Fullerton Creek Channel (OCFCD Facility No. A03) from downstream Beach Blvd. including undercrossing to downstream I-5 Freeway.

Size: px
Start display at page:

Download "Fullerton Creek Channel (OCFCD Facility No. A03) from downstream Beach Blvd. including undercrossing to downstream I-5 Freeway."

Transcription

1 Fullerton Creek Channel (OCFCD Facility. A03) Lead Agency: Agency: Project Director: Address: Orange County, Public Works, Infrastructure Programs, Capital Programs Sam Ali 300 N. Flower Street Santa Ana Phone: Cell Phone: General Project Information: Name: Description: Fullerton Creek Channel (OCFCD Facility. A03) from downstream Beach Blvd. including undercrossing to downstream I -5 Freeway. This channel was constructed in the (1960s and 1995) designed to convey the 25-year storm event and is hydraulically deficient. This channel segment is in a FEMA Special Flood Hazard Zone AO and Zone AH. The existing geometric of this channel is a trapezoidal reinforce-concrete lined channel, 15-feet base width, 12.2-feet high and 1.0 side slope; 20-feet base width, feet height, and 1.0 side slope under the Southern Pacific Rail Road crossing. There are three bridges within this segment; Beach Blvd, Stanton Avenue, and Southern Pacific Railroad. The ultimate improvements will be designed to convey the 100- year storm event. It includes constructing a vertical reinforcedconcrete channel, 37.5-feet width, 17-feet height, widening the undercrossings at Beach Blvd to 31 feet; the existing Stanton Ave needs to be retrofitted; no need to encase bridge piles, can accommodate the ultimate improvements; length is approximately 2,128 feet. Goals/Objectives: 1 of 5

2 Fullerton Creek Channel (OCFCD Facility. A03) To increase the level of flood protection for the residents within the A03 flood plain by reducing or eliminating potential for personal injury and property damage due to flooding. Improve this reach of the flood control channel to be able to convey the 100-year storm design discharge and eventually reduce the FEMA Special Flood Hazard Area (SFHA) aka 100- year floodplain to containment within the channel, thus eliminating the high cost of obtaining mandatory flood insurance. Utilize a flood control improvement alternative that fits within the existing right-of-way constraints. Prioritize phasing of the construction of the proposed channel improvements to maximize benefits for the watershed. Need: The existing channel is deficient, capacity is 65% of a 25-year storm event. Need to construct improvements to convey 100-year storm event. Meets statutory eligibility gates of 2015 IRWM Grant Funding: IRWM Goals: Safely manage flood protection. Maintain quality of life. IRWM Type OWOW Plan Project Type: Construction Latitude: Project Location: Longitude: Project is construction improvements to Orange County Flood Control District (OCFCD) Facility. A03, Fullerton Creek Channel located in Orange County, City of Buena Park Benefit Zone Area (mi2): 6 Project Benefits: Benefits Water supply reliability, conservation and water-use efficiency Stormwater capture, storage, cleanup, treatment and management Removal of invasive species; wetlands creation or enhancement; acquisition, protection and restoration of open space n-point source pollution reduction, management, monitoring Groundwater recharge and management Applicable 2 of 5

3 Fullerton Creek Channel (OCFCD Facility. A03) Contaminant and salt removal, reclamation, desalting and conveyance to users Water banking, exchange, reclamation and improvement of water quality Multipurpose flood and stormwater management programs Watershed protection and management Drinking water treatment and distribution Ecosystem and fisheries restoration and protection Where Benefits Accrue: Jurisdiction: Explanation: Watershed/Su b-region: Explanation: Synergies: Multiple Communities The benefactors are residences and businesses from Cities of Buena Park, Fullerton, Anaheim, and La Palma. Entire Watershed The Fullerton Creek Watershed has a drainage area of 10,100 acres. It is within the A Watershed which has a drainage area of 52,107 acres. The OCFCD s goal and plans work towards FEMA & National Flood Insurance Program s (NFIP) efforts in protecting property and lives from the threat of flood damage from storms. When the project has been completed, the OCFCD submits a Letter of Map Revision (LOMR) to FEMA to revise Flood Insurance Rate Map (FIRM) to reflect the floodplain as removed or diminished to containment within the channel facility. The floodplain administrators, city(s), are also notified by FEMA for review/concurrence. The benefactors are residents and businesses from that community(s); Cities of Buena Park, Fullerton, Anaheim, and La Palma. Benefits to Disadvantaged Communities (DAC) and Native Tribal Communities (NATC) 3 of 5

4 Fullerton Creek Channel (OCFCD Facility. A03) 100% DAC: Portion DAC: NA DAC %: % NATC: Portion NATC: NATC %: 0 Project area benefiting DAC (acres) : 0 Describe DAC and NATC Benefits: The FEMA Flood Insurance Rate Map will be revised to reflect the 100-year to be contained in channel alleviating the costly mandatory flood insurance premiums imposed on the DAC. Human Right to Water: N/A Environmental Justice: N/A Project Partners: Agency Name Contact Phone Collab Planning Direct Funding In-Kind Service Co-Manager Project Funding: Category Amount Percent Total Project Cost $8,400, Requested OWOW 2015 Funding $ Match Contribution $8,400, Local Contribution $8,400, Federal Contribution $ In-Kind Contribution $ Other $ SRF Loan $ Annual O&M Costs: $168, Funding Secured: Explain: 4 of 5

