DELTA WASTEWATER TREATMENT PLANT UPGRADES

Size: px
Start display at page:

Download "DELTA WASTEWATER TREATMENT PLANT UPGRADES"

Transcription

1 Delta, Ohio Environmental and Electrical Engineering, Grant Administration Cost $2.6 million $3.2 million OWDA Loan 1,100 SF Admin Building Addition MGD Average Daily Flow 1.5 MGD Peak Capacity Professional Services 2013 Construction: 2014 Mike Atherine, P.E., Project Manager Steve Wonderly, P.E., Project Engineer DELTA WASTEWATER TREATMENT PLANT UPGRADES PDG was the prime consultant for the planning, design and construction of improvements to the Village of Delta s wastewater treatment plant. Work consisted of new motors, and variable frequency drives and PLC control for the four raw sewage pumps; and a new mechanical fine screen to replace the grinder and masonry building to enclose the screen. We replaced the aerated grit removal equipment with vortex style grit removal equipment, replaced the decanters in the SBR tanks and modified the influent piping to the SBR tanks, and replaced the SBR blowers. Submersible waste sludge pumps were installed in the SBR tanks. Improvements were made to the sludge holding tanks including structural rehabilitation, diffused aeration and new blowers. An ultraviolet disinfection system replaced the chlorine disinfection equipment and a new administration building with a laboratory was constructed. WWTP Upgrades Screen Replacement New Building Grant Administration Dan D. Miller, Mayor 401 Main Street Delta, Ohio (voice) (fax) mayor@villageofdelta.org

2 Put-in-Bay, Ohio Environmental and Electrical Engineering, and Construction Administration Project Cost $3.5 million PUT-IN-BAY WASTEWATER TREATMENT PLANT IMPROVEMENTS $1,192,000 OPWC/ARRA/Corps of Engineers Grants 500,000 GPD 1.32 MGD Peak Wet Weather Jack A. Jones, P.E., Principal-in-Charge Michael Atherine, P. E., Project Manager Steve Wonderly, P.E., Environmental Dan L. Knott, P.E., Electrical Doug Nusser, Construction Administration Michelle L. Hister, Grants Administration PDG was the prime consultant for the design and construction of improvements to Put-In-Bay s wastewater treatment plant. The project involved the installation of a third Sequencing Batch Reactor (SBR) treatment basin; replacement of the PLC control system, raw sewage pumps, SBR equipment in the two existing tanks, the chlorine disinfection system with an ultraviolet disinfection system; and the addition of an innovative tipping sludge de-watering system and blower building. The expanded plant has an average day capacity of 500,000 GPD and a peak wet weather capacity of 1.32 MGD. The Village received funding assistance from the American Recovery and Reinvestment Act (ARRA), Ohio Public Works Commission (OPWC), and The Corps of Engineers (Section 594) consisting of $1,192,000 in grants, and funding the remaining costs in low-interest loans. Wastewater Treatment Plant Construction Administration Construction Observation UV Disinfection System New Building Grant Administration Mr. Doug Knauer, Village Administrator Village of Put-in-Bay 157 Concord Avenue Put-in-Bay, Ohio

3 Wood County, Ohio BAIRDSTOWN WASTEWATER TREATMENT AND COLLECTION Engineering, Grant Writing/Administration Cost Engineers Estimate Contract A (gravity sewers, pump stations and force main) $2,216,000 Contract B (WWTP) $3,674,000 Bids Contract A - $1,985,438 Contract B - $3,020,000 OEPA WPCLF Principal Forgiveness ($3.49 M) CDBG OWDA unsewered communities Grant Estimated completion date October 31, 2017 Denise M. Plummer, P.E. Project Manager Steven R. Wonderly, P.E., Project Engineer Joel Sharrit, Electrical Design PDG provided design and construction engineering for the installation of sanitary sewers, 2 pump stations and a new oxidation ditch WWTP in Bloomdale that would be able to handle Bloomdale s existing flow and add the flow from the unsewered community of Bairdstown. Project Elements 6800 LF of 8 gravity sanitary sewer 27 manholes 15,500 lf of 4 force main, including 2 railroad crossings Two (2) 90 gpm submersible pump stations 100,000 gpd oxidation ditch WWTP including a screening building, oxidation ditch, 2 clarifiers, sludge holding tank, sludge drying bed and an administration building. Mr. Jerry Greiner, President Northwestern Water & Sewer District Middleton Pike Bowing Green, Ohio district@nww

4 Grafton, Ohio Environmental and Electrical Engineering, Construction Administration and Observation, Start-up Assistance Project Cost $10.5 million 1.5 MGD Daily Capacity 4.5 MGD Peak Capacity Michael Atherine, P.E., Project Manager Jack A. Jones, P.E., Principal-in-Charge Douglas A. Nusser, Construction Administration Steven R. Wonderly, P.E., Project Engineer Daniel L. Knott, P.E., Electrical Engineer WASTEWATER TREATMENT PLANT SCADA SYSTEM PDG was the prime consultant for the design and construction of phased improvements to the existing wastewater treatment plant consisting of a four-basin Sequencing Batch Reactor (SBR) type treatment process, cloth disk filter type tertiary treatment system, self-cleaning ultraviolet disinfection system, chemical feed facilities for phosphorous removal, dried sludge cake storage building, PLC based automated control system, demolition and renovation of existing treatment plant components, control building laboratory improvements, diesel engine generator standby power system, influent raw wastewater self-cleaning screen, two 400,000-gallon aerobic sludge holding tanks, computerization of plant controls, 1.5-meter-wide sludge dewatering press, 5 MG equalization basin, and miscellaneous buildings. The treatment plant has a capacity of 1.5 MGD on an average daily basis with a peak hydraulic capacity of 4.5 MGD. The project also involved modifications to sanitary sewer lines, repairs to manholes and several thousand feet of sanitary sewer extension from 12-inch to 24-inch diameter. The cloth disk filter type tertiary filter system, which is the first system in Ohio, was selected over conventional sand filters because of its compact footprint and ease of operation. WWTP Improvements Construction Administration/ Observation Building Renovations Screen Replacement SBR Treatment Process David DiVencenzo President of Council Village of Grafton

5 Grafton Wastewater Treatment Plant Improvements The project also included the design and installation of a plant Supervisory Control and Data Acquisition (SCADA) system for control, monitoring and alarming of the entire wastewater plant facility with remote monitoring via an internet connection. The SCADA system include Allen Bradley programmable logic controllers with local HMI as well as a plant wide HMI employing Wonderware software. PDG was responsible for the design of the system in clouding I/O, equipment selection, panel design, functional control description, programming requirements specification, screen requirements development, field installation design, checkout and start-up of wiring system. An independent system integrator was a responsible for the programming and system integration with plant equipment and the remote internet connection based on the design developed by PDG.

