Size: px
Start display at page:

Download ""

Transcription

1

2

3

4

5

6

7

8

9

10

11

12

13

14 FIGURES

15 Printed By: aday Print Date: 3/23/ :48:08 PM File Name: \\geodesign.local\files\jobs\m-r\penskeauto\penskeauto-1\penskeauto-1-01\figures\cad\penskeauto-1-01-vm01.dwg Layout: FIGURE 1 VICINITY MAP BASED ON AERIAL PHOTOGRAPH OBTAINED FROM GOOGLE EARTH PRO 2121 S Towne Centre Place - Suite 130 Anaheim CA Off Fax PENSKEAUTO-1-01 MARCH 2011 SITE 10 0 LONGO TOYOTA EL MONTE, CA (SCALE IN APPROXIMATE FEET) VICINITY MAP N FIGURE 1

16 Printed By: aday Print Date: 3/23/ :50:03 PM File Name: \\geodesign.local\files\jobs\m-r\penskeauto\penskeauto-1\penskeauto-1-01\figures\cad\penskeauto-1-01-sp01.dwg Layout: FIGURE 2 LEGEND: B-1 EXISTING COLLISION REPAIR BUILDING EXISTING CURB FACE BORING SITE PLAN BASED ON DRAWING PREPARED BY GENSLER, 2010 (SHEET A00.50) B EXISTING SERVICE BAY CANOPY EXISTING MECHANIC BAYS EXISTING NEW CAR SHOWROOM PROPOSED NEW PORTAL AT MAIN ENTRANCE WALKWAY PROPOSED CANOPY EXTENSION B-2 EXISTING USED CAR SHOWROOM DN EXISTING CURB FACE 0 N (SCALE IN FEET) PENSKEAUTO-1-01 SITE PLAN 2121 S Towne Centre Place - Suite 130 Anaheim CA Off Fax MARCH 2011 LONGO TOYOTA EL MONTE, CA FIGURE 2

17 APPENDIX

18

19

20 SYMBOL SAMPLING DESCRIPTION Location of sample obtained in general accordance with ASTM D 1586 Standard Penetration Test with recovery Location of sample obtained using thin-wall Shelby tube or Geoprobe sampler in general accordance with ASTM D 1587 with recovery Location of sample obtained using Dames & Moore sampler and 300-pound hammer or pushed with recovery Location of sample obtained using Dames & Moore and 140-pound hammer or pushed with recovery Location of sample obtained using 3-inch-O.D. California split-spoon sampler and 140-pound hammer Location of grab sample Rock coring interval Graphic Log of Soil and Rock Types Observed contact between soil or rock units (at depth indicated) Water level during drilling Water level taken on date shown Inferred contact between soil or rock units (at approximate depths indicated) GEOTECHNICAL TESTING EXPLANATIONS ATT CBR CON DD DS HYD MC MD OC P Atterberg Limits California Bearing Ratio Consolidation Dry Density Direct Shear Hydrometer Gradation Moisture Content Moisture-Density Relationship Organic Content Pushed Sample PP P200 RES SIEV TOR UC VS kpa Pocket Penetrometer Percent Passing U.S. Standard No. 200 Sieve Resilient Modulus Sieve Gradation Torvane Unconfined Compressive Strength Vane Shear Kilopascal ENVIRONMENTAL TESTING EXPLANATIONS CA P PID ppm Sample Submitted for Chemical Analysis Pushed Sample Photoionization Detector Headspace Analysis Parts per Million ND NS SS MS HS Not Detected No Visible Sheen Slight Sheen Moderate Sheen Heavy Sheen 2121 S Towne Centre Place - Suite 130 Anaheim CA Off Fax EXPLORATION KEY TABLE A-1

21 RELATIVE DENSITY - COARSE-GRAINED SOILS Relative Density Standard Penetration Resistance Dames & Moore Sampler (140-pound hammer) Dames & Moore Sampler (300-pound hammer) Very Loose Loose Medium Dense Dense Very Dense More than 50 More than 120 More than 47 CONSISTENCY - FINE-GRAINED SOILS Consistency Standard Penetration Resistance Dames & Moore Sampler (140-pound hammer) Dames & Moore Sampler (300-pound hammer) Unconfined Compressive Strength (tsf) Very Soft Less than 2 Less than 3 Less than 2 Less than 0.25 Soft Medium Stiff Stiff Very Stiff Hard More than 30 More than 65 More than 31 More than 4.0 COARSE-GRAINED SOILS (more than 50% retained on No. 200 sieve) FINE-GRAINED SOILS (50% or more passing No. 200 sieve) MOISTURE CLASSIFICATION Term dry moist wet PRIMARY SOIL DIVISIONS GROUP SYMBOL GROUP NAME GRAVEL (more than 50% of coarse fraction retained on No. 4 sieve) SAND CLEAN GRAVELS (< 5% fines) GW or GP GRAVEL GRAVEL WITH FINES GW-GM or GP-GM GRAVEL with silt ( 5% and 12% fines) GW-GC or GP-GC GRAVEL with clay GRAVELS WITH FINES (> 12% fines) CLEAN SANDS (<5% fines) GM GC GC-GM SW or SP silty GRAVEL clayey GRAVEL silty, clayey GRAVEL SAND SANDS WITH FINES SW-SM or SP-SM SAND with silt (50% or more of ( 5% and 12% fines) coarse fraction SW-SC or SP-SC SAND with clay passing SM silty SAND SANDS WITH FINES No. 4 sieve) SC clayey SAND (> 12% fines) SC-SM silty, clayey SAND ML SILT CL CLAY Liquid limit less than 50 CL-ML silty CLAY SILT AND CLAY OL ORGANIC SILT or ORGANIC CLAY MH SILT Liquid limit 50 or CH CLAY greater OH ORGANIC SILT or ORGANIC CLAY HIGHLY ORGANIC SOILS PT PEAT Field Test very low moisture, dry to touch ADDITIONAL CONSTITUENTS Percent Fine-Grained Soils Secondary granular components or other materials such as organics, man-made debris, etc. Silt and Clay In: Sand and Gravel In: Coarse- Grained Soils Percent Fine-Grained Soils Coarse- Grained Soils damp, without < 5 trace trace < 5 trace trace visible moisture 5 12 minor with 5 15 minor minor visible free water, > 12 some silty/clayey with with usually saturated > 30 sandy/gravelly sandy/gravelly 2121 S Towne Centre Place - Suite 130 Anaheim CA Off Fax SOIL CLASSIFICATION SYSTEM TABLE A-2

22 DEPTH FEET 0.0 GRAPHIC LOG MATERIAL DESCRIPTION ASPHALT CONCRETE (4 inches). CRUSHED AGGREGATE BASE (12 inches). ELEVATION DEPTH TESTING SAMPLE BLOW COUNT MOISTURE CONTENT % RQD% CORE REC% INSTALLATION AND COMMENTS 2.5 Medium dense, brown SAND with silt (SP-SM); moist - FILL. Dense, light brown, fine to medium SAND (SP), trace gravel (1/2- to 1-inch diameter); dry DD DS 35-50/4" DD = 114 pcf 5.0 with clay; moist at 5.0 feet Stiff, brown CLAY (CL), minor silt; moist DD DS 37 DD = 87 pcf 7.5 Medium dense, light brown, fine SAND (SP); moist DD 34 DD = 89 pcf 12.5 grades to medium at 13.0 feet BORING LOG PENSKEAUTO-1-01-B1_2.GPJ GEODESIGN.GDT PRINT DATE: 3/23/11:KT becomes dense, medium to coarse, trace gravel at 15.0 feet DRILLED BY: JDK Drilling, Inc S Towne Centre Place - Suite 130 Anaheim CA Off Fax BORING METHOD: hollow-stem auger (see report text) PENSKEAUTO-1-01 MARCH 2011 DD = 97 pcf 52 DD LOGGED BY: CJZ/GAD COMPLETED: 03/14/11 BORING BIT DIAMETER: 7-inch BORING B-1 LONGO TOYOTA FIGURE A-1 EL MONTE, CA

