1 IE RP-0001, Issue A 17/10/2013 Attachment 12 Stage 1 Flood Risk Assessment (IE RP-0001) IE RP-0001_A_02.DOC

2 Flood Risk Assessment Celebrating 40 Years in Business Jazz Pharmaceuticals Ireland IE RP-0001, Issue: A Issue date:

3

4 Contents 1 Introduction Requirements for a Flood Risk Assessment (FRA) 4 2 Stage 1 Flood Risk Identification Potential Sources of Flooding River Flooding Overland Flow Flooding From Artificial Drainage Systems Groundwater Flooding Risk of Flooding Arising from Proposed Development 11 3 Conclusion 12 Attachment 1 Drawing IE DR-0090 Rev. A Approximated Flood Risk Zone Resulting from River Cross IE RP-0001_A_01.DOC Page 3 of 12

5 1 Introduction PM Group has been requested by Jazz Pharmaceuticals Ireland (JPI) to prepare an Environmental Impact Statement (EIS) as part of a planning application for its proposed development known as. As part of the EIS, a Flood Risk Assessment (FRA) is required to assess the risk of potential flooding to the proposed site. This report contains the first stage of an FRA which involves identifying whether there may be any flooding or surface water management issues related to the proposed development site that may warrant further investigation. The proposed development site in question is located in the western environs of Athlone in Monksland, Co. Roscommon. The River Shannon flow southwards approximately 3km to the east of the proposed site, while a tributary of the River Shannon, the Cross River flows eastwards along the southern boundary of the site. These two rivers are considered to be the most likely sources of flooding at the site, but other potential flood sources such as on-site drainage and groundwater flooding have also been considered as part of this Stage 1 Flood Risk Identification. 1.1 Requirements for a Flood Risk Assessment (FRA) The government recognises the significance of flood risk and the need to integrate flood risk assessment and its management into the planning process. The following is taken from The Office of Public Work s (OPW) guidance document and highlights the need for an FRA to be carried out for this proposed development: At the project level, development either exceeding the specified thresholds for Environmental Impact Assessments (EIA) or development under the thresholds but with significant environmental effects and in an area at risk of flooding will require an EIS. Flood risk will therefore need to be an integral part of the EIA process. Screening for EIA should be an integral element of all planning applications in an area at risk of flooding. IE RP-0001_A_01.DOC Page 4 of 12

6 2 Stage 1 Flood Risk Identification According to the OPW guidelines, a Stage 1 Flood Risk Identification is a desktop study which is carried out to identify whether there may be any flooding or surface water management issues related to a plan area or proposed development site that may warrant further investigation. The following sections of this report details the Stage 1 Flood Risk Identification that has been carried out for the proposed JPI development site. 2.1 Potential Sources of Flooding The following are considered to be all potential sources of flooding for the subject site: - River flooding - Overland flow - Flooding from artificial drainage systems - Groundwater flooding - Risk of flooding arising from proposed development 2.2 River Flooding River flooding occurs when the capacity of a watercourse is exceeded or the channel is blocked or restricted, and excess water spills out from the channel onto the adjacent low-lying areas (the floodplain). This can occur rapidly in short steep rivers or after some time and some distance from where the rain fell in rivers with a gentler gradient. Flooding that results from a river or a stream is known as Fluvial flooding. The two rivers that could potentially cause fluvial flooding at the proposed development site are the River Shannon and one of its tributaries, the Cross River Cross River The proposed development is located adjacent to and within the catchment of the Cross River, which is a small tributary of the River Shannon. The river rises in the Brideswell area, approximately 7km to the north west of the proposed site and meanders through the lowlands to the area west of Athlone town for a distance of approximately 10km prior to its confluence with the River Shannon to the south of Athlone town, approximately 5km south west of the proposed site. The river also has a number of minor tributary streams along its course. The river is located in the Shannon River Basin District under the Water Framework Directive. Flow data collection by the EPA for the Cross River was ceased in August The flow for the 12 months before this was reviewed as part of this FRA. The data was obtained from a location downstream of the proposed site at Summer Hill. The river was reported to have an average flow rate of 1.81m 3 /sec. over this period. The maximum flow rate for this period was 11.22m 3 /sec while the minimum flow rate recorded was 0.32m 3 /sec River Shannon The River Shannon rises in a spring fed pool, the Shannon Pot in the Cuilcagh Mountains on the Cavan-Fermanagh Border at an elevation of 150m and its headwaters drain the raised mountainous regions around Lough Allen. On leaving these elevated areas, the Shannon winds its way through the drumlin masses of South County Leitrim and flows through Lough Ree and Lough Derg before reaching Parteen Weir. The river is characterised by slow flowing lacustrine expanses meandering between callows, bogs and wetlands, frequently breaking its banks in periods of flood and widens to several solution lakes along its course. The Shannon with its series of natural and artificial controls has a slow hydraulic response to incident rainfall. The system is considered in four main sections: IE RP-0001_A_01.DOC Page 5 of 12

7 - Upper Catchment Source to Lough Allen outlet; - Middle Catchment Lough Allen to Lough Ree outlet; - Lower Catchment Lough Ree to Parteen Weir; - Downstream of Parteen Weir. The site in question is located approximately 3km west of the lower catchment of the River Shannon at its closest point. The lower catchment has an area of 5,833km 2. The bulk of the lower catchment, including the catchment of the River Suck (the largest tributary of the Shannon with a catchment area of 1,619km 2 ) feeds into the Shannon upstream of Lough Derg. This section between Athone to Meelick is the worst effected by flooding in the catchment. The channel capacity is inadequate due to very low natural gradients (approximately 1:20,000) and a number of the previous studies have suggested that siltation of the channel has recently worsened flooding. The outlet from Lough Derg feeds into a channel about 3.5km long and then into an artificial reservoir about 4.5km long. The level of this reservoir is controlled by the sluice barrage at Parteen Weir and Power Station at Ardnacrushna. This channel and reservoir restrict the outflow from Lough Derg. The reservoir upstream of Parteen Weir is contained partly by two embankments Ardclooney at the West and Fort Henry to the East. Due to the distance between the proposed site and the River Shannon, and the fact that any previous flood events associated with the River Shannon has not affected the proposed site, as discussed in Section below, it is considered that the River Shannon does not pose any flood risk to the proposed site Office of Public works (OPW) Flood Hazard Maps and Hydrometric Stations Figure 2.1 illustrates a flood map history report for an area within 2.5km of the centre of the site. There were three reports of previous flooding recorded in this area; two of which can be attributed to the River Shannon. However, neither of these flood events affected the proposed JPI development site. The OPW has produced draft Preliminary Flood Risk Assessment (PFRA) maps for consultation. While these maps are based on high level data, they are of great value in indicating areas of potential risk. These maps are readily available from the OPW website. Draft Drawing No. 2019/MAP/249/A PFRA Indicative Extents and Outcomes is presented below in Figure 2.2. Figure 2.3 is a blow up of the proposed development site and its surrounding area from Figure 2.2 and illustrates that the south west of the site is at risk to fluvial flooding during a 1 in 100 year storm event (blue), while the south east of the site is a risk of fluvial flooding during an extreme storm event (light blue). In addition, drawing IE DR-0090 Rev. A has been included as Attachment 1, which illustrates the approximated flood risk zone on the site resulting from the River Cross, based on the OPW s PFRA. Therefore, in order to prevent any damage from potential fluvial flooding, the facility should not be located in this southern portion which is considered in risk of flooding. IE RP-0001_A_01.DOC Page 6 of 12

8 Figure 2.1: OPW Flood Hazard Map within 2.5km of centre of the site IE RP-0001_A_01.DOC Page 7 of 12

9 Figure 2.2: Draft Drawing No 2019/MAP/249/A PFRA Indicative Extents and Outcomes IE RP-0001_A_01.DOC Page 8 of 12

10 Figure 2.3: OPW s Preliminary Flood Risk Assessment (PFRA) of proposed development site IE RP-0001_A_01.DOC Page 9 of 12

