1 DECONSTRUCTION OPPORTUNITIES FOR SALVAGE, REUSE & RECYCLING Northeast Recycling Council Inc. Spring Conference EPA Region III, March 2006 Tom Napier Construction Engineering Research Laboratory Champaign, IL
2 WHAT CAUSES C&D DEBRIS?
3 C&D DEBRIS Response to a Mission Upgrade capabilities or mission performance Improve quality of life for employees or occupants Remove & replace obsolete buildings Debris is a byproduct of business activities
4 C&D DEBRIS Why are we concerned? Estimated 136 Million Tons annually in the US (US EPA, 1996) 25-40% of all solid waste 26% fewer C&D landfills in the US from 1990 to 2002 (US EPA) Higher disposal costs in the future Limits on C&D debris materials New landfill construction Rising fuel costs Potential liability
5 C&D DEBRIS 2004 Army Solid Waste Burden 764,000 Tons MSW (35%) 19,400 Tons Yard waste (1%) 19,400 Tons Other (1%) 1,380,000 Tons Construction & Demolition (63%)
6 C&D DEBRIS Estimated 26 Million Tons* Army C&D Debris (15 years) 260,000 Tons Drywall (1% ) 780,000 Tons Brick (3% ) 3,120,000 Tons Other (12%) 1,040,000 Tons Roofing (4% ) * BRAC, ARMY MODULARITY, & TROOP RE-STATIONING SUGGEST THIS FIGURE MAY NOW BE LOW 780,000 Tons Metals (3% ) 3,640,000 Tons Wood (14% ) 16,380,000 Tons Concrete (63% )
7 C&D DEBRIS Concern On-post landfill capacity is finite Tipping off-post will increase Army costs $ 8 MILLION- WORTH OF LANDFILL CAPACITY, FORT GORDON, GA LESS THAN $ 8 MILLION- WORTH OF LANDFILL CAPACITY, FORT GORDON, GA
8 C&D DEBRIS Demolishing ONE WWII-era two-story barracks Debris: 135 tons Building mat ls: 72 tons Concrete : 63 tons Demolition cost: ~$20,000 On-post landfill life cycle cost: $35 - $50/ton Off-post costs: Hauling cost: ~$1/ton/mile Tipping fee: $18-90/ton AND IT S AWFULLY DARNED WASTEFUL!!
9 C&D DEBRIS One barracks, cont d Creates > 40 Metric Tons Carbon Equivalent (MTCE)* Creates > 160 Metric Tons C0 2 Equivalent (MTC0 2 E)* Energy use reduction ~ 960 million BTU* Equivalent to > 30 cars / year & 2,400 gal gasoline Other life-cycle effects** Soil erosion Depleted CO 2 sequestration Altered habitat * USEPA WAste Reduction Model WARM ** AIA Environmental Resources Guide
10 C&D DEBRIS A liability.. or a RESOURCE? WASTE A RESOURCE IN THE WRONG PLACE AN OLD CHINESE PROVERB
11 REUSE & RECYCLING
12 REUSE / RECYCLING Typical WWII-era Barracks Building BARRACKS MATERIALS CHARACTERIZATION By Weight METALS 5% OTHER 22% WOOD 29% COMMODITY ON-THE-HOOF MASONRY 10% CONCRETE 34%
13 REUSE / RECYCLING
14 REUSE / RECYCLING Typical WWII-era Barracks Building PRODUCT Concrete Reinforcing steel Masonry Framing lumber Board sheathing Roofing (shingles) Insulation Wood siding Vinyl siding Soffit, fascia, gutters Doors & windows Gypsum wallboard Acoustic ceiling Plywood paneling Wood T&G flooring Floor coverings Furnaces Plumbing fixtures Duct Piping Electrical fixtures Electrical conductor 18 CY 0.6 T 385 CF 26,100 BF 8,200 BF 3,100 SF 6,400 CF 4,000 SF 4,000 SF 660 SF 43 EA 16,400 SF 4,700 SF 1,000 SF 4,700 SF 4,700 SF 3 EA 16 EA 1.7 T 350 LF 28 EA 960 LF
15 REUSE / RECYCLING A caution; not everything is salvageable Availability of working area on-site Materials quality, integrity Physical damage Obsolescence Contamination; biological, chemical Hazardous material Lead-based paint Glues and adhesives Complexity of disassembly Entanglement Connections Elevation Required equipment
16 REUSEE / RECYCLING Used building materials outlets
17 SOME DRIVERS FOR REDUCING C&D DEBRIS
18 DRIVERS Public policy & regulation Public Ordinances State, county, & local Guides EPA National Strategic Plan, Recycling Goals
19 DRIVERS Army policy Army operations Facilities Sustainable Design & Development Installations Sustainability Plans New C&D Waste Management Policy
20 DRIVERS $tate-of-practice
21 DRIVERS $tate-of-practice
22 DRIVERS $tate-of-practice
23 DRIVERS $tate-of-practice Inertia: The ability of a body to resist a change in its state of motion
24
25 EXAMPLES Pilot Deconstruction Project Fort Campbell KY Deconstruction project administered by CERL CERL contracted directly with Austin TX HfH for deconstruction services for 5 WWII-era buildings HfH achieved 85% diversion HfH recovered $41,000 worth of materials for sale locally & at the Austin Re-Store Cost was comparable to conventional demolition
26 EXAMPLES Building 919, Fort Hood TX Deconstruction contract administered by USACE Contracted directly with Austin TX HfH AHfH achieved an estimated 90% diversion Approx. 36,000 BF of lumber was recovered Salvaged materials were sold at the AHfH ReStore
