REQUEST FOR PROPOSALS FOR PROFESSIONAL ENGINEERING SERVICES FOR DESIGN OF RECHARGE BASIN ON VICTORIA SITE

Size: px
Start display at page:

Download "REQUEST FOR PROPOSALS FOR PROFESSIONAL ENGINEERING SERVICES FOR DESIGN OF RECHARGE BASIN ON VICTORIA SITE"

Transcription

1 REQUEST FOR PROPOSALS FOR PROFESSIONAL ENGINEERING SERVICES FOR DESIGN OF RECHARGE BASIN ON VICTORIA SITE General Provisions Western Municipal Water District (WMWD) requests a qualified Design Consultant to submit a proposal and qualification for providing professional engineering services for design of recharge basin at Victoria Site, located in Riverside, Riverside County, California. Design Consultant should submit five (5) hard copies and one CD (in PDF format) copy of the proposal in one package including one separately sealed fee proposal envelope addressed to the attention of Fakhri Manghi and must be received in the office at Meridian Parkway, Riverside, CA The package of the five (5) shall be clearly marked PROPOSAL FOR ARLINGTON RECHARGE PROJECT. The copies of the proposal must be received by Western, no later than 2:00 PM, September 4, If Western amends the proposal deadline, the new deadline will be posted on Western s official website ( A non-mandatory pre-proposal meeting will be held at Western, Median Parkway, Riverside, CA on August 21, 2015 at 1:30 PM. Optional site visit can be arranged in the morning of the pre-proposal meeting, at 10:30 AM. Send an to: fmanghi@wmwd.com to schedule a site tour. Any relevant questions concerning the Request for Proposal (RFP) other than those asked at the pre-proposal meeting shall be directed in writing to the project manager: Fakhri Manghi, Ph.D, PE Western Municipal Water District Meridian Parkway Riverside, CA Answers to these questions will be sent to all Consultants. No answer will be given on an individual basis. Selection Process Proposals will be evaluated by a selection committee comprised Western staff and possibly members from other agencies. Proposals will be evaluated and ranked based on criteria including understanding of the purpose of the work, project approach, scope-of-work, relevant project experience, and project team members qualifications. This is not a competitive bid process. The most highly ranked proposals may be interviewed and rated by the selection committee. After selection of prospective Consultant deemed most qualified, Western will initiate negotiations. If an acceptable contract cannot be reached with the prospective Consultant deemed most qualified, Western may then negotiate with the next most qualified prospective Consultant. Western reserves the right, after opening the proposals, to reject any or all proposals, or to accept proposal(s) that in its sole judgment are in the best interest Western.

2 Prospective Consultants are responsible for ensuring that proposals are received at the specified location by the specified time whether they are sent by mail or delivered in person. proposals will not be considered for evaluation. Victoria Site Western is planning to construct an artificial recharge basin on Victoria site. Victoria site consists of a 10-acres parcel currently vacant and undeveloped, located in Riverside, Riverside County, California. The site is located in the southeast part of the Arlington Basin, boarded by Victoria Avenue to the north, an agricultural parcel to the south, Jackson Street to the east, and an agricultural parcel to the west. The site is a flow-through basin located downstream of the Mockingbird Reservoir. The Mockingbird Reservoir can serve as a controlled source of supplemental water to the site through a dirt undeveloped channel. The Gage Canal carries nonpotable groundwater is located upstream of the site. Western s nonpotable water distribution system is located upstream of the site, on Cleveland Avenue (Project Map). The parcel was one of several candidate recharge sites in the Arlington Basin identified during a 2009 feasibility study conducted by WEI (attached). A field investigation was conducted at the site in 2012 by Todd Engineers to evaluate subsurface conditions and to determine if the surrounding area has been exposed to contamination (attached). Victoria site will allow recharge water of up to 2,500 acre-feet per year. Three types of recharge water will be used for the project including urban runoff, stormwater, and nonpotable imported groundwater with low concentrations of total dissolved solid (TDS) and Nitrate. The source of stormwater is from Mockingbird Reservoir and surrounding tributary area. Recycled water may also be used in the future through Western s nonpotable distribution system, along Cleveland Avenue. Annual stormwater released from the Mockingbird Reservoir is in the range of AFY, depending on available storage in the reservoir during storm events. Annual stormwater from surrounding area for normal hydrology condition is approximately 200 AFY. The balance of the recharge water is from nonpotable imported groundwater and recycled water (as part of a future project). Scope of Work The scope of work includes the following items: Design recharge basins and water conveyance from Mockingbird Reservoir, surrounding area, Gage Canal and Western s nonpotable water, Design pilot testing basin (basin size, duration, source of water, and others), Provide materials and earthworks estimates, Estimate construction costs for recharge basins and water conveyance, Obtain permitting requirements (now and future), Provide services during bidding process, and Prepare Project Design Report (PDR)

3 Detailed Requirements The general intent of the RFP is to secure the services of a qualified engineering consultant to plan, design, estimate costs, and provide complete and accurate sets of construction documents (plans and specifications) for the project facilities. Construction documents shall include bid documents, detailed technical specification, and construction plans. Proposals shall specify tasks required to complete the final design of the recharge system at Victoria site. Key elements of the system include the location and number of basins, design and dimensions of the basins and berms, and movement of water between basins. The project will also include design of conveyance facilities and appurtenances to transmit source water to the basins. Stormwater released from Mockingbird Reservoir can naturally move through a dirt unimproved channel. Consultant shall recommend the efficient maintenance method for the basins. Imported nonpotable groundwater would be delivered to the site from either the nonpotable water distribution system along Cleveland Avenue or from the nearby Gage Canal, located upstream of the site. Consideration shall be given to transmission of water from the nearby Gage Canal to the site. In addition, monitoring of operational performance, including required instrumentation, will be specified as part of the design. Consultant shall recommend type(s) of vandalism resistance fences for the recharge basin, and landscaping requirements for Victoria Avenue per the City of Riverside. Recommendations shall also be made on the number, location, and design of monitoring wells. The project shall also design pilot recharge testing including basin size, length of testing, source of water and any other pertaining requirements to perform pilot testing. Recommendations on the operation of pilot testing shall be provided as part of the project. The proposal shall provide a complete scope of work to complete all designs and permitting/environmental compliance work required prior to construction. Tasks shall also include estimates for all equipment, supplies and materials costs required for recharge basin construction. The Consultant shall provide design surveys including aerial photography to provide a level of accuracy appropriate to design the facilities. The 2012 hydrogeological investigation Report (Todd Engineers) includes information that shall enable the Consultant to evaluate the subsurface conditions of Victoria site and provide design criteria for the project. Here is the general scope of services: Task 1: Project Administration and Multi-Agency Coordination Upon receipt a written Notice to Proceed from WMWD, consultant shall conduct a kickoff meeting with WMWD, inviting City of Riverside, and Riverside County Flood Control & Water Conservation District to review the Scope-Of-Work of the Project, develop project schedule, and confirm deliverables. The project schedule shall include each

4 task and subtasks, milestone, critical path designation and schedule for progress meeting. Consultant shall prepare a project execution schedule with major milestones to WMWD Project Manager for approval. Consultant shall prepare and present regular project progress report to WMWD staff each month or as otherwise agreed upon with WMWD s Project Manager. Consultant shall make sure to invite staff from Riverside County Flood Control & Water Conservation District to the meeting. Consultants is responsible for organizing these meetings including preparing agenda, compiling meeting minutes and distributing the minutes to all attendees or as requested. Task 2: Utility Documentation, ROW, and Utility Research Consultant shall conduct thorough research to obtain all available utility documents within the Project area. Consultant shall be responsible for researching all applicable agency and utility company records. Consultant shall conduct field research to collect visible information for Project site. Consultant shall be responsible for preparing a complete list of all underground (UG) and aboveground (AG) utilities and facilities in the Project area. Upon completion of research, Consultant shall prepare a comprehensive utility and property map including near and long term facilities. Consultant shall prepare a complete list of utility documents found and these shall be referenced in the plans and specifications. Consultant shall assist WMWD to prepare easement documents and/or public ROW encroachment permit applications for the Project and to record easement documents with County Recorder s Office. Task 3: Potholing Plan Consultant shall be responsible for developing a potholing plan for locating and profiling existing UG utilities, and when approved by WMWD, will be responsible for conducting the required potholing work and obtain approvals from City and County Traffic Engineers. The Consultant shall provide the surveying and coordination with utility companies to have the utilities marked prior to potholing. Consultant shall submit Potholing Report describing all findings in PDF format. Consultant shall work with all Potholing of existing utilities that could be in conflict with proposed construction. Task 4: Preliminary Design Upon completion record document research, field data collection, potholing, and any other pertaining information, Consultant shall compile all gathered information and prepare Preliminary Design Plans. Preliminary Design shall include configuration of recharge basins, pilot testing, and water conveyance. Consultant shall prepare alternative designs and life cycle cost estimates for different alternatives and configurations. Consultant shall prepare cost estimate for construction and calculate cost per acre-foot of recharge water delivered to the recharge basin through Western s nonpotable system and Gage Canal. Consultant shall recommend the best alternative to WMWD and prepare the Preliminary Design and cost estimate based on the recommended alternative. Consultant shall submit Preliminary Design in PDF format. Consultant shall submit Preliminary Design to Riverside County Flood Control and Water Conservation District (RCFC&WCD) and Riverside City for review and comments. WMWD will review and comment on the submitted Preliminary Design. WMWD may request Consultant to supplement more information or modify the

5 Preliminary Design. After the Preliminary Design is approved by WMWD, Consultant will proceed with Detailed Design. Task 5: Detailed Design With Preliminary Design review comments from WMWD, City of Riverside, and RCFC&WCD, Consultant shall prepare Detailed Design Plan Specifications & Estimates (PS&E) for the proposed recharge basin at Victoria site. Plans shall be prepared using computer aided design software (AutoCAD) and shall be printed on size 36 X 24 paper. Final plan submittal shall be signed by a California Registered Professional Engineer. Plan shall include a construction staging concept. Consultant shall submit the Detailed Design plans including traffic control plans to City of Riverside for required permit application and approval. The General Condition shall follow Western s format. The Special Condition and Technical Specifications shall be prepared based on CSI specification format. WMWD will review the submitted PS&E, provide comments, and request revisions until it is in compliance with WMWD s Standard and Policies. Task 6: Final Plan Specifications and Estimates Upon approval of Detailed Design PS&E from WMWD and receiving permits from agencies, Consultant shall prepare the Final PS&E for bid. The final bid package shall include plans, specifications and required appendices. Final design shall include the preparation of engineered construction drawings and specifications to be used for construction bids, preparation of project costs estimates, geotechnical investigation (if required), and design surveys and mapping. Consultant shall prepare a complete and accurate set of construction plans for the proposed project including general, civil, structural, mechanical, electrical, instrumentation and process drawings. Consultant is responsible to identify SCADA and telemetry requirements. Consultant shall finalize plans, specifications, and estimates for all the work of the project. Consultant shall prepare drawings on 24" x 36" Mylar per Western standards. Task 7: Assistance in Bidding and Construction Consultant shall coordinate with plan rooms to distribute Plans and Specifications to prospected contractors. During bidding period, contractors may have questions on the plans and specifications. Consultant shall assist WMWD staff to answer questions from prospected contractors and attend the Pre-bid Meeting. After bids are opened, Consultant shall prepare bid analysis, verify contractor information, and make recommendations to WMWD regarding the apparent low bidder. Consultant shall attend the bid opening and read the bids. Additional Services Consultant is encouraged to identify any additional work that is not specified in this Scope-Of-Work that would be, in its opinion, necessary to complete the Project as defined herein. Consultant may propose additional services that in its opinion will improve the efficiency and quality of the Project. If identified, the Additional Work or Services must be included in the proposal but separated out in the Consultant s Fee Schedule.

6 Selection Procedure/Process Proposals will be uniformly and objectively evaluated by a selection committee comprised of District s staff and possibly members from other agencies. The proposal shall be of such scope and depth to sufficiently describe and demonstrate the consultant s understanding of and approach to the project. Submittal of incomplete or vague responses to any section or subsection of this RFP may result in rejection of the proposal. Proposals will be evaluated and ranked based on the criteria specified herein. The most highly ranked proposers may be interviewed and rated by the selection committee. Based on the results of this procedure, a purchase order will be negotiated with the top-rated proposer. If the District is unable to reach an agreement with the top-rated proposer, negotiations will be formally terminated. The District will then negotiate with the next highest-rated proposer. Once negotiations with a proposer are terminated, the District will not renegotiate with that proposer. Attachment Todd Engineers 2012, Hydrogeologic Investigation, Potential Recharge Sites, Arlington Basin, Riverside County, prepared for Western Municipal Water District, Final May 15, 2012.

Western Municipal Water District Request for Proposals (RFPs) Professional Services for La Sierra Pipeline Project

Western Municipal Water District Request for Proposals (RFPs) Professional Services for La Sierra Pipeline Project Page 1 of 11 Western Municipal Water District Request for Proposals (RFPs) Professional Services for La Sierra Pipeline Project Western Municipal Water District (WMWD) invites the submittal of written

More information

REQUEST FOR PROPOSALS PROFESSIONAL SERVICES FOR THE ROOF AND HVAC REPLACEMENT PROJECT PW1320

REQUEST FOR PROPOSALS PROFESSIONAL SERVICES FOR THE ROOF AND HVAC REPLACEMENT PROJECT PW1320 REQUEST FOR PROPOSALS PROFESSIONAL SERVICES FOR THE 2015 2016 ROOF AND HVAC REPLACEMENT PROJECT PW1320 Issued by: City of Stockton Public Works Department 22 E. Weber Avenue, Room 301 Stockton, CA 95202

More information

Request for Proposals and Bids for Civil Engineering Services for Off-site Improvements for a Residential Neighborhood

Request for Proposals and Bids for Civil Engineering Services for Off-site Improvements for a Residential Neighborhood Request for Proposals and Bids for Civil Engineering Services for Off-site Improvements for a Residential Neighborhood The Quinault Indian Nation (QIN) is pleased to present a Request for Proposal and

More information

REQUEST FOR PROPOSAL. HRIS Human Resources Information Software Fort Morgan, Colorado

REQUEST FOR PROPOSAL. HRIS Human Resources Information Software Fort Morgan, Colorado REQUEST FOR PROPOSAL HRIS Human Resources Information Software Fort Morgan, Colorado October 7, 2014 Michael Boyer Director, Human Resources and Risk Management CITY OF FORT MORGAN P.O. BOX 100 FORT MORGAN,

More information

Village of Lincolnwood

Village of Lincolnwood Village of Lincolnwood REQUEST FOR QUALIFICATIONS (RFQ) MUNICIPAL ENGINEERING SERVICES Response Due Date: Friday, March 21, 2014, 4:00 p.m. Send Sealed Qualifications to: Timothy C. Wiberg Village Manager

More information

Request for Proposal & Statement of Qualifications

Request for Proposal & Statement of Qualifications Request for Proposal & Statement of Qualifications TREE and ELDERBERRY RELOCATION/TRANSPLANTING Natomas Levee Improvement Program Mandatory Pre Proposal Site Walk: September 09, 2009 10:30 AM Submit Questions

More information

REQUEST FOR PROPOSAL Engineering Design for Culinary Water Tank and Secondary Water Tank Conversion

REQUEST FOR PROPOSAL Engineering Design for Culinary Water Tank and Secondary Water Tank Conversion REQUEST FOR PROPOSAL Engineering Design for Culinary Water Tank and Secondary Water Tank Conversion Page 1 of 5 REQUEST FOR PROPOSALS Syracuse City is seeking the services of a qualified engineering consultant

More information

Review Zone Application for D&R Canal Commission Decision

Review Zone Application for D&R Canal Commission Decision Review Zone Application for D&R Canal Commission Decision MEETING DATE: December 21, 2016 DRCC #: 16-4345 Latest Submission Received: December 7, 2016 Applicant: Robert McCarthy, PE PSE&G 4000 Hadley Road,

More information

Enterprise Parkway Improvement Project, CIP# E364

Enterprise Parkway Improvement Project, CIP# E364 Exhibit A SCOPE OF SERVICES AND FEES This project, in general, consists of: Construction of roadway improvements to extend Enterprise Parkway east of Superior Industries and Lockheed Martin to connect

More information

REQUEST FOR PROPOSAL. Construction Management Services Not at Risk

REQUEST FOR PROPOSAL. Construction Management Services Not at Risk REQUEST FOR PROPOSAL Construction Management Services Not at Risk The St. Charles County Ambulance District proposes to retain a qualified firm/team for the Construction Management Services Not at Risk

More information

Task Order Authorization

Task Order Authorization Task Order Authorization Task Order Number: 6 Task Order Name: 2017 Small Drainage Program Hourly Rate: See attached Exhibit B Budget Not To Exceed: $79,795.00 This Task Order pertains to the On-Call Agreement

More information

REQUEST FOR STATEMENT OF QUALIFICIATIONS FOR WATER SOURCE RAW WATER TRANSMISSION MAIN

REQUEST FOR STATEMENT OF QUALIFICIATIONS FOR WATER SOURCE RAW WATER TRANSMISSION MAIN REQUEST FOR STATEMENT OF QUALIFICIATIONS FOR WATER SOURCE RAW WATER TRANSMISSION MAIN FOR CITY OF SIDNEY SIDNEY, OHIO PROPOSALS TO BE RECEIVED AT THE OFFICE OF THE PUBLIC WORKS DIRECTOR 201 WEST POPLAR

More information

REQUEST FOR PROPOSALS (RFP) Design Services for District Heat Distribution System

REQUEST FOR PROPOSALS (RFP) Design Services for District Heat Distribution System REQUEST FOR PROPOSALS (RFP) Design Services for District Heat Distribution System Issued by the City of Montpelier, Vermont Department of Planning and Community Development Responses Due: August 12, 2011,

More information

Exhibit B - A/E Scope of Services (General Contracting Project) State of Ohio Professional Services Agreements for Public Facility Construction

Exhibit B - A/E Scope of Services (General Contracting Project) State of Ohio Professional Services Agreements for Public Facility Construction - State of Ohio Professional Services Agreements for Public Facility Construction TABLE OF CONTENTS ARTICLE 1 - BASIC SERVICES... 1 ARTICLE 2 - PROGRAM VERIFICATION STAGE... 2 ARTICLE 3 - SCHEMATIC DESIGN

More information

PROFESSIONAL SERVICES REQUEST FOR PROPOSALS Moffat Collection System Siphon 1 River Crossing

PROFESSIONAL SERVICES REQUEST FOR PROPOSALS Moffat Collection System Siphon 1 River Crossing Project Description PROFESSIONAL SERVICES REQUEST FOR PROPOSALS Moffat Collection System Siphon 1 River Crossing The Siphon 1 River Crossing project consists of replacing an existing aerial pipe crossing

More information

Request for Proposals No ; Various On-call Professional Design and Engineering Services Addendum No. 1 Page 2

Request for Proposals No ; Various On-call Professional Design and Engineering Services Addendum No. 1 Page 2 Addendum Number 1 Request for Proposals No. 17-001 Various On-call Professional Design and Engineering Services To all prospective firms under specifications for Request for Proposals (RFP) No. 17-001,

More information

REQUEST FOR PROPOSALS OREGON CITY ANNEX FIBER OPTIC ENGINEERING & INSTALLATION. Date Due: Friday, September 8, Time Due: 4:00 p.m.

REQUEST FOR PROPOSALS OREGON CITY ANNEX FIBER OPTIC ENGINEERING & INSTALLATION. Date Due: Friday, September 8, Time Due: 4:00 p.m. Information Technology 625 Center Street Oregon City OR 97045 Ph (503) 657-0891 fax (503) 657-7892 REQUEST FOR PROPOSALS OREGON CITY ANNEX FIBER OPTIC ENGINEERING & INSTALLATION Date Due: Friday, September

More information

EL PASO WATER - PUBLIC SERVICE BOARD REQUEST FOR SUBMITTALS RFS June 27, 2017

EL PASO WATER - PUBLIC SERVICE BOARD REQUEST FOR SUBMITTALS RFS June 27, 2017 EL PASO WATER - PUBLIC SERVICE BOARD REQUEST FOR SUBMITTALS RFS 21-17 June 27, 2017 TO: RE: Invited Firms Request for Submittals to El Paso Water - Public Service Board (EPWater) Statement of Work Professional

More information

1997 Part 2. Document B141. Standard Form of Architect's Services: Design and Contract Administration TABLE OF ARTICLES

1997 Part 2. Document B141. Standard Form of Architect's Services: Design and Contract Administration TABLE OF ARTICLES TM Document B141 Standard Form of Architect's Services: Design and Contract Administration 1997 Part 2 TABLE OF ARTICLES 2.1 PROJECT ADMINISTRATION SERVICES 2.2 SUPPORTING SERVICES 2.3 EVALUATION AND PLANNING

More information

1969 Western Judgment History and Application. January 7, 2011 Board of Public Utilities

1969 Western Judgment History and Application. January 7, 2011 Board of Public Utilities 1969 Western Judgment History and Application January 7, 2011 Board of Public Utilities Presentation Overview Overview of the Judgment Safe Yield Summary RPU Water Rights by Basin Judgment Overview Complaint

More information

Chapter 3 DESIGN. C. Project Scope: The Designer may proceed only with the authorized scope of work. Scope changes must be approved by the OFD-PM.

Chapter 3 DESIGN. C. Project Scope: The Designer may proceed only with the authorized scope of work. Scope changes must be approved by the OFD-PM. Chapter 3 DESIGN 3.01 INTRODUCTION A. The Designer, in providing professional services for the project in accordance with the terms and conditions of the Owner/Designer Agreement, should adhere to the

More information

CITY OF REDLANDS MASTER PLAN OF DRAINAGE San Bernardino County, California

CITY OF REDLANDS MASTER PLAN OF DRAINAGE San Bernardino County, California CITY OF REDLANDS MASTER PLAN OF DRAINAGE San Bernardino County, California Prepared for City of Redlands 35 Cajon Street Redlands, California 92373 Prepared by 14725 Alton Parkway Irvine, CA 92618 Contact

More information

Transit Return on Investment (ROI) Study Request for Proposals (RFP)

Transit Return on Investment (ROI) Study Request for Proposals (RFP) Transit Return on Investment (ROI) Study Request for Proposals (RFP) Table of Contents 1. Introduction... 1 2. Scope of Services... 1 3. Project Schedule... 5 4. Evaluation Criteria... 5 5. Submission

More information

PUBLIC NOTICE 19 TH STREET PUBLIC PARKING FACILITY INCLUDING MIXED USE DEVELOPMENT SOLICITATION RFQ NO

PUBLIC NOTICE 19 TH STREET PUBLIC PARKING FACILITY INCLUDING MIXED USE DEVELOPMENT SOLICITATION RFQ NO March 22, 2013 PUBLIC NOTICE 19 TH STREET PUBLIC PARKING FACILITY INCLUDING MIXED USE DEVELOPMENT SOLICITATION RFQ NO. 1-2013 The City of Virginia Beach Development Authority (VBDA) hereby provides notice

More information

I. RELEASE FROM PLANNING PRIOR TO SUBMITTAL TO ENGINEERING DEPARTMENT

I. RELEASE FROM PLANNING PRIOR TO SUBMITTAL TO ENGINEERING DEPARTMENT Revised August 2005 I. RELEASE FROM PLANNING PRIOR TO SUBMITTAL TO ENGINEERING DEPARTMENT Before the applicant submits improvement plans and reports for Engineering plan checking, the applicant shall contact

More information

REQUEST FOR PROPOSALS TO PROVIDE PLANNING, RECOMMENDATIONS, AND CONTRACT DOCUMENTS FOR PIPELINE INSPECTION AND CONDITION ASSESSMENT FOR THE

REQUEST FOR PROPOSALS TO PROVIDE PLANNING, RECOMMENDATIONS, AND CONTRACT DOCUMENTS FOR PIPELINE INSPECTION AND CONDITION ASSESSMENT FOR THE REQUEST FOR PROPOSALS TO PROVIDE PLANNING, RECOMMENDATIONS, AND CONTRACT DOCUMENTS FOR PIPELINE INSPECTION AND FOR THE 24-INCH UNIT B AND 27-INCH UNIT K RANCHO SUMMIT DRIVE PIPELINES 12-INCH ENCINITAS

More information

SOUTH FLORIDA WATER MANAGEMENT DISTRICT. Question 13: Wetlands

SOUTH FLORIDA WATER MANAGEMENT DISTRICT. Question 13: Wetlands SOUTH FLORIDA WATER MANAGEMENT DISTRICT Question 13: Wetlands 1. The wetland responses and topographical data provided in the ADA for the 520- acre project site are conceptual in nature. The referenced

More information

RFQ WEB Advertisement

RFQ WEB Advertisement 165 Capitol Avenue, Hartford, CT 06106 Selection Type: Request for Qualifications (RFQ) Web Advertisement Construction Manager at Risk Adv. No.: Web Advertisement Date: July 18, 2008 General Statement:

More information

HOUSING AUTHORITY OF THE CITY OF BOULDER (dba Boulder Housing Partners)

HOUSING AUTHORITY OF THE CITY OF BOULDER (dba Boulder Housing Partners) HOUSING AUTHORITY OF THE CITY OF BOULDER (dba Boulder Housing Partners) SOLICITATION TYPE: DESCRIPTION: Request For Proposals Paperless Invoice Automation Software ISSUE DATE: 04/03/2018 DUE DATE: 04/20/2018

More information

June 20, 2016 REQUEST FOR PROPOSAL STRATEGIC PLANNING CONSULTANT

June 20, 2016 REQUEST FOR PROPOSAL STRATEGIC PLANNING CONSULTANT ADULT EDUCATION BLOCK GRANT DESERT REGIONAL CONSORTIUM June 20, 2016 REQUEST FOR PROPOSAL STRATEGIC PLANNING CONSULTANT Proposals will be received until MONDAY, JULY 25TH 2:00 p.m. PST Return Proposal

More information

PUBLIC ANNOUNCEMENT REQUEST FOR DESIGN-BUILD SERVICES STATEMENTS OF QUALIFICATIONS (GREENVILLE CITY SCHOOL DISTRICT)

PUBLIC ANNOUNCEMENT REQUEST FOR DESIGN-BUILD SERVICES STATEMENTS OF QUALIFICATIONS (GREENVILLE CITY SCHOOL DISTRICT) PUBLIC ANNOUNCEMENT REQUEST FOR DESIGN-BUILD SERVICES STATEMENTS OF QUALIFICATIONS (GREENVILLE CITY SCHOOL DISTRICT) The Greenville City School District (the "District") invites interested parties to submit

More information

Ipswich Public Schools

Ipswich Public Schools Ipswich Public Schools Executive Search Consultant Services for the position of Superintendent of Schools December 2016 I. RFQ Timeline and Decision to Use a Request for Quotes Time Line Superintendent

More information

School Risk Assessment

School Risk Assessment RSU #14 WINDHAM RAYMOND SCHOOLS AND YARMOUTH SCHOOLS School Risk Assessment RFP # 12-06 Bill Hansen and Judy Paolucci 12/2/2011 RSU #14 Windham Raymond Schools and the Yarmouth School Department are requesting

More information

City and County of San Francisco

City and County of San Francisco City and County of San Francisco Port of San Francisco REQUEST FOR QUALIFICATIONS FOR AS-NEEDED ENVIRONMENTAL AND RELATED PROFESSIONAL SERVICES RFQ#PRT1617-17 CONTACT: Boris Delepine, boris.delepine@sfport.com,

More information

REQUEST FOR PROPOSALS EXECUTIVE SEARCH SERVICES. Issuance Date November 27, 2017

REQUEST FOR PROPOSALS EXECUTIVE SEARCH SERVICES. Issuance Date November 27, 2017 REQUEST FOR PROPOSALS EXECUTIVE SEARCH SERVICES Issuance Date November 27, 2017 Submittal Deadline January 8, 2018 Page Is Blank For Photocopying MARIN LAFCO 2 TABLE OF CONTENTS Section Page Number I.

More information

SCRRA RIGHT-OF-WAY ENCROACHMENT PROCESS

SCRRA RIGHT-OF-WAY ENCROACHMENT PROCESS SCRRA RIGHT-OF-WAY ENCROACHMENT PROCESS MARCH 2017 SCRRA RIGHT-OF-WAY ENCROACHMENT PROCESS 1.0 General A. All work activities within the SCRRA operating corridor and right-of-way, or work activities that

More information

4.6 - Hydrology and Water Quality

4.6 - Hydrology and Water Quality City of Wasco - Wasco Center Walmart Hydrology and Water Quality 4.6 - Hydrology and Water Quality 4.6.1 - Introduction This section provides an evaluation of hydrology and water quality. The analysis

More information

REQUEST FOR PROPOSALS

REQUEST FOR PROPOSALS REQUEST FOR PROPOSALS CONSTRUCTION MANAGEMENT SERVICES OCTOBER 09, 2014 EAST BAY REGIONAL PARK DISTRICT Atlas Road Extension Improvements POINT PINOLE REGIONAL SHORELINE PROPOSALS DUE: 2:00PM, NOVEMBER

More information

Project Manager- Park Operations

Project Manager- Park Operations Page 1 of 5 COSUMNES COMMUNITY SERVICES DISTRICT invites applications for the position of: Project Manager- Park Operations SALARY: $73,812.00 - $98,904.00 Annually OPENING DATE: 11/03/17 CLOSING DATE:

More information

ALTERNATIVE PROJECT DELIVERY DIVISION

ALTERNATIVE PROJECT DELIVERY DIVISION VIRGINIA DEPARTMENT OF TRANSPORTATION ALTERNATIVE PROJECT DELIVERY DIVISION INSTRUCTIONAL AND INFORMATIONAL MEMORANDUM GENERAL SUBJECT: Design-Build Requirements for Advertisement SPECIFIC SUBJECT: APPROVED:

More information

Chapter 6. Competitive Sealed Bidding: Elements of an Invitation for Bids

Chapter 6. Competitive Sealed Bidding: Elements of an Invitation for Bids Chapter 6. Competitive Sealed Bidding: Elements of an Invitation for Bids Summary This chapter identifies the minimum elements of an invitation for bids when procuring goods or services using the competitive

More information

US Army Corps of Engineers

US Army Corps of Engineers I I I ' A I US Army Corps of Engineers LA River Ecosystem Restoration, CA Preconstruction Engineering and Design Phase 104791 LOS ANGELES DISTRICT SOUTH PACIFIC DIVISION August 15, 2017 1 Table of Contents

More information

REQUEST FOR PROPOSAL FOR CONSTRUCTION MANAGEMENT SERVICES NOT AT RISK FOR THE. St. Charles County Ambulance District

REQUEST FOR PROPOSAL FOR CONSTRUCTION MANAGEMENT SERVICES NOT AT RISK FOR THE. St. Charles County Ambulance District REQUEST FOR PROPOSAL FOR CONSTRUCTION MANAGEMENT SERVICES NOT AT RISK FOR THE St. Charles County Ambulance District Base 3 & Training Facility Construction 4169 Old Mill Parkway St. Peters, MO 63376 September

More information

REQUEST FOR QUALIFICATIONS AND PROPOSALS. On Behalf of the Crawford County Board of Commissioners. for

REQUEST FOR QUALIFICATIONS AND PROPOSALS. On Behalf of the Crawford County Board of Commissioners. for REQUEST FOR QUALIFICATIONS AND PROPOSALS On Behalf of the Crawford County Board of Commissioners for The Crawford County Jail/Sheriff Office Roof Replacement Request for Qualifications and Proposals The

More information

For The Design Architect for Phase 1 of a Visual and Performing Arts Center and Site Micro-Master Plan

For The Design Architect for Phase 1 of a Visual and Performing Arts Center and Site Micro-Master Plan STATE OF COLORADO OFFICE OF THE STATE ARCHITECT STATE BUILDINGS PROGRAMS REQUEST FOR QUALIFICATIONS FOR ARCHITECTURAL SERVICES July 2, 2013 For The University of Colorado Colorado Springs For The Design

More information

REQUEST FOR PROPOSAL CONSULTING SERVICES DEVELOPING A CORPORATE STRATEGIC PLAN

REQUEST FOR PROPOSAL CONSULTING SERVICES DEVELOPING A CORPORATE STRATEGIC PLAN THE CORPORATION OF THE REQUEST FOR PROPOSAL CONSULTING SERVICES DEVELOPING A CORPORATE STRATEGIC PLAN Proposals will be received prior to 2:00pm on Friday May 29, 2015. All inquiries related to this Request

More information

REQUEST FOR PROPOSALS

REQUEST FOR PROPOSALS REQUEST FOR PROPOSALS Title Organizational Review LRFP Number 2100.17.01 Project Manager Alan Sorum Submittal Deadline June 17, 2016 Award Announcement July 15, 2016 Submit Proposals to: or Alan Sorum,

More information

Request for Proposal: Controlled System Separation Feasibility Study

Request for Proposal: Controlled System Separation Feasibility Study Request for Proposal: Controlled System Separation Feasibility Study I. INTRODUCTION A. Overview The New York Independent System Operator ( NYISO ) is requesting proposals for professional services from

More information

Forsyth County General Services Department Construction Management Division 201 North Chestnut Street Winston-Salem, NC 27101

Forsyth County General Services Department Construction Management Division 201 North Chestnut Street Winston-Salem, NC 27101 Forsyth County General Services Department Construction Management Division 201 North Chestnut Street Winston-Salem, NC 27101 Request for Qualifications Construction Manager at Risk (CMAR) INSTRUCTIONS

More information

WESTERN ENGINEERING CONSULTANTS, Inc LLC

WESTERN ENGINEERING CONSULTANTS, Inc LLC WESTERN ENGINEERING CONSULTANTS, Inc LLC 127 S. Denver Avenue, Ft. Lupton CO 80621 2501 Mill St. Brush, CO 80723 Ph. 303-913-7341, Fax 720-294-1330 Email: firstname.lastname@westerneci.com August 24, 2017

More information

City and County of Broomfield, Colorado CITY COUNCIL AGENDA MEMORANDUM. 11f - Page 1

City and County of Broomfield, Colorado CITY COUNCIL AGENDA MEMORANDUM. 11f - Page 1 To: From: Prepared by: Agenda Title: CITY COUNCIL AGENDA MEMORANDUM Mayor and City Council Charles Ozaki, City and County Manager Jim Becklenberg, Assistant City and County Manager David Allen, Director

More information

Port of Camas/Washougal Levee Recertification and Engineering Analysis Request for Proposal May 3, 2011

Port of Camas/Washougal Levee Recertification and Engineering Analysis Request for Proposal May 3, 2011 I. Project Summary As part of their Map Modernization Program, FEMA has initiated a countywide Flood Insurance Study (FIS) and Digital Flood Insurance Rate Map (DFIRM) for the Port of Camas/Washougal.

More information

REQUEST FOR QUALIFICATIONS FOR DAYTON VALLEY AREA DRAINAGE MASTER PLAN

REQUEST FOR QUALIFICATIONS FOR DAYTON VALLEY AREA DRAINAGE MASTER PLAN REQUEST FOR QUALIFICATIONS FOR DAYTON VALLEY AREA DRAINAGE MASTER PLAN Statement of Qualifications due Friday, November 3, 2017 at 12:00 PM (Pacific Time) To the Carson Water Subconservancy District Office

More information

RESOLUTION NO.15- The Planning Commission of the City of La Habra does hereby resolve as follows:

RESOLUTION NO.15- The Planning Commission of the City of La Habra does hereby resolve as follows: RESOLUTION NO.15- A RESOLUTION OF THE PLANNING COMMISSION OF THE CITY OF LA HABRA CERTIFYING MITIGATED NEGATIVE DECLARATION OF ENVIRONMENTAL IMPACTS 14-02 FOR A 32 UNIT MULTI-FAMILY RESIDENTIAL DEVELOPMENT

More information

NC State University OESAD GUIDELINES Contract Year

NC State University OESAD GUIDELINES Contract Year July 1, 2014 NC State University OESAD GUIDELINES Contract Year 2014-2016 I. Informal Projects A. Preface Based on the North Carolina Administrative Code (NCAC), Title 01, Subchapter 30D Section.0300 Selection

More information

CUSTOMER NAME Security Awareness Education Request for Proposal. Program Content & Hosting Services Date

CUSTOMER NAME Security Awareness Education Request for Proposal. Program Content & Hosting Services Date CUSTOMER NAME Security Awareness Education Request for Proposal Program Content & Hosting Services Date Contents SAE Project Overview... 3 SAE Vendor Qualifications... 3 Project Milestones... 3 CUSTOMER

More information

The Devil is in the Details!

The Devil is in the Details! The Devil is in the Details! Presentation to: Sherwood Park & District Chamber of Commerce April 20, 2017 Agenda Welcome Types of RFx documents Mandatory requirements What not to do Preparing your best

More information

CITY OF CHINO HILLS. Request for Proposals (RFP) for. On-call Electrical Repair Service. On-call Electrical Repair including Water and Wastewater

CITY OF CHINO HILLS. Request for Proposals (RFP) for. On-call Electrical Repair Service. On-call Electrical Repair including Water and Wastewater CITY OF CHINO HILLS Request for Proposals (RFP) for On-call Electrical Repair Service March 30, 2016 Department: Project Name: Public Works On-call Electrical Repair including Water and Wastewater Proposal

More information

Hiring An Environmental Consultant For A Brownfields Redevelopment Project

Hiring An Environmental Consultant For A Brownfields Redevelopment Project Hiring An Environmental Consultant For A Brownfields Redevelopment Project Steps Brownfields projects often demand expertise that staff from local governments may not have. Environmental consultants can

More information

The Richland-Lexington Riverbanks Park District ("District") requests the submittal of Qualifications for Q /19/13-Specialty Contract Design

The Richland-Lexington Riverbanks Park District (District) requests the submittal of Qualifications for Q /19/13-Specialty Contract Design The Richland-Lexington Riverbanks Park District ("District") requests the submittal of Qualifications for Q14001-12/19/13-Specialty Contract Design Build Services Portions of the Children s Garden Project

More information

PEIRCE ISLAND WASTEWATER TREATMENT FACILITY UPGRADE

PEIRCE ISLAND WASTEWATER TREATMENT FACILITY UPGRADE REQUEST FOR QUALIFICATIONS CITY OF PORTSMOUTH NEW HAMPSHIRE Public Works Department ENGINEERING SERVICES PEIRCE ISLAND WASTEWATER TREATMENT FACILITY UPGRADE VALUE ENGINEERING REVIEW RFQ No. 59-14 City

More information

Suwannee River Water Management District LOW BID DESIGN-BUILD REQUEST FOR PROPOSAL. For

Suwannee River Water Management District LOW BID DESIGN-BUILD REQUEST FOR PROPOSAL. For Suwannee River Water Management District LOW BID DESIGN-BUILD REQUEST FOR PROPOSAL For Starke Bypass Wetland Mitigation Project Bradford County, Florida Contract Number: RFP 14-038RM Table of Contents

More information

600 - Phase C Intermediate Review Checklist for the Architect- Engineer

600 - Phase C Intermediate Review Checklist for the Architect- Engineer 600 Phase C Intermediate Review Checklist for the Architect Engineer This checklist is to be used by the ArchitectEngineer during Phase C of the Project and shall be included in the Intermediate Review

More information

REQUEST FOR QUALIFICATIONS AND QUOTES 1716 VEHICLE WRAPS AND DECALS

REQUEST FOR QUALIFICATIONS AND QUOTES 1716 VEHICLE WRAPS AND DECALS OLYMPIA, WASHINGTON REQUEST FOR QUALIFICATIONS AND QUOTES 1716 VEHICLE WRAPS AND DECALS REQUEST FOR QUALIFICATIONS AND QUOTES (RFQQ) RELEASE DATE: April 13, 2017 PRE-PROPOSAL MEETING: Date: April 24, 2017

More information

TOMPKINS COUNTY CIVIL SERVICE EXAMINATION Inclusion Through Diversity OPEN TO THE PUBLIC

TOMPKINS COUNTY CIVIL SERVICE EXAMINATION Inclusion Through Diversity OPEN TO THE PUBLIC TOMPKINS COUNTY CIVIL SERVICE EXAMINATION Inclusion Through Diversity OPEN TO THE PUBLIC Tompkins County Department of Human Resources Office 125 E. Court Street Ithaca, NY 14850 (607) 274-5526 Tompkins

More information

AGENDA ITEM NO. June 6, 2017

AGENDA ITEM NO. June 6, 2017 DocuSign Envelope ID: 7CA39164-0C90-42A5-B40D-ED361AA88939 AGENDA ITEM NO. June 6, 2017 May 23, 2017 Honorable Board of Supervisors County of Alameda 1221 Oak Street, Suite 536 Oakland, CA 94612-4305 Dear

More information

1.0 ABOUT THE NU GUIDELINES

1.0 ABOUT THE NU GUIDELINES Construction Policies & Procedures Northeastern University Guidelines for Capital Project Design & Implementation.0 ABOUT THE NU GUIDELINES This document is intended to describe in a comprehensive manner

More information

ADVERTISEMENT FOR DESIGN BUILDER PREQUALIFICATION

ADVERTISEMENT FOR DESIGN BUILDER PREQUALIFICATION ADVERTISEMENT FOR DESIGN BUILDER PREQUALIFICATION Subject to conditions prescribed by the University of California, San Diego, responses to the University's prequalification documents for a Design Build

More information

REQUEST FOR LETTERS OF INTEREST IN PROFESSIONAL ENGINEERING SERVICES PROJECT NO /05. Ref: General Engineering Services

REQUEST FOR LETTERS OF INTEREST IN PROFESSIONAL ENGINEERING SERVICES PROJECT NO /05. Ref: General Engineering Services REQUEST FOR LETTERS OF INTEREST IN PROFESSIONAL ENGINEERING SERVICES PROJECT NO. 99-16-04/05 Ref: General Engineering Services The Ohio Turnpike and Infrastructure Commission ( Commission ) issues this

More information

REQUEST FOR PROPOSALS

REQUEST FOR PROPOSALS REQUEST FOR PROPOSALS UTILITY BILLING SOFTWARE DUE DATE: NO LATER THAN 5:00 PM EASTERN TIME, MARCH 11, 2016 QUESTIONS: JESSICA MARTIN-LANE JESSICA@MARTIN-MCGILL.COM NOTE: THE COUNTY OF HARNETT RESERVES

More information

Request For Proposal Of Printing and Design Services. Marketing Department

Request For Proposal Of Printing and Design Services. Marketing Department Request For Proposal Of Printing and Design Services Marketing Department Released on June 3, 2016 Mosaic Youth Theatre of Detroit Printing and Design Services REQUEST FOR PROPOSAL (RFP) BACKGROUND Mosaic

More information

Los Angeles Unified School District - Job Opportunity

Los Angeles Unified School District - Job Opportunity Los Angeles Unified School District - Job Opportunity Job Posting Title Reference code Environmental Planning Specialist (Business Administration) JP15-200-XA2 Minimum Salary $ 35.08 Hourly Maximum Salary

More information

Dates/Times: p.m. Pacific Time.

Dates/Times: p.m. Pacific Time. Notice - Request for Qualifications (RFQ) For Corrosion Engineering and Investigations For The "E" Street Reservoir Cover Repainting For The City of Port Angeles 06-12-12 The City of Port Angeles, Washington,

More information

There are Four areas in the systems transformation process (1) assessment, (2) planning, (3) implementation, and (4) evaluation.

There are Four areas in the systems transformation process (1) assessment, (2) planning, (3) implementation, and (4) evaluation. Request for Proposal: Subject Matter Experts (SME) in the area of Transformation Release Date: Wednesday, February 8, 2017 Deadline: Friday, March 3, 2017 Overview Who Are We? The Ohio Center for Autism

More information

REQUEST FOR COUNCIL ACTION

REQUEST FOR COUNCIL ACTION REQUEST FOR COUNCIL ACTION Date: 8/10/09 Item No.: 1.b Department Approval Acting City Manager Approval Item Description: Discussion of Revised Professional Services Policy 1 6 7 8 9 BACKGROUND The City

More information

SITE PLAN AND ARCHITECTURAL REVIEW APPLICATION

SITE PLAN AND ARCHITECTURAL REVIEW APPLICATION SITE PLAN AND ARCHITECTURAL REVIEW APPLICATION CITY OF GENEVA, NEW YORK The purpose of the site plan and architectural review process is to secure compliance with the City s Zoning Ordinance and to promote

More information

16.0 Water Quality Management Criteria for Developed Land

16.0 Water Quality Management Criteria for Developed Land October 2003, Revised February 2005 Criteria for Developed Land Page 1 16.1 Introduction 16.0 Water Quality Management Criteria for Developed Land Stormwater quality control is an integral part of any

More information

I. General Information. A. Project Team & Contacts: Role Company Name Phone City of Johnson City Jeff Owner Water & Sewer Harmon, PE Department

I. General Information. A. Project Team & Contacts: Role Company Name Phone  City of Johnson City Jeff Owner Water & Sewer Harmon, PE Department I. General Information Civil Engineering Surveying Environmental Consulting Tysinger, Hampton & Partners, Inc. OPTIONAL PRE-BID MEETING MINUTES Austin Springs Road Water Line Replacement Project ITB #6190

More information

Proposals will be received at 101 East 11 th Street, Suite G13, Chattanooga, TN until 4:00 P M, EST. End of Day on February 3, 2012 End of Day

Proposals will be received at 101 East 11 th Street, Suite G13, Chattanooga, TN until 4:00 P M, EST. End of Day on February 3, 2012 End of Day Date: 01/17/2012 Ref. No.: PURCHASING DEPARTMENT 101 EAST 11 TH STREET CITY HALL SUITE G13 CHATTANOOGA, TENNESSEE 37402 Request for Qualification (RFQ) for the City of Chattanooga, Tennessee Proposals

More information

E. STORMWATER MANAGEMENT

E. STORMWATER MANAGEMENT E. STORMWATER MANAGEMENT 1. Existing Conditions The Project Site is located within the Lower Hudson Watershed. According to the New York State Department of Environmental Conservation (NYSDEC), Lower Hudson

More information

MS4 Programs: Quality, the Other Stormwater Q. Dan Bounds, PE, D.WRE IAFSM March 9, 2017

MS4 Programs: Quality, the Other Stormwater Q. Dan Bounds, PE, D.WRE IAFSM March 9, 2017 MS4 Programs: Quality, the Other Stormwater Q Dan Bounds, PE, D.WRE IAFSM March 9, 2017 MS4 Rule and Regulations MS4 Municipal Separate Storm Sewer System A conveyance or system of conveyances (catch basins,

More information

Request for Proposal Subsurface Soil Investigation

Request for Proposal Subsurface Soil Investigation Request for Proposal Subsurface Soil Investigation The County of Westchester is seeking a qualified environmental consulting firm to conduct subsurface soil investigations for a proposed dredging project.

More information

Science Technology Engineering and Mathematics (STEM) Initiative

Science Technology Engineering and Mathematics (STEM) Initiative DEPARTMENT of FACILITIES DESIGN December 17, 2013 and CONSTRUCTION REQUEST for PROPOSAL Science Technology Engineering and Mathematics (STEM) Initiative PRE-CONSTRUCTION SERVICES Facilities Design and

More information

REQUEST FOR QUALIFICATIONS. Design/Build Project Number CP Power Plant - Boiler 10 Gas Burner Replacement

REQUEST FOR QUALIFICATIONS. Design/Build Project Number CP Power Plant - Boiler 10 Gas Burner Replacement REQUEST FOR QUALIFICATIONS Project Number CP160801 Power Plant - Boiler 10 Gas Burner Replacement University of Missouri Campus Facilities Planning, Design and Construction Columbia, Missouri February

More information

Preliminary Drainage Analysis

Preliminary Drainage Analysis Preliminary Drainage Analysis Tanimura and Antle Employee Housing Town of Spreckels County of Monterey, California LIB150205 May 29, 2015 Prepared For: Tanimura and Antle Produce Prepared By: 9699 Blue

More information

Request for Qualifications. Legal and Regulatory Support. Date of Issue: February 9, 2018

Request for Qualifications. Legal and Regulatory Support. Date of Issue: February 9, 2018 Request for Qualifications Legal and Regulatory Support Date of Issue: February 9, 2018 Upper Neuse River Basin Association P.O. Box 270 Butner, NC 27509 Table of Contents Request for Qualifications...

More information

Request for Proposal Simulation-Based Learning Competition

Request for Proposal Simulation-Based Learning Competition International Council on Hotel, Restaurant, and Institutional Education February 1, 2018 Request for Proposal Simulation-Based Learning Competition RFP#2018-SIM-101 Your firm is invited to submit a proposal

More information

Request for Proposals (RFP): Transportation Study for On Demand Service for People with Disabilities in the Valley Region

Request for Proposals (RFP): Transportation Study for On Demand Service for People with Disabilities in the Valley Region Introduction Request for Proposals (RFP): Transportation Study for On Demand Service for People with Disabilities in the Valley Region The Kennedy Center, Inc. December 2014 The Kennedy Center, Inc. is

More information

Industrial waste pretreatment facilities that discharge to public sewers.

Industrial waste pretreatment facilities that discharge to public sewers. Bureau of Point and Non-Point Source Management Standard Operating Procedure (SOP) 1 for Clean Water Program Water Quality Management Permits for Industrial Waste Treatment Facilities SOP No. BPNPSM-PMT-024

More information

REQUEST FOR PROPOSAL. For Technical Contractor CanGym Revitalization City Park Drive, Suite 120 Ottawa, ON K1J 1A3

REQUEST FOR PROPOSAL. For Technical Contractor CanGym Revitalization City Park Drive, Suite 120 Ottawa, ON K1J 1A3 REQUEST FOR PROPOSAL For Technical Contractor CanGym Revitalization 1900 City Park Drive, Suite 120 Ottawa, ON K1J 1A3 Request for Proposal For Technical Contractor CanGym Revitalization Gymnastics Canada

More information

REQUEST FOR QUALIFICATIONS (RFQ)

REQUEST FOR QUALIFICATIONS (RFQ) REQUEST FOR QUALIFICATIONS (RFQ) AGENCY STRATEGIC PLANNING CONSULTANT April 15, 2016 Fresno Economic Opportunities Commission (Fresno EOC) seeks a qualified, experienced, professional consultant or consultant

More information

Denver Water Capital Projects Contractor Prequalification REQUEST FOR QUALIFICATIONS

Denver Water Capital Projects Contractor Prequalification REQUEST FOR QUALIFICATIONS RFQ Term: 1/1/2016 1/1/2020 Denver Water Capital Projects Contractor Prequalification REQUEST FOR QUALIFICATIONS Denver Water (DW), in an effort to improve the administration and efficiency, has initiated

More information

House Doctor Consulting Services Application Package

House Doctor Consulting Services Application Package Public Facilities Department House Doctor Consulting Services Application Package For FY2013 FY2015 House Doctor Consulting Services Project #7005 City of Boston Thomas M. Menino, Mayor Michael Galvin

More information

REQUEST FOR CONSTRUCTION BIDS May 23, 2017

REQUEST FOR CONSTRUCTION BIDS May 23, 2017 REQUEST FOR CONSTRUCTION BIDS May 23, 2017 Cambridge Greenway Trail / Railroad Bridge Replacement Flood Mitigation Project 1.0 Project Background A former railroad bridge that currently carries the Cambridge

More information

Spring Forecast Based Operations, Folsom Dam, California

Spring Forecast Based Operations, Folsom Dam, California Spring Forecast Based Operations, Folsom Dam, California Paul E. Pugner, P.E. Chief, Water Management Section Sacramento District U.S. Army 1325 J Street, Room 1126 Sacramento, CA 95814-2922 Tel: (916)

More information

# 5 ) UN THREE CUPS YARD NORTH AMERICA CULTIVATION FACILITY SPECIAL USE PERMIT PUBLIC HEARING

# 5 ) UN THREE CUPS YARD NORTH AMERICA CULTIVATION FACILITY SPECIAL USE PERMIT PUBLIC HEARING # 5 ) UN-74-16 THREE CUPS YARD NORTH AMERICA CULTIVATION FACILITY SPECIAL USE PERMIT PUBLIC HEARING STAFF REPORT To: Planning Commission Meeting date: November 9, 2016 Item: UN-74-16 Prepared by: Marc

More information

SIXTH STREET VIADUCT REPLACEMENT PROJECT MONTHLY EXECUTIVE MEETING REPORT JULY 2013

SIXTH STREET VIADUCT REPLACEMENT PROJECT MONTHLY EXECUTIVE MEETING REPORT JULY 2013 SIXTH STREET VIADUCT REPLACEMENT PROJECT MONTHLY EXECUTIVE MEETING REPORT JULY 2013 Sixth Street Viaduct Replacement Project Monthly Executive Meeting Report July 2013 TABLE OF CONTENTS Project Manager

More information

3.4 Harvest and Use BMPs

3.4 Harvest and Use BMPs 3.4 Harvest and Use BMPs Type of BMP Treatment Mechanisms Minimum Tributary Drainage Area Other Names LID Harvest and Use Volume Reduction This BMP is generally limited by the cistern / detention storage

More information

Sustainable Ag Lands Conservation (SALC) Stakeholder Kickoff Meeting Agenda (Meeting #1) 1) Welcome and Introductions (10 min)

Sustainable Ag Lands Conservation (SALC) Stakeholder Kickoff Meeting Agenda (Meeting #1) 1) Welcome and Introductions (10 min) Sustainable Ag Lands Conservation (SALC) Stakeholder Kickoff Meeting Agenda (Meeting #1) Thursday, April 28, 2016 10:00 am to Noon Development Services Training Room 7 County Center Drive, Oroville AGENDA

More information

THE CROSSROADS IN WINCHESTER 4. DRAINAGE PLAN. 4. Drainage Plan. a. Drainage Plan Description

THE CROSSROADS IN WINCHESTER 4. DRAINAGE PLAN. 4. Drainage Plan. a. Drainage Plan Description THE CROSSROADS IN WINCHESTER 4. DRAINAGE PLAN 4. Drainage Plan a. Drainage Plan Description The Specific Plan area drains naturally into two separate watersheds: approximately 6 percent of the Specific

More information