1 CITY OF DICKINSON DRAINAGE CRITERIA MANUAL ()

2 I. INTRODUCTION Purpose This DRAINAGE CRITERIA MANUAL (the Manual ) provides design guidance for use by developers and engineers in preparation of drainage plans for development within the City of Dickinson (the City ). It establishes rules and regulations that must be consistently followed and will be enforced throughout the City s jurisdiction including the portions of the Dickinson Bayou watershed lying within the City s boundaries. The design methods presented in this manual are intended to provide guidance for determination of runoff rates; methods of storm water collection, conveyance, and detention; and design standards for facilities (ditches, ponds, detention basins, etc.). Methods of design and analysis other than those included in this Manual may be considered in certain cases where there may be inherent problems with the traditional methods. However, any deviation from this Manual will require consideration and acceptance by the City before approval will be granted for any work based on these alternatives. Policy Due to the nature of the watershed hydraulics within the City s boundaries and the prevalent existence of flood plains that exceed the banks of the creeks, it shall be the policy of the City to maintain zero net increase in storm water runoff rates and to insure no negative impacts attributable to new development and redevelopment that increases impervious cover by at least five percent (5%). Although it is the City s long-term goal to construct and maintain facilities (i.e., channels and regional detention facilities) that will contain 100-year storm flows within drainage rights-of-way, it is recognized that further impacts to the existing system cannot be tolerated. Therefore, the current City policy is based upon an on-site detention storm water management policy. Strict adherence to this policy will insure that existing runoff rates will not increase as a byproduct of development, and therefore no off-site impacts will be developed. It is further recognized that impacts to other land owners and jurisdictions outside of the City s boundaries are unacceptable, and the City believes that this policy will effectively eliminate any such out-of-district impacts. It is the goal of the City to support channel improvements of the major Creeks within its jurisdiction in general conformance with the adopted regional Master Plan. The City will also support and cooperate with the other governmental entities including the City of League City, City of Santa Fe, City of Texas City, Galveston County, Galveston County Consolidated Drainage District, Galveston County Drainage District No. 1, Galveston County Drainage District No. 2 and Brazoria County Conservation and Reclamation District No. 3 to improve local drainage. Individual developers must provide infrastructure required to meet the City s stated objective of zero net increase in runoff rates and no negative impacts. Practically, this Page 2 of 44

3 will mean that developers will provide adequate on-site detention volume to off-set increased runoff rates and must provide compensating storage volume for all fill placed in the floodplain. The City will require separate off-line detention facilities, and no in-line detention scenarios will be approved. Additionally, development in the delineated floodway will be restricted by the City. This Manual also establishes minimum right-of-way requirements for certain ditches, channels and bayous within the City s jurisdiction. These minimum right-of-way requirements are based upon past engineering studies, and generally allow for conveyance of the projected 100-year flow in a ditch section that can readily be accessed and maintained by the City. Jurisdiction The area within the City of Dickinson boundary is drained entirely by the Dickinson Bayou. Subdivisions and other developments in the area that are not located directly on this major drainage artery generally drain by man-improved or man-made ditches and storm sewers which convey the rainfall runoff to the major drainage artery. The City of Dickinson is responsible for the maintenance of those drainage ways that drain City road rights-of-way (within rights of way and identified in the Master Plan) within its City Limits. Watersheds The City s service area covers approximately 12 square miles and lies in north central Galveston County. Historically, this service area was primarily rural agricultural, but recent growth in the area is changing the land use to urban development at an increasing rate. The City s boundaries include a portion of one major watershed: Dickinson Bayou. Dickinson Bayou Dickinson Bayou watershed covers the entire City service area. Dickinson Bayou drains surface water from Alvin, Friendswood, League City, Santa Fe, Dickinson and unincorporated Galveston County as it flows from its upstream end in Brazoria County to its outfall in Galveston Bay (approximately 22 miles in length). The topography of the Dickinson Bayou basin is relatively flat, soils are typically low permeable clays, and land use includes agricultural, some light industrial/commercial and residential development. The main channel of Dickinson Bayou is generally unimproved, and while some individual land owners have cleared underbrush along the banks, there has been no major effort by any jurisdictional entity to realign, widen or otherwise change the natural channel. Page 3 of 44

4 Definitions Administrative Official: The individual charged with the administration and enforcement of this manual, or their duly authorized representative City: City of Dickinson Conduit: Any open channel or closed pipe system for conveying flowing water. Developer: An individual or entity that makes improvements to real property for the purpose of reselling that property as a course of business, or for personal, non-residential use, and subdivision development greater than two adjoining lots shall be considered a Developer by the City. An individual engaging in construction of a single homestead to be used by that individual and his/her immediate family, including all reasonable associated improvements (i.e., driveways, garages, personal storage buildings and swimming pools) or infill development where public infrastructure including roadways and utilities exist adjacent to the parcel for lots less than one-half (1/2) acre in size shall not be considered a Developer by the City. Additionally, an individual who is subdividing a lot without improvements and only for subdivision purposes shall not be considered a Developer by the City. Development: The term includes New Development, Redevelopment and In-fill Development. 1. In-fill Development: Development of open tracts of land in areas where the storm drainage infrastructure is already in place and takes advantage of the existing infrastructure as a drainage outlet. 2. New Development: Development of open tracts of land in areas where the storm drainage infrastructure has not been constructed and a drainage outlet must be extended to a conduit system under the jurisdiction of the City and/or Galveston County. 3. Redevelopment: A change in land use that alters the impervious cover from one type of Development to either the same type or another type, and takes advantage of the existing storm drainage infrastructure in place as a drainage outlet. Drainage Plan: All Developers shall provide the City with a drainage plan prepared by a Professional Engineer licensed to practice in the State of Texas3 showing the overall approach for the collection, conveyance and storm water detention required by the City s Drainage Criteria Manual to assure a no impact development. Individuals constructing a homestead for their personal use shall be required to provide a grading and/or drainage plan that will eliminate negative impacts to the adjacent properties but that may not need to be prepared by a licensed engineer as determined by the City Council or the Administrative Official. Page 4 of 44

5 Floodplain Administrator: The individual charged with enforcing the City s floodplain management ordinance. Infiltration Trenches: Trenches or basins that temporarily detain a design water quality volum while allowing infiltration to occur over a prescribed period of time. Green Roof: A roof that is partially or completely covered with vegetation and growing medium with a drainage and irrigation system. Hard Roof: Horizontal roof surfaces used to attenuate peak runoff associated with rainfall and effectively detain flow resulting from smaller rain events. Porous Pavement: Permeable surface course that allows for infiltration of storm water runoff into a permeable layer of uniformly graded stone bed. (Remainder of Page Intentionally Left Blank) Page 5 of 44

6 II. ADMINISTRATION Submittal The City has authority for review and approval of plats and development plans for projects within its jurisdiction. Prior to commencing construction on proposed improvements, two (2) copies of plans, plats, reports, and calculations shall be submitted for review at least thirty (30) days prior to the meeting at which the item will be considered. Proposed plats and plans shall be submitted for each development unless an overall master drainage plan for the development has been previously approved, in which case the applicant must demonstrate compliance with the approved master plan. For projects of 25 acres or more or out of tracts of 25 acres or more, approval of a preliminary engineering report and conceptual master plan shall be required, detailing design methodology and concepts for drainage of the project prior to preliminary plat approval. All plans and reports must be prepared and sealed by a Professional Engineer licensed to practice in the State of Texas. Fees Drainage plans submitted to the City for approval must be accompanied by a check made payable to City of Dickinson for an amount specified in the Master Fee Schedule as determined by the City Council from time to time and on file at City Hall. A schedule of fees will be provided upon request to the City. Site Visit The City may require a representative of the property owner or developer to meet with City staff at the project site prior to plat or drainage plan approval. This meeting shall be for the City s benefit and allow the City to understand the developer s intentions. Datum All topographic information shown on plats and plans must be on the same vertical datum as the current FEMA FIRM Map showing the project area. In the event GPS surveying is used to establish bench marks, at least two references to bench marks relating to the Flood Insurance Rate Maps shall be identified. Adjustments between datum elevations must be completed and certified by a Texas Registered Professional Land Surveyor. Plat Review and Approval The plat review and approval process is detailed in the Subdivision Ordinance. Page 6 of 44

7 Drainage Plan Review All construction plan sets shall include a Drainage Plan for review and approval by the City. The drainage plan shall present the applicant s overall approach to collecting and conveying rainfall runoff to the appropriate drainage artery. It is recommended that prior to preparation of the plan a meeting be arranged between the applicant and City Staff to discuss the proposed concept for drainage of the project. The design submittal shall contain the following items: 1. Name, address, and phone number of engineer that prepared the plan including contact person. 2. Scale of drawing with a minimum scale of 1"=100'. 3. Benchmark and reference benchmark with datum and year of adjustment. 4. A detailed location or vicinity map drawn to a scale. The project site shall be accurately located on the map. 5. Date on all submittals with date of all revisions with month, day, and year. 6. Signature lines for City Officials in accordance with ATTACHMENT D. 7. City notes in accordance with ATTACHMENT E. 8. Contour lines at 0.5 foot where slopes do not exceed 1.0% and 1 foot intervals for slopes exceeding 1.0% intervals covering the entire development and extended beyond the development boundaries at least 200 feet on all sides for developments over 5 acres and 50 feet on developments under 5 acres. At least two contours are required for each project. 9. Preliminary scheme for the passage of sheet flow from adjacent properties. 10. Drainage area divides for project area, with peak run-off rates and calculations for each drainage area. 11. Plan and profile drawings of all storm sewers and roadways at a minimum scale of 1 =50 horozontally and 1 =5 vertically. 12. Locations of all planned drainage improvements proposed for moving run-off water from the development to the principle drainage artery, i.e., creek, stream, bayou, ditch etc., and their point(s) of entry into the drainage artery. 13. Points at which structures or pipelines will cross drainage ditches, streams etc., within the development. 14. Locations of structures or other physical features on the development area to provide orientation as required during field inspection of the site. 15. Location of all existing drainage structures, utility lines, pipelines, and other underground features on the property and adjacent rights-of-way. 16. Location and dimensions of all proposed drainage easements and rights-of-way. 17. Location of major drainage arteries adjacent to or crossing the development as determined through actual ground survey by the developer s surveyor. Survey shall have been completed within the past year and shall show stream alignment 200 feet upstream and downstream of development. 18. Cross-section of detention facility. 19. Detention calculations in accordance with Section VI including volumetric calculations of detention provided. Page 7 of 44

