1 3 rd Annual AJM CTL & GTL Conference (26 27 February 2008) The Arckaringa CTL and Power Project From Concept to Project Development Chris Schrape, Managing Director, Altona Resources PLC 1
2 Important Notice Statements in this presentation, to the extent not based on historical events, constitute forward-looking statements. Forward-looking statements include, without limitation, statements evaluating market and general economic conditions in the preceding sections, and statements regarding future-oriented costs and expenditures. Investors are cautioned not to place undue reliance on these forward-looking statements, which reflect management s analysis only as of the date thereof. These forward-looking statements are subject to certain risks and uncertainties that could cause actual results to differ materially. Such risks and uncertainties with respect to the company include the effects of general economic conditions, changing foreign exchange rates and actions by government authorities, uncertainties associated with legal proceedings and negotiations, industry supply levels, competitive pricing pressures and misjudgments in the course of preparing forward-looking statements.
3 The Arckaringa Project Location 3
4 Arckaringa Coal Resources A World Scale Energy Bank Altona Resources holds a 100% interest in three coal exploration tenements with a combined area of 2,592 km 2 in the Arckaringa Basin Coalfield, South Australia The coal deposits have been extensively explored and are one of the World s largest undeveloped Energy Banks combined resource > 7.8 billion tonnes of sub-bituminous coal technically suitable for conversion into clean petroleum products and low cost power equivalent to 7.8 Billion barrels of petroleum products 4
5 Project Development - A Steady Approach Taking stock - the Hatch Gap Analysis Report (March - April 2007): validated the historical coal data base and conceptual CTL and mine study results identified the work needed to complete a Pre Feasibility Study to Major Company standard ensure a sound basis for proceeding to Final Feasibility, including confidence in technology options attractive project economics critical issues and risk identification a development budget and timeline Pre Feasibility Studies now nearing completion, with encouraging results to date
6 Pre Feasibility Study Progress Update Technical Program Aspect Status Coal Resource update and coal quality evaluation End March 2008 Groundwater and geotechnical evaluation End March 2008 Mine cost review, based on existing mine designs CTL plant cost and technology review Transport and Fuel Markets study Electricity market competitiveness study CO2 Geo-sequestration plan Final Feasibility Budget and Timeline study Completed Completed Completed Completed Initial study completed Completed
7 Pre Feasibility Study Progress Update Commercial Project Financial Model developed (Royal Bank of Scotland) Budget and Timeline for Final Feasibility scoped Relationships enhanced, including Investor briefings and regular media releases BP MOU extension Freight Link MOU and joint work program Government and Community Relations Regular briefings for SA Government and Opposition Framework for future State and Commonwealth approvals under development Briefings for local communities and stakeholders
8 Wintinna Drilling Program May 2007 March 2008 Validation of Coal Resources to current JORC compliant reporting standards Definition of at least 700 million tonnes in the Measured and Indicated Category Extraction of a 5 tonne bulk sample for coal testing and analysis confirmation of quality parameters for mine design and coal feedstock New Geotechnical and Hydro-geological studies to confirm dewatering and mine design parameters 8
9 First Large Diameter Borehole ACL 1
10 Wintinna Drilling Program 27 boreholes 6 large diameter (bulk sample) 21 slim core Water production wells Geotechnical holes Native Title clearance obtained Base Mt Barry and top Nilkinina Seam 200mm core Large Diameter core extraction - mid 2007 Arckaringa Seam 200mm core 10
11 Pre Feasibility - A World Class Group of Advisors and Technical Consultants Project Finance Advisor RBS Due Diligence and independent engineering advisor CTL and Power Plant Design and Costing Groundwater and Geotechnical Assessment Open Cut Mine Design and Costing Non binding MOU Transport MOU Coal Quality Testing and Verification
12 12 Study Findings to Date - 10 Pillars for Success 1. Huge and proven Coal Resource 2. Conventional Open Cut Mining 3. Suitable CTL technology 4. Large and Expandable Scale 5. Access to existing Railway and Ports 6. Markets for Fuels (export and domestic) 7. Markets for Electricity in South Australia 8. Strong Government support in a stable country 9. Environmental Issues understood 10. Attractive Project Economics
13 Huge and Proven Coal Resource Huge coal resource, discovered in the 1980 s, with the best part of the Wintinna deposit now being upgraded to current JORC standards Deposit Million Tonnes Measured 2 Indicated 2 Inferred 2 Total Wintinna 1 1, ,000 3,900 Westfield Murloocoppie ,600 3,150 7,850 Notes: 1. For Further detail on coal quality refer to Appendix 1 2. Based on JORC equivalent standards of the day 13
