Environmental Impact Assessment

Save this PDF as:
 WORD  PNG  TXT  JPG

Size: px
Start display at page:

Download "Environmental Impact Assessment"

Transcription

1 Environmental Impact Assessment A brief discussion Presented by: Apekshit Solanki Kirti Neetu Yadav Sameera Vishakha Shankar

2 Introduction EIA is a formal process to predict the environmental consequences of any planned development. Compared 2 different power projects. Jaitapur Nuclear Power Plant. Modification of the Nashik thermal power plant. We have used 2 different tools for the comparison of the projects, to determine the better project.

3 Background In October, 2009, GOI approved the 6 X 1650 MWe NPP at Jaitapur. The total capacity being 10 GWe. NCPIL intends to install these in a phased manner. It is being developed with the help of French multinational Areva. To implement the above, NPCIL requested to acquire 976 Hectares of land. To get the required clearances from MoEF, NEERI was awarded the EIA work.

4 Location

5 Environmental Setting

6 Environmental Setting

7 Environmental Setting Land measuring 693 hectares has been acquired for the PWR type nuclear Power Park. 245 hectares have been acquired for the residential complex at a distance of 5 kms. Not a single family displaced due to project as land is barren. JNPP site falls in CRZ III category.

8 EIA as a Tool (Impacts of JNPP) Barren land with no habitation, and 0.24 ha of vegetation No breeding sites and land based activities No national park or sanctuary within 25 kms from site Poor biodiversity with respect to invertebrates, sea weeds etc.

9

10

11

12

13

14 Thermal Power Plant in Nashik, Maharashtra 2x140 MW were in operation with de-rated capacity of 2x125 MW. MAHAGENCO planned to install energy efficient 1x660 MW coal based thermal unit with coal. A total of Ha area was required for the proposed power plant in which 8.66 ha is for Main Plant & Auxilliary unit. A total of MMC /Year of water is required for the power plant and the total coal requirement is 3.44 MTPA. Various tests for conductivity,total hardness,chlorides,cod, BOD and D.O. were conducted to check the environmental conditions.

15 Location

16 Necessary Resources and Availability Input Water Fuel Resource Backwaters of Gangapur Dam reservoir Land Requirement Coal been used in the power plant being replaced Rest from Mahanadi coalfields of Orissa. Private land, already acquired by MAHAGENCO

17 Environmental Setting Nearest Habitation Gangawadi (0.85-km, W) Panchak (3-km,WNW) Nearest Tourist places/archaeological important places. Defence Installations Reserved/Protected forest / Presence of any wildlife migratory corridors, migratory bird paths in study area or presence of Sch-I animals in study area Nil within 15 km radius

18 Impacts during Operational Phase

19 Impacts due to solid waste Area for disposal of ash 277 ha. The disposal of ash will convert this land into non usable land. The ash dumped in the ponds may lead to one or more of the following processes: Leaching of water soluble components from ash into groundwater. Incorporation of the ash into soil matrix.

20 Mitigation measures Fly Ash Slurry Disposal System. Kitchen waste shall be disposed off through vermicomposting and shall be used as manure with sludge from water treatment processes for the development of green belt. Other solid wastes such as empty containers, metal scrap will be sold off to authorized dealers for recycling.

21 Impacts on air quality Indian coal will be used as fuel. Expected released pollutants in the emission will mainly be the Particulate Matter. The concerning emission will be from Point Source.

22 Mitigation measures Zero effluent discharge will be implemented. Minimal impact on the surface water quality. The sources of plant effluent are mainly: CW System blowdown Plant drains and boiler blowdown Oily waste

23 Impacts on Noise Levels Noise levels at the source: db Incremental noise levels will be less than 43.2 db at all the surrounding habitations. The main noise generating stationary sources are pumps, compressors, cooling tower and boilers. Noise levels at the source: db Incremental noise levels will be less than 43.2 db at all the surrounding habitations.

24 Impacts during construction phase Land Environment Air Environment Terrestrial Ecological Water Environment NO MAJOR IMPACT No sensitive receptors No critical pollution zones No major changes expected in land use pattern IMPACT FOR SHORT DURATION REVERSIBLE TEMPORARY Marginal increase in the levels of SO2, NOx, SPM and CO NO MAJOR ADVERSE IMPACTS Vegetation may be disturbed Fugitive dust generated WATER REQUIREMENT IS LOW Sewage generated from the construction workforce Non-point discharges of solids from soil loss IMPACT ON WATER IS NEGLIGIBLE.

25 Network

26 EIA - A tool for comparison Project and non-project scenario Project A and Project B at a given site Site A and Site B for a given project

27 Environmental component Phase of Project Thermal Power Plant Air Environment Construction -Reversible, marginal and temporary impact -Proper maintenance of vehicles, equipment -Water sprinkling on roads and site -Point Source Emission Operation -Released through a stack of 275 m. height. Water Environment Construction -Non-point discharges of solids from soil loss and sewage generated Operation -Zero effluent discharge -Oil water separator Nuclear Power Plant -Small level of pollutants -Proper maintenance of machinery, vehicles -Regular monitoring of conventional pollutants -Radioactive gaseous emissions of magnitude within AERB standards. -Proper monitoring -Impact on aquatic system / ground water - Proper appropriate sanitary facilities for the construction workers. - Construction of oil and water separation facility. -Effective collection & treatment of active liquid effluents. -Provision of on line monitoring for taking appropriate measures -Implementation of rainwater harvesting measures.

28 Land Environment -Segregation of waste -Construction waste used for land filling Construction -Industrial Land used -Use of top soil for green belt development -Ash not disposed but used in construction industry -Temporary effect Operation -Low noise level -Confinement of noise generating equipment. - Job and employment to local people; - construction site to be fenced; - Social, cultural and infrastructural development Construction Operation Noise Environment Socio- economic Environment Construction Operation -Effective collection & segregation of active solid waste - Employees and workers will be provided with ear muffs etc. -Isolation of site Awareness camps, health care; R & R plan; job and employment generation; Social, cultural and infrastructural development

29 Highlights and lessons: Transparency is needed in projects to avoid the the risk occurring from misleading information provided by authorities or people associated with project. A proper timely monitoring is needed where the damage caused due to any negligence can have huge impact on locals and environment. Noise and socioeconomic impacts also needs to be taken into taken apart from land, water and environment. Nuclear power plants are very clean and require minimal amounts of water while thermal power plants are polluting even during operations, polluting air, land and also using massive amounts of water. A drawback of a nuclear power plant is solid waste management of nuclear waste, which if not done properly can cause huge problem.