8 20. Drainage area map of receiving system, if discharging to existing storm sewer system. Drainage area of receiving channel if discharging to open ditch or stream. Include calculations to prove capacity is available. 21. Copy of approved permit from TxDOT if draining to or impacting their system. 22. Copies of documents and letters of request for permission to cross privately held easements or rights-of-way and their approvals to do so. 23. Limits of 100-year flood plain by a vertically controlled survey (not scaled from FEMA FIRM Maps). 24. A Floodplain Statement that specifies the site s position in relationship to the floodplain zones described on the appropriate FEMA FIRM map. This statement will specify the FIRM panel number, revision date, applicable zone(s), and the elevation of the 100-year floodplain (if applicable). 25. A statement that specifies that the development shall not impede, impound or block the existing flow of drainage on or from the adjacent properties. Certification Calculations and design drawings must be prepared under the supervision of a Professional Engineer licensed to practice in the State of Texas trained and licensed under the disciplines required by the project scope. All construction documents and design calculations must be sealed, signed and dated by the Professional Engineer licensed to practice in the State of Texas responsible for the development of the drawings. Design Analysis (1) Projects shall be tied to the National Geodetic Survey (NGS) datum adjustment Federal Emergency Management Agency (FEMA) rate maps or the most current NGS datum that match the FEMA rate maps. In the event GPS surveying is used to establish bench marks, at least two references to bench marks relating to the rate maps shall be identified. Equations may be used to translate other datum adjustments to the required adjustment. (2) Drawing sets shall include a Drainage Area Map that will contain calculations of flow by the rational method. Development and Roadway Outfalls Drainage systems for curb-and-gutter pavements shall be underground closed Conduits. Individual residential lot drainage is exempt. Drainage systems for pavements without curb-and-gutter shall be roadside open-ditch sections. Low Impact Development Design requirements for Low Impact Development (LID) techniques are included in below. Only four techniques may be considered to have impact on detention rates: Infiltration Trenches, Hard Roof, Green Roof, and Porous Pavement. The overall Page 8 of 44

9 detention mitigation volume and outflow rates determined in Section VI may be provided through a combination of LID measures and a detention facility. Maintenance and inspection of all LID measures shall be completed at the property owner s expense and shall not be the responsibility of the City. Documentation of all periodic inspections and maintenance shall be kept onsite by the property owner. Infiltration Trenches a. Overview Infiltration Trenches are applicable for both water quality and water quantity control practices. b. Design Criteria (1) In-situ subsoil will have a minimum infiltration rate of 0.5 inches per hour. Geotechnical testing including one boring per 5000 square feet or two per project is required to confirm infiltration rate. (2) Subsurface drainage systems are required where the in-situ subsoil rate is less than 0.5 inches per hour or where the project is constructed on fill soils. (3) Avoid placement on slopes greater than 15% in fill areas. (4) Trench area must be designed to empty with 48 hours. (5) Backfill using clean aggregate larger than 1.5 and smaller than 3 surrounded by engineered filter fabric. (6) Provide overflow structure or channel to accommodate larger runoff events. (7) Provide 4 PVC observation well into subgrade. (8) Runoff from commercial areas and parking lots require pretreatment; grass buffer strip or vegetated swabs, prior to draining into infiltration trench. (9) Locate bottom of facility at least 4 ft. above seasonal high water table elevation. (10) Locate at least 100 ft. from any water supply well. (11) Maximum contributing drainage area is 5 acres or less. (12) Mitigating detention volume can be reduced by the amount of infiltration into the subsoil and the volume of voids within the trench area. c. Inspection and Maintenance Requirements Inspect observation well for water level and drainage times. Conduct landscaping, mowing, and desilting of facility. Hard Roof a. Overview Horizontal roof surfaces can be used to attenuate peak runoff associated with rainfall and effectively detain flow resulting from smaller rain events. The detention volume can be controlled in several ways, but typically a simple drain ring is placed around the roof drains. As storm water begins to pond on the roof, Page 9 of 44

10 flow into the roof drains is controlled by orifices or slits in the drain ring. Extreme flows can be designed to overflow the ring and drain directly to the roof drains or be directed to openings in the parapet walls to prevent structural and flood damage to the roof. The roof deck must be designed to withstand the live load and be properly waterproofed. b. Design Criteria (1) The structural capability of the roof system must be considered when designing a temporary rooftop storage system and must comply with applicable building codes. For example, a three inch water depth is equivalent to a load of 15.6 lbs/sq.ft., which is less than most current building code requirements for live loads. (2) Consideration must be given to the placement of electrical devices on the roof, such as air conditioning or ventilation systems and lights, and proper measures must be taken to protect the electrical devices from the collected water. (3) Overflow mechanisms will be provided so that there is no danger of overloading the roof storage system during major storms. Additionally, roof slopes must be designed to drain positively toward the roof drains to help minimize localized roof ponding or bird bath formation after the detained water volume is released. (4) The adopted building codes used by the City of Dickinson will be used for additional structural criteria along with ASCE Standard Reference Number 7, Minimum Design Loads for Buildings and Other Structures. (5) The amount of credit given for detention volume for rooftop storage must take into account that many flat roofs already pond significant amounts of water although not by design. Therefore, when measuring credit given for hard roof detention volume, it is recommended that credit only be given for the total rooftop storage volume less the rooftop storage volume associated with the first inch of rain. Typically, rooftop storage volumes are only effective during the smaller, more frequent rainfall events as the larger, less frequent storms typically exceed the rooftop storage capacity. c. Inspection and Maintenance Requirements (1) Each hard roof installation will be inspected by the City Inspector and/or City Engineer to check compliance with the approved drawings before final acceptance is issued. At a minimum, the following items will be checked during the inspection: (a) Roof penetrations for ventilation, electrical or plumbing connections to verify proper sealing against leaks. (b) The overflow system that drains excessive rainfall off of the hard roof once the maximum storage volume is captured. (c) Certification from a Professional Engineer licensed to practice in the State of Texas or Architect registered to practice in the State Page 10 of 44

11 of Texas that the hard roof, drain system and appurtenances have been installed and operate as designed. (d) Drawings of the hard roof installation. (2) Once the hard roof is installed, additional inspections will be required in order to properly maintain the drainage system and roof membrane. Routine inspections must be conducted and associated maintenance activities performed by the property owner on the following: (a) Designated drainage paths and drainage system components must be inspected to ensure proper surface drainage is maintained and that the roof is draining properly after the collected storm water volume is released from a rainfall event. (b) Routine inspections to collect and remove any trash or debris from the roof must be conducted to prevent clogging of the roof drains and overflow drainage system. (c) Visible cracks in the roof surface must be identified and repaired in accordance with the roof manufacturer s recommendations in order to maintain roof integrity. Green Roof a. Overview A green roof, in simplest terms, is a vegetated roof. The vegetation varies, but must be suitable to the local climate and be drought tolerant, unless a method of irrigation is also installed. Installation generally consists of a waterproof membrane installed over a suitably constructed roof deck. For in-situ installations, an under-drain drainage system is installed over the membrane. A lightweight engineered soil is installed on top of the under-drain, as fill dirt or topsoil is typically too heavy to use in rooftop applications. The engineered soil is then planted with select vegetation. If a modular system is selected, the drainage system may already be incorporated into the design, along with the soil and vegetation, depending on the manufacturer. The substrate material and depth are also factors that influence the efficiency of the green roof to store and/ or treat storm water. Roofs consisting of relatively thin soil layers, called extensive roofs, are not as heavy as the intensive roofs, which are covered with thicker soil layers. b. Design Criteria (1) Vegetation suitable to the climate and preferably a species that is drought tolerant, unless a method of irrigation is provided, must be installed. The effect of wind on the vegetation must also be considered when selecting the roof foliage, as wind velocities are typically higher at rooftop elevations. (2) The amount of credit given for the rainfall amount stored will be as prescribed by the manufacturer for a modular system. (3) The amount of credit given for the rainfall amount stored for nonmodular systems will be calculated for the engineered soil. The rate will be derived by in-situ porosity testing. The porosity test will be Page 11 of 44

12 performed four times with the first time results being discarded and the three remaining results averaged. The test will require the first sample remain wet a minimum of 1 hour. The subsequent porosity tests will be performed the same day. In no case will the storage volume be credited more than 33% of total volume, as that is the assumed volume of clean graded washed gravel. (4) The roof membrane must be sufficiently designed and installed to pond a minimum of 1-inch of water at the most shallow point on the roof for 24 hours without leaks. This must be tested in the same manner as shower pans are tested under the building code. Additionally, special consideration must be given for the plant root structure and prevention of soil migration during membrane selection. A root barrier may also be required to protect the waterproof membrane integrity. (5) The under-drain drainage system must be designed for the selected plant s tolerance for drought and varying soil moisture contents by maintaining the proper balance of moisture and aerobic conditions within the soil media for optimum vegetation sustainability. Design provisions must address higher volume rainfall events to keep excessive amounts of water from ponding on top of the soil, to prevent erosion, and to prevent soil media saturation for extended periods. Structural calculations will be submitted that demonstrate the structure s ability to sustain the additional loading of the green roof appurtenances plus the maximum water weight that could be stored. c. Inspection and Maintenance Requirements (1) A maintenance plan for the green roof system must be developed in accordance with the membrane manufacturer s instructions and plant species selected. At a minimum, maintenance inspections must be performed at least four times per year. The maintenance plan must include provisions for vegetation maintenance and replacement as needed to maintain a minimum 80% coverage/survival rate in order to sustain storm water quality and/or detention credits. Irrigation may be required initially in order to establish the roof vegetation and to supply water under severe drought conditions. Any requirements for initial or intermittent use of fertilizer and pesticides for disease or insect control must be identified in the plan. Plant species must be carefully selected to minimize intermittent fertilizer and pesticide applications. (2) Each green roof installation will be inspected by the agency responsible for issuing the storm water quality or detention credits to check compliance with the approved drawings before final acceptance is issued and the proper credits are approved. At a minimum, the following items must be checked during the inspection: Page 12 of 44

