PRE- FEASIBILITY REPORT

Size: px
Start display at page:

Download "PRE- FEASIBILITY REPORT"

Transcription

1 PRE- FEASIBILITY REPORT FOR PROPOSED GRAIN BASED DISTILLERY 100KLPD At VILLAGE GOANDPUR JAI CHAND, TEHSIL HAROLI, DISTT. UNA, HIMACHAL PRADESH APPLICANT M/S ROCK AND STORM DISTILLERIES (P) LIMITED OFFICE NO. 11, GROUND FLOOR, CENTRA MALL, INDUSTRIAL AREA, PHASE-I, CHANDIGARH. 1

2 PRE-FEASIBILITY REPORT 1.0 INTRODUCTION Earlier, the assessment of the projects was done on Technical feasibility reports and Cost-Benefit-Ratio which mainly considered financial & technical resources. But no consideration was given to the environment protection in this evaluation and these flaws became apparent with continuous deterioration of environment. Thus in order to have more realistic evaluation, and keeping in view the deteriorating conditions, another dimension was added which is now called as Environmental Impact Assessment (E.I.A.). This forms an integral part of the project and is taken into account while appraising the project at different stages. Thus in the new comprehensive approach all considerations like, Technical, Financial & Environmental are given due weightage. M/s. Rock and Storm Distilleries (P) Limited is proposes to install grain based Distillery having capacity 100 KLPD at Village Goandpur Jai Chand, Tehsil Haroli & District Una, Himachal Pradesh. Grain will be used as Raw Material, which is easily available from the local nearby markets. As per EIA Notification dated 14 th Sep, 2006 and amendment dated 1 st December 2009, the proposed project falls under Category A, Project or Activity 5(g). They have to submit Form-I along with Pre-Feasibility Report and other relevant documents for getting Environmental Clearance. This pre-feasibility report has, therefore, been prepared by the consultants to assess the likely impact of the proposed project, on various factors which may be affected with the implementation of the programme and to suggest remedial/precautionary measures, if any. 1.2 REQUIREMENTS FOR THE PROJECT 1. Name of the Industry M/s. Rock and Storm Distilleries (P) Limited 2. Products to be manufactured 100 KLPD ENA, RS, AA & 3.0 MW Power 3. Main Raw Material Grain 4. Total Plot Area 14 acres 2

3 2.0 PROFILE OF THE COMPANY & PROMOTORS. The Company was incorporated on with Registrar of Companies, Punjab, Chandigarh and Himachal Pradesh with the objective of installing a Indian made foreign liquor bottling plant with following promoters directors: SH. ARUNDEEP SINGLA SH. AMANDEEP SINGLA The Company established its unit at Village Chajjli, Jakhal Lehragag Road, Sunam and started production in the financial year The turnover of the company is growing year on year. Detail of revenue from operations and net profit of the company for last three years is as under:- Rs. In Lac FINANCIAL REVENUE FROM % INCREASE IN NET PROFIT YEAR OPERATION TURNOVER In the beginning the company had started operations only in Punjab but gradually expanded its business in the following states other than Punjab -DELHI -UTTRAKHNAD -HARYANA -BIHAR Other details of M/s Rock and Storm Distilleries Pvt. Ltd. (Sunam Unit): PARTICULARS DETAILS Date of incorporation Installed Production capacity Paid up share capital as on Reserves & Surplus as on Revenue from operation for Financial year ,880,000 cases per annum Rs Lacs Rs Lacs Rs Lacs 3

4 ABOUT THE PROMOTERS DIRECTORS OF THE COMPANY: The company is floated and promoted by following persons: Sh. Arundeep Singla Sh. Amandeep Singla SH. ARUNDEEP SINGLA: He is a young, educated& energetic man. He is graduate in business administration from Australia. He is experienced businessman and has played a vital role in the growth of the company. Company is achieving new heights under his stewardship and sales man ship. SH. AMANDEEP SINGLA: He is a young, energetic and educated man. He is in this business for last 8 years. Company is growing under his good management and leadership. 4

