Equipment for Engineering Education

Size: px
Start display at page:

Download "Equipment for Engineering Education"

Transcription

1 Equipment for Engineering Education Operating Instructions HM70.24 Boundary Layer Plate G.U.N.T. Gerätebau GmbH P.O. Box 25 D-2288 Barsbüttel Germany Phone (040) Fax (040)

2 Table of Contents Description Experiments Installation of model Plate replacement Performance of experiment Evaluation Technical data /96

3 Description The model HM70.24 is used for investigating the boundary layer on a plate subjected to longitudinal flow. The unit consists of two optionally insertable plates () of differing roughness which can be fitted in parallel with the flow in the working section (2) of the wind tunnel HM70 and a Pitot tube probe () for measuring velocity. The plates () can be moved in axial direction by way of a gear drive (4) for measuring velocity after different flow lengths. For exact measurement of the flow field in vertical direction, the Pitot tube probe () can be adjusted with extreme precision via a micrometer spindle (5). A second measurement connection (6) for detecting the static pressure is provided at the bracket for the Pitot tube probe. 4

4 2 Experiments In the case of flow around a plate, both laminar and turbulent boundary layers are encountered. At first the boundary layer is laminar with a virtually linear velocity profile resulting from the viscosity of the fluid. The laminar boundary layer may become turbulent after a certain flow distance. A measure of this is the Reynolds number Re formed by the distance x u of the transition point from the front edge of the plate. Re crit. = w x u. ν Re crit. assumes values between 0 5 and 0 6. y w w Laminar Transition zone Turbulent Boundary layer at the plate As the exchange of energy between zones close to the wall and zones away from the wall is now more intensive in the boundary layer on account of the turbulence, the turbulent boundary layer is thicker than the laminar one and the velocity profile versus height y is no longer linear but rather convex. The boundary layer thickness at a given location decreases with velocity. Furthermore, the thick- 2

5 ness increases with increasing distance x from the front edge. p dyn. p stat. p tot. For measurement, velocity is determined by way of the dynamic pressure p dyn., which represents the difference between the total pressure/stagnation pressure p tot. at the Pitot tube probe and the static pressure p stat., measured at the measurement connection on the bracket of the Pitot tube probe. The inclined-tube manometer forms the difference and thus gives a direct indication of the dynamic pressure. 2. Installation of model View from below The velocity is calculated as follows w = 2 p dyn ρ. Installing plate in working section - Insert plate () with bracket in working section such that plate faces upwards and its bevelled edge forwards. - Use the 4 bolts (2) provided to secure the bracket through the dia. 5. mm holes. - Insert rotary knob () for plate adjustment in centre hole Inserting micrometer spindle with Pitot tube probe - Loosen knurled screw (4) at bracket of Pitot tube probe (5). Pull probe upwards such that it does not protrude more than 00 mm into the working section. This will protect the sensitive probe from hard contact to the plate (). - Insert micrometer spindle (6) with Pitot tube probe into working section from above and fasten from inside with the knurled screw (7) provided.

6 ATTENTION: The Pitot tube is highly sensitive and is not to be bent or kinked. - Screw in probe bracket with micrometer adjusting screw (6) to roughly mm before lower stop. Insert probe (5) until it just makes contact with the plate (), align in flow direction and secure again at probe bracket with knurled screw (4). - Connect inclined-tube manometer as shown. 2.2 Plate replacement 2 ATTENTION: Before running up wind tunnel, make sure all components are securely fastened and that there are no loose parts in the working section. Replacement of the plate with one of differing roughness involves removing the model from the working section and setting it down with the underside facing upwards. - Remove front securing bolts () of racks (2) on either side (use dia. 2 mm pin to loosen bolts) and push out plate to rear. Attention: Brake springs () may drop out on removing the plate. - Likewise remove front securing bolts (4) (bevelled side) of racks on new plate and press plate into bracket from rear. Make sure that bevelled side (5) is facing forwards and upwards

7 ATTENTION: Make sure brake springs () are properly seated in their mounts. - After inserting plate, fit and tighten securing bolts (4) of racks. 2. Performance of experiment p dyn ATTENTION: Before running up wind tunnel, make sure all components are securely fastened and that there are no loose parts in the working section. - Measure ambient temperature, atmospheric pressure and relative humidity and thus establish current air density. - Set inclined-tube manometer to zero by shifting scale. - Run up wind tunnel to desired speed. - Use adjusting knob to move plate to rear position so that Pitot tube probe at front edge is at x=0 mm. - Lower probe onto surface of plate and record first measured value for p dyn. On account of the probe diameter of d=0.7 mm, this value corresponds to a height of y=0.5 mm. - Record a measured value every 0.25 mm up to a height of y=.5 mm. One measured value every mm suffices up to a height of y=0 mm. - Repeat procedure for other positions (e.g. x= 50, 00, 50mm). 5

8 2.4 Evaluation The table below lists the results of a specimen experiment with a smooth plate (roughness R z = 25µm). Velocity distribution in the boundary layer, smooth plate, roughness Rz = 25µm w = 2.6m/s, density ρ =.2kg/m Distance from the plate y in mm x= 0 mm x = 50 mm x = 00 mm x = 50 mm Pressure p dyn. in Pa Velocity w in m/s Pressure p dyn. in Pa Velocity w in m/s Pressure p dyn. in Pa Velocity w in m/s Pressure p dyn. in Pa Velocity w in m/s The velocity distributions w (x,y) are represented as a graph in the following. The distance y, at which 90% of the undisturbed velocity w is attained, was taken as a measure of the boundary layer thickness. 6

9 w Distance y from surface in mm w (x,y) Distand x from front edge in mm Velocity distribution and boundary layer thickness at a plane plate Boundary layer thickness 7