13 (a) Results from porosity testing (for non-modular installations). (b) Certification from a Professional Engineer licensed to practice in the State of Texas or Architect registered to practice in the State of Texas that the green roof, including membrane, drain system and engineered soil system, was installed per the approved (permitted) drawings and operates as designed. (c) Drawings of the green roof installation. (3) Once the green roof is installed and established, additional inspections will be required in order to properly maintain the vegetation, drainage system and roof membrane. Routine inspections must be conducted and associated maintenance activities performed by the property owner on the following: (a) Joints at adjoining walls, roof penetrations for vents, electrical and air conditioning conduits must be inspected regularly for leaks. The ceilings located directly below the green roof installation must also be visually inspected for signs of water staining or leaking. (b) Designated drainage paths and drainage system components must be inspected to ensure proper surface drainage is maintained and that the soil layer is drained to prevent excessively saturated soils. Vegetation selected to tolerate drought conditions may rot or die if the soil is allowed to become saturated for extended periods. (c) Vegetation must be visually inspected to identify weeds, accumulated trash or debris, dead or dying vegetation, disease or other infestation problems requiring maintenance attention. Weeds and dead vegetation must be removed on a regular basis, especially right after the roof is planted. If a certain plant or grass species continues to die, that plant or grass must be removed and replaced with a more tolerant species. Certified professionals will be used to apply chemical applications for the control of disease or insects at trouble spot locations. (d) Trimming and pruning will be done in accordance with horticulture practices to keep vegetation aesthetically groomed. Porous Pavement a. Overview Porous Pavement consists of a permeable surface course that allows infiltration of storm water runoff into a permeable layer of uniformly graded stone bed. The pavement surface may either be soft (grass) or hard (concrete, asphalt or advance gravel systems). The underlying permeable layer serves as a storage reservoir for runoff and/or infiltration. Porous Pavement is applicable for both water quality and water quantity control practices. Page 13 of 44

14 b. Design Criteria (1) In-situ subsoil will have a minimum infiltration rate of 0.5 inches per hour. Geotechnical testing including one boring per 5000 square feet or two per project is required to confirm infiltration rate. (2) Subsurface drainage systems are required where the in-situ subsoil rate is less than 0.5 inches per hour or where the project is constructed on fill soils. (3) Will be limited to lightly traveled surfaces such as parking pads in parking lots, trails and sidewalks. Porous pavement is not permitted for residential driveways (area of pavement likely to be coated or paved over because of a lack of awareness) and commercial areas designed for heavy traffic volume and/or vehicles. (4) Typical section of porous pavement and underlying permeable stone bed is shown on Figure 1 followed by a description of each layer of material. (5) Subsurface drainage systems are required to be drained in 48 hours. (6) If the volume of storage within the voids of the subsurface drainage system s stone bed meets the detention volume rate of 0.5 acre-feet per acre of development or 0.2 acre-feet per acre for tracts less than one acre, the area of the porous pavement is considered undeveloped. Otherwise, the total voids storage volume will be credited toward the required detention volume. (7) If the time of concentration (Tc) from a project site that includes porous pavement and subsurface drainage system, is equal to the undeveloped time of concentration, the development of the project site is considered undeveloped. (8) Soft porous pavement area will be considered undeveloped. (9) The cross-section typically consists of four layers. The aggregate reservoir can sometimes be avoided or minimized if the sub-grade is sandy and there is adequate time to infiltrate the necessary runoff volume into the sandy soil without by-passing the water quality volume. A description of each of the layers is presented below: Porous Concrete Layer The porous concrete layer consists of an open-graded concrete mixture usually ranging from depths of 2 to 4 inches depending on required bearing strength and pavement design requirements. Porous concrete can be assumed to contain 18 percent voids (porosity = 0.18) for design purposes. Thus, for example, a 4 inch thick porous concrete layer would hold 0.72 inches of rainfall. The omission of the fine aggregate provides the porosity of the porous pavement. To provide a smooth riding surface and to enhance handling and placement a coarse aggregate of 3/8 inch maximum size is normally used. Top Filter Layer Consists of a 0.5 inch diameter crushed stone to a depth of 1 to 2 inches. This layer serves to stabilize the porous Page 14 of 44

15 concrete layer. Top filter layer can be combined with reservoir layer using suitable stone. Reservoir Layer The reservoir gravel base course consists of washed, bank-run gravel, 1.5 to 2.5 inches in diameter with a void space of about 40 %. The depth of this layer depends on the desired storage volume, which is a function of the soil infiltration rate and void spaces, but typically ranges from two to four feet. The layer must have a minimum depth of nine inches. The layer will be designed to drain completely in 48 hours. The layer will be designed to store at a minimum the water quality volume (WQv). Aggregate contaminated with soil must not be used. A porosity value (void space/total volume) of 0.32 must be used in calculations unless aggregate specific data exist. Bottom Filter Layer The surface of the subgrade must be a 6 inch layer of sand (ASTM C-33 concrete sand) or a 2 inch thick layer of 0.5 inch crushed stone, and be completely flat to promote infiltration across the entire surface. This layer serves to stabilize the reservoir layer, to protect the underlying soil from compaction, and act as the interface between the reservoir layer and the filter fabric covering the underlying soil. Filter Fabric It is very important to line the entire trench area, including the sides, with filter fabric prior to placement of the aggregate. The filter fabric serves a very important function by inhibiting soil from migrating into the reservoir layer and reducing storage capacity. Fabric used must be MIRFI # 14 N or equivalent. Underlying Soil The underlying soil must have an infiltration capacity of at least 0.5 in/hr, but preferably greater than 0.50 in/hr. as initially determined from NRCS soil textural classification, and subsequently confirmed by field geotechnical tests. The minimum geotechnical testing is one test hole per 5000 square feet, with a minimum of two borings per facility (taken within the proposed limits of the facility). Infiltration trenches cannot be used in fill soils. Soils at the lower end of this range may not be suited for a full infiltration system. Test borings are recommended to determine the soil classification, seasonal high ground water table elevation, and impervious substrata, and an initial estimate of permeability. Often a double-ring infiltrometer test is done at subgrade elevation to determine the impermeable layer, and for safety, one-half the measured value is allowed for infiltration calculations. Page 15 of 44

16 c. Inspection and Maintenance Requirements (1) Initial inspection of porous pavement to be conducted by the property owner shall be monthly for the first three months post construction. (2) Property owner shall be required to conduct semi-annual inspections to ensure pavement surface is free of sediment. (3) Property owner must vacuum sweep hard porous pavement followed by high pressure hosing to keep voids free of sediment quarterly. (4) Property owner must annually inspect pavement surface and subsurface drainage system (if any) for deterioration, spalling or malfunctioning. Drainage Plan Approval The City shall provide comments to the applicant as soon as possible after submittal. Once all comments have been addressed and the Drainage Plan has been approved by the City, the related plat will be placed on a Planning and Zoning Commission agenda. The Drainage Plan must be approved before the P&Z will take final action on the related plat. Project Acceptance Upon completion of all construction improvements, the applicant shall contact the City for an inspection of the project. Upon successful final inspection, the applicant must submit one copy of the as-built plans to the City. Page 16 of 44

17 The City will require the developer to provide a one year maintenance period upon completion of the improvements. Correction of any deficiencies discovered on the final inspection will begin the maintenance period. After one year the City will re-inspect the facility. A letter of final acceptance will be issued after correction of any deficiencies which will promptly be corrected by the developer before City release. Maintenance of Storm Water Storage Facilities (Detention Ponds) For the purpose of this section, a storm water storage facility shall mean an engineered system serving as a storm runoff collection and storage facility. In each case where an on-site storm water storage facility is provided pursuant to this Manual, the Developer shall furnish evidence of acceptance for maintenance of such storage facility from the entity having authority to perform such service. All facilities are to be maintained privately. Evidence of dedication and provision of maintenance of such facilities must be provided to the City before final acceptance will be issued. Revisions to Drainage Plans All revisions to the approved drainage plan must be approved by the City. The City may require a re-submittal of a drainage plan or plat dependent upon the character and extent of the changes made as determined by the City. Page 17 of 44

18 III. PRIVATE AND PUBLIC UTILITY CROSSINGS Utility, Pipeline, and Cable Crossing All utilities, pipelines, and cable crossings, either publicly or privately owned, shall obtain a permit from the City prior to any construction to cross any drainage facility within the City boundaries. All utilities, pipelines, and cables shall cross City facility within 20 degrees of perpendicular to that facility. No utility, pipeline, or cable shall be located within and parallel to a creek right-of-way without specific approval of the City Council. Submittal Procedures shall be the same as required for plats and plans. Application fees are as stated in the Master Fee Schedule located on file in the City s office. Review Procedure Three copies of plans, plats, reports, and calculations shall be submitted for review. The City Engineer and the Administrative Official shall review the submitted materials and either approve, disapprove or specify changes to be made to comply with this rule for approval. Submittal Top of utility, pipeline, or cable shall be a minimum of five (5) feet below the existing flowline of the channel being crossed, or five (5) feet below the projected flowline of the channel as provided by the City Engineer. Proposed utility, pipeline, or cable must stay at this depth for the entire width of existing easement, and then may be sloped towards the ground surface at a slope not to exceed 3:1. All pipelines with a working pressure exceeding 200 pounds per square inch shall be constructed with a concrete pad over the line. Pads shall extend a minimum of one (1) foot on either side of edge of pipeline for the total length of the City s easement, and shall be six (6) inches thick. Top surface of pad shall be a minimum of five (5) feet below the existing flowline of the channel being crossed, or five (5) feet below the projected flowline of the channel as provided by the most recent available information. The City may release the requirement for a concrete pad if the pipeline is directionally drilled under easement and is at least ten (10) feet below the existing flowline of the channel being crossed, or ten (10) feet below the projected flowline of the channel as provided by the most recently available information. Benchmark and survey requirements will comply with those listed for drainage plans. The drawings shall have the City s signature block as shown in ATTACHMENT D and shall contain the City design notes contained in ATTACHMENT E. Page 18 of 44

