1 Cottonmount Landfill Stable Non Reactive (SNR) Asbestos Cell Volume 2 NON TECHNICAL SUMMARY December 2012 SLR Ref:

2 INTRODUCTION 1. This Non Technical Summary (NTS) has been produced by SLR Consulting Limited (SLR) on behalf of Biffa Waste Services Limited (the applicant) as a separate document to accompany the planning submission, being a mandatory part of the Planning Application & Environmental Statement (PA&ES). 2. The NTS is part of a package of documents being submitted to DOE Planning in support of a planning application in respect of land at Cottonmount Landfill, Mallusk. 3. The planning application is for a Stable Non-Reactive (SNR) cell within the confines of the existing landfill development area at Cottonmount Landfill, Mallusk, Newtownabbey. The nature of the planning application is such that it falls within the scope of The Planning (Environmental Impact Assessment) Regulations (Northern Ireland) 2012, however the hazardous waste in this case is limited to asbestos and wastes contaminated with asbestos only. It does not therefore mean that a new hazardous waste landfill site is being developed. Previously, asbestos waste could be landfilled with general waste but under current legislation it must handled separately and placed in a separately engineered cell which is what is proposed in this application. 4. The Stable Non-Reactive cell within the existing licensed non hazardous Cottonmount landfill will be capable of accepting asbestos waste and waste contaminated with asbestos. This Stable Non Reactive (SNR) cell will be similar to their existing facilities which Biffa successfully manage at Redhill (Surrey) and Eye (Peterborough) in the UK and other similar facilities which they have operated previously on other sites in Hertfordshire, Leeds, Warwickshire and elsewhere. Biffa therefore have considerable experience in successfully managing this type of material. APPLICATION SUBMISSION PACKAGE 5. This summary comprises Volume 2 of a multi volume submission to accompany the planning application. In addition to the formal planning application forms and certificates, the full submission comprises: Volume 1: Planning Application & Environmental Statement (PA&ES); and Volume 2: Non Technical Summary (NTS). 6. The PA&ES supports the planning application and considers the proposal in the context of relevant local planning policies and includes an assessment of environmental effects of the proposed development by setting out the results of the Environmental Impact Assessment (EIA). It is intended to provide DOE Planning with sufficient information to determine the planning application having due regard to the protection of the local amenity and the environment as a whole. Cottonmount SNR Vol 2 P a g e 1 SLR Consulting Limited

3 7. This NTS provides, in non-technical language, a brief summary of the proposals and the likely significant effects that the proposed development would have on the environment. THE APPLICANT 8. Biffa was founded over 100 years ago by the Biffa family as a haulage business. Today, Biffa is the UK's leading nationwide integrated waste management business that provides collection, treatment, recycling and technologically-driven energy generation services. Biffa provide an essential service to satisfy the business needs of their commercial, industrial and public sector customers throughout the UK and help them to meet their legal obligations and corporate responsibility commitments. Through the expertise of their people and investment in technology they promote and deliver sustainable waste management solutions with a focus on treating and utilising waste as a resource. 9. In 2010/11 Biffa handled over 13.6 million tonnes of waste and handled or collected for recycling over 2.1 million tonnes of waste. It has the largest Commercial and Industrial waste collection network in the UK, with more than 60 depots nationwide, over 1,300 collection vehicles and the most advanced route planning and optimisation systems in use in the sector. They also collect waste from nearly 2 million households through the UK. 10. Further information on Biffa can be found on their website at THE SITE 11. The development site for the SNR cell is located within the footprint of the existing quarry and landfill complex that covers a total area of 56 hectares within the district of Newtownabbey Borough Council. 12. Cottonmount Landfill lies approximately 15 km to the north-west of Belfast City Centre. From the direction of Belfast, Cottonmount Landfill is accessed via Junction 4 of the M2 motorway which runs approximately 3 km to the east of the site. The motorway runs generally parallel to Mallusk Road some 1 km to the north east. Direct access to the site is achieved from an existing well established access via the B95 Glengormley to Mallusk Road which runs parallel to the site. Cottonmount SNR Vol 2 P a g e 2 SLR Consulting Limited

4 Figure 1 Site Location within Cottonmount Landfill 13. The area in the vicinity of the proposed development site is characterised by generally rural land-uses and landscape to the south, west and north. To the south east lies the village of Mallusk, beyond which is the Mallusk Industrial Estate that extends to some 1,500 hectares of industrial and commercial development, located approximately 1.3 km east of the site. 14. The proposed SNR cell at Cottonmount Landfill will be located within the currently permitted area which is under Biffa s control for the existing nonhazardous landfill site at Cottonmount. The landfill site is regulated under PPC Cottonmount SNR Vol 2 P a g e 3 SLR Consulting Limited

5 Permit Variation Number P0090/05A/V1 issued in 2008 by the Northern Ireland Environment Agency (NIEA). 15. Section 2 within the PA&ES (Volume 1) provides further information on the application site. THE PROPOSED DEVELOPMENT 16. To enable the applicant to maintain flexibility in the final design and layout, and to allow the SNR cell to be incorporated into the developing landfill, a floating cell design has been identified as the most appropriate solution to the location of the SNR cell at Cottonmount. The intended proposed development area for the SNR will be located within a restricted isolated area in the south-western corner of the site within the existing licensed site boundary. The proposed SNR cell will be located within the application area however the final design will not be fixed under pre construction; this approach is typical of cells of this nature within operational landfills and has been successfully adopted by Biffa at their similar facilities in England. 17. The proposals are to develop a separate engineered cell within the confines of the consented landfill area, to be able to accept asbestos waste and waste containing asbestos. As this cell is specifically for asbestos waste it does not change the classification of the site as a whole as a non-hazardous site. The remainder of the landfill site will continue to accept non hazardous waste which does not include asbestos. 18. The Landfill Site is currently permitted to accept 325,000 tonnes per annum of non-hazardous waste and 75,000 tonnes per annum of inert wastes. These proposals will not increase the overall inputs to the site or increase the utilized void space at the site. The proposal will simply enable the applicant to use allocated non hazardous void space for stable non reactive (SNR) waste. The general operations of the landfill will remain unchanged. 19. SLR Consulting have submitted a PPC permit variation application to include the operation of the SNR cell as a disposal activity at the existing landfill. The PPC permit variation application will detail how Biffa will accept and dispose waste without causing significant harm to the environment (water, air and land) or human health. 20. The proposed operating hours would be the same as currently existing for the landfill site. The development proposal would not impact upon the approved restoration scheme for the landfill site. 21. As previously stated, this Stable Non Reactive (SNR) cell will be similar to existing facilities which Biffa successfully manage at Redhill (Surrey) and Eye (Peterborough) in the UK and other similar facilities they have operated. Biffa therefore have considerable experience in successfully managing this type of material. Cottonmount SNR Vol 2 P a g e 4 SLR Consulting Limited

6 22. A full description of the proposed development is included in Section 3 of the PA&ES (Volume 1). Figure 2 Proposed SNR Cell Layout Cottonmount SNR Vol 2 P a g e 5 SLR Consulting Limited