30 References "Ministry of Environment and Forest (MoEF), grants Environmental Clearance for Jaitapur Nuclear Power Project (JNPP)" (Press release). Mumbai- India: Nuclear Power Corporation of India Limited. 29 November Retrieved 30 November2010. A Gopalakrishnan (3 December 2010). "Reject French reactors for Jaitapur". The Indian Express. Retrieved 3 December "Jaitapur nuclear project: villagers turn down compensation". The Hindu (MumbaiIndia). 25 July Retrieved 29 November Siddhaye, Ninad (26 December 2010). "Jaitapur nuke plant will be a social disaster: TISS report". Daily News and Analysis (Mumbai). Retrieved 27 December Environmental Impact Assessment of Jaitapur Nuclear Power Project (JNPP) by National Environmental Engineering Research Institute. Environmental Impact Assessment of expansion of Nasik TPP by addition of 1x 660MW coal based Thermal Power Plant at Village Eklahare, Tal-Nasik, Dist-Nasik, Maharashtra

31 Thank you

ENVIRONMENTAL IMPACT ASSESSMENT AND YOU

ENVIRONMENTAL IMPACT ASSESSMENT AND YOU ENVIRONMENTAL IMPACT ASSESSMENT AND YOU PARTICIPATING IN PUBLIC CONSULTATIONS FOR: COAL FUELED THERMAL POWER PLANTS C A G Citizen consumer and civic Action Group 1. What are Thermal Power Plants? Electricity

More information

Hind Energy & Coal Beneficiation (India) Ltd.

Hind Energy & Coal Beneficiation (India) Ltd. SUMMARY ON ENVIRONMENTAL IMPACT ASSESSMENT REPORT OF Hind Energy & Coal Beneficiation (India) Ltd. 0.96 MTPA Wet type Coal Washery at Birgahani Village, Baloda Tehsil Janjgir-Champa District, Chhattisgarh

More information

Rajasthan State Pollution Control Board

Rajasthan State Pollution Control Board M/s Raj West Power Private Limited Village- Bhadresh, Tehsil:Barmer District:Barmer Sub: Ref: Sir, Consent to Operate under section 25/26 of the Water (Prevention & Control of Pollution) Act, 1974 and

More information

HINGULA OPEN CAST PROJECT HINGULA AREA MAHANADI COALFIELDS LIMITED

HINGULA OPEN CAST PROJECT HINGULA AREA MAHANADI COALFIELDS LIMITED HALF YEARLY PROGRESS REPORT ON IMPLEMENTATION OF ENVIRONMENTAL CLEARANCE CONDITION BY MoEF (PERIOD FROM OCTOBER 13 TO MARCH 14) HINGULA OPEN CAST PROJECT HINGULA AREA MAHANADI COALFIELDS LIMITED SIX MONTHLY

More information

PROPOSED TERM OF REFERENCE

PROPOSED TERM OF REFERENCE PROPOSED TERM OF REFERENCE FOR ESTABLISHMENT OF PROPOSED MOLASSES/GRAIN BASED DISTILLERY HAVING CAPACITY: 160.0 KLD (MOLASSES BASED) OR 120.0 KLD (MOLASSES BASED) + 40.0 KLD (GRAIN BASED) ALONGWITH 7.0

More information

Pre-Feasibility Report For Khargone STPP Stage-I (2X660 MW) District- Khargone, Madhya Pradesh

Pre-Feasibility Report For Khargone STPP Stage-I (2X660 MW) District- Khargone, Madhya Pradesh 1.0 Executive Summary Name of Project: Name of Project Proponent: Location of the Project: Capacity & Unit Configurations: Land Requirement, Current Land Use and Availability: Water Requirement and Availability:

More information

Clearance Letter no. : MoEF Vide Letter no. J-11011/79/2003-IA-II (I) dated April 21, 2004

Clearance Letter no. : MoEF Vide Letter no. J-11011/79/2003-IA-II (I) dated April 21, 2004 Name of the Project: Jaypee Rewa Plant, Unit of M/s Jaiprakash Associates Limited for expansion Of cement production from 2.5 MTPA to 3.5 MTPA at Jaypee Nagar, District Rewa, Madhya Pradesh Project Code:

More information

V.S LIGNITE POWER Pvt. Ltd AT VILLAGE-GURHA, KOLAYAT, BIKANER, RAJASTHAN

V.S LIGNITE POWER Pvt. Ltd AT VILLAGE-GURHA, KOLAYAT, BIKANER, RAJASTHAN V.S LIGNITE POWER Pvt. Ltd AT VILLAGE-GURHA, KOLAYAT, BIKANER, RAJASTHAN HALF YEARLY REPORT FOR THE PERIOD OCTOBER, 2011 to MARCH 2012 V. S. Lignite Power Pvt. Ltd. Name of the Project : 1x 135 MW Lignite

More information

SIX MONTHLY COMPLIANCE REPORT JUNE- 2015

SIX MONTHLY COMPLIANCE REPORT JUNE- 2015 SIX MONTHLY COMPLIANCE REPORT JUNE- 2015 Group Housing Complex My woods AT Plot no. GH-04, Sector -16 C, Noida Extension, Greater Noida, U.P. Being developed by M/s Mahagun India Pvt. Ltd. A-19, Sector-63,

More information

4.0 ENVIRONMENTAL IMPACTS AND MITIGATION MEASURES. Negative or adverse impacts during the construction phase are:

4.0 ENVIRONMENTAL IMPACTS AND MITIGATION MEASURES. Negative or adverse impacts during the construction phase are: 4.0 ENVIRONMENTAL IMPACTS AND MITIGATION MEASURES 4.1 POTENTIAL ENVIRONMENTAL IMPACTS 4.1.1 Impacts during Construction Phase Negative or adverse impacts during the construction phase are: Land environment:

More information

JAYPEE NIGRIE SUPER THERMAL POWER PROJECT

JAYPEE NIGRIE SUPER THERMAL POWER PROJECT JAYPEE NIGRIE SUPER THERMAL POWER PROJECT (A Unit of M/s Jaiprakash Power Ventures Limited) Villages: Nigrie, Tehsil :Sarai District: Singrauli 2014 2015 SUBMITTED M.P. POLLUTION CONTROL BOARD BHOPAL (M.P.)

