam boilers Note: Proposed boiler of 1.1 capacity will be kept as standby Furnace oil Existing: 250 l/day Page 3

4 Stack details Proposed: 330 l/day after expansion: 580 l/day Stack No. 1 : 30.0 m existing stack same will be used as a common stack for proposed boiler Stack No. 2 : 3.0 m (above roof level) for existing DG set of 63 kva Stack No. 3: 10.0 m existing two stage Alkaline scrubber attached to process reactors Stack No. 4: 7.0 m existing Alkaline scrubber attached to Bromine storage tank Stack No. 5: 10.0 m proposed two stage Alkaline scrubber to be attached to process reactors Stack No. 6: 10.0 m proposed two stage Alkaline scrubber to be attached to process reactors Scrubber Existing: 1 No. two stage Alkaline scrubber attached to process reactors 1 No. Alkaline scrubber attached Bromine storage tank Proposed: 2 Nos. two stage Alkaline scrubbers to be attached to process reactors Man power Existing : Skilled - 10, Unskilled - 20 : 30 Proposed: Skilled - 5, Unskilled - 15 : 20 after expansion: Skilled - 15, Unskilled - 35 : 50 EMP cost Project Cost Capital: 1.78 Crore, Recurring: lakh Existing: 6.60 Crore Proposed: 5.6 Crore : 12.2 Crore Pollution Load and Mitigation Measures The industry takes the necessary precaution to protect the environment by implementing efficient pollution control equipments like scrubbers to control air emissions from process & adequate stack height for boilers & DG sets as well as full-fledged ETP for treatment of waste water. Company is having memberships of Maharashtra Enviro Power Ltd. - CHWTSDF at Ranjangoan for disposal of hazardous waste and the entire quantum of treated effluent will be completely used within the factory premises thereby making it a Zero Liquid Discharge (ZLD) project. The production process equipments are so efficient and modern as such the waste generation is very minimal. Page 4

5 A. Quantum of Waste Water Generated : CMD Existing quantity of effluent quantity of effluent (after expansion) Quantity of effluent to be recycled : 1.3 CMD : CMD : 21.6 CMD Effluent Treatment Plant Company is having existing ETP of 5 CMD capacity comprising of primary, secondary & tertiary treatment scheme in wake of proposed expansion the Existing ETP will be upgraded to 22 CMD capacity along with installation of Stripper, MEE of 12 CMD capacity & RO of 25 CMD capacity. B. Quantum of Waste Generated: 1. Non Hazardous waste: Wastes such as papers/office waste from administrative buildings, metal wastes/scraps from industrial operations. Disposal: Papers/office waste will be disposed through local municipal waste disposal system and metal wastes/scraps from industrial operations will be sold to recyclers. 2. Hazardous waste Sr. No. Hazardous Solid Waste Category of waste quantity (Existing) quantity (Proposed) Disposal 1 Spent solvent kg/m 10.0 T/M 10.5 T/M 2 Distillation T/M 1.0 T/M 1.1 T/M residue Maharashtra Enviro Power Ltd. - CHWTSDF at Ranjangaon 3 ETP sludge kg/m 3.0 T/M T/M 4 MEE residue T/A T/A 5 Discarded containers Nos./M 200 Nos./M 300 Nos./M Sale to authorized recycler Page 5

6 Waste Disposal: The hazardous waste will be sent to Maharashtra Enviro Power Ltd. - CHWTSDF at Ranjangaon for disposal. Air Emission Control Sr. No Item Utilities Existing / Proposed to be installed 1. Air Stack attached to various utilities with sufficient height Utilities Boiler Capacity Existing 1) 1 x 1.1 TPH Proposed 1) 1x 1.1 TPH steam steam boiler boiler Note: Proposed boiler 1.1 TPH will be kept as standby Fuel Furnace oil: 250 Furnace oil: 580 l/day l/day ( after expansion) Source of Indian Oil, Navi Indian Oil, Navi fuel Stack height Mumbai Steam Boiler: Stack of 30.0 m height Mumbai Steam boiler: Stack of 30.0 m height Note: Existing stack of 30.0 m height will be used as a common stack for proposed boiler of 1.1 TPH Scrubbers Plant Section & Units Process Scrubbers: Height form ground level Existing/Proposed Scrubber No. 1: 2 stage Alkaline scrubber attached to process reactors 10.0 m Existing Scrubber No. 2: Alkaline scrubber attached to Bromine storage tank 7.0 m Existing Scrubber No. 3: 2 stage Alkaline scrubber attached to process reactors 10.0 m Proposed Page 6

7 Scrubber No. 4: 2 stage Alkaline scrubber attached to process reactors 10.0 m Proposed 2. Introduction of the project/background information i) Identification of Project & Project Proponent Identification of Project: The project in consideration is for enhanced production capacity of Synthetic Organic Chemicals from existing consented quantity of 468 MT/A with addition of 6,444 MT/A to a total of 6864 MT/A along with bi-products MT/A. Note: Manufacturing of 2 existing products with consented value of 24.0 MT/A each will be stopped. Project Proponent: Adima Organics (I) Pvt. Ltd. is a manufacturer of Synthetic Organic Chemicals based in India, the products manufactured by Adima are further used for manufacturing of APIs (Active Pharmaceutical Ingredients) & Drugs. Adima Organics (I) Pvt. Ltd. has a team of highly qualified work force having vast experience in various facets of chemical process development, process scale-up, chemical technology & manufacturing expertise, well trained in all process & safety requirements. Sigma Solvents provides cost effective solutions for customer s diverse requirements. Adima Organics (I) Pvt. Ltd. s existing infrastructure is designed to carry out many types of processes in a safe manner. Adima Organics (I) Pvt. Ltd. has a successful track record in developing non-infringing processes and scaling them up from laboratory to kilo scale to commercial scale production. Adima Organics (I) Pvt. Ltd. s expertise enables to successfully manage and develop a wide range of processes that conform to stringent quality and safety guidelines. Adima Organics (I) Pvt. Ltd. s quality assurance & quality control departments are staffed with competent individuals. Page 7

8 Adima a Organ nics (I)Pvvt. Ltd. Adim ma Organicss (I) Pvt. Ltdd. s long-term m relationshiips with custtomers bear testimony too our strict adherence to Intellectuual Property. We leveragge best practiices and techhnology to ensu ure confidenttiality in ourr operations. Adima Organiccs (I) Pvt. Ltd. L is comm mitted to thhe health annd safety off employees, the munity and environmennt protection. Adima Orgganics (I) Pvt. P Ltd. playy s a welffare of comm proaactive role inn creating aw wareness, impparting trainning and minnimizing polllution. Figure 1: Google Eartth Imagery depicting d Loccation of Adiima Organics (I) Ltd. at Sinnar S Taluk ka Industria al CO-OP Esstate (STICE E), Musalgaon Highlights of o the propoosed project are: The proposed prod duction capaacity enhanccement projject with exxisting and new produccts is locatedd in the Sinnaar Taluka Industrial CO--OP Estate (STICE), Muusalgaon. The prroject activitty will not any involvee creation of o new infrastructure for f the propposed expansiion. Since thhe proposedd expansion will be achiieved withinn the existinng manufactuuring plant lo ocated at Pllot No. 103 & 104, Phhase-IV, STIICE, Musalggaon hence no new lannd is required. Sadekar Enviro Engine eers Pvt. Ltd. Page 8

9 The existing ETP of 5 CMD capacity with primary, secondary & treatment scheme will be upgraded to 22 CMD capacity along with installation of Stripper, MEE of 12 CMD capacity & RO of 25 CMD capacity. The unit is located in Sinnar Taluka Industrial Co-Operative Estate (STICE), Musalgaon which provides a good infrastructure for the supply of power and transportation facility. ii) Brief description of nature of project The project in consideration is for enhanced production capacity of Synthetic Organic Chemicals which will further used by various pharmaceutical industries for manufacture of APIs (Active Pharmaceutical Ingredients) & Drugs. iii) Employment generation (Direct & Indirect due to the project) The current man power employed by the industry is 30 people (skilled 10 & unskilled 20) & the man power required in wake of proposed expansion will be 20 (skilled 5 & unskilled 15), the total man power after expansion will be 50 of which skilled will be 15 and unskilled will be 35. Applicability for Environmental Clearance: The expansion project in consideration of Adima Organics (I) Pvt. Ltd. comes under the project activity 5(f) category A, as per the EIA Notification No. S.O.1533 (E) dated 14 th September 2006 & amendments till date. 3. Project Description (i) Type of project including interlinked and interdependent projects, if any. The proposed expansion project is for enhanced production of dyes with addition of new (blending) products no interlinked and interdependent projects are involved. (II) Location (map showing general location, specific location and project boundary & project site layout with co ordinates). Page 9

