Environmental Impact Assessment
|
|
- Luke Underwood
- 6 years ago
- Views:
Transcription
1 Environmental Impact Assessment A brief discussion Presented by: Apekshit Solanki Kirti Neetu Yadav Sameera Vishakha Shankar
2 Introduction EIA is a formal process to predict the environmental consequences of any planned development. Compared 2 different power projects. Jaitapur Nuclear Power Plant. Modification of the Nashik thermal power plant. We have used 2 different tools for the comparison of the projects, to determine the better project.
3 Background In October, 2009, GOI approved the 6 X 1650 MWe NPP at Jaitapur. The total capacity being 10 GWe. NCPIL intends to install these in a phased manner. It is being developed with the help of French multinational Areva. To implement the above, NPCIL requested to acquire 976 Hectares of land. To get the required clearances from MoEF, NEERI was awarded the EIA work.
4 Location
5 Environmental Setting
6 Environmental Setting
7 Environmental Setting Land measuring 693 hectares has been acquired for the PWR type nuclear Power Park. 245 hectares have been acquired for the residential complex at a distance of 5 kms. Not a single family displaced due to project as land is barren. JNPP site falls in CRZ III category.
8 EIA as a Tool (Impacts of JNPP) Barren land with no habitation, and 0.24 ha of vegetation No breeding sites and land based activities No national park or sanctuary within 25 kms from site Poor biodiversity with respect to invertebrates, sea weeds etc.
9
10
11
12
13
14 Thermal Power Plant in Nashik, Maharashtra 2x140 MW were in operation with de-rated capacity of 2x125 MW. MAHAGENCO planned to install energy efficient 1x660 MW coal based thermal unit with coal. A total of Ha area was required for the proposed power plant in which 8.66 ha is for Main Plant & Auxilliary unit. A total of MMC /Year of water is required for the power plant and the total coal requirement is 3.44 MTPA. Various tests for conductivity,total hardness,chlorides,cod, BOD and D.O. were conducted to check the environmental conditions.
15 Location
16 Necessary Resources and Availability Input Water Fuel Resource Backwaters of Gangapur Dam reservoir Land Requirement Coal been used in the power plant being replaced Rest from Mahanadi coalfields of Orissa. Private land, already acquired by MAHAGENCO
17 Environmental Setting Nearest Habitation Gangawadi (0.85-km, W) Panchak (3-km,WNW) Nearest Tourist places/archaeological important places. Defence Installations Reserved/Protected forest / Presence of any wildlife migratory corridors, migratory bird paths in study area or presence of Sch-I animals in study area Nil within 15 km radius
18 Impacts during Operational Phase
19 Impacts due to solid waste Area for disposal of ash 277 ha. The disposal of ash will convert this land into non usable land. The ash dumped in the ponds may lead to one or more of the following processes: Leaching of water soluble components from ash into groundwater. Incorporation of the ash into soil matrix.
20 Mitigation measures Fly Ash Slurry Disposal System. Kitchen waste shall be disposed off through vermicomposting and shall be used as manure with sludge from water treatment processes for the development of green belt. Other solid wastes such as empty containers, metal scrap will be sold off to authorized dealers for recycling.
21 Impacts on air quality Indian coal will be used as fuel. Expected released pollutants in the emission will mainly be the Particulate Matter. The concerning emission will be from Point Source.
22 Mitigation measures Zero effluent discharge will be implemented. Minimal impact on the surface water quality. The sources of plant effluent are mainly: CW System blowdown Plant drains and boiler blowdown Oily waste
23 Impacts on Noise Levels Noise levels at the source: db Incremental noise levels will be less than 43.2 db at all the surrounding habitations. The main noise generating stationary sources are pumps, compressors, cooling tower and boilers. Noise levels at the source: db Incremental noise levels will be less than 43.2 db at all the surrounding habitations.
24 Impacts during construction phase Land Environment Air Environment Terrestrial Ecological Water Environment NO MAJOR IMPACT No sensitive receptors No critical pollution zones No major changes expected in land use pattern IMPACT FOR SHORT DURATION REVERSIBLE TEMPORARY Marginal increase in the levels of SO2, NOx, SPM and CO NO MAJOR ADVERSE IMPACTS Vegetation may be disturbed Fugitive dust generated WATER REQUIREMENT IS LOW Sewage generated from the construction workforce Non-point discharges of solids from soil loss IMPACT ON WATER IS NEGLIGIBLE.
25 Network
26 EIA - A tool for comparison Project and non-project scenario Project A and Project B at a given site Site A and Site B for a given project
27 Environmental component Phase of Project Thermal Power Plant Air Environment Construction -Reversible, marginal and temporary impact -Proper maintenance of vehicles, equipment -Water sprinkling on roads and site -Point Source Emission Operation -Released through a stack of 275 m. height. Water Environment Construction -Non-point discharges of solids from soil loss and sewage generated Operation -Zero effluent discharge -Oil water separator Nuclear Power Plant -Small level of pollutants -Proper maintenance of machinery, vehicles -Regular monitoring of conventional pollutants -Radioactive gaseous emissions of magnitude within AERB standards. -Proper monitoring -Impact on aquatic system / ground water - Proper appropriate sanitary facilities for the construction workers. - Construction of oil and water separation facility. -Effective collection & treatment of active liquid effluents. -Provision of on line monitoring for taking appropriate measures -Implementation of rainwater harvesting measures.