5 Fullerton Creek Channel (OCFCD Facility. A03) this project is on the Flood Control Capital Improvement Project Plan which is a list of prioritized projects through a 7-year period. This channel system is one of OCFCD s highest priorities; it is one of several segments of the channel system to be constructed. Funds for flood control capital improvement projects, including operation and maintenance come mainly from property taxes and state contributions; this project is listed on the third tier from being budgeted. O&M Funding Secured: Explain:. Funds for flood control capital improvement projects, including operation and maintenance come mainly from property taxes and state contributions. Operation and maintenance is ongoing for this channel system and is budgeted every fiscal year. Project Criteria: Criteria Metric Description Flood Risk Reduction e+008 $ NA Other Quantifiable Benefits NA Flood insurance premiums will not be mandatory for this DAC when the FIRMS are revised to reflect 100-year flood contained within channel. Project Status: Project Status: Preliminary design (30%) completed Est. Complete Date: 06/30/2017 Est. Operational Life (years): 100 Agency Constructed Similar Projects : CEQA Status: In Progress Date: 01/01/2017 NEPA Status: In Progress Date: 01/01/2017 Project Attachments: Type Status FileName 3073_7-Yr Plan FY Adopted by CEFCAC pdf Project Complete: Project Active: 5 of 5

Carbon Creek Channel (OCFCD Facility No. B01) from upstream Intersection of Western/Orange to upstream Beach Boulevard.

Carbon Creek Channel (OCFCD Facility No. B01) from upstream Intersection of Western/Orange to upstream Beach Boulevard. Carbon Creek Channel (OCFCD Facility. B01) from Lead Agency: Agency: Project Director: Address: Orange County, Public Works, Infrastructure Programs, Capital Programs Sam Ali 300 N. Flower Street Santa

More information

CHAPTER 7. San Dieguito River Flooding Adaptation

CHAPTER 7. San Dieguito River Flooding Adaptation CHAPTER 7 San Dieguito River Flooding Adaptation This chapter includes a range of adaptation measures to address vulnerabilities from flooding along the San Dieguito River, including the river valley,

More information

Newport Bay Watershed Executive Committee

Newport Bay Watershed Executive Committee Newport Bay Watershed Executive Committee June 21, 2017 Discussion Calendar AGENDA ITEM 1 ACTION MINUTES OF THE MARCH 15, 2017 MEETING Amanda Carr, County of Orange Recommended Action Approve the action

More information

SECTION 1. REGIONAL PLANNING, OUTREACH, GOVERNANCE AND COORDINATION

SECTION 1. REGIONAL PLANNING, OUTREACH, GOVERNANCE AND COORDINATION SECTION 1. REGIONAL PLANNING, OUTREACH, GOVERNANCE AND COORDINATION 1.1 Introduction The North and Central Orange County Watershed Management Area Integrated Regional Water Management (IRWM) Plan (The

More information

THE CROSSROADS IN WINCHESTER 4. DRAINAGE PLAN. 4. Drainage Plan. a. Drainage Plan Description

THE CROSSROADS IN WINCHESTER 4. DRAINAGE PLAN. 4. Drainage Plan. a. Drainage Plan Description THE CROSSROADS IN WINCHESTER 4. DRAINAGE PLAN 4. Drainage Plan a. Drainage Plan Description The Specific Plan area drains naturally into two separate watersheds: approximately 6 percent of the Specific

More information

Project Prioritization

Project Prioritization Project Prioritization The Santa Ana Watershed Project Authority (SAWPA), as the regional watershed planning group for the Santa Ana River Watershed, has been facilitating efforts to implement a watershed

More information

STORMWATER MANAGEMENT LEGISLATION IN COOK COUNTY (P.A )

STORMWATER MANAGEMENT LEGISLATION IN COOK COUNTY (P.A ) STORMWATER MANAGEMENT LEGISLATION IN COOK COUNTY (P.A. 093-1049) Summary of the Act In November 2004, the responsibility of Stormwater Management* in Cook County was placed under the authority of the MWRDGC

More information

SURFACE WATER UTILITY FEE

SURFACE WATER UTILITY FEE The Surface Water Utility Fee section of the FY2014 Budget Message provides background, impacts and actions associated with the County s prior and new surface water level of service in the unincorporated

More information

Go Green, Save Money: Lowering Flood Insurance Rates in Virginia with Stormwater Management. Kristen Clark VCPC Alumna, Spring 2014

Go Green, Save Money: Lowering Flood Insurance Rates in Virginia with Stormwater Management. Kristen Clark VCPC Alumna, Spring 2014 Go Green, Save Money: Lowering Flood Insurance Rates in Virginia with Stormwater Management Kristen Clark VCPC Alumna, Spring 2014 Rising Waters, Rising Rates Coastal Communities in Virginia are confronted

More information

Engineering Department

Engineering Department Engineering Department Stormwater Mission: To provide for the efficient and effective cleaning and repair of the stormwater collection system and implement the federally mandated Stormwater Pollution Prevention

More information

3.0 CUMULATIVE PROJECTS SCENARIO

3.0 CUMULATIVE PROJECTS SCENARIO 3.0 CUMULATIVE PROJECTS SCENARIO The CEQA Guidelines define cumulative impacts as two or more individual effects that, when considered together, are considerable or which compound or increase other environmental

More information

TOWN OF KILL DEVIL HILLS, NORTH CAROLINA ANNUAL PROGRESS REPORT ON ADOPTED HAZARD MUTIGATION PLAN COMMUNITY #

TOWN OF KILL DEVIL HILLS, NORTH CAROLINA ANNUAL PROGRESS REPORT ON ADOPTED HAZARD MUTIGATION PLAN COMMUNITY # TOWN OF KILL DEVIL HILLS, NORTH CAROLINA ANNUAL PROGRESS REPORT ON ADOPTED HAZARD MUTIGATION PLAN COMMUNITY # 375353 Since the last application for continued participation in the Community Rating System

