Narragansett Bay Commission Checklist for Stormwater Connection Permit Applications
|
|
- Nancy Carmel Mason
- 6 years ago
- Views:
Transcription
1 Checklist for An application is complete and will be reviewed by the Narragansett Bay Commission only if the following items are submitted: 1. Complete the attached application form in its entirety (pages 1 through 4) along with the appropriate signatures. Please Note: The Applicant information listed in item 1, should name the person responsible for the stormwater connection permit, not an engineering consulting agency or other parties providing the service. 2. Submit a Stormwater Management Plan that evaluates all onsite stormwater management measures to reduce or eliminate stormwater flow to the NBC combined system. Include supporting engineering documentation of method(s) and calculations used for estimating the flows of pre-construction/post construction stormwater of the site as well as all green infrastructure opportunities used. (See NBC s Rules & Regulations, Article 4.4 for complete requirements for developing a Stormwater Management Plan.) 3. Submit a location plan of the property (plat & lot) with a North arrow that points up or to the right. This plan should show the street location with the public sewer/stormwater line, as well as a detailed plan of the proposed stormwater connection. If plans are produced on CAD, an electronic copy shall be submitted. 4. Submit a utility site plan identifying all utilities on/around the property. This utility site plan should show any stormwater drainage systems, LID use and any alternative options available to discharge stormwater into natural waterways. 5. Submit building layout plans. These plans should include plumbing plans showing any measures taken to separate sewer and stormwater and incorporate water reuse. 6. Submit plan(s) showing special stormwater design methods that will be used on site to reduce or eliminate stormwater flow to the NBC combined sewage system. Indicate the size/capacity of the equipment and the piping/plumbing connection arrangements. Submit a minimum of 2 copies of each of the Stormwater Management Plan, location plan, utility plan, building layout plan, and any plans for stormwater reduction along with the completed stormwater connection permit application. If plans are produced on CAD, one electronic copy shall be submitted. 4. Submit the stormwater connection permit application fee payable by check or money order to the Narragansett Bay Commission. This fee is applicable to all applications for a new stormwater connection, either connecting directly or indirectly to NBC facilities. The fee is payable at the time of application. RESIDENTIAL $260 per building connection COMMERCIAL/INDUSTRIAL $779 per building connection All residential condominiums will be charged under residential tariffs regardless of the number of dwelling units. No stormwater connection permit application will be processed without the appropriate fees. Any questions regarding this application, please call the Narragansett Bay Commission Permitting Section at (401) or visit our website at Applications can be mailed to Narragansett Bay Commission, Permit Section, One Service Road, Providence, RI
2 PERMIT NUMBER: F APPROVED I N REJECTED A L INACTIVE INTERNAL USE ONLY 1. Applicant: Company (if applicable) Address (Permit will be mailed to this address): City/Town: State: Zip: Telephone: (Cell) (Bus.) (Fax) 2. Property Owner: (if other than applicant) Company (if applicable) Address: City/Town: State: Zip: Telephone: (Cell) (Bus.) (Fax) 3. Name of Project (if applicable) Project 4. Property Location: Is the property part of a new subdivision? YES NO Provide a sketch or map identifying the property location with street names and/or plat & lot number(s). Property Address*: City/Town: Plat No.(s): Lot No.(s): *If a street address has not been assigned, the Applicant will be required to submit the street address prior to discharging from the connection. Revised 1/2016 Page 1 of 4
3 5. Building Description: Attach floor plan(s), site plan(s), and plans for special equipment to be used on site. Please check ( ) the appropriate building type. Residential (Up to and including two (2) dwelling units per building) Commercial/ Residential (Three (3) or more dwelling units per building) Commercial (Offices, Restaurants, Salons, Retail Stores, Hotels/Motels, Nursing Homes) Industrial/ Commercial (Retail/ Wholesale Factories, Multi-use Buildings) Industrial (Jewelry Companies, Machine Shops, Printing Companies) If the building is Residential, please supply the following: No. of Building(s) If the building is Commercial/Residential, please supply the following: If the building is Commercial, please supply the following: Describe the commercial operation and any special equipment to be used on site. If the building is Industrial, please supply the following: Will there be site remediation/dewatering associated with this project that will be discharged to the public combined sewer system? YES NO 6. Stormwater Sources: What is the source of stormwater on the premises? (please check the appropriate boxes) Shed Flow Areaway Drains Roof Down Spouts Others Sources Revised 1/2016 Page 2 of 4
4 7. Stormwater Mitigation Measures: Please indicate the types of Low Impact Development (LID) technology that will be installed at the project site. Dry Wells Green Roofs Catch Basins Reuse Sand Filters Filter Strips Swales Separated Storm Drain Permeable Paving Bioretention Areas Infiltration Systems Underground Storage Devices Stormwater Basins Oil & Grit Separator Landscape Areas Rainwater Harvesting What is the approximate cost of construction mitigation methods? $ Other: 8. Discharge Method: Please indicate the method(s) to be used to discharge stormwater from the project site. Recharge Discharged to River Public combined sewer facility 9. Stormwater Generation: Please indicate the total quantity of flow for the following questions. Pre-Construction Post-Construction 24 hr. Storm Duration (CFS) 24 hr. Storm Duration (CFS) 2 yr. 2 yr. 10 yr. 10 yr. 25 yr. 25 yr. 50 yr. 50 yr. 100 yr. 100 yr. *Please document and attach calculations for the method used for estimating stormwater flow. Revised 1/2016 Page 3 of 4
5 10. Construction: What are the approximate starting and finishing dates of construction? Starting : Finishing : Please provide information about the Drain Layer. License Number: Company: Address: City/Town: State: Zip: Telephone: (Bus.) (Fax) Please provide information about the Drain Layer s Bond Company. Company: Address: City/Town: State: Zip: Amount of Bond: Telephone (Bus.) (FAX) Will the proposed stormwater connection(s) require an extension to the public combined sewer system? YES NO If YES, this application must be signed below by an authorized representative of the City or Town confirming that the proposed sewer extension will conform to the City or Town RI DEM approved Facility Plan. Signature of Authorized City or Town Agent If this Stormwater Connection Permit Application is approved, the undersigned applicant agrees to accept and abide by all provisions of the Narragansett Bay Commission's Rules and Regulations for the Use of Wastewater Facilities within the Narragansett Bay Water Quality Management District, as amended, and shall in every respect conform to the terms of this application. Any changes to the information of this Stormwater Connection Permit Application must be reported to the Narragansett Bay Commission. Signature of Property Owner Signature of Drain Layer Revised 1/2016 Page 4 of 4
BYRON TOWNSHIP BUILDING PERMIT APPLICATION 8085 Byron Center Ave SW., Byron Center, MI /Fax
BYRON TOWNSHIP BUILDING PERMIT APPLICATION 8085 Byron Center Ave SW., Byron Center, MI 49315 616-878-9155/Fax 616-878-0699 Applicant to complete all items in Section I, II, III, IV, V Note: Separate applications
More information4.8. Subsurface Infiltration
4.8. Subsurface Infiltration Subsurface infiltration systems are designed to provide temporary below grade storage infiltration of storm water as it infiltrates into the ground. Dry wells, infiltration
More informationCITY OF DENTON ON-SITE SEWAGE FACILITY PERMIT APPLICATION. Permit Number
Please direct all documents and questions to: John Glover, R.S. Pollution Control Abatement Officer 1100 S. Mayhill Rd. Denton, TX 76208 (940) 349-8619 CITY OF DENTON ON-SITE SEWAGE FACILITY PERMIT APPLICATION
More informationA Case for the Design and Modeling of BMP Infiltration and LID Techniques. By: Bob Murdock
A Case for the Design and Modeling of BMP Infiltration and LID Techniques 2009 IAFSM Annual Conference 2009 IAFSM Annual Conference By: Bob Murdock Presentation Outline 1. Runoff Reduction (RR) and Low
More informationThe following is required for a complete permit submittal for each unit.
P: (847)810-3502 OR (847)810-3503/3521, F: (847)615-4383 MULTI-FAMILY OR COMMERCIAL ADDITION OR ALTERATION PERMIT REQUIREMENTS The following is required for a complete permit submittal for each unit. MULTI-FAMILY
More informationS.O.P. No. HMD
Page: 1 of 9 PURPOSE: To establish (SOP) for submission requirements, review process and approval of applications for Non-vehicular Access Permits for the purpose of connection or discharge to any MassDOT
More informationThe following is required for a complete permit submittal for each unit.
P: (847)810-3503 OR (847)810-3503/3521, F: (847)615-4383 NEW MULTI-FAMILY DWELLING OR COMMERCIAL PERMIT REQUIREMENTS The following is required for a complete permit submittal for each unit. NEW MULTI-FAMILY
More information4.8. Subsurface Infiltration
4.8. Subsurface Infiltration Subsurface infiltration systems are designed to provide temporary below grade storage infiltration of stormwater as it infiltrates into the ground. Dry wells, infiltration
More informationFood Service Establishment Permit Application
Pinellas County Department of Environment and Infrastructure Water & Sewer Division, Grease Management Program Food Service Establishment Permit Application SECTION A: INTRODUCTION Pinellas County s Grease
More informationReview of State and Federal Stormwater Regulations November 2007
Review of State and Federal Stormwater Regulations November 2007 By: James T. Spaulding, PE, CPESC Joseph M. Ducharme, Jr., PE TTG ENVIRONMENTAL CONSULTANTS, LLC 27 LOCKE ROAD, CONCORD, NH 03301-5301 TELEPHONE:
More informationOur Eastern Shore Groundwater Part IV Groundwater Quality on the Eastern Shore: How safe is our groundwater and are there ways we can protect it?
Our Eastern Shore Groundwater Part IV Groundwater Quality on the Eastern Shore: How safe is our groundwater and are there ways we can protect it? Britt McMillan, Malcolm Pirnie, Inc. Mercury Venus Mars
More informationParaprofessional Training Session 1
Paraprofessional Training Session 1 Part 2: Stormwater Basics November 26, 2012 Rutgers University, Cook Campus Christopher C. Obropta, Ph.D., P.E. Extension Specialist in Water Resources Associate Professor
More informationBackground / Regulatory Requirements
Chapter 2 Background / Regulatory Requirements This Chapter summarizes the impacts of development on stormwater quality and quantity and explains the postconstruction stormwater control requirements for
More informationWest Virginia Department of Health & Human Resources Department of Health
SS-182A Rev 6/07 West Virginia Department of Health & Human Resources Department of Health Application for a Permit to Install or Modify an Onsite Sewage Disposal System Property Owner Phone (H) (W) Address
More information2011 Guidance Manual for Development Stormwater Quality Control Measures
CITY OF MODESTO STORMWATER MANAGEMENT PROGRAM 2011 Guidance Manual for Development Stormwater Quality Control Measures Prepared for NPDES Permit No. CAS083526; Order R5-2008-0092 This page intentionally
More informationCass County Soil Erosion & Sedimentation Control Program
Cass County Soil Erosion & Sedimentation Control Program Both residents and visitors of Cass County enjoy the beauty of over 250 lakes and ponds, along with numerous streams, creeks, and wetlands that
More informationConstruction Application for Permit (CAP) Instructions
Construction Application for Permit (CAP) Instructions A CAP is required to be completed and submitted to the Wayne Soil & Water Conservation District (SWCD) office for non-farm, earth-disturbing activities
More informationINSTRUCTIONS TO FILL OUT WASTEWATER DISCHARGE PERMIT APPLICATION BASELINE MONITORING REPORT
INSTRUCTIONS TO FILL OUT WASTEWATER DISCHARGE PERMIT APPLICATION BASELINE MONITORING REPORT All questions must be answered. DO NOT LEAVE BLANKS. If a question is not applicable, indicate so on the form.
More informationSECTION 14 - GENERAL INDUSTRIAL ZONE (M2) REGULATIONS
SECTION 14 - GENERAL INDUSTRIAL ZONE (M2) REGULATIONS 14.1 GENERAL USE REGULATIONS 14.1.1 PERMITTED USES No land, building, or structures shall be used or erected in the General Industrial Zone (M2) unless
More informationWATER QUALITY MANAGEMENT PLAN PROCEDURES
PUBLIC WORKS DEPARTMENT DEVELOPMENT SERVICES DIVISION SUBDIVISION SERVICES SECTION City Hall East 200 S. Anaheim Boulevard. 2 nd Floor Anaheim, California 92805 www.anaheim.net/publicworks WATER QUALITY
More informationINFRASTRUCTURE ELEMENT STORMWATER SUB-ELEMENT GOALS, OBJECTIVES & POLICIES
INFRASTRUCTURE ELEMENT STORMWATER SUB-ELEMENT GOALS, OBJECTIVES & POLICIES GOALS, OBJECTIVES & POLICIES GOAL DR 1: STORMWATER MANAGEMENT/DRAINAGE SYSTEMS. It is the goal of the City of Casselberry to provide
More informationPrivate Side Sewer Inspections for Sources of Inflow & Infiltration Frequently Asked Questions
Private Side Sewer Inspections for Sources of Inflow & Infiltration Frequently Asked Questions As of Oct. 1, 2010, Tacoma property owners are required to have a certified inspection of their private side
More informationBOARD OF PUBLIC UTILITIES SCHEDULE OF WASTEWATER RATES PROVISIONS APPLICABLE TO ALL CONSUMERS
NATURE OF SERVICE PROVIDED: VOTE: November 21, 2016 Effective Date: All billing after January 1, 2017 Service Area: All Wastewater service shall be provided for the purposes provided to users in accordance
More informationChapter 6. Hydrology. 6.0 Introduction. 6.1 Design Rainfall
6.0 Introduction This chapter summarizes methodology for determining rainfall and runoff information for the design of stormwater management facilities in the City. The methodology is based on the procedures
More informationChapter 21 Stormwater Management Bylaw
Chapter 21 Stormwater Management Bylaw SECTION 1. PURPOSE The purpose of this Bylaw is to: implement the requirements of the National Pollutant Discharge Elimination System (NPDES) General Permit for Storm
More informationMunicipal Stormwater Ordinances Summary Table
APPENDIX F Municipal Ordinances Summary Table Municipality Abington Bryn Athyn Borough Hatboro Borough Ordinance, SALDO Runoff equals pre post Erosion Sediment Control Water Quality Requirements Any which
More informationTHE FOLLOWING INFORMATION IS REQUIRED TO OBTAIN A CITY OF OTHELLO COMMERCIAL BUILDING PERMIT:
City of Othello Community Development Department 500 East Main Street Othello, WA 99344 (509) 331-2710 Public Works Department 111 North Broadway Avenue Othello, WA 99344 (509) 488-6997 Commercial Building
More informationCITY OF HOMESTEAD Utility Rights-of-Way Use Permit Application
CITY OF HOMESTEAD Utility Rights-of-Way Use Permit Application Good for 90 days from the Date Issued This permit is only required if the work location is owned or controlled by the City of Homestead and
More information9.3.9 Industry uses code
9.3.9 Industry uses code 9.3.9.1 Application (1) This code applies to accepted development and assessable development identified as requiring assessment against the Industry uses code by the tables of
More informationDecatur, Georgia Stormwater Management Policy Guidelines. DRAFT November 5, 2014
Decatur, Georgia Stormwater Management Policy Guidelines Stormwater Management Policy Guidelines Decatur, Georgia STORMWATER MANAGEMENT POLICY GUIDELINES 1.0 Introduction... 3 2.0 Determining Predevelopment
More informationModelling Stormwater Contaminant Loads in Older Urban Catchments: Developing Targeted Management Options to Improve Water Quality
Modelling Stormwater Contaminant Loads in Older Urban Catchments: Developing Targeted Management Options to Improve Water Quality Frances J. CHARTERS 1, Thomas A. COCHRANE 1, Aisling D. O SULLIVAN 1 1
More informationResidential Sewer Backup Prevention Program
City of Wheaton Residential Sewer Backup Prevention Program Please Note: The City reserves the right to modify the policies, procedures and rules of this program or discontinue the program in its entirety
More informationKeys Edge Community Development District. Engineer s Report Infrastructure Improvements
Keys Edge Community Development District Engineer s Report Infrastructure Improvements Prepared for Keys Edge Community Development District Board of Supervisors Miami-Dade County, Florida Prepared by
More information8 Green Building Certification Credits
8 Green Building Certification Credits San Francisco Stormwater Management Requirements and Design Guidelines Stormwater management can help project proponents achieve green building certification credits.
More informationStormwater Attenuation Systems Sustainable Drainage Solutions for Domestic & Commercial Applications
Environmental Stormwater Attenuation Systems Sustainable Drainage Solutions for Domestic & Commercial Applications Sustainable, Reliable, Affordable Stormwater Attenuation Systems Sustainable Drainage
More informationSEPTIC SYSTEM EVALUATION AND CERTIFICATION FORM
SEPTIC SYSTEM EVALUATION AND CERTIFICATION FORM This form shall be completed in its entirety by a New Hampshire certified or licensed septic system evaluator. This form shall be signed by both the septic
More informationCity of Aliso Viejo Stormwater Program 2017 ANNUAL WATER QUALITY MANAGEMENT PLAN FOR HOMEOWNER ASSOCIATIONS AND PROPERTY MANAGEMENT COMPANIES
City of Aliso Viejo Stormwater Program 2017 ANNUAL WATER QUALITY MANAGEMENT PLAN FOR HOMEOWNER ASSOCIATIONS AND PROPERTY MANAGEMENT COMPANIES ANNUAL SUBMITTAL FORM DEADLINE: 5:00 PM ON FEBRUARY 15, 2017
More informationAPPLICATION FOR PORCH / DECK PERMIT
Department of Neighborhood Services and Inspections 625 52nd Street, Room 100, Kenosha, WI 53140 Phone: 262.653.4263, Fax: 262.653.4254 APPLICATION FOR PORCH / DECK PERMIT Permit Fee: $60.00, Zoning Plan
More informationActivity Calculating Property Drainage
Page 1 of 5 Activity 2.3.11 Calculating Property Drainage Introduction When a property is developed, it is important to understand that changes to watershed characteristics (i.e., land use, slope, soil
More informationRichland County Department of Public Works Engineering (Land Development) Division
Richland County Department of Public Works Engineering (Land Development) Division Commercial Projects What is a Commercial Project? Projects that are not related to residential single family homes and/or
More information6.1 Introduction to Wastewater Issues
Section 6: Water Pollution This Section will help you: Understand if you generate industrial wastewater; Understand where your wastewater goes; Make sure you meet requirements for floor drains; Properly
More informationInfiltration Guidelines
Appendix E Infiltration Guidelines As a stormwater management method, infiltration means retaining or detaining water within soils to reduce runoff. Infiltration can be a cost-effective method to manage
More informationMadison County Property Improvement Check List
Madison County Property Improvement Check List Property Owner: Previous Owner: Phone: Cell: Email: Department Initial Date Township MA Number Tax Assessor Parent Pin Street Name of Property Vacant Property
More informationIntegrated Catchment Modelling
Integrated Catchment Modelling Modelling the whole water cycle in one package Ann Pugh Integrated Water Planning Historically water, wastewater and stormwater modelling occurred in silos with little integration
More informationResidential Electrical Upgrade Permit Revised: 11/15/17
CITY OF GENEVA BUILDING DIVISION 109 JAMES STREET GENEVA, IL 60134 630/262.0280 630/262.0286 fax www.geneva.il.us Residential Electrical Upgrade Permit Revised: 11/15/17 A building permit is required prior
More informationVillage of Arlington Heights. Sewer Back-up Rebate Program
Village of Arlington Heights Sewer Back-up Rebate Program (Including Enhanced Program Information) Updated: October 1, 2017 Village of Arlington Heights Building & Life Safety Department 33 S. Arlington
More informationApplication Requirements for obtaining a Building Permit
CITY OF BIRMINGHAM Community Development Building Department 151 Martin Street, Birmingham, MI 48009 Application Requirements for obtaining a Building Permit Residential Structures Building Permit Application
More informationTHE CORPORATION OF THE CITY OF PENTICTON DEVELOPMENT COST CHARGES REDUCTION BYLAW NO
This is a consolidated bylaw prepared by The Corporation of the City of Penticton for convenience only. The city does not warrant that the information contained in this consolidation is current. It is
More informationRESIDENTIAL BUILDING PERMIT
A APPLICATION FOR A RESIDENTIAL BUILDING PERMIT JACKSON CO. MS. PLAN CASE NUMBER: PERMIT NUMBER: ACCEPTED BY: APPROVED BY: Application is hereby made for a permit under the provisions of the Comprehensive
More informationORDINANCE #16- PROPOSED ORDINANCE #16-14
ORDINANCE #16- PROPOSED ORDINANCE #16-14 AN ORDINANCE TO AMEND CHAPTER 21, ZONING, OF THE WILLIAMSBURG CODE BY ADDING ARTICLE III, DIVISION 9.1. CULINARY ARTS AND HOSPITALITY DISTRICT B-4 (PCR #16-008)
More informationMS4 Programs: Quality, the Other Stormwater Q. Dan Bounds, PE, D.WRE IAFSM March 9, 2017
MS4 Programs: Quality, the Other Stormwater Q Dan Bounds, PE, D.WRE IAFSM March 9, 2017 MS4 Rule and Regulations MS4 Municipal Separate Storm Sewer System A conveyance or system of conveyances (catch basins,
More informationWater sensitive urban design. Developing design objectives for urban development in South East Queensland
Water sensitive urban design Developing design objectives for urban development in South East Queensland Version 2-8 November 2007 Contents Contents......... ii Executive Summary............1 1 Introduction.........1
More informationNEW CASTLE CONSERVATION DISTRICT. through. (Name of Municipality) PLAN REVIEW APPLICATION DRAINAGE, STORMWATER MANAGEMENT, EROSION & SEDIMENT CONTROL
NEW CASTLE CONSERVATION DISTRICT through (Name of Municipality) PLAN REVIEW APPLICATION DRAINAGE, STORMWATER MANAGEMENT, EROSION & SEDIMENT CONTROL Office use only: Received by Municipality: Received by
More informationB U I L D I N G P E R M I T A P P L I C A T I O N
B U I L D I N G P E R M I T A P P L I C A T I O N City of Sand Springs, Oklahoma Sand Springs Fire Department Neighborhood Services Department 108 E. Broadway, Sand Springs ok 74063 Phone: (918) 246-2500
More informationChatham Park Stormwater Manual
Chatham Park Stormwater Manual Table of Contents A. Introduction... 2 B. Calculation Methods... 2 C. BMP Design Standards... 3 D. Compliance Points... 3 E. Critical Environmental Resources... 3 F. Submittal
More informationGUIDELINES FOR STORMWATER BACTERIA REDUCTIONS THROUGH BMP IMPLEMENTATION NY/NJ HARBOR TMDL DEVELOPMENT
GUIDELINES FOR STORMWATER BACTERIA REDUCTIONS THROUGH BMP IMPLEMENTATION NY/NJ HARBOR TMDL DEVELOPMENT Elevated bacteria in stormwater runoff in urban areas are well documented by many researchers. Monitoring
More informationCITY OF CRANSTON PLANS MUST BE APPROVED BY THE FIRE DEPARTMENT BEFORE SUBMITTING TO OUR OFFICE FOR REVIEW.
CITY OF CRANSTON NEW 1 & 2 HOME PERMIT PROCEDURE AND PERMIT SUBMITTAL CHECKLIST ALL REQUESTED PLANS AND PAPERWORK MUST BE SUBMITTED TO START THE REVIEW AND PERMITTING PROCESS. PLANS MUST BE APPROVED BY
More informationRESIDENTIAL CONSTRUCTION New Dwellings and Additions
How to Obtain a Building Permit For RESIDENTIAL CONSTRUCTION New Dwellings and Additions MIAMI COUNTY, KANSAS CODE SERVICES DEPARTMENT 201 South Pearl Street, Suite 201 Paola, Kansas 66071-1777 Phone:
More informationCHAPTER 7 - INFRASTRUCTURE INSPECTION AND ACCEPTANCE... 2
CHAPTER 7 - INFRASTRUCTURE INSPECTION AND ACCEPTANCE... 2 7.1. GENERAL.... 2 7.1.1. Inspection Restriction Dates.... 2 7.1.2. Complete Improvements.... 2 7.1.3. Public Improvements.... 2 7.1.4. Warranty
More informationThe Islamic University of Gaza- Civil Engineering Department Sanitary Engineering- ECIV 4325 L5. Storm water Management
The Islamic University of Gaza- Civil Engineering Department Sanitary Engineering- ECIV 4325 L5. Storm water Management Husam Al-Najar Storm water management : Collection System Design principles The Objectives
More informationAt least 2 feet above the seasonal high water table Overflow path or structure provided
General Conditions Map of proposed subwatershed to each subbasin, including total area and CN Design Flow or Design Volume to each STF, as appropriate Operation and Maintenance instructions for each STF
More informationSITE ALTERATION PERMIT INFORMATION PACKAGE FOR LAND OWNERS
SITE ALTERATION PERMIT INFORMATION PACKAGE FOR LAND OWNERS Revised: June 4, 2014 Requirements for obtaining a site alteration permit vary depending on the type of project being proposed. This information
More informationAPPLICATION FOR PUBLIC INFRASTRUCTURE PERMIT
APPLICATION FOR PUBLIC INFRASTRUCTURE PERMIT Engineering Division 550 Landa Street New Braunfels, Texas 78130 (830) 221-4020 1. Subdivision Plat Name: Location Description/ Nearest Intersection: Acreage:
More informationRESIDENTIAL CONSTRUCTION PERMIT FEES
RESIDENTIAL CONSTRUCTION PERMIT FEES R-1 Building Permit: One- or Two-Family New Construction (Complete Permit Packet) Combination permit to include Building, Electrical, Mechanical, Plumbing (to include
More informationBoise City Public Works General Drainage Plan Review Requirements Checklist
Boise City Public Works General Drainage Plan Review Requirements Checklist Development Name Bldg. Permit # Drainage Reviewer Site Address Initial Review Date ODI Number Designer Company Name Treated Acres
More informationBuilding Permit Submittal Requirements
CITY OF MONTE SERENO 18041 Saratoga-Los Gatos Road Monte Sereno, CA 95030 Phone (408) 354-7635 Fax (408) 395-7653 www.cityofmontesereno.org Building Permit Submittal Requirements NOTE: Submit three (3)
More informationPERMIT APPLICATION REQUIREMENTS NEW COMMERCIAL BUILDING/CONSTRUCTION CODES USED: CURRENT ADOPTED FLORIDA BUILDING CODE AND NEC
PERMIT APPLICATION REQUIREMENTS MANDATORY DOCUMENTS: NEW COMMERCIAL BUILDING/CONSTRUCTION CODES USED: CURRENT ADOPTED FLORIDA BUILDING CODE AND NEC 1. COMPLETED NEW COMMERCIAL or MULTIFAMILY PERMIT APPLICATION
More informationResidential Accessory Structure Application Packet (Carport, Shed, Garage, Pool)
Caroline County Department of Planning & Community Development 233 W. Broaddus Avenue 804-633-4303 phone 804-633-1766 fax www.visitcaroline.com Residential Accessory Structure Application Packet (Carport,
More informationAPPENDIX G Fire BMPs
APPENDIX G Fire BMPs BEST MANAGEMENT PRACTICES Plan for URBAN RUNOFF MANAGEMENT PARTICIPATING RIVERSIDE COUNTY FIRE FIGHTING AGENCIES City of Corona Fire Department City of Hemet Fire Department City of
More informationLOT GRADING. LOT GRADING REQUIREMENTS The following lot grading requirements came into effect on May 1, 2007:
LOT GRADING DEFINITION Lot grading is the reshaping or sloping of the land in such a way that surface drainage from rain runoff is directed away from the buildings and is controlled in a manner that eliminates
More information62 POTOMAC STREET WEST ROXBURY, MA 02132
62 POTOMAC STREET SET P R O J E C T T E A M COVER 1. ALL WORK SHALL BE IN COMPLIANCE WITH ALL APPLICABLE LOCALS BUILDING CODES AND REGULATIONS. 2. CONTRACTOR SHALL BE RESPONSIBLE FOR S REQUIRED FOR CONSTRUCTION
More informationSTORMWATER MANAGEMENT PROGRAM & ILLICIT DISCHARGE DETECTION AND ELIMINATION
STORMWATER MANAGEMENT PROGRAM & ILLICIT DISCHARGE DETECTION AND ELIMINATION Brandon Tester R.S. Toledo-Lucas County Health Department November 19, 2013 NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM (NPDES)
More informationTHE CROSSROADS IN WINCHESTER 4. DRAINAGE PLAN. 4. Drainage Plan. a. Drainage Plan Description
THE CROSSROADS IN WINCHESTER 4. DRAINAGE PLAN 4. Drainage Plan a. Drainage Plan Description The Specific Plan area drains naturally into two separate watersheds: approximately 6 percent of the Specific
More informationWhat is a stormwater utility fee?
What is a stormwater utility fee? A stormwater utility fee is similar to a water or sewer utility fee. In essence, customers pay a fee to convey stormwater from their properties. The City of Goodlettsville
More informationEXAMPLE Stormwater Management Plans w/ CSS BMP Sizing Calculator (v2.1)
525 Golden Gate Avenue, 11th Floor San Francisco, CA 94102 EXAMPLE Stormwater Management Plans w/ CSS BMP Sizing Calculator (v2.1) The following example Stormwater Management Plans (SMPs) are provided
More informationCity of Redwood City Stormwater Pollution Prevention Program. Drainage Guidelines for Residential Development
City of Redwood City Stormwater Pollution Prevention Program Drainage Guidelines for Residential Development General Requirements A. Plot & Finished Grading Plan must be submitted with Building Permit
More informationBuilding Consent Process
1 Building Consent Process Other Approvals You May Need For Your Building Project 2 Contents Page Council utilities: water supply, sewage disposal, stormwater disposal 3 Sewer connection/disconnection
More informationApplication for adoption of new sewers
Application for adoption of new sewers Section 104 WIA 1991 This form should be used to offer proposed drainage systems for adoption by United Utilities under Section 104 of the Water Industry Act 1991.
More informationRESIDENTIAL FIRE SERVICE METERS Addendum #1
109 WATER METERS (Addendum #1) 109.1 GENERAL All meters to be used for billing purposes shall be provided by the Water Utility. The Water Utility reserves the right to read, inspect, test or replace the
More informationFENCES. This hand out is for REFERENCE ONLY. For more details see specific code sections.
Village of Vernon Hills Community Development Department 290 Evergreen Drive, Vernon Hills, IL 60061 Phone 847-367-3704 - Fax 847-367-2541 - http:// www.vernonhills.org FENCES This hand out is for REFERENCE
More informationProperty Owner's Name: Telephone #: Mailing Address: System Address (if different): Directions to location of installation:
SANGAMON COUNTY DEPARTMENT OF PUBLIC HEALTH Environmental Health Division 2833 S. Grand Ave. East Springfield, Illinois 62703 Phone: (217) 535-3145 Fax: (217) 747-5103 envhealth@co.sangamon.il.us, website
More informationCity of Altamonte Springs Developer s Guide
Section 11 BUILDING PERMIT ISSUANCE, CONSTRUCTION, AND PROJECT CLOSEOUT This section contains information and checklists related to building permit issuance, construction, and project closeout for site
More informationSECTION 4 SURFACE WATER MANAGEMENT DESIGN AND CONSTRUCTION REQUIREMENTS
SECTION 4 SURFACE WATER MANAGEMENT DESIGN AND CONSTRUCTION REQUIREMENTS Page 4-1 INTRODUCTION 4-3 4-1.01 Applicability of VMCs 14.24, 14.25, 14.26 4-4 4-1.02 Minimum Requirements - Projects Below Threshold
More information6.0 Runoff. 6.1 Introduction. 6.2 Flood Control Design Runoff
October 2003, Revised February 2005 Chapter 6.0, Runoff Page 1 6.1 Introduction 6.0 Runoff The timing, peak rates of discharge, and volume of stormwater runoff are the primary considerations in the design
More informationE. STORMWATER MANAGEMENT
E. STORMWATER MANAGEMENT 1. Existing Conditions The Project Site is located within the Lower Hudson Watershed. According to the New York State Department of Environmental Conservation (NYSDEC), Lower Hudson
More informationPLANNED UNIT DEVELOPMENT, PLANNING APPROVAL & SUBDIVISION STAFF REPORT Date: June 4, 2015
PLANNED UNIT DEVELOPMENT, PLANNING APPROVAL & SUBDIVISION STAFF REPORT Date: June 4, 2015 NAME SUBDIVISION NAME CC Williams Plant Subdivision CC Williams Plant Subdivision LOCATION CITY COUNCIL DISTRICT
More informationCHAPTER 13 R-5 MANUFACTURED MOBILE HOME PARK RESIDENTIAL DISTRICT
15.1300 CHAPTER 13 R-5 MANUFACTURED MOBILE HOME PARK RESIDENTIAL DISTRICT 15.1301 SECTION 13.01 STATEMENT OF PURPOSE To provide for manufactured home park development, of long-term duration of stay, in
More informationLOT GRADING GUIDELINES
LOT GRADING GUIDELINES RESIDENTIAL PROPERTIES The Drainage Bylaw 16200 came into effect on June 1, 2013 replacing previous versions of the Surface Drainage Bylaw 11501. This Bylaw requires that all single
More informationIngham County Drain Commissioner Patrick E. Lindemann 707 BUHL AVENUE P. O. BOX 220 MASON MI PH. (517) FAX (517)
Date Issued Ingham County Drain Commissioner Patrick E. Lindemann 707 BUHL AVENUE P. O. BOX 220 MASON MI 48854 PH. (517) 676-8395 FAX (517) 676-8364 APPLICATION FOR SOIL EROSION AND SEDIMENTATION POLLUTION
More informationCenter for Watershed Protection Howard County Planning & Zoning Stormwater Maintenance, LLC
Environmental Site Design (ESD) and Innovative Technology Introduction In October 2011, the Maryland Department of the Environment (MDE) convened a panel (see Table 1 below) to determine how to evaluate
More informationOIL AND GAS DRILLING/PRODUCTION PLAN
OIL AND GAS DRILLING/PRODUCTION PLAN An OIL AND GAS DRILLING/PRODUCTION PLAN (PPP) provides for discretionary review of the specific design, layout and provisions for oil and gas exploration in order to
More informationBradley M. Hill, R.G. Utilities Director City of Flagstaff
Closing the Gap Case Study City of Flagstaff Bradley M. Hill, R.G. Utilities Director City of Flagstaff Closing the Gap between Water Supply and Demand WRRC Conference 2014 April 8, 2014 Goals History
More informationArlington s New Stormwater Management Ordinance. Informational Meeting May 28, 2014
Arlington s New Stormwater Management Ordinance Informational Meeting May 28, 2014 Outline Overview Plan submission and review P2 plan/implementation Construction inspection SWMF construction Landscape
More informationWalker County Manufactured Home Rental Community Regulations Infrastructure Development Plan
A. In accordance with Local Government Code Section 232.007, an Infrastructure Development Plan (IDP) is required for all manufactured home rental communities, as defined in Section A 1.0 E of these regulations,
More informationWestern Washington Hydrology Model (WWHM) Software Introduction. Doug Beyerlein, P.E., P.H., D.WRE Clear Creek Solutions, Inc. Mill Creek, Washington
Western Washington Hydrology Model (WWHM) Software Introduction Doug Beyerlein, P.E., P.H., D.WRE Clear Creek Solutions, Inc. Mill Creek, Washington Clear Creek Solutions Hydrology Expertise Clear Creek
More informationAGREEMENT CONCERNING EXISTING AS BUILT CONSTRUCTION
AGREEMENT CONCERNING EXISTING AS BUILT CONSTRUCTION Building Permit Number: Date Received: By: I,, as owner of record of the above property, hereby request a permit for and final inspection of the installation
More informationTOWN OF CHEEKTOWAGA BUILDING PERMIT FEE SCHEDULE
TOWN OF CHEEKTOWAGA BUILDING PERMIT FEE SCHEDULE Each application shall be accompanied by the required fee based upon the valuation of the structure or improvement except where a specific fee is provided
More informationNew Draft Model BMP Design Manual for San Diego Region
New Draft Model BMP Design Manual for San Diego Region Public Input 2013 Storm Water Permit June 10, 2014 & June 11, 2014 1 Welcome Sign-In Refreshments Sponsor Break Q&A and Input 2 Outline of Presentation
More informationOntario s 2012 Building Code Division B, Part 7 Ontario Regulation 332/12
Ontario s 2012 Building Code Division B, Part 7 Ontario Regulation 332/12 Notice: This e-learning module is intended for general information purposes only. It only highlights certain provisions of the
More informationSITE DEVELOPMENT PLAN
SITE DEVELOPMENT PLAN Current Planning Division 410 E. 5th Street Loveland, CO 80537 (970) 962-2523 eplan-planning@cityofloveland.org www.cityofloveland.org/dc Updated 1-15-18 This application is used
More information