VINE STREET GRADE SEPARATION AND STORM WATER PUMP STATION

VINE STREET GRADE SEPARATION AND STORM WATER PUMP STATION 2012 Build Ohio Award Winner Industrial/Heavy Category AGC of Ohio AWARD WINNING PROJECT Location Lima, Ohio Civil, Mechanical, Electrical and Architectural Engineering $7.4 million Project Funding Funded

More information

BEFORE THE PENNSYLVANIA PUBLIC UTILITY COMMISSION : : : : : : : : : : : : : : : DIRECT TESTIMONY MICHAEL J. GUNTRUM, P.E.

BEFORE THE PENNSYLVANIA PUBLIC UTILITY COMMISSION : : : : : : : : : : : : : : : DIRECT TESTIMONY MICHAEL J. GUNTRUM, P.E. BEFORE THE PENNSYLVANIA PUBLIC UTILITY COMMISSION Application of Pennsylvania-American Water Company for (1) approval of the transfer, by sale, of substantially all of the Borough of New Cumberland s assets,

More information

Project Name: Central WWTP Capacity Improvements and CSO Reduction Project. MWS Project Number: 14-SC-0153 Last Updated: 12/19/14

Project Name: Central WWTP Capacity Improvements and CSO Reduction Project. MWS Project Number: 14-SC-0153 Last Updated: 12/19/14 Project Name: Central WWTP Capacity Improvements and CSO Reduction Project MWS Project Number: 14-SC-0153 Last Updated: 12/19/14 BACKGROUND / PURPOSE Metro Water Services (MWS), in order to comply with

More information

Wastewater Treatment. Knowledge. Commitment. Excellence.

Wastewater Treatment. Knowledge. Commitment. Excellence. Wastewater Treatment Knowledge. Commitment. Excellence. www.kcepc.com Wastewater Treatment KC s wastewater treatment group has designed, constructed, and helped to operate over 70 facilities. We work with

More information

Taylor Creek Treatment Plant. Metropolitan Sewer District of Greater Cincinnati

Taylor Creek Treatment Plant. Metropolitan Sewer District of Greater Cincinnati Taylor Creek Treatment Plant Metropolitan Sewer District of Greater Cincinnati Who is this guy and what is he talking about? Brad Blankenship Taylor Creek Operator 3.5 years MSD Operator 5.5 years (total)

More information

CHAPTER IV EXISTING SEWAGE TREATMENT FACILITIES IN THE PLANNING AREA

CHAPTER IV EXISTING SEWAGE TREATMENT FACILITIES IN THE PLANNING AREA CHAPTER IV EXISTING SEWAGE TREATMENT FACILITIES IN THE PLANNING AREA A. EXISTING FACILITIES 1. Westtown-Chester Creek Plant Westtown Township acquired the Westtown-Chester Creek Treatment Plant (WCC Plant)

More information

BEING GOOD STEWARDS: IMPROVING EFFLUENT QUALITY ON A BARRIER ISLAND. 1.0 Executive Summary

BEING GOOD STEWARDS: IMPROVING EFFLUENT QUALITY ON A BARRIER ISLAND. 1.0 Executive Summary BEING GOOD STEWARDS: IMPROVING EFFLUENT QUALITY ON A BARRIER ISLAND Brett T. Messner, PE, Tetra Tech, Inc., 201 E Pine St, Suite 1000, Orlando, FL 32801 Brett.Messner@tetratech.com, Ph: 239-851-1225 Fred

More information

Ann Arbor Wastewater Treatment Plant Facilities Renovations Project October 2017

Ann Arbor Wastewater Treatment Plant Facilities Renovations Project October 2017 Ann Arbor Wastewater Treatment Plant Facilities Renovations Project October 2017 The Facilities Master Plan was completed in 2004 and identified the need for improvements to the City of Ann Arbor s Wastewater

More information

CITY OF FORT MYERS CENTRAL ADVANCED WASTEWATER TREATMENT FACILITY

CITY OF FORT MYERS CENTRAL ADVANCED WASTEWATER TREATMENT FACILITY CITY OF FORT MYERS CENTRAL ADVANCED WASTEWATER TREATMENT FACILITY RAW SEWAGE Raw sewage is the water that flows into a wastewater treatment facility. It is made up of waste from toilets, sinks, garbage

More information

AquaPASS. Aqua MixAir System. Phase Separator. System Features and Advantages. Anaerobic. Staged Aeration. Pre-Anoxic.

AquaPASS. Aqua MixAir System. Phase Separator. System Features and Advantages. Anaerobic. Staged Aeration. Pre-Anoxic. PHASED ACTIVATED SLUDGE SYSTEM PHASED ACTIVATED SLUDGE SYSTEM Aqua-Aerobic Systems has led the industry in time-managed, biological technology since 1984. In 2004, Aqua-Aerobic applied its expertise in

More information

Best practice in monitoring process, operation and maintenance of wastewater treatment plants 12 September 2011, Bucharest

Best practice in monitoring process, operation and maintenance of wastewater treatment plants 12 September 2011, Bucharest Best practice in monitoring process, operation and maintenance of wastewater treatment plants 12 September 2011, Bucharest Steve Russell WRc PLC Swindon UK Steve.russell@wrcplc.co.uk WRc plc 2011 Plan

More information

Proposed Wastewater Treatment Facility Equipment Repair and Replacement Project

Proposed Wastewater Treatment Facility Equipment Repair and Replacement Project Proposed Wastewater Treatment Facility Equipment Repair and Replacement Project Presented August 29 th, 2016 Function of IMKWWTP Treatment Facility History Reasons for Proposed Project Why Now? Modest