11 As the majority of the proposed development site is not considered to be at risk from fluvial flooding according to the OPW s PFRA maps and considering that there has been no previous flood events recorded at the site, the risk of damage to the facility resulting from fluvial flooding at this site for the purposes of this Stage 1 Flood Risk Identification is considered to be low to nil. 2.3 Overland Flow Overland flow occurs when the amount of rainfall exceeds the infiltration capacity of the ground to absorb it. This excess water flows overland, ponding in natural hollows and low-lying areas or behind obstructions. This occurs as a rapid response to intense rainfall and eventually enters a pipe or natural drainage system. The natural lie of the land on the proposed development site is from north to south. The land to the east of the site is developed with drainage systems in place, eliminating any potential of overland flow on the site from the east. The land to the west of the proposed JPI site is a greenfield area which also slopes from north to south towards the Cross River, eliminating any possibility of overland flooding on the site from the west. From a desktop investigation of the land to the north of the site, the R362 road runs east/west approximately 300m from the site. There is drainage in this road that will ensure that any excess surface water to the north of the road will be drained appropriately and will not pose any risk to the JPI site. Therefore, the only area of land that could cause overland flow flooding at the proposed development site is the section of land between the R362 and northern boundary of the site. The majority of this land consists of greenfield areas, with a few residential dwellings located towards the south of the land. The area of land is approximately 23 acres. There is a drainage ditch which runs along the northern boundary of the site which is currently capable of draining any excess surface water from this portion of land. It is expected that this drainage system will remain in place following the completion of the development. However, if it is removed, suitable artificial drainage will be installed to carry any excess surface water from this land. Therefore, the risk of flooding of the site from overland flow is considered to be low to nil. 2.4 Flooding From Artificial Drainage Systems Flooding from artificial drainage systems results when flow entering a system, such as an urban storm water drainage system, exceeds its discharge capacity, and the system becomes blocked, and/or cannot discharge due to a high water level in the receiving watercourse. This mostly occurs as a rapid response to intense rainfall. Together with overland flow, it is often known as pluvial flooding. Flooding arising from a lack of capacity in the urban drainage network has become an important source of flood risk, as evidenced during recent summers. The proposed development site is a greenfield site and as such there are no existing artificial drainage systems. There are no artificial drainage systems to the north or west of the proposed development site as they are also greenfield areas. To the south of the proposed development site is the Cross River. Finally, to the east are further greenfield areas, together with Monksland Industrial Estate and Monksland Wastewater Treatment Plant (WWTP). Stormwater sewerage within the vicinity of the proposed development is provided by a combination of land drains (open field drains) within the greenfield areas and separate stormwater sewers within the nearby Monksland Industrial estate. The stormwaters within the Monksland Industrial Estate are discharged to an open ditch which runs along the eastern boundary of Plot B at a distance of approximately 125m upstream of the River Cross. A meeting was held with Roscommon County Council (RCC) on 2 nd July 2013, and it was confirmed that to the best of RCC s knowledge, there have not been any problems in relation to flooding on the proposed site as a result of the stormwaters from Monksland Industrial Estate discharging to this ditch. A site visit by PM Group on the same day confirmed that there is no pipework in place within the ditch for drainage purposes. The open ditch is at least 1m deep and approximately 1.5m wide. IE RP-0001_A_01.DOC Page 10 of 12 EPA Export :23:24:40

12 In addition, due to the close proximity of the entry point to the Cross River, there is no risk of flooding for the development of Plot A of the site and it is unlikely there will be any risk of flooding in any subsequent development in Plot B of the site. It is concluded that the risk of flooding from artificial drainage systems is low to nil. 2.5 Groundwater Flooding Groundwater flooding occurs when the level of water stored in the ground rises as a result of prolonged rainfall to meet the ground surface and flows out over it, i.e. when the capacity of this underground reservoir is exceeded. Groundwater flooding tends to be very local and results from interactions of site-specific factors such as tidal variations. While the water level may rise slowly, it may be in place for extended periods of time. Hence, such flooding may often result in significant damage to property rather than be a potential risk to life. A site investigation was carried out between November 2005 and February 2006 by Site Investigations Ltd. for the western half of the proposed development site as part of the preparation of an EIS for a previous planning application. Groundwater levels measured during this investigation varied across the site with levels dropping off from north to south across the site in line with the natural moderate sloping gradient of the land. Water levels in the two trial pits, which were located in the centre of the field approximately, were recorded as 1.5m below ground level (bgl) in both instances. Whilst no data was available for the northern boundary of the site it is expected that levels are deeper due to the increased gradient and levels close to the Cross River are likely to be shallower due to their proximity to the river. The groundwater flow direction at the site is likely to be in a north to south direction towards the Cross River, due to the natural gradient decline of the site topography towards the river. It should be noted, however, that water levels noted during this site investigation do not generally give an accurate indication of the actual groundwater conditions as the trial pits and borehole are rarely left open for sufficient time for the water level to reach equilibrium. Further site investigation will be required, to determine the equilibrium groundwater levels. The risk of groundwater flooding occurring at the site is considered low to nil and groundwater levels will be managed throughout the design. 2.6 Risk of Flooding Arising from Proposed Development The proposed development will be designed so as not to cause any increase in flooding within the catchment. In general, the site slopes from north to south towards the Cross River and the proposed facility will be laid to falls so that any excess surface water will flow towards the river. The site drainage systems will be designed in accordance with EN standards and the design guidance advised by the OPW Planning system and Flood Risk Management, Guidelines for Planning Authorities, Technical Appendices, In addition, surface water attenuation will be provided on site in accordance with the Greater Dublin Strategic Drainage Study (GDSDS) in order to control stormwater releases to the Cross River. Stormwater from a 1 in 30 year storm event will be attenuated on site, while stormwater from a 1 in 100 year storm event will be retained on site until the flood event alleviates. These measures will ensure that no buildings on site will be allowed to flood during a 1 in 100 year storm event. For any storm event with an intensity greater than that of a 1 in 100 year storm event, the excess stormwater will flow towards the Cross River due to the layout of the site as previously discussed. It can therefore be concluded that the flood risk arising from the proposed development itself is low to nil. IE RP-0001_A_01.DOC Page 11 of 12 EPA Export :23:24:40

13 3 Conclusion The purpose of this Stage 1 Flood Risk Identification was to identify if there will be any risk of flooding or surface water management issues related to the proposed JPI facility in Monksland, Co. Roscommon. - The report illustrates that there is the potential for the southern portion of the proposed development site to be flooded in a 1 in 100 year storm event, resulting from the River Cross, as illustrated in Drawing IE DR-0090 Rev. A, included in Attachment 1. - It is not expected that there will be any risk of flooding associated with overland flow, artificial drainage systems, groundwater flooding and the proposed development itself. - Therefore, it is considered that this Stage 1 Flood Risk Identification is sufficient and that it is not necessary to carry out Stages 2 or 3 of the FRA process. IE RP-0001_A_01.DOC Page 12 of 12 EPA Export :23:24:40

14 Attachment 1 Drawing IE DR-0090 Rev. A Approximated Flood Risk Zone Resulting from River Cross IE RP-0001_A_01.DOC EPA Export :23:24:40

15 NOTES N LEGEND N N N FORMAL ISSUE Jazz Pharmaceuticals JAZZ PHARMACEUTICALS IRELAND PROJECT ROCK Ordnance Survey Ireland Licence No. EN c Ordnance Survey Ireland/Government of Ireland APPROXIMATED FLOOD RISK ZONE RESULTING FROM RIVER CROSS IE :1000 IE DR-0090 EPA Export :23:24:40

