1 Energy Conservation Work Shop on Knowledge exchange Platform on Best practices in Iron & Steel Industry By MCJ Energy Engineers Pvt Ltd
2 Who We are? MCJ Energy Engineers Pvt Ltd serving in energy conservation field for past 23 years and also an Accredited Energy Auditor & Empaneled Energy Consultant with BEE and EESL (MOP). Involved in Conducting 20+Baseline audit associate with EESL. 13 Monitoring and verification audit under 1 st PAT cycle. 20 Mandatory energy audit under EC ACT 2001 for Diverse Industries Thermal Power Plant, Cement, Iron and Steel and Paper and Pulp Industries. A total of 120+ energy audit have been done.
3 What We Do? Energy Audit / process & system wise Audit PAT Consultancy Energy efficiency Project consultancy / ISO Audit consultancy Solar Project Consultancy
4 Schematic Diagram of Steel Plant
5 Case Study on DRI Plant (350 TPD) Actual Mass Balance of Kiln (Basis 1 Kg Sponge Iron): Input T/Hr Kg Output T/Hr Kg Pellet Ore Sponge Iron 13 1 Coal Char Air Flue Gas 6.74 Dolomite Comparison of Theoretical Mass Balance vs. Actual Mass Balance & Its Result: Instead of 1.43, consumption of ore is 1.53 i.e. 6.9% higher than the stoichiometric ratio. This implies that the ore contains 6.4% impurity which finally comes out with char.
6 Similarly coal consumption is 1.73 instead of 0.64 i.e % higher than the theoretical requirement. The extra amount = 1.09 Kg is used as fuel to supply the heat required to make up additional losses. The reductant part of coal is 0.64 Kg and the fuel part 1.09 Kg. Therefore total heat supplied to the kiln in the process of making 1 Kg sponge iron is Kcal. We have already seen that theoretical heat supplied to the kiln to produce 1 Kg of sponge iron is Kcal and actual is Kcal. Therefore, Thermal efficiency of the Kiln is / = 61.15%.
7 Comments: 1.To produce 13 ton of sponge iron, 8.32 tons of coal are used as reducing agent which contributes to MKcal of heat tons of coal used as fuel which releases MKcal of heat. Total heat input to the kiln per hour is MKcal. 2) Heat loss thru flue gas is much less (44%) compared to theoretical one and value wise it is MKcal/hr. Its Used through WHRB to generate 7 MW. 3) In this manufacturing process the products (sponge iron + char) are generated at high temp (around 1000 C) and they need to be cooled below 100 C before they are sent to subsequent handling processes. 4) Cooling is done in rotary cooler 7.7 Mkcal is been energy wasted and 13% of the input.
8 5) On contrary, two major heat loss areas are most often overlooked by the plant people-loss of fixed carbon thru char and skin loss due to high surface temp of the kiln. 6) High percentage of fixed carbon is found in char. Fixed carbon is the major contributor of heat in coal. Loss of fixed carbon leads higher demand of coal in the process. This loss is 7.13% or 3.96 MKcal/hr. 7) Similarly skin loss (which is the combination of radiation & convection loss) is 8.13MKcal/hr or 14.16%. 8) These two losses put together is around 27% of the total heat input.
9 Heat Balance
10 Temperature C Temperature at different stage of Kiln 1400 Temperature in different zone Series Series
11 Energy Saving opportunity : 1. Flue gas Temperature at WHRB ESP outlet C. 2. Scope of Heat Recovery in cooler which is used to cool down the hot sponge iron from C to C. Waste Heat Recovery APH for PA fan for sponge Iron Kiln: To Kiln Air ESP Outlet / ID Fan Inlet Duct APH PAB Fan
12 The Hot gases from WHRB of the Kiln at Deg C would be taken into APH after ESP. After the exchange of the heat with the incoming primary air blower( PAB) air the hot flue gas will be sent back to stack through ID fan. Air from atmosphere is taken as suction by PAB fan and then forced through APH and then transmitted through suitable ducting to the kiln primary air inlet. Saving: The Air pre Heater system reduces heat requirement = Kcal/Hr Coal Saving = kgs/hr = tons/day Reduction in CO2 Emission = tons/ day
13 Waste Heat Recovery ORC Power Project based on Kiln shell heat recovery Waste heat recovery is one of the most important development fields for the organic Rankine cycle (ORC). It can be applied to heat and power plants for example a small scale cogeneration plant on a domestic water heater. The working principle of the organic Rankine cycle is the same as that of the Rankine cycle. Purpose of the ORC focuses on the recovery of low grade heat power, so a superheated approach like the traditional Rankine cycle is not required. A fluid with a high latent heat and density will absorb more energy from source in the evaporator and thus reduce the required flow rate, size of the facility and pump consumption.
14 Installation of ORC have no direct effect on fuel saving, but as it generates electricity and will partially avoid electricity being consumed from the power generated from the power plant, using coal as a fuel. So there will be a fuel saving in terms of saving in coal consumption of the total unit. Saving : Mass flow rate Sponge iron inlet temperature Sponge Iron Outlet Temp Thermal Energy ORC Recovery Net Power Power Plant Capacity Water Inlet Temperature Water outlet Temperature Total energy Saving = kg/hr = 1000 Deg C = 120 Deg C = KwTh = Kwe = 125 Kwe = 130 Kw = 90 deg C = 145 Deg C = 2550 units per day Energy Saving from ORC considering 330 Days of operation Coal Saving from APH, 330 days of operation Total Investment Payback Annual Saving = Lakh unit Amount= Rs Rs 4 per unit Saving : Mt of coal : Rs 20.6 Rs 2500/Mt Rs Lakh Rs Lakh 6.3 Years
15 Case Study on Coke Oven Plant The productivity and coke quality are affected by several factors such as Initial charging temperature, rate of heating, moisture content, bulk density, cooking time and temperature of carbonization uncontrollable: Controllable: Oven Operation Moisture Content In coke Uncontrollable: Quantity of coal blend Coal Cake Breakage and Bulging
16 Temperature in C Pressure in mmwc Temperature in C Temperature Temperature Oven No Comparision of Temperature and Pressure Oven No Temperature C High negative pressure and temperature will be on higher side. With By-pass temp: 203 C, Chimney: 204 C is found to be satisfactory but still temperature in chimney can be reduced. Flue gas temp: 956 C, Boiler I/L: 906 C a drop in 50 C in flue gas between Outlet of gas oven and Boiler Inlet due to cleaning process. ID fan in Waste heat recovery Boiler is operating at -27 mmwc Pressure Oven No Pressure mmwc Linear (Pressure mmwc)
17 Heat Input Heat Output Calorific value of coal X 10³ Kcal Calorific value of coke X 10³ Kcal Calorific value of coke X 10³ Kcal Calorific value of X 10³ Kcal oven gas coke oven gas Sensible heat in coke X 10³ Kcal Sensible heat in X 10³ Kcal coke oven gas Heat Consumed* X 10³ Kcal X 10³ Kcal X 10³ Kcal Coke: it carries both sensible heat and potential energy. Potential energy can be obtained by combustions. Sensible heat cannot be used because coke cannot be used directly in blast furnace. It is to quenched and then stored for future use. Coke oven gas: it also contains potential energy and sensible heat. One should consider usage of sensible heat and potential energy of coke oven gas. Gas existing from coke oven contains, among gaseous constituents, dust. Hence, cleaning is required which may lead to loss of sensible heat. 14MW of Waste heat recovery boiler is used recover heat in coke oven gas.