27 EXAMPLES Building 227, Fort Carson CO Demolition contract administered by Ft Carson Fort Carson DECAM requested contractor to deconstruct instead of demolish; contractor agreed Deconstruction subcontractor diverted >80% of building materials Contractor continued to deconstruct additional buildings at Fort Carson
28 EXAMPLES Facility Reduction, Fort Monroe VA Demolition contract administered by Ft Monroe Initially, demolition specification req d 40% diversion Later, RFP req d deconstruction & provided options for diversion above minimums (60%-plus) Diversion averaged 72% over 58 buildings
29 EXAMPLES 4 Warehouses, Fort Gordon GA Building Removal administered by Ft Gordon Extensive outreach was performed Recycle rights to buildings were sold via live auction Contractor retrieved an estimated $50,000-worth (retail value) of lumber from EACH warehouse 80% of the debris was diverted
30 EXAMPLES WWII-era buildings, Fort McCoy WI Building sales administered by USACE & Ft McCoy Buildings were sold via sealed bidding & live auction Over a 10-year period of time Deconstructed > 140 buildings Diverted > 15,000 tons of building debris, PLUS concrete Recovered enough material to build 300 houses
31 EXAMPLES Njmegen Neighborhood, Fort Bragg NC Fayetteville NC HfH & Picerne Military Housing Removed doors & windows, cabinets, oak flooring, kitchen & bath fixtures, plumbing & HVAC equipment, & other materials from 60 units before demolition
32 EXAMPLES Walker Village, Fort Hood TX Austin TX HfH & Actus Lend-Lease Performed soft strip of housing units prior to demoliton Performed some complete deconstruction
33 EXAMPLES How are we doing?* Decon/recycle/salvage: >1,000 buildings/2.5 Million SF Potential debris: ~ 80,000 Tons Diverted: ~ 63,000 Tons Landfill cost avoidance: ~$1.9 Million Value of salvaged materials: ~ $4.4 Million The future Forecast of 26 Million tons over the next 15 years 50% diversion is minimum required 75%-plus is achievable Potential to put 20 million tons of C&D to a better use than filling a hole in the ground!! * DOCUMENTED PROJECTS
34 CHALLENGES Shifting the Paradigm Remove instead of demolish Resource instead of debris Incentive instead of path of least resistance Acknowledging other economic factors Cost avoidance Value of recovered materials Life Cycle Cost impacts
35 CHALLENGES Accommodating Schedules Planning ahead Alternative building removal strategies Taking advantage of the marketplace Industry capabilities & practices Non-traditional sources of services Marketable materials Costs & values Adjusting business practices Planning Contract & specification provisions Mainstreaming the practice
36
37 CAN WE WORK TOGETHER? Identify Mutual Interests Develop Markets; Match Supply & Demand Adjust Business Practices Army: outreach -- engage SW management agencies & attract potential resources & services SW management agencies: communicate, coordinate, & network among the stakeholders Industry: provide services to the Army
38 WORKING TOGETHER Army installations & Installation Management Agency Regional Offices
39 WORKING TOGETHER Corps Districts & Divisions
40 WORKING TOGETHER Can you help us Information, education Sources of services Exchanges Experience Partnerships Industry capabilities & practices Criteria & standards Methods & techniques Economic data; values & costs Incentives Other Mid-America Council of Recycling Officials
41 AN ETHIC MAINE TOWNSHIP HIGH SCHOOL, DES PLAINES IL, circa 1929
42 QUESTIONS / COMMENTS? Tom Napier 217/ t-napier@cecer.army.mil
Construction / Demolition (C&D) Recycling Program
Construction / Demolition (C&D) Recycling Program The State of California requires that all cities in the State divert at least 65% of its waste materials from landfills (AB 939). The City of Stockton
More informationAn Introduction to Recycling Construction and Demolition Waste
An Introduction to Recycling Construction and Demolition Waste Course No: B04-005 Credit: 4 PDH J. Paul Guyer, P.E., R.A., Fellow ASCE, Fellow AEI Continuing Education and Development, Inc. 9 Greyridge
More informationConstruction Summary
Construction Summary Project Name Item of Work Base Building Add-ons Total Cost Code Site Development $ 18,150.00 $ - $ 18,150.00 Landscaping $ 500.00 $ - $ 500.00 Cast-in-place Concrete $ 7,806.00 $ -
More informationRebuilding your Home after the storm? Adding on, renovating, or remodeling your home? Here's information YOU need to know about the 50% Rule.