16 EPA Export :23:24:40

17 Met Eireann Return Period Rainfall Depths for sliding Durations Irish Grid: Easting: , Northing: , Interval Years DURATION 6months, 1year, 2, 3, 4, 5, 10, 20, 30, 50, 75, 100, 150, 200, 250, 500, 5 mins 2.5, 3.5, 4.0, 4.8, 5.3, 5.7, 7.0, 8.5, 9.5, 10.9, 12.1, 13.0, 14.5, 15.6, 16.5, N/A, 10 mins 3.5, 4.9, 5.6, 6.7, 7.4, 8.0, 9.8, 11.9, 13.2, 15.1, 16.8, 18.1, 20.1, 21.7, 23.0, N/A, 15 mins 4.1, 5.7, 6.6, 7.9, 8.7, 9.4, 11.5, 14.0, 15.6, 17.8, 19.8, 21.3, 23.7, 25.5, 27.0, N/A, 30 mins 5.5, 7.5, 8.5, 10.1, 11.1, 11.9, 14.5, 17.4, 19.2, 21.8, 24.1, 25.9, 28.5, 30.6, 32.3, N/A, 1 hours 7.3, 9.8, 11.1, 12.9, 14.2, 15.1, 18.2, 21.6, 23.7, 26.7, 29.3, 31.3, 34.4, 36.7, 38.6, N/A, 2 hours 9.7, 12.8, 14.3, 16.6, 18.1, 19.2, 22.8, 26.8, 29.3, 32.7, 35.7, 37.9, 41.4, 44.0, 46.1, N/A, 3 hours 11.5, 14.9, 16.7, 19.2, 20.9, 22.1, 26.1, 30.4, 33.1, 36.8, 40.0, 42.5, 46.1, 48.9, 51.2, N/A, 4 hours 13.0, 16.7, 18.6, 21.3, 23.1, 24.4, 28.7, 33.2, 36.1, 40.0, 43.4, 46.0, 49.8, 52.7, 55.1, N/A, 6 hours 15.3, 19.5, 21.7, 24.7, 26.6, 28.1, 32.7, 37.7, 40.8, 45.1, 48.7, 51.4, 55.5, 58.7, 61.2, N/A, 9 hours 18.1, 22.9, 25.2, 28.6, 30.7, 32.3, 37.4, 42.8, 46.2, 50.7, 54.6, 57.5, 61.9, 65.2, 67.9, N/A, 12 hours 20.4, 25.6, 28.1, 31.7, 34.0, 35.7, 41.1, 46.8, 50.4, 55.2, 59.2, 62.3, 66.9, 70.3, 73.1, N/A, 18 hours 24.2, 29.9, 32.7, 36.7, 39.2, 41.1, 47.0, 53.1, 56.9, 62.1, 66.4, 69.7, 74.6, 78.2, 81.1, N/A, 24 hours 27.2, 33.4, 36.4, 40.7, 43.4, 45.4, 51.6, 58.1, 62.1, 67.5, 72.1, 75.5, 80.5, 84.3, 87.4, 97.6, 2 days 33.8, 40.5, 43.8, 48.3, 51.1, 53.2, 59.7, 66.3, 70.4, 75.8, 80.3, 83.7, 88.7, 92.4, 95.4, 105.2, 3 days 39.4, 46.7, 50.1, 54.9, 57.9, 60.1, 66.9, 73.7, 77.9, 83.5, 88.1, 91.5, 96.6, 100.3, 103.3, 113.2, 4 days 44.6, 52.3, 56.0, 61.0, 64.1, 66.4, 73.4, 80.6, 84.9, 90.6, 95.3, 98.8, 104.0, 107.7, 110.8, 120.7, 6 days 54.0, 62.5, 66.5, 72.0, 75.3, 77.9, 85.4, 92.9, 97.5, 103.5, 108.4, 112.1, 117.4, 121.3, 124.5, 134.7, 8 days 62.7, 71.9, 76.2, 82.0, 85.6, 88.3, 96.2, 104.2, 109.0, 115.2, 120.4, 124.2, 129.7, 133.8, 137.0, 147.5, 10 days 70.9, 80.7, 85.2, 91.4, 95.2, 98.0, 106.4, 114.7, 119.7, 126.2, 131.5, 135.4, 141.1, 145.3, 148.6, 159.4, 12 days 78.7, 89.1, 93.9, 100.4, 104.4, 107.3, 116.0, 124.6, 129.8, 136.5, 142.1, 146.1, 152.0, 156.2, 159.7, 170.7, 16 days 93.8, 105.1, 110.4, 117.4, 121.7, 124.8, 134.2, 143.4, 148.9, 156.0, 161.8, 166.1, 172.2, 176.7, 180.3, 191.8, 20 days 108.2, 120.4, 126.0, 133.5, 138.1, 141.5, 151.3, 161.1, 166.9, 174.3, 180.4, 184.8, 191.2, 195.9, 199.6, 211.5, 25 days 125.6, 138.8, 144.8, 152.8, 157.7, 161.3, 171.8, 182.1, 188.2, 196.0, 202.4, 207.0, 213.7, 218.6, 222.4, 234.8, NOTES: N/A Data not available These values are derived from a Depth Duration Frequency (DDF) Model For details refer to: Fitzgerald D. L. (2007), Estimates of Point Rainfall Frequencies, Technical Note No. 61, Met Eireann, Dublin, Available for download at EPA Export :23:24:40

Refer to Chapter 3.0 (Description of Development) for a detailed site and development description.

Refer to Chapter 3.0 (Description of Development) for a detailed site and development description. 7. WATER: HYDROGEOLOGY & HYDROLOGY 7.1 Introduction This chapter of the EIAR comprises of an assessment of the likely impact of the proposed development on the surrounding surface water and hydrogeological

More information

Flood Risk and Drainage Assessment.

Flood Risk and Drainage Assessment. Flood Risk and Drainage Assessment. Change of Use off land to Leisure Complex At, Caersws, Powys, SY17 5SB October 2018 Statement prepared for: Mr T Bebb By Woodsyde Developments Ltd Woodsyde Developments

More information

Respond! Housing Association. Residential Development at Flinters Field, Athy, Co. Kildare. Engineering Report. Job No. : Date: April 2017

Respond! Housing Association. Residential Development at Flinters Field, Athy, Co. Kildare. Engineering Report. Job No. : Date: April 2017 Job No. : 16036 Date: April 2017 Respond! Housing Association Residential Development at Flinters Field, Athy, Co. Kildare Engineering Report 2B Richview Office Park Clonskeagh Dublin 14 Contents Amendment

More information

Unique ID: (from PFRA database) Location: Clonfert, Co. Galway. Stage 1: Desktop Review

Unique ID: (from PFRA database) Location: Clonfert, Co. Galway. Stage 1: Desktop Review Location: Clonfert, Co. Galway Unique ID: 252906 (from PFRA database) Initial OPW Designation APSR AFRR IRR Co-ordinates Easting: 197134 Northing: 221731 River / Catchment / Sub-catchment Un-named minor

More information

ATTACHMENT E.2 EMISSIONS TO SURFACE WATERS SITE SERVICES LAYOUT SHEET 1 OF 2 (IE DR-0021)

ATTACHMENT E.2 EMISSIONS TO SURFACE WATERS SITE SERVICES LAYOUT SHEET 1 OF 2 (IE DR-0021) ATTACHMENT E.2 EMISSIONS TO SURFACE WATERS SITE SERVICES LAYOUT SHEET 1 OF 2 (IE0310818-30-DR-0021) SITE SERVICES LAYOUT SHEET 2 OF 2 (IE0310818-30-DR-0022) LOCATION OF EMISSION TO SURFACE WATER (IE0310818-22-DR-

