1 CE 240 Soil Mechanics & Foundations Lecture 4.1 Soil Compaction: Field work (Das, Ch. 5)

2 Outline of this Lecture 1. Factors controlling degree of compaction 2. Compaction field work 3. Compaction quality control on site

3 Objectives for Compaction Increasing the bearing capacity of foundations; Decreasing the undesirable settlement of structures; Control undesirable volume changes; Reduction in hydraulic conductivity; Increasing the stability of slopes.

4 There are 4 control factors affecting the extent of compaction: 1. Compaction effort; 2. soil type and gradation; 3. moisture content; and 4. dry unit weight (dry density).

5 Compaction with the engineering sense: Compaction is for making the optimum density as close as the zero-air-void as possible. More compaction effort make the optimum density closed to ρ(zav) by the fact of the 2 linear lines have different slopes.

6

7

8 After passing the point of optimum water content, increasing water content will not decrease the hydraulic conductivity any more.

9 Compaction Specifications Work-Type specification contractor what to do and how to do it Lowest bid Performance based specification contractor must achieve a certain degree of compaction based on lab data. Most common

10 Field Compaction Equipment Smooth wheel roller Sheepsfoot roller Pneumatic tired roller Vibratory roller Dynamic Compaction ramming

11 Types of Rollers 1. Smooth Wheel Rollers or Smooth Drum Rollers are suitable for thin layers, and for finishing operations. 2. Pneumatic Rubber-Tired Rollers have a series of rubber tires side-by-side instead of a smooth drum. Compaction is achieved by a combination of weight and kneading action. 3. Sheepsfoot Rollers are drums with a large number of "sheepsfoot" projections. They are most effective in compacting clayey soils. The initial pass in the field compacts the lower portion of the lift, with subsequent passes compacting the middle and upper portions. The roller is said to "walk out" as the soil is compacted and the feet do not penetrate as deeply as the initial pass. 4. Vibratory Rollers work well in compacting granular soils. Vibratory action can be used with smooth drum, rubber tired, or sheepsfoot rollers.

12 Compaction

13

14 Compaction

15

16 Inflation pressure-slight tire bulge with the proper pressure on radial ply tires 18 psi 6 psi Bulge

17 Impact of Tire Pressure 18 psi 6 psi

18 Top View: Measured soil-tire interface stress (psi) distribution of an 18.4R38 tire

19 At Proper Inflation Pressure, Radials have greater Contact Area

20 Impact of soil moisture on compaction (depth and sinkage) Depth, In Hard dry soil Normal Wet soil

21 B. Ramming Rammers have a low frequency (800 blows/minute), and a higher stroke (1.5" to 3.5 height). As the machine operates the ramming action breaks down the soil, pushes the particles closer together, and forces air out of the voids.

22 C. Vibration Vibratory machines are distinguished by their high frequency (2,000 to 6,000 blows/minute) and a low amplitude. The vibratory action sets the soil particles in motion, which rearranges them into a denser packing. (Das, 2006)

23

24 Field Compaction A. Relative Compaction Relative compaction is a way of comparing compaction on the construction site with the laboratory compaction results. It is defined as:

25 Specification for Field Compaction Specifications will refer to % Relative Compaction Relative to what? Proctor Test standard or modified % Relative Compaction R ( ) d ( field ) % = γ γ d max ( lab ) 100 R ~ (90 100%) If R > 100 % use Modified Proctor Test

26

27 A. Water Content the experience In the field it has been found that soils compact better at water contents on the dry side of the optimum water content determined in the lab. B. Why? Lab and field have used different compaction pressure.

28 The clayey soil compacted at the dry side of the optimum water content will possess greater strength.

29 A number of roller passes are the most efficient and economical way to yield the maximum dry unit weight.

30 Specification for Field Compaction 98% means the soil in the field should be 98% of the lab result For example, if the peak of the curve is at 100 pcf and 22% moisture The field compaction must be at least 98 pcf and within the stated moisture range (20 ~24%)

31 Specification for Field Compaction (cont.) Soil will be compacted to 98% relative compaction as compared to a standard proctor test, ASTM D-698 The soil moisture content will be ± 2% of optimum.

32 Measurement of Field Compaction Most common methods are Nuclear Method Sand Cone method Rubber Balloon method

33

34

35 In-Place Soil Unit Weight Test Density of soil in-place by drive cylinder method ASTM D2937 or AASHTO T 204 Unit weight of soil in-place by the sandcone method (Fig. 4-12) ASTM D 1556 or AASHTO T 191

36 In-Place Soil Unit Weight Test (cont.) Unit weight of soil in-place by the rubberballoon method ASTM 2167 or AASHTO T 205 Unit weight of soil and soil-aggregate inplace by nuclear methods ASTM D 2922

37 Figure 5.28 (Das, 2006) Calibrated vessel used with rubber balloon

38 Nuclear density gauges consist of a sealed source in a source holder and a scintillation detector. The source holder is mounted on the end of a pipe or chute with the detector in the instrument console. The nuclear source radiation transmits from the source through the material to the detector. As the density of the material changes the amount of radiation reaching the detector changes. The greater the density of the material, the lower the radiation field at the detector; the lower the density of the material, the higher the radiation field at the detector. A big disadvantage of this instrument is the safety precautions that has to be taken into account. It is even necessary to have the operators attend a special training just to work with the gauge.

39 Non-nuclear density gauge To avoid the hassle of the existing nuclear method, non-nuclear density gauge has also been developing and remaining as an active research field in geotechnical engineering. One of such kind f density meter called Pavement Quality Indicator (PQI). A measuring plate underneath the gauge generates an altering electric field through the asphalt. This way it measures the dielectric properties of the material. This property is tells how much electrical energy the material can hold. It is obvious that air has a complete other properties than solid material. Because more dense material holds less air, it is possible to calculate the density based on the electrical properties of that material. Because it is 'just' an electrical device anyone is allowed to work with it. This makes it possible that staff working with the compactor or near the paving process can measure the compaction during the day as often as necessary.

