1 Alamogordo Desalination Project 2015 Multi State Salinity Conference Robert Fowlie, PE, BCEE February 19, 2015
2 Alamogordo Regional Water Supply Project
3 Existing Water Sources Surface Water City has 5400 AFY of surface water rights. Approximately 70 percent of the City s water supply is provided by surface water sources. Surface water comes from the Sacramento Mountains east of the City and from Bonito Lake 90 miles northeast of the City. Bonito Lake supplies approximately 25 percent of City s water supply. Bonito Lake supply lost in 2012 due to Little Bear Fire.
4 Existing Water Sources Ground Water City uses ground water to supplement surface water supply AFY of ground water rights. Ground water supplied by 9 wells. Groundwater high in TDS ( mg/l) blended with surface water. Groundwater supply affected by drought (water levels dropping, production reduced).
5
6 Bonito Lake
7 Need for Project Water Supply Need for future water supply based on concept of Firm Water Supply. Firm Water Supply the reliable withdrawal rate of acceptable quality water that can be supplied by available flows and/or storage releases from reservoirs and/or groundwater reserves throughout a critical drought period (AWWA M50). Method uses past data to estimate what can be expected in the future. Same methodology used to estimate firm supply of groundwater.
8 Need for Project Demand and Supply Requirements Projected Water Demand and Water Supply Requirements 2015 to 2050 Year Total Demand (AFY) Ground Water Supply 2 (AFY) Surface Water Supply (AFY) Additional ARSWP Supply Required (AFY) Additional ARSWP Supply Required (MGD) ,185 3,909 2, , ,626 3,909 2, , ,095 3,909 2, , ,594 3,909 2, ,122 3,909 2,525 2, ,685 3,909 2,525 3, ,279 3,909 2,525 3, ,914 3,909 2,525 4, Reference: Draft 40-Year Water Plan, Livingston Associates and John Shomaker and Associates Existing ground water sources 3- Assumes Bonito Lake is out of service until Assumes Bonito Lake is in service
9 Alamogordo Regional Water Supply Project Develop 4000 AFY of brackish groundwater from Tularosa Basin as a new source of water for the City of Alamogordo. Project to completed in phases - First phase consists of development of 1 MGD treatment plant. Future expansions to ultimate capacity of 4 MGD.
10 City of Alamogordo Desalination Treatment Plant
11 Concentrate Disposal Interim Plant will use evaporation ponds for concentrate disposal 13 acres of ponds provides storage for 4 months of plant operation (30.25 MG or 93 AF) Ponds are double lined (2-60 mil HDPE liners separated by geonet) Future expansions in production capacity will require injection well for concentrate disposal
12 Overall Site Plan
13 Regulatory Requirements Groundwater Discharge Permit required for concentrate disposal Oversight from NMED Solid Waste Bureau due to buried solid waste on plant site New Mexico Office of State Engineer (NMOSE) permit for withdrawals from Snake Tank Well Field
14 Groundwater Discharge Permit Lead agency is New Mexico Environment Department Ground Water Quality Bureau (GWQB) Permit application requires following information: Volume of discharge Quality of discharge Depth to groundwater table (most shallow) Quality of existing groundwater (TDS) Public Notice Permit requires preparation of Operational, Monitoring, Contingency, and Closure plans
15 Groundwater Discharge Permit Monitoring Construct 3 monitoring wells (one upstream of ponds, two downstream) Sample quarterly (or more frequently depending on permit) Leak detection weekly (inspection by operator) Operations solids removed from ponds every 5 years Ponds are filled simultaneously
16 Groundwater Discharge Permit Evap Ponds Contingency Plan (Discharge piping or liner failure) Isolate piping and repair Drain pond and repair liner Notify NMED! Closure Plan Cap piping, remove solids and liner Test soils under liner Fill in pond and regrade site City will abandon 2 ponds in future; use one for emergencies if injection well fails
17 Regulatory Requirements Solid Waste Bureau Plant site is located adjacent to former Alamogordo Landfill City conducted Focused Environmental Investigation during preliminary design Buried solid waste encountered throughout plant site and in area of evaporation ponds - Buried solid waste varied in depth below grade and in thickness Landfill gas was not detected in any of the LFG wells
18 Plant Site in Relation to Alamogordo Landfill
19 Focused Environmental Site Investigation
20 Regulatory Requirements Solid Waste Bureau Solid Waste Bureau wanted all solid waste removed; not cost effective Developed engineered solution acceptable to NMED Settlement Analysis of pond liner Landfill gas venting system under liner Landfill gas venting system under treatment plant Deep foundation system LFG monitors inside treatment plant building
21 Regulatory Requirements Injection Well Concentrate disposal for future expansion will be an injection well Permits for injection wells are not common in New Mexico Regulations require permit from GWQB coordination with Oil Conservation Division Class I Injection well will be required inject fluids below formation containing TDS less than 10,000 mg/l
22 Regulatory Requirements Injection Well City conducted Hydrogeologic Assessment for injection wells Suitable formations for injection at the desalination plant site ( feet bgs) Test well is required to determine thickness and characteristics of formation Detailed hydraulic analysis (groundwater flow modeling) will also be required City to pursue this option once Interim Plant is completed and producing treated water
23 Regulatory Requirements NMOSE Permit NMOSE issued permit for groundwater withdrawals from Snake Tank Well Field City is limited to 4000 AFY - can withdraw 5000 AFY in a calendar year sum of annual diversions cannot not exceed 20,000 AFY over a five year period. Permit issued based on water demand of 165 gpcd Install monitoring wells in vicinity of Snake Tank Well Field monitoring must begin before production wells are completed.