19 Notices The Applicant shall provide the City with written notice of intent to begin construction at least forty-eight (48) hours notice prior to the start of construction. Upon completion of crossing, the Applicant shall install markers on either end of crossing, at the right-of-way limits of the City easement. It shall be the Applicant s responsibility to maintain the condition of all markers. Page 19 of 44

20 IV. HYDROLOGY Hydrology is the study of precipitation. Policy makers and engineers must study and understand hydrology because they are interested in designing and building structures and systems to safely convey and discharge precipitation runoff while minimizing the potential of flooding. They must determine how much water should be collected and conveyed or stored, how fast this process must take place, how much can be safely discharged without adversely impacting surrounding properties, and what are other effects of the development being considered. The following sections discuss specific parameters and methods to be used in analyzing proposed developments in the City s service area. Storm Frequency All drainage improvements shall, at the minimum, be designed for the following storm frequencies. The return intervals listed here are minimums, and the individual design engineer or the City may choose to exceed these minimums given site specific requirements or constraints. Type of Facility Closed Conduit Storm Sewers (for new developments) Ditch Culverts (serving less than 50 acres) Ditch Culverts (serving 50 to 100 acres) Ditch Culverts (serving 100 acres or more) Bridges crossing City Ditches Major Ditches and City Channels Detention Facilities Return Interval Storm 3-year 5-year 25-year 50-year 100-year 100-year 100-year Peak Storm Runoff Rates The Rational Method can be used for determining peak runoff flow rate for both existing and proposed conditions. These peak runoff rates are used to estimate the impact of development and the conveyance requirements for drainage improvements. This method is applicable for small to medium drainage areas (generally less than 200 acres) where the flow domain is typically overland sheet flow or shallow surface ditch flow. Other methods should be used to estimate peak runoff rates for larger areas or those served by well defined channels where flow routing in defined channels may be significant. The Rational Method takes the following form: Q = C f * (C * I * A) Page 20 of 44

21 Where: Q = Peak Runoff Flow Rate (cfs) C = Runoff Coefficient, See ATTACHMENT A C f = Frequency factor (the product of C f and C should not exceed 1.0) A = Area of drainage basin being studied (acres) I = Rainfall Intensity of the design storm (inches/hour) Frequency Factor (C f ) The Frequency Factor is used in the Rational Method to scale the magnitude of the peak runoff in relationship to the return interval of the storm consistent with observed runoff data. This adjustment factor is used to account for the effects of antecedent moisture conditions that are generally associated with the less frequent storms. Appropriate values of C f are presented in the following table. Storm Frequency Frequency Factor (C f ) The product of C f and C used in the Rational Method should not exceed 1.0. Basin Time of Concentration (T c ) The storm rainfall Intensity used in Rational Method will be selected based upon the return interval of the storm to be used (specified in the Storm Frequency Table above), and the duration of the storm to be used (based on the study basin s time of concentration). Time of Concentration (T c ) is defined as the length of time it takes a drop of water to travel from the most hydraulically remote portion of the drainage basin to its outlet. T c is a property of the drainage basin reflective of its area, shape, surface gradient, land use, land cover, and soil type. T c (in minutes) may be estimated from the following equation: Where: T c = Length/(Velocity * 60) + 10 Length = Velocity = Flow distance (feet) Flow velocity (fps) [see following table] Page 21 of 44

22 Flow Condition Shallow overland flow in undefined channels Flow in street curb & gutter or road ditches Flow in shallow ditches Flow in defined channels Flow in closed conduit storm sewers Representative Velocities 0.25 to 0.50 fps 0.75 to 1.25 fps 1.5 to 3.0 fps 2.0 to 4.0 fps 3.0 to 5.0 fps The constant value of 60 in this equation is used to convert seconds to minutes and 10 is used as an estimate of initial delay between the start of rainfall and development of actual surface runoff. This method can be applied fairly accurately to large and small basins with either undeveloped or developed surfaces. However, the designer must specify the flow condition and estimated flow velocities for each flow domain on the site (i.e., the first 100 is overland flow followed by 250 in a gutter followed by 400 in closed conduit, etc.) and estimate time of concentration as the sum of all these individual flow conditions. The flow path used as the basis of this calculation should be clearly denoted on the plans with the associated design calculations. Another method that can be used to estimate time of concentration for developed areas (i.e., storm sewer projects) is in the following form: Where: T c = 10*(A) A = Drainage Basin area (acres) This method accurately estimates T c for sewered projects; however it tends to underestimate actual T c for basins with significant overland flow or open ditch flow, and therefore may overestimate peak runoff flow rates for these basins. Alternative methods for estimating the basin s time of concentration will be accepted for reviewed by the City, and may be allowed for use if the method s applicability to a specific situation warrants its use over the methods presented. Storm Intensity (I) For small watersheds and individual developments, the storm intensity should be based upon the time of concentration of the basin being analyzed. For example, in the design of a detention facility serving a basin with a 2-hour time of concentration, an Intensity for a 100-year, 2-hour storm should be selected for use in the analysis. For large watersheds and regional studies, use a 24-hour duration storm for the analysis and design. Appropriate design storm intensities are shown in ATTACHMENT C for various return interval storms. Page 22 of 44

23 V. HYDRAULICS Hydraulics is the study of fluid flow behavior. Policy makers and engineers must study and understand hydraulics because they are responsible for designing and constructing conveyance and storage facilities capable of managing storm water runoff in a safe and effective manner while reducing the potential for flooding. The following sections discuss specific methods and parameters to be used in analyzing proposed developments in the City s service area. Open Channel Flow The vast majority of conveyance capacity within the City s service area is located in the network of open channels that the City builds and maintains. The Chezy-Manning equation will be used to estimate a ditch s conveyance capacity. This equation is in the following form: Where: Q = 1.486/n * A * R 2/3 * S 1/2 n = A = R = S = Manning s Roughness Coefficient (unitless) Flow Cross-sectional area (sf) Hydraulic Radius (ft) Slope of the Hydraulic Grade Line (ft/ft) Typical values for Manning s n are included in ATTACHMENT B. The flow area (A) is estimated from the ditch cross-section, and is the area that will be conveying water (also called the wet area). The hydraulic radius is calculated as the wetted area divided by the wetted perimeter. The wetted perimeter is defined as the length of water/surface interface around the perimeter of the wetted area (does not include the water/air interface length). For open channels, the slope of the hydraulic grade line is estimated to be the same as the ditch slope. Closed Conduit (Pipe) Flow The Chezy-Manning equation presented earlier is also applicable for estimating flow capacity for closed conduits (i.e., pipes). There are some important distinctions to remember, including: Manning s n for pipe materials are significantly different (i.e., smaller) than those for bare earth or vegetative surfaces. See ATTACHMENT B for appropriate n values. The assumption of hydraulic grade line slope being approximately equal to the pipe slope is only valid under free flow conditions. Once the pipe is full and experiences surcharge conditions, the hydraulic grade line slope will increase as flow increases. Page 23 of 44

24 VI. DETENTION FACILITIES The intention of storm water detention is to mitigate increases in peak flow rates resulting from new development, redevelopment or in-fill development on an existing drainage system. Storm water detention volume is based on increased impervious cover and is calculated at the minimum rates set forth herein. Additional mitigation may also be required at the discretion of the City Engineer if upgrades to the storm conveyance system (i.e. larger storm sewers or channels) are anticipated to have a significant impact on downstream facilities. To meet the City s requirements for zero net increase in runoff rates and no negative impacts to an existing drainage system or the immediately adjacent properties due to new development, redevelopment or in-fill development, projects will need to provide one or a combination of on-site detention facilities, Low Impact Development measures, or offsite improvements to outfall systems. If Redevelopment occurs without increasing the overall impervious character of the site, then no detention will be required by the City. Each detention facility should be designed based upon site specific parameters and constraints using accepted engineering methods. The City will not allow in-line storage within City ditches or channels. No approvals will be given by the City for any proposed development until staff has been satisfied that the proposed design meets the City s requirements. The following paragraphs describe general design requirements and allowable methods for generating appropriate designs. General Requirements (1) As shown in the storm frequency table earlier, detention facilities must be designed to provide enough storage to accommodate a 100-year event for the subarea it is intended to serve. (2) Detention facilities may be designed to be wet (constant level ponds) or may be designed to drain completely. A wet detention facility must provide for aeration or pumping and must achieve an acceptable design that will prevent the breeding of mosquitoes and other insects. Engineer to provide the manufacturer s specifications and data for the proposed aeration system and calculations to support the adequacy of the number and size of aerators provided to support the size and depth of the proposed wet detention basin. (3) Detention facilities must: (a) Be designed and constructed with stable slopes (no greater than 4:1) (b) Provide adequate access and maintenance berms around the entire perimeter (10 minimum for ponds less than 1 acre and 20 minimum for ponds larger than 1 acre); (c) Have erosion control elements (i.e., backslope swales, drop pipes, slope pavement, etc.) as necessary to ensure a stable, low maintenance facility. Page 24 of 44

DICKINSON BAYOU WATERSHED STEERING COMMITTEE FINAL MEMBER CRITERIA COMPARISON

DICKINSON BAYOU WATERSHED STEERING COMMITTEE FINAL MEMBER CRITERIA COMPARISON DICKINSON BAYOU WATERSHED STEERING COMMITTEE FINAL MEMBER CRITERIA COMPARISON May 25, 2006 INTRODUCTION The Dickinson Bayou Watershed covers approximately 95.5 square miles and stretches from western Brazoria

More information

CONSTRUCTION PLAN CHECKLIST

CONSTRUCTION PLAN CHECKLIST CONSTRUCTION PLAN CHECKLIST The design engineer is responsible for ensuring that plans submitted for city review are in accordance with this checklist. It is requested that the executed checklist be submitted

