1 COMMENTS OF THE PROJECT PROPONENT ON THE VARIOUS CONCERNS RAISED IN THE PUBLIC CONSULTATION PROCESS The public hearing of the proposed expansion of steel plant from 1.0 MTPA to 2.0 MTPA at Village - Barbadi, Bhugaon & Selukate, Bhugaon Link Road, Wardha, Maharashtra was held on at Krida Sankul Ground, In front of Police Head Quarter, Near Dr. Babasaheb Ambedkar Statue, Sewagram Road, Wardha. The proceedings of the environmental public hearing are attached at the end of the chapter. In this public hearing total of thirty three (33) numbers of representations / memorandum / suggestions / views were received in covering six (6) areas of issues as specified below. Majority of the public in PH i.e. more than 2/3 rd have expressed their support for expansion project. Summary of areas of issues raised / suggestions given by the public in general and comments /action plan of the project proponent i.e. UVSL for addressing these issues are given below: Areas of issues Nos. Comments / Action Plan 1 Water Drawl Water drawl from Wana / Vena River at Hinganghat 9 The water requirement of M/s. UVSL has been fulfilled from Dham River near Wardha. 2 Infrastructure Development Further development of infrastructure in terms of Roads in the villages, Drinking water, Schools premises and recreation. No water is drawn from Wana / Vena River at Hinganghat for this project. Company has clarified that public has wrongly misconceived that water will be drawn from Wana / Vena river at Hinganghat for this project. 1 The infrastructure in the villages around the Uttam Steel Complex is being continuously improved. Work has already commenced to up-grade the roads and school infrastructure in the surrounding villages. Till date 1624 meters of cement roads have been constructed and 20 solar lamps have also been installed at conspicuous places in the villages. Ground water samples taken from 8 different locations in surrounding villages were tested and compared with drinking water quality standards specified in IS:10500 (2012) and observed to be well within the permissible limits. Improved infrastructure by undertaking repair / replenishment of school building s roofs, boundary walls, entrance gates, playground etc. and by providing ceiling fans in the classrooms of schools. And one dozen molded chairs MECON Limited. All rights reserved 12-1

2 Areas of issues Nos. Comments / Action Plan Every year meritorious students from the S.S.C. to college level are being given rewards / incentives for their studies by the company. Till date Company has distributed 9 Laptops, 60 Mobile Telephones, 50 Bicycles, 1,800 Schoolbags and 11,100 notebooks to students in surrounding villages. 3 Employment opportunities More employment to qualified and skilled local youth These efforts will be continued and further reinforced. 8 The Company is committed to give more employment opportunities to local youths directly or indirectly and this will be continued. As on date around 85% employees are local. As suggested in the PH, company will make efforts for development of required skillsets for the industry through local Technical / Engineering institutions. 4 Health care & medical facilities More medical check-up to local villagers Company has distributed 40 sewing machines with accessories to the widows to make them self-reliant for earning their livelihood. 1 Medical camps / health check-ups are being periodically organized for the local people through the qualified medical practitioners / specialists. Necessary medicines and medical aids have been provided in these camps free of cost. Eye camps were also held in which 1305 patients have been checked and 1025 Spectacles have been distributed to the needy patients free of cost. Blood donation camps were also organized from time to time. As the response of the villagers is overwhelming company plans to hold such camps more frequently in future. Company shall send deserving patients for further treatment to main hospitals for treating certain diseases for which treatment is not available locally MECON Limited. All rights reserved 12-2

3 Areas of issues Nos. Comments / Action Plan 5 Environmental pollution Water pollution from the industry Reduction of agriculture yields 7 Water is used in the industry for processing, cooling, gardening and sprinkling. The above operations do not pollute the water. The company has embarked upon 100% utilisation of water by its recycle in the process / reuse for gardening and sprinkling after treatment for conserving the precious water resources and control the cost also. This has been confirmed in the ground water survey undertaken in and around various locations of the plant premises. 1 In the case of adjoining unit of M/s. Uttam Galva Metallics Ltd., based on the assurance given in the Legislative Assembly by the Honourable Minister for Environment a Study group comprising MPCB officials, EE (MIDC), Principal Scientist & Head of Air Pollution Department of NEERI, Village Sarpanch, Representative of Human Rights Sangh & Bapu Kuti was constituted to find out the facts. The Study group visited the plant and surrounding areas for personal inspection and interaction with the people and also called for report from the District Agricultural Officer, Wardha who has confirmed that due to the existing plant there has been no adverse effect on the crop as well as there is no reduction in the yield of main crop in the region. Due to Air & Water pollution people in the surrounding villages are suffering from disease In light of the above it is established that this concern is not based on facts and as such company envisage that there will not be reduction in the yield even after expansion takes place. 6 In the case of adjoining unit of M/s. Uttam Galva Metallics Ltd., based on the assurance given in the Legislative Assembly by the Honourable Minister for Environment a Study group comprising MPCB officials, EE (MIDC), Principal Scientist & Head of Air Pollution Department of NEERI, Village Sarpanch, Representative of Human Rights Sangh & Bapu Kuti was constituted to find out the facts. The Study group visited the plant and surrounding area for personal inspection and interaction with the 2015 MECON Limited. All rights reserved 12-3

4 Areas of issues Nos. Comments / Action Plan people and also called for report from the District Health Officer, Wardha who has confirmed that due to the existing plant people from the villages are not suffering from any specific diseases and there has been no adverse effect on their health. In light of the above it is established that this concern is not based on facts and as such company envisage that there will not be any adverse effect on health of the people residing in vicinity of plant. Effect of Fly ash 1 Company is not generating any power and therefore fly ash is not generated. The concern is not based on facts. 6 Greenery & Tree Plantation Tree plantation in nearby villages and contribution to Wardha City 3 Company has extensively covered all areas under its precincts and control for development as green belt by planting trees. The company has planted 1,92,600 trees till date. Company is also distributing tree saplings in the surrounding villages with Tree guards. All the schools are involved in this movement. We will continue our efforts of planting trees in coming years too as an ongoing activity. Company has undertaken beautification of Mahavir garden located in heart of Wardha city and also installed CCTV at 5 locations in Wardha city for improving traffic regulation and prevention of crimes MECON Limited. All rights reserved 12-4

