Indonesia-Lombok Poverty Alleviation and... Environmental Infrastructure Project

Size: px
Start display at page:

Download "Indonesia-Lombok Poverty Alleviation and... Environmental Infrastructure Project"

Transcription

1 Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Name Region Sector Project ID Borrower(s) Implementing Agency Regional Dev. & Ntb Environment Category Report No. PID8710 Indonesia-Lombok Poverty Alleviation and... Environmental Infrastructure Project East Asia and Pacific Region Other Urban Development IDPE40522 REPUBLIC OF INDONESIA Date PID Prepared February 8, 2000 Projected Appraisal Date June 15, 2000 Projected Board Date October 24, Country and Sector Background Sector Issues Ministry of Human Settlements and B (a) Poverty. Per-capita income in Indonesia had increased steadily for several years, and the 1996 government estimate of the absolute poor was seven million in urban areas (with a 10 percent incidence) and 15 million in rural areas (with a 12 percent incidence). However, a significant percentage of the population remained just above the poverty line. As a result of the economic crisis, which started in the second half of 1997, poverty levels increased substantially, especially in urban areas; mid-1998 urban poverty estimates started at 20%. (b) Access to basic services and income opportunities. Poverty in Indonesia is associated with lack of income opportunities, lack of access to basic environmental infrastructure services and lack of basic social services, e.g., education and health. In the post-crisis period, unemployment was estimated to have risen to 15 million (out of a labor force of 90 million), and underemployment was estimated at 45 percent (up from the pre-crisis estimate of 35 percent). The poor are inadequately covered by most basic environmental infrastructure services, including clean water, sanitation, storm drainage, and access roads. While the effects of the economic crisis on environmental infrastructure are yet to be empirically investigated, preliminary findings indicate that the poor are particularly affected by lack of government funds for: maintenance of existing infrastructure, and urgently needed new investments. (c) Centralized government, weak local fiscal, administrative and human capacities. Weak government capacity, especially in the provision of infrastructure services, has been a major problem. Though changing, the Indonesian government's planning and implementation mechanisms are still predominantly centralized. In the context of greater decentralization from central government, weak fiscal, administrative, and human capacities at local and provincial government levels have become even more critical. Government Strategy

2 (a) Poverty alleviation. Prior to the crisis, Government targeted its poverty alleviation efforts to the "left behind" villages, through a series of own funded and donor supported programs that provided basic infrastructure through labor intensive methods. With the onset of the crisis, Government increased the range and scale of its poverty interventions in both rural and in urban areas, to include: (a) labor-intensive public works programs; (b) subsidy programs for food and medicine; (c) school fee waivers; (d) food coupons and food stamps; and (e) implementation by local governments of their own programs, including promotion of food production on idle urban land. (b) Improved service provision to clear up back logs and to stimulate economic development. The Integrated Urban Infrastructure Development Program (IUIDP), and its more recent slightly enlarged version, have been the corner-stone of Government strategy for the last decade to ensure efficient delivery of basic urban services and to stimulate economic development in urban areas. The operational approach of the policy requires local governments to prepare action plans for institutional strengthening and improvements in resource mobilization, sector programming, and financing arrangements. IUIDP has received substantial donor support through various projects in the country. (c) Decentralization. Government's somewhat measured approach of the past towards decentralization has accelerated considerably with the recent enactment of laws on regional governance (Law no. 22/1999), fiscal balance (Law no 25/1999), and urban rural spatial planning. Major civil service reform is under discussion, with inputs from donors. Drafting of necessary regulations to implement the decentralization laws is underway, and Government estimates that there will be a transition period of up to two years. Government is currently making efforts to strengthen local and provincial government institutional and human capacities, and is seeking donor support in this regard. Sector Issues and Government Strategy in Lombok NTB is one of the poorest provinces in Indonesia. In 1996, prior to the crisis, Lombok (which accounts for three-fourths of the NTB population) had a poverty incidence of 17.6 percent, compared to the national incidence of 11 percent. Further, over 53 percent of the population was in the "near poor" and below category, with an expenditure level of Rp. 39,000 per month, compared with the national average of 30 percent. As an already backward province, NTB did not lose further ground during the crisis, and the postcrisis estimate of poverty is about 17 percent. Consistent with the overall poverty picture, Lombok has some of the poorest health indicators in Indonesia. According to a 1993 survey, average life expectancy was years, compared to the national average of years. Infant mortality rate was twice the national average, at 101 deaths per 1000 births, compared to the national average of 51. Service coverage for essential infrastructure services like water supply and sanitation was also extremely low. The Government of NTB province, with support from the national government, intends to undertake poverty alleviation measures through targeted income generation activities for the poor and improved provision of environmental infrastructure, public health and education services, as well as through tourism led economic growth. In this context, the provincial government is -2 -

3 conscious of the need to strengthen local capacity, protect the environment, and preserve Lombok's sasak culture. 2. Objectives The objective of the project, which is the first phase of a three phase program, is to: (a) support the preparation of a Medium Term Poverty Alleviation Action Plan in NTB province; (b) assist in providing basic environmental infrastructure to the poor; (c) support assistance to the poor for income generation; and (d) assist in the provision of environmental infrastructure to support economic development. The major portion of the investments under (b) to (d) will be in Lombok, while the remainder (about 15%) will be in Sumbawa. 3. Rationale for Bank's Involvement GOI believes that the Bank's in-country and international experience in poverty alleviation and urban environmental infrastructure would provide a strong impetus for poverty alleviation in one of the poorest provinces in Indonesia. In addition to direct support, Bank involvement in the project will likely attract assistance from other donors to poverty alleviation efforts in Lombok/NTB. GOI would also seek the involvement of other Bank units to complement the project's poverty alleviation efforts. Further, this project provides an ideal opportunity to operationalize government's decentralization efforts in a small island. 4. Description Possible project components are grouped according to the project's objectives of poverty alleviation through: (a) preparation of Medium Term Poverty Alleviation Action Plan; (b) targeted provision of basic services and support for income generation for the poor; and (c) infrastructure provision to support economic development. A. Preparation of Medium-term Poverty Alleviation Action Plan B. Environmental Infrastructure in Lombok - Oriented towards poverty groups - For economic development C. Support for Income Generation D. Investment for A & B above in Sumbawa (programmatic) E. Technical Assistance and Training. 5. Financing Total ( US$m) Government 2.5 IBRD 10.0 IDA Total Project Cost Implementation January 1, 2001 to December 31, 2003, i.e., three GOI fiscal years. The remaining two phases of the program will be implemented over the following six GOI fiscal years, ending December 31, Executing Agency and Principle Implementing Agency -3 -

4 The Directorate General of Urban Development in the Ministry of Human Settlements and Regional Development will be the Executing Agency for the project. NTB province will be the principle Implementing Agency. DG Urban (and its predecessor, DG Human Settlements) and NTB province have been responsible for project preparation. Project Implementation arrangements proposed by Government will be reviewed at pre-appraisal and the agreed arrangements will be a part of the draft PIP. It is likely that implementation will be fully decentralized to the province during Phase 2 of the APL. 7. Sustainability The benefits of the project in the area of poverty alleviation, through both the direct and the indirect means envisaged in the project, are expected to be sustainable because of the strong commitment of the provincial and local governments. In the current more democratic political environment in Indonesia, poverty alleviation will remain a major priority for the national, provincial, and local governments, especially in Lombok/NTB. The major risks are: (a) lack of clarity in roles and responsibilities at central, provincial, and local levels during the current period of transition, which could affect project processing and implementation; and (b) limited institutional and human capacity in NTB. 8. Lessons learned from past operations in the country/sector Overall Bank Experience. Bank involvement in the urban environmental infrastructure sector started in the early 1970s with low cost investment projects in shelter, water supply, sanitation, and urban transport, aimed at alleviating urban poverty. The primary lesson from these projects was the need for decentralization of responsibility for service delivery and management to appropriate local levels. Please also see the Operations Evaluation Department's retrospective, "OED: Twenty Years of Lending for Urban Development ", Report No , Experience in Indonesia. The Bank's core poverty-targeted interventions include the Village Infrastructure Projects (VIP, Lns and 4100-IND), the Kecamatan Development Project (KDP, Ln IND), and the Urban Poverty Project (UPP, Cr IND). The central learning of the VIP project, which closed recently, was that a large scale project can be used to address village level needs at considerable speed, and that villages are capable and willing under the right conditions to "be the subject of development rather than the object of development." (Please see the VIP project ICR, report no , for a more detailed discussion). The ongoing VIP2 is rated satisfactory both in development objectives and implementation progress. The KDP provides block grants to raise rural incomes and to build public infrastructure through labor intensive methods, using sub-district and village level government and community institutions. The project is rated highly satisfactory in development objectives and satisfactory in implementation progress. The UPP, which is similar in concept to the KDP, became effective in June 1999, and implementation has just started. Urban environmental infrastructure lending in Indonesia has progressed from demonstration projects in Jakarta, through more programmatic investments in - 4 -

5 other large cities, to sector lending within an agreed policy and institutional framework. For a comprehensive review of the Bank's support for urban environmental infrastructure projects in Indonesia till the eighties, please refer to a 1995 study carried out by OED entitled, "Indonesia: Impact Evaluation Report, Enhancing the Quality of Life in Urban Indonesia - The Legacy of the Kampung Improvement Program," Report no IND. Eight on-going and completed urban infrastructure projects were approved during the nineties and have contributed to a number of successful innovations - decentralization of urban services, integrated urban infrastructure development, development of local government capacity, improving local resource mobilization and utilization of borrowing capacities. Greater consultation of local communities on their needs and in the design of individual sub-projects is becoming an increasing feature in the more recent projects. A major lesson from the on-going and completed IUIDP projects is that given weak institutional and human capacities at local government levels, both the geographical and sectoral scope of individual interventions should be limited to a manageable level. Impact on the Lombok Project. The Lombok project will build on the lessons of previous experience, especially in Indonesia, in poverty alleviation and in environmental infrastructure interventions. Poverty interventions will be targeted through a poverty profile and community consultations/involvement will be an integral part of the project, right from preparation through an Initial Social Assessment and civil society representation in local level committees. In order to avoid project complexity, the geographical scope is limited to Lombok and to selected areas of Sumbawa, and the sectoral scope is limited to environmental infrastructure and income generation. 9. Program of Targeted Intervention (PTI) Y 10. Environment Aspects (including any public consultation) Issues According to the Umbrella Environmental Assessment (UEA) that is already in draft form, the most significant environmental problem on Lombok is degradation of coastal water quality and beaches, and destruction of the coral reef ecosystem in the vicinity of the Gili Islands and Senggigi, which were the two main areas of coastal tourism until development began in Kuta. Localized land-based pollution sources, coral mining, and destructive fishing practices are the principal causes. If coastal tourism proceeds in other parts of Lombok, as it is doing in Kuta, the risk of similar degradation is significant. The project will directly address several of these problems by providing infrastructure for sanitation, wastewater collection and treatment, and solid waste management. It may indirectly address destructive fishing coral mining if it is successful in alleviating poverty and in instilling environmentally sensitive developmental guidelines in coastal tourism projects. Given the scale of infrastructure sub-projects, the project itself is unlikely to cause major adverse impacts. Lombok's other environmental problems include: localized surface and groundwater contamination related to inadequate waste water management in unorganized areas; lack of sufficient, well managed solid waste disposal facilities; and erosion and sedimentation caused by deforestation and by sand and gravel mining in rivers. According to the draft UEA, there are also occasional violations of air quality standards in high traffic areas, and lime kilns are a source of air pollution. The project will directly address water pollution and solid waste disposal problems, thus having a significant - 5 -

6 positive impact. Potential negative impacts include: erosion, dust, noise, flooding and water quality degradation caused by various types of construction activities; air pollution and noise from road construction and operation; decline in water availability or quality from raw water extraction; water pollution from increased amounts of waste water that are generated when public water supplies are available; water pollution from incomplete or improperly operated waste water treatment plants; and water pollution, nuisance odors and vermin from solid waste facilities. A preliminary environmental screening of prospective infrastructure sub-projects indicates that very few might have sufficient potential adverse impacts to require ANDALs under GOI EA regulations, which are generally consistent with Bank guidelines. The impacts of nearly all of the sub-projects under consideration for funding are expected to be relatively minor. 11. Contact Points: The InfoShop The World Bank 1818 H Street, NW Washington, D.C Telephone: (202) Fax: (202) Task Manager Rajagopal S. Iyer The World Bank 1818 H Street, NW Washington D.C Telephone: (202) Fax: (202) Note: This is information on an involving project. Certain components may not be necessarily included in the final project. Processed by the InfoShop week ending Fabruary 18,

7 Annex Because this is a Category B project, it may be required that the borrower prepare a separate EA report. If a separate EA report is required, once it is prepared and submitted to the Bank, in accordance with OP 4.01, Environmental Assessment, it will be filed as an annex to the Public Information Document (PID). If no separate EA report is required, the PID will not contain an EA annex; the findings and recommendations of the EA will be reflected in the body of the PID. -7-

PROJECT INFORMATION DOCUMENT (PID) ADDITIONAL FINANCING Report No.: PIDA Project Name. Parent Project Name. Region Country Sector(s) Theme(s)

PROJECT INFORMATION DOCUMENT (PID) ADDITIONAL FINANCING Report No.: PIDA Project Name. Parent Project Name. Region Country Sector(s) Theme(s) Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Name Parent Project Name Region Country Sector(s) Theme(s) Lending Instrument

More information

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE. Lahendong II Geothermal Power Project

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE. Lahendong II Geothermal Power Project Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Name PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Lahendong II Geothermal

More information

Himachal Pradesh Environmentally Sustainable Development DPL Region

Himachal Pradesh Environmentally Sustainable Development DPL Region Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROGRAM INFORMATION DOCUMENT (PID) CONCEPT STAGE May 30, 2011 Report No.: AB6585 (The

More information

Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Report No.

Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Report No. Project Name Region Sector Project ID Borrower Implementing Agency Environmental Category Report No. PIC3394 Trinidad & Tobago-Water & Sewerage (@+) Privatization Support Project Latin America and Caribbean

More information

Integrated Safeguards Data Sheet (Initial)

Integrated Safeguards Data Sheet (Initial) Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Integrated Safeguards Data Sheet (Initial) Report No: AC124 Section I - Basic Information

More information

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE I. Basic Information Date prepared/updated:

More information

Appendix 1: Scoping Techniques

Appendix 1: Scoping Techniques Appendix 1: Scoping Techniques 1 Scoping Techniques Checklist technique Checklist technique is used for identifying the project impacts. Such lists usually cover all possible impacts of the project. In

More information

IDA16 Results Measurement System

IDA16 Results Measurement System IDA16 Results Measurement System A I IDA16 Results Measurement System International Development Association THE WORLD BANK S FUND FOR THE POOREST B I IDA16 Results Measurement System What is the Results

More information

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized I. Basic Information Date prepared/updated: 10/28/2009 INTEGRATED SAFEGUARDS DATASHEET

More information

Fresh Water Treaty. International Setting and Issues in Water, Environment and Development

Fresh Water Treaty. International Setting and Issues in Water, Environment and Development Fresh Water Treaty Preamble International Setting and Issues in Water, Environment and Development 1. In recent years most countries have faced a grave economic crisis which generated a great decrease

More information

This project will support the development of a sewerage service targeting districts not

This project will support the development of a sewerage service targeting districts not Ex-Ante Evaluation 1. Name of Project Country: The Republic of Indonesia Project: Denpasar Sewerage Development Project (II) Loan Agreement: March 28, 2008 Loan Amount: 6,004 million yen Borrower: The

More information

INTEGRATED SAFEGUARDS DATA SHEET APPRAISAL STAGE. Project ID:

INTEGRATED SAFEGUARDS DATA SHEET APPRAISAL STAGE. Project ID: Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Copy Public Disclosure Copy Date ISDS Prepared/Updated: 05-Mar-2014

More information

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: PIDA Project Name Region Country Sector(s) Theme(s)

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: PIDA Project Name Region Country Sector(s) Theme(s) Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Name Region Country Sector(s) Theme(s) Lending Instrument Project ID Borrower(s)

More information

Indonesia: Rising to the Challenge on Sanitation for Sustainable

Indonesia: Rising to the Challenge on Sanitation for Sustainable Indonesia: Rising to the Challenge on Sanitation for Sustainable Human Settlements Dwityo A. Soeranto Deputy Director for Foreign Cooperation Directorate General for Human Settlements Ministry of Public

More information

State of the Environment

State of the Environment - 91 - State of the Environment Attachment 5 Environmental Sustainability in Cambodia 1. Cambodia's economy depends heavily on agriculture, fisheries, and natural resources. The agricultural sector accounts

More information

A Partnership for Saving West Africa s Coastal Assets

A Partnership for Saving West Africa s Coastal Assets A Partnership for Saving West Africa s Coastal Assets 2015 West Africa Coastal Areas Management Program (WACA) 1 Africa s development and climate agendas are inextricably linked: If unaddressed, climate

More information

Executive Summary. xiii

Executive Summary. xiii Executive Summary Growth is good for the poor, but the impact of growth on poverty reduction depends on both the pace and the pattern of growth. A pattern of growth that enhances the ability of poor women

More information

[Approval by mail] Indonesia: Promoting Sustainable Community Based Natural Resource Management and Institutional Development (World Bank) FIP

[Approval by mail] Indonesia: Promoting Sustainable Community Based Natural Resource Management and Institutional Development (World Bank) FIP October 2, 2015 [Approval by mail] Indonesia: Promoting Sustainable Community Based Natural Resource Management and Institutional Development (World Bank) FIP World Bank Response to Comments Received from

More information

WHERE THERE ARE NO JOBS: THE CHALLENGES OF DEVELOPMENT AT O.R. TAMBO DISTRICT MUNICIPALITY

WHERE THERE ARE NO JOBS: THE CHALLENGES OF DEVELOPMENT AT O.R. TAMBO DISTRICT MUNICIPALITY WHERE THERE ARE NO JOBS: THE CHALLENGES OF DEVELOPMENT AT O.R. TAMBO DISTRICT MUNICIPALITY Lindile L. Ndabeni, Ph.D. O.R. Tambo District Municipality Strategic Planning Workshop, Mzamba, 11-14 February

More information

1. Introduction and Country Overview

1. Introduction and Country Overview CASE STUDY NATURAL DISASTER AND CRISES RESPONSE BY THE TANZANIA SOCIAL ACTION FUND 1 1. Introduction and Country Overview 2. The Tanzania Social Action Fund: Program Overview 3. Response to Crises and

More information

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: PIDA Project Name Region Country Sector(s) Theme(s)

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: PIDA Project Name Region Country Sector(s) Theme(s) Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Name Region Country Sector(s) Theme(s) Lending Instrument Project ID Borrower(s)

More information

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB6559 Project Name. Arab World Initiative for Financing Food Security Region

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB6559 Project Name. Arab World Initiative for Financing Food Security Region PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB6559 Project Name Arab World Initiative for Financing Food Security Region MIDDLE EAST AND NORTH AFRICA Sector General agriculture, fishing

More information

Terms of Reference for the Outcome Evaluation of Achieving the MDGs and Reducing Human Poverty Programme

Terms of Reference for the Outcome Evaluation of Achieving the MDGs and Reducing Human Poverty Programme Terms of Reference for the Outcome Evaluation of Achieving the MDGs and Reducing Human Poverty Programme Introduction The United Nations Development Programme (UNDP) will undertake outcome evaluation to

More information

SECTOR ASSESSMENT: WATER SUPPLY AND OTHER MUNICIPAL INFRASTRUCTURE AND SERVICES. 1. Sector Performance, Problems, and Opportunities

SECTOR ASSESSMENT: WATER SUPPLY AND OTHER MUNICIPAL INFRASTRUCTURE AND SERVICES. 1. Sector Performance, Problems, and Opportunities Dhaka Environmentally Sustainable Water Supply Project (RRP BAN 42173) SECTOR ASSESSMENT: WATER SUPPLY AND OTHER MUNICIPAL INFRASTRUCTURE AND SERVICES Sector Road Map 1. Sector Performance, Problems, and

More information

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: PIDA1291. Project Name. Region. Country

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: PIDA1291. Project Name. Region. Country Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: PIDA1291 Project Name

More information

Forest Carbon Partnership Facility (FCPF) Participants Committee (PC23) Meeting. March 27-29, 2017, Washington DC

Forest Carbon Partnership Facility (FCPF) Participants Committee (PC23) Meeting. March 27-29, 2017, Washington DC Forest Carbon Partnership Facility (FCPF) Participants Committee (PC23) Meeting Update on Gabon s Readiness progress March 27-29, 2017, Washington DC 1 Agenda I. Characteristics and challenge of Gabon

More information

International Union for Conservation of Nature. Conserving biodiversity Pioneering nature s solutions to global challenges

International Union for Conservation of Nature. Conserving biodiversity Pioneering nature s solutions to global challenges International Union for Conservation of Nature Conserving biodiversity Pioneering nature s solutions to global challenges WHO WE ARE Founded in 1948, IUCN is the world s largest global environmental organization.

More information

VALUING NATURAL CAPITAL IN WEALTH ACCOUNTING IN MADAGASCAR

VALUING NATURAL CAPITAL IN WEALTH ACCOUNTING IN MADAGASCAR GABORONE DECLARATION FOR SUSTAINABILITY IN AFRICA Photos Left to Right, CI/Rod Mast, CI/Cristina Mittermeier VALUING NATURAL CAPITAL IN WEALTH ACCOUNTING IN MADAGASCAR SUSTAINABILITY APPROACH Developing

More information

An Effective Strategy for Poverty Reduction

An Effective Strategy for Poverty Reduction Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized An Effective Strategy for Poverty Reduction Plenary Address to the International Development

More information

STRENGTHENING THE ENABLING ENVIRONMENT FOR STBM IN EAST NUSA TENGGARA (NTT) PROVINCE

STRENGTHENING THE ENABLING ENVIRONMENT FOR STBM IN EAST NUSA TENGGARA (NTT) PROVINCE STRENGTHENING THE ENABLING ENVIRONMENT FOR STBM IN EAST NUSA TENGGARA (NTT) PROVINCE Reflections from Final Project Learning Event with Change Agents and Delivery Team June 2016 A more conducive enabling

More information

USAID FROM THE AMERICAN PEOPLE

USAID FROM THE AMERICAN PEOPLE USAID FROM THE AMERICAN PEOPLE I. Executive Summary: USAID Water and Development Country Plan for Haiti Despite the considerable increase in investments in water, sanitation, and hygiene (WASH) since 2010,

More information

MARINE POLLUTION DEGRADATION MITIGATION MANAGEMENT IS ESSENTIAL FOR IMPROVING MARINE ENVIRONMENT

MARINE POLLUTION DEGRADATION MITIGATION MANAGEMENT IS ESSENTIAL FOR IMPROVING MARINE ENVIRONMENT MARINE POLLUTION DEGRADATION MITIGATION MANAGEMENT IS ESSENTIAL FOR IMPROVING MARINE ENVIRONMENT The health of the world s oceans and marine life is degrading rapidly as a result of excess human activities.

More information

Vision for Water for the World Bank

Vision for Water for the World Bank Vision for Water for the World Bank How the Bank will increase its effectiveness to help clients deal with an increasingly urgent and increasingly complex water challenge EAP Water CoP June 2015 The Water

More information

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Project Name Region Country Sector(s) Theme(s) Lending Instrument Project ID Borrower(s) Implementing Agency Environmental Category Date PID Prepared/ Updated

More information

FAST TRACK BRIEF. Water and Development: World Bank Support,

FAST TRACK BRIEF. Water and Development: World Bank Support, FAST TRACK BRIEF December 16, 2009 The IEG report Water and Development An Evaluation of World Bank Support, 1997-2007, was discussed by CODE on December16, 2009 Water and Development: World Bank Support,

More information

I. Project Outline. Background. Objectives of the Project. Activities of the project

I. Project Outline. Background. Objectives of the Project. Activities of the project Internal Ex-Post Evaluation for Technical Cooperation Project conducted by Indonesia Office: March 2016 Country Name The Beef Cattle Development Project Utilizing Local Resources in the Eastern Part Republic

More information

Maldives National Adaptation to Climate Change / the Human Dimension of Global Climate Change

Maldives National Adaptation to Climate Change / the Human Dimension of Global Climate Change Maldives National Adaptation to Climate Change / the Human Dimension of Global Climate Change Mr Amjad Abdulla Maldives Ministry of Environment, Energy and Water European Parliament Temporary Committee

More information

GEF Focal Area Climate Change (Operational Program No. 7)

GEF Focal Area Climate Change (Operational Program No. 7) Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Name Country Region Sector Project Report No. India-Solar Thermal Power Project

More information

INTEGRATED URBAN RESOURCE MANAGEMENT A NEW APPROACH

INTEGRATED URBAN RESOURCE MANAGEMENT A NEW APPROACH INTEGRATED URBAN RESOURCE MANAGEMENT A NEW APPROACH Assoc. Prof. Nguyen Hong Tien Director General Administration of Technical Infrastructure, Ministry of Construction Da Nang, 25/6/2014 I. URBAN CONSTRUCTION

More information

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Name Region Country Sector(s) Theme(s) Lending Instrument Project ID Borrower(s)

More information

Transport and ICT (GTIDR), Southeast Asia and the Pacific (SEAP - GTI02)

Transport and ICT (GTIDR), Southeast Asia and the Pacific (SEAP - GTI02) TOR No: 2017-042 Title: Junior Professional Officer Grade: UC Division/VPU: Transport and ICT (GTIDR), Southeast Asia and the Pacific (SEAP - GTI02) Duty Location: Sydney, Australia Appointment Type Two-year

More information

Aichi Biodiversity Target 10

Aichi Biodiversity Target 10 Priority Actions to Achieve Aichi Biodiversity Target 10 for Coral Reefs and Closely Associated Ecosystems Annex to decision XII/23 of the Conference of the Parties to the Convention on Biological Diversity

More information

Ex-ante Project Evaluation

Ex-ante Project Evaluation Ex-ante Project Evaluation 1. Name of project Country: Socialist Republic of Vietnam Name of project: Hai Phong City Environmental Improvement Project (II) L/A signing date: March 31, 2009 Loan amount:

More information

Pakistan Development Forum. Presentation by

Pakistan Development Forum. Presentation by Pakistan Development Forum Presentation by M. Ali Shah, Country Director, ADB Pakistan Resident Mission Islamabad 18 March 2004 Part 1 - An Overview of Pakistan Part 2 - The Water Perspective Part 3 -

More information

THE ASSESSMENT OF RAPID LANDUSE CHANGE AND ITS IMPACT ON SUSTAINABLE FISHERIES

THE ASSESSMENT OF RAPID LANDUSE CHANGE AND ITS IMPACT ON SUSTAINABLE FISHERIES THE ASSESSMENT OF RAPID LANDUSE CHANGE AND ITS IMPACT ON SUSTAINABLE FISHERIES By: Dewayany Sutrisno National Coordination Agency For Survey And Mapping - Indonesia e-mail: dewayani@bakosurtanal.go.id

More information

For more details on Poverty Status in Afghanistan Disclaimer Acknowledgements:

For more details on Poverty Status in Afghanistan Disclaimer Acknowledgements: Introduction The availability of statistics on development indicators is key to monitoring the impact of development interventions and progress towards implementation of the Afghanistan National Development

More information

International Bank for Reconstruction and Development International Development Association MANAGEMENT REPORT AND RECOMMENDATION IN RESPONSE TO THE

International Bank for Reconstruction and Development International Development Association MANAGEMENT REPORT AND RECOMMENDATION IN RESPONSE TO THE Report No. INSP/R2007-0006/2 International Bank for Reconstruction and Development International Development Association INSP/47713 GH MANAGEMENT REPORT AND RECOMMENDATION IN RESPONSE TO THE INSPECTION

More information

Mongolia s Green Development Policy Outcome-level Indicators. Yongsung Kim, GGGI Xin Zhou, IGES Mustafa Moinuddin, IGES

Mongolia s Green Development Policy Outcome-level Indicators. Yongsung Kim, GGGI Xin Zhou, IGES Mustafa Moinuddin, IGES Mongolia s Green Development Policy Outcome-level Indicators Yongsung Kim, GGGI Xin Zhou, IGES Mustafa Moinuddin, IGES Table of Contents Background and Objectives Review of Existing Indicators Methodological

More information

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Date ISDS Prepared/Updated: June 10, 2004 I. BASIC INFORMATION A. Basic Project Data Country: Brazil Project Name: Brasilia Environmentally Sustainable Pro

More information

4.05. Groundwater Program. Chapter 4 Section. Background. Follow-up to VFM Section 3.05, 2004 Annual Report. Ministry of the Environment

4.05. Groundwater Program. Chapter 4 Section. Background. Follow-up to VFM Section 3.05, 2004 Annual Report. Ministry of the Environment Chapter 4 Section 4.05 Ministry of the Environment Groundwater Program Follow-up to VFM Section 3.05, 2004 Annual Report Chapter 4 Follow-up Section 4.05 Background Groundwater is defined as water located

More information

L/C/TF Number(s) Closing Date (Original) Total Financing (USD) IBRD Sep ,000, Original Commitment 550,000,

L/C/TF Number(s) Closing Date (Original) Total Financing (USD) IBRD Sep ,000, Original Commitment 550,000, Public Disclosure Authorized Independent Evaluation Group (IEG) 1. Project Data Report Number : ICRR0020046 Public Disclosure Authorized Operation ID P132768 Country Brazil Operation Name BR-Pernambuco

More information

Project Name PROJECT INFORMATION DOCUMENT (PID) Nepal Village Micro Hydro Carbon Offset Project. South Asia SASSD P095978

Project Name PROJECT INFORMATION DOCUMENT (PID) Nepal Village Micro Hydro Carbon Offset Project. South Asia SASSD P095978 Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Name Region Sector Project ID Borrower(s) Implementing Agency PROJECT INFORMATION

More information

SECTOR ASSESSMENT (SUMMARY): AGRICULTURE, NATURAL RESOURCES, AND RURAL DEVELOPMENT 1

SECTOR ASSESSMENT (SUMMARY): AGRICULTURE, NATURAL RESOURCES, AND RURAL DEVELOPMENT 1 Country Partnership Strategy: Timor-Leste, 2016 2020 SECTOR ASSESSMENT (SUMMARY): AGRICULTURE, NATURAL RESOURCES, AND RURAL DEVELOPMENT 1 A. Sector Performance, Problems, and Opportunities 1. Agriculture

More information

Yemen: Social Fund for Development III Project

Yemen: Social Fund for Development III Project Yemen: Social Fund for Development III Project 101 Yemen: Social Fund for Development III Project Author: Yasser El-Gammal, Senior Operations Officer, MNSHD, World Bank Executive Summary T he Yemen Social

More information

Survey Responses from Women Workers in Indonesia s Textile, Garment and Footwear Industries

Survey Responses from Women Workers in Indonesia s Textile, Garment and Footwear Industries i Survey Responses from Women Workers in Indonesia s Textile, Garment and Footwear Industries Mari Pangestu and Medelina K. Hendytio Center for Strategic and International Studies, Jakarta and Consultants,

More information

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB5150 Project Name. Indonesia Power Transmission Development Project Region

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB5150 Project Name. Indonesia Power Transmission Development Project Region PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB5150 Project Name Indonesia Power Transmission Development Project Region EAST ASIA AND PACIFIC Sector Power (100%) Project ID P117323 Borrower(s)

More information

Coastal Community. Planning and Management (top-down issues)

Coastal Community. Planning and Management (top-down issues) Coastal Community Planning and Management (top-down issues) SOC5200 Coastal Community Development Khairul Hisyam Kamarudin Website: khairulhkamarudin.wordpress.com The boundary between the land and ocean

More information

Yes: Y No: N (a) (b) (c) (d) (a) (a) (b) (c) (d) (e)

Yes: Y No: N (a) (b) (c) (d) (a) (a) (b) (c) (d) (e) Checklist: 3. Hydropower Stations, Dams and Reservoirs (1) 1 Permits and Explanation 2 Pollution Control (1) EIA and Permits (2) Explanation to the Local Stakeholders Main Check s Have EIA reports been

More information

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: PIDA Project Name. Region. Country

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: PIDA Project Name. Region. Country Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: PIDA14823 Project Name

More information

Partnership for sustainable development in Morocco

Partnership for sustainable development in Morocco Kingdom of Morocco CSD 16 Partnerships Fair UNDESA Partnership in Practice 7 May 2008 Partnership for sustainable development in Morocco Abdallah RATTAL Ministry of Environment Morocco CONTENT Context

More information

Adapting Road Infrastructure to Climate Extremes and Change

Adapting Road Infrastructure to Climate Extremes and Change Adapting Road Infrastructure to Climate Extremes and Change Experience from Small Pacific Island States September 2015 Pacific Island Countries (PICs) - - geographically dispersed, remote with small populations

More information

SOCIALIST REPUBLIC OF VIETNAM Independence - Freedom - Happiness No.: 19/2015/ND-CP Hanoi, 14 February 2015 DECREE

SOCIALIST REPUBLIC OF VIETNAM Independence - Freedom - Happiness No.: 19/2015/ND-CP Hanoi, 14 February 2015 DECREE THE GOVERNMENT ------- SOCIALIST REPUBLIC OF VIETNAM Independence - Freedom - Happiness --------------- No.: 19/2015/ND-CP Hanoi, 14 February 2015 DECREE DETAILING THE IMPLEMENTATION OF A NUMBER OF ARTICLES

More information

OVERVIEW CAPACITY & CONDITION

OVERVIEW CAPACITY & CONDITION OVERVIEW Over 18,000 sites and an associated 22 million acres of land are related to the primary hazardous waste programs that comprise much of the nation s hazardous waste infrastructure, and more than

More information

BELIZE (INDC) Submitted to the UNFCCC on 1 October, 2015

BELIZE (INDC) Submitted to the UNFCCC on 1 October, 2015 BELIZE (INDC) Submitted to the UNFCCC on 1 October, 2015 1. National Context Belize is a small country with relatively minor contributions to global greenhouse gas emissions and has limited capacity to

More information

Greening Urban Development : the Challenges and the Opportunities

Greening Urban Development : the Challenges and the Opportunities Greening Urban Development : the Challenges and the Opportunities Donovan Storey Chief, Sustainable Urban Development, Environment & Development Division National Workshop on Sustainable Urban and Industry

More information

Bio-Based Eco Industrial Clustering in Dambulla Sri Lanka

Bio-Based Eco Industrial Clustering in Dambulla Sri Lanka Bio-Based Eco Industrial Clustering in Dambulla Sri Lanka Gemunu Herath and Uditha Ratnayake Department of Civil Engineering University of Peradeniya Sri Lanka Gemunu 1 Country Profile Sri Lanka Population

More information

Issues in Rural Development and Agriculture

Issues in Rural Development and Agriculture Issues in Rural Development and Agriculture A Presentation for the Public Expenditure Analysis and Management Course Csaba Csaki (RDV) May 22, 2002 Structure of Presentation New Framework: Revised Rural

More information

Case of MIGA s Guarantee Linked to the Engineering and Feasibility Phase of Developing the PT Weda Bay Nickel Project. Summary

Case of MIGA s Guarantee Linked to the Engineering and Feasibility Phase of Developing the PT Weda Bay Nickel Project. Summary APPRAISAL REPORT CAO Appraisal for Audit of MIGA CAO Compliance October 3, 2011 PT Weda Bay Nickel Indonesia Case of MIGA s Guarantee Linked to the Engineering and Feasibility Phase of Developing the PT

More information

MINISTÈRE DES AFFAIRES ÉTRANGÈRES ET EUROPÉENNES 20 December /5 6th World Water Forum Ministerial Process Draft document

MINISTÈRE DES AFFAIRES ÉTRANGÈRES ET EUROPÉENNES 20 December /5 6th World Water Forum Ministerial Process Draft document MINISTÈRE DES AFFAIRES ÉTRANGÈRES ET EUROPÉENNES 20 December 2011 1/5 6th World Water Forum Ministerial Process Draft document 1. We the Ministers and Heads of Delegations assembled in Marseille, France,

More information

Community-Driven Development in Local Government Capacity Building Projects: Emerging Approaches in Africa

Community-Driven Development in Local Government Capacity Building Projects: Emerging Approaches in Africa Number 86 /January 2004 Community-Driven Development in Local Government Capacity Building Projects: Emerging Approaches in Africa This note discusses the interface between community-driven development

More information

G20 Action Plan on Marine Litter

G20 Action Plan on Marine Litter G20 Action Plan on Marine Litter Introduction The G20 recognizes the urgent need for action to prevent and reduce marine litter in order to preserve human health and marine and coastal ecosystems, and

More information

Dr. Joe Leitmann Lead Environment Specialist, EASER SDN FORUM: CEA and Climate Change, January 27, 2010

Dr. Joe Leitmann Lead Environment Specialist, EASER SDN FORUM: CEA and Climate Change, January 27, 2010 Dr. Joe Leitmann Lead Environment Specialist, EASER SDN FORUM: CEA and Climate Change, January 27, 2010 Introduction Climate Change in the CEA Lessons from the Indonesia experience Process Substance Impact

More information

Environmental and Social Considerations in Detailed Planning Survey. (Technical Cooperation for Development Planning)

Environmental and Social Considerations in Detailed Planning Survey. (Technical Cooperation for Development Planning) Page: 1 Date: May 27, 2014 Environmental and Social Considerations in Detailed Planning Survey (Technical Cooperation for Development Planning) 1. Full Title of the Project 2. Type of the study (e.g. Master

More information

APEC Fossil Fuel Subsidy Reform Capacity-Building Workshop Effective Pricing Mechanisms and Mitigation Strategies ENERGY WORKING GROUP SUMMARY REPORT

APEC Fossil Fuel Subsidy Reform Capacity-Building Workshop Effective Pricing Mechanisms and Mitigation Strategies ENERGY WORKING GROUP SUMMARY REPORT APEC Fossil Fuel Subsidy Reform Capacity-Building Workshop Effective Pricing Mechanisms and Mitigation Strategies ENERGY WORKING GROUP SUMMARY REPORT July 10-11, 2017 Jakarta, Indonesia The United States

More information

Project Information Document/ Integrated Safeguards Data Sheet (PID/ISDS)

Project Information Document/ Integrated Safeguards Data Sheet (PID/ISDS) te to Task Teams: The following sections are system generated and can only be edited online in the Portal. Project Information Document/ Integrated Safeguards Data Sheet (PID/ISDS) Concept Stage Date Prepared/Updated:

More information

Conservation International Contribution to Zero Draft Outcomes for Rio+20 The Contribution of Natural Capital to Sustainable Development

Conservation International Contribution to Zero Draft Outcomes for Rio+20 The Contribution of Natural Capital to Sustainable Development Conservation International Contribution to Zero Draft Outcomes for Rio+20 The Contribution of Natural Capital to Sustainable Development UN Conference on Sustainable Development 4 6 June 2012 Rio de Janeiro,

More information

Land Accounting for SDG Monitoring and Reporting

Land Accounting for SDG Monitoring and Reporting Regional Expert Workshop on Land Accounting for SDG Monitoring and Reporting Bangkok - Thailand 25-27 September 2017 Mrs. Niroshinie De Silva Assistant Director Ministry of Mahaweli development & Environment

More information

YEMEN PLAN OF ACTION. Towards Resilient and Sustainable Livelihoods for Agriculture and Food and Nutrition Security SUMMARY

YEMEN PLAN OF ACTION. Towards Resilient and Sustainable Livelihoods for Agriculture and Food and Nutrition Security SUMMARY YEMEN PLAN OF ACTION Towards Resilient and Sustainable Livelihoods for Agriculture and Food and Nutrition Security 2014 2018 SUMMARY INTRODUCTION Yemen, one of the least developed countries in the world,

More information

Case Study PDAM Tirtanadi, Indonesia

Case Study PDAM Tirtanadi, Indonesia Public Disclosure Authorized WATER GLOBAL PRACTICE WSS GSG UTILITY TURNAROUND SERIES Case Study PDAM Tirtanadi, Indonesia Public Disclosure Authorized Alizar Anwar and Maria Salvetti AUGUST 2017 Key Characteristics

More information

"Research Activities on Sustainable Sanitation in LIPI".

Research Activities on Sustainable Sanitation in LIPI. "Research Activities on Sustainable Sanitation in LIPI". Neni Sintawardani The Indonesian Institute of Sciences (LIPI) 1. Research Center for Physics 2. Bureau for Cooperation and Promotion of Science

More information

PRSP and HNP (Health, Nutrition and Population) Resources for PRSP Teams and Appraisal Teams

PRSP and HNP (Health, Nutrition and Population) Resources for PRSP Teams and Appraisal Teams PRSP and HNP (Health, Nutrition and Population) Resources for PRSP Teams and Appraisal Teams Documents The Health Chapter in the PRSP Sourcebook (this presentation) Quick Guidelines for I-PRSP Teams (Africa

More information

Intended Nationally Determined Contributions

Intended Nationally Determined Contributions Intended Nationally Determined Contributions Objective: The State of Kuwait - November 2015 In accordance with Decision 1/CP.19 and based on the information mentioned in decision 1/CP.20 which invites

More information

1. SOURCES OF NATIONAL LEGISLATION (PRIMARY AND SECONDARY LEGISLATION)

1. SOURCES OF NATIONAL LEGISLATION (PRIMARY AND SECONDARY LEGISLATION) 1. SOURCES OF NATIONAL LEGISLATION (PRIMARY AND SECONDARY LEGISLATION) The national water legislative framework in the Republic of Macedonia is comprehensive and regulates, from different perspectives,

More information

Exploring legal and policy aspects of urban sanitation and hygiene

Exploring legal and policy aspects of urban sanitation and hygiene W SH learning brief Exploring legal and policy aspects of urban sanitation and hygiene By: Kome, A., Ross, K., Carrard, N., Willetts, J., Mills, F., Abeysuriya, K., Murta, J. A review of legal arrangements

More information

Logical Framework and Objectively Verifiable Impact Indicators

Logical Framework and Objectively Verifiable Impact Indicators Logical Objectively Verifiable Impact Indicators Goal To contribute to sustainable development in the Pacific Isls Region through improvements in water resource. Risks Objective: Improved water resources

More information

Ex-Ante Evaluation (for Japanese ODA Loan)

Ex-Ante Evaluation (for Japanese ODA Loan) Japanese ODA Loan Ex-Ante Evaluation (for Japanese ODA Loan 1.Name of the Project Country: The Republic of Indonesia Project: Upper Citarum Basin Flood Management Sector Loan Loan Agreement: March 28,

More information

World Bank Group Recruitment Drive (TOR for Future Vacancies)

World Bank Group Recruitment Drive (TOR for Future Vacancies) World Bank Group Recruitment Drive (TOR for Future Vacancies) The World Bank Group is launching a recruitment drive aimed at attracting qualified candidates to fill positions in selected areas. Employment

More information

Brief 4: An Analysis of Household Income and Expenditure in Tanzania

Brief 4: An Analysis of Household Income and Expenditure in Tanzania Brief 4: An Analysis of Household Income and Expenditure in Tanzania UNITED REPUBLIC OF TANZANIA Produced by the Research and Analysis Working Group of the MKUKUTA Monitoring System, Ministry of Finance

More information

CREATING JOBS IN SRI LANKA

CREATING JOBS IN SRI LANKA CREATING JOBS IN SRI LANKA Role of Private Sector Financial Institutions Case Study Cover photo Dominic Sansoni / The World Bank IFC Disclaimer This publication may contain advice, opinions, and statements

More information

India Development Policy Review Charts

India Development Policy Review Charts Development Policy Review 2006 -- Charts has been very successful on a number of fronts: the country has maintained electoral democracy, reduced absolute poverty by more than half, dramatically reduced

More information

Rural Poverty and Agricultural Water Development in Sub-Saharan Africa

Rural Poverty and Agricultural Water Development in Sub-Saharan Africa CHAPTER 1 Rural Poverty and Agricultural Water Development in Sub-Saharan Africa 1.1 The Millennium Development Goals, Agricultural Growth, and Rural Poverty In 2, the Millennium Declaration committed

More information

Economic and Social Council

Economic and Social Council United Nations Economic and Social Council Distr.: General 18 December 2002 E/CN.3/2003/11 Original: English Statistical Commission Thirty-fourth session 4-7 March 2003 Item 4 (c) of the provisional agenda*

More information

Environment Protection (Water Quality) Policy 2015, stormwater pollution prevention & dewatering guidance

Environment Protection (Water Quality) Policy 2015, stormwater pollution prevention & dewatering guidance South Australia s Environment Protection Authority Environment Protection (Water Quality) Policy 2015, stormwater pollution prevention & dewatering guidance Clive Jenkins, Ruth Ward and Lara Settimio Outline

More information

Integrated landscape approach

Integrated landscape approach Integrated landscape approach Terry Sunderland Ani Adiwinata Nawir Capacity-building workshop for South East Asia on ecosystem conservation and restoration to support achievement of the Aichi Biodiversity

More information

OPERATIONAL GUIDLINES OF BOAD

OPERATIONAL GUIDLINES OF BOAD ARID AND SEMI-ARID ZONES 1. The West Africa arid zone is a natural environment with low productivity, the main factor limiting biological production in general is the lack of water. If we can overcome

More information

UN-Water and Global Water Partnership (GWP) Roadmapping for Advancing Integrated Water Resources Management (IWRM) Processes

UN-Water and Global Water Partnership (GWP) Roadmapping for Advancing Integrated Water Resources Management (IWRM) Processes UN-Water and Global Water Partnership (GWP) Roadmapping for Advancing Integrated Water Resources Management (IWRM) Processes Based on the Copenhagen Initiative on Water and Development 1 prepared jointly

More information

COUNCIL OF EUROPE COMMITTEE OF MINISTERS. RECOMMENDATION No. R (84) 2 OF THE COMMITTEE OF MINISTERS TO MEMBER STATES

COUNCIL OF EUROPE COMMITTEE OF MINISTERS. RECOMMENDATION No. R (84) 2 OF THE COMMITTEE OF MINISTERS TO MEMBER STATES COUNCIL OF EUROPE COMMITTEE OF MINISTERS RECOMMENDATION No. R (84) 2 OF THE COMMITTEE OF MINISTERS TO MEMBER STATES ON THE EUROPEAN REGIONAL/SPATIAL PLANNING CHARTER (Adopted by the Committee of Ministers

More information

Addressing Key Environmental Hazards after an Earthquake

Addressing Key Environmental Hazards after an Earthquake Addressing Key Environmental Hazards after an Earthquake A. International Experience 1. Environmental management is not a well-recognized priority issue in an emergency situation. So rather than confine

More information

MAIN REPORT of SOCIO ECONOMIC BASELINE SURVEY (SEBS) AND PARTICIPATORY RURAL APPRAISAL (PRA)

MAIN REPORT of SOCIO ECONOMIC BASELINE SURVEY (SEBS) AND PARTICIPATORY RURAL APPRAISAL (PRA) FOOD AND AGRICULTURE ORGANIZATION OF THE UNITED NATIONS - ROME Special Programme for Food Security (SPFS Project GCSP/INS/073/JPN) MAIN REPORT of SOCIO ECONOMIC BASELINE SURVEY (SEBS) AND PARTICIPATORY

More information

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB5158 Project Name

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB5158 Project Name PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB5158 Project Name Pakistan Skill Development Region SOUTH ASIA Sector Vocational training (100%) Project ID P118177 Borrower(s) GOVERNMENT

More information