10 Adima a Organ nics (I)Pvvt. Ltd. G Eartth Imagery depicting d L Location of Adima A Organ nics (I) Ltd. at a Sinnar Taaluka Figure 2: Google Indusstrial CO-OP P Estate (STIICE), Musalgaon with boundary b coorners of prooject plot Table 1: Laatitude & Longitude off Boundary Corners of the project plot ary Corner Latitude & Longitude Bounda A 19 51''15.99"N 74 2'39.09"E B 19 51''18.45"N 74 2'39.05"E C 19 51''18.49"N Sadekar Enviro Engine eers Pvt. Ltd. Page 10

11 D 74 2'40.83"E 19 51'15.99"N 74 2'40.83"E (iii) Details of alternate site considered and the basis of selecting the proposed site: The proposed activity is a production capacity expansion of the existing unit of Adima Organics (I) Pvt. Ltd. located at Plot No. 103 & 104, Phase-IV,STICE Musalgaon with an existing ground coverage of 2, sq. m. whereas for the proposed expansion activity additional ground coverage of 4,00.00 sq. m. will be required for which adequate open space is available. The production capacity enhancement will be achieved by replacing the existing reactor with reactors of high volume capacity now since there is no requirement of any new/additional land & the project inconsideration being a brown field activity none alternative sites were considered for the proposed expansion project. (IV) Size or Magnitude of Operation: The project in consideration is for enhanced production capacity of Synthetic Organic Chemicals from existing consented quantity of 468 MT/A with addition of 6,444 MT/A to a total of 6864 MT/A along with bi-products MT/A. Note: Manufacturing of 2 existing products with consented value of 24.0 MT/A each will be stopped. The detailed existing & proposed product list along with quantities is attached as Annexure I. (v) Project description with process details: Process Description of N Hexyl Bromide Brief manufacturing process & mass balance: Page 11

12 Note: The brief manufacturing process & mass balance of only 1 product is attached as an example whereas the same for all other products will be furnished in detail in EIA report. (vi) Raw materials required The detailed raw material list is attached as Annexure II. Source of the Raw Material: Local Marketing Area of the Finished Product: Local & Abroad Mode of Transport of Raw material and Finished Products: By Road (vii) Resource optimization/recycling and reused envisaged in the project, if, should be briefly outlined The project in consideration envisages resources optimization measures such as recycle & reuse of treated effluent to the tune of 21.6 CMD thereby reducing the intake of fresh water. (viii) Availability of water, its source, Energy/Power requirement Existing water requirement: 4.0 CMD Proposed water requirement: CMD water requirement: CMD Source: STICE (Sinnar Taluka Industrial Co-Operative Estate) Power Requirement: Existing connected load: 200 kw, Existing maximum demand: 250 kva Page 12

13 Proposed connected load: 400 kw, Proposed additional demand: 500 kva connected load (after expansion): 600 kw, demand after expansion: 750 kva Source: MSEDCL (ix) Quantity of wastes to be generated (liquid & solid) A. Quantum of Waste Water Generated : CMD Existing quantity of effluent quantity of effluent (after expansion) Quantity of effluent to be recycled : 1.3 CMD : CMD : 21.6 CMD Liquid (Effluent) Existing quantity of effluent : 1.3 CMD quantity of effluent to be generated after expansion: CMD quantity of effluent to be recycled: 21.6 CMD Hazardous waste generation The hazardous waste generation details are as shown in the table below: Sr. No. Hazardous Solid Waste Category of waste quantity (Existing) quantity (Proposed) Disposal 1 Spent solvent kg/m 10.0 T/M 10.5 T/M 2 Distillation T/M 1.0 T/M 1.1 T/M residue Maharashtra Enviro Power Ltd. - CHWTSDF at Ranjangaon 3 ETP sludge kg/m 3.0 T/M T/M 4 MEE residue T/A T/A 5 Discarded containers Nos./M 200 Nos./M 300 Nos./M Sale to authorized recycler Page 13

14 (x) Schematic Representation of the Feasibility Drawing of EIA RESOURCE CONSUMPTION (WATER) POWER CONSUMPTION RAW MATERIAL PRODUCTION ACTIVITY WASTE GENERATION FINISHED PRODUCTS POLLUTION ABATEMENT EMPLOYMENT MARKET CLEAN ENVIRONMENT ECONOMY 4. Site Analysis (i) Connectivity: The project is located in Sinnar Taluka Industrial CO-OP Estate (STICE) at Musalgaon which is easily accessible by State Highway 39 (SH 39) viz. Nashik - Shirdi Higway Page 14

15 which is connected to National Highway (NH 50), the access to the project site is achievable by internal roads developed by STICE which is connected to SH 39. Nearest Railway Station: Devlali Railway Station is approximately km (aerial distance) from the project site. Nearest Airport: Ozar Airport, approximately at an aerial distance of km from the project site. Location and Access The industrial estate is centrally located and easily accessible through all modes of transport. Road: The entire industrial estate is well connected by internal roads. Available Road Network: The internal STICE road plies adjoining to the project plot. (ii) Land Form, Land use and Land Ownership: The Project location & the surrounding environs being located in the industrial estate prevail industrial type of land use form and the project plots in consideration are in possession of the project proponent. (iii) Topography: Since the topographic characteristics govern a greater land mass, the topography of entire district has been taken into account as described under. Nashik District is one part of the Deccan Plateau. The district boundaries are marked by Palghar, Thane, Ahmadnagar, Aurangabad, Jalgaon, Dhule districts & Gujarat State. Nashik district is divided into four agro climatic zone s namely Ghat zone, Transitional zone 1, Transitional zone 2 and Scarcity zone. The Western Ghats or Sahyadri range stretches from north to south across the western portion of the district. With the exception of the westernmost few villages, the western portion is hilly, and intersected by ravines, and only the simplest kind of cultivation is possible. The western slope of the Ghats is drained by several rivers, including the Daman Ganga River, which drains westwards to the Arabian Sea. The larger eastern portion of the district, which lies on the Deccan Plateau, is open, fertile, and well cultivated. The Satmala-Chandwad Range, which runs east and west, forms the chief divide of the plateau region. Peninsular India's largest river Godavari originates in the district in Page 15

16 the Trimbakeshwar Range and continues its soujourn eastwards through the district. The Satmala- Chandwad Range forms a watershed, such that, the rivers emerging to its south drain into the Godavari. These include the Kadva and Darna both of which are tributaries of the Godavari. To the north of the Satmala-Chandwad Range, the Girna River and its tributary, the Mosam, flow eastward through fertile valleys into the Tapti River. The entire Nashik district is underlain by the basaltic lava flows. These flows are normally horizontally disposed over a wide stretch and give rise to table land type of topography also known a plateau. These flows occur in layered sequences and represented by massive unit at the bottom and vesicular unit at the top of the flow.the shallow alluvial formation of recent age also occurs as narrow stretch along the banks of Godavari Rivers.The soils are the weathering products of Basalt and have various shades from gray to black, red and pink colour. The prominent soils occurring in the district are black soil 65%, red soil 13%, loamy soil 18%, varak soil 4%. Black soil is dominant in the area occurring particularly in Goavari river valley. Almost all soils are alkaline in nature. Nashik District is a noted for the mountains and hills occupying the north and north-east of its territory. These hill ranges are eastward spurs of the Western Ghats and form prominent landmarks in the district, some noted for the shrines they harbor while others for the trekking adventures which can be undertaken while ascending the peaks. Broadly categorized, the hills can be segregated into 3 noteworthy ranges: Selbari Range which may be inclusive of the Dholbari range, alternately called Selbari- Dholbari range. Satmala Range also called the Satmala-Ajanta range. Trimbakeshwar Range constituting the Trimbak-Anjaneri hills. Source of information: Reference 1 - Excerpts from the Comprehensive District Agriculture Plan, C-DAP 12 th Five Year Plan, Dist.-Nasik prepared by Collecter Nasik, District Agriculture Superintending Officer, Nasik. (Source: act=8&ved=0ahukewjsut2e1mryahubs48khxklb0aqfghmmac&url=http%3a%2f%2f mahaagri.gov.in%2flevel3pdfdisp.aspx%3fid%3d5%26subid%3d15%26sub2id%3d6%26fi Page 16

17 lename%3dchepter-1.pdf&usg=aovvaw0r-hrqzurxi4nw5tkwk8dn). Reference 2 - Wikipedia (Source: (iv) Existing land use pattern The proposed project is located in the industrial estate which has been developed for industrial development. The existing land use pattern in the 10 km radial distance of the project site comprises of Industrial, human habitations/settlements, commercial set ups, small agricultural/ crop lands land use classes. (v) Existing Infrastructure Sr. No. Description Existing Infrastructure 1. Location Plot No. 103 & 104, Phase- IV, STICE, Musalgaon, Tal. Sinner, Dist. Nashik Power demand Existing connected load: 200 kw, Maximum demand Status Proposed Infrastructure for Expansion Proposed expansion activity will be carried out within the existing premises connected load (after expansion): 600 kw, Maximum demand = 750 kva = 250kVA 3. Water Requirement 4.0 CMD CMD 4. ETP Capacity 5 CMD Existing ETP will be upgraded to 22 CMD capacity along with installation of Stripper, MEE of 12 CMD capacity & RO of 25 CMD capacity. 5. Fuel Requirement Furnace oil: 250 l/day Furnace oil: 330 l/day 6. Boiler Existing- 1Nos. Boiler No. 1: Steam boiler Capacity: 1.1 TPH Fuel used: Furnace oil Fuel quantity: 250 l/day Fuel Source: Indian Oil, Navi Mumbai The list of existing & proposed machinery & equipments - Annexure III Proposed Boilers: 1 Nos. Boiler No. 1: Steam boiler Capacity: 1.1 TPH Fuel used: Furnace oil Fuel quantity: 330 l/day Fuel Source: Indian Oil, Navi Munbai Note: This proposed boiler will be kept as standby whereas the fuel quantity is increasing due to increase in operations hours of the existing boiler (vi) Soil Classification The prominent soils occurring in the district are black soil 65%, red soil 13%, loamy soil 18%, Page 17