24 Project Status 30% Design is complete Ground Water Discharge Permit application has been submitted waiting for comments from NMED Construction scheduled for
High Density Polyethylene (HDPE) Lined Produced/Frac Flowback Water Evaporation Ponds
IPEC 23 Petroleum Environmental Issues & Solutions in Exploration, Production, Refining November 8-10, 2016 New Orleans, LA Hotel Monteleone High Density Polyethylene (HDPE) Lined Produced/Frac Flowback
More informationHigh Density Polyethylene (HDPE) Lined Evaporation Ponds
High Density Polyethylene (HDPE) Lined Evaporation Ponds Presented by: Neil Nowak, PE Phone: 303-221-1719 Email: nnowak@scsengineers.com Website: scsengineers.com TOPIC OF PRESENTATION: Use of High Density
More information(Instructions and explanations of bid items and sources of unit costs are provided on the back of this page.)
CLOSURE COST ESTIMATE WORKSHEET FOR MSW LANDFILL FORM 1 OWNER: TOTAL PERMITTED AREA: AREA CURRENTLY OPEN: Total Volume of Site: LARGEST AREA TO EVER BE OPEN AT ANY TIME: (use this area for estimating closure
More informationDRAFT ENVIRONMENTAL IMPACT STATEMENT SUMMARY
DRAFT ENVIRONMENTAL IMPACT STATEMENT SUMMARY Proposed Leasing of Lands at Fort Bliss, Texas for the Proposed Siting, Construction, and Operation by the City of El Paso of a Brackish Water Desalination
More informationSummary of Issues Strategies Benefits & Costs Key Uncertainties Additional Resources
Summary of Issues Strategies Benefits & Costs Key Uncertainties Additional Resources KEY POINT: Costs associated with concentrate disposal via evaporation ponds are typically excessive for all but the
More informationDesalination Concentrate Disposal Using Injection Wells: Technical Challenges
Desalination Concentrate Disposal Using Injection Wells: Technical Challenges Robert G. Maliva, Ph.D., and Scott Manahan, P.E. Schlumberger GWPC UIC Conference Sarasota, Florida (January 22-24, 2013) Smanahan@slb.com
More informationAlternative Futures for the City of La Paz, Mexico
O N T H E G R O U N D Alternative Futures for the City of La Paz, Mexico Caroline Dragoo University of Arizona and Robert Faris Harvard University La Paz, Mexico is working hard not to turn into Cabo San
More informationLANDFILL GAS CONTROL SYSTEMS: DESIGN AND CONSTRUCTION CONSIDERATIONS. Mike Bradford, P.E.
LANDFILL GAS CONTROL SYSTEMS: DESIGN AND CONSTRUCTION CONSIDERATIONS Mike Bradford, P.E. 2 Today s Agenda SOLUTIONS YOU CAN COUNT ON. PEOPLE YOU CAN TRUST. What are we controlling? FOCUS: How do we control
More informationDeep Well Injection for Concentrate Disposal. Why use injection wells for concentrate disposal?
Deep Well Injection for Concentrate Disposal Robert G. Maliva, Ph.D., P.G. RO Roundtable Meeting February 7, 2006 Why use injection wells for concentrate disposal? Often more cost-effective than other
More informationSLIDES: Status of Southern Nevada Water Authority (SNWA): Third Intake into Lake Mead and Groundwater Project
University of Colorado Law School Colorado Law Scholarly Commons Western Water Law, Policy and Management: Ripples, Currents, and New Channels for Inquiry (Martz Summer Conference, June 3-5) Getches-Wilkinson
More informationWater Issues Relating to Unconventional Oil and Gas Production
Water Issues Relating to Unconventional Oil and Gas Production John Veil 410 212 0950 john@veilenvironmental.com www.veilenvironmental.com National Research Council Workshop on the Development of Unconventional
More information12:00 noon 7. Tour of the Silicon Valley Water Advanced Water Purification Center
Joint Recycled Water Policy Advisory Committee Pat Burt, Council Member, City of Palo Alto Tom DuBois, Council Member, City of Palo Tony Estremera, Board Member, Santa Clara Valley Water District Gary
More informationDrilling for Natural Gas in the Marcellus and Utica Shales: Environmental Regulatory Basics
January 2014 Introduction This fact sheet provides a basic overview of natural gas drilling in the Marcellus and Utica Shale regions of Ohio and the potential environmental issues associated with these
More informationA HYDROLOGIST S PERSPECTIVE ON DEEP SALINE WATER EXPLORATION by Casey W. Cook Balleau Groundwater, Inc.