FEMA 50% RULE - SUBSTANTIAL IMPROVEMENT SUBSTANTIAL IMPROVEMENT/DAMAGE Z101-0410 NOTICE TO PROPERTY OWNERS Rebuilding your Home after the storm? Adding on, renovating, or remodeling your home? Here's information
More informationCONSTRUCTION AND DEMOLITION PERMIT APPLICATION PACKAGE
CONSTRUCTION AND DEMOLITION PERMIT APPLICATION PACKAGE CITY OF RANCHO SANTA MARGARITA 22112 El Paseo Rancho Santa Margarita, CA 92688 (949) 635-1800 x 6506 Revised July 2017 Construction and Demolition
More informationMaterial Report - [Trade Contractors] for plan: [E:\SoftPlan14\Projects\Sample Drawings.spf\2-Storey sqft.spf] Page 1 of 5
Material Report - [Trade Contractors] for plan: [E:\SoftPlan14\Projects\Sample Drawings.spf\2-Storey 01-2320 sqft.spf] Page 1 of 5 PREPARATION PRELIM PERMITS & FEES Building Permit 1 each 2200.00 _ 2200.00
More informationREQUIREMENTS FOR SUBSTANTIALLY DAMAGED AND SUBSTANTIALLY IMPROVED STRUCTURES
REQUIREMENTS FOR SUBSTANTIALLY DAMAGED AND SUBSTANTIALLY IMPROVED STRUCTURES If your home or business incurred damage, the engineering department, in conjunction with the Flood Mitigation Officer, will
More informationIntegrating Deconstruction and Recycling Into the Demolition Process in Buffalo, NY
Cornell University ILR School DigitalCommons@ILR Buffalo Commons Centers, Institutes, Programs 2007 Integrating Deconstruction and Recycling Into the Demolition Process in Buffalo, NY Tara Stahl Follow
More informationVenable Hall Demolition recycling and waste management
UNC Chapel Hill Venable Hall Demolition recycling and waste management Planning: June 2004 July 2007 Decommission/demolition: August 2007 January 2008 Prepared by Sarah Myers January 9, 2009 Venable Hall
More informationCONSTRUCTION WASTE MANAGEMENT PLAN
CONSTRUCTION WASTE MANAGEMENT PLAN Project: Construction Manager: Location: Prepared by: PREMIER FACILITY MANAGEMENT (PFM) Date: I. OBJECTIVES The objectives of this plan are to: 1. Recycle, reuse or salvage
More informationLEED Analysis of the Knight Management Center. Energy & Atmosphere. Materials & Resources
LEED of the Knight Management Center Energy & Atmosphere Materials & Resources Energy & Atmosphere: 17 possible points LEED-NC Scorecard LEED for New Construction v2.2 Registered Project Checklist Project
More informationINFORMATION SHEET. To demolish the entire building to the foundation will require a demolition permit (Form 6).
City and County of San Francisco Department of Building Inspection Edwin M. Lee, Mayor Tom C. Hui, S.E., C.B.O., Director INFORMATION SHEET NO. 5-04 DATE CATEGORY SUBJECT : June 22, 2015 Structural Demolition
More information(August 2015) UNIFIED FACILITIES GUIDE SPECIFICATIONS **************************************************************************
USACE / NAVFAC / AFCEC / NASA UFGS-02 42 91 (May 2010) ------------------------- Preparing Activity: USACE Nontechnical Title Revision (August 2015) UNIFIED FACILITIES GUIDE SPECIFICATIONS SECTION TABLE
More informationGreen Remodeling Illustrations GREEN REMODELING ILLUSTRATIONS GREEN BUILDING GUIDELINES FOR HOME REMODELING
Green Remodeling Illustrations GREEN REMODELING ILLUSTRATIONS GREEN BUILDING GUIDELINES FOR HOME REMODELING WWW.STOPWASTE.ORG New Addition Consider the following green remodeling options in a new addition.