5 3.0 PROJECT SITE The Project site is situated at Village Goandpur Jai Chand, Tehsil Haroli & District Una, Himachal Pradesh. It lies near Long: 76 13' 36.33" East and Lat: 31 18' 51.3" North and is at an Altitude of about 449m above mean sea level. It is well connected with Santokhgarh through well maintained metalled roads. It is about 19 K.M. from Una by road. The nearest rail head is Una, which is at a distance of about 17 km from the site. Key Plan, Location Plan & Google Map of the unit is given in Fig 3.1, 3.2 & 3.3 respectively. Layout Plan of the unit is given in Fig

6 FIGURE 3.1 KEY PLAN Project site 6

7 FIGURE 3.2 LOCATION PLAN 7

8 FIGURE 3.3 GOOGLE IMAGE 8

9 FIGURE 3.4 LAYOUT PLAN 9

10 4.0 PROJECT DESCRIPTIONS 4.1 GENERAL: The plant is located at Village Goandpur Jai Chand, Tehsil Haroli, District Una, Himachal Pradesh. Proposed project site has been selected keeping in mind the easy availability of raw materials. Other infrastructural facilities like Land, Water and Transportation & Communication etc. are also well established & available at the selected location. No ecologically sensitive area, National Park, Biosphere Reserve & Bird Sanctuary are found with-in 5 km radius of the project site. Salient features of the project is given in table RAW MATERIALS, PRODUCTS & QUANTITIES: Raw materials used for proposed project are given in table 4.1. The details of production is given in table 4.2 Raw Material: TABLE 4.1 S. No. PARTICULAR REQUIREMENTS SOURCES 1. Grain (MT/D) Local markets 2. Fresh Water (KL/D) 922 Ground water 3. Steam Requirement 30TPH Own Boiler & Turbine Product: TABLE 4.2 S. No. PARTICULAR UNITS CAPACITY 1. Rectified Spirit (RS) KLPD 100or 2. Extra Neutral Alcohol (ENA) KLPD 100or 3. Anhydrous Alcohol* (AA) KLPD 100or 5. Liquefied Carbon-Dioxide (CO 2 ) TPD Captive Power Plant MW

11 TABLE 4.3 DETAILS OF THE PROJECT S. No. Particulars Details A. LOCATION DETAILS 1. Location A. Village Goandpur Jai Chand B. Tehsil Haroli C. District Una D. State Himachal Pradesh 2. Latitude 31 18'51.03"N 3. Longitude 76 13'36.33"E 4. Toposheet No Project Area Total Area 16 acres Green Area- 33% (5.3 acre) C. PRODUCTION CAPACITY Capacity KLPD Co-gen Power Plant 3.0 MW. D. ENVIRONMENTAL SETTINGS 1. Nearest Village Village Goandpur Jai Chand, approx. 3 Km in North west direction from the project site. 2. Nearest City Una City, approx. 17 km in North- East direction from the project site 3. National Highway/State Highway/ Express NH-21 (Nangal-Una) is about 13km Highway east direction from the project site. 4. Nearest Railway Station Una Railway Station, approx. 17 km in North East direction. 5. Nearest Airport Chandigarh Airport approx. 90 km in South-East from the project site. 6. National Parks/ Wild Life Sanctuaries/ No any wild Life Sanctuaries exist Biosphere Reserves within 10 km radius within 5 km radius from project 7. Reserved / Protected Forest within 10 km radius No Reserved Forests exists within 10 (Boundary to boundary distance) km radius. 8. Nearest water bodies No water body exists within 5 km area. 11

12 9. Source of Water Ground water 10. Seismic Zone Seismic Zone IV D. COST DETAILS 1 Capital Cost of the project Rs. 101 Cr 2 Total cost for Environmental Management Plan Rs 7.6 Cr (EMP) 3 Total Working Day 330 days annually 12