More information

LAKE COUNTY HYDROLOGY DESIGN STANDARDS

LAKE COUNTY HYDROLOGY DESIGN STANDARDS LAKE COUNTY HYDROLOGY DESIGN STANDARDS Lake County Department of Public Works Water Resources Division 255 N. Forbes Street Lakeport, CA 95453 (707)263-2341 Adopted June 22, 1999 These Standards provide

More information

ZONING ORDINANCE FOR THE ZONED UNINCORPORATED AREAS ARTICLE 1500 OF PUTNAM COUNTY, WEST VIRGINIA Page 149 ARTICLE 1500 DRAINAGE AND STORM SEWERS

ZONING ORDINANCE FOR THE ZONED UNINCORPORATED AREAS ARTICLE 1500 OF PUTNAM COUNTY, WEST VIRGINIA Page 149 ARTICLE 1500 DRAINAGE AND STORM SEWERS OF PUTNAM COUNTY, WEST VIRGINIA Page 149 ARTICLE 1500 DRAINAGE AND STORM SEWERS 1500.01 GENERAL REQUIREMENTS 1500.02 NATURE OF STORM WATER FACILITIES 1500.03 DRAINAGE EASEMENTS 1500.04 STORM WATER MANAGEMENT

More information

Dawson County Public Works 25 Justice Way, Suite 2232, Dawsonville, GA (706) x 42228

Dawson County Public Works 25 Justice Way, Suite 2232, Dawsonville, GA (706) x 42228 Dawson County Public Works 25 Justice Way, Suite 2232, Dawsonville, GA 30534 (706) 344-3500 x 42228 DAWSON COUNTY STORM WATER REVIEW CHECKLIST Project Name: Property Address: Engineer: Fax #/Email: Date:

More information

CITY OF HILSHIRE VILLAGE SWIMMING POOL PLAN SUBMITTAL CHECK LIST ADDRESS: DATE:

CITY OF HILSHIRE VILLAGE SWIMMING POOL PLAN SUBMITTAL CHECK LIST ADDRESS: DATE: CITY OF HILSHIRE VILLAGE SWIMMING POOL PLAN SUBMITTAL CHECK LIST "THE FOLLOWING CHECKLIST IS ONLY A SUMMARY THAT IS PROVIDED FOR THE APPLICANT'S BENEFIT; HOWEVER, FULFILLING THE REQUIREMENTS OF THIS SUMMARY

More information

Stormwater Local Design Manual For Houston County, Georgia

Stormwater Local Design Manual For Houston County, Georgia Stormwater Local Design Manual For Houston County, Georgia Adopted November 15, 2005 TABLE OF CONTENTS 1. FORWARD... 1 2. GENERAL LEVEL OF SERVICE STANDARDS... 2 2.1. DETENTION REQUIREMENTS... 2 2.1.1.

More information

Shelbyville, Kentucky Stormwater Best Management Practices (BMPs) Stormwater Pollution Treatment Practices (Structural) DRAFT

Shelbyville, Kentucky Stormwater Best Management Practices (BMPs) Stormwater Pollution Treatment Practices (Structural) DRAFT Shelbyville, Kentucky Stormwater Best Management Practices (BMPs) Stormwater Pollution Treatment Practices (Structural) Activity: Infiltration Systems PLANNING CONSIDERATIONS: Design Life: Short IS Acreage

More information

6 STORMWATER IMPROVEMENTS

6 STORMWATER IMPROVEMENTS 6 STORMWATER IMPROVEMENTS 6.01 General Requirements a. In addition to the standards contained in this, the design of stormwater systems is also governed by several ordinances and regulations. (1) Projects

More information

MODEL Stormwater Local Design Manual. City of Centerville

MODEL Stormwater Local Design Manual. City of Centerville MODEL Stormwater Local Design Manual City of Centerville Adopted December 6, 2005 TABLE OF CONTENTS 1. FORWARD... 1 2. GENERAL LEVEL OF SERVICE STANDARDS... 1 2.1. DETENTION REQUIREMENTS... 1 2.1.1. Discharge

More information

6 STORMWATER IMPROVEMENTS

6 STORMWATER IMPROVEMENTS 6 STORMWATER IMPROVEMENTS 6.01 General Requirements a. In addition to the standards contained in this, the design of stormwater systems is also governed by several ordinances and regulations. (1) Projects

More information

Chapter 4. Drainage Report and Construction Drawing Submittal Requirements

Chapter 4. Drainage Report and Construction Drawing Submittal Requirements 4.0 Introduction The requirements presented in this section shall be used to aid the design engineer or applicant in the preparation of drainage reports, drainage studies, and construction drawings for

More information

Warner Robins Stormwater Local Design Manual

Warner Robins Stormwater Local Design Manual Warner Robins Stormwater Local Design Manual Prepared for Houston County City of Warner Robins City of Perry City of Centerville May 17, 2005 Version 4 (As presented with adopted Stormwater Ordinance)

More information

MINNEHAHA CREEK WATERSHED DISTRICT BOARD OF MANAGERS REVISIONS PURSUANT TO MINNESOTA STATUTES 103D.341. Adopted April 24, 2014 Effective June 6, 2014

MINNEHAHA CREEK WATERSHED DISTRICT BOARD OF MANAGERS REVISIONS PURSUANT TO MINNESOTA STATUTES 103D.341. Adopted April 24, 2014 Effective June 6, 2014 MINNEHAHA CREEK WATERSHED DISTRICT BOARD OF MANAGERS REVISIONS PURSUANT TO MINNESOTA STATUTES 103D.341 Adopted April 24, 2014 Effective June 6, 2014 EROSION CONTROL RULE 1. POLICY. It is the policy of

More information

SECTION STORM DRAINAGE DESIGN, GRADING, AND WATER QUALITY TECHNICAL CRITERIA TABLE OF CONTENTS PAGE 402 STORM DRAINAGE DESIGN CRITERIA 400-1

SECTION STORM DRAINAGE DESIGN, GRADING, AND WATER QUALITY TECHNICAL CRITERIA TABLE OF CONTENTS PAGE 402 STORM DRAINAGE DESIGN CRITERIA 400-1 CITY OF THORNTON Standards and Specifications Revised: October 2012 SECTION 400 - STORM DRAINAGE DESIGN, GRADING, AND WATER QUALITY TECHNICAL CRITERIA TABLE OF CONTENTS PAGE 401 GENERAL PROVISIONS 400-1

More information

SECTION 3 DRAINAGE. 3-1 General. 3-2 Drainage Ordinances and Legal Requirements

SECTION 3 DRAINAGE. 3-1 General. 3-2 Drainage Ordinances and Legal Requirements SECTION 3 DRAINAGE 3-1 General All Drainage plans for proposed development shall be prepared by a Professional Engineer registered in Virginia, except as noted below. Further, their seal and signature

More information

SECTION 12 STANDARDS FOR CONSTRUCTION PLANS AND SPECIFICATIONS

SECTION 12 STANDARDS FOR CONSTRUCTION PLANS AND SPECIFICATIONS SECTION 12 STANDARDS FOR CONSTRUCTION PLANS AND SPECIFICATIONS 12.1 The subdivider shall construct and install the improvements in accordance with the County's Standards for Construction Plans and Specifications

More information

STORMWATER AND EROSION CONTROL PERMIT

STORMWATER AND EROSION CONTROL PERMIT STORMWATER MANAGEMENT AND EROSION CONTROL PERMIT INSTRUCTIONS AND INFORMATION Any project that involves the disturbance of ANY quantity of land requires the applicant to receive approval for the project

More information

CITY UTILITIES DESIGN STANDARDS MANUAL

CITY UTILITIES DESIGN STANDARDS MANUAL CITY UTILITIES DESIGN STANDARDS MANUAL () September 2017 Page Chapter 1 Acronyms and Definitions 1.01 Purpose 1 1.02 Acronyms 1 1.03 Definitions 3 Chapter 2 Introduction 2.01 Purpose 1 2.02 Applicability

More information

STORMWATER AND EROSION CONTROL PERMIT

STORMWATER AND EROSION CONTROL PERMIT STORMWATER MANAGEMENT AND EROSION CONTROL PERMIT INSTRUCTIONS AND INFORMATION Any project that involves the disturbance of ANY quantity of land requires the applicant to receive approval for the project

More information

Chapter 6. Hydrology. 6.0 Introduction. 6.1 Design Rainfall

Chapter 6. Hydrology. 6.0 Introduction. 6.1 Design Rainfall 6.0 Introduction This chapter summarizes methodology for determining rainfall and runoff information for the design of stormwater management facilities in the City. The methodology is based on the procedures

More information

NEW CASTLE CONSERVATION DISTRICT. through. (Name of Municipality) PLAN REVIEW APPLICATION DRAINAGE, STORMWATER MANAGEMENT, EROSION & SEDIMENT CONTROL

NEW CASTLE CONSERVATION DISTRICT. through. (Name of Municipality) PLAN REVIEW APPLICATION DRAINAGE, STORMWATER MANAGEMENT, EROSION & SEDIMENT CONTROL NEW CASTLE CONSERVATION DISTRICT through (Name of Municipality) PLAN REVIEW APPLICATION DRAINAGE, STORMWATER MANAGEMENT, EROSION & SEDIMENT CONTROL Office use only: Received by Municipality: Received by

More information

4.8. Subsurface Infiltration

4.8. Subsurface Infiltration 4.8. Subsurface Infiltration Subsurface infiltration systems are designed to provide temporary below grade storage infiltration of storm water as it infiltrates into the ground. Dry wells, infiltration

More information

LOT GRADING GUIDELINES FOR COMMERCIAL, INDUSTRIAL, INSTITUTIONAL, MEDIUM AND HIGH DENSITY RESIDENTIAL PROPERTIES

LOT GRADING GUIDELINES FOR COMMERCIAL, INDUSTRIAL, INSTITUTIONAL, MEDIUM AND HIGH DENSITY RESIDENTIAL PROPERTIES LOT GRADING GUIDELINES FOR COMMERCIAL, INDUSTRIAL, INSTITUTIONAL, MEDIUM AND HIGH DENSITY RESIDENTIAL PROPERTIES Contents COMMERCIAL, INDUSTRIAL, INSTITUTIONAL, MEDIUM AND HIGH DENSITY... 1 RESIDENTIAL