More information

Rising Sun. Scaffold Hill. Flood Risk Assessment

Rising Sun. Scaffold Hill. Flood Risk Assessment Rising Sun Scaffold Hill Flood Risk Assessment August 2010 Contents 1.0 Introduction... 4 2.0 Site Description... 5 3.0 Legislative Framework... 6 4.0 Flood Risk... 10 5.0 Surface Water Drainage... 11

More information

Attachment N o F.2 EMISSIONS MONITORING AND SAMPLING POINTS

Attachment N o F.2 EMISSIONS MONITORING AND SAMPLING POINTS Attachment N o F.2 EMISSIONS MONITORING AND SAMPLING POINTS Lagan Cement Ltd. IPPC Licence Application Attachment N o F.2 EMISSIONS MONITORING AND SAMPLING POINTS Air Contents F.2.0 Air Emissions.3 Water

More information

Limerick Smarter Travel Route 2 Planning Application. Flood Risk Assessment Report

Limerick Smarter Travel Route 2 Planning Application. Flood Risk Assessment Report Planning Application March 2014 Document Control Document Number 131-143-RP002- Flood Risk Assessment Revision Date Prepared Checked Approved R0 (1 st issue) 5 March 2014 A Prendergast S. Ryan C. Lewis

More information

Isle of Wight Strategic Flood Risk Assessment MK2. Appendix P Newport

Isle of Wight Strategic Flood Risk Assessment MK2. Appendix P Newport Isle of Wight Strategic Flood Risk Assessment MK2 Appendix P June 2010 Isle of Wight Strategic Flood Risk Assessment Overview Please review this discussion in conjunction with the mapping provided in this

More information

Unique ID: (from PFRA database) Location: Newport, Co. Tipperary. Stage 1: Desktop Review

Unique ID: (from PFRA database) Location: Newport, Co. Tipperary. Stage 1: Desktop Review Location: Newport, Co. Tipperary Unique ID: 240433 (from PFRA database) Initial OPW Designation APSR AFRR IRR Co-ordinates Easting: 172620 Northing: 162375 River / Catchment / Sub-catchment Newport/Mulcair

More information

Barton Farm Winchester. Outline Planning Application A New Suburb for Winchester. Flood Risk Assessment prepared by Parsons Brinckerhoff

Barton Farm Winchester. Outline Planning Application A New Suburb for Winchester. Flood Risk Assessment prepared by Parsons Brinckerhoff Barton Farm Winchester Outline Planning Application A New Suburb for Winchester Flood Risk Assessment prepared by Parsons Brinckerhoff November 2009 BARTON FARM WINCHESTER FLOOD RISK ASSESSMENT May 2009

More information

Land North East of Blandford

Land North East of Blandford Land North East of Blandford On behalf of Savills Plc Project Ref: 36965/4001 Rev: B Date: February 2016 Office Address: Lakeside House, Blackbrook Business Park, Blackbrook Park Avenue, Taunton TA1 2PX

More information

Isle of Wight Strategic Flood Risk Assessment MK2. Appendix E West Wight

Isle of Wight Strategic Flood Risk Assessment MK2. Appendix E West Wight Isle of Wight Strategic Flood Risk Assessment MK2 Appendix E June 2010 Isle of Wight Strategic Flood Risk Assessment Overview The RDA is comprised of the towns of Totland and Freshwater and is classified

More information

Kildare County Council. Proposed Development of 77 no. Residential Units at College Wood Manor, Ballingappa Road, Clane, Co. Kildare.

Kildare County Council. Proposed Development of 77 no. Residential Units at College Wood Manor, Ballingappa Road, Clane, Co. Kildare. Job No. : 16027 SHB2-CLA-CS-MOR Date: Feb 2018 Kildare County Council Proposed Development of 77 no. Residential Units at College Wood Manor, Ballingappa Road, Clane, Co. Kildare. Engineering Report 2B

More information

Flood risk management and land use planning in changing climate conditions Mikko Huokuna Finnish Environment Institute, SYKE

Flood risk management and land use planning in changing climate conditions Mikko Huokuna Finnish Environment Institute, SYKE 10th International Drainage Workshop of ICID 06.-11. July 2008 Flood risk management and land use planning in changing climate conditions Mikko Huokuna Finnish Environment Institute, SYKE Background hydrological

More information

SITE SPECIFIC FLOOD RISK ASSESSMENT NEW STUDENT ACCOMMODATION, FASSAUGH AVENUE, CABRA, DUBLIN / F5.1 3 RD JANUARY 2018

SITE SPECIFIC FLOOD RISK ASSESSMENT NEW STUDENT ACCOMMODATION, FASSAUGH AVENUE, CABRA, DUBLIN / F5.1 3 RD JANUARY 2018 SITE SPECIFIC FLOOD RISK ASSESSMENT NEW STUDENT ACCOMMODATION, FASSAUGH AVENUE, CABRA, DUBLIN 7 26 098 / F5.1 3 RD JANUARY 2018 Issued For Distribution Revision Final Architect B 1 INTRODUCTION 1.1 It

More information

Foul Drainage Assessment and Surface Water Management Plan Land at Mill Lane Hawkinge CT18 7BY

Foul Drainage Assessment and Surface Water Management Plan Land at Mill Lane Hawkinge CT18 7BY Foul Drainage Assessment and Surface Water Management Plan Land at Mill Lane Hawkinge CT18 7BY RMB Consultants (Civil Engineering) Ltd March 2015 RMB Consultants (Civil Engineering) Ltd 39 Cossington Road

More information

City of Elmhurst Comprehensive Flood Plan Golden Meadows Park Flood Storage Facility

City of Elmhurst Comprehensive Flood Plan Golden Meadows Park Flood Storage Facility December 16, 2014 City of Elmhurst Comprehensive Flood Plan Golden Meadows Park Flood Storage Facility Prepared by CBBEL Project Background & Timeline June and July 2010 Severe storm events hit Elmhurst,

More information

FLOOD RISK ASSESSMENT OF FARRAGH PROTEINS FOR SUBMISSION TO CAVAN COUNTY COUNCIL MONERY UPPER CROSSDONEY CO. CAVAN

FLOOD RISK ASSESSMENT OF FARRAGH PROTEINS FOR SUBMISSION TO CAVAN COUNTY COUNCIL MONERY UPPER CROSSDONEY CO. CAVAN FLOOD RISK ASSESSMENT OF FARRAGH PROTEINS FOR SUBMISSION TO CAVAN COUNTY COUNCIL AT MONERY UPPER CROSSDONEY CO. CAVAN Prepared By: Traynor Environmental Ltd Belturbet Business Park, Creeny Belturbet Co.

More information

PRELIMINARY DRAINAGE STUDY

PRELIMINARY DRAINAGE STUDY PRELIMINARY DRAINAGE STUDY For 34 th & J Residences 3402 J St. San Diego, CA 92102 A.P.N 545-250-08 Prepared By: Kenneth J. Discenza, P.E. Site Design Associates, Inc. 1016 Broadway, Suite A El Cajon,

More information

Developing a local flood risk management strategy Annex 1: Flooding, flood sources and flood defences

Developing a local flood risk management strategy Annex 1: Flooding, flood sources and flood defences Developing a local flood risk management strategy Annex 1: Flooding, flood sources and flood defences Pennine Water Group, University of Sheffield in collaboration with the partners of the FloodResilienCity

More information

Kildare County Council. Proposed Development of 74 no. Residential Units at Craddockstown Road, Cradockstown Demesne, Naas, Co. Kildare.