A HYDROLOGIST S PERSPECTIVE ON DEEP SALINE WATER EXPLORATION by Casey W. Cook Balleau Groundwater, Inc. Introduction Deep, non-potable water is defined in New Mexico as: an aquifer, the top of which aquifer
More informationRecovery & Concentrate Management
WRRC 2011 Annual Conference, Yuma AZ April 26 th & 27th Recovery & Concentrate Management A Quick Look at Three Local Projects Guy W. Carpenter, PE Vice President, Water Supply & Reuse How do we make use
More informationENVIRONMENTAL SITE ASSESSMENT QUESTIONNAIRE
100 Broadway Road, Dracut, MA 01826 ENVIRONMENTAL SITE ASSESSMENT QUESTIONNAIRE TO BE COMPLETED BY THE APPLICANT ADDRESS: 1a. Is the property used for an industrial use? 1b. Is any adjoining property used
More informationMr. Michael Malone CPS Energy 145 Navarro Street San Antonio, Texas Project No
Environmental Resources Management January 13, 2017 Mr. Michael Malone 145 Navarro Street San Antonio, Texas 78205 Project No. 0352436 CityCentre Four 840 West Sam Houston Parkway North, Suite 600 Houston,
More informationCITY OF LOVINGTON 40 YEAR WATER DEVELOPMENT PLAN
CITY OF LOVINGTON 40 YEAR WATER DEVELOPMENT PLAN by Annie M. McCoy, CPG Roger Peery, CPG Water Resource and Environmental Consultants 2611 Broadbent Parkway NE Albuquerque, New Mexico 87107 505 345 3407
More informationRaw Water Supply Master Plan Development
Raw Water Supply Master Plan Development Stakeholder Outreach Meeting - II 31 August 2016 Welcome Introductions Master Plan Goals and Objectives Refine our standard approach to long-term plan for securing
More informationCommon Oil & Gas Environmental Issues
Common Oil & Gas Environmental Issues Environment July 2, 2013 Drilling Operations Drilling operations involve creating access to hydrocarbon-bearing zones. Environment 2 1 Upstream (Production) Operations
More informationApplication For Waste Regulation (Check all that apply)
Environmental Protection and Growth Management Department ENVIRONMENTAL ENGINEERING AND PERMITTING DIVISION 1 North University Drive, Mailbox #201 Plantation, Florida 33324 954-519-1483 FAX 954-519-1412
More informationColorado River Challenges Impacts to Southern Arizona
Colorado River Challenges Impacts to Southern Arizona 2 3 4 5 Colorado River Basics 7 States, 2 Nations Annual Flow 15.0 MAF 40 Million People All of the Major Cities in Southwest 5.5m Irrigated Acres
More informationDEEP INJECTION WELL CONSTRUCTION AND OPERATION
DEEP INJECTION WELL CONSTRUCTION AND OPERATION MORGAN COUNTY PLANNING AND ZONING DEPARTMENT UIC WELL STAKEHOLDERS HAL DEMUTH, M.S. WES JANES, P.G. PETROTEK ENGINEERING CORPORATION SEPTEMBER 19, 2017 2
More informationTECHNICAL MEMORANDUM
FOR INTERNAL DISCUSSION PURPOSES ONLY TECHNICAL MEMORANDUM TO: Augusta Resource Corp. ATTENTION: Jamie Sturgess FROM: Troy Meyer Project Manager, Vector Colorado LLC (Vector) DATE: June 5, 2006 SUBJECT:
More informationMEMORANDUM. The general findings of the assessment are as follows:
November 28, 2006 MEMORANDUM Project No.: 030009-002-01 To: From: Re: WRIA 31 Planning Unit Steve Germiat, LHG, CGWP, and Timothy J. Flynn, LHG, CWGP Evaluation of Winterizing Existing River Pump/Conveyance
More informationOshkosh Water Filtration Plant Clearwells Replacement Project. Public Information Meeting October 16, 2017
Oshkosh Water Filtration Plant Clearwells Replacement Project Public Information Meeting October 16, 2017 Agenda Background City of Oshkosh Water System Need for Clearwells Replacement Project Project
More informationPrepared For: Town of Castle Valley, Utah
HYDROLOGIC ASSESSMENT OF THE SURFACE WATER AND GROUNDWATER RESOURCES OF CASTLE VALLEY, UTAH: PART 2: HESA-BASED SITING OF CULINERY WELL FOR TOWN OF CASTLE VALLEY Authors: Dr. Kenneth E. Kolm, Hydrologic
More informationAPPENDIX F NON-ROUTINE SERVICES
APPENDIX F NON-ROUTINE SERVICES Non-Routine Services means Services and maintenance that cannot be performed by the staffing assigned to carry out Routine Services and the other duties of the operator.
