1 The Relationship Between Water and the CCR Rule A Vital Issue for CCR Rule Compliance Teresa L. Entwistle, P.E., CFM AECOM St. Louis, MO MWCC Conference
2 Introduction With the strict regulations presented in the EPA s CCR Rule, has water become a liability? The objective of this presentation is to highlight some of the issues that must be addressed with continued water usage in the power industry and the regulations as they apply to Surface Impoundments.
3 CCR Unit Water Regulations for Consideration CCR Rule June 14, 2016 CCR Rule Surface Water CCR Rule Groundwater CCR Rule Uppermost Aquifer NPDES Discharge and Dewatering ELGs
4 June 14, 2016 The inactive impoundment closure, Section 100, has been accepted for vacatur. EPA will issue the Extension Rule Will address revision dates for compliance in regards to Surface Impoundments Very Soon
5 Surface Water Timeline (T-18, 10/17/2016) Section Certifications Included Type of Action Action That Has to Be Completed Closure Trigger (a) Yes Complete Hazard potential classification No (c) No Compile History of Construction No (d) Yes Complete Structural Stability Assessment If Not Submitted (c) Yes Prepare Initial inflow design and flood control system plan No
6 Surface Water Analysis Points to Consider Upstream Conditions Operating Conditions Erosion Potential Spillway Capacity (or no spillway) Changing Conditions during Remediation Activities Differing Hazard Category than State Hazard Potential Classification High Significant Low Initial Inflow Design and Flood Control System Plan Design Storm PMF 1000 year 100 year
7 Surface Water Certifications October 17, 2016 Relevant Sections (a)(2) Hazard Potential State vs CCR (c)(1) History of Construction Description of each spillway and diversion design features, capacities, and calculations used in their determination (d)(3) Structural Stability Slope protection to protect against surface erosion, wave action, and adverse affects of sudden drawdown Spillway configured as specified Adequately manage flow during and after peak discharge Hydraulic Structure Penetrations Structural integrity Free of significant deterioration, distortion, deformation Bedding deficiencies Sedimentation and debris
8 Groundwater Monitoring Timeline (T-30) Timeframe Due Date Section Certifications Included Type of Action Action That Has to Be Completed Closure Trigger T-30 mos 10/17/ (f) Install Groundwater monitoring system (f) (f)(6) Select Statistical Method for baseline monitoring to establish background levels (b) Initiation of and Collection of Detection monitoring program 8 independent samples (d) (d)(3) Demonstrate Optional - Alternative monitoring frequency Timeline starts when rule published in Federal Register Monitoring program must be in place within 30 months Characterization of groundwater system and identification of uppermost aquifer Installation of monitoring wells Development of Sampling and Analysis Plan 8 independent samples from wells to form background dataset Typically quarterly sampling for 2 years Language provides for flexibility and a shorter total time period
9 Groundwater Monitoring System Requirements Monitoring Wells Thorough hydrogeologic characterization to identify uppermost aquifer, groundwater flow characteristics, and seasonal/temporal variability Wells to be located at downgradient waste boundary (perimeter of waste unit) Minimum of 1 upgradient, 3 downgradient wells Presumption that more wells are needed - use of minimum has to be justified Facilities with large CCR units could have as many as thirty or more downgradient wells Sampling Cannot filter samples for metals analysis Consider spatial and seasonal variability Triggers One statistical failure in detection monitoring triggers assessment monitoring (unless alternative source or error can be demonstrated within 90 days) Exceedance of a GWPS at unlined surface impoundments triggers closure A multi-unit monitoring program is allowed However, triggers apply to all units being monitoring (e.g., forced closure of all units)
10 Groundwater Compliance Timeline Timeframe Due Date Section Certifications Included Groundwater - Date not dependant upon CCR Rule publication date T-90 days w/in 90 days of detection of constituents w/in App III (e) (e)(1); or (e)(2) Type of Action Establish; or Demonstrate Action That Has to Be Completed Assessment Monitoring Program; or Source other than CCR unit responsible for statistical increase Closure Trigger - T-90 days w/in 90 days of triggering Assessment Monitoring (b) Conduct Analyses for all parameters inappendix IV - T-90 days + T-90 days after results T-90 days + T-90 days after results w/in 90 days of obtaining results from (b) w/in 90 days of obtaining results from (b) (d) Conduct Analyses for all parameters in Appendix III and for those constituents in Appendix IV that are detected in response to paragraph (b) (g)(3)(i); or (g)(3)(ii) (g)(3)(ii) Initiate; or Demonstrate Assessment of Corrective Neasures Source other than the CCR unit caused the contamination, or that the statistically significant increase resulted from error - Yes (g)(5) if unlined As soon as feasible (a) Document Groundwater Corrective Remedy meets requirement - Upon Completion (e) Document Remedy has been completed in compliance -
11 Indeterminate Timelines If Groundwater Protection Standards (GWPSs) exceeded at an existing unlined impoundment, stop placing waste and initiate closure (or retrofit) within 6 mos. of determination Additional deadlines for many actions once monitoring program is in place, such as: Complete statistical determinations Annual reporting Conduct certain assessment activities Initiate and complete Corrective Measures evaluation Select a remedy Initiate Corrective Action
12 CCR Groundwater Compliance 01 Detection Monitoring Statistically Significant Increase (SSI) in Appendix III Constituent 02 Assessment Monitoring SSI of Appendix IV Constituent 03 Assessment of Corrective Action (leading to Corrective Action) or 04 Closure for Unlined Surface Impoundments 05 Alternate Source Demonstration Allowed Appendix III Boron Calcium Chloride Fluoride ph Sulfate TDS Appendix IV Antimony Arsenic Barium Beryllium Cadmium Chromium Cobalt Fluoride Lead Lithium Mercury Molybdenum Selenium Thallium Radium
13 Typical Structure of Groundwater Compliance Programs Detection Monitoring Purpose: to identify a release from the unit Based on comparison to background Statistically-based trigger Assessment monitoring Assessment monitoring (= Compliance monitoring) Purpose: Confirm release from unit as well as nature and extent of contamination Comparison of groundwater concentrations to GWPSs Default is background or drinking water standard, maximum contaminant level (MCLs) Flexibility for site-specific, risk-based Alternate Concentration Limits (ACLs) allowed at discretion of regulatory authority Exceedance of GWPSs Corrective Action Corrective Action to return to compliance with GWPSs
14 When Compliance Monitoring Programs Go Bad Regulations are based on simplistic assumptions Groundwater is uncontaminated prior to waste unit Representative background can be characterized Units have simple hydrogeology and geochemistry Releases are easily identified and then fixed Basic statistics are appropriate to identify release from unit Reality Many units are built over pre-existing groundwater contamination Many units pre-exist regulations, so groundwater is contaminated at the start of the monitoring program Large units can expect variable hydrogeology/ geochemistry conditions, such that simple upgradient/ downgradient comparison not appropriate Large units can create their own geochemical conditions not related to releases from the unit Ground disturbance/construction activities can change chemistry
15 When Complying with the Regulations Goes Awry Regulations are based on simplistic assumptions Water being discharged is uncontaminated prior to waste unit Representative background can be characterized Units have simple construction, hydrogeology and geochemistry Releases are easily identified and then fixed Basic statistics are appropriate to identify release from unit Reality Many units are built over pre-existing facilities or contamination Many units pre-exist regulations, so many units pre-date current regulations exclusive of CCR Large units can expect variable hydrogeology/ geochemistry conditions, such that surface water / groundwater is connected Large units can create their own geochemical conditions not related to releases from the unit Ground disturbance / remediation / construction activities can change discharge quantities, locations and chemistry
16 CCR Units in the Floodplain Why does it matter? Who decides regulatory obligations? Differing state requirements No-Rise, Floodplain Storage, Washout How to counteract opposition? Can a unit be removed from the regulatory floodplain? LOMR / LOMA and the important difference between them Presentation Title September 22, 2016 Page 16
17 Location Restrictions (Uppermost Aquifer) Applies to new and existing impoundments Minimum 5-ft separation between high groundwater and base of unit Groundwater in uppermost aquifer Geologic separation allowed Low yield/clay formations may not be included in this uppermost aquifer Definition of useable groundwater Alternative if less than 5 in arid conditions, may demonstrate no hydraulic connection between unit and groundwater If cannot demonstrate separation at existing unlined impoundment: Stop accepting waste Close or retrofit unit
18 Hydrogeology Identifying the Uppermost Aquifer Perched groundwater in residuum dominated by downward flow Uppermost aquifer may be in the underlying bedrock secondary porosity (caves and other karst conduits) Open channels = Rapid infiltration of rainfall Rapid flow-through to the river Similar to flow in an intermittent stream
19 Discharge and Dewatering Dewatering Questions Why How When Where to Discharge
20 Dewatering Points to Consider Composition of Stored Ash Percent of Saturation Location of Site Continued Operation Disposal of Water / Ash Final Configuration of Impoundment Pilot Study
21 Dewatering Why How Trenches Excavation, Stockpiling and Seepage Pumping Geomembrane, tube vs surface layer VCD When Where to Discharge How the NPDES Permit can work in your favor?
22 BRIEF Overview about ELGs Rule CCR ELG Applicability Set to manage the structures that contain the CCR and transport waters and any unanticipated releases. Set to measure the managed release of the water that comes out of the structure. Until rule is applicable for each individual unit, all legacy units can continue to discharge all streams produced under current NPDES permit. ELG regulation will likely lead to tighter management of water, conversion to dry handling methods, or reuse water collectively
23 Questions Discussion and Questions
24 Thank You Please contact us for more information Teresa L. Entwistle, P.E., CFM Senior Project Manager, AECOM
Groundwater Monitoring Requirements of the CCR Rule What s Next?
2017 World of Coal Ash (WOCA) Conference in Lexington, KY - May 9-11, 2017 http://www.flyash.info/ Groundwater Monitoring Requirements of the CCR Rule What s Next? Thomas A. Mann, PE SynTerra Corporation,
More informationThe electronic PDF version of this paper is the official archival record for the CCGP journal.
Coal Combustion and Gasification Products is an international, peer-reviewed on-line journal that provides free access to full-text papers, research communications and supplementary data. Submission details
More informationNewmont Mining Corporation Water Management Standard
Page No: Page 1 of 5 1 PURPOSE AND OBJECTIVES This Global Standard sets the minimum Newmont requirements to proactively plan and manage water from exploration to post-closure in accordance with Newmont
More informationDavid Miller, P.E.- Atlanta. The New Coal Ash Regulations Wednesday, May 6, 2015
David Miller, P.E.- Atlanta The New Coal Ash Regulations Wednesday, May 6, 2015 Overview of CCR Management & Regulations Subtitle D Requirements & Compliance Schedule Non-Utility Boilers Beneficial Reuse
More informationTrans- Ash Landfill Benton County, Tennessee Class II Disposal Facility
1 Trans- Ash Landfill Benton County, Tennessee Class II Disposal Facility We have reviewed the Environmental Integrity report concerning the Trans Ash Landfill and believe there are several errors and/or
More informationHuman Health and Ecological Risks Associated with Surface Impoundments
Copyright Gradient 2012 Human Health and Ecological Risks Associated with Surface Impoundments Ari Lewis Flyash Ponds and Power Plant Wastewater Treatment Issues McIlvaine Webinar May 4, 2012 Gradient
More informationGROUNDWATER MONITORING SYSTEM AND SAMPLING AND ANALYSIS PROGRAM
GROUNDWATER MONITORING SYSTEM AND SAMPLING AND ANALYSIS PROGRAM CCR LANDFILL MUSCATINE POWER AND WATER Muscatine County, Iowa May 18, 2016 Prepared For: Muscatine Power and Water Prepared By: O:\10100095.03\6-7.
More informationA Guide to Navigating EPA s Final CCR Rule
A Guide to avigating EPA s Final CCR Rule The final Coal Combustion Residuals (CCR) rule, published by the U.S. Environmental Protection Agency (EPA) on April 17, 2015 and effective October 19, 2015, will
More informationPilot Study Report. Z-92 Uranium Treatment Process
Pilot Study Report for Z-92 Uranium Treatment Process conducted at the Mountain Water & Sanitation District, Conifer, Colorado Revised November 11, 4 Page 2 Executive Summary Mountain Water & Sanitation
More informationChemical Constituents in Coal Combustion Residues: Risks and Toxicological Updates
2011 World of Coal Ash (WOCA) Conference May 9-12, 2011 in Denver, CO, USA http://www.flyash.info/ Chemical Constituents in Coal Combustion Residues: Risks and Toxicological Updates Ari Lewis Gradient,
More informationIn-Situ Coal Combustion Products Impoundment Closure/Remediation Strategy
2015 World of Coal Ash (WOCA) Conference in Nasvhille, TN - May 5-7, 2015 http://www.flyash.info/ In-Situ Coal Combustion Products Impoundment Closure/Remediation Strategy Tim Silar 1, John Magee 1 Christopher
More informationAPPENDIX 8E SITE DISCHARGE WATER QUALITY MODELLING REPORT
APPENDIX 8E SITE DISCHARGE WATER QUALITY MODELLING REPORT Table of Contents 8E1 INTRODUCTION... 1 8E2 MODEL APPROACH... 3 8E2.1 Mine Water Management Plan... 3 8E2.1.1 Phase 1: Dewatering and Operations...
More informationCOUNTY OF NEVADA COMMUNITY DEVELOPMENT AGENCY NEVADA COUNTY CDA GUIDELINES FOR ASH AND BURN DEBRIS CLEAN UP AND REMOVAL AFTER A FIRE
COUNTY OF NEVADA COMMUNITY DEVELOPMENT AGENCY Environmental Health Department 950 MAIDU AVENUE, SUITE 170 NEVADA CITY, CA 95959-8617 (530) 265-1222 FAX (530) 265-9853 http://mynevadacounty.com Amy Irani,
More informationGreen Station CCR Surface Impoundment Sebree Generating Station Address: 9000 Highway 2096 Robards, Kentucky 42452
Big Rivers Electric Corporation Disposal of Coal Combustion Residuals (CCR) from Electric Utilities Final Rule CCR Impoundment Groundwater Monitoring System and Statistical Methods Assessment and Certification
More informationGroundwater Statistical Analysis Plan
Groundwater Statistical Analysis Plan Milton R. Young Station Coal Combustion Residuals Waste Disposal Facility Center, ND Prepared for Minnkota Power Cooperative, Inc. October 2017 Groundwater Statistical
More informationSelection of Statistical Procedures Professional Engineer Certification, (f)(6) J.H. Campbell Generating Complex, Unit 3 Bottom Ash Pond
A CMS Energy Company Date: October, To: Operating Record From: Harold D. Register, Jr., P.E. RE: Selection of Statistical Procedures Professional Engineer Certification, 5.93f)6) J.H. Campbell Generating
More informationCCR Certification: Initial Structural Stability Assessment (d)
Submitted to Southern Indiana Gas & Electric Company dba Vectren Power Supply, Inc. (SIGECO) One Vectren Square Evansville, IN 47708 Submitted by AECOM 9400 Amberglen Boulevard Austin, Texas 78729 CCR
More informationCONSTRUCTION AND DEMOLITION DEBRIS DISPOSAL SITE GUIDELINES
Nova Scotia Environment and Labour CONSTRUCTION AND DEMOLITION DEBRIS DISPOSAL SITE GUIDELINES Approval Date: October 24, 1997 Effective Date: October 24, 1997 Approved By: Peter Underwood Version Control:
More informationCCR Annual Inspection (b) for the Ash Pond at the San Miguel Plant. Revision 0
Submitted to San Miguel Electric Cooperative, Inc. 6200 FM 3387 Christine, Texas 78012 Submitted by AECOM 9400 Amberglen Boulevard Austin, Texas 78729 257.83 (b) for the Ash Pond at the San Miguel Plant
More informationLANDFILL CLOSURE PLAN ENTERGY ARKANSAS, INC. INDEPENDENCE PLANT CLASS 3N CCR LANDFILL PERMIT NO S3N-R2 AFIN
LANDFILL CLOSURE PLAN ENTERGY ARKANSAS, INC. INDEPENDENCE PLANT CLASS 3N CCR LANDFILL PERMIT NO. 0200-S3N-R2 AFIN 32-00042 OCTOBER 12, 2016 LANDFILL CLOSURE PLAN ENTERGY ARKANSAS, INC. INDEPENDENCE PLANT
More informationCoal Ash Material Safety
Coal Ash Material Safety A Health Risk-Based Evaluation of USGS Coal Ash Data from Five US Power Plants Lisa JN Bradley, Ph.D., DABT International Concrete Sustainability Conference, May 2013 Study Objective
More informationDRAFT DRAFT DRAFT DRAFT DRAFT DRAFT DRAFT DRAFT DRAFT DRAFT. Solid Waste Management Facility Permit Otter Tail Power Co Hoot Lake Plant Action: PER009
DRAFT Solid Waste Management Facility Permit Permit: SW 211 Otter Tail Power Co Hoot Lake Plant Action: PER009 In accordance with Minn. Stat. chs. 115, 115A, and 116, and Minn. Rules chs. 7000, 7001, and
More informationReview of ML/ARD Geochemistry & Water Quality Predictions
Review of ML/ARD Geochemistry & Water Quality Predictions Presented by Kim Bellefontaine, M.Sc., P.Geo. Senior Mine Review Geologist, MEMPR With contributions from: Kelly Sexsmith, M.S., P.Geo. Senior
More informationBoise City Public Works General Drainage Plan Review Requirements Checklist
Boise City Public Works General Drainage Plan Review Requirements Checklist Development Name Bldg. Permit # Drainage Reviewer Site Address Initial Review Date ODI Number Designer Company Name Treated Acres
More informationE7. Taking, using, damming and diversion of water and drilling
E7. Taking, using, damming and diversion of water and drilling E7.1. Introduction Taking, using, damming and diversion of surface water and groundwater provisions in this plan apply in accordance with
More informationRE: Split Ash Sample Results October 2017 Charah Brickhaven Facility
November 7, 2017 Mr. Brian Burkhart, P.E. Environmental Quality Director Chatham County 720 Renaissance Drive Pittsboro, North Carolina RE: Split Ash Sample s October 2017 Charah Brickhaven Facility Dear
More informationHydrogeologic Investigation Phase II PolyMet NorthMet Mine Site RS-10
RS 10 Draft-01 March 31, 2006 RS 10 Hydrogeological Drill Hole Monitoring and Data Collection Phase 2 Hydrogeologic Investigation Phase II PolyMet NorthMet Mine Site RS-10 Table of Contents 1.0 Introduction...1
More informationStormwater Construction General Permit CGP-2013
Stormwater Construction General Permit CGP-2013 Stormwater Construction General Permit (CGP) Stormwater Outreach for Regional Municipalities MS4 Statewide Summit June 18, 2013 Prepared by Chris Henninger
More informationHydrogeologic Investigation Phase II PolyMet NorthMet Mine Site RS-10
RS 10 Draft-02 November 16, 2006 RS 10 Hydrogeological Drill Hole Monitoring and Data Collection Phase 2 Hydrogeologic Investigation Phase II PolyMet NorthMet Mine Site RS-10 Table of Contents Executive
More informationBorough of Hopewell, New Jersey
Pilot Study Report for Z-92 Uranium and Z-88 Radium Treatment Processes conducted for Borough of Hopewell, New Jersey February 22, 2010 9500 West 49 th Ave., Suite D100, Wheat Ridge, Colorado 80033 TEL:
More informationSILLIKER, Inc. Southern California Laboratory 6360 Gateway Drive, Cypress, CA Tel. 209/ Fax. 714/
6360 Gateway Drive, 90630 95073 Page 1 of 8 CI-516 Cistanche 361439388 ICP MS Full Mineral Screen EPA 3050/6020 USP730 BRN Aluminum 2.2 ppm (w/w) Antimony Arsenic 0.06 ppm (w/w) Barium 0.09 ppm (w/w) Beryllium
More informationClyde Mine Discharge/Tenmile Creek Water Quality Final Report
Clyde Mine Discharge/Tenmile Creek Water Quality Final Report November 01, 2016 Background In follow-up to the Pennsylvania Department of Environmental Protection s (DEP) December 15, 2015, Tenmile Creek
More informationSteam Electric Power Generating Effluent Guidelines Protecting Surface Water from Power Plant Discharges
Steam Electric Power Generating Effluent Guidelines Protecting Surface Water from Power Plant Discharges EPA Call with the Institute of Clean Air Companies June 22, 2016 Effluent Guidelines Definition
More informationPlanning for the New CCR Rule: A Focus on Groundwater EPA Expected to Finalize Rule by December 2014
Briefs Planning for the New CCR Rule: A Focus on Groundwater EPA Expected to Finalize Rule by December 2014 By Katie Bland, PE, and Chris Snider, PE Currently, coal combustion residuals (CCRs) are deemed
More informationStatistical Analysis Plan Sherco Unit 3 Landfill
Statistical Analysis Plan Sherco Unit 3 Landfill Northern States Power Company, a Minnesota Corporation 10/16/2017 Prepared by: Chuck Donkers, NSPM Nick Bonow, Carlson McCain, Inc. Statistical Analysis
More informationSonoma County Complex Fires Health Screening Level Guidance, Cleanup Goals and Background Data Sets
Sonoma County Complex Fires Health Screening Level Guidance, Cleanup Goals and Data Sets The following summary tables provide updated health screening level guidance and cleanup goals for the Sonoma County
More information2.0 Scope of Work. 3.0 Stream Discharge Measurements. Technical Memorandum City of Farmers Branch Page 2
Technical Memorandum City of Farmers Branch Page 2 over the No. 1 dam. Discharge of commingled water from the reservoirs must be of sufficient quality to meet the Surface Water Quality Standards of Segment
More informationWater Management for Mines. Solutions and Technology
Water Management for Mines Solutions and Technology Water Management for Mines Too Much Water? Too Little Water? Innovative technologies that minimize uncertainty INTEGRATED SOLUTIONS FOR MINES Water supply
More informationAGL UPSTREAM INVESTMENTS PTY LTD GLOUCESTER GAS PROJECT
AGL UPSTREAM INVESTMENTS PTY LTD GLOUCESTER GAS PROJECT July 2016 Water Monitoring Report Waukivory Pilot Project: Fracture Stimulation and Flow Test EPL 20358 Reporting Period: June 2016 AGL Upstream
More informationCLOSURE PLAN. CFR (b) Document No. GERS Stingy Run Flyash Pond. Gavin Plant Cheshire, Ohio. October, 2016
CLOSURE PLAN CFR 257.102(b) Stingy Run Flyash Pond Gavin Plant Cheshire, Ohio October, 2016 Prepared for: AEP Generation Resources Gavin Plant Cheshire, Ohio Prepared by: American Electric Power Service
More informationComments of. Jeffery A. Foran, Ph.D. EHSI, LLC Whitefish Bay, WI. Draft U.S. EPA Human and Ecological Risk Assessment of Coal Combustion Wastes
Comments of Jeffery A. Foran, Ph.D. EHSI, LLC Whitefish Bay, WI On the Draft U.S. EPA Human and Ecological Risk Assessment of Coal Combustion Wastes (6 August 2007) Prepared for Earthjustice 426 17 th
More informationDrilling for Natural Gas in the Marcellus and Utica Shales: Environmental Regulatory Basics
January 2014 Introduction This fact sheet provides a basic overview of natural gas drilling in the Marcellus and Utica Shale regions of Ohio and the potential environmental issues associated with these
More informationXcel Energy Pawnee Station Bottom Ash Storage Pond and Ash Water Recovery Pond CCR Removal Certification
August, 0 Xcel Energy Ms. Jennifer McCarter 00 Larimer St. Suite 00 enver, CO 00 RE: Xcel Energy Pawnee Station Bottom Ash Storage Pond and Ash Water Recovery Pond CCR Removal Certification ear Ms. McCarter,
More informationGROUNDWATER COMPONENT IN MINING OPERATION-MINING HYDROLOGY
GROUNDWATER COMPONENT IN MINING OPERATION-MINING HYDROLOGY 24 October 2016 Presented by Braden Hanna MINING HYDROLOGY Hydrology Surface-Water Hydrology Groundwater Hydrology Hydrogeology (Geohydrology?)
More informationOttumwa Generating Station Project No Closure Plan for Existing CCR Revision: 0 Surface Impoundments TABLE OF CONTENTS
Surface Impoundments Page No. i TABLE OF CONTENTS 1. INTRODUCTION... 1 2. PROPOSED CCR IMPOUNDMENTS CLOSURE PROCEDURE... 3 3. PROPOSED COVER SYSTEM... 4 4. ESTIMATED MAXIMUM INVENTORY OF CCR... 4 5. ESTIMATED
More informationEnvironment Protection (Water Quality) Policy 2015, stormwater pollution prevention & dewatering guidance
South Australia s Environment Protection Authority Environment Protection (Water Quality) Policy 2015, stormwater pollution prevention & dewatering guidance Clive Jenkins, Ruth Ward and Lara Settimio Outline
More informationLANDFILL CLOSURE PLAN PLUM POINT ENERGY STATION CLASS 3N CCR LANDFILL PERMIT NO S3N AFIN:
LANDFILL CLOSURE PLAN PLUM POINT ENERGY STATION CLASS 3N CCR LANDFILL PERMIT NO. 0303-S3N AFIN: 47-00461 OCTOBER 14, 2016 LANDFILL CLOSURE PLAN PLUM POINT ENERGY STATION CLASS 3N CCR LANDFILL PERMIT NO.
More informationSection 2 Corrective Action Objectives
Section 2 Corrective Action Objectives 2.1 Corrective Action Objectives Corrective action objectives have been developed for this site based on the requirements provided under the North Carolina Solid
More informationTable 1. VOCs Detections (all data in µg/l)
AMBIENT WATER QUALITY IN THE UPPER GLACIAL AQUIFER NEAR THE TOWN OF BROOKHAVEN LANDFILL, SUFFOLK COUNTY, NEW YORK David J. Tonjes Waste Reduction and Management Institute Marine Sciences Research Center
More informationEnvironmental Information Worksheet
Environmental Information Worksheet Water System Owner (Attach additional sheets if necessary) Needs and Alternatives Provide a brief narrative that describes: Current drinking water system needs. Project
More informationGeneral Permit No.: OHR Page 53 of 146
Page 53 of 146 Part 8 Sector-Specific Requirements for Industrial Activity Subpart J Sector J Non-Metallic Mineral Mining and Dressing. You shall comply with Part 8 sector-specific requirements associated
More informationCLOSURE AND POST-CLOSURE CARE PLAN JAMES RIVER POWER STATION UTILITY WASTE LANDFILL CITY UTILITIES OF SPRINGFIELD, MISSOURI
CLOSURE AND POST-CLOSURE CARE PLAN JAMES RIVER POWER STATION UTILITY WASTE LANDFILL CITY UTILITIES OF SPRINGFIELD, MISSOURI INITIAL PREPARATION DATE: October 11, 2016 TABLE OF CONTENTS 1. CERTIFICATION
More informationJanuary 25, 2016 VIA (HARD COPY TO FOLLOW BY U.S. MAIL)
January 25, 2016 VIA E-MAIL (HARD COPY TO FOLLOW BY U.S. MAIL) Virginia Department of Environmental Quality David K. Paylor James Golden 629 E. Main Street Richmond, VA 23219 Re: Dominion Dear Messrs.
More informationEffect of the Underlying Groundwater System on the Rate of Infiltration of Stormwater Infiltration Structures.
Effect of the Underlying Groundwater System on the Rate of Infiltration of Stormwater Infiltration Structures. Presented at: Storm Water Infiltration & Groundwater Recharge A Conference on Reducing Runoff
More informationTSUNAMI DISASTER AND GROUNDWATER RESOURCES: THE SOUTHEASTERN COAST OF INDIA. Bhanu Neupane Regional Hydrologist, UNESCO
TSUNAMI DISASTER AND GROUNDWATER RESOURCES: THE SOUTHEASTERN COAST OF INDIA Bhanu Neupane Regional Hydrologist, UNESCO Background On December 26, 2004, Tsunami waves struck the coast of the Indian subcontinent
More informationSoil Treatment Facility Design and Operation for Bioremediation of Hydrocarbon Contaminated Soil. Version 1.0
PROTOCOL 15 FOR CONTAMINATED SITES Soil Treatment Facility Design and Operation for Bioremediation of Hydrocarbon Contaminated Soil Version 1.0 Prepared pursuant to Section 64 of the Environmental Management
More informationENVIRONMENTAL ENGINEERING LAND SURVEYING
ENVIRONMENTAL ENGINEERING LAND SURVEYING Inflow Design Flood Control System Plan Bottom Ash Pond Sherburne County Generating Plant Introduction This report presents documentation and certification of the
More informationMANAGEMENT OF SONOMA COUNTY WILDFIRE DEBRIS
Planning & Economic Development 100 Santa Rosa Ave, Rm. 3 Santa Rosa, CA 95404 Phone: (707) 543-4691 Email: planning@srcity.org MANAGEMENT OF SONOMA COUNTY WILDFIRE DEBRIS To ensure safety to workers,
More informationClosure Plan Brame Fly Ash Pond
Brame Fly Ash Pond CLECO Corporation Rodemacher Unit 2 Project No. 90965 Revision 0 10/14/2016 Brame Fly Ash Pond prepared for CLECO Corporation Rodemacher Unit 2 Rapides Parish, Louisiana Project No.
More informationFORM 26R CHEMICAL ANALYSIS OF RESIDUAL WASTE ANNUAL REPORT BY THE GENERATOR INSTRUCTIONS GENERAL INFORMATION
COMMONWEALTH OF PENNSYLVANIA DEPARTMENT OF ENVIRONMENTAL PROTECTION BUREAU OF WASTE MANAGEMENT FORM 26R CHEMICAL ANALYSIS OF RESIDUAL WASTE ANNUAL REPORT BY THE GENERATOR INSTRUCTIONS GENERAL INFORMATION
More informationSTORMWATER RUNOFF AND WATER QUALITY IMPACT REVIEW
SUBCHAPTER 8 STORMWATER RUNOFF AND WATER QUALITY IMPACT REVIEW 7:45-8.1 Purpose and scope of review Except for those projects expressly exempted by this chapter or waived by the Commission, the Commission
More informationCHAPTER 4 MINIMUM DESIGN CRITERIA
4.1 INTRODUCTION CHAPTER 4 MINIMUM DESIGN CRITERIA Establishing realistic design criteria is paramount to evaluation of the existing water system s adequacy and planning for future water system improvements.
More informationINSTRUCTIONS AND SAMPLE FORMAT FOR PREPARING A PETITION FOR VARIANCE FOR AN AQUIFER REMEDIATION ZONE OF DISCHARGE
INSTRUCTIONS AND SAMPLE FORMAT FOR PREPARING A PETITION FOR VARIANCE FOR AN AQUIFER REMEDIATION ZONE OF DISCHARGE The Bureau of Petroleum Storage Systems encourages users and manufacturers of injection-type
More informationINFLOW DESIGN FLOOD CONTROL SYSTEM PLAN PLANT BARRY ASH POND ALABAMA POWER COMPANY
INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN PLANT BARRY ASH POND ALABAMA POWER COMPANY Section 257.82 of EPA s regulations requires the owner or operator of an existing or new CCR surface impoundment or any
More informationHAZARD POTENTIAL CLASSIFICATION REPORT
HAZARD POTENTIAL CLASSIFICATION REPORT PONDS 1 & 2, JR WHITING PLANT ERIE, MICHIGAN OCTOBER 13, 2016 PREPARED FOR: CONSUMERS ENERGY COMPANY TABLE OF CONTENTS SECTION: PAGE NO.: Certification... i 1.0 Introduction...
More informationNAUGHTON POWER PLANT NORTH ASH POND INITIAL CLOSURE PLAN
NAUGHTON POWER PLANT NORTH ASH POND INITIAL CLOSURE PLAN Prepared for: PacifiCorp Energy Project Manager: Chad Tomlinson Date: 01 September 2016 Document No.: NP-TR-022 Quality Assurance Statement Office
More informationIntroduction to Sediment Remediation. Presented to: Lower Passaic River Community Advisory Group July 14, 2011
Introduction to Sediment Remediation Presented to: Lower Passaic River Community Advisory Group July 14, 2011 Overview Feasibility Considerations Conceptual Site Model Dredging / Capping Dredged Material
More informationCITY UTILITIES DESIGN STANDARDS MANUAL
CITY UTILITIES DESIGN STANDARDS MANUAL () September 2017 Page Chapter 1 Acronyms and Definitions 1.01 Purpose 1 1.02 Acronyms 1 1.03 Definitions 3 Chapter 2 Introduction 2.01 Purpose 1 2.02 Applicability
More information901 STORMWATER POLLUTION MANAGEMENT SECTION 901 STORMWATER POLLUTION MANAGEMENT
SECTION 901 STORMWATER POLLUTION MANAGEMENT 901.1 DESCRIPTION Design, implement, inspect and maintain appropriate best management practices to minimize or eliminate erosion, sediment and other pollutants
More informationEarth s Pools of Water What is the residence time of these pools?
(1) The Hydrologic Cycle What are the major pools (reservoirs) of water on EARTH? More than enough water on our planet to sustain life. Why then do we have water shortages? And, why are we concerned about
More informationGROUNDWATER AND SURFACE WATER MONITORING DATA RELEASE 2013 SAMPLING EVENT SHALLOW LAND DISPOSAL AREA FUSRAP SITE
GROUNDWATER AND SURFACE WATER MONITORING DATA RELEASE 2013 SAMPLING EVENT SHALLOW LAND DISPOSAL AREA FUSRAP SITE U.S. Army Corps of Engineers Building Strong Pittsburgh District December 2013 Formerly
More informationInformation Requirements Table for Liquid Waste
Applicant Summary Tracking # Authorization # Applicant / Facility Name Ministry of Environment Prepared by: Title Date The Information Requirements Table (IRT) for Liquid Waste is a tool used by Ministry
More informationGUIDE TO THE DEVELOPMENT OF A MINING AND RECLAMATION PLAN IN NEW BRUNSWICK
PROVINCE OF NEW BRUNSWICK DEPARTMENT OF ENERGY AND RESOURCE DEVELOPMENT Minerals and Petroleum Development Branch GUIDE TO THE DEVELOPMENT OF A MINING AND RECLAMATION PLAN IN NEW BRUNSWICK Guide to the
More informationTHE SKINNY ON GROUNDWATER STATISTICS
THE SKINNY ON GROUNDWATER STATISTICS PRESENTED BY KIRK CAMERON, PH.D. MACSTAT CONSULTING, LTD 27 years of environmental statistical consulting to EPA, DoE, DoD, AFCEC, EPRI, private & public entities Primary
More informationSlow Motion Spills: Coal Combustion Waste and Water in Kentucky
Slow Motion Spills: Coal Combustion Waste and Water in Kentucky A Report by the Sierra Club, Kentucky Waterways Alliance, and Global Environmental, LLC Researched and written by Mark Quarles, P.G., and
More informationPennsylvania Stormwater Best Management Practices Manual
Pennsylvania Stormwater Best Management Practices Manual Presented by the Pennsylvania Department of Environmental Protection Bureau of Watershed Protection In cooperation with: Cahill Associates Environmental
More informationCorrective action design and implementation Petroleum Remediation Program
www.pca.state.mn.us Corrective action design and implementation Petroleum Remediation Program This document describes the process for obtaining Minnesota Pollution Control Agency (MPCA) corrective action
More informationIn the United States Environmental Protection Agency
In the United States Environmental Protection Agency Utility Solid Waste Activities Group Petition for Rulemaking to Reconsider Provisions of the Coal Combustion Residuals Rule, 80 Fed. Reg. 21,302 (April
More informationWatershed size and name: The drainage area is acres. The pond is located within the Ohio River watershed. (2016 Inflow Design Plan)
A. B. Brown History of Construction 40 CFR 257.73 (c) (i.) (ii.) (iii.) Owner Name: Southern Indiana Gas and Electric Company dba Vectren Power Supply Owner Address: One Vectren Square, PO Box 209, Evansville,
More informationCITY OF ST. LOUIS Water Quality Report 2016
CITY OF ST. LOUIS Water Quality Report 2016 In compliance with the Safe Drinking Water Act, the City of St. Louis Water Division is delivering this Water Quality Report to all its customers who receive
More informationUniversity Lands Produced Water Frac Pit Application, Design, Construction, Operation, and Closure Specifications
Application: Before constructing a produced water frac pit ( Pit ), this application ( Application to Construct ) shall be submitted to University Lands (UL) that describes the proposed Pit location and
More informationFlorida Department of Environmental Protection. Bureau of Mining and Minerals Regulation. Regulation of Mines. Howard J. Hayes, Program Administrator
Florida Department of Environmental Protection Bureau of Mining and Minerals Regulation Regulation of Mines Howard J. Hayes, Program Administrator April 2011 What is a mine? Nonphosphate mine: Subsections
More informationUnderstanding Stormwater Pollution Prevention Plans (SWPPPs) (SWPPPS)
Understanding Stormwater Pollution Prevention Plans (SWPPPs) (SWPPPS) Definitions SWPPP: Storm Water Pollution Prevention Plan BMP: Best Management Practice(s) to control pollution IDNR: Iowa Department
More informationMaterial Characterization Report
SSI-Metro12 Facility Carteret, NJ Page 1 of 3 Please complete all sections of the form, sign where indicated and return completed form to: Soil Safe, Inc. 6700 Alexander Bell Dr., Suite 300, Columbia MD
More information4.0 SAN GABRIEL RIVER WATERSHED MANAGEMENT AREA
4.0 SAN GABRIEL RIVER WATERSHED MANAGEMENT AREA 4.1 Watershed Description 4.1.1 Watershed Land Use, Percent Impervious, and Population Land use in the San Gabriel River Watershed Management Area is approximately
More informationCombined Sewer Overflows July 2012-December 2013
CSO Facilities Summary Report 213 Combined Sewer Overflows July 212-December 213 Overview MWRA monitored four CSO facilities in the North System during the period covered in this report (July 212 December
More informationThe Afton TSF, situated approximately 12 km west of Kamloops, BC has been under care and maintenance since 1997.
November 27, 2014 KGHM Ajax Mining Inc. Ajax Project Suite 200-124 Seymour Street Kamloops, BC V2C 2E1 ISSUED FOR USE FILE: V15103098-01 via Email: kate.parsons@kghm.com Attention: Subject: Kate Parsons,
More informationDr. Larry R. Parsons. Reclaimed Water A Sustainable Source for Florida s Growing Water Demands. Citrus Research & Education Center Lake Alfred, FL
UNIVERSITY OF FLORIDA Institute of Food and Agricultural Sciences Reclaimed Water A Sustainable Source for Florida s Growing Water Demands Dr. Larry R. Parsons Citrus Research & Education Center Lake Alfred,
More informationWELCOME TO THE CONSTRUCTION STORMWATER PERMIT WEBINAR
WELCOME TO THE CONSTRUCTION STORMWATER PERMIT WEBINAR All the documents shown today are in the MN Stormwater Manual on the page titled 2018 Construction Stormwater Permit Public Notice and Public Informational
More informationLABORATORY TURNAROUND TIMES AND CHARGES
LABORATORY TURNAROUND TIMES AND CHARGES The enclosed prices reflect a 5 business day turnaround time. There will be a $25.00 minimum charge per report. Same Day Rush 24 Hour Rush 48 Hour Rush 72 Hour Rush
More informationLandfills And The New Virginia Stormwater Management Program Regulations
Landfills And The New Virginia Stormwater Management Program Regulations Agenda Overview of regulatory programs Specific guidance from DEQ Quiz Questions and Answers Why Is this such a hot topic? NEW REGULATIONS
More informationClosed Castner Firing Range Remedial Investigation. Technical Project Planning (TPP) Meeting #4 07 November :00 AM 11:00 AM
Closed Castner Firing Range Remedial Investigation Technical Project Planning (TPP) Meeting #4 0 9:00 AM 11:00 AM Imagine result 2017 7 the November 1 Meeting Agenda Remedial Investigation (RI) Project
More informationA Preliminary Assessment of Potential Impacts of Uranium Mining in Virginia on Drinking Water Sources
A Preliminary Assessment of Potential Impacts of Uranium Mining in Virginia on Drinking Water Sources EXECUTIVE SUMMARY January 28, 2011 ES-0 Executive Summary A large uranium reserve, estimated to be
More informationTECHNOLOGY OVERVIEW EXCAVATION AND DISPOSAL OF SOLID MINING WASTE
TECHNOLOGY OVERVIEW EXCAVATION AND DISPOSAL OF SOLID MINING WASTE August 2010 Prepared by The Interstate Technology & Regulatory Council Mining Waste Team Permission is granted to refer to or quote from
More informationOHIO ENVIRONMENTAL PROTECTION AGENCY L PE RMIT-TO4 N STALL t
OHIO ENVIRONMENTAL PROTECTION AGENCY L PE RMIT-TO4 N STALL t * - r..- T' c!f L 3 CZ.= > F 3 c- Application Number: PTI # 03-9614 Application Received: March 1, 1996 - -? c I- Permit Fee: $80,000.00 L;
More informationInflow Design Flood Control System Plan
Inflow Design Flood Control System Plan R.M. SCHAHFER GENERATING STATION CCR SURFACE IMPOUNDMENT INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN Wheatfield, Indiana Pursuant to 40 CFR 257.82 Submitted To: Northern
More informationCANADA BRITISH COLUMBIA WATER QUALITY MONITORING AGREEMENT
CANADA BRITISH COLUMBIA WATER QUALITY MONITORING AGREEMENT WATER QUALITY ASSESSMENT OF Thompson River AT SPENCES BRIDGE (1984 24) Prepared by: L. G. Swain, P. Eng. B.C. Ministry of Environment Prepared
More information2008 Douglas County Nitrate Study
2008 Douglas County Nitrate Study Lessons Learned Warren Brown, PE, Senior EH Consultant CPOW 2017 AEC Overview Nitrate and Health Study Purpose Background Study Design Potential Factors Limitations Methods