28 Land Environment -Segregation of waste -Construction waste used for land filling Construction -Industrial Land used -Use of top soil for green belt development -Ash not disposed but used in construction industry -Temporary effect Operation -Low noise level -Confinement of noise generating equipment. - Job and employment to local people; - construction site to be fenced; - Social, cultural and infrastructural development Construction Operation Noise Environment Socio- economic Environment Construction Operation -Effective collection & segregation of active solid waste - Employees and workers will be provided with ear muffs etc. -Isolation of site Awareness camps, health care; R & R plan; job and employment generation; Social, cultural and infrastructural development
29 Highlights and lessons: Transparency is needed in projects to avoid the the risk occurring from misleading information provided by authorities or people associated with project. A proper timely monitoring is needed where the damage caused due to any negligence can have huge impact on locals and environment. Noise and socioeconomic impacts also needs to be taken into taken apart from land, water and environment. Nuclear power plants are very clean and require minimal amounts of water while thermal power plants are polluting even during operations, polluting air, land and also using massive amounts of water. A drawback of a nuclear power plant is solid waste management of nuclear waste, which if not done properly can cause huge problem.
30 References "Ministry of Environment and Forest (MoEF), grants Environmental Clearance for Jaitapur Nuclear Power Project (JNPP)" (Press release). Mumbai- India: Nuclear Power Corporation of India Limited. 29 November Retrieved 30 November2010. A Gopalakrishnan (3 December 2010). "Reject French reactors for Jaitapur". The Indian Express. Retrieved 3 December "Jaitapur nuclear project: villagers turn down compensation". The Hindu (MumbaiIndia). 25 July Retrieved 29 November Siddhaye, Ninad (26 December 2010). "Jaitapur nuke plant will be a social disaster: TISS report". Daily News and Analysis (Mumbai). Retrieved 27 December Environmental Impact Assessment of Jaitapur Nuclear Power Project (JNPP) by National Environmental Engineering Research Institute. Environmental Impact Assessment of expansion of Nasik TPP by addition of 1x 660MW coal based Thermal Power Plant at Village Eklahare, Tal-Nasik, Dist-Nasik, Maharashtra
31 Thank you
M/s Hind Energy & Coal Beneficiation Pvt. Ltd. is presently operating a 2 x 1.2 MTPA
1.0 INTRODUCTION M/s Hind Energy & Coal Beneficiation Pvt. Ltd. is presently operating a 2 x 1.2 MTPA dry type of coal washery at Village: Hindadih, Tehsil: Masturi, District: Bilaspur (C.G.) for which
More informationENVIRONMENTAL MANAGEMENT PLAN
INTRODUCTION ENVIRONMENTAL MANAGEMENT PLAN An environmental management plan (EMP) has been prepared for the proposed construction of commercial project to minimize negative impacts and is formed on the
More informationINSPIRE INDUSTRIES PVT. LTD.
For Proposed 0.999 MTPA Coal Washery At Village: Bhelai, Tehsil: Baloda, District: Janjgir-Champa, Chhattisgarh Envirotech East (P) Limited An ISO 9001:2008, 14001:2004 & OHSAS:18001:2007 Company Laboratory
More informationAccord Energy Corporation India Pvt. Ltd.
Accord Energy Corporation India Pvt. Ltd. PRE-FEASIBILITY REPORT ON ENVIRONMENTAL ASPECTS OF PROPOSED INCREASE IN CAPACITY 2 x 150 MW to 2 x 180 MW OF EXISTING ENVIRONMENTAL CLEARANCE ( J-13012/107/ 2009-IA-II
More informationHind Energy & Coal Beneficiation (India) Ltd.
SUMMARY ON ENVIRONMENTAL IMPACT ASSESSMENT REPORT OF Hind Energy & Coal Beneficiation (India) Ltd. 0.96 MTPA Wet type Coal Washery at Birgahani Village, Baloda Tehsil Janjgir-Champa District, Chhattisgarh
More informationENVIRONMENTAL IMPACT ASSESSMENT AND YOU
ENVIRONMENTAL IMPACT ASSESSMENT AND YOU PARTICIPATING IN PUBLIC CONSULTATIONS FOR: COAL FUELED THERMAL POWER PLANTS C A G Citizen consumer and civic Action Group 1. What are Thermal Power Plants? Electricity
More informationProposed Terms of reference for EIA studies ToR for EIA studies in respect of the isolated storages, which are involved in handling of hazardous
Proposed Terms of reference for EIA studies ToR for EIA studies in respect of the isolated storages, which are involved in handling of hazardous chemicals may include, but not limited to the following
More informationRajasthan State Pollution Control Board
M/s Raj West Power Private Limited Village- Bhadresh, Tehsil:Barmer District:Barmer Sub: Ref: Sir, Consent to Operate under section 25/26 of the Water (Prevention & Control of Pollution) Act, 1974 and
More informationProposed Terms of Reference for EIA studies
1 Proposed Terms of Reference for EIA studies Collection of Base line data in any season other than Monsoon season in study area of 10 kms radius from Lease Area. Based on the Meteorological data from
More informationV: PROJECT SCOPING & METHODOLOGY
V: PROJECT SCOPING & METHODOLOGY 5.0 INTRODUCTION The scoping exercise is carried out to define the focus and scope of the EIA Study. The scoping exercise is required to understand the type of activities
More informationPROJECT NAME: UTKAL ALUMINA INTERNATIONAL LTD. PERIOD OF COMPLIANCE: APRIL, 2013 TO SEPTEMBER, 2013.