More information

The Chemical Industry and Climate Change. A Snapshot from India

The Chemical Industry and Climate Change. A Snapshot from India The Chemical Industry and Climate Change A Snapshot from India B.H. Rahill Lead Environmental Specialist South Asia Environment June 14, 2006 Presentation Outline The Indian Situation (Part of) LBNL Benchmarking

More information

TERMS OF REFERENCE. Identification of the sources of pollution and assessing the impacts on the environment due to proposed project if any;

TERMS OF REFERENCE. Identification of the sources of pollution and assessing the impacts on the environment due to proposed project if any; TERMS OF REFERENCE 1.0 PROPOSED SCOPE OF WORK FOR EIA STUDY The components of the EIA study include: Determination of baseline data using primary data generation and secondary data available from various

More information

ENVIRONMENTAL MONITORING PROGRAMME

ENVIRONMENTAL MONITORING PROGRAMME Stage-I (2x800 MW) Page 1 5 CHAPTER - VI ENVIRONMENTAL MONITORING PROGRAMME 6.0 OBJECTIVES Regular monitoring program the environmental parameters is essential to take into account the changes in the environment.

More information

CMPDI. 4.6 Mine Closure Plan

CMPDI. 4.6 Mine Closure Plan 4.6 Mine Closure Plan Post-mining Land Use Planning The mine closure planning with regard to for Lekhapani OCP will broadly involve the following aspects: 1. Technical Aspects 2 Environmental Aspects 2.

More information

North East Roofing Pvt. Ltd. Expansion of Asbestos Cement Sheets & Accessories Manufacturing Unit (50,000 TPA to 70,000 TPA)

North East Roofing Pvt. Ltd. Expansion of Asbestos Cement Sheets & Accessories Manufacturing Unit (50,000 TPA to 70,000 TPA) SUMMARY ON ENVIRONMENTAL IMPACT ASSESSMENT REPORT OF North East Roofing Pvt. Ltd. Expansion of Asbestos Cement Sheets & Accessories Manufacturing Unit (50,000 TPA to 70,000 TPA) Proposed at: Bonda Industrial

More information

FORM-1. Sr. No 1 Name of the Project Harbour Heights 2 S. No. in the Schedule 8(b) Townships and Area Development projects.

FORM-1. Sr. No 1 Name of the Project Harbour Heights 2 S. No. in the Schedule 8(b) Townships and Area Development projects. (I) Basic Information FORM-1 Item Details 1 Name of the Project Harbour Heights 2 S.. in the Schedule 8(b) Townships and Area Development projects. 3 Proposed capacity/area /length/tonnage to be Total

More information

ENVIRONMENTAL IMPACT ASSESSMENT FOR PROPOSED CONSTRUCTION OF SEWAGE PUMPING STATION & SEWAGE TREATMENT PLANT

ENVIRONMENTAL IMPACT ASSESSMENT FOR PROPOSED CONSTRUCTION OF SEWAGE PUMPING STATION & SEWAGE TREATMENT PLANT ENVIRONMENTAL IMPACT ASSESSMENT FOR PROPOSED CONSTRUCTION OF SEWAGE PUMPING STATION & SEWAGE TREATMENT PLANT EXECUTIVE SUMMARY NAGERCOIL MUNICIPALITY, KANYAKUMARI DISTRICT TWAD BOARD,SEWERAGE DIVISION,NAGERCOIL

More information

Consultant: M/s. SADEKAR ENVIRO ENGINEERS PVT. LTD.

Consultant: M/s. SADEKAR ENVIRO ENGINEERS PVT. LTD. Summary For Ria Organics Private Limited, D-26/2, Kurkumbh - MIDC, Taluka - Daund Dist. Pune, Maharashtra, India. Consultant: M/s. SADEKAR ENVIRO ENGINEERS PVT. LTD. Accredited by QCI NABET Lab. Recognized

More information

Environmental Impact Assessment of Hydroelectric Power Plant LEEZA MALIK (2013CEP2080) TUSHAR SINGLA (2011MT50623)

Environmental Impact Assessment of Hydroelectric Power Plant LEEZA MALIK (2013CEP2080) TUSHAR SINGLA (2011MT50623) Environmental Impact Assessment of Hydroelectric Power Plant LEEZA MALIK (2013CEP2080) TUSHAR SINGLA (2011MT50623) 1 Contents Background Objective EIA of Hydroelectric plants Tools and Techniques used

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT VENSUB LABORATORIES PRIVATE LIMITED SY. NO. 29, TUPAKULAGUDEM VILLAGE, TALLAPUDI MANDAL, WEST GODAVARI DISTRICT, ANDHRA PRADESH PRE FEASIBILITY REPORT VENSUB LABORATORIES PRIVATE LIMITED Duplex No. 12,

More information

FORM V ENVIRONMENTAL STATEMENT REPORT FOR THE FINANCIAL YEAR M/s Halki Lime Stone Mine (Unit: J. K. Cement Limited) PART A

FORM V ENVIRONMENTAL STATEMENT REPORT FOR THE FINANCIAL YEAR M/s Halki Lime Stone Mine (Unit: J. K. Cement Limited) PART A (I) FORM V ENVIRONMENTAL STATEMENT REPORT FOR THE FINANCIAL YEAR 2013-14 M/s Halki Lime Stone Mine (Unit: J. K. Cement Limited) Name & Address of the Owner / Occupier of the Industry Operation or Process

More information

LANCO ANPARA POWER PVT. LTD

LANCO ANPARA POWER PVT. LTD LANCO ANPARA POWER PVT. LTD PLOT No. 229, PHASE-I, UDYOG VIHAR, GURGAON-122016, HARYANA Ph: 0124 4691000-04, 2341625, Fax: 0124 2341627, 4691005 SUMMARY OF RAPID ENVIRONMENTAL IMPACT ASSESSMENT AND ENVIRONMENTAL

More information

No. J-l1015/313/2010-IA.II (M) Government of India Ministry of Environment & Forests

No. J-l1015/313/2010-IA.II (M) Government of India Ministry of Environment & Forests No. J-l1015/313/2010-IA.II (M) Government of India Ministry of Environment & Forests Paryavaran Bhavan, C.G.O. Complex, Lodi Road, New Delhi-110 003. Dated the 28th June, 2013 To, M/ s Arbind Kumar Singh

More information

16 Management of Natural Resources

16 Management of Natural Resources Assignments in Science Class X (Term II) 16 Management of Natural Resources 1. We can manage and conserve our natural resources as well as the environment through sustainable development. 2. Sustainable

More information

Environmental Guideline on Stone crushing plant set up temporarily for the purpose of a project by a public department

Environmental Guideline on Stone crushing plant set up temporarily for the purpose of a project by a public department 2017 [Type a quote from the document or the summary of an interesting point. You can position the text box anywhere in the document. Use the Drawing Tools tab to change the formatting of the pull quote

More information

PRE FEASIBILITY REPORT. For PROPOSED BULK DRUG PRODUCTS MANUFACTURING UNITS. M/s. M.K. DRUGS. F-10, Industrial Area, Focal Point, Tehsil: Derabassi