40 Reading assignment: Ch. 5 Homework: Problems 5.9, 5.10, 5.11, 5.12

CE 240 Soil Mechanics & Foundations Lecture 3.3. Soil Compaction (Das, Ch. 5)

CE 240 Soil Mechanics & Foundations Lecture 3.3. Soil Compaction (Das, Ch. 5) CE 240 Soil Mechanics & Foundations Lecture 3.3 Soil Compaction (Das, Ch. 5) Class Outlines Soil compaction introduction Standard Proctor Compaction Test Effect of Compaction Energy Modified Proctor Compaction

More information

Soil Mechanics IX. SOIL IMPROVEMENT

Soil Mechanics IX. SOIL IMPROVEMENT Soil Mechanics IX. SOIL IMPROVEMENT Methods for Soil Improvement Ground Reinforcement Stone Columns Soil Nails Deep Soil Nailing Micropiles (Mini-piles) Jet Grouting Ground Anchors Geosynthetics Fiber

More information

t ghi yr Cop

t ghi yr Cop In many situations, soil itself is used as a construction material Highway embankments Railway embankments Earth dams Highway / Airfield pavements Backfilled trenches Landfills When soil is used as foundation

More information

SECTION AGGREGATES

SECTION AGGREGATES SECTION 32 05 00 AGGREGATES PART 1 GENERAL 1.01 SUMMARY A. Section Includes: 1. Aggregate base 2. Engineered fill 3. Backfill 4. Fine filter aggregate (non-frost susceptible fill) 5. Riprap 6. Recreational

More information

BACKFILL COMPACTION FOR VOLCLAY WATERPROOFING: An Essential Ingredient for a Successful Project

BACKFILL COMPACTION FOR VOLCLAY WATERPROOFING: An Essential Ingredient for a Successful Project BACKFILL COMPACTION FOR VOLCLAY WATERPROOFING: An Essential Ingredient for a Successful Project For several years, CETCO has required that soil backfill placed against a foundation wall with Volclay waterproofing

More information

Mix Design & Construction -1-

Mix Design & Construction -1- Mix Design & Construction -1- AGENDA RCC Mix Design RCC Mix Production RCC Construction Process -2- THE FINAL SURFACE TYPE WILL DICTATE THE NECESSARY TECHNIQUES & EQUIPMENT NEEDED TO BE SUCCESSFUL Natural

More information

CONSOLIDATED EDISON COMPANY OF NEW YORK, INC. 4 IRVING PLACE NEW YORK, NY DISTRIBUTION ENGINEERING TOOLS AND STRUCTURES

CONSOLIDATED EDISON COMPANY OF NEW YORK, INC. 4 IRVING PLACE NEW YORK, NY DISTRIBUTION ENGINEERING TOOLS AND STRUCTURES CONSOLIDATED EDISON COMPANY OF NEW YORK, INC. 4 IRVING PLACE NEW YORK, NY 10003 DISTRIBUTION ENGINEERING TOOLS AND STRUCTURES SPECIFICATION EO-1181 REVISION 6 May 2010 EFFECTIVE DATE June 1, 2010 GENERAL

More information

Successful Compaction using Vibratory Pneumatic Tire(VPT) Roller GW750-2/GW751. Hitoshi Fujita & Josh Steel, Feb.22, 2017

Successful Compaction using Vibratory Pneumatic Tire(VPT) Roller GW750-2/GW751. Hitoshi Fujita & Josh Steel, Feb.22, 2017 Successful Compaction using Vibratory Pneumatic Tire(VPT) Roller GW750-2/GW751 Hitoshi Fujita & Josh Steel, Feb.22, 2017 Major Changes for GW751(iT4) Compared with GW750-2(T3) Engine with DPF: KUBOTA,

More information

A. Texas Department of Transportation 2004 Standard Specifications for Construction and Maintenance of Highways, Streets and Bridges (TxDOT).

A. Texas Department of Transportation 2004 Standard Specifications for Construction and Maintenance of Highways, Streets and Bridges (TxDOT). SECTION 32 01 16 ASPHALT OVERLAY PART 1 - GENERAL 1.1 SCOPE OF WORK A. This Section specifies the requirements for scarifying, grinding, sweeping and repair of existing asphalt concrete pavement to establish

More information

Cement Stabilized Soil (CSS) (Portland cement)

Cement Stabilized Soil (CSS) (Portland cement) Cement Stabilized Soil (CSS) (Portland cement) 1.0 DESCRIPTION. This specification shall govern the process known as Cement Stabilized Soil (CSS). CSS consists of mixing the existing base, subbase and

More information

LTRC. Alternative Tests for Durability of Cement Stabilized Low Plasticity Soils. Presentation to Louisiana Engineering Conference.

LTRC. Alternative Tests for Durability of Cement Stabilized Low Plasticity Soils. Presentation to Louisiana Engineering Conference. Alternative Tests for Durability of Cement Stabilized Low Plasticity Soils Presentation to Louisiana Engineering Conference LTRC February 27 Louisiana Transportation Research Center Background o Portland

More information

CETCO-VOLCLAY CG-50 SPECIFICATION GUIDELINES MIX IN PLACE

CETCO-VOLCLAY CG-50 SPECIFICATION GUIDELINES MIX IN PLACE CETCO-VOLCLAY CG-50 SPECIFICATION GUIDELINES MIX IN PLACE 1.0 GENERAL 1.1 Scope A. This specification guideline covers the technical requirements for furnishing all labor, materials, equipment, and incidentals

More information

StormTech Construction Guide

StormTech Construction Guide A division of StormTech solid end caps and pre-cored end caps StormTech chambers StormTech manifolds and fittings Acceptable fill materials per Table 1 Woven and non-woven geotextiles 80-7 DC REQUIRED

More information

RESILIENT MODULUS TESTING OF OPEN GRADED DRAINAGE LAYER AGGREGATES FOR INTERLOCKING CONCRETE BLOCK PAVEMENTS

RESILIENT MODULUS TESTING OF OPEN GRADED DRAINAGE LAYER AGGREGATES FOR INTERLOCKING CONCRETE BLOCK PAVEMENTS RESILIENT MODULUS TESTING OF OPEN GRADED DRAINAGE LAYER AGGREGATES FOR INTERLOCKING CONCRETE BLOCK PAVEMENTS SUMMARY David Hein, P. Eng., Principal Engineer Applied Research Associates, Inc. 541 Eglinton