5 2015 MECON Limited. All rights reserved 12-5

6 2015 MECON Limited. All rights reserved 12-6

7 2015 MECON Limited. All rights reserved 12-7

8 2015 MECON Limited. All rights reserved 12-8

9 2015 MECON Limited. All rights reserved 12-9

10 2015 MECON Limited. All rights reserved 12-10

11 2015 MECON Limited. All rights reserved 12-11

12 2015 MECON Limited. All rights reserved 12-12

13 2015 MECON Limited. All rights reserved 12-13

14 2015 MECON Limited. All rights reserved 12-14

15 2015 MECON Limited. All rights reserved 12-15

16 2015 MECON Limited. All rights reserved 12-16

17 2015 MECON Limited. All rights reserved 12-17

18 2015 MECON Limited. All rights reserved 12-18

19 2015 MECON Limited. All rights reserved 12-19

20 2015 MECON Limited. All rights reserved 12-20

21 2015 MECON Limited. All rights reserved 12-21

22 2015 MECON Limited. All rights reserved 12-22

23 2015 MECON Limited. All rights reserved 12-23

24 2015 MECON Limited. All rights reserved 12-24

25 2015 MECON Limited. All rights reserved 12-25

26 2015 MECON Limited. All rights reserved 12-26

27 2015 MECON Limited. All rights reserved 12-27

28 2015 MECON Limited. All rights reserved 12-28

29 2015 MECON Limited. All rights reserved 12-29

CORPORATE SOCIAL RESPONSIBILITY (CSR) POLICY

CORPORATE SOCIAL RESPONSIBILITY (CSR) POLICY Preamble CORPORATE SOCIAL RESPONSIBILITY (CSR) POLICY By induction of Section 135 of Companies Act, 2013, the Government of India has given the statutory strength to the concept of Corporate Social Responsibility.

More information

TIDEL PARK LTD. Corporate Social Responsibility (CSR) Policy. Vision:

TIDEL PARK LTD. Corporate Social Responsibility (CSR) Policy. Vision: TIDEL PARK LTD Corporate Social Responsibility (CSR) Policy Vision: TIDEL, as a responsible corporate organisation, has ingrained the philosophy of Corporate Social Responsibility deeply into its value

More information

CORPORATE SOCIAL RESPONSIBILITY POLICY

CORPORATE SOCIAL RESPONSIBILITY POLICY CORPORATE SOCIAL RESPONSIBILITY POLICY (I) PREAMBLE The Policy outlines the company s responsibility as a corporate citizen and lays down the guidelines and mechanism for undertaking activities for welfare

More information

Loan Number: 2419 India: Mundra Ultra Mega Power Project Implementation of Remedial Action Plan Eleventh Quarterly Progress Report March 2018

Loan Number: 2419 India: Mundra Ultra Mega Power Project Implementation of Remedial Action Plan Eleventh Quarterly Progress Report March 2018 Loan Number: 2419 India: Mundra Ultra Mega Power Project Implementation of Remedial Action Plan Eleventh Quarterly Progress Report March 2018 Note: all Scheduled dates (unless otherwise stated) are for

More information

ReGen Powertech Pvt. Ltd., CORPORATE SOCIAL RESPONSIBILITY (CSR) POLICY

ReGen Powertech Pvt. Ltd., CORPORATE SOCIAL RESPONSIBILITY (CSR) POLICY ReGen Powertech Pvt. Ltd., CORPORATE SOCIAL RESPONSIBILITY (CSR) POLICY INDEX 1. Concept 1.1. Short title & Applicability 1.2. CSR Vision Statement & Objective 1.3. CSR Committee 2. Resources & Areas to

More information

Check list for construction Project of EC [Category 8(a)]:

Check list for construction Project of EC [Category 8(a)]: Check list for construction Project of EC [Category 8(a)]: Provide authenticated (with stamp & Signature) hard copy of this check-list during submission of hard copy of ToR application. Sr. no. Checklist

More information

JAYPEE NIGRIE SUPER THERMAL POWER PROJECT

JAYPEE NIGRIE SUPER THERMAL POWER PROJECT JAYPEE NIGRIE SUPER THERMAL POWER PROJECT (A Unit of M/s Jaiprakash Power Ventures Limited) Villages: Nigrie, Tehsil :Sarai District: Singrauli 2014 2015 SUBMITTED M.P. POLLUTION CONTROL BOARD BHOPAL (M.P.)

More information

EXECUTIVE SUMMARY. Kumardeipur Sand Quarry Cum ' 13.3" N to 20 44' 20.7"N Longitude " E to 85 35'27.5 "E

EXECUTIVE SUMMARY. Kumardeipur Sand Quarry Cum ' 13.3 N to 20 44' 20.7N Longitude  E to 85 35'27.5 E EXECUTIVE SUMMARY 1.0 INTRODUCTION Sri Mahesh Prasad Mishra proposes to mine Sand Quarry from an approved Mining Lease over an area of 14.85 Ac or 6.01 hectares (Non-Forest Land) which is located in at

More information

Details of the proposed project as presented before the committee are tabulated below:

Details of the proposed project as presented before the committee are tabulated below: Shrungal Homes Block No. 141, F.P.No.42, O.P.No.42, T.P.S.No.58 (Bamroli), Choryasi, Surat. Screening & scoping / appraisal. Details of the proposed project as presented before the committee are tabulated

More information

B-2 COMMUNITY COMMERCIAL BUSINESS DISTRICT. Uses allowed in the B-2 Community Commercial Business District are subject to the following conditions:

B-2 COMMUNITY COMMERCIAL BUSINESS DISTRICT. Uses allowed in the B-2 Community Commercial Business District are subject to the following conditions: SECTION 46-53.1 B-2 COMMUNITY COMMERCIAL BUSINESS DISTRICT A. PURPOSE The B-2 Community Commercial Business District is oriented toward retail, service businesses and multi-family residential development.