13 4.2 FUEL REQUIREMENT: The details of fuel requirement are given in Table 4.4, Table 4.4 S. NO. FUEL TOTAL QUANTITY SOURCE REQUIRED 1 Rice Husk 125 TPD Nearby area 4.3 WATER REQUIREMENT: Total water requirement for the proposed project will be 922m 3 /day. Water requirement for first run would be 3011 m 3 /day, which will be reduced through recycling of 2089m 3 /day of treated water/ Condensates. Water requirement for the proposed project will be met from ground water as well as recycled water. Permission for ground water extraction is under process. The detail of water requirement is given in table 4.5 Table 4.5 S. NO. Operation Water required 1 Grain Based Distillery, Blending & Bottling and 3.0 MW Power co-generation 922 (Net fresh water after recycle) It will be sourced from ground water as well as the recycled water. The details worked out are given below: Water Requirement for grain Based Operation The total water requirement for the grain based is estimated at 922 KLD, worked out as per details given in table MANPOWER REQUIREMENT: The total manpower required for the proposed project will be 250 persons which include all categories of unskilled, semiskilled, skilled personnel and contract labour. 4.5 POWER REQUIREMENT: The estimated power requirement for proposed will be 2.5 MW. The company s proposal is to install 3.0 MW Co Generation Power Plant. 13

14 Table 4.6 WATER BALANCE FLOW CHART INPUTS PROCESS WATER IN LIQN & FERMENTATION 547 m 3 DM WATER FOR RS DILUTION 900 m 3 DM WATER FOR BOILER FEED 624 m 3 SOFT WATER FOR VACUUM PUMP & OTHERS 50 m 3 BLENDING 30 m 3 BOTTLE WASHINGS 10 m 3 SOFT WATER MAKEUP FOR COOLING TOWER 840 m 3 OTHER DOMESTIC USAGE 10 m 3 Total 3011 m 3 OUTPUTS STEAM CONDENSATE 544 m 3 SPENT LEES PR +RO 160 m 3 SPENT LEES RECTIFER 900 m 3 WATER IN THIN SLOPS & DWG 442 m 3 SOFT WATER FOR VACUUM PUMP & OTHERS 50 m 3 WATER IN PRODUCT (IMFL/CL) 30 m 3 CT EVAPORATION & DRIFT LOSSES 840m 3 BOTTLE WASHING 10 m 3 DOMESTIC CONSUMPTION 10 m 3 BOILER DRIFT AND BLOWDOWN 25 m 3 Total 3011 m 3 14

15 RECYLCE & UTILIZATION STREAMS LEES RECYCLE FOR RS DILUTION 720 m 3 STEAM CONDENSATE RECYCLE FOR BOILER 544m 3 SPENT LEES (RECT) - COOLING TOWER MAKEUP 180 m 3 THIN SLOPS RECYCLE TO PROCESS 125 m 3 PROCESS CONDENSATE TO PROCESS 310 m 3 SPENT LEES PRC+FOC 160 m 3 SOFT WATER FOR VACUUM PUMP & OTHERS 50 m 3 TOTAL RECYCLING /RE-UTILIZATIONS OF WATER PER DAY 2089m 3 TOTAL FRESH WATER INPUT 922 m 3 * NET DAILY FRESH WATER CONSUMPTION-9.2 KL/KL 4.6 LAND REQUIREMENT: The total project area is 14.0 acres out of which approx 33% (4.62 acres) of the total project area will be developed as greenbelt. The land breakup of the proposed project is given in table 4.7 Table 4.7 BREAKUP OF LAND S. NO. Details Area 1 Type of land Private 2 Total Land m 2 3 Green area development m 2 4 Admin office and Excise office 1850 m 2 5 Raw material/products storage 2550 m 2 6 Utilities 840 m 2 7 Plant & Machinery 3650 m 2 8 Roads/Pavements 6580 m 2 9 Miscellaneous m 2 15