18 varak soil 4%. Black soil is dominant in the area occurring particularly in Goavari river valley. Almost all soils are alkaline in nature. (vii) Climatic data Nashik's climate is classified as tropical. The summers are much rainier than the winters in Nashik. According to Köppen and Geiger, this climate is classified as Aw. In Nashik, the average annual temperature is 24.7 C. About 812 mm of precipitation falls annually. Precipitation is the lowest in February, with an average of 0 mm. The greatest amount of precipitation occurs in July, with an average of 248 mm. At an average temperature of 29.5 C, May is the hottest month of the year. The lowest average temperatures in the year occur in January, when it is around 20.4 C. Between the driest and wettest months, the difference in precipitation is 248 mm. The variation in temperatures throughout the year is 9.1 C. (Source: (viii) Social Infrastructure Hotels, Motels, sports ground, public ground, public garden, petrol pumps, school, hospital, roads, railway station are available around the project location. 5. Planning Brief Adima Organics (I) Pvt. Ltd. is located in Sinnar Taluka Industrial CO-OP Estate (STICE) at Musalgaon. The total project plot area is 4, sq. m. Since this a production capacity enhancement project, existing plot & infrastructures with modifications and realignment will be used. Additional power supply & water requirement will be availed from MSEDCL &?? respectively. In the industry all necessary safety and fire fighting equipments like Hydrant, Sprinklers, Fire Detector System, Fire extinguishers are available in case of emergency. 6. Proposed Infrastructure (i) Industrial Area: Sinnar Taluka Industrial CO-OP Estate (STICE), Musalgaon (ii) Residential Area: Not applicable (iii) Green Belt: sq. m. (IV) Social Infrastructure and (V) Connectivity Road: STICE has provided asphalt roads with varying widths; these are mainly two lane roads and raised footpaths on either side of the roads. Page 18

19 Water: Water consumption of unit will be around CMD (Existing CMD & Proposed CMD). Electricity: Existing connected load: 200 KW, Existing demand: 250 kva Proposed connected load ( after expansion): 600 KW, Proposed demand: 700 kva Streetlights: STICE has provided street lighting facility in the area. Telecommunication Facility / Connectivity: Fax, telex, and Internet facilities are available in the vicinity of project area. (VI) Source of the Water will be STICE (Sinnar Taluka Industrial Co-Operative Estate). The daily water requirement will be around CMD (VII) Domestic Waste water will be routed to the in house aeration tank of ETP. (VIII) The Industrial Waste will be disposed off to Maharashtra Enviro Power Ltd. - CHWTSDF at Ranjangaon. (IX) The non hazardous Solid Waste generated will be mainly day to day office waste which will be disposed off through local municipal waste disposal system. (X) The Power Requirement will be 750 kva which will be supplied by MSEDCL 7. Rehabilitation & Resettlement (R & R) Plan: Not Applicable 8. Project Schedule & Cost Estimates 1. The proposed schedule for approval and implementation. Sr. No. Description Time Cost in % 1. Obtaining all statutory permission with 22 Months 0.85 % respect to industry 2. Design and Engineering Plan 2 Months 4.0 % 3. Factory Set Up 20 Months % 4. Testing and Commissioning 6 Months 1.0 % 5. Actual Starting 26 Months 2.0 % 2. Estimated project cost along with analysis of economic viability of the project. The estimated cost of the project is given as under in the following table. Page 19

20 Sr. No. Existing (Cost in Rs.) Proposed (Cost in Rs.) (Cost in Rs.) 1 6,60,00, ,60,00, ,20,00, For the proposed products the new infrastructure to be constructed The necessary required infrastructure will be erected within the premises on the existing plot. 9. Analysis of proposal (Final Recommendations) The project will provide employment opportunities to local people and it will increase the living standard. Since, the industry has the export market it will add to the net foreign exchange earning of the country. The industry takes pride in maintaining healthy relationship with the environment by further improvised technology of effluent treatment plant. The industry is committed to manufacture and supply of finished products to achieve enhance customer satisfaction by establishing and maintaining quality management system. Industry trusts on employee s strength so management of the industry always promotes and maintains the safety conditions in and around the workers. The regular medical checkups, safety training programs, mock drill are being conducted in the industry. In view of the above points it is concluded that the project proposal will not have any negative impact on the environment and people on the other hand will have positive impact by improving the socio economic aspects with employment generation. Page 20

21 ANNEXXURE I (Existing & Proposed products list) Sr. Product name Existing Proposed (MT/A) (MT/A) No. (MT/A) 1 N PROPYL BROMIDE N BUTYL BROMIDE N HEXYL BROMIDE CHLOROPROPIONYL CHLORIDE Production will be stopped Production will be stopped 5 3-PICOTYL CHLORIDE HYDROCHLORIDE Production will be stopped Production will be stopped 6 Alpha Bromo 2-Choro Phenyl Acetic Acid 7 Methyl Alpha Bromo Chloro Phenyl Acetate 8 1,4-DIBROMO BUTANE TRIETHYL PHOSPHONOACETATE 10 Bromoacetaldehyde Dimethyl Acetal 11 DECYL BROMIDE Phthalazinone Stage Glyocuril ,3-Dioxo Indole , Bi-Products 1 Sulphuric acid Hydrobomic acid Methyl acetate Calclium bromide solution Phosophoric acid Page 21

22 ANNEXXURE II (Raw Material List) Sr. No. Raw Material 1 Liquid Bromine Physical status Storage method Existing Consumption (MT/year) Proposed Consumption (MT/year) Consumption (MT/year) Maximum storage quantity at any given point of time (MT) Source of supply Liquid Tanks Local & Importe d 2 n Butanol Liquid Tanks Local & Importe d 3 n Liquid Tanks Importe Propanol d 4 n Hexanol Liquid Tanks Importe d 5 Tetrahydr ofuran Liquid Drums Local & Importe d 6 n Decanol Liquid Tanks Importe d 7 o- Solid Bags Importe Chlorophe d nyl Acetic Acid Mode of Transp ortation Road Road Road Road Road Road Road

23 Sr. No. Raw Material Physical status Storage method Existing Consumption (MT/year) Proposed Consumption (MT/year) Consumption (MT/year) Maximum storage quantity at any given point of time (MT) Source of supply Mode of Transp ortation 8 Methanol Liquid Tanks Local Road 9 Sulphur Solid Bags Local Road 10 Glyoxal Liquid Drums Local & Road Importe d 11 Urea Solid Bags Local Road 12 Vinyl Liquid Drums Local Road Acetate 13 Triethyl Liquid Drums Importe Road Phosphite d 14 Ethyl Liquid Drums Local Road Chloroace tate 15 Phthalide Solid Bags Local Road 16 Aniline Liquid Drums Local Road 17 Dimethyl Liquid Drums Local Road Oxalate 18 Polphosph Liquid Drums Local & Road Page 23

24 Sr. No. Raw Material oric Acid 19 Dichlorom ethane 20 Sulphuric acid 21 Polyphosp horic Acid 22 Benzoyl peroxide Physical status Storage method Existing Consumption (MT/year) Proposed Consumption (MT/year) Consumption (MT/year) Maximum storage quantity at any given point of time (MT) Source of supply Mode of Transp ortation Importe d Liquid Drums Local Road Liquid Drums Local Road Liquid Carboys Local Road Liquid Carboy Local Road 23 ABC Acid Powder Bags Local Road 24 Vinyl acetate monomer 25 Calcium hydroxide Liquid Drums Local Road Powder Bags Local Road Page 24

Consultant: M/s. SADEKAR ENVIRO ENGINEERS PVT. LTD.