PRE FEASIBILITY REPORT. For PROPOSED BULK DRUG PRODUCTS MANUFACTURING UNITS. M/s. M.K. DRUGS. F-10, Industrial Area, Focal Point, Tehsil: Derabassi PRE FEASIBILITY REPORT For PROPOSED BULK DRUG PRODUCTS MANUFACTURING UNITS Of M/s. M.K. DRUGS F-10, Industrial Area, Focal Point, Tehsil: Derabassi Dist: Mohali, Punjab INTRODUCTION M/s. M.K. Drugs is

More information

Form -1. [Vide Notification dated 1 st December 2009] FOR PROPOSED. COSTAL ROAD AT DRONAGIRI, NAVI MUMBAI Precast RCC Bridges On Holding Ponds-

Form -1. [Vide Notification dated 1 st December 2009] FOR PROPOSED. COSTAL ROAD AT DRONAGIRI, NAVI MUMBAI Precast RCC Bridges On Holding Ponds- Project Name : Design and Construction of Precast Arch Bridges(3s.) on Holding Pond. 3A, 3 & 4 for Form -1 [Vide tification dated 1 st December 2009] FOR PROPOSED COSTAL ROAD AT DRONAGIRI, NAVI MUMBAI

More information

No. 138 /PS-MS/MPPCB/SEAC/TOR (75)/2011 Bhopal, dt. 03 /06/2011. Env. Consultant: Créative Enviro Service, Bhopal. (SN-29)

No. 138 /PS-MS/MPPCB/SEAC/TOR (75)/2011 Bhopal, dt. 03 /06/2011. Env. Consultant: Créative Enviro Service, Bhopal. (SN-29) 1 By: Speed-Post State Level Expert Appraisal Committee (Formed as per S.O. no. 1533 dated 14 th Sept 2006 of Government of India, Ministry of Environment & Forests) PARYAWARAN PARISAR, E-5, ARERA COLONY,

More information

2 No. Continuous Ambient Air Quality Monitoring System (CAAQMS) installed in downwind & upwind direction and are connected to APPCB server.

2 No. Continuous Ambient Air Quality Monitoring System (CAAQMS) installed in downwind & upwind direction and are connected to APPCB server. Environmental Clearance Point Wise Half Yearly Compliance Report (October 2014 to March 2015) Cement Plant - EC No: F.No. J-11011/450/2007-IA II(I) Dated: 24 th March 2008 A. SPECIFIC CONDITIONS : S.NO.

More information

.in Dated 9th August, Sharma ;

.in Dated 9th August, Sharma  ; F. No. J-11011/151/2010-IA II (I) Government of India Ministry of Environment and Forests (I.A. Division) Paryavaran Bhawan CGO Complex, Lodhi Road New Delhi -110 003.. To, Ankleshwar E-mail: pb.rastoai@nic.in

More information

COAL STOCKPILES IN INDIAN POWER PLANTS. H Ramakrishna TCE Consulting Engineers Limited 73/1, St Marks Road, Bangalore , Karnataka, India

COAL STOCKPILES IN INDIAN POWER PLANTS. H Ramakrishna TCE Consulting Engineers Limited 73/1, St Marks Road, Bangalore , Karnataka, India SUMMARY: Coal will be transported to the power plant by belt conveyors in case of pit head power plants. In case of power plants located far away from the mines, coal will be transported by rail. In some

More information

RECLAMATION OF COAL MINE VOID

RECLAMATION OF COAL MINE VOID RECLAMATION OF COAL MINE VOID Reclamation of Coal Mine Void with Fly Ash Filling of mine voids with fly ash in an environmental sound process is the most viable option of bulk utilisation. This not only

More information

CHAPTER 3 POLICY, LEGAL AND ADMINISTRATIVE FRAMEWORK

CHAPTER 3 POLICY, LEGAL AND ADMINISTRATIVE FRAMEWORK CHAPTER 3 POLICY, LEGAL AND ADMINISTRATIVE FRAMEWORK 3.1 Introduction Current national environmental policies are based on the need to take an integrated approach to environmental management and the need

More information

Particulate Emission Monitoring HN Pathak Supdtg Engr Madhya Pradesh Power Generation Co. Ltd

Particulate Emission Monitoring HN Pathak Supdtg Engr Madhya Pradesh Power Generation Co. Ltd Particulate Emission Monitoring HN Pathak Supdtg Engr Madhya Pradesh Power Generation Co. Ltd MADHYA PRADESH POWER GENERATING Co. Ltd. INTRODUCTION Satpura Thermal Power Station is an oldest running plant

More information

February Reference Section in Supplemental. Reference Section in Consultants Reports. Reference Section in Application. TOR No.

February Reference Section in Supplemental. Reference Section in Consultants Reports. Reference Section in Application. TOR No. Request i Final Terms of Environmental Impact Assessment Report for Coal Valley Resources Inc. (CVRI) Proposed Robb Trend Project Cross (Concordance) Table to Location in ii PURPOSE OF THE TERMS OF REFERENCE

More information

SCHEDULE. FORM A (Rule 3(1)) THE CERTIFICATE OF ENVIRONMENTAL CLEARANCE RULES 2001 APPLICATION FOR A CERTIFICATE OF ENVIRONMENTAL CLEARANCE

SCHEDULE. FORM A (Rule 3(1)) THE CERTIFICATE OF ENVIRONMENTAL CLEARANCE RULES 2001 APPLICATION FOR A CERTIFICATE OF ENVIRONMENTAL CLEARANCE SCHEDULE FORM A (Rule 3(1)) THE CERTIFICATE OF ENVIRONMENTAL CLEARANCE RULES 2001 APPLICATION FOR A CERTIFICATE OF ENVIRONMENTAL CLEARANCE This form must be completed in triplicate for any proposed activity

More information

VALLIAMMAI ENGINEERING COLLEGE

VALLIAMMAI ENGINEERING COLLEGE VALLIAMMAI ENGINEERING COLLEGE SRM Nagar, Kattankulathur 603 203 DEPARTMENT OF ELECTRONICS AND INSTRUMENTATION ENGINEERING QUESTION BANK III SEMESTER GE6351 Environmental Science and Engineering Regulation

More information

SINGHAL ENTERPRISES PRIVATE LIMITED

SINGHAL ENTERPRISES PRIVATE LIMITED SINGHAL ENTERPRISES PRIVATE LIMITED (INTEGRATED MINI STEEL & POWER PLANTS) Taraimal Village, Gharghoda Mandal, Raigarh District, Chattisgarh State. 1.0 INTRODUCTION SINGHAL ENTERPRISES PRIVATE LIMITED

More information

Molvan- Chhamuchhal Group Gram Panchayat. Taluka- Mangrol, District- Surat. Ph. No

Molvan- Chhamuchhal Group Gram Panchayat. Taluka- Mangrol, District- Surat. Ph. No Serial Number FORM 1 (Application for Environment Clearance Certificate) Item 1. Name of the project/s 2. S. No. in the schedule 3. Proposed capacity/ area/ length/ tonnage to be handled/ command area/lease

More information

CHECK LIST OF DOCUMENTS / OTHER REQUISITES FOR OBTAINING VARIOUS CLEARANCES FROM THE STATE POLLUTION CONTROL BOARD, ODISHA.