More information

SECTION 6: MITIGATION STRATEGY

SECTION 6: MITIGATION STRATEGY SECTION 6: MITIGATION STRATEGY This section describes the process by which the Lehigh Valley Steering Committee and municipal planning partnership performed the update to the county and local mitigation

More information

Integrated Regional. South Tahoe Public Utility District. Water Management Plan. July 2014 K/J Prepared By Kennedy/Jenks Consultants

Integrated Regional. South Tahoe Public Utility District. Water Management Plan. July 2014 K/J Prepared By Kennedy/Jenks Consultants Tahoe-Sierra Integrated Regional Water Management Plan July 2014 K/J 1270036 Photo courtesy of Matthew Grimm South Tahoe Public Utility District Prepared By Kennedy/Jenks Consultants 10850 Gold Center

More information

Walnut Creek Watershed Management Authority. Project Kick Off March 18, 2015

Walnut Creek Watershed Management Authority. Project Kick Off March 18, 2015 Walnut Creek Watershed Management Authority Project Kick Off March 18, 2015 Agenda Schedule & Meeting Purpose Meeting Purpose TMDL Raccoon River TMDL Impaired by Nitrate and E.coli Includes Walnut Creek

More information

Application for Gas Exploration and Production

Application for Gas Exploration and Production 1800 Washington Blvd. Suite 655 Baltimore Maryland 21230 Application for Gas Exploration and Production This application is to be used to obtain a permit to Drill and Operate a well, within the State for

More information

CITY OF REDLANDS MASTER PLAN OF DRAINAGE San Bernardino County, California

CITY OF REDLANDS MASTER PLAN OF DRAINAGE San Bernardino County, California CITY OF REDLANDS MASTER PLAN OF DRAINAGE San Bernardino County, California Prepared for City of Redlands 35 Cajon Street Redlands, California 92373 Prepared by 14725 Alton Parkway Irvine, CA 92618 Contact

More information

Water and Environment. Monterey Peninsula, Carmel Bay and South Monterey Bay Integrated Regional Water Management Draft Plan

Water and Environment. Monterey Peninsula, Carmel Bay and South Monterey Bay Integrated Regional Water Management Draft Plan Water and Environment Monterey Peninsula, Carmel Bay and South Monterey Bay Integrated Regional Water Management Draft Plan December 11, 2006 Presentation Outline Purpose of IRWM Planning Status of Plan

More information

New Castle County, DE. Floodplain Regulations

New Castle County, DE. Floodplain Regulations New Castle County, DE Floodplain Regulations John J. Gysling, PE CFM Department of Land Use New Castle County, DE February 26, 2009 Today s Presentation Floodplain Protection and Uses Terms and Definitions

More information

Stormwater Quality Extended Detention Basin Operation and Maintenance (O&M) Manual. for: Located at: Prepared for: Prepared by:

Stormwater Quality Extended Detention Basin Operation and Maintenance (O&M) Manual. for: Located at: Prepared for: Prepared by: Stormwater Quality Extended Detention Basin Operation and Maintenance (O&M) Manual for: Insert Development Name Located at: Insert Address Prepared for: Insert Property Owner Name, Address, and Phone Number

More information

SAN GABRIEL RIVER/ COYOTE CREEK 2 LEVEE SYSTEM LOS ANGELES COUNTY, CALIFORNIA NLD SYSTEM ID #

SAN GABRIEL RIVER/ COYOTE CREEK 2 LEVEE SYSTEM LOS ANGELES COUNTY, CALIFORNIA NLD SYSTEM ID # SAN GABRIEL RIVER/ COYOTE CREEK 2 LEVEE SYSTEM LOS ANGELES COUNTY, CALIFORNIA NLD SYSTEM ID # 3805010031 PERIODIC INSPECTION REPORT NO. 2 GENERALIZED EXECUTIVE SUMMARY FINAL SYSTEM RATING: MINIMALLY ACCEPTABLE

More information

APPENDIX A. Project Scoping

APPENDIX A. Project Scoping APPENDIX A Project Scoping Notice of Preparation To: From: Agencies and Interested Parties Paul Brunner, Executive Director, Three Rivers Levee Improvement Authority Date: June 13, 2006 Subject: Notice

More information

Stormwater Management Studies PDS Engineering Services Division ES Policy # 3-01

Stormwater Management Studies PDS Engineering Services Division ES Policy # 3-01 Stormwater Management Studies PDS Engineering Services Division Revised Date: 2/28/08 INTRODUCTION The City of Overland Park requires submission of a stormwater management study as part of the development

More information

CFWI STORMWATER SUBTEAM PROJECTS REPORT. Steering Committee Meeting

CFWI STORMWATER SUBTEAM PROJECTS REPORT. Steering Committee Meeting CFWI STORMWATER SUBTEAM PROJECTS REPORT Steering Committee Meeting October 24, 2014 Stephen R. Miller, PE Subteam Leader Other Stormwater, Dispersed, Storage, etc. County CFWI SubRegions Project Name Implementing

More information

3.6 HYDROLOGY AND WATER QUALITY Environmental Setting

3.6 HYDROLOGY AND WATER QUALITY Environmental Setting 3.6 HYDROLOGY AND WATER QUALITY This section of the Environmental Impact Report (EIR) describes existing hydrology and water quality resources, and analyzes potential impacts resulting from implementation

More information

For Public Input Period

For Public Input Period 20142018 CAPITAL IMPROVEMENT PLAN ( Thousands) CITY OF HOUSTON STREET & TRAFFIC CONTROL Project: Kingwood Drive N100011 Loop 494 to Woodland Hills Project Description Project provides for the ROW acquisition,

More information

Instructions for the South Pacific Division Nationwide Permit Pre- Construction Notification (PCN):

