ENVIRONMENTAL STATEMENT REPORT FOR THE FINANCIAL YEAR

Size: px
Start display at page:

Download "ENVIRONMENTAL STATEMENT REPORT FOR THE FINANCIAL YEAR"

Transcription

1

2 ENVIRONMENTAL STATEMENT REPORT FOR THE FINANCIAL YEAR FOR ACC LIMITED SINDRI CEMENT WORKS P.O. : ACC COLONY DIST. : DHANBAD JHARKHAND

3 INDEX S.N. PART PARTICULARS 1 INTRODUCTION 2 A GENERAL STATEMENT 3 B CONSUMPTION STATEMENT 4 C POLLUTION STATEMENT 5 D HAZARDOUS WASTE STATEMENT 6 E SOLID WASTE STATEMENT 7 F CHARACTERISATION STATEMENT 8 G IMPACT STATEMENT 9 H ADDITIONAL INVESTMENT STATEMENT 10 I MISCELLANEOUS

4 1. INTRODUCTION M/s ACC Limited own and operate - 17 Cement Manufacturing Units located all over India with three wholly owned subsidiaries. The annual turn over of ACC Ltd. for the period of January 2013 December 2013 was Rs. 10,908 Crores. ACC manufactures Portland cement, blended Cement like Portland Pozzolana and Portland Slag Cement. All products were developed in house using indigenous know-how and technology at their Central Research Station, Thane, Maharashtra. M/S. ACC is committed to providing a safe and healthy working atmosphere and maintaining harmony with its surroundings environment. Apart from Corporate division of Environment and Safety each manufacturing works has a fully functional Environmental Management Cell having experienced environmental engineers, Technicians & Chemists, etc. SINDRI WORKS PLANT LOCATION Sindri Cement Works (SCW) is located at Sindri, at a distance of 26 kms. from Dhanbad Railway Station on Western side, in Dhanbad, District of Jharkhand. Sindri is an industrial township having major industries such as Fertilizer Corporation of India (FCI) and Projects & Development India Limited (PDIL). Dhanbad is an important Railway station located on the broad gauge Mughal Sarai Howrah section on East Central Railway. It is directly connected to important cities like Mumbai, New Delhi, Kolkata, Chennai, Ranchi & Patna. TOPOGRAPHY Area around SCW has fairly plain topography with no hill or valleys in the vicinity.

5 CLIMATIC CONDITION The climate of Sindri is Semi Arid. Winds are light to moderate in summer and winter season, whereas its speed increases towards the end of summer and beginning of monsoon. The maximum temperature recorded for the financial year is 43 0 C on 2 nd May, 2013 and minimum is C on 07 th January, The Max. Relative Humidity was noted max. 99% on 28 th July, 2013 and min. 42% on 7 th April, The maximum rainfall recorded in the month of August 2013 as 250 mm and minimum rainfall recorded in the months of December 2013 as 0.0 mm and total rainfall for the financial year is recorded as 1305 mm. MANUFACTURING PROCESS Manufacturing process at Sindri Cement Works is of a Grinding Unit. SCW is operating as a cement-grinding unit wherein clinker is transported from sister ACC works located at various places in India. Granulated blast furnace slag is obtained from various steel plants such as TATA Steel Plant, Jamshedpur and Durgapur Steel Plant, Durgapur. Gypsum is obtained from Rajasthan / Haldia / Paradip. ACC Ltd. decided to run the Sindri Cement Works as a full-fledged grinding unit, augmenting the grinding capacity (from 6LTPA to 1 MTPA) without any major modification, under the scheme of balancing modernization and rehabilitation, to contribute the community and economic development of the nation. In the modified process Slag and Clinker are ground separately. The ground materials are then blended to produce Portland Slag Cement. Sindri cement Works commissioned a vertical Roller Mill (VRM) on Jan. 15, 1998 for separate grinding of wet slag. Since slag drying as well as grinding takes place in VRM, the operation of the Slag drier was stopped. Coal fuel hot gas generates the hot air required for the drying of the Slag. Venting of the flue gasses is carried out through the VRM. The VRM is equipped with Bag house, which itself act as collector of Slag fines (Product) for further blending with Ordinary Portland Cement. It is also integrated part of VRM process. By this process of slag grinding use of blast furnace slag could be maximized maintaining the quality of the cement.

6 Clinker is ground separately in existing cement mills along with gypsum to produced ordinary Portland cement (OPC). The blending of both ingredients (OPC & SLAG) is done in a continuous blender to obtain Portland Slag Cement (PSC). The Sindri Cement Works has got certification for all three management systems i.e. IS/ISO 9001 (QMS), IS/ISO (EMS) and IS (OHSMS). Expansion project from 1.0 MTPA to 2.5 MTPA ACC Sindri Cement Works has cement grinding capacity of 1.0 MTPA (Million Tones Per Annum) and it is planning to expand this unit from its existing capacity of 1.0 MTPA to 2.5 MTPA by installing the separate grinding & packing circuit with the existing land. For that we have already got the Environmental Clearance vide reference number: F. No. J-11011/623/2009-IA-II(I) dated 13 th May 2011 issued from Ministry Of Environment and Forests (I.A. Division),New Delhi and also received NOC vide Memo number PC/NOC/DHN/279/10/B-4131 date 06 th Sep 2012 from Jharkhand State Pollution Control Board, Ranchi. The various site pre construction activities & Engineering activities are in under progress. Manufacturing Process Manufacturing Process vis-à-vis Ecological Balance In accordance with the philosophy of industrial ecology, Sindri Cement Works is consuming waste of other industries as its raw material for manufacturing of cement. The wastes of other industries being used at Sindri are: a. Blast Furnace Slag of the Steel Industry ACC has always endeavored to ensure that the ecological balance is improved and the waste of other industries is properly utilized in the cement manufacturing process so as to produce high quality blended cement. USE OF BLAST FURNACE SLAG: The process uses the granulation slag / blast furnace slag as a raw material obtained from various steel plants such as Steel Plants at Bokaro and Durgapur. The slag is a waste product of steel industry, which causes damage to the environment to a great extent and is a major cause of land pollution. By making huge capital investment in and then advancing it further we are now using

7 around 50-54% of slag for cement manufacturing. As we are consuming the slag to such a big amount, we are protecting the environment to the great extent. Moreover slag is replacing clinker in the cement. To produce clinker we have to heat calcium compounds in form of carbonate, sulphate or hydro-oxide which releases harmful corbon-di-oxide, sulphar-di-oxide etc to the atmosphere as a result of the chemical reaction. More use of slag reduces these harmful effects and help the environment else where in clinkering unit (NOT AT SINDRI). Hence more use of slag have advantages in two ways of conserving valuable high grade lime stone reserve and prevention of CO 2, SO 2 release in atmosphere in one hand and use of blast furnace slag on the other there by preventing land contamination and Sindri Cement Works will be committed to do so in the years to come. In the last year (April 13 to March 14) we consumed near about Tons slag and it will be continued in the future proposed expansion project which will consume around Tons/year of Blast furnace slag obtained from Steel Plant. REGULATORY FRAMEWORK To assure better environment Government of India has made it statutory to submit an Environmental (Statement) Audit Report with reference to the notification issue by the Ministry of Environmental and Forests, Government of India on March 13, 1992 (amended vide notification No. G. S. R. 386 (E) dated April 22,1993) under the Environmental (Protection) Rules, 1986 all those carrying on an industry, operation or process requiring consent to operate under section 25 of the Water (Prevention and Control of Pollution) Act, 1974, (6 of 1974) or under Section 21 of the Air (Prevention and Control of Pollution) 1981 (14 of 1981) and / or Authorization under the Hazardous (Management, Handling and Transboundary Movement) Rules 2008 issued under the Environment (Protection) Act, 1986 (29 of 1986). Environmental Statement is a tool approved by the Government to the industries for making environmental self-introspection and setting environmental goals. It provides an opportunity to select options for waste minimization, which in turn could even benefit the industry in economic terms. It is for the industries to use the tool effectively. Objectives of the Environmental Statement

8 Performance evaluation of pollution control systems Set goals & Major process changes Annual assessment of progress towards the goals Motivates all employees to environmental responsibility. Involvement of Top management Identification of raw material conservation Better house keeping practices. Opportunities for recycle, Reuse, Recovery. 2. GENERAL STATEMENT PART A

9 Name of the industry : M/s. Sindri Cement Works. Address of the industry : P. O. ACC Colony, Dist. Dhanbad, State Jharkhand, PIN Registered Address of the industry : Cement House, 121, Maharshi Karve Road, Mumbai Name of the M. D. : Mr. Kuldip Kaura Name of the Director Plant : Mr. Manoj Jindal Industrial Category : Cement Manufacturer. NIC CODE Name of the Products : Cement. Total Production Capacity : 1.00 MTPA. Year of establishment : Date of last Environmental Statement Submitted : 12th July 2013.