More information

LATEST GUIDELINES & DIRECTIVES OF POLLUTION BOARDS FOR DISTILLERS VIDE THEIR CIRCULAR DATED 2 nd JUNE 2017

LATEST GUIDELINES & DIRECTIVES OF POLLUTION BOARDS FOR DISTILLERS VIDE THEIR CIRCULAR DATED 2 nd JUNE 2017 By K.P.SINGH LATEST GUIDELINES & DIRECTIVES OF POLLUTION BOARDS FOR DISTILLERS VIDE THEIR CIRCULAR DATED 2 nd JUNE 2017 1. Distilleries to install Online Mass Flow Measurement with online data transfer

More information

Corporate Social Responsibility Policy of SAIPL for

Corporate Social Responsibility Policy of SAIPL for Considered and approved by CSR Committee in its meeting held on 25/04/2016 for recommendation to the Board Considered and approved by Board in its meeting held on 19/05/2016 Corporate Social Responsibility

More information

C-3 COMMERCIAL/LIGHT MANUFACTURING DISTRICT

C-3 COMMERCIAL/LIGHT MANUFACTURING DISTRICT CHAPTER 500. SECTION 527. ZONING STANDARDS C-3 COMMERCIAL/LIGHT MANUFACTURING DISTRICT 527.1. Purpose The purpose of the C-3 Commercial/Light Manufacturing District is to provide for the development of

More information

PROJECT PARTICULARS. Lease address - Village panchayat - Nara, Tahsil -Kanker, Name of the proponent - Village panvhayat Nara

PROJECT PARTICULARS. Lease address - Village panchayat - Nara, Tahsil -Kanker, Name of the proponent - Village panvhayat Nara PROJECT PARTICULARS Name of the project - Sand mining Lease address - Village panchayat - Nara, Tahsil -Kanker, Dist Kanker (C.G.) Khasra No. - 1025 Sand mining area - 5.00 Hectares Name of the mineral

More information

The aforementioned key areas will be mapped with the specified activities under Schedule VII of the Companies Act, 2013.

The aforementioned key areas will be mapped with the specified activities under Schedule VII of the Companies Act, 2013. CSR Policy 1. Foreword At Hetero, we value health and prosperity for all. Our passion for improving quality of life extends beyond our business and transcends everything we do. While we work towards making

More information

ANNEXURE-6. Public Hearing details such as Advertisement, Minutes of PH, Attendance sheet, photographs and query & answer raised in public hearing

ANNEXURE-6. Public Hearing details such as Advertisement, Minutes of PH, Attendance sheet, photographs and query & answer raised in public hearing ANNEXURE-6 Public Hearing details such as Advertisement, Minutes of PH, Attendance sheet, photographs and query & answer raised in public hearing Advertisement Minutes of Public Hearing Photographs

More information

ENVIRONMENT MANAGEMENT PLAN. For Excavation of Brick Earth (Total Mining Area Ha.) (for Manufacturing of Bricks)

ENVIRONMENT MANAGEMENT PLAN. For Excavation of Brick Earth (Total Mining Area Ha.) (for Manufacturing of Bricks) ENVIRONMENT MANAGEMENT PLAN For Excavation of Brick Earth (Total Mining Area 2.121 Ha.) (for Manufacturing of Bricks) By M/s Bhagwati Eth (bzv) Udyog Village Shokanangla, Pargana & Tehsil Bazpur, District-

More information

C-3 COMMERCIAL/LIGHT MANUFACTURING DISTRICT

C-3 COMMERCIAL/LIGHT MANUFACTURING DISTRICT CHAPTER 500. SECTION 527. ZONING STANDARDS C-3 COMMERCIAL/LIGHT MANUFACTURING DISTRICT 527.1. Purpose The purpose of the C-3 Commercial/Light Manufacturing District is to provide for the development of

More information

RT-10 and RT-10N Districts Schedule

RT-10 and RT-10N Districts Schedule Districts Schedule 1 Intent The intent of this Schedule is to encourage development of multiple small houses and duplexes on large lots and assembled sites, while continuing to permit lower intensity development

More information

Environmental Clearance Compliance Half Yearly Report

Environmental Clearance Compliance Half Yearly Report Environmental Clearance Compliance Half Yearly Report HALF YEARLY COMPLIANCE REPORT- April 2015 to September 2015 Ref: 1. MOEF, New Delhi Environment Clearance F. No. J-11011/119/2007- IA II (I) dated

More information

Corporate Social Responsibility Policy of SAIPL for

Corporate Social Responsibility Policy of SAIPL for Considered and approved by CSR Committee in its meeting held on 11 th September, 2017 for recommendation to the Board Considered and approved by Board in its meeting held on 13 th September, 2017 Corporate

More information

Construction Method Statement

Construction Method Statement Construction Method Statement Introduction. The project involves the construction of the new Apartment Extra Car Home for Grwp Cynefin in Pothmadog, Gwynedd, Wales. The programme and construction methodology

More information

M/s. SAL STEEL LTD Survey no.245/p, Village:-Bharapar, Taluka:- Gandhidham, District:-Kutch, Gujarat.

M/s. SAL STEEL LTD Survey no.245/p, Village:-Bharapar, Taluka:- Gandhidham, District:-Kutch, Gujarat. Pre-Feasibility Study Report For Proposed Fly Ash Co-processing clinker grinding cement Unit of 40,000 MT/month Production capacity within our Existing Premises for M/s. SAL STEEL LTD Survey no.245/p,

More information

Section 7.25 REGULATION OF SOLAR FARMS AND SOLAR PANELS

Section 7.25 REGULATION OF SOLAR FARMS AND SOLAR PANELS Section 7.25 REGULATION OF SOLAR FARMS AND SOLAR PANELS This amendment Solar Energy is hereby added to the Montcalm Township Zoning Ordinance to state as follows: A. INTENT AND PURPOSE This section is

More information

CARDIFF COUNTY COUNCIL S STRATEGY FOR ALLEY GATING SCHEMES

CARDIFF COUNTY COUNCIL S STRATEGY FOR ALLEY GATING SCHEMES CARDIFF COUNTY COUNCIL S STRATEGY FOR ALLEY GATING SCHEMES CARDIFF COUNTY COUNCIL S STRATEGY ON ALLEY GATING SCHEMES POLICY OBJECTIVES Policy AG 1: Cardiff County Council will only encourage and support