Instructions for the South Pacific Division Nationwide Permit Pre- Construction Notification (PCN): This PCN integrates the requirements of the U.S. Army Corps of Engineers (Corps) Nationwide Permit Program within the South Pacific Division (SPD), including the Albuquerque, Los Angeles, San Francisco,

More information

South St. Vrain / Hall Meadows Restoration Planning August 20, 2015

South St. Vrain / Hall Meadows Restoration Planning August 20, 2015 South St. Vrain / Hall Meadows Restoration Planning August 20, 2015 Agenda Introductions Purpose & Goals of Meeting Planning Area Master Plan Restoration Planning: Cost Estimates, Grants, Scope, Timeline

More information

POLICY FOR NATURAL RESOURCE MANAGEMENT AREAS

POLICY FOR NATURAL RESOURCE MANAGEMENT AREAS POLICY FOR NATURAL RESOURCE MANAGEMENT AREAS I. POLICY STATEMENT Auburn University's (the University's) "Policy for Natural Resource Management Areas" implements the Campus Master Plan Land Use Element

More information

Project Goals and Scoping

Project Goals and Scoping Prepared for: Boulder County, Colorado Flood Planning & Preliminary Design Services for South St. Vrain Creek Restoration at Hall Ranch and Scoping May 24, 2016 Meeting with General Public In association

More information

CHAPTER 26. SAN RAMON VALLEY FIRE PROTECTION DISTRICT ANNEX

CHAPTER 26. SAN RAMON VALLEY FIRE PROTECTION DISTRICT ANNEX CHAPTER 26. SAN RAMON VALLEY FIRE PROTECTION DISTRICT ANNEX 26.1 HAZARD MITIGATION PLAN POINT OF CONTACT Primary Point of Contact Mike Picard, Battalion Chief 1500 Bollinger Canyon Rd San Ramon, CA 94583

More information

Location Drainage Study

Location Drainage Study Location Drainage Study PROJECT ROUTE: LIMITS: MUNICIPALITY/COUNTY: JOB NUMBER: IL 47 at Burlington Road 750ft NW to 750ft SE of IL 47(Burlington), & 1000ft S to 1000ft N of Burlington (IL47) Kane County

More information

CITY OF PACIFICA 170 Santa Maria Avenue Pacifica, California

CITY OF PACIFICA 170 Santa Maria Avenue Pacifica, California CITY OF PACIFICA 170 Santa Maria Avenue Pacifica, California 94044-2506 www.cityofpacifica.org MAYOR Karen Ervin MAYOR PRO TEM Sue Digre Scenic Pacifica Incorporated Nov. 22, 1957 COUNCIL Mary Ann Nihart

More information

Constructed Wetland Channel T-9

Constructed Wetland Channel T-9 Description A constructed wetland channel is a conveyance BMP that is built, in part, to enhance stormwater quality. Constructed wetland channels use dense vegetation to slow down runoff and allow time

More information

Protecting Your Water Resources

Protecting Your Water Resources Protecting Your Water Resources Clean Water Fund, Delaware Riverkeeper Network and Green Valleys Association have developed a Model Municipal Water Resources Ordinance designed to protect public health,

More information

City of Palo Alto (ID # 7047) City Council Staff Report

City of Palo Alto (ID # 7047) City Council Staff Report City of Palo Alto (ID # 7047) City Council Staff Report Report Type: Consent Calendar Meeting Date: 6/13/2016 Summary Title: East Palo Alto Comment Letter Title: Approval and Authorization for the City

More information

The City of North Las Vegas (CNLV) does not allow valley gutters to be constructed across streets with right-of-way widths of 80 feet or greater.

The City of North Las Vegas (CNLV) does not allow valley gutters to be constructed across streets with right-of-way widths of 80 feet or greater. Background The City of rth Las Vegas strives to provide the development community with adequate information to ensure the successful completion of any project in the City. To aid in the submittal of a

More information

UPRR criteria for sizing waterway openings under bridges and through culverts are as follows:

UPRR criteria for sizing waterway openings under bridges and through culverts are as follows: UNION PACIFIC RAILROAD SCOPE OF HYDROLOGIC/HYDRAULIC DESIGN ENGINEERING AND PERMITTING SERVICES FOR SIZING WATERWAY OPENINGS AT NEW AND REPLACEMENT STRICTURES These flood passage criteria were developed

More information

Table D-1. Montour County Hazard Mitigation Projects - Municipalities Affected. Structural Projects

Table D-1. Montour County Hazard Mitigation Projects - Municipalities Affected. Structural Projects Table D-1 Montour County Hazard Mitigation Projects - Municipalities Affected Structural Projects Project Description Mitigation Objective Hazard Municipality(s) Affected Pursue re-mapping of the 100-year

More information

COON CREEK WATERSHED DISTRICT PERMIT REVIEW. Spring Lake Park Schools Westwood Middle School st Avenue NE, Spring Lake Park, MN 55432

COON CREEK WATERSHED DISTRICT PERMIT REVIEW. Spring Lake Park Schools Westwood Middle School st Avenue NE, Spring Lake Park, MN 55432 PAN 16-112, Westwood Middle School, Page 1 of 6 COON CREEK WATERSHED DISTRICT PERMIT REVIEW MEETING DATE: August 22, 2016 AGENDA NUMBER: 10 FILE NUMBER: 16-112 ITEM: Westwood Middle School RECOMMENDATION:

More information

Functional Uplift Based Stream Assessment & Restoration Design

Functional Uplift Based Stream Assessment & Restoration Design Functional Uplift Based Stream Assessment & Restoration Design Darcy K.L. Turner Senior Environmental Scientist, Biohabitats, Inc. (dturner@biohabitats.com) Christopher A. Streb, PE Ecological Engineer,