More information

4.8. Subsurface Infiltration

4.8. Subsurface Infiltration 4.8. Subsurface Infiltration Subsurface infiltration systems are designed to provide temporary below grade storage infiltration of stormwater as it infiltrates into the ground. Dry wells, infiltration

More information

Municipal Stormwater Ordinances Summary Table

Municipal Stormwater Ordinances Summary Table APPENDIX F Municipal Ordinances Summary Table Municipality Abington Bryn Athyn Borough Hatboro Borough Ordinance, SALDO Runoff equals pre post Erosion Sediment Control Water Quality Requirements Any which

More information

3.0 Planning and Submittal Requirements

3.0 Planning and Submittal Requirements October 2003, Revised February 2005 Chapter 3.0, Planning and Submittal Requirements Page 1 3.0 Planning and Submittal Requirements 3.1 Drainage Studies and Drawings The City of Greenwood Village (Village)

More information

TOWN OF MANCHESTER PLANNING AND ZONING COMMISSION Subdivision Application Minimum Submission Requirements

TOWN OF MANCHESTER PLANNING AND ZONING COMMISSION Subdivision Application Minimum Submission Requirements TOWN OF MANCHESTER PLANNING AND ZONING COMMISSION Subdivision Application Minimum Submission Requirements This checklist is to be completed and submitted with all Subdivision Applications. The Town reserves

More information

Practices that capture and temporarily store the WQ v before allowing it to infiltrate into the soil.

Practices that capture and temporarily store the WQ v before allowing it to infiltrate into the soil. Chapter 5: Acceptable Stormwater Management Practices (SMPs) This section presents a list of practices that are acceptable for water quality treatment. The practices on this list are selected based on

More information

C-1. Infiltration System

C-1. Infiltration System C-1. Infiltration System Design Objective An infiltration system captures surface stormwater runoff and allows it to infiltrate into the soil. This SCM is typically the work horse of a runoff volume match

More information

CHAPTER 4 - EROSION & SEDIMENT CONTROL AND STORMWATER MANAGEMENT ORDINANCE OF DUBUQUE COUNTY, IOWA. Adopted March 29, 2010.

CHAPTER 4 - EROSION & SEDIMENT CONTROL AND STORMWATER MANAGEMENT ORDINANCE OF DUBUQUE COUNTY, IOWA. Adopted March 29, 2010. CHAPTER 4 - EROSION & SEDIMENT CONTROL AND STORMWATER MANAGEMENT ORDINANCE OF DUBUQUE COUNTY, IOWA Adopted March 29, 2010 Table of Contents Page Part 1 Introduction...3 4-1 Title..................3 4-2

More information

100-yr Design Runoff (cfs) Basin ID 103b A a B B C Totals

100-yr Design Runoff (cfs) Basin ID 103b A a B B C Totals PROPOSED DEVELOPMENT The drainage for this site has been designed to be less than the maximum allowable runoff from each basin as stated in the Overall Rigden Farm drainage plan. Table 1 compares the actual

More information

PLANNING AND ZONING COMMISSION APPLICATION FOR IMPROVEMENT PLAT APPROVAL

PLANNING AND ZONING COMMISSION APPLICATION FOR IMPROVEMENT PLAT APPROVAL PLANNING AND ZONING COMMISSION APPLICATION FOR IMPROVEMENT PLAT APPROVAL Date Submitted: Project Number: CITY OF ALEXANDRIA 8236 WEST MAIN STREET ALEXANDRIA, KY 41001 (859) 635-4125 FAX (859) 635-4127

More information

Stormwater Erosion Control & Post-Construction Plans (Stormwater Quality Plans)

Stormwater Erosion Control & Post-Construction Plans (Stormwater Quality Plans) Stormwater Erosion Control & Post-Construction Plans (Stormwater Quality Plans) Allen County Stormwater Plan Submittal Checklist The following items must be provided when applying for an Allen County Stormwater

More information

Permeable Pavement. Pavements constructed with these units create joints that are filled with permeable

Permeable Pavement. Pavements constructed with these units create joints that are filled with permeable Permeable Permeable pavement is a paving system which allows rainfall to percolate through the surface into the underlying soil or an aggregate bed, where stormwater is stored and infiltrated to underlying

More information

DESIGN GRADING AND EROSION CONTROL A. Slope Criteria

DESIGN GRADING AND EROSION CONTROL A. Slope Criteria Section 5. DESIGN GRADING AND EROSION CONTROL A. Slope Criteria Earthen slopes shall conform to the following: Maximum slope should not be steeper than 6:1 (horizontal to vertical) unless protected from

More information

PART 3 - STANDARDS FOR SEWERAGE FACILITIES DESIGN OF STORM SEWERS

PART 3 - STANDARDS FOR SEWERAGE FACILITIES DESIGN OF STORM SEWERS PART 3 - STANDARDS FOR SEWERAGE FACILITIES 3.3 - DESIGN OF STORM SEWERS 3.301 Design of Storm Sewers A. General Information B. Investigations and Surveys C. Special Projects 3.302 Design Criteria for Storm

More information

STANDARD GRADING AND SOIL EROSION & SEDIMENT CONTROL PLAN FOR SINGLE LOT SINGLE FAMILY RESIDENTIAL CONSTRUCTION AND MINOR EARTH DISTURBANCES

STANDARD GRADING AND SOIL EROSION & SEDIMENT CONTROL PLAN FOR SINGLE LOT SINGLE FAMILY RESIDENTIAL CONSTRUCTION AND MINOR EARTH DISTURBANCES DIVISION OF ENGINEERING & CONSTRUCTION MANAGEMENT PLAN REVIEW DEPARTMENT WASHINGTON COUNTY SOIL CONSERVATION DISTRICT 1260 Maryland Avenue, Suite 101 Hagerstown, MD 21740 Telephone: (301) 797-6821, Ext.

More information

FORT COLLINS STORMWATER CRITERIA MANUAL Hydrology Standards (Ch. 5) 1.0 Overview

FORT COLLINS STORMWATER CRITERIA MANUAL Hydrology Standards (Ch. 5) 1.0 Overview Chapter 5: Hydrology Standards Contents 1.0 Overview... 1 1.1 Storm Runoff Determination... 1 1.2 Design Storm Frequencies... 1 1.3 Water Quality Storm Provisions... 2 1.4 Design Storm Return Periods...

More information

TABLE OF CONTENTS PART III - MINIMUM DESIGN STANDARDS Section 105 DRAINAGE SYSTEM DESIGN SPECIFICATIONS AND SCOPE 105.1

TABLE OF CONTENTS PART III - MINIMUM DESIGN STANDARDS Section 105 DRAINAGE SYSTEM DESIGN SPECIFICATIONS AND SCOPE 105.1 TABLE OF CONTENTS PART III - MINIMUM DESIGN STANDARDS Section 105 DRAINAGE SYSTEM DESIGN SECTION TITLE PAGE 105.1. SPECIFICATIONS AND SCOPE 105.1 105.2. METHODS OF ANALYSIS 105.1 105.2.1. Rational Method

More information

SUBDIVISION CHECKLIST. Subdivision Name. Prior To Review. Preliminary plan approved by Planning Commission / Council as required.

SUBDIVISION CHECKLIST. Subdivision Name. Prior To Review. Preliminary plan approved by Planning Commission / Council as required. SUBDIVISION CHECKLIST Subdivision Name Account Number Review Engineer Prior To Review Preliminary plan approved by Planning Commission / Council as required. Review fee paid. Statement of Responsibility

More information

DRAINAGE & DESIGN OF DRAINAGE SYSTEM

DRAINAGE & DESIGN OF DRAINAGE SYSTEM Drainage on Highways DRAINAGE & DESIGN OF DRAINAGE SYSTEM P. R.D. Fernando Chartered Engineer B.Sc.(Hons), M.Eng. C.Eng., MIE(SL) Drainage Requirement of Highway Drainage System Introduction Drainage means

More information

SECTION TRENCHING

SECTION TRENCHING SECTION 31 23 17 TRENCHING PART 1 GENERAL 1.1 SUMMARY A. Section Includes: 1. Excavating trenches for utilities and utility structures. 2. Bedding. 3. Backfilling and compacting to subgrade elevations.

More information

BMP 6.4.4: Infiltration Trench

BMP 6.4.4: Infiltration Trench BMP 6.4.4: Infiltration Trench An Infiltration Trench is a leaky pipe in a stone filled trench with a level bottom. An Infiltration Trench may be used as part of a larger storm sewer system, such as a

More information

HYDROLOGY CHECKLIST FOR LAND DISTURBANCE PERMITS

HYDROLOGY CHECKLIST FOR LAND DISTURBANCE PERMITS HYDROLOGY CHECKLIST FOR LAND DISTURBANCE PERMITS Project Name: Project Number: Reviewed By: Date: Telephone: Email: Address all items marked with an X Minimum Submittal Requirements 1. Conceptual Review

More information

Highway Drainage 1- Storm Frequency and Runoff 1.1- Runoff Determination

Highway Drainage 1- Storm Frequency and Runoff 1.1- Runoff Determination Highway Drainage Proper drainage is a very important consideration in design of a highway. Inadequate drainage facilities can lead to premature deterioration of the highway and the development of adverse

More information

16.0 Water Quality Management Criteria for Developed Land

16.0 Water Quality Management Criteria for Developed Land October 2003, Revised February 2005 Criteria for Developed Land Page 1 16.1 Introduction 16.0 Water Quality Management Criteria for Developed Land Stormwater quality control is an integral part of any

More information

Stormwater Management Studies PDS Engineering Services Division ES Policy # 3-01

Stormwater Management Studies PDS Engineering Services Division ES Policy # 3-01 Stormwater Management Studies PDS Engineering Services Division Revised Date: 2/28/08 INTRODUCTION The City of Overland Park requires submission of a stormwater management study as part of the development