More informationNotice of Preparation of an Environmental Impact Report and Scoping Meeting
Notice of Preparation of an Environmental Impact Report and Scoping Meeting Date: August 15, 2017 To: Project Sponsor and Lead Agency: Staff Contact: Project Title: Location: General Plan Designation:
More informationNAVAJO NATION WATER DEVELOPMENT AND CUTTER LATERAL OF THE NAVAJO-GALLUP WATER SUPPLY PROJECT
NAVAJO NATION WATER DEVELOPMENT AND CUTTER LATERAL OF THE NAVAJO-GALLUP WATER SUPPLY PROJECT ROBERT KIRK, PRINCIPAL HYDROLOGIST WATER MANAGEMENT BRANCH OF NAVAJO DEPARTMENT OF WATER RESOURCES NOVEMBER
More informationLake County Success. support through synergistic local partnerships that not only mitigate, but also produce
Lake County Success Generating Environmental Gains With Geothermal Power By Mark Dellinger, Administrator, Lake County (CA) Sanitation District, and Eliot Allen, Principal, Criterion/Planners Engineers
More informationNAUGHTON POWER PLANT NORTH ASH POND INITIAL CLOSURE PLAN
NAUGHTON POWER PLANT NORTH ASH POND INITIAL CLOSURE PLAN Prepared for: PacifiCorp Energy Project Manager: Chad Tomlinson Date: 01 September 2016 Document No.: NP-TR-022 Quality Assurance Statement Office
More informationSMART GYPSUM STACK MANAGEMENT FROM CONCEPT TO REALITY
SMART GYPSUM STACK MANAGEMENT FROM CONCEPT TO REALITY Phong Vo, Manager - Engineering/Gypsum, Mosaic Fertilizer, LLC. 13830 Circa Crossing Drive Lithia, Florida 33547, USA and Ashraf H. Riad, Ph.D., P.E.,
More informationLeachate Management Leachate Control and Collection
Leachate Management Leachate Control and Collection Leachate Collection Sanitary landfills have leachate collection and removal system above liner At un-lined landfills and dump sites Perimeter Ditch -
More informationSubsurface Fire Identification, Assessment, and Mitigation (A Presentation of Selected Case Studies)
Subsurface Fire Identification, Assessment, and Mitigation (A Presentation of Selected Case Studies) Raymond H. Huff, R.E.P.A. Vice President - SCS Engineers SWANA NW Symposium April 2015 Outline of Presentation
More informationThe State of the Colorado River
April 2014 The State of the Colorado River Executive Summary The Colorado River Basin is now in its fifteenth year of drought. System runoff during this period has been comparable to or less than that
More informationReview of Groundwater Information in the Lower Mekong Basin
Review of Groundwater Information in the Lower Mekong Basin Khem Sothea Hydrology Team (Component-2) 17-19 February 2014 Bangkok & Khon Kean, Thailand FIRST MISSION OF USGS IN THE LMB (April 27 July 22,
More informationWATER FOOTPRINTING SUGAR BEET PROCESSING. The Amalgamated Sugar Company LLC,
WATER FOOTPRINTING SUGAR BEET PROCESSING Dean C. DeLorey The Amalgamated Sugar Company LLC, 3184 Elder Street, Boise, ID 83705 Water Footprinting Sugar Beet Processing Dean C. DeLorey Director of Environmental
More informationFACT PATTERN THE RESERVATION
FACT PATTERN THE RESERVATION Great Lakes Tribal Reservation Surrounded by Big River National Forest Big River flows through Reservation and into Big Lake General Environmental Concerns Wild rice areas
More informationMichael Weatherby, P.G., MWH, Tampa, FL
Michael Weatherby, P.G., MWH, Tampa, FL T. Barton Weiss, P.G., Hillsborough County, Tampa, FL James Duncan, P.E., Hillsborough County, Tampa, FL Philip Waller, P.E., MWH, Tampa, FL Groundwater Protection
More informationClosure Plan Ash Disposal Area PGE Boardman Power Plant
FIRST ISSUE REVISION 0 Closure Plan Ash Disposal Area PGE Boardman Power Plant Prepared for Portland General Electric September 2015 2020 SW 4th Avenue, Suite 300 Portland, Oregon 97201 This document was
More informationENVIRONMENTAL RESTORATION SERVICES FORT DETRICK, FREDERICK MD
ENVIRONMENTAL RESTORATION SERVICES FORT DETRICK, FREDERICK MD Progress Report for the RAB August 10, 2016 John Cherry Arcadis Overview of Topics Site Inspections (SI) Status Area A / Area B Area B Groundwater
More informationFort George G. Meade. Performance Based Acquisition (PBA) Five-Year Summary. Restoration Advisory Board Meeting November 20, 2014
Fort George G. Meade Performance Based Acquisition (PBA) Five-Year Summary Restoration Advisory Board Meeting November 20, 2014 Presentation Agenda PBA Site Locations CERCLA Recap CERCLA Progress during
More informationOption 11. Divert Water from Miocene and Hendricks Canal to Supply the Ridge
Integrated Water Resources Plan Option 11 Divert Water from Miocene and Hendricks Canal to Supply the Ridge This option would use water from the Miocene Canal and/or Hendricks Canal for municipal supplies
More informationJohn M. Stomp III, PE
A Dynamic Simulation Model for Integrated Water Resources Management in Albuquerque, NM John M. Stomp III, PE Chief Operating Officer, Albuquerque Bernalillo County Water Utility Authority November 2013
More informationS.O.P. No. HMD
Page: 1 of 9 PURPOSE: To establish (SOP) for submission requirements, review process and approval of applications for Non-vehicular Access Permits for the purpose of connection or discharge to any MassDOT
More informationConsiderations for hydraulic fracturing and groundwater and surface water protection: lessons learned in the U.S.