More information

POTABLE WATER ELEMENT

POTABLE WATER ELEMENT Goal 4.0. Provide current and future residents of the County's utility service areas, and large users of the regional raw water system a cost-effective and equitable potable or raw water supply system

More information

APPLICATION FOR PUBLIC INFRASTRUCTURE PERMIT

APPLICATION FOR PUBLIC INFRASTRUCTURE PERMIT APPLICATION FOR PUBLIC INFRASTRUCTURE PERMIT Engineering Division 550 Landa Street New Braunfels, Texas 78130 (830) 221-4020 1. Subdivision Plat Name: Location Description/ Nearest Intersection: Acreage:

More information

STREAM AND BUFFER AREA PROTECTION/RESTORATION

STREAM AND BUFFER AREA PROTECTION/RESTORATION STREAM AND BUFFER AREA PROTECTION/RESTORATION AMENDMENT OPTIONS TO STRENGTHEN POLICY IN HEADWATERS AREAS DRAFT SUBSEQUENT TO THE JANUARY 25, 2007 MEETING OF THE PLANNING COMMISSION ENVIRONMENT COMMITTEE

More information

Built to Last Rehabilitating 5 Miles of Sewer Force Main in Newport Beach, CA September 30, 2014

Built to Last Rehabilitating 5 Miles of Sewer Force Main in Newport Beach, CA September 30, 2014 87 th Annual WEFTEC Conference Built to Last Rehabilitating 5 Miles of Sewer Force Main in Newport Beach, CA September 30, 2014 Dan Bunce, P.E., PMP and Victoria Pilko, PMP Orange County Sanitation District

More information

Funding Stormwater Services

Funding Stormwater Services Funding Stormwater Services Public Works Officers Institute March 10, 2016 By Mitch Avalon Consultant, County Engineers Association of California Pine Creek Flooding, Concord 1958 Overview Ballot Measure

More information

WATERSHED MANAGEMENT INITIATIVE: GOALS & IMPLEMENTATION OBJECTIVES, JULY 26, 1999

WATERSHED MANAGEMENT INITIATIVE: GOALS & IMPLEMENTATION OBJECTIVES, JULY 26, 1999 WATERSHED MANAGEMENT INITIATIVE: GOALS & IMPLEMENTATION OBJECTIVES, JULY 26, 1999 The following table indicates the draft goals and objectives for the Santa Clara Basin WMI process. The overall objectives

More information

City of Bellevue Stormwater Management Guide

City of Bellevue Stormwater Management Guide City of Bellevue Stormwater Management Guide January 2012 2012 City of Bellevue City of Bellevue Stormwater Management Guide Message from the Utilities Director Dear Reader: It is with great excitement

More information

EFFECT OF UPSTREAM DEVELOPMENT ON THE CLEAR CREEK AREA

EFFECT OF UPSTREAM DEVELOPMENT ON THE CLEAR CREEK AREA EFFECT OF UPSTREAM DEVELOPMENT ON THE CLEAR CREEK AREA Technical Memorandum Farming in the Floodplain Project Prepared for May 2017 PCC Farmland Trust Photo credit: Google Earth TABLE OF CONTENTS Page

More information

Trails Permitting Process

Trails Permitting Process Appendix H: Trail Permitting Process A PPENDIX H: T RAIL P ERMITTING P ROCESS Trails Permitting Process The permitting process is a critical component in the successful development of a trail network.

More information

County of Calaveras Department of Planning

County of Calaveras Department of Planning Date: July 18, 2013 To: From: Project: Advisory Agencies Amy Augustine, AICP - Planner County of Calaveras Department of Planning Rebecca L. Willis, AICP ~ Planning Director Phone (209) 754-6394 Fax (209)

More information

CEQA Scoping Meeting. West Desert Hot Springs Master Drainage Plan Program Environmental Impact Report

CEQA Scoping Meeting. West Desert Hot Springs Master Drainage Plan Program Environmental Impact Report CEQA Scoping Meeting West Desert Hot Springs Master Drainage Plan Program Environmental Impact Report CEQA Lead Agency: City of Desert Hot Springs January 8, 2014 Scoping Meeting Agenda 1. Welcome and

More information

JOINT PUBLIC NOTICE SAM PAH U. S. ARMY CORPS OF ENGINEERS MISSISSIPPI DEPARTMENT OF ENVIRONMENTAL QUALITY OFFICE OF POLLUTION CONTROL

JOINT PUBLIC NOTICE SAM PAH U. S. ARMY CORPS OF ENGINEERS MISSISSIPPI DEPARTMENT OF ENVIRONMENTAL QUALITY OFFICE OF POLLUTION CONTROL DEPARTMENT OF THE ARMY U.S. ARMY ENGINEER DISTRICT, MOBILE DISTRICT P.O. BOX 2288 MOBILE, ALABAMA 36628-0001 June 2, 2015 CESAM-RD-C PUBLIC NOTICE NO. SAM-2015-00573-PAH JOINT PUBLIC NOTICE SAM-2015-00573-PAH

More information

Public Notice of Application for Permit

Public Notice of Application for Permit US Army Corps of Engineers Alaska District Regulatory Division (1145) CEPOA-RD Post Office Box 6898 JBER, Alaska 99506-0898 Public Notice of Application for Permit PUBLIC NOTICE DATE: July 5, 2017 EXPIRATION

More information

Chapter 6. Hydrology. 6.0 Introduction. 6.1 Design Rainfall

Chapter 6. Hydrology. 6.0 Introduction. 6.1 Design Rainfall 6.0 Introduction This chapter summarizes methodology for determining rainfall and runoff information for the design of stormwater management facilities in the City. The methodology is based on the procedures