STATUS OF CONDITIONS IMPOSED IN ENVIRONMENTAL CLEARANCE FOR 3 MTPA REFINERY & 3X30 MW CO-GENERATION POWER PLANT VIDE LETTER NO. J-11011/753/2007-IA II (I), DATED 29.01.2008. PROJECT NAME: UTKAL ALUMINA
More informationHind Energy & Coal Beneficiation (India) Ltd.
SUMMARY ON ENVIRONMENTAL IMPACT ASSESSMENT REPORT OF Hind Energy & Coal Beneficiation (India) Ltd. (Change in Technology) at Hindadih Village, Masturi Tehsil Bilaspur District, Chhattisgarh Submitted to
More informationMars Power & Steel Ltd.
SUMMARY ON ENVIRONMENTAL IMPACT ASSESSMENT REPORT OF Mars Power & Steel Ltd. Village : Baihamura Tehsil : Ghargoda District : Raigarh Submitted to: Page 1 CHHATTISGARH ENVIRONMENT CONSERVATION BOARD Executive
More informationEXECUTIVE SUMMARY ON ENVIRONMENTAL IMPACT ASSESSMENT REPORT
EXECUTIVE SUMMARY ON ENVIRONMENTAL IMPACT ASSESSMENT REPORT For CHHATTISGARH ENVIRONMENT CONSERVATION BOARD CHHATTISGARH 0 P a g e 1.0 INTRODUCTION SUMIT ISPAT PVT. LTD. has proposed to establish Submerged
More informationSUMMARY ON ENVIRONMENTAL IMPACT ASSESSMENT REPORT. Chandu Cattle Feeds
SUMMARY ON ENVIRONMENTAL IMPACT ASSESSMENT REPORT OF Chandu Cattle Feeds 10 KLPD Ethanol & 50 TPD Cattle Feed Unit Plot no. 31 & 30 B of Sy. No. 432/2 P, APIIC Industrial park, Kakuturu village, Venkatachalam
More informationHINGULA OPEN CAST PROJECT HINGULA AREA MAHANADI COALFIELDS LIMITED
HALF YEARLY PROGRESS REPORT ON IMPLEMENTATION OF ENVIRONMENTAL CLEARANCE CONDITION BY MoEF (PERIOD FROM OCTOBER 13 TO MARCH 14) HINGULA OPEN CAST PROJECT HINGULA AREA MAHANADI COALFIELDS LIMITED SIX MONTHLY
More informationM/s. LAKSHMANAN CEMENTS PVT LTD, Survey Number 69-3, 69-4, Pachanapalli Village, Chittoor Mandal and District, Andhra Pradesh
M/s. LAKSHMANAN CEMENTS PVT LTD, Survey Number 69-3, 69-4, Pachanapalli Village, Chittoor Mandal and District, Andhra Pradesh EXECUTIVE SUMMARY SUBMITTED BY M/s. Lakshmanan Cements Pvt Ltd No. 58-A, 25
More informationSTATE EXPERT APPRAISAL COMMITTEE, PUNJAB Ministry of Environment and Forests, Government of India
STATE EXPERT APPRAISAL COMMITTEE, PUNJAB Ministry of Environment and Forests, Government of India O/O Punjab Pollution Control Board, Vatavaran Bhawan, Nabha Road, Patiala 147 001 Telefax:- 0175-2215802
More informationDESCRIPTIVE REPORT ON STATUS OF COMPLIANCE TO THE CONDITIONS OF ENVIRONMENTAL CLEARANCE AND ENVIRONMENTAL MANAGEMENT
DESCRIPTIVE REPORT ON STATUS OF COMPLIANCE TO THE CONDITIONS OF ENVIRONMENTAL CLEARANCE AND ENVIRONMENTAL MANAGEMENT Subject: Compliance report of Environmental Clearance for CDR & Revamp Reference: J-11011/272/2007-IA,
More informationSTATE POLLUTION CONTROL BOARD, ORISSA Paribesh Bhawan, A/118, Nilakanthanagar,Unit-VIII, Bhubaneswar , INDIA
OPERATING GUIDELINES FOR PROCESSING OF CONSENT TO ESTABLISH APPLICATION FOR ESTABLISHMENT OF COAL WASHERIES IN THE STATE OF ORISSA STATE POLLUTION CONTROL BOARD, ORISSA Paribesh Bhawan, A/118, Nilakanthanagar,Unit-VIII,
More informationDheeru Powergen Private Limited.
Executive Summary Of The Proposed 2 x 300 MW Dhanras Thermal Power Station At Dhanras Village Katgora Taluk, Korba District, Chhattisgarh. Implemented By Dheeru Powergen Private Limited. Submitted to CHHATTISGARH
More informationSTATE EXPERT APPRAISAL COMMITTEE GOVERNMENT OF PUNJAB (Office of the Secretary) Vatavaran Bhawan, Nabha Road, Patiala
STATE EXPERT APPRAISAL COMMITTEE GOVERNMENT OF PUNJAB (Office of the Secretary) Vatavaran Bhawan, Nabha Road, Patiala-147001. No. SEAC/80/37967 Dated 15/10/2008 Speed Post To M/s Green Planet Energy Pvt.
More informationContd7. Theft of water by using pumps on water lines from dam to TPS. 8. Plant premise is not compact hence piping's are long.