More information

Memorandum of Understanding

Memorandum of Understanding Memorandum of Understanding between the NSW Ministry of Health and Sydney Water Corporation July 2016 MoU between Sydney Water and NSW Ministry of Health - July 2016 Page 1 of 11 1. Introduction and purpose

More information

Report on Damage Assessment and. Remediation Plan and Natural & Community Augmentation Plan

Report on Damage Assessment and. Remediation Plan and Natural & Community Augmentation Plan Report on 1. PROJECT LOCATION & LAND USE The Ganesh Park 3 is a residential building project constructed on plot 608 to 613/5 Vil: GIDC Ankleshwar in Bharuch district of Gujarat state. The project land

More information

JAYPEE NIGRIE SUPER THERMAL POWER PLANT

JAYPEE NIGRIE SUPER THERMAL POWER PLANT JAYPEE NIGRIE SUPER THERMAL POWER PLANT (A Division of M/s Jaiprakash Power Ventures Limited) Village: Nigrie, Tehsil: Sarai District: Singrauli 2015 2016 SUBMITTED M.P. POLLUTION CONTROL BOARD BHOPAL

More information

ARTICLE VI GENERAL PROVISIONS

ARTICLE VI GENERAL PROVISIONS ARTICLE VI GENERAL PROVISIONS Section 600. Accessory Uses or Structures: Accessory structures shall be permitted only in rear yards, except as otherwise provided in this Ordinance. In an R District, accessory

More information

Hind Energy & Coal Beneficiation (India) Ltd.

Hind Energy & Coal Beneficiation (India) Ltd. SUMMARY ON ENVIRONMENTAL IMPACT ASSESSMENT REPORT OF Hind Energy & Coal Beneficiation (India) Ltd. (Change in Technology) at Hindadih Village, Masturi Tehsil Bilaspur District, Chhattisgarh Submitted to

More information

WELCOME & PURPOSE. Overford Farm, Wytham - Conversion of Outbuildings to Form Dwellings. Welcome - we are delighted you are attending the event today.

WELCOME & PURPOSE. Overford Farm, Wytham - Conversion of Outbuildings to Form Dwellings. Welcome - we are delighted you are attending the event today. WELCOME & PURPOSE 1 Welcome - we are delighted you are attending the event today. The property at Overford Farm has been within the ownership of the University of Oxford since 1943 when it was acquired

More information

SUBURBAN RESIDENTIAL. QLDC PROPOSED DISTRICT PLAN [PART THREE] DECISIONS VERSION 7 lower density SUBURBAN residential

SUBURBAN RESIDENTIAL. QLDC PROPOSED DISTRICT PLAN [PART THREE] DECISIONS VERSION 7 lower density SUBURBAN residential 7 LOWER DENSITY SUBURBAN RESIDENTIAL 7.1 Zone Purpose The Lower Density Suburban Residential Zone is the largest residential zone in the District. The District Plan includes such zoning that is within

More information

Pre-Feasibility Report For

Pre-Feasibility Report For Pre-Feasibility Report For Proposed New Project for manufacturing of Intermediates of Agro Chemicals & Synthetic Organic Chemicals. By M/s. MANBRO POLYMERS LIMITED, Plot No. D-2/CH-275, INDUSTRIAL ESTATE,

More information

Zoning Permits 11-1 ZONING PERMITS

Zoning Permits 11-1 ZONING PERMITS Zoning Permits 11-1 ZONING PERMITS (a) Building or structures shall be started, repaired, reconstructed, enlarged or altered only after a zoning permit has been obtained from the administrator and a building

More information

Scanned by CamScanner

Scanned by CamScanner Scanned by CamScanner ENVIRONMENT STATEMENT (FORM V) Udaipur Cement Works Limited Daroli Limestone Mine-1 YEAR 2017-18 Udaipur Cement Works Limited SHRIPATINAGAR, P.O. CFA: DABOK, DISTRICT UDAIPUR (RAJASTHAN)-313021

More information

PART A. M/s Shree Cement Ltd, (Grinding Unit) village - Udepur, Tehsil- Suratgarh, District -Shri Ganganagar, Rajasthan

PART A. M/s Shree Cement Ltd, (Grinding Unit) village - Udepur, Tehsil- Suratgarh, District -Shri Ganganagar, Rajasthan Page 1 of 9 Environmental Statement for Clinker Grinding Unit of M/s Shree Cement Limited, situated at village - Udepur, Tehsil- Suratgarh, District -Shri Ganganagar, Rajasthan for the Period from: 10

More information

Management Plan: Hazardous Materials Removal & Demolition

Management Plan: Hazardous Materials Removal & Demolition Management Plan: Hazardous Materials Removal & Demolition Kingswood School (Upper Site), Corby 1.0 Introduction 1.1 Background Lambert Smith Hampton has been instructed by Northamptonshire County Council

More information

COMPLIANCE STATUS REPORT

COMPLIANCE STATUS REPORT COMPLIANCE STATUS REPORT Sona Alloys Pvt. Ltd. Additional Director (IA) Ministry of Environment & Forests, Paryavaran Bhavan, CGO Complex, Lodhi Road, New Delhi 11003 Date: 08.02.2014 Sub: Compliance Status

More information

HINDALCO INDUSTRIES LIMITED WEST COAST BAUXITE MINES DIST. KOLHAPUR

HINDALCO INDUSTRIES LIMITED WEST COAST BAUXITE MINES DIST. KOLHAPUR HINDALCO INDUSTRIES LIMITED WEST COAST BAUXITE MINES DIST. KOLHAPUR Corporate Social Responsibility Activities at West Coast Mines CSR ACTIVITIES OF WEST COAST MINES: CSR PHILOSOPHY: The philosophy of

More information

Introduction. Makes our vision transparent

Introduction. Makes our vision transparent Abdullah Hamood Mohd. Al Shukaili Trd & Cont. L. L. C. Company Profile Your Requirement, Our Involvement. Make it Perfect PO Box. 131, PC. 115, Al Athaiba Street (No. 068), Muscat, Sultanate of Oman. Tel.