More informationConstruction and Demolition Material Recycling Program
Construction and Demolition Material Recycling Program WMAC Meeting June 26, 2012 Purpose As part of the Waste Management Advisory Committee s (WMAC) defined role and associated task/project document:
More informationTOWN OF PORT ROYAL BUILDING CODES DEPARTMENT Building Permit Submittal Requirements
TOWN OF PORT ROYAL BUILDING CODES DEPARTMENT Building Permit Submittal Requirements 700 Paris Ave. PO Drawer 9 Port Royal, SC 29935 Application for Permit - P O Drawer 9, Port Royal South Carolina Permit
More informationC&D/wood debris management trends
C&D/wood debris management trends by Peter Yost P romising C&D debris recovery results are beginning in the residential sector As the field of construction and demolition debris management develops, new
More informationThe Ashland Project. Total Area: 1,778 Sq.Ft. 3 Bedroom, 2 Bath, 2 Car Garage
The Ashland Project Total Area: 1,778 Sq.Ft. 3 Bedroom, 2 Bath, 2 Car Garage The garage and bedroom extend from the front of this three bedroom home, drawing you visually into the entryway. Brick and stucco
More informationMecklenburg County Solid Waste Management Plan Public Meeting Tuesday, April 17 th
Mecklenburg County Solid Waste Management Plan 2012 Public Meeting Tuesday, April 17 th Why do we Plan? A requirement of the North Carolina Solid Waste Management Act of 1996 (NCGS 130A 309.09A) County
More informationIncluded in our prices are the following: Monroe County Required for Certificate of Occupancy (Included in Our Prices) Notice to Customer:
Dear Customer: We appreciate your interest in Sweetwater Homes, Inc! Please take a few moments to review our brochure and we assure that you will find it informative. We have included a selection of our
More informationCITY OF SOUTH GATE SCHEDULE OF FEES APPROVED
DESCRIPTION OF FEE - BUILDING & SAFETY PERMIT FEES - BUILDING $124 s.f. valuation PERMIT FEES - BUILDING ISSUANCE FEE $27 PERMIT FEES - BUILDING PERMIT TO RESTORE $46 PERMIT FEES - SPECIAL REVOLVING FUND
More informationHOUSE REPAIRS & RENOVATIONS BUILDING PERMIT REQUIREMENTS
St. Louis County Department of Public Works Division of Code Enforcement HOUSE REPAIRS & RENOVATIONS BUILDING PERMIT REQUIREMENTS This guide is intended to provide the homeowner or contractor with the
More informationBUILDING PERMIT APPLICATION
TOWN OF LEICESTER 132 Main Street Post Office Box 197 Leicester, New York 14481 Phone: (585) 382-3231 FAX: (585) 382-9766 BUILDING PERMIT APPLICATION All Town of Leicester property owners are required
More informationSTRATEGY 1 Increase composting by county employees to achieve 85% waste diversion; continue education about including soiled paper in compost stream
INTRODUCTION Zero Waste or Darn Near is Boulder County s commitment to sensible resource management in government operations, where staff won a 2012 state award for reducing solid waste by 69% in county
More informationConstruction Waste Minimization and Reuse Management
Construction Waste Minimization and Reuse Management Mr.M.KalilurRahman 1, Mr.S.S.Janagan 2 1 Student M.E., (CE&M), Gnanamani College of Engineering, Namakkal-637018, Tamilnadu, India 2 Assistant Prof,
More informationEnvironmental Implications of Increasing Wood Use in Building Construction. Dr. Jim Bowyer Dovetail Partners Minneapolis, MN
Environmental Implications of Increasing Wood Use in Building Construction Dr. Jim Bowyer Dovetail Partners Minneapolis, MN Environmental Implications of Increasing Wood Use in Building Construction Importance
More informationREQUEST FOR BIDS BUILDING DEMOLITION 102 W. Main St.
531 N. Nash Street Hortonville, WI 54944-0099 Phone: 920-779-6011 Fax: 920-779-6552 www.hortonvillewi.org REQUEST FOR BIDS BUILDING DEMOLITION 102 W. Main St. Date Issued: February 5, 2016 Date Due: March
More informationA SYSTEM FOR ESTIMATING RESIDENTIAL CONSTRUCTION AND DEMOLITION DEBRIS
A SYSTEM FOR ESTIMATING RESIDENTIAL CONSTRUCTION AND DEMOLITION DEBRIS Authors: Ali Touran, James Wang, Christoforos Christoforou, Nasiru Dantata (Northeastern University, Boston, Massachusetts) ABSTRACT
More informationRSMeans Contractor s Pricing Guide Residential Repair & Remodeling Costs 2015
Reliable 2015 construction cost information for the home repair and remodeling contractor Improve planning and budgeting with this comprehensive cost guide specifically designed for home improvement and
More informationSECTION UNIT PRICES. A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION.
SECTION 012200 PART 1 GENERAL 1.01 GENERAL REQUIREMENTS A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION. B. Examine all conditions as they exist at the project prior to submitting
More informationOne That is Already Built.
Montgomery County Planning Board 2009 Growing Smarter Speaker Series Thursday, February 12 th, 2009 Green Building: Today s Practices Tomorrow s Challenges Carl Elefante, FAIA, LEED AP Principal Director
More informationFeasibility Report. Property Inspection Engineers, Inc. (248) Property Address. 405 Fairgrove Royal Oak, MI.
