1 FORM I, PRE FEASIBILITY REPORT FOR PROPOSED EXPANSION IN PRODUCTION OF PIGMENTS AND PIGMENT RELATED PRODUCTS AT PLOT NO. A-6/3, SIPCOT INDUSTRIAL COMPLEX, PACHAYAKUPPAM VILLAGE, CUDDALORE DISTRICT, TAMIL NADU. 5(f) Synthetic Organic Chemicals Project Proponent M/s. Supreme Dyechem Pvt. Ltd. Prepared By August 2016

2

3 Table of Contents 1. EXECUTIVE SUMMARY INTRODUCTION Identification of the Project & Project Proponent Project Project Proponent Brief description of nature of the project Need of the project and its importance for the country Demand supply gap Import Export possibility Employment generation PROJECT DESCRIPTION Type of the project Location of the project Details of alternate site Size or magnitude of the operation Manufacturing Process and Material Balance Alpha Blue Beta Blue CPC Crude Blue Blue Additives Raw material requirement Resource optimization Water requirement Quantity of waste generation (Liquid and Solid) & its management Air Pollution Management Wastewater Generation and disposal measures Noise Generation and its management Hazardous waste Management JANUARY 2017

4 3.10 Power Requirement SITE ANALYSIS Connectivity Land Form, Land use and Land ownership Topography Existing Infrastructure List of Industries Soil Classification Rainfall and Climate Social Infrastructure PLANNING BRIEF AND INFRASTRUCTURE FOR PROPOSED PROJECT Planning Concept Population Projection Land Use Planning Assessment of Infrastructure Demand Amenities/Facilities PROPOSED INFRASTRUCTURE Industrial Area Processing Area Residential Area Non Processing Area Green Belt Social Infrastructure Connectivity Drinking water Management Source & Supply Sewerage System Effluent Treatment System Solid waste Management Power requirement, Supply & Source Rain Water Harvesting System & Storm water management system REHABILITATION AND RESETTLEMENT (R&R) PLAN PROJECT SCHEDULE AND COST ESTIMATES ANALYSIS OF PROPOSAL (FINAL RECOMMENDATIONS) JANUARY 2017

5 List of Tables Table 3.1 Environmental setting of the project site... 5 Table 3.2 Products and their Production Capacity Table 3.3 Raw Material Requirement Table 3.4 : List of Key Machineries Required Table 3.5 Stack Details Table 3.6 Details of Wastewater Generation Table 3.7 Details of Hazardous waste generated Table 5.1 Land Use Break-Up of Project Site List of Figures Figure 3.1 Location Map of Project Site... 7 Figure 3.2 Satellite Image of the Project Site... 8 Figure 3.3 Master Layout... 9 Figure 3.4 Process Flow chart and Material Balance of Alpha Blue Figure 3.5 Process Flow chart and Material Balance for Beta Blue Figure 3.6 Process Flow chart and Material Balance for CPC Crude Blue Figure 3.7 Process Flow chart and Material Balance for Blue Additives Figure 3.8 Water Balance Figure 3.9 ETP Flow Chart Figure 4.1 Site Connectivity List of Annexure Annexure I: Sale deed with Tamil Nadu Pigments Annexure II: Lease deed with SIPCOT Annexure - III: Memorandum of Association and Articles of Association Annexure IV: Water Supply Agreement SIPCOT Annexure V: CUSECS Letter Annexure VI: Consent for Air, Water& HW from TNPCB Annexure VII: TNPCB Test Report JANUARY 2017

6 1. EXECUTIVE SUMMARY S. No. Particulars Details 1. Name of the project Proposed expansion of Pigment and Pigment related products manufacturing unit located at SIPCOT Industrial Area, Cuddalore Taluk, Cuddalore District. 2. Project Proponent M/s. Supreme Dye Chem Limited, SF-45-47, Rudraksh Complex-II, Opp. Annapurna Restaurant, Nr. Jashodanagar Cross Road, Vatva, Ahmedabad Gujarat, India 3. Location of the project Plot No. A - 6/3, Sipcot Industrial Complex, Pachayakuppam Village, Cuddalore District, 4. Co-ordinates Latitude(N) '37.97"N Longitude(E) '33.64"E 5. Production Capacity Name of the product Capacity (TPM) Pigment Beta Blue 100 Pigment Alpha Blue 150 Copper Phthalocyanine Blue 300 Pigment Blue Additives Major Raw Materials Phthalic Anhydride, Urea, Blue Crude, Sulphuric Acid, Phthalamide, Caustic Lye, solvent Para formaldehyde etc. 7. Land availability 0.5 ha (1.23 acres) 8. Man Power 20 to 250 persons Requirement 9. Power Requirement 1200 to 1500 KVA 10. Water Requirement 21.5 KLD to 1405 KLD 11. Source of Water SIPCOT Water Supply 12. Sewage generation 1 KLD to 9.25 KLD 13. Effluent Generation 12 KLD to 924 KLD 14. APC measures Cyclone Separator followed by Bag Filter, Water Scrubber & stacks of adequate height 15. Project Cost (Rs.) Rs.24.0Crores 16. EMP Cost (Rs.) Rs 7.5 Crores 17. CSR Cost(Rs.) 14 Lakhs 1 JANUARY 2017

7 2. INTRODUCTION 2.1 Identification of the Project & Project Proponent M/s Supreme Dyechem Private Limited is engaged in the production of pigments for use in the industry. In view of expanding requirement and to meet customer s demand, the project proponent has proposed to increase the production capacity of pigments at their factory located in SIPCOT Industrial Area, Cuddalore Project Due to increase in demand for the pigments in the domestic as well as export market needs, Supreme Dyechem Private Limited proposes to enhance the production capacity of its pigments and pigment related products. This proposal has been submitted for obtaining Environmental Clearance for increasing the production capacity from T/Month to 650 T/Month. The proposed activity will take place within the existing factory Project Proponent M/s Supreme Dye Chem Private Ltd established in the year The organization is an ISO 9001:2008 & 14001:2004 certified manufacturers of Phthalocyanine Pigments and Additives. The companies of Supreme Group has been providing technical services in the field of Environment, Health & Safety for the past 2 decades and thus as a group Supreme family stands out as a complete industrial solution provider in various diversified areas under one roof. 2.2 Brief description of nature of the project The unit currently manufactures two products and the proponent has planned to increase the products and their production capacity based on market demand. The proposed change of product in pigment production 2 JANUARY 2017

8 will fall under Schedule 5 (f) of the EIA Notification The existing facility is located within a notified industrial area/estate i.e. Cuddalore Industrial Area & treated as Category B project, requires prior Environmental Clearance from the State Environmental Impact Assessment Authority (SEIAA). 2.3 Need of the project and its importance for the country Products intended to expand are suitable for coatings, inks, paints, plastics and textile. Dyestuff sector is one of the core chemical industries in India. It is also the second highest export segment in chemical industry. The Indian dyestuff industry is made up of about 1,000 small scale units and 50 large organized units, who produce around 1,30,000 tones of dyestuff. The major users of dyes in India are textiles, paper, plastics, printing ink and foodstuffs. The textiles sector consumes around 80% of the total production due to high demand for polyester and cotton, globally and also contribute towards the growth rate of dye industry in India. Pigment Blue is a cyclic product of copper and reaction between phthalic anhydride and urea. Alpha Blue and Beta Blue are variations of Phthlocyanine Blues. Alpha Blue is redder in shade and of smaller particle size and is available as crystallizing type and non-crystallizing nonflocculating type. Beta Blue yields bright greenish blue shades with slightly lower tintorial strength. Beta Blue is of a more stable crystal formulation than Alpha Blue and is available as the non-crystallizing type and the noncrystallizing non-flocculating type. 2.3 Demand supply gap The gap between demand and availability of dye & intermediate sources is likely to increase over the years. The growing demand and supply gap would require increasing emphasis to be given to the exploration and production sector. This calls for such projects which can help in bridging the gap. Pigments contribute heavily for the use of color. 3 JANUARY 2017

9 2.4 Import Raw materials will be procured from indigenous sources. This will help in the economic development of the country to a great extent thus, to decrease the dependency on imports the proposed project can work in a positive manner. 2.5 Export possibility There is always demand for dyes in world market as India is one of the leading exporters. The proposed expansion project will contribute significant role in the above export market too. 2.6 Employment generation The total direct employment potential of the proposed industry is about 250 people. However, there are indirect employment generations due to the project during the transportations, marketing & distribution etc. 4 JANUARY 2017

10 3. PROJECT DESCRIPTION 3.1 Type of the project The proposed project involves the production of Pigments CPC Blue crude, Alpha and Beta Blue and Blue additives of capacity about 640 TPM. As the project site located within Industrial Estate developed by SIPCOT, the expansion in production will fall under Category B and it requires Environmental Clearance from State Environmental Impact Assessment Authority (SEIAA), Tamilnadu under Category B in the Schedule 5 (f) of EIA Notification It is an independent project not interlinked or interdependent project. The proposed project of pigment manufacturing plant is located in SIPCOT Industrial Complex, Cuddalore. The proposed project will utilize existing facility with some modification. 3.2 Location of the project The proposed activity will be carried out within the existing production facility at Plot no. A 6/3, SIPCOT Industrial Complex, Cuddalore district, Tamil Nadu. The Environmental setting of the project site is presented in the Table 3.1.The location map of the project area is represented in Figure 3.1. The satellite imagery showing the project site is given in Figure 3.2 & site layout in Figure 3.3. Table 3.1 Environmental setting of the project site S.NO. PARTICULARS DETAILS 1 Site Latitude 11 41'37.97"N 2 Site Longitude 79 45'33.64"E 3 Site Elevation above MSL 7m 4 Nearest highway SH Km (W) NH 45 A 0.31 Km (W) SH Km (NW) NH Km (N) 5 Nearest railway station Cuddalore Old town 3.0 Km (N) 5 JANUARY 2017