More information

4-07 Asphalt Treated Permeable Base (ATPB)

4-07 Asphalt Treated Permeable Base (ATPB) 1 1 0 1 0 1 Supplement Division with the following: (November 0,, APWA GSP) -0 Asphalt Treated Permeable Base (ATPB) -0.1 Description Asphalt treated permeable base (ATPB) consists of a compacted course

More information

SPECIFICATIONS FOR PRECAST MODULAR BLOCK RETAINING WALL SYSTEM (revised 5/8/7)

SPECIFICATIONS FOR PRECAST MODULAR BLOCK RETAINING WALL SYSTEM (revised 5/8/7) Page 1 of 7 STONE STRONG SYSTEMS SPECIFICATIONS FOR PRECAST MODULAR BLOCK RETAINING WALL SYSTEM (revised 5/8/7) PART 1: GENERAL 1.01 Description A. Work includes furnishing and installing precast modular

More information

2.1 Backfill - General

2.1 Backfill - General 2.1 Backfill - General Excavations are made for the purpose of constructing bridge substructure elements, and consequently requiring competent backfill material. The backfill material must be adequately

More information

SECTION PERMEABLE INTERLOCKING CONCRETE UNIT PAVEMENT

SECTION PERMEABLE INTERLOCKING CONCRETE UNIT PAVEMENT SECTION 32 14 13 19 PERMEABLE INTERLOCKING CONCRETE UNIT PAVEMENT SECTION 32 14 13 19 PERMEABLE INTERLOCKING CONCRETE UNIT PAVEMENT PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Permeable Articulating

More information

BIO-AQUIFER STORM SYSTEM

BIO-AQUIFER STORM SYSTEM BIO-AQUIFER STORM SYSTEM Specifications for Construction PART 1 GENERAL 1.01 SECTION INCLUDES A. Providing labor, materials, tools and equipment to furnish and install a permeable concrete paving stone

More information

SPECIFICATIONS FOR BRIDGE CONSTRUCTION SECTION 2 BACKFILL. 2.1 General...2-1

SPECIFICATIONS FOR BRIDGE CONSTRUCTION SECTION 2 BACKFILL. 2.1 General...2-1 SPECIFICATIONS FOR BRIDGE CONSTRUCTION SECTION 2 BACKFILL TABLE OF CONTENTS 2.1 General...2-1 2.2 Materials...2-1 2.2.1 Compacted Non-granular Material...2-1 2.2.2 Gravel Material and Crushed Aggregate

More information

SACRAMENTO COUNTY ASPHALT RUBBER HOT MIX-GAP GRADED (ARHM-GG):

SACRAMENTO COUNTY ASPHALT RUBBER HOT MIX-GAP GRADED (ARHM-GG): SACRAMENTO COUNTY ASPHALT RUBBER HOT MIX-GAP GRADED (ARHM-GG): ARHM-GG shall conform to the provisions for Type "A" asphalt concrete in Section 39, "Asphalt Concrete," of the State Standard Specifications

More information

R-TANK SPECIFICATIONS

R-TANK SPECIFICATIONS TECHNICAL STORMWATER MANAGEMENT R-TANK SPECIFICATIONS PART 1 GENERAL 1.01 Related Documents A. Drawings, technical specification and general provisions of the Contract as modified herein apply to this

More information

Concrete. Chapter 10 Properties of Fresh Concrete. Materials of Construction-Concrete 1. Wikipedia.org

Concrete. Chapter 10 Properties of Fresh Concrete. Materials of Construction-Concrete 1. Wikipedia.org Wikipedia.org Concrete Chapter 10 Properties of Fresh Concrete Materials of Construction-Concrete 1 What is Concrete? Concrete is a composite material that consists of a cement paste within which various

More information

SECTION ECO-CITYLOCK PERMEABLE INTERLOCKING CONCRETE UNIT PAVING

SECTION ECO-CITYLOCK PERMEABLE INTERLOCKING CONCRETE UNIT PAVING SECTION 32 14 13.19 ECO-CITYLOCK PERMEABLE INTERLOCKING CONCRETE UNIT PAVING 1-800-245-PAVE http://www.pavestone.com ATLANTA, GA: (770) 306-9691 AUSTIN/SAN ANTONIO, TX: (512) 558-7283 BOSTON, MA: (508)

More information

DIVISION II CONSTRUCTION AND MATERIAL SPECIFICATIONS SECTION 2200 PAVING. APPROVED AND ADOPTED THIS 15th DAY OF FEBRUARY, 2017

DIVISION II CONSTRUCTION AND MATERIAL SPECIFICATIONS SECTION 2200 PAVING. APPROVED AND ADOPTED THIS 15th DAY OF FEBRUARY, 2017 DIVISION II CONSTRUCTION AND MATERIAL SPECIFICATIONS SECTION 2200 PAVING APPROVED AND ADOPTED THIS 15th DAY OF FEBRUARY, 2017 KANSAS CITY METROPOLITAN CHAPTER OF THE AMERICAN PUBLIC WORKS ASSOCIATION TABLE

More information

SECTION SPECIFICATION FOR STONEBRIDGE RETAINING WALL SYSTEM

SECTION SPECIFICATION FOR STONEBRIDGE RETAINING WALL SYSTEM SECTION 32 32 23 SPECIFICATION FOR STONEBRIDGE RETAINING WALL SYSTEM PART 1: GENERAL 1.01 Scope Work includes furnishing all materials, labor, equipment, and supervision to install a Stonebridge segmental

More information

Section 25 Aggregate Subbase

Section 25 Aggregate Subbase Black text from standard FAA spec Strikeout text deletions from FAA standard spec Blue text additions to FAA standard spec Red text notes to the Engineer/won t appear in spec I. DESCRIPTION A. GRANULAR

More information

Extraction and Sieve Analysis ( µm minus) Forming Marshall Specimens, Field Method