More information

US Army Corps of Engineers

US Army Corps of Engineers I I I ' A I US Army Corps of Engineers LA River Ecosystem Restoration, CA Preconstruction Engineering and Design Phase 104791 LOS ANGELES DISTRICT SOUTH PACIFIC DIVISION August 15, 2017 1 Table of Contents

More information

Public Notice. Applicant: City of Dallas Project No.: SWF Date: April 18, Name: Chandler Peter Phone Number:

Public Notice. Applicant: City of Dallas Project No.: SWF Date: April 18, Name: Chandler Peter Phone Number: Public Notice Applicant: City of Dallas Project No.: SWF- 2014-00151 Date: April 18, 2014 The purpose of this public notice is to inform you of a proposal for work in which you might be interested. It

More information

WATER QUALITY MANAGEMENT PLAN PROCEDURES

WATER QUALITY MANAGEMENT PLAN PROCEDURES PUBLIC WORKS DEPARTMENT DEVELOPMENT SERVICES DIVISION SUBDIVISION SERVICES SECTION City Hall East 200 S. Anaheim Boulevard. 2 nd Floor Anaheim, California 92805 www.anaheim.net/publicworks WATER QUALITY

More information

ASHVILLE PARK STORMWATER UPDATE

ASHVILLE PARK STORMWATER UPDATE ASHVILLE PARK STORMWATER UPDATE JULY 18, 2017 1 ASHVILLE PARK CHRONOLOGY 2005: Ashville Park conditionally rezoned. Consisted of Five Villages 2006-2007: Village A Wilshire Village was approved and construction

More information

Walker County Manufactured Home Rental Community Regulations Infrastructure Development Plan

Walker County Manufactured Home Rental Community Regulations Infrastructure Development Plan A. In accordance with Local Government Code Section 232.007, an Infrastructure Development Plan (IDP) is required for all manufactured home rental communities, as defined in Section A 1.0 E of these regulations,

More information

Notice of Preparation For Link Union Station (Link US) Project. Joint Environmental Impact Statement and Environmental Impact Report

Notice of Preparation For Link Union Station (Link US) Project. Joint Environmental Impact Statement and Environmental Impact Report Notice of Preparation For Link Union Station (Link US) Project Joint Environmental Impact Statement and Environmental Impact Report Date: May 27, 2016 To: Subject: Project Title: From: All Interested Agencies,

More information

Public Notice. Applicant: Lennar Homes Project No.: SWF Date: October 29, Name: Mr. Darvin Messer Phone Number:

Public Notice. Applicant: Lennar Homes Project No.: SWF Date: October 29, Name: Mr. Darvin Messer Phone Number: Public Notice Applicant: Lennar Homes Project No.: SWF-2013-00265 Date: October 29, 2013 The purpose of this public notice is to inform you of a proposal for work in which you might be interested. It is

More information

(1)(A)Inventory of the following existing natural resources on the USFSP Campus or within the context area adjacent to the University.

(1)(A)Inventory of the following existing natural resources on the USFSP Campus or within the context area adjacent to the University. 13. 6C-21.208 CONSERVATION ELEMENT Information Sources George F. Young, Interview notes, June 2002 Sasaki Associates, Inc., interview notes, April, 2000 Interviews between DRMP Staff and USF Staff, May,

More information

APPENDIX H Guidance for Preparing/Reviewing CEQA Initial Studies and Environmental Impact Reports

APPENDIX H Guidance for Preparing/Reviewing CEQA Initial Studies and Environmental Impact Reports APPENDIX H H.1 Guidance for Preparing and Reviewing CEQA Initial Studies Step 1: Consider the Project Characteristics as Provided by the Project Applicant Review the project application and draft plan

More information

PUBLIC NOTICE. REPLY TO: Denver Regulatory Office 9307 South Wadsworth Blvd 30 DAY NOTICE Littleton, CO FAX (303)

PUBLIC NOTICE. REPLY TO: Denver Regulatory Office 9307 South Wadsworth Blvd 30 DAY NOTICE Littleton, CO FAX (303) PUBLIC NOTICE US Army Corps of Engineers Omaha District Application No: NWO-2017-01366-DEN Project: Douglas Lane Tributary Stabilization Project Applicant: Town of Castle Rock Waterway: Douglas Lane Tributary

More information

King County Flood Control District approves grants for flood prevention projects Regional projects to benefit from district funds

King County Flood Control District approves grants for flood prevention projects Regional projects to benefit from district funds News Release Contact: Al Sanders 206-477-1016 August 31, 2015 Flood Control District approves grants for flood prevention projects Regional projects to benefit from district funds The Flood Control District

More information

REQUEST FOR QUALIFICATIONS FOR DAYTON VALLEY AREA DRAINAGE MASTER PLAN

REQUEST FOR QUALIFICATIONS FOR DAYTON VALLEY AREA DRAINAGE MASTER PLAN REQUEST FOR QUALIFICATIONS FOR DAYTON VALLEY AREA DRAINAGE MASTER PLAN Statement of Qualifications due Friday, November 3, 2017 at 12:00 PM (Pacific Time) To the Carson Water Subconservancy District Office

More information

POND SITING REPORT TABLE OF CONTENTS LIST OF TABLES LIST OF FIGURES EXECUTIVE SUMMARY SECTION 1.0 INTRODUCTION SECTION 2.0 PROJECT DESCRIPTION

POND SITING REPORT TABLE OF CONTENTS LIST OF TABLES LIST OF FIGURES EXECUTIVE SUMMARY SECTION 1.0 INTRODUCTION SECTION 2.0 PROJECT DESCRIPTION November, 2014 TABLE OF CONTENTS LIST OF TABLES LIST OF FIGURES EXECUTIVE SUMMARY POND SITING REPORT Summary of section 1.0 & 2.0. Specify datum used in the design calculations and the construction plans.