14 Conventional Open Cut Mining All past and current studies show that the Wintinna deposit can be mined as a conventional Open Cut and Back Fill operation Initial 150 meter deep box cut, thereafter steady state operations through dewatered overburden and gently dipping, consistent coal seams (8 main seams with combined meter thickness within a meter vertical horizon)* 14 *see Appendix 1 slide
15
16
17
18
19
20
21 Suitable Technology for CTL and Power With CO2 extraction and storage capability, the process is Sequestration ready and a prime example of clean coal technology ** Refer Appendix 4 for further detail on technology selection Pre Feasibility Plant Design** based on: Coal Gasification - ConocoPhilips Fischer-Tropsch Synthesis Rentech Combined Cycle Gas Turbine power generation 21
22 Figure 1. Potential Feeds Coal Petroleum Coke Residual Oils Natural Gas Refinery Gas Orimulsion Sewage Sludge Waste Oils Biomass Black Liquor Municipal Solid Waste Hazardous Waste Coal to Liquids Product Options Gasification Plant Slag for Construction Materials or Metals Recovery Combined Cycle Chemical Production Potential Products Oxygen Nitrogen Argon Carbon Dioxide Sulfur/Sulfuric Acid Steam Hot Water Electric Power Hydrogen Carbon Monoxide Fertilizer (Ammonia, Urea, Ammonium Nitrate) SNG Industrial Chemicals Methanol/Ethanol Fine Chemicals Fischer-Tropsch Synthesis Naphtha Diesel Jet Fuel Wax 22
23 CTL Fuel Products are Environmentally Clean Example: Ultra Clean Diesel Fuel Can be used in existing diesel engines High Cetane and low aromatics increase engine efficiency and decrease maintenance costs Zero Sulphur and lower emissions than conventional diesel Source: Shell 23
24 The Arckaringa Project - Large and Expandable The Plant can be expanded in 5 MBPA Modular Phases, either sequentially or in combination Output Phase 1 Phase 1 and 2 Combined BASE CASE Construction time BASE CASE After Phase 3 Phase 3 Construction time Liquids (80% distillate, 20% naptha) 15 KBPD or 5 MBPA 30 KBPD or 10 MBPA 4.5 years 45 KBPD or 15 MBPA 2.5 years Pre-Feasibility Studies: Export Power 280 MW 560 MW (Included in above) 840 MW (Included in above) Jacobs Consultancy (UK) for CTL and Power MineConsult Australia for Wintinna Open Cut mining costs Coal from Wintinna Mine 5 MTPA 10 MTPA 2.5 years 15 MTPA 1 year KBPD = Thousand Barrels Per Day MBPA = Million Barrels Per Annum MTPA = Million Tonnes Per Annum 24
25 Access to Railway and Ports Key strategic location on the Adelaide Darwin railway (owned and operated by Freightlink) Altona has MOU with Freightlink to develop the future transport and port storage contract Darwin is a deep water port and growing gateway to Asia
26 Fuel and Electricity Markets in South Australia None of this will happen without power and fuel! 26
27 Fuels Markets CTL fuels (diesel, jet fuel) are environmentally clean and free from market volatility and refinery product margins Altona will provide a secure source of supply from a politically stable country boost Australia s exports to Asia help make SA and NT self sufficient and effectively provide a strategic fuel stockpile for the region
28 Electricity Markets A growing power deficit in South Australia According to the ESIPC 2007 Annual Planning Report, South Australia has a growing gap between electricity supply and demand The projected Reserve Deficit of 500 MW by excludes the Olympic Dam Expansion and other new mine project demand (an extra 500 MW) 28
29 Electricity Markets Prominent Hill Olympic Dam Leigh Creek Port Augusta Flinders Power Station Adelaide The project can generate competitive base load power, plus some peak power, and will sell via a new national grid connection and regional links
30 Strong Government Support Stable geopolitical environment Bipartisan support for resources development in South Australia Strong relationship already established with Government Ministers and Departments Project will likely receive Major Project Status in South Australia provides streamlined framework for Government approvals 30
31 Environment Issues Understood Environmental Issue Current Status Prognosis Water Use CTL Plant gets all its process water from the coal (high moisture content) No issue plant will be a net supplier of clean water Groundwater Management 1 Part of current prefeasibility Studies Technically achievable Sensitive but potential win/win CO 2 Mitigation 2 Aboriginal Heritage Strategy developed and Geo sequestration site identified Exploration cleared, further survey work needed Gas Storage Licence pioneer Manageable if done well Notes: 1. Refer to Appendix 2 for more information on the proposed Groundwater management 2. Refer to Appendix 3 for further information on CO 2 mitigation 31
32 Attractive Project Economics - Large Revenues and Low Production Costs Results derived from Royal Bank of Scotland CTL, Power and Mine (Cumulative) Phase 1 and 2 Combined 10 MBPA After Phase 3 15 MBPA Industry Benchmarks for new Plants Project Financial Capital US$m (+ / - 30%) 2,706 4,035 Model CTL and Power Mine (incl. development opex) Est. Annual Revenue US$m The Project s combination of CTL products and Power can reduce - - Costs per Barrel, after Power Sales Revenue credit 1, , unit operating costs to the low end of the world cost curve Total Project expenditure US$/bbl Opex US$/bbl US$35 US$20 < 35 < ** equates to a crude oil price of approx US$85/barrel 32
33 Project Development Timeline As per Jacobs Pre-feasibility Studies Module 1 & 2 (10 MBPA Plant) Module 3 (additional 5 MBPA) 33