18 Case Study On Blast Furnace
19 Performance of the blast furnace is depending upon: productivity Quality of Raw material Operation of blast furnance Ratio of feeding Raw material Quality of Raw material: Ash content Sulphur CSR (coke strength after reaction) CRI (coke reactivity index) micum indexes (M40 or I 40 and M10 or I 10) Sinter Parameters Desired value Actual Value CaO/SiO ± MgO (%) 1.80 ± SiO2 (%) 5.75 ± FeO (%) < P (%) < Na2O+K2O (%) < ZnO (%) < RDI (%) < 20.0 NA
20 Flux Iron Content Burden HOT Blast temperature Pulverized coal and Oxygen enrichment Ratio of Raw Materials: Raw Mix: Iron ore + Sinter + Flux Fuel Mix: Coal + PCI Coke Consumption: T/THM PCI Consumption : T/THM Operating Parameters: Top Pressure Silicon Content Iron Ore 33% Sinter Iron Ore Sinter 67%
21 Energy Saving Measures Increase in 10% of burden mix use results decrease in coke consumption by 2%. So increasing 5% burden mix will reduce 1% of coke consumption. Specific Energy consumption: Kcal/THM Average monthly use of Coke= MT Saving = MT New Specific energy consumption = Kcal/THM Reduction In CO₂ Emission= Tons per day
22 Sinter Plant Measures These parameters are affectively analyzed by drawing relationship between the below given following. AL2O3 SCC 1.Al2O3 Vs Carbon Input 2.FeO Vs Tumbler index 3.Bed Permeability Vs Burn Through Point 4.Burn Through Point Vs FeO Fixed C Feo Bed Permeability Feo SCC Tumbler Index BTP BTP The parameter which determine permeability of sinter bed. 1. Pressure drop across bed 2. Air Flow Rate
23 Pressure Profile of Sinter Plant Pressure (mmwc) Bellow 1 Bellow 2 Bellow 3 Bellow 4 Bellow 5 Bellow 6 Bellow 7 Bellow 8 ESP I/L ESP O/L How pressure drop across wind box will affect permeability and what purpose of permeability? Maximum air inflation through air bed it gives complete consumption of fuel so specific fuel consumption will be reduced Δp can be increased by increasing the driving force across the bed i.e. under grate suction for sinter machine. But for a particular sinter machine, under grate suction depends on exhauster capacity & suction track dimensions. As per design pressure drop at ESP O/L should be -1100mmWC but they are achieving around -950 to -850 mmwc. If suction pressure is high then recirculating lines will be high that means pressure drop should be maintained as per requirement.
24 Case Study on Captive Power plants The efficiency is the different between losses and energy input. Parameters which influence Boiler efficiency Uncontrollable: GCV value of coal. Properties of coal. (%Carbon, %ash, %Hydrogen, %Nitrogen,%oxygen, %Moisture) Ambient Temperature. Controllable: Flue gas Outlet temperature at APH outlet. %O₂, % CO₂ and %CO in flue gas. Loss of Ignition
25 > Three 30TPH AFBC are consider for this case. > The graph which compares design and Actual efficiency. > Deficit in efficiency of boiler will be discussed further Design Vs Actual Efficiency AFBC -1 AFBC -2 AFBC-3 Design Actual
26 Heat Balance of Boiler
27 Flue gas temperature Vital Parameters %O₂ in Boiler Loss if ignition %O2 LOI Flue gas temperature AFBC AFBC AFBC
28 Reason for High LOI possible: LOI of 7% 1. There is severe Fluctuation in operating Load, FD air is Decreased or increased as per Load fluctuation. 2. PA was lesser than necessary. 3. FD was lesser than necessary. 4. The Furnace draft was maintained at Low instead of design draft. The operation indicates Air velocity already in decreased condition irrespective of load. The main reason was identified that the air settings indicated insufficient air in the system, causing LOI as unburn carbon.
29 Efficiency With 11 & 9.6 % O2 it will be either leakage from air pre heater tube or air ingress. Flue gas temperature is 10 C higher than design but it can be bring back to normal once O2% is under desired level. Desired Values: % O2 LOI Flue gas temperature AFBC AFBC-1 Actual Vs Design Desired Actual AFBC
30 Efficiency Efficiency %O2 LOI Flue gas temperatur e AFBC AFBC-2 Actual Vs Design Desired Actual AFBC %O2 LOI Flue gas temperatur e AFBC AFBC-3 Actual Vs Design Desired Actual AFBC
31 Performance on Economizer AFBC -1 AFBC- 3 ECO-1 ECO-3 Gas temperature at Economizer IN C Gas temperature at Economizer OUT C FW temperature at economizer IN C FW temperature at economizer OUT C HEAT GAINED BY FEED WATER EFFECTIVENESS % HEAT TRANSFER
32 Performance on Air-Preheater Calculation: Actual Air temperature at APHout : 117 C Design Air temperature at APHout : 137 C Desired Air Temperature at APHout : 127 C Heat pick 117 C Kcal/hr : Kcal/hr Heat Pick 127 C Kcal/hr: Kcal/hr GCV of Coal Kcal/Kg : 3100 Saving in Kcal/hr = Kcal/hr = /3100 = kg/hr Reduction in CO₂ = kg/hr Total saving = Rs 6.50 Lakh /annum Investment = Rs 6 lakh Payback = 11 Month Calculation: Actual Air temperature at APHout : 122 C Desired Air Temperature at APHout : 133 C Heat pick 122 C Kcal/hr : Kcal/hr Heat Pick 133 C Kcal/hr: Kcal/hr GCV of Coal Kcal/Kg : 3100 Saving in Kcal/hr Reduction in CO₂ Investment Payback = Kcal/hr = /3100 = kg/hr = kg/hr = Rs 8 Lakh = 6 Month
33 Case study on Boiler Feed Pump Parameter Units Design s value Flow m³/hr NA Pressure Kg/cm2 110 Power Kw 250 No of stages 11
34 Each feed control valve controls the quantity of the flow w.r.t the boiler drum level. Pressure drop across each equipment in the feed water circuit is estimated and as shown in the below table Parameters Pressure drop Approximately, 13 kg/cm2 is the pressure drop is taking place across the control valve. FRS (Flow 2 regulation station) ECO 3 Static head 3 Pipe losses 1 Total 9 kg/cm2 Boiler drum level is being controlled by three element control valve. This automatic flow based control valve operates based on the level of the boiler drum. As per the drum level the open % of the control valve varies. Flow controlling with the control valve is not an energy efficient mechanism. The loss happening across the control valve can be minimized / reduced by reducing the speed of the pump. With 11 stages of Boiler FEED PUMP each stage produces 10 kg/cm2. At present discharge pressure is 94.5 Kg/cm2. so only 9.5 stages are in operation doing useful work.