10 PART-B CONSUMPTION STATEMENT A: WATER CONSUMPTION UTILIZED PER TONNE OF PRODUCTION WATER USE QUANTITY CONSUMED IN KL DURING FINANCIAL YEAR QUANTITY CONSUMED IN KL PER TONNE OF PRODUCT PROCESS DOMESTIC TOTAL WATER CONSUMPTION DURING THE FINANCIAL YEAR IS AS GIVEN BELOW: YEAR MONTH WATER CONSUMPTION DOMESTIC IN M 3 /M TYPE OF ACTIVITY WATER CONSUMPTION INDUSTRIAL IN M 3 /M 2013 April May June July Aug Sept Oct Nov Dec Jan Feb March TOTAL NOTE: Sources of drinking water / industrial water Through FCI Sindri at various location in and around factory premises and from rain water harvesting pond. Industry has provided online flow meter for water supply line. In the current financial year industry experienced reduction in water consumption due to following water conservative initiatives: Rain Water harvesting: We have made four numbers of rainwater harvesting ponds. Two are made in factory premises and two in colony. Closed drainage & cooling system, Proper monitoring and distribution of water Arresting leakages in pipeline by proper maintenance / replacement of damaged pipe.

11 B: DURING THE FINANCIAL YEARS RAW MATERIAL CONSUMPTION IN TONNES IS AS GIVEN BELOW: S.N. NAME OF THE QUANTITY CONSUMED RAW MATERIAL DURING FINANCIAL YEAR PER TONNE OF PRODUCT % Clinker Slag Gypsum C: DURING FINANCIAL YEARS PRODUCTION QUANTITY (MT) AS BELOW: NAME OF THE PRODUCT QUANTITY PRODUCED FOR THE FINANCIAL YEAR Year Portland Slag Cement TOTAL PART-C 4. POLLUTION STATEMENT WATER POLLUTION STATEMENT : Industrial effluent : Effluent generation is not occurring from manufacturing activity. Treatment : N. A. Domestic Effluent : On an average KL water is consumed for residential colony and office buildings during a month time. Treatment : Out of KL water consumed in a month time, 80% would be waste water as per the standard norms i.e. domestic sewage water generation would be 2019 KL in a month. The effluent generation from domestic activity is treated in a large septic tank and its overflow is collected in an oxidation pond, where the overflow from septic tank is aerated to polish the effluent and reduce solid load from the

12 effluent. After the treatment it is being used in irrigation of the gardens maintained in the Colony Areas. Earlier, Jharkhand State Pollution Control Board was regularly collecting and analyzing the domestic discharged water samples. The quarterly records of which is attached as Annexure V. AIR POLLUTION STATEMENT Source of particulate matter : Basically manufacturing process is dry process. Unit operation carried out for manufacturing of cement, Cement Mills, Vertical Roller Mill, Silos, and Packing Plant are the sources of particulate matter in the form of dust emissions and fugitive emissions. Treatment : Company has provided bag filters as air pollution controlling devices to control the particulate matter emissions from process and for controlling fugitive emissions from Handling, of materials. Location, Type, No of bags, Handling gas volume is described in Annexure VI. Fugitive emissions of the finished product are controlled by adopting pneumatically conveyor system instead of Traditional conveyor system. Fugitive emissions of particulate matter from road transporting activity also is controlled by using sprinkling system. SCW regularly monitoring and analyzing the point sources and ambient air quality in and around the process activity. Company has identified 10 point sources and 04 ambient air quality monitoring stations. Results of which are

13 enclosed as Annexure III and IV. and we have also installed one CAAQMS station at our premises. SOLID WASTE POLLUTION STATEMENT : Source of solid waste : Dust collected from various process locations. Garbage generating from canteen and colony domestic activity. Scrap papers and waste materials from office, colony residence and factory. Treatment : Dust collected from various locations in around manufacturing process is utilized as a recyclable material hence further disposal arrangement is not needed. Garbage wastes is biodegradable in nature, which is being disposed off in the factory premises as landfill. Scrap papers and waste combustible materials is being burn in sparsely populated area.

14 PART-D 5. HAZARDOUS WASTES STATEMENT As per the conditions under Hazardous (Management Handling and Transboundary Movement) Rules S.N. Hazardous Waste Quantity generated per annum 1 Spent Oils & Lubricants (in waste sludge form) 2000 KL 2 Used Cotton Cloth 350 Kg. 3 Acid Batteries 16 in numbers send to registered recycler 4 Discarded bottles/ containers used for storing the hazardous chemicals in Laboratory 20 in numbers (from size of 200 Litter) 5 Discarded bag filters 480 in numbers After use, the spent oils and lubricants are collected and sent to store yard for temporary storage in proper containers and then finally disposed by selling it to authorized vendor of Jharkhand State Pollution Control Board. Similarly, the used cotton cloth and discarded bag filters are also used as fuel in the burner of Hot Air Generator. Acid batteries are also disposed by returning them to the vendors from whom they are being bought. Discarded bottles are first carefully washed with water to remove any traces of the hazardous chemicals and then sold to the scrapper. Apart from it there is no hazardous waste, which Sindri Cement Works is generated at present. We have received the authorization/ consent as per the Hazardous (Management, Handling and Transboundary Movement) Rules The copy of the authorization/ consent is enclosed herewith as Annexure VII. Residential Colony has clinic/ dispensary from where biomedical waste generates. For comply the act company has authorization to handle and disposed off the same. The copy of the application for renewal of authorization under Biomedical Waste Rules is enclosed herewith as Annexure VIII.

15 PART - E 6. SOLID WASTES STATEMENT SOLID WASTE GENERATION IN SCW IS AS FOLLOWS: Type of Waste Source Disposal Facility Dust Dust Collector 100 % Recycled back into the system Garbage Colony, Canteen Factory, Office buildings Land filling Land Filling PART F 7. CHARACTERISATION STATEMENT Solid waste from process : Dust collected in Bag filters equivalent to the product quality. Solid waste from pollution Control facility : Septic tank sludge collected during cleaning of septic tanks is completely biodegradable in nature and which is being used as manure or disposed off as a Land filling material. Solid garbage : Dry garbage collected from colony, Canteen is totally biodegradable in nature. Garbage collected from offices and factory is totally combustible in nature, which mainly contains waste papers, etc. Bio- Medical Waste : Category No. 4, 5 & 6

16 PART- G 8. IMPACT STATEMENT WATER AIR NOISE : Water required in the process is only for the cooling purpose. Occurrence of contamination in the industrial process water is not occurred. Hence quality of water is not drastically changed with respect to inlet characterization. It has only thermal effect in terms of the rising water temp, which subsequently reduced in cooling devices. Fresh water only added in cooling tanks as a make up quantity against evaporated water quantity as per the requirement. Used water continuously recycled back to the system, thereby reducing the consumption of fresh water. : Basically cement manufacturing activity is air pollution prone activity. But impact of cement production activity is sustained by SCW by providing pollution-controlling equipment. Observed ambient air quality monitoring results carried out in and around of SCW shows that pollutant concentration are well within limits of prescribed standard : Industrial operation activity is well controlled by lubrication and regular maintenance hence there is very negligible generation of noise which cross the Noise Levels of Factories Law. Also plantation shielding helps in controlling work environment noise, if any. HAZARDOUS WASTE : Not Applicable. SOCIAL ECONOMIC : Increased the awareness amongst the local public toward the educational aspects and Health aspects through social awareness program and activity conducted by SCW. : Increased the standard of leaving of the peoples due to the activities and auxiliary units for operation of SCW.

17 PART-H 9. ADDITIONAL INVESTMENT STATEMENT ADDITIONAL MEASURES/ INVESTMENTS PROPOSALS FOR THE ENVIRONMENTAL PROTECTION: The management of M/s ACC is fully conscious of their environmental protection obligations and pollution abatements. These activities are always focused on top priority in the annual budget of the Sindri Cement Works. The following Expenditure have been made during the financial year FUNDS EARMAKED FOR ENVIRONMENTAL CONTROL MEASURE FOR April 2013 to March 2014 SL.NO ITEM Budget for the year Environmental monitoring 1 Renewal air & water consent Payment for water cess Green manufacture Excellence Award Environmental EMS audit of IS/ISO 14001: Celebration of World Environment Day 2013 & Awareness New Plantation, maintenance of old plantation and maintenance of garden and green belt development Operation & Maintenance of Bag filters & Bag House Water Tanker for water sprinkling Third party monitoring charges Third party environment equipment Testing & calibration charges Maintenance of sewage treatment plant CAPITAL 12 Project for Rain Water Harvesting system plan & design Annual maintenance and monitoring of Continues Ambient Air Quality Monitoring station

18 CSR Financial Progress from 2013 to 2014 S.No Nature of Activities Expenditure in (Lakhs) A Community Level Health Awareness &Wellness Program B Building Basic Rural Infrastructure 4.18 C Quality education & literacy Enhancement 3.33 D Livelihood promotion for the Upliftment Tribal Backward Class & for the Empowerment of Women 8.11 E Safe Drinking water facilities 3.13 F ACC AHEAD Community Development activity 0.18 Total S.No Nature of Activities Expenditure in (Lakhs) A B C D Community Level Health Awareness &Wellness Program Building Basic Rural Infrastructure 9.99 Quality education & literacy Enhancement 3.86 Livelihood promotion for the Up liftment Tribal Backward Class & for the Empowerment of Women 7.50 E Safe Drinking water facilities 0.12 F ACC AHEAD Community Development activity 0.17 Total In the last financial year (April 2013 March 2014) company has spent; Lakhs : On Environmental Activities and protection Lakhs : On managing local Environment.

19 PART-I 10. MISCELLANEOUS (Any other particulars for improving the quality of the environment) During the last financial year (2013 April March 2014), SCW has carried out / completed the following jobs: For point and Fugitive Emission Controls Sindri Cement Works has commissioned vacuum cleaning mechanism in the packing house to control the fugitive emission at all transfer points in the system during the packing and loading. Works has also procured sweeping machine to control the dust emission during the cleaning of roads and walkways. We have installed one new Bag Filter at Cement Mill no1 & 2 Separator venting. and another 1 no of new bag filter at cement mill no1. Sewage Treatment Company has spend Rs. 1 Lakhs for the maintenance of sewage treatment facilities and Rs Lakhs has been spend on the improving, modification of the colony drainage system. Employee and Rural Welfare Facilities like fully equipped Occupational Health Centre, Canteen, Rest Hall, chilled drinking water, and many other amenities are provided by SCW. Also SCW has provided club for recreation activities. For development of rural area company always helps in terms of road development, Distribution of materials required for education, construction of water reservoirs, installation of hand pumps for village water supply and free health check up camps. Company also gives co sponsorship for such activities. For green belt Development SCW has planted about 500 saplings and planned to plant further 100 saplings inside the factory, in the colony area and in the area nearby of various species like neem, bargarh, tamarind, gulmohar, teak, babul, asoka, etc.

20 Safety, fire fighting and Disaster management SCW has implementing safety, fire fighting and disaster management plan regularly. The plant has been rated FIVE STAR (*****) from consecutive FOUR years as per British Safety Council s 5-star audit system by National Safety Council. Pollution Monitoring SCW is regularly carrying out ambient air monitoring, Stack monitoring, Noise monitoring, Water testing and SCW has recently installed Continuous ambient air quality monitoring station and Continuous emission monitoring system installed. Environment: Company creating their own environmental Department library. Rain Water Harvesting SCW is regularly working out in the field of water conservation. For this it had already developed 5 nos. rain water harvesting pond in colony and plant area. We are regularly deepening the existing ponds so as to increase the storage capacity of the ponds. We have further planned to make rain water harvesting pits for all buildings of the organization. The following list is showing the rain water harvesting pond developed in SCW. RAIN WATER HARVESTING PONDS Sr.No. Location Approx. Size of Pond Catchment Area 1 In factory near load center 1 10,000 cum. 2 In factory near railway crossing 10,000 cum. 3 In colony near Inspection Bungalow 20,000 cum. 4 In colony in front of D type quarters 2,40,000 cum. 5 In colony in front of temple. 15,000 cum.

21 THE ACC LIMITED SINDRI CEMENT WORKS GREEN BELT & GARDEN DEVELOPMENT SN Location Area (Sq.Mt) Type of Plants Status 1 Garden in front of 400 Ornamental & Developed Engg. Office Flowers 2 Garden near 350 Ornamental & Developed Laboratory. Flowers 3 Greenery by side of Workshop. 300 Plants Dust & Gaseous Tole. Developed 4 Garden near Coal 1500 Ornamental & Developed Mill. Flower. 5 Garden & Greenery 2000 Tall & dense Developed by side of road at plants Packing Plant. 6 Greenery by side of 1000 Ashoka / Thuja Developed roads inside plant 7 Garden around General Office 8 Greenery near vehicle parking 9 Near Transport Office 10 Garden behind Time Office & Assembly Place 11 Garden & greenery at old scrap yard Ashoka/ Thuja/ flower and lawn grass. 400 Ashoka/ Sesam/ Kadam 400 Tall & dense plant Developed Developed Developed 150 Gulmohar etc. Developed 9900 Ornamental, Flower & tall trees Developed 12 Greenery at Colony Teak, Sesam. Developed Gulmohor etc. 13 Garden / Children Park Ornamental, Flower etc Developed 14 Greenery at colony Teak, Neem, Developed Mango 15 Greenery by side club Eucalyptus Developed 16 Children Park at 4500 Lawn grass & Developed colony. ornamental 17 Pallav garden 15,000 Neem, Teak Developed near factory gate 18 Demonstration Farm 15,000 Fruit plants and Developed in colony* grains 19 Shraddha garden near Club planted by senior citizen 10,000 Teak, Neem Developed

22 20 Sports club ground 15,000 Ashoka, Neem Developed 21 Packing road side 2500 Ashoka,Mahoga ny Developed 22 Road side area 4500 Jatropa Developed infront of barrier gate 23 Infront of work 370 Ashoka,Mahoga Developed shop,stock yard ny,coconut Annexure no. VI THE ACC LIMITED SINDRI CEMENT WORKS AIR POLLUTION CONTROL EQUIPMENT ARE IN OPERATION SN Description Type Make No. of Bags Gas Volume (NM3/hr) BAG FILTER PACKING PLANT1(Packer) BAG FILTER PACKING PLANT1venting BAG FILTER PACKING PLANT1(Packer) BAG FILTER PACKING PLANT1venting 5 BAG FILTER OF CM1 NEW 6 BAG FILTER OF CM2 7 BAG FILTER OF CM3 main 8 BAG FILTER OF CM3 venting 9 BAG FILTER OF CM4 main 10 BAG FILTER OF CM4 venting 11 BAG FILTER OF VRM 12 BAG FILTER OF SLAG SILO 13 BAG FILTER OF OPC SILO BAG FILTER OF CEMENT 14 SILO 15 PSC ELEVATOR VENTING 16 BAG FILTER OF CM 1&2 VENT Pulse Jet Enviro Care Pulse Enviro Jet Care Pulse Enviro Jet Care Pulse Enviro Jet Care Pulse Jet ACC Pulse Jet ACC Pulse Jet Harley Pulse Jet Baltech Pulse Jet Baltech Pulse Andrew Jet Yule Pulse Andrew Jet Yule Pulse Andrew Jet Yule Pulse Andrew Jet Yule Pulse Jet Thermax Pulse Andrew Jet Yule Pulse Andrew Jet Yule

23 AVERAGE DUST PARTICULATE EMISSION POINT SOURCES PIONT SOURCE CONCENTRATION OF POLLUTANTS IN mg/nm 3 % VARIATION FROM PRESCRIDED STANDARDS (150 mg/nm 3 ) Bag Filter of Cement Mill No Bag Filter of Cement Mill No Bag Filter of Cement Mill No Bag Filter of Cement Mill No Bag House of Vertical Roller Mill Bag Filter of Slag Silo at VRM Bag Filter of OPC Silo at VRM Bag filter of Rotary Packer Bag Filter of Elevator of R/ Packer Bag Filter of Cement Silos at PH AVERAGE DUST PARTICULATE POLLUTANTS FOR AMBIENT AIR QUALITY Location of sampling Parameters PM 10 (µg/m 3 ) Parameters PM 2.5 (µg/m 3 ) SO 2 (µg/m 3 ) CO (µg/m 3 ) NO x (µg/m 3 ) Near Factory Main Gate < Near Packing House < Near Railway Yard < Between DVC Yard & VRM < AVERAGE WATER POLLUTANTS (DOMESTIC EFFLUENTS) DISCHARGED POLLUTION PARAMETERS CONCENTRATION (mg/lit.) TSS 14.5 C.O.D 39 B.O.D. 10 Temperature 22.6 ph 7.3

PART A. M/s Shree Cement Ltd, (Grinding Unit) village - Udepur, Tehsil- Suratgarh, District -Shri Ganganagar, Rajasthan

PART A. M/s Shree Cement Ltd, (Grinding Unit) village - Udepur, Tehsil- Suratgarh, District -Shri Ganganagar, Rajasthan Page 1 of 9 Environmental Statement for Clinker Grinding Unit of M/s Shree Cement Limited, situated at village - Udepur, Tehsil- Suratgarh, District -Shri Ganganagar, Rajasthan for the Period from: 10

More information

Hind Energy & Coal Beneficiation (India) Ltd.

Hind Energy & Coal Beneficiation (India) Ltd. SUMMARY ON ENVIRONMENTAL IMPACT ASSESSMENT REPORT OF Hind Energy & Coal Beneficiation (India) Ltd. (Change in Technology) at Hindadih Village, Masturi Tehsil Bilaspur District, Chhattisgarh Submitted to

More information

FORM V ENVIRONMENTAL STATEMENT REPORT FOR THE FINANCIAL YEAR M/s Halki Lime Stone Mine (Unit: J. K. Cement Limited) PART A

FORM V ENVIRONMENTAL STATEMENT REPORT FOR THE FINANCIAL YEAR M/s Halki Lime Stone Mine (Unit: J. K. Cement Limited) PART A (I) FORM V ENVIRONMENTAL STATEMENT REPORT FOR THE FINANCIAL YEAR 2013-14 M/s Halki Lime Stone Mine (Unit: J. K. Cement Limited) Name & Address of the Owner / Occupier of the Industry Operation or Process

More information

4. The ambient air quality monitoring stations We are monitoring the ambient air quality

4. The ambient air quality monitoring stations We are monitoring the ambient air quality GLOBAL CALCIUM PRIVATE LTD., 125&126, SIPCOT COMPLEX, HOSUR 635 126 Ref : No. J-11011/411/2006-IA-II(I) dated 1 st August 2007. Compliance Report for the Period ending 31.3.2015 Sl. Specific Conditions

More information

Hind Energy & Coal Beneficiation (India) Ltd.

Hind Energy & Coal Beneficiation (India) Ltd. SUMMARY ON ENVIRONMENTAL IMPACT ASSESSMENT REPORT OF Hind Energy & Coal Beneficiation (India) Ltd. 0.96 MTPA Wet type Coal Washery at Birgahani Village, Baloda Tehsil Janjgir-Champa District, Chhattisgarh

More information

M/s Hind Energy & Coal Beneficiation Pvt. Ltd. is presently operating a 2 x 1.2 MTPA

M/s Hind Energy & Coal Beneficiation Pvt. Ltd. is presently operating a 2 x 1.2 MTPA 1.0 INTRODUCTION M/s Hind Energy & Coal Beneficiation Pvt. Ltd. is presently operating a 2 x 1.2 MTPA dry type of coal washery at Village: Hindadih, Tehsil: Masturi, District: Bilaspur (C.G.) for which

More information

HINAUTI LIMESTONE MINE Mine Lease area ha. (A UNIT OF JAIPRAKASH ASSOCIATES LIMITED) JAYPEE VIHAR, SIDHI (M.P)

HINAUTI LIMESTONE MINE Mine Lease area ha. (A UNIT OF JAIPRAKASH ASSOCIATES LIMITED) JAYPEE VIHAR, SIDHI (M.P) HINAUTI LIMESTONE MINE Mine Lease area 378.261 ha. (A UNIT OF JAIPRAKASH ASSOCIATES LIMITED) JAYPEE VIHAR, SIDHI (M.P) 2012-2013 SUBMITTED TO M.P.POLLUTION CONTROL BOARD BHOPAL (M.P.) Jaypee Sidhi Cement

More information

2 No. Continuous Ambient Air Quality Monitoring System (CAAQMS) installed in downwind & upwind direction and are connected to APPCB server.

2 No. Continuous Ambient Air Quality Monitoring System (CAAQMS) installed in downwind & upwind direction and are connected to APPCB server. Environmental Clearance Point Wise Half Yearly Compliance Report (October 2014 to March 2015) Cement Plant - EC No: F.No. J-11011/450/2007-IA II(I) Dated: 24 th March 2008 A. SPECIFIC CONDITIONS : S.NO.

More information

Naubasta Lime Stone Mine ML - I Jaypee Rewa Plant Jaiprakash Associates Limited

Naubasta Lime Stone Mine ML - I Jaypee Rewa Plant Jaiprakash Associates Limited Naubasta Lime Stone Mine ML - I Jaypee Rewa Plant Jaiprakash Associates Limited Introduction: Jaypee Group is the 3 rd largest cement producer in the country. The Groups cement facilities are located in

More information

SIX MONTHLY COMPLIANCE REPORT JUNE- 2015

SIX MONTHLY COMPLIANCE REPORT JUNE- 2015 SIX MONTHLY COMPLIANCE REPORT JUNE- 2015 Group Housing Complex My woods AT Plot no. GH-04, Sector -16 C, Noida Extension, Greater Noida, U.P. Being developed by M/s Mahagun India Pvt. Ltd. A-19, Sector-63,

More information

Clearance Letter no. : MoEF Vide Letter no. J-11011/79/2003-IA-II (I) dated April 21, 2004

Clearance Letter no. : MoEF Vide Letter no. J-11011/79/2003-IA-II (I) dated April 21, 2004 Name of the Project: Jaypee Rewa Plant, Unit of M/s Jaiprakash Associates Limited for expansion Of cement production from 2.5 MTPA to 3.5 MTPA at Jaypee Nagar, District Rewa, Madhya Pradesh Project Code:

More information

EXECUTIVE SUMMARY 1.0 PROJECT DESCRIPTION 1.1 INTRODUCTION

EXECUTIVE SUMMARY 1.0 PROJECT DESCRIPTION 1.1 INTRODUCTION EXECUTIVE SUMMARY 1.0 PROJECT DESCRIPTION 1.1 INTRODUCTION Jaypee Group is a leading Business House of the country with its presence in Core industries and Service Sectors like Cement, Infrastructure development,

More information

Jaypee Lime Stone Mine Jaypee Bela Plant (A Unit of Jaiprakash Associates Limited)

Jaypee Lime Stone Mine Jaypee Bela Plant (A Unit of Jaiprakash Associates Limited) Jaypee Lime Stone Mine Jaypee Bela Plant (A Unit of Jaiprakash Associates Limited) Introduction: Jaypee Group is the 3 rd largest cement producer in the country. The groups cement facilities are located

More information

JAYPEE NIGRIE SUPER THERMAL POWER PROJECT

JAYPEE NIGRIE SUPER THERMAL POWER PROJECT JAYPEE NIGRIE SUPER THERMAL POWER PROJECT (A Unit of M/s Jaiprakash Power Ventures Limited) Villages: Nigrie, Tehsil :Sarai District: Singrauli 2014 2015 SUBMITTED M.P. POLLUTION CONTROL BOARD BHOPAL (M.P.)

More information

MAJHIGAWAN LIMESTONE MINE Mine Lease area ha. ( A UNIT OF JAIPRAKASH ASSOCIATES LIMITED) JAYPEE VIHAR, SIDHI (M.

MAJHIGAWAN LIMESTONE MINE Mine Lease area ha. ( A UNIT OF JAIPRAKASH ASSOCIATES LIMITED) JAYPEE VIHAR, SIDHI (M. MAJHIGAWAN LIMESTONE MINE Mine Lease area 362.68 ha. ( A UNIT OF JAIPRAKASH ASSOCIATES LIMITED) JAYPEE VIHAR, SIDHI (M.P) 2012-2013 SUBMITTED TO M.P.POLLUTION CONTROL BOARD BHOPAL (M.P.) Jaypee Sidhi Cement

More information

Max. building height (m)

Max. building height (m) Environmental Management Plan (EMP) for Himalaya Falaknuma by Himalaya Developers Ahmedabad No. Particulars Details 1. Proposal for New Project 2. Type of Project and Commercial Building Construction Project

More information

M/s. SAL STEEL LTD Survey no.245/p, Village:-Bharapar, Taluka:- Gandhidham, District:-Kutch, Gujarat.

M/s. SAL STEEL LTD Survey no.245/p, Village:-Bharapar, Taluka:- Gandhidham, District:-Kutch, Gujarat. Pre-Feasibility Study Report For Proposed Fly Ash Co-processing clinker grinding cement Unit of 40,000 MT/month Production capacity within our Existing Premises for M/s. SAL STEEL LTD Survey no.245/p,

More information

V.S LIGNITE POWER Pvt. Ltd AT VILLAGE-GURHA, KOLAYAT, BIKANER, RAJASTHAN

V.S LIGNITE POWER Pvt. Ltd AT VILLAGE-GURHA, KOLAYAT, BIKANER, RAJASTHAN V.S LIGNITE POWER Pvt. Ltd AT VILLAGE-GURHA, KOLAYAT, BIKANER, RAJASTHAN HALF YEARLY REPORT FOR THE PERIOD OCTOBER, 2011 to MARCH 2012 V. S. Lignite Power Pvt. Ltd. Name of the Project : 1x 135 MW Lignite

More information

HALF YEARLY COMPLIANCE REPORT OF ENVIRONMENTAL CLEARANCE CONDITIONS

HALF YEARLY COMPLIANCE REPORT OF ENVIRONMENTAL CLEARANCE CONDITIONS HALF YEARLY COMPLIANCE REPORT OF ENVIRONMENTAL CLEARANCE CONDITIONS 1. Name of the Project: M/s MCC PTA India Corp. Private Limited Haldia ( WB) Note: Company Name was change from MCC PTA India Corp.Private

More information

ZZH/CLAB-KSPCB/04/ Environmental Officer,

ZZH/CLAB-KSPCB/04/ Environmental Officer, ZZH/CLAB-KSPCB/04/ 21273 08-12-2014 Environmental Officer, Regional Office, Karnataka State Pollution Control Board Parisara Bhavan, LIG II, B 217 B-1, Main Road, A-16 th Cross Near Hari Om Trust, Habbuwada

More information

RED CATEGORY CONSENT & AUTHORIZATION ORDER BY REGISTERED POST WITH ACKNOWLEDGEMENT DUE

RED CATEGORY CONSENT & AUTHORIZATION ORDER BY REGISTERED POST WITH ACKNOWLEDGEMENT DUE ANDHRA PRADESH POLLUTION CONTROL BOARD Paryavarana Bhavan, A-III, Industrial Estate, Sanathnagar, Hyderabad-500 018 Phone : 040-23887500, Website : www.appcb.ap.nic.in RED CATEGORY CONSENT & AUTHORIZATION

More information

Rajasthan State Pollution Control Board

Rajasthan State Pollution Control Board M/s Raj West Power Private Limited Village- Bhadresh, Tehsil:Barmer District:Barmer Sub: Ref: Sir, Consent to Operate under section 25/26 of the Water (Prevention & Control of Pollution) Act, 1974 and

More information

HINGULA OPEN CAST PROJECT HINGULA AREA MAHANADI COALFIELDS LIMITED

HINGULA OPEN CAST PROJECT HINGULA AREA MAHANADI COALFIELDS LIMITED HALF YEARLY PROGRESS REPORT ON IMPLEMENTATION OF ENVIRONMENTAL CLEARANCE CONDITION BY MoEF (PERIOD FROM OCTOBER 13 TO MARCH 14) HINGULA OPEN CAST PROJECT HINGULA AREA MAHANADI COALFIELDS LIMITED SIX MONTHLY

More information

MEMORANDUM OF UNDERSTANDING BETWEEN HINDUSTAN COPPER LIMITED AND MINISTRY OF MINES FOR

MEMORANDUM OF UNDERSTANDING BETWEEN HINDUSTAN COPPER LIMITED AND MINISTRY OF MINES FOR i.exe MEMORANDUM OF UNDERSTANDING BETWEEN HINDUSTAN COPPER LIMITED AND MINISTRY OF MINES FOR 2010-2011 MEMORANDUM OF UNDERSTANDING (MOU) BETWEEN HINDUSTAN COPPER LIMITED AND MINISTRY OF MINES FOR 2010-2011

More information

PRE-FEASIBILITY REPORT FOR OM SAIRAM STEEL AND ALLOYS PVT LTD

PRE-FEASIBILITY REPORT FOR OM SAIRAM STEEL AND ALLOYS PVT LTD PRE-FEASIBILITY REPORT FOR OM SAIRAM STEEL AND ALLOYS PVT LTD PLOT No. F-1,2,3,8,9,10, ADDL. MIDC, PHASE II, AND GUT NO. 46 & 63, VILLAGE DAREGAON, TEHSIL: JALNA DIST: JALNA, MAHARASHTRA 2014-15 1. Executive

More information

CHECK LIST OF DOCUMENTS / OTHER REQUISITES FOR OBTAINING VARIOUS CLEARANCES FROM THE STATE POLLUTION CONTROL BOARD, ODISHA.

CHECK LIST OF DOCUMENTS / OTHER REQUISITES FOR OBTAINING VARIOUS CLEARANCES FROM THE STATE POLLUTION CONTROL BOARD, ODISHA. CHECK LIST OF DOCUMENTS / OTHER REQUISITES FOR OBTAINING VARIOUS CLEARANCES FROM THE STATE POLLUTION CONTROL BOARD, ODISHA. A. CONSENT TO ESTABLISH UNDER THE PROVISIONS OF WATER (PREVENTION & CONTROL OF

More information

F.P.No.52, S.No.53/B, 54/2/B, D.T.P.S.No.80, Village: Bhat, Dist: Gandhinagar.

F.P.No.52, S.No.53/B, 54/2/B, D.T.P.S.No.80, Village: Bhat, Dist: Gandhinagar. 20. Karnavati Premier Living F.P.No.52, S.No.53/B, 54/2/B, D.T.P.S.No.80, Village: Bhat, Dist: Gandhinagar. Screening & scoping / appraisal Details of the proposed project as presented before the committee

More information

4.0 ENVIRONMENTAL IMPACTS AND MITIGATION MEASURES. Negative or adverse impacts during the construction phase are:

4.0 ENVIRONMENTAL IMPACTS AND MITIGATION MEASURES. Negative or adverse impacts during the construction phase are: 4.0 ENVIRONMENTAL IMPACTS AND MITIGATION MEASURES 4.1 POTENTIAL ENVIRONMENTAL IMPACTS 4.1.1 Impacts during Construction Phase Negative or adverse impacts during the construction phase are: Land environment:

More information

Environmental Impact Assessment

Environmental Impact Assessment Environmental Impact Assessment A brief discussion Presented by: Apekshit Solanki Kirti Neetu Yadav Sameera Vishakha Shankar Introduction EIA is a formal process to predict the environmental consequences

More information

INNOVATION IN ENERGY CONSUMPTION

INNOVATION IN ENERGY CONSUMPTION INNOVATION IN ENERGY CONSUMPTION SYNOPSIS In the cement industry, during the last few years there has been a steep rise in the cost of production as the cost of energy inputs has increased sharply. Studies

More information

Performance Analysis of Cement manufacturing Industry

Performance Analysis of Cement manufacturing Industry www.ijecs.in International Journal Of Engineering And Computer Science ISSN:2319-7242 Volume 4 Issue 3 March 2015, Page No. 10937-10941 Performance Analysis of Cement manufacturing Industry Neeraj Pandagre

More information

PROJECT FEASIBILITY REPORT

PROJECT FEASIBILITY REPORT PROJECT FEASIBILITY REPORT FOR OBTAINING PRIOR ENVIRONMENT CLEARANCE For PROPOSED CHEMICAL MANUFACTURING UNIT From M/s. MORADIA BROTHERS CHEM PVT LTD LOCATED AT: Block No.: 45, JalBhumi Industrial Estate,

More information

Sustainability and Environmental Issues in the Kraft Pulp Industry. Celso Foelkel

Sustainability and Environmental Issues in the Kraft Pulp Industry. Celso Foelkel Sustainability and Environmental Issues in the Kraft Pulp Industry Celso Foelkel www.celso-foelkel.com.br www.eucalyptus.com.br Sustainability Sustainability Anthropocentric-oriented concept Long term

More information

North East Roofing Pvt. Ltd. Expansion of Asbestos Cement Sheets & Accessories Manufacturing Unit (50,000 TPA to 70,000 TPA)

North East Roofing Pvt. Ltd. Expansion of Asbestos Cement Sheets & Accessories Manufacturing Unit (50,000 TPA to 70,000 TPA) SUMMARY ON ENVIRONMENTAL IMPACT ASSESSMENT REPORT OF North East Roofing Pvt. Ltd. Expansion of Asbestos Cement Sheets & Accessories Manufacturing Unit (50,000 TPA to 70,000 TPA) Proposed at: Bonda Industrial

More information

LATEST GUIDELINES & DIRECTIVES OF POLLUTION BOARDS FOR DISTILLERS VIDE THEIR CIRCULAR DATED 2 nd JUNE 2017

LATEST GUIDELINES & DIRECTIVES OF POLLUTION BOARDS FOR DISTILLERS VIDE THEIR CIRCULAR DATED 2 nd JUNE 2017 By K.P.SINGH LATEST GUIDELINES & DIRECTIVES OF POLLUTION BOARDS FOR DISTILLERS VIDE THEIR CIRCULAR DATED 2 nd JUNE 2017 1. Distilleries to install Online Mass Flow Measurement with online data transfer

More information

Country Questionnaire Prior to the Senior Officials Meeting on the 3R Initiative - INDIA -

Country Questionnaire Prior to the Senior Officials Meeting on the 3R Initiative - INDIA - Country Questionnaire Prior to the Senior Officials Meeting on the 3R Initiative - INDIA - [Country Questionnaire Survey] 1. Major developments regarding the strategies, policies and activities on the

More information

PLEASE NOTE. For more information concerning the history of these regulations, please see the Table of Regulations.

PLEASE NOTE. For more information concerning the history of these regulations, please see the Table of Regulations. PLEASE NOTE This document, prepared by the Legislative Counsel Office, is an office consolidation of this regulation, current to August 7, 2004. It is intended for information and reference purposes only.

More information

PRE FEASIBILITY REPORT JOJOBERA CEMENT PLANT

PRE FEASIBILITY REPORT JOJOBERA CEMENT PLANT PRE FEASIBILITY REPORT Of JOJOBERA CEMENT PLANT (STAND-ALONE CEMENT GRINDING UNIT) FOR ENVIRONMENTAL CLEARANCE FOR CHANGE IN PRODUCT MIX OF 4.6 MILLION TONNES PER ANNUM CEMENT PRODUCTION (NO INCREASE IN

More information

Form V is to be filled before 30th September annually; for the period from 1st April to 31st March PART A. Company Information

Form V is to be filled before 30th September annually; for the period from 1st April to 31st March PART A. Company Information Form V is to be filled before 30th September annually; for the period from 1st April to 31st March PART A Company Information Company Name : Facility Name : Person Name * : Designation * : Premise Name

More information

COAL STOCKPILES IN INDIAN POWER PLANTS. H Ramakrishna TCE Consulting Engineers Limited 73/1, St Marks Road, Bangalore , Karnataka, India

COAL STOCKPILES IN INDIAN POWER PLANTS. H Ramakrishna TCE Consulting Engineers Limited 73/1, St Marks Road, Bangalore , Karnataka, India SUMMARY: Coal will be transported to the power plant by belt conveyors in case of pit head power plants. In case of power plants located far away from the mines, coal will be transported by rail. In some

More information

Environmental Guideline on Stone crushing plant set up temporarily for the purpose of a project by a public department

Environmental Guideline on Stone crushing plant set up temporarily for the purpose of a project by a public department 2017 [Type a quote from the document or the summary of an interesting point. You can position the text box anywhere in the document. Use the Drawing Tools tab to change the formatting of the pull quote

More information

ENVIRONMENTAL MONITORING PROGRAMME

ENVIRONMENTAL MONITORING PROGRAMME Stage-I (2x800 MW) Page 1 5 CHAPTER - VI ENVIRONMENTAL MONITORING PROGRAMME 6.0 OBJECTIVES Regular monitoring program the environmental parameters is essential to take into account the changes in the environment.

More information

Annual CCR Fugitive Dust Report. TS Power Plant. Eureka County, Nevada

Annual CCR Fugitive Dust Report. TS Power Plant. Eureka County, Nevada Annual CCR Fugitive Dust Report TS Power Plant Eureka County, Nevada November 16, 2016 Prepared by: Dennis Laybourn Senior Environmental Manager Newmont Nevada Energy Investment - TS Power Plant 450 TS

More information

Save your money and the environment!!!! BIONEST onsite waste water treatment solutions

Save your money and the environment!!!! BIONEST onsite waste water treatment solutions Save your money and the environment!!!! BIONEST onsite waste water treatment solutions Introduction Qatar is an extremely dry and arid environment with very little natural water courses and very low levels

More information

PRE FEASIBILITY REPORT. For PROPOSED BULK DRUG PRODUCTS MANUFACTURING UNITS. M/s. M.K. DRUGS. F-10, Industrial Area, Focal Point, Tehsil: Derabassi

PRE FEASIBILITY REPORT. For PROPOSED BULK DRUG PRODUCTS MANUFACTURING UNITS. M/s. M.K. DRUGS. F-10, Industrial Area, Focal Point, Tehsil: Derabassi PRE FEASIBILITY REPORT For PROPOSED BULK DRUG PRODUCTS MANUFACTURING UNITS Of M/s. M.K. DRUGS F-10, Industrial Area, Focal Point, Tehsil: Derabassi Dist: Mohali, Punjab INTRODUCTION M/s. M.K. Drugs is

More information

Chemplast Sanmar Limited Marine Terminal Facility, Chitrapettai Village Cuddalore District, Tamil Nadu

Chemplast Sanmar Limited Marine Terminal Facility, Chitrapettai Village Cuddalore District, Tamil Nadu Chemplast Sanmar Limited Marine Terminal Facility, Chitrapettai Village Cuddalore District, Tamil Nadu Compliance Report for Environmental Clearance No.11.63/2005.1A.III dated 19.12.2005 Specific Conditions

More information

Viridor Waste Management. Proposed Development of an In-Vessel Composting Facility. Land at Exide Batteries, Salford Road, Bolton

Viridor Waste Management. Proposed Development of an In-Vessel Composting Facility. Land at Exide Batteries, Salford Road, Bolton Viridor Waste Management Proposed Development of an In-Vessel Composting Facility Land at Exide Batteries, Salford Road, Bolton Non-Technical Summary January 2009 Introduction Viridor Waste Management

More information

Environmental Monitoring Results Summary

Environmental Monitoring Results Summary Environmental Monitoring Results Summary Quarter 1 2016 Name of Mine: CSA Mine Environment Protection Licence: EPL 1864 Licensee Name and Operator: Cobar Management Pty Ltd Licensee Address: PO Box 31,

More information

ENVIRONMENTAL PROTECTION ACT AIR QUALITY REGULATIONS

ENVIRONMENTAL PROTECTION ACT AIR QUALITY REGULATIONS c t ENVIRONMENTAL PROTECTION ACT AIR QUALITY REGULATIONS PLEASE NOTE This document, prepared by the Legislative Counsel Office, is an office consolidation of this regulation, current to August 7, 2004.

More information

IRISH CEMENT PLATIN INVESTING IN OUR FUTURE

IRISH CEMENT PLATIN INVESTING IN OUR FUTURE IRISH CEMENT PLATIN INVESTING IN OUR FUTURE INTRODUCTION Investing in our future. The next phase of investment in Platin will see further energy efficiency improvements with on site electricity generation

More information

Dalmia Cement (Bharat) Limited, Kadapa 1 st Workshop on Energy Efficiency in Cement Sector 23 rd June 2015

Dalmia Cement (Bharat) Limited, Kadapa 1 st Workshop on Energy Efficiency in Cement Sector 23 rd June 2015 Dalmia Cement (Bharat) Limited, Kadapa 1 st Workshop on Energy Efficiency in Cement Sector 23 rd June 2015 Presented by :Mr. P. Kamalanathan Manager Electrical p.kamalanathan@dalmiacement.com Dalmia Cement

More information

DR. SANJAY V. PATIL HEAD AND TECHNICAL ADVISER DEPARTMENT OF ALCOHOL TECHNOLOGY VASANTDADA SUGAR INSTITUTE, MANJARI, PUNE (INDIA)

DR. SANJAY V. PATIL HEAD AND TECHNICAL ADVISER DEPARTMENT OF ALCOHOL TECHNOLOGY VASANTDADA SUGAR INSTITUTE, MANJARI, PUNE (INDIA) DR. SANJAY V. PATIL HEAD AND TECHNICAL ADVISER DEPARTMENT OF ALCOHOL TECHNOLOGY VASANTDADA SUGAR INSTITUTE, MANJARI, PUNE (INDIA) Email: sv.patil@vsisugar.org.in AIDA Technical Seminar www.vsisugar.com

More information

ENVIRONMENTAL AUDIT REPORT [STATEMENT] CONSTRUCTION WORK [ HALF YEARLY ] PERIOD OCTOBER 2012 TO MARCH 2013 FOUNDRY PARK

ENVIRONMENTAL AUDIT REPORT [STATEMENT] CONSTRUCTION WORK [ HALF YEARLY ] PERIOD OCTOBER 2012 TO MARCH 2013 FOUNDRY PARK ENVIRONMENTAL AUDIT REPORT [STATEMENT] ON CONSTRUCTION WORK [ HALF YEARLY ] PERIOD OCTOBER 2012 TO MARCH 2013 FOUNDRY PARK HOULI BAGAN, RANIHATI AMTA ROAD, HOWRAH Prepared by: FOUNDRY CLUSTER DEVELOPMENT

More information

Visakhapatnam Steel Plant Rashtriya Ispat Nigam Ltd.

Visakhapatnam Steel Plant Rashtriya Ispat Nigam Ltd. Visakhapatnam Steel Plant Rashtriya Ispat Nigam Ltd. Half yearly Environment Compliance Report in respect of stipulated conditions while issuing Environmental Clearance Rashtriya Ispat Nigam Limited -

More information

CEMENT MANUFACTURING PROCESS

CEMENT MANUFACTURING PROCESS CEMENT MANUFACTURING PROCESS Definition: Defined as a product material obtained by calcination of calcareous (a material containing lime) and argillaceous (a material which contain silica) materials. According

More information

Watershed Management and Rainwater Harvesting in Vishwaniketan Campus

Watershed Management and Rainwater Harvesting in Vishwaniketan Campus Watershed Management and Rainwater Harvesting in Vishwaniketan Campus 1. Rupesh Devale, 2 Sayyed Sohail, 3 Dr. Seema Jagtap 1 PG Student, Dept. of Civil Engg, Yadavrao Tasgonkar College of Engg. and Management,

More information

For PROPOSED IT PARK. By M/s.Balewadi Tech Park Pvt.Ltd. Submitted to State Environment Expert Appraisal Committee III, Maharashtra

For PROPOSED IT PARK. By M/s.Balewadi Tech Park Pvt.Ltd. Submitted to State Environment Expert Appraisal Committee III, Maharashtra Draft Terms of References (ToR) (Based on the model TOR given in Environmental Impact Assessment Guidance Manual for building construction projects by MoEF & CC) For PROPOSED IT PARK By M/s.Balewadi Tech