7 PLANNING POLICY 23. The Government is committed to a plan led system, with the Development Plan forming the basis of all planning decisions. Legislation confers a presumption in favour of development proposals which accord with the Development Plan, unless material considerations indicate otherwise. The planning application will therefore be determined in accordance with prevailing policies at national and local level. 24. Through the application process, it has been able to demonstrate that the development proposals would not conflict with the stated aims and policies of the Development Framework. The prevailing policies at a European, national, regional and local level all support the reduction in the quantities of waste being directed towards landfill and if disposal cannot be avoided, for the safe disposal of waste including the asbestos wastes proposed in the development scheme. 25. The proposed development is considered to be fully consistent with the general thrust of Government Policy to ensure that if waste, under the hierarchy is destined for landfill disposal, is disposed of safely. There are no overriding planning constraints specific to the site, and the project would not conflict with development plan policies. NEED FOR THE DEVELOPMENT 26. Biffa currently operates the existing landfill at Cottonmount and has identified the site as an excellent location to make further investment to expand its business serving existing and future customers. Northern Ireland currently has relatively few facilities for the treatment or disposal of stable non reactive (SNR) wastes such as asbestos and the development of the SNR cell at Cottonmount is in a strategic location for Biffa and their customers. 27. Although disposal of SNR asbestos waste does occur in Northern Ireland, there remains a heavy reliance on Great Britain to meet its facility needs. It is important that Northern Ireland remains or becomes self-sufficient in the treatment and disposal of wastes including stable non reactive (SNR) hazardous wastes in order to meet with local demand and provide an economically feasible option for disposal. This major shortfall in the capacity to treat and dispose of SNR waste safely will inevitably lead to storage problems, an increase in illegal disposal (including fly-tipping) and rising public concern about health and environmental impacts. 28. Cottonmount landfill is currently licensed to accept non-hazardous waste. The development proposals seek to provide a separate cell within the confines of the consented landfill area, thus allowing the disposal of asbestos wastes which are classed as stable non-reactive (SNR) wastes and which can be disposed of within non-hazardous landfill sites. The remainder of the site will continue to accept non-hazardous wastes which do not contain asbestos. Cottonmount SNR Vol 2 P a g e 6 SLR Consulting Limited

8 AIR QUALITY 29. An assessment of the air quality impacts associated with the proposed SRC at the existing Cottonmount landfill site has been undertaken. The assessment has considered: dust; Air Quality Strategy Pollutants from vehicle exhausts; and asbestos fibres during the operational phase. 30. In considering the potential impacts, it is important to keep in mind that the SNR cell would also be regulated by a PPC Permit issued by the Northern Ireland Environment Agency (NIEA). The PPC permit variation application will detail how Biffa will accept and dispose of the waste without causing significant harm to the environment (water, air and land) or human health. These assessments have been submitted to NIEA. 31. The assessment of dust has found that there is no change in the risk of impact between the proposed and currently consented landfill scheme and mitigation measures would continue to be required (primarily during earthworks). 32. There is not predicted to be significant additional traffic associated with the asbestos cell and therefore impacts associated with vehicle exhaust emissions are not considered to be an issue. 33. In terms of asbestos fibres from the asbestos cell during operation, the PPC Permit variation would not be approved by the NIEA unless they are satisfied that operations would not cause significant pollution to the environment or harm to human health. LANDSCAPE AND VISUAL IMPACT 34. The application site for the SNR cell is located within the boundary of the existing permitted and consented landfill operation at Cottonmount and it is apparent that there is precedent for such a development at the site. 35. The existing site is currently a relatively flat area that has been previously excavated although the immediate surroundings comprise active landfill and quarrying activity, and ancillary built infrastructure in the form of landfill netting, site offices and internal haul roads. The proposed development will not increase landfill void space within the existing permitted and consented landfill boundary, but will substitute a small amount of existing consented non hazardous void space with capacity for asbestos waste. 36. The proposals would not alter the existing permitted final restoration scheme of the landfill and would not be visible when viewed externally from the site due to the location of the proposed facility within the quarry void, surrounded by active quarry and landfill operations. Cottonmount SNR Vol 2 P a g e 7 SLR Consulting Limited

9 37. The proposals will blend in with the existing on site development (landfill and quarrying operations) and will not be out of character with the site operations and would not cause an unacceptable landscape or visual impacts. HIGHWAYS & TRANSPORTATION 38. The traffic and transport implications of the proposed SRC have been assessed in accordance with recognised standards guidance issued by the Department of the Environment (DOE) Planning Service s Transport Assessment Guidelines for Development Proposals in Northern Ireland (October 2006) and the guidelines for the Environmental Assessment of Road Traffic (IEA, 1993). 39. During the operation of the SNR cell it is anticipated that 5 trips per day will arise, based on an average payload of 20t per lorry. This equates to less than one heavy goods vehicle trip every two hours throughout the day. The inputs to the SNR cell will replace existing trips associated with the importation of nonhazardous waste materials to the existing landfill, and are therefore already present in the baseline operation of the highway network. 40. The assessment has considered the local highway network in the context of geometry and safety risks, and the assessment has concluded that there is no existing adverse safety risk associated with either the geometry of the network or the existing operation of the landfill site. 41. The assessment concludes that the magnitude of the change in traffic flows and its significance are immaterial and indiscernible in the context of highway capacity and safety, being that they are well within the baseline day-to-day traffic flow fluctuations that can expected. NOISE 42. The PA&ES has considered the potential impact of the SNR cell on noise sensitive receptors in close proximity to the site. 43. The current proposal will not increase imported tonnages to the site, but will replace existing consented tonnage for non-hazardous waste with stable non reactive (SNR) waste. There will be no increase in on-site activity nor will the proposals result in a significant increase in traffic movements to and from the site. The location of the SNR cell within the quarry void, surrounded by active quarry and consented landfill operations will ensure there will be no noticeable noise emissions from the proposed SNR cell. 44. The proposed operations will be broadly identical to the existing and will utilise the same plant and machinery throughout the current working hours. Cottonmount SNR Vol 2 P a g e 8 SLR Consulting Limited