Kildare County Council. Proposed Development of 74 no. Residential Units at Craddockstown Road, Cradockstown Demesne, Naas, Co. Kildare. Job No. : 16027 SHB1-CRA-CS-MOR Date: April 2017 Kildare County Council Proposed Development of 74 no. Residential Units at Craddockstown Road, Cradockstown Demesne, Naas, Co. Kildare. 2B Richview Office

More information

Introduction to Urban Drainage. Scott Arthur. Civil Engineering at the School of the Built Environment. [Class 1 - Into+ 1]

Introduction to Urban Drainage. Scott Arthur. Civil Engineering at the School of the Built Environment. [Class 1 - Into+ 1] Introduction to Urban Drainage Scott Arthur s.arthur@hw.ac.uk Civil Engineering at the School of the Built Environment [Class 1 - Into+ 1] Do we even need a drainage system? [Class 1 - Into+ 2] Greenfield

More information

Appendix 15.3 Hydraulic Assessment of Sewers

Appendix 15.3 Hydraulic Assessment of Sewers Appendix 15.3 Hydraulic Assessment of Sewers Irish Water Arklow Wastewater Treatment Plant Project EIA Report Issue September 2018 Arup \\GLOBAL\EUROPE\DUBLIN\JOBS\247000\247825-00\4. INTERNAL\4-03 DESIGN\4-03-02

More information

East Riding of Yorkshire Council STRATEGIC FLOOD RISK ASSESSMENT (SFRA) Level 1. APPENDIX C Surface Water Flood Hazard Mapping

East Riding of Yorkshire Council STRATEGIC FLOOD RISK ASSESSMENT (SFRA) Level 1. APPENDIX C Surface Water Flood Hazard Mapping APPENDIX C Surface Water Flood Hazard Mapping (this page intentionally left blank) Introduction Surface water or pluvial flooding can be defined as flooding which results from rainfall generated overland

More information

Lough Ree Power Generating Station Continuous Monitoring Summary Report Period 14: January 2017

Lough Ree Power Generating Station Continuous Monitoring Summary Report Period 14: January 2017 Lough Ree Power Generating Station Continuous Monitoring Summary Report Document No.: QS-000152-01-R114-000 Date: February 2018 ESB International, One Dublin Airport Central, Dublin Airport, Cloghran,

More information

Surface Water Guidance for Developers

Surface Water Guidance for Developers Surface Water Guidance for Developers Contents Overview of Sustainable Drainage Systems (SuDS)... 2 Information Required in a Flood Risk Assessment or Drainage Strategy... 3 Outline Planning Applications...

More information

STORM WATER MANAGEMENT REPORT

STORM WATER MANAGEMENT REPORT Silvercreek Junction STORM WATER MANAGEMENT REPORT Howitt Creek at the Silvercreek Parkway Site Guelph, Ontario August, 2008 TSH File 22304A-04 August 19, 2008 STORMWATER MANAGEMENT REPORT Howitt Creek

More information

STORMWATER MANAGEMENT REPORT DRAFT PLAN OF CITY OF GUELPH

STORMWATER MANAGEMENT REPORT DRAFT PLAN OF CITY OF GUELPH Debrob Investments Limited STORMWATER MANAGEMENT REPORT DRAFT PLAN OF SUBDIVISION, CITYVIEW DRIVE CITY OF GUELPH PRELIMINARY NOVEMBER 2, 2011 I B I G R O U P P R E L I M I N A R Y Debrob Investments Limited

More information

Aquatic Science Unit 1. Introduction to Freshwater Ecology

Aquatic Science Unit 1. Introduction to Freshwater Ecology Aquatic Science Unit 1 Introduction to Freshwater Ecology Water is essential to life Water is essential to the survival of all living things No living organism can survive without water Humans cannot go

More information

Clean Water Services Design and Construction Standards Update: Base Strategy and Methodology to Address Hydromodification Impacts

Clean Water Services Design and Construction Standards Update: Base Strategy and Methodology to Address Hydromodification Impacts Clean Water Services Design and Construction Standards Update: Base Strategy and Methodology to Address Hydromodification Impacts 1.0 INTRODUCTION The proposed hydromodification base strategy (Base Strategy)

More information

Clean Water Services Design and Construction Standards Update: Base Strategy and Methodology to Address Hydromodification Impacts

Clean Water Services Design and Construction Standards Update: Base Strategy and Methodology to Address Hydromodification Impacts Clean Water Services Design and Construction Standards Update: Base Strategy and Methodology to Address Hydromodification Impacts 1.0 INTRODUCTION The proposed hydromodification base strategy (Base Strategy)

More information

Herrington Property Surface Water Issue. Presented to BLLC on Thursday August 6 th, 2009

Herrington Property Surface Water Issue. Presented to BLLC on Thursday August 6 th, 2009 Herrington Property Surface Water Issue Presented to BLLC on Thursday August 6 th, 2009 BRIGHTON LANDFILL SW10 SW1 BRIGHTON LANDFILL SW2 SW4 SW7 SW11 SW6 SW5 SW3 BRIGHTON LANDFILL History of Surface

More information

Chapter 2: Selecting Best Management Practices (BMPs)

Chapter 2: Selecting Best Management Practices (BMPs) Chapter 2: Selecting Best Management Practices (BMPs) 2.1 - Temporary versus Permanent BMPs The same level of care should be taken to select both temporary BMPs and permanent BMPs. The same level of care

More information

Preliminary Rainfall Runoff Management for Developments EA/Defra Report Procedure W5-074/A Summary Guidance for Developers and Engineers

Preliminary Rainfall Runoff Management for Developments EA/Defra Report Procedure W5-074/A Summary Guidance for Developers and Engineers Preliminary Rainfall Runoff Management for Developments EA/Defra Report Procedure W5-074/A Summary Guidance for Developers and Engineers 1. Objective of this guidance and Procedure W5-074/A is to assist

More information

Rainwater Harvesting at Stillwater Country Club

Rainwater Harvesting at Stillwater Country Club technical memo Project Name BCWD Community Demonstration BMP Projects Date 12/05/2018 / Contact info Cc / Contact info From / Contact info Regarding BCWD Board of Managers Karen Kill, District Administrator

More information

PARAMETERS OF LOW FLOW AND DATA ON LOW FLOWS IN SELECTED IRISH RIVERS

PARAMETERS OF LOW FLOW AND DATA ON LOW FLOWS IN SELECTED IRISH RIVERS PARAMETERS OF LOW FLOW AND DATA ON LOW FLOWS IN SELECTED IRISH RIVERS, Senior Scientific Officer, Environmental Protection Agency SUMMARY Low flow conditions in Ireland are usually expressed in terms of

More information

Lough Ree Power Generating Station Continuous Monitoring Summary Report Period 16: March 2018

Lough Ree Power Generating Station Continuous Monitoring Summary Report Period 16: March 2018 Lough Ree Power Generating Station Continuous Monitoring Summary Report Period 16: March 2018 Document No.: QS-000152-01-R116-000 Date: April 2018 ESB International, One Dublin Airport Central, Dublin

More information

COON CREEK WATERSHED DISTRICT PERMIT REVIEW. Spring Lake Park Schools Westwood Middle School st Avenue NE, Spring Lake Park, MN 55432

COON CREEK WATERSHED DISTRICT PERMIT REVIEW. Spring Lake Park Schools Westwood Middle School st Avenue NE, Spring Lake Park, MN 55432 PAN 16-112, Westwood Middle School, Page 1 of 6 COON CREEK WATERSHED DISTRICT PERMIT REVIEW MEETING DATE: August 22, 2016 AGENDA NUMBER: 10 FILE NUMBER: 16-112 ITEM: Westwood Middle School RECOMMENDATION:

More information

Initial OPW Designation APSR AFRR IRR Co-ordinates Easting: Northing: PFRA database comments (in italics):

Initial OPW Designation APSR AFRR IRR Co-ordinates Easting: Northing: PFRA database comments (in italics): Location: Aughinish CHP and ESB Sub Station Co. Limerick Unique ID: 240366 (from PFRA database) Initial OPW Designation APSR AFRR IRR Co-ordinates Easting: 129250 Northing: 153000 River / Catchment / Sub-catchment