More information

Industrial Condo FOR SALE SE S Niemeyer Circle Port Saint Lucie, FL $195,000

Industrial Condo FOR SALE SE S Niemeyer Circle Port Saint Lucie, FL $195,000 FOR SALE $195,000 Property Details PRICE $195,000 BUILDING SIZE 1,871 sf BUILDING TYPE ACREAGE.02 AC FRONTAGE 323.81 Two warehouse condominiums with a combined area of 1,871 sq. ft. with upstairs office

More information

Ref: Environment Department, MS, SEIAA Letter SEAC 2010/CR.824/TC-2 Dated 2 nd Nov 2011

Ref: Environment Department, MS, SEIAA Letter SEAC 2010/CR.824/TC-2 Dated 2 nd Nov 2011 Ref.No:POL/U-II/EC/12-13/176 Date : 23.11.2012 To, Dr. A. Mehrotra, Director (S) Ministry of Environment & Forests, Regional Office, Western Region, Kendriya Paryavaran Bhavan Link Road No.3, E-5, Ravi

More information

ADDITIONAL STUDIES PUBLIC CONSULTATION As per EIA notification 14 th September 2006 and ToR issued by Expert Appraisal Committee (EAC) Ministry

ADDITIONAL STUDIES PUBLIC CONSULTATION As per EIA notification 14 th September 2006 and ToR issued by Expert Appraisal Committee (EAC) Ministry ADDITIONAL STUDIES 7 7.1. PUBLIC CONSULTATION As per EIA notification 14 th September 2006 and ToR issued by Expert Appraisal Committee (EAC) Ministry of Environment, Forest and Climate Change (MoEFCC),

More information

Sr. No. Date of starting the project and completion schedule. January 2012 January 2017 (Tentative)

Sr. No. Date of starting the project and completion schedule. January 2012 January 2017 (Tentative) Six Monthly Progress Report reg. Construction of Group Housing Colony at village Sarai Aurangabad in Sector 3-A, Bahadurgarh (Distt. Jhajjar), Haryana by M/s Prabhu Shanti Real Estate Pvt. Ltd., due in

More information

INSPIRE INDUSTRIES PVT. LTD.

INSPIRE INDUSTRIES PVT. LTD. For Proposed 0.999 MTPA Coal Washery At Village: Bhelai, Tehsil: Baloda, District: Janjgir-Champa, Chhattisgarh Envirotech East (P) Limited An ISO 9001:2008, 14001:2004 & OHSAS:18001:2007 Company Laboratory

More information

NORTHWEST TERRITORIES CONSOLIDATION OF CAPITAL AREA DEVELOPMENT SCHEME BY LAW NO. 3934

NORTHWEST TERRITORIES CONSOLIDATION OF CAPITAL AREA DEVELOPMENT SCHEME BY LAW NO. 3934 NORTHWEST TERRITORIES CONSOLIDATION OF CAPITAL AREA DEVELOPMENT SCHEME BY LAW NO. 3934 Adopted December 16, 1996 AS AMENDED BY By law No. 4811 September 22, 2014 (This Consolidation is prepared for convenience

More information

BUSINESS PLAN FOR THE MAKANA MUNICIPALITY FOR A MUNICIPAL COMMUNITY PARTNERSHIP PROJECT

BUSINESS PLAN FOR THE MAKANA MUNICIPALITY FOR A MUNICIPAL COMMUNITY PARTNERSHIP PROJECT BUSINESS PLAN FOR THE MAKANA MUNICIPALITY FOR A MUNICIPAL COMMUNITY PARTNERSHIP PROJECT Prepared by 65 Havelock Street Central Port Elizabeth 6000 041 585 4017 041 585 1226 usg@global.co.za TABLE OF CONTENTS

More information

RESIDENTIAL ACCESSORY BUILDING SETBACKS. April 17, 2014 Staff Memo

RESIDENTIAL ACCESSORY BUILDING SETBACKS. April 17, 2014 Staff Memo RESIDENTIAL ACCESSORY BUILDING SETBACKS April 17, 2014 Staff Memo P.O. Box 128 125 S. Second Odessa, MO 64076 Phone: (816) 230-5577 Fax: (816) 633-4985 cityofodessamo.com To: Chair McDermed and Planning

More information

24-28 Nursery Lane, Rye, New York

24-28 Nursery Lane, Rye, New York 24-28 Nursery Lane Rye, New York Space Available Specifications Location: Space 1: Space 2: Rental Rate: 24-28 Nursery Lane, Rye, New York 10,570± sf - leased 14,305± sf $13.00/psf /NNN Term: 5-10 Years

More information

E3072 v2. GEF Large City Congestion and Carbon Reduction Project. Environment Management Plan. Public Disclosure Authorized

E3072 v2. GEF Large City Congestion and Carbon Reduction Project. Environment Management Plan. Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized E3072 v2 GEF Large City Congestion and Carbon Reduction Project Environment Management

More information

MIXED ACTIVITY ZONE. Chapter 4. Mixed Activity Zone

MIXED ACTIVITY ZONE. Chapter 4. Mixed Activity Zone Chapter 4 Mixed Activity Zone 4. MIXED ACTIVITY ZONE 4.1 RESOURCE MANAGEMENT ISSUES 1. Activities adjoining main arterial roads can adversely affect the safety, sustainability and efficiency of the network.