More information

LONE HILL TO WHITE DOUBLE TRACK STUDY Community Open Houses May 16 & 17

LONE HILL TO WHITE DOUBLE TRACK STUDY Community Open Houses May 16 & 17 LONE HILL TO WHITE DOUBLE TRACK STUDY Community Open Houses May 16 & 17 1 PROJECT TEAM & COLLABORATORS 2 OPEN HOUSE SERIES Tuesday, May 16, 2017 6-8:00 pm La Verne City Council Chambers 3660 D Street La

More information

The newly updated and comprehensive SWMP shall:

The newly updated and comprehensive SWMP shall: RFQ SCOPE OF SERVICES 2.1 Project Purpose The City of Miami, ( City ) is seeking professional engineering services from a qualified firm for the purpose of planning and developing a newly updated and comprehensive

More information

State Highway 10A Improvements (from the SH-10 junction extending 6.18 miles east to the SH-100 junction, Muskogee and Sequoyah Counties, Oklahoma)

State Highway 10A Improvements (from the SH-10 junction extending 6.18 miles east to the SH-100 junction, Muskogee and Sequoyah Counties, Oklahoma) (from the SH-10 junction extending 6.18 miles east to the SH-100 junction, Muskogee and Sequoyah Counties, Oklahoma) Open House January 31, 2017 Open House Purpose Explain purpose and need for SH-10A improvements

More information

Chapter 10. Hydrology and Water Quality

Chapter 10. Hydrology and Water Quality Chapter 10. Hydrology and Water Quality This chapter evaluates the potential s on hydrology and water quality of the CWP. This chapter describes existing hydrology and water quality in the Program Area

More information

10.0 Storm Sewer Systems

10.0 Storm Sewer Systems October 2003 Chapter 10.0, Storm Sewer Systems Page 1 10.0 Storm Sewer Systems 10.1 Introduction A storm sewer system consists of a system of inlets, pipes, manholes, junctions, cleanouts, outlets, and

More information

URBAN CENTER COMMUNITY ROLE COUNCIL ROLE ALL COMMUNITIES URBAN CENTER

URBAN CENTER COMMUNITY ROLE COUNCIL ROLE ALL COMMUNITIES URBAN CENTER Orderly and Efficient Land Use Align land use, development patterns, and infrastructure to make the best use of public and private investment. Plan for forecasted population and household growth at average

More information

SECTION 3 DRAINAGE. 3-1 General. 3-2 Drainage Ordinances and Legal Requirements

SECTION 3 DRAINAGE. 3-1 General. 3-2 Drainage Ordinances and Legal Requirements SECTION 3 DRAINAGE 3-1 General All Drainage plans for proposed development shall be prepared by a Professional Engineer registered in Virginia, except as noted below. Further, their seal and signature

More information

SECTION 11: REGULATORY FLOODWAYS

SECTION 11: REGULATORY FLOODWAYS SECTION 11: REGULATORY FLOODWAYS Contents 11.1. The Floodway... 11-2 11.1.1. The floodway concept... 11-2 11.1.2. Floodway map... 11-2 11.1.3. Floodway permitting... 11-3 11.1.4. Changing the floodway...

More information

The following paragraphs provide a bulleted summary of the items discussed during the meeting:

The following paragraphs provide a bulleted summary of the items discussed during the meeting: minutes Flood Insurance Study Update Meeting City of Vacaville Public Works Conference Room #2 650 Merchant Street Vacaville, California June 22, 2011 10:00 a.m. 12:00 p.m. ATTENDEES: Tim Burke, Public

More information

BAO Interpretations of the Board s Governance Policies V. BAO Interpretations

BAO Interpretations of the Board s Governance Policies V. BAO Interpretations V. BAO Interpretations V - 1 V. BAO INTERPRETATIONS Page E-2 Water Supply... V-3 E-3 Natural Flood Protection... V-10 E-4 Water Resources Stewardship... V-16 EL-1 General Principles... V-23 EL-2 Customer

More information

TWIN PLATTE NATURAL RESOURCES DISTRICT

TWIN PLATTE NATURAL RESOURCES DISTRICT TWIN PLATTE NATURAL RESOURCES DISTRICT Twin Platte NRD Multi-Jurisdictional Hazard Mitigation Plan Update Twin Platte NRD Multi-Jurisdictional Hazard Mitigation Plan Update 2016 1 INTRODUCTION This HMP

More information

Tampa Bay Region. FY2015 Cooperative Funding Initiative. Preliminary Project Evaluations and Rankings

Tampa Bay Region. FY2015 Cooperative Funding Initiative. Preliminary Project Evaluations and Rankings SOUTHWEST FLORIDA WATER MANAGEMENT DISTRICT Tampa Bay Region FY2015 Cooperative Initiative Preliminary Project s and Rankings Table of Contents Cooperative Projects - Ranked 1A... 1 L737 - WMP - Duck Lake

More information

Boise City Public Works General Drainage Plan Review Requirements Checklist

Boise City Public Works General Drainage Plan Review Requirements Checklist Boise City Public Works General Drainage Plan Review Requirements Checklist Development Name Bldg. Permit # Drainage Reviewer Site Address Initial Review Date ODI Number Designer Company Name Treated Acres

More information

STORM WATER MANAGEMENT REPORT

STORM WATER MANAGEMENT REPORT Silvercreek Junction STORM WATER MANAGEMENT REPORT Howitt Creek at the Silvercreek Parkway Site Guelph, Ontario August, 2008 TSH File 22304A-04 August 19, 2008 STORMWATER MANAGEMENT REPORT Howitt Creek