More information

Corporate Social Responsibility Policy of SAIPL for

Corporate Social Responsibility Policy of SAIPL for Considered and approved by CSR Committee in its meeting held on 25/04/2016 for recommendation to the Board Considered and approved by Board in its meeting held on 19/05/2016 Corporate Social Responsibility

More information

Flue Gas Desulphurization (FGD) plant 2 x 600 MW Coal based Thermal power plant Cuddalore, Tamil Nadu. By MK Parameswaran 23 rd Dec, 2016

Flue Gas Desulphurization (FGD) plant 2 x 600 MW Coal based Thermal power plant Cuddalore, Tamil Nadu. By MK Parameswaran 23 rd Dec, 2016 Flue Gas Desulphurization (FGD) plant 2 x 600 MW Coal based Thermal power plant Cuddalore, Tamil Nadu. By MK Parameswaran 23 rd Dec, 2016 Introduction Flue Gas Desulfurization is a process of removing

More information

PRE-FEASIBILITY REPORT

PRE-FEASIBILITY REPORT PRE-FEASIBILITY REPORT For ToR of Proposed Project of MANUFACTURING OF SYNTHETIC ORGANIC DYES (5 f B IND II) By SHREEJI BAPA DYE CHEM PLOT NO 1319 & 1320, PHASE-III, GIDC, VATVA, AHEMADABAD-382445, GUJARAT,

More information

Coke Manufacturing. Environmental Guidelines for. Multilateral Investment Guarantee Agency. Industry Description and Practices. Waste Characteristics

Coke Manufacturing. Environmental Guidelines for. Multilateral Investment Guarantee Agency. Industry Description and Practices. Waste Characteristics Multilateral Investment Guarantee Agency Environmental Guidelines for Coke Manufacturing Industry Description and Practices Coke and coke by-products (including coke oven gas) are produced by the pyrolysis

More information

Capacity Enhancement and Energy Conservation in Cement Plant

Capacity Enhancement and Energy Conservation in Cement Plant Capacity Enhancement and Energy Conservation in Cement Plant V.K. Batra*, P.N. Chhangani**, Dinesh Satija*** and R. B. Garg**** Holtec Consulting Private Limited, Gurgaon ABSTRACT The cement industry continues

More information

PRE-FEASIBILITY REPORT. for

PRE-FEASIBILITY REPORT. for PRE-FEASIBILITY REPORT for PROPOSED COMMON EFFLUENT TREATMETN PLANT (CETP) of M/s. VIKASHTEX ENVIROTECH CETP PVT. LTD. Block No. 523, Village: Hathoda, Taluka: Mangrol, Dist: Surat - 394 405 (Guj.) Prepared

More information

Dilipbhai D. Patel. BLOCK NO. 43, F.P. NO. 45,O.P NO. 40 T.P.S. No- 17 (PUNA), Ta: SURAT CITY, DIST: SURAT

Dilipbhai D. Patel. BLOCK NO. 43, F.P. NO. 45,O.P NO. 40 T.P.S. No- 17 (PUNA), Ta: SURAT CITY, DIST: SURAT Annexure B Land Possession letters & N.A. permission letters Annexure C Photograph of the Site Annexure D Details of Buildings Area Calculation Annexure 1 Topo Sheet Annexure 2 Soil Analysis Report Annexure

More information

LIST OF EMS LICENCES UNDER ERO AS ON 31 JANUARY 2013

LIST OF EMS LICENCES UNDER ERO AS ON 31 JANUARY 2013 LIST OF EMS LICENCES UNDER ERO AS ON 31 JANUARY 2013 NAMEORGN CERTADD1 CERTADD2 CERTADD3 EMSSTD CERTNSCOPE LICENCEN LICEXPDAT O J.K. FILES LTD 22, NEW TANGRA ALL ACTIVITIES OF M/S J.K.FILES LTD, KOLKATA

More information

STANDARD OPERATING PROCEDURE

STANDARD OPERATING PROCEDURE STANDARD OPERATING PROCEDURE Consent to Established/Operate Procedural Guidelines Consent to Establish NOC Check List Consent to Operate NOC Check List Renewal to Consent to Operate Check List Time Frame

More information

SITE SELECTION AND PLANNING

SITE SELECTION AND PLANNING SITE SELECTION AND PLANNING Mandatory Requirement 1 Mandatory Requirement 2 Site Selection and Planning Credit Title Point(s) Local Building Regulations Soil Erosion Control Required Required Credit 1

More information

Village Ponds in Punjab Past Perspective

Village Ponds in Punjab Past Perspective Department of Water Supply & Sanitation Govt. of Punjab By : Mohd Ishfaq Village Ponds in Punjab Past Perspective Village ponds in the Punjab State have great importance and these were considered as the

More information

(this cover page left intentionally blank)

(this cover page left intentionally blank) 4. Siting the Well (this cover page left intentionally blank) 4. Siting the Well Chapter Table of Contents Chapter Table of Contents Chapter Description... 4 Regulatory Requirements Well Siting... 4 Relevant

More information

Enhanced usage of Alternative Fuels in Cement Industry

Enhanced usage of Alternative Fuels in Cement Industry ALTERNATE FUEL --- MSW RDF BY V. P. TONDAPURKAR ROCHEM GREEN ENERGY PVT LTD MUMBAI 51 1 UNDERSTANDING OF CEMENT INDUSTRY - Cement Production India Year Capacity Mn T 2010 228.3 2014 255.6 2024 666 Plant

More information

Details of Project. Underground source

Details of Project. Underground source Details of Project The project proponent wants to develop a Residential complex with all modern amenities at R.S./L.R. Dag No - (442,447,453,454, 443,444), J.LNo-29 Of Khamar Mouja & R.S./L.R. Dag No-(99(P),101,102(P),103,105,106,107,108,109,110,111,112,113(P),114(P),115,125,126,

More information

PRE-FEASIBILITY REPORT

PRE-FEASIBILITY REPORT PRE-FEASIBILITY REPORT For PRIOR ENVIRONMENTAL CLEARANCE STORAGE CAPACITY ENHANCEMENT OF HPCL, LPG BOTTLING PLANT Capacity: 3 X 500 MT At Plot No.499 Kota-Jhalawar Road (NH-12) Village- Mandana, Tehsil-

More information

TOTAL WATER MANAGEMENT IN THE STEEL INDUSTRY. By N. Ramachandran, Ion Exchange (India) Ltd

TOTAL WATER MANAGEMENT IN THE STEEL INDUSTRY. By N. Ramachandran, Ion Exchange (India) Ltd TOTAL WATER MANAGEMENT IN THE STEEL INDUSTRY By N. Ramachandran, Ion Exchange (India) Ltd Large quantities of water are required to produce steel and steel products - typically 180-200 m 3 of water per

More information

Decentralized waste resource management: Nisargruna experience Sharad P. Kale Head, Technology Transfer and Collaboration Division BHABHA ATOMIC RESEARCH CENTRE MUMBAI 400085 sharadkale@gmail.com Shrinagar

More information

Sustainable Solutions In Energy & Environment

Sustainable Solutions In Energy & Environment Sustainable Solutions In Energy & Environment Thermax Group, a billion dollar company, provides a range of engineering solutions to the energy and environment sectors. Our presence spans 75 countries across

More information

Environmental Leadership Program Inspection Form Portable Asphalt Facility

Environmental Leadership Program Inspection Form Portable Asphalt Facility Environmental Leadership Program Inspection Form Portable Asphalt Facility Company Name -Name & Location of Facility: Date of Inspection: FID Number Name of Inspector: Names of Inspection Participants:

More information

THE RAMCO CEMENTS LIMITED

THE RAMCO CEMENTS LIMITED 1 P a g e 2 P a g e THE RAMCO CEMENTS LIMITED (Formerly Madras Cements Ltd.) COMPLIANCE REPORT FOR ENVIRONMENTAL CLEARANCE JAYANTHIPURAM NORTH BAND MINING LEASE 2.0 MILLION TPA CAPACITY EC Lr. No. : J-11015/377/2006-IA.II

More information

(Consolidated Version) 1 of COUNCIL DIRECTIVE ON WASTE

(Consolidated Version) 1 of COUNCIL DIRECTIVE ON WASTE (Consolidated Version) 1 of COUNCIL DIRECTIVE ON WASTE THE COUNCIL OF THE EUROPEAN COMMUNITIES,... HAS ADOPTED THIS DIRECTIVE: For the purposes of this Directive: Article 1 (a) "waste" shall mean any substance

More information

Compliance of Environmental Clearance SEIAA/GUJ/EC/8(a)/251/2012 Dated (Period April 2016 to September 2016)