23 DEPTH FEET 20.0 GRAPHIC LOG MATERIAL DESCRIPTION gray to light brown, with gravel at 20.0 feet ELEVATION DEPTH TESTING DD SAMPLE BLOW COUNT MOISTURE CONTENT % RQD% CORE REC% INSTALLATION AND COMMENTS DD = 112 pcf light brown, trace gravel (1/4- to 1/2- inch diameter) at 25.0 feet Medium dense to dense, brown, fine SAND with silt (SP-SM); moist Dense, brown, medium to coarse SAND with gravel (SP); moist DD 75 DD = 108 pcf 32.5 BORING LOG PENSKEAUTO-1-01-B1_2.GPJ GEODESIGN.GDT PRINT DATE: 3/23/11:KT becomes very dense, trace gravel at 35.0 feet DRILLED BY: JDK Drilling, Inc S Towne Centre Place - Suite 130 Anaheim CA Off Fax BORING METHOD: hollow-stem auger (see report text) PENSKEAUTO-1-01 MARCH /6" LOGGED BY: CJZ/GAD COMPLETED: 03/14/11 BORING BIT DIAMETER: 7-inch BORING B-1 (continued) LONGO TOYOTA FIGURE A-1 EL MONTE, CA

24 DEPTH FEET 40.0 GRAPHIC LOG MATERIAL DESCRIPTION (continued from previous page) silt lens (6-inch thick) at 40.5 feet ELEVATION DEPTH TESTING DD SAMPLE BLOW COUNT MOISTURE CONTENT % RQD% CORE REC% /6" INSTALLATION AND COMMENTS DD = 104 pcf with gravel at 45.0 feet Exploration completed at a depth of 50.5 feet /6" Groundwater not encountered Hole backfilled with cuttings and patched. BORING LOG PENSKEAUTO-1-01-B1_2.GPJ GEODESIGN.GDT PRINT DATE: 3/23/11:KT DRILLED BY: JDK Drilling, Inc S Towne Centre Place - Suite 130 Anaheim CA Off Fax BORING METHOD: hollow-stem auger (see report text) PENSKEAUTO-1-01 MARCH LOGGED BY: CJZ/GAD COMPLETED: 03/14/11 BORING BIT DIAMETER: 7-inch BORING B-1 (continued) LONGO TOYOTA FIGURE A-1 EL MONTE, CA

25 DEPTH FEET 0.0 GRAPHIC LOG MATERIAL DESCRIPTION ASPHALT CONCRETE (2.5 inches). CRUSHED AGGREGATE BASE (6 inches). Medium dense, light brown, fine SAND (SP); moist - FILL. Stiff, brown SILT with sand (ML); moist. ELEVATION DEPTH TESTING SAMPLE BLOW COUNT MOISTURE CONTENT % RQD% CORE REC% INSTALLATION AND COMMENTS 2.5 DD CON 15 DD = 87 pcf 5.0 Medium dense, brown, fine SAND (SP); moist becomes light gray at 10.0 feet DD 23 DD = 80 pcf 12.5 BORING LOG PENSKEAUTO-1-01-B1_2.GPJ GEODESIGN.GDT PRINT DATE: 3/23/11:KT Medium dense, light brown, fine SAND with silt (SP-SM); moist. Medium dense to dense, red-brown, coarse SAND (SP, trace gravel; moist. DRILLED BY: JDK Drilling, Inc S Towne Centre Place - Suite 130 Anaheim CA Off Fax BORING METHOD: hollow-stem auger (see report text) PENSKEAUTO-1-01 MARCH DD LOGGED BY: GAD BORING BIT DIAMETER: 7-inch LONGO TOYOTA EL MONTE, CA BORING B-2 DD = 89 pcf COMPLETED: 03/14/11 FIGURE A-2

26 DEPTH FEET 20.0 GRAPHIC LOG MATERIAL DESCRIPTION (continued from previous page) ELEVATION DEPTH TESTING DD SAMPLE BLOW COUNT MOISTURE CONTENT % RQD% CORE REC% INSTALLATION AND COMMENTS DD = 91 pcf Exploration completed at a depth of 21.5 feet Groundwater not encountered. Hole backfilled with cuttings and patched BORING LOG PENSKEAUTO-1-01-B1_2.GPJ GEODESIGN.GDT PRINT DATE: 3/23/11:KT DRILLED BY: JDK Drilling, Inc S Towne Centre Place - Suite 130 Anaheim CA Off Fax BORING METHOD: hollow-stem auger (see report text) PENSKEAUTO-1-01 MARCH LOGGED BY: GAD COMPLETED: 03/14/11 BORING BIT DIAMETER: 7-inch BORING B-2 (continued) LONGO TOYOTA FIGURE A-2 EL MONTE, CA

27 0 2 STRAIN (PERCENT) CONSOL_STRAIN_100K PENSKEAUTO-1-01-B1_2.GPJ GEODESIGN.GDT PRINT DATE: 3/23/11:KT KEY 2121 S Towne Centre Place - Suite 130 Anaheim CA Off Fax EXPLORATION NUMBER B-2 PENSKEAUTO-1-01 MARCH ,000 10, ,000 SAMPLE DEPTH (FEET) 2.5 STRESS (PSF) MOISTURE CONTENT (PERCENT) CONSOLIDATION TEST RESULTS LONGO TOYOTA EL MONTE, CA DRY DENSITY (PCF) FIGURE A-3

28 4,000 3,500 3,000 SHEAR STRENGTH (PSF) 2,500 2,000 1,500 1, DIRECT_SHEAR_FAIL_ENV_NO BOX PENSKEAUTO-1-01-B1_2.GPJ GEODESIGN.GDT PRINT DATE: 3/23/11:KT ,000 1,500 2,000 2,500 3,000 3,500 4,000 KEY EXPLORATION NUMBER B-1 B S Towne Centre Place - Suite 130 Anaheim CA Off Fax SAMPLE DEPTH (FEET) PENSKEAUTO-1-01 MARCH 2011 NORMAL PRESSURE (PSF) MOISTURE CONTENT (PERCENT) YES YES DIRECT SHEAR TEST RESULTS LONGO TOYOTA EL MONTE, CA DRY DENSITY (PCF) SOAKED FIGURE A-4

29 EXPLORATION NUMBER SAMPLE INFORMATION SAMPLE DEPTH (FEET) ELEVATION (FEET) MOISTURE CONTENT (PERCENT) DRY DENSITY (PCF) GRAVEL (PERCENT) SIEVE SAND (PERCENT) P200 (PERCENT) LIQUID LIMIT (PERCENT) ATTERBERG LIMITS PLASTIC LIMIT (PERCENT) PLASTICITY INDEX (PERCENT) B B B B B B B B B B B LAB SUMMARY PENSKEAUTO-1-01-B1_2.GPJ GEODESIGN.GDT PRINT DATE: 3/23/11:KT 2121 S Towne Centre Place - Suite 130 Anaheim CA Off Fax PENSKEAUTO-1-01 MARCH 2011 SUMMARY OF LABORATORY DATA LONGO TOYOTA EL MONTE, CA FIGURE A-5

30 ACRONYMS

31

Site Location. Figure 1: Site Location Map US-24 and I-275 Interchange Ash Township, Monroe County, Michigan