35 Recommendation: Blinding of one stage in BFP doesn t make any difference but it will make difference power consumption by motor as each stage consume 25 KW. Saving calculation: Present power consumption = 250 kw Savings at 8% = 20 kw Yearly savings (kwh) = 20 kw *8000 hours = kwh Yearly savings in Rs. = kwh x Rs. 4/kWh= Rs Investment = Rs 1Lakh Payback = 2 month
36 Temp In C Case Study on LP heater Performance assessment C C C C Temperature FW Heaters out Design vs measured Temperature FW Heaters In Temperature Extr Steam to Heaters Terminal Temperature Difference (TTD) measured Design Extraction Steam temperature is Low due to low pressure compared to design which is 5.6% 2. With Inlet Feed water temperature is 2.4% more than design. 3. Outlet feed water temperature is 8.2% less than Design. 4. TTD is more than design. 5. By considering Low Input and Same low output with TTD as supportive parameter also less than Design. 6. We can conclude that LP heater working satisfactory.
37 Case Study on HP heater Performance assessment 1. Extraction Steam temperature is Low due to low pressure compared to design which is 4.9% 2. With Inlet Feed water temperature is 4.2% less than design. 3. Outlet feed water temperature is 6.4% less than Design. 4. TTD is greater than design. 5. By considering Low Input and Same low output with TTD as supportive parameter also greater than Design. 6. So it can be concluded that HP heaters need to be checked.
38 HP HEATER MEASURED DESIRED FW temp outlet (ºC) FW temp inlet (ºC) FW flow (TPH) SATURATION Temp. (ºC) Sp. Heat of water(cp) HEAT (KJ/kg) HEAT (Kcal/hr) HEAT LOSS (Kcal/hr) GCV OF COAL(Kcal/kg) 4015 FUEL LOSS (TPA) Considering 50% achievable 183 FUEL COST (Rs./Ton) 4500 SAVINGS (LPA) 8 Investment 5 Payback 8 Months Saving Calculation
39 Case Study on cooling Tower Parameter Unit CW-1 CW-2 CT outlet temp To C CT Inlet temp Ti C Wet Bulb Temperature of air Tw C Flow m3/hr Efficiency of cooling Tower Range C Approach C COMPARISION CHART CW-1 CW Efficiency Range C Approach C
40 Condenser Performance associate with cooling Towers Parameter Unit Conden ser-1 Condenser -2 Unit Load MW vacuum Kg/cm² Condenser CW inlet temp C Condenser CW outlet temp C Condenser CW flow m³/hr Vacuum in Condenser is getting deteriorated due to Outlet cooling water from cooling tower. 2. Approach to maintain between 3-4 C. 3. Where flow of Cooling tower is 2992 m3/hr but capacity of cooling tower is around 2160 m3/hr and required is 2980m3/hr. so the cooling tower need to be upgraded to required capacity or to be replace cooling tower. Rise in cooling water temperature C 8.6 6
41 Recommendation and Saving Calculation Recommendation: CW-2 cooling tower need to be upgraded or to be replaced. Saving Calculation: 1. Condenser Vacuum can be maintained and to improve the desired vacuum of Kg/cm2 Comparision of Heat Rate The estimated steam savings/mw = 0.27 Ton/MW Turbine heat Rate Kacl/hr The steam savings/hr = 0.27 x 5.5 Linear (Turbine heat Rate Kacl/hr) = 1.49 tons The equivalent generation per hr = 0.24 MWh Taking 60% achievement = MW The Annual 0.85% = MWh The estimated savings in Rs 5 = Rs.44 Lakh Vaccum Vaccum -0.91
42 2. The ΔT of the cooling water across cooling tower will be improved and flow of the cooling water can be further be reduced. By mass balance between present and improved operating conditions M1 X cp X Δt1 = M2 X cp X Δt2 M1 X Cp X (38-32) = M2 X cp X (38-28) M2 = 0.4 M1 Hence 15 % reduction in flow is possible on conservative side. 15% power reduction in Cooling Water Flow. 3. Present Power consumption of pump (Cw-1 and Cw-2) = 251 Kw Power saving Rs 5 = 251*0.15*330*24 = kwh = Rs. 14 Lakh Total saving In Kw = = kwh Total Saving in Rs. Total Investment for new cooling tower = 58 Lakh = Rs 120 Lakh Pay back = 25 month or 2 years
43 Our clients
44 Contact us: Bhilai Office: ; to Visit :
14 th NATIONAL CERTIFICATION EXAMINATION FOR ENERGY AUDITORS August, 2013
14 th NATIONAL CERTIFICATION EXAMINATION FOR ENERGY AUDITORS August, 2013 PAPER 4: Energy Performance Assessment for Equipment and Utility Systems Date: 25.8.2013 Timings: 14:00-16:00 Hrs Duration: 2 Hrs
More information19 th NATIONAL CERTIFICATION EXAMINATION FOR ENERGY MANAGERS & ENERGY AUDITORS SEPTEMBER, 2018 PAPER 2: ENERGY EFFICIENCY IN THERMAL UTILITIES
Paper 2 Set A 19 th NATIONAL CERTIFICATION EXAMINATION FOR ENERGY MANAGERS & ENERGY AUDITORS SEPTEMBER, 2018 PAPER 2: ENERGY EFFICIENCY IN THERMAL UTILITIES Section I: OBJECTIVE TYPE Marks: 50 x 1 = 50
More informationBEST PRACTICES IN THERMAL POWER PLANT. Confederation of Indian Industry CII Godrej Green Business Centre, Hyderabad, India
BEST PRACTICES IN THERMAL POWER PLANT Confederation of Indian Industry CII Godrej Green Business Centre, Hyderabad, India Agenda Indian Scenario Power Plant Factors affecting Power Plant Performance Case
More information17 th NATIONAL CERTIFICATION EXAMINATION FOR ENERGY MANAGERS & ENERGY AUDITORS September, PAPER 2: Energy Efficiency in Thermal Utilities
Regn No: Name : (To be written by the candidate) 17 th NATIONAL CERTIFICATION EXAMINATION FOR ENERGY MANAGERS & ENERGY AUDITORS September, 2016 PAPER 2: Energy Efficiency in Thermal Utilities Date: 24.09.2015
More information16 th NATIONAL CERTIFICATION EXAMINATION FOR ENERGY MANAGERS & ENERGY AUDITORS September, 2015
16 th NATIONAL CERTIFICATION EXAMINATION FOR ENERGY MANAGERS & ENERGY AUDITORS September, 2015 PAPER 2: Energy Efficiency in Thermal Utilities Date: 19.09.2015 Timings: 1400-1700 HRS Duration: 3 HRS Max.