11 6 Nearest airport Puducherry Airport 31.0 Km (NNE) 7 Nearest town/ city Pachayakuppam 0.58 km (WNW) Kudikkadu 1.07 Km (S) Sothikuppam 1.44 km (SE) Cuddalore Old town 6 Km (N) 8 Topography Plain 9 Archaeologically important Nil in 10 km radius places 10 National parks/ Wildlife Sanctuaries Nil in 10 km radius 11 Reservoir Uppanar river 0.77 Km (E) Bay of Bengal 1.78 Km (E) 12 Reserved/ Protected Forests Nil in 10 km radius 13 Seismicity Zone II - Least Active as per seismic zone map of India 14 Defense Installations Nil in 15km radius 15 Nearest Port Cuddalore Port 2.06 km (NE) 6 JANUARY 2017

12 Figure 3.1 Location Map of Project Site 7 JANUARY 2017

13 Figure 3.2 Satellite Image of the Project Site 8 JANUARY 2017

14 Figure 3.3 Master Layout 9 JANUARY 2017

15 N NO ELECTRICAL INSTALLTION VARIOUS MACHINERY NAME OF THE EQUIPMENTS HP OF EACH TOTAIL HP 1A PULVARIZER 75 1B PULVARIZER BALL MILL CENTRIFUGE A SLURRY PUMP 5 4B SLURRY PUMP 5 4C SLURRY PUMP 3 4D SLURRY PUMP A WOODEN VAT 5 5B WOODEN VAT MS STEAM KETTLE MS STEAM KETTLE AIR COMPRESSOP A TRAY DRIER 2 9B TRAY DRIER 2 6 9C TRAY DRIER 2 10A BOILER B 3 11A CENTRIFUGAL WATER PUMP B CENTRIFUGAL WATER PUMP 1 12 MOND BLOCK PUMP LABORATORY ACID TRANSFER PUMP 5 5 TOTAL 128 SUPREME DYE CHEM PVT LTD., AT PLOT NO - A 6/3, SIPCOT INDUSTRIAL COMPLEX, PACHAYANKUPPAM VILLAGE R.S.NO 62/1Part & 62/2Part CUDDALORE. JOP NO /90 SCALE: 1:100 CKD DRG NO - DATE: DRN AREA DETAILS SQFT FACTORY SHED 5663Ft GODOWN 2114Ft OFFICE 804Ft 1. RCC REACTOR 2. RCC REACTOR 3,4. COLLECTION TANK 5A. NUTRALISATION TANK 5B. LIME 6,7. SETTLING TANK 8. AERATION TANK 9. SLUQGE BED TANK COLOUR INDEX SITE BOUNDARY EXIS., FACTORY BUILDING PRO., FACTORY BUILDING APPLICANT'S SIGNATURE LICENSED SURVEYOR SMPS

16 3.3 Details of alternate site The proposed change of products will take place within the existing facility owned & operated by M/s. Supreme Dyechem Private Ltd. This site has the following advantages: As the factory is currently in operation all infrastructural facilities are already in place. There is no adverse siting factor such as reclassification of land use and pattern, R & R as the facility is located within notified Industrial Area. As well as the efficient functioning of any industry mainly depends on the availability of its basic requirements viz. raw materials, fuel, power, water, manpower etc. The industry is proposed to be established in SIPCOT Industrial Complex, Cuddalore. The choice of the land confers several advantages, which are summarized below. 1. The land use of the site is Industrial 2. The site is well connected by roadways. 3. Water supply facility is available with SIPCOT. 4. Power will be supplied by TNEB Hence, no alternative sites were considered. 3.4 Size or magnitude of the operation M/s Supreme Dyechem Private Ltd is currently manufacturing 10.5 T/month of Alpha Blue and Beta Blue Pigments and has proposed to expand its production capacity to 640 T/month. Details of the products and their production capacity are given in Table JANUARY 2017

17 Table 3.2 Products and their Production Capacity S.NO Name of the Product Production Capacity (Ton/Month) Existing After Expansion 1 Alpha Blue (Solid) Beta Blue (Solid) CPC Blue Crude Blue Additives - 90 Total By Product S.NO Name of the Product Production Capacity (kg/ton) 1 Ammonium Carbonate Ammonium Sulphate Copper Sulphate 20 Total 1120 *Dilute Sulphuric Acid 240 Ton/Day 3.5 Manufacturing Process and Material Balance Alpha Blue Blue crude is grinded in ball or swing mill and dissolved under cooling with sulphuric acid in a glass vessel. The dissolved material is dumped into cold water in FRP drowning vessel where the particle pigment is separated. The material is then filtered and washed and transferred to treatment vessel where the wet cake is treated with distilled/ro water. Additives are added according to the desired product quality. ph raised to 9 on addition of caustic and the material is heated to certain temperature and filtered through PP Filter Press. The filter press is washed with plenty of water till ph of filtrate is neutral. The wet cake is dried in spin flash dryer and the material is collected in jumbo bags and dispatched to sale. The manufacturing process flow chart is given in Figure JANUARY 2017

18 Caprylic Acid = 216 Sulphuric Acid = Sulphuric Acid = 4222 Water = Ball Milling and Acid Swelling Drowning Reactor Water = Sulphuric acid = 1317 Caprylic acid = 216 Water = Filtration Lye = Additive = 778 Neutralization Sulphuric acid= Water = Water = Filtration (Filter Press) Water = Drying SFD Evaporation Loss = Blending and Packing Water = Alpha Blue Pigment 5000 kg Water = All units in kg/day Figure 3.4 Process Flow chart and Material Balance of Alpha Blue 12 JANUARY 2017

19 3.5.2 Beta Blue Dried Blue Crude is charged to Blender and homogenized for 2 hours. Required quantities of Sulphuric acid is added to the blender and blended for about 2 3 hours and then the powder is removed and milled in swing or ball mill for at least 2 hours. After milling the powder is sent to acid leaching tank (MS/BL). Sulphuric acid is added so as to make concentration equal to 21% by adding fresh water. The contents are heated to required temperature and maintained for 2 hours. The filter is washed and neutral ph and cake is removed. The cake is treated with water and dispersed by agitation. The slurry rotated through Gyrator for 2 hours to break agglomerate formed during the process. Caustic Lye (48%) is added emulsified and heated till the reflux starts and the reflux of solvent is continued for 5 hours and then the solvent is recovered. The solvent is recovered in a separate tank at the end of the recovery inject live steam into the vessel to recover maximum quantity of solvent. Material is Filtered under hot condition and washed to neutral ph. The wet cake is dumped in re-slurry vessel and ph adjusted in between 6.5 to 7.5 by 98% Sulphuric acid. The material is filtered and the ph of wet cake is brought to neutral. Final wash with RO/DM water to the wet cake is given till the conductivity of filtrate is found less than 100micro ohms/cm. The material is dried in SFD and collected in the HDPE/ Jumbo bags. If necessary, the material is blended and packed in PP bags or Jumbo bags depending upon the requirement of the plant. 13 JANUARY 2017

20 MEK/IBA 8273 Kg Crude Blue 3170 Kg Additive 160 Kg Water L Water for floor washing 5171 L Reactor Filtration (Filter Press) Drying (Spin Flash Dryer) Drain to WWTP Water 1990 L Distillation MEK/IBA 8174 Evaporation Loss Water 595 L Water to WWTP L Milling & Packing Water for washing 5171 All units in kg/day Beta Blue Pigment 3330 Kg Water to WWTP L Figure 3.5 Process Flow chart and Material Balance for Beta Blue CPC Crude Blue Phthalic Anhydride and Urea in a Glass Vessel has a solvent at temperature around 80 C.This is further heated to higher temperature and then the catalyst and cuprous chloride are added to it. The temperature of the reaction mass is further raised and maintained around 180 C for 6/8 hours. On completion of the reaction sample is checked for complete conversion of Phthalic Anhydride to CPC Blue Crude. The material is 14 JANUARY 2017

21 discharged to Horizontal Rotary Vacuum Dryer (HRVD) for solvent removal. After complete removal of solvent water is added to the Horizontal Rotary Vacuum Dryer (HRVD) and transferred to treatment tank. Requisite treatment to CPC Blue Crude is given and filtered through PP Filter Press. The material is dried using Spin Flash Dryer (SFD) and the dried powder is collected in bags and stored. 15 JANUARY 2017

22 Cuprous Chloride Kg Phthalic Anhydride Kg Urea Kg Ammonium Molybdate Kg Solvent Kg Glass Vessel Copper Salt Kg Molybdate salts Kg Recovered Solvent Kg CO Kg Water Kg Scrubber Weak Ammonical Soln. & solvent Steam Rotary Vacuum Dryer Recovered Solvent Kg Water Kg Sulphuric acid Kg Acid Treatment Wash water Kg Filtration Effluent Kg All units in kg/day Spin Flash Dryer CPC Crude Blue 10,000 Kg Evaporation loss Kg Figure 3.6 Process Flow chart and Material Balance for CPC Crude Blue 16 JANUARY 2017

23 3.5.4 Blue Additives Figure 3.7 Process Flow chart and Material Balance for Blue Additives 3.6 Raw material requirement The raw materials required for the production of each product are presented in Table 3.3.The final products will be marketed indigenous as well as exported. 17 JANUARY 2017

24 Table 3.3 Raw Material Requirement S.No. Raw materials (Kg/Kg) A. Copper Phthalocyanine Blue 01 Phthalic Anhydride Urea Cuprous Chloride Solvent Loss Sulphuric Acid Caustic Lye Catalyst B. Pigment Beta Blue (Kg./Kg.) (Kg. /Kg.) Pig. B Pig. A 01 Blue Crude Solvent Loss Gum Rosin Sulphuric Acid / HCl % 05 Caustic Lye S.No. Raw materials (Kg/Kg) (Kg/Kg) D. Pigment Alpha Blue (Alpha 15:0) (Alpha 15:1) 01 Blue Crude Sulphuric Acid (98%) Emulsifier Additives I Additive II Caustic Lye (48%) E. Pigment Blue Additives (PCPC) (Kg/Kg) 01 CPC Blue Crude Phthalamide Para formaldehyde Sulphuric Acid JANUARY 2017