10 HYDROGEOLOGY AND HYDROLOGY NON TECHNICAL SUMMARY 45. The proposals are for the development of an SNR cell for disposal of asbestos and wastes contaminated with asbestos only. It does not therefore mean that a new hazardous waste landfill site is being developed. Previously, asbestos waste could be landfilled with general waste but under current legislation it must handled separately and placed in a separately engineered cell which is what is proposed in this application. The geology of the site has been described, having regard to published data and site investigations. The site is located within an area of Tertiary basalt which is classified as moderately permeable. Cottonmount landfill is primarily underlain by a bedrock aquifer classified as of moderate productivity and fracture flow. The site is not underlain by a superficial aquifer but has the highest groundwater vulnerability rating of The application site lies within the catchment of the Flush River, a tributary of the Ballymartin Water. The Flush River flows in a north easterly direction and is located approximately 450 m to the south east of the application site. 47. A permit variation application to include the operation of the SNR cell as a disposal activity at the existing landfill has been submitted to NIEA. An updated Revised HRA is required every 4 years and NIEA requested the Revised RHRA be submitted at this time to update the HRA and support the permit variation application to include the Stable Non Reactive (asbestos) cell. The Revised HRA concluded that the proposed and installed landfill engineering systems and precautions at Cottonmount Landfill continue to operate effectively and comply with the relevant requirements of the Groundwater Regulations (Northern Ireland) It is concluded that, with the implementation of the proposals and the continuation of the approved landfill engineering system there would be a no impact on the surrounding environment. ECOLOGY 49. The application area for the SNR cell is located wholly within the existing active Cottonmount Landfill boundary, within the footprint designated for future cell development. The application area has been quarried and the site is being landfilled and restored in a phased approached. Landfill cell engineering operations for the adjoining cells are currently taking place within this area of bare ground which is subjected to daily disturbances. 50. The development site is not subject to any statutory or non-statutory designations. Due to the proposal not requiring the development of any additional land but rather for the modification of waste stream in existing permitted waste cells, an extended Phase 1 Habitat Survey or other specialist surveys was not necessary however an ecological review was undertaken and addressed: habitat loss and fragmentation; Cottonmount SNR Vol 2 P a g e 9 SLR Consulting Limited

11 disturbance; dust; increase in pest species; and restoration. 51. The review has found that the proposed operations will be broadly identical to the existing. The proposals would lead to no loss of habitat or protected species as all development will take place within existing active consented landfill and would not involve any physical extension of the facility or increase in void space. The SNR cell development is unlikely to have significant ecological impact on the existing baseline conditions within the application site, or on the wider surrounding area, over and above the impacts already experienced spatially from the existing landfill. Accordingly the current proposals are considered to have no adverse ecological impacts. CULTURAL HERITAGE 52. The nature of the site within an active quarry and landfill is such that the potential for archaeological record has been excavated as a result of the quarrying operations. Due to the location of the SNR cell within an area of consented landfill and below the level of the surrounding terrain there would be no indirect impacts on heritage features around the area. 53. The proposed development would not impact upon cultural heritage and therefore not conflict with any legislation or planning policies related to archaeology and the built heritage. CONCLUSIONS 54. The proposals are for a Stable Non-Reactive (SNR) cell within the confines of the existing landfill development area at Cottonmount Landfill, Mallusk. This Stable Non-Reactive cell will be capable of accepting asbestos waste and waste contaminated with asbestos. 55. To enable the applicant to maintain flexibility in the final design and layout the final design will not be fixed under pre construction; this approach is typical of cells of this nature within operational landfills and has been successfully adopted by Biffa at their similar facilities in England where they have considerable experience in successfully managing this type of material. 56. These proposals will not increase the overall inputs to the site or increase the utilized void space at the site. The proposals will simply enable the applicant to use allocated non hazardous void space for stable non reactive (SNR) waste. The general operations of the landfill will remain unchanged. 57. The PA&ES has not identified any significant impact from the proposed development. The SNR cell would also be regulated by a PPC Permit issued by the Northern Ireland Environment Agency (NIEA). The PPC permit variation application will detail how Biffa will accept and dispose of the waste without Cottonmount SNR Vol 2 P a g e 10 SLR Consulting Limited

12 causing significant harm to the environment (water, air and land) or human health. Cottonmount SNR Vol 2 P a g e 11 SLR Consulting Limited

Clifton Marsh Landfill Variation of planning permission 05/09/0376 & 06/09/0395 for the continuation of landfilling until Non Technical Summary

Clifton Marsh Landfill Variation of planning permission 05/09/0376 & 06/09/0395 for the continuation of landfilling until Non Technical Summary Clifton Marsh Landfill Variation of planning permission 05/09/0376 & 06/09/0395 for the continuation of landfilling until 2035 Non Technical Summary SLR Consulting Limited Project Ref: 403.00079.00474

More information

Viridor Waste Management. Proposed Development of an In-Vessel Composting Facility. Land at Exide Batteries, Salford Road, Bolton

Viridor Waste Management. Proposed Development of an In-Vessel Composting Facility. Land at Exide Batteries, Salford Road, Bolton Viridor Waste Management Proposed Development of an In-Vessel Composting Facility Land at Exide Batteries, Salford Road, Bolton Non-Technical Summary January 2009 Introduction Viridor Waste Management

More information

Portbury Dock Renewable Energy Plant. Cumulative Impact Assessment Non-Technical Summary September 2009

Portbury Dock Renewable Energy Plant. Cumulative Impact Assessment Non-Technical Summary September 2009 Portbury Dock Renewable Energy Plant Cumulative Impact Assessment Non-Technical Summary September 2009 INTRODUCTION On 28 th August 2009 E.ON Climate & Renewables UK Developments Limited (EC&R) submitted

More information

High Speed Rail (London- West Midlands)

High Speed Rail (London- West Midlands) High Speed Rail (London- West Midlands) Draft Environmental Minimum Requirements Annex 4: Draft Environmental Memorandum November 2013 ESA 4.2 High Speed Rail (London- West Midlands) Draft Environmental

More information

introduction 1 On behalf of db symmetry we are pleased to welcome you to view our emerging plans for a new logistics park at Rugby.

introduction 1 On behalf of db symmetry we are pleased to welcome you to view our emerging plans for a new logistics park at Rugby. introduction 1 On behalf of db symmetry we are pleased to welcome you to view our emerging plans for a new logistics park at Rugby. The site comprises the employment element of the South West Rugby allocation

More information

Chapter 17 Cumulative Impacts

Chapter 17 Cumulative Impacts Chapter 17 Cumulative Impacts CONTENTS 17. Cumulative Effects... 2 17.1 Introduction... 2 17.2 Summary of Relevant Legislation, Planning Policy and Guidance... 2 17.3 Methods... 5 17.4 Consultation...

More information

Appendix General Environmental Risk Analysis

Appendix General Environmental Risk Analysis Proposed Solar Power Station Near Moree, NSW (MOREE SOLAR FARM) Appendix Prepared by BP Solar & Walsh Consulting January 011 Background The body of the identifies all significant environmental risks identified

More information

State of the Nation Report

State of the Nation Report State of the Nation Report Landfilling Practices and Regulation in Scotland Contents 1. Summary of Solid Waste Management Sector... 2 2. Overview of Landfill Practices... 5 3. Key Stakeholders in the solid

More information

Delivering Zero Waste Supplementary Guidance

Delivering Zero Waste Supplementary Guidance 1 Appendix 2 Delivering Zero Waste Supplementary Guidance June 2016 Perth & Kinross Council - The Environment Service INTRODUCTION Why is this guidance needed? This guidance expands on The Local Development

More information

MATERIALS MANAGEMENT PLAN (MMP)

MATERIALS MANAGEMENT PLAN (MMP) MATERIALS MANAGEMENT PLAN (MMP) CONTENTS 1. INTRODUCTION...5 1.1 Background...5 1.2 Scope...5 1.3 Conclusions from the Environmental Impact Assessments...6 2. THE USE OF SITE-DERIVED MATERIALS...7 2.2