Contd7. Theft of water by using pumps on water lines from dam to TPS. 8. Plant premise is not compact hence piping's are long. 9. Most of the pipes are underground, Hence identification and attending leakage
More informationHealth and safety norms of CPWD should be followed during construction.
Status of Compliance of Conditions of the Environmental Clearance Issued to Riveria Commercial Developers Ltd. DLF Center, Sansad Marg, New Delhi 110001- Construction of "YASHWANT PLACE COMMUNITY CENTRE"
More informationEnvironmental Impact Assessment for Proposed Relocation and Installation of 1 x 100 Ton per day / 30,000 TPA Sponge Iron manufacturing industry from Village Nayapara-Bodri, PO- Chakrabhata Camp, Bilaspur
More informationM/s. Jindal Electricity Generation (P) Limited was promoted by Sri Omprakash Agrawal & Associates having other business in the area.
1. INTRODUCTION Executive Summary 1.1 Background: M/s. Jindal Electricity Generation (P) Limited was promoted by Sri Omprakash Agrawal & Associates having other business in the area. 1.2 Proposed Project:
More informationSTATE EXPERT APPRAISAL COMMITTEE, PUNJAB MINISTRY OF ENVIRONMENT AND FORESTS, GOVERNMENT OF INDIA
STATE EXPERT APPRAISAL COMMITTEE, PUNJAB MINISTRY OF ENVIRONMENT AND FORESTS, GOVERNMENT OF INDIA O/O PUNJAB POLLUTION CONTROL BOARD, VATAVARAN BHAWAN, NABHA ROAD, PATIALA 147 001 Telefax:- 0175-2215802
More informationHINDUSTAN ZINC LIMITED Maton Rock Phosphate Mine (Maton Mine), Tehsil: Girwa District: Udaipur (Rajasthan) PROPOSED TERMS OF REFERENCE FOR EIA STUDIES
HINDUSTAN ZINC LIMITED Maton Rock Phosphate Mine (Maton Mine), Tehsil: Girwa District: Udaipur (Rajasthan) PROPOSED TERMS OF REFERENCE FOR EIA STUDIES Maton Rock Phosphate Mine of M/s HZL is proposing
More informationEnvironmental Policy Statement:
1 Environmental Policy Statement: Coal India Limited (CIL) is committed to protect the environment through prevention, mitigation of pollution, proper disposal and recycling of wastes, conservation of
More informationScanned by CamScanner
Scanned by CamScanner ENVIRONMENT STATEMENT (FORM V) Udaipur Cement Works Limited Daroli Limestone Mine-1 YEAR 2017-18 Udaipur Cement Works Limited SHRIPATINAGAR, P.O. CFA: DABOK, DISTRICT UDAIPUR (RAJASTHAN)-313021
More information(1) LAND ENVIRONMENT (Attach panoramic view of the project site and the vicinity)
[Vide Paragraph - 6 of Notification dated 14 th September 2006, only for construction projects listed under item 8 of the Schedule] (1) LAND ENVIRONMENT (Attach panoramic view of the project site and the
More informationSTATE EXPERT APPRAISAL COMMITTEE, PUNJAB MINISTRY OF ENVIRONMENT AND FORESTS, GOVERNMENT OF INDIA
STATE EXPERT APPRAISAL COMMITTEE, PUNJAB MINISTRY OF ENVIRONMENT AND FORESTS, GOVERNMENT OF INDIA O/O PUNJAB POLLUTION CONTROL BOARD, VATAVARAN BHAWAN, NABHA ROAD, PATIALA 147 001 Telefax:- 0175-2215802
More informationPART A. 3. Production Capacity 3.6 Million TPA Cement 4. Year of Establishment th September 2015 PART B WATER AND RAW MATERIAL CONSUMPTION
Page 1 of 8 Environmental Statement for Clinker Grinding Unit of M/s Bihar Cement Plant (A Unit of Shree Cement Ltd.), situated at Jasoia Mor, BIADA, Industrial Growth Centre, Aurangabad, Tehsil & Dist.
More informationPROJECT NAME: UTKAL ALUMINA INTERNATIONAL LTD. PERIOD OF COMPLIANCE: OCTOBER 2014 TO MARCH 2015.
STATUS OF CONDITIONS IMPOSED IN ENVIRONMENTAL CLEARANCE FOR 3 MTPA REFINERY& 3X30 MW CO-GENERATION POWER PLANT VIDE LETTER NO. J-11011/753/2007- IA II (I), DATED 29.01.2008. PROJECT NAME: UTKAL ALUMINA
More informationPre-Feasibility Report [Application submitted for obtaining Terms of Reference for Prior Environment Clearance]
Pre-Feasibility Report [Application submitted for obtaining Terms of Reference for Prior Environment Clearance] Project Proposal: Expansion of Cement Plant capacity from 1.5 to 2.20 MTPA of Clinker and
More informationFor PROPOSED IT PARK. By M/s.Balewadi Tech Park Pvt.Ltd. Submitted to State Environment Expert Appraisal Committee III, Maharashtra
Draft Terms of References (ToR) (Based on the model TOR given in Environmental Impact Assessment Guidance Manual for building construction projects by MoEF & CC) For PROPOSED IT PARK By M/s.Balewadi Tech
More informationEIA SUMMARY FOR PROPOSED 15 MW AND 33 MW CAPACITY CAPTIVE POWER PLANT FOR M/S AMBUJA CEMENT EASTERN LTD. RAWAN, BHATAPARA (C.G.)