More informationMODEL SOLUTIONS. 16 th NATIONAL CERTIFICATION EXAMINATION FOR ENERGY MANAGERS & ENERGY AUDITORS September, 2015
MODEL SOLUTIONS 16 th NATIONAL CERTIFICATION EXAMINATION FOR ENERGY MANAGERS & ENERGY AUDITORS September, 2015 PAPER 2: Energy Efficiency in Thermal Utilities Date: 19.09.2015 Timings: 1400-1700 HRS Duration:
More information16 th NATIONAL CERTIFICATION EXAMINATION FOR ENERGY MANAGERS & ENERGY AUDITORS September, 2016
Regn No: Name : (To be written by the candidate) 16 th NATIONAL CERTIFICATION EXAMINATION FOR ENERGY MANAGERS & ENERGY AUDITORS September, 2016 PAPER 4:Energy Performance Assessment for Equipment and Utility
More information16 th NATIONAL CERTIFICATION EXAMINATION FOR ENERGY MANAGERS & ENERGY AUDITORS September, 2016
Regn No: Name : (To be written by the candidate) 16 th NATIONAL CERTIFICATION EXAMINATION FOR ENERGY MANAGERS & ENERGY AUDITORS September, 2016 PAPER 4:Energy Performance Assessment for Equipment and Utility
More informationMODEL SOLUTIONS. 16 th NATIONAL CERTIFICATION EXAMINATION FOR ENERGY MANAGERS & ENERGY AUDITORS September, 2015
MODEL SOLUTIONS 16 th NATIONAL CERTIFICATION EXAMINATION FOR ENERGY MANAGERS & ENERGY AUDITORS September, 2015 PAPER 2: Energy Efficiency in Thermal Utilities Date: 19.09.2015 Timings: 1400-1700 HRS Duration:
More informationMODEL SOLUTIONS. 16 th NATIONAL CERTIFICATION EXAMINATION FOR ENERGY MANAGERS & ENERGY AUDITORS September, 2015
MODEL SOLUTIONS 16 th NATIONAL CERTIFICATION EXAMINATION FOR ENERGY MANAGERS & ENERGY AUDITORS September, 2015 PAPER 2: Energy Efficiency in Thermal Utilities Date: 19.09.2015 Timings: 1400-1700 HRS Duration:
More information16 th NATIONAL CERTIFICATION EXAMINATION FOR ENERGY MANAGERS & ENERGY AUDITORS September, 2015
Regn No: Name : (To be written by the candidate) 16 th NATIONAL CERTIFICATION EXAMINATION FOR ENERGY MANAGERS & ENERGY AUDITORS September, 2015 PAPER 2: Energy Efficiency in Thermal Utilities Date: 19.09.2015
More information7 th NATIONAL CERTIFICATION EXAMINATION Nov FOR ENERGY MANAGERS & ENERGY AUDITORS
Regn No: Name: (To be written by the candidates) 7 th NATIONAL CERTIFICATION EXAMINATION Nov. 2008 FOR ENERGY MANAGERS & ENERGY AUDITORS PAPER 2: Energy Efficiency in Thermal Utilities Date: 22.11.2008
More information16 th NATIONAL CERTIFICATION EXAMINATION FOR ENERGY MANAGERS & ENERGY AUDITORS September, 2015
16 th NATIONAL CERTIFICATION EXAMINATION FOR ENERGY MANAGERS & ENERGY AUDITORS September, 2015 PAPER 4:Energy Performance Assessment for Equipment and Utility Systems Date: 20.09.2015 Timings: 14:00-16:00
More informationEnergy Efficiency: Best Practices Thermal Power Stations
Energy Efficiency: Best Practices Thermal Power Stations By Ravindra Datar Senergy Consultants (P) Ltd Cell: +91 9821271630 ravi@senergy.co.in www.senergy.india.com Key Parameters Inlet (as well as Re-heater)
More information15 th NATIONAL CERTIFICATION EXAMINATION FOR ENERGY AUDITORS August, 2014
15 th NATIONAL CERTIFICATION EXAMINATION FOR ENERGY AUDITORS August, 2014 Paper 4 SET A PAPER 4: Energy Performance Assessment for Equipment and Utility Systems Date: 24.8.2013 Timings: 14:00-16:00 Hrs
More informationChapter 4.3: Cogeneration, Turbines (Gas, Steam)
Short type questions Chapter 4.3: Cogeneration, Turbines (Gas, Steam) 1. What could be the range of energy saving potential from co-generation systems? Co-generation offers energy savings in the range
More informationPerformance Improvement and Efficiency Optimization of an Industry through Energy Audit
Performance Improvement and Efficiency Optimization of an Industry through Energy Audit Barot Vishal Kumar G, Sirish K Patel Department of Mechanical Engineering, Government Engineering College Valsad,
More information17 th NATIONAL CERTIFICATION EXAMINATION FOR ENERGY MANAGERS & ENERGY AUDITORS September, 2016 PAPER 1: GENERAL ASPECTS OF ENERGY MANAGEMENT & ENERGY
17 th NATIONAL CERTIFICATION EXAMINATION FOR ENERGY MANAGERS & ENERGY AUDITORS September, 2016 PAPER 1: GENERAL ASPECTS OF ENERGY MANAGEMENT & ENERGY AUDIT Date: 24.09.2016 Timings: 0930-1230 HRS Duration:
More informationCHAPTER 2 STUDY OF 210 MW BOILER SYSTEM 2.1 DESCRIPTION OF 210 MW BOILER
8 CHAPTER 2 STUDY OF 210 MW BOILER SYSTEM 2.1 DESCRIPTION OF 210 MW BOILER Detailed study has been carried out on a 210 MW boiler system with regard to model development, control and optimization. Figure
More information16 th NATIONAL CERTIFICATION EXAMINATION FOR ENERGY MANAGERS & ENERGY AUDITORS September, 2015
Note to Evaluator: Please give marks for the steps & logic. A mistake in value in initial step would lead to subsequent steps getting wrong values. Consider 75% marks, if step is right. 16 th NATIONAL
More informationIndustrial Thermal Utilities
Industrial Thermal Utilities Engr. Adnan Qamar Lecturer adnan@uet.edu.pk WEEK_06 Introduction What is Waste Heat? Dumped heat that can still be reused Value (quality) more important than quantity Waste
More informationBoilers & Fired Systems. Clean Coal Technology Dr. Tanveer Iqbal
Boilers & Fired Systems Clean Coal Technology Dr. Tanveer Iqbal 1 What is a Boiler? Vessel that heats water to become hot water or steam At atmospheric pressure water volume increases 1,600 times Hot water
More informationRegn No: Name : (To be written by the candidate)
Regn No: Name : (To be written by the candidate) 17 th NATIONAL CERTIFICATION EXAMINATION FOR ENERGY MANAGERS & ENERGY AUDITORS September, 2016 PAPER 4:Energy Performance Assessment for Equipment and Utility
More informationORC Technology for waste Heat Recovery Power Generation. Dr Vijayakumar Kunche, M.Tech., Ph.D.