Consultant: M/s. SADEKAR ENVIRO ENGINEERS PVT. LTD. Summary For Ria Organics Private Limited, D-26/2, Kurkumbh - MIDC, Taluka - Daund Dist. Pune, Maharashtra, India. Consultant: M/s. SADEKAR ENVIRO ENGINEERS PVT. LTD. Accredited by QCI NABET Lab. Recognized

More information

M/s. NGL Fine-Chem Limited Plot no. S 18/3, Tarapur MIDC, Boisar, District Palghar, Maharashtra. PIN:

M/s. NGL Fine-Chem Limited Plot no. S 18/3, Tarapur MIDC, Boisar, District Palghar, Maharashtra. PIN: Pre-feasibility Study Report For M/s. NGL Fine-Chem Limited Plot no. S 18/3, Tarapur MIDC, Boisar, District Palghar, Maharashtra. PIN: 401506 Prepared By: M/s SADEKAR ENVIRO ENGINEERS PVT. LTD. Accredited

More information

Pre-Feasibility Report For

Pre-Feasibility Report For Pre-Feasibility Report For Proposed New Project for manufacturing of Intermediates of Agro Chemicals & Synthetic Organic Chemicals. By M/s. MANBRO POLYMERS LIMITED, Plot No. D-2/CH-275, INDUSTRIAL ESTATE,

More information

Proposed Project of Halcyon Labs Pvt Ltd D-2/CH : 335,336,337, GIDC-Dahej-2, DIst: Bharuch, Gujarat Ramans Enviro Services Pvt Ltd Ahmedabad

Proposed Project of Halcyon Labs Pvt Ltd D-2/CH : 335,336,337, GIDC-Dahej-2, DIst: Bharuch, Gujarat Ramans Enviro Services Pvt Ltd Ahmedabad 1. EXECUTIVE SUMMARY OF THE PROJECT BRIEF SUMMARY OF THE PROJECT : TYPE OF PROJECT : Proposed Project for manufacturing of pharma intermediates by Halcyon Labs Pvt.Ltd. LOCATION : Proposed Project of Halcyon

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT PRE FEASIBILITY REPORT for PROPOSED PROJECT FOR DYES, PIGMENTS AND DYE INTERMEDIATES MANUFACTURING PLANT IN GIDC, DAHEJ-II Of M/s. SHREEJI INDUSTRIES Plot No. D2/CH/24, Dahej-II, GIDC Industrial Estate,

More information

PRE-FEASIBILITY REPORT

PRE-FEASIBILITY REPORT PRE-FEASIBILITY REPORT For ToR of Proposed Project of MANUFACTURING OF SYNTHETIC ORGANIC DYES (5 f B IND II) By SHREEJI BAPA DYE CHEM PLOT NO 1319 & 1320, PHASE-III, GIDC, VATVA, AHEMADABAD-382445, GUJARAT,

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT VENSUB LABORATORIES PRIVATE LIMITED SY. NO. 29, TUPAKULAGUDEM VILLAGE, TALLAPUDI MANDAL, WEST GODAVARI DISTRICT, ANDHRA PRADESH PRE FEASIBILITY REPORT VENSUB LABORATORIES PRIVATE LIMITED Duplex No. 12,

More information

For TOR New Projects. Mo. no. : Contact no. and ID of the Applicant

For TOR New Projects. Mo. no. : Contact no. and  ID of the Applicant SEAC, Gujarat : Page 1 of 6 For TOR New Projects 1. Basic Information of the Project: i Name & Address of the Project site (Complete details with plot /Survey, Landmark etc. ) M/s. Perstorp Industries

More information

PREFEASIBILITY REPORT

PREFEASIBILITY REPORT PREFEASIBILITY REPORT For ToR Application of Expansion Project For MANUFACTURING OF SYNTHETIC ORGANIC CHEMICALS (Dyes Intermediates) Proposed By: M/s. Plot No. C/1/B-145-3 Phase-II, GIDC Estate, Naroda,

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT PRE FEASIBILITY REPORT For NEW PROJECT (PIGMENT MANUFACTURING PLANT) Of M/s. SHREY INDUSTRIES Survey No. 111 & 112, Plot No. 7 & 8, Village: Dhanot, Ta: Kalol, Dist: Gandhinagar (Gujarat) CONTENTS Sr.

More information

IDA, JEEDIMETLA, QUTUBULLAPUR MANDAL, RANGAREDDY DISTRICT, TELANGANA

IDA, JEEDIMETLA, QUTUBULLAPUR MANDAL, RANGAREDDY DISTRICT, TELANGANA M/s. ARTEMIS BIO TECH LTD., (A Division of Themis Medicare Ltd.,) PLOT NO. 1 & 5, Phase I, IDA, JEEDIMETLA, QUTUBULLAPUR MANDAL, RANGAREDDY DISTRICT, TELANGANA PRE FEASIBILITY REPORT Artemis Bio tech Ltd.,

More information

M/S. Dain Colour Chem

M/S. Dain Colour Chem PRE FEASIBILITY REPORT For PROPOSED EXPANSION IN EXISTING MANUFACTURING PLANT Of M/S. Dain Colour Chem Plot No.: 5, Nilkanth Estate, Village: Dhanot, Ta.: Kalol, Dist.: Gandhinagar-382729, Gujarat 1 CONTENTS

More information

PRE-FEASIBILITY REPORT

PRE-FEASIBILITY REPORT PRE-FEASIBILITY REPORT 0.0 EXECUTIVE SUMMARY Shri Ashok Patel Partner of M/s. Patel Polymers is planning to manufacture organic chemical Different Types of Resins, for proposed expansion project at Plot

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT PRE FEASIBILITY REPORT For EXPANSION IN EXISTING MANUFACTURING PLANT Of M/s. SHIVA DYE STUFF PVT. LTD Plot no. A2-11/6104,G.I.D.C. Industrial Estate, Ankleshwar-393002, Gujarat. 1 CONTENTS Sr. No. Description

More information

PRE-FEASIBILITY REPORT

PRE-FEASIBILITY REPORT PRE-FEASIBILITY REPORT 1.0 EXECUTIVE SUMMARY M/s Arti Chemical Industries is a project located at Plot No. E-22, Vilayat G.I.D.C. Tal: Vagra area of Bharuch district in Gujarat. M/s Arti Chemical Industries

More information

PRE-FEASIBILITY REPORT

PRE-FEASIBILITY REPORT PRE-FEASIBILITY REPORT For ToR of Proposed Project of MANUFACTURING OF SYNTHETIC ORGANICCHEMICALS (RESINS) (5 f B IND II) By M/s M R INDUSTRIES SURVEY NO. 58/1 & 58/3 OPPOSITE WHOLESOME FOOD PVT. LTD.,

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT PRE FEASIBILITY REPORT For PROPOSED EXPANSION OF BAKELITE POWDER MANUFACTURING UNIT of M/S. HINDUSTAN BAKELITE COMPANY PLOT NO. J-3436, GIDC ESTATE, ANKLESHWAR, DISTRICT: BHARUCH-393002, GUJARAT 0 CONTENTS

More information

Synthetic Organic Chemicals 5(f)

Synthetic Organic Chemicals 5(f) SEAC, Gujarat Page 1 of 14 Synthetic Organic Chemicals 5(f) For Terms of Reference [ToR] New Project 1. Basic Information of the Project: i Name & Address of the Project site (Complete details with plot

More information

(B) PREFEASIBILITY REPORT OF EXISTING BLACK TRAP PROJECT OF

(B) PREFEASIBILITY REPORT OF EXISTING BLACK TRAP PROJECT OF (B) PREFEASIBILITY REPORT OF EXISTING BLACK TRAP PROJECT OF Makwana Dineshbhai Khimjibhai AT VILLAGE:- Tithava, TALUKA:- Wankaner, DIST.:- Morbi 1 CONTENTS 1.0 INTRODUCTION 1.1 PREAMBLE 2.0 EXCUTIVE SUMMARY

More information

PROPOSED BULK DRUG & BULK DRUG INTERMEDIATES MANUFACTURING UNIT

PROPOSED BULK DRUG & BULK DRUG INTERMEDIATES MANUFACTURING UNIT PRE - FEASIBILITY REPORT For PROPOSED BULK DRUG & BULK DRUG INTERMEDIATES MANUFACTURING UNIT Of M/s. SHREE RAM INDUSTRIES PLOT NO.5117, GIDC-ANKLESHWAR, PIN-393002 TAL: ANKLESHWAR, DIST: BHARUCH, GUJARAT

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT PRE FEASIBILITY REPORT FOR OBTAINING PRIOR ENVIRONMENT CLEARANCE FOR MANUFACTURING OF SYNTHETIC ORGANIC CHEMICALS OF M/s. MAYUR COLOUR AND CHEMICALS LOCATED AT Plot No. 5148, GIDC Industrial Estate, Ankleshwar

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT ANVITHA LIFE CARE PLOT NO. 6, ATTIVARAM INDUSTRIAL PARK, ATTIVARAM VILLAGE, OZILI MANDAL, SPSR NELLORE DISTRICT, ANDHRA PRADESH PRE FEASIBILITY REPORT ANVITHA LIFE CARE PLOT NO. 6, ATTIVARAM INDUSTRIAL

More information

PRE-FEASIBILITY REPORT. for

PRE-FEASIBILITY REPORT. for PRE-FEASIBILITY REPORT for PROPOSED COMMON EFFLUENT TREATMETN PLANT (CETP) of M/s. VIKASHTEX ENVIROTECH CETP PVT. LTD. Block No. 523, Village: Hathoda, Taluka: Mangrol, Dist: Surat - 394 405 (Guj.) Prepared

More information

PRE-FEASIBILITY REPORT

PRE-FEASIBILITY REPORT PRE-FEASIBILITY REPORT For Polyurethane Foam Manufacturing Facility Of M/s. KRISHNA MARUTI LTD. At Plot No-13, SMG JV Park, Block No- 334,335 Vill- Hansalpur, Tal - Mandal Dist.: Ahmedabad, Gujarat INDEX

More information

PREFEASIBILITY REPORT

PREFEASIBILITY REPORT PREFEASIBILITY REPORT 1.0 INTRODUCTION OF THE PROJECT Pannageshwar Sugar Mills Ltd. (PSML), At: Pangaon, Tal.: Renapur, Dist.: Latur, Maharashtra was registered vide registration no. 11-130803 dated 01.01.2001.