CHECK LIST OF DOCUMENTS / OTHER REQUISITES FOR OBTAINING VARIOUS CLEARANCES FROM THE STATE POLLUTION CONTROL BOARD, ODISHA. CHECK LIST OF DOCUMENTS / OTHER REQUISITES FOR OBTAINING VARIOUS CLEARANCES FROM THE STATE POLLUTION CONTROL BOARD, ODISHA. A. CONSENT TO ESTABLISH UNDER THE PROVISIONS OF WATER (PREVENTION & CONTROL OF

More information

HALF YEARLY COMPLIANCE REPORT OF ENVIRONMENTAL CLEARANCE CONDITIONS

HALF YEARLY COMPLIANCE REPORT OF ENVIRONMENTAL CLEARANCE CONDITIONS HALF YEARLY COMPLIANCE REPORT OF ENVIRONMENTAL CLEARANCE CONDITIONS 1. Name of the Project: M/s MCC PTA India Corp. Private Limited Haldia ( WB) Note: Company Name was change from MCC PTA India Corp.Private

More information

PROJECT FEASIBILITY REPORT

PROJECT FEASIBILITY REPORT PROJECT FEASIBILITY REPORT FOR OBTAINING PRIOR ENVIRONMENT CLEARANCE For PROPOSED CHEMICAL MANUFACTURING UNIT From M/s. MORADIA BROTHERS CHEM PVT LTD LOCATED AT: Block No.: 45, JalBhumi Industrial Estate,

More information

Excerpt of Thermal Power Guidelines for New Plants

Excerpt of Thermal Power Guidelines for New Plants Excerpt of Thermal Power Guidelines for New Plants The following is an excerpt of the Thermal Power guidelines for New Plants, a complete version of which is found in the Pollution Prevention and Abatement

More information

4. The ambient air quality monitoring stations We are monitoring the ambient air quality

4. The ambient air quality monitoring stations We are monitoring the ambient air quality GLOBAL CALCIUM PRIVATE LTD., 125&126, SIPCOT COMPLEX, HOSUR 635 126 Ref : No. J-11011/411/2006-IA-II(I) dated 1 st August 2007. Compliance Report for the Period ending 31.3.2015 Sl. Specific Conditions

More information

Monitoring of IFC s Response to: CAO Audit of IFC Investment in Coastal Gujarat Power Limited, India

Monitoring of IFC s Response to: CAO Audit of IFC Investment in Coastal Gujarat Power Limited, India MONITORING REPORT CAO Audit of IFC CAO Compliance January 14, 2015 Monitoring of IFC s Response to: CAO Audit of IFC Investment in Coastal Gujarat Power Limited, India Office of the Compliance Advisor

More information

Country Questionnaire Prior to the Senior Officials Meeting on the 3R Initiative - INDIA -

Country Questionnaire Prior to the Senior Officials Meeting on the 3R Initiative - INDIA - Country Questionnaire Prior to the Senior Officials Meeting on the 3R Initiative - INDIA - [Country Questionnaire Survey] 1. Major developments regarding the strategies, policies and activities on the

More information

APPENDIX 2. Nova Scotia Department of Environment and Labour Environmental Assessment Terms and Conditions for Environmental Assessment Approval

APPENDIX 2. Nova Scotia Department of Environment and Labour Environmental Assessment Terms and Conditions for Environmental Assessment Approval APPENDIX 2 Nova Scotia Department of Environment and Labour Terms and Conditions for Approval Approval Approval Date: March 14, 2007 Keltic Petrochemicals Inc. LNG and Petrochemical Plant Facilities Keltic

More information

6 Risk assessment methodology

6 Risk assessment methodology Risk assessment methodology 6 Risk assessment methodology 6.1 Introduction INPEX has committed to a systematic risk assessment process as a means of achieving best practice in environmental management

More information

Nuclear Power Generation: Water Needs and Environmental Impacts

Nuclear Power Generation: Water Needs and Environmental Impacts Nuclear Power Generation: Water Needs and Environmental Impacts Nebiyu Tiruneh, Richard Raione, Hosung Ahn, Mark McBride, Joseph Giacinto United States Nuclear Regulatory Commission 2011 GROUNDWATER PROTECTION

More information

Monitoring the Implementation of Environmental Safeguards

Monitoring the Implementation of Environmental Safeguards Monitoring the Implementation of Environmental Safeguards Ministry of Environment & Forest Western Region, Regional Office, Bhopal MONITORING REPORT PART I DATA SHEET RASHTRIYA CHEMICAS AND FERTILISERS

More information

ENVIRONMENTAL IMPACT ASSESSMENT (EIA) Dr. B. K. Bindhani Assistant Professor KIIT School of Biotechnology KIIT University, Bhubaneswar, Orissa, India

ENVIRONMENTAL IMPACT ASSESSMENT (EIA) Dr. B. K. Bindhani Assistant Professor KIIT School of Biotechnology KIIT University, Bhubaneswar, Orissa, India ENVIRONMENTAL IMPACT ASSESSMENT (EIA) Dr. B. K. Bindhani Assistant Professor KIIT School of Biotechnology KIIT University, Bhubaneswar, Orissa, India Review: Definition of EIA Environmental Impact Assessment

More information

MIDC, Nagpur Expansion of Existing Butibori Industrial Area (BIA Phase II) - Form-1

MIDC, Nagpur Expansion of Existing Butibori Industrial Area (BIA Phase II) - Form-1 ANNEXURE I SITE LOCATION MAP Building Environment (India) Pvt. Ltd 1 ANNEXURE II LAYOUT PLAN Building Environment (India) Pvt. Ltd 2 ANNEXURE III LAND DETAILS Sr. No. LAND DETAILS (In Ha.) 1. LARGE SIZE

More information

Summary of Preparatory Study

Summary of Preparatory Study Summary of Preparatory Study 1. Title of the Cooperation Project, Relevant Project Report Preparatory Survey on the Project for the Establishment of Rural Water Supply System in Kambia Town in the Republic

More information

Environmental Management Plan (EMP)

Environmental Management Plan (EMP) SE DELI GS DRIFT MI E ORA GE RIVER MI ES MI I G ACTIVITIES A D PROPOSED EW I PIT SLIMES DISPOSAL Environmental Management Plan (EMP) Compiled for: Namdeb Diamond Corporation (Pty) Ltd Compiled by: Unit

More information

INTERNATIONAL O&M CONFERENCE

INTERNATIONAL O&M CONFERENCE INTERNATIONAL O&M CONFERENCE COAL SUPPLY CHALLENGES & WAY FORWARD 14 TH FEB 2012 - BY DK SAHA, DGM(FM) & JANARTHAN C. DGM(FM) Electricity Per Capita consumption India Egypt China Brazil World Average Russia

More information

Visakhapatnam Steel Plant Rashtriya Ispat Nigam Ltd.