34 Thank you.
35 Appendix 1 - Coal Quality Quality Parameter (As Received Basis) Wintinna Run of Mine Quality (for CTL Plant) Proximate Analysis Unit Value Total Moisture % 38.0 Ash % 10.9 Volatile Matter % 22.0 Fixed Carbon % 29.1 Total Sulphur % 0.98 Gross Specific Energy GJ/tonne 16.2 Other Arckaringa deposits Westfield and Murloocoppie have similar energy, moisture and ash, but higher sulphur (which is extracted in the CTL process in any event) 35
36 Appendix 2 - Groundwater Management Average groundwater inflows likely to be > 100 ML/day, requiring substantial mine area dewatering and a responsible water disposal plan Aspect Mine Dewatering - Water Allocation Licence Water Supply Opportunities Issues Net usage, requiring assessment of aquifer re-injection replacing other user s needs Regional Drawdown and protection of Spring flows and associated species Aboriginal Heritage Pastoral and other regional water supplies Final mine void management (avoid loss of water to evaporation) Potential to supply regional centres and mining projects with clean water 36
37 Appendix 3 - CO2 Mitigation Strategy Steps Status Timing Mitigation Options Study GHD Study completed Geo-sequestration best option April 2007 Initial Geosequestration investigations Site Assessment Work program Completed East Officer Basin (~100 km away) site identified Work plan In preparation, to be secured either via agreement with existing PEL holder or via a new Gas Storage Licence Initial discussions with CRCCO2 for research help Aug Ongoing Government Support Initial investigations into Clean coal technology funding Ongoing 37
38 Appendix 4 CTL Technology Options The principal technologies selected by Jacobs during the Pre Feasibility Study for the expandable CTL/Power Plant are: Conoco Phillips (CoP) Technology for Gasification selected following a techno-economic evaluation of 4 leading commercial gasification technologies currently available worldwide. Rentech Technology for FT Synthesis selected as one of only two technologies available for third party use. (Jacobs has worked with Rentech on various projects and has detailed data on the technology) UOP Hydro treating and Hydro cracking Technology for Product Upgrade considered as the best suited processes for upgrading Rentech s FT crude products (UOP, Rentech and Jacobs have worked closely over many years to develop and optimise the process conditions of the Product Upgrade Unit to maximise diesel fuel production) Jacobs advises that CoP, Rentech and UOP are world class leaders in their respective technologies, and believes the technologies proposed for the CTL/Power Plant will be well suited and competitive in world terms 38
QUARTERLY REPORT March 2011
QUARTERLY REPORT March 2011 Australian energy company, Blackham Resources Ltd (Blackham) ( ASX: BLK ) continues to advance the development of the Scaddan and Zanthus Coal to Liquids ( CTL ) projects. The
More informationZero emission Energy Recycling Oxidation System. June 2012
ZER S Zero emission Energy Recycling Oxidation System June 2012 Patented Gasification / Oxidation Method & System A brilliant integration of established technologies: Rotary Kiln Technology Gasification
More informationSyntroleum Coal to Liquids Integrating Gasification, Fischer-Tropsch and Refining Technology. CTL Forum, Beijing China June 15-16, 2006
Syntroleum Coal to Liquids Integrating Gasification, Fischer-Tropsch and Refining Technology CTL Forum, Beijing China June 15-16, 2006 Forward Looking Statements This presentation includes forward-looking
More informationFT-GTL UNLOCKS VALUE FROM NATURAL GAS
FT-GTL UNLOCKS VALUE FROM NATURAL GAS Doug Miller Michael Goff Black & Veatch Corporation Ken Agee Emerging Fuels Technology April 2017 Introduction An estimated 147 billion cubic meters of gas was flared
More informationEnefit s oil shale projects in Jordan
Enefit s oil shale projects in Jordan October 2010 Andres Anijalg Project Manager Business Development Department Enefit Contents Enefit Overview Enefit in Jordan Oil and Power Projects Development Plan
More informationProducing Liquid Fuels from Coal
Producing Liquid Fuels from Coal David Gray Presented at the National Research Council Board on Energy and Environmental Systems Workshop on Trends in Oil Supply and Demand 20-21 October 2005, Washington
More informationDKRW, Medicine Bow and EOR
DKRW, Medicine Bow and EOR June 2007 DKRW Energy LLC Current Projects DKRW Wind Energy 505 MW operational in TX; 700 MW total under development 132 MW under development in Maine 800 MW under development
More informationGeothermic Fuel Cell Applications in Coal Coal Gasification---Coal to Liquids (Summary Highlights)
Geothermic Fuel Cell Applications in Coal Coal Gasification---Coal to Liquids (Summary Highlights) Introduction Historically, capital costs of Fischer-Tropsch (FT) coal-to-liquids projects have been high.