More information

Definitions 3/16/2010. GG22A: GEOSPHERE & HYDROSPHERE Hydrology

Definitions 3/16/2010. GG22A: GEOSPHERE & HYDROSPHERE Hydrology GG22A: GEOSPHERE & HYDROSPHERE Hydrology Definitions Streamflow volume of water in a river passing a defined point over a specific time period = VxA discharge m 3 s -1 Runoff excess precipitation - precipitation

More information

Engineers Ireland Presentation

Engineers Ireland Presentation Engineers Ireland Presentation Kevin Gallagher Chartered Engineer Senior Executive Engineer Cork City Council Local Authority Response to Flooding in an Urban Area INTRODUCTION: Context Flooding Types

More information

LAKE COUNTY HYDROLOGY DESIGN STANDARDS

LAKE COUNTY HYDROLOGY DESIGN STANDARDS LAKE COUNTY HYDROLOGY DESIGN STANDARDS Lake County Department of Public Works Water Resources Division 255 N. Forbes Street Lakeport, CA 95453 (707)263-2341 Adopted June 22, 1999 These Standards provide

More information

Dry Creek Flood Control Improvement Project

Dry Creek Flood Control Improvement Project Dry Creek Flood Control Improvement Project The following is a brief overview of the planned IRWM Stormwater Flood Management Grant Application from the Fresno Metropolitan Flood Control District (FMFCD)

More information

Appendix A Stormwater Site Plan Report Short Form

Appendix A Stormwater Site Plan Report Short Form Appendix A Stormwater Site Plan Report Short Form The Stormwater Site Plan Report Short Form may be used for projects that trigger only Minimum Requirements #1-#5. These projects typically fall within

More information

The Town of Chester Stormwater Mapping Report

The Town of Chester Stormwater Mapping Report The Town of Chester Stormwater Mapping Report Prepared by the Warren County Soil & Water Conservation District December 2013 Table of Contents Introduction and Location 3 Stormwater Runoff 3 Assessment

More information

THE STUDY ON INTEGRATED URBAN DRAINAGE IMPROVEMENT FOR MELAKA AND SUNGAI PETANI IN MALAYSIA FINAL REPORT

THE STUDY ON INTEGRATED URBAN DRAINAGE IMPROVEMENT FOR MELAKA AND SUNGAI PETANI IN MALAYSIA FINAL REPORT THE GOVERNMENT OF MALAYSIA PRIME MINISTER S DEPARTMENT ECONOMIC PLANNING UNIT THE STUDY ON INTEGRATED URBAN DRAINAGE IMPROVEMENT FOR MELAKA AND SUNGAI PETANI IN MALAYSIA FINAL REPORT VOL. 5: TECHNICAL

More information

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN PLANT GREENE COUNTY ASH POND ALABMA POWER COMPANY

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN PLANT GREENE COUNTY ASH POND ALABMA POWER COMPANY INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN PLANT GREENE COUNTY ASH POND ALABMA POWER COMPANY Section 257.82 of EPA s regulations requires the owner or operator of an existing or new CCR surface impoundment

More information

Chapter 1 Introduction

Chapter 1 Introduction Engineering Hydrology Chapter 1 Introduction 2016-2017 Hydrologic Cycle Hydrologic Cycle Processes Processes Precipitation Atmospheric water Evaporation Infiltration Surface Runoff Land Surface Soil water

More information

ZONING ORDINANCE FOR THE ZONED UNINCORPORATED AREAS ARTICLE 1500 OF PUTNAM COUNTY, WEST VIRGINIA Page 149 ARTICLE 1500 DRAINAGE AND STORM SEWERS

ZONING ORDINANCE FOR THE ZONED UNINCORPORATED AREAS ARTICLE 1500 OF PUTNAM COUNTY, WEST VIRGINIA Page 149 ARTICLE 1500 DRAINAGE AND STORM SEWERS OF PUTNAM COUNTY, WEST VIRGINIA Page 149 ARTICLE 1500 DRAINAGE AND STORM SEWERS 1500.01 GENERAL REQUIREMENTS 1500.02 NATURE OF STORM WATER FACILITIES 1500.03 DRAINAGE EASEMENTS 1500.04 STORM WATER MANAGEMENT

More information

Lough Ree Power Generating Station Continuous Monitoring Summary Report Period 18: May 2018

Lough Ree Power Generating Station Continuous Monitoring Summary Report Period 18: May 2018 Lough Ree Power Generating Station Continuous Monitoring Summary Report Period 18: May 2018 Document No.: QS-000152-01-R118-000 Date: June 2018 ESB International, One Dublin Airport Central, Dublin Airport,

More information

Lowestoft Flood Risk

Lowestoft Flood Risk Lowestoft Flood Risk Management Project Consultation 30th October to 14th December 2017 Flooding from rivers and extreme rainfall Mike Page Introduction Lowestoft is a coastal town with low lying areas

More information

Public Works and Engineering

Public Works and Engineering 6.C Exhibit Incorporated in 1909 Public Works and Engineering Committee Report To: From: Mayor and Board of Trustees Bill Emmerich For Village Board Meeting of: November 27, 2017 Subject: Division and

More information

Abstract. Environmental Impact Statement (EIS) Scoping Report

Abstract. Environmental Impact Statement (EIS) Scoping Report Abstract On 1 st January 2014, Irish Water assumed responsibility for managing Ireland s water and wastewater investment and maintenance programmes. On that date, Irish Water also took over the management

More information

Hydromodification Management Measures

Hydromodification Management Measures Chapter 7 Hydromodification Management Measures This Chapter summarizes the requirements for controlling erosive flows from development projects. 7.1 Why Require Hydromodification Management? Changes in

More information

Hydromodification Management Measures

Hydromodification Management Measures Chapter 7 Hydromodification Management Measures This Chapter summarizes the requirements for controlling erosive flows from development projects. 7.1 Why Require Hydromodification Management? Changes in

More information

DESIGN BULLETIN #16/2003 (Revised July 2007) Drainage Guidelines for Highways Under Provincial Jurisdiction in Urban Areas.

DESIGN BULLETIN #16/2003 (Revised July 2007) Drainage Guidelines for Highways Under Provincial Jurisdiction in Urban Areas. Drainage Guidelines for Highways Under Provincial Jurisdiction in Urban Areas. July 2007 Update to Design Bulletin #16/2003: Added under Design Criteria Culverts of 600mm diameter are commonly used to

More information

Lough Ree Power Generating Station Continuous Monitoring Summary Report Period 19: June 2018

Lough Ree Power Generating Station Continuous Monitoring Summary Report Period 19: June 2018 Lough Ree Power Generating Station Continuous Monitoring Summary Report Period 19: June 2018 Document No.: QS-000152-01-R119-000 Date: August 2018 ESB International, One Dublin Airport Central, Dublin

More information

Preliminary Design Report: Prices Subdivision Drainage Improvements & Wastewater Servicing

Preliminary Design Report: Prices Subdivision Drainage Improvements & Wastewater Servicing B.5.1 Preliminary Design Report: Prices Subdivision Drainage Improvements & Wastewater Servicing --Greenland Consulting Engineers-- 1 The Study Location (Prices Subdivision) consists of the lots fronting

More information

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN PLANT GASTON GYPSUM POND ALABAMA POWER COMPANY

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN PLANT GASTON GYPSUM POND ALABAMA POWER COMPANY INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN PLANT GASTON GYPSUM POND ALABAMA POWER COMPANY Section 257.82 of EPA s regulations requires the owner or operator of an existing or new CCR surface impoundment or

More information

Proposed Alterations and Extension to 17 St. John's Road, Sandymount, Dublin 4

Proposed Alterations and Extension to 17 St. John's Road, Sandymount, Dublin 4 Proposed Alterations and Extension to 17 St. John's Road, Sandymount, Dublin 4 Engineering Report April, 2014 1422 Issue 1 Casey O Rourke Associates Structural & Civil Consulting Engineers 77 Merrion Square