ORC Technology for waste Heat Recovery Power Generation Dr Vijayakumar Kunche, M.Tech., Ph.D. Waste Heat - Present situation Industrial Processes use Oil, Gas, Coal or electricity for Heating Furnaces,
More informationAUXILIARY POWER MEASUREMENT, OPTIMIZATION & ANALYSIS. Steag Energy Training Center EEC WORKSHOP to
AUXILIARY POWER MEASUREMENT, OPTIMIZATION & ANALYSIS Steag Energy Training Center EEC WORKSHOP-25.09.2013 to 27.09.2013 Heat Input into a Large Coal Fueled Power Plant- Sub Critical design. 3% Stack Clean-up
More informationPerformance Analysis of Cement manufacturing Industry
www.ijecs.in International Journal Of Engineering And Computer Science ISSN:2319-7242 Volume 4 Issue 3 March 2015, Page No. 10937-10941 Performance Analysis of Cement manufacturing Industry Neeraj Pandagre
More informationAgenda. Two Examples from Sports. Olympic Gold Medal Winners in High Jump. CII Sohrabji Godrej Green Business Centre, Hyderabad. Energy Conservation
Energy Conservation CII Sohrabji Godrej Green Business Centre, Hyderabad A unique Public Private Partnership ( CII, Govt of Andhra Pradesh, USAID and Pirojsha Godrej Foundation ) Opportunities in Boilers
More informationNATIONAL CERTIFICATION EXAMINATION 2004 FOR ENERGY MANAGERS
NATIONAL CERTIFICATION EXAMINATION 2004 FOR ENERGY MANAGERS PAPER EM2: Energy Efficiency in Thermal Utilities Date: 22.05.2004 Timings: 1400-1700 HRS Duration: 3 HRS Max. Marks: 150 General instructions:
More informationBoiler Efficiency Testing. To understand the operation of a fire tube boiler To determine the operating efficiency of the boiler
Boiler Efficiency Testing Objectives: To understand the operation of a fire tube boiler To determine the operating efficiency of the boiler Theory Most industrial processes require heating. This is usually
More informationInternational Journal of Advance Engineering and Research Development
Scientific Journal of Impact Factor (SJIF): 3.134 International Journal of Advance Engineering and Research Development Volume 3, Issue 2, February -2016 e-issn (O): 2348-4470 p-issn (P): 2348-6406 ENERGY
More informationCO27: DEVELOPMENT OF AN EFFICIENT SLOP FIRED BOILER. Speaker Rajesh Singla. ISGEC Heavy Engineering Ltd, Noida, India IBEES
IBEES CO27: DEVELOPMENT OF AN EFFICIENT SLOP FIRED BOILER Speaker Rajesh Singla ISGEC Heavy Engineering Ltd, Noida, India At : 29th ISSCT, Chiang Mai, Thailand, 7 Dec 2016 AUTHORS A.K. Subramanian Head
More informationEnergy Audit of 250 MW Thermal Power Stations PTPS, Panipat
Energy Audit of 250 MW Thermal Power Stations PTPS, Panipat Vikrant Bhardwaj 1, Rohit Garg 2, Mandeep Chahal 3, Baljeet Singh 4 1 Asstt. Professor in Deptt. Of Mechanical Engineering, IIET, (Kinana) Jind
More informationSOME ENERGY-EFFICIENT TECHNOLOGIES IN JAPAN
SOME ENERGY-EFFICIENT TECHNOLOGIES IN JAPAN (EXECUTIVE SESSION) November, 2007 JAPAN EXTERNAL TRADE ORGANIZATION JAPAN CONSULTING INSTITUTE SOME ENERGY-EFFICIENT TECHNOLOGIES IN JAPAN 1. Power Generation
More information18 th NATIONAL CERTIFICATION EXAMINATION FOR ENERGY MANAGERS & ENERGY AUDITORS September, 2017
Regn No: Name : (To be written by the candidate) 18 th NATIONAL CERTIFICATION EXAMINATION FOR ENERGY MANAGERS & ENERGY AUDITORS September, 2017 PAPER 4:Energy Performance Assessment for Equipment and Utility
More informationBOILERS. Outline. Introduction. Types of Boilers. Assessment of a Boiler. Energy Efficiency Opportunities 2/16/2014
BOILERS Maravillo, Shiela May Molina, Marc Andrei Outline Introduction Types of Boilers Assessment of a Boiler Energy Efficiency Opportunities 1 I n t r o d u c t i o n What is a Boiler? pressure vessel
More informationEnergy Analysis of 12.5 MW Co-generation plant at Porbandar
Energy Analysis of 12.5 MW Co-generation plant at Porbandar 1 MILAN PANKHANIYA, 2 AKASH SHUKLA, 3 ASHUTOSH JOSHI, 4 HARDIK PANELIYA 1,4 Lecturer in Mechanical Engineering Department, Atmiya Institute of
More informationCHAPTER 6 BOILER EFFICIENCY
CHAPTER 6 BOILER EFFICIENCY 6.1 Introduction Boiler operation is very complex and plays very important role in sugar mill. Sugar mill requires steam for the process and electric power for auxiliary consumption.
More informationSTORM ONE MORE TIME: FIRST APPLY THE FUNDAMENTALS! S T O R M T E C H N O L O G I E S, I NC.
STORM S T O R M T E C H N O L O G I E S, I NC. ONE MORE TIME: FIRST APPLY THE FUNDAMENTALS! The right way to improve plant performance for best capacity, efficiency, reliability, turn down and minimal
More informationEstimation of Heat Losses in Textile Industrial Boiler and Energy Conservation Opportunities Case Study.