More information

PROJECT FEASIBILITY REPORT

PROJECT FEASIBILITY REPORT PROJECT FEASIBILITY REPORT FOR OBTAINING PRIOR ENVIRONMENT CLEARANCE For PROPOSED CHEMICAL MANUFACTURING UNIT From M/s. MORADIA BROTHERS CHEM PVT LTD LOCATED AT: Block No.: 45, JalBhumi Industrial Estate,

More information

EXISTING PROJECT FOR ORDINARY SAND MINING

EXISTING PROJECT FOR ORDINARY SAND MINING (C) PROJECT REPORT OF EXISTING PROJECT FOR ORDINARY SAND MINING OF JASHUBEN CHHAGANBHAI OAD AT VILLAGE:-TIMBA, TALUKA:- KAMREJ, DIST.:- SURAT 1 CONTENTS 1.0 INTRODUCTION 1.1 PREAMBLE 2.0 EXECUTIVE SUMMARY

More information

Pre-Feasibility Report

Pre-Feasibility Report Pre-Feasibility Report 1. Executive Summary Residential, Commercial, Retail and Hotel projects and an IT/ITES. The Project has already obtained an Environmental Clearance from Ministry of Environment &

More information

LG POLYMERS INDIA PVT. LTD. SY. NO.S 29 TO 45, 83/1 AND 83/3, RR VENKATAPURAM VILLAGE, PENDURTI MANDAL, VISAKHAPATNAM DISTRICT, ANDHRA PRADESH

LG POLYMERS INDIA PVT. LTD. SY. NO.S 29 TO 45, 83/1 AND 83/3, RR VENKATAPURAM VILLAGE, PENDURTI MANDAL, VISAKHAPATNAM DISTRICT, ANDHRA PRADESH LG POLYMERS INDIA PVT. LTD. SY. NO.S 29 TO 45, 83/1 AND 83/3, RR VENKATAPURAM VILLAGE, PENDURTI MANDAL, VISAKHAPATNAM DISTRICT, ANDHRA PRADESH PRE FEASIBILITY REPORT LG Polymers India Pvt. Ltd. Sy. No.s

More information

STONE QUARRY Survey No. : 57/5, Village : Dhadhade, Tehsil: Vikramgad, District Thane, Maharashtra Area (2.0 Ha)

STONE QUARRY Survey No. : 57/5, Village : Dhadhade, Tehsil: Vikramgad, District Thane, Maharashtra Area (2.0 Ha) Pre Feasibility Report On STONE QUARRY Survey No. : 57/5, Village : Dhadhade, Tehsil: Vikramgad, District Thane, Maharashtra Area (2.0 Ha) Submitted to MINISTRY OF ENVIRONMENT & FOREST STATE LEVEL ENVIRONMENTAL

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT GENSYNTH FINE CHEMICALS PVT. LTD. PLOT NO. 220, 239 & 248, PHASE II, IDA, PASHAMAILARAM VILLAGE, PATANCHERU MANDAL, MEDAK DISTRICT, ANDHRA PRADESH PRE FEASIBILITY REPORT Gensynth Fine Chemicals Pvt. Ltd.,

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT ASTRIX LABORATORIES LIMITED SY. NO. 10 & 42, IDA, GADDAPOTHARAM VILLAGE, JINNARAM MANDAL, MEDAK DISTRICT, ANDHRA PRADESH PRE FEASIBILITY REPORT Sy. No. 10 & 42, IDA, Gaddapotharam (V), Jinnaram (M), Medak

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT PRE FEASIBILITY REPORT 1.0 EXECUTIVE SUMMARY AND INTRODUCTION OF THE PROJECT Shivneri Sugars Ltd., A/p. - Ganesh tekadi, Nhavi (Bk.), Tal.: Koregaon, Dist.: Satara, Maharashtra State was registered vide

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT ESHWAR PHARMACEUTICALS (P) LTD. (Formerly known as Konar Organics Ltd.,) SY. NO. 180/2, IDA KHAZIPALLY, KHAZIPALLY VILLAGE, JINNARAM MANDAL, MEDAK DISTRICT, ANDHRA PRADESH PRE FEASIBILITY REPORT Eshwar

More information

1.0 EXECUTIVE SUMMARY

1.0 EXECUTIVE SUMMARY 1.0 EXECUTIVE SUMMARY M/s Merino Industries Limited has proposed for manufacturing Phenol Formaldehyde Resin, Melamine Formaldehyde Resin at Plot No D2 CH 36, Dahej Phase II, Dist. Bharuch, Gujarat. The

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT ASTRICA LABORATORIES PRIVATE LIMITED SY. NO. Part of 46,50,51,52,53, 54,55&56, ANANTHSAGAR VILLAGE, CHEGUNTA MANDAL, MEDAK DISTRICT, TELANGANA PRE FEASIBILITY REPORT ASTRICA LABORATORIES PRIVATE LIMITED

More information

EXECUTIVE SUMMARY. Kumardeipur Sand Quarry Cum ' 13.3" N to 20 44' 20.7"N Longitude " E to 85 35'27.5 "E

EXECUTIVE SUMMARY. Kumardeipur Sand Quarry Cum ' 13.3 N to 20 44' 20.7N Longitude  E to 85 35'27.5 E EXECUTIVE SUMMARY 1.0 INTRODUCTION Sri Mahesh Prasad Mishra proposes to mine Sand Quarry from an approved Mining Lease over an area of 14.85 Ac or 6.01 hectares (Non-Forest Land) which is located in at

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT PRE FEASIBILITY REPORT 1.0 EXECUTIVE SUMMARY AND INTRODUCTION OF THE PROJECT The Proposed Th Proposed Food Colours and Lake Colours Manufacturing Unit will be established on Plot 22/1 - B, Dhatav, MIDC

More information

For TOR New. 1. Basic Information of the Project:

For TOR New. 1. Basic Information of the Project: SEAC, Gujarat: Page 1 of 12 For TOR New. 1. Basic Information of the Project: i Name & Address of the Project site M/s. Shreenathji Dye Chem (Complete details with plot no./survey no., Landmark etc. )

More information

PRE FEASIBILTY REPORT

PRE FEASIBILTY REPORT PRE FEASIBILTY REPORT FOR ENVIRONMENT CLEARANCE OF PROPOSED NEW PROJECT S. O. CHEMICALS (5 f Category) Proposed By: COREL PHARMA CHEM PVT. LTD. SURVEY NO. 473 & 481, BORISANA, KADI THOL ROAD, KADI, DIST

More information

BALAJI AMINES LIMITED

BALAJI AMINES LIMITED FOR EXPANSION OF EXISTING SYNTHETIC ORGANIC CHEMICALS MANUFACTURING UNIT BALAJI AMINES LIMITED At Plot No: 4 & 5, Beside Sub-Station-II, I.D.A, Bollaram, Jinnaram (M), Medak District, Telangana State -

More information

ANNEXURES. 1 Google image showing proposed project site. 3 Manufacturing process details. 4 Details of hazardous waste management

ANNEXURES. 1 Google image showing proposed project site. 3 Manufacturing process details. 4 Details of hazardous waste management ANNEXURES Annexure No. Description 1 Google image showing proposed project site 2 Plant Lay-Out 3 Manufacturing process details 4 Details of hazardous waste management 5 Details of Effluent Treatment Plant

More information

PRE-FEASIBILITY REPORT

PRE-FEASIBILITY REPORT M/S. VANAS INFRA PROJECTS PVT. LTD SURVEY NO. 598, CHINTALAPALLY VILLAGE, KOLLAPUR MANDAL, NAGARKURNOOL DISTRICT, TELANGANA PRE-FEASIBILITY REPORT SUBMITTED BY M/s. Sri Soma Jitendra H. No. 7-1-397/150,

More information

M/s. SAL STEEL LTD Survey no.245/p, Village:-Bharapar, Taluka:- Gandhidham, District:-Kutch, Gujarat.