Extraction and Sieve Analysis ( µm minus) Forming Marshall Specimens, Field Method 3.56 COLD IN-PLACE RECYCLING 3.56.1 GENERAL This specification covers the requirements for Cold In-Place Recycling (CIR) which consists of reclaiming the existing asphalt pavement; sizing the reclaimed

More information

Research on Application of Pavement Quality Indicator and Infrared Thermal Camera in Asphalt Pavement Process Control in China

Research on Application of Pavement Quality Indicator and Infrared Thermal Camera in Asphalt Pavement Process Control in China Research on Application of Pavement Quality Indicator and Infrared Thermal Camera in Asphalt Pavement Process Control in China Wenhuan Zhou Chang an University, Xi an, Shannxi, China Dajin Guo Tongji University,

More information

OPTIMIZED 3/4" GRADATION LIGHTWEIGHT AGGREGATE REPORT

OPTIMIZED 3/4 GRADATION LIGHTWEIGHT AGGREGATE REPORT OPTIMIZED 3/4" GRADATION LIGHTWEIGHT AGGREGATE REPORT PREPARED BY: JODY WALL, P.E. DIRECTOR OF RESEARCH AND DEVELOPMENT CAROLINA STALITE COMPANY RESEARCH LAB GOLD HILL, NORTH CAROLINA Optimized 3/4" Gradation

More information

A. Texas Department Transportation 2004 Standard Specifications for Construction of Highways, Streets and Bridges (TxDOT):

A. Texas Department Transportation 2004 Standard Specifications for Construction of Highways, Streets and Bridges (TxDOT): SECTION 31 32 13.16 CEMENT STABILIZATION PART 1 GENERAL 1.1 SCOPE OF WORK A. This Section pertains to the specifications for cement stabilization of sandy or silty soil and consists of pulverizing, addition

More information

SECTION RIPRAP, BOULDERS, AND BEDDING

SECTION RIPRAP, BOULDERS, AND BEDDING SECTION 31 37 00 RIPRAP, BOULDERS, AND BEDDING PART 1 GENERAL 1.01 SECTION INCLUDES A. The WORK includes excavation, grading, and installation of riprap, boulders, soil riprap, void-filled riprap, and

More information

PERMEABLE INTERLOCKING PAVERS

PERMEABLE INTERLOCKING PAVERS PERMEABLE INTERLOCKING PAVERS PART 1 - GENERAL 1.01 SECTION INCLUDES A. Subgrade Preparation B. Placement of Storage Aggregate C. Placement of Filter Aggregate D. Placement of Bedding Course E. Placement

More information

Asphalt Rubber Chip Sealing DRAFT MAINTENANCE SPECIFICATION. March 22, 2007

Asphalt Rubber Chip Sealing DRAFT MAINTENANCE SPECIFICATION. March 22, 2007 Asphalt Rubber Chip Sealing DRAFT MAINTENANCE SPECIFICATION March 22, 2007 Description: This work consists of furnishing and applying asphalt rubber binder followed by an application of treated cover aggregate

More information

What is it? What is Granular Base Stabilization ti (GBS)? Emulsion Full Depth Reclamation Process

What is it? What is Granular Base Stabilization ti (GBS)? Emulsion Full Depth Reclamation Process Emulsion Full Depth Reclamation and Granular Base Stabilization An Engineered Approach 47 th Idaho Asphalt Conference Rocktober 25 th, 2007 Full Depth Reclamation (FDR) What is it? Rehabilitation technique

More information

City of Brandon Division 2 Standard Construction Specifications Section January 2000 Page 1 of 10 SOIL CEMENT BASE COURSE PART 1 GENERAL

City of Brandon Division 2 Standard Construction Specifications Section January 2000 Page 1 of 10 SOIL CEMENT BASE COURSE PART 1 GENERAL January 2000 Page 1 of 10 PART 1 GENERAL 1.01 OTHER CONTRACT DOCUMENTS 1.02 DESCRIPTION OF WORK 1.03 RELATED WORK 1.04 APPROVALS PART 2 PRODUCTS 2.01 CEMENT 2.02 WATER The General Conditions of the Contract,

More information

SUPERPAVE. SUperior PERforming Asphalt PAVEments. History of Hveem Mix Design

SUPERPAVE. SUperior PERforming Asphalt PAVEments. History of Hveem Mix Design SUPERPAVE SUperior PERforming Asphalt PAVEments History of Hveem Mix Design Hveem mix design was created by Francis Hveem in the 1920 s Basic premise of the design methodology is to coat each aggregate

More information

SECTION EXCAVATION AND BACKFILL FOR UTILITIES AND STRUCTURES

SECTION EXCAVATION AND BACKFILL FOR UTILITIES AND STRUCTURES SECTION 02215 EXCAVATION AND BACKFILL FOR UTILITIES AND STRUCTURES PART 1 - GENERAL 1.1 DESCRIPTION: This section includes materials, testing, and installation of earthwork for excavations, fills, and

More information

Full Depth Reclamation

Full Depth Reclamation Full Depth Reclamation FDR Has Been Around A While 2 3 What is Full Depth Reclamation (FDR)? Full Depth Reclamation is a pavement rehabilitation technique in which the full flexible pavement section and

More information

TESTING SOIL CONDITIONS FOR VEHICLE SECURITY BARRIER TESTS

TESTING SOIL CONDITIONS FOR VEHICLE SECURITY BARRIER TESTS TESTING SOIL CONDITIONS FOR VEHICLE SECURITY BARRIER TESTS May 2015 Disclaimer Reference to any specific commercial product, process or service by trade name, trademark, manufacturer, or otherwise, does

More information

COLD-IN-PLACE RECYCLING

COLD-IN-PLACE RECYCLING COLD-IN-PLACE RECYCLING A Cost Effective Pavement Preservation Treatment Kit Black, P.E. October 15, 2013 Footer Text Outline 1 2 3 4 5 6 7 Definition Equipment & Construction Process Project Selection

More information

MACHINE-LAY Installation Manual

MACHINE-LAY Installation Manual MACHINE-LAY Installation Manual PaveDrain Installation Manual Table of Contents Section 1: Base Preparation (pages 3 6) Section 2: Machine-Lay PaveDrain Blocks (pages 8 11) Section 3: Edge Restraints (pages