25 Table 3.4 : List of Key Machineries Required S. No. CPC Blue Crude Blue Pigment Additives Alpha Blue 01 Glass Reactors Glass Reactors Glass Reactor 02 Rotary Vacuum Drowning Drowning Dryer vessel vessel 03 Condensers Filter presses Filter presses 04 Absorption Towers 05 Circulation Tanks 06 Spin Flash Dryer Purification vessels Treatment Vessels Weighing machine Treatment Vessels Spin Flash Dryer Blender Beta Blue Attritor Mills Conveying system Silos Treatment Vessels Filter Presses Spin Flash Dryer Pneumatic Blender Weighing machine 07 Filter presses Scrubbing System Weighing Machine 08 Belt Conveyor Scrubber Dust Collector 09 Treatment -- Scrubber Packing Vessels Machine 10 Solvent Storage Dust tanks Collector 11 Scrubber Scrubber 12 Weighing Machine 13 Packing Machine 14 Dust Collector Resource optimization In the proposed expansion project every effort will put to recycle/reuse the wastewater and reduce fresh water requirement. 3.8 Water requirement The total water requirement of the existing plant is about 21.5 KLD and it will be increased to 1405 KLD after the proposed expansion. The total water requirement of the plant will be sourced from SIPCOT water 19 JANUARY 2017

26 supply scheme. M/s. Supreme Dyechem already has a permission letter from SIPCOT for supplying water. The copy of the supply of water is enclosed in Annexure IV. The water balance diagram showing source, water requirement and waste water generation & usage of treated water is given in Figure JANUARY 2017

27 Figure 3.8 Water Balance 21 JANUARY 2017

28 3.9 Quantity of waste generation (Liquid and Solid) & its management In the process along with the products, different waste materials will also be generated. These waste materials mainly include dust emissions and solid wastes from the utilities Air Pollution Management The major air pollution sources from the industry are DG set and boiler apart from the process sections. These sources are provided with stacks of adequate height so as to disperse the emanating flue gases containing SPM, oxides of sulfur and nitrogen without affecting the ground level concentrations are proposed to the process section with adequate stack height as per the regulatory requirements. The details of existing stack and APC measures are given in Table 3.5. Table 3.5 Stack Details S.NO Source of Emission Stack Height, in m APC measures 1. Boiler 1.0 T/hr 15 Adequate Stack height 2. DG Set 65 KVA 15 Acoustic enclosures with stack Wastewater Generation and disposal measures Domestic Waste water generation, treatment & disposal The quantity of wastewater generated from domestic activities during operation phase will be disposed through septic tank followed by dispersion trench Trade Effluent generation, treatment & disposal The trade Effluent generated from the proposed project is treated in an Effluent treatment plant and the treated effluent is disposed in Marine Coastal Areas. Approval letter for disposal of the treated effluent is enclosed as Annexure V. The Flow of ETP is given in Figure JANUARY 2017

29 Table 3.6 Details of Wastewater Generation S.N Maximum Daily Discharge Description (KLD) Point of Disposal Existing After Expansion 1. Sewage On Industry own land 2. Treated Effluent Marine Coastal area Figure 3.9 ETP Flow Chart Noise Generation and its management The major source of noise pollution in the industry is the DG set for which acoustic enclosure is proposed. Also ambient noise levels will be ensured within the ambient standards by inbuilt design of mechanical equipment and building apart from vegetation (tree plantations) along the periphery and at various locations within the industry premises. 23 JANUARY 2017

30 3.9.4 Hazardous waste Management The hazardous waste expected to be generated for the existing and future production ephedrine hydrochloride is given in below in Table 3.7 Table 3.7 Details of Hazardous waste generated S. No. Details of process generating hazardous waste Details of waste stream generated Quantity generated Tons per year Activity for which authorization is issued 1. Industrial operations using mineral/ synthetic oil as lubricant in hydraulic systems or in other applications 2 Production / formulation of drugs / pharmaceuticals Source: Consent Order 5.1 used/ spent oil 34.3 Chemical Sludge from Wastewater Treatment Collection, storage, Transport and disposal Collection, storage, Transport and disposal 3.10 Power Requirement The power requirement for the project is increased from 1200 KVA to 1500 KVA which is sourced from TNEB (Tamil Nadu Electricity Board).DG set of capacity of 1250 KVA, is available as backup power supply. 24 JANUARY 2017

31 4. SITE ANALYSIS The proposed activity will be carried out at S.F. No 62/1pt, and 62/2, Plot No. A 6/3, Pachayakuppam Village, SIPCOT Industrial Complex, Cuddalore Taluk and district, Tamil Nadu. 4.1 Connectivity The project site is well connected with other parts of country through Road, and Rail. National Highway NH 532 connecting Cuddalore Virudhachalam Salem Road is on the North West direction of project Site. State highway SH- 49 is located adjacent to the project site at a distance of 0.32km (W) connecting Chennai with Cuddalore via Pondicherry. State highway SH- 10 connecting Cuddalore to Chinna salem is also on the western side of the project site. The site is connected to Cuddalore old town railway station at a distance of 6km. Figure 4.1 Site Connectivity 25 JANUARY 2017

32 4.2 Land Form, Land use and Land ownership The proposed activity will be carried out at S.F. No 62/1pt, and 62/2, Plot No. A 6/3, Pachayakuppam Village, SIPCOT Industrial Complex, Cuddalore Taluk and district, Tamil Nadu. The land use classification of the project site is Industrial use. The entire land area of 0.5 Hectares belongs to the company and land ownership documents are enclosed as Annexure - I 4.3 Topography M/s. Supreme Dye Chem. Private Limited, is located at latitude of 11 41'37.97"N & Longitude 79 45'33.64"E at an elevation of 7m above MSL. The proposed change of expansion will be carried out within the existing industrial site is topographically plan without any undulations. 4.4 Existing Infrastructure The list of existing infrastructure at the project site is 1. Water supply from SIPCOT 2. Power supply from TANGEDCO 3. Existing storm water drainage system List of Industries The site is located within the SIPCOT industrial complex, Cuddalore. List of some major industries are listed below. Kumar Chemicals M.A.B Chemicals TAGROS-I TAGROS-II Penta four Products J.K. Pharma Maruti Laboratories Pentasia Chemicals Morgan Acids SPIC Pharma 26 JANUARY 2017

33 Sudhakar Chemicals Kumaran Carbonates TASMAC TANTECH Agro Chem AKB Ice Factory Victor Chemicals Coastal Pakers Shasun Chemicals 4.5 Soil Classification The soil of the study is seen along the coast in Cuddalore and Chidambaram taluks. The younger alluvial soils are found as small patches along the stream and river courses in the district. Red sandy soil is seen covering the Cuddalore sandstone, laterite and lateritic gravels occur in parts of Virudhachalam, Panruti and Cuddalore taluks. 4.6 Rainfall and Climate The climatic condition of study area is hot tropical. The summer season, which is very oppressive, is from March to May with maximum temperature around 29 C whereas the minimum temperature recorded was 23 C. The southwest monsoon, which follows, lasts till September. October to December constitutes northeast monsoon season. January to February is the comparatively cooler period. The annual normal rainfall for the period ( ) range from mm. The normal annual rainfall over the district varies from about 1050 mm to about 1400 mm. 4.7 Social Infrastructure Infrastructure is the basic physical and organizational structures needed for the operation of a society or enterprise or the services and facilities necessary for an economy to function. The term typically refers to the technical structures that support a society, such as roads, water supply, sewers, electrical grids, telecommunications and so forth and can be defined as "the 27 JANUARY 2017

34 physical components of interrelated systems providing commodities and services essential to enable, sustain, or enhance societal living conditions. Viewed functionally, infrastructure facilitates the production of goods and services, and also the distribution of finished products to markets, as well as basic social services such as schools and hospitals; for example, roads enable the transport of raw materials to a factory. 28 JANUARY 2017

35 5. PLANNING BRIEF AND INFRASTRUCTURE FOR PROPOSED PROJECT 5.1 Planning Concept M/s. Supreme Dye chem Private Limited has proposed to enhance their production capacity of pigments at S.F. No 62/1pt, and 62/2, Plot No. A 6/3, Pachayakuppam Village, SIPCOT Industrial Complex, Cuddalore Taluk and district, Tamil Nadu. The facility is proposed for increasing the production of pigments from MT/month to 640 MT/month. The necessary infrastructure in terms of land, power, water and personnel are readily available. It is only an Expansion of the existing operation. There will be no significant adverse impact on the environment due to the project; rather many beneficial impacts are estimated. There is no adverse factor such as reclassification of land use and pattern, displacement etc. 5.2 Population Projection The total existing direct employment potential of the industry is about 250 people. However, there are indirect employment generations due to the project during the transportations, marketing & distribution etc. Hence no major population is expected to rise in the region. 5.3 Land Use Planning The proposed project will be facilitated within the existing land of Supreme Dye chem Private Limited. The land use of the site is General Industrial use zone. The land use break-up showing the proposed activities is given in Table All required amenities and facilities are available in the plant itself. The total area of the facility is 0.5 hectares. 29 JANUARY 2017

36 Table 5. 1 Land Use Break-Up of Project Site S. No. Description Area (Ha) Percentage (%) 1 Built-up area Storage area Green belt area Open area Total Assessment of Infrastructure Demand Adequate physical and social facilities are available in this area. 5.5 Amenities/Facilities All infrastructure facilities such as education, health facilities and other social facilities are adequate at district headquarter which site makes the region adequate in amenities. 30 JANUARY 2017

37 6. PROPOSED INFRASTRUCTURE 6.1 Industrial Area Processing Area The land available and earmarked for the proposed expansion project is categorized as Industrial use. The total land available under the ownership of the promoter is 0.5 hectares. The proposed activities will be carried out within the above area which is sufficient for the planned activities. The site will be facilitated only for the manufacturing of various pigments. 6.2 Residential Area Non Processing Area No residential classified area will utilized for the proposed expansion project. No housing or non-processing area is proposed in this project. 6.3 Green Belt The factory has a total of 0.5 hectares as green belt out of a total area of ha to achieve the mandatory requirement of 33% of green belt requirement by CPCB / MoEF. Survey was conducted to obtain the knowledge on existing flora within the factory premises. Adequate no of trees, bushes, shrubs will be planted based on the site conditions. 6.4 Social Infrastructure Infrastructure is the basic physical and organizational structures needed for the operation of a society or enterprise or the services and facilities necessary for an economy to function. The proposed expansion of the project enables, sustain, or enhance societal living conditions of the workers family. Adequate capacity of social Infrastructure facilitates the production of goods and services, and also the distribution of finished products to markets, as well as basic social services such as schools and hospitals water supply, etc. is available in the region to manage the current expansion proposal. 31 JANUARY 2017