M/s. SAL STEEL LTD Survey no.245/p, Village:-Bharapar, Taluka:- Gandhidham, District:-Kutch, Gujarat. Pre-Feasibility Study Report For Proposed Fly Ash Co-processing clinker grinding cement Unit of 40,000 MT/month Production capacity within our Existing Premises for M/s. SAL STEEL LTD Survey no.245/p,

More information

Prasol Chemicals Ltd., Add. Mahad MIDC BRIEF SUMMARY

Prasol Chemicals Ltd., Add. Mahad MIDC BRIEF SUMMARY 1. INTRODUCTION BRIEF SUMMARY Prasol Chemicals Limited (Prasol), form an integral part of the global chemical industry. Prasol is an ISO 9001: 2008, ISO 14001: 2004 and an OHSAS 18001:2007 certified company

More information

4. The ambient air quality monitoring stations We are monitoring the ambient air quality

4. The ambient air quality monitoring stations We are monitoring the ambient air quality GLOBAL CALCIUM PRIVATE LTD., 125&126, SIPCOT COMPLEX, HOSUR 635 126 Ref : No. J-11011/411/2006-IA-II(I) dated 1 st August 2007. Compliance Report for the Period ending 31.3.2015 Sl. Specific Conditions

More information

Shri Hari Dyes & Chemicals Plot No.: 439/1,417, Phase No. II, GIDC Estate, Vatva , Ahmedabad

Shri Hari Dyes & Chemicals Plot No.: 439/1,417, Phase No. II, GIDC Estate, Vatva , Ahmedabad Annexure Prefeasibility Report (PFR) File PRE FEASIBILITY REPORT For PROPOSED EXPANSION IN EXISTING MANUFACTURING PLANT Of Shri Hari Dyes & Chemicals Work & Regd. Office: CONTENTS Sr. No. Description 1.

More information

PREFEASIBILITY REPORT

PREFEASIBILITY REPORT (B) PREFEASIBILITY REPORT OF EXISTING SAND MINING PROJECT OF RAJESHBHAI BHAGUBHAI PATEL AT VILLAGE:- Panchlai, TALUKA:- Pardi, DIST.:-Valdad. 1 CONTENTS 1.0 INTRODUCTION 1.1 PREAMBLE 2.0 EXECUTIVE SUMMARY

More information

FORM-1 FOR PROPOSED API PLANT AT MADURAI, TAMIL NADU. Name of Products. Products. 1 Metformin Hydrochloride Paracetamol Bronopol 25

FORM-1 FOR PROPOSED API PLANT AT MADURAI, TAMIL NADU. Name of Products. Products. 1 Metformin Hydrochloride Paracetamol Bronopol 25 3 ANNEXURES Annexure 1: Production Details Name of Products Products Production Capacity in MT/Month 1 Metformin Hydrochloride 1000 2 Paracetamol 1200 3 Bronopol 25 By-Products Total 2225 1 Acetic acid

More information

PRE-FEASIBILITY REPORT. Name of Company / Mine Owner Shri Jayant Kumar Choudhary Location

PRE-FEASIBILITY REPORT. Name of Company / Mine Owner Shri Jayant Kumar Choudhary Location 1. SUMMARY PRE-FEASIBILITY REPORT Project Stone Quarry Name of Company / Mine Owner Shri Jayant Kumar Choudhary Location Village Taluka District State Rupapali Basna Mahasamund Chhattisgarh 1 Mining Lease

More information

PRE FEASIBILITY REPORT 1.0 EXECUTIVE SUMMARY AND INTRODUCTION OF THE PROJECT

PRE FEASIBILITY REPORT 1.0 EXECUTIVE SUMMARY AND INTRODUCTION OF THE PROJECT PRE FEASIBILITY REPORT 1.0 EXECUTIVE SUMMARY AND INTRODUCTION OF THE PROJECT Shri Dudhganga Vedganga Sahakari Sakhar Karkhana Limited, (SDVSSKL) located at Bidri (Mouninagar), Tal.: Kagal, Dist.: Kolhapur,

More information

vii Total cost of Proposed Project Existing : 0.16 Cr Proposed: 0.25 Cr Total : 0.41 Cr viii Total Plot area ( sq. meter)

vii Total cost of Proposed Project Existing : 0.16 Cr Proposed: 0.25 Cr Total : 0.41 Cr viii Total Plot area ( sq. meter) SEAC, Gujarat: Page 1 of 28 For TOR Expansion Case. 1. Basic Information of the Project: i Name & Address of the Project site (Complete details with plot no./survey no., Landmark etc. ) M/s. Om Interchem

More information

PRE-FEASIBILITY REPORT FOR OM SAIRAM STEEL AND ALLOYS PVT LTD

PRE-FEASIBILITY REPORT FOR OM SAIRAM STEEL AND ALLOYS PVT LTD PRE-FEASIBILITY REPORT FOR OM SAIRAM STEEL AND ALLOYS PVT LTD PLOT No. F-1,2,3,8,9,10, ADDL. MIDC, PHASE II, AND GUT NO. 46 & 63, VILLAGE DAREGAON, TEHSIL: JALNA DIST: JALNA, MAHARASHTRA 2014-15 1. Executive

More information

UNSATURATED POLYESTER RESIN

UNSATURATED POLYESTER RESIN PROJECT REPORT ON UNSATURATED POLYESTER RESIN BY AQUA CHEM INDUSTRIES Survey No. 50/2, Jodhpar (Nadi), Morbi - 363641, Gujarat. I N D E X Sr. No. Contents Page No. 1 Introduction 3 2 Project Description

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT DR. REDDY S LABORATORIES LTD. CHEMICAL TECHOPS III PLOT NO.116, 116A, 116B & 126C, S.V. CO OP. IND. ESTATE, BOLLARAM VILLAGE, JINNARAM MANDAL, MEDAK DISTRICT, TELANGANA PRE FEASIBILITY REPORT DR. REDDY

More information

PRE - FEASIBILITY REPORT

PRE - FEASIBILITY REPORT PRE - FEASIBILITY REPORT For PROPOSED BULK DRUGS INTERMEDIATES MANUFACTURING UNIT at SY. NO: PARTS OF 318, 319 AND 321 LOCATED AT PALLEPAHAD VILLAGE, THURKAPALLY MANDAL, YADADRI - BHONGIR DISTRICT, TELANGANA

More information

M/s. Pest Control (India) Pvt. Ltd.

M/s. Pest Control (India) Pvt. Ltd. Prefeasibility Report of Pest Control (India) Pvt. Ltd. at, Plot no. 38 and 39, MIDC Taloja, Taluka Panvel, District Raigad, Maharashtra Prepared by, Sadekar Enviro Engineers Pvt. Ltd. QCI-NABET Accredited

More information

Prefeasibility Report. 30,000 KLPY Anhydrous (Absolute) Alcohol Manufacturing Plant at Patalganga MIDC

Prefeasibility Report. 30,000 KLPY Anhydrous (Absolute) Alcohol Manufacturing Plant at Patalganga MIDC Prefeasibility Report For 30,000 KLPY Anhydrous (Absolute) Alcohol Manufacturing Plant at Patalganga MIDC of Alkyl Amines Chemicals Limited 401-407 Nirman Vyapar Kendra, Plot No. 10, Sector 17, Vashi,

More information

To The Member Secretary State Expert Appraisal Committee Paryavaran Bhavan Sector 10 A Gandhinagar

To The Member Secretary State Expert Appraisal Committee Paryavaran Bhavan Sector 10 A Gandhinagar March 18, 2019 BY HAND DELIVERY/RPAD To The Member Secretary State Expert Appraisal Committee Paryavaran Bhavan Sector 10 A Gandhinagar 382 010 SUB.: APPLICATION FOR SUBMISSION OF ESSENTIAL DETAIL SOUGHT

More information

Pre- Feasibility RepoRt

Pre- Feasibility RepoRt Pre- Feasibility RepoRt AREA- 59.28 ACRE (24.0 HA) FOR KEN RIVER SAND/MORRUM MINING AT BLOCK NO-09 KHAND NO-03 GATA NO-337 VILLAGE- KANWARA TEHSIL-BANDA, DISTRICT- BANDA(U.P) SHRI RAVINDRA NATH SINGH JULY

More information

Shree Swami Samarth Stone Crusher

Shree Swami Samarth Stone Crusher PREFEASIBILITY STUDY FOR SHREE SWAMI SAMARTH STONE CRUSHER. Sadekar Enviro Engineers Pvt. Ltd Page 1 Executive summary Shree Swami Samarth Stone Crusher. has been granted a quarrying over an area 1.00

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT PRE FEASIBILITY REPORT Of Shri Upendra Suryawanshi At Khasra No. 413/1, 413/3 Vill.-Ambada, Tehsil-Amla, District-Betul (M.P.) Production Capacity: Max 6,320 Cu.mt/year Area 1.00Hectare Proponent Name