More information

4.4.5 Grassed Swale (also known as Enhanced Swale or Biofiltration Swale)

4.4.5 Grassed Swale (also known as Enhanced Swale or Biofiltration Swale) Signs of trespass or unauthorized traffic Sediment buildup Additionally, a program of regular monitoring of the aquatic environment for a permanent wet detention basin should be established to allow for

More information

SECTION 4 STORM DRAINAGE

SECTION 4 STORM DRAINAGE 4.01 GENERAL SECTION 4 STORM DRAINAGE These standards shall provide minimum requirements for the design of Storm Drainage and related appurtenances within the City of West Sacramento rights of way and

More information

PRELIMINARY DRAINAGE STUDY

PRELIMINARY DRAINAGE STUDY PRELIMINARY DRAINAGE STUDY For 34 th & J Residences 3402 J St. San Diego, CA 92102 A.P.N 545-250-08 Prepared By: Kenneth J. Discenza, P.E. Site Design Associates, Inc. 1016 Broadway, Suite A El Cajon,

More information

CHAPTER 17: STORM SEWER STANDARDS Introduction Administration Standards 17.1

CHAPTER 17: STORM SEWER STANDARDS Introduction Administration Standards 17.1 CHAPTER 17: STORM SEWER STANDARDS 17.00 Introduction 17.01 Administration 17.02 Standards 17.1 17.00 INTRODUCTION The purpose of this chapter is to provide guidance for the design and construction of storm

More information

3.11 Sand Filter Basin

3.11 Sand Filter Basin 3.11 Sand Filter Basin Type of BMP Priority Level Treatment Mechanisms Maximum Drainage Area Flow-Through Treatment Priority 3 Treatment Control BMP Filtration 25 acres Description The Sand Filter Basin

More information

Chapter 3 Dispersion BMPs

Chapter 3 Dispersion BMPs Chapter 3 Dispersion BMPs 3.1 BMP L611 Concentrated Flow Dispersion 3.1.1 Purpose and Definition Dispersion of concentrated flows from driveways or other pavement through a vegetated pervious area attenuates

More information

UNIFORM DESIGN AND CONSTRUCTION STANDARDS FOR EXTENDING WATER DISTRIBUTION SYSTEMS SECTION 2 DESIGN STANDARDS

UNIFORM DESIGN AND CONSTRUCTION STANDARDS FOR EXTENDING WATER DISTRIBUTION SYSTEMS SECTION 2 DESIGN STANDARDS UNIFORM DESIGN AND CONSTRUCTION STANDARDS FOR EXTENDING WATER DISTRIBUTION SYSTEMS SECTION 2 DESIGN STANDARDS DESIGN STANDARDS SECTION 2 INDEX ITEM DESCRIPTION 2.00 GENERAL STATEMENT 2.01 WATER DISTRIBUTION

More information

TxDOT Houston District Permit Requirements (Information contained herein is subject to change)

TxDOT Houston District Permit Requirements (Information contained herein is subject to change) Houston District Permit Requirements (Information contained herein is subject to change) Access Driveway for Commercial / Industrial Developments; or Street Tie-In / Drainage-Only 1) Complete the three

More information

15A NCAC 02H.1005 STORMWATER REQUIREMENTS: COASTAL COUNTIES

15A NCAC 02H.1005 STORMWATER REQUIREMENTS: COASTAL COUNTIES 1 1 1 1 1 1 1 1 0 1 0 1 1A NCAC 0H.0 STORMWATER REQUIREMENTS: COASTAL COUNTIES (a) The following definitions are applicable to this rule: (1) Built upon area as defined in Session Law 00- means that portion

More information

STORM DRAINS AND IRRIGATION

STORM DRAINS AND IRRIGATION TABLE OF CONTENTS PART III - MINIMUM DESIGN STANDARDS Section 105 STORM DRAINS AND IRRIGATION 105.1. STORM DRAINS... 105.1 105.2. METHODS OF ANALYSIS... 105.1 105.2.1. Rational Method... 105.1 105.2.2.

More information

Submittal Requirements. Post Construction Verification Document Plan Requirements

Submittal Requirements. Post Construction Verification Document Plan Requirements Submittal Requirements Post Construction Verification Document survey plan in accordance with the items of this Checklist Supporting calculations in accordance with the items of this Checklist A copy of

More information

LOT GRADING GUIDELINES FOR LOW DENSITY RESIDENTIAL PROPERTIES

LOT GRADING GUIDELINES FOR LOW DENSITY RESIDENTIAL PROPERTIES LOT GRADING GUIDELINES FOR LOW DENSITY RESIDENTIAL PROPERTIES Contents LOT GRADING GUIDELINES... 3 LOW DENSITY RESIDENTIAL PROPERTIES... 3 Introduction... 3 Definitions:... 3 Purpose... 3 LOT GRADING APPROVAL

More information

City of Charlottesville Water Resources Protection Program

City of Charlottesville Water Resources Protection Program City of Charlottesville Water Resources Protection Program Stormwater Utility Fee Credits Manual Your guide to reducing stormwater utility fees and protecting our City s water resources. City of Charlottesville,

More information

CITY OF JENKS EARTH CHANGE PERMIT APPLICATION

CITY OF JENKS EARTH CHANGE PERMIT APPLICATION CITY OF JENKS EARTH CHANGE PERMIT APPLICATION Any applicable State or Federal permits must be attached to this application or must be applied for with copies attached to this application if this permit

More information

2. DEFINITIONS. American Association of State Highway and Transportation Officials.

2. DEFINITIONS. American Association of State Highway and Transportation Officials. 2. DEFINITIONS 2.010 Definitions [See Amendment 2] In addition to words and terms that may be defined elsewhere in this manual, the following words and terms shall have the meanings defined below: AASHTO:

More information

Storm Water System Improvements

Storm Water System Improvements IV Storm Water System Improvements A. General The purpose of this Section is to establish standard principles and practices for the design and construction of storm drainage facilities within the City

More information

CITY OF MIDDLETOWN STORM WATER UTILITY ADJUSTMENT AND CREDIT POLICY

CITY OF MIDDLETOWN STORM WATER UTILITY ADJUSTMENT AND CREDIT POLICY CITY OF MIDDLETOWN STORM WATER UTILITY ADJUSTMENT AND CREDIT POLICY JANUARY 2006 1 SECTION 1 - INTRODUCTION The City of Middletown established a Storm Water Utility on September 6 th, 2005, with the passage

More information

3.3 Acceptable Downstream Conditions

3.3 Acceptable Downstream Conditions iswm TM Criteria Manual - = Not typically used or able to meet design criterion. 1 = The application and performance of proprietary commercial devices and systems must be provided by the manufacturer and

More information

RETENTION BASIN EXAMPLE

RETENTION BASIN EXAMPLE -7 Given: Total Tributary Area = 7.5 ac o Tributary Area within Existing R/W = 5.8 ac o Tributary Area, Impervious, Outside of R/W = 0.0 ac o Tributary Area, Pervious, Outside of R/W = 1.7 ac o Tributary

More information

Ordinance No Lot Surface Drainage

Ordinance No Lot Surface Drainage Ordinance No. 35-2008 - Lot Surface Drainage The Township has adopted a new Lot Surface Drainage Ordinance which amends Chapter 170, Article IX, Subdivision and Site Plan Review by adding a new Section

More information

Local Stormwater Design Manual. City of Fairburn

Local Stormwater Design Manual. City of Fairburn APPENDIX D LOCAL STORMWATER DESIGN MANUAL Local Stormwater Design Manual City of Fairburn May 2008 TABLE OF CONTENTS 1. FORWARD... 1 2. GENERAL LEVEL OF SERVICE STANDARDS... 2 2.1. DETENTION REQUIREMENTS...

More information

Fort Collins Amendments to the Urban Drainage and Flood Control District Criteria Manual

Fort Collins Amendments to the Urban Drainage and Flood Control District Criteria Manual Fort Collins Amendments to the Urban Drainage and Flood Control District Criteria Manual Fort Collins Amendments to the Urban Drainage and Flood Control District Criteria Manual, adopted by the City Council

More information

PART V - STORM DRAIN DESIGN CRITERIA

PART V - STORM DRAIN DESIGN CRITERIA PART V - STORM DRAIN DESIGN CRITERIA A. Hydrology Studies and Hydraulic Analyses 1. Drainage area master plans and calculations are to be submitted with all subdivision improvement plans, permit improvement

More information

PART V - STORM DRAIN DESIGN CRITERIA

PART V - STORM DRAIN DESIGN CRITERIA PART V - STORM DRAIN DESIGN CRITERIA A. Hydrology Studies and Hydraulic Analyses 1. Drainage area master plans and calculations are to be submitted with all subdivision improvement plans, permit improvement

More information

Chapter 3: Post Construction Water Quality Best Management Practices

Chapter 3: Post Construction Water Quality Best Management Practices Chapter 3: Post Construction Water Quality Best Management Practices 3.1 Introduction to Stormwater Quality Under the regulations governing the NPDES Stormwater Phase II program, Montgomery County is required

More information

ILLINOIS URBAN MANUAL PRACTICE STANDARD TEMPORARY STREAM CROSSING (no.) CODE 975. Source: Hey and Associates, Inc.

ILLINOIS URBAN MANUAL PRACTICE STANDARD TEMPORARY STREAM CROSSING (no.) CODE 975. Source: Hey and Associates, Inc. ILLINOIS URBAN MANUAL PRACTICE STANDARD TEMPORARY STREAM CROSSING (no.) CODE 975 Source: Hey and Associates, Inc. DEFINITION A bridge or culvert crossing installed across a stream or watercourse for short-term

More information

REQUIRED INFORMATION Please check the following boxes that apply to your lot or parcel and complete the other requested information.