International Journal of Advance Engineering and Research Development Scientific Journal of Impact Factor (SJIF): 4.7 Special Issue SIEICON-017,April -017 e-issn : 348-4470 p-issn : 348-6406 Estimation
More informationPerformance of Thermal Power Plant on System Based
Performance of Thermal Power Plant on System Based Mr. Manjeet B Shende 1, Prof. N. N. Shinde 2*, Prof. S. B. Desai 3*, Prof. M.M. Wagh 4* 1 2 4Energy Technology, Dept. of Technology, Shivaji University,
More information16 th NATIONAL CERTIFICATION EXAMINATION FOR ENERGY MANAGERS & ENERGY AUDITORS September, 2015
16 th NATIONAL CERTIFICATION EXAMINATION FOR ENERGY MANAGERS & ENERGY AUDITORS September, 2015 PAPER 4:Energy Performance Assessment for Equipment and Utility Systems Date: 20.09.2015 Timings: 14:00-16:00
More information4.1 Introduction 4.2 Kiln System. 4.3 Kiln System Analysis 4.4 Results and Discussion 4.5 Conclusion
ENERGY AND EXERGY ANALYSIS OF THE KILN SYSTEM IN THE CEMENT PLANT 4 Contents 4.1 Introduction 4.2 Kiln System. 4.3 Kiln System Analysis 4.4 Results and Discussion 4.5 Conclusion 4.1 Introduction The conservation,
More informationAssessment of Losses of Reheating Furnace in a Steel Re-Rolling Mill
Assessment of Losses of Reheating Furnace in a Steel Re-Rolling Mill Yogesh Chandra Gupta 1 1 Industry Fellow, College of Engineering Studies, University of Petroleum & Energy Studies, Energy Acres, Bidholi
More informationEnergy Efficiency Strategies Waste Heat Recovery & Emission Reductions
Energy Efficiency Strategies Waste Heat Recovery & Emission Reductions TUR Continuing Education Conference Sturbridge Host Hotel April 14, 2010 With fuel prices increasing and environmental pressure to
More informationTransPacific Energy Advantage: Case Studies
TransPacific Energy Advantage: Case Studies Typical Power Plant TPE-ORC 0.60 KWh ORC 2.3 KWh LP steam 0.35 KWh 30% (maximum) 2.05 KWh CHP Typical Power Generated 1.1 KWh Typical Power Wasted 2.31 KWh Typical
More informationBest Energy Practices Implementation in Seshasayee Paper
Best Energy Practices Implementation in Seshasayee Paper Knowledge Exchange Platform Workshop Bureau of Energy Efficiency & Institute of Industrial Productivity New Delhi 26 th Feb 2015 Dr T.G.Sundara
More informationLecture (6) on. Schematic of a Thermal Power Plant. By Dr. Emad M. Saad. Mechanical Engineering Dept. Faculty of Engineering.
1 2 Lecture (6) on Schematic of a Thermal Power Plant By Dr. Emad M. Saad Mechanical Engineering Dept. Faculty of Engineering Fayoum University Faculty of Engineering Mechanical Engineering Dept. 2015-2016
More informationHigh Efficient Cogeneration in Seshasayee Paper -Erode
High Efficient Cogeneration in Seshasayee Paper -Erode Dr T.G.Sundara Raman Seshasayee Paper and Boards Ltd. National Workshop for Promoting Industrial Energy Efficiency KEP/BEE New Delhi 8 th Nov. 2016
More informationBEST PRACTICES ON ENERGY EFFICIENCY
BEST PRACTICES ON ENERGY EFFICIENCY > JSW Steel Limited, Dolvi Works Key Themes: Lowest Energy Consuming unit amongst Integrated Steel Plant in India Continuously Improving Energy
More informationPerformance Analysis of 210 Mw at NTPC Vindhyachal, Singrauli
International Journal of Current Engineering and Technology E-ISSN 2277 4106, P-ISSN 2347 5161 2017 INPRESSCO, All Rights Reserved Available at http://inpressco.com/category/ijcet Research Article Sadhana
More informationWaste Heat to Power Economic Tradeoffs and Considerations
Waste Heat to Power Economic Tradeoffs and Considerations By Dr. Arvind C. Thekdi E3M, Inc. Presented at 3 rd Annual Waste Heat to Power Workshop 2007 September 25, 2007 Houston, TX. Waste Heat Sources
More information18 th NATIONAL CERTIFICATION EXAMINATION FOR ENERGY MANAGERS & ENERGY AUDITORS September, 2017
Regn No: Name : (To be written by the candidate) 18 th NATIONAL CERTIFICATION EXAMINATION FOR ENERGY MANAGERS & ENERGY AUDITORS September, 2017 PAPER 2: Energy Efficiency in Thermal Utilities Date: 23.09.2017
More information18 th NATIONAL CERTIFICATION EXAMINATION FOR ENERGY MANAGERS & ENERGY AUDITORS September, 2017
Regn No: Name : (To be written by the candidate) 18 th NATIONAL CERTIFICATION EXAMINATION FOR ENERGY MANAGERS & ENERGY AUDITORS September, 2017 PAPER 2: Energy Efficiency in Thermal Utilities Date: 23.09.2017
More informationImpact of novel PCC solvents on existing and new Australian coal-fired power plants 1 st PCC Conference, Abu-Dhabi
Impact of novel PCC solvents on existing and new Australian coal-fired power plants 1 st PCC Conference, Abu-Dhabi Dr Narendra Dave Principal Research Engineer CSIRO Energy Technology, North Ryde, Australia
More informationGenerate Green Power. using ORC technology
Organic Rankine Cycle Technology Generate Green Power from agricultural waste biomass using ORC technology Antonio MENDES NAZARE Organic Rankine Cycle Technology 2 Summary Executive Summary 1) Current
More informationSuperior Efficiency Reduced Costs Viable Alternative Energy Kalex Kalina Cycle Power Systems For Biomass Applications
Superior Efficiency Reduced Costs Viable Alternative Energy Kalex Kalina Cycle Power Systems For Biomass Applications Copyright 2009, 2010, Kalex LLC. Kalex LLC's Kalina Cycle for Biomass Applications
More informationMARAMA Webinar August 7, Angelos Kokkinos Chief Technology Officer Babcock Power, Inc.