Visakhapatnam Steel Plant Rashtriya Ispat Nigam Ltd. Visakhapatnam Steel Plant Rashtriya Ispat Nigam Ltd. Half yearly Environment Compliance Report in respect of stipulated conditions while issuing Environmental Clearance Rashtriya Ispat Nigam Limited -

More information

CAMLICA ELEKTRIK URETIM A.S. CAMLICA III RESERVOIR AND HYDROELECTRIC POWER PLANT (HEPP) ENVIRONMENTAL MANAGEMENT PLAN (EMP)

CAMLICA ELEKTRIK URETIM A.S. CAMLICA III RESERVOIR AND HYDROELECTRIC POWER PLANT (HEPP) ENVIRONMENTAL MANAGEMENT PLAN (EMP) Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized CAMLICA ELEKTRIK URETIM A.S. CAMLICA III RESERVOIR AND HYDROELECTRIC POWER PLANT (HEPP)

More information

12 Oct Virama Karya presentation on South Coast Highway. Therefore require a new route expressway

12 Oct Virama Karya presentation on South Coast Highway. Therefore require a new route expressway in association with Design 151.66 Km (Existing Road Apr. 180 km) 2 OBJECTIVE: The Government of Timor Lestewishes to Engage Consultant to carry out the Preliminary, Detailed Engineering Design and Environment

More information

Cooling Tower Blowdown Treatment and Reuse in a Coal Fired Power Plant in India - Reducing the water footprint in coal fired power plants -

Cooling Tower Blowdown Treatment and Reuse in a Coal Fired Power Plant in India - Reducing the water footprint in coal fired power plants - Powergen Bangkok 3 rd October 2103 Session 5 Intake, Cooling and Blowdown Treatment Considerations Cooling Tower Blowdown Treatment and Reuse in a Coal Fired Power Plant in India - Reducing the water footprint

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT TATA CONSULTING ENGINEERS LIMITED PRE FEASIBILITY REPORT FOR 4000 MW COAL BASED ULTRA MEGA POWER PLANT AT HUSAINABAD, DEOGHAR DISTRICT, JHARKHAND, INDIA Project Proponent: Deoghar Mega Power Limited A

More information

Environmental and socioeconomic impacts of surface mining operations: A review of the Greek experience

Environmental and socioeconomic impacts of surface mining operations: A review of the Greek experience Environmental and socioeconomic impacts of surface mining operations: A review of the Greek experience Francis F. Pavloudakis Public Power Corporation SA West Macedonia Lignite Centre, P.O.Box 21, Ptolemais

More information

ENVIRONMENTAL FACTORS

ENVIRONMENTAL FACTORS Comparison of Fuels Used for Electric Generation in the U.S, 2014 Update Study Details ENVIRONMENTAL FACTORS Natural Gas, Combined Cycle 400 MW Typically, a gas fired combined cycle plant must control

More information

Phase II (BIA Phase-II),

Phase II (BIA Phase-II), PROJECT PREFEASIBILITY REPORT FOR OBTAINING PRIOR ENVIRONMENTAL CLEARENCE IN TERMS OF PROVISIONS OF EIA NOTIFICATION-2006 1.0 EXECUTIVE SUMMARY OF THE PROJECT Sr. No Description Details 1 Proposed project

More information

GUIDE TO THE DEVELOPMENT OF A MINING AND RECLAMATION PLAN IN NEW BRUNSWICK

GUIDE TO THE DEVELOPMENT OF A MINING AND RECLAMATION PLAN IN NEW BRUNSWICK PROVINCE OF NEW BRUNSWICK DEPARTMENT OF ENERGY AND RESOURCE DEVELOPMENT Minerals and Petroleum Development Branch GUIDE TO THE DEVELOPMENT OF A MINING AND RECLAMATION PLAN IN NEW BRUNSWICK Guide to the

More information

MINING REGULATIONS IN FOREST AND ECO-FRAGILE AREAS A PRESENTATION BY RAJEEVA, IFS, ADDITIONAL PRINCIPAL CHIEF CONSERVATOR OF FORESTS.

MINING REGULATIONS IN FOREST AND ECO-FRAGILE AREAS A PRESENTATION BY RAJEEVA, IFS, ADDITIONAL PRINCIPAL CHIEF CONSERVATOR OF FORESTS. MINING REGULATIONS IN FOREST AND ECO-FRAGILE AREAS A PRESENTATION BY RAJEEVA, IFS, ADDITIONAL PRINCIPAL CHIEF CONSERVATOR OF FORESTS. MINERAL RESOURCES IN INDIA The mineral resources in India consist of

More information

Ukraine Sustainable Energy Lending Facility (USELF) Strategic Environmental Review (SER) Ecoline EA Centre

Ukraine Sustainable Energy Lending Facility (USELF) Strategic Environmental Review (SER) Ecoline EA Centre Ukraine Sustainable Energy Lending Facility (USELF) Strategic Environmental Review (SER) Ecoline EA Centre Objectives of Strategic Environmental Review (SER) The European Bank for Reconstruction and Development

More information

Factor Potential Effects Mitigation Measures

Factor Potential Effects Mitigation Measures Natural Environment No impacts of provincial significance to the natural environment are anticipated for the rapid transit project. Other impacts and how they will be mitigated are outlined in the table

More information

Telephone Lake project

Telephone Lake project Telephone Lake project Cenovus Energy Inc. is a Canadian oil company. We re committed to applying fresh, progressive thinking to safely and responsibly unlock energy resources the world needs. Our operations

More information

Total No. of Questions : 5] [Total No. of Printed Pages : 2 [3683]-1. P. G. D. E. M. (Semester - I) Examination

Total No. of Questions : 5] [Total No. of Printed Pages : 2 [3683]-1. P. G. D. E. M. (Semester - I) Examination Total No. of Questions : 5] [Total No. of Printed Pages : 2 [3683]-1 P. G. D. E. M. (Semester - I) Examination - 2009 ENVIRONMENTAL MANAGEMENT TECHNIQUES - I (1) Answer any four questions. (3) Use of calculator