More information

Damodhar Cement Works

Damodhar Cement Works Excellence Through Teamwork Water conservation through recycle and reuse Presented By ACC Limited Damodhar at a glance. DCSL commenced commercial production in October 199 as a joint venture project of

More information

Shri Gurudatt Sugars Ltd., Gat No. 61/A, Akiwat - Takaliwadi Road, Takaliwadi , Taluka - Shirol, Dist Kolhapur, Maharashtra

Shri Gurudatt Sugars Ltd., Gat No. 61/A, Akiwat - Takaliwadi Road, Takaliwadi , Taluka - Shirol, Dist Kolhapur, Maharashtra Shri Gurudatt Sugars Ltd., Gat No. 61/A, Akiwat - Takaliwadi Road, Takaliwadi - 416108, Taluka - Shirol, Dist Kolhapur, Maharashtra Compliance of Conditions Stipulated in environmental clearance granted

More information

Creating a Better Tomorrow. Sustainable initiatives for better healing and better living

Creating a Better Tomorrow. Sustainable initiatives for better healing and better living Creating a Better Tomorrow Sustainable initiatives for better healing and better living choices that create a better tomorrow Northeast Georgia Medical Center (NGMC) Braselton was created after years

More information

TAX INCREMENT FINANCING

TAX INCREMENT FINANCING TAX INCREMENT FINANCING Tax Increment Financing (TIF) is a mechanism under Iowa Code chapter 403 for municipalities (cities and counties) to use to finance public improvement projects or, added later,

More information

ENVIRONMENTAL STATEMENT FOR THE YEAR

ENVIRONMENTAL STATEMENT FOR THE YEAR ENVIRONMENTAL STATEMENT FOR THE YEAR 2016-17 6 MTPA STEEL PLANT OF TATA STEEL AT KLAINGANAGAR INDUSTRIAL COMPLEX, ODISHA ENVIRONMENTAL DEPARTMENT TATA STEEL KALINGANAGAR Kalinga Nagar Industrial Complex,

More information

HILTI INDIA PRIVATE LIMITED. Policy on Corporate Social Responsibility

HILTI INDIA PRIVATE LIMITED. Policy on Corporate Social Responsibility HILTI INDIA PRIVATE LIMITED Policy on Corporate Social Responsibility 1) PREAMBLE Corporate Social Responsibility (CSR) is strongly connected with the principles of Sustainability; an organization should

More information

MEMORANDUM. Tax map number(s) / total acreage: acres of parcels 12J-5-1, 12J-5-2, 12J-5-3, 12J-5-3A & 12J-5-4A / 12.

MEMORANDUM. Tax map number(s) / total acreage: acres of parcels 12J-5-1, 12J-5-2, 12J-5-3, 12J-5-3A & 12J-5-4A / 12. MEMORANDUM To: From: Subject: Board of Supervisors Sandra M. Shackelford, Planner SMS Rezoning # PL-15-28 (Timberlake Road) Date: October 27, 2015 BACKGROUND: This request is to rezone 10.76 +/- acres

More information

Chapter MINERAL EXTRACTION AND MINING OPERATIONS

Chapter MINERAL EXTRACTION AND MINING OPERATIONS Chapter 17.31 MINERAL EXTRACTION AND MINING OPERATIONS Sections: 17.31.010 Purpose 17.31.020 Procedure for Extraction and Rehabilitation Requests 17.31.030 Operation and Rehabilitation Standards for all

More information

RS-1 District Schedule

RS-1 District Schedule District Schedule 1 Intent The intent of this Schedule is generally to maintain the single-family residential character of the District, but also to permit conditionally one-family dwellings with secondary

More information

SIX MONTHLY COMPLIANCE REPORT JUNE- 2015

SIX MONTHLY COMPLIANCE REPORT JUNE- 2015 Six Monthly Compliance Report June-2015 M/s Mahagun Real Estate Pvt. Ltd SIX MONTHLY COMPLIANCE REPORT JUNE- 2015 Group Housing Complex Mahagunpuram AT VILLAGE Mehrauli, Dasna, Ghaziabad, U.P. Being developed

More information

PRE FEASIBILITY REPORT PROPOSED CONSCTRUCTION BUILDING PROJECT GUJARAT HOUSING BOARD

PRE FEASIBILITY REPORT PROPOSED CONSCTRUCTION BUILDING PROJECT GUJARAT HOUSING BOARD PRE FEASIBILITY REPORT FOR PROPOSED CONSCTRUCTION BUILDING PROJECT (66460.23 SQ. M) BY GUJARAT HOUSING BOARD AFFORDABLE RESIDENTIAL BUILDING & COMMERCIAL PROJECT PACKAGE 23, PLOT NO. 61/1, 63/1 & 64, TARSAMIYA,

More information

Form V is to be filled before 30th September annually; for the period from 1st April to 31st March PART A. Company Information

Form V is to be filled before 30th September annually; for the period from 1st April to 31st March PART A. Company Information Form V is to be filled before 30th September annually; for the period from 1st April to 31st March PART A Company Information Company Name : Facility Name : Person Name * : Designation * : Premise Name

More information

RS-1 District Schedule

RS-1 District Schedule District Schedule 1 Intent The intent of this Schedule is generally to maintain the single-family residential character of the District, but also to permit conditionally one-family dwellings with secondary

More information

Major changes proposed in the Bio- Medical Waste Management Rules, 2016 and its likely implication

Major changes proposed in the Bio- Medical Waste Management Rules, 2016 and its likely implication Major changes proposed in the Bio- Medical Waste Management Rules, 2016 and its likely implication Bio- Medical Waste (Management and Handling) Rules, 2011 Title Bio- Medical Waste (Management and Handling)

More information

California Community Colleges Board of Governors Energy and Sustainability Policy

California Community Colleges Board of Governors Energy and Sustainability Policy This of the of the California Community Colleges provides goals and guidance for districts to achieve energy conservation, sustainable building, and physical plant management best practices necessary to

More information

Short Project Brief Resort Development South Denarau Island Project Fiji. Prepared by. Cocciardi Holdings Pty Ltd

Short Project Brief Resort Development South Denarau Island Project Fiji. Prepared by. Cocciardi Holdings Pty Ltd Short Project Brief Resort Development South Denarau Island Project Fiji Prepared by Cocciardi Holdings Pty Ltd May 2012 Contents Page 1. Introduction 3 2. Updated Property Valuation 6 3. Government Support

More information

RS-2 District Schedule

RS-2 District Schedule District Schedule 1 Intent The intent of this Schedule is primarily to maintain the single-family residential character of the District, but also to conditionally permit laneway houses and in some instances

More information

RS-2 District Schedule

RS-2 District Schedule District Schedule 1 Intent The intent of this Schedule is primarily to maintain the single-family residential character of the District, but also to conditionally permit laneway houses and in some instances