More information

CHEMICAL FREE PHOSPHOROUS ELIMINSTION P-UPTAKE PROCESS

CHEMICAL FREE PHOSPHOROUS ELIMINSTION P-UPTAKE PROCESS CHEMICAL FREE PHOSPHOROUS ELIMINSTION P-UPTAKE PROCESS 2013 Florida Water Resources Conference Albert Bock Panama City, Florida, 32404 (407) 913 1495, info@aquaconeer.com 1 Introduction: Today Bay County

More information

Tour of Regional Water Reclamation Facility

Tour of Regional Water Reclamation Facility Name: Date: Tour of Regional Water Reclamation Facility High School Physical Science Fall Module 3 Regional Water Reclamation Facility NGSSS Big Idea: Standard 17 Interdependence Benchmark Code & Description:

More information

THE WASTEWATER MANAGEMENT IMPROVEMENT PROJECT OF DARKHAN CITY

THE WASTEWATER MANAGEMENT IMPROVEMENT PROJECT OF DARKHAN CITY THE WASTEWATER MANAGEMENT IMPROVEMENT PROJECT OF DARKHAN CITY Asian Development Bank Ministry of Construction and Urban Development Governor s Office of the Darkhan Uul aimag Project Goals, Outcomes and

More information

Facilities Plan. Technical Memorandum No. TM-WW-7 Hydraulic Analysis and Effluent Pump Station

Facilities Plan. Technical Memorandum No. TM-WW-7 Hydraulic Analysis and Effluent Pump Station City of St. Joseph, Missouri Hydraulic Analysis and Effluent Pump Station By Work Order No. 09-001 B&V Project 163509 May 20, 2010 Table of Contents 1.0 Executive Summary...1 2.0 Purpose of Study...2 3.0

More information

CITY OF OXFORD WASTEWATER TREATMENT FACILITY ANNUAL PERFORMANCE REPORT FOR THE CALENDAR YEAR OF 2012

CITY OF OXFORD WASTEWATER TREATMENT FACILITY ANNUAL PERFORMANCE REPORT FOR THE CALENDAR YEAR OF 2012 CITY OF OXFORD WASTEWATER TREATMENT FACILITY ANNUAL PERFORMANCE REPORT FOR THE CALENDAR YEAR OF 2012 PREPARED: January 2013 2012 ANNUAL PERFORMANCE REPORT FOR THE CITY OF OXFORD WASTEWATER TREATMENT FICILITY

More information

Advanced Wastewater Treatment Plant Plant Profile

Advanced Wastewater Treatment Plant Plant Profile Advanced Wastewater Treatment Plant Plant Profile 2008 Brief History Wastewater treatment started in Penticton in 1948 with a Package Primary / Secondary plant at what is now the Alberni Lift Station.

More information

Eco-Efficient Solids Separation

Eco-Efficient Solids Separation Eco-Efficient Solids Separation Benchmarking water solutions THREE CRITICAL PROCESSES In a Salsnes Filter system SOLIDS SEPARATION, SLUDGE THICKENING and DEWATERING are performed in one compact unit, removing,

More information

Copies: Mark Hildebrand (NCA) ARCADIS Project No.: April 10, Task A 3100

Copies: Mark Hildebrand (NCA) ARCADIS Project No.: April 10, Task A 3100 MEMO To: Jeff Pelz (West Yost) Kathryn Gies (West Yost) Copies: Mark Hildebrand (NCA) ARCADIS U.S., Inc. 200 Harvard Mills Square Suite 430 Wakefield Massachusetts 01880 Tel 781 224 4488 Fax 781 224 3033

More information

Dynamic Hydraulic Modeling of a Wastewater Treatment Plant. City of Fort Worth Case Study

Dynamic Hydraulic Modeling of a Wastewater Treatment Plant. City of Fort Worth Case Study Dynamic Hydraulic Modeling of a Wastewater Treatment Plant City of Fort Worth Case Study AGENDA Drivers for a Dynamic Integrated Large WWTP Hydraulic Model Model Development Modeling Conduits and Bends

More information

GRIT HAPPENS: KNOW HOW TO DEAL WITH IT

GRIT HAPPENS: KNOW HOW TO DEAL WITH IT GRIT HAPPENS: KNOW HOW TO DEAL WITH IT A CASE STUDY ON SELECTION OF GRIT REMOVAL SYSTEMS FOR WWTPs Murali Erat, P.E. November 18, 2014 Outline What is Grit? Characteristics of Grit Grit Removal Technologies

More information

Eco-Efficient Solids Separation

Eco-Efficient Solids Separation Eco-Efficient Solids Separation Benchmarking water solutions THREE CRITICAL PROCESSES In a Salsnes Filter system SOLIDS SEPARATION, SLUDGE THICKENING and DEWATERING are performed in one compact unit, removing,

More information

TABLE OF CONTENTS SCHEDULE 18 (TECHNICAL REQUIREMENTS) DBFO AGREEMENT SECTION 2 - WATER AND WASTEWATER SYSTEMS EXECUTION VERSION

TABLE OF CONTENTS SCHEDULE 18 (TECHNICAL REQUIREMENTS) DBFO AGREEMENT SECTION 2 - WATER AND WASTEWATER SYSTEMS EXECUTION VERSION TABLE OF CONTENTS 2. Description of Water and Wastewater Systems... 2 2.1 General... 2 2.2 Existing Facilities Reference and Record Documents... 2 2.3 Existing Infrastructure Location and Legal Description...

More information

Anaerobic Digester Optimization with Bio-Organic Catalyst. NYWEA 81 st Annual Meeting February 3, 2009 One Year Study November 07 - November 08

Anaerobic Digester Optimization with Bio-Organic Catalyst. NYWEA 81 st Annual Meeting February 3, 2009 One Year Study November 07 - November 08 Anaerobic Digester Optimization with Bio-Organic Catalyst NYWEA 81 st Annual Meeting February 3, 2009 One Year Study November 07 - November 08 Municipal Anaerobic Digester Optimization Program Index! Overview

More information

Alexandria Sewage Lagoon Treatment Facility Municipal Class C Environmental Assessment Public Information Centre #2 Welcome!