EIA SUMMARY FOR PROPOSED 15 MW AND 33 MW CAPACITY CAPTIVE POWER PLANT FOR M/S AMBUJA CEMENT EASTERN LTD. RAWAN, BHATAPARA (C.G.) 1. PROJECT DESCRIPTION: Ambuja Cement Eastern Ltd. (ACEL) has the cement
More informationExecutive Summary for R-EIA Report for 60
Executive Summary 1. INTRODUCTION Maihar Cement is a unit of M/s Century Textiles and Industries Ltd. located at Sarla Nagar near Maihar in district Satna (M.P). Maihar Cement Unit has come into operation
More informationEnvironment Impact Assessment (EIA) The proposed project falls in category 8 (a) B2 as per schedule of EIA Notification, 2006.
Environment Impact Assessment (EIA) The proposed project falls in category 8 (a) B2 as per schedule of EIA Notification, 2006. Thus, EIA is not applicable for proposed project. We have derived project
More informationRoquette Riddhi Siddhi Private Limited
SUMMARY ON DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT OF Roquette Riddhi Siddhi Private Limited (Expansion of co-generation power plant from 6MW to 18 MW) at Gokak Village & Taluk, Belagavi District,
More informationDRAFT ORDINANCE. B. Applicability
DRAFT ORDINANCE Chapter 21.34.150 IP Inland Port Overlay District A. Purpose: The purpose of the IP Inland Port Overlay District is to allow for the development of an inland port as required in Utah Code
More information1.0 The Need for EIA. (a) the project proponent; (b) the regulatory agencies; and, (c) all stakeholders and interest groups.
1.0 The Need for EIA Every anthropogenic activity has some impact on the environment. More often it is harmful to the environment than benign. However, mankind as it is developed today cannot live without
More informationPROPOSED TERMS OF REFERENCE
ENVIRONMENTAL IMPACT ASSESSMENT FOR RESIDENTIAL TOWNSHIP WITH VACATION RESORTS PROJECT AT ALIBAUG, RAIGAD, MAHARASHTRA PROPOSED TERMS OF REFERENCE Submitted to State Level Environment Impact Assessment
More information[FORM-V] PART-A PART-B
[FORM-V] (See Rule 14) Environment Statement for the financial year ending the 31 st March 2015 PART-A (1) Name and address of the owner - M/s. Serajuddin and Co. / Occupier of the industry, Balda Block
More informationJ-11011/45/2009- IA II (I)
SL SPECIFIC CONDITIONS STATUS 1 Continuous stack monitoring facilities to monitor gaseous emissions from all the stacks shall be provided. The particulate emissions shall be controlled within 50 mg/nm
More informationCE 213 WATER QUALITY & POLLUTION
CE 213 WATER QUALITY & POLLUTION L20-21 - Module E. Solid Waste Management Need, Objectives, Process Involved, Treatment of MSW, Case Study India Dr. Anubha Goel FB 308, anubha@iitk.ac.in, x 7027 Schedule
More informationSUMMARY ENVIRONMENTAL IMPACT ASSESSMENT REPORT. 380 MW Gas Based Combined Cycle Power Plant at
SUMMARY ENVIRONMENTAL IMPACT ASSESSMENT REPORT for 380 MW Gas Based Combined Cycle Power Plant at Vijaipur, District: Guna MADHYA PRADESH NOVEMBER 2011 1 CONTENTS 1.0 Project Description Page 3 2.0 Description
More informationPRE-FEASIBILITY REPORT
PRE-FEASIBILITY REPORT FOR EXPANSION OF ALUMINA REFINERY (FROM 1.5 TO 3.0 MTPA) & CAPTIVE CO-GENERATION POWER PLANT (FROM 90 TO 150 MW) OF UTKAL ALUMINA INTERNATIONAL LIMITED AT DORAGUDA, RAYAGADA DIST,
More informationBHUSHAN STEEL LIMITED
for the period October 2017 to March 2018 Environment Clearances of Jagannath Mine Void Letter no.: Z-11013/43/2011-I-A.II (M) dated 05 th Sept 2013 Letter no.: Z-11013/43/2011-I-A.II (M) dated 08 th April
More informationBHORER ALO ECO TOURISM PROJECT AT GAJALDOBA, JALPAIGURI
TERMS OF REFERENCE (TOR) FOR AN ENVIRONMENTAL IMPACT ASSESSMENT (EIA) FOR BHORER ALO ECO TOURISM PROJECT AT GAJALDOBA, JALPAIGURI AT PLOT NO.: 63, 67-70, 72-101 AND 105, MOUZA-JUNGLE MOHAL, JL. NO. 01,
More informationBHUSHAN STEEL LIMITED
for the period April2017 to September 2017 Environment Clearances of Jagannath Mine Void Letter no.: Z-11013/43/2011-I-A.II (M) dated 05 th Sept 2013 Letter no.: Z-11013/43/2011-I-A.II (M) dated 08 th
More informationPRE FEASIBILITY REPORT. Company of production capacity: 14,40,000 CFT/ Year located at Khasra No near Village:
PRE FEASIBILITY REPORT 1.0 EXECUTIVE SUMMARY In our Masonry Stone Mining Lease (M.L. No. 15/96, Area: 1.0 ha), Production capacity of masonry stone: 142920 TPA and existing Stone Crusher Unit named M/s.