More informationCoal to Liquids at Sasol Kentucky Energy Security Summit CAER s 30 th Anniversary 11 October P Gibson Sasol Technology R&D
Coal to Liquids at Sasol Kentucky Energy Security Summit CAER s 30 th Anniversary 11 October 2007 P Gibson Sasol Technology R&D 1 global energy dynamics. Proven reserves of fossil fuels will sustain the
More informationHeavy Oil Upgrading Environment Market and Technology
2008 Rice RGF Global - Heavy E&C Forum Oil Upgrading Environment: Markets & Technology Eleventh Annual Forum Session September 9, 2008 Heavy Oil Upgrading Environment Market and Technology John D. Elliott
More informationDevelopment Potential of the Wara Coal Deposit to meet Indonesia s Future Power Requirements
1 Development Potential of the Wara Coal Deposit to meet Indonesia s Future Power Requirements 2 COAL RESOURCE Indonesia has large resources of lower heating value subbituminous coal the resources are
More informationOutline. Anderson Mining Company Ltd. Peel Region - Yukon s Mineral Wealth Wind River Energy Project The Future Planning Issues
Outline Anderson Mining Company Ltd. Peel Region - Yukon s Mineral Wealth Wind River Energy Project The Future Planning Issues Anderson Mining Company Limited Incorporated Jan 2003 Initially a mineral
More informationPit to Port Infrastructure in SA
Pit to Port Infrastructure in SA An Explorer s Perspective Dr A. John Parker Managing Director SA Mining and Energy Infrastructure Conference 2011 12-13 April 2011 Disclaimer & Competent Person s Statement
More informationPROJECT UPDATES. Westinghouse Plasma Commercialized; Industrial Scale Syngas Production
Westinghouse Plasma Commercialized; Industrial Scale Syngas Production PROJECT UPDATES Gasification Technologies Council (GTC) October 26-29, Washington, DC WESTINGHOUSE PLASMA CORP (WPC) Excels by gasifying
More informationCO 2 reduction potential of coal-to-liquids (CTL) plants
Carnegie Mellon University Research Showcase @ CMU Department of Engineering and Public Policy Carnegie Institute of Technology 11-2008 CO 2 reduction potential of coal-to-liquids (CTL) plants Hari Chandan
More informationGreatPoint Energy International Advanced Coal Technologies Conference June 2010
GreatPoint Energy International Advanced Coal Technologies Conference June 2010 GreatPoint Energy is commercializing its proprietary bluegas TM process to convert coal and petroleum residues into low cost
More informationGasification: A Key Technology Platform for Western Canada s Coal and Oil Sands Industries
Gasification: A Key Technology Platform for Western Canada s Coal and Oil Sands Industries Twenty-Fifth Annual International Pittsburgh Coal Conference Westin Conference Center September 20 October 2,
More informationEnergy sector in Mongolia. Contents Brief of energy sector Energy sector policy Future trend
Energy sector in Mongolia Contents Brief of energy sector Energy sector policy Future trend 1 Energy sector in Mongolia Contents Brief of energy sector Energy sector policy Future trend 2 Mongolia-Socioeconomic
More informationCarbon To X. Processes
World CTX Carbon To X Processes Processes and Commercial Operations World CTX: let s Optimize the Use of Carbon Resource Carbon To X Processes Carbon To X technologies are operated in more than 50 plants
More informationThe Hope for Pakistan s Future
The Hope for Pakistan s Future Dr. SAMAR MUBARAKMAND NI, HI, SI Planning Commission Total Power Generation of World) No Source % No Source % 1 Coal Based 41.61 4 Nuclear 13.75 2 Oil Based 5.63 5 Hydro
More informationSynthesis Energy Systems, Inc.
NASDAQ: SYMX www.synthesisenergy.com Synthesis Energy Systems, Inc. Update on SES Projects and Progress GASIFICATION TECHNOLOGIES COUNCIL CONFERENCE WASHINGTON, D.C. OCTOBER 29-31, 2012 UNLOCKING VALUE
More informationAdvanced Coal Technologies. Laufer Energy Symposium. Dianna Tickner Peabody Energy April 5, 2013
Advanced Coal Technologies Laufer Energy Symposium Dianna Tickner Peabody Energy April 5, 2013 What is 21st Century Coal? Clean Coal Defined Use of modern, highly efficient methods and technology in the
More informationD. Sasongko RESEARCH GROUP OF ENERGY AND CHEMICAL ENGINEERING PROCESSING SYSTEM FACULTY OF INDUSTRIAL TECHNOLOGY INSTITUT TEKNOLOGI BANDUNG NRE
A BRIEF OVERVIEW ON COAL LIQUEFACTION IN INDONESIA Lokakarya Energi Baru dan Terbarukan LPPM ITB, January 21, 2011 D. Sasongko RESEARCH GROUP OF ENERGY AND CHEMICAL ENGINEERING PROCESSING SYSTEM FACULTY
More informationFor personal use only. Minerals Explorer in South Korea
Minerals Explorer in South Korea Forward-looking and Competent Person Statement Certain statements contained in this presentation constitute forward looking statements. Such forward-looking statements
More informationFor personal use only
INVESTOR UPDATE May 2016 Disclaimer Statements & material contained in this presentation, particularly those regarding possible or assumed future performance, production levels or rates, metal prices,
More informationA1 Australian and South Australian Government Guidelines 813. A2 South Australian Government Guidelines 871
Appendix A EIS Guidelines CONTENTS A1 Australian and South Australian Government Guidelines 813 A2 South Australian Government Guidelines 871 A3 Northern Territory Government Guidelines 929 Olympic Dam
More informationWESTINGHOUSE PLASMA GASIFICATION
WESTINGHOUSE PLASMA GASIFICATION 2 clean renewable energy Westinghouse Plasma has over 30 years of experience in research, development, testing, design and commercial use of proven plasma torch technology.