38 6.5 Connectivity The project site is well connected with other parts of country through Road, Rail and Air. National Highway NH 532 connecting Cuddalore Virudhachalam Salem road is on the North West direction of project Site. State highway SH-49 is located adjacent to the project site at a distance of 0.32km (W) connecting Chennai with Cuddalore via Pondicherry used to transport the raw materials to the plant and final products to the consumers / ports to export. 6.6 Drinking water Management Source & Supply Drinking water requirement will be met by supply from SIPCOT water supply scheme after required treatment. 6.7 Sewerage System In the existing unit the sewage generated from the domestic activities, toilets and canteen are treated in the septic tank followed by dispersion trench arrangement which is also to be followed even after expansion. 6.8 Effluent Treatment System The generated trade effluents will be treated in Effluent Treatment Plant. The details of the Effluent Treatment Plant are given in Table 6.1 Table 6.1 ETP Details S.No. Name of the Equipment Nos. of units Size of the unit with SWD in m 1 Acid proof brick lined Mother liquor collection φ x 2.0 (each) 2 Collection/Neutralization Tank 3 10 x 10 x Plate and Frame type plates each of 2 Press size1.2x1.2 4 Filtrate collation sum 1 50 m 3 5 Primary settling Tank x 4.3 ( ) 6 Air Stripper 1 50 m 3 7 Flash mixer 1 1 m 3 & 20 m 3 32 JANUARY 2017

39 8 Flocculation Chamber 1 1 m 3 & 20 m 3 9 Chemical Dosing tanks 2-10 Aeration Tank for secondary Treatment 2 11 x 9 x 4 (each) 11 Secondary settling tank x 3.5 x ( ) (each) 12 Treated water Sump 1 5 x 5 x Activated Charcoal Column dia x 1.5 m 14 Sand filter 1 2.2diax2 m 15 Guard Pond m 3 16 Sludge drying bed Solid waste Management The generated solid wastes will be properly collected and managed Power requirement, Supply & Source The power requirement for the project is increased from 1200 KVA to 1500 KVA which is sourced from TNEB (Tamil Nadu Electricity Board).DG set of capacity of 1250 KVA, is available as backup power supply Rain Water Harvesting System & Storm water management system M/s. Supreme Dye Chem Private Limited has proposed to provide adequate rain water harvesting and storm water drainage system after consultation with professionals. 33 JANUARY 2017

40 7. REHABILITATION AND RESETTLEMENT (R&R) PLAN The increase in the product capacity will be carried out within the existing plant of Supreme Dye Chem Private Limited. No home outstees /land outstees are expected & hence no rehabilitation plan is envisaged. 8. PROJECT SCHEDULE AND COST ESTIMATES The proposed expansion project will be implemented immediately after obtaining EC from SEIAA. The implementation period of the expansion project is six months from date of implementation to achieve the significant production with new equipments. The total cost of proposed expansion project is estimated as Rs Crores. 9. ANALYSIS OF PROPOSAL (FINAL RECOMMENDATIONS) The project is well conceived as horizontal integration efforts and effectively planned by one of the leading Industry in India. India contributes about 6% of the share in the global market with a CAGR of more than 15% in the last decade. The demand for dyes is expected to grow in future as these two dyes are dominant in all the regions. This project will be implemented at the earliest from the date of approvals and thereon commercial production will commence. This unit is expected to provide employment to 250 persons. By adding more advanced technologies and cost effective production techniques, the project will be more and more beneficial to the people as the company progress and expands its activity. 34 JANUARY 2017

Proposed Project of Halcyon Labs Pvt Ltd D-2/CH : 335,336,337, GIDC-Dahej-2, DIst: Bharuch, Gujarat Ramans Enviro Services Pvt Ltd Ahmedabad

Proposed Project of Halcyon Labs Pvt Ltd D-2/CH : 335,336,337, GIDC-Dahej-2, DIst: Bharuch, Gujarat Ramans Enviro Services Pvt Ltd Ahmedabad 1. EXECUTIVE SUMMARY OF THE PROJECT BRIEF SUMMARY OF THE PROJECT : TYPE OF PROJECT : Proposed Project for manufacturing of pharma intermediates by Halcyon Labs Pvt.Ltd. LOCATION : Proposed Project of Halcyon

More information

Prefeasibility Report For Pigments Manufacturing Plant. Plot No. FS- 34, Mahad Five star Industrial area, MIDC, Mahad, Raigad, Maharashtra

Prefeasibility Report For Pigments Manufacturing Plant. Plot No. FS- 34, Mahad Five star Industrial area, MIDC, Mahad, Raigad, Maharashtra Prefeasibility Report For Pigments Manufacturing Plant At Plot No. FS- 34, Mahad Five star Industrial area, MIDC, Mahad, Raigad, Maharashtra of Sapphire Pigments Private Limited A-1/12, Phase II GIDC,

More information

PRE-FEASIBILITY REPORT

PRE-FEASIBILITY REPORT PRE-FEASIBILITY REPORT For ToR of Proposed Project of MANUFACTURING OF SYNTHETIC ORGANIC DYES (5 f B IND II) By SHREEJI BAPA DYE CHEM PLOT NO 1319 & 1320, PHASE-III, GIDC, VATVA, AHEMADABAD-382445, GUJARAT,

More information

Pre-Feasibility Report For

Pre-Feasibility Report For Pre-Feasibility Report For Proposed New Project for manufacturing of Intermediates of Agro Chemicals & Synthetic Organic Chemicals. By M/s. MANBRO POLYMERS LIMITED, Plot No. D-2/CH-275, INDUSTRIAL ESTATE,

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT PRE FEASIBILITY REPORT FOR OBTAINING PRIOR ENVIRONMENT CLEARANCE FOR MANUFACTURING OF SYNTHETIC ORGANIC CHEMICALS OF M/s. MAYUR COLOUR AND CHEMICALS LOCATED AT Plot No. 5148, GIDC Industrial Estate, Ankleshwar

More information

PRE-FEASIBILITY REPORT

PRE-FEASIBILITY REPORT PRE-FEASIBILITY REPORT 0.0 EXECUTIVE SUMMARY Shri Ashok Patel Partner of M/s. Patel Polymers is planning to manufacture organic chemical Different Types of Resins, for proposed expansion project at Plot

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT PRE FEASIBILITY REPORT for PROPOSED PROJECT FOR DYES, PIGMENTS AND DYE INTERMEDIATES MANUFACTURING PLANT IN GIDC, DAHEJ-II Of M/s. SHREEJI INDUSTRIES Plot No. D2/CH/24, Dahej-II, GIDC Industrial Estate,

More information

PRE-FEASIBILITY REPORT

PRE-FEASIBILITY REPORT PRE-FEASIBILITY REPORT For ToR of Proposed Project of MANUFACTURING OF SYNTHETIC ORGANICCHEMICALS (RESINS) (5 f B IND II) By M/s M R INDUSTRIES SURVEY NO. 58/1 & 58/3 OPPOSITE WHOLESOME FOOD PVT. LTD.,

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT PRE FEASIBILITY REPORT For EXPANSION IN EXISTING MANUFACTURING PLANT Of M/s. SHIVA DYE STUFF PVT. LTD Plot no. A2-11/6104,G.I.D.C. Industrial Estate, Ankleshwar-393002, Gujarat. 1 CONTENTS Sr. No. Description

More information

ANNEXURE-1 TERMS OF REFERENCES. TOR prescribed by MoEF & CC for this sector will be taken into account. M/s. RAMDEV CHEMICAL INDUSTRIES UNIT-(II)

ANNEXURE-1 TERMS OF REFERENCES. TOR prescribed by MoEF & CC for this sector will be taken into account. M/s. RAMDEV CHEMICAL INDUSTRIES UNIT-(II) ANNEXURE-1 TERMS OF REFERENCES TOR prescribed by MoEF & CC for this sector will be taken into account. M/s. RAMDEV CHEMICAL INDUSTRIES UNIT-(II) ANNEXURE-2 Sr. Products No. LIST OF PRODUCTS Existing Quantity

More information

ANNEXURE A DETAILS OF PRODUCTS

ANNEXURE A DETAILS OF PRODUCTS Annexures to Form 1 & Pre Feasibility Report Proposed Project for manufacturing of Dyes Intermediates of M/s Jay Dyechem, Narol-Vatva Road,Ta : City, District : Ahmedabad, Gujarat. ANNEXURE A DETAILS OF

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT PRE FEASIBILITY REPORT For NEW PROJECT (PIGMENT MANUFACTURING PLANT) Of M/s. SHREY INDUSTRIES Survey No. 111 & 112, Plot No. 7 & 8, Village: Dhanot, Ta: Kalol, Dist: Gandhinagar (Gujarat) CONTENTS Sr.