More information

M/S. HETERO INFRASTRUCTURE SEZ LIMITED

M/S. HETERO INFRASTRUCTURE SEZ LIMITED ENVIRONMENTAL STATEMENT (FORM - V) FOR THE FINANCIAL YEAR ENDING MARCH-2016. M/S. HETERO INFRASTRUCTURE SEZ LIMITED N.NARASAPURAM(V),NAKKAPALLI(M) VISAKHAPATNAM DISTRICT. SUBMITTED TO : ANDHRA PRADESH

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT AGRSOL (NDA) PVT. LTD SY. NO. 163, 164 & 165, UDUMULAPADU VLLAGE, DHONE MANDAL, KURNOOL DSTRCT, ANDHRA PRADESH PRE FEASBLTY REPORT AGRSOL (NDA) PVT. LTD H.No. 10 2 289/87, 101 Fortune Heights, Shantinagar,

More information

PREFEASIBILITY REPORT. Jakraya Sugar Ltd. (JSL), Watwate, Tal.: Mohol, Dist.: Solapur was registered vide registration no.u15421pn2007plc

PREFEASIBILITY REPORT. Jakraya Sugar Ltd. (JSL), Watwate, Tal.: Mohol, Dist.: Solapur was registered vide registration no.u15421pn2007plc PREFEASIBILITY REPORT 1.0 INTRODUCTION OF THE PROJECT Jakraya Sugar Ltd. (JSL), Watwate, Tal.: Mohol, Dist.: Solapur was registered vide registration no.u15421pn2007plc130078. As per the provision of EIA

More information

M/s.Aarti Industries Limited (Apple Organics Division), Vapi.

M/s.Aarti Industries Limited (Apple Organics Division), Vapi. EXECUTIVE SUMMARY M/s. Aarti Industries Limited (Apple Organics Division) first obtained CCA order 3431, issued on 16/08/2004. Further it was extended by CCA order no. AWH-73091 dated 14/09/2015 for manufacturing

More information

BRIEF DESCRIPTION OF THE PROJECT

BRIEF DESCRIPTION OF THE PROJECT BRIEF DESCRIPTION OF THE PROJECT. Introduction M/s Indorama Industries Limited is proposing to expand their project known as Indorama Spandex for manufacture of manmade textile fibre using petro chemical

More information

PREFEASIBILITY REPORT OF EXISTING SILICA SAND MINING PROJECT OF MANGUBEN KANTILAL THAKKAR

PREFEASIBILITY REPORT OF EXISTING SILICA SAND MINING PROJECT OF MANGUBEN KANTILAL THAKKAR PREFEASIBILITY REPORT OF EXISTING SILICA SAND MINING PROJECT OF MANGUBEN KANTILAL THAKKAR AT VILLAGE:- BRAHMPURI, TALUKA:- Sayla, DIST.:-Surendranagar 1 CONTENTS 1.0 INTRODUCTION 1.1 PREAMBLE 2.0 EXECUTIVE

More information

LIST OF ANNEXURE. Details of products and raw materials and storage facility for the same. Details of water consumption and wastewater generation

LIST OF ANNEXURE. Details of products and raw materials and storage facility for the same. Details of water consumption and wastewater generation LIST OF ANNEXURE Annexure-1 Location of the project site Annexure-2 Layout plan Annexure-3 Break up of land area requirement Annexure-4 Details of products and raw materials and storage facility for the

More information

PROPOSED EXPANSION OF DEVELOPER AND AZOCOLORANTS DYES IN EXISTING UNIT. M/s. BASF INDIA LTD. (UNIT-II)

PROPOSED EXPANSION OF DEVELOPER AND AZOCOLORANTS DYES IN EXISTING UNIT. M/s. BASF INDIA LTD. (UNIT-II) BRIEF SUMMARY OF THE PROJECT for PROPOSED EXPANSION OF DEVELOPER AND AZOCOLORANTS DYES IN EXISTING UNIT of M/s. BASF INDIA LTD. (UNIT-II) PLOT NO. 8001 & 8001A, PHASE-VI, G.I.D.C., ANKLESHWAR, DIST: BHARUCH-393002,

More information

PRE FEASIBILITY REPORT. For PROPOSED BULK DRUG PRODUCTS MANUFACTURING UNITS. M/s. M.K. DRUGS. F-10, Industrial Area, Focal Point, Tehsil: Derabassi

PRE FEASIBILITY REPORT. For PROPOSED BULK DRUG PRODUCTS MANUFACTURING UNITS. M/s. M.K. DRUGS. F-10, Industrial Area, Focal Point, Tehsil: Derabassi PRE FEASIBILITY REPORT For PROPOSED BULK DRUG PRODUCTS MANUFACTURING UNITS Of M/s. M.K. DRUGS F-10, Industrial Area, Focal Point, Tehsil: Derabassi Dist: Mohali, Punjab INTRODUCTION M/s. M.K. Drugs is

More information

Format for Appraisal-New:5

Format for Appraisal-New:5 SEAC Gujarat: Pageof5 Format for Appraisal-New:5. Basic Information of the Project: i Name & Address of the Project site (Complete details with plot no./survey no., Landmark etc. ) M/S. DHARMANANDAN FINE

More information

PRE-FEASIBILITY REPORT. 1. SUMMARY Kudeli Brick Earth Quarry Name of Company / Mine Owner Smt. Premawati Location 744, 760/1, 760/4, 750/1, 750/2

PRE-FEASIBILITY REPORT. 1. SUMMARY Kudeli Brick Earth Quarry Name of Company / Mine Owner Smt. Premawati Location 744, 760/1, 760/4, 750/1, 750/2 PRE-FEASIBILITY REPORT 1. SUMMARY Project Kudeli Brick Earth Quarry Name of Company / Mine Owner Smt. Premawati Location 744, 760/1, 760/4, 750/1, 750/2 Village Kudeli Taluka Baikunthpur District Koriya

More information

Ramans Enviro Services Pvt. Ltd. Ahmedabad. Annexure A. Product Profile. Crude OBA AND/OR Crude OBA-CBS-X. Standardized OBA Solid AND/OR

Ramans Enviro Services Pvt. Ltd. Ahmedabad. Annexure A. Product Profile. Crude OBA AND/OR Crude OBA-CBS-X. Standardized OBA Solid AND/OR Annexure A Product Profile Sr. No. 1 2 Product Crude OBA AND/OR Crude OBA-CBS-X Standardized OBA Solid AND/OR Standardized OBA Liquid Proposed Qty (MT/ M) 400 400 1600 Note : For making Standardized OBA

More information

PRE-FEASIBILITY REPORT FOR ORDINARY SAND

PRE-FEASIBILITY REPORT FOR ORDINARY SAND PRE-FEASIBILITY REPORT FOR ORDINARY SAND Proponent NISANT TRADERS At- Opp. Survey No.- 3 Panam River Area-2.50.00 Hectare Village-Ramji-ni-Nal, Taluka- Shahera Dist.- Panchmahal Mob.- +91924040782 CONTENTS

More information

PRE-FEASIBILITY REPORT PROPOSED PROJECT FOR MANUFACTURING OF DYES INTERMEDIATES. OF M/s. UMIYA CHEM INTERMEDIATES

PRE-FEASIBILITY REPORT PROPOSED PROJECT FOR MANUFACTURING OF DYES INTERMEDIATES. OF M/s. UMIYA CHEM INTERMEDIATES PRE-FEASIBILITY REPORT ON PROPOSED PROJECT FOR MANUFACTURING OF DYES INTERMEDIATES OF M/s. UMIYA CHEM INTERMEDIATES AT PLOT NO: 4705/1/1, GIDC ESTATE,ANKLESHWAR, DIST:BHARUCH STATE:-GUJARAT 1 1.0 EXECUTIVE

More information

PRE-FEASIBILITY REPORT

PRE-FEASIBILITY REPORT PRE-FEASIBILITY REPORT For ToR of Proposed Project Of MANUFACTURING OF SYNTHETIC ORGANIC CHEMICALS of 850 MT/Month By PASHUPATI INDUSTRIES 169/1/A2, Phase 1, Opposite Telephone Exchange, GIDC Naroda, Ahmedabad-382330

More information

Environment Consultant:

Environment Consultant: MODERNIZATION CUM EXPANSION OF INDUCTION FURNACE PRODUCTION(2,05,000 TPA TO 6,00,000 TPA) AND ROLLING MILL PRODUCTION (3, 69,000 TPA TO 6,00,000 TPA) at Sy. No. 158 (part) 159 (part), 166 170, village

More information

M/s. RAPID INTERMEDIATES

M/s. RAPID INTERMEDIATES BRIEF SUMMARY OF THE PROJECT for PROPOSED PESTICIDE SPECIFIC INTERMEDIATES AND SPECIALTY CHEMICALS PLANT of M/s. RAPID INTERMEDIATES PLOT NO. 2325, GIDC ESTATE-PANOLI, TALUKA: ANKLESHWAR, DIST: BHARUCH,

More information

Kana Aroma Industries. Pre-Feasibility Report

Kana Aroma Industries. Pre-Feasibility Report Pre-Feasibility Report 1. INTRODUCTION M/s. is a proposed unit to be located at Shed no. C1-41/B/1 & 2, GIDC Industrial Estate, Nandesari, Vadodara, Gujarat and proposes to manufacture Allyl Iso Thiocynate,