More informationConventional Energies (Oil & Gas)
13 Conventional Energies (Oil & Gas) 162 Conventional Energies (Oil & Gas) Conventional Energies (Oil & Gas) I. History and Background The first documented systematic oil exploration and drilling in Iran
More informationFor personal use only
9 August 2012 PRAIRIE DOWNS SECURES A LARGE COAL PROJECT IN POLAND Prairie Downs Metals Limited ( Prairie or Company ) is pleased to advise that the Company has secured a highly prospective and potentially
More informationTailor-made Gasification Solutions: ThyssenKrupp Uhde's HTW and PRENFLO Technologies
Tailor-made Gasification Solutions: ThyssenKrupp Uhde's HTW and PRENFLO Technologies Karsten Radtke Uhde Corporation of America Developing the future. At a Glance ThyssenKrupp Uhde s Gasification Technologies
More informationFor personal use only
Shareholder Update 2011 Annual General Meeting 22 nd December 2011 ASX: SYS Forward Looking Statement Disclaimer This presentation has been prepared as a summary only, and does not contain all information
More informationBitumen Upgrader Residue Conversion to Incremental Synthetic Fuels Products
Bitumen Upgrader Residue Conversion to Incremental Synthetic Fuels Products Technical Paper Expander Energy Inc. Jan Wagner, P.Eng. Steve Kresnyak, P.Eng. Final Issue June 19, 2013 Introduction During
More informationCommercial Application of BGL Gasifiers M. Olschar, H. Hirschfelder, W. F. Staab, A. R. Williams (GL)
Commercial Application of BGL Gasifiers M. Olschar, H. Hirschfelder, W. F. Staab, A. R. Williams (GL) 4th International Freiberg Conference on IGCC & XtL Technologies, 3-5th May, 2010, Dresden, Germany
More informationUranium mining legal and regulatory framework
South Australia s Environment Protection Authority Uranium mining legal and regulatory framework An Australian perspective Keith Baldry Director Mining Radiation and Regulatory Support IAEA Seminar on
More information2001 Question 28 Organic Geology A Non-renewable Resource (25 marks) (a) (i) Identify ONE property of coal that changes with increasing coal rank.
2001 Question 28 Organic Geology A Non-renewable Resource (25 marks) (a) (i) Identify ONE property of coal that changes with increasing coal rank. 1 (ii) Coal mined from a coal seam contains mineral matter
More informationProcess Economics Program
IHS Chemical Process Economics Program Report 148C Synthesis Gas Production from Coal and Petroleum Coke Gasification By Jamie Lacson IHS Chemical agrees to assign professionally qualified personnel to
More informationOur refining and chemicals facilities in Saudi Arabia some wholly owned, some ventures with global companies increase opportunities for domestic
Our refining and chemicals facilities in Saudi Arabia some wholly owned, some ventures with global companies increase opportunities for domestic conversion industries, manufacturers, and service providers,
More informationLow-cost, rich, DRC copper
Low-cost, rich, DRC copper May 20, 2014 Brad Marwood, Managing Director Disclaimer Forward-Looking Statements This presentation contains forward-looking information, which is based on assumptions and judgments
More informationConfidence in Carrapateena project grows
7 NOVEMBER 2016 Confidence in Carrapateena project grows Carrapateena Pre-Feasibility Study released - project competitive with, or better than comparable long-life copper assets globally Project metrics
More informationLURGI CLEAN COAL TECHNOLOGY CO - LCCT A NEW NAME, BUT A WELL PROVEN TECHNOLOGY BACK TO LURGI
LURGI CLEAN COAL TECHNOLOGY CO - LCCT A NEW NAME, BUT A WELL PROVEN TECHNOLOGY BACK TO LURGI 2008-05-13 Max-Michael Weiss & Osman Turna, Lurgi GmbH / Air Liquide Group Lurgi GmbH 2009 All rights reserved
More informationPlasma Gasification: The Next Generation of Waste-to-Energy (WTE) Solutions
Alter NRG / Westinghouse Plasma Plasma Gasification: The Next Generation of Waste-to-Energy (WTE) Solutions Gasification India December 6-7, 2017 New Delhi, India WE HAVE A GLOBAL WASTE PROBLEM Landfills
More informationCarbon capture and storage
Low Carbon Green Growth Roadmap for Asia and the Pacific FACT SHEET Carbon capture and storage Key point Carbon capture and storage can potentially mitigate greenhouse gas emissions from large-scale fossil
More informationThe South African Coal Chain 2011
The South African Coal Chain 2011 1Mt Stocks 181.4Mt Washing Local Use 24.0Mt 50.4Mt 4.0Mt 40.0Mt 18 Exports 64.0Mt 303.6Mt Run-of-Mine Production Discards 51.8Mt Synfuels 44.0Mt Electricity 120.8Mt 1.4Mt
More informationENERGY OPTIONS & COAL
ENERGY OPTIONS & COAL Amitabha Ray CGM(QC),CIL Coal Connect :: 19 th November 2007, Kolkata Key factors for consideration.. Energy security depends on availability of secure and reliable energy at affordable
More informationPresentation and Company Update 7 July 2016 Dr Chris Giles, Managing Director. Cash flow from gold sales New project developments Exploration success
Presentation and Company Update 7 July 2016 Dr Chris Giles, Managing Director Cash flow from gold sales New project developments Exploration success The information in this presentation that relates to