More information

M/S. Dain Colour Chem

M/S. Dain Colour Chem PRE FEASIBILITY REPORT For PROPOSED EXPANSION IN EXISTING MANUFACTURING PLANT Of M/S. Dain Colour Chem Plot No.: 5, Nilkanth Estate, Village: Dhanot, Ta.: Kalol, Dist.: Gandhinagar-382729, Gujarat 1 CONTENTS

More information

PROJECT FEASIBILITY REPORT

PROJECT FEASIBILITY REPORT PROJECT FEASIBILITY REPORT FOR OBTAINING PRIOR ENVIRONMENT CLEARANCE For PROPOSED CHEMICAL MANUFACTURING UNIT From M/s. MORADIA BROTHERS CHEM PVT LTD LOCATED AT: Block No.: 45, JalBhumi Industrial Estate,

More information

PRE-FEASIBILITY REPORT

PRE-FEASIBILITY REPORT PRE-FEASIBILITY REPORT 1.0 EXECUTIVE SUMMARY M/s Arti Chemical Industries is a project located at Plot No. E-22, Vilayat G.I.D.C. Tal: Vagra area of Bharuch district in Gujarat. M/s Arti Chemical Industries

More information

Product Profile. Annexure A. Annexures to Form - I & PFR. MT/ M Consented Ultimate. Crude OBA AND/ OR Standardized OBA liquid/ powder 190 AND/ OR 2600

Product Profile. Annexure A. Annexures to Form - I & PFR. MT/ M Consented Ultimate. Crude OBA AND/ OR Standardized OBA liquid/ powder 190 AND/ OR 2600 Annexure A Product Profile Sr. No. 1 Product Crude OBA AND/ OR Standardized OBA liquid/ powder MT/ M Consented Ultimate 525 190 AND/ OR 2600-23 - Annexure - B Details of Raw Materials Qty (Kg/ Kg) Qty/

More information

Manufacturing and Mass Balance of Copper Phthalocyanine (CPC) Blue and Green Pigments

Manufacturing and Mass Balance of Copper Phthalocyanine (CPC) Blue and Green Pigments Journal of Drug Discovery and Development Volume 2, Issue 1-2018, Pg. o. 18-23 Peer Reviewed & Open Access Journal Manufacturing and Mass Balance of opper Phthalocyanine (P) Blue and Green Pigments Ashok

More information

Proposed Project for Manufacturing of Pigments

Proposed Project for Manufacturing of Pigments PREFEASIBILITY STUDY REPORT Of Proposed Project for Manufacturing of Pigments of M/s. Nirva Pigments Located at PLOT NO. DP-10, Saykha industrial Estate Ta: Vagra, Dist.: Bharuch P a g e 1 27 Contents

More information

M/s. Shiva Dye Stuff Pvt. Ltd Plot No.: A2-11/6104, GIDC Estate, Ankleshwar, Dist: Bharuch. ID:

M/s. Shiva Dye Stuff Pvt. Ltd Plot No.: A2-11/6104, GIDC Estate, Ankleshwar, Dist: Bharuch.  ID: ANNEXURE-ADDITIONAL ATTACHMENTS INDEX Sr. No. Name of Enclosure 1. Name of Product with its quantity. 2. Packing, Storage and Final use of Product. 3. Name of Raw Material with its quantity. 4. Storage

More information

Product Profile. Quantity in MT/Month CAS Solvent Dark Violet R Solvent Black

Product Profile. Quantity in MT/Month CAS Solvent Dark Violet R Solvent Black Annexure - A Product Profile Sr. No. Product Name Quantity in MT/Month CAS Existing Proposed Ultimate Number End Users 1 Acid Dyes 5.000-5.000 0.000 -- -- Solvent Yellow 82 12227-67-7 Solvent Dark Violet

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT VENSUB LABORATORIES PRIVATE LIMITED SY. NO. 29, TUPAKULAGUDEM VILLAGE, TALLAPUDI MANDAL, WEST GODAVARI DISTRICT, ANDHRA PRADESH PRE FEASIBILITY REPORT VENSUB LABORATORIES PRIVATE LIMITED Duplex No. 12,

More information

Pre-Feasibility Report

Pre-Feasibility Report Pre-Feasibility Report 1. Executive Summary Residential, Commercial, Retail and Hotel projects and an IT/ITES. The Project has already obtained an Environmental Clearance from Ministry of Environment &

More information

PREFEASIBILITY REPORT

PREFEASIBILITY REPORT PREFEASIBILITY REPORT For ToR Application of Expansion Project For MANUFACTURING OF SYNTHETIC ORGANIC CHEMICALS (Dyes Intermediates) Proposed By: M/s. Plot No. C/1/B-145-3 Phase-II, GIDC Estate, Naroda,

More information

Ramans Enviro Services Pvt. Ltd. Ahmedabad. Annexure A. Product Profile. Crude OBA AND/OR Crude OBA-CBS-X. Standardized OBA Solid AND/OR

Ramans Enviro Services Pvt. Ltd. Ahmedabad. Annexure A. Product Profile. Crude OBA AND/OR Crude OBA-CBS-X. Standardized OBA Solid AND/OR Annexure A Product Profile Sr. No. 1 2 Product Crude OBA AND/OR Crude OBA-CBS-X Standardized OBA Solid AND/OR Standardized OBA Liquid Proposed Qty (MT/ M) 400 400 1600 Note : For making Standardized OBA

More information

PROPOSED BULK DRUG & BULK DRUG INTERMEDIATES MANUFACTURING UNIT

PROPOSED BULK DRUG & BULK DRUG INTERMEDIATES MANUFACTURING UNIT PRE - FEASIBILITY REPORT For PROPOSED BULK DRUG & BULK DRUG INTERMEDIATES MANUFACTURING UNIT Of M/s. SHREE RAM INDUSTRIES PLOT NO.5117, GIDC-ANKLESHWAR, PIN-393002 TAL: ANKLESHWAR, DIST: BHARUCH, GUJARAT

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT PRE FEASIBILITY REPORT 1. Introduction 1. Identification of project and project proponent The Pahanbarri Sand Quarry area is located in the Tawa River at Village- Pahanbarri, Tehsil- Itarsi & District-

More information

EIA-EMP REPORT GRAVEL QUARRY (Category-B2)

EIA-EMP REPORT GRAVEL QUARRY (Category-B2) EIA-EMP REPORT GRAVEL QUARRY (Category-B2) EXTENT : 4.00.0 Hectares S. F. No : 436/1A (P) VILLAGE TALUK DISTRICT STATE : IYANPAPPAKKUDI : MADURAI : MADURAI : TAMIL NADU PROJECT PROPONENT Thiru P. Ayyanar

More information

Accord Energy Corporation India Pvt. Ltd.

Accord Energy Corporation India Pvt. Ltd. Accord Energy Corporation India Pvt. Ltd. PRE-FEASIBILITY REPORT ON ENVIRONMENTAL ASPECTS OF PROPOSED INCREASE IN CAPACITY 2 x 150 MW to 2 x 180 MW OF EXISTING ENVIRONMENTAL CLEARANCE ( J-13012/107/ 2009-IA-II

More information

PRE FEASIBILTY REPORT

PRE FEASIBILTY REPORT PRE FEASIBILTY REPORT FOR ENVIRONMENT CLEARANCE OF PROPOSED NEW PROJECT S. O. CHEMICALS (5 f Category) Proposed By: COREL PHARMA CHEM PVT. LTD. SURVEY NO. 473 & 481, BORISANA, KADI THOL ROAD, KADI, DIST

More information

EXECUTIVE SUMMARY 1.0 PROJECT DESCRIPTION 1.1 INTRODUCTION

EXECUTIVE SUMMARY 1.0 PROJECT DESCRIPTION 1.1 INTRODUCTION EXECUTIVE SUMMARY 1.0 PROJECT DESCRIPTION 1.1 INTRODUCTION Jaypee Group is a leading Business House of the country with its presence in Core industries and Service Sectors like Cement, Infrastructure development,

More information

EXISTING PROJECT FOR ORDINARY SAND MINING

EXISTING PROJECT FOR ORDINARY SAND MINING (C) PROJECT REPORT OF EXISTING PROJECT FOR ORDINARY SAND MINING OF JASHUBEN CHHAGANBHAI OAD AT VILLAGE:-TIMBA, TALUKA:- KAMREJ, DIST.:- SURAT 1 CONTENTS 1.0 INTRODUCTION 1.1 PREAMBLE 2.0 EXECUTIVE SUMMARY

More information

ANNEXURES. 1 Google image showing proposed project site. 3 Manufacturing process details. 4 Details of hazardous waste management

ANNEXURES. 1 Google image showing proposed project site. 3 Manufacturing process details. 4 Details of hazardous waste management ANNEXURES Annexure No. Description 1 Google image showing proposed project site 2 Plant Lay-Out 3 Manufacturing process details 4 Details of hazardous waste management 5 Details of Effluent Treatment Plant

More information

PREFEASIBILITY REPORT

PREFEASIBILITY REPORT (B) PREFEASIBILITY REPORT OF EXISTING SAND MINING PROJECT OF RAJESHBHAI BHAGUBHAI PATEL AT VILLAGE:- Panchlai, TALUKA:- Pardi, DIST.:-Valdad. 1 CONTENTS 1.0 INTRODUCTION 1.1 PREAMBLE 2.0 EXECUTIVE SUMMARY

More information

EXECUTIVE SUMMARY. Kumardeipur Sand Quarry Cum ' 13.3" N to 20 44' 20.7"N Longitude " E to 85 35'27.5 "E

EXECUTIVE SUMMARY. Kumardeipur Sand Quarry Cum ' 13.3 N to 20 44' 20.7N Longitude  E to 85 35'27.5 E EXECUTIVE SUMMARY 1.0 INTRODUCTION Sri Mahesh Prasad Mishra proposes to mine Sand Quarry from an approved Mining Lease over an area of 14.85 Ac or 6.01 hectares (Non-Forest Land) which is located in at

More information

(B) PREFEASIBILITY REPORT OF EXISTING BLACK TRAP PROJECT OF

(B) PREFEASIBILITY REPORT OF EXISTING BLACK TRAP PROJECT OF (B) PREFEASIBILITY REPORT OF EXISTING BLACK TRAP PROJECT OF Makwana Dineshbhai Khimjibhai AT VILLAGE:- Tithava, TALUKA:- Wankaner, DIST.:- Morbi 1 CONTENTS 1.0 INTRODUCTION 1.1 PREAMBLE 2.0 EXCUTIVE SUMMARY

More information

UNSATURATED POLYESTER RESIN

UNSATURATED POLYESTER RESIN PROJECT REPORT ON UNSATURATED POLYESTER RESIN BY AQUA CHEM INDUSTRIES Survey No. 50/2, Jodhpar (Nadi), Morbi - 363641, Gujarat. I N D E X Sr. No. Contents Page No. 1 Introduction 3 2 Project Description

More information

PRE-FEASIBILITY REPORT. Name of Company / Mine Owner Shri Jayant Kumar Choudhary Location

PRE-FEASIBILITY REPORT. Name of Company / Mine Owner Shri Jayant Kumar Choudhary Location 1. SUMMARY PRE-FEASIBILITY REPORT Project Stone Quarry Name of Company / Mine Owner Shri Jayant Kumar Choudhary Location Village Taluka District State Rupapali Basna Mahasamund Chhattisgarh 1 Mining Lease

More information

RESINS & ALLIED CHEMICALS INDUSTRIES (BOMBAY) PVT. LTD.