Feasibility Report Property Inspection Engineers, Inc. (248) 644-8798 Inspection ate: 10/27/2010 Consultant's Job No: Consultant: Christopher J. aggy Applicant ark Beard Property Address 405 Fairgrove
More informationCITY OF CHICAGO DEPARTMENT OF ENVIRONMENT. CONSTRUCTION or DEMOLITION SITE WASTE RECYCLING RULES AND REGULATIONS
CITY OF CHICAGO DEPARTMENT OF ENVIRONMENT CONSTRUCTION or DEMOLITION SITE WASTE RECYCLING RULES AND REGULATIONS W hereas, pursuant to Chapters 11-4 and 2-30 of the Municipal Code of Chicago (the Code ),
More informationTompkins County Solid Waste Management Plan Executive Summary
Tompkins County Solid Waste Management Plan Executive Summary Tompkins County has prepared a comprehensive, twenty-year Solid Waste Management Plan to comply with the requirements of the Solid Waste Management
More informationLASALLE - BACKUS EDUCATION CAMPUS
INITIAL YEAR BUILT 1957 BUILDING AREA 63,000 SF CURRENT PROGRAM CAPACITY 406 ENROLLMENT 2008 349 WARD 4 PROPOSED PROGRAM CAPACITY 425 Site Plan LASALLE - BACKUS - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION
More informationConstruction and Demolition Waste Used as Recycled Aggregates in Concrete: Solutions for Increasing the Marketability of Recycled Aggregate Concrete
Construction and Demolition Waste Used as Recycled Aggregates in Concrete: Solutions for Increasing the Marketability of Recycled Aggregate Concrete Brett tttempest, Tara Cavalline, Janos Gergely, and
More informationHOTEL SANDFORD. C. Remove and Reinstall: Detach items from existing construction, prepare for reuse, and reinstall where indicated.
SECTION 024119 - PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply
More informationHOW COST EFFECTIVE C&D RECYCLING METHOD. Bradley Guy and Sean McLendon. And Recovery Options
I Wood Recycling And Recovery Options C&D RECYCLING METHOD HOW COST EFFECTIVE - -I University of Florida project compiles comparative data on demolition vs. deconstructionl salvage, and suggests policies
More informationMICHIGAN WOOD WASTE A CIRCULAR ECONOMY OPPORTUNITY!
MICHIGAN WOOD WASTE A CIRCULAR ECONOMY OPPORTUNITY! Michigan Forest Bioeconomy Conference February 1-2, 2017 Norman Christopher MSW (Municipal Solid Waste) Food Waste Household and Commercial Waste Packaging
More informationCHECKLIST Inspecting a Garage
CHECKLIST Inspecting a Garage By Ben Gromicko This section deals with the details of the garage or carport inspection that may be performed. At the end of this section, you shall be able to: describe the
More informationTOWN OF ROTTERDAM RESIDENTIAL BUILDING PERMIT APPLICATION Ext. 395 Needed to Obtain Permit:
TOWN OF ROTTERDAM RESIDENTIAL BUILDING PERMIT APPLICATION 355-7575 Ext. 395 Needed to Obtain Permit: 1. Building Permit Application, and/or residential plumbing permit application, as applicable, to be
More informationAVID Intelligent Home Plans
Home Builder Rental Equipment Landscaping, Sprinklers Gutters & Downspouts Insulation, Rough electrical, lighting, appliances Engineered lumber, Joist Trusses, Sheathing Plywood, Lumber Roofing, siding,
More informationDIVISION 02 SELECTIVE DEMOLITION
DIVISION 02 SELECTIVE DEMOLITION SECTION 02 41 19 - SELECTIVE DEMOLITION PART 1 - GENERAL 1.01 SUMMARY A. This Section includes the following: 1. Demolition and removal of selected portions of a building.
More informationGeneral Conditions 39,522 5, ,292 26,050 75,921 1, Labor hours
Basic Edition Standard Estimate Report Page 1 Name 1000 General Conditions 1107 Professional Consultant 10 Surveying 1.00 day 600.000 /day 600 - - - - - - 600 Professional Consultant 600 600 8.00 hours
More informationBuildingName The Description of the Project P DOCUMENTS
ARCHITECTURE, ENGINEERING AND CONSTRUCTION P00000000 0000 DOCUMENTS ARCHITECTURE & ENGINEERING 326 East Hoover, Mail Stop B Ann Arbor, MI 48109-1002 Phone: 734-764-3414 Fax: 734-936-3334 SPECIFICATION
More informationThe Inspection Process. Waxhaw N.C.