Compliance of Environmental Clearance SEIAA/GUJ/EC/8(a)/251/2012 Dated (Period April 2016 to September 2016) Compliance of Environmental Clearance SEIAA/GUJ/EC/8(a)/251/2012 Dated 06.09.2012 (Period April 2016 to September 2016) Sr. No. Conditions Compliance status A. Specific Conditions A.1 Water 1. The fresh

More information

MCDR INSPECTION REPORT

MCDR INSPECTION REPORT 1 MCDR INSPECTION REPORT General SN Particulars Details Date of Inspection 18.10.2016 1 Name of the Mine Dhobitola Titaniferous Iron Ore Mine 2 Total Lease Area (Ha) 2.61 Ha (Entire Forest Land) with breakup

More information

Connecting. markets. you to key

Connecting. markets. you to key Essar Ports Ltd. Essar House, Keshavrao Khadye Marg Mahalaxmi Mumbai - 400 034 Maharashtra, India Telephone: (+9 22) - 50000 / 666000 Fax: (+9 22) - 6660809 Email: eptlbdm@essar.com www.essarports.com

More information

Monitoring the Implementation of Environmental Safeguards

Monitoring the Implementation of Environmental Safeguards Monitoring the Implementation of Environmental Safeguards Ministry of Environment & Forest Western Region, Regional Office, Bhopal MONITORING REPORT PART I DATA SHEET RASHTRIYA CHEMICAS AND FERTILISERS

More information

Urban Rainwater Harvesting Systems: Promises and Challenges

Urban Rainwater Harvesting Systems: Promises and Challenges TheWaterChannel Webinar #5 Urban Rainwater Harvesting Systems: Promises and Challenges By Vishwanath S Zenrainman@gmail.com www.ircsa.org www.rainwaterclub.org Thanks for coming. The webinar will begin

More information

Excreta Matters: 7 th Citizens Report on the state of India s Environment. An agenda for water-prudent and waste-wise India.

Excreta Matters: 7 th Citizens Report on the state of India s Environment. An agenda for water-prudent and waste-wise India. Excreta Matters: 7 th Citizens Report on the state of India s Environment An agenda for water-prudent and waste-wise India Need to reinvent Rapid urbanization is creating new water stresses Violence is

More information

Sr.No Condition Status A. SPECIFIC CONDITIONS:

Sr.No Condition Status A. SPECIFIC CONDITIONS: J.K. CEMENT WORKS, MANGROL (RAJ.) Compliance report of Mangrol Lime stone mine (For the period from April 2011 to September 2011) Sub:- Conditions of Environment Clearance from MOEF, New Delhi Letter No.

More information

40 CFR Part 257. Rollin M. Schahfer Generating Station

40 CFR Part 257. Rollin M. Schahfer Generating Station Annual CCR Fugitive Dust Control Report in support of 40 CFR Part 257 for Northern Indiana Public Service Company s Rollin M. Schahfer Generating Station Table of Contents Introduction... 3 Requirement

More information

TOTAL WATER MANAGEMENT

TOTAL WATER MANAGEMENT TOTAL WATER MANAGEMENT 1 JSW Steel Group Companies SISCOL, Salem Tarapur JSW Steel, Vijayanagar 4.0 mtpa. JSW Port, Goa VMPL, Iron Ore mining JPOCL JSW Captive power JSW Steel, Bellary 2 JSW : Process

More information

Tackling Non-point Source Water Pollution in British Columbia

Tackling Non-point Source Water Pollution in British Columbia Water Quality Clean Water Tackling Non-point Source Water Pollution in British Columbia Our well-being depends on sustainable supplies of clean water for our physical health and for a healthy environment

More information

ENVIRONMENTAL POLLUTION ENVR-252 CHAPTER # 2

ENVIRONMENTAL POLLUTION ENVR-252 CHAPTER # 2 ENVIRONMENTAL POLLUTION ENVR-252 CHAPTER # 2 POLLUTION Pollution - addition of undesirable material into the environment as a result of human activities. The agents which cause environmental pollution

More information

Technical Presentation on Spent Pot lining Management & Red Mud

Technical Presentation on Spent Pot lining Management & Red Mud Technical Presentation on Spent Pot lining Management & Red Mud 0 Bharat Aluminium Company Ltd, Korba & Vedanta limited, Jharsuguda & Lanjigarh OUR PRESENCE 1 Jharsuguda Smelter Capacity 3,615 MW 1.75

More information

Guidance on use of Disposal and Recovery Codes (Waste Management Act, 1996 as amended)

Guidance on use of Disposal and Recovery Codes (Waste Management Act, 1996 as amended) Guidance on use of Disposal and Recovery Codes (Waste Management Act, 1996 as amended) This information is provided as a source of reference for operators completing waste surveys for the EPA. Under each

More information

ENVIRONMENTAL IMPACT ASSESSMENT AND YOU

ENVIRONMENTAL IMPACT ASSESSMENT AND YOU ENVIRONMENTAL IMPACT ASSESSMENT AND YOU PARTICIPATING IN PUBLIC CONSULTATIONS FOR: COAL FUELED THERMAL POWER PLANTS C A G Citizen consumer and civic Action Group 1. What are Thermal Power Plants? Electricity

More information

CASE STUDY 1 : ALTERNATIVE FUEL AND RAW MATERIAL CO-PROCESSING EXPERIENCES - ACC LTD., KYMORE CEMENT WORKS

CASE STUDY 1 : ALTERNATIVE FUEL AND RAW MATERIAL CO-PROCESSING EXPERIENCES - ACC LTD., KYMORE CEMENT WORKS Case Study Manual on Alternative Fuels & Raw Materials Utilization CII-SOHRABJI in GODREJ Indian GREEN Cement BUSINESS Industry CENTRE CASE STUDY 1 : ALTERNATIVE FUEL AND RAW MATERIAL CO-PROCESSING EXPERIENCES

More information

Best Practices Adopted By Shriram Alkali & Chemicals Jhagadia To improve Energy Efficiency. Navin Jaiswal Addl General Manager DCM Shriram Ltd

Best Practices Adopted By Shriram Alkali & Chemicals Jhagadia To improve Energy Efficiency. Navin Jaiswal Addl General Manager DCM Shriram Ltd Best Practices Adopted By Shriram Alkali & Chemicals Jhagadia To improve Energy Efficiency Navin Jaiswal Addl General Manager DCM Shriram Ltd 1 The Company DCM Shriram Ltd. DCM Shriram Limited is formed

More information

CLEANER PRODUCTION IN FOUNDRY INDUSTRIES

CLEANER PRODUCTION IN FOUNDRY INDUSTRIES CLEANER PRODUCTION IN FOUNDRY INDUSTRIES INTRODUCTION Foundry is one of the most energy intensive metallurgical industries. Various sections of Foundry namely Pattern making, molding, melting, core making,

More information

Efforts for Energy Conservation: The campus lights have been replaced by LED lights to reduce energy consumption.

Efforts for Energy Conservation: The campus lights have been replaced by LED lights to reduce energy consumption. The Institution is aware of its social responsibility and makes special efforts to inculcate environmental consciousness amongst its students. The institution believes that knowledge of environmental degradation

More information

Definitions and Comments on 2016 Consolidated Nestlé Environmental Performance Indicators

Definitions and Comments on 2016 Consolidated Nestlé Environmental Performance Indicators Definitions and Comments on 2016 Consolidated Nestlé Environmental Performance Indicators General Comments Environmental performance indicators cover all Nestlé factories except some of the factories acquired

More information

EIA REPORT FOR PROPOSED EXPANSION OF STEEL PLANT FROM 1.0 MTPA TO 2.0 MTPA 0F UTTAM VALUE STEELS LIMITED

EIA REPORT FOR PROPOSED EXPANSION OF STEEL PLANT FROM 1.0 MTPA TO 2.0 MTPA 0F UTTAM VALUE STEELS LIMITED COMMENTS OF THE PROJECT PROPONENT ON THE VARIOUS CONCERNS RAISED IN THE PUBLIC CONSULTATION PROCESS The public hearing of the proposed expansion of steel plant from 1.0 MTPA to 2.0 MTPA at Village - Barbadi,

More information

OPTIMISATION OF WATER USAGES IN THERMAL POWER PLANTS AND A STUDY ON DRY COOLING SYSTEM

OPTIMISATION OF WATER USAGES IN THERMAL POWER PLANTS AND A STUDY ON DRY COOLING SYSTEM CONFERENCE ON WATER OPTIMISATION IN THERMAL POWER PLANTS OPTIMISATION OF WATER USAGES IN THERMAL POWER PLANTS AND A STUDY ON DRY COOLING SYSTEM S. K. Thakur, Dr. L. D. Papney, Chief Engineer (I/C), TE&TD

More information

AMBUJA CEMENTS LIMITED

AMBUJA CEMENTS LIMITED Page 1 of I II FORM V (See Rule 14) Environmental Statement for the Financial Year Ending on 31 st March 17 Name & Address of the Owner/Occupier of the Industry PART A Industry Category Primary ( STC Code)

More information