More information

DIVISION 31 EARTHWORK 2006 Edition, Published January 1, 2006; Division Revision Date: January 31, 2012

DIVISION 31 EARTHWORK 2006 Edition, Published January 1, 2006; Division Revision Date: January 31, 2012 2006 Edition, Published January 1, 2006; Division Revision Date: January 31, 2012 PART FIVE DOCUMENTS FOR SITE AND INFRASTRUCTURE 31 00 00. EARTHWORK 31 10 00. SITE CLEARING.1 STRUCTURE REMOVAL: Include

More information

Anchorplex retaining wall construction guide. Building. Anchorplex. Retaining Wall Systems

Anchorplex retaining wall construction guide. Building. Anchorplex. Retaining Wall Systems Anchorplex retaining wall construction guide Building Anchorplex Retaining Wall Systems Table of Contents and ow to Use This Guide table of contents ow to Use This Guide. 2 About the Anchorplex System.

More information

Method of Test for Determining Target Dry Density & In-place Density of Salvaged/Recycled Materials Using the Nuclear Gauge (Test Strip)

Method of Test for Determining Target Dry Density & In-place Density of Salvaged/Recycled Materials Using the Nuclear Gauge (Test Strip) Method of Test for Determining Target Dry Density & In-place Density of Salvaged/Recycled Materials Using the Nuclear Gauge (Test Strip) 1. Scope: This test is for determining the target dry density of

More information

LANDSCAPE RETAINING WALLS

LANDSCAPE RETAINING WALLS SUDAS Standard Specifications Division 9 - Site Work and Landscaping Section 9070 - Landscape Retaining Walls LANDSCAPE RETAINING WALLS PART - GENERAL.0 SECTION INCLUDES A. Modular Block Retaining Walls

More information

Floor Preparation Recommendations. Best Practices to Prepare Concrete for Polishing

Floor Preparation Recommendations. Best Practices to Prepare Concrete for Polishing Floor Preparation Recommendations Best Practices to Prepare Concrete for Polishing Polishing Basics FACT #1 Poorly finished concrete WILL result in a substandard polishing process. Finished concrete is

More information

SECTION 402 PLANT MIX BITUMINOUS SURFACE LEVELING

SECTION 402 PLANT MIX BITUMINOUS SURFACE LEVELING SECTION 402 PLANT MIX BITUMINOUS SURFACE LEVELING 402.1 Description. This work shall consist of placing, spreading and compacting a bituminous mixture as shown on the plans or as directed by the engineer.

More information

CITY OF FARGO SPECIFICATIONS ASPHALT PAVING

CITY OF FARGO SPECIFICATIONS ASPHALT PAVING ASPHALT PAVING PART 1 DESCRIPTION OF WORK The work to be done under this section of the Specifications and the accompanying plans consists of furnishing all labor, material, accessories, and plant necessary

More information

VIRGINIA DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION FOR LATEX MODIFIED EMULSION TREATMENT (MICRO-SURFACING)

VIRGINIA DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION FOR LATEX MODIFIED EMULSION TREATMENT (MICRO-SURFACING) S312EM2-1110 VIRGINIA DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION FOR LATEX MODIFIED EMULSION TREATMENT (MICRO-SURFACING) August 10, 2010 I. DESCRIPTION This work shall include furnishing and placing

More information

SELF-CONSOLIDATING CONCRETE FOR SLIP-FORM CONSTRUCTION: PROPERTIES AND TEST METHODS

SELF-CONSOLIDATING CONCRETE FOR SLIP-FORM CONSTRUCTION: PROPERTIES AND TEST METHODS SELF-CONSOLIDATING CONCRETE FOR SLIP-FORM CONSTRUCTION: PROPERTIES AND TEST METHODS Kejin Wang (1), Surendra P. Shah (2) and Thomas Voigt (3) (1) Department of Civil, Construction and Environmental Engineering,

More information

SPECIFICATIONS FOR SAND SEAL

SPECIFICATIONS FOR SAND SEAL SPECIFICATIONS FOR SAND SEAL 1.0 DEFINITIONS The term Director [Superintendent, etc.] shall mean the Director of Public Works of the awarding authority. The term Designee shall mean an employee of the

More information

PAVING SLABS ON A CONCRETE BASE

PAVING SLABS ON A CONCRETE BASE SECTION 32 14 13.16 PAVING SLABS ON A CONCRETE BASE (1995 MasterFormat Section 02784) Note: This guide specification for the U.S. is for paving slabs on a sand bed over concrete for pedestrian applications.

More information

Road Stabilization And Dust Control

Road Stabilization And Dust Control Road Stabilization And Dust Control What to expect from SOS Environmental & Services? Dust Control? Less Road Maintenance Choices to meet needs and budget Technical Support Road Stabilization? Sub base

More information

Bump Formation & Prevention

Bump Formation & Prevention Bump Formation & Prevention In Asphalt Concrete Overlays Vern Thompson Central Region Sales Manager Crafco, Inc. INTRODUCTION Crack Treatments #1 Sealing cracks in asphalt concrete pavements is a widely

More information

Standard Cut vs. Keyhole

Standard Cut vs. Keyhole 1 KEYHOLE TECHNOLOGY An O&M Infrastructure Management Tool For the 21 st Century Utility Micro-Surgery 2005 APWA International Public Works Congress and Exposition Tuesday, 13 September 2005 T. Mark Andraka----

More information

DRAFT Guidance Specification for Porous or Dense-Graded Asphalt Pavement Structures for Storm Water Management Revised July 28, 2016

DRAFT Guidance Specification for Porous or Dense-Graded Asphalt Pavement Structures for Storm Water Management Revised July 28, 2016 DRAFT Guidance Specification for Porous or Dense-Graded Asphalt Pavement Structures for Storm Water Management Revised July 28, 2016 INTRODUCTION Storm water management is a challenge facing our ever expanding