Site Location. Figure 1: Site Location Map US-24 and I-275 Interchange Ash Township, Monroe County, Michigan Site Location 0606 1771 North Dixie Highway Monroe, Michigan 48162 Tel: 734-289-2200 Fax: 734-289-2345 www.manniksmithgroup.com Figure 1: Site Location Map US-24 and I-275 Interchange Ash Township, Monroe

More information

Geotechnical Engineering Report

Geotechnical Engineering Report Geotechnical Engineering Report Pavement Subgrade Survey State Highway 125 over Hudson Creek Ottawa County, Oklahoma September 23, 21 Terracon Project No. 415121 Prepared for: Guy Engineering Services,

More information

GEOTECHNICAL INVESTIGATION I-15 SIGN BRIDGES LAS VEGAS EA JANUARY

GEOTECHNICAL INVESTIGATION I-15 SIGN BRIDGES LAS VEGAS EA JANUARY GEOTECHNICAL INVESTIGATION I-15 SIGN BRIDGES LAS VEGAS EA 73171 JANUARY 06 MATERIALS DIVISION STATE OF NEVADA DEPARTMENT OF TRANSPORTATION MATERIALS DIVISION GEOTECHNICAL SECTION GEOTECHNICAL REPORT I-15

More information

Subsurface Environmental Investigation

Subsurface Environmental Investigation Subsurface Environmental Investigation Lake Development East Lake and 21 st Avenue South February 23, 201 Terracon Project No. MP14738A Prepared for: Minneapolis Public Schools Prepared by: Terracon Consultants,

More information

Typical Subsurface Profile. November 28, 2016

Typical Subsurface Profile. November 28, 2016 November 28, 2016 RSCCD Facility Planning, District Construction and Support Services 2323 N. Broadway, Suite 112, Santa Ana, CA 92706 Attn: Re: Ms. Allison Coburn Facilities Project Manager P: (714) 480-7530

More information

Geotechnical Engineering Report

Geotechnical Engineering Report Geotechnical Engineering Report Turner Turnpike Widening Milepost 210 to 218 Drainage Structure Pipe Jacking Creek County, Oklahoma July 1, 2016 Terracon Project No. 04165017 Prepared for: Benham Tulsa,

More information

Geotechnical Engineering Report

Geotechnical Engineering Report Geotechnical Engineering Report Shaw AFB East Gate Entrance Control Facility Amendment Sumter, South Carolina September 13, 2010 Terracon Project No. 73105020A Prepared for: TranSystems North Charleston,

More information

You also requested information regarding a sieve analysis at each boring locations. The test results are attached.

You also requested information regarding a sieve analysis at each boring locations. The test results are attached. FORENSICS CONSULTANTS ENVIRONMENTAL GEOTECHNICAL MATERIALS October 4, 2016 Washington County Public Works 11660 Myeron Road Stillwater, MN 55082 Attn: Mr. Marc Briese Re: Additional Borings CSAH 22 (70

More information

April 7, Webster Street Sub-Surface Stormwater Storage System Bid No Bid Date: 4/13/17 ADDENDUM NO 1

April 7, Webster Street Sub-Surface Stormwater Storage System Bid No Bid Date: 4/13/17 ADDENDUM NO 1 PUBLIC WORKS DEPARTMENT David A. Jones, P.E., Director April 7, 2017 Webster Street Sub-Surface Stormwater Storage System Bid No. 2017-022 Bid Date: 4/13/17 ADDENDUM NO 1 Please make the following changes

More information

Applied GeoScience, Inc Hammond Dr., Suite 6 Schaumburg, Illinois

Applied GeoScience, Inc Hammond Dr., Suite 6 Schaumburg, Illinois AGI Project No. 13-276 Subsurface Investigation Report For the Proposed New Retail Center 9601 South Pulaski Road Evergreen Park, Illinois Prepared for Mr. Feras Sweis FHS Design + Build LLC 2010 West

More information

GEOTECHNICAL ENGINEERING REPORT

GEOTECHNICAL ENGINEERING REPORT GEOTECHNICAL ENGINEERING REPORT PROJECT MINECRAFT ACCESS ROAD BOYDTON PLANK ROAD DINWIDDIE COUNTY, VIRGINIA JOB NUMBER: 37775.003 PREPARED FOR: DINWIDDIE COUNTY PO BOX 70 DINWIDDIE COUNTY, STATE 23841

More information

GEOTECHNICAL REPORT B-1942

GEOTECHNICAL REPORT B-1942 GEOTECHNICAL REPORT TUSCARORA BRIDGE REPLACEMENT B-1942 E.A. 73561 March 2011 MATERIALS DIVISION STATE OF NEVADA DEPARTMENT OF TRANSPORTATION MATERIALS DIVISION GEOTECHNICAL SECTION GEOTECHNICAL REPORT

More information

Earth Mechanics, Inc. Geotechnical & Earthquake Engineering

Earth Mechanics, Inc. Geotechnical & Earthquake Engineering Earth Mechanics, Inc. Geotechnical & Earthquake Engineering TECHNICAL MEMORANDUM DATE: June 3, 2009 EMI PROJECT NO: 01-143 TO: COPY: FROM: SUBJECT: John Chun, P.E. / Port of Long Beach (POLB) Jorge Castillo

More information

PARKING LOTS 4, 7, AND 8 RECONSTRUCTION REPORT

PARKING LOTS 4, 7, AND 8 RECONSTRUCTION REPORT PARKING LOTS 4, 7, AND 8 RECONSTRUCTION REPORT Converse Project No. 15-81-177-01 Prepared For: David Evans and Associates, Inc. 17782 17th Street, Suite 200 Tustin, California 92780 Prepared By: 10391

More information

Washtenaw Community College Design & Construction Facilities Management 4800 East Huron River Drive Ann Arbor, MI

Washtenaw Community College Design & Construction Facilities Management 4800 East Huron River Drive Ann Arbor, MI Washtenaw Community College Design & Construction Facilities Management 4800 East Huron River Drive Ann Arbor, MI 4810-4800 GEOTECHNICAL INVESTIGATION FOR Proposed Pavement Rehabilitation Parking Lots

More information

Subsurface Investigation Report. Proposed New 1-Story Building 6447 Grand Avenue Gurnee, Illinois

Subsurface Investigation Report. Proposed New 1-Story Building 6447 Grand Avenue Gurnee, Illinois AGI Project No. -11 Subsurface Investigation Report For the Proposed New 1-Story Building 6447 Grand Avenue Gurnee, Illinois Prepared for Mr. Steve Panko Key Development Partners, LLC North State Street,

More information

Classification of Soils

Classification of Soils Classification of Soils Soils - What are they? Particulate materials - Sedimentary origins (usually) - Residual Wide range of particle sizes - larger particles: quartz, feldspar - very small particles:

More information

PD - 6 THRUST RESTRAINT DESIGN EQUATIONS AND SOIL PARAMETERS FOR DUCTILE IRON AND PVC PIPE

PD - 6 THRUST RESTRAINT DESIGN EQUATIONS AND SOIL PARAMETERS FOR DUCTILE IRON AND PVC PIPE PD - 6 THRUST RESTRAINT DESIGN EQUATIONS AND SOIL PARAMETERS FOR DUCTILE IRON AND PVC PIPE 4 3 2 1 D D C C B B A A 4 3 2 1 Thrust Restraint Design Equations and Soil Parameters These equations and soil

More information

REPORT OF SUBSURFACE EXPLORATION AND GEOTECHNICAL ANALYSIS DMA TAMPA RED BRICK BUILDING TAMPA, FLORIDA FOR MRI ARCHITECTURAL GROUP, INC.