Considerations for hydraulic fracturing and groundwater and surface water protection: lessons learned in the U.S. Robert W. Puls, Ph.D. Director, Oklahoma Water Survey University of Oklahoma Hydraulic
More informationWritten Post-Closure Plan. Pawnee Station - Active CCR Landfill Public Service Company of Colorado Denver Colorado
Written Post-Closure Plan Pawnee Station - Active CCR Landfill Public Service Company of Colorado Denver Colorado October 17, 2016. Table of Contents 1.0 General Information... 1 2.0 Monitoring and Maintenance
More informationInformation Requirements Table for Liquid Waste
Applicant Summary Tracking # Authorization # Applicant / Facility Name Ministry of Environment Prepared by: Title Date The Information Requirements Table (IRT) for Liquid Waste is a tool used by Ministry
More informationFORM 4340 ENVIRONMENTAL QUESTIONNAIRE
FORM 4340 ENVIRONMENTAL QUESTIONNAIRE ENVIRONMENTAL QUESTIONNAIRE Persons to be Questioned The following questions should be asked of the current owner of the property any commercial occupant of the property
More informationApplying landforming to reclamation: A case study in Central Appalachia
Applying landforming to reclamation: A case study in Central Appalachia Leslie Hopkinson, John Quaranta April 12, 2017 Department of Civil and Environmental Engineering West Virginia University WEST VIRGINIA
More informationIndirect Reuse with Multiple Benefits The El Monte Valley Mining, Reclamation, and Groundwater Recharge Project
ABSTRACT & POWERPOINT PRESENTATION Indirect Reuse with Multiple Benefits The El Monte Valley Mining, Reclamation, and Groundwater Recharge Project Tim Smith Principal Engineer Helix Water District La Mesa,
More informationCOON CREEK WATERSHED DISTRICT PERMIT REVIEW. Spring Lake Park Schools Westwood Middle School st Avenue NE, Spring Lake Park, MN 55432
PAN 16-112, Westwood Middle School, Page 1 of 6 COON CREEK WATERSHED DISTRICT PERMIT REVIEW MEETING DATE: August 22, 2016 AGENDA NUMBER: 10 FILE NUMBER: 16-112 ITEM: Westwood Middle School RECOMMENDATION:
More informationSOUTH FLORIDA WATER MANAGEMENT DISTRICT. Question 13: Wetlands
SOUTH FLORIDA WATER MANAGEMENT DISTRICT Question 13: Wetlands 1. The wetland responses and topographical data provided in the ADA for the 520- acre project site are conceptual in nature. The referenced
More informationPennsylvania Hydraulic Fracturing State Review September, 2010
Pennsylvania Hydraulic Fracturing State Review September, 2010 TABLE OF CONTENTS INTRODUCTION 2 EXECUTIVE SUMMARY.. 4 HYDRAULIC FRACTURING Background 10 General... 10 Standards 12 Reporting 18 Staffing
More informationShale Gas (D: unkonventionelles Erdgas )
1 Shale Gas (D: unkonventionelles Erdgas ) Aus: W. Zittel (ASPO) Kurzstudie Unkonventionelles Erdgas, 2010 Shale + Tight Gas (worldwide resources) In total: shale gas volume convential gas tight gas 50%
More information1. All underground utilities under railroad tracks shall be encased in a larger pipe or conduit called the casing pipe.