More information

Yes: Y No: N (a) (b) (c) (d) (a) (a) (b) (c) (d) (e)

Yes: Y No: N (a) (b) (c) (d) (a) (a) (b) (c) (d) (e) Checklist: 3. Hydropower Stations, Dams and Reservoirs (1) 1 Permits and Explanation 2 Pollution Control (1) EIA and Permits (2) Explanation to the Local Stakeholders Main Check s Have EIA reports been

More information

Naubasta Lime Stone Mine ML - I Jaypee Rewa Plant Jaiprakash Associates Limited

Naubasta Lime Stone Mine ML - I Jaypee Rewa Plant Jaiprakash Associates Limited Naubasta Lime Stone Mine ML - I Jaypee Rewa Plant Jaiprakash Associates Limited Introduction: Jaypee Group is the 3 rd largest cement producer in the country. The Groups cement facilities are located in

More information

Viridor Waste Management. Proposed Development of an In-Vessel Composting Facility. Land at Exide Batteries, Salford Road, Bolton

Viridor Waste Management. Proposed Development of an In-Vessel Composting Facility. Land at Exide Batteries, Salford Road, Bolton Viridor Waste Management Proposed Development of an In-Vessel Composting Facility Land at Exide Batteries, Salford Road, Bolton Non-Technical Summary January 2009 Introduction Viridor Waste Management

More information

Gold Standard Passport CONTENTS

Gold Standard Passport CONTENTS Gold Standard Passport CONTENTS A. Project title B. Project description C. Proof of project eligibility D. Unique Project Identification E. Outcome stakeholder consultation process F. Outcome sustainability

More information

Environmental and Social Review Summary. Ejuva One and Ejuva Two Solar Projects

Environmental and Social Review Summary. Ejuva One and Ejuva Two Solar Projects Environmental and Social Review Summary Ejuva One and Ejuva Two Solar Projects This Environmental and Social Review Summary (ESRS) is prepared by MIGA staff and disclosed prior to the date on which MIGA

More information

Water Use, Electric Power, and Nuclear Energy: Environmental Stewardship. William Skaff Nuclear Energy Institute September 15, 2009

Water Use, Electric Power, and Nuclear Energy: Environmental Stewardship. William Skaff Nuclear Energy Institute September 15, 2009 Water Use, Electric Power, and Nuclear Energy: A Holistic Approach to Environmental Stewardship William Skaff Nuclear Energy Institute September 15, 2009 Assumption: Energy Diversityit In addition to efficiency

More information

ENVIRONMENT ACT TERMS OF REFERENCE NOVA SCOTIA DEPARTMENT OF TRANSPORTATION AND PUBLIC WORKS. Beaver Bank Bypass

ENVIRONMENT ACT TERMS OF REFERENCE NOVA SCOTIA DEPARTMENT OF TRANSPORTATION AND PUBLIC WORKS. Beaver Bank Bypass ENVIRONMENT ACT TERMS OF REFERENCE NOVA SCOTIA DEPARTMENT OF TRANSPORTATION AND PUBLIC WORKS Beaver Bank Bypass Highway 101 to the Beaver Bank Road Halifax County, NS NOVA SCOTIA DEPARTMENT OF THE ENVIRONMENT

More information

WE EEN Wizard of the Environment: the Enterprise Europe Network. Eurosportello del Veneto Via delle Industrie 19/C Venezia

WE EEN Wizard of the Environment: the Enterprise Europe Network. Eurosportello del Veneto Via delle Industrie 19/C Venezia WE EEN Wizard of the Environment: the Enterprise Europe Network Eurosportello del Veneto Via delle Industrie 19/C Venezia Directive 2008/98/EC on waste (Waste Framework Directive) The Directive introduces

More information

A MODEL FOR EFFICIENT RESOURCE UTILIZATION: DEVELOPMENT AND VALIDATION. Abstract

A MODEL FOR EFFICIENT RESOURCE UTILIZATION: DEVELOPMENT AND VALIDATION. Abstract A MODEL FOR EFFICIENT RESOURCE UTILIZATION: DEVELOPMENT AND VALIDATION B.V. Babu 1 * and V. Ramakrishna 2 Birla Institute of Technology & Science Pilani 333031 Abstract The population growth is increasing

More information

Dr. NARLA TATA RAO THERMAL POWER STATION (Dr. NTTPS) STAGE V (1X800 MW)

Dr. NARLA TATA RAO THERMAL POWER STATION (Dr. NTTPS) STAGE V (1X800 MW) FORM 1 AND TOR FOR Dr. NARLA TATA RAO THERMAL POWER STATION (Dr. NTTPS) STAGE V (1X800 MW) Submitted by ANDHRA PRADESH POWER GENERATION CORPORATION LTD (APGENCO) Vidyut Soudha, Hyderabad 500 082 1 ANDHRA

More information

KENT BREEZE WIND FARMS

KENT BREEZE WIND FARMS Decommissioning Plan Report MAY 2010 TABLE OF CONTENTS 1. INTRODUCTION... 1 2. DECOMMISSIONING PROCESS DESCRIPTION... 2 3. SITE RESTORATION... 3 4. EXCESS MATERIALS AND WASTE MANAGEMENT... 4 5. MANAGING

More information

PRE-FEASIBILITY REPORT

PRE-FEASIBILITY REPORT PRE-FEASIBILITY REPORT For ToR of Proposed Project of MANUFACTURING OF SYNTHETIC ORGANIC DYES (5 f B IND II) By SHREEJI BAPA DYE CHEM PLOT NO 1319 & 1320, PHASE-III, GIDC, VATVA, AHEMADABAD-382445, GUJARAT,

More information

"Biogas Technology Development and Evaluation for Bottling and Bio-CNG Applications"

Biogas Technology Development and Evaluation for Bottling and Bio-CNG Applications "Biogas Technology Development and Evaluation for Bottling and Bio-CNG Applications" Dr. Rimika Kapoor Prof. Virendra K. Vijay Centre for Rural Development & Technology IIT, Delhi vkvijay@rdat.iitd.ernet.in

More information

SCOPE OF WORK TECHNICAL SPECIFICATIONS

SCOPE OF WORK TECHNICAL SPECIFICATIONS SCOPE OF WORK & TECHNICAL SPECIFICATIONS PROJECT DESCRIPTION/ SITE INFORMATION New storage depot is to be constructed at Bokaro in the state of Jharkhand. This tender envisages carrying out HAZOP Study,

More information

NPDES COMPLIANCE OF COOLING TOWERS BLOWDOWN AT POWER PLANTS WITH RECLAIMED WATER AS SOURCE WATER

NPDES COMPLIANCE OF COOLING TOWERS BLOWDOWN AT POWER PLANTS WITH RECLAIMED WATER AS SOURCE WATER NPDES COMPLIANCE OF COOLING TOWERS BLOWDOWN AT POWER PLANTS WITH RECLAIMED WATER AS SOURCE WATER Nathan Schmaus, P.E. *, Joseph Viciere, P.E., BCEE, CDM Smith CDM Smith, 1715 North Westshore Boulevard,

More information

PROJECT BRIEF. Noise environment: No Entrant noise generation sources exist in and around project area.