More information

Lough Ree Power Generating Station Continuous Monitoring Summary Report Period 15: February 2018

Lough Ree Power Generating Station Continuous Monitoring Summary Report Period 15: February 2018 Lough Ree Power Generating Station Continuous Monitoring Summary Report Period 15: February 2018 Document No.: QS-000152-01-R115-000 Date: April 2018 ESB International, One Dublin Airport Central, Dublin

More information

CRYSTAL LAKE FLOODING STUDY EXECUTIVE SUMMARY

CRYSTAL LAKE FLOODING STUDY EXECUTIVE SUMMARY Project #08223 CRYSTAL LAKE FLOODING STUDY EXECUTIVE SUMMARY PREPARED FOR: City of Crystal Lake 100 West Woodstock Street Crystal Lake, Illinois 60014 FEBRUARY 11, 2009 26575 W. COMMERCE DRIVE, SUITE 601,

More information

Bluff Creek One Water

Bluff Creek One Water Bluff Creek One Water The Bluff Creek Watershed has no lakes within its boundaries. As the westernmost watershed within the District, land use changes from agricultural to residential have occurred relatively

More information

Lough Ree Power Generating Station Continuous Monitoring Summary Report Period 17: April 2018

Lough Ree Power Generating Station Continuous Monitoring Summary Report Period 17: April 2018 Lough Ree Power Generating Station Continuous Monitoring Summary Report Period 17: April 2018 Document No.: QS-000152-01-R117-000 Date: May 2018 ESB International, One Dublin Airport Central, Dublin Airport,

More information

Background for: Upper Piddle Headwaters

Background for: Upper Piddle Headwaters Background for: Upper Piddle Headwaters Environment Agency Information Waterbody Upper Piddle Waterbody ID GB108044010120 Status Poor Failing elements Fish macrophytes (flows) Phytobenthos (nutrients)

More information

D12 LAND DRAINAGE, WATER CONSERVATION, FOUL DRAINAGE AND SEWAGE DISPOSAL AN INTEGRATED WATER STRATEGY

D12 LAND DRAINAGE, WATER CONSERVATION, FOUL DRAINAGE AND SEWAGE DISPOSAL AN INTEGRATED WATER STRATEGY D12 LAND DRAINAGE, WATER CONSERVATION, FOUL DRAINAGE AND SEWAGE DISPOSAL AN INTEGRATED WATER STRATEGY OBJECTIVES D12/a To ensure that the development would not be at risk of flooding either from itself

More information

E. STORMWATER MANAGEMENT

E. STORMWATER MANAGEMENT E. STORMWATER MANAGEMENT 1. Existing Conditions The Project Site is located within the Lower Hudson Watershed. According to the New York State Department of Environmental Conservation (NYSDEC), Lower Hudson

More information

Stormwater Erosion Control & Post-Construction Plans (Stormwater Quality Plans)

Stormwater Erosion Control & Post-Construction Plans (Stormwater Quality Plans) Stormwater Erosion Control & Post-Construction Plans (Stormwater Quality Plans) Allen County Stormwater Plan Submittal Checklist The following items must be provided when applying for an Allen County Stormwater

More information

14 NATURAL HAZARDS Background Resource Management Issues

14 NATURAL HAZARDS Background Resource Management Issues 14 NATURAL HAZARDS 14.1 Background The particular geology, hydrology and topography of the Hutt Valley make Upper Hutt vulnerable to a variety of natural hazards. Earthquakes and flooding are the most

More information

APPENDIX F DRAINAGE AND STORMWATER MANAGEMENT TECHNICAL MEMO

APPENDIX F DRAINAGE AND STORMWATER MANAGEMENT TECHNICAL MEMO APPENDIX F DRAINAGE AND STORMWATER MANAGEMENT TECHNICAL MEMO MEMO To: Emily Sangster Date: April 28, 2015 From: Bhavika Patel Job No.: 34-14015-000-B02 Subject: Stormwater Management Impact Assessment

More information

Site 25: Lappet Mill, Calder Vale

Site 25: Lappet Mill, Calder Vale Site 25: Lappet Mill, Calder Vale Site Assessment Report Title Figure 1 Map showing general layout Calder Vale Mill or Lappet Mill in Calder Vale is historically a water-powered cotton mill. It was built

More information

FLOOD RISK ASSESSMENT

FLOOD RISK ASSESSMENT Firth Buildings, 99-101 Leeds Road, Dewsbury, WF12 7BU t 01924 464342 f 01924 450662 e trevor.haigh@haighhuddleston.co.uk FLOOD RISK ASSESSMENT ON LAND AT BUTT LANE SNAITH WEST YORKSHIRE FOR HARRON HOMES

More information

Appendix B Stormwater Site Plan Submittal Requirements Checklist

Appendix B Stormwater Site Plan Submittal Requirements Checklist Stormwater Site Plan Submittal Requirements Checklist The Submittal Requirements Checklist is intended to aid the design engineer in preparing a Stormwater Site Plan. All items included in the following

More information

Detention Pond Design Considering Varying Design Storms. Receiving Water Effects of Water Pollutant Discharges

Detention Pond Design Considering Varying Design Storms. Receiving Water Effects of Water Pollutant Discharges Detention Pond Design Considering Varying Design Storms Land Development Results in Increased Peak Flow Rates and Runoff Volumes Developed area Robert Pitt Department of Civil, Construction and Environmental

More information

APPLICATION FORM AF-50: CONSENT UNDER SECTION 50, ARTERIAL DRAINAGE ACT, 1945

APPLICATION FORM AF-50: CONSENT UNDER SECTION 50, ARTERIAL DRAINAGE ACT, 1945 APPLICATION FORM AF-50: CONSENT UNDER SECTION 50, ARTERIAL DRAINAGE ACT, 1945 APPLICATION DETAILS Name of Applicant: Company / authority: Address: Date of Application: Client (if appropriate): BRIDGE DETAILS

More information

Pre-Event Activities. Blue River. Pre Field Trip Suggestions

Pre-Event Activities. Blue River. Pre Field Trip Suggestions Blue River Have you heard we all live in a watershed? Well, it is true! This total body activity will allow students to demonstrate how water flows in a watershed while exploring how seasonal variations

More information

Masters Geelong Stormwater Management Plan

Masters Geelong Stormwater Management Plan ` Masters Geelong Job Number: CG111748 ABN 47 106 610 913 150 Oxford Street, Collingwood Victoria 3066 Australia Telephone: 03 8415 7777 Facsimile: 03 8415 7788 International: +61 3 8415 7777 victoria@cardno.com.au

More information

Strategic Flood Risk Assessment (SFRA) Level 2

Strategic Flood Risk Assessment (SFRA) Level 2 Strategic Flood Risk Assessment (SFRA) Level 2 (Final) South Bucks District Council Capswood Oxford Road Denham UB9 4LH (this page intentionally blank) Level 2 SFRA Background The South Bucks Level 1 SFRA

More information

Drainage Report. New Braunfels Municipal Airport. Master Plan Update 2005

Drainage Report. New Braunfels Municipal Airport. Master Plan Update 2005 Drainage Report Master Plan Update 2005 General The Texas Department of Transportation (TxDOT), Aviation Division, retained the consulting engineering team of Parkhill, Smith & Cooper, Inc. (PSC), to prepare

More information

APPENDIX A. Hydraulic Investigations: Cascade Mall at Burlington

APPENDIX A. Hydraulic Investigations: Cascade Mall at Burlington APPENDIX A m SUMMARY REPORT FOR E.I.S. Hydraulic Investigations: Cascade Mall at Burlington July 12, 1982 John E. Norman, P.E. 14779 Northeast 32nd, #A201 Bellevue, WA 98007 (206) 882-1767 92 General A