MARAMA Webinar August 7, 2014 Angelos Kokkinos Chief Technology Officer Babcock Power, Inc. Rankine cycle is a thermodynamic cycle which converts heat into work. The heat is supplied externally to a closed
More information1 st Renewable Energy Technologies, LP. Organic Rankine Cycle
11/18/2010 1 st Renewable Energy Technologies, LP 8147 Clear Shade Drive, Windber, PA 15963 Phone: (814) 467-0431 Fax: (814) 467-8675 Email: Sales@1stRET.com Web: www.1stret.com Organic Rankine Cycle The
More informationENERGY EFFICIENCY BENCHMARKING FOR CEMENT INDUSTRY- IMPROVEMENT OPPORTUNITIES
2ND WORKSHOP ON BEST PRACTICES IN ENERGY EFFICIENCY IN CEMENT SECTOR UNDER KEP INITIATIVE ENERGY EFFICIENCY BENCHMARKING FOR CEMENT INDUSTRY- IMPROVEMENT OPPORTUNITIES 7 th & 8 th July 16, at My Home Industries
More informationHeat Balance in Pyrometallurgical Processes
Heat Balance in Pyrometallurgical Processes The heat balance shows the important sources of heat energy and their relative contribution to the total energy usage in a process The heat balance in general
More informationPRODUCTIVITY IMPROVEMENT AND ITS RELEVANCE IN INDIAN CEMENT INDUSTRY- CASE STUDIES Rabindra Singh *, Ramachandra Rao* AK Mishra *
ABSTRACT PRODUCTIVITY IMPROVEMENT AND ITS RELEVANCE IN INDIAN CEMENT INDUSTRY- CASE STUDIES Rabindra Singh *, Ramachandra Rao* AK Mishra * S Kumar**, Lokesh Bahety**, NKM Sudhakar*** * National Council
More informationTheme 4. Energy Efficiency. I-Fundamentals. Nguyen Thi Anh Tuyet Hanoi University of Science and Technology
Theme 4 Energy Efficiency I-Fundamentals Nguyen Thi Anh Tuyet Hanoi University of Science and Technology Energy types Contents - Primary energy - Secondary energy - The difference between power and energy
More informationENERGY RECOVERY IMPROVEMENT USING ORGANIC RANKINE CYCLE AT COVANTA S HAVERHILL FACILITY
Proceedings of the 18th Annual North American Waste-to-Energy Conference NAWTEC18 May 11-13, 2010, Orlando, Florida, USA Paper Number: NAWTEC18-3563 ENERGY RECOVERY IMPROVEMENT USING ORGANIC RANKINE CYCLE
More informationBoiler and. steadily increases while the supply decreases energy
FEATURE ARTICLE by William G. Acker ENERGY SURVEYS FOR Stewart Cohen/Stone The efficient use of energy is fast becoming a top concern for industry. As business managers become more conscientious about
More informationChapter 2.1: Fuels and Combustion
Chapter 2.1: Fuels and Combustion Part I: Objective type Questions and Answers 1. The unit of Density in SI system is. a) kg/m 2 b) kgf/m 3 c) kg/m 2 d) kg/m 3 2. Name the instrument used for the measurement
More informationDESIGN CHALLENGES IN LOW FLUE GAS TEMPERATURE HEAT EXCHANGER
DESIGN CHALLENGES IN LOW FLUE GAS TEMPERATURE HEAT EXCHANGER INTRODUCTION Inventor of fuel economisers Founded in Wakefield, UK, 1833 Patented fuel economiser in 1845 More than 180 years heritage Edward
More informationPI Heat and Thermodynamics - Course PI 25 CRITERION TEST. of each of the following a. it
Heat and Thermodynamics - Course PI 25 CRITERION TESTS PI 25-1 - 1. Define: heat temperature (c) enthalpy 2. State the applies to meaning water: of each of the following a. it saturation temperature subcooled
More informationR13 SET - 1 '' ''' '' ' '''' Code No: RT31035
R13 SET - 1 III B. Tech I Semester Regular/Supplementary Examinations, October/November - 2016 THERMAL ENGINEERING II (Mechanical Engineering) Time: 3 hours Max. Marks: 70 Note: 1. Question Paper consists
More informationBoiler & Heater Group
Boiler & Heater Group Boiler & Heater Group New Trends in Tail Gas Fired Boiler Carbon Black Conference 2017 Chennai, India About Thermax A leading engineering company providing equipment and solutions
More informationOUTCOME 2 TUTORIAL 2 STEADY FLOW PLANT
UNIT 47: Engineering Plant Technology Unit code: F/601/1433 QCF level: 5 Credit value: 15 OUTCOME 2 TUTORIAL 2 STEADY FLOW PLANT 2 Be able to apply the steady flow energy equation (SFEE) to plant and equipment
More informationSteam Power Station (Thermal Station)
Steam Power Station (Thermal Station) A generating station which converts heat energy into electrical energy through turning water into heated steam is known as a steam power station. A steam power station
More informationInternational Journal of Advance Engineering and Research Development
Scientific Journal of Impact Factor (SJIF): 4.72 International Journal of Advance Engineering and Research Development Volume 4, Issue 9, September -2017 Review of Thermal Characteristics of Diesel Fired
More informationPOWER PLANT- BOILER OPERATIONS SIMULATOR
POWER PLANT- BOILER OPERATIONS SIMULATOR The PS-5030 is a simulation software package is rigorous and detailed simulation models of POWER PLANT-Boiler Operations and processing facilities. The package
More informationSHRI RAMSWAROOP MEMORIAL COLLEGE OF ENGG. & MANAGEMENT B.Tech. [SEM IV (ME-41, 42,43 & 44)] QUIZ TEST-1 (Session: )
QUIZ TEST-1 Q.1. In a stage of an impulse turbine provided with a single row wheel, the mean diameter of the blade ring is 80cm and the speed of the rotation is 3000rpm. The steam issues from the nozzle
More informationORGANIC RANKINE CYCLE TECHNOLOGY PRODUCTS AND APPLICATIONS APRIL 2013 EAR 99 - NLR
ORGANIC RANKINE CYCLE TECHNOLOGY PRODUCTS AND APPLICATIONS APRIL 2013 UNITED TECHNOLOGIES CORP. Hamilton Sundstrand Pratt & Whitney Sikorsky Otis UTC Fire & Security UTC Power Carrier 2 TURBODEN OVERVIEW
More informationEnergy Audit Of A Boiler- A Case Study Thermal Power Plant, Unit-Iii Parli (V) Maharastra.
Energy Audit Of A Boiler- A Case Study Thermal Power Plant, Unit-Iii Parli (V) Maharastra. Mr. M. G. Poddar. Asst.Prof. Instrumentation Engg. Dept. M.B.E.S. College of Engg, Ambajogai. Maharastra. Mrs.
More informationENCON IN THERMAL SYSTEM
ENCON IN THERMAL SYSTEM Orchid chemicals & Pharmaceuticals ltd. Bulk API Alathur facility Bulk API Aurangabad facility OHC (Formulations) Alathur facility R&D Centre Corporate Office OHC (Formulations)
More informationIntroduction to PAT-2
Energy Efficiency can deliver 38% of what is needed to keep our plant within the two-degree scenario of global warming by 2050 Introduction to PAT-2 By MC Jain Accredited Energy Auditor - AEA 030 Representing
More informationEnhancement of Boiler Efficiency for Industrial Boiler by Energy Audit
IJSRD - International Journal for Scientific Research & Development Vol., Issue 0, 06 ISSN (online): -06 Enhancement of Boiler Efficiency for Industrial Boiler by Energy Audit Mrs. Nishadevi N. Jadeja
More informationWaste Heat Management Options Industrial Process Heating Systems. Dr. Arvind C. Thekdi E3M, Inc.
Waste Heat Management Options Industrial Process Heating Systems By Dr. Arvind C. Thekdi E-mail: athekdi@e3minc.com E3M, Inc. August 20, 2009 Source of Waste Heat in Industries Waste heat is everywhere!