10 Technical data Bracket Width: 290 mm Length: 220 mm Attachment holes geared to working section of wind tunnel HM70 Plate Length : 250 mm Thickness : mm Horizontal adjustment: 80 mm Surface roughness Rz smooth 25 µm rough 400 µm Pitot tube probe with micrometer spindle: Probe diameter: dia. 0.7 mm Vertical adjustment: 25 mm Resolution: 0.0 mm Hose connections: dia. 2 mm Attachment holes geared to working section of wind tunnel HM70 8

EXPERIMENTAL AERODYNAMICS FLOW TROUGH AN ORIFICE LAB SHEET

EXPERIMENTAL AERODYNAMICS FLOW TROUGH AN ORIFICE LAB SHEET EXPERIMENTAL AERODYNAMICS FLOW TROUGH AN ORIFICE LAB SHEET EMRE KOÇ ONUR GÜNEL 1- Introduction When a fluid passes through a constriction, such as through a sharp-edged hole or over a weir, the constriction

More information

ROOF MOUNT KIT OWNERS MANUAL

ROOF MOUNT KIT OWNERS MANUAL ROOF MOUNT KIT OWNERS MANUAL Made in the USA by: Primus Wind Power, Inc. 938 Quail St. Lakewood, CO 80215 Phone: (303) 242-5820 www.primuswindpower.com AIR is a trademark of Primus Wind Power, Inc. ROOF

More information

M7 Shelving for picking. for medium and heavy loads

M7 Shelving for picking. for medium and heavy loads M7 Shelving for picking for medium and heavy loads Storage system for manual picking of products following the man-togoods principle. Its main benefits are: - Possibility of storing medium to heavy loads.

More information

HYDRAULIC DEMONSTRATION CHANNEL

HYDRAULIC DEMONSTRATION CHANNEL HYDRAULIC DEMONSTRATION CHANNEL PACKING LIST Pitot-Static Tube and Manometer Tube Flow Meters 1. 48 Long Differential Manometer 2. Clear Tubing 3. Pitot-static Tube Clamp 4. Pitot-static Tube 1. Venturi

More information

Air flue duct for use with ecotec boilers

Air flue duct for use with ecotec boilers For the installer Flue installation instructions Air flue duct for use with ecotec boilers Concentric System Ø 80/5 (Galvanized steel air duct/plastic flue duct) GB Contents Notes on the documentation

More information

SPECIFICATION FOR REINFORCED SOIL WALL

SPECIFICATION FOR REINFORCED SOIL WALL SPECIFICATION FOR REINFORCED SOIL WALL 1.0 EXTENT OF WORK The work shall consist of Reinforced Soil walls built in accordance with this specification and in conformity with the lines, levels and details

More information

Thank you for purchasing our product. *Please read these instructions and follow them step by step.

Thank you for purchasing our product. *Please read these instructions and follow them step by step. PAGE 1 OF 5 PORTA-DOCK, INC. AD01- DS 4'x 16'SW-AA - AP01- DS 4'x 16'SW-APD AW01- DS 4'X 16'SW-CPD ALUMINUM PORTA-DOCK *For Beige Decking Add the Letter B to the Model* Thank you for purchasing our product.

More information

TECHNICAL DATA SHEET DS 060

TECHNICAL DATA SHEET DS 060 of 9 General Notes: This instruction covers the installation of a resilient mounted system for a marine propulsion engine driving a rigidly mounted gearbox through a flexible coupling utilising an independent

More information

MGPL owes its growth and success to the strong support of its customers & colleagues.

MGPL owes its growth and success to the strong support of its customers & colleagues. MGPL Made a modest beginning by making Plain Limit gauges in steel & was the first one to introduce CARBIDE Limit gauges in INDIA. MGPL has been serving the customers since last 30 years. Keeping an eye

More information

TESTING APPLICATION STANDARD (TAS) No TEST PROCEDURE FOR WIND AND WIND DRIVEN RAIN RESISTANCE OF DISCONTINUOUS ROOF SYSTEMS

TESTING APPLICATION STANDARD (TAS) No TEST PROCEDURE FOR WIND AND WIND DRIVEN RAIN RESISTANCE OF DISCONTINUOUS ROOF SYSTEMS TESTING APPLICATION STANDARD (TAS) No. 100-95 TEST PROCEDURE FOR WIND AND WIND DRIVEN RAIN RESISTANCE OF DISCONTINUOUS ROOF SYSTEMS 1. 2. Scope 1.1 This Protocol covers the determination of the water infiltration

More information

FLOW MEASUREMENT Product Code 316 Instruction manual Contents

FLOW MEASUREMENT Product Code 316 Instruction manual Contents FLOW MEASUREMENT Product Code 316 Instruction manual Contents 1 Description 2 Specifications 3 Installation requirements 4 Installation Commissioning 5 Troubleshooting 6 Components used 7 Packing slip

More information

DOUBLE SLIDE RAIL INSTALLATION METHOD. Double Slide Rail August

DOUBLE SLIDE RAIL INSTALLATION METHOD. Double Slide Rail August Double Slide Rail August 2015 1 DOUBLE SLIDE RAIL INSTALLATION METHOD Introduction Slide rail shoring systems can be used for trenches up to 12m wide and 6m deep. Module length is determined by panels

More information

Panel Jack Pro System BRACING, ALIGNMENT AND SCAFFOLDING EQUIPMENT

Panel Jack Pro System BRACING, ALIGNMENT AND SCAFFOLDING EQUIPMENT IMPORTANT SAFETY INFORMATION FOR USERS OF THE REECHCRAFT, BRACING SYSTEM PLEASE READ BEFORE USE Panel Jack Pro System BRACING, ALIGNMENT AND SCAFFOLDING EQUIPMENT UK Edition 1.3 26/11/2012 1 TABLE OF CONTENTS