More information

TRENCH EXCAVATION AND BACKFILL

TRENCH EXCAVATION AND BACKFILL SUDAS Standard Specifications Division 3 - Trench and Trenchless Construction Section 300 - Trench Excavation and Backfill TRENCH EXCAVATION AND BACKFILL PART - GENERAL.0 SECTION INCLUDES A. Trench Excavation

More information

Construction Specification for Concrete Unit Pavers

Construction Specification for Concrete Unit Pavers Engineering & Construction Services Division Standard Specifications for Road Works TS 3.80 September 2017 for Concrete Unit Pavers Table of Contents TS 3.80.01 SCOPE... 2 TS 3.80.02 REFERENCES... 2 TS

More information

SECTION 19 - TRENCH EXCAVATION, BEDDING AND BACKFILL TABLE OF CONTENTS

SECTION 19 - TRENCH EXCAVATION, BEDDING AND BACKFILL TABLE OF CONTENTS SECTION 19 - TRENCH EXCAVATION, BEDDING AND BACKFILL TABLE OF CONTENTS Section Page 19-1 TRENCH EXCAVATION... 19-1 19-1.01 Exploratory Excavation... 19-1 19-1.02 Trench... 19-1 19-1.02.AStorm Drain Pipe...

More information

The Cardiac Arrest of Hot Mix Asphalt Pavements

The Cardiac Arrest of Hot Mix Asphalt Pavements The Cardiac Arrest of Hot Mix Asphalt Pavements Timothy R. Murphy, P.E. President What Are You Really Going To Remember from this Convention? What will you really remember most about today? 70% of what

More information

METHOD OF MAKING AND CURING CONCRETE TEST SPECIMENS IN THE FIELD FOP FOR AASHTO T 23

METHOD OF MAKING AND CURING CONCRETE TEST SPECIMENS IN THE FIELD FOP FOR AASHTO T 23 METHOD OF MAKING AND CURING CONCRETE TEST SPECIMENS IN THE FIELD FOP FOR AASHTO T 23 Scope This procedure covers the method for making, initially curing, and transporting concrete test specimens in the

More information

Presentation to the 60 th Annual NJ Asphalt Paving Conference March 14, 2017 Ewing, NJ

Presentation to the 60 th Annual NJ Asphalt Paving Conference March 14, 2017 Ewing, NJ Presentation to the 60 th Annual NJ Asphalt Paving Conference March 14, 2017 Ewing, NJ James J. Purcell, PE, PMP Technical Director, New Jersey Asphalt Pavement Association Reduce impervious surface Recharge

More information

machine Drive Power compaction control

machine Drive Power compaction control machine Drive ower Cat compaction control What is MD? MD (Machine Drive ower) is an innovative new soil compaction measurement technology that helps operators determine when the load bearing strength of

More information

Warm Mix Asphalt (WMA) Guide Specification for Highway Construction

Warm Mix Asphalt (WMA) Guide Specification for Highway Construction Warm Mix Asphalt (WMA) Guide Specification for Highway Construction Division 400 - Asphalt Pavements and Surface Treatments SECTION 4XX - WARM MIX ASPHALT (WMA) PAVEMENT Warm mix asphalt (WMA) is the generic

More information

Vibroflot Modular Product Range

Vibroflot Modular Product Range NTERNTONL CONSTRUCTON EQUPMENT Vibroflot Modular Product Range Deep Vibro Techniques NTERNTONL CONSTRUCTON EQUPMENT Deep Vibro techniques by CE nternational Construction Equipment CE nternational Construction

More information

SEGMENTAL BLOCK RETAINING WALLS. Comply with Division 1 - General Provisions and Covenants, as well as the following:

SEGMENTAL BLOCK RETAINING WALLS. Comply with Division 1 - General Provisions and Covenants, as well as the following: SEGMENTAL BLOCK RETAINING WALLS PART 1 - GENERAL 1.01 SECTION INCLUDES Segmental Block Retaining Walls 1.02 DESCRIPTION OF WORK Constructing segmental block retaining walls. 1.03 SUBMITTALS Comply with

More information

ITEM 275 PORTLAND CEMENT TREATED MATERIALS (ROAD MIXED)

ITEM 275 PORTLAND CEMENT TREATED MATERIALS (ROAD MIXED) ITEM 275 PORTLAND CEMENT TREATED MATERIALS (ROAD MIXED) 275.1. Description. This Item shall govern for treating subgrade, new and/or existing base [with or without asphaltic concrete pavement (ACP)], or

More information

PERFORMANCE OF SOIL-CEMENT PLATING IN THE TEXAS PANHANDLE. Abstract

PERFORMANCE OF SOIL-CEMENT PLATING IN THE TEXAS PANHANDLE. Abstract PERFORMANCE OF SOIL-CEMENT PLATING IN THE TEXAS PANHANDLE By: D.N. Clute, P.E.; M.S. Garsjo, P.E.; K.R. Worster, P.E. National Design, Construction, and Soil Mechanics Center, USDA-NRCS, Fort Worth, Texas

More information

FINAL REPORT COMPARISON OF SEVERAL ASPHALT DESIGN METHODS. G. W. Maupin, Jr. Principal Research Scientist

FINAL REPORT COMPARISON OF SEVERAL ASPHALT DESIGN METHODS. G. W. Maupin, Jr. Principal Research Scientist FINAL REPORT COMPARISON OF SEVERAL ASPHALT DESIGN METHODS G. W. Maupin, Jr. Principal Research Scientist (The opinions, findings, and conclusions expressed in this report are those of the author and not

More information

SECTION 19 - TRENCH EXCAVATION, BEDDING AND BACKFILL TABLE OF CONTENTS

SECTION 19 - TRENCH EXCAVATION, BEDDING AND BACKFILL TABLE OF CONTENTS SECTION 19 - TRENCH EXCAVATION, BEDDING AND BACKFILL TABLE OF CONTENTS Section Page 19-1 TRENCH EXCAVATION...19.1 19-1.01 Exploratory Excavation...19.1 19-1.02 Trench Width...19.1 19-1.02.A Storm Drain

More information

EFFECT OF CEMENT CONTENT ON UNCONFINED COMPRESSIVE STRENGTH OF JAMSHORO SOIL

EFFECT OF CEMENT CONTENT ON UNCONFINED COMPRESSIVE STRENGTH OF JAMSHORO SOIL International Symposium on Sustainable Geosynthetics and Green Technology for Climate Change (SGCC) 2 to 21 June 212 Bangkok, Thailand EFFECT OF CEMENT CONTENT ON UNCONFINED COMPRESSIVE STRENGTH OF JAMSHORO

More information

CRUSHED AGGREGATE BLENDED WITH GRANITECRETE ADMIXTURE SURFACING

CRUSHED AGGREGATE BLENDED WITH GRANITECRETE ADMIXTURE SURFACING Guide Specification CRUSHED AGGREGATE BLENDED WITH GRANITECRETE ADMIXTURE SURFACING COORDINATE WITH DRAWINGS: Show location and extent of stabilized aggregate surfacing. Show details required at adjoining

More information

C. Foundation stabilization for pipe and utility structures.

C. Foundation stabilization for pipe and utility structures. PART 1 - GENERAL 1.1 SECTION INCLUDES A. Excavating, backfilling, and compacting for utilities, including pipe, structures, and appurtenances. B. Control of water in trenches. C. Foundation stabilization

More information

Please include this addendum in your Bid proposal for the above referenced project. Questions are in black ink, and the answers are in red ink.

Please include this addendum in your Bid proposal for the above referenced project. Questions are in black ink, and the answers are in red ink. JAHarchitects, LLC PROJECT NO. 393 RIVERCREST CDD 11560 RAMBLE CREEK DRIVE, RIVERVIEW FL ADDENDUM TO BID PROJECT: RIVERCREST CDD MULTI PURPOSE FIELD MAINTENANCE BUILDING & DOG PARK POOL & CABANNA JAH PROJECT

More information

MOLDING, TESTING, AND EVALUATING ASPHALT BLACK BASE MATERIALS

MOLDING, TESTING, AND EVALUATING ASPHALT BLACK BASE MATERIALS Test Procedure for MOLDING, TESTING, AND EVALUATING ASPHALT BLACK BASE TxDOT Designation: Tex-126-E Effective Date: June 201 1. SCOPE 1.1 Use this method to mold, test, and determine the design asphalt

More information

Florida Method of Test for NONREPETITIVE STATIC PLATE LOAD TEST OF SOILS AND FLEXIBLE PAVEMENT COMPONENTS

Florida Method of Test for NONREPETITIVE STATIC PLATE LOAD TEST OF SOILS AND FLEXIBLE PAVEMENT COMPONENTS Florida Method of Test for NONREPETITIVE STATIC PLATE LOAD TEST OF SOILS AND FLEXIBLE PAVEMENT COMPONENTS 1. SCOPE Designation: FM 5-527 Modified AASHTO T-222-78 1.1 This method covers the making of nonrepetitive

More information

Stanford University Facilities Design Guidelines SECTION SEAL COATS. C. Section : Traffic Striping and Pavement Markings

Stanford University Facilities Design Guidelines SECTION SEAL COATS. C. Section : Traffic Striping and Pavement Markings SECTION 32 12 36 SEAL COATS PART 1 GENERAL 1.1 RELATED WORK A. Section 31 10 00: Site Preparation B. Section 32 12 00: Flexible Paving C. Section 32 17 23 01: Traffic Striping and Pavement Markings 1.2

More information

MIDLAND COUNTY ROAD COMMISSION

MIDLAND COUNTY ROAD COMMISSION MIDLAND COUNTY ROAD COMMISSION BID FORM Sealed Proposals will be received at the office of the Board of Road Commissioners, County of Midland, at 2334 N. Meridian Road, Sanford, Michigan, 48657, until:

More information

SECTION Section Excavation and Backfill For Structures Section Embedment and Base Course Aggregate

SECTION Section Excavation and Backfill For Structures Section Embedment and Base Course Aggregate SECTION 2110 EXCAVATION AND EMBANKMENT 1.00 GENERAL 1.01 Scope. Work to be performed under this section shall include all labor, equipment, materials and miscellaneous items necessary to perform all clearing

More information

Foreword... iii Table of Contents...v List of Figures...vii List of Tables...viii. Chapter 1 : Background...1

Foreword... iii Table of Contents...v List of Figures...vii List of Tables...viii. Chapter 1 : Background...1 Foreword... iii Table of Contents...v List of Figures...vii List of Tables...viii Chapter 1 : Background...1 Introduction...1 Asphalt Mixtures... 2 Asphalt Binder Behavior... 2 Mineral Aggregate Behavior...

More information

STATE OF OHIO DEPARTMENT OF TRANSPORTATION SUPPLEMENT 1120 MIXTURE DESIGN FOR CHEMICALLY STABILIZED SOILS. June 13, 2011

STATE OF OHIO DEPARTMENT OF TRANSPORTATION SUPPLEMENT 1120 MIXTURE DESIGN FOR CHEMICALLY STABILIZED SOILS. June 13, 2011 STATE OF OHIO DEPARTMENT OF TRANSPORTATION SUPPLEMENT 1120 MIXTURE DESIGN FOR CHEMICALLY STABILIZED SOILS June 13, 2011 1120.01 Description 1120.02 Testing Laboratory 1120.03 Sampling and Testing of Untreated

More information

ITEM D-701 PIPE FOR STORM DRAINS AND CULVERTS

ITEM D-701 PIPE FOR STORM DRAINS AND CULVERTS ITEM D-701 PIPE FOR STORM DRAINS AND CULVERTS 701-1 DESCRIPTION 701-1.1 This item shall consist of the construction of pipe culverts, and storm drains, removal of existing storm pipes, connections to existing

More information

-vs- Figure 4.1. Comparison of the residual asphalt content of different binders.

-vs- Figure 4.1. Comparison of the residual asphalt content of different binders. CHAPTER 4. SEAL COAT DESIGN Seal coats should be designed to ensure that the proposed materials are of sufficient quality and have the desired properties required for a successful seal coat project. In

More information

SUPPLEMENTAL SPECIFICATION HIGH PERFORMANCE CHIP SEAL

SUPPLEMENTAL SPECIFICATION HIGH PERFORMANCE CHIP SEAL May 21, 2008 HIGH PERFORMANCE CHIP SEAL 411 High Performance Chip Seal 411.1 Description High Performance Chip Seal is a high macro-texture surface treatment that is applied in a continuous operation.