Alexandria Sewage Lagoon Treatment Facility Municipal Class C Environmental Assessment Public Information Centre #2 Welcome! Alexandria Sewage Lagoon Treatment Facility Municipal Class C Environmental Assessment Public Information Centre #2 Welcome! Municipal Class Environmental Assessment Status We are Here Study Overview The

More information

Northfield Township WWTP Capacity Evaluation Report

Northfield Township WWTP Capacity Evaluation Report Northfield Township WWTP Capacity Evaluation Report March 18, 2015 PRESENTED TO PRESENTED BY Northfield Township 8350 Main Street Suite A Whitmore Lake, Michigan 48189 Tetra Tech 710 Avis Drive Suite 100

More information

membrane bioreactor performance compared to conventional wastewater treatment

membrane bioreactor performance compared to conventional wastewater treatment Water Technologies & Solutions technical paper membrane bioreactor performance compared to conventional wastewater treatment Authors: Thomas C. Schwartz and Brent R. Herring, Woodard and Curran Incorporated

More information

Sulaibiya world s largest membrane water reuse project

Sulaibiya world s largest membrane water reuse project Water Technologies & Solutions technical paper Sulaibiya world s largest membrane water reuse project background In May 2001, a consortium including Mohammed Abdulmohsin Al-Kharafi and Sons (The Kharafi

More information

New York State Department of Environmental Conservation

New York State Department of Environmental Conservation May 2012 New York State Department of Environmental Conservation Award Submission for Environmental Excellence Awards Port Washington Water Pollution Control District (PWWPCD) Submitted by D&B Engineers

More information

Special Report MUB WWTP Expansion and Upgrade Evaluation of Alternatives

Special Report MUB WWTP Expansion and Upgrade Evaluation of Alternatives Special Report MUB WWTP Expansion and Upgrade Evaluation of Alternatives Introduction The expansion and upgrade of the MUB Wastewater Treatment Plant (WWTP) is a critical component of MUB s response to

More information

A COMPARATIVE PERFORMANCE STUDY OF TWO TYPES OF CLOTH FILTER MEDIA APPLIED IN MUNICIPAL WASTEWATER TREATMENT

A COMPARATIVE PERFORMANCE STUDY OF TWO TYPES OF CLOTH FILTER MEDIA APPLIED IN MUNICIPAL WASTEWATER TREATMENT A COMPARATIVE PERFORMANCE STUDY OF TWO TYPES OF CLOTH FILTER MEDIA APPLIED IN MUNICIPAL WASTEWATER TREATMENT Hui Lin, P.E., Matthew Castillo, Lloyd W. Johnson, P.E., MPD Aqua-Aerobic Systems, Inc., 6306

More information

Need-to-Know Criteria Wastewater Treatment Operator Class III

Need-to-Know Criteria Wastewater Treatment Operator Class III 2017 Need-to-Know Criteria Wastewater Treatment Operator Class III A Need-to-Know Guide when preparing for the ABC Wastewater Treatment Operator Class III Certification Exam Before You Dive In What is

More information

FAYOUM CITY SEWAGE TREATMENT PLANT, DEVELOPMENT STAGES, CASE STUDY

FAYOUM CITY SEWAGE TREATMENT PLANT, DEVELOPMENT STAGES, CASE STUDY FAYOUM CITY SEWAGE TREATMENT PLANT, DEVELOPMENT STAGES, CASE STUDY Ahmed El-Zayat, Environmental Engineering Group, Egypt Emaill: ahmed_el_zayat@yahoo.com Introduction This case study focuses on three

More information

Comparison on the Treatment Performance of Full-scale Sewage Treatment Plants using Conventional and Modified Activated Sludge Processes

Comparison on the Treatment Performance of Full-scale Sewage Treatment Plants using Conventional and Modified Activated Sludge Processes Comparison on the Treatment Performance of Full-scale Sewage Treatment Plants using Conventional and Modified Activated Sludge Processes FATIHAH SUJA 1, RAKMI ABDUL RAHMAN 2 AND OTHMAN JAAFAR 3 1,3 Department

More information

Energy Optimized Resource Recovery Project Presented By: Curtis Czarnecki, P.E.

Energy Optimized Resource Recovery Project Presented By: Curtis Czarnecki, P.E. Kenosha Wastewater Treatment Plant Energy Optimized Resource Recovery Project Presented By: Curtis Czarnecki, P.E. Kenosha Water Utility March 22, 2016 WWTP Service Area Overview Population: 110,000 Service

More information

REQUEST FOR QUALIFICATIONS -ENGINEERING DESIGN SERVICES-

REQUEST FOR QUALIFICATIONS -ENGINEERING DESIGN SERVICES- BUCKSKIN SANITARY DISTRICT Parker, Arizona PUBLIC NOTICE FOR PROFESSIONAL ENGINEERING SERVICES REQUEST FOR QUALIFICATIONS -ENGINEERING DESIGN SERVICES- PHASE 5&6 WASTEWATER TREATMENT PLANT DESIGN Chairman

More information

AUTHORITY OF THE BOROUGH OF CHARLEROI WASHINGTON COUNTY, PENNSYLVANIA ACT 537 SEWAGE FACILITIES PLAN UPDATE

AUTHORITY OF THE BOROUGH OF CHARLEROI WASHINGTON COUNTY, PENNSYLVANIA ACT 537 SEWAGE FACILITIES PLAN UPDATE PLAN SUMMARY AUTHORITY OF THE BOROUGH OF CHARLEROI WASHINGTON COUNTY, PENNSYLVANIA ACT 537 SEWAGE FACILITIES PLAN UPDATE The Pennsylvania Sewage Facilities Act (Act 537) was enacted by the Pennsylvania

More information

Hillsdale Wastewater Treatment Plant

Hillsdale Wastewater Treatment Plant Hillsdale Wastewater Treatment Plant SRF Project Plan Public Hearing sdgfdgdf June 10, 2014 Presented by: Jeff Pugh, PE and Elaine Venema, PE Synopsis/Agenda Purpose of Presentation Project Background

More information

Ellis Creek Water Recycling Facility, City of Petaluma

Ellis Creek Water Recycling Facility, City of Petaluma Ellis Creek Water Recycling Facility, City of Petaluma Historical Timeline Facility Treatment Processes / Flow Schematics Challenges of Wetlands Dechlorination Mode of Operation Benefits of Natural Dechlorination

More information

I am writing in response to your request for a Revenue Legal Opinion addressing the Sales Tax on the Wastewater Treatment equipment.