More informationPractical Boiler. Operation Engineering and Power Plant FOURTH EDITION. Amiya Ranjan Mallick
Practical Boiler Operation Engineering and Power Plant FOURTH EDITION Amiya Ranjan Mallick General Manager (Power Plant) B.K. Birla Group of Industries Maharashtra Delhi-110092 2015 PRACTICAL BOILER OPERATION
More informationPower Engineering II. Technological circuits of thermal power plants
Technological circuits of thermal power plants Lay out scheme of coal power plant climatetechwiki.com Technological circuits 2 Coal and ash circuit Air and gas circuit Feed water and steam circuit Cooling
More informationABOUT SLRM. SLRMetaliksiscertifiedbyQMSISO9001:2008, EMS ISO14001:2004andOHSAS 18001:2007 in 2015
1 ABOUT SLRM SLRMetaliksiscertifiedbyQMSISO9001:2008, EMS ISO14001:2004andOHSAS 18001:2007 in 2015 Located near Hospet, World heritage center and steel city of Karnataka, spread out in more than 200 acres
More informationExperimental Study on Heat Recovery from Continuous Blow down Water And Reduced Feed Water Consumption By Utilizing It In CFBC Boiler
RESEARCH ARTICLE OPEN ACCESS Experimental Study on Heat Recovery from Continuous Blow down Water And Reduced Feed Water Consumption By Utilizing It In CFBC Boiler Kiran G. Gayakwad 1, Prof.V.H.Patil 2,
More informationOPTIMISATION OF WATER USAGES IN THERMAL POWER PLANTS AND A STUDY ON DRY COOLING SYSTEM
CONFERENCE ON WATER OPTIMISATION IN THERMAL POWER PLANTS OPTIMISATION OF WATER USAGES IN THERMAL POWER PLANTS AND A STUDY ON DRY COOLING SYSTEM S. K. Thakur, Dr. L. D. Papney, Chief Engineer (I/C), TE&TD
More informationPERFORMANCE ASSESSMENT OF 2 X 100 TPH AFBC BOILER OF 40 MW COAL BASED THERMAL POWER PLANT (M.P.)
PERFORMANCE ASSESSMENT OF 2 X 100 TPH AFBC BOILER OF 40 MW COAL BASED THERMAL POWER PLANT (M.P.) Nishant Singh Verma 1, Jitendra Jayant 2, Anubhav yadav 3, Abhay Gehlot 4, Sandeep Garg 5 M. Tech Scholar
More informationHeat recovery from industrial installations
Environmentally friendly For high temperature applications, AQYLON s organic working fluids have a very low Global Warming Potential (320). Rugged AQYLON s ORC modules are designed for durability and fit
More informationNew Power Plant Concept for Moist Fuels, IVOSDIG
ES THE AMERICAN SOCIETY OF MECHANICAL ENGINEERS 91-GT-293 345 E. 47 St., New York, N.Y. 10017 The Society shall not be responsible for statements or opinions advanced in papers or in discussion at meetings
More informationSintering of iron ore
GOVERNMENT POLYTECHNIC DHANBAD Sintering of iron ore [project & seminar] By abhishek malakar 2015 Please myabhishekmalakar.wordpress.com use purchased version to remove this message. Sintering of Iron
More informationRENOVATION AND EFFICIENCY ENHANCEMENT OF PULVERIZED COAL FIRED BOILERS (3 x 35 TPH - RUSSIAN MAKE) - A Case Study
RENOVATION AND EFFICIENCY ENHANCEMENT OF PULVERIZED COAL FIRED BOILERS (3 x 35 TPH - RUSSIAN MAKE) - A Case Study Tej Bahadur Additional General Manager Pollution Control Research Institute BHEL, Haridwar
More informationmetals temperature limits.
9:41 Page 39 Richard F. Storm, Stephen K. Storm and Sammy Tuzenew, Storm Technologies, Inc., US, consider how to conduct a comprehensive diagnostic test on a pulverised coal-fuelled boiler. T Tuning of
More informationComputational Approach of Green House Gases in Thermal Power Plant (An Energy Audit Approach) - Process Model
Computational Approach of Green House Gases in Thermal Power Plant (An Energy Audit Approach) - Process Model Anil B. Onkar, Dr. G. A. Dhomane, Dr. R.M.Moharil, Prashant P.Mawle Addl.Ex.Engr. Prof. Elect.
More information40 MW CPP Chanda. Energy Leadership. Presenter : Sandeep Kumar Garg
Energy Leadership 40 MW CPP Chanda Presenter : Sandeep Kumar Garg Welcome to CII 17th National Award for Excellence in Energy Management 30, 31 August & 01 September Contents 1. Company Profile 2. Process
More informationCapacity as per EC Dt commissioned 1 Sponge Iron 2.0 MTPA 1.0 MTPA 0.4 MTPA 0.6 MTPA 2 Captive Power Plant Co-generation Power Plant (WHRB)
Brief Note Prakash Industries Limited (PIL) is existing Integrated Steel Plant located at Hathneora, Champa Villages, Janjgir-Champa District, Chhattisgarh. Existing plant has obtained Environment Clearance
More informationKEPCO KEPRI Kim eui hwan
2015 KEPIC PERFORMANCE TEST SEMINAR New Start! Open Soft Speed AGAIN KEPCO! 2015. 9. 22 KEPCO KEPRI Kim eui hwan 1 2 3 test Steam turbine test 2/42 3/42 Thermal analysis of Power Plant Cycle Grasp of the
More informationEmerging Technologies for Optimizing Efficiency and Minimising GHG Emission in Existing and Upcoming Coal Fired Plants in India
I J E E E C International Journal of Electrical, Electronics and Computer Engineering 1(1): 74-79(2012) ISSN No. (Online) : 2277-2626 Emerging Technologies for Optimizing and Minimising GHG Emission in
More informationPRESENTED BY: R MADHUSUDHAN RAO THE SOLUTION THE PROBLEM DEPLETING RESOURCES SOLAR ENERGY TECHNOLOGY INCREASING PRICES INCREASING DEMAND
CLEANTECH HEATING & COOLING PRESENTED BY: R MADHUSUDHAN RAO APPLICATION - HEATING THE PROBLEM THE SOLUTION APPLICATION - HEATING DEPLETING RESOURCES FUEL SOURCES USED SOLAR ENERGY TECHNOLOGY COAL OIL GAS
More informationR.K.Yadav/Automobile Engg Dept/New Polytechnic Kolhapur. Page 1
6.1 Types of fuels 4 Marks Definition, classification, properties, Calorific value of fuels. Ultimate analysis and proximate analysis of solid fuels. Liquid fuels- Comparative information about composition,
More informationA Trans-critical CO2 Heat Pump System for Waste Heat Utilization in Warm Weather Condition Applied to a Milk Refrigeration Plant
Purdue University Purdue e-pubs International Refrigeration and Air Conditioning Conference School of Mechanical Engineering 2016 A Trans-critical CO2 Heat Pump System for Waste Heat Utilization in Warm
More informationNITIN CORPORATION. 402, 4 th Floor, Bezzola Commercial Complex, V.N. Purav Marg, Sion Trombay Road, Chembur, Mumbai , India.
402, 4 th Floor, Bezzola Commercial Complex, V.N. Purav Marg, Sion Trombay Road, Chembur, Mumbai 400071, India. WEB : www.corponit.com E MAIL : enquiry@corponit.com nitincorporation@yahoo.com FAX : +91-22
More information