More information

Ordinance Amendment. Request for an Ordinance Amendment to Ordinance No. 155 Zoning

Ordinance Amendment. Request for an Ordinance Amendment to Ordinance No. 155 Zoning . Ordinance Amendment 180 Request for an Ordinance Amendment to Ordinance No. 155 Zoning Consistency with Dwelling Width for zones R-1-A, R-1-C, and R-3 Zones Use of vacant lot as storage, to be prohibited

More information

QLDC PROPOSED DISTRICT PLAN [PART THREE] AUGUST 2015 BUSINESS MIXED USE

QLDC PROPOSED DISTRICT PLAN [PART THREE] AUGUST 2015 BUSINESS MIXED USE 16 QLDC PROPOSED DISTRICT PLAN [PART THREE] AUGUST 2015 16 b usiness mix ed use BUSINESS MIXED USE QLDC PROPOSED DISTRICT PLAN [PART THREE] AUGUST 2015 16 business mixed use 16.1 Purpose The intention

More information

You have applied in accordance with Section 9 of the Environmental Protection Act for approval of:

You have applied in accordance with Section 9 of the Environmental Protection Act for approval of: Ministry of the Environment Ministère de l Environnement CERTIFICATE OF APPROVAL AIR NUMBER 7970-7QNRDJ Issue Date: April 2, 2009 William Day Construction Limited 2500 Elm Street, P.O. Box 700 Copper Cliff,

More information

Environmental statement for the financial year ending the 31 st March 2012

Environmental statement for the financial year ending the 31 st March 2012 FORM V (See rule 14) Environmental statement for the ending the 31 st March 2012 1. Name and address of the Owner/Occupier of the Industry, operation of the process. PART A : BINANI CEMENT LIMITED, VILLAGE:

More information

Environment protection measures / technology

Environment protection measures / technology Sr. No. Conditions A. Specific Conditions: i. The gaseous and particulate matter emissions from various units should conform to the standards prescribed by the State Pollution Control Board. At no time,

More information

FAST TRAC. Prefab Shelters. Factory made pre-engineered structure. Futuristic Convenient Durable. Leading through Innovations and Technology

FAST TRAC. Prefab Shelters. Factory made pre-engineered structure. Futuristic Convenient Durable. Leading through Innovations and Technology FAST TRAC Prefab Shelters Factory made pre-engineered structure Futuristic Convenient Durable Leading through Innovations and Technology Infrastructure Division Time Technoplast Ltd., is a technology driven

More information

ADDITIONAL ATTACHMENTS TO FORM-1 M/S. SDB DIAMOND BOURSE

ADDITIONAL ATTACHMENTS TO FORM-1 M/S. SDB DIAMOND BOURSE ADDITIONAL ATTACHMENTS TO FORM-1 FOR OBTAINING ENVIRONMENT CLEARANCE For Proposed Commercial Complex Surat Diamond Bourse M/S. SDB DIAMOND BOURSE Block No. 177/P, Moje- Khajod, Taluka- Surat City, District

More information

: Industrial Projects - 2. : 26th October, 2016

: Industrial Projects - 2. : 26th October, 2016 1. Proposal No. : IA/AP/IND/26243/2014, 2. MoEFCC File No. : J-11011/408/2014-IA II (I) 3. Category of the Proposal : Industrial Projects - 2 4. Name of the proposal : M/s Divis laboratories limited, Unit

More information

EIA for Proposed Additional Butibori Industrial Area, Tehsil and District Nagpur, State Maharashtra.

EIA for Proposed Additional Butibori Industrial Area, Tehsil and District Nagpur, State Maharashtra. PUBLIC CONSULTATION PUBLIC HEARING According to EIA Notification 2006 and its subsequent amendments, the proposed project comes under the project activity of 7 (c) & (a), Industrial estates /parks, complexes/area

More information

This table identifies provisions subject to and consequentially affected by appeals:

This table identifies provisions subject to and consequentially affected by appeals: Chapter 17 Airport Zone This table identifies provisions subject to and consequentially affected by appeals: Provision Subject To Appeal (identified in red text in the relevant chapter/s) Consequentially

More information

MY HOME INDUSTRIES PRIVATE LIMITED

MY HOME INDUSTRIES PRIVATE LIMITED MY HOME INDUSTRIES PRIVATE LIMITED Under the dynamic leadership of Dr. Rameswar Rao Jupally, My Home Industries Private Limited (MHIPL) has grown from strength to strength to its current annual cement

More information

10.2 RESPONSIBILITIES 10.1 IMPLEMENTATION PROCESS. City Council. Planning Commission

10.2 RESPONSIBILITIES 10.1 IMPLEMENTATION PROCESS. City Council. Planning Commission 10 IMPLEMENTATION The 2035 General Plan provides specific policy guidance for the implementation of plan concepts in each of the Plan elements. This framework establishes a basis for coordinated action

More information

CHAPTER 7 ADDITIONAL STUDIES

CHAPTER 7 ADDITIONAL STUDIES 7.0 INTRODUCTION CHAPTER 7 ADDITIONAL STUDIES Besides environmental issues, there are other issues that are associated with construction & operation of the project. In previous chapters, the environmental

More information

PRE- FEASIBILITY REPORT FOR PROPOSED ORDINARY EARTH EXCAVATION PROJECT (94.59 ARES) of Shri Saji Sebastian, Madeckal House, Kizhakambalam P.