The Inspection Process In Waxhaw N.C. This information is provided by the Waxhaw Enforcement Division to assist you in the progression of your project. Nothing in this document should be considered "Code"
More informationDESIGN AND CONSTRUCTION STANDARDS. Section 2: Standards for Specific Categories of Work. Laboratory Standards
Laboratory Standards These criteria include general planning guidelines. They are intended for use of Designers during the design phases of the project. Planning Assumptions Overview In order to maximize
More informationReceived by:* Date Received:* Zoning Approval:* Date:* PERMIT#:* *ZONING: *SETBACKS: FRONT ft/ SIDE ft/ REAR ft *FLOOD ZONE:
HENDRY COUNTY BUILDING, LICENSING & CODE ENFORCEMENT POST OFFICE BOX 2340 * 640 SOUTH MAIN STREET * LABELLE, FLORIDA 33975 * (863) 675-5245 * FAX: (863) 674-4194 1100 OLYMPIA ST CLEWISTON, FLORIDA 33440
More informationConstruction & Demolition (C&D) Materials Management in the Northeast in 2013 December 7, 2017
Construction & Demolition (C&D) Materials Management in the Northeast in 2013 December 7, 2017 Prepared by the NEWMOA C&D Materials Management Workgroup State environmental agencies in the Northeast have
More informationSUBSTANTIAL IMPROVEMENT
SUBSTANTIAL IMPROVEMENT General Discussion The following discussion addresses several of the issues surrounding the NFIP regulations concerning substantial improvement and substantial damage. The attached
More informationstandard features Power Exhaust Fans w/light - Both Baths GFCI Receptacles Upgrade Light Fixture - Bath 1 Vanity - Per Lav GFCI Receptacles
2017 standard features INTERIOR Cornice w / Full Length Drapes Panels-Main Living Areas only Shaw Moxie Carpet with Pad and Tack Designer Select Congoleum No Wax Vinyl Flooring 8 Flat Ceilings Throughout
More informationFeatures & Amenities. EXTERIOR FINISHES COMMUNITY FEATURES
Features & Amenities COMMUNITY FEATURES EXTERIOR FINISHES WARRANTY COVERAGE Located in the heart of Troy along the east side of Rochester Road, between Wattles and Long Lake Roads Easy access to I-75 and
More informationLand Reclamation Site Siting and Application Guidelines
Department of Environment and Local Government Land Reclamation Site Siting and Application Guidelines Rationale In an effort to reduce the cost associated with the transportation of demolition wastes,
More informationHIGHLANDVIEW CEMETERY CHAPEL
HIGHLANDVIEW CEMETERY CHAPEL CONTACT: Ferris State University Small Town Studio Christopher Cosper, AIA, LEED, AP, Assistant Professor cosperc@ferris.edu 23.59.33 Sheet List Sheet Name Sheet # COVER A00
More informationLimited Asbestos Demolition Survey
Limited Asbestos Demolition Survey Limited Asbestos Demolition Survey Former Fire Station Facility 25 to 45 S. Orlando Avenue Cocoa Beach, Florida Client: City of Cocoa Beach Public Works Department 1600
More informationConstruction & Demolition Recycling Program Building Contractor s Resource Guide & FAQ s (Revised December 2016)
Construction & Demolition Recycling Program Building Contractor s Resource Guide & FAQ s (Revised December 2016) Table of Contents Frequently Asked Questions 3 List of Organizations & Agencies....7 List
More informationRENOVATION ESTIMATING & BUDGET GUIDE TYPICAL COSTS OF RESIDENTIAL CONSTRUCTION AND HOME REMODELLING
RENOVATION ESTIMATING & BUDGET GUIDE TYPICAL COSTS OF RESIDENTIAL CONSTRUCTION AND HOME REMODELLING REPRINTED WITH PERMISSION THE CANADIAN BUILDING CONSULTING GROUP INC. Revised: April 2016 1. ROOFING
More informationGREEN DEMOLITION CERTIFICATION
GREEN DEMOLITION CERTIFICATION Authors: G. Bradley Guy, Associate Director; Timothy J. Williams, Research Coordinator (Powell Center for Construction and Environment, University of Florida, Gainesville,
More informationTHE RESTORE LOUISIANA REIMBURSEMENT ESTIMATE
THE RESTORE LOUISIANA REIMBURSEMENT ESTIMATE Reimbursement estimates are component by component assessments of the value of completed repairs. They are produced through the use of Xactimate assessment
More informationApplying for Permits to build a new house in Linn County
Planning & Development Linn County, Iowa Building Division Linn County Building Code Residential Guidelines Single Family Dwellings Page 1 of 4 Applying for Permits to build a new house in Linn County
More informationAsbestos Elevator Industry Workshop November 25, 2015
Asbestos Elevator Industry Workshop November 25, 2015 BOB SWING CONTACT INFO EMAIL: Bob.Swing@ThyssenKrupp.com Phone: 604-499-5714 SOME ASBESTOS-CONTAINING MATERIALS Cement Pipes Cement Wallboard Cement
More informationBuilding Inspection Report
Building Inspection Report Sample Commercial Inspection Report Inspection Date: Prepared For: Prepared By: Professional Property Inspection Consultants 4857 Winterset Drive Columbus, OH 43220 (614) 459-5941