RESINS & ALLIED CHEMICALS INDUSTRIES (BOMBAY) PVT. LTD. FOR THE PROPOSED EXPANSION PROJECT FOR THE MANUFACTURING OF KETONIC RESINS Category: 5(f) OF RESINS & ALLIED CHEMICALS INDUSTRIES (BOMBAY) PVT. LTD. Located at: Plot No. C-1/46, 100 SHED AREA, GIDC, Vapi,

More information

ANNEXURE: MOU BETWEEN CLARIANT CHEMICALS (INDIA) LIMITED AND STAHL INDIA PVT LTD

ANNEXURE: MOU BETWEEN CLARIANT CHEMICALS (INDIA) LIMITED AND STAHL INDIA PVT LTD ANNEXURE: AFFADIVIT ANNEXURE: MOU BETWEEN CLARIANT CHEMICALS (INDIA) LIMITED AND STAHL INDIA PVT LTD ANNEXURE:RECTIFICATION DEED BETWEEN CLARIANT CHEMICALS (INDIA) LIMITED AND STAHL INDIA PVT LTD

More information

Environment Consultant:

Environment Consultant: MODERNIZATION CUM EXPANSION OF INDUCTION FURNACE PRODUCTION(2,05,000 TPA TO 6,00,000 TPA) AND ROLLING MILL PRODUCTION (3, 69,000 TPA TO 6,00,000 TPA) at Sy. No. 158 (part) 159 (part), 166 170, village

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT PRE FEASIBILITY REPORT For PROPOSED EXPANSION OF BAKELITE POWDER MANUFACTURING UNIT of M/S. HINDUSTAN BAKELITE COMPANY PLOT NO. J-3436, GIDC ESTATE, ANKLESHWAR, DISTRICT: BHARUCH-393002, GUJARAT 0 CONTENTS

More information

Pre-Feasibility Report

Pre-Feasibility Report Pre-Feasibility Report M/s. Veer Poly Chem 0 1. Introduction M/s. Veer Polychem is an existing unit located at Plot 119 & 120, Ranpur road, GIDC Dhandhuka, Dist: Ahmedabad, Gujarat. Currently, unit is

More information

M/s. SAL STEEL LTD Survey no.245/p, Village:-Bharapar, Taluka:- Gandhidham, District:-Kutch, Gujarat.

M/s. SAL STEEL LTD Survey no.245/p, Village:-Bharapar, Taluka:- Gandhidham, District:-Kutch, Gujarat. Pre-Feasibility Study Report For Proposed Fly Ash Co-processing clinker grinding cement Unit of 40,000 MT/month Production capacity within our Existing Premises for M/s. SAL STEEL LTD Survey no.245/p,

More information

IDA, JEEDIMETLA, QUTUBULLAPUR MANDAL, RANGAREDDY DISTRICT, TELANGANA

IDA, JEEDIMETLA, QUTUBULLAPUR MANDAL, RANGAREDDY DISTRICT, TELANGANA M/s. ARTEMIS BIO TECH LTD., (A Division of Themis Medicare Ltd.,) PLOT NO. 1 & 5, Phase I, IDA, JEEDIMETLA, QUTUBULLAPUR MANDAL, RANGAREDDY DISTRICT, TELANGANA PRE FEASIBILITY REPORT Artemis Bio tech Ltd.,

More information

CHAPTER REHABILITATION AND RESETTLEMENT (R&R) PLAN (I) POLICY TO BE ADOPTED (CENTRAL / STATE)... 32

CHAPTER REHABILITATION AND RESETTLEMENT (R&R) PLAN (I) POLICY TO BE ADOPTED (CENTRAL / STATE)... 32 CONTENTS CHAPTER 1... 1 1.0 PROJECT SUMMARY... 1 CHAPTER 2... 2 2.0 INTRODUCTION... 2 (I) IDENTIFICATION OF PROJECT AND PROJECT PROPONENT... 2 (II) BRIEF DESCRIPTION OF NATURE OF THE PROJECT... 2 (III)

More information

STONE QUARRY Survey No. : 57/5, Village : Dhadhade, Tehsil: Vikramgad, District Thane, Maharashtra Area (2.0 Ha)

STONE QUARRY Survey No. : 57/5, Village : Dhadhade, Tehsil: Vikramgad, District Thane, Maharashtra Area (2.0 Ha) Pre Feasibility Report On STONE QUARRY Survey No. : 57/5, Village : Dhadhade, Tehsil: Vikramgad, District Thane, Maharashtra Area (2.0 Ha) Submitted to MINISTRY OF ENVIRONMENT & FOREST STATE LEVEL ENVIRONMENTAL

More information

M/s. LAKSHMANAN CEMENTS PVT LTD, Survey Number 69-3, 69-4, Pachanapalli Village, Chittoor Mandal and District, Andhra Pradesh

M/s. LAKSHMANAN CEMENTS PVT LTD, Survey Number 69-3, 69-4, Pachanapalli Village, Chittoor Mandal and District, Andhra Pradesh M/s. LAKSHMANAN CEMENTS PVT LTD, Survey Number 69-3, 69-4, Pachanapalli Village, Chittoor Mandal and District, Andhra Pradesh EXECUTIVE SUMMARY SUBMITTED BY M/s. Lakshmanan Cements Pvt Ltd No. 58-A, 25

More information

BALAJI AMINES LIMITED

BALAJI AMINES LIMITED FOR EXPANSION OF EXISTING SYNTHETIC ORGANIC CHEMICALS MANUFACTURING UNIT BALAJI AMINES LIMITED At Plot No: 4 & 5, Beside Sub-Station-II, I.D.A, Bollaram, Jinnaram (M), Medak District, Telangana State -

More information

4. The ambient air quality monitoring stations We are monitoring the ambient air quality

4. The ambient air quality monitoring stations We are monitoring the ambient air quality GLOBAL CALCIUM PRIVATE LTD., 125&126, SIPCOT COMPLEX, HOSUR 635 126 Ref : No. J-11011/411/2006-IA-II(I) dated 1 st August 2007. Compliance Report for the Period ending 31.3.2015 Sl. Specific Conditions

More information

FORM-1 FOR PROPOSED API PLANT AT MADURAI, TAMIL NADU. Name of Products. Products. 1 Metformin Hydrochloride Paracetamol Bronopol 25

FORM-1 FOR PROPOSED API PLANT AT MADURAI, TAMIL NADU. Name of Products. Products. 1 Metformin Hydrochloride Paracetamol Bronopol 25 3 ANNEXURES Annexure 1: Production Details Name of Products Products Production Capacity in MT/Month 1 Metformin Hydrochloride 1000 2 Paracetamol 1200 3 Bronopol 25 By-Products Total 2225 1 Acetic acid

More information

LIST OF ANNEXURE. Details of products and raw materials and storage facility for the same. Details of water consumption and wastewater generation

LIST OF ANNEXURE. Details of products and raw materials and storage facility for the same. Details of water consumption and wastewater generation LIST OF ANNEXURE Annexure-1 Location of the project site Annexure-2 Layout plan Annexure-3 Break up of land area requirement Annexure-4 Details of products and raw materials and storage facility for the

More information

PRE-FEASIBILITY REPORT

PRE-FEASIBILITY REPORT M/S. VANAS INFRA PROJECTS PVT. LTD SURVEY NO. 598, CHINTALAPALLY VILLAGE, KOLLAPUR MANDAL, NAGARKURNOOL DISTRICT, TELANGANA PRE-FEASIBILITY REPORT SUBMITTED BY M/s. Sri Soma Jitendra H. No. 7-1-397/150,

More information

Pre- Feasibility RepoRt

Pre- Feasibility RepoRt Pre- Feasibility RepoRt AREA- 59.28 ACRE (24.0 HA) FOR KEN RIVER SAND/MORRUM MINING AT BLOCK NO-09 KHAND NO-03 GATA NO-337 VILLAGE- KANWARA TEHSIL-BANDA, DISTRICT- BANDA(U.P) SHRI RAVINDRA NATH SINGH JULY

More information

TABLE OF CONTENTS. Para No. Contents Page No

TABLE OF CONTENTS. Para No. Contents Page No TABLE OF CONTENTS Para No. Contents Page No Chapter-1 Introduction 1.0 Preamble 1 1.1 Location of the project 1 1.2 Objectives of the EIA study 3 1.3 Methodology of study 3 1.4 Structure of EIA report

More information

Table 1.1: The Salient Features of the Project Proposed Quartz Mine Of M/s. Viswanadha Stone Crusher & 16 others

Table 1.1: The Salient Features of the Project Proposed Quartz Mine Of M/s. Viswanadha Stone Crusher & 16 others 1. EXECUTIVE SUMMARY 1.1 Introduction The Road Metal Quarries was granted in Guntur District, Andhra Pradesh has been allotted to M/s. Viswanadha Stone Crusher & 16 others by Assistant Director of Mines

More information

PRE-FEASIBILITY REPORT FOR ORDINARY SAND

PRE-FEASIBILITY REPORT FOR ORDINARY SAND PRE-FEASIBILITY REPORT FOR ORDINARY SAND Proponent NISANT TRADERS At- Opp. Survey No.- 3 Panam River Area-2.50.00 Hectare Village-Ramji-ni-Nal, Taluka- Shahera Dist.- Panchmahal Mob.- +91924040782 CONTENTS

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT ASTRIX LABORATORIES LIMITED SY. NO. 10 & 42, IDA, GADDAPOTHARAM VILLAGE, JINNARAM MANDAL, MEDAK DISTRICT, ANDHRA PRADESH PRE FEASIBILITY REPORT Sy. No. 10 & 42, IDA, Gaddapotharam (V), Jinnaram (M), Medak

More information

The unit obtained NOC (CFE) of A.P. Pollution control Board in the year 1988 and started operations.