REQUIRED INFORMATION Please check the following boxes that apply to your lot or parcel and complete the other requested information. MARTIN COUNTY EXCAVATION AND FILL PERMIT APPLICATION This application to be used only for excavating or filling activities not associated with a building permit or development review and for projects requiring

More information

6.0 Runoff. 6.1 Introduction. 6.2 Flood Control Design Runoff

6.0 Runoff. 6.1 Introduction. 6.2 Flood Control Design Runoff October 2003, Revised February 2005 Chapter 6.0, Runoff Page 1 6.1 Introduction 6.0 Runoff The timing, peak rates of discharge, and volume of stormwater runoff are the primary considerations in the design

More information

CUYAHOGA COUNTY ENGINEER

CUYAHOGA COUNTY ENGINEER CUYAHOGA COUNTY ENGINEER DRAINAGE MANUAL Supplement to O.D.O.T. LOCATION and DESIGN MANUAL, Volume 2, Drainage Design, Section 1000 and 1100 May 28, 2010 Revisions to the July 29, 2009 edition are noted

More information

T a b l e o f C o n t e n t s

T a b l e o f C o n t e n t s C i t y o f G l a d s t o n e P u b l i c W o r k s D e s i g n S t a n d a r d s T a b l e o f C o n t e n t s SECTION THREE SANITARY SEWER REQUIREMENTS... 1 3.0000 SANITARY SEWERS... 1 3.0010 General

More information

GRASS-LINED CHANNEL (acre) CODE 840

GRASS-LINED CHANNEL (acre) CODE 840 NATURAL RESOURCES CONSERVATION SERVICE ILLINOIS URBAN MANUAL PRACTICE STANDARD GRASS-LINED CHANNEL (acre) CODE 840 (Source: NC Erosion and Sediment Control Field Manual) DEFINITION A natural or constructed

More information

Schedule A DISTRICT OF MAPLE RIDGE Watercourse Protection Bylaw

Schedule A DISTRICT OF MAPLE RIDGE Watercourse Protection Bylaw Schedule A DISTRICT OF MAPLE RIDGE Watercourse Protection Bylaw 6410 2006 The Erosion and Sediment Control plan should seek (i) to protect the soil surface from erosion where possible and (ii) capture

More information

E. STORMWATER MANAGEMENT

E. STORMWATER MANAGEMENT E. STORMWATER MANAGEMENT 1. Existing Conditions The Project Site is located within the Lower Hudson Watershed. According to the New York State Department of Environmental Conservation (NYSDEC), Lower Hudson

More information

STORM DRAINAGE DESIGN MANUAL

STORM DRAINAGE DESIGN MANUAL Appendix I STORM DRAINAGE DESIGN MANUAL by: SUNGATE DESIGN GROUP, P.A. GEN ERAL DESIGN STAN DARDS AN D POLICIES 1. STREET AND LOCAL DRAINAGE Discharge estimates for specified design storms shall be calculated

More information

CITY OF ASTORIA PUBLIC WORKS ENGINEERING DIVISION ENGINEERING DESIGN STANDARDS FOR IN-FILL DEVELOPMENT

CITY OF ASTORIA PUBLIC WORKS ENGINEERING DIVISION ENGINEERING DESIGN STANDARDS FOR IN-FILL DEVELOPMENT CITY OF ASTORIA PUBLIC WORKS ENGINEERING DIVISION ENGINEERING DESIGN STANDARDS FOR IN-FILL DEVELOPMENT Adopted by City Council: May 21, 2007 X:\General Eng\DESIGN STANDARDS\Engineering Design Standards

More information

City of Redwood City Stormwater Pollution Prevention Program. Drainage Guidelines for Residential Development

City of Redwood City Stormwater Pollution Prevention Program. Drainage Guidelines for Residential Development City of Redwood City Stormwater Pollution Prevention Program Drainage Guidelines for Residential Development General Requirements A. Plot & Finished Grading Plan must be submitted with Building Permit

More information

EROSION AND SEDIMENTATION CONTROL SECTION 1 - GENERAL 1.1 SUMMARY

EROSION AND SEDIMENTATION CONTROL SECTION 1 - GENERAL 1.1 SUMMARY 31 25 00 EROSION AND SEDIMENTATION CONTROL SECTION 1 - GENERAL 1.1 SUMMARY A. Erosion and sedimentation control shall be provided by the Contractor for all areas of the site denuded or otherwise disturbed

More information

Modular Porous Paver Systems

Modular Porous Paver Systems 4.3.11 Modular Porous Paver Systems General Application Water Quality BMP Description: A pavement surface composed of structural units with void areas that are filled with pervious materials such as sand

More information

CHELTENHAM TOWNSHIP Chapter 290: WATERSHED STORMWATER MANAGEMENT Article IV: Stormwater Management

CHELTENHAM TOWNSHIP Chapter 290: WATERSHED STORMWATER MANAGEMENT Article IV: Stormwater Management CHELTENHAM TOWNSHIP Chapter 290: WATERSHED STORMWATER MANAGEMENT Article IV: Stormwater Management Online ECode Available on Cheltenham Township Website at: http://ecode360.com/14477578 For all regulated

More information

EROSION CONTROL AND GRADING PERMIT APPLICATION

EROSION CONTROL AND GRADING PERMIT APPLICATION EROSION CONTROL AND GRADING PERMIT APPLICATION COMMUNITY DEVELOPMENT DEPARTMENT 1735 MONTGOMERY STREET OROVILLE, CA 95965 530-538-2420 FAX (530) 5382426 www.cityoforoville.org APPLICATION DATE PERMIT FEE

More information

Will County Site Development Permit Submittal Checklist TAB 1 PROJECT OVERVIEW

Will County Site Development Permit Submittal Checklist TAB 1 PROJECT OVERVIEW Applicant: Reviewer: Permit No.: The following tables contain a checklist of the requirements before a review for a Site Development Permit submittal will be accepted. Not all requirements pertain to every

More information

Storm Water Standards 105

Storm Water Standards 105 Storm Water Standards 105 Schematic of Dry Swale 2006 S-13 (Source: Center for Watershed Protection, modified) 106 Edgewood - Public Works Schematic of Grass Channel 2006 S-13 Storm Water Standards 107

More information

Chapter 3: Permit Procedures and Requirements

Chapter 3: Permit Procedures and Requirements Chapter 1: General Provisions 1 1 Short Title 1 2 Jurisdiction 1 3 Amendments and Revisions 1 4 Enforcement Responsibility 1 5 Review Process 1 6 Prior Approval 1 7 Relationship to Other Standards 1 8

More information

WQ-08 ENHANCED DRY SWALE

WQ-08 ENHANCED DRY SWALE Greenville County Technical Specification for: WQ-08 ENHANCED DRY SWALE 1.0 Enhanced Dry Swale 1.1 Description An Enhanced Dry Swale is a shallow open-channel drainage way stabilized with turf grass or

More information

STORM WATER MANAGEMENT STANDARDS DRAFT

STORM WATER MANAGEMENT STANDARDS DRAFT STORM WATER MANAGEMENT STANDARDS 1. Storm Water Management Plans (SWMP) - All development activity that is required to have a permit for land disturbing shall have an approved Storm Water Management Plan

More information

Permeable Pavement Facilities and Surfaces

Permeable Pavement Facilities and Surfaces Permeable Pavement Facilities and Surfaces This checklist is intended to highlight items critical to the performance of permeable pavement facilities and surfaces that need to be addressed in the design

More information

CENTRALIZED BMPS TYPICALLY PUBLICLY OWNED & MAINTAINED BMPS, TREATING A LARGE (>20 ACRES) URBAN DRAINAGE WITH MULTIPLE LAND

CENTRALIZED BMPS TYPICALLY PUBLICLY OWNED & MAINTAINED BMPS, TREATING A LARGE (>20 ACRES) URBAN DRAINAGE WITH MULTIPLE LAND BMP RAM BMP Type Definitions 1 CENTRALIZED BMPS TYPICALLY PUBLICLY OWNED & MAINTAINED BMPS, TREATING A LARGE (>20 ACRES) URBAN DRAINAGE WITH MULTIPLE LAND USES AND OWNERSHIP STRUCTURAL BMP TYPE OTHER NAMES

More information

Chapter 7. Street Drainage. 7.0 Introduction. 7.1 Function of Streets in the Drainage System. 7.2 Street Classification

Chapter 7. Street Drainage. 7.0 Introduction. 7.1 Function of Streets in the Drainage System. 7.2 Street Classification 7. Introduction This chapter summarizes methods to evaluate runoff conveyance in various street cross sections and curb types in the Town of Castle Rock and identifies acceptable upper limits of street

More information

APPLICATION FOR PUBLIC INFRASTRUCTURE PERMIT

APPLICATION FOR PUBLIC INFRASTRUCTURE PERMIT APPLICATION FOR PUBLIC INFRASTRUCTURE PERMIT Engineering Division 550 Landa Street New Braunfels, Texas 78130 (830) 221-4020 1. Subdivision Plat Name: Location Description/ Nearest Intersection: Acreage:

More information

SITE SPECIFIC GRADING PLAN FOR CONTIGUOUS SINGLE LOT SINGLE FAMILY RESIDENTIAL CONSTRUCTION WITH PREVIOUSLY APPROVED PRELIMINARY PLAT (FORM 2)

SITE SPECIFIC GRADING PLAN FOR CONTIGUOUS SINGLE LOT SINGLE FAMILY RESIDENTIAL CONSTRUCTION WITH PREVIOUSLY APPROVED PRELIMINARY PLAT (FORM 2) WASHINGTON COUNTY DIVISION OF PLAN REVIEW AND PERMITTING 80 West Baltimore Street Hagerstown, Maryland 21740-6003 Telephone: (240) 313-2460 FAX: (240) 313-2461 Hearing Impaired call 7-1-1 for Maryland

More information

Metropolitan St. Louis Sewer District Statement of Policy for Maintenance of Stormwater Sewer Systems

Metropolitan St. Louis Sewer District Statement of Policy for Maintenance of Stormwater Sewer Systems Metropolitan St. Louis Sewer District Statement of Policy for Maintenance of Stormwater Sewer Systems 1.0 Introduction Adequate drainage in the Metropolitan St. Louis area is necessary to preserve and

More information