More informationEnvironmental Management Plan during Construction Phase
Management Plan during Phase Sr 1 Ambient Air Quity Negative inside site premises outside site 2 ise Negative near noise generation sources inside premises on ambient noise levels in the Surrounding area
More informationPre-Feasibility Report For Khargone STPP Stage-I (2X660 MW) District- Khargone, Madhya Pradesh
1.0 Executive Summary Name of Project: Name of Project Proponent: Location of the Project: Capacity & Unit Configurations: Land Requirement, Current Land Use and Availability: Water Requirement and Availability:
More informationJAYPEE NIGRIE SUPER THERMAL POWER PLANT
JAYPEE NIGRIE SUPER THERMAL POWER PLANT (A Division of M/s Jaiprakash Power Ventures Limited) Village: Nigrie, Tehsil: Sarai District: Singrauli 2015 2016 SUBMITTED M.P. POLLUTION CONTROL BOARD BHOPAL
More informationSIX MONTHLY COMPLIANCE REPORT JUNE- 2015
SIX MONTHLY COMPLIANCE REPORT JUNE- 2015 Group Housing Complex My woods AT Plot no. GH-04, Sector -16 C, Noida Extension, Greater Noida, U.P. Being developed by M/s Mahagun India Pvt. Ltd. A-19, Sector-63,
More informationACTION PLAN FOR ABATEMENT OF POLLUTION IN CRITICALLY POLLUTED INDUSTRIAL CLUSTERS (IB VALLEY-JHARSUGUDA AREA)
ACTION PLAN FOR ABATEMENT OF POLLUTION IN CRITICALLY POLLUTED INDUSTRIAL CLUSTERS (IB VALLEY-JHARSUGUDA AREA) ORISSA POLLUTION CONTROL BOARD BHUBANESWAR JUNE 2010 CONTENTS 1.0 Background. 01 2.0 Objective.
More informationRajasthan State Pollution Control Board
M/s Raj West Power Private Limited Village- Bhadresh, Tehsil:Barmer District:Barmer Sub: Ref: Consent to Operate under section 25/26 of the Water (Prevention & Control of Pollution) Act, 1974 and under
More informationReport on Damage Assessment and. Remediation Plan and Natural & Community Augmentation Plan
Report on 1. PROJECT LOCATION & LAND USE The Ganesh Park 3 is a residential building project constructed on plot 608 to 613/5 Vil: GIDC Ankleshwar in Bharuch district of Gujarat state. The project land
More informationProposed Terms of Reference for EIA studies
Proposed Terms of Reference for EIA studies M/s Maithan Steel and Power Ltd. is located at: At/PO- Bonra, PS- Neturia in Purulia district of WB with latitude:23 0 37 53.85 Nand longitude 86 0 50 08.10
More informationEnvironment protection measures / technology
Sr. No. Conditions A. Specific Conditions: i. The gaseous and particulate matter emissions from various units should conform to the standards prescribed by the State Pollution Control Board. At no time,
More informationEnvironmental Clearance Compliance Half Yearly Report
Environmental Clearance Compliance Half Yearly Report HALF YEARLY COMPLIANCE REPORT- April 2015 to September 2015 Ref: 1. MOEF, New Delhi Environment Clearance F. No. J-11011/119/2007- IA II (I) dated
More informationWELCOM TO THE STATE LEVEL ENVIRONMENT IMPACT ASSESSMENT APPRAISAL COMMITTEE,A.P. For the Presentation proposed Granite Mine 7.50 Acres M/S N.R.
WELCOM TO THE STATE LEVEL ENVIRONMENT IMPACT ASSESSMENT APPRAISAL COMMITTEE,A.P. For the Presentation proposed Granite Mine 7.50 Acres M/S N.R.Global Granites Production Granite Black Granits At Survey
More informationEnvironmental Assessment Report
TE-TO AD SKOPJE Combined Cycle Co-Generation Power Plant Project Skopje Environmental Assessment Report ENVIRONMENTAL MANAGEMENT PLAN Thermal Energy Plants Department Combined Cycle Co-Generation Power
More informationV.S LIGNITE POWER Pvt. Ltd AT VILLAGE-GURHA, KOLAYAT, BIKANER, RAJASTHAN
V.S LIGNITE POWER Pvt. Ltd AT VILLAGE-GURHA, KOLAYAT, BIKANER, RAJASTHAN HALF YEARLY REPORT FOR THE PERIOD OCTOBER, 2011 to MARCH 2012 V. S. Lignite Power Pvt. Ltd. Name of the Project : 1x 135 MW Lignite
More informationSimran Industries Pvt. Ltd.
SUMMARY ON ENVIRONMENTAL IMPACT ASSESSMENT REPORT OF Patharra Village Bemetara Tehsil Durg District Chhattisgarh Submitted to: CHHATTISGARH ENVIRONMENT CONSERVATION BOARD Raipur, Chhattisgarh 1.0 INTRODUCTION
More informationOverburden dumps are stacked separately as per the guidelines and the same will be used for backfilling in mined out area.
ENVIRONMENT CLEARANCE COMPLIANCE STATUS ENVIRONMENT CLEARANCE No. J-11015/406/2006-IA.II(M) dt. 13/04/2007 DHANGARWADI MINES Sr. CONDITIONS COMPLIANCE No. A) Specific Conditions :- i) Top soil to be stacked
More informationClearance Letter no. : MoEF Vide Letter no. J-11011/79/2003-IA-II (I) dated April 21, 2004
Name of the Project: Jaypee Rewa Plant, Unit of M/s Jaiprakash Associates Limited for expansion Of cement production from 2.5 MTPA to 3.5 MTPA at Jaypee Nagar, District Rewa, Madhya Pradesh Project Code:
More informationHigh efficient ESP s has been provided to maintain an emission level below 100mg/Nm 3 in CPP. Modification of ESPs and.