More informationMCINTOSH STAGE 1 PRE-FEASIBILITY STUDY UPDATE
ASX ANNOUNCEMENT 8 June 2016 MCINTOSH STAGE 1 PRE-FEASIBILITY STUDY UPDATE Open pit mining optimisation results demonstrate the potential for multiple low strip ratio, open pit operations across a range
More informationRole of the Ports Industry in Coal and Gas
Role of the Ports Industry in Coal and Gas Mike Garratt & Gail Bradford MDS Transmodal Tuesday 4 th March 2014, London 214009_presentationMG-v6 1. UK Ports in the coal & gas markets Provide strategic infrastructure
More informationDrilling, metallurgical test work and a new resource model add 21% to oxide gold reserves
LA ARENA GOLD OXIDE RESERVES INCREASED TO 1.28MM OZ AT AU PRICE OF $1,200 COMPLETION OF THE PRE-FEASIBILITY STUDY FOR THE PHASE II SULPHIDE Cu-Au PROJECT Drilling, metallurgical test work and a new resource
More informationEnergy Sector March 2016, Maseru, Lesotho Pavel Shermanau, IPCC TFI TSU
Energy Sector Africa Regional Workshop on the Building of Sustainable National Greenhouse Gas Inventory Management Systems, and the Use of the 2006 IPCC Guidelines for National Greenhouse Gas Inventories
More informationB, C, G, XtL - what else? Lurgi s Routes to Transportation Fuels
B, C, G, XtL - what else? Lurgi s Routes to Transportation Fuels International Conference on IGCC & XtL Freiberg, 16-18 th June, 2005 Dr. Waldemar Liebner, Dr. Holger Schlichting / Lurgi AG Lurgi AG 2004
More informationTransforming Resources into Mines
Transforming Resources into Mines YEC LNG Workshop January 18th, 2012 JANUARY 2012 CASINO PROJECT TSX: WRN / NYSE Amex: WRN Transforming Resources Into Mines 2 CASINO OVERVIEW SIZE LOCATION Reserves: 1.1
More informationCoal Gasification Renewed technology options to exploit Europe s coal reserves. Brussels, November 13, 2013
technology options to exploit Europe s coal reserves Brussels, November 13, 2013 Presentation Outline ThyssenKrupp Why coal gasification (gasification of solids)? TK Uhde s experience and expertise in
More informationDEPLETED FIELDS WITH ACTIVE AQUIFERS
DEPLETED FIELDS WITH ACTIVE AQUIFERS Perfect CO 2 storage candidates? Dr Owain Tucker, Global deployment lead CCS & CCUS Dr Carol Thompson, Reservoir engineer, Peterhead CCS May 2015 1 CAUTIONARY STATEMENT
More informationSTARVED ACID LEACH TECHNOLOGY (SALT) CONCEPTUAL STUDY. InCoR Holdings Plc MINING AND METALLURGY. April 2014 REPORT Rev. 00 > Internal ref.
STARVED ACID LEACH TECHNOLOGY (SALT) CONCEPTUAL STUDY InCoR Holdings Plc MINING AND METALLURGY April 2014 REPORT Rev. 00 > Internal ref. 140226 Document Number: 140226-0000-49ER-0001 Date: 28/04/2014 Revision:
More informationAdvice to decision maker on coal mining project
. Advice to decision maker on coal mining project IESC 2015-063: West Muswellbrook Project New Development Requesting agency The New South Wales Mining and Petroleum Gateway Panel Date of request 27 January
More informationLARGE-SCALE PRODUCTION OF FISCHER-TROPSCH DIESEL FROM BIOMASS
ECN-RX--04-119 LARGE-SCALE PRODUCTION OF FISCHER-TROPSCH DIESEL FROM BIOMASS Optimal gasification and gas cleaning systems H. Boerrigter A. van der Drift Presented at Congress on Synthetic Biofuels - Technologies,
More informationTERRAMIN AUSTRALIA LIMITED. Annual General Meeting
TERRAMIN AUSTRALIA LIMITED Annual General Meeting 27 May 2016 Disclaimer & Competent Person Statement Disclaimer This presentation has been prepared by Terramin Australia Limited (Terramin). It is current
More informationNOLANS RARE EARTHS PROJECT: MAIDEN JORC ORE RESERVE
ASX RELEASE 11 December 2012 NOLANS RARE EARTHS PROJECT: MAIDEN JORC ORE RESERVE Independently prepared JORC Ore Reserve for Nolans Bore to support a 22 year mine life; 95% of Measured and Indicated Resources
More informationMartin Garrood and Tony Clemens. Liquid Fuels from Lignite. Ministry of Economic Development. Ralph Samuelson
Author(s): Martin Garrood and Tony Clemens CRL Ref: 07/11012 Title: Liquid Fuels from Lignite Client Name: Client Address: P.O. Box 1473 Wellington Ministry of Economic Development Distribution: (Other
More informationFor personal use only
19 October 2015 PARINGA CONTRACTS FUTURE COAL SALES TOTALING US$220 MILLION WITH A MAJOR UTILITY HIGHLIGHTS: Paringa has executed its cornerstone coal sales agreement with LG&E and KU, two of the largest
More informationCarbon Sequestration, FutureGen, and Coal Gasification Development in the Illinois Basin
Illinois and CCS-FutureGen Carbon Sequestration, FutureGen, and Coal Gasification Development in the Illinois Basin Robert J. Finley Illinois State Geological Survey December 7, 2007 Lexington, Kentucky
More informationASX RELEASE BY METROCOAL LIMITED (ASX-MTE) $30 MILLION JOINT VENTURE SIGNED WITH CHINA COAL
ASX ANNOUNCEMENT Thursday 8 April 2010 ASX RELEASE BY METROCOAL LIMITED (ASX-MTE) $30 MILLION JOINT VENTURE SIGNED WITH CHINA COAL Metallica Minerals Limited (ASX-MLM) advises that it s 56% owned subsidiary,
More informationForward Looking Statement