More information

INITIAL INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN PLANT MCMANUS ASH POND A (AP-1) 40 CFR

INITIAL INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN PLANT MCMANUS ASH POND A (AP-1) 40 CFR INITIAL INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN PLANT MCMANUS ASH POND A (AP-1) 40 CFR 257.82 EPA s Disposal of Coal Combustion Residuals from Electric Utilities Final Rule (40 C.F.R. Part 257 and Part

More information

COLDRA WOODS HOTEL BY CELTIC MANOR AND STARBUCKS DRIVE- THRU RESTAURANT Flood Consequences Assessment

COLDRA WOODS HOTEL BY CELTIC MANOR AND STARBUCKS DRIVE- THRU RESTAURANT Flood Consequences Assessment COLDRA WOODS HOTEL BY CELTIC MANOR AND STARBUCKS DRIVE- THRU RESTAURANT Flood Consequences Assessment APRIL 2017 CONTACTS JOSHUA MOORE Graduate Hydrologist dd ++44 (0) 117 372 1238 joshua.moore@arcadis.com

More information

Powburn Flood Risk Study Powburn FRS

Powburn Flood Risk Study Powburn FRS Powburn FRS Northumberland County Council November 2011 Draft Report 9W1520 A COMPANY OF HASKONING UK LTD. COASTAL & RIVERS Marlborough House Marlborough Crescent Newcastle upon Tyne NE1 4EE United Kingdom

More information

Grovelands Park Wetlands, Enfield

Grovelands Park Wetlands, Enfield Grovelands Park Wetlands, Enfield Description This project was undertaken as part of the Salmons Brook Healthy River Challenge, an initiative designed to improve water quality in the Salmons Brook and

More information

THE EFFECTS OF URBANIZATION ON THE MINGO CREEK WATERSHED

THE EFFECTS OF URBANIZATION ON THE MINGO CREEK WATERSHED THE EFFECTS OF URBANIZATION ON THE MINGO CREEK WATERSHED by Tim Marshall (presented at the Sixth Conference on Hydrometeorology in Indianapolis, IN, 1984) 1. INTRODUCTION Urbanization of flood plains presents

More information

ICELANDIC RIVER / WASHOW BAY CREEK INTEGRATED WATERSHED MANAGEMENT PLAN STATE OF THE WATERSHED REPORT CONTRIBUTION SURFACE WATER HYDROLOGY REPORT

ICELANDIC RIVER / WASHOW BAY CREEK INTEGRATED WATERSHED MANAGEMENT PLAN STATE OF THE WATERSHED REPORT CONTRIBUTION SURFACE WATER HYDROLOGY REPORT ICELANDIC RIVER / WASHOW BAY CREEK INTEGRATED WATERSHED MANAGEMENT PLAN STATE OF THE WATERSHED REPORT CONTRIBUTION SURFACE WATER HYDROLOGY REPORT Disclaimer: The hydrologic conditions presented in this

More information

APPENDIX E APPENDIX E ESTIMATING RUNOFF FOR SMALL WATERSHEDS

APPENDIX E APPENDIX E ESTIMATING RUNOFF FOR SMALL WATERSHEDS APPENDIX E ESTIMATING RUNOFF FOR SMALL WATERSHEDS March 18, 2003 This page left blank intentionally. March 18, 2003 TABLES Table E.1 Table E.2 Return Frequencies for Roadway Drainage Design Rational Method

More information

Created by Simpo PDF Creator Pro (unregistered version) Asst.Prof.Dr. Jaafar S. Maatooq

Created by Simpo PDF Creator Pro (unregistered version)  Asst.Prof.Dr. Jaafar S. Maatooq Lect.No.9 2 nd Semester Barrages, Regulators, Dams 1 of 15 In order to harness the water potential of a river optimally, it is necessary to construct two types of hydraulic structures, as shown in Figure

More information

Flood Risk Assessment

Flood Risk Assessment 15T788 Proposed Lidl Store, Stanley Street, South Shields 07 December 2015 Prepared By Billinghurst George & Partners www.bgp-consulting.co.uk Waterloo House, Teesdale South, Thornaby, Stockton on Tees

More information

RE: FLOOD MITIGATION STRATEGY FOR THE PROPOSED DEVELOPMENT REFERRED TO AS LAND AT BRACKENWAY, FORMBY

RE: FLOOD MITIGATION STRATEGY FOR THE PROPOSED DEVELOPMENT REFERRED TO AS LAND AT BRACKENWAY, FORMBY Your Reference: DC/2018/00093 Our Ref: 881079 FRA L05 18 th December 2018 Sefton Council Planning Services Magdalen House 30 Trinity Road Bootle L20 3NJ 14,Beecham Court, Pemberton Business Park, Wigan,

More information

Flood Risk Assessment

Flood Risk Assessment Temporary Shale Gas Exploration Roseacre Wood, Lancashire PNR_PL_ June 2014 Contents 1 Introduction 1 2 Development Description and Location 2 Page 2.1 Location 2 2.2 Existing Site Characteristics 3 2.3

More information

SECTION III: WATERSHED TECHNICAL ANALYSIS

SECTION III: WATERSHED TECHNICAL ANALYSIS Trout Creek Watershed Stormwater Management Plan SECTION III: WATERSHED TECHNICAL ANALYSIS A. Watershed Modeling An initial step this study of the Trout Creek watershed was the selection of a stormwater

More information

Memorandum. Executive Summary

Memorandum. Executive Summary 277 Bendix Road Suite 300 Virginia Beach, VA 23452 Main: 757-466-1732 Fax: 757-466-1493 Memorandum To: The City of Virginia Beach From: Lewis White and Rachael Johnson on behalf of WSP Parsons Brinckerhoff

More information

Nuriootpa (Sturt Highway Service Centre) DPA The Barossa Council Appendices. Appendix C - Herriot Consulting Engineering Assessment

Nuriootpa (Sturt Highway Service Centre) DPA The Barossa Council Appendices. Appendix C - Herriot Consulting Engineering Assessment Nuriootpa (Sturt Highway Service Centre) DPA The Barossa Council Appendices Appendix C - Herriot Consulting Engineering Assessment 4th May 2018 C1803-002 Rocland Estate Lot 147 Sturt Highway, Nuriootpa

More information

Glenfarg Hydropower Development. Hydro-potential in the Glenfarg area

Glenfarg Hydropower Development. Hydro-potential in the Glenfarg area Client: Glenfarg Renewable Energy Association Contract Start Date: May 2014 Report Reference: Contributors: Checked by: MNV/GF001/2011 Dr R C Johnson Rita Day Document Revisions: Status Version Date Final

More information

Deep River-Portage Burns Waterway Watershed 2015

Deep River-Portage Burns Waterway Watershed 2015 2.4 Soils Soil development is the product of the interaction of parent material, topography, climate, organisms and time. Understanding the types of soils that exist within a watershed and their characteristics

More information

CHAPTER 4 - EROSION & SEDIMENT CONTROL AND STORMWATER MANAGEMENT ORDINANCE OF DUBUQUE COUNTY, IOWA. Adopted March 29, 2010.

CHAPTER 4 - EROSION & SEDIMENT CONTROL AND STORMWATER MANAGEMENT ORDINANCE OF DUBUQUE COUNTY, IOWA. Adopted March 29, 2010. CHAPTER 4 - EROSION & SEDIMENT CONTROL AND STORMWATER MANAGEMENT ORDINANCE OF DUBUQUE COUNTY, IOWA Adopted March 29, 2010 Table of Contents Page Part 1 Introduction...3 4-1 Title..................3 4-2

More information

Storm Sewer Design - Introduction

Storm Sewer Design - Introduction Class 4 [1] Storm Sewer Design - Introduction As urban drainage can not be expected to accommodate all rainfall events, the first step in the design procedure is to select an appropriate design storm.

More information