More information

Wind loads at solar and photovoltaic modules for large plants

Wind loads at solar and photovoltaic modules for large plants Ruscheweyh Consult GmbH Aachen Veröffentlichung Wind loads at solar and photovoltaic modules for large plants Hans Ruscheweyh, Reiner Windhövel Ruscheweyh Consult GmbH, Teichstr. 8, Aachen, Germany, info@ruscheweyh.de

More information

HELIOSTAR 252, 218 HORIZONTAL, FREE INSTALLATION

HELIOSTAR 252, 218 HORIZONTAL, FREE INSTALLATION HELIOSTAR 252, 218 HORIZONTAL, FREE INSTALLATION INSTALLATION INSTRUCTIONS ENERGY AND SANITARY SYSTEMS Installation requirements General requirements The free-standing installation set is to be used for

More information

ASSEMBLY AND OPERATING MANUAL LTW SHORING BOXES VB 100

ASSEMBLY AND OPERATING MANUAL LTW SHORING BOXES VB 100 Dealer: MV Trench Support Ltd Letham Road Houston Industrial Estate Livingston EH54 5BY Phone: +44 (0) 1506 / 445800 Fax: +44 (0) 1506 / 443080 Mobile: +44 (0) 7917 / 208767 MV Trench Support Ltd * Letham

More information

Model # 800SM-PS3. 8/3/2016 Page 1 of 8

Model # 800SM-PS3. 8/3/2016 Page 1 of 8 Model # 800SM-PS3 8/3/2016 Page 1 of 8 /3/2016 Page 2 of 8 1675 Locust Street Red Bud, IL 62278 Phone: 618-282-8200 Fax: 618-282-8202 WARRANTY & TERMS WARRANTY: 5 Year Limited Warranty on Thermoplastic

More information

SECTION IMPACT RESISTANT WALL PROTECTION

SECTION IMPACT RESISTANT WALL PROTECTION SECTION 10265 PART I - GENERAL 1.01 DESCRIPTION A. Scope: Work under this Section shall include all materials and installation necessary to provide Impact-Resistant Wall Protection including Wall guards,

More information

SHORING SYSTEMS FROM SHORING PROFESSIONALS

SHORING SYSTEMS FROM SHORING PROFESSIONALS MANUAL STANDARD-BOX VB 100 Klosterhofweg 62 Tel: +492166-2163850 Site: www.euroverbau.de GmbH D-41199 Mönchengladbach-Güdderath Fax: +492166-1320506 Mail: info@euroverbau.de TRENCH SHORING SYSTEMS FROM

More information

INSTALLATION GUIDE Sika SolarMount 1 Exposition East West

INSTALLATION GUIDE Sika SolarMount 1 Exposition East West Exposition East West CONTENTS 1 Notes on the Sika SolarMount 1 system (Exposition East West) for PV solar arrays 3 2 Setting up on site 3 3 Required Tools for mounting Sika SolarMount 1 to Sika roofing

More information

WHAT IS CANTILEVER RACK?

WHAT IS CANTILEVER RACK? PRODUCT INFORMATION WHAT IS CANTILEVER RACK? 2946 Larimer St. Denver, CO 80205 303-295-1100 / 800-373-7693 FAX 303-295-2464 Email info@snyderequipment.com www.snyderequipment.com MODERN EQUIPMENT COMPANY,

More information

Agilent G2615A Bar Code Reader

Agilent G2615A Bar Code Reader Agilent G2615A Bar Code Reader User Information Agilent Technologies Notices Agilent Technologies, Inc. 2002 No part of this manual may be reproduced in any form or by any means (including electronic storage

More information

AP5K-C Precision AC Double-Pulse Spot Welding Machine User s Manual Shenzhen Will-Best Electronics Co., Ltd

AP5K-C Precision AC Double-Pulse Spot Welding Machine User s Manual Shenzhen Will-Best Electronics Co., Ltd AP5K-C Precision AC Double-Pulse Spot Welding Machine User s Manual Shenzhen Will-Best Electronics Co., Ltd 1 Content 1. Introduction...3 1.1 Functions...3 1.2 Units of AP5K-C...4 2. The Initial Installation

More information

R-Group Finland Oy. REA Lifting Inserts Technical Manual According to Eurocodes, EU Machinery directive 2006/42/EC and VDI/BV-BS 6205 CE Approved

R-Group Finland Oy. REA Lifting Inserts Technical Manual According to Eurocodes, EU Machinery directive 2006/42/EC and VDI/BV-BS 6205 CE Approved R-Group Finland Oy REA Lifting Inserts Technical Manual According to Eurocodes, EU Machinery directive 2006/42/EC and VDI/BV-BS 6205 CE Approved 10.2.2017 2 Table of Contents 1 DESCRIPTION OF THE SYSTEM...

More information

Layher. Aluminium Rolling Towers. Layher SuperKlaxTower. Instructions for Assembly and Use

Layher. Aluminium Rolling Towers. Layher SuperKlaxTower. Instructions for Assembly and Use Mobile access and working towers in accordance with: HD 1004; DIN 4422, Part 1 (Version 8/92) Working platform 2.8 x 2.8 m and 2.8 x 1.95 m Max. working height: in closed rooms 13.95 m, outdoors 10.0 m

More information

Standard Test Method for Permeability of Granular Soils (Constant Head) 1

Standard Test Method for Permeability of Granular Soils (Constant Head) 1 Designation: D 2434 68 (Reapproved 2000) Standard Test Method for Permeability of Granular Soils (Constant Head) 1 This standard is issued under the fixed designation D 2434; the number immediately following

More information

PATENTS ARE PENDING. Building Dimensions. Exterior Dimensions Roof Edge to Roof Edge