I am writing in response to your request for a Revenue Legal Opinion addressing the Sales Tax on the Wastewater Treatment equipment. STATE OF ARKANSAS REVENUE LEGAL COUNSEL Department of Finance Post Office Box 1272, Room 2380 Little Rock, Arkansas 72203-1272 and Administration Phone: (501) 682-7030 Fax: (501) 682-7599 http://dfa.arkansas.gov

More information

OPERATIONS OVERVIEW TABLE 1-1 ANTICIPATED FLOW RATES. Design Flows (mgd)

OPERATIONS OVERVIEW TABLE 1-1 ANTICIPATED FLOW RATES. Design Flows (mgd) OPERATIONS OVERVIEW PURPOSE OF THE TREATMENT PLANT The Moundsville WWTP has been designed to protect the waters of the Ohio River from direct raw sewage discharges. To accomplish this, the treatment process

More information

CEDAR CREEK Wastewater Treatment Facility

CEDAR CREEK Wastewater Treatment Facility CEDAR CREEK Wastewater Treatment Facility Where does the waste originate Private homes Businesses from? Condominium complexes Nursing homes Apartments ANY DWELING THAT USES WATER AND IS CONNECTED TO THE

More information

Municipal Installations

Municipal Installations Municipal Installations Eco-efficient solids separation ABOUT SALSNES FILTER Over 25 years ago, we designed the first rotating belt filter to provide customers with a highly efficient and reliable technology

More information

WEFTEC.06. **Cobb County Water System, Marietta, Georgia

WEFTEC.06. **Cobb County Water System, Marietta, Georgia CHEMICALLY ENHANCED PRIMARY TREATMENT FOR A LARGE WATER RECLAMATION FACILITY ON A CONSTRICTED SITE - CONSIDERATIONS FOR DESIGN, START-UP, AND OPERATION ABSTRACT Jeffrey A. Mills, P.E., BCEE,* Roderick

More information

Nutrient Removal Processes MARK GEHRING TECHNICAL SALES MGR., BIOLOGICAL TREATMENT

Nutrient Removal Processes MARK GEHRING TECHNICAL SALES MGR., BIOLOGICAL TREATMENT Nutrient Removal Processes MARK GEHRING TECHNICAL SALES MGR., BIOLOGICAL TREATMENT Presentation Outline 1. Nutrient removal, treatment fundamentals 2. Treatment strategies Treatment methods: CAS, SBR,

More information

Energy Efficiency in Wastewater Treatment

Energy Efficiency in Wastewater Treatment Energy Efficiency in Wastewater Treatment October 09, 2012 3pm Eastern Moderators: Joel Rogers, Center on Wisconsin Strategy (COWS) James Irwin, Center on Wisconsin Strategy (COWS) Agenda Welcome Introduction

More information

Sanitary Sewer Extensions, Lift Stations, and Force Mains Engineering Report Form. I. General Information. 1. Name of Facility:

Sanitary Sewer Extensions, Lift Stations, and Force Mains Engineering Report Form. I. General Information. 1. Name of Facility: Oklahoma Department of Environmental Quality Water Quality Division Phone: 405-702-8100 Construction Permitting Section 707 N. Robinson, OKC, OK 73102-6010 P.O. Box 1677, OKC, OK 73101-1677 Sanitary Sewer

More information

Kenosha Wastewater Treatment Plant - Energy Optimized Resource Recovery Project

Kenosha Wastewater Treatment Plant - Energy Optimized Resource Recovery Project Kenosha Wastewater Treatment Plant - Energy Optimized Resource Recovery Project Prepared By: Curt Czarnecki, P.E. Kenosha Water Utility Presented By: Joseph Hughes, P.E. Centrisys Corporation MIWEA June

More information

AQUAROBIC MINI-PLANT TM

AQUAROBIC MINI-PLANT TM AQUAROBIC MINI-PLANT TM Process Description The Mini-Plant TM is a Sequential Batch Reactor (SBR) system, controlled by a factory set programmer that regulates aeration, settling, and pump functions. The

More information

First things first.. A Brief Overview of the PTI Program. Why offer training? PTI Survey Results. Today s Main Topics:

First things first.. A Brief Overview of the PTI Program. Why offer training? PTI Survey Results. Today s Main Topics: The Ohio EPA Division of Surface Water Presents: First things first.. Can I have your attention??? What You Need to Know About a Permit to Install (PTI) Application A Brief Overview of the PTI Program

More information

City of Staples, Minnesota

City of Staples, Minnesota Wastewater Treatment Facility Plan November 2012 City of Staples, Minnesota Bolton & Menk kproject No. W13.104619 104619 TABLE OF CONTENTS SECTION 1 INTRODUCTION... 1-1 A. Purpose... 1-1 B. Background...

More information

Buffalo Sewer Authority. David P. Comerford General Manager

Buffalo Sewer Authority. David P. Comerford General Manager Buffalo Sewer Authority David P. Comerford General Manager Introduction Like it has since its inception in 1938, the Buffalo Sewer Authority has successfully safeguarded the public health and protected

More information

City of Redlands Wastewater Treatment Plant. Redlands, CA LOCATION: Carollo Engineers; CH2M HILL MBR MANUFACTURER: COMMENTS:

City of Redlands Wastewater Treatment Plant. Redlands, CA LOCATION: Carollo Engineers; CH2M HILL MBR MANUFACTURER: COMMENTS: FACILITY: City of Redlands Wastewater Treatment Plant LOCATION: Redlands, CA GEO. AREA: Southern California STATUS 07/14: Operational CONSTRUCTION: ENGINEERING: Carollo Engineers; CH2M HILL MBR MANUFACTURER:

More information

Outline. Introduction Case Studies. Anoxic Zone Mixing Channel Mixing. Theory and Criteria. Mixing Theory Design Criteria.

Outline. Introduction Case Studies. Anoxic Zone Mixing Channel Mixing. Theory and Criteria. Mixing Theory Design Criteria. Outline Introduction Case Studies Anoxic Zone Mixing Channel Mixing Theory and Criteria Mixing Theory Design Criteria Recommendations Where Do We Mix at WWTPs? Introduction Flow Equalization Tanks Headworks

More information

A H. Marcela Velázquez-Carrillo Consultant to Mountain Systems Inc. on the application of Proficy for Water Treatment

A H. Marcela Velázquez-Carrillo Consultant to Mountain Systems Inc. on the application of Proficy for Water Treatment WASTEWATER TREATMENT IINORMATIION TECHNOLOGY SUEZ, parent company of United Water ONDEO, is one of the largest water and wastewater treatment firms in the world. On January 5 th, 1998, United Water Milwaukee

More information

PEIRCE ISLAND WASTEWATER TREATMENT FACILITY UPGRADE

PEIRCE ISLAND WASTEWATER TREATMENT FACILITY UPGRADE REQUEST FOR QUALIFICATIONS CITY OF PORTSMOUTH NEW HAMPSHIRE Public Works Department ENGINEERING SERVICES PEIRCE ISLAND WASTEWATER TREATMENT FACILITY UPGRADE VALUE ENGINEERING REVIEW RFQ No. 59-14 City

More information

Minnesota Pollution Control Agency

Minnesota Pollution Control Agency Minnesota Pollution Control Agency STATE OF MINNESOTA Minnesota Pollution Control Agency MUNICIPAL DIVISION PUBLIC NOTICE OF INTENT TO REISSUE NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM (NPDES)/ STATE

More information

6 WASTEWATER. 6.1 Overview. 6.2 Darvill Wastewater Works

6 WASTEWATER. 6.1 Overview. 6.2 Darvill Wastewater Works 6 WASTEWATER 6.1 Overview Umgeni Water currently owns and operates the Darvill and Ixopo Wastewater Works (WWWs). It also operates the Howick WWW for umgungundlovu District Municipality under a management

More information

ENVIRONMENTAL VISITATION CENTER ALEGRIA WWTP

ENVIRONMENTAL VISITATION CENTER ALEGRIA WWTP ENVIRONMENTAL VISITATION CENTER ALEGRIA WWTP ENVIRONMENTAL VISITATION CENTER ALEGRIA WWTP The new CEDAE, offering to the public the Environmental Visitation Center at Alegria WWTP, seals its commitment

More information

Appendix A EXAMPLE COLLECTION SYSTEM PERFORMANCE INDICATOR DATA COLLECTION FORM

Appendix A EXAMPLE COLLECTION SYSTEM PERFORMANCE INDICATOR DATA COLLECTION FORM Appendix A EXAMPLE COLLECTION SYSTEM PERFORMANCE INDICATOR DATA COLLECTION FORM EXAMPLE COLLECTION SYSTEM PERFORMANCE INDICATOR DATA COLLECTION FORM I. General Information A. Agency Name B. Agency Address

More information

Conceptual Design for a Future Wastewater Treatment Plant

Conceptual Design for a Future Wastewater Treatment Plant Wastewater Master Plan DWSD Project No. CS-1314 Conceptual Design for a Future Wastewater Treatment Plant Technical Memorandum Original Date: April 1, 2003 Revision Date: September 2003 Author: CDM Table

More information

Tour of Altamonte Springs Regional Water Reclamation Facility

Tour of Altamonte Springs Regional Water Reclamation Facility Name: Date: Tour of Altamonte Springs Regional Water Reclamation Facility Middle School Earth Science Spring Module 3 Regional Water Reclamation Facility NGSSS Big Idea: Big Idea 2 The Characteristics

More information

STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY FINDINGS OF FACT

STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY FINDINGS OF FACT STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY IN THE MATTER OF THE DECISION ON THE NEED FOR AN ENVIRONMENTAL IMPACT STATEMENT FOR THE PROPOSED LESTER PRAIRIE WASTEWATER TREATMENT FACILITY EXPANSION

More information

Aqua MSBR MODIFIED SEQUENCING BATCH REACTOR

Aqua MSBR MODIFIED SEQUENCING BATCH REACTOR MODIFIED SEQUENCING BATCH REACTOR MODIFIED SEQUENCING BATCH REACTOR For over three decades, Aqua-Aerobic Systems has led the industry in sequencing batch reactor technology with performance proven and

More information

Sanitary Sewer Systems. Sewage Collection System. Types of Sewage 10/12/2016. General Overview

Sanitary Sewer Systems. Sewage Collection System. Types of Sewage 10/12/2016. General Overview Sanitary Sewer Systems General Overview Sewage Collection System Pipes Pumping stations Maintenance entry points manholes Types of Sewage Sanitary Domestic sewage: human wastes and washwater from public

More information

CHAPTER 12 TRICKLING FILTER PLANTS

CHAPTER 12 TRICKLING FILTER PLANTS CHAPTER 12 TRICKLING FILTER PLANTS TM 5-814-3/AFM 88-11, Volume III 12-1. General considerations. Trickling filter plants have been justified by their low initial cost, low operating and maintenance costs,

More information

TWO YEARS OF BIOLOGICAL PHOSPHORUS REMOVAL WITH AN ADVANCED MSBR SYSTEM AT THE SHENZHEN YANTIAN WASTEWATER TREATMENT PLANT

TWO YEARS OF BIOLOGICAL PHOSPHORUS REMOVAL WITH AN ADVANCED MSBR SYSTEM AT THE SHENZHEN YANTIAN WASTEWATER TREATMENT PLANT TWO YEARS OF BIOLOGICAL PHOSPHORUS REMOVAL WITH AN ADVANCED MSBR SYSTEM AT THE SHENZHEN YANTIAN WASTEWATER TREATMENT PLANT Chester Yang, Ph.D., Gaowei Gu, Baowei Li, Hongyuan Li, Wanshen Lu, Lloyd Johnson,

More information

Case History: Anaerobic and Aerobic Treatment of Textile Wastes at South Carolina Textile Plants. Introduction