More information

Storm Water and Sanitary Sewer

Storm Water and Sanitary Sewer Public Works Department Summary Report on Planned Capital Improvements Storm Water and Sanitary Sewer Introduction Public Works has assembled this summary report to highlight major capital improvements

More information

5th Street Bridge Replacement Project Yuba City, California Location Hydraulic Study Report Bridge No. 18C0012

5th Street Bridge Replacement Project Yuba City, California Location Hydraulic Study Report Bridge No. 18C0012 EA 03-0L2324 Yuba City, California Location Hydraulic Study Report Submitted to: Prepared by: November 2012 Table of Contents Executive Summary... iii Acronyms... v 1 General Description... 1 1.1 Project

More information

Section 5.8 Hydrology, Drainage, and Water Quality

Section 5.8 Hydrology, Drainage, and Water Quality Section 5.8 Hydrology, Drainage, and Water Quality SECTION 5.8 HYDROLOGY, DRAINAGE, AND WATER QUALITY This section describes the existing hydrological and water quality conditions within the City of Buena

More information

Chapter 1. Introduction

Chapter 1. Introduction Chapter 1 Introduction James P. Heaney, Robert Pitt, and Richard Field Introduction Stormwater has traditionally been considered a nuisance, requiring rapid and complete drainage from areas of habitation.

More information

4.6 - Hydrology and Water Quality

4.6 - Hydrology and Water Quality City of Wasco - Wasco Center Walmart Hydrology and Water Quality 4.6 - Hydrology and Water Quality 4.6.1 - Introduction This section provides an evaluation of hydrology and water quality. The analysis

More information

a landowner whose parcel was subjected to the discharge of a neighbor's ditch which was being used to drain a swamp;

a landowner whose parcel was subjected to the discharge of a neighbor's ditch which was being used to drain a swamp; PA Act 167 Watershed Stormwater Management Planning DEFINITION Stormwater management has been traditionally defined as measures used by property owners and local governments to limit the amount of stormwater

More information

Agenda Item #17. OCWD Board Meeting. November 15, Irvine Ranch Water District October 18, 2017 Request

Agenda Item #17. OCWD Board Meeting. November 15, Irvine Ranch Water District October 18, 2017 Request Agenda Item #17 OCWD Board Meeting November 15, 2017 Irvine Ranch Water District October 18, 2017 Request 1 Summary OCWD establishes the Replenishment Assessment, Basin Production Percentage and Basin

More information

Presentation Overview

Presentation Overview A Watershed Approach to Environmental Restoration in Mecklenburg County David A. Woodie, PE, CPSWQ Mecklenburg County Land Use & Environmental Services Agency Special Thanks to: Emily G. Reinicker, PE,

More information

Keys Edge Community Development District. Engineer s Report Infrastructure Improvements

Keys Edge Community Development District. Engineer s Report Infrastructure Improvements Keys Edge Community Development District Engineer s Report Infrastructure Improvements Prepared for Keys Edge Community Development District Board of Supervisors Miami-Dade County, Florida Prepared by

More information

Pre-Treatment Bioretention Cells Bioswales IOWA STORMWATER MANAGEMENT MANUAL DECEMBER 16, 2015

Pre-Treatment Bioretention Cells Bioswales IOWA STORMWATER MANAGEMENT MANUAL DECEMBER 16, 2015 Pre-Treatment Bioretention Cells Bioswales IOWA STORMWATER MANAGEMENT MANUAL DECEMBER 16, 2015 Urban Runoff Background How we got here What Problem?? Provenance of the Problem Unified Sizing Criteria What

More information

TVA Colbert Fossil Facility Ash Disposal Pond 4

TVA Colbert Fossil Facility Ash Disposal Pond 4 2011 World of Coal Ash (WOCA) Conference May 9-12, 2011 in Denver, CO, USA http://www.flyash.info/ TVA Colbert Fossil Facility Ash Disposal Pond 4 Improving Operations While Preparing for Closure May 10,

More information

Basements and Crawlspaces: What s the Difference, and Who Cares?

Basements and Crawlspaces: What s the Difference, and Who Cares? Basements and Crawlspaces: What s the Difference, and Who Cares? Cadastral Consulting, LLC The difference between a basement and a crawlspace seems clear by common perception of what each one is. But when

More information

PROPOSED STORMWATER PROJECT IMPLEMENTATION PLAN. o Execution of New and Expanded Flood Control Projects o Program Options

PROPOSED STORMWATER PROJECT IMPLEMENTATION PLAN. o Execution of New and Expanded Flood Control Projects o Program Options PROPOSED STORMWATER PROJECT IMPLEMENTATION PLAN o Execution of New and Expanded Flood Control Projects o Program Options PHILLIP A. DAVENPORT DIRECTOR OF PUBLIC WORKS APRIL 25, 2017 FLOOD CONTROL PROJECTS

More information

Phase II Report on Hydrology, Hydraulics, and Low Water Dams

Phase II Report on Hydrology, Hydraulics, and Low Water Dams Phase II Report on Hydrology, Hydraulics, and Low Water Dams Arkansas River Corridor Tulsa, OK May 2005 Submitted To: U. S. Army Corps of Engineers Tulsa District Prepared by: The GUERNSEY Team 5555 N.

More information

Developments in the Safety and Security of Mining Industry Dams

Developments in the Safety and Security of Mining Industry Dams Developments in the Safety and Security of Mining Industry Dams John W. Fredland, P.E. Civil Engineer / Dam Safety Officer Mine Safety and Health Administration Tailings and Mine Waste `08 Conference Dam-Safety

More information