Sl. No. CONDITIONS COMPLIANCE STATUS SPECIFIC CONDITIONS i The gaseous emissions (PM, SO 2, NO X, PAH, HC, VOCs and Fluoride) from various process units shall conform to the standards prescribed by the
More informationENVIRONMENTAL IMPACT ASSESSMENT IN INDIAN SCENARIO
Review Paper (SS-3) ENVIRONMENTAL IMPACT ASSESSMENT IN INDIAN SCENARIO S.N. Ranshur*, P.H. Sawant and R.A. Hegde Civil (Env. Engg. Subjects), S.P. College of Engineering, Mumbai (INDIA) *E-mail : sandeepranshur@yahoo.com
More informationProposed Draft Terms of Reference for Preparation of EIA & EMP for Louis Pharmaceuticals Pvt Ltd STANDARD TERMS OF REFERENCE
Proposed Draft Terms of Reference for Preparation of EIA & EMP for Louis Pharmaceuticals Pvt Ltd 1. Executive Summary 2. Introduction STANDARD TERMS OF REFERENCE I. Details of the EIA Consultant including
More informationTHE RAMCO CEMENTS LIMITED, KSR NAGAR COMPLIANCE REPORT - ENVIRONMENTAL CLEARANCE CEMENT PLANT 2.5 MILLION TPA CLINKER, 2
THE RAMCO CEMENTS LIMITED, KSR NAGAR COMPLIANCE REPORT - ENVIRONMENTAL CLEARANCE CEMENT PLANT 2.5 MILLION TPA CLINKER, 2.6 MILLION TPA CEMENT & THERMAL POWER PLANT 36 MW EC Lr. No. : J-11011/403/2006-IA-II
More informationEXECUTIVE SUMMARY 1.0 PROJECT DESCRIPTION 1.1 INTRODUCTION
EXECUTIVE SUMMARY 1.0 PROJECT DESCRIPTION 1.1 INTRODUCTION Jaypee Group is a leading Business House of the country with its presence in Core industries and Service Sectors like Cement, Infrastructure development,
More informationPART A. M/s Shree Cement Ltd, (Grinding Unit) village - Udepur, Tehsil- Suratgarh, District -Shri Ganganagar, Rajasthan
Page 1 of 9 Environmental Statement for Clinker Grinding Unit of M/s Shree Cement Limited, situated at village - Udepur, Tehsil- Suratgarh, District -Shri Ganganagar, Rajasthan for the Period from: 10
More informationPROPOSED TERM OF REFERENCE
PROPOSED TERM OF REFERENCE FOR ESTABLISHMENT OF PROPOSED MOLASSES/GRAIN BASED DISTILLERY HAVING CAPACITY: 160.0 KLD (MOLASSES BASED) OR 120.0 KLD (MOLASSES BASED) + 40.0 KLD (GRAIN BASED) ALONGWITH 7.0
More informationPRE FEASIBILITY REPORT
PRE FEASIBILITY REPORT for PROPOSED PROJECT FOR DYES, PIGMENTS AND DYE INTERMEDIATES MANUFACTURING PLANT IN GIDC, DAHEJ-II Of M/s. SHREEJI INDUSTRIES Plot No. D2/CH/24, Dahej-II, GIDC Industrial Estate,
More informationENVIRONMENTAL MANAGEMENT PLAN. Hotel Project for Mohamed Ilyas & Ms. Alamzahan
ENVIRONMENTAL MANAGEMENT PLAN Of Hotel Project for Mohamed Ilyas & Ms. Alamzahan at Khasra No. 269Ga, 269Kh, 266Kh & 270 Village Majra, Tehsil Central Doon, District Dehradun (Uttarakhand) GENERAL ENVIRONMENTAL
More informationAnalysis of the Draft EIA/EMP Report for Durgapur II Taraimar Coal Block. For. M/S Bharat Aluminium Company Limited
Analysis of the Draft EIA/EMP Report for Durgapur II Taraimar Coal Block For M/S Bharat Aluminium Company Limited Background of the technical report Bharat Aluminium Company (BALCO) is planning to set
More informationEXECUTIVE SUMMARY 1.0 INTRODUCTION
1.0 INTRODUCTION NTPC Ltd is proposing to setup Khargone Super Thermal Power Project (2x660 MW) in Khargone district of Madhya Pradesh. The project is being implemented as regional Mega power project for
More informationENVIRONMENTAL MANAGEMENT PLAN. CONSTRUCTION PHASE 1.Construction Contractors
1. Increased water demand (12 KLD) due water usage for, dust suppression and for workers 2. Sewage generation (11 KLD) and disposal 3. Municipal solid waste generation (15 kg/day) by workers 4. Construction
More informationThe below is a detailed evaluation of the EIA report, based on a community request from Ekta Parishad, a local NGO in Chhattisgarh.