Olympias Forward Looking Statement Certain of the statements made in this Presentation may contain forward-looking statements or information within the meaning of the United States Private Securities Litigation
More informationFUELS. might come across a. dramatically. things. >>> turn the page to the Energy of the Future
FUELS o n c e i n a l i f e t i m e y o u might come across a p r o j e c t t h a t w o u l d dramatically c h a n g e t h e w a y w e d o things >>> turn the page to the Energy of the Future Eco Global
More informationResource corridors: A case study of the Pilbara, Australia
Supporting sustainable resources development Resource corridors: A case study of the Pilbara, Australia Ian Satchwell 29 October 2012 Outline Overview of the Pilbara History of Pilbara development Key
More informationHelping Pay For CO 2 Capture Projects Through Geological Sequestration of CO 2 Used for Enhanced Oil Recovery (EOR)
Helping Pay For CO 2 Capture Projects Through Geological Sequestration of CO 2 Used for Enhanced Oil Recovery (EOR) Eric Redman, President & CEO Summit Power Group, LLC Oil & Gas Industry Forum Denver
More informationSconi and Flemington: Two near-production cobalt-nickel-scandium deposits. ASX: AUZ October 2017
Sconi and Flemington: Two near-production cobalt-nickel-scandium deposits ASX: AUZ October 2017 www.australianmines.com.au Important notes on these slides This document is a visual aid accompanying a presentation
More informationLarge-Scale CCS Demonstration Projects in Canada
Carbon capture and sequestration technology holds enormous potential to reduce our greenhouse gas emissions as we use our own energy resources to power our economy. Prime Minister Stephen Harper, February
More informationBrunei Ammonia/Urea Manufacturing Project
Brunei Ammonia/Urea Manufacturing Project Consortium Presentation Bandar Seri Begawan Brunei Darussalam 20 September 2004 Ammonia/Urea Project Presentation Introduce Project Partners Urea Product and Market
More informationROYAL SOCIETY OF CHEMISTRY TECHNOLOGY IN THE USE OF COAL
ROYAL SOCIETY OF CHEMISTRY TECHNOLOGY IN THE USE OF COAL Professor James Harrison FRSC FEng 1 National Coal Board 1947 Mines 958 Manpower 718000 Use electricity 28 -domestic 37 -steel 43 -other 80 Total
More informationHydrogen for the NWR Upgrader by Lurgi MPG Technology A challenging Project
Hydrogen for the NWR Upgrader by Lurgi MPG Technology A challenging Project Washington DC 29.10.2014 l Max-Michael Weiss, Stefan Walter l Air Liquide Global E&C Solutions Germany GmbH, Frankfurt General
More informationcalifornia CCS coalition Created to represent CCS industry to ensure CCS is part of state s carbon stabilization program. Bring voices to the table th
california CCS coalition A Voice for California s CCS Industry SUPPORTING THE DEPLOYMENT OF CCS TECHNOLOGIES THROUGHOUT CALIFORNIA california CCS coalition Created to represent CCS industry to ensure CCS
More informationWorld s first LNG from Queensland, Australia A precursor to US LNG exports
World s first LNG from Queensland, Australia A precursor to US LNG exports Jason Klein AGM, America American Petroleum Institute, Houston Chapter Legal notice No representation or warranty, express or
More informationwww.sindhcoal.gos.pk Vision To position Sindh as the power house of the region Mission To develop Thar Coal as a major source of power generation for Energy & Economic Security of the country and as a
More informationTechnologies For Conversion Of Unconventional and Renewable Feedstocks From BP. Philip M J Hill, BP International
Technologies For Conversion Of Unconventional and Renewable Feedstocks From BP Philip M J Hill, BP International Disclaimer Copyright 2013, 2014 BP plc. All rights reserved. Contents of this presentation
More informationWelcome To Our Exhibition
Welcome To Our Exhibition Welcome to the exhibition of our proposals for a Waste Recycling and Renewable Energy Facility Distributed Renewable Energy Networks Ltd (DRENL) propose to develop a 10MW Waste
More informationThe Energy Challenge
The Energy Challenge Farrokh Najmabadi Prof. of Electrical Engineering Director of Center for Energy Research UC San Diego October 10, 2007 With Thanks to Dr. Steve Koonin, BP for energy charts Energy
More informationCMM Development at the Amasra Mine, Turkey
CMM Development at the Amasra Mine, Turkey Global Methane Forum March 28-30, 2016 Washington, D.C. Jonathan Kelafant, Advanced Resources International 1 Presentation Outline Project Overview and Background
More informationDRILLING INTERSECTS SIGNIFICANT COAL SEAMS AT TCM COAL PROJECT, KALIMANTAN, INDONESIA
311 313 Hay Street SUBIACO WA 6008 P: + 61 8 9381 5819 F: + 61 8 9388 3701 ABN: 45 098 448 269 www.panasiacorp.com.au 1 February 2010 The Manager Company Announcements Platform Australian Securities Exchange
More informationCOAL RESOURCES INCREASE TO 79Mt AT KATINGAN RIA, INDONESIA
ASX/Media Release 18 January 2012 COAL RESOURCES INCREASE TO 79Mt AT KATINGAN RIA, INDONESIA Highlights Phase 2 drilling work commenced and will continue through to mid February Inferred Resources estimate