PATENTS ARE PENDING. Building Dimensions. Exterior Dimensions Roof Edge to Roof Edge Assembly Manual 8x9 PATENTS ARE PENDING Approximate Size 7640303 Storage Area Building Dimensions Exterior Dimensions Roof Edge to Roof Edge Interior Dimensions Wall to Wall Sq. Ft. Cu. Ft. Width Depth

More information

Raised Basement. Mechanical Installation Guide

Raised Basement. Mechanical Installation Guide R Raised Basement Mechanical Installation Guide Ensure masonry work is correct. If recessed, the depth must be 14 inches deep unless otherwise specified for a custom application. Width and length may vary

More information

SECTION I -- IRONWORK

SECTION I -- IRONWORK SECTION I -- IRONWORK CONTENTS PAGE 1. GENERAL... I-2 1.1. Introduction... I-2 2. REQUIREMENTS... I-2 2.1. General... I-2 2.2. Auxiliary Framing... I-2 2.3. High Seismic Risk Zone Requirements... I-3 2.4.

More information

SpaVault TM Installation Guide for Bullfrog Spas (7-10 x 7-10 x 38 )

SpaVault TM Installation Guide for Bullfrog Spas (7-10 x 7-10 x 38 ) SpaVault TM Installation Guide for Bullfrog Spas (7-10 x 7-10 x 38 ) WARNING - When unpacking SpaVault, DO NOT discard styrofoam pieces, these are not packaging materials. Step 1 Excavation Important:

More information

SECTION VIBRATION CONTROLS FOR HVAC PIPING AND EQUIPMENT

SECTION VIBRATION CONTROLS FOR HVAC PIPING AND EQUIPMENT SECTION 230548 - PART 1 - GENERAL 1.1 SUMMARY A. This Section includes the following: 1. Elastomeric Isolation pads. 2. Elastomeric Isolation mounts. 3. [Freestanding] [Restrained] [Freestanding and restrained]

More information

- 2 - GUIDELINES FOR SAFE UNLOADING OF 20 LINED BOX CONTAINERS CONTENTS

- 2 - GUIDELINES FOR SAFE UNLOADING OF 20 LINED BOX CONTAINERS CONTENTS GUIDELINES FOR SAFE UNLOADING OF 20 FOOT LINED ISO BOX CONTAINERS V1 September 2016 - 2 - CONTENTS 1: INEOS O&P CUSTOMER COMMITMENT 3 2: INEOS O&P SAFETY POLICY 4 3:TYPE OF DELIVERY 5 4:RISKS 8 4: UNLOADING

More information

Leak Tightness of Jointing. 1. Basic Principles

Leak Tightness of Jointing. 1. Basic Principles Leak Tightness of Jointing a) Fischer roof element low pressure box 28th November 2000 low pressure on corrugated side L = Rota tube L1/50-8623 n = 2 Pressure Airflow Airflow Brandenburg Technical University

More information

ROOFING APPLICATION STANDARD (TAS) No. 102(A)-95

ROOFING APPLICATION STANDARD (TAS) No. 102(A)-95 ROOFING APPLICATION STANDARD (TAS) No. 102(A)-95 TEST PROCEDURE FOR STATIC UPLIFT RESISTANCE OF MECHANICALLY ATTACHED, CLIPPED, RIGID, ROOF SYSTEMS (For Methods of Mechanical Attachment Excluding Clips,

More information

Soil Volume Change Meter (PVC)

Soil Volume Change Meter (PVC) 05.11 product manual HM-2415 Soil Volume Change Meter (PVC) General Information The HM-2415 Soil Volume Change Meter is used to evaluate potentially dangerous swelling or shrinking conditions existing

More information

APN029. The SER2 Universal platform for material testing. A.Franck TA Instruments Germany

APN029. The SER2 Universal platform for material testing. A.Franck TA Instruments Germany APN029 The SER2 Universal platform for material testing A.Franck TA Instruments Germany Keywords: Elongation viscosity, Hencky rate, SER, friction testing INTRODUCTION The roots of extensional rheometry

More information

QUALITY CONTROL TESTING OF PLASTERBOARD FOR BRACING APPLICATIONS. Y L Liew Vicroads Victoria, Australia

QUALITY CONTROL TESTING OF PLASTERBOARD FOR BRACING APPLICATIONS. Y L Liew Vicroads Victoria, Australia Int. Journal for Housing Science, Vol.32, No.1 pp. 51-60, 2008 Published in the United States QUALITY CONTROL TESTING OF PLASTERBOARD FOR BRACING APPLICATIONS Y L Liew Vicroads Victoria, Australia E F

More information

SAMPLE TC6K Elevator Design Summary. Order No PO-47201

SAMPLE TC6K Elevator Design Summary. Order No PO-47201 SAMPLE TC6K Elevator Design Summary 900 RR 620 S., Ste C206 Austin TX 78734 (512) 266-6200 voice (512) 266-6210 fax SAMPLE CCR TC6K Elevator Design Summary - Elevator System Design Parameters Nominal Height

More information

No other walling system can be installed as quickly. Allows easy cleaning and unloading. No protruding toe to get caught on.

No other walling system can be installed as quickly. Allows easy cleaning and unloading. No protruding toe to get caught on. I r i s hmanuf ac t ur er s : Al f abl oci r el and Vi s i t :ht t p: / /www. al f abl oc i r el and. c om Alpha Bloc NEW A4 pp 9/5/05 12:32 pm Page 3 Alfabloc The unique Alfabloc walling system is only

More information

1. Start by removing the ash-pit door. Remove from frame by removing two rivet pins. Remove the frame by unscrewing the 4 bolts. (Fig 1.