Case History: Anaerobic and Aerobic Treatment of Textile Wastes at South Carolina Textile Plants. Introduction Case History: Anaerobic and Aerobic Treatment of Textile Wastes at South Carolina Textile Plants Charles C. Ross, P.E. Environmental Treatment Systems, Inc. Atlanta, Georgia John S. Cox, P.E. John S. Cox

More information

by M k h GROVER Degremont

by M k h GROVER Degremont Innovative Technologies for Urban Waste Water Treatment by M k h GROVER Mukesh Degremont 4th March2013 Sewage a complex waste water URBAN WASTE WATER - SEWAGE Source of Foul odour Infectious Diseases Surface

More information

Wastewater Master Facility Report. (Project Name) (Project Basin Location)

Wastewater Master Facility Report. (Project Name) (Project Basin Location) Wastewater Master Facility Report For (Project Name) (Project Basin Location) The Wastewater Master Facility Report for (Project name) dated (Date); located in the (Basin Name) Basin has been completed

More information

Startup of Virginia's Newest Organics Co-Digestion Facility. Dennis Clough, Energy Systems Group George Bevington, Gerhardt, LLC

Startup of Virginia's Newest Organics Co-Digestion Facility. Dennis Clough, Energy Systems Group George Bevington, Gerhardt, LLC Startup of Virginia's Newest Organics Co-Digestion Facility Dennis Clough, Energy Systems Group George Bevington, Gerhardt, LLC FWSA the Next 20 Years $14,000,000.00 $12,000,000.00 $10,000,000.00 $8,000,000.00

More information

Decentralized WW Management: Issues for Small-Scale WWTPs. Mike Stephens MWEA Local Sections Committee Frankenmuth, MI

Decentralized WW Management: Issues for Small-Scale WWTPs. Mike Stephens MWEA Local Sections Committee Frankenmuth, MI Decentralized WW Management: Issues for Small-Scale WWTPs Mike Stephens MWEA Local Sections Committee Frankenmuth, MI Topics What is Decentralized Wastewater Treatment? What are small-scale facilities?

More information

BOC Hydrogen Sulfide Odor Control Reduction Program

BOC Hydrogen Sulfide Odor Control Reduction Program CASE STUDY bio-organic.com BOC Hydrogen Sulfide Odor Control Reduction Program GILLETTE STADIUM WWTP COMPLEX Executive Summary-Conditions A modified SBR with membranes waste water plant is operated by

More information

Typed Resource Definitions Public Works Teams. Federal Emergency Management Agency (FEMA) 508-7

Typed Resource Definitions Public Works Teams. Federal Emergency Management Agency (FEMA) 508-7 Typed Resource Definitions Public Works Teams Federal Emergency Management Agency (FEMA) 508-7 NIMS Overview The National Incident Management System (NIMS) provides a consistent nationwide template to

More information

WASTEWATER DISINFECTION

WASTEWATER DISINFECTION WASTEWATER DISINFECTION Proven UV Solutions for Low Quality Effluent & Large Flows Selected for some of the world's largest & most challenging treatment applications Trojan Technologies is an ISO 9001:

More information

Prepared for: Stanislaus County th Street Modesto, CA (209)

Prepared for: Stanislaus County th Street Modesto, CA (209) CROWS LANDING INDUSTRIAL BUSINESS PARK SANITARY SEWER INFRASTRUCTURE AND FACILITIES STUDY November 30, 2017 by AECOM Technical Services, Inc. 2020 L Street, Suite 400 Sacramento, CA 95811 (916) 414-5800

More information

Pittsburgh Water Treatment Plant Projects. by Jay R. Lucas, P.E. Senior Project Manager

Pittsburgh Water Treatment Plant Projects. by Jay R. Lucas, P.E. Senior Project Manager Pittsburgh Water Treatment Plant Projects by Jay R. Lucas, P.E. Senior Project Manager Who Is American Water We are the largest publicly traded water and wastewater utility in the United States Broad national

More information

Norwalk, CT Water Pollution Control Facility (WPCF) CSO Capacity and Treatment Evaluation. Subject: Task 3 Existing Grit Removal System Assessment

Norwalk, CT Water Pollution Control Facility (WPCF) CSO Capacity and Treatment Evaluation. Subject: Task 3 Existing Grit Removal System Assessment A Technical Memorandum Date: Project: Norwalk, CT Water Pollution Control Facility (WPCF) CSO Capacity and Treatment Evaluation Subject: Task 3 Existing Grit Removal System Assessment This memorandum presents

More information

Wastewater Treatment Plant Facility Plan Update City Project # City of Liberty, Missouri May 6, 2013

Wastewater Treatment Plant Facility Plan Update City Project # City of Liberty, Missouri May 6, 2013 Wastewater Treatment Plant Facility Plan Update City Project #11-013 City of Liberty, Missouri May 6, 2013 Background 2 HDR Begins Feasibility Study to Evaluate Construction of a New Wastewater Treatment

More information

Streamlining I/I Repairs in Berlin Charter Township

Streamlining I/I Repairs in Berlin Charter Township Case Study: Streamlining I/I Repairs in Berlin Charter Township Presented by: Rich Grant, PE Agenda Discussion of the problems & the SAW I/I Evaluation & SSES = Asset Management Groundtruthing of Results

More information

City of Grenora, ND Municipal Infrastructure Needs Assessment August 2012

City of Grenora, ND Municipal Infrastructure Needs Assessment August 2012 City of Grenora, ND Municipal Infrastructure Needs Assessment August 2012 Project made possible by US Dept. of HUD Regional Substantiality Planning Grant and ND Energy Development Infrastructure and Impact

More information

City of Surrey, ND Municipal Infrastructure Needs Assessment September 2012

City of Surrey, ND Municipal Infrastructure Needs Assessment September 2012 City of Surrey, ND Municipal Infrastructure Needs Assessment September 2012 Project made possible by US Dept. of HUD Regional Substantiality Planning Grant and ND Energy Development Infrastructure and

More information

Air Lift Pumps (Grit Pump) ST-027

Air Lift Pumps (Grit Pump) ST-027 Air Lift Pumps (Grit Pump) ST-027 I. Grit removal facilities at Gilroy/Morgan Hill Plant. a. Aerated grit chambers and appurtenant equipment. 1. 2 grit tanks 2. Effective volume 47,713 Gal each. 3. Aeration