MTS Jack and Bore Design Criteria Note: For the purposes of this Design Criteria and subsequent Construction Notes, the term Jack and Bore is used generically to refer to a number of trenchless construction
More informationEnvironmental Management Division. David Amidei NASA HQ
NASA s Remediation Challenges David Amidei NASA HQ Environmental Management Division i i NASA Facilities Environmental Management Division Previous Practices Environmental Management Division and more
More informationINITIAL INSPECTION REPORT ASH LANDFILL AREA SPRINGERVILLE GENERATING STATION SPRINGERVILLE, ARIZONA
INITIAL INSPECTION REPORT ASH LANDFILL AREA SPRINGERVILLE GENERATING STATION SPRINGERVILLE, ARIZONA Prepared for Tucson Electric Power Company January 19, 2016 Prepared by AMTECH Associates, L.L.C. 8666
More informationPOLK COUNTY SOUTHEAST WELLFIELD DESCRIPTION OF PROJECT PLANNING LEVEL PROJECT DETAILS. (Water Supply Options project number 28)
POLK COUNTY SOUTHEAST WELLFIELD (Water Supply Options project number 28) DESCRIPTION OF PROJECT The proposed Polk County Southeast Wellfield project includes the construction of a new water treatment plant
More informationRock Fill Layer Management and Maintenance Plan Former BNSF Site 13 Highway 99 Eugene, Oregon
Rock Fill Layer Management and Maintenance Plan 13 Highway 99 Prepared for: Half Moon LLC P.O. Box 25112 97402 PBS Project No. 51833.000 Rock Fill Layer Management and Maintenance Plan TABLE OF CONTENTS
More informationTIERED APPROACH TO EVALUATION AND MANAGEMENT OF PRODUCED WATER IMPACTS ON GROUNDWATER RESOURCES
TIERED APPROACH TO EVALUATION AND MANAGEMENT OF PRODUCED WATER IMPACTS ON GROUNDWATER RESOURCES Shawn M. Paquette, P.E., BCEE, John A. Connor, P.E., P.G., BCEE, Lisa J. Molofsky, P.G., Kenneth L. Walker,
More informationGreenfield Pond B Rehabilitation
Preliminary Investigation Report Centennial, Colorado November 15, 2011 Prepared for: Liverpool Metropolitan District Prepared by: Stantec Consulting Services, Inc. Table of Contents Executive Summary...
More informationSTANDARD SPECIFICATIONS SECTION BORING AND JACKING. A. Section includes requirements for boring and jacking casing pipe.
STANDARD SPECIFICATIONS SECTION 02445 BORING AND JACKING PART 1 GENERAL 1.1 DESCRIPTION A. Section includes requirements for boring and jacking casing pipe. 1.2 DEFINITIONS A. Carrier Pipe: Sewer or water
More informationSan Diego, A Cadillac Desert; Presentation by: Dana Fi Friehauf, fpe P.E. Water Resources Manager
San Diego, A Cadillac Desert; Sustainable Strategies for Living in a Desert Presentation by: Dana Fi Friehauf, fpe P.E. Water Resources Manager Green Lunch Bag Series September 24, 2014 San Diego County
More informationOHIO ENVIRONMENTAL PROTECTION AGENCY L PE RMIT-TO4 N STALL t
OHIO ENVIRONMENTAL PROTECTION AGENCY L PE RMIT-TO4 N STALL t * - r..- T' c!f L 3 CZ.= > F 3 c- Application Number: PTI # 03-9614 Application Received: March 1, 1996 - -? c I- Permit Fee: $80,000.00 L;
More informationMuskeg River Mine Dedicated Disposal Area (DDA) Plan for In-pit Cell 1
Muskeg River Mine Dedicated Disposal Area (DDA) Plan for In-pit Cell 1 Updated: November 2010 Directive 74 Appendix C Requirement Approval: 8512D Submitted to SHELL CANADA ENERGY MRM DDA PLAN-UPDATE NOV
More informationNewmont Mining Corporation Tailing & Heap Leach Facility Management Standard
Page No: Page 1 of 5 1 PURPOSE AND OBJECTIVES This (the Standard ) sets the minimum Newmont requirements for the design and management of tailing storage facilities (TSF) and heap leach facilities (HLF)
More informationDesign Considerations. Pursuing Dynamic Compaction. waste considered. Pursuing Dynamic Compaction. Page 1 of6
Page 1 of6 waste considered. Pursuing Dynamic Compaction Waste Age Ali Khatami, Ph.D., Bruce Clark and Myles Clewner of SCS Engineers Fri, 2013-07-19 16:26 Rapid growth of development in metropolitan areas
More informationIndian Health Service Sanitation Facilities Construction Program Wastewater Lagoon Operation & Maintenance
Indian Health Service Sanitation Facilities Construction Program Wastewater Lagoon Operation & Maintenance http://www.dsfc.ihs.gov By: Christen P. Glime, P.E., District Engineer Santa Fe District Office,
More informationCity of Redlands Wastewater Treatment Plant. Redlands, CA LOCATION: Carollo Engineers; CH2M HILL MBR MANUFACTURER: COMMENTS:
FACILITY: City of Redlands Wastewater Treatment Plant LOCATION: Redlands, CA GEO. AREA: Southern California STATUS 07/14: Operational CONSTRUCTION: ENGINEERING: Carollo Engineers; CH2M HILL MBR MANUFACTURER:
More informationSeepage Losses for the Rio Grande Project (Franklin Canal Case Study)
Seepage Losses for the Rio Grande Project (Franklin Canal Case Study) Zhuping Sheng, Ph.D., P.E. Yaqi Wanyan, M.S., EIT Luis S. Aristizabal Kadambari Reddy, M.S., EIT TAMU, Agricultural Research and Extension
More informationSulaibiya world s largest membrane water reuse project
Water Technologies & Solutions technical paper Sulaibiya world s largest membrane water reuse project background In May 2001, a consortium including Mohammed Abdulmohsin Al-Kharafi and Sons (The Kharafi
More information2015 ANNUAL ENGINEERING INSPECTION REPORT ENTERGY WHITE BLUFF PLANT CLASS 3N LANDFILL PERMIT NO S3N-R3 AFIN:
2015 ANNUAL ENGINEERING INSPECTION REPORT ENTERGY WHITE BLUFF PLANT CLASS 3N LANDFILL PERMIT NO. 0199-S3N-R3 AFIN: 35-00110 JANUARY 15, 2016 ENTERGY WHITE BLUFF PLANT CLASS 3N LANDFILL 2015 ANNUAL ENGINEERING
More informationCERTIFICATION AND FINANCING PROPOSAL
CERTIFICATION AND FINANCING PROPOSAL DRINKING WATER SYSTEM IMPROVEMENTS TOMBSTONE, ARIZONA Submitted: May 18, 2016 CERTIFICATION AND FINANCING PROPOSAL DRINKING WATER SYSTEM IMPROVEMENTS TOMBSTONE, ARIZONA
More informationNatural Gas Well Development in the Marcellus Shale: The Use of Fresh Water and Beyond
Natural Gas Well Development in the Marcellus Shale: The Use of Fresh Water and Beyond Jason de Wolfe, Chief Oil and Gas Q: How much water does the industry use to develop the Marcellus Shale? Each well
More informationPennsylvania s Chesapeake Bay Tributary Strategy Implementation Plan for Sewage Facilities Planning
The strategy outlined in this guidance document is intended to supplement existing requirements. Nothing in the strategy shall affect regulatory requirements. The information herein is not an adjudication
More informationNorthern Arizona Hydrogeology
Northern Arizona Hydrogeology Some basics Coconino Plateau Hydrogeology Flagstaff and Coconino Plateau Water Resources Well development, City of Flagstaff Effluent discharge to the Rio de Flag from Wildcat
More informationContents. Executive Summary. Section 1 - Introduction. Section 2 - Objectives. Section 3 Surficial Aquifer. Section 4 Seawater Desalination
Contents Executive Summary ES.1 ES.2 ES.3 ES.4 ES.5 ES.6 ES.7 Section 1 - Introduction Section 2 - Objectives Background... ES-1 Pros and Cons... ES-1 Schedule for Implementation of Alternative Water Supplies...
More informationTITLE 35 LEGISLATIVE RULES BUREAU OF ENVIRONMENT DIVISION OF ENVIRONMENTAL PROTECTION OFFICE OF OIL AND GAS
TITLE 35 LEGISLATIVE RULES BUREAU OF ENVIRONMENT DIVISION OF ENVIRONMENTAL PROTECTION OFFICE OF OIL AND GAS SERIES 1 MISCELLANEOUS WATER POLLUTION CONTROL RULES 35-1. General. 1.1. Scope. -- This legislative
More informationWastewater Master Facility Report. (Project Name) (Project Basin Location)
Wastewater Master Facility Report For (Project Name) (Project Basin Location) The Wastewater Master Facility Report for (Project name) dated (Date); located in the (Basin Name) Basin has been completed
More informationLyon Creek Cedar Way Stormwater Detention Dam Operation and Maintenance Manual
Lyon Creek Cedar Way Stormwater Detention Dam Operation and Maintenance Manual Prepared by: Mike Shaw Stormwater Program Manager City of Mountlake Terrace January 2010 Section I General Information This
More informationMinnesota Pollution Control Agency
Minnesota Pollution Control Agency STATE OF MINNESOTA Minnesota Pollution Control Agency MUNICIPAL DIVISION PUBLIC NOTICE OF INTENT TO REISSUE NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM (NPDES)/ STATE
More informationCoal Combustion Facility Assessment Report. October 20, 2010
Coal Combustion Facility Assessment Report October 20, 2010 Introduction Stantec Consulting Services Inc. North American Consulting Firm 10,000 Engineers, Geologists, Architects, Scientists and Technicians
More informationEngineer s Report. Santa Clara Valley Water District California Aqueduct Reverse Flow Project Project No
17 Santa Clara Valley Water District California Aqueduct Reverse Flow Project Project No. 60061007-6810 Engineer s Report February 2015 Water Utility Capital Division This page intentionally left blank.