16 4.7 STEAM REQUIREMENT: Steam generated from the boilers will be utilized in the generation of 3.0 MW Power which will be for the own consumption. Steam generated from boiler will also be used for boiler feed water heating and distillery. The steam requirement for different purposes is given in table 4.8 Table-4.8 S. NO. Purpose Steam Required (TPH) 1 Distillation 12 2 MEE 11 Total PROCESS DESCRIPTION: A. LIQUEFACTION SECTION: In liquefaction process, starch is hydrolyzed to dextrin. The Liquefaction is carried out in Single Liquefaction Tank. Feedstock Flour is transferred to Pre-masher and mixed with Recycle Streams, thin stillage and liquefying enzyme. Slurry from Pre-masher is taken to Liquefaction tank where temperature is maintained by means of steam. Necessary retention time is maintained in the Liquefaction Tank. Slurry ph is maintained by supplying dilute caustic solution. Contents in Slurry Tank are kept in suspension by Agitation. The Liquefied Slurry is then cooled in Slurry Cooler (wide Gap PHE) and transferred to Pre-fermentation and Fermentation section. B HIFERM FERMENTATION: The purpose of fermentation is to convert the fermentable substrate into alcohol. To prepare the mash for fermentation, it is diluted with water. Yeast is added in sufficient quantity to complete fermentation to produce alcohol. At the start of the cycle, the Fermenter is charged with mash and contents of the Yeast Activation Vessel (Pre-fermenter). Significant heat release takes place during fermentation. This is removed by passing the mash through heat exchangers to maintain an optimum temperature. The recirculation pumps also serve to empty the Fermenters into Beer Well. CO 2 evolved during fermentation carries along with it some entrained alcohol. This CO 2 is taken to a CO 2 scrubber where it is washed with water to remove the entrained alcohol. The scrubbed CO 2 can then be taken to CO 2 plant or vented out. After emptying of Fermenter, it is cleaned with CIP using cleaning nozzles. After CIP Fermenter is ready for next batch be filled. 16

17 C. MPR DISTILLATION WASH TO ENA: Multi-Pressure Distillation system has eight Distillation columns operating at various pressure conditions. Heat energy from columns operating under high pressure is utilized for columns operating under low pressure to optimize the operation for energy consumption. Following Columns will be under operation Analyser Column Degasifying Column Pre-Rectifier Column cum Exhaust Column Extractive Distillation Column Rectifier cum Exhaust Column Recovery Column Simmering Column Pre-heated fermented wash is fed at the top of the Degasifying column. Analyser Column is provided with Reboiler. Top vapors of Analyser column containing all the alcohol in the wash are sent to Pre- Rectifier column. Rest of the fermented wash flows down the Analyser column and is taken out as thick slops from Analyser column bottom. Low boiling impurities are concentrated in the Pre-Rectifier column. A draw of impure alcohol is taken out from the top of the Pre-Rectifier column. RS draw is taken from the top of Pre rectifier column, which further is sent to Extractive Distillation column. Dilution water is fed to this column. The Extractive Column operates on the principle of inversion of relative volatility. Low boiling impurities are separated in the Extractive Distillation Column & bottom is sent to Rectifier cum Exhaust column. The Rectifier/Exhaust column concentrates the alcohol to 96% v/v. The spirit is drawn from the upper trays of the Rectification Column. Fusel oil build up is avoided in the Rectifier cum exhaust column by withdrawing side streams (fusel oils). ED condensates, fusel oil draw from R/E column are sent to Recovery column where these fusel oils are concentrated and then sent to decanter where these streams are diluted with water and fusel oil rich layer is separated. Washings are sent back to the column to recover alcohol. The spirit Draw from the Rectifier column is sent to the Simmering column where methanol is separated in the form of a cut from the top and ENA is taken out from the bottom. ENA drawn from the Simmering Column is taken to the receiver after cooling in ENA cooler. 17