1. Start by removing the ash-pit door. Remove from frame by removing two rivet pins. Remove the frame by unscrewing the 4 bolts. (Fig 1. Page 1 INTRODUCTION This instruction shows how to replace ceramic bricks in the Solo Plus and Excel solid fuel boiler. Please read carefully before replacement. Follow the instruction point by point. Fig

More information

Installation. Smart-UPS VT in Parallel kva 380/400/415 V 208/220 V 200/208 V

Installation. Smart-UPS VT in Parallel kva 380/400/415 V 208/220 V 200/208 V Installation Smart-UPS VT in Parallel 10-40 kva 380/400/415 V 208/220 V 200/208 V Contents Safety... 1 IMPORTANT SAFETY INSTRUCTIONS - SAVE THESE INSTRUCTIONS.............................. 1 Prepare for

More information

SYSTEM S7-RHOMBOS INSTALLATION MANUAL

SYSTEM S7-RHOMBOS INSTALLATION MANUAL SYSTEM S7-RHOMBOS INSTALLATION MANUAL GENERAL INFORMATION GENERAL INFORMATION This assembly manual addresses all metal ceilings manufactured by durlum. The different sections describe the related/relevant

More information

Safety on Heights: Our Policy

Safety on Heights: Our Policy 11/17/14 Safety on Heights: Our Policy Only volunteers over the age of 18 are allowed to work on heights of more than six feet off the ground. This includes all work on scaffolds. Only volunteers who are

More information

PROFESSIONAL ROLLING TOWER SYSTEMS

PROFESSIONAL ROLLING TOWER SYSTEMS Relax. It s an Altrex. ROLLING TOWER SYSTEMS Rolling tower Folding frame Relax. It s an Altrex. Working at height has several risks. Choosing Altrex is choosing safety, quality and durability. Altrex access

More information

Performance Analysis for Natural Draught Cooling Tower & Chimney through Numerical Simulation

Performance Analysis for Natural Draught Cooling Tower & Chimney through Numerical Simulation Performance Analysis for Natural Draught Cooling Tower & Chimney through Numerical Simulation Kanteyya A 1, Kiran Kumar Rokhade 2 Assistant Professor, Department of Mechanical Engineering, HKESSLN College

More information

SOLAR SHADING SYSTEMS - Manual Solar Shade SECTION ROLLER WINDOW SHADES

SOLAR SHADING SYSTEMS - Manual Solar Shade SECTION ROLLER WINDOW SHADES PART 1 - GENERAL SECTION 122413 - ROLLER WINDOW SHADES 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification

More information

HIGH SEAL ULF Live Loaded Packing System

HIGH SEAL ULF Live Loaded Packing System Instruction Manual HIGH-SEAL Live-Loaded Packing HIGH SEAL ULF Live Loaded Packing System Contents Introduction... 1 Scope of Manual... 1 Description... 2 Spring Selection... 3 Installation... 3 Parts

More information

BESTMOVE STANDING TRANSFER AID

BESTMOVE STANDING TRANSFER AID BESTMOVE STANDING TRANSFER AID L.L.C. MODELS BestMove 400 BestMove 450 PRODUCT FEATURES *BestMove 450 shown Ensure the product has been assembled according to the instructions in this manual. OPERATING

More information

Protective Capony RTC-16

Protective Capony RTC-16 Protective Capony RTC-16 ASSEMBLY AND OPERATION MANUAL Protective Canopy RTC-16 Assembly and Operation Manual CONTENT: 1 APPLICATION...3 2 OPERATION CONDITIONS...3 3 TECHNICAL SPECIFICATIONS...3 4 DELIVERY

More information

BoSS Climalite Camera and lighting tower

BoSS Climalite Camera and lighting tower Contents Safety First Safety First Quantity Schedules Toeboard 2 9 13 33 INTRODUCTION Please read this guide carefully. Please note that diagrams are for illustrative purposes only. User guides are also

More information

On-roof system Tau Installation manual

On-roof system Tau Installation manual On-roof system Tau Installation manual 810-0052 Table of Contents 1 Introduction 1 1.1 Short description 1 1.2 Intended use 1 1.3 Standards and guidelines 1 1.4 About these instructions 1 Tau The innovative

More information

TEST PROCEDURE FOR AIR PERMEABILITY TESTING OF RIGID, DISCONTINUOUS ROOF SYSTEMS

TEST PROCEDURE FOR AIR PERMEABILITY TESTING OF RIGID, DISCONTINUOUS ROOF SYSTEMS TESTING APPLICATION STANDARD (TAS) 116-95 TEST PROCEDURE FOR AIR PERMEABILITY TESTING OF RIGID, DISCONTINUOUS ROOF SYSTEMS Scope 1.1 This Protocol covers the determination of the air permeability characteristics

More information

Designation: TTU NWI DIF Air Bladder Standard Scope

Designation: TTU NWI DIF Air Bladder Standard Scope Designation: TTU NWI DIF Air Bladder Standard 1.1.2016 Standard Test Method for Structural Performance of Exterior Doors, Windows, Curtain Walls, and Skylights by Uniform Static Air Pressure Difference

More information

H 12 Heavy Duty Modern Tripod 8 Seat Swing Heavy Duty Hangers

H 12 Heavy Duty Modern Tripod 8 Seat Swing Heavy Duty Hangers Page 1 IMPORTANT Please retain this instruction sheet in your files. It contains important replacement parts information. All equipment should be installed in accordance with these instructions. It is

More information

B. Polyethylene samples shall be submitted for Owner approval of color and quality.

B. Polyethylene samples shall be submitted for Owner approval of color and quality. Glass Rail ENGINEERED DASHERBOARD SPECIFICATIONS PART 1 - GENERAL 1.01 PROJECT SCOPE A. Contractor shall furnish and install one complete set of steel framed dasherboards as indicated on the drawings and

More information

A-Series Aluminum Gantry Crane

A-Series Aluminum Gantry Crane SPANCO PRODUCT SPECIFICATIONS 1 A-Series Aluminum Gantry Crane This guide can be used to prepare a bid specification for the incorporation of an A-Series Gantry Crane into a competitive bid project or

More information

De Montfort Mark 7 Incinerator (Flatpack)

De Montfort Mark 7 Incinerator (Flatpack) De Montfort Mark 7 Incinerator (Flatpack) Introduction This design is specially for those occasions when a large number of incinerators are to be built at one location and transported to the places where

More information

SECTION ALUMINUM GATES

SECTION ALUMINUM GATES P.O. Box 1058 370 South Athol Rd. Athol, Massachusetts 01331 Phone: (978) 249-7924 Fax: (978) 249-3072 SECTION ALUMINUM GATES PART 1 GENERAL 1.01 SCOPE OF WORK A. The CONTRACTOR shall furnish all labor,

More information

ON-ROOF ATTACHMENT FLAT COLLECTOR HELIOSTAR

ON-ROOF ATTACHMENT FLAT COLLECTOR HELIOSTAR ON-ROOF ATTACHMENT FLAT COLLECTOR HELIOSTAR INSTALLATION INSTRUCTIONS ENERGY AND SANITARY SYSTEMS Installation requirements Generel requirements The on-roof attachment set is capable for installation of

More information

Low-profile, 11U high cabinets hold networking equipment, servers, and phone equipment.

Low-profile, 11U high cabinets hold networking equipment, servers, and phone equipment. RM140A-R3 RM140A-M-R3 RM145A-R3 RM145A-M-R3 Small Office/Home Office (SOHO) Cabinets Low-profile, 11U high cabinets hold networking equipment, servers, and phone equipment. Fit under most desktops in the

More information

SECTION PRECAST CONCRETE PAVERS AND PEDESTAL LOK DOWN SYSTEM

SECTION PRECAST CONCRETE PAVERS AND PEDESTAL LOK DOWN SYSTEM SECTION 07555 PRECAST CONCRETE PAVERS AND PEDESTAL LOK DOWN SYSTEM PART ONE: GENERAL 1.1 SUMMARY A. Concrete paver and pedestal support system with Lok Down devices are to be placed over roofing/waterproofing

More information

SP Standard Profile. Flanged to Duct Install Type THERMAL BREAKS OPPOSED ACTION PARALLEL ACTION. T.A. Morrison & Co. Inc.

SP Standard Profile. Flanged to Duct Install Type THERMAL BREAKS OPPOSED ACTION PARALLEL ACTION.  T.A. Morrison & Co. Inc. 1 SUBMITTAL DATA Series 9000 BF Thermally Insulated Damper with Thermally Broken Frames & Blades SP Standard Profile Flanged to Duct Install Type THERMAL BREAKS OPPOSED frame is 4 (101.6 mm) deep x 1 (25.4

More information

DIVISION: MASONRY SECTION: MASONRY ANCHORS REPORT HOLDER: DEWALT 701 EAST JOPPA TOWSON, MARYLAND EVALUATION SUBJECT:

DIVISION: MASONRY SECTION: MASONRY ANCHORS REPORT HOLDER: DEWALT 701 EAST JOPPA TOWSON, MARYLAND EVALUATION SUBJECT: 0 Most Widely Accepted and Trusted ICC ES Evaluation Report ICC ES 000 (800) 423 6587 (562) 699 0543 www.icc es.org ESR 4105 Issued 08/2017 This report is subject to renewal 08/2018. DIVISION: 04 00 00

More information

EPA Method 1 Field Procedures Example:

EPA Method 1 Field Procedures Example: EPA Method 1 Field Procedures Step Instruction 100 Is the stack or duct circular or square/rectangle? If square/rectangular go to step 170. 105 Determine the diameter of the stack from one of the following

More information

TEST REPORT. Rendered to: KEYLINK FENCING & RAILING, INC. For: PRODUCT: Lancaster Series. TYPE: Aluminum Level Guardrail System

TEST REPORT. Rendered to: KEYLINK FENCING & RAILING, INC. For: PRODUCT: Lancaster Series. TYPE: Aluminum Level Guardrail System TEST REPORT Rendered to: KEYLINK FENCING & RAILING, INC. For: PRODUCT: Lancaster Series TYPE: Aluminum Level Guardrail System Report No: Report Date: 07/05/13 130 Derry Court York, PA 17406-8405 phone:

More information

B-02 THERMAL OIL HEATERS

B-02 THERMAL OIL HEATERS Guideline No.: B-02(201510) B-02 THERMAL OIL HEATERS Issued date: October 20,2015 China Classification Society Foreword: This Guide is a part of CCS Rules, which contains technical requirements, inspection

More information

HELIOSTAR 252, 218 VERTICAL, FREE INSTALLATION

HELIOSTAR 252, 218 VERTICAL, FREE INSTALLATION HELIOSTAR 252, 218 VERTICAL, FREE INSTALLATION INSTRUCTION MANUAL ENERGY AND SANITARY SYSTEMS Installation requirements General requirements The free-standing installation set is to be used or installing

More information

Span 400 Instruction Manual

Span 400 Instruction Manual Span 400 Instruction Manual DESIGNATION SPAN 400 Double Width EN 004 3 8/2 XXCD SPAN 400 Single Width EN 004 3 8/8 XXCD CEN designation of this instruction manual EN 298 IM en Rev-00 WARNING NEVER STAND

More information

Ladders and scaffold systems

Ladders and scaffold systems Ladders and scaffold systems Customised-solutions for railway vehicles For each application the right solution! www.krause-systems.com Introduction Business Portrait KRAUSE-Werk GmbH & Co. KG For more

More information

Original Scandinavian rainwater system

Original Scandinavian rainwater system Original Scandinavian rainwater system Siba Siba Square Contents Siba rainwater systems 3 Measuring 15-16 Siba 4-9 Gutter brackets 18-19 Siba Square 10-11 Gutters 20-23 Materials 12 Angles 24 Technical

More information

FE Review Mechanics of Materials

FE Review Mechanics of Materials 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 1. T he element is subjected to the plane stress condition shown. a-x = - 140 M Pa a- y = 205 M Pa Txy = 100 M Pa What is t

More information

Vision Platform System

Vision Platform System Owner s Manual Vision Platform System CONTENTS Safety Precautions.................................. 2 Setup........................................ 2 Guard Rails.................................... 2 Transport/Storage

More information

ANALYSIS OF APPLICABILITY OF FLOW AVERAGING PITOT TUBES IN THE AREAS OF FLOW DISTURBANCE

ANALYSIS OF APPLICABILITY OF FLOW AVERAGING PITOT TUBES IN THE AREAS OF FLOW DISTURBANCE Metrol. Meas. Syst., Vol. XXIII (2016), No. 1, pp. 71 84. METROLOGY AND MEASUREMENT SYSTEMS Index 330930, ISSN 0860-8229 www.metrology.pg.gda.pl ANALYSIS OF APPLICABILITY OF FLOW AVERAGING PITOT TUBES

More information

Study of water falling film over horizontal drop shaped and inverted drop shaped tubes

Study of water falling film over horizontal drop shaped and inverted drop shaped tubes Study of water falling film over horizontal drop shaped and inverted drop shaped tubes Vipul Kumar Sharma, Nirmal Kant Singh 2 Dept. of Mechanical Engineering, GLBITM, Greater Noida, U.P, 236, India 2

More information

ifix INSTALLATION MANUAL PV flat roof installation system Version

ifix INSTALLATION MANUAL PV flat roof installation system Version ifix PV flat roof installation system INSTALLATION MANUAL Version 2012-09-06 ifix Installation Manual Version 2012-09-06 Seite 1 Table of contents Table of contents... 1 Special characteristics of ifix...

More information

MODEL: SIGHT-LINE- COMMAND CENTER CONSOLES

MODEL: SIGHT-LINE- COMMAND CENTER CONSOLES 2015 WINSTED CORPORATION 1) GENERAL DESCRIPTION 1.1 Sight-Line Command Center Consoles. SeeAppendix A - C for typical styles and measurements. 1.2 The contractor shall supply a system capable of supporting

More information

SECTION HANGERS AND SUPPORTS FOR ELECTRICAL SYSTEMS

SECTION HANGERS AND SUPPORTS FOR ELECTRICAL SYSTEMS SECTION 26 05 29 HANGERS AND SUPPORTS FOR ELECTRICAL SYSTEMS PART 1 GENERAL 1.1 DESCRIPTION A. Scope: 1. CONTRACTOR shall provide all labor, materials, equipment, and incidentals as shown, specified, and

More information

Installation Instructions

Installation Instructions Installation Instructions Dynarail Safety Ladder System Corrosion Resistant Nonconductive Fire Retardant High Strength-To-Weight Ratio Long, Low Maintenance Life Meets OSHA, BOCA & Other Building Code

More information

Flush mounting boxes. For masonry - TECHNICAL CHARACTERISTICS

Flush mounting boxes. For masonry - TECHNICAL CHARACTERISTICS Flush mounting boxes For masonry - TECHNICAL CHARACTERISTICS Technical specifications technopolymer highly resistant to impacts and to deformation temperature during installation: from -15 C to +60 C resistance

More information

1675 Locust Street Red Bud, IL Phone: Fax: WARRANTY & TERMS

1675 Locust Street Red Bud, IL Phone: Fax: WARRANTY & TERMS Model # 349S-P6 1675 Locust Street Red Bud, IL 62278 Phone: 618-282-8200 Fax: 618-282-8202 WARRANTY & TERMS WARRANTY: 5 Year Limited Warranty on Thermoplastic coated elements. Ultra Play guarantees all

More information

BakeMax Dough Mini Moulder BMMDM02

BakeMax Dough Mini Moulder BMMDM02 BakeMax Dough Mini Moulder BMMDM02 2 Instruction Manual 1. Preface ------------------------------------------- P2 2. Machine Introduction -------------------------------- P2 3. Machine Specification and

More information

Instructions for 12 and 15 IGT systems (12 pictured)

Instructions for 12 and 15 IGT systems (12 pictured) Instructions for 12 and 15 IGT systems (12 pictured) Step 1: IGT Site Preparation Site Location Several factors must be considered when choosing the site for your new In-Ground Trampoline (IGT) system.

More information

Trench Duct Class Catalog 5230CT9601R10/08

Trench Duct Class Catalog 5230CT9601R10/08 5230CT9601R10/08 2009 Class 5230 CONTENTS Application.................................................5 Unassembled Trench Duct Components.........................6 Factory Assembled Trench Duct..............................11

More information

VESDURA VINYL PLANKS 7.5MM WPC CLICK LOCK - AMERICANA COLLECTION

VESDURA VINYL PLANKS 7.5MM WPC CLICK LOCK - AMERICANA COLLECTION VESDURA VINYL PLANKS 7.5MM WPC CLICK LOCK - AMERICANA COLLECTION Before You Start Click lock vinyl plank flooring is normally laid without adhesive. Before installation, planks must be allowed to acclimatize