PRE- FEASIBILITY REPORT FOR PROPOSED ORDINARY EARTH EXCAVATION PROJECT (94.59 ARES) of Shri Saji Sebastian, Madeckal House, Kizhakambalam P. PRE- FEASIBILITY REPORT FOR PROPOSED ORDINARY EARTH EXCAVATION PROJECT (94.59 ARES) of Shri Saji Sebastian, Madeckal House, Kizhakambalam P.O, Ernakulam (Dist.) Survey No. 129/1-4,129/2-1, Arakuzha Village,

More information

SWACHH BHARAT ABHIYAN - INITIATIVES BY CEMENT INDUSTRY

SWACHH BHARAT ABHIYAN - INITIATIVES BY CEMENT INDUSTRY SWACHH BHARAT ABHIYAN - INITIATIVES BY CEMENT INDUSTRY All cement plants in the country have been taking a number of measures and initiatives to realize the Prime Minister s various Missions and Visions,

More information

CONSERVATION/ OPEN SPACE ELEMENT

CONSERVATION/ OPEN SPACE ELEMENT CONSERVATION/ OPEN SPACE ELEMENT E l C e n t r o G e n e r a l P l a n This Implementation Program provides actions to implement the adopted policies and plans identified in the Conservation/Open Space

More information

MAHARASHTRA INDUSTRIAL DEVELOPMENT CORPORATION (A Government Of Maharashtra Undertaking) CIRCULAR

MAHARASHTRA INDUSTRIAL DEVELOPMENT CORPORATION (A Government Of Maharashtra Undertaking) CIRCULAR MAHARASHTRA INDUSTRIAL DEVELOPMENT CORPORATION (A Government Of Maharashtra Undertaking) CIRCULAR No. MIDC/CP/ C55174 /2017 Date : 13.07.2017 Subject : Guidelines for Inspection while issuing Completion

More information

[FORM-V] PART-A PART-B

[FORM-V] PART-A PART-B [FORM-V] (See Rule 14) Environment Statement for the financial year ending the 31 st March 2015 PART-A (1) Name and address of the owner - M/s. Serajuddin and Co. / Occupier of the industry, Balda Block

More information

RS-5 District Schedule

RS-5 District Schedule District Schedule 1 Intent The intent of this Schedule is generally to maintain the existing single-family residential character of the District by encouraging new development that is compatible with the

More information

Sindh Engro Coal Mining Company

Sindh Engro Coal Mining Company Sindh Engro Coal Mining Company Development of Water Resources at Thar 21 st November 2017 Agenda 1. Thar Coal Mining and Power Projects 2. Thar Foundation & Community Development Initiatives at Thar 3.

More information

Title 15 BUILDINGS AND CONSTRUCTION

Title 15 BUILDINGS AND CONSTRUCTION Title 15 BUILDINGS AND CONSTRUCTION Chapters: 15.04 International Codes Adopted 15.08 Building Permits 15.12 Movement of Buildings Chapter 15.04 INTERNATIONAL CODE COMMISSION CODES Sections: 15.04.010

More information

Chambal Fertilisers and Chemicals Limited CSR Report

Chambal Fertilisers and Chemicals Limited CSR Report Chambal Fertilisers and Chemicals Limited CSR Report Keeping the idea of philanthropy and development of Rural India of our Founder Mr. K. K. Birla, Chambal Fertilisers and Chemicals Limited (CFCL) is

More information

Environment Consultant:

Environment Consultant: MODERNIZATION CUM EXPANSION OF INDUCTION FURNACE PRODUCTION(2,05,000 TPA TO 6,00,000 TPA) AND ROLLING MILL PRODUCTION (3, 69,000 TPA TO 6,00,000 TPA) at Sy. No. 158 (part) 159 (part), 166 170, village

More information

PRE-FEASIBILITY REPORT FOR OM SAIRAM STEEL AND ALLOYS PVT LTD

PRE-FEASIBILITY REPORT FOR OM SAIRAM STEEL AND ALLOYS PVT LTD PRE-FEASIBILITY REPORT FOR OM SAIRAM STEEL AND ALLOYS PVT LTD PLOT No. F-1,2,3,8,9,10, ADDL. MIDC, PHASE II, AND GUT NO. 46 & 63, VILLAGE DAREGAON, TEHSIL: JALNA DIST: JALNA, MAHARASHTRA 2014-15 1. Executive

More information

TATA BLUESCOPE STEEL LIMITED CSR Policy

TATA BLUESCOPE STEEL LIMITED CSR Policy TATA BLUESCOPE STEEL LIMITED CSR Policy The Company has always endeavored to conduct its business responsibly, mindful of its social accountability, respecting applicable laws and with regard for human

More information

CEQA Categorical Exemption Determination

CEQA Categorical Exemption Determination CEQA Categorical Exemption Determination PROPERTY INFORMATION/PROJECT DESCRIPTION Project Address SF REC & PARK: 6335 FULTON STREET Case No. 2018-003817ENV Block/Lot(s) 1700001 Permit No. Addition/ Alteration

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT Page1 PRE FEASIBILITY REPORT KALDA FLAG STONE QUARRY AREA OF -1.55 HACTARE STRICTLY AS PER MOEF GUIDELINE DATE 30/12/2006 IN TERMS OF PROVISIONS OF EIA NOTIFICATION 2006 VILLAGE KALDA TEHSIL PAWAI DISTRICT

More information

CORPORATE SOCIAL RESPONSIBILITY (CSR) POLICY

CORPORATE SOCIAL RESPONSIBILITY (CSR) POLICY CORPORATE SOCIAL RESPONSIBILITY (CSR) POLICY TABLE OF CONTENTS 1. SHORT TITLE AND APPLICABILIRTY 2. CSR VISION STATEMENT AND OBJECTIVE 3. RESOURCES AND ALLOCATION FUNDS 4. PLANNING 4.1 PLANNING 4.2 Identification

More information

Content Copy Of Original

Content Copy Of Original Content Copy Of Original Site Location: Mobile Ministry of the Environment and Climate Change Ministère de l Environnement et de l Action en matière de changement climatique R.W. Tomlinson ed 5597 Power

More information

Appendix 1. Recommended Revised Chapter

Appendix 1. Recommended Revised Chapter Appendix 1. Recommended Revised Chapter 28378447_1.docx 17 Chp.10 S42A Key: Recommend changes to notified chapter are shown in underlined text for additions and strike through text for deletions. Appendix

More information

CHARTER TOWNSHIP OF PORT HURON

CHARTER TOWNSHIP OF PORT HURON CHARTER TOWNSHIP OF PORT HURON 3800 Lapeer Road Phone: (810) 987-6600 Port Huron Twp., Michigan 48060 Fax: (810) 987-6712 www.porthurontownship.org KLavigne@PortHuronTownship.org MEMORANDUM To: Chairman

More information