18 D DECANTATION SECTION EXCLUDING DECANTER CENTRIFUGES Decantation section comprises of a Centrifuge Decanters for separation of suspended solids from Thick slop coming out of Grain Distillation Plant. Wet cake is removed from bottom of Decanter. Thin slops coming out of Decanter are collected in a tank and partly recycled into the process & Evaporation for further concentration. The concentrated thin slops called as Syrup is mixed with Wet cake and sold in wet form as cattle feed (DWGS) Or the entire mixture can be dried in a DWGS Dryer and then sold in dry form as Cattle feed (DDGS). E INTEGRATED EVAPORATION: The suggested treatment scheme is a MULTI EFFECT Evaporation Plant for Thin Slop Evaporation. Shell & Tube type Evaporators with highly efficient liquid distributor working on the principle of Falling Film and Forced circulation Evaporation has been used. The product at the desired concentration of 40%w/w Total Solid is obtained at the outlet of the final effect. Each effect is provided with recirculation cum transfer pumps. The condensate from surface condensers is collected in a common condensate pot. The condensate is transferred for Further treatment / drain by using centrifugal pump. The system operates under vacuum. Water-ring vacuum pumps are used to maintain a desired vacuum. Cooling water from cooling tower is used in the surface condensers for condensing the vapors. F DWGS DRYER SECTION: Wet distiller s grains shall be fed into the dryer housing at controlled rate through a suitable feeding system. The Rotary Bundle is enclosed in an insulated dryer housing and on its outer flights are fixed. Dry, saturated steam is to be supplied to the bundle through rotary joint at one end & the condensate is discharged through rotary joint mounted of another end. During the course of rotation, these flights pick up the material and shower them on to the tube bundles. The heat transfer is primarily by conduction. The water vapors are exhausted through an Exhaust Blower & passed through a cyclone separator for separating fines. Dry product partially recycled back to feed conditioner for feed conditioning through Product Screw & Recycle Conveyor. Entire operation of the Dryer is controlled through Local Indication cum Control panel. 18

19 System Description for Cooling & Conveying: Dry DWGS below product screw is discharged into charging hopper of pneumatic conveying system. Rotary feeder feeds it into the conveying line. Ambient air is used for conveying. The material gets conveyed to product collector & discharged from rotary discharge valve. Exhaust air is vented to atmosphere. The conveying system is lean phase suction type, using centrifugal blower as prime mover. The conveying air quantity is designed considering cooling requirement & to cool the product before discharge G ALCOHOL) MOLECULAR SIEVE DEHYDRATION (MSDH) PLANT: ETHANOL (ABSOLUTE Rectified Spirit containing at least 95% v/v alcohol is pumped from RS feed tank to dehydration section. Rectified spirit is preheated in Feed pre heater with the help of product vapors and then fed to top tray of Evaporator Column. The objective of the Evaporator Column is to evaporate rectified spirit. The Evaporator Column operates under pressure. Energy is supplied to the Evaporator Column through Evaporator Column Re-boiler with steam condensing on shell side. Overhead feed alcohol vapors from the Evaporator Column are then passed through Super heater where alcohol vapors are superheated. Energy for superheating is supplied by steam condensation on shell side of the Super heater. Superheated hydrous alcohol vapors are sent to twin Adsorbent Beds. The twin Adsorbent Beds operate in cyclic manner. Twin beds are provided to allow for bead regeneration in continuous operation. While one bed is in dehydration mode, the other is in regeneration mode. Depending on feed and product specifications, dehydration-regeneration exchange takes place approximately every few minutes. The feed alcohol vapors are passed through the bed under dehydration mode. The Adsorbent Bed will absorb moisture present in feed vapors and dehydrated product alcohol vapors are obtained from bottom of the bed. 19

20 The product alcohol vapors are then passed through Regeneration Pre-heater and Feed Pre-heater for heat recovery. The Product alcohol vapors are then passed through Product Condenser where product vapors are condensed with the help of cooling water. Condensed product alcohol is collected in product receiver. The Product alcohol from Product Receiver is pumped to Product Cooler where it is cooled with the help of cooling water and then sent for anhydrous alcohol storage. During regeneration mode, vacuum is applied to the bed under regeneration. A small amount of product alcohol vapors are purged through the bed in regeneration mode under high vacuum, to prepare the desiccant for cycle changeover when this bed goes online. The purged alcohol vapors act as carrier for removal of moisture from the bed. These alcohol vapors along with moisture are obtained from the top of bed. These alcohol-water vapors (regeneration stream) are condensed in Regeneration Condenser, which is attached to Vacuum Eductor. Vacuum is pulled in the system with the help of Vacuum Eductor. Regeneration stream is used as motive fluid for Vacuum Eductor. The regeneration stream coming from the Regeneration Condenser is pumped, preheated in Regeneration Pre-heater and fed to the Evaporator Column for recovery of alcohol. Moisture present in feed alcohol is removed from the bottom of the Evaporator Column in the form of spent lees. After one cycle is over, the beds are interchanged, that is, the bed on dehydration mode will be switch over to regeneration mode and the bed on regeneration mode will be switch over to dehydration mode, with the help of automation system. 20