More information

BASE CONSTRUCTION MATERIALS A Aggregate

BASE CONSTRUCTION MATERIALS A Aggregate BASE CONSTRUCTION 2211 AGGREGATE BASE 2211.1 DESCRIPTION This work consists of placing aggregate base. 2211.2 MATERIALS A Aggregate... 3138 Provide the class of aggregate as required by the contract. 2211.3

More information

CHARACTERISTICS CSA A TECHO-BLOC Compressive strength psi [45 MPa] min.

CHARACTERISTICS CSA A TECHO-BLOC Compressive strength psi [45 MPa] min. PATIOS, WALKWAYS, POOLSIDES & STEPPING STONES PHYSICAL AND GEOMETRICAL CHARACTERISTICS CHARACTERISTICS CSA A231.1 2 TECHO-BLOC Compressive strength - 6 500 psi [45 MPa] min. Flexural strength 650 psi [4.5

More information

ITEM 340 DENSE-GRADED HOT-MIX ASPHALT (METHOD)

ITEM 340 DENSE-GRADED HOT-MIX ASPHALT (METHOD) ITEM 340 DENSE-GRADED HOT-MIX ASPHALT (METHOD) 340.1. Description. Construct a pavement layer composed of a compacted, dense-graded mixture of aggregate and asphalt binder mixed hot in a mixing plant.

More information

1. Evolution of Screeds in the USA A. Fixed Screeds with Hydraulic Strike-off, Becoming Obsolete B. Rear Mount Screeds with & without strikeoff C. Fro

1. Evolution of Screeds in the USA A. Fixed Screeds with Hydraulic Strike-off, Becoming Obsolete B. Rear Mount Screeds with & without strikeoff C. Fro 1. Evolution of Screeds In the US 2. Inline Pave (Hot on Hot) 3. Spray Paver Technology 4. RCC, CTB & Applications 5. Foam Mix and Recycling 6. Narrow & Medium Width High Quality Pavement 7. Navitronic

More information

SUPERPAVE FACT SHEET

SUPERPAVE FACT SHEET WASHINGTON STATE DEPARTMENT OF TRANSPORTATION December 2003 SUPERPAVE FACT SHEET stands for SUperior PERforming asphalt PAVEment and is the result of a Strategic Highway Research Program (SHRP) initiative

More information

RUBBERIZED ASPHALT CONCRETE (TYPE G)

RUBBERIZED ASPHALT CONCRETE (TYPE G) 10-1.19 RUBBERIZED ASPHALT CONCRETE (TYPE G) Rubberized asphalt concrete (Type G) shall consist of furnishing and mixing gap graded aggregate and asphalt-rubber binder and spreading and compacting the

More information

A Comparison of Density-Based and Modulus-Based In Situ Test Measurements for Compaction Control

A Comparison of Density-Based and Modulus-Based In Situ Test Measurements for Compaction Control A Comparison of Density-Based and Modulus-Based In Situ Test Measurements for Compaction Control Christopher L. Meehan 1 ; Faraz S. Tehrani 2 ; Farshid Vahedifard 3 Abstract: This paper presents and compares

More information

Contracts Specifications and Technical Writing

Contracts Specifications and Technical Writing Contracts Specifications and Technical Writing Outline Module 1: ASTM International Standards Module 2: Specifications and Special Provisions Module 1: Outline Background of ASTM What is ASTM Why we need

More information

A POORLY GRADED SAND COMPACTION CASE STUDY

A POORLY GRADED SAND COMPACTION CASE STUDY Proceedings of Softsoils 2014, October, 21-23 rd 2014 A POORLY GRADED SAND COMPACTION CASE STUDY Liu Yu 1, Marcello Djunaidy 2 ABSTRACT: One 350 hectare artificial island using hydraulic dredging sand

More information

Full-Depth Reclamation with Cement

Full-Depth Reclamation with Cement Full-Depth Reclamation with Cement 28th Annual Regional Local Roads Conference David L. Rettner Sr. Vice President American Engineering Testing, Inc. Design Construction Field Testing Performance Types

More information

Construction Procedures

Construction Procedures Construction Procedures 2014 Rev. 1.6 1 Introduction This manual presents the methods and procedures necessary for the proper erection of a LOCK+LOAD retaining wall. problems later during the service life

More information

Cold Foam In-Place Recycling (CIR)

Cold Foam In-Place Recycling (CIR) Cold Foam In-Place Recycling (CIR) FONSECA/McELROY GRINDING CO., INC. Cold Foam CIR CIR Method/Foamed Asphalt Cold In-Place Recycling Foamed Asphalt Hot Bitumen Water Air Foamed Asphalt The larger surface

More information

LPESA Spring Meeting Asphalt Paver Equipment Innovations L. Nars, Product Manager

LPESA Spring Meeting Asphalt Paver Equipment Innovations L. Nars, Product Manager A WIRTGEN GROUP COMPANY LPESA Spring Meeting Asphalt Paver Equipment Innovations L. Nars, Product Manager Asphalt Paver Equipment Innovations A. The Wirtgen Group Quick Review on the Wirtgen Group & and

More information

Tack Coat Materials and Methods for Optimizing for Thin HMA Applications

Tack Coat Materials and Methods for Optimizing for Thin HMA Applications Tack Coat Materials and Methods for Optimizing for Thin HMA Applications May 2011 2011 Road Science, LLC. BondTekk is a registered servicemark of Road Science, LLC. Objectives The presentation will describe

More information

Standard Test Methods for Wetting and Drying Compacted Soil-Cement Mixtures 1

Standard Test Methods for Wetting and Drying Compacted Soil-Cement Mixtures 1 Designation: D 559 96 AMERICAN SOCIETY FOR TESTING AND MATERIALS 00 Barr Harbor Dr., West Conshohocken, PA 9428 Reprinted from the Annual Book of ASTM Standards. Copyright ASTM Standard Test Methods for

More information