EIA Review of Nalwa integrated steel plant (NSPL) Background Nalwa integrated steel plant (0.198 MTPA sponge iron), located near village Taraimal, Raigarh district, Chhattisgarh proposes to expand its
More informationJAYPEE NIGRIE SUPER THERMAL POWER PROJECT
JAYPEE NIGRIE SUPER THERMAL POWER PROJECT (A Unit of M/s Jaiprakash Power Ventures Limited) Villages: Nigrie, Tehsil :Sarai District: Singrauli 2014 2015 SUBMITTED M.P. POLLUTION CONTROL BOARD BHOPAL (M.P.)
More informationTelefax: 011: Dated:10 th May, 2013
F. No. J-11011/41/2011-IA-II (I) Government of India Ministry of Environment and Forests (I.A. Division) Paryavaran Bhawan CGO Complex, Lodhi Road New Delhi 110 003 E-mail:vp.upadhyay@nic.in Telefax: 011:
More informationOPTIMISATION OF WATER USAGES IN THERMAL POWER PLANTS AND A STUDY ON DRY COOLING SYSTEM
CONFERENCE ON WATER OPTIMISATION IN THERMAL POWER PLANTS OPTIMISATION OF WATER USAGES IN THERMAL POWER PLANTS AND A STUDY ON DRY COOLING SYSTEM S. K. Thakur, Dr. L. D. Papney, Chief Engineer (I/C), TE&TD
More information4.0 ENVIRONMENTAL IMPACTS AND MITIGATION MEASURES. Negative or adverse impacts during the construction phase are:
4.0 ENVIRONMENTAL IMPACTS AND MITIGATION MEASURES 4.1 POTENTIAL ENVIRONMENTAL IMPACTS 4.1.1 Impacts during Construction Phase Negative or adverse impacts during the construction phase are: Land environment:
More informationANDHRA PRADESH POLLUTION CONTROL BOARD, REGIONAL OFFICE, TIRUPATI
M/s. JANANY CEMENT INDUSTRIES PRIVATE LIMITED SURVEY NO 462, INDUSTRIAL PARK, GUNTAKINDAPALLI VILLAGE, SRIKALAHASTI MANDAL, CHITTOOR DISTRICT, ANDHRA PRADESH EXECUTIVE SUMMARY SUBMITTED BY M/s.Janany Cement
More informationThe following were present to supervise the proceedings:- 1. Sh. Varun Roojam, IAS. Additional Deputy Commissioner. Muktsar. 2. Er. G.S.
Proceeding of the Public Hearing conducted on 27.01.2009 for grant of environmental clearance to M/s Universal Bio-Mass Energy Pvt. Ltd. for setting up of 14.5 MW capacity Biomass based Independent power
More information(Period April 2017 ~ Sept. 2017)
CHAMBAL FERTILIZERS AND CHEMICALS LIMITED, GADEPAN MOEF ENVIRONMENTAL CLEARANCE COMPLIANCE REPORT [PHASE- I] (Period April 2017 ~ Sept. 2017) Letter No.J-11011 / 8 / 87-IA DT.15.11.88 01. The Project Proponent
More informationPRE-FEASIBILITY REPORT. Name of Company / Mine Owner Shri Jayant Kumar Choudhary Location
1. SUMMARY PRE-FEASIBILITY REPORT Project Stone Quarry Name of Company / Mine Owner Shri Jayant Kumar Choudhary Location Village Taluka District State Rupapali Basna Mahasamund Chhattisgarh 1 Mining Lease
More informationRisk Assessment Nagla
Risk and Hazards HAZARD Major Risks involved in River Bed Mining are following: 1. River Bed Inundation 2. Soil Erosion 3. Disturbance of Ground water Level 4. Damage of River bank due to access of Ramps
More informationPROPOSED TERMS OF REFERENCE
PROPOSED TERMS OF REFERENCE For PROPOSED RESIDENTIAL AND COMMERCIAL DEVELOPMENT AT Plot bearing survey no. 86/1, 86/2, 86/3 (pt), 86/4 (pt), 86/5 (pt), 115/1 (pt), 115/2 (pt), 115/3 (pt), 115/4 (pt), 115/5
More informationDESCRIPTIVE REPORT ON STATUS OF COMPLIANCE TO THE CONDITIONS OF ENVIRONMENTAL CLEARANCE AND ENVIRONMENTAL MANAGEMENT
DESCRIPTIVE REPORT ON STATUS OF COMPLIANCE TO THE CONDITIONS OF ENVIRONMENTAL CLEARANCE AND ENVIRONMENTAL MANAGEMENT Subject: Compliance report of Environmental Clearance for Plant 3 Reference: J-11011/603/2010-IA,
More informationA Case Study: Problem Associated With Fly Ash Disposal
A Case Study: Problem Associated With Fly Ash Disposal Ashish V Talati 1, Vaishakhi ATalati 2 Civil Engineering, Dr. Jivraj Mehta Institute of Technology Abstract: Coal based thermal power stations are
More informationEnvironmental impact assessment of a 1600 MW thermal power plant project in Karimnagar district of Telangana
Environmental impact assessment of a 1600 MW thermal power plant project in Karimnagar district of Telangana 1 D.V.S. Praneeth, 2 Arghajeet Saha 1,2 M.Tech. Scholar 1 Environmental Engineering, Department
More informationDEPARTMENT OF COMPUTER SCIENCE AND ENGINEERING Year and Semester : II / III Section : CSE 1 Subject Code : GE6351 Subject Name : ENVIRONMENTAL SCIENCE AND ENGINEERING Degree and Branch : BE - CSE Staff
More information