More information

ENVIRONMENT ACT TERMS OF REFERENCE NOVA SCOTIA DEPARTMENT OF TRANSPORTATION AND PUBLIC WORKS. Beaver Bank Bypass

ENVIRONMENT ACT TERMS OF REFERENCE NOVA SCOTIA DEPARTMENT OF TRANSPORTATION AND PUBLIC WORKS. Beaver Bank Bypass ENVIRONMENT ACT TERMS OF REFERENCE NOVA SCOTIA DEPARTMENT OF TRANSPORTATION AND PUBLIC WORKS Beaver Bank Bypass Highway 101 to the Beaver Bank Road Halifax County, NS NOVA SCOTIA DEPARTMENT OF THE ENVIRONMENT

More information

WASTE & RESOURCE MANAGEMENT

WASTE & RESOURCE MANAGEMENT WASTE & RESOURCE MANAGEMENT www.wyg.com creative minds safe hands MANAGING A VALUABLE RESOURCE The way we handle our waste can have a huge effect on the environment and has the potential to leave an unwelcome

More information

Thorn Turn Winter Maintenance and Highways Depot

Thorn Turn Winter Maintenance and Highways Depot Thorn Turn Winter Maintenance and Highways Depot Non-Technical Summary Central Bedfordshire Council 12 May 2015 1 Notice This document and its contents have been prepared and are intended solely for Central

More information

OPENCAST COAL PLANNING SERIES

OPENCAST COAL PLANNING SERIES SCOTTISH PLANNING POLICY 16 pp OPENCAST COAL PLANNING SERIES Scottish Planning Policy SPP 16 Opencast Coal Revised July 2005 Crown copyright 2005 ISSN 1741 1203 spp PLANNING SERIES: Scottish Planning Policies

More information

06/01851/MIN CONSTRUCTION OF A NOISE ATTENUATION BUND AT Hermitage Farm, Newport Road, Moulsoe FOR NGW and EF Richards

06/01851/MIN CONSTRUCTION OF A NOISE ATTENUATION BUND AT Hermitage Farm, Newport Road, Moulsoe FOR NGW and EF Richards 06/01851/MIN CONSTRUCTION OF A NOISE ATTENUATION BUND AT Hermitage Farm, Newport Road, Moulsoe FOR NGW and EF Richards THE APPLICATION Planning permission is sought for the construction of a noise attenuation

More information

Waste Management, a Role for Surveyors - Linking the Environment and Planning

Waste Management, a Role for Surveyors - Linking the Environment and Planning Waste Management, a Role for Surveyors - Linking the Environment and Planning John R PARKER, Australia Key words: Waste management, environment, planning, extractive industry, recycling, landfill SUMMARY

More information

Parc Adfer Energy Recovery Facility, Deeside Industrial Park, Flintshire. Volume 3 NON TECHNICAL SUMMARY. August 2014 SLR Ref:

Parc Adfer Energy Recovery Facility, Deeside Industrial Park, Flintshire. Volume 3 NON TECHNICAL SUMMARY. August 2014 SLR Ref: Parc Adfer Energy Recovery Facility, Deeside Industrial Park, Flintshire Volume 3 NON TECHNICAL SUMMARY August 2014 SLR Ref: 403.04097.00005 Wheelabrator Technologies Inc. TABLE OF CONTENTS Contents Introduction...

More information

Annex F Scoping Checklist

Annex F Scoping Checklist Scoping Checklist Table F1: Scoping Checklist Table. Questions to be considered in Scoping /? Which Characteristics of the Project 1. Will construction, operation or decommissioning of the Project involve

More information

Environmental Policy and Guide December 2010

Environmental Policy and Guide December 2010 Environmental Policy and Guide December 2010 Page 1 of 11 ENVIRONMENTAL POLICY A responsible and forward-looking approach to environmental issues is an important factor in Intu Properties plc s continuing

More information

Technical Guidance Document for Operational Environmental Management Plan (OEMP)

Technical Guidance Document for Operational Environmental Management Plan (OEMP) Technical Guidance Document for Operational Environmental Management Plan (OEMP) EAD-EQ-PCE-TG-06 Signature on Original Environment Quality Sector * Corporate Management Representative Secretary General

More information

(1) Site Suitability PURPOSE

(1) Site Suitability PURPOSE 3.3 Code for Development and Use of Rural Service Industries PURPOSE This purpose of this code is to encourage the development and use of suitable rural service industries on rural, industrial or suitable

More information

Rural Living Environment

Rural Living Environment 1 RLE.1 Rural Living Environment RLE.1.1 Description & Expectations The Rural Living Environment (RLE) covers rural areas within the District that are either already characterised by lifestyle activities

More information

Hazardous substances

Hazardous substances Hazardous substances Anticipated environmental outcomes Care of hazardous substances (a) Avoidance of harm to people, property and the environment from the use, storage, transportation and disposal of

More information

Coire Glas Pumped Storage Scheme

Coire Glas Pumped Storage Scheme About SSE SSE is one of the UK s largest energy companies and is headquartered in Perth. Our purpose is to provide the energy people need in a reliable and sustainable way. We're involved in producing,

More information

12 WASTE. Introduction. Review of proposed development

12 WASTE. Introduction. Review of proposed development 12 WASTE Introduction 12.1 This chapter provides a qualitative assessment of the likely significant environmental effects of solid waste generation, associated with the construction and operation of the

More information

Waste Minimisation, Re-use, and Resource Recovery

Waste Minimisation, Re-use, and Resource Recovery Cambridgeshire & Peterborough Minerals and waste Core Strategy APPENDIX A COUNCIL CHANGES THAT GO TO SOUNDNESS S2 Policy CS28, Waste Minimisation, Reuse, and Resource Recovery Amend to read: Waste Minimisation,

More information

Western Rail Link To Heathrow

Western Rail Link To Heathrow Non-T echnical Summar y - Initi al Envir onmental Infor mati on R eport Networ k R ail Western Rail Link To Heathrow Network Rail Non-Technical Summary - Initial Environmental 129088-JAC-REP-HEN-000014

More information

Annesley Andalusite Mine: Section 24G Rectification Process. Consultation with community members 15 June 2017

Annesley Andalusite Mine: Section 24G Rectification Process. Consultation with community members 15 June 2017 Annesley Andalusite Mine: Section 24G Rectification Process Consultation with community members 15 June 2017 AGENDA Welcome and introduction Meeting protocol Purpose of the meeting Project background Project

More information

Environmental Information Worksheet

Environmental Information Worksheet Environmental Information Worksheet Water System Owner (Attach additional sheets if necessary) Needs and Alternatives Provide a brief narrative that describes: Current drinking water system needs. Project

More information

SCHEDULE. FORM A (Rule 3(1)) THE CERTIFICATE OF ENVIRONMENTAL CLEARANCE RULES 2001 APPLICATION FOR A CERTIFICATE OF ENVIRONMENTAL CLEARANCE

SCHEDULE. FORM A (Rule 3(1)) THE CERTIFICATE OF ENVIRONMENTAL CLEARANCE RULES 2001 APPLICATION FOR A CERTIFICATE OF ENVIRONMENTAL CLEARANCE SCHEDULE FORM A (Rule 3(1)) THE CERTIFICATE OF ENVIRONMENTAL CLEARANCE RULES 2001 APPLICATION FOR A CERTIFICATE OF ENVIRONMENTAL CLEARANCE This form must be completed in triplicate for any proposed activity

More information

Murra Warra Wind Farm Project Environmental Management Plan

Murra Warra Wind Farm Project Environmental Management Plan 1. Introduction This (EMP) covers the pre-construction, construction, operation and decommissioning phases for the Murra Warra Wind Farm Project. RES Australia recognises the importance of reducing human

More information

28 JULY 2015 PLANNING COMMITTEE. 5i 14/1315 Reg d: Expires: Ward: OW. of Weeks on Cttee Day:

28 JULY 2015 PLANNING COMMITTEE. 5i 14/1315 Reg d: Expires: Ward: OW. of Weeks on Cttee Day: 5i 14/1315 Reg d: 25.11.2014 Expires: 29.04.15 Ward: OW Nei. Con. Exp: 14.01.15 BVPI Target Minor (13) Number of Weeks on Cttee Day: 21/8 On Target? No LOCATION: PROPOSAL: TYPE: London House, 134 High

More information

South Bristol Link Sustainability Statement. May 2013

South Bristol Link Sustainability Statement. May 2013 May 2013 1 2 Notice This document and its contents have been prepared and are intended solely for West of England Partnership s information and use in relation to the of South Bristol Link. It may not

More information

Struma Lot 3.2 EIA Development, Working Document

Struma Lot 3.2 EIA Development, Working Document Struma Lot 3.2 EIA Development, Working Document Revision 1, 03 February 2016 1 Introduction 1.1 Background Struma Motorway is one of the most challenging road projects in Bulgaria. The motorway is about

More information

Oil and Gas Exploration, Production and Distribution SPD 30 September :00:00 BST 11 November :00:00 GMT 16 September :19:41 BST

Oil and Gas Exploration, Production and Distribution SPD 30 September :00:00 BST 11 November :00:00 GMT 16 September :19:41 BST Consultation Start End Published on Oil and Gas Exploration, Production and Distribution SPD 30 September 2016 09:00:00 BST 11 November 2016 17:00:00 GMT 16 September 2016 11:19:41 BST Help us to reduce

More information

10 RECAP Waste Management Design Guide Toolkit

10 RECAP Waste Management Design Guide Toolkit 10 RECAP Waste Management Design Guide Toolkit 43 How to use the Toolkit 10.1 The purpose of the RECAP Waste Management Design Toolkit (referred to as the Toolkit) is to allow the effective assessment

More information

BSkyB Site Levelling and Remediation Works. Environmental Statement Volume 3. Planning Application June 2013 Non-Technical Summary

BSkyB Site Levelling and Remediation Works. Environmental Statement Volume 3. Planning Application June 2013 Non-Technical Summary BSkyB Site Levelling and Remediation Works Environmental Statement Volume 3 Planning Application June 2013 Non-Technical Summary BSkyB Site Levelling and Remediation Works Environmental Statement Volume

More information

Advice to decision maker on coal mining project

Advice to decision maker on coal mining project . Advice to decision maker on coal mining project IESC 2015-063: West Muswellbrook Project New Development Requesting agency The New South Wales Mining and Petroleum Gateway Panel Date of request 27 January

More information

COLCHESTER STANWAY QUARRY

COLCHESTER STANWAY QUARRY COLCHESTER STANWAY QUARRY STANWAY QUARRY FIVE WAYS FRUIT FARM EXTENSION AND CONSOLIDATION APPLICATION ENVIRONMENTAL STATEMENT NON TECHNICAL SUMMARY VOLUME 3 May 2014 ENVIRONMENTAL STATEMENT NON TECHNICAL

More information

9.3.9 Industry uses code

9.3.9 Industry uses code 9.3.9 Industry uses code 9.3.9.1 Application (1) This code applies to accepted development and assessable development identified as requiring assessment against the Industry uses code by the tables of

More information

Hydropower Guidance Note: HGN 7 Competing Schemes

Hydropower Guidance Note: HGN 7 Competing Schemes Guidance Note Hydropower Guidance Note: HGN 7 Competing Schemes This guidance is not intended as a statement of law and should be read in combination with and in the context of the relevant enactments

More information

Oweninny Wind Farm. Oweninny Power Ltd. Environmental Impact Statement. Chapter 20. Indirect and Interaction of Impacts

Oweninny Wind Farm. Oweninny Power Ltd. Environmental Impact Statement. Chapter 20. Indirect and Interaction of Impacts Oweninny Wind Farm Oweninny Power Ltd. Chapter 20 Indirect and Interaction of Impacts Copyright ESB International Limited, all rights reserved. TABLE OF CONTENTS 20. INDIRECT AND INTERACTION OF IMPACTS

More information

RMB Chivenor Flood Defence Scheme. Non-Technical Summary FINAL. Version 3.0

RMB Chivenor Flood Defence Scheme. Non-Technical Summary FINAL. Version 3.0 RMB Chivenor Flood Defence Scheme Non-Technical Summary FINAL Version 3.0 RMB CHIVENOR FLOOD DEFENCE SCHEME ENVIRONMENTAL STATEMENT CONTENTS 1 INTRODUCTION AND BACKGROUND II 2 THE PROPOSED PROJECT III

More information

Shell Quest Carbon Capture and Storage Project. Shell Canada Limited

Shell Quest Carbon Capture and Storage Project. Shell Canada Limited SCREENING SCOPING DOCUMENT For the proposed Shell Quest Carbon Capture and Storage Project Shell Canada Limited Prepared by: Canadian Environmental Assessment Agency Natural Resources Canada Fisheries

More information

6 Risk assessment methodology

6 Risk assessment methodology Risk assessment methodology 6 Risk assessment methodology 6.1 Introduction INPEX has committed to a systematic risk assessment process as a means of achieving best practice in environmental management

More information

PROJECT CONCEPT PRELIMINARY QUESTIONAIRE PART I: GENERAL INFORMATION. GEF: OTHER(S) (Specify)

PROJECT CONCEPT PRELIMINARY QUESTIONAIRE PART I: GENERAL INFORMATION. GEF: OTHER(S) (Specify) PROJECT CONCEPT PRELIMINARY QUESTIONAIRE PART I: GENERAL INFORMATION Interested Organization Name: Project Location: Projected amount of required project funding ($ /USD): TOTAL: Project Sector or Similar:

More information

NOTICE OF PREPARATION OF AN ENVIRONMENTAL IMPACT REPORT

NOTICE OF PREPARATION OF AN ENVIRONMENTAL IMPACT REPORT Date: September 19, 2017 NOTICE OF PREPARATION OF AN ENVIRONMENTAL IMPACT REPORT To: Agencies and Interested Parties Lead Agency: Sacramento Municipal Utility District 6201 S Street, MS B203 Sacramento,

More information

WE EEN Wizard of the Environment: the Enterprise Europe Network. Eurosportello del Veneto Via delle Industrie 19/C Venezia

WE EEN Wizard of the Environment: the Enterprise Europe Network. Eurosportello del Veneto Via delle Industrie 19/C Venezia WE EEN Wizard of the Environment: the Enterprise Europe Network Eurosportello del Veneto Via delle Industrie 19/C Venezia Directive 2008/98/EC on waste (Waste Framework Directive) The Directive introduces

More information

Environmental Guideline on Stone crushing plant set up temporarily for the purpose of a project by a public department

Environmental Guideline on Stone crushing plant set up temporarily for the purpose of a project by a public department 2017 [Type a quote from the document or the summary of an interesting point. You can position the text box anywhere in the document. Use the Drawing Tools tab to change the formatting of the pull quote

More information

Introduction. They can help ensure that all key issues and elements have been considered; They help ensure that the review process is systematic; and

Introduction. They can help ensure that all key issues and elements have been considered; They help ensure that the review process is systematic; and Introduction There are many tools that a reviewer of environmental impact assessment documents can use to help determine whether such documents are complete and adequate. Among the powerful tools that

More information

18 Cumulative Impacts and Interaction of Effects

18 Cumulative Impacts and Interaction of Effects 18 Cumulative Impacts and Interaction of Effects 18.1 Introduction This chapter addresses the cumulative impacts and main interactions between different aspects of the environment likely to be significantly

More information

ENVIRONMENTAL GUIDELINES FOR PREPARATION OF AN ENVIRONMENT MANAGEMENT PLAN. Environment Protection Authority, ACT May 2009

ENVIRONMENTAL GUIDELINES FOR PREPARATION OF AN ENVIRONMENT MANAGEMENT PLAN. Environment Protection Authority, ACT May 2009 ENVIRONMENTAL GUIDELINES FOR PREPARATION OF AN ENVIRONMENT MANAGEMENT PLAN Environment Protection Authority, ACT May 2009 ISBN-13: 978-0-642-60494-1 ISBN-10: 0-642-60494-0 Australian Capital Territory,

More information

National Environmental Standards for Plantation Forestry. Overview of the regulations

National Environmental Standards for Plantation Forestry. Overview of the regulations National Environmental Standards for Plantation Forestry Overview of the regulations New national rules for plantation forestry Plantation forestry is New Zealand s third largest primary sector. It delivers

More information

! Environmental Impact Assessment process!

! Environmental Impact Assessment process! Environmental Impacts"! Environmental Impact Assessment process! Prof. Doutora Maria do Rosário Partidário Environmental Impacts @ MRPartidário 1 EIA Started with NEPA (National Environmental Policy Act,

More information

Former MOD Site Hempsted Lane, Gloucester

Former MOD Site Hempsted Lane, Gloucester FORMER MOD SITE, HEMPSTED LANE, GLOUCESTER NON-TECHNICAL SUMMARY Introduction Bovale Ltd proposes to undertake the redevelopment of the former MOD site, Hempsted Lane, Gloucester. The redevelopment will

More information

VIRIDOR WASTE MANAGEMENT LIMITED. Glasgow Recycling and Renewable Energy Centre. Non Technical Summary

VIRIDOR WASTE MANAGEMENT LIMITED. Glasgow Recycling and Renewable Energy Centre. Non Technical Summary VIRIDOR WASTE MANAGEMENT LIMITED Glasgow Recycling and Renewable Energy Centre Non Technical Summary Wardell Armstrong 2 The Avenue, Leigh, Greater Manchester, WN7 1ES, United Kingdom Telephone: +44 (0)1942

More information

Waste Management Plan. September 2015

Waste Management Plan. September 2015 Contents Contents Executive Summary 1 Introduction Background Waste Management Context Objectives Scope Plan Period Content and Structure Publicity and Consultation Equality 2 Legislative and Policy Context

More information

BUT001: Land to the east of Benington Road, Butterwick Sustainability Objective

BUT001: Land to the east of Benington Road, Butterwick Sustainability Objective BUT001: Land to the east of Benington Road, Butterwick Sustainability Objective 1. Provide a miture of sustainably designed new housing to provide everybody in South East Lincolnshire with the opportunity

More information

E20 Māori Land. (2) The importance of economic development to support the occupation, development and use of Māori land is recognised.

E20 Māori Land. (2) The importance of economic development to support the occupation, development and use of Māori land is recognised. E20. Māori Land E20.1. Background These Auckland-wide provisions recognise the unique legal and governance framework for Māori Land being subject to Te Ture Whenua Māori Act 1993. They provide for the

More information

Works, services and infrastructure code

Works, services and infrastructure code 9.4.11 Works, services infrastructure code 9.4.11.1 Application (1) This code applies to assessable development identified as requiring assessment against the Works, services infrastructure code by the

More information

4.0 ENVIRONMENTAL IMPACTS AND MITIGATION MEASURES. Negative or adverse impacts during the construction phase are:

4.0 ENVIRONMENTAL IMPACTS AND MITIGATION MEASURES. Negative or adverse impacts during the construction phase are: 4.0 ENVIRONMENTAL IMPACTS AND MITIGATION MEASURES 4.1 POTENTIAL ENVIRONMENTAL IMPACTS 4.1.1 Impacts during Construction Phase Negative or adverse impacts during the construction phase are: Land environment:

More information

Construction Site Waste Management Process.

Construction Site Waste Management Process. Construction Site Waste Management Process. EMS DOCUMENT TYPE: ENVIRONMENTAL ASPECT: PURPOSE: Operational Control Document Waste Management To ensure we manage our waste in compliance with legislation

More information

POSITION June Circular Economy Proposal for a Directive amending Directive 2008/98/EC on Waste. Parliamentary Draft Report of Simona Bonafè, MEP

POSITION June Circular Economy Proposal for a Directive amending Directive 2008/98/EC on Waste. Parliamentary Draft Report of Simona Bonafè, MEP POSITION June 2016 Circular Economy Proposal for a Directive amending Directive 2008/98/EC on Waste Parliamentary Draft Report of Simona Bonafè, MEP The European Aggregates Industry has embraced the imperative

More information

Division 8 Intensive Animal Husbandry Code

Division 8 Intensive Animal Husbandry Code Division 8 Intensive Animal Husbry Code 12.8.1 Intensive Animal Husbry Code (1) The provisions in this division comprise the Intensive Animal Husbry Code. (2) They are compliance with the Intensive Animal

More information

4. Submitting a project for ENTRUST approval

4. Submitting a project for ENTRUST approval 4. Submitting a project for ENTRUST approval 4.1 The project approval process The project approval process ensures that proposed LCF expenditure is in compliance with the Regulations. No LCF monies may

More information

Level 3 Diploma in Warehousing and Storage ( )

Level 3 Diploma in Warehousing and Storage ( ) Level 3 Diploma in Warehousing and Storage (06-07) Candidate logbook 600/3766/0 www.cityandguilds.com January 202 Version.0 About City & Guilds City & Guilds is the UK s leading provider of vocational

More information

Guidelines for the Treatment of Air Quality During the Planning and Construction of National Road Schemes

Guidelines for the Treatment of Air Quality During the Planning and Construction of National Road Schemes Guidelines for the Treatment of Air Quality During the Planning and Construction of National Road Schemes Consultation Draft NATIONAL ROADS AUTHORITY Guidelines for the Treatment of Air Quality During

More information

Report for Agenda Item: 2

Report for Agenda Item: 2 QLDC Council 28 September 2017 Department: Planning & Development Report for Agenda Item: 2 Stage 2 Proposed District Plan Notification Purpose The purpose of this paper is to present those parts of Stage

More information

These potential changes and their implications are outlined in Annex 1.

These potential changes and their implications are outlined in Annex 1. Guidance Note Hydropower Guidance Note: This Guidance Note has been prepared by Natural Resources Wales (NRW) to provide applicants for abstraction and impoundment licences for hydropower schemes with

More information

Welcome To Our Exhibition

Welcome To Our Exhibition Welcome To Our Exhibition Welcome to the exhibition of our proposals for a Waste Recycling and Renewable Energy Facility Distributed Renewable Energy Networks Ltd (DRENL) propose to develop a 10MW Waste

More information

ENVIRONMENTAL IMPACT STATEMENT METRO NORTH BELINSTOWN TO SWORDS STOP AREA MN101 VOLUME 2 BOOK 1 OF 7

ENVIRONMENTAL IMPACT STATEMENT METRO NORTH BELINSTOWN TO SWORDS STOP AREA MN101 VOLUME 2 BOOK 1 OF 7 ENVIRONMENTAL IMPACT STATEMENT METRO NORTH BELINSTOWN TO SWORDS STOP AREA MN101 VOLUME 2 BOOK 1 OF 7 ENVIRONMENTAL IMPACT STATEMENT For ease of local identification this Environmental Impact Statement

More information

Copyright 2007 Essex Contaminated Land Consortium All rights reserved. December 2007 v2

Copyright 2007 Essex Contaminated Land Consortium All rights reserved. December 2007 v2 Copyright 2007 Essex Contaminated Land Consortium All rights reserved December 2007 v2 CONTENTS 1. Introduction 5 2. Site Characterisation & Risk Assessment 6 Phase 1 Desktop Study 6 Phase 2 Intrusive

More information

energy, environment & design aterman Poniel, South Lanarkshire Environmental Statement: Non-Technical Summary

energy, environment & design aterman Poniel, South Lanarkshire Environmental Statement: Non-Technical Summary aterman energy, environment & design Poniel, South Lanarkshire Poniel, South Lanarkshire Non-Technical Summary INTRODUCTION SRG Estates Limited (SRGE) (hereafter referred to as the Applicant ) is seeking

More information

Cambridgeshire & Peterborough Minerals and Waste Core Strategy Schedule of Council s Proposed Changes APPENDIX B MINOR CHANGES

Cambridgeshire & Peterborough Minerals and Waste Core Strategy Schedule of Council s Proposed Changes APPENDIX B MINOR CHANGES Cambridgeshire & Peterborough Minerals and Waste Core Strategy APPENDIX B MINOR CHANGES M1 Policy CS3, Amend bullet points two and three to read: a continuation in the role of the area as a major producer

More information

13 Section 32 Summary for the Residential Chapter

13 Section 32 Summary for the Residential Chapter 13 Section 32 Summary for the Residential Chapter The purpose of this section is to present a summary of the evaluation of the objectives, policies and methods of the Residential Zone Chapter of the Proposed

More information

LEVENSEAT GASIFICATION PLANT NON-TECHNICAL SUMMARY

LEVENSEAT GASIFICATION PLANT NON-TECHNICAL SUMMARY LEVENSEAT GASIFICATION PLANT NON-TECHNICAL SUMMARY S1481-0320-0004IRT Levenseat Waste Management - Non-Technical Summary Page 1 LEVENSEAT GASIFICATION PLANT NON-TECHNICAL SUMMARY Document Production &

More information

H3. Residential Single House Zone

H3. Residential Single House Zone H3. Residential Single House Zone H3.1. Zone description The purpose of the Residential Single House Zone is to maintain and enhance the amenity values of established residential neighbourhoods in number

More information

H2. Residential Rural and Coastal Settlement Zone

H2. Residential Rural and Coastal Settlement Zone H2. Residential Rural and Coastal Settlement Zone H2.1. Zone description The Residential Rural and Coastal Settlement Zone applies to rural and coastal settlements in a variety of environments including

More information

Spoil and Water. Irish Ports Association Conference Ciaran Callan Dublin Port Company. 26 th September 2008

Spoil and Water. Irish Ports Association Conference Ciaran Callan Dublin Port Company. 26 th September 2008 Spoil and Water Ciaran Callan Dublin Port Company Irish Ports Association Conference 2008 26 th September 2008 Disposal of Dredge Material: Regulation and Process of Application Requirement for disposal

More information

The Importance of Interim Storage in the Management of Higher Activity Radioactive Waste

The Importance of Interim Storage in the Management of Higher Activity Radioactive Waste in the Management of Higher Activity Radioactive Waste February 2017 Contents 1. Purpose of the document 1 2. The lifecycle of HAW 1 3. Storage of HAW implementing Government policies 1 4. Storage of HAW

More information

GUIDE TO THE DEVELOPMENT OF A MINING AND RECLAMATION PLAN IN NEW BRUNSWICK

GUIDE TO THE DEVELOPMENT OF A MINING AND RECLAMATION PLAN IN NEW BRUNSWICK PROVINCE OF NEW BRUNSWICK DEPARTMENT OF ENERGY AND RESOURCE DEVELOPMENT Minerals and Petroleum Development Branch GUIDE TO THE DEVELOPMENT OF A MINING AND RECLAMATION PLAN IN NEW BRUNSWICK Guide to the

More information

LOCATION: Mowbray House, Edgware Way, Edgware, Middx, HA8 8DJ REFERENCE: H/01384/12 Received: 06 April 2012 Accepted: 10 July 2012 WARD(S):

LOCATION: Mowbray House, Edgware Way, Edgware, Middx, HA8 8DJ REFERENCE: H/01384/12 Received: 06 April 2012 Accepted: 10 July 2012 WARD(S): LOCATION: Mowbray House, 58-70 Edgware Way, Edgware, Middx, HA8 8DJ REFERENCE: H/01384/12 Received: 06 April 2012 Accepted: 10 July 2012 WARD(S): Edgware Expiry: 04 September 2012 Final Revisions: APPLICANT:

More information

20 INDIRECT AND INTERACTION OF IMPACTS

20 INDIRECT AND INTERACTION OF IMPACTS 20 INDIRECT AND INTERACTION OF IMPACTS 20.1 INTRODUCTION The EU Guidelines for the Assessment of Indirect and Cumulative Impacts as well as Impact Interactions states that Including an assessment of the

More information

Energy from Waste Electricity Generation Plant - Preliminary Environmental Impact Statement

Energy from Waste Electricity Generation Plant - Preliminary Environmental Impact Statement 31 October 2013 Director General Department of Planning and Infrastructure 23-33 Bridge Street SYDNEY NSW 2000 Dear Sir, Energy from Waste Electricity Generation Plant - Preliminary Environmental Impact

More information

Remediation of the Former Gasworks, High Wycombe, UK

Remediation of the Former Gasworks, High Wycombe, UK Remediation of the Former Gasworks, High Wycombe, UK Apr-4-06 MGP Symposium, Reading UK, April 2006 Presented By Stuart Arch Apr-4-06 4/4/06 WPREpresentation1.ppt 1 Site Setting Contents of Presentation

More information

Ardersier Wastewater Treatment Works

Ardersier Wastewater Treatment Works Ardersier Wastewater Treatment Works Environmental Statement: Non-Technical Summary March 2010 Scottish Water Ardersier Wastewater Treatment Works 251886 SNI INV ES 021 10 March 2010 Environmental Statement:

More information

TABLE OF CONTENTS 4.17 UTILITIES AND SERVICE SYSTEMS...

TABLE OF CONTENTS 4.17 UTILITIES AND SERVICE SYSTEMS... TABLE OF CONTENTS 4.17 UTILITIES AND SERVICE SYSTEMS... 4.17-1 4.17.0 Introduction... 4.17-1 4.17.1 Methodology... 4.17-2 4.17.2 Existing Conditions... 4.17-2 4.17.3 Impacts... 4.17-4 4.17.4 Applicant-Proposed

More information

TABLE OF CONTENTS LIST OF FIGURES. Mt Arthur Coal Open Cut Modification Environmental Assessment

TABLE OF CONTENTS LIST OF FIGURES. Mt Arthur Coal Open Cut Modification Environmental Assessment Executive Summary TABLE OF CONTENTS ES1 BACKGROUND ES-1 ES2 EXISTING OPERATIONS ES-1 ES3 MODIFICATION OVERVIEW ES-1 ES4 CONSULTATION ES-1 ES5 COMMUNITY INITIATIVES AND INVOLVEMENT ES-3 ES6 ENVIRONMENTAL

More information

ENVIRONMENTAL IMPACT ASSESSMENT (EIA) AND THE ENVIRONMENTAL IMPACT STATEMENT (EIS) 2.0 Developments requiring preparation of an EIS

ENVIRONMENTAL IMPACT ASSESSMENT (EIA) AND THE ENVIRONMENTAL IMPACT STATEMENT (EIS) 2.0 Developments requiring preparation of an EIS ENVIRONMENTAL IMPACT ASSESSMENT (EIA) AND THE ENVIRONMENTAL IMPACT STATEMENT (EIS) 1.0 Background 2.0 Developments requiring preparation of an EIS 3.0 The contents of an EIS 4.0 Exemption from the requirement

More information

Natural Heritage assessment of small scale wind energy projects which do not require formal Environmental Impact Assessment (EIA).

Natural Heritage assessment of small scale wind energy projects which do not require formal Environmental Impact Assessment (EIA). Guidance Natural Heritage assessment of small scale wind energy projects which do not require formal Environmental Impact Assessment (EIA). March 2008 Table of Contents Page INTRODUCTION... 2 DEFINITIONS...

More information

CMPDI. 4.6 Mine Closure Plan

CMPDI. 4.6 Mine Closure Plan 4.6 Mine Closure Plan Post-mining Land Use Planning The mine closure planning with regard to for Lekhapani OCP will broadly involve the following aspects: 1. Technical Aspects 2 Environmental Aspects 2.

More information

Understanding the State Planning Policy July 2017 Changes to state interest statements, policies and assessment benchmarks

Understanding the State Planning Policy July 2017 Changes to state interest statements, policies and assessment benchmarks Understanding the State Planning Policy July 2017 Changes to state statements, policies and assessment benchmarks This fact sheet outlines the key policy changes to the state statements, policies and assessment

More information

ENVIRONMENTAL AND SOCIAL IMPACT ASSESSMENT GUIDELINES FOR HYDROPOWER PROJECTS IN MYANMAR

ENVIRONMENTAL AND SOCIAL IMPACT ASSESSMENT GUIDELINES FOR HYDROPOWER PROJECTS IN MYANMAR ENVIRONMENTAL AND SOCIAL IMPACT ASSESSMENT GUIDELINES FOR HYDROPOWER PROJECTS IN MYANMAR Overview of Presentation 1. Objectives of the Consultancy 2. Hydropower in Myanmar 3. Draft Table of Contents 4.

More information

H3 Residential Single House Zone

H3 Residential Single House Zone H3. Residential Single House Zone [ENV-2016-AKL-000243: K Vernon] Addition sought [CIV-2016-404-002333: Franco Belgiorno-Nettis]-Note: The properties affected by this appeal are identified on the Auckland

More information

2. Project Justification and Feasible Alternatives

2. Project Justification and Feasible Alternatives 2. Project Justification and Feasible Alternatives 2.1 Project Justification Energy intensive industries associated with the coal and gas sectors in the Surat region continue to drive electricity demand

More information

Non-Technical Summary

Non-Technical Summary RIVERSIDE RESOURCE RECOVERY FACILITY, BEXLEY SECTION 36C VARIATION APPLICATION PROPOSED OPERATIONAL EFFICIENCY IMPROVEMENTS NON-TECHNICAL SUMMARY RIVERSIDE RESOURCE RECOVERY LIMITED SEPTEMBER 2014 Introduction

More information

SUTTON ESTATE, CHELSEA ENVIRONMENTAL STATEMENT JULY 2015 Volume I - Non-Technical Summary

SUTTON ESTATE, CHELSEA ENVIRONMENTAL STATEMENT JULY 2015 Volume I - Non-Technical Summary SUTTON ESTATE, CHELSEA ENVIRONMENTAL STATEMENT JULY 2015 Volume I - Environmental Statement Volume 1 Sutton Estate, Chelsea Project no: KU048600 Document title: Environmental Statement Volume 1 - Revision:

More information

BNPB3: Plasterboard - legislation and policy drivers

BNPB3: Plasterboard - legislation and policy drivers BNPB3: Plasterboard - legislation and policy drivers Version 1.6 This Briefing Note and referenced information is a public consultation document and will be used to inform Government decisions. The information

More information

GELLIGAER QUARRY Consolidation Application. Non Technical Summary Volume 3. August 2013

GELLIGAER QUARRY Consolidation Application. Non Technical Summary Volume 3. August 2013 GELLIGAER QUARRY Consolidation Application Non Technical Summary Volume 3 August 2013 ENVIRONMENTAL STATEMENT NON TECHNICAL SUMMARY VOLUME 3 GELLIGAER QUARRY Client: HANSON UK Job no. 407.00027.000356

More information