PROJECT BRIEF. Noise environment: No Entrant noise generation sources exist in and around project area. PROJECT BRIEF PROJECT LOCATION: - Pahar Kua Marble Range Mining Project Q L No 235 is located near village Pahar Kua, Tehsil Makrana., District Nagaur Rajasthan. Project is approachable from national highway.

More information

Water Recycling and Reuse

Water Recycling and Reuse Water Recycling and Reuse WATER RECYCLING Water recycling is reusing treated wastewater for beneficial purposes such as agricultural and landscape irrigation, industrial processes, toilet flushing, and

More information

FORM I I. BASIC INFORMATION S. No. Proposed Mixed Use Development Project SPR Binny 2 S. no. in the schedule 8 (b) 1 Name of the project

FORM I I. BASIC INFORMATION S. No. Proposed Mixed Use Development Project SPR Binny 2 S. no. in the schedule 8 (b) 1 Name of the project FORM I I. BASIC INFORMATION. Item Details 1 Name of the project Proposed Mixed Use Development Project SPR Binny 2 no. in the schedule 8 (b) 3 Proposed area Area Details: Total land area: 200243.50 Sqm

More information

Information Request 37

Information Request 37 Information Request 37 Information Request 37 37-1 Response to Information Request 37 Response to Information Requests 37a Response to Information Requests 37b 37-3 37-5 Federal Review Panel Information

More information

Checklist in respect of selection of Design Consultancy for EER&M of Parli TPS (U-3)

Checklist in respect of selection of Design Consultancy for EER&M of Parli TPS (U-3) Checklist in respect of selection of Design Consultancy for EER&M of Parli TPS (U-3) (a) Names of all consultants who submitted proposals; 1. M/s Tractable Engineers Pvt.Ltd New Delhi 2. M/s Evonik Energy

More information

The unit obtained NOC (CFE) of A.P. Pollution control Board in the year 1988 and started operations.

The unit obtained NOC (CFE) of A.P. Pollution control Board in the year 1988 and started operations. 1. Introduction M/s. Sri Krishna Pharmaceuticals Limited, Unit-III (Formerly Sri Krishna Drugs Limited) was established in the year 1988. It is located at Sy. No. 57, Golkonda kalan, Raikunta (V), shamshabad

More information

Sustainable Solutions In Energy & Environment

Sustainable Solutions In Energy & Environment Sustainable Solutions In Energy & Environment Thermax Group, a billion dollar company, provides a range of engineering solutions to the energy and environment sectors. Our presence spans 75 countries across

More information

COAL, OIL SHALE, NATURAL BITUMEN, HEAVY OIL AND PEAT Vol. II -Environmental Impacts of Oil Shale and Pollution Control Technologies - J. Q.

COAL, OIL SHALE, NATURAL BITUMEN, HEAVY OIL AND PEAT Vol. II -Environmental Impacts of Oil Shale and Pollution Control Technologies - J. Q. ENVIRONMENTAL IMPACTS OF OIL SHALE AND POLLUTION CONTROL TECHNOLOGIES J. Q. Wan School of Chemical Engineering, University of Petroleum, Beijing, China Keywords : Environmental impacts, Pollution control,

More information

407 TRANSITWAY. Planning & Preliminary Design

407 TRANSITWAY. Planning & Preliminary Design FROM EAST OF HIGHWAY 400 TO KENNEDY ROAD GWP #252-96-00 Public Information Centre #2 June 24 th and 29 th, 2010 Purpose of Public Information Centre #2 The first Public Information Centre (PIC #1) was

More information

Aus dem Institut für Betriebswirtschaft, Agrarstruktur und ländliche Räume

Aus dem Institut für Betriebswirtschaft, Agrarstruktur und ländliche Räume Aus dem Institut für Betriebswirtschaft, Agrarstruktur und ländliche Räume Heike Nitsch Good farming practice - definitions, implementation, experiences : Report on the results of work package 2 within

More information

Cooling Tower Blowdown Treatment and Reuse in a Coal Fired Power Plant in India Reducing the water footprint in coal fired power plants

Cooling Tower Blowdown Treatment and Reuse in a Coal Fired Power Plant in India Reducing the water footprint in coal fired power plants Cooling Tower Blowdown Treatment and Reuse in a Coal Fired Power Plant in India Reducing the water footprint in coal fired power plants Author name Deepak Kachru Company Aquatech Systems (Asia) Pvt. Ltd.

More information

M/s. SAL STEEL LTD Survey no.245/p, Village:-Bharapar, Taluka:- Gandhidham, District:-Kutch, Gujarat.

M/s. SAL STEEL LTD Survey no.245/p, Village:-Bharapar, Taluka:- Gandhidham, District:-Kutch, Gujarat. Pre-Feasibility Study Report For Proposed Fly Ash Co-processing clinker grinding cement Unit of 40,000 MT/month Production capacity within our Existing Premises for M/s. SAL STEEL LTD Survey no.245/p,

More information

THE RAMCO CEMENTS LIMITED

THE RAMCO CEMENTS LIMITED 1 P a g e 2 P a g e THE RAMCO CEMENTS LIMITED (Formerly Madras Cements Ltd.) COMPLIANCE REPORT FOR ENVIRONMENTAL CLEARANCE JAYANTHIPURAM NORTH BAND MINING LEASE 2.0 MILLION TPA CAPACITY EC Lr. No. : J-11015/377/2006-IA.II

More information

WESTINGHOUSE PLASMA GASIFICATION. Hazardous Waste Management

WESTINGHOUSE PLASMA GASIFICATION. Hazardous Waste Management WESTINGHOUSE PLASMA GASIFICATION Hazardous Waste Management Hazardous waste is just that hazardous. Medical, industrial and petrochemical wastes are all types of hazardous waste and pose threats to human

More information

Draft - Smart City Proposal. Kalyan Dombivli Municipal Corporation

Draft - Smart City Proposal. Kalyan Dombivli Municipal Corporation Draft - Smart City Proposal Kalyan Dombivli Municipal Corporation 1 1. Kalyan-Dombivli Introduction 2 Kalyan Dombivli Kalyan Dombivli and Titwala cities form KDMC jurisdiction; Population increased from

More information