More informationIndirect Coal Liquefaction Better Solution to Clean Energy System
Indirect Coal Liquefaction Better Solution to Clean Energy System Yong-Wang Li, Director, Chief Scientist State Key Laboratory of Coal Conversion Institute of Coal Chemistry Chinese Academy of Sciences
More informationAlter NRG Plasma Gasification: The Next Generation of Waste-To-Energy Solutions
Alter NRG Plasma Gasification: The Next Generation of Waste-To-Energy Solutions Deep Dive Workshop on Waste-to-Energy 2016 Asia Clean Energy Forum, 7 June 2016 ABOUT US: ALTER NRG Our Focus and What We
More informationGas vs. Diesel Generator Sets Performance Cost & Application Differences
Gas vs. Diesel Generator Sets Performance Cost & Application Differences Page 1 Agenda Introduction Distributed Energy Products Diesel, Gas and Turbine generator sets How Engines Accept Loads Gas Product
More informationWestinghouse Plasma Gasification is the Next Generation of Energy from Waste Technology. USEA Annual Meeting May 30, 2013 Washington, DC
Westinghouse Plasma Gasification is the Next Generation of Energy from Waste Technology USEA Annual Meeting May 30, 2013 Washington, DC WHO WE ARE Alter NRG is a publicly traded (TSX: NRG; OTCQX: ANRGF)
More informationA new HP version of Lurgi s FBDBTM gasifier is bringing more value to clients
A new HP version of Lurgi s FBDBTM gasifier is bringing more value to clients 2011 Max-Michael Weiss Air Liquide E&C/ Lurgi GmbH, Frankfurt, Germany GAP Conference Beijing 2011 Outline AIR LIQUIDE Group
More informationBrunei Darussalam Country Report
Chapter 3 Brunei Darussalam Country Report September 2016 This chapter should be cited as Energy and Industry Department of Prime Minister s office (2016), Brunei Darussalam Country Report, in Kimura,
More informationLochinvar Coking Coal Project March 2017
Lochinvar Coking Coal Project March 2017 Cautionary Statements Information in relation to the Lochinvar Coking Coal Project, including production targets and financial information, included in this presentation
More informationIntegrated Power Solutions Modular and cost-effective power plant design
Integrated Power Solutions Modular and cost-effective power plant design Rolls-Royce modular concept The concept boosts productivity and operating economics Generating set Engine + generator + baseplate
More informationMAIDEN RESOURCE STATEMENT FOR TCM COAL PROJECT, INDONESIA
311 313 Hay Street SUBIACO WA 6008 P: + 61 8 9381 5819 F: + 61 8 9388 3701 ABN: 45 098 448 269 www.panasiacorp.com.au 11 May 2010 The Manager Company Announcements Platform Australian Securities Exchange
More informationLIQUEFIED NATURAL GAS LIMITED
LIQUEFIED NATURAL GAS LIMITED ASX: LNG CNPC HQCEC: Company Making Transaction Liquefied Natural Gas Limited 5 Ord Street West Perth WA 6005 +61 8 9366 3700 www.lnglimited.com.au LNG Limited An Overview
More informationSupplying Key Resources into Expanding Asian Markets COMPANY PRESENTATION
Supplying Key Resources into Expanding Asian Markets COMPANY PRESENTATION Thermal Coal: Indonesia - Kalimantan In Major Coal Provinces South and East Kalimantan Close to Asian Markets # 1 thermal coal
More informationTECHNOLOGY. E-COMPANY Holding, s.e., Europe
TECHNOLOGY E-COMPANY Holding, s.e., Europe With ZERO-EMISSION WASTE TREATMENT RECYCLING is guaranteed and total ENVIRONMENT is safeguarded COMBUSTIBLE is green and free BAT - Best Available Techniques
More informationTechno economic and Market Analysis of Pathways from Syngas to Fuels and Chemicals
Techno economic and Market Analysis of Pathways from Syngas to Fuels and Chemicals Michael Talmadge, Abhijit Dutta & Richard Bain IEA Bioenergy, Task 33 / IEA IETS Workshop on System and Integration Aspects
More informationTechnical Aspects of Clean Hydrogen Production
Technical Aspects of Clean Hydrogen Production GCEP Energy Workshop Stanford University Stanford, CA April 26, 2004 Charles E. Taylor, Leader Methane Hydrates Research Group National Energy Technology
More informationBiomass Pyrolysis. Tony Bridgwater Bioenergy Research Group Aston University, Birmingham B4 7ET, UK
Biomass Pyrolysis Tony Bridgwater Bioenergy Research Group Aston University, Birmingham B4 7ET, UK Aston University Bioenergy Research Group IEA Bioenergy, York, 12 October 2010 2 What is pyrolysis? Biomass
More informationTransport, Energy and CO2: Moving Toward Sustainability
INTERNATIONAL AGENCY Transport, Energy and CO2: François Cuenot, IEA Expert Group Meeting on Transport for Sustainable Development, 27 August 2009 Index Transport Sector in the big picture Oil demand,
More informationMajuba Underground Coal Gasification
Majuba Underground Coal Gasification 17 September 2010 Presenter: MJ BEESLAAR Context Coal is the predominant natural energy resource in RSA. Eskom presently generates 88% of its electricity from coal.
More informationFor personal use only
ACN 097 088 689 01 DEFINITIVE FEASIBILITY STUDY SUPPORTS A MAJOR EXPANSION OF THE SYAMA GOLD MINE Definitive Feasibility Study completed for multifaceted expansion of Syama operation confirms its technical
More information