21 5.0 DESCRIPTION OF THE ENVIRONMENT 5.1 INTRODUCTION: The main objectives of describing the environment, which may be potentially affected, are (i) to assess present environmental quality and the environmental impacts and (ii) to identify environmentally significant factors that could preclude project development. This chapter contains information on existing environmental scenario for the following parameters. 1. Land Environment 2. Meteorology 3. Air Environment 4. Noise Environment 5. Water Environment 6. Soil Environment 7. Biological Environment 8. Socio-economic Environment 5.2 ENVIRONMENTAL BASELINE DATA COLLECTION: Baseline data for the proposed project will be collected after issued of TORs. The Primary data will be collected by monitoring & surveying of various environmental components/ parameters in the core zone during the study period are given in Table TABLE-5.1 PRIMARY DATA S. NO. PARAMETERS DESCRIPTION 1 Meteorology Meteorological parameters on hourly basis at project site. Parameters: Temperature, Relative humidity, Wind Speed & Wind Direction. 2 Air Ambient air quality monitoring (24 hourly), twice a week. Parameters are PM 10, PM 2.5, SO 2, NO 2 & CO. No. of Locations: 6 locations in core. 3 Noise Noise level monitoring (day & night time), once in a season. No. of Locations: 8 locations in core and buffer zone. 4 Water Ground water sampling, once in a season. 21

22 No. of Locations: 8 locations in core and buffer zone. Tested for physical and chemical parameters. 5 Soil Soil sampling, once in a season. No. of Locations: 6 locations in core and buffer zone. 6 Biological Factors Biodiversity survey, once in a season. 7 Socio-economic Environment Location: Core and buffer zone. Socio-economic survey, once in a season. Location: Core and buffer zone. 22

23 6.0 ENVIRONMENTAL MANAGEMENT PLAN PARTICULARS Air Quality Management: Emissions Management DETAILS A stack of adequate height equipped with APCD will be installed with the boiler to control the particulate and gaseous emissions due to combustion of fuel. CO 2 generated during the fermentation process will be collected by utilizing CO 2 Scrubbers and will sell to vendor. All the roads are asphalted to control the fugitive dust emissions Proper servicing & maintenance of vehicles is/will be carried out. Green Belt around the periphery and within premises is already in place and same will be maintained. STANDARDS: Monitoring Management Water Management Management NO. OF STACK STACK ATTACHED TO 1. BOILER (30TPH) 2 DG SETS (750KVA) FUEL APCD STACK HEIGHT RICE BAG 30 MTR HUSK FILTER (GL) DIESEL ACOUSTIC 10 MTR (GL) POLLUTANTS LIMITS PM 150 mg/nm3 PM 75 mg/nm3 NO x 1458 mg/nm3 Ambient air quality and stack emission will be regularly monitored to ensure that ambient air quality standards and suggested limits on stack emission loads would be met honestly at all the time. The project will be based on Zero Effluent Discharge. Fresh water requirement of the project will be met by Ground Water & recycled water. Efforts will be made to conserve as much water as possible by recycling and reuse. Record of wastewater returned back to process for utilization in Fermentation/cooling tower and to gardening will be kept. Process condensate from MEE will be recycled back to the process and use for cooling tower as make up. Spent lees generation from distillation column will be recycled partly to the columns for dilution and balance will be used for 23

24 Noise Management cooling tower make up. Domestic waste water generated from the plant will be treated in Septic Tank fallowed by ETP. And treated water will be used in green belt development. Effluent Treatment Plant will be installed for treatment of waste water. Management There will be no danger of noise pollution from plant. The green belt (plantation of dense trees across the boundary) helps in reducing noise levels in distillery plant as a result of attenuation of noise generated due to plant operations and transportation. Earmuffs will be used while running the equipments of the plant. D.G sets will be provided with acoustic to control the noise level within the prescribed limit. A high standard of maintenance will be practiced for plant machinery and equipments, which helