ACO Building Drainage

Size: px
Start display at page:

Download "ACO Building Drainage"

Transcription

1 ACO Building Drainage Backflow systems Installation, Operation and Maintenance Manual ACO TRIPLEX Anti-flood valve for GREYWATER drainage (wastewater without sewage)

2 PLEASE READ THESE INSTRUCTIONS BEFORE COMMENCING INSTALLATION OF THE SYSTEM Table of Contents Page(s) 1. General notes 3 2. Function 4 3. Model/specification 4 4. Set up 5 5. Preparation 6 6. Operating the emergency flap 7 7. Installation above ground 7 8. Installation below ground 8 9. Inspection and servicing Technical data Service log 13 ACO Building Drainage ACO Business Park Hitchin Road Shefford Bedfordshire SG17 5TE Tel: Fax: buildingdrainage@aco.co.uk 2

3 1. General notes The ACO TRIPLEX-K-2 backflow valve is designed to protect dwellings and properties from backflow surcharge and conforms to the requirements of BS EN :2002, Anti-flooding devices for buildings Part1: Requirements and is suitable for use with grey water connections (not containing faeces). The backflow safety valve is equipped with two backflow flaps - a primary flap and a secondary flap that can also be manually locked shut (emergency) flap. The TRIPLEX-K-2 range is available with its own access chamber or in situations requiring deep set pipe inverts, can be installed within a manhole. Optional fittings can provide for a fully bonded DPM as well as access chamber extension pieces. Clause 2.8 of Approved Document H Building Regulations (2002), drainage and waste disposal (England & Wales) states Combined and rainwater sewers are designed to surcharge (i.e. the water level in the manhole rises above the top of sewer pipe) in heavy rainfall. Some foul sewers also receive rainwater and therefore surcharge. For low-lying sites (where the ground level of a site or the level of a basement is below ground level at the point where the drainage connects to the public sewer) care should be taken to ensure the property is not at risk of flooding. In all such cases the sewerage undertaker should be contacted to determine the extent and possible frequency of the likely surcharge. For Scotland, Part M Building Standards (2001), drainage and sanitary facilities apply in a similar manner. Clause 2.9 of Part H Building Regulations (2002) also states that for basements containing sanitary appliances where the risk of flooding due to surcharge of the sewer is considered by the sewerage undertaker to be low, an anti-flooding valve should be installed on the drainage from the basement. Additionally, where the risk of flooding is considered to be high, the drainage from the basement should be pumped. If pumped solutions are required, please contact ACO Building Drainage technical helpline on or buildingdrainage@aco.co.uk As part of the building maintenance programme and after commissioning, the backflow valve should be inspected on a monthly basis and serviced every six months. This manual contains important information and guidance notes. Please read the manual thoroughly prior to installing a unit. The equipment should only be installed, commissioned, operated and maintained by persons who are familiar with the operating manual, the instructions there-in and the relevant regulations for job safety and accident prevention. 3

4 2. Function The ACO TRIPLEX consists of two main units: The primary flap and the secondary/emergency flap. The device is non-motorised and depends on backflow to force the primary flap shut. In this application the device is only suitable for grey wastewater not containing solids. The body unit is manufactured from heavy duty polypropylene which is highly corrosion resistant and suitable for hot water and domestic waste water. Smooth waterway surfaces and a 12mm stepped fall allow unrestricted flow through the backflow body. (Fig. 1). Should backflow occur in the drainage system, the primary flap is forced closed preventing backflow into the premises. After backflow has subsided, and primary flap is free to allow wastewater to flow through to the sewer. Fig. 1 Note that during backflow conditions the drainage system should not be used as wastewater is unable to pass through the closed backflow stop resulting in an internal back up condition with risk of self-flooding. 3. Model type / specification Fig. 2 Fig. 3 Triplex-K-2 For above ground (or below ground drainage in brick built chamber) comprising: Body unit only +Casing with sealed cover +Six nuts with flat washers +Primary flap +Emergency flap + Test funnel Part no Ø Part no Ø Triplex-K-2 For below ground drainage comprising: Body unit with access chamber +Casing with sealed cover +Six nuts with flat washers +Primary flap +Emergency flap + Test funnel Part no Ø Part no Ø 4

5 4. Set up ACO backflow stops are supplied with an in-built stepped 12mm gradient. When preparing groundworks ensure that there are no backfalls on the pipe run. Note that during backflow conditions appliances and sanitary connections below the surcharge level should not be used, as wastewater is unable to pass through the closed backflow stop resulting in an internal back up condition with risk of self-flooding. Wrong Right Accidental self-flooding Do not use basement appliances 4.1 Drainage appliances and sanitary connections above the backflow level must not be connected to the foul drainage system upstream of the backflow stop. Closure of the backflow stop will prevent drainage from leaving the building and may result in accidental self-flooding of lower levels if used. 4.2 To prevent accidental self-flooding, connections to the foul drainage systems that are from above the backflow level must be made downstream of the backflow stop. Closure of the backflow stop will prevent backflow from flooding at lower levels whilst drainage from above the backflow level will continue to function as a result of natural displacement. 5

6 5. Preparation Before installation, carefully inspect (flaps, seals, body casing etc.) for any signs of transit damage. A damaged unit must not be put into operation. If any damage is found, contact the supplier immediately. 5.1 The ACO TRIPLEX-K-2 is a passive backflow valve intended for use with grey waste water (not containing sewage). The backflow valve is equipped with two passive flaps, a primary flap and a secondary flap that can be manually operated as an emergency flap. In normal operating conditions both flaps are open in the ready position. (Fig. 4). Fig When backflow occurs, water levels in the sewer rise above the safe pipe filling height forcing the primary flap shut, if for any reason the primary flap fails to fully close the secondary flap (emergency) flap will be forced shut. (Fig. 5). Fig When the backflow condition abates and the water level subsides, normal flow through the backflow valve resumes. 5.4 The use of the secondary flap as an emergency flap provides additional security that allows the backflow stop to be manually locked. This may be useful during maintenance or extended periods of absence, for example vacation, but it is essential to be reopened before using the drainage system again. (Fig. 6). Fig Note that during backflow conditions the building drainage system should not be used as wastewater is unable to pass through the closed backflow stop resulting in an internal back up condition with risk of self-flooding. 6

7 6. Operating the emergency flap Before installing the backflow valve it is important to be familiar with the settings and operation of the emergency flap. Important! Locking can only be effected by following two steps. 6.1 Emergency flap open Normal position. Locking lever in down position (the primary flap will shut in the event of backflow). 6.2 Emergency flap locking Pull locking lever to the vertically up position - you will hear a click sound. Flap locked. 6.3 Emergency flap re-opening Push locking lever to down position - you will hear a click sound. Flap unlocked. 7. Installation above ground Above ground drainage pipework - ACO TRIPLEX-K-2 without access chamber 7.1 The TRIPLEX-K-2 unit without access chamber, can be installed either wall mounted or, in situations requiring deep set invert levels, within a purpose built brick access chamber.( It will be necessary to build the chamber with sufficient room for standing access). 7.2 Install the body unit for correct flow direction and ensure the casing is absolutely level front to back and side-to-side. (Fig. 7). Protect all parts from damage and soiling from building materials. Note: Stepped drop of 12mm between inflow and outflow pipes. Fig The backflow stop features plain-ended pipe spigots for connection to most types of pipework - plastic, steel, cast iron, clay ware. (Fig. 8). Fig For wall mounted applications fixing brackets should be positioned on either side of the backflow stop pipe connections. (Fig. 9). 7.5 Ensure that both the primary and secondary/emergency flaps are in the ready position (refer to section 7 above). Fig. 9 7

8 8. Installation below ground Below ground drainage pipework - ACO TRIPLEX-K-2 with access chamber 8.1 Prepare a granular bed and install the body unit for correct flow direction and ensure the casing is absolutely level front to back and side-to-side. (Fig. 10). Protect all parts from damage and soiling from building materials. Note. Stepped invert drop of 12mm between inflow and outflow pipes. Fig The backflow stop features plain-ended pipe spigots for connection to most types of pipework -plastic, steel, cast iron, clay ware. (Fig. 11). Fig Backfill with adequate depth of granular bed to cover pipework. (Fig. 12). 8.4 Ensure that both the primary and secondary/emergency flaps are in the ready position (refer page 7 section 7). Fig DPM flexible flange (option): In situations where a waterproofing membrane is required in the subfloor, a flexible bonding flange (art. No ) can be site fitted to the factory fitted, (intermediate) ribbed chamber section. The DPM flange locates within one of the four ribbed grooves relative to the level of the waterproofing membrane. (Fig. 13). Fig. 13 8

9 8. Installation below ground - continued Below ground drainage pipework - ACO TRIPLEX-K-2 with access chamber 8.6 Optional access chamber extension. Depending on invert depth, an additional extension piece (part no ) can be site fitted onto the factory fitted extension piece (intermediate ribbed chamber section). Care must be taken to ensure the lip seal is correctly located. If required, the flexible DPM flange can be fitted within any one of the four grooves of the extension piece. (Fig.14). Fig Fit the telescopic top section to finished floor level and orientate for tiling layout. (Fig. 15). Fig Option - conversion to motorised QUATRIX version. If in the future it is required to convert the TRIPLEX backflow valve to a QUATRIX-K blackwater application, a 40mm conduit connection to the telescopic top section must be laid. Tank cut a 40mm (nominal) hole, (core bit diameter 43mm) and attach a 40mm conduit pipe, with necessary fittings. (Fig. 16). Install 40mm pipe conduit ensuring a fall towards the backflow chamber to relieve any condensation in the conduit pipework. Fig. 16 Note Dimension H1 minimum (see page 12) changes to 460mm. 8.9 Continue with floor construction. 9

10 8. Installation below ground - continued Below ground drainage pipework - ACO TRIPLEX-K-2 with access chamber 8.10 Before floor tiling, it is necessary to insert the reversible access cover. (Fig. 17). Insert O ring in upper groove Apply lubricant to O ring Reversible cover options:- Topside - ready finish, heavy duty ribbed ABS. Underside - for tiled infill. Note. Leave 5mm rebate to apply flexible sealant between outer edge of access frame and finished tile edge. Fig Tiled finish to access cover. The tiling face of the reversible cover is suitable for tiles up to 10mm thickness onto a 5mm adhesive bed. Ensure that the surfaces to be tiled are free from dust, grease and completely dry before applying tiling adhesive (suitable for plastic surfaces) to the cellular face of the cover. (Fig. 18). Fig. 18 Note. When laying floor the tiles the maximum possible filling height including bedding is 15mm On completion, the emergency flap must be in the ready position (refer page 7 section 7). 10

11 9. Inspection & Servicing 9.1 ACO recommend that the backflow stop is visually checked once a month and the emergency flap opened and closed to ensure correct function. A full service should be carried out at least twice yearly by an appropriately qualified engineer. The following service procedures must be carried out: Torque setting should be 5 8 Nm and tightening sequence as diagramme Fig Open emergency flap (refer page 7), undo brass nuts and carefully remove casing cover. Remove both flaps. Fig Inspect and clean seals to flaps and cover. Replace as necessary. Flush through the body unit. Fig Grease seals and re-insert both flaps taking care to seat seals correctly. Refit cover and tighten in sequence. Fig Close emergency flap (refer page 7). Fig Remove filler screw and fit screw-in graduated test funnel. Fig Fill chamber with clean water up to funnel upper edge (100mm). Fig Observe water level over 10 minute test period. If filling level drops, replenish to 100mm level. Record the total refill volume of water required. Fig Less than 500cm³ loss over the test period is a pass. Remove test funnel and replace filler screw. Open emergency flap (follow procedure on page 7). Fig Total water loss greater than 500cm³ will require flap check and retesting. If losses repeat, replacement flaps may be required. 11

12 10. Technical data TRIPLEX-K-2 without access chamber Part no. Ø (mm) L (mm) H (mm) Flow direction TRIPLEX-K-2 with access chamber Part no. Ø (mm) L (mm) H (mm) H1 (mm) Optional DPM flange Flow direction 12

13 11. Service log Date Monthly service Notes Serviced by Bi-annual service Replacement parts HELPLINE ACO Building Drainage, ACO Business Park, Hitchin Road, Shefford, Bedfordshire, SG17 5TE Tel:

14 11. Service log - continued Date Monthly service Notes Serviced by Bi-annual service Replacement parts HELPLINE ACO Building Drainage, ACO Business Park, Hitchin Road, Shefford, Bedfordshire, SG17 5TE Tel:

ACO Haustechnik. Installation information F DIN EN 13564

ACO Haustechnik. Installation information F DIN EN 13564 Installation information ACO Haustechnik 0173.03.48 F Triplex-K Cleaning pipe Triplex-K-0 Single backflow stop type 0 Triplex-K-1 Single anti-flood protection type 1 Triplex-K-2 Double anti-flood protection

More information

Perfect Manhole Installation Manual May 2012 Rev 8 Perfect Manhole System Precast concrete manholes with load bearing elastomeric joints

Perfect Manhole Installation Manual May 2012 Rev 8 Perfect Manhole System Precast concrete manholes with load bearing elastomeric joints Perfect Manhole System Precast concrete manholes with load bearing elastomeric joints Installation Manual 1 1 Introduction This manual gives guidance on how to install the CPM Group Perfect manhole system

More information

7.00 MANHOLES AND INSPECTION CHAMBERS. Hunter Underground Systems

7.00 MANHOLES AND INSPECTION CHAMBERS. Hunter Underground Systems 7.00 MANHOLES AND INSPECTION CHAMBERS Hunter Underground Systems 7.01 Access to drains 7.02 preformed plastic Inspection Chambers 7.03 Manholes 7.04 450mm diameter inspection chambers Equal 110mm inspection

More information

Box Culverts. Easy to install, suitable for very shallow or deep fill, ideal for use in a wide variety of civil engineering applications.

Box Culverts. Easy to install, suitable for very shallow or deep fill, ideal for use in a wide variety of civil engineering applications. Box Culverts Box Culverts Easy to install, suitable for very shallow or deep fill, ideal for use in a wide variety of civil engineering applications. 2 3 System Overview Forterra is one of the largest

More information

Assembly Instruction wedi Fundo Floor element

Assembly Instruction wedi Fundo Floor element Assembly Instruction wedi Fundo Floor element Assembly Instructions wedi Fundo Legend A Caulking nut B Rubber caulking gasket C Drain body D wedi sealant E Rubber gasket F Fiber gasket G Locking nut A

More information

(For compliance with the new sewers for adoption regulation or building regulations part H1)

(For compliance with the new sewers for adoption regulation or building regulations part H1) Plastic Drainage Keyline offers a comprehensive range of products suitable for all building, foul, surface water and land drainage applications - including new innovative, cost-effective systems for compliance

More information

SPECIFICATION FOR PIPE CULVERT CONSTRUCTION

SPECIFICATION FOR PIPE CULVERT CONSTRUCTION SPECIFICATION FOR PIPE CULVERT CONSTRUCTION 1. SCOPE Pipe culverts shall be constructed in accordance with this specification and in conformity with the lines, levels and cross-sections shown on the drawings.

More information

H series. for upper balconies DN 100. DN 100 Vers. a X X. Partial unit Side drain

H series. for upper balconies DN 100. DN 100 Vers. a X X. Partial unit Side drain instructions LORO direct balcony drains with connecting sleeve, EN 123-compliant, Steel, hot-dip galvanised, additionally coated, and DN 100 System overview for balcony storeys one-piece for upper balconies

More information

ZS880 Linear Shower Drain Installation Instructions

ZS880 Linear Shower Drain Installation Instructions Introduction PATENT PENDING The Zurn ZS880 Stainless Steel Linear Shower Drain incorporates a simple approach to bathroom shower design, when compared to traditional point-drain applications. The linear

More information

Air flue duct for use with ecotec boilers

Air flue duct for use with ecotec boilers For the installer Flue installation instructions Air flue duct for use with ecotec boilers Concentric System Ø 80/5 (Galvanized steel air duct/plastic flue duct) GB Contents Notes on the documentation

More information

STEP UP SHOWER BASE INSTALLATION GUIDE FOR TIMBER AND CONCRETE FLOORS

STEP UP SHOWER BASE INSTALLATION GUIDE FOR TIMBER AND CONCRETE FLOORS GUIDE FOR TIMBER AND CONCRETE FLOORS EDITION: APRIL 2016 IMPORTANT: This guide is for the installation of a Step Up shower base on a timber or concrete floor. If you require a walk in (flush with floor)

More information

BioPrism Solid Surface

BioPrism Solid Surface Please read all instructions before installing products. STORAGE & HANDLING: Check for damage that may have occurred during transit. Keep receptor flat on pallet, as it was shipped, until ready to install.

More information

SECTION FACILITY SANITARY SEWERS

SECTION FACILITY SANITARY SEWERS SECTION 22 13 13 FACILITY SANITARY SEWERS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification

More information

BUILD A SHOWER CUBICLE

BUILD A SHOWER CUBICLE BUILD A SHOWER CUBICLE Building a shower cubicle requires some experience in carpentry and tiling. You also need a degree of expertise in wiring and plumbing in order to install a shower unit. By all means

More information

Wavin: Range 600 Inspection Chambers

Wavin: Range 600 Inspection Chambers Uniclass EPIC G632:G581 JR12 CI/SfB (52.7) In6 August 2013 WP004 J34 Wavin: Range 600 Inspection Chambers Product Technical Guide Solutions for Essentials Contents Foul water Surface water Indicates where

More information

R10 RAINWATER DRAINAGE SYSTEMS

R10 RAINWATER DRAINAGE SYSTEMS R10 RAINWATER DRAINAGE SYSTEMS To be read with Preliminaries/General conditions. GENERAL INFORMATION/REQUIREMENTS 110 GRAVITY RAINWATER DRAINAGE SYSTEM - Rainwater outlets: Proprietary (see clause 365)

More information

ACO Marine. ACO Scuppers - ACO Channels ACO Drainage Systems for Shipbuilding and Offshore Installations

ACO Marine. ACO Scuppers - ACO Channels ACO Drainage Systems for Shipbuilding and Offshore Installations ACO Marine ACO Scuppers - ACO Channels ACO Drainage Systems for Shipbuilding and Offshore Installations Basic characteristic Through a consistent and effective product development, ACO Marine has developed

More information

SECTION MANHOLES AND STRUCTURES. A. Section Includes: 1. Manholes for water, storm drain and sanitary sewer systems.

SECTION MANHOLES AND STRUCTURES. A. Section Includes: 1. Manholes for water, storm drain and sanitary sewer systems. SECTION 33 05 13 MANHOLES AND STRUCTURES PART 1 GENERAL 1.1 SUMMARY A. Section Includes: 1. Manholes for water, storm drain and sanitary sewer systems. B. Related Sections: 1. Section 03 20 00 - Concrete

More information

PART A : CPVC PIPES AND FITTNGS (EXTERNAL WATERSUPPLY):

PART A : CPVC PIPES AND FITTNGS (EXTERNAL WATERSUPPLY): PART A : CPVC PIPES AND FITTNGS (EXTERNAL WATERSUPPLY): 01 Providing and Fixing of CPVC pipes confirming to ASTM standard including all CPVC fittings like tees, elbows, bends, unions, coupling, reducer

More information

SECTION UTILITY MANHOLES AND STRUCTURES

SECTION UTILITY MANHOLES AND STRUCTURES SECTION 33 05 14 UTILITY MANHOLES AND STRUCTURES PART 1 GENERAL 1.1 SUMMARY A. Section Includes: 1. Precast reinforced concrete manholes and structures with tongue-and-groove joints with masonry transition

More information

Original Scandinavian rainwater system

Original Scandinavian rainwater system Original Scandinavian rainwater system Siba Siba Square Contents Siba rainwater systems 3 Measuring 15-16 Siba 4-9 Gutter brackets 18-19 Siba Square 10-11 Gutters 20-23 Materials 12 Angles 24 Technical

More information

84 Lapping & Jointing 86 Service Pipe Penetrations 87 Sealing to Cavity Wall Constructions 88 Protecting Membranes System Components.

84 Lapping & Jointing 86 Service Pipe Penetrations 87 Sealing to Cavity Wall Constructions 88 Protecting Membranes System Components. 84 Lapping & Jointing 86 Service Pipe Penetrations 87 Sealing to Cavity Wall Constructions 88 Protecting Membranes 90 System Components installation/ SYSTEM COMPONENTS INSTALLATION ADVICE LAPPING and JOINTING

More information

RAINWATER HARVESTING SYSTEMS

RAINWATER HARVESTING SYSTEMS BALMORAL TANKS RAINWATER HARVESTING SYSTEMS www.balmoralrainwatersystems.co.uk UK Designed and manufactured The Balmoral HydroStore TM With the recognition of water as a valued commodity, Balmoral Tanks

More information

MASTERSPEC TECHNICAL SPECIFICATIONS DIVISION 22 PLUMBING

MASTERSPEC TECHNICAL SPECIFICATIONS DIVISION 22 PLUMBING SECTION 221316 - SANITARY WASTE AND VENT PIPING PART 1 - GENERAL 1.1 SUMMARY A. This Section includes the following soil and waste, sanitary drainage and vent piping inside the building: 1. Pipe, tube,

More information

Oil Separation Systems Product and Installation Guide

Oil Separation Systems Product and Installation Guide Uniclass JR20/JV50 L731/L75624 CI/SfB (56.3) May 2009/rev Dec 2009 WM422 EPIC L634 L2242 L511 Intelligent stormwater solutions by Wavin Oil Separation Systems Product and Installation Guide For residential,

More information

Rediflow Concrete Gas Flue System

Rediflow Concrete Gas Flue System Rediflow Concrete Gas Flue System Rediflow Concrete Gas Flue System Rediflow the complete gas flue block system Red Bank s range of Rediflow pre-cast concrete gas flue block system manufactured to BS EN

More information

Rodding Eye Details. Inspection Chambers

Rodding Eye Details. Inspection Chambers Rodding Eye Details Inspection Chambers 1 2 Deep Inspection Chambers BS7158:2001 Installation Procedures 1. Excavate to the required depth for the Polypipe Non Man Entry Deep Inspection Chamber system

More information

Assembly Instruction. wedi Fundo Primo Shower System

Assembly Instruction. wedi Fundo Primo Shower System Assembly Instruction wedi Fundo Primo Shower System Assembly Instructions wedi Fundo wedi Fundo Shower System-Primo Overview & General Product Description of the wedi Fundo Shower Systems All wedi Waterproof

More information

TILING SPECIFICATIONS

TILING SPECIFICATIONS TILING SPECIFICATIONS SPECIFICATION NUMBER: NR204-16 PREPARED BY: Mike Cubley PREPARED FOR: Porcelain Plus ATTENTION: Kirk Pollock INSTALLATION: 712 Turner Floor and Wall Tiling Specification. M40 STONE/

More information

Assembly Instruction. wedi Fundo Primo Steam Shower System

Assembly Instruction. wedi Fundo Primo Steam Shower System Assembly Instruction wedi Fundo Primo Steam Shower System Assembly Instructions wedi Fundo wedi Fundo Steam Shower System Residential and Commercial Use Whether installed in a steam room with commercial

More information

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017 SECTION 22 1316 - SANITARY WASTE AND VENT PIPING PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01

More information

LIPUMAX GREASE SEPARATOR

LIPUMAX GREASE SEPARATOR ACO Passavant Installation guide LIPUMAX GREASE SEPARATOR AUTHOR Kate Jennings DATE COMPLETED 8 August 2016 v14 ACO Polycrete, 134-140 Old Bathurst Road, Emu Plains, NSW 2750 Tel: +61 2 4747 4000 Fax:

More information

Village of Arlington Heights. Sewer Back-up Rebate Program

Village of Arlington Heights. Sewer Back-up Rebate Program Village of Arlington Heights Sewer Back-up Rebate Program (Including Enhanced Program Information) Updated: October 1, 2017 Village of Arlington Heights Building & Life Safety Department 33 S. Arlington

More information

Easy Drain. Modulo. TAF Side outlet INSTALLATION MANUAL FOR WOODEN OR CONCRETE SUBFLOORS

Easy Drain. Modulo. TAF Side outlet INSTALLATION MANUAL FOR WOODEN OR CONCRETE SUBFLOORS Easy Drain TAF Side outlet INSTALLATION MANUAL FOR WOODEN OR CONCRETE SUBFLOORS Easy Drain CONTENTS Installation options... 3 Frame options... 3 Height adjustable feet... 4 Height adjustable feet Wall

More information

T-T PUMPS T-T PUMPS PACKAGE PUMPING STATIONS

T-T PUMPS T-T PUMPS PACKAGE PUMPING STATIONS T-T PUMPS Ltd APPROVAL INSPECTION TESTING CERTIFICATION Onneley Works Newcastle Road Woore Cheshire CW3 9RU Tel: 01630 647200 Fax: 01630 642100 TECHNICAL APPROVALS FOR CONSTRUCTION Agrément Certificate

More information

Horizontal and Vertical End Suction Pumps

Horizontal and Vertical End Suction Pumps EN Horizontal and Vertical End Suction Pumps A range of versatile, energy efficient bearing frame pumps, suitable for horizontal or vertical mounting and incorporating the Hidrostal Screw Centrifugal Impeller.

More information

ITEM D-701 PIPE FOR STORM DRAINS AND CULVERTS

ITEM D-701 PIPE FOR STORM DRAINS AND CULVERTS ITEM D-701 PIPE FOR STORM DRAINS AND CULVERTS 701-1 DESCRIPTION 701-1.1 This item shall consist of the construction of pipe culverts, and storm drains, removal of existing storm pipes, connections to existing

More information

SECTION DUCTILE IRON FITTINGS. A. This section includes materials, installation, and testing of ductile iron fittings 48 inches and smaller.

SECTION DUCTILE IRON FITTINGS. A. This section includes materials, installation, and testing of ductile iron fittings 48 inches and smaller. PART 1 - GENERAL 1.1 DESCRIPTION A. This section includes materials, installation, and testing of ductile iron fittings 48 inches and smaller. 1.2 RELATED WORK SPECIFIED ELSEWHERE A. Section 01300 Record

More information

BOILER INSTALLATION INSTRUCTIONS FOR RU 1S / BRU 1 RU 2S / BRU 2 RU 3S

BOILER INSTALLATION INSTRUCTIONS FOR RU 1S / BRU 1 RU 2S / BRU 2 RU 3S BOILER INSTALLATION INSTRUCTIONS FOR RU 1S / BRU 1 RU 2S / BRU 2 RU 3S ASSEMBLY INSTRUCTIONS General Instructions: The STREBEL RU boilers are special boilers for oil or gas-fired (forced) burners. They

More information

TCC/SHORE TRANSIT BUS MAINTENANCE FACILITY - PHASE II

TCC/SHORE TRANSIT BUS MAINTENANCE FACILITY - PHASE II SECTION 221313 - FACILITY SANITARY SEWERS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification

More information

Channel Drain Shower Base. Aqua Line pro. Installation Instructions

Channel Drain Shower Base. Aqua Line pro. Installation Instructions Channel Drain Shower Base. Aqua Line pro Installation Instructions 02 JACKOBOARD Aqua Line pro System components a JACKOBOARD Aqua Line pro b JACKOBOARD Aqua Line pro - Horizontal Drain (Art. No. 4510370)

More information

SECTION SLUICE GATES

SECTION SLUICE GATES SECTION 11100 SLUICE GATES PART 1--GENERAL Fill in the blank with a short description of sluice gate usage, i.e., for isolation of wastewater, or for tank drainage, or for control of water surface. 1.01

More information

DRAINS AND CLEANOUTS. 1. Division 7 - Thermal and Moisture Protection Piping (Plumbing).

DRAINS AND CLEANOUTS. 1. Division 7 - Thermal and Moisture Protection Piping (Plumbing). SECTION 15421 DRAINS AND CLEANOUTS PART 1 GENERAL 1.01 SUMMARY A. Related Sections: 1. Division 7 - Thermal and Moisture Protection. 2. 15410 - Piping (Plumbing). 1.02 SUBMITTALS A. Product Data: Submit

More information

A. BILL OF QUANTITIES FOR SANITARY SEWER

A. BILL OF QUANTITIES FOR SANITARY SEWER Note: Unit prices of BoQ items shall include the execution of all small and unforeseen works not covered by BoQ, but that are necessary to be carried out during construction for smooth process of works

More information

Specialists in Acoustic Flooring and House to Flat Conversions

Specialists in Acoustic Flooring and House to Flat Conversions Sound Solution Consultants Ltd Po Box 755 Capel St Mary Ipswich Suffolk IP9 2WF Tel No: 0845 5212096 Fax No: 0845 5212097 Email: mpconsultservice@aol.com Specialists in Acoustic Flooring and House to Flat

More information

CHAPTER 6. Sanitary Sewer

CHAPTER 6. Sanitary Sewer CHAPTER 6 Sanitary Sewer A. Introduction All proposed developments, subdivisions, and buildings must have a properly designed and constructed sanitary sewer collection system. The system shall provide

More information

ON-ROOF ATTACHMENT FLAT COLLECTOR HELIOSTAR

ON-ROOF ATTACHMENT FLAT COLLECTOR HELIOSTAR ON-ROOF ATTACHMENT FLAT COLLECTOR HELIOSTAR INSTALLATION INSTRUCTIONS ENERGY AND SANITARY SYSTEMS Installation requirements Generel requirements The on-roof attachment set is capable for installation of

More information

ROOF MOUNT KIT OWNERS MANUAL

ROOF MOUNT KIT OWNERS MANUAL ROOF MOUNT KIT OWNERS MANUAL Made in the USA by: Primus Wind Power, Inc. 938 Quail St. Lakewood, CO 80215 Phone: (303) 242-5820 www.primuswindpower.com AIR is a trademark of Primus Wind Power, Inc. ROOF

More information

SEPTIC TANK CONSTRUCTION GUIDELINES

SEPTIC TANK CONSTRUCTION GUIDELINES SEPTIC TANK CONSTRUCTION GUIDELINES Septic tank for this airport will be designed/ built by the general contractor of the building facilities. At the time of the project design, availability of a septic

More information

801-MORD Mordred FIXING: Ground. ORDER No: CUSTOMER: Complied by Date AB 30/06/15 ISSUE ECN DATE SIGN /07/15 AB

801-MORD Mordred FIXING: Ground. ORDER No: CUSTOMER: Complied by Date AB 30/06/15 ISSUE ECN DATE SIGN /07/15 AB CUSTOMER: 0-MORD Mordred ORDER No: FIXING: Ground Complied by Date 0/0/5 ISSUE ECN DATE SIGN 0 7 0/07/5 CUSTOMER: 0-MORD Mordred ORDER No: FIXING: Ground Low tower.m single slide Low scramble net High

More information

ACO Building Drainage

ACO Building Drainage Uniclass L7315 CI/SfB (52.6) January 2012 Gully Systems ACO Building Drainage Product catalogue ACO Stainless Steel Gully Systems - Handbook for Specifiers, Installers and Contractors ACO Building Drainage

More information

B. Subsurface data is available from the Owner. Contractor is urged to carefully analyze the site conditions.

B. Subsurface data is available from the Owner. Contractor is urged to carefully analyze the site conditions. SECTION 31 23 33 - TRENCHING, BACKFILLING AND COMPACTION PART 1 - GENERAL 1.1 SCOPE A. This Section specifies the requirements for excavating and backfilling for storm sewer, sanitary sewer, water distribution

More information

TOLL FREE: (866) VANITY SPECIFICATIONS. VANITY COMPONENTS Model VG09008

TOLL FREE: (866) VANITY SPECIFICATIONS. VANITY COMPONENTS Model VG09008 VANITY SPECIFICATIONS VANITY COMPONENTS Model VG09008 MODEL VG09008 FEATURES Wall-mounted cabinet Soft closing sliding cabinet drawer hardware Cabinet ships assembled PACKING LIST Vanity Brackets - 2 Plastic

More information

South West Water s amendments & requirements for Sewers For Adoption 6 th Edition

South West Water s amendments & requirements for Sewers For Adoption 6 th Edition South West Water s amendments & requirements for Sewers For Adoption 6 th Edition Sewers offered for adoption to South West Water should be designed and constructed in accordance with Sewers for Adoption

More information

SERIES 1100 KERBS, FOOTWAYS AND PAVED AREAS

SERIES 1100 KERBS, FOOTWAYS AND PAVED AREAS MANUAL OF CONTRACT DOCUMENTS FOR HIGHWAY WORKS VOLUME 1 THE SPECIFICATION FOR HIGHWAY WORKS SERIES 1100 KERBS, FOOTWAYS AND PAVED AREAS Contents Clause Title Page 1100 (02/17) General 2 #1101 Precast Concrete

More information

A reliable solution for ditching, underpassing and rainwater drainage

A reliable solution for ditching, underpassing and rainwater drainage PIPES AND CHAMBERS CULVERT PIPES A reliable solution for ditching, underpassing and rainwater drainage Culvert pipes are used to convey drain pipe water or rainwater under the ground. The smallest (110

More information

TYPES OF SEWAGE PUMPS. Solids Handling Pumps: Grinder Pumps: Effluent Pumps:

TYPES OF SEWAGE PUMPS. Solids Handling Pumps: Grinder Pumps: Effluent Pumps: Effluent Pumps: Effluent pumps are the pumps most often used in small on-site systems. They are designed to pump effluent, the effluent flowing out of a septic tank. This effluent is relatively clear liquid

More information

ACO Civicline CL. Line drainage. ACO product catalogue ACO Civicline CL

ACO Civicline CL. Line drainage. ACO product catalogue ACO Civicline CL ACO ACO product catalogue ACO Introduction ACO Civicline system overview ACO Civicline is a channel drainage system for light to medium duty traffic applications up to load class C 250 according to EN

More information

112mm. 117x75mm Polyflow. 130x70mm Ogee 68mm Round 65mm Square. 112mm Half Round 68mm Round. 65mm. Round. 112mm. 117x75mm Polyflow

112mm. 117x75mm Polyflow. 130x70mm Ogee 68mm Round 65mm Square. 112mm Half Round 68mm Round. 65mm. Round. 112mm. 117x75mm Polyflow Gutter and Systems A comprehensive range of fittings accompanies each rainwater profile in Polypipes unrivalled product range, to provide the specifier and installer with a complete roof drainage solution.

More information

FLOOR AND AREA DRAINS

FLOOR AND AREA DRAINS Pictorial Index Product Recommendations Floor Drain Selection Factors Load Rating Grate Free Area Material & Characteristics Pipe Connection Commonly Specified Options Typical Installations FLOOR AND AREA

More information

Module 7: Hydraulic Design of Sewers and Storm Water Drains. Lecture 7: Hydraulic Design of Sewers and Storm Water Drains

Module 7: Hydraulic Design of Sewers and Storm Water Drains. Lecture 7: Hydraulic Design of Sewers and Storm Water Drains Module 7: Hydraulic Design of Sewers and Storm Water Drains Lecture 7: Hydraulic Design of Sewers and Storm Water Drains 7.0 HYDRAULIC DESIGN OF SEWERS AND STORM WATER DRAINS 7.1 General Consideration

More information

BILL OF QUANTITY ENGINEERING & MANAGEMENT CONSULTING CENTRE. "Beit Hanoun Emergency Water Supply Project"

BILL OF QUANTITY ENGINEERING & MANAGEMENT CONSULTING CENTRE. Beit Hanoun Emergency Water Supply Project "Beit Hanoun Emergency Water Supply Project" " Rehabilitation and Construction of Beit Hanoun Water Network " BILL OF QUANTITY ENGINEERING & MANAGEMENT CONSULTING CENTRE Bill of Quantities PREAMBLE TO

More information

Section Storm Sewers STORM SEWERS PART 1 - GENERAL 1.01 SECTION INCLUDES. A. Storm Sewers. B. Abandonment of Storm Sewers

Section Storm Sewers STORM SEWERS PART 1 - GENERAL 1.01 SECTION INCLUDES. A. Storm Sewers. B. Abandonment of Storm Sewers STORM SEWERS PART 1 - GENERAL 1.01 SECTION INCLUDES A. Storm Sewers B. Abandonment of Storm Sewers 1.02 DESCRIPTION OF WORK A. Construct storm sewers. B. Abandon storm sewers. 1.03 SUBMITTALS Comply with

More information

SECTION STORM UTILITY DRAINAGE PIPING PART 1 - GENERAL 1.1 SUMMARY 1.2 SUBMITTALS 1.3 PROJECT CONDITIONS

SECTION STORM UTILITY DRAINAGE PIPING PART 1 - GENERAL 1.1 SUMMARY 1.2 SUBMITTALS 1.3 PROJECT CONDITIONS SECTION 334100 - STORM UTILITY DRAINAGE PIPING PART 1 - GENERAL 1.1 SUMMARY Section Includes: 1. Pipe and fittings. 2. Drain Basin. 3. De-chlorination tablet feeder. 4. Non-pressure transition couplings.

More information

FIREPRO FIRESTOP PIPE COLLARS. Firestop solution for plastic pipework penetrations

FIREPRO FIRESTOP PIPE COLLARS. Firestop solution for plastic pipework penetrations FIREPRO FIRESTOP PIPE COLLARS Firestop solution for plastic pipework penetrations FIREPRO FIRESTOP PIPE COLLARS Firestop solution for plastic pipework penetrations. ROCKWOOL Firestop Pipe s provide a simple

More information

A M E R I C A N A R C H I T E C T U R A L M A N U F A C T U R E R S A S S O C I A T I O N

A M E R I C A N A R C H I T E C T U R A L M A N U F A C T U R E R S A S S O C I A T I O N A M E R I C A N A R C H I T E C T U R A L AAMA 2410-13 Standard Practice for Installation of Windows with an Exterior Flush Fin Over an Existing Window Frame M A N U F A C T U R E R S A S S O C I A T I

More information

SECTION PLUMBING PIPING SYSTEMS

SECTION PLUMBING PIPING SYSTEMS SECTION 15300 PLUMBING PIPING SYSTEMS PART 1 - GENERAL 1.01 SPECIAL NOTICE A. Each contractor shall read all relevant documents, become familiar with the job, the scope of work, type of general construction,

More information

South Waikato District Council Code of Practice for Subdivision and Development PART 4. Drainage. Part 4: Drainage 56

South Waikato District Council Code of Practice for Subdivision and Development PART 4. Drainage. Part 4: Drainage 56 PART 4 Drainage Part 4: Drainage 56 PART 4: DRAINAGE 401 STORMWATER DRAINAGE 401.1 General The stormwater drainage system shall be available to any building site within urban development or subdivision.

More information

RIW SHEETSEAL GR BENEFITS APPLICATIONS APPLIED TO

RIW SHEETSEAL GR BENEFITS APPLICATIONS APPLIED TO CI/SfB TN6 LI4143 August 2017 RIW SHEETSEAL GR is a cold applied, high density polyethylene film bonded to aluminium foil and coated with a bitumen/rubber self adhesive layer with a removable reinforced

More information

TILE TILE

TILE TILE 09300 - TILE 09300-1 PART ONE: GENERAL 1.1 Description TILE 1.1.1 Work of this Section, as shown or specified, shall be provided by the Interior Contractor and shall be in accordance with the requirements

More information

A. This Section includes subdrainage systems for foundations and underslab areas. A. Product Data: For each type of drainage panel indicated.

A. This Section includes subdrainage systems for foundations and underslab areas. A. Product Data: For each type of drainage panel indicated. ZGF Partnership Page 1 of 7 SECTION 33 46 00 - PART 1 - GENERAL 1.1 SUMMARY A. This Section includes subdrainage systems for foundations and underslab areas. 1.2 SUBMITTALS A. Product Data: For each type

More information

DIVISION 3: SEWER. Improvement Design Standards City of Dundee Oregon. Division 3 : Sewer Page 1

DIVISION 3: SEWER. Improvement Design Standards City of Dundee Oregon. Division 3 : Sewer Page 1 DIVISION 3: SEWER 3.1 DESIGN CRITERIA A. APPLICABILITY 1. These Design Standards shall govern all construction and upgrading of public sanitary sewer facilities in the City of Dundee and applicable work

More information

This policy will generally explain the following in regards to the City sewerage collection systems:

This policy will generally explain the following in regards to the City sewerage collection systems: CITY OF SACO POLICY ON SEWER AND STORMWATER BACK-UPS PURPOSE The purpose of this policy is to explain how and why sewer or stromwater backups occur, what to do in the event a homeowner has a backup, and

More information

HELIOSTAR 252, 218 VERTICAL, FREE INSTALLATION

HELIOSTAR 252, 218 VERTICAL, FREE INSTALLATION HELIOSTAR 252, 218 VERTICAL, FREE INSTALLATION INSTRUCTION MANUAL ENERGY AND SANITARY SYSTEMS Installation requirements General requirements The free-standing installation set is to be used or installing

More information

Storm Drainage

Storm Drainage University of New Hampshire University of New Hampshire Scholars' Repository Division 33 Utilities Chapter 5 Technical Construction and Renovation Standards 4-23-2015 334100 - Storm Drainage Sandra Hickey

More information

Level 1 Certificate in Basic Construction Skills

Level 1 Certificate in Basic Construction Skills Qualification Specification ProQual 2011 ProQual, May 2016 1 Contents Page Introduction 3 The Qualifications and Credit Framework (QCF) 3 Qualification profile 4 Rules of combination 5 Credit transfer

More information

eccles The new COVER-ALL recessed range Keeping above from below

eccles The new COVER-ALL recessed range Keeping above from below eccles The new COVER-ALL recessed range Keeping above from below Manufactured to European Standards All models in the new advanced composite range are manufactured to BS EN 124 : 1994, an exacting industry

More information

Materials Carbon Steel and Malleable Iron are used in the manufacture of concrete inserts. Stainless Steel and other materials are available.

Materials Carbon Steel and Malleable Iron are used in the manufacture of concrete inserts. Stainless Steel and other materials are available. Concrete inserts offered in this section are designed to provide a pre-set support point in concrete ceilings, walls, and floors. A range of inserts with varying design loads are available. Materials Carbon

More information

TECHNICAL DATA SHEET DS 060

TECHNICAL DATA SHEET DS 060 of 9 General Notes: This instruction covers the installation of a resilient mounted system for a marine propulsion engine driving a rigidly mounted gearbox through a flexible coupling utilising an independent

More information

The better way to build TM. Installation Manual FOUNDATION SIPs & FROST WALLS SIPs

The better way to build TM. Installation Manual FOUNDATION SIPs & FROST WALLS SIPs The better way to build TM Installation Manual FOUNDATION SIPs & FROST WALLS SIPs November 2016 PWF FOUNDATION & FROST WALL SIPs Installation Manual Table of Contents Topics General Requirements....................................

More information

PURUS DRAINAGE PRODUCTS PURUS FLOOR GULLIES

PURUS DRAINAGE PRODUCTS PURUS FLOOR GULLIES PURUS AB Södra Dragongatan 15 SE-271 39 Ystad Sweden Tel: +46 10 41 44 900 Fax: +46 10 41 44 996 e-mail: info@purus.se web: www.purus.se/en-gb APPROVAL INSPECTION TESTING CERTIFICATION TECHNICAL APPROVALS

More information

PASSAIC COUNTY TECHNICAL INSTITUTE CCA 1422 NEW S.T.E.M. BUILDING 2017

PASSAIC COUNTY TECHNICAL INSTITUTE CCA 1422 NEW S.T.E.M. BUILDING 2017 SECTION 02630 - STORM DRAINAGE PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections,

More information

PIPEWORK INSULATION. 14/ Page 1 of 10 Pipework Insulation Rev D

PIPEWORK INSULATION. 14/ Page 1 of 10 Pipework Insulation Rev D PIPEWORK INSULATION 14/10-2014 Page 1 of 10 Pipework Insulation Rev D Contents INTRODUCTION General Scope Surfaces to be Insulated Pumps, Turbines etc Performance Minimum Pipe Insulation Thickness Physical

More information

Planning and installation instructions

Planning and installation instructions Planning and installation instructions Stofix Oy Ahlmaninkatu 2 E 40100 Jyväskylä Finland stofixgroup@stofix.com www.stofix.com 2 PLANNING AND INSTALLATION INSTRUCTIONS... 1 1 General... 3 2 Project Design...

More information

WHY SPECIFY KOALA: Koala s new KB200 Baby Changing Station has redefined the benefits of Family Friendly accommodation:

WHY SPECIFY KOALA: Koala s new KB200 Baby Changing Station has redefined the benefits of Family Friendly accommodation: WHY SPECIFY KOALA: Koala s new KB200 Baby Changing Station has redefined the benefits of Family Friendly accommodation: COMPLIANCE: Exceeds ASTM, EN standards SAFETY: Less than 1% deflection PEACE OF MIND:

More information

DARTMOUTH COLLEGE DESIGN January 3, 2012 & CONSTRUCTION GUIDELINES

DARTMOUTH COLLEGE DESIGN January 3, 2012 & CONSTRUCTION GUIDELINES SECTION 15420 DRAINAGE AND VENT SYSTEMS PART 1 DESIGN DIRECTIVES 1.1 DESIGN CRITERIA A. All cleanouts above finished (accessible and non-accessible) ceilings shall be extended to the floor above. B. Do

More information

h Installation Manual

h Installation Manual h Installation Manual 1 General Information The installation of HOBAS GRP Pipes is subject to applicable standards and guidelines such as EN 1610 and ISO/ TS 10465-1. Correct installation always requires

More information

INSTALLATION INSTRUCTIONS B-407-RB SERIES SINGLEWALL RETROFIT TANK SUMP

INSTALLATION INSTRUCTIONS B-407-RB SERIES SINGLEWALL RETROFIT TANK SUMP INSTALLATION INSTRUCTIONS B-407-RB SERIES SINGLEWALL RETROFIT TANK SUMP NEW! SNAP-LOCK cover with high-pressure water-right vertical o-ring seal Pour-in Place channel joint sealed by new Epoxy Slurry mix

More information

All Prospective Bidders. SUBJECT: Addendum #2. DATE: April 8, Huntley High School Athletic Field Improvements Bid Release #2

All Prospective Bidders. SUBJECT: Addendum #2. DATE: April 8, Huntley High School Athletic Field Improvements Bid Release #2 TO: All Prospective Bidders SUBJECT: Addendum #2 DATE: April 8, 2013 PROJECT: Huntley High School Athletic Field Improvements Bid Release #2 OWNER: Consolidated School District #158 Algonquin, IL CONSTRUCTION

More information

B. Shop Drawings: For metal lockers. Include plans, elevations, sections, details, and attachments to other work.

B. Shop Drawings: For metal lockers. Include plans, elevations, sections, details, and attachments to other work. SECTION 10 5113 - METAL LOCKERS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification Sections,

More information

INDUSTRIAL PIPE FITTINGS, LLC

INDUSTRIAL PIPE FITTINGS, LLC Page 1 of 9 SPIROLITE MUNICIPAL AND INDUSTRIAL ODOR CONTROL PIPING Municipal wastewater treatment plants, industrial processes and composting facilities can be assured of trouble free transport of foul

More information

SECTION HIGH DENSITY POLYETHYLENE PIPE AND FITTINGS (PRESSURE PIPE)

SECTION HIGH DENSITY POLYETHYLENE PIPE AND FITTINGS (PRESSURE PIPE) SECTION 02623 HIGH DENSITY POLYETHYLENE PIPE AND FITTINGS (PRESSURE PIPE) PART 1 - GENERAL 1.1 SCOPE OF WORK A. Furnish all labor, materials, equipment and incidentals required and install high density

More information

Stormwater Attenuation Systems Sustainable Drainage Solutions for Domestic & Commercial Applications

Stormwater Attenuation Systems Sustainable Drainage Solutions for Domestic & Commercial Applications Environmental Stormwater Attenuation Systems Sustainable Drainage Solutions for Domestic & Commercial Applications Sustainable, Reliable, Affordable Stormwater Attenuation Systems Sustainable Drainage

More information

PASSAIC COUNTY TECHNICAL INSTITUTE CCA 1422 NEW S.T.E.M. BUILDING 2017

PASSAIC COUNTY TECHNICAL INSTITUTE CCA 1422 NEW S.T.E.M. BUILDING 2017 SECTION 10505 - METAL STUDENT LOCKERS PART 1 - GENERAL 1.01 SCOPE OF WORK A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification

More information

SECTION C1 DUCTILE IRON PIPE AND FITTINGS GENERAL

SECTION C1 DUCTILE IRON PIPE AND FITTINGS GENERAL SECTION C1 DUCTILE IRON PIPE AND FITTINGS GENERAL This section covers the furnishing and installation of ductile iron water pipe, fittings, thrust restraint and pipe disinfection. Ductile Iron Pipe MATERIALS

More information

MODULAR ACOUSTIC FENCING INSTALLATION GUIDE

MODULAR ACOUSTIC FENCING  INSTALLATION GUIDE MODULAR ACOUSTIC FENCING WWW.QUICKBUILTSYSTEMS.COM.AU INSTALLATION GUIDE INTRODUCTION THE QUICKBUILT FENCE SYSTEM IS A SMARTLY DESIGNED MODULAR SYSTEM EASY AND FAST TO INSTALL AND COST EFFECTIVE. // THE

More information

WaStop Check Valve System

WaStop Check Valve System WaStop Check Valve System Scan for more information Technical Guide D9.1 WaStop is a unique patented check valve that stops backflow in drains, providing reliable protection against pipe infiltration by

More information

Pre-Fabricated Roof Curbs

Pre-Fabricated Roof Curbs Knock Down Curb Assembly Instructions These roof curb assembly instructions are to be used as general guidelines only. Included with shipment are as-built drawings for proper location of sections and channels.

More information

Cast Iron Sluice Gates Rugged Dependability in Demanding Applications

Cast Iron Sluice Gates Rugged Dependability in Demanding Applications Cast Iron Sluice Gates Rugged Dependability in Demanding Applications A Proud Tradition Since 1840, the team at Rodney Hunt has pioneered safe and reliable flow control systems to help communities and

More information

SPECIFICATION: CAST IRON SLUICE GATES

SPECIFICATION: CAST IRON SLUICE GATES SPECIFICATION: CAST IRON SLUICE GATES PART 1 GENERAL 1.01 SCOPE OF WORK A. The CONTRACTOR shall furnish all labor, materials, equipment and incidentals required to install, ready for operation and field

More information