REPORT OF SUBSURFACE EXPLORATION AND GEOTECHNICAL ANALYSIS DMA TAMPA RED BRICK BUILDING TAMPA, FLORIDA FOR MRI ARCHITECTURAL GROUP, INC. REPORT OF SUBSURFACE EXPLORATION AND GEOTECHNICAL ANALYSIS DMA TAMPA RED BRICK BUILDING TAMPA, FLORIDA FOR MRI ARCHITECTURAL GROUP, INC. JANUARY 7, 2015 January 7, 2015 Mr. Pete Ikegami MRI Architectural

More information

CEEN Geotechnical Engineering

CEEN Geotechnical Engineering CEEN 3160 - Geotechnical Engineering Lab Report 1 Soil Classification prepared by Student Name 1 Student Name 2 Student Name 3 Student Name 4 Tuesday Lab Time 9:30 10:45 Lab Team 1 Submission Date INTRODUCTION

More information

REPORT OF SUBSURFACE INVESTIGATION AND GEOTECHNICAL ENGINEERING SERVICES

REPORT OF SUBSURFACE INVESTIGATION AND GEOTECHNICAL ENGINEERING SERVICES REPORT OF SUBSURFACE INVESTIGATION AND GEOTECHNICAL ENGINEERING SERVICES Elizabeth City, North Carolina G E T Project No: EC14-188G May 30, 2014 PREPARED FOR: 106 Capital Trace, Unit E Elizabeth City,

More information

In preparation for constructing buildings on a property, the builder. Site Preparation CHAPTER

In preparation for constructing buildings on a property, the builder. Site Preparation CHAPTER CHAPTER 3 Site Preparation In preparation for constructing buildings on a property, the builder must consider a number of factors related to code requirements. The buildings must be located according to

More information

Prepared for: HDR Engineering, Inc. 200 West Forsyth Street, Suite 800 Jacksonville, Florida Prepared by:

Prepared for: HDR Engineering, Inc. 200 West Forsyth Street, Suite 800 Jacksonville, Florida Prepared by: REPORT OF GEOTECHNICAL EXPLORATION REHABILITATE WHARF STRUCTURE AT BERTHS 6 AND ½ OF BERTH 5 TALLEYRAND MARINE TERMINAL, JACKSONVILLE, FLORIDA E&A PROJECT NO. 0756-0081 Prepared for: HDR Engineering, Inc.

More information

Geotechnical Testing Laboratory, Inc. Engineering and Construction Materials Testing Services

Geotechnical Testing Laboratory, Inc. Engineering and Construction Materials Testing Services Engineering and Construction Materials Testing Services February 27, 15 Central Louisiana Economic and Development Alliance P.O. Box 465 Alexandria, Louisiana 719 Attention: Mr. Rick Ranson Vice President

More information

GEOTEK ENGINEERING & TESTING SERVICES, INC. 909 East 50 th Street North Sioux Falls, South Dakota Phone Fax

GEOTEK ENGINEERING & TESTING SERVICES, INC. 909 East 50 th Street North Sioux Falls, South Dakota Phone Fax GEOTEK ENGINEERING & TESTING SERVICES, INC. 909 East 50 th Street North Sioux Falls, South Dakota 57104 Phone 605-335-5512 Fax 605-335-0773 October 28, 2016 City of Vermillion 25 Center Street 57069 Attn:

More information

FORT ROUGE GLASS GEOTECHNICAL INVESTIGATION SOUTH LANDING BUSINESS PARK. RM of MacDONALD, MANITOBA

FORT ROUGE GLASS GEOTECHNICAL INVESTIGATION SOUTH LANDING BUSINESS PARK. RM of MacDONALD, MANITOBA FORT ROUGE GLASS GEOTECHNICAL INVESTIGATION SOUTH LANDING BUSINESS PARK RM of MacDONALD, MANITOBA Prepared for: Berntt Holdings Ltd. Winnipeg, Manitoba October 2016 File #163984 Table of Contents 1.0

More information

Subsurface Investigation Report

Subsurface Investigation Report AGI Project No. 17-154 Subsurface Investigation Report For the Proposed New One-Story Building Addition 7030 West 111 th Street Worth, Illinois Prepared for T63 Development LLC 11052 Mayflow er Lane Orland

More information

REPORT OF SUBSURFACE EXPLORATION

REPORT OF SUBSURFACE EXPLORATION REPORT OF SUBSURFACE EXPLORATION WELDING & JOINING TECHNOLOGY FACILITY NORTH GEORGIA TECHNICAL COLLEGE CLARKESVILLE, GEORGIA S&ME PROJECT NO. 161-10-061 Prepared For: LW Engineering, P.C. Post Office Box

More information

GEOTECHNICAL STUDY NEW CONSTRUCTION AT THE WESTFALL APARTMENTS VISTA DEL SOL DRIVE EL PASO, EL PASO COUNTY, TEXAS

GEOTECHNICAL STUDY NEW CONSTRUCTION AT THE WESTFALL APARTMENTS VISTA DEL SOL DRIVE EL PASO, EL PASO COUNTY, TEXAS GEOTECHNICAL STUDY NEW CONSTRUCTION AT THE WESTFALL APARTMENTS 10661 VISTA DEL SOL DRIVE EL PASO, EL PASO COUNTY, TEXAS Amec Foster Wheeler Project No. 1637192025 Submitted To: 101. S. Jennings Avenue,

More information

Rock Creek Apartments Wheatland, WY

Rock Creek Apartments Wheatland, WY Subsurface Exploration and Geotechnical Engineering Report Prepared for: Rock Creek Apartments, LLC C/O Blue Line Development 1004 South Ave West Missoula, MT 59801 Rock Creek Apartments Wheatland, WY

More information

SOIL MECHANICS Assignment #2: Soil Classification Solution.

SOIL MECHANICS Assignment #2: Soil Classification Solution. Geotechnical Engineering Research Laboratory One University Avenue Lowell, Massachusetts 01854 Edward L. Hajduk, D.Eng, PE Lecturer PA105D Tel: (978) 934 2621 Fax: (978) 934 3052 e mail: Edward_Hajduk@uml.edu

More information

Applied GeoScience, Inc Hammond Dr., Suite 6 Schaumburg, Illinois

Applied GeoScience, Inc Hammond Dr., Suite 6 Schaumburg, Illinois AGI Project No. 13-109B Subsurface Investigation Report For the Proposed Roosevelt Middle School Site Improvements 7560 Oak Avenue River Forest, Illinois Prepared for Mr. Jerry Pilipowicz Terra Engineering,

More information

GEOTECHNICAL STUDY PROPOSED CONCRETE ROADWAY TIKI ISLAND COMMUNITY GALVESTON COUNTY, TEXAS PROJECT NO E

GEOTECHNICAL STUDY PROPOSED CONCRETE ROADWAY TIKI ISLAND COMMUNITY GALVESTON COUNTY, TEXAS PROJECT NO E GEOTECHNICAL STUDY PROPOSED CONCRETE ROADWAY TIKI ISLAND COMMUNITY GALVESTON COUNTY, TEXAS PROJECT NO. 15-945E TO VILLAGE OF TIKI ISLAND TIKI ISLAND, TEXAS BY SERVICING TEXAS, LOUISIANA, NEW MEXICO, OKLAHOMA

More information

GEOTECHNICAL INVESTIGATION MDACC GUHN ROAD FLOOD MITIGATION PROJECT 5610 GUHN ROAD HOUSTON, TEXAS REPORT NO

GEOTECHNICAL INVESTIGATION MDACC GUHN ROAD FLOOD MITIGATION PROJECT 5610 GUHN ROAD HOUSTON, TEXAS REPORT NO GEOTECHNICAL INVESTIGATION MDACC GUHN ROAD FLOOD MITIGATION PROJECT 5610 GUHN ROAD HOUSTON, TEXAS REPORT NO. 1140189301 Reported to: URS CORPORATION Houston, Texas Reported by: GEOTEST ENGINEERING, INC.

More information

CHAPTER 7 PAVEMENT DESIGN. 1. Gradation (sieve and hydrometer analysis) 3. Moisture density relationships and curves

CHAPTER 7 PAVEMENT DESIGN. 1. Gradation (sieve and hydrometer analysis) 3. Moisture density relationships and curves CHAPTER 7 PAVEMENT DESIGN 7.0 GENERAL The purpose of this chapter is to define the requirements for design of pavement within proposed and existing roadways for new subdivision streets and secondary roads.

More information

SUBSURFACE INVESTIGATION, LABORATORY TESTING PROGRAM, AND PAVEMENT RECOMMENDATIONS

SUBSURFACE INVESTIGATION, LABORATORY TESTING PROGRAM, AND PAVEMENT RECOMMENDATIONS February 7, 2017 EDR Architects, PLLC PO Box 271613 Corpus Christi, TX 78427 Attention: Ms. Emily D. Rozypal, AIA SUBJECT: SUBSURFACE INVESTIGATION, LABORATORY TESTING PROGRAM, AND PAVEMENT RECOMMENDATIONS

More information

Amendment 03 Soils Report. At Air Academy High School 6910 Carlton Drive Colorado Springs, CO 80840

Amendment 03 Soils Report. At Air Academy High School 6910 Carlton Drive Colorado Springs, CO 80840 Amendment 03 Soils Report Issued: November 7, 2017 For RFP 18-KG-0928(BF) Design/Build Services for New Synthetic Turf Field At Air Academy High School 6910 Carlton Drive Colorado Springs, CO 80840 Academy

More information

GENERAL SOILS EVALUATION REPORT. For

GENERAL SOILS EVALUATION REPORT. For GENERAL SOILS EVALUATION REPORT For EPWU PROPOSED KENTUCKY DAM (DAM 5) DRAINAGE SYSTEM IMPROVEMENTS KENTUCKY ST. & ALABAMA ST. EL PASO, EL PASO COUNTY, TEXAS Prepared For MORENO CARDENAS INC. 2505 E. MISSOURI

More information

GEOTECHNICAL EXPLORATION REPORT. For the. Project ID: th Avenue Vogt Drive to Decorah Road Local Street Washington County.

GEOTECHNICAL EXPLORATION REPORT. For the. Project ID: th Avenue Vogt Drive to Decorah Road Local Street Washington County. GEOTECHNICAL EXPLORATION REPORT For the Project ID: 277--9 18 th Avenue Vogt Drive to Decorah Road Local Street Washington County Prepared for: Alfred Benesch & Company 1 West Canal Street, Suite 15 Milwaukee,

More information

This report presents the findings of the subsurface exploration concerning the design of the taxiway rehabilitation. Description

This report presents the findings of the subsurface exploration concerning the design of the taxiway rehabilitation. Description September 22, 2016 American Infrastructure Development, Inc. 3810 Northdale Boulevard, Suite 170 Tampa, Florida 33624 Attn: Mr. Mohsen Mohammadi, Ph.D., P.E. Senior Consultant Mob: (813) 244-6609 E-mail:

More information

REPORT OF SUBSURFACE EXPLORATION AND GEOTECHNICAL ENGINEERING SERVICES

REPORT OF SUBSURFACE EXPLORATION AND GEOTECHNICAL ENGINEERING SERVICES REPORT OF SUBSURFACE EXPLORATION AND GEOTECHNICAL ENGINEERING SERVICES Addendum No.1 5 th Bay Ocean View Norfolk, Virginia G E T Project No: VB15-342G November 18, 2016 PREPARED FOR: 204 Grayson Road Virginia

More information

Excavation for Natural Gas Mains and Services

Excavation for Natural Gas Mains and Services Excavation for Natural Gas Mains and Services Trench Padding & Backfilling Requirements for Mains General Install mains with a minimum of 36 of cover. Exceptions may be made within state and federal codes

More information

Subsurface Investigations PDCA Professor s Driven Pile Institute. Loren R. Anderson Utah State University June 25, 2015

Subsurface Investigations PDCA Professor s Driven Pile Institute. Loren R. Anderson Utah State University June 25, 2015 Subsurface Investigations PDCA Professor s Driven Pile Institute Loren R. Anderson Utah State University June 25, 2015 Ralph B. Peck (1962) Subsurface engineering is an art; soil mechanics is an engineering

More information

GEOTECHNICAL INVESTIGATION For PROPOSED OUTDOOR THEATER 495 Upper Park Road APN Santa Cruz, California

GEOTECHNICAL INVESTIGATION For PROPOSED OUTDOOR THEATER 495 Upper Park Road APN Santa Cruz, California GEOTECHNICAL INVESTIGATION For PROPOSED OUTDOOR THEATER 495 Upper Park Road APN 009-301-06 Santa Cruz, California Prepared For SANTA CRUZ SHAKESPEAR Santa Cruz, California Prepared By DEES & ASSOCIATES,

More information

SUBSURFACE EXPLORATION, LABORATORY TESTING PROGRAM, AND FOUNDATION AND PAVEMENT RECOMMENDATIONS

SUBSURFACE EXPLORATION, LABORATORY TESTING PROGRAM, AND FOUNDATION AND PAVEMENT RECOMMENDATIONS GEOTECHNICAL ENGINEERING CONSTRUCTION MATERIALS ENGINEERING & TESTING SOILS ASPHALT CONCRETE Elsasser Architectural Inc. P.O. Box 833 Georgetown, Texas 78627 Attention: Richard Elsasser relsasser@eai-tx.com

More information

GENERAL SOILS EVALUATION REPORT. For

GENERAL SOILS EVALUATION REPORT. For GENERAL SOILS EVALUATION REPORT For EL PASO WATER UTILITIES (EPWU) PROPOSED AUSTIN STORMWATER POND IMPROVEMENTS NE OF ALTURA AVE. & LACKLAND ST. EL PASO, EL PASO COUNTY, TEXAS Prepared For MORENO CARDENAS

More information

GEOTECHNICAL STUDY HIDDEN VALLEY SPORTS PARK RESTROOM FACILITY MABEL JONES DRIVE CANYON LAKE, TEXAS

GEOTECHNICAL STUDY HIDDEN VALLEY SPORTS PARK RESTROOM FACILITY MABEL JONES DRIVE CANYON LAKE, TEXAS FUGRO CONSULTANTS, INC. GEOTECHNICAL STUDY HIDDEN VALLEY SPORTS PARK RESTROOM FACILITY MABEL JONES DRIVE CANYON LAKE, TEXAS COMAL COUNTY Canyon Lake, Texas GEOTECHNICAL STUDY HIDDEN VALLEY SPORTS PARK

More information

Preliminary Geotechnical Exploration Armstrong Tract Rivers Avenue and Hanahan Road North Charleston, South Carolina S&ME Project No.

Preliminary Geotechnical Exploration Armstrong Tract Rivers Avenue and Hanahan Road North Charleston, South Carolina S&ME Project No. Preliminary Geotechnical Exploration Rivers Avenue and Hanahan Road S&ME Project No. 4213-16-016 Prepared for: Charleston Water System 103 Saint Phillip Street Charleston, South Carolina 29403 Prepared

More information

SECTION AGGREGATES

SECTION AGGREGATES SECTION 32 05 00 AGGREGATES PART 1 GENERAL 1.01 SUMMARY A. Section Includes: 1. Aggregate base 2. Engineered fill 3. Backfill 4. Fine filter aggregate (non-frost susceptible fill) 5. Riprap 6. Recreational

More information

SECTION XXXXX AGGREGATE PIERS PART 1 - GENERAL

SECTION XXXXX AGGREGATE PIERS PART 1 - GENERAL SECTION XXXXX AGGREGATE PIERS PART 1 - GENERAL 1.1 RELATED DOCUMENTS: Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 00 and Division

More information

Laboratory Soil Classification

Laboratory Soil Classification Laboratory Soil Classification Lin Li, Ph.D. Center for Environmentally Sustainable Transportation in Cold Climates University of Alaska Fairbanks June 6 th, 2016 2016 Summer Transportation Institute,

More information

GEOTECHNICAL STUDY. Proposed East Point Fire Station No Ben Hill Road Drive East Point, Georgia

GEOTECHNICAL STUDY. Proposed East Point Fire Station No Ben Hill Road Drive East Point, Georgia GEOTECHNICAL STUDY AT Proposed East Point Fire Station No. 4 2222 Ben Hill Road Drive East Point, Georgia Submitted to Brown Design Group Mr. Coy Cooper, Jr. RA Brown Design Group 3099 Washington Road

More information

SOIL CLASSIFICATION BASICS Commonly based on grain size and soil consistency. Several classification systems exist:

SOIL CLASSIFICATION BASICS Commonly based on grain size and soil consistency. Several classification systems exist: SOIL CLASSIFICATION BASICS Commonly based on grain size and soil consistency. Several classification systems exist: 1. Unified System (USCS) (ASTM D2487-11). 2. American Association of State Highway and

More information

PROJECT NO A. ISSUED: February 29, 2016

PROJECT NO A. ISSUED: February 29, 2016 INTERPRETIVE REPORT FOR INFILTRATION SYSTEM DESIGN, PROPOSED VILLA VERONA APARTMENT COMMUNITY, ASSESSOR S PARCEL NUMBERS 311-040-015, 311-040-021, 311-040-024, 311-040-026 AND 311-040-013, LOCATED ON THE

More information

Geotechnical Engineering Report

Geotechnical Engineering Report Geotechnical Engineering Report Foothills Drive Widening Holmes Drive to Lakewood Street Farmington, New Mexico April 9, 2014 Terracon Project No. 69135010 Prepared for: Souder Miller & Associates Farmington,

More information

Iowa Thickness Design Guide for Low Volume Roads Using Reclaimed Hydrated Class C Fly Ash Bases

Iowa Thickness Design Guide for Low Volume Roads Using Reclaimed Hydrated Class C Fly Ash Bases Bergeson and Barnes 1998 TRANSPORTATION CONFERENCE PROCEEDINGS 253 Iowa Thickness Design Guide for Low Volume Roads Using Reclaimed Hydrated Class C Fly Ash Bases KENNETH L. BERGESON AND ANDREW G. BARNES

More information

SUBSURFACE EXPLORATION & GEOTECHNICAL ENGINEERING EVALUATION

SUBSURFACE EXPLORATION & GEOTECHNICAL ENGINEERING EVALUATION Report of Subsurface Exploration and Geotechnical Engineering Evaluation Proposed Courtyard Marriott Phenix City, Alabama BHATE Project Number: 112263 October 9, 2012 SUBSURFACE EXPLORATION & GEOTECHNICAL

More information

TRENCH EXCAVATION AND BACKFILL

TRENCH EXCAVATION AND BACKFILL SUDAS Standard Specifications Division 3 - Trench and Trenchless Construction Section 300 - Trench Excavation and Backfill TRENCH EXCAVATION AND BACKFILL PART - GENERAL.0 SECTION INCLUDES A. Trench Excavation

More information

SPECIFICATIONS FOR PRECAST MODULAR BLOCK RETAINING WALL SYSTEM (revised 5/8/7)

SPECIFICATIONS FOR PRECAST MODULAR BLOCK RETAINING WALL SYSTEM (revised 5/8/7) Page 1 of 7 STONE STRONG SYSTEMS SPECIFICATIONS FOR PRECAST MODULAR BLOCK RETAINING WALL SYSTEM (revised 5/8/7) PART 1: GENERAL 1.01 Description A. Work includes furnishing and installing precast modular

More information

August 15, 2006 (Revised) July 3, 2006 Project No A

August 15, 2006 (Revised) July 3, 2006 Project No A August 15, 2006 (Revised) July 3, 2006 Project No. 01-05-0854-101A Mr. David Reed, P.E. Protean Design Group 100 East Pine Street, Suite 306 Orlando, Florida 32801 Preliminary Soil Survey Report Polk Parkway

More information

Monitoring Well Installation Report

Monitoring Well Installation Report Monitoring Well Installation Report Xcel Energy February 1, 2016, Morgan County, Colorado Xcel Energy Monitoring Well Installation Report Table of Contents 1.0 Introduction... 1 2.0 Background Information...

More information

TEAM Services. Subsurface Exploration Grant Wood Elementary Future Additions - Bettendorf, Iowa Project No November 29, 2016 TABLE OF CONTENTS

TEAM Services. Subsurface Exploration Grant Wood Elementary Future Additions - Bettendorf, Iowa Project No November 29, 2016 TABLE OF CONTENTS Subsurface Exploration Grant Wood Elementary Future Additions - Bettendorf, Iowa Project No. 1-00 November 29, 20 TEAM Services TABLE OF CONTENTS PROJECT INFORMATION... 1 SITE CONDITIONS... 1 FIELD EXPLORATION...

More information

Preliminary Geotechnical Engineering Study DCPL Capitol View Branch Library Washington, D.C. HCEA Job No A. Prepared for:

Preliminary Geotechnical Engineering Study DCPL Capitol View Branch Library Washington, D.C. HCEA Job No A. Prepared for: Preliminary Geotechnical Engineering Study DCPL Capitol View Branch Library Washington, D.C. HCEA Job No. 14465A Prepared for: Smoot Construction Company 5335 Wisconsin Avenue, NW Washington, DC 20015

More information

Geotechnical Investigation Report

Geotechnical Investigation Report MC Squared, Inc. Geotechnical Investigation Report City of St. Petersburg Forcemain Pinellas County, Florida Prepared for: Hazen and Sawyer 10002. Princess Palm Ave., Suite 200 Tampa, Florida 33610 Prepared

More information

SCG INTERNATIONAL TRINIDAD AND TOBAGO LIMITED COUVA CHILDREN S HOSPITAL

SCG INTERNATIONAL TRINIDAD AND TOBAGO LIMITED COUVA CHILDREN S HOSPITAL SCG INTERNATIONAL TRINIDAD AND TOBAGO LIMITED COUVA CHILDREN S HOSPITAL GEOTECHNICAL CONSULTANT Prepared by Checked by Approved by Mr. C Allen Dr. Derek Gay Dr. Derek Gay Signature Date Signature Date

More information

REPORT. Explorations and Geotechnical Engineering Services. Proposed Seaport Village Healthcare Facility Ellsworth, Maine. March 27, S

REPORT. Explorations and Geotechnical Engineering Services. Proposed Seaport Village Healthcare Facility Ellsworth, Maine. March 27, S REPORT March 27, 2013 S Explorations and Geotechnical Engineering Services Proposed Seaport Village Healthcare Facility Ellsworth, Maine PREPARED FOR: First Atlantic Corporation Attention: Craig Coffin,

More information

UPDATED 04 OCT GEOTECHNICAL INVESTIGATIONS

UPDATED 04 OCT GEOTECHNICAL INVESTIGATIONS 8.0 GEOTECHNICAL INVESTIGATIONS Throughout this section, reference to the Contractor simply means the entity responsible for the subject work. The same procedures and requirements generally apply to anyone

More information

Experience of a Large Scale Unintentionally Long Surcharge on Organic Soils

Experience of a Large Scale Unintentionally Long Surcharge on Organic Soils Experience of a Large Scale Unintentionally Long Surcharge on Organic Soils Ying Liu, Ph.D., P.E., Senior Engineer, Group Delta Consultants, Inc., 37 Amapola Ave., Suite 212, Torrance, CA. Email: yingl@groupdelta.com

More information

REPORT OF SUBSURFACE INVESTIGATION AND GEOTECHNICAL ENGINEERING SERVICES. Proposed Soundside Boardwalk Expansion Duck, North Carolina

REPORT OF SUBSURFACE INVESTIGATION AND GEOTECHNICAL ENGINEERING SERVICES. Proposed Soundside Boardwalk Expansion Duck, North Carolina REPORT OF SUBSURFACE INVESTIGATION AND GEOTECHNICAL ENGINEERING SERVICES Proposed Soundside Boardwalk Expansion Duck, North Carolina G E T PROJECT NO: EC10-260G November 17, 2010 Prepared for VHB, Inc.

More information

Waterbury Library / Municipal Complex 28 North Main Street Waterbury, Vermont KAS Project #

Waterbury Library / Municipal Complex 28 North Main Street Waterbury, Vermont KAS Project # Waterbury Library / Municipal Complex 28 North Main Street Waterbury, Vermont KAS Project #505140338 PHASE II ENVIRONMENTAL SITE ASSESSMENT June 26, 2014 Prepared for: Town of Waterbury 51 South Main Street

More information

Consultant Specifications for Subsurface Investigation & Geotechnical Analysis and Design Recommendations

Consultant Specifications for Subsurface Investigation & Geotechnical Analysis and Design Recommendations Consultant Specifications for Subsurface Investigation & Geotechnical Analysis and Design Recommendations Mn/DOT Geotechnical Section - Office of Materials & Road Research http://www.mrr.dot.state.mn.us/geotechnical/foundations/tcontract.asp

More information

Sent: Friday, June 24, :17 PM. Subject: RE: Southwood 4 - Monitoring Well update

Sent: Friday, June 24, :17 PM. Subject: RE: Southwood 4 - Monitoring Well update Sent: Friday, June 24, 2016 5:17 PM Subject: RE: Southwood 4 - Monitoring Well update Please see attached for a copy of our Draft Borehole Logs, Draft Borehole Location Plan and Interim Ground Water Monitoring

More information

paterson -MEMO consulting engineers

paterson  -MEMO consulting engineers paterson consulting engineers EMAIL-MEMO to: Minto Communities Inc. - Mr. Barry Gray bgray@minto.com cc: Minto Communities Inc. - Mr. Julio Da Silva julio_dasilva@minto.com re: Grade Raise Recommendations

More information

LEVELTON CONSULTANTS LTD. 1.0 Introduction. 2.0 Project Description. December 16, Levelton File # R

LEVELTON CONSULTANTS LTD. 1.0 Introduction. 2.0 Project Description. December 16, Levelton File # R LEVELTON CONSULTANTS LTD. Abbotsford Office 110-34077 Gladys Avenue Abbotsford, BC V2S 2E8 T: 604.855.0206 F: 604.853.1186 abbotsford@levelton.com www.levelton.com December 16, 2015 Levelton File # R715-1604-00

More information

Addendum 1 - Appendix A - 1 of 22

Addendum 1 - Appendix A - 1 of 22 Addendum 1 - Appendix A - 1 of 22 Erdman Anthony of Florida, Inc. August 1, 2007 1402 Royal Palm Beach Boulevard Building 500 Royal Palm Beach, Florida 33411 Attention: Subject: Ms. Dana I. Gillette, P.E.,

More information

REPORT OF SUBSURFACE EXPLORATION AND GEOTECHNICAL ENGINEERING SERVICES

REPORT OF SUBSURFACE EXPLORATION AND GEOTECHNICAL ENGINEERING SERVICES REPORT OF SUBSURFACE EXPLORATION AND GEOTECHNICAL ENGINEERING SERVICES NORTH SHORE SCHOOL DISTRICT 11 HIGHLAND PARK, ILLINOIS ECS PROJECT NO. 1:8 FOR NORTH SHORE SCHOOL DISTRICT 11 SEPTEMBER, 1 REPORT

More information

Irvine Unified School District Measure E Series 1 Improvements Athletic Field Improvements at Northwood HS (Project #100E )

Irvine Unified School District Measure E Series 1 Improvements Athletic Field Improvements at Northwood HS (Project #100E ) ADDENDUM NO. 01 TO: All Registered Bidders DATE: January 26, 2018 PROJECT: CONTACT: Irvine Unified School District Measure E Series 1 Improvements Athletic Field Improvements at Northwood HS (Project #100E011-16-021)

More information

SITE INVESTIGATION. Foundation Engineering

SITE INVESTIGATION. Foundation Engineering SITE INVESTIGATION Assist. Prof. Berrak TEYMUR Foundation Engineering Analysis Design Construction As a foundation engineer, you need to consider geotechnical/structural issues (involves geology, subsurface

More information

CONNECTION TO INSPECTION CHAMBERS PRAKTO

CONNECTION TO INSPECTION CHAMBERS PRAKTO CONNECTION TO INSPECTION CHAMBERS PRAKTO The inspection chambers PRAKTO made by Pipelife are designed and manufactured to be conveniently and securely connected to pipes and fittings of the Pragma series

More information

ECS PROJECT NO. 04:9974. For. Community Housing Partners c/o Mr. Lee S. Alford 4915 Radford Avenue, Suite 300 Richmond, Virginia 23230

ECS PROJECT NO. 04:9974. For. Community Housing Partners c/o Mr. Lee S. Alford 4915 Radford Avenue, Suite 300 Richmond, Virginia 23230 PRELIMINARY REPORT OF SUBSURFACE EXPLORATION AND GEOTECHNICAL ENGINEERING ANALYSIS TRANQUILITY AT THE LAKES 82 BURTON STATION ROAD VIRGINIA BEACH, VIRGINIA ECS PROJECT NO. 0:99 For Community Housing Partners

More information

Report of Geotechnical Study

Report of Geotechnical Study Report of Geotechnical Study Baltimore Sun Consolidation Baltimore, Maryland F&R Project No. 75V0084 Prepared For: 901 Dulaney Valley Road, Suite 801 Towson, MD 21204 Prepared By: Froehling & Robertson,

More information

APPENDIX A PROJECT DESCRIPTION

APPENDIX A PROJECT DESCRIPTION APPENDIX A PROJECT DESCRIPTION Keeyask Infrastructure Environmental Assessment Appendix A Appendix A1 Concept Design for Wastewater Disposal Keeyask Infrastructure Environmental Assessment Appendix A1

More information

REPORT OF SUBSURFACE EXPLORATION AND GEOTECHNICAL ENGINEERING ANALYSIS

REPORT OF SUBSURFACE EXPLORATION AND GEOTECHNICAL ENGINEERING ANALYSIS REPORT OF SUBSURFACE EXPLORATION AND GEOTECHNICAL ENGINEERING ANALYSIS HADENSVILLE FIRE STATION # THREE CHOPT ROAD AND OLD FREDERICKSBURG ROAD GOOCHLAND COUNTY, VIRGINIA FOR Mr. Josh Bennett Moseley Architects,

More information

NLA Test & Measurement 2011 Workshops Roodevallei conference & meeting Hotel 19 th 20 th September 2011

NLA Test & Measurement 2011 Workshops Roodevallei conference & meeting Hotel 19 th 20 th September 2011 NLA Test & Measurement 2011 Workshops Roodevallei conference & meeting Hotel 19 th 20 th September 2011 Currents test methods on SABS website Summary of changes for granular methods Grading revisions General

More information

geotechnical and construction materials consultants

geotechnical and construction materials consultants geotechnical and construction materials consultants City of Dallas Public Works and Transportation Department 320 E. Jefferson Blvd, Room 307 Dallas, Texas 75203 ATTN: Mr. Vincent Lewis, P.E. Email: Vincent.lewis@dallascityhall.com

More information

A Case Study: Foundation Design in Liquefiable Site

A Case Study: Foundation Design in Liquefiable Site RESEARCH ARTICLE OPEN ACCESS A Case Study: Foundation Design in Liquefiable Site Tahar Ayadat* *(Department of Civil Engineering, College of Engineering, PMU University, P.O. Box 1664, Al-Khobar, 31952,

More information

1970 s and. Site Location Map. and shed transform the. Gateway Project.

1970 s and. Site Location Map. and shed transform the. Gateway Project. Bayview Gateway and Tulare Park Improvements Project August 2013 Page 2 of 10 Tulare Park Improvement Project Tulare Park is an existing 8,000 square foot park that is located within the Port s portion

More information

Memorandum. FOUNDATION ENGINEERING, INC. Professional Geotechnical Services. Date: August 13, 2012 To:

Memorandum. FOUNDATION ENGINEERING, INC. Professional Geotechnical Services. Date: August 13, 2012 To: FOUNDATION ENGINEERING, INC. Professional Geotechnical Services Memorandum Date: August 13, 2012 To: From: Subject: Project: Brett C. Martin, P.E. LEI Engineering & Surveying, LLC James K. Maitland, P.E.,

More information

GEOTECHNICAL SUBSURFACE EXPLORATION GRIC CENTRAL SUBDIVISION SEC CHOLLA ROAD AND SEED FARM ROAD SCATON, ARIZONA

GEOTECHNICAL SUBSURFACE EXPLORATION GRIC CENTRAL SUBDIVISION SEC CHOLLA ROAD AND SEED FARM ROAD SCATON, ARIZONA GEOTECHNICAL SUBSURFACE EXPLORATION GRIC CENTRAL SUBDIVISION SEC CHOLLA ROAD AND SEED FARM ROAD SCATON, ARIZONA Prepared for: GRIC Property and Supply 312 W. Casa Blanca Rd., Post Box 97 Sacaton, AZ 84257

More information

GEOTECHNICAL STUDY FRANKLIN EAST 1A EST AND NORTH 2 EST TANKS EL PASO, TEXAS AMEC PROJECT NO

GEOTECHNICAL STUDY FRANKLIN EAST 1A EST AND NORTH 2 EST TANKS EL PASO, TEXAS AMEC PROJECT NO GEOTECHNICAL TUDY FRANKLIN EAT 1A ET AND NORTH ET TANK EL PAO, TEXA AMEC PROJECT NO. 133719050 ubmitted To: Parkhill, mith & Cooper, Inc. 810 East Yandell 7990 ubmitted By: AMEC Environment & Infrastructure,

More information

Geogrid-Reinforced Segmental Block Retaining Wall Design Computations (Keystone Retaining Wall Systems) D Street Improvements. Purcellville, Virginia

Geogrid-Reinforced Segmental Block Retaining Wall Design Computations (Keystone Retaining Wall Systems) D Street Improvements. Purcellville, Virginia Geogrid-Reinforced Segmental Block Retaining Wall Design Computations (Keystone Retaining Wall Systems) D Street Improvements Purcellville, Virginia 19955 Highland Vista Drive, Suite 170, Ashburn, Virginia

More information

November 13, IP3406. Mr. Uriah Sowell Rooney Engineering 115 Inverness Drive East, Suite 300, Englewood, CO 80112

November 13, IP3406. Mr. Uriah Sowell Rooney Engineering 115 Inverness Drive East, Suite 300, Englewood, CO 80112 November 13, 2015 103IP3406 Mr. Uriah Sowell Rooney Engineering 115 Inverness Drive East, Suite 300, Englewood, CO 80112 Subject: Infiltration Testing Hopeland Road Valve Site Sunoco Pennsylvania Pipeline

More information

Geotechnical Assessment Clackamette Cove Development Oregon City, Oregon

Geotechnical Assessment Clackamette Cove Development Oregon City, Oregon Geotechnical Assessment Development Prepared for: Pacific Property Search, LLC May 26, 2011 Table of Contents 1.0 INTRODUCTION AND LIMITATIONS... 1 2.0 SITE DESCRIPTION AND PROJECT UNDERSTANDING... 1

More information

Stormwater Standards. Clackamas County Service District No. 1. Infiltration Testing Guide

Stormwater Standards. Clackamas County Service District No. 1. Infiltration Testing Guide Stormwater Standards Clackamas County Service District No. 1 APPENDIX E Infiltration Testing Guide Table of Contents Appendix E - Infiltration Testing Guide... Page E.1 General... 1 E.2 Basic Method -

More information

Please include this addendum in your Bid proposal for the above referenced project. Questions are in black ink, and the answers are in red ink.

Please include this addendum in your Bid proposal for the above referenced project. Questions are in black ink, and the answers are in red ink. JAHarchitects, LLC PROJECT NO. 393 RIVERCREST CDD 11560 RAMBLE CREEK DRIVE, RIVERVIEW FL ADDENDUM TO BID PROJECT: RIVERCREST CDD MULTI PURPOSE FIELD MAINTENANCE BUILDING & DOG PARK POOL & CABANNA JAH PROJECT

More information

Engineering Properties of Soils

Engineering Properties of Soils 2 Engineering Properties of Soils 2 1 SOIL TYPES Soils may be classified into three very broad categories: cohesionless, cohesive, and organic soils. In the case of cohesionless soils, the soil particles

More information

ASDSO Webinars. Characterizing the Headcut Erodibility Index (Kh) for Soils. Part I. Introduction to SITES and Background.

ASDSO Webinars. Characterizing the Headcut Erodibility Index (Kh) for Soils. Part I. Introduction to SITES and Background. ASDSO Webinars Characterizing the Headcut Erodibility Index (Kh) for Soils Presented by Danny McCook, P.E. 1 Acknowledgments Personnel of the ARS and the NRCS are gratefully acknowledged for many photographs

More information

The following sections provide the approved standard infiltration testing specifications.

The following sections provide the approved standard infiltration testing specifications. APPENDIX F.2 INFILTRATION TESTING To properly size and locate stormwater management facilities, it is necessary to characterize the soil infiltration conditions at the location of the proposed facility.

More information

BEST PRACTICE DESIGN FOR CONCRETE PAVERS FOR CANADIAN MUNICIPAL APPLICATIONS

BEST PRACTICE DESIGN FOR CONCRETE PAVERS FOR CANADIAN MUNICIPAL APPLICATIONS BEST PRACTICE DESIGN FOR CONCRETE PAVERS FOR CANADIAN MUNICIPAL APPLICATIONS David Hein, P.Eng.,* Patrick Leong and Dr. Susan Tighe, P.Eng.** *Applied Research Associates Inc. 5401 Eglinton Avenue West,

More information

Electrical Conductivity & Hydraulic Profiling. The Combining of Two Subsurface Investigation Methods (With More to Come)

Electrical Conductivity & Hydraulic Profiling. The Combining of Two Subsurface Investigation Methods (With More to Come) Electrical Conductivity & Hydraulic Profiling The Combining of Two Subsurface Investigation Methods (With More to Come) How has field work been progressing? Split Spoon and Standard Penetration Testing

More information