More information

PRE-FEASIBILITY REPORT OF SAND QUARRY

PRE-FEASIBILITY REPORT OF SAND QUARRY PRE-FEASIBILITY REPORT OF SAND QUARRY Survey No Village Taluka District Lease area : 1 Paiki : Marigana : Anjar, : Kutch, Gujarat, : 2.00 Ha. Submitted to MINISTRY OF ENVIRONMENT & FORESTS STATE LEVEL

More information

PREFEASIBILITY REPORT

PREFEASIBILITY REPORT PREFEASIBILITY REPORT 1.0 INTRODUCTION OF THE PROJECT Padmashree Dr. D. Y. Patil Sahakari Sakhar Karkhana Ltd. (PDDPSSKL), Dnyanshantinagar, Vesaraf - Palsambe, Tal: Gaganbavda, Dist.: Kolhapur was registered

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT Page1 PRE FEASIBILITY REPORT KALDA FLAG STONE QUARRY AREA OF -1.55 HACTARE STRICTLY AS PER MOEF GUIDELINE DATE 30/12/2006 IN TERMS OF PROVISIONS OF EIA NOTIFICATION 2006 VILLAGE KALDA TEHSIL PAWAI DISTRICT

More information

Plot No. 2-D1, Obadenahalli, 3 rd Phase KIADB Industrial Area, Doddaballapur taluk, Bangalore Rural District , Karnataka State.

Plot No. 2-D1, Obadenahalli, 3 rd Phase KIADB Industrial Area, Doddaballapur taluk, Bangalore Rural District , Karnataka State. ON Plot No. 2-D1, Obadenahalli, 3 rd Phase KIADB Industrial Area, Doddaballapur taluk, Bangalore Rural District 561 205, Karnataka State. Table of Contents 1. EXECUTIVE SUMMARY 2. INTRODUCTION OF THE PROJECT/

More information

Pre-feasibility Report

Pre-feasibility Report Pre-feasibility Report for expansion of production capacity of Fluoropolymers including Poly Tetrafluoro Ethylene (PTFE), manufacturing of new age refrigerant gas Difluoromethane (HFC 32) and related products,

More information

PRE FEASIBILTY REPORT MANUFACTURING OF ORGANIC PIGMENT M/S PRINCE CHEMICALS

PRE FEASIBILTY REPORT MANUFACTURING OF ORGANIC PIGMENT M/S PRINCE CHEMICALS PRE FEASIBILTY REPORT ON PROPOSED PROJECT FOR MANUFACTURING OF ORGANIC PIGMENT OF M/S PRINCE CHEMICALS AT PLOT NO: 9111/3,9111/2/1 GIDC ESTATE, ANKLESHWAR, DIST: BHARUCH, STATE: GUJARAT 1 Index Sr no.

More information

Dated: 22 nd June, To The Director, Mjs Vulcan Waste Management Pvt. Ltd., 1046, Sector-31, Gurgaon, Haryana

Dated: 22 nd June, To The Director, Mjs Vulcan Waste Management Pvt. Ltd., 1046, Sector-31, Gurgaon, Haryana F.No.10-12/201S-IA.III Government of India Ministry of Environment, Forest & Climate Change (IA.IIISection) Indira Paryavaran Bhawan, Jor Bagh Road, New Delhi - 110 003. To The Director, Mjs Vulcan Waste

More information

Environmental Clearance; Letter No J / 152 / 2006-IA-II (I) Dt and corrigendum dated

Environmental Clearance; Letter No J / 152 / 2006-IA-II (I) Dt and corrigendum dated Environmental Clearance; Letter No J-11011 / 152 / 2006-IA-II (I) Dt. 21.05.2007 and corrigendum dated 18.09.2007 For Revamping of Ammonia and Urea Plant at Gadepan, Kota; Rajasthan by M/S Chambal Fertilisers

More information

Environmental Clearance; Letter No J / 152 / 2006-IA-II (I) Dt and corrigendum dated

Environmental Clearance; Letter No J / 152 / 2006-IA-II (I) Dt and corrigendum dated Environmental Clearance; Letter No J-11011 / 152 / 2006-IA-II (I) Dt. 21.05.2007 and corrigendum dated 18.09.2007 For Revamping of Ammonia and Urea Plant at Gadepan, Kota; Rajasthan by M/S Chambal Fertilisers

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT DR. REDDY S LABORATORIES LTD. CHEMICAL TECHOPS I PLOT NO.137, 138, 145 & 146, S.V. CO OP. IND. ESTATE, BOLLARAM VILLAGE, JINNARAM MANDAL, MEDAK DISTRICT, TELANGANA PRE FEASIBILITY REPORT DR. REDDY S LABORATORIES

More information

The unit obtained NOC (CFE) of A.P. Pollution control Board in the year 1988 and started operations.

The unit obtained NOC (CFE) of A.P. Pollution control Board in the year 1988 and started operations. 1. Introduction M/s. Sri Krishna Pharmaceuticals Limited, Unit-III (Formerly Sri Krishna Drugs Limited) was established in the year 1988. It is located at Sy. No. 57, Golkonda kalan, Raikunta (V), shamshabad

More information

Pre-Feasibility Report

Pre-Feasibility Report Pre-Feasibility Report M/s. Veer Poly Chem 0 1. Introduction M/s. Veer Polychem is an existing unit located at Plot 119 & 120, Ranpur road, GIDC Dhandhuka, Dist: Ahmedabad, Gujarat. Currently, unit is

More information

PREFEASIBILITY REPORT

PREFEASIBILITY REPORT PREFEASIBILITY REPORT 1.0 INTRODUCTION OF THE PROJECT Deshbhakt Ratnappa Kumbhar Panchganga Sahakari Sakhar Karkhana Ltd. (D.B.R.K. Panchganga S.S.K.L.) leased unit of Shree Renuka Sugars Ltd. is located

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT PRE FEASIBILITY REPORT For PROPOSED EXPANSION OF CARBON BLACK (10950 TPM TO 15750 TPM ) AND CO-GENERATION POWER PLANT (22 MW TO 32 MW) IN EXISTING PREMISES of M/s. PHILLIPS CARBON BLACK LTD. Survey No.

More information

Accord Energy Corporation India Pvt. Ltd.

Accord Energy Corporation India Pvt. Ltd. Accord Energy Corporation India Pvt. Ltd. PRE-FEASIBILITY REPORT ON ENVIRONMENTAL ASPECTS OF PROPOSED INCREASE IN CAPACITY 2 x 150 MW to 2 x 180 MW OF EXISTING ENVIRONMENTAL CLEARANCE ( J-13012/107/ 2009-IA-II

More information

RESINS & ALLIED CHEMICALS INDUSTRIES (BOMBAY) PVT. LTD.

RESINS & ALLIED CHEMICALS INDUSTRIES (BOMBAY) PVT. LTD. FOR THE PROPOSED EXPANSION PROJECT FOR THE MANUFACTURING OF KETONIC RESINS Category: 5(f) OF RESINS & ALLIED CHEMICALS INDUSTRIES (BOMBAY) PVT. LTD. Located at: Plot No. C-1/46, 100 SHED AREA, GIDC, Vapi,

More information

M/s. Lakeland Chemicals (India) Ltd.

M/s. Lakeland Chemicals (India) Ltd. FOR THE PROPOSED EXPANSION PROJECT FOR MANUFACTURING OF SPECALITY CHEMICALS Category: 5(f) A OF Located at: Plot no 63,6A,6B, Rasayani Road, Vill. Madap, Tq. Khalapur, Dist. Raigad.( Maharashtra) 1 Project

More information

Pre-Feasibility Report. for. Educational Institute Allen Career Institute-Supath

Pre-Feasibility Report. for. Educational Institute Allen Career Institute-Supath Pre-Feasibility Report for Educational Institute Allen Career Institute-Supath at Plot No. 1, Educational Scheme, Naya Nohra & Hanuwantkhera, Kota, Rajasthan-324001 By M/s. Allen Career Institute Registered

More information

Sanjivani Paranteral Ltd.

Sanjivani Paranteral Ltd. Pre - Feasibility Report For Sanjivani Paranteral Ltd. Plot no - K-2/1/2, Additional MIDC Mahad, Mahad, Raigad, Maharashtra. 402301 EIA Consultant M/s. SADEKAR ENVIRO ENGINEERS PVT. LTD. QCI NABET accredited

More information

PROJECT PRE-FEASIBILITY REPORT. For

PROJECT PRE-FEASIBILITY REPORT. For PROJECT PRE-FEASIBILITY REPORT For THE PROPOSED ORGANIC CHEMICALS MANUFACTURING IN EXISTING IN FORMULATION OF PESTICIDE, AGROCHEMICAL AND BIO FERTILIZERS MANUFACTURING UNIT AT M/S. SULPHUR MILLS LTD. PLOT