More information

Sludge Co-Thickening and Biogas Cogeneration in the Electric City

Sludge Co-Thickening and Biogas Cogeneration in the Electric City Sludge Co-Thickening and Biogas Cogeneration in the Electric City by Vincent Apa Electricity and the Light Bulb In 1879, Thomas Edison produced a reliable, long-lasting source of light using lower current

More information

Proceedings of the 4th Annual Texas Water Reuse Conference. A Case Study for Decentralized Wastewater Treatment Plants in Sugar Land, Texas

Proceedings of the 4th Annual Texas Water Reuse Conference. A Case Study for Decentralized Wastewater Treatment Plants in Sugar Land, Texas Proceedings of the 4th Annual Texas Water Reuse Conference A Case Study for Decentralized Wastewater Treatment Plants in Sugar Land, Texas Michael Rolen, P.E. Page 1 Reasons for this Study Subsidence issues

More information

ASSET MANAGEMENT PROGRAM

ASSET MANAGEMENT PROGRAM ASSET MANAGEMENT PROGRAM MAKING IT PRACTICAL & USEFUL NORTHERN MICHIGAN OPERATORS SEMINAR Sam Bender Fleis & VandenBrink September 29, 2016 What is asset management and why should I care about it? Asset

More information

Nutrient Removal Enhancement Using Process Automation at Holly Hill

Nutrient Removal Enhancement Using Process Automation at Holly Hill F W R J Nutrient Removal Enhancement Using Process Automation at Holly Hill Brad T. Blais, Kevin A. Lee, John E. Olson, and David W. Dubey The City of Holly Hill, located on the Atlantic Coast just north

More information

Economics, Design, and Operation of Sewage-Treatment Plants W. E. Ross

Economics, Design, and Operation of Sewage-Treatment Plants W. E. Ross Economics, Design, and Operation of Sewage-Treatment Plants W. E. Ross Superintendent, Treatment Plant Richmond, Indiana In view of all the stress placed on post-war planning and construction, it was thought

More information

Prepared by the Operation of Municipal Wastewater Treatment Plants Task Force of the Water Environment Federation

Prepared by the Operation of Municipal Wastewater Treatment Plants Task Force of the Water Environment Federation Operation of Municipal Wastewater Treatment Plants WEF Manual of Practice No. 11 Chapter 31 Aerobic Digestion Sixth Edition Prepared by the Operation of Municipal Wastewater Treatment Plants Task Force

More information

SEWER SYSTEM DESIGN GUIDELINES

SEWER SYSTEM DESIGN GUIDELINES SEWER SYSTEM DESIGN GUIDELINES PART 1 GENERAL 1.1 GENERAL GUIDELINES A. The following sewer system design guidelines are based on Federal, State and Local health requirements, and the Berkeley County Water

More information

International Joint Commission Water & Wastewater Treatment Best Management Practices Forum Monday, March 26, 2012 Wayne State University, Detroit MI

International Joint Commission Water & Wastewater Treatment Best Management Practices Forum Monday, March 26, 2012 Wayne State University, Detroit MI STARTUP AND OPERATION OF A BIOLOGICAL AERATED FILTER (BAF) FOR SIMULTANEOUS BOD REMOVAL AND NITRIFICATION AT THE LOU ROMANO WATER RECLAMATION PLANT WINDSOR ONTARIO CANADA International Joint Commission

More information

Renovation of the Filters at the Soldier Canyon Filter Plant in Fort Collins, Colorado

Renovation of the Filters at the Soldier Canyon Filter Plant in Fort Collins, Colorado JUST ADD WATER Renovation of the Filters at the Soldier Canyon Filter Plant in Fort Collins, Colorado Thomas M. Getting, P.E., DEE, Filtration Product Manager John Geibel, P.E., Chief Engineer Michael

More information

Figure 6.3 STORAGE BASIN AREA OF INFLUENCE INTEGRATED WASTEWATER MASTER PLAN CITY OF SAN MATEO. sm0914f ai

Figure 6.3 STORAGE BASIN AREA OF INFLUENCE INTEGRATED WASTEWATER MASTER PLAN CITY OF SAN MATEO. sm0914f ai sm0914f10-8562.ai Figure 6.3 STORAGE BASIN AREA OF INFLUENCE INTEGRATED WASTEWATER MASTER PLAN CITY OF SAN MATEO 6.6 PRELIMINARY MODELING RESULTS FOR THE STORAGE ALTERNATIVES Following the preliminary

More information

November 28, Dear Mr. Bechtold:

November 28, Dear Mr. Bechtold: 4000 Hollywood Boulevard Seventh Floor, North Tower Hollywood, Florida 33021 (954) 987-0066 Fax: (954) 987-2949 November 28, 2012 Wastewater Compliance and Enforcement Section FLORIDA DEPARTMENT OF ENVIRONMENTAL

More information

INDUSTRIAL SOLAR MANUFACTURING WWTP DESIGN AND EXPANSION

INDUSTRIAL SOLAR MANUFACTURING WWTP DESIGN AND EXPANSION Location Northwest Ohio Services Provided Engineering, Permitting, Installation of Equipment and Facilities Cost $3 million Size 300 GPM (432,000 GPD) Metal Hydroxide Precipitation WWTP 50 GPM (72,000

More information

Long Point Water Treatment Plant Process Evaluation and Design Upgrades for Performance Enhancement; Dover, DE

Long Point Water Treatment Plant Process Evaluation and Design Upgrades for Performance Enhancement; Dover, DE Long Point Water Treatment Plant Process Evaluation and Design Upgrades for Performance Enhancement; Dover, DE Christopher Walker, PE Christopher Curran, PE Mark Prouty, PE May 12, 2016 Long Point Water

More information

Primary Clarifier Odor Control Replacing Nitrates with D.O. Kevin Jacobs, P.E. ECO Oxygen Technologies

Primary Clarifier Odor Control Replacing Nitrates with D.O. Kevin Jacobs, P.E. ECO Oxygen Technologies Primary Clarifier Odor Control Replacing Nitrates with D.O. Kevin Jacobs, P.E. ECO Oxygen Technologies Presentation Outline Primary Clarifier Odor Challenges Odor Treatment Options Case Study Anson-Madison

More information