The unit obtained NOC (CFE) of A.P. Pollution control Board in the year 1988 and started operations. 1. Introduction M/s. Sri Krishna Pharmaceuticals Limited, Unit-III (Formerly Sri Krishna Drugs Limited) was established in the year 1988. It is located at Sy. No. 57, Golkonda kalan, Raikunta (V), shamshabad

More information

LG POLYMERS INDIA PVT. LTD. SY. NO.S 29 TO 45, 83/1 AND 83/3, RR VENKATAPURAM VILLAGE, PENDURTI MANDAL, VISAKHAPATNAM DISTRICT, ANDHRA PRADESH

LG POLYMERS INDIA PVT. LTD. SY. NO.S 29 TO 45, 83/1 AND 83/3, RR VENKATAPURAM VILLAGE, PENDURTI MANDAL, VISAKHAPATNAM DISTRICT, ANDHRA PRADESH LG POLYMERS INDIA PVT. LTD. SY. NO.S 29 TO 45, 83/1 AND 83/3, RR VENKATAPURAM VILLAGE, PENDURTI MANDAL, VISAKHAPATNAM DISTRICT, ANDHRA PRADESH PRE FEASIBILITY REPORT LG Polymers India Pvt. Ltd. Sy. No.s

More information

Table of Contents. Paint production process Raw material storage details Hazardous waste quantity and proposed details

Table of Contents. Paint production process Raw material storage details Hazardous waste quantity and proposed details Table of Contents Annexure No Annexure 1 Annexure 2 Annexure 3A Annexure 3B Annexure 3C Annexure 4 Annexure 5 Annexure 6 Annexure 7A Annexure 7B Annexure 7C Annexure 7D Annexure 8 Annexure 9 Annexure 10A

More information

PREFEASIBILITY REPORT OF EXISTING SILICA SAND MINING PROJECT OF MANGUBEN KANTILAL THAKKAR

PREFEASIBILITY REPORT OF EXISTING SILICA SAND MINING PROJECT OF MANGUBEN KANTILAL THAKKAR PREFEASIBILITY REPORT OF EXISTING SILICA SAND MINING PROJECT OF MANGUBEN KANTILAL THAKKAR AT VILLAGE:- BRAHMPURI, TALUKA:- Sayla, DIST.:-Surendranagar 1 CONTENTS 1.0 INTRODUCTION 1.1 PREAMBLE 2.0 EXECUTIVE

More information

ANDHRA PRADESH POLLUTION CONTROL BOARD, REGIONAL OFFICE, TIRUPATI

ANDHRA PRADESH POLLUTION CONTROL BOARD, REGIONAL OFFICE, TIRUPATI M/s. JANANY CEMENT INDUSTRIES PRIVATE LIMITED SURVEY NO 462, INDUSTRIAL PARK, GUNTAKINDAPALLI VILLAGE, SRIKALAHASTI MANDAL, CHITTOOR DISTRICT, ANDHRA PRADESH EXECUTIVE SUMMARY SUBMITTED BY M/s.Janany Cement

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT ASTRICA LABORATORIES PRIVATE LIMITED SY. NO. Part of 46,50,51,52,53, 54,55&56, ANANTHSAGAR VILLAGE, CHEGUNTA MANDAL, MEDAK DISTRICT, TELANGANA PRE FEASIBILITY REPORT ASTRICA LABORATORIES PRIVATE LIMITED

More information

Annexure-I List of Products

Annexure-I List of Products Annexure-I List of Products Sr. No. Name of Products Quantity (MT/Month) 1. Mono Chloro Acetic Acid (MCA) 300 2. Chloro Acetyl Chloride (CAC) 150 3. Tri Chloro Acetyl Chloride (TCAC) 150 4. Aluminum Chloroide

More information

For TOR New Projects. Mo. no. : Contact no. and ID of the Applicant

For TOR New Projects. Mo. no. : Contact no. and  ID of the Applicant SEAC, Gujarat : Page 1 of 6 For TOR New Projects 1. Basic Information of the Project: i Name & Address of the Project site (Complete details with plot /Survey, Landmark etc. ) M/s. Perstorp Industries

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT ANVITHA LIFE CARE PLOT NO. 6, ATTIVARAM INDUSTRIAL PARK, ATTIVARAM VILLAGE, OZILI MANDAL, SPSR NELLORE DISTRICT, ANDHRA PRADESH PRE FEASIBILITY REPORT ANVITHA LIFE CARE PLOT NO. 6, ATTIVARAM INDUSTRIAL

More information

PROJECT PRE-FEASIBILITY REPORT. For

PROJECT PRE-FEASIBILITY REPORT. For PROJECT PRE-FEASIBILITY REPORT For THE PROPOSED ORGANIC CHEMICALS MANUFACTURING IN EXISTING IN FORMULATION OF PESTICIDE, AGROCHEMICAL AND BIO FERTILIZERS MANUFACTURING UNIT AT M/S. SULPHUR MILLS LTD. PLOT

More information

Sub: - An application for obtaining Environment Clearance for New Unit.

Sub: - An application for obtaining Environment Clearance for New Unit. Brief Note: Sub: - An application for obtaining Environment Clearance for New Unit. We M/s. Nemi Chem Industries Unit-2 are planning to manufacturing activity following products at Plot 1, Survey 316,

More information

PRE-FEASIBILITY REPORT OF SAND QUARRY

PRE-FEASIBILITY REPORT OF SAND QUARRY PRE-FEASIBILITY REPORT OF SAND QUARRY Survey No Village Taluka District Lease area : 1 Paiki : Marigana : Anjar, : Kutch, Gujarat, : 2.00 Ha. Submitted to MINISTRY OF ENVIRONMENT & FORESTS STATE LEVEL

More information

ENVIRONMENTAL IMPACT ASSESSMENT FOR PROPOSED CONSTRUCTION OF SEWAGE PUMPING STATION & SEWAGE TREATMENT PLANT

ENVIRONMENTAL IMPACT ASSESSMENT FOR PROPOSED CONSTRUCTION OF SEWAGE PUMPING STATION & SEWAGE TREATMENT PLANT ENVIRONMENTAL IMPACT ASSESSMENT FOR PROPOSED CONSTRUCTION OF SEWAGE PUMPING STATION & SEWAGE TREATMENT PLANT EXECUTIVE SUMMARY NAGERCOIL MUNICIPALITY, KANYAKUMARI DISTRICT TWAD BOARD,SEWERAGE DIVISION,NAGERCOIL

More information

PRE- FEASIBILITY REPORT

PRE- FEASIBILITY REPORT PRE- FEASIBILITY REPORT PREPARED FOR SHIV SHANTHI CEMENT PRIVATE LIMITED Sy. Nos. 92, 93 & 94, Tatiguda Village, Garividi Mandal, Vizianagaram District, Andhra Pradesh. PREPARED BY ISO 9001: 2008 Certified

More information

Synthetic Organic Chemicals 5(f)

Synthetic Organic Chemicals 5(f) SEAC, Gujarat Page 1 of 14 Synthetic Organic Chemicals 5(f) For Terms of Reference [ToR] New Project 1. Basic Information of the Project: i Name & Address of the Project site (Complete details with plot

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT PRE FEASIBILITY REPORT Of Shri Upendra Suryawanshi At Khasra No. 413/1, 413/3 Vill.-Ambada, Tehsil-Amla, District-Betul (M.P.) Production Capacity: Max 6,320 Cu.mt/year Area 1.00Hectare Proponent Name

More information

EXECUTIVE SUMMARY. (Approved Consultant)

EXECUTIVE SUMMARY. (Approved Consultant) ENVIRONMENTAL IMPACT ASSESSMENT FOR THE PROPOSED CAPTIVE RESIN PLANT OF 100000 TPA PRODUCTION CAPACITY AT ROUTHUSURAMALA VILLAGE, THOTTAMBEDU MANDAL, CHITTOOR DISTRICT, ANDHRA PRADESH EXECUTIVE SUMMARY

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT Page1 PRE FEASIBILITY REPORT KALDA FLAG STONE QUARRY AREA OF -1.55 HACTARE STRICTLY AS PER MOEF GUIDELINE DATE 30/12/2006 IN TERMS OF PROVISIONS OF EIA NOTIFICATION 2006 VILLAGE KALDA TEHSIL PAWAI DISTRICT

More information

MODIFIED QUARRYING PLAN FOR "SHINGATALOOR SAND MINING BLOCK-2" EXTENT Acres (4.86 Ha) IN TUNGABHADRA RIVER BED ADJ ACENT TO SY.

MODIFIED QUARRYING PLAN FOR SHINGATALOOR SAND MINING BLOCK-2 EXTENT Acres (4.86 Ha) IN TUNGABHADRA RIVER BED ADJ ACENT TO SY. MODIFIED QUARRYING PLAN FOR "SHINGATALOOR SAND MINING BLOCK-2" EXTENT -12.00 Acres (4.86 Ha) IN TUNGABHADRA RIVER BED ADJ ACENT TO SY.NO - 129 & 131OF SHINGATALOOR - VILLAGE MUNDARGI - TALUK GADAG - DISTRICT

More information

Shri Hari Dyes & Chemicals Plot No.: 439/1,417, Phase No. II, GIDC Estate, Vatva , Ahmedabad

Shri Hari Dyes & Chemicals Plot No.: 439/1,417, Phase No. II, GIDC Estate, Vatva , Ahmedabad Annexure Prefeasibility Report (PFR) File PRE FEASIBILITY REPORT For PROPOSED EXPANSION IN EXISTING MANUFACTURING PLANT Of Shri Hari Dyes & Chemicals Work & Regd. Office: CONTENTS Sr. No. Description 1.