More informationAGRUSAFE CONCRETE PROTECTIVE LINERS
AGRUSAFE CONCRETE PROTECTIVE LINERS Worldwide Competence in Plastics AGRU - Competence in Plastics AGRU Kunststofftechnik GmbH is a successful, Austrian family business with worldwide activities in production
More informationCity of Surrey, ND Municipal Infrastructure Needs Assessment September 2012
City of Surrey, ND Municipal Infrastructure Needs Assessment September 2012 Project made possible by US Dept. of HUD Regional Substantiality Planning Grant and ND Energy Development Infrastructure and
More informationENVIRONMENTAL BASELINE STUDY ANYWHERE
ENVIRONMENTAL BASELINE STUDY ANYWHERE Location: Site coordinates Area name: Official name or nick name Issued by: Organisation/unit that issue the EBS Surveyor: Organisation/unit that perform the EBS Date:
More informationWater Resources Management Strategy
Water Resources Management Strategy 5 CHAPTER 5 Alternatives CHAPTER 5 - ALTERNATIVES CHAPTER 5 5.1 Introduction and Purpose The Albuquerque Bernalillo County Water Utility Authority (Water Authority)
More informationStreamlines V2, n2 (May 1997) A Newsletter for North Carolina Water Supply Watershed Administrators
Page 1 of 5 STREAMLINES A Newsletter for North Carolina Water Supply Watershed Administrators Volume 2, Number 2 May 1997 Non-Point Source (NPS) Pollution This issue of Streamlines provides basic information
More informationThe surface water hydrology of the site has been logically divided into six phases of monitoring, analyses, and investigation as outlined below:
SURFACE WATER HYDROLOGY The surface water hydrology of the site has been logically divided into six phases of monitoring, analyses, and investigation as outlined below: Sample Station Locations and Descriptions
More informationEVALUATING NANOFILTRATION, REVERSE OSMOSIS, AND ION EXCHANGE TO MEET CONSUMPTIVE USE CONSTRAINTS AND FINISHED WATER QUALITY GOALS FOR BROWARD COUNTY
EVALUATING NANOFILTRATION, REVERSE OSMOSIS, AND ION EXCHANGE TO MEET CONSUMPTIVE USE CONSTRAINTS AND FINISHED WATER QUALITY GOALS FOR BROWARD COUNTY Frank A. Brinson, P.E., DEE, CDM, Fort Lauderdale, FL
More informationS z5a MPC&D July 31, U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C
-1 SMUD SACRAMENTO MUNICIPAL UTILITY DISTRICT 7 P. 0. Box 15830, Sacramento CA 95852-1830, (916) 452-3211 AN ELECTRIC SYSTEM SERVING THE HEART OF CALIFORNIA MPC&D 03-088 July 31, 2003 U. S. Nuclear Regulatory
More informationMadison Water Utility Pressure Zone 4 Well Siting Study
Madison Water Utility Summary of Potential Well Sites March 24 2011 Site Status Comment 1 Dairy Center In consideration Several suitable properties in this area are available. 2 Tradewinds In consideration
More information(1) All sanitary landfill facilities, at a minimum, shall include the following:
3745-27-08 Sanitary landfill facility construction. (A) Applicability. The construction requirements for a sanitary landfill facility specified in this rule are applicable to a particular facility or permit
More informationThe City of Cocoa (City) is located in east
FWRJ Reclaimed Water and Stormwater: A Perfect Pair to Meet Total Maximum Daily Load Wasteload Allocations? Danielle Honour, James Wittig, John A. Walsh, and Don Stevens Danielle Honour, P.E., D.WRE, and
More informationWastewater Flow Monitoring Services
Wastewater Flow Monitoring Services For San Gabriel, CA July 13, 2015 through July 21, 2015 Revised October 9, 2015 Leaders in Sewer Flow Monitoring Services 601 N. Parkcenter Dr., Suite 209 Santa Ana,
More informationLong Term Water Supply Board of Directors Workshop. March 10, 2015
Long Term Water Supply Board of Directors Workshop March 10, 2015 Agenda Water Supply Management Plan (WSMP) 2040 2014 Activities Use of the Freeport Regional Water Project Planning for the Future Freeport
More informationc. Sites subject to regulation under Subtitle D of RCRA. The following discharges are not authorized by this permit:
Page 1 of 6 Permit No: MNR050000 PART VII. SECTOR-SPECIFIC REQUIREMENTS The Permittee shall comply with Part VII (sector-specific requirements) for any primary SIC code and/or narrative activity and co-located
More informationState of Oregon Department of Environmental Quality
State of Oregon Department of Environmental Quality Memorandum To: Rich Muza, US Environmental Protection Agency, Region 10 Date: April 5, 2013 Through: From: Subject: Keith Johnson, NWR Cleanup Manager
More information