More information

PERI PD 8 The cost-effective shoring for slab tables and high loads

PERI PD 8 The cost-effective shoring for slab tables and high loads PERI PD 8 The cost-effective shoring for slab tables and high loads Edition 06/2010 PERI GmbH Formwork Scaffolding Engineering P.O. Box 1264 89259 Weissenhorn Germany Tel +49 (0)7309.950-0 Fax +49 (0)7309.951-0

More information

ENGR 1181 Lab 7: Wind Turbine

ENGR 1181 Lab 7: Wind Turbine ENGR 1181 Lab 7: Wind Turbine - Preparation Material (Lab 7A) - Lab Procedure (Lab 7A) - Preparation Material (Lab 7B) - Lab Procedure (Lab 7B) - Report Guidelines (Combined) 1 Preparation Material 7A

More information

COMP ONENT CATA LO GUE FOR INDUSTRIAL BUILDINGS

COMP ONENT CATA LO GUE FOR INDUSTRIAL BUILDINGS M a d e f o r b u i l d i n g b u i l t f o r l i v i n g COMP ONENT CATA LO GUE FOR INDUSTRIAL BUILDINGS I M P R i n t KLH Massivholz GmbH Publisher and responsible for the content: KLH Massivholz GmbH

More information

Se incluyen las instrucciones en español

Se incluyen las instrucciones en español Page 1 of 16 Pittsburgh Corning Corporation Pittsburgh, PA 15239 1-800-624-2120 www.pittsburghcorning.com All trademarks and registered trademarks in this brochure are owned and protected by Pittsburgh

More information

Model # 158-P4. 12/12/2013 Page 1 of 11

Model # 158-P4. 12/12/2013 Page 1 of 11 Model # 158-P4 12/12/2013 Page 1 of 11 2/12/2013 Page 2 of 11 1675 Locust Street Red Bud, IL 62278 Phone: 618-282-8200 Fax: 618-282-8202 WARRANTY & TERMS WARRANTY: 5 Year Limited Warranty on Thermoplastic

More information

SECTION SECTIONAL OVERHEAD DOORS

SECTION SECTIONAL OVERHEAD DOORS SECTION 08360 SECTIONAL OVERHEAD DOORS PART 1 GENERAL 1.1 SECTION INCLUDES A. Aluminum Doors B. Track and Framing 1.2 RELATED SECTIONS A. Section 04810 - Unit Masonry Assemblies: Prepared opening in masonry.

More information

PITTSBURGH CORNING ASSEMBLY INSTRUCTIONS. KWiK N EZ Rigid Track Silicone System for Thinline Series Glass Block

PITTSBURGH CORNING ASSEMBLY INSTRUCTIONS. KWiK N EZ Rigid Track Silicone System for Thinline Series Glass Block Page 1 of 6 PITTSBURGH CORNING KWiK N EZ Rigid Track Silicone System for Thinline Series Glass Block ASSEMBLY INSTRUCTIONS Introduction The KWiK N EZ Rigid Track Silicone System is the easiest way to install

More information

Model # 238HS-P8. 4/27/2011 Page 1 of 11

Model # 238HS-P8. 4/27/2011 Page 1 of 11 Model # 238HS-P8 4/27/2011 Page 1 of 11 4/27/2011 Page 2 of 11 1675 Locust Street Red Bud, IL 62278 Phone: 618-282-8200 Fax: 618-282-8202 WARRANTY & TERMS WARRANTY: 5 Year Limited Warranty on Thermoplastic

More information

VERIS Accelabar. Superior Flow Measurement Accuracy

VERIS Accelabar. Superior Flow Measurement Accuracy VERIS Superior Flow Measurement Accuracy Designs, materials, weights and performance ratings are approximate and subject to change without notice. Visit for up-to-date information. ...A New Idea in Flow

More information

Post Style with ABS Real Tuff

Post Style with ABS Real Tuff Post Style with ABS Real Tuff Mantova s patented Post Shelving with ABS Real Tuff removable shelves have been making life easier for thousands of Australian businesses for more then a decade. Removable

More information

This guide can be used to prepare a specification for incorporating free standing jib cranes into a competitively bid construction project.

This guide can be used to prepare a specification for incorporating free standing jib cranes into a competitively bid construction project. SECTION 14651 FREE STANDING JIB CRANE ***** Gorbel, Inc. manufacturers a broad range of material handling cranes including monorail, bridge, gantry, and jib cranes. Numerous work station and industrial

More information

PS-4045 Adjustable-Height Pallet Stand Use and Maintenance Manual

PS-4045 Adjustable-Height Pallet Stand Use and Maintenance Manual Vestil Manufacturing Co. 2999 North Wayne Street, P.O. Box 507, Angola, IN 46703 Telephone: (260) 665-7586 -or- Toll Free (800) 348-0868 Fax: (260) 665-339 http://www.vestilmfg.com/ e-mail: sales@vestil.com

More information

Impact of Pitot tube calibration on the uncertainty of water flow rate measurement

Impact of Pitot tube calibration on the uncertainty of water flow rate measurement Journal of Physics: Conference Series PAPER OPEN ACCESS Impact of Pitot tube calibration on the uncertainty of water flow rate measurement To cite this article: Icaro de Oliveira Buscarini et al 2015 J.

More information

GroundTrac. Installation Manual

GroundTrac. Installation Manual APPLICATION: The GroundTrac system is designed with a minimum amount of installed footings at greatly reduced labor. The system integrates with ordinary 1-1/2 schedule #40 galvanized water pipe. This ground

More information

Vibration Control SCHWINGMETALL. The Original Rubber-To-Metal Bonding from ContiTech

Vibration Control SCHWINGMETALL. The Original Rubber-To-Metal Bonding from ContiTech Vibration Control SCHWINGMETALL The Original Rubber-To-Metal Bonding from ContiTech ContiTech Vibration Control Innovator and Development Partner ContiTech is an innovator and development partner for vibration-damping

More information