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT DR. REDDY S LABORATORIES LTD. CHEMICAL TECHOPS III PLOT NO.116, 116A, 116B & 126C, S.V. CO OP. IND. ESTATE, BOLLARAM VILLAGE, JINNARAM MANDAL, MEDAK DISTRICT, TELANGANA PRE FEASIBILITY REPORT DR. REDDY

More information

PRE FEASIBILITY REPORT INCREASE IN THE PRODUCTION OF PENTAERYTHRITOL FROM 560 MTM TO 730 MTM & SODIUM FORMATE FROM 336 MTM TO 480 MTM

PRE FEASIBILITY REPORT INCREASE IN THE PRODUCTION OF PENTAERYTHRITOL FROM 560 MTM TO 730 MTM & SODIUM FORMATE FROM 336 MTM TO 480 MTM PRE FEASIBILITY REPORT INCREASE IN THE PRODUCTION OF PENTAERYTHRITOL FROM 560 MTM TO 730 MTM & SODIUM FORMATE FROM 336 MTM TO 480 MTM (PRODUCT IS IN POWDER & SOLUTION FORM) at SIPCOT INDUSTRIAL COMPLEX,

More information

Pre-Feasibility Report

Pre-Feasibility Report Pre-Feasibility Report Essentials Pharma 1 1. Introduction M/s. Essentials Pharma is an new unit to be located at Plot 19, Survey 10/1, Rajkot-Ahmedabad National Highway 8-B, Village: Hirasar, Tal: Rajkot,

More information

PRE-FEASIBILITY REPORT

PRE-FEASIBILITY REPORT PRE-FEASIBILITY REPORT For ToR of Proposed Project Of MANUFACTURING OF SYNTHETIC ORGANIC CHEMICALS of 850 MT/Month By PASHUPATI INDUSTRIES 169/1/A2, Phase 1, Opposite Telephone Exchange, GIDC Naroda, Ahmedabad-382330

More information

PRE-FEASIBILITY REPORT

PRE-FEASIBILITY REPORT PRE-FEASIBILITY REPORT For Polyurethane Foam Manufacturing Facility Of M/s. KRISHNA MARUTI LTD. At Plot No-13, SMG JV Park, Block No- 334,335 Vill- Hansalpur, Tal - Mandal Dist.: Ahmedabad, Gujarat INDEX

More information

PRE-FEASIBILITY REPORT. 1. SUMMARY Kudeli Brick Earth Quarry Name of Company / Mine Owner Smt. Premawati Location 744, 760/1, 760/4, 750/1, 750/2

PRE-FEASIBILITY REPORT. 1. SUMMARY Kudeli Brick Earth Quarry Name of Company / Mine Owner Smt. Premawati Location 744, 760/1, 760/4, 750/1, 750/2 PRE-FEASIBILITY REPORT 1. SUMMARY Project Kudeli Brick Earth Quarry Name of Company / Mine Owner Smt. Premawati Location 744, 760/1, 760/4, 750/1, 750/2 Village Kudeli Taluka Baikunthpur District Koriya

More information

PREFEASIBILITY REPORT

PREFEASIBILITY REPORT PREFEASIBILITY REPORT 1.0 INTRODUCTION OF THE PROJECT Pannageshwar Sugar Mills Ltd. (PSML), At: Pangaon, Tal.: Renapur, Dist.: Latur, Maharashtra was registered vide registration no. 11-130803 dated 01.01.2001.

More information

SRI K. RAVI SHANKAR SURVEY NO.100, ODULAPALLI VILLAGE, TALPULA MANDAL, ANANTHAPURAMU DISTRICT, ANDHRA PRADESH

SRI K. RAVI SHANKAR SURVEY NO.100, ODULAPALLI VILLAGE, TALPULA MANDAL, ANANTHAPURAMU DISTRICT, ANDHRA PRADESH SRI K. RAVI SHANKAR SURVEY NO.100, ODULAPALLI VILLAGE, TALPULA MANDAL, ANANTHAPURAMU DISTRICT, ANDHRA PRADESH PRE FEASIBILITY REPORT (OPENCAST QUARTZ MINE 40.313 ha) SUBMITTED BY Sri Door No. 39/49/39,

More information

PRE FEASIBILITY REPORT. Company of production capacity: 14,40,000 CFT/ Year located at Khasra No near Village:

PRE FEASIBILITY REPORT. Company of production capacity: 14,40,000 CFT/ Year located at Khasra No near Village: PRE FEASIBILITY REPORT 1.0 EXECUTIVE SUMMARY In our Masonry Stone Mining Lease (M.L. No. 15/96, Area: 1.0 ha), Production capacity of masonry stone: 142920 TPA and existing Stone Crusher Unit named M/s.

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT PRE FEASIBILITY REPORT 1.0 EXECUTIVE SUMMARY AND INTRODUCTION OF THE PROJECT The Proposed Th Proposed Food Colours and Lake Colours Manufacturing Unit will be established on Plot 22/1 - B, Dhatav, MIDC

More information

Limestone Mining Project (Area: ha) at Near Village: Bhod, Taluka Ranavav, District Porbandar (Gujarat) Pre-feasibility Report

Limestone Mining Project (Area: ha) at Near Village: Bhod, Taluka Ranavav, District Porbandar (Gujarat) Pre-feasibility Report Limestone Mining Project (Area: 16.18 ha) at Near Village: Bhod, Taluka Ranavav, District Porbandar PRE - FEASIBILITY REPORT FOR OBTAINING PRIOR ENVIRONMENT CLEARANCE For MINING ACTIVITY CATEGORY B2 UNDER

More information

For TOR New. 1. Basic Information of the Project:

For TOR New. 1. Basic Information of the Project: SEAC, Gujarat: Page 1 of 12 For TOR New. 1. Basic Information of the Project: i Name & Address of the Project site M/s. Shreenathji Dye Chem (Complete details with plot no./survey no., Landmark etc. )

More information

SEIAA KARNATAKA CHECK LIST FOR BUILDING & CONSTRUCTION PROJECTS

SEIAA KARNATAKA CHECK LIST FOR BUILDING & CONSTRUCTION PROJECTS Annexure No - 13 SEIAA KARNATAKA CHECK LIST FOR BUILDING & CONSTRUCTION PROJECTS File No : Name of the Project: Proposed Commercial project called Bagmane Tech Park RIO Campus of M/s. Bagmane Developers

More information

SIX MONTHLY COMPLIANCE REPORT JUNE- 2015

SIX MONTHLY COMPLIANCE REPORT JUNE- 2015 SIX MONTHLY COMPLIANCE REPORT JUNE- 2015 Group Housing Complex My woods AT Plot no. GH-04, Sector -16 C, Noida Extension, Greater Noida, U.P. Being developed by M/s Mahagun India Pvt. Ltd. A-19, Sector-63,

More information

INSPIRE INDUSTRIES PVT. LTD.

INSPIRE INDUSTRIES PVT. LTD. For Proposed 0.999 MTPA Coal Washery At Village: Bhelai, Tehsil: Baloda, District: Janjgir-Champa, Chhattisgarh Envirotech East (P) Limited An ISO 9001:2008, 14001:2004 & OHSAS:18001:2007 Company Laboratory

More information

PRE-FEASIBILITY REPORT

PRE-FEASIBILITY REPORT PRE-FEASIBILITY REPORT For Excavation of Brick Earth (Total Mining Area 1.112Ha.) (For Manufacturing of Bricks) Submitted By M/s New Kaptan Brick Field Shri Krishna Kr. Singh S/o Shri Brahma DevSingh Pure

More information

M/s. KRIMASIL PVT. LTD, GIDC, ANKLESHWAR

M/s. KRIMASIL PVT. LTD, GIDC, ANKLESHWAR ANNEXURE-1 TOR Standard TOR of sector specific organic synthetic chemicals prescribed by MoEFand CCE will be followed. To use Baseline monitoring details of A-One Chemicals for the month Dec-2016 to Feb-2017.

More information

To The Member Secretary State Expert Appraisal Committee Paryavaran Bhavan Sector 10 A Gandhinagar

To The Member Secretary State Expert Appraisal Committee Paryavaran Bhavan Sector 10 A Gandhinagar March 18, 2019 BY HAND DELIVERY/RPAD To The Member Secretary State Expert Appraisal Committee Paryavaran Bhavan Sector 10 A Gandhinagar 382 010 SUB.: APPLICATION FOR SUBMISSION OF ESSENTIAL DETAIL SOUGHT

More information

(MT/Month) Total Consumption MT/Month

(MT/Month) Total Consumption MT/Month 1. INTRODUCTION M/s. Ambic Organic proposed to manufacture Aluminum Phosphide technical, Zinc Phosphide technical and its formulation at Survey No. 717/4, at Post: Kathlal, Taluka: Kathlal, Dist: Kheda.

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT ESHWAR PHARMACEUTICALS (P) LTD. (Formerly known as Konar Organics Ltd.,) SY. NO. 180/2, IDA KHAZIPALLY, KHAZIPALLY VILLAGE, JINNARAM MANDAL, MEDAK DISTRICT, ANDHRA PRADESH PRE FEASIBILITY REPORT Eshwar

More information

1.0 EXECUTIVE SUMMARY

1.0 EXECUTIVE SUMMARY 1.0 EXECUTIVE SUMMARY M/s Merino Industries Limited has proposed for manufacturing Phenol Formaldehyde Resin, Melamine Formaldehyde Resin at Plot No D2 CH 36, Dahej Phase II, Dist. Bharuch, Gujarat. The

More information

Hind Energy & Coal Beneficiation (India) Ltd.

Hind Energy & Coal Beneficiation (India) Ltd. SUMMARY ON ENVIRONMENTAL IMPACT ASSESSMENT REPORT OF Hind Energy & Coal Beneficiation (India) Ltd. (Change in Technology) at Hindadih Village, Masturi Tehsil Bilaspur District, Chhattisgarh Submitted to

More information

PRE - FEASIBILITY REPORT

PRE - FEASIBILITY REPORT PRE - FEASIBILITY REPORT For PROPOSED BULK DRUGS INTERMEDIATES MANUFACTURING UNIT at SY. NO: PARTS OF 318, 319 AND 321 LOCATED AT PALLEPAHAD VILLAGE, THURKAPALLY MANDAL, YADADRI - BHONGIR DISTRICT, TELANGANA

More information