More informationGreen Building Ordinance Overview
Green Building Ordinance Overview September, 2013 City of Dallas Sustainable Development and Construction Dallas Green Ordinance 2008 Task Force Recommendations Two-phase implementation strategy Solution
More informationDavis Frame Co., Inc. Construction Budget Considerations
Davis Frame Co., Inc. Construction Budget Considerations ITEM BID 1 BID 2 BID 3 MISCELLANEOUS COSTS Surveying Building Permit Engineering Fees Interest on Construction Loan Property Taxes Hazard & Liability
More informationH 7033 SUBSTITUTE A AS AMENDED ======== LC003107/SUB A ======== S T A T E O F R H O D E I S L A N D
01 -- H 0 SUBSTITUTE A AS AMENDED LC00/SUB A S T A T E O F R H O D E I S L A N D IN GENERAL ASSEMBLY JANUARY SESSION, A.D. 01 A N A C T RELATING TO HEALTH AND SAFETY -- FOOD RESIDUALS RECYCLING Introduced
More informationBUILDING ASSESSMENT REPORT for NMSU GREENHOUSES at NEW MEXICO STATE UNIVERSITY LAS CRUCES, NEW MEXICO
BUILDING ASSESSMENT REPORT for NMSU GREENHOUSES at NEW MEXICO STATE UNIVERSITY LAS CRUCES, NEW MEXICO July 14, 2014 Prepared By: 6501 Americas Parkway NE, Suite 550 Albuquerque, New Mexico 87110-8154 (505)
More informationPermit Requirements: Building Codes: The City of Clanton has adopted the following codes which are enforced by the Building Department:
Permit Requirements: Any owner, authorized agent, or contractor who desires to construct, enlarge, alter, repair, move, demolish, or change the occupancy of a building or structure, or to erect, install,
More informationBuilding green via design for deconstruction and adaptive reuse
Building green via design for deconstruction and adaptive reuse T. Saleh1, A. Chini1 1M.E. Rinker Sr. School of Building Construction, University of Florida, Gainesville, Florida, United States of America
More informationA study on construction and demolition wastes from buildings in Seberang Perai
A study on construction and demolition wastes from buildings in Seberang Perai Faridah A.H.Asaari 1, Hasmanie Bt Abdul Halim 2, M Hasnain Isa 1 1 School Of Civil Engineering, Engineering Campus, Universiti
More informationConstruction & Demolition Debris Reduction
PDHonline Course C348 (2 PDH) Construction & Demolition Debris Reduction Instructor: John Poullain, PE 2012 PDH Online PDH Center 5272 Meadow Estates Drive Fairfax, VA 22030-6658 Phone & Fax: 703-988-0088
More informationSteps in Building a Shed
Steps in Building a Shed The design and location of your new shed will depend on how it will be used - a shed for storing tools will be much simpler than one you intend to use as a small shop. For example,
More informationINDICATIVE FEASIBILITY BUDGET (RIBA STAGE 1) for ST JAMES'S CHURCH : WEYBRIDGE SURREY. June 2016
INDICATIVE FEASIBILITY BUDGET (RIBA STAGE 1) for INTERNAL REPAIRS AND REDECORATIONS OF THE CHURCH HALL at ST JAMES'S CHURCH : WEYBRIDGE SURREY June 2016 SAWYER & FISHER (EPSOM) LTD THOMAS FORD & PARTNERS
More informationTraining Certification Categories
Training Certification Categories Residential Residential Building Inspector structures are free from hazardous structural conditions and comply with the UCC. Duties include inspection of footings and
More informationAbout asbestos. About asbestos
About asbestos About asbestos Contact customer services on 01225 715 715 About asbestos This leaflet explains what asbestos is, how it is being managed in homes and what you can do to stay safe if it is
More informationOne and Two Family Additions
One and Two Family Additions An addition to a house, duplex, garage, or an accessory structure requires a building permit prior to performing any construction. Building Department & Permit Office Mon-Fri
More informationFLOORS 3, 14 & 21 D322, D1422, D2122 Qty. 3 Size 2-6 x 6-0
entirely and masonry as required for installation of new door & frame (Kitchen Floors 5, 12, & 19). 4. At the DEMOLITION NOTES, DELETE Note D-4 in its entirety and REPLACE with the following: Saw cut and
More informationOffice of Design & Construction State University Plaza Albany, New York
Instructions: Consultant should meet with the Campus and Fund at the work area(s) prior to completing this Checklist. At least two (2) meetings are required, one prior to Schematic Phase submission and
More information2016 CALGREEN RESIDENTIAL CHECKLIST MANDATORY ITEMS City of San Carlos - Building Division 600 Elm Street, San Carlos, CA Phone:
2016 CALGREEN RESIDENTIAL CHECKLIST MANDATORY ITEMS City of San Carlos - Building Division 600 Elm Street, San Carlos, CA 94070 Phone: 650-802-4261 PURPOSE: The residential provisions of the 2016 CalGreen
More informationSeasons Business Center New Construction!
Seasons Business Center New Construction!...Seasons Business Center Stow, Ohio 114,188 SF of High Bay Space 32 Clear Height 80 480 ESFR Sprinklers Tax Abatement Available 8 Reinforced Concrete Floor 271
More informationLEED-2009 Green Building Rating System. New Construction & Major Renovations
LEED-2009 Green Building Rating System New Construction & Major Renovations 1 The following pages are designed to assist Engineers acquire LEED Credits in the design of Green Sustainable building utilizing
More informationEdouard AVANT GROVE U I C U I C. Modern Living Made Easy uichomes.com
Edouard Modern Living Made Easy uichomes.com - new construction - 3 stories + full basement - 4 bedrooms - 2.5 baths - 2,380 s.f. call 314.881.2333 or e-mail sales@uicstl.com PLAN NTS DECK 13' 0" X 12'-0"
More informationPOC: John Roberts, or (843)
NAVAL FACILITIES ENGINEERING COMMAND, MID-ATLANTIC FACILITIES ENGINEERING AND ACQUISITION DIVISION (FEAD) PARRIS ISLAND 62 ATSUGI STREET (BUILDING 852) PARRIS ISLAND, SC 29905 POC: John Roberts, john.b.roberts@navy.mil
More informationLEED LEED. Leadership in Energy and Environmental Design. A voluntary, consensus-based. high-performance, sustainable buildings and neighborhoods
LEED An Introduction to LEED V3 2009 LEED Leadership in Energy and Environmental Design A voluntary, consensus-based national standard for developing high-performance, sustainable buildings and neighborhoods
More informationISO Types 1-6: Construction Code Descriptions
ISO 1 Frame (combustible walls and/or roof) Typically RMS Class 1 Wood frame walls, floors, and roof deck Brick Veneer, wood/hardiplank siding, stucco cladding Wood frame roof with wood decking and typical
More informationHighland Park. Exceptional Interiors (cont.) Green Technology. Designer Kitchen Features. Distinctive Exterior Features
unit 2 HOMES 650 Mill Valley Parkway 2332 Sq.Ft. 3-Car 4/3 $542,800 6 Mt. Shasta Views 643 Mill Valley Parkway 2332 Sq.Ft. 3-Car 4/3 $552,800 8 Mt. Shasta Views Under construction 945 Rollingview Raised
More informationABOVEGROUND HOME FALLOUT SHELTER H-12-2 / November 1983 (Supercedes H-12-2 dated June 1980)
ABOVEGROUND HOME FALLOUT SHELTER H-12-2 / November 1983 (Supercedes H-12-2 dated June 1980) Page 1 General Information This family shelter is intended for persons who prefer an aboveground shelter or,
More informationSubject: Lucretia Mott School No. 3 Rehabilitation. Figure 1 Figure 2 Figure 3
MEMORANDUM To: Ashley Rosenthal Payne, Indianapolis Historic Preservation Commission Adrienne Schmetzer, Indiana Housing and Community Development Authority Architecture Preservation Interior Design Landscape
More informationTHE STRATA UNIT May 25, 2008
THE STRATA UNIT May 25, 2008 Over the years, we have been asked time and time again from our experience as a cost consultant and a project manager from both a restoration and renovation point of view What
More informationResidential Planning Guide Clear-Span Custom Design Post-Frame Efficient Low Maintenance
HOME PLANNING GUIDE Residential Planning Guide Clear-Span Custom Design Post-Frame Efficient Low Maintenance #3978 Why Choose Morton Buildings for Your Next Home? There are lots of choices and building
More informationSeal Harbor Development 1 Nagog Park Acton, MA 01720
Seal Harbor Development 1 Nagog Park Acton, MA 01720 Specifications for Ocean Mist Villages Foundation and Concrete Floors Footings All footings are constructed and poured with 3000 lb mix, continuous
More informationCITY OF ORANGE BUILDING DIVISION 2016 Green Building Code Requirements For Residential Construction
CITY OF ORANGE BUILDING DIVISION 2016 Green Building Code Requirements For Residential Construction In order to facilitate sustainable construction practices, all new projects* must comply with the State
More informationDetached Garages and Building Permits. 1 and 2 Family Dwellings
Detached Garages and Building Permits 1 and 2 Family Dwellings Why do I need a permit? The City of Minneapolis adopts the State of Minnesota Building Code (MNSBC) and its associated state statutes and
More informationBuilding Regulations; Construction 11
Building Regulations; Construction 11 b. Ceilings or roofs shall have a minimum of an "R" factor of 12; and c. Where the roof serves also as the finished ceiling a vent space of two inches shall be required
More informationModular Wood Framing Goes Vertical
Modular Wood Framing Goes Vertical By: Troy Bean, P.E., S.E. DCI Engineers January 2013 The Wood Products Council is a Registered Provider with. Credit(s) earned on completion of this program will be reported
More informationMANHATTAN COLLEGE STUDENT COMMONS
MANHATTAN COLLEGE STUDENT COMMONS BUDGET CHECK USING GILBANE S COSTADVISOR MODEL OCTOBER 29, 2010 Introduction: Gilbane developed this CostAdvisor Model of the proposed new Manhattan College Student Commons
More informationRequired Information for Permit Issuance
Required Information for Permit Issuance 1. Parcel #: It is very important that we have this information. It can be accessed in different ways. It may already be on your septic application, you can get
More information37% 100% 100% PROJECT HIGHLIGHTS LEED Facts. Wiener Auditorium
Taubman Building, 15 Eliot St., Cambridge, MA, 02138 LEED CI V2009 GOLD The is a 2,943 square foot space located in the Taubman Building of the Harvard Kennedy School of Government. The project scope includes
More informationCENTENNIAL SCHOOL DISTRICT
CENTENNIAL SCHOOL DISTRICT Middle School Feasibility Study Project PLANNING STUDY PRESENTATION 24 May 2016 Middle School Master Planning Process 1. Familiarized team with existing middle schools and sites
More information