1 APPENDIX 5 ENVIRONMENTAL IMPACT ASSESSMENT METHODOLOGY

2 ENVIRONMENTAL IMPACT ASSESSMENT METHODOLOGY In line with the Minerals and Petroleum Resource Development Act 20 of 2002 (MPRDA), an Impact Assessment is required for prospecting in terms of Section 39(3)(b). The requirements for the EIA include an an assessment of the nature, extent, duration probability, and significance of the identified potential environmental, social and cultural impacts of the proposed mining operation, including cumulative environmental impacts. In the baseline study of this document, the environmental parameters that can be impacted by the proposed prospecting activities are described; i.e. fauna, flora, surface hydrology, groundwater, etc. Each impact identified for the proposed prospecting project is ranked based on the categories detailed here, considering the consequence of the impact and the likelihood of its occurrence. Once the consequence and likelihood are ranked, the overall significance of an activity/impact is evaluated based on the total score. This value can be read off the matrix presented below. A significance ranking of LOW, MEDIUM or HIGH is then indicated. When reviewing the significance ranking, it is important to note that the impact score presented in has been ranked based on available information (desk study) and the assumption that no mitigation measures are implemented. By ranking in this way, it is possible to determine (qualitatively) if management measures are effective, through re-evaluation of the ranking assuming management measures are in place. Impacts that are associated with the proposed mining operation were determined in the following ways: Consultation with Interested and Affected Parties (I&AP), including: o Members of the public; o The local farmers group and individual farmers; o The Authorities; o The Municipality; Conducting a baseline environmental study, including: o Air Quality and Noise Assessment; o Soil Classification and Characterisation, Land Use and Land Capability Assessment; o Geological Assessment; o Hydrology and Hydrogeological Assessment; o Heritage Assessment; o Biodiversity Assessment; o Socio-economic Assessment. The method used to rank the impacts (determine significance) is described below.

3 Ranking of Impacts Criteria to Consider The ranking system used to determine the significance of the impacts resulting from prospecting was developed, taking cognizance of the requirements of the MPRDA. Regulation 50 of the MPRDA stipulates that the EIA must include an assessment of the nature, extent, duration, probability and significance of the identified environmental impacts. Therefore, for the purpose of this report, the significance ranking of mining related impacts will be determined through the evaluation of the following criteria: Criteria Nature / intensity of impact Spatial extent of impact Duration of impact Probability of potential occurrence Frequency of potential occurrence Overall Significance Abbreviation used in the Impact Assessment Nat Ext Dur Prob Freq OS Table Ranking of evaluation criteria CONSEQUENCE LIKELIHOOD Nature / Intensity / Severity of Impact: Low Impacts affect the environmental in such a way that natural, cultural and/or social functions and processes are not affected. Medium Impacts affect the environment in such a way that natural, cultural and/or social functions and processes are altered 3 High Impacts affect the environment in such a way that natural, cultural and/or social functions and processes will temporarily or permanently cease. 5 Spatial extent of Impact: On-site Impact occurs on-site. Local Impact occurs within 5km radium of the site. 2 Regional Impact occurs within a 00km radius of the site 3 National Impact occurs within South Africa 4 International Impact occurs internationally 5 Duration of Impact: Short-term Through dilution and dispersion, the impact reduces to insignificant within week. Medium-term Through dilution and dispersion, the impact reduces to insignificant within the life of the mine. 2 Long-term The impact will cease after the operational life of the mine either because of natural process or by human intervention 3 Permanent Where mitigation either by natural process or by human intervention will not occur in such a way or in such a time span that the impact can be 4 considered transient. Probability of potential occurrence of the Impact: Improbable The possibility of the impact materializing is very low either because of design or historic experience. Probable There is a distinct possibility that the impact will occur. 2 Highly probably It is most likely that the impact will occur. 3 Definite The impact will occur regardless of any prevention measures. 4 Frequency of potential occurrence of the Impact: Annually or less Impact occurs at least once in a year or less frequently. 6 months Impact occurs at least once in 6 months. 2 Monthly Impact occurs at least once a month. 3 Weekly Impact occurs at least once a week. 4 Daily Impact occurs daily. 5

4 Table 2 Significance Ranking Matrix LIKELIHOOD CONSEQUENCE The significance of impacts is determined based on the evaluation of an activity s impact in terms of; consequence and likelihood. Using the sum of the evaluated ranking within Table and the matrix in Table 2, overall significance can be classified as follows: Low Medium High Where it will not have a significant influence on the environment. Management measures can be proposed to ensure that significance does not increase. Where it could have a significant influence on the environment unless it is mitigated or managed. Where it would have a significant influence on the environment regardless of any possible mitigation and hence must be either avoided or managed As indicated previously, Regulation 50 of the MPRDA specifically lists the criteria to be used for evaluation, including the cumulative environmental impacts. In addition, comments from interested and affected parties (IAP) will also influence the ranking of impacts as these will vary from site to site. For example, where prospecting is being undertaken close to a residential area, concerns regarding dust and noise will have a higher significance ranking for prospecting that is far away from any human habitation. Similarly, the impact on the ecological environment will be greater in pristine environments than in disturbed areas. An explanation of these additional criteria is given below. Additional criteria that influence significance Abbreviation used in the Tables in Section 4 Cumulative impacts with off-site activities Cum Feedback from interested and affected parties IAP Seasonality Sea Cumulative Impacts Cumulative Impacts affect the significance ranking of an impact because it considers an impact in terms of both on-site (directly related to prospecting) and offsite (not related to prospecting) sources. Feedback from Interested and affected parties According to the MPRDA, the applicant must consult with IAPs and record their comments and concerns. Although the significance ranking (as described above) may evaluate an impact to have a medium impact, the members of the public may consider the impact as having a high significance. The concerns raised by the public will then be indicated with the significance ranking with management measures being proposed and implemented to address all realistic concerns raised by IAPs.

5 Seasonality Although seasonality is not considered in the ranking of the significance, if may influence the evaluation during various times of year. For example, during the summer/rainy months, the significance ranking of dust generation is likely to be low, while during winter, the significance of the impact will increase. As seasonality will only influence certain impacts, it will only be considered for these, with management measures being imposed accordingly (i.e. dust suppression measures being implemented during winter). Prioritising impacts for management The evaluation of the impacts, as described above, will be used to prioritise which impacts require mitigation measures. Management measures will be drawn up for negative impacts that are ranked as a medium - high significance. For impacts ranked as low significance, no alternatives will be considered but management measures may be proposed (where possible) to ensure that the impacts remain of low significance. Where an impact is considered to have a positive high to medium significance, commitments will be included that ensure these benefit are continued. Presentation of evaluation For ease of reference, the significance of each impact is tabulated in each subsection of the EIA. Tables highlighted in blue indicate a positive impact, while those highlighted in red indicate a negative impact.

4 PROJECT ALTERNATIVES

4 PROJECT ALTERNATIVES 4 PROJECT ALTERNATIVES 4.1 Introduction In terms of the EIA Regulations published in Government Notice R543 of 2 August 2010 in terms of Section 24 of the National Environmental Management Act (Act No.

More information

5. ENVIRONMENTAL IMPACT ASSESSMENT

5. ENVIRONMENTAL IMPACT ASSESSMENT 5. ENVIRONMENTAL IMPACT ASSESSMENT 5.1 INTRODUCTION Environmental Impact Assessment (EIA) is a process that considers how a proposed development will change existing environmental conditions, and what

More information

6 Risk assessment methodology

6 Risk assessment methodology Risk assessment methodology 6 Risk assessment methodology 6.1 Introduction INPEX has committed to a systematic risk assessment process as a means of achieving best practice in environmental management

More information

The three alternative sites were inspected by the specialists in order to:

The three alternative sites were inspected by the specialists in order to: 5. SITE SELECTION PROCESS UNDERTAKEN DURING THE ENVIRONMENTAL SCOPING STUDY The Environmental Scoping Study identified the potential positive and negative environmental (biophysical and social) impacts

More information

VLAKVARKFONTEIN COAL MINE

VLAKVARKFONTEIN COAL MINE VLAKVARKFONTEIN COAL MINE PURPOSE OF THIS DOCUMENT: This Background Information Document (BID) provides you, as an Interested and Affected Party (I&AP), an overview of the proposed project. The BID invites

More information

Environmental Impact Statement. Avoca Tank Project

Environmental Impact Statement. Avoca Tank Project ABN 88 100 095 494 Environmental Impact Statement for the Avoca Tank Project Prepared by: R.W. CORKERY & CO. PTY. LIMITED July 2014 This page has intentionally been left blank ABN 88 100 095 494 Environmental

More information

IMPORTANT NOTICE. Kindly note that:

IMPORTANT NOTICE. Kindly note that: 1 APPLICATION FORM FOR ENVIRONMENTAL AUTHORISATIONS IN TERMS OF THE NATIONAL ENVIRONMENTAL MANAGEMENT ACT, 1998 AND THE NATIONAL ENVIRONMENTAL MANAGEMENT WASTE ACT, 2008 IN RESPECT OF LISTED ACTIVITIES

More information

Appendix A Schedule of Amendments to the EIAR

Appendix A Schedule of Amendments to the EIAR Appendix A Schedule of Amendments to the EIAR EIAR Chapter Page Number Changes Made to the Original EIS Submitted Chapter 1 Introduction Update of all references from EIS to EIAR Update of references to

More information

Arafura Resouces Ltd. Nolans Environmental Impact Statement. volume one. Risk assessment. Chapter 5

Arafura Resouces Ltd. Nolans Environmental Impact Statement. volume one. Risk assessment. Chapter 5 Arafura Resouces Ltd Nolans volume one 05 Risk assessment Chapter 5 5. Risk assessment 5.1 Introduction This chapter provides a description of the whole-of-project risk assessment undertaken for the identification,

More information

Annesley Andalusite Mine: Section 24G Rectification Process. Consultation with community members 15 June 2017

Annesley Andalusite Mine: Section 24G Rectification Process. Consultation with community members 15 June 2017 Annesley Andalusite Mine: Section 24G Rectification Process Consultation with community members 15 June 2017 AGENDA Welcome and introduction Meeting protocol Purpose of the meeting Project background Project

More information

Environmental Setting, Impacts, and Mitigation Measures

Environmental Setting, Impacts, and Mitigation Measures First page header CHAPTER 4 Environmental Setting, Impacts, and Mitigation Measures 4.0 INTRODUCTION TO THE ENVIRONMENTAL ANALYSIS Sections 4.1 through 4.13 of Chapter 4 of this EIR contain a discussion

More information

TERMS OF REFERENCE. Identification of the sources of pollution and assessing the impacts on the environment due to proposed project if any;

TERMS OF REFERENCE. Identification of the sources of pollution and assessing the impacts on the environment due to proposed project if any; TERMS OF REFERENCE 1.0 PROPOSED SCOPE OF WORK FOR EIA STUDY The components of the EIA study include: Determination of baseline data using primary data generation and secondary data available from various

More information

BACKGROUND INFORMATION DOCUMENT:

BACKGROUND INFORMATION DOCUMENT: BACKGROUND INFORMATION DOCUMENT: APPLICATION FOR A MINING RIGHT MMAKAU COAL (PTY) LTD SCHURVEKOP 227 IS, BETHAL, MPUMALANGA 1. INTRODUCTION Mmakau Coal (Pty) Ltd intends to submit an application for a

More information

Annexure: Need & Desirability

Annexure: Need & Desirability Annexure: Need & Desirability Table 1 Need for the proposed expansion QUESTION: NEED (TIMING) OF PROPOSED PROJECT 1. Is the land use (associated with the activity being applied for) considered within the

More information

Appendix General Environmental Risk Analysis

Appendix General Environmental Risk Analysis Proposed Solar Power Station Near Moree, NSW (MOREE SOLAR FARM) Appendix Prepared by BP Solar & Walsh Consulting January 011 Background The body of the identifies all significant environmental risks identified

More information

In-combination and Cumulative Effects Assessment

In-combination and Cumulative Effects Assessment P O R T I S H E A D B R A N C H L I N E P R E L I M I N A R Y ENV I R O N M E N T A L I N F O R M A T I O N R E P O R T V O L U M E 2 C H A P T E R 18 In-combination and Cumulative Effects Assessment Table

More information

4 APPROACH TO THE ENVIRONMENTAL IMPACT ASSESSMENT

4 APPROACH TO THE ENVIRONMENTAL IMPACT ASSESSMENT 4 APPROACH TO THE ENVIRONMENTAL IMPACT ASSESSMENT 4.1 INTRODUCTION This section describes the broad principles of the methodology adopted for the EIA of the Proposed Development. EIA is a procedure required

More information

CONCLUSIONS AND RECOMMENDATIONS CHAPTER 7

CONCLUSIONS AND RECOMMENDATIONS CHAPTER 7 CONCLUSIONS AND RECOMMENDATIONS CHAPTER 7 The Environmental Scoping Study for the proposed activities within the Gauteng Province has been undertaken in accordance with the EIA Regulations which was published

More information

Section 3 - Consultation and Issue Identification

Section 3 - Consultation and Issue Identification ENVIRONMENTAL ASSESSMENT 3-1 MUDGEE STONE COMPANY PTY LTD 3Section 3 Consultation and Issue Identification P R E A M B L E This section describes how the environmental issues assessed in the Environmental

More information

ANNEX II. IUA (Oxford Brookes University) Review Package (Glasson et al., 2005) 1 DESCRIPTION OF THE DEVELOPMENT

ANNEX II. IUA (Oxford Brookes University) Review Package (Glasson et al., 2005) 1 DESCRIPTION OF THE DEVELOPMENT ANNEX II IUA (Oxford Brookes University) Review Package (Glasson et al., 2005) Principal features of the project 1 DESCRIPTION OF THE DEVELOPMENT 1.1 Explains the purpose(s) and the objectives of the development.

More information

NOTICE OF ENVIRONMENTAL IMPACT ASSESSMENT PROCESS: APPLICATION FOR THE MINING OF SAND AT BORROW PIT MR771/8.6/R/80, VAN WYKSVLEI, NORTHERN CAPE.

NOTICE OF ENVIRONMENTAL IMPACT ASSESSMENT PROCESS: APPLICATION FOR THE MINING OF SAND AT BORROW PIT MR771/8.6/R/80, VAN WYKSVLEI, NORTHERN CAPE. ENVIRONMENTAL AUTHORISATION AMENDMENT APPLICATION NOTICE OF ENVIRONMENTAL IMPACT ASSESSMENT PROCESS: APPLICATION FOR THE MINING OF SAND AT BORROW PIT MR771/8.6/R/80, VAN WYKSVLEI, NORTHERN CAPE. BACKGROUND

More information

Proposed Terms of Reference for EIA studies

Proposed Terms of Reference for EIA studies 1 Proposed Terms of Reference for EIA studies Collection of Base line data in any season other than Monsoon season in study area of 10 kms radius from Lease Area. Based on the Meteorological data from

More information

6 IMPACT ASSESSMENT METHOD

6 IMPACT ASSESSMENT METHOD 6 IMPACT ASSESSMENT METHOD ENTER HERE BACK TO CONTENTS 6 Impact Assessment Method This chapter outlines the methods employed within the EIS specialist technical studies to undertake an assessment of potential

More information

HINDUSTAN ZINC LIMITED Maton Rock Phosphate Mine (Maton Mine), Tehsil: Girwa District: Udaipur (Rajasthan) PROPOSED TERMS OF REFERENCE FOR EIA STUDIES

HINDUSTAN ZINC LIMITED Maton Rock Phosphate Mine (Maton Mine), Tehsil: Girwa District: Udaipur (Rajasthan) PROPOSED TERMS OF REFERENCE FOR EIA STUDIES HINDUSTAN ZINC LIMITED Maton Rock Phosphate Mine (Maton Mine), Tehsil: Girwa District: Udaipur (Rajasthan) PROPOSED TERMS OF REFERENCE FOR EIA STUDIES Maton Rock Phosphate Mine of M/s HZL is proposing

More information

Information Requirements Table for Liquid Waste

Information Requirements Table for Liquid Waste Applicant Summary Tracking # Authorization # Applicant / Facility Name Ministry of Environment Prepared by: Title Date The Information Requirements Table (IRT) for Liquid Waste is a tool used by Ministry

More information

Fort McKay Specific Assessment

Fort McKay Specific Assessment SURFACE WATER HYDROLOGY Fort McKay Specific Assessment Fort McKay Industry Relations Corporation March 2010 Contents 4.0... 1 4.1 Fort McKay s Key Concerns Related to Surface Water... 1 4.2 Fort McKay

More information

8 Geology, Hydrology & Hydrogeology

8 Geology, Hydrology & Hydrogeology Inverneill Wind Farm Scoping Report Page 42 8 Geology, Hydrology & Hydrogeology 8.1 Introduction The EIA will consider the potential issues arising from the construction, operation and decommissioning

More information

Definitions & Concepts

Definitions & Concepts Introduction Risk provides the answer to three key questions: what can go wrong; how likely is it; what are the consequences? (Kaplan and Garrick, 1981). To this can be added the question: what can be

More information

18 Cumulative Impacts and Interaction of Effects

18 Cumulative Impacts and Interaction of Effects 18 Cumulative Impacts and Interaction of Effects 18.1 Introduction This chapter addresses the cumulative impacts and main interactions between different aspects of the environment likely to be significantly

More information

8. Risk Assessment Process

8. Risk Assessment Process 134 Browse FLNG Development Draft Environmental Impact Statement 8. Risk Assessment Process This section provides an overview of the EIA process undertaken for the Browse FLNG Development, from identification

More information

Environmental Assessment in Canada

Environmental Assessment in Canada Environmental Assessment in Canada 1. International Building Blocks for Environmental Assessment 2. Role of the Canadian Environmental Assessment Act 3. The Ontario Environmental Assessment Act 4. Procedures

More information

PROPOSED TERM OF REFERENCE

PROPOSED TERM OF REFERENCE PROPOSED TERM OF REFERENCE FOR ESTABLISHMENT OF PROPOSED MOLASSES/GRAIN BASED DISTILLERY HAVING CAPACITY: 160.0 KLD (MOLASSES BASED) OR 120.0 KLD (MOLASSES BASED) + 40.0 KLD (GRAIN BASED) ALONGWITH 7.0

More information

FINAL. WREP Sectional Replacement Project Environmental and Social Impact Assessment. Georgian Pipeline Company

FINAL. WREP Sectional Replacement Project Environmental and Social Impact Assessment. Georgian Pipeline Company FINAL WREP Sectional Replacement Project Georgian Pipeline Company AUGUST 2016 TABLE OF CONTENTS NON-TECHNICAL SUMMARY 1 INTRODUCTION 1-1 1.1 General 1-1 1.2 Background to the WREP 1-1 1.3 Rationale for

More information

DEPARTMENT OF ENVIRONMENTAL PROTECTION BUREAU OF MINING AND RECLAMATION. Coal Refuse Disposal - Site Selection

DEPARTMENT OF ENVIRONMENTAL PROTECTION BUREAU OF MINING AND RECLAMATION. Coal Refuse Disposal - Site Selection DEPARTMENT OF ENVIRONMENTAL PROTECTION BUREAU OF MINING AND RECLAMATION DOCUMENT NUMBER: 563-2113-660 TITLE: Coal Refuse Disposal - Site Selection EFFECTIVE DATE: February 8, 1999 AUTHORITY: The Coal Refuse

More information

7. EIA Assessment Methodology

7. EIA Assessment Methodology 7. EIA Assessment Methodology Introduction 7.1 This Chapter of the PEIR sets out the process and methodology that has been adopted in undertaking the draft EIA. Whilst the overall approach and methodology

More information

Mining in Sensitive Areas: Balancing Conservation & Development. Portfolio Committee for Environmental Affairs

Mining in Sensitive Areas: Balancing Conservation & Development. Portfolio Committee for Environmental Affairs Mining in Sensitive Areas: Balancing Conservation & Development Portfolio Committee for Environmental Affairs 1 Overview of presentation 1. Background 2. Legislative context 3. Efforts to balance conservation

More information

NEW BUGESERA INTERNATIONAL AIRPORT ENVIRONMENTAL AND SOCIAL IMPACT ASSESSMENT REPORT- CUMULATIVE IMPACT ASSESSMENT

NEW BUGESERA INTERNATIONAL AIRPORT ENVIRONMENTAL AND SOCIAL IMPACT ASSESSMENT REPORT- CUMULATIVE IMPACT ASSESSMENT Intended for Bugesera Airport Company Limited Date January 2018 Project Number UK11-24483 NEW BUGESERA INTERNATIONAL AIRPORT ENVIRONMENTAL AND SOCIAL IMPACT ASSESSMENT REPORT- CUMULATIVE IMPACT ASSESSMENT

More information

DRAFT BASIC ASSESSMENT REPORT QUATUM OF CLOSURE REPORT ESTABLISHMENT OF A BORROW PIT ON POGELA FARM LOCATED NEAR HEATONVILLE, KWAZULU-NATAL

DRAFT BASIC ASSESSMENT REPORT QUATUM OF CLOSURE REPORT ESTABLISHMENT OF A BORROW PIT ON POGELA FARM LOCATED NEAR HEATONVILLE, KWAZULU-NATAL DRAFT BASIC ASSESSMENT REPORT APPENDIX 7 QUATUM OF CLOSURE REPORT FOR THE PROPOSED ESTABLISHMENT OF A BORROW PIT ON POGELA FARM LOCATED NEAR HEATONVILLE, KWAZULU-NATAL April 2017 Prepared for: Prepared

More information

The following potential environmental receptors and impacts form the basis of TRCA s review under Ontario Regulation 166/06 and the Fisheries Act:

The following potential environmental receptors and impacts form the basis of TRCA s review under Ontario Regulation 166/06 and the Fisheries Act: TRCA Technical Guidelines for the Development of Environmental Management Plans for Dewatering September 2013 Rationale: The Technical Guidelines for the Development of Environmental Management Plans for

More information

The following potential environmental receptors and impacts form the basis of TRCA s review under Ontario Regulation 166/06 and the Fisheries Act:

The following potential environmental receptors and impacts form the basis of TRCA s review under Ontario Regulation 166/06 and the Fisheries Act: Interim TRCA Technical Guidelines for the Development of Environmental Management Plans for Dewatering September 2013 Rationale: The Technical Guidelines for the Development of Environmental Management

More information

Advice to decision maker on coal mining project

Advice to decision maker on coal mining project . Advice to decision maker on coal mining project IESC 2015-063: West Muswellbrook Project New Development Requesting agency The New South Wales Mining and Petroleum Gateway Panel Date of request 27 January

More information

BACKGROUND INFORMATION DOCUMENT

BACKGROUND INFORMATION DOCUMENT Kingfisher Farms (Pty) Ltd SAND MINING APPLICATION Manor Grange Farm, Hibberdene (KwaZulu-Natal) BACKGROUND INFORMATION DOCUMENT BACKGROUND INFORMATION An application has been submitted to the Department

More information

Environmental Impact Assessment Report

Environmental Impact Assessment Report Environmental Impact Assessment Report Volume I (Main Document) Residential Development at Barnhall Leixlip Co. Kildare on behalf of Ardstone Homes Ltd. December 2017 Volume I (Main Document) December

More information

TECHNICAL ASSISTANCE DESCRIPTION, COST ESTIMATES AND OUTLINE TERMS OF REFERENCE

TECHNICAL ASSISTANCE DESCRIPTION, COST ESTIMATES AND OUTLINE TERMS OF REFERENCE Greater Mekong Subregion Nam Ngum 3 Hydropower Project (RRP LAO 41385) Supplementary Appendix 5 TECHNICAL ASSISTANCE DESCRIPTION, COST ESTIMATES AND OUTLINE TERMS OF REFERENCE Strengthening Biodiversity

More information

3.0 APPROACH AND METHODOLOGY

3.0 APPROACH AND METHODOLOGY 3.0 APPROACH AND METHODOLOGY The EIA will be completed to meet the requirements as set out in the Environmental Impact Assessment Guidelines and Procedures for Barbados, 1998 and the Thermal Power Guidelines

More information

MINING EIA REVIEW CHECKLIST

MINING EIA REVIEW CHECKLIST EIA Review Checklist Mining and the Environment Mining is a sustainable activity MINING EIA REVIEW CHECKLIST Reviewing the Content General aspects Does the environmental assessment conform to national

More information

Prospective Radiological Environmental Impact Assessment for Facilities and Activities

Prospective Radiological Environmental Impact Assessment for Facilities and Activities DS427 Draft Version 8.5 Date: 23 November 2016 IAEA SAFETY STANDARDS For protecting people and the environment Status: STEP 13 Endorsed by the CSS For submission to the PC Prospective Radiological Environmental

More information

Notes for NEPA for Generic Terms of Reference

Notes for NEPA for Generic Terms of Reference TERMS OF REFERENCE IIRRIIGATIION AND WATER MANAGEMENT Notes for NEPA for Generic Terms of Reference This generic Terms of Reference (TOR) is applicable to the construction and/or the development of Irrigation

More information

Information on the focal point for the Convention. Information on the point of contact for the Convention

Information on the focal point for the Convention. Information on the point of contact for the Convention Questionnaire for the REPORT OF MONTENEGRO ON THE IMPLEMENTATION OF THE CONVENTION ON ENVIRONMENTAL IMPACT ASSESSMENT IN A TRANSBOUNDARY CONTEXT in the period 2006 2009 Information on the focal point for

More information

BACKGROUND INFORMATION DOCUMENT & INVITATION TO COMMENT JULY 2015

BACKGROUND INFORMATION DOCUMENT & INVITATION TO COMMENT JULY 2015 Introduction EOH Coastal & Environmental Services has been appointed by K2014173145 (South Africa) (Pty) Ltd (Reg No. 2014/173145/07), to undertake the Public Participation Process and associated Basic

More information

The Project will consist of the following key components: PV solar panels/modules (arranged in arrays); DC-AC current inverters and transformers;

The Project will consist of the following key components: PV solar panels/modules (arranged in arrays); DC-AC current inverters and transformers; 1 INTRODUCTION 1.1 OVERVIEW Solaire Direct Southern Africa (Pty) Ltd, hereafter referred to as Solaire Direct, appointed Environmental Resources Management Southern Africa (Pty) Ltd, hereafter referred

More information

Environmental Impact Assessment. GEO: East West Highway (Khevi Ubisa Section) Improvement Project

Environmental Impact Assessment. GEO: East West Highway (Khevi Ubisa Section) Improvement Project May 2018 Third Draft GEO: East West Highway (Khevi Ubisa Section) Improvement Project Section F2 of the Khevi Ubisa Shorapani Argveta Road (E60 Highway) Part 6 Appendices A D Prepared by JV IRD Engineering

More information

EIA FOR THREE 10MW PHOTOVOLTAIC (SOLAR) ENERGY FACILITIES PROPOSED FOR MARIENTAL, OMARURU AND OKAHANDJA BACKROUND INFORMATION DOCUMENT

EIA FOR THREE 10MW PHOTOVOLTAIC (SOLAR) ENERGY FACILITIES PROPOSED FOR MARIENTAL, OMARURU AND OKAHANDJA BACKROUND INFORMATION DOCUMENT EIA FOR THREE 10MW PHOTOVOLTAIC (SOLAR) ENERGY FACILITIES PROPOSED FOR MARIENTAL, OMARURU AND OKAHANDJA BACKROUND INFORMATION DOCUMENT PURPOSE OF THIS DOCUMENT The purpose of this Background Information

More information

BIODIVERSITY RISK & OPPORTUNITY ASSESSMENT HANDBOOK

BIODIVERSITY RISK & OPPORTUNITY ASSESSMENT HANDBOOK BIODIVERSITY RISK & OPPORTUNITY ASSESSMENT HANDBOOK The Biodiversity Risk and Opportunity Assessment (BROA) Handbook, The British American Tobacco Biodiversity Partnership: British American Tobacco, Earthwatch

More information

NON TECHNICAL SUMMARY

NON TECHNICAL SUMMARY NON TECHNICAL SUMMARY CONTENTS Introduction... 1 The Proposed Development... 1 Planning Policy and Need... 2 Landscape and Visual Impact... 3 Noise... 4 Ecology... 4 Hydrogeology... 5 Land Quality... 6

More information

Celbridge Draft Local Area Plan

Celbridge Draft Local Area Plan Celbridge Draft Local Area Plan 2017 2023 Dréachtphlean Ceantair Áitiúil Cill Droichid Planning Department Kildare County Council May 2017 PROPOSED MATERIAL ALTERATIONS STRATEGIC ENVIRONMENTAL ASSESSMENT

More information

BIODIVERSITY INDICATORS FOR CORPORATE REPORTING. MINING, MINERALS and SUSTAINABLE DEVELOPMENT BIODIVERSITY and MINING WORKSHOP October 26, 2001

BIODIVERSITY INDICATORS FOR CORPORATE REPORTING. MINING, MINERALS and SUSTAINABLE DEVELOPMENT BIODIVERSITY and MINING WORKSHOP October 26, 2001 BIODIVERSITY INDICATORS FOR CORPORATE REPORTING MINING, MINERALS and SUSTAINABLE DEVELOPMENT BIODIVERSITY and MINING WORKSHOP October 26, 2001 Conservation International CI believes that the Earth s natural

More information

BHORER ALO ECO TOURISM PROJECT AT GAJALDOBA, JALPAIGURI

BHORER ALO ECO TOURISM PROJECT AT GAJALDOBA, JALPAIGURI TERMS OF REFERENCE (TOR) FOR AN ENVIRONMENTAL IMPACT ASSESSMENT (EIA) FOR BHORER ALO ECO TOURISM PROJECT AT GAJALDOBA, JALPAIGURI AT PLOT NO.: 63, 67-70, 72-101 AND 105, MOUZA-JUNGLE MOHAL, JL. NO. 01,

More information

The Halifax Harbour Solutions Project Provision of Sewage Treatment

The Halifax Harbour Solutions Project Provision of Sewage Treatment The Halifax Harbour Solutions Project Provision of Sewage Treatment ENVIRONMENTAL SCREENING PURSUANT TO THE CANADIAN ENVIRONMENTAL ASSESSMENT ACT Prepared by Halifax Regional Municipality June, 2000 Revised

More information

NOVEMBER 2016 REVISION 0. Prepared by: JG AFRIKA (PTY) LTD

NOVEMBER 2016 REVISION 0. Prepared by: JG AFRIKA (PTY) LTD DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT & ENVIRONMENTAL MANAGEMENT PROGRAMME REPORT: PROPOSED ESTABLISHMENT OF A STAGED MOBILE CRUSHING PLANT WITHIN THE CURRENT FOOTPRINT OF THE AMASUNDU GRAVEL CC

More information

Clifton Marsh Landfill Variation of planning permission 05/09/0376 & 06/09/0395 for the continuation of landfilling until Non Technical Summary

Clifton Marsh Landfill Variation of planning permission 05/09/0376 & 06/09/0395 for the continuation of landfilling until Non Technical Summary Clifton Marsh Landfill Variation of planning permission 05/09/0376 & 06/09/0395 for the continuation of landfilling until 2035 Non Technical Summary SLR Consulting Limited Project Ref: 403.00079.00474

More information

ENVIRONMENTAL IMPACT ASSESSMENT REPORT

ENVIRONMENTAL IMPACT ASSESSMENT REPORT ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR THE AMENEDMENT APPLICATION: MONAVONI EXTENSION 19 Part of Portions 3 of the Farm Stukground 382 JR, Part of the Remainder of Portion 5 of the Farm Mooiplaats

More information

Environmental Review Process. Presented by Environment and Natural Resource Unit, Lands and Economic Development, BC Region

Environmental Review Process. Presented by Environment and Natural Resource Unit, Lands and Economic Development, BC Region Environmental Review Process Presented by Environment and Natural Resource Unit, Lands and Economic Development, BC Region Outline 1. Overview of the Canadian Environmental Assessment Act (CEAA) 2. Indigenous

More information

Anna Marks and Helen Meekings

Anna Marks and Helen Meekings Anna Marks and Helen Meekings Anna Marks Ecovision ul. Stanislawa Kostki Potockiego 2B/ 93 02-958 Warszawa, Poland anna.marks@ecovision.pl Helen Meekings Golder Associates 1 Alie Street London E1 8DE,

More information

PLAN OF STUDY FOR ENVIRONMENTAL IMPACT ASSESSMENT CHAPTER 7

PLAN OF STUDY FOR ENVIRONMENTAL IMPACT ASSESSMENT CHAPTER 7 PLAN OF STUDY FOR ENVIRONMENTAL IMPACT ASSESSMENT CHAPTER 7 A detailed description of the components which form part of the Tshwane Strengthening Project Phase 1, the Scoping process, as well as the issues

More information

Environmental Assessment Approval

Environmental Assessment Approval Environmental Assessment Approval Approval Date: Original Dated April 20, 2012 Trimper Sand and Gravel Pit Expansion Ivan H. Trimper Construction Ltd., Proponent Annapolis County, Nova Scotia The Trimper

More information

A Biodiversity (and Environment) Shared Analytics Partnership for Western Australia

A Biodiversity (and Environment) Shared Analytics Partnership for Western Australia A Biodiversity (and Environment) Shared Analytics Partnership for Western Australia Who are our Customers? Planning Research Approvals & Compliance New Opportunities Body of data about WA s flora and fauna

More information

Table of Contents. O Devaney Gardens. Page i. Page Number. Section. 1 Introduction

Table of Contents. O Devaney Gardens. Page i. Page Number. Section. 1 Introduction Section 1 Introduction Page Number 1.1 Introduction 2 1.2 Screening - Requirement for an EIA 5 1.3 Purpose of this EIA 6 1.4 Objectives of this EIA 6 1.5 Scoping 10 1.6 Format and Structure of this EIS

More information

SLR Consulting (Pty) Ltd

SLR Consulting (Pty) Ltd SLR Consulting (Pty) Ltd Page i SCOPING REPORT FOR THE PROPOSED EXPLORATION RIGHT APPLICATION FOR PETROLEUM ON VARIOUS FARMS IN THE MAGISTERIAL DISTRICTS OF MATATIELE AND MT FLETCHER, EASTERN CAPE March

More information

Strategic Environment Assessment. For the. New Structure Plan for the Maltese Islands. Scoping Report

Strategic Environment Assessment. For the. New Structure Plan for the Maltese Islands. Scoping Report Strategic Environment Assessment For the New Structure Plan for the Maltese Islands Scoping Report Structure Plan Team December 2004 CONTENTS 1 Introduction...3 1.1 Purpose of the scoping report...3 1.2

More information

Environmental Management Plan Introduction Environmental Management Objectives Structure, Implementation and Review

Environmental Management Plan Introduction Environmental Management Objectives Structure, Implementation and Review Environmental Management Plan Introduction This Environmental Management Plan (EMP) has been prepared for SEF Energy Co. Ltd. for the purpose of providing a stand-alone plan for managing the potential

More information

Technical Guidance Document for Strategic Environmental Assessment (SEA)

Technical Guidance Document for Strategic Environmental Assessment (SEA) Technical Guidance Document for Strategic Environmental Assessment (SEA) EAD-EQ-PCE-TG-03 Signature on Original Environment Quality Sector * Corporate Management Representative Secretary General Originated

More information

Environmental Impact Assessment (EIA) for Oil & Gas and Power Projects

Environmental Impact Assessment (EIA) for Oil & Gas and Power Projects Environmental Impact Assessment (EIA) for Oil & Gas and Power Projects Insert then choose Picture select your picture. Right click your picture and Send to back. August 6-8 th, 2014 Craig A. Reid Partner,

More information

6 SUMMARY OF CUMULATIVE AND INDIRECT EFFECTS 6.1 INTRODUCTION

6 SUMMARY OF CUMULATIVE AND INDIRECT EFFECTS 6.1 INTRODUCTION 6 SUMMARY OF CUMULATIVE AND INDIRECT EFFECTS 6.1 INTRODUCTION Cumulative and indirect effects result from the combined impacts of multiple projects / plans. Their consideration is important as the impacts

More information

Environmental Impact Report for the proposed establishment of a New Coal-Fired Power Station in the Lephalale Area, Limpopo Province

Environmental Impact Report for the proposed establishment of a New Coal-Fired Power Station in the Lephalale Area, Limpopo Province 3. SCOPE OF ENVIRONMENTAL INVESTIGATIONS 3.1. Approach to Undertaking the Study An Environmental Scoping Study for the proposed establishment of a new coalfired Power Station, in Lephalale, was undertaken

More information

RE: STAKEHOLDER INFORMATION DOCUMENT 1: RIETKOL MINING OPERATIONS

RE: STAKEHOLDER INFORMATION DOCUMENT 1: RIETKOL MINING OPERATIONS 6 October 2016 Dear Stakeholder, RE: STAKEHOLDER INFORMATION DOCUMENT 1: RIETKOL MINING OPERATIONS As indicated in our previous notification dated 12 February 2016, Consol Glass (Pty) Limited ( Consol

More information

V: PROJECT SCOPING & METHODOLOGY

V: PROJECT SCOPING & METHODOLOGY V: PROJECT SCOPING & METHODOLOGY 5.0 INTRODUCTION The scoping exercise is carried out to define the focus and scope of the EIA Study. The scoping exercise is required to understand the type of activities

More information

1 Introduction 1-1. Project Need and Objectives

1 Introduction 1-1. Project Need and Objectives Introduction 1 CONTENTS 1 Introduction 1-1 1.1 1.1 Introduction Introduction 1-1 1-1 1.2 1.2 Project Overview Project Overview 1-1 1-1 1.3 1.3 Project Site Project Site 1-1 1-1 1.4 1.4 The Proponent The

More information

Environmental Assessment Approval

Environmental Assessment Approval Environmental Assessment Approval Approval Date: Original Dated October 1, 2010 Hants County Aggregate Quarry Extension Project Municipal Enterprises Ltd., Proponent Hants County, Nova Scotia The Hants

More information

Appendix J: IESC Advice and Response Checklist

Appendix J: IESC Advice and Response Checklist Appendix J: IESC Advice and Response Checklist Description of the Proposal Description of the Proposal Groundwater Context and Conceptualisation A regional overview of the proposed Project area including

More information

Environmental Risk Assessment

Environmental Risk Assessment 4 Environmental Risk Assessment Section 4 Environmental Risk Assessment CONTENTS 4 Environmental Risk Assessment 4-1 4.1 4.1 Introduction Introduction 4-1 4-1 4.2 4.2 Methodology Methodology 4-1 4-1 4.2.1

More information

ABOUT US. Earth Link & Advanced Resources Development (ELARD)

ABOUT US. Earth Link & Advanced Resources Development (ELARD) ABOUT US Earth Link & Advanced Resources Development (ELARD) As a leading regional consultancy firm, operating primarily in the Middle-East, Gulf and North Africa, ELARD has become a key service provider

More information

CONCLUSIONS 14 CONTENTS

CONCLUSIONS 14 CONTENTS CONTENTS Introduction... 14-1 Traffic... 14-1 Air Quality... 14-1 Noise and Vibration... 14-2 Geology and Hydrology... 14-2 Landscape and Visual... 14-3 Ecology... 14-4 Cultural Heritage... 14-4 Population

More information

Abstract. Environmental Impact Statement (EIS) Scoping Report

Abstract. Environmental Impact Statement (EIS) Scoping Report Abstract On 1 st January 2014, Irish Water assumed responsibility for managing Ireland s water and wastewater investment and maintenance programmes. On that date, Irish Water also took over the management

More information

Norfolk Minerals and Waste Local Plan. Sustainability Appraisal Report Non-technical summary

Norfolk Minerals and Waste Local Plan. Sustainability Appraisal Report Non-technical summary Norfolk Minerals and Waste Local Plan Minerals Site Specific Allocations Development Plan Document (DPD) Single Issue Silica Sand Review Sustainability Appraisal Report Non-technical summary March 2016

More information

2 ENVIRONMENTAL IMPACT ASSESSMENT

2 ENVIRONMENTAL IMPACT ASSESSMENT 2 ENVIRONMENTAL IMPACT ASSESSMENT Introduction 2.1 Environmental Impact Assessment (EIA) is required for certain categories of projects and involves a process of drawing together, in a systematic way,

More information

IX: HAZARDOUS WASTE MANAGEMENT

IX: HAZARDOUS WASTE MANAGEMENT IX: HAZARDOUS WASTE MANAGEMENT 9.0 INTRODUCTION The Government of India has promulgated the Hazardous Waste (Management and Handling) Rules, 1989 and the aegis of Environment (Protection) Act, 1886 through

More information

1 INTRODUCTION 1.1 TERMS OF REFERENCE FOR THIS ENVIRONMENTAL IMPACT ASSESSMENT REPORT

1 INTRODUCTION 1.1 TERMS OF REFERENCE FOR THIS ENVIRONMENTAL IMPACT ASSESSMENT REPORT 1 INTRODUCTION 1.1 TERMS OF REFERENCE FOR THIS ENVIRONMENTAL IMPACT ASSESSMENT REPORT This Environmental Impact Assessment Report (EIA Report) has been prepared by Environmental Resources Management Ltd

More information

determine the effect of the Proposed Development together with the other planned changes within defined areas of influence;

determine the effect of the Proposed Development together with the other planned changes within defined areas of influence; 14 SUMMARY OF CUMULATIVE AND INDIRECT EFFECTS 14.1 INTRODUCTION Cumulative and indirect effects result from the combined impacts of multiple projects / plans. Their consideration is important as the impacts

More information

Operational Policy Statement

Operational Policy Statement Operational Policy Statement Determining Whether a Designated Project is Likely to Cause Significant Adverse Environmental Effects under the Canadian Environmental Assessment Act, 2012 November 2015 i

More information

Environmental Risk Analysis

Environmental Risk Analysis Appendix 10 11 12 13 14 15 16 17 18 191 Groundwater Controlled UHSA Air Agricultural Historic EIS Preliminary Environmental Blasting Quality Surface Secretary s Noise Statement Aboriginal Economic Action

More information

SLAUGHTERHOUSES AND ABATTOIRS

SLAUGHTERHOUSES AND ABATTOIRS TERMS OF REFERENCE SLAUGHTERHOUSES AND ABATTOIRS Notes for NEPA for Generic Terms of Reference This generic Terms of Reference (TOR) is applicable to Slaughterhouses and Abattoirs. The TOR outlines the

More information

(50MW) Non Technical Summary (NTS)

(50MW) Non Technical Summary (NTS) RISHEH SOLAR PV POWER PLANT PROJECT (50MW) Non Technical Summary (NTS) 13 August 2017 REV 0 TABLE OF CONTENT Table of Content... i 1. Introduction... 1 2. Project Description... 1 2.1 Project Location...

More information

For PROPOSED IT PARK. By M/s.Balewadi Tech Park Pvt.Ltd. Submitted to State Environment Expert Appraisal Committee III, Maharashtra

For PROPOSED IT PARK. By M/s.Balewadi Tech Park Pvt.Ltd. Submitted to State Environment Expert Appraisal Committee III, Maharashtra Draft Terms of References (ToR) (Based on the model TOR given in Environmental Impact Assessment Guidance Manual for building construction projects by MoEF & CC) For PROPOSED IT PARK By M/s.Balewadi Tech

More information

6 ESIA PROCESS AND SCOPING

6 ESIA PROCESS AND SCOPING 6 ESIA PROCESS AND SCOPG An EIA is a systematic process that identifies and evaluates the potential impacts a proposed Project may have on the biophysical and social environment and develops mitigation

More information

Draft Amendment Application Report, Agni Steels SA February 2011 Executive Summary EXECUTIVE SUMMARY

Draft Amendment Application Report, Agni Steels SA February 2011 Executive Summary EXECUTIVE SUMMARY EXECUTIVE SUMMARY PROJECT BACKGROUND AND DESCRIPTION On the 16 February 2009, Agni Steels SA (Pty) Ltd (formerly Afro Asia Steels), was issued an Environmental Authorisation for the construction and operation

More information

19. INTERACTION OF IMPACTS

19. INTERACTION OF IMPACTS 19. INTERACTION OF IMPACTS 19.1 INTRODUCTION In addition to the requirement to describe the likely significant effects of the proposed development on the different elements of the environment, it is also

More information

(Reg. No. 2007/003002/08) NPO NUMBER NPO PBO No. (TAX EXEMPT) Postnet Suite 87 Private Bag X033 RIVONIA 2128

(Reg. No. 2007/003002/08) NPO NUMBER NPO PBO No. (TAX EXEMPT) Postnet Suite 87 Private Bag X033 RIVONIA 2128 (Reg. No. 2007/003002/08) NPO NUMBER 062986-NPO PBO No. (TAX EXEMPT) 930 039 506 Postnet Suite 87 Private Bag X033 RIVONIA 2128 FOR ATTENTION: Lufuno Nengwani Fax: 086 697 9452 Email: lnengwani@multiviewinv.co.za

More information

EIA must identify, predict, evaluate and mitigate likely direct and indirect environmental effects of activities on: human beings fauna, flora, soil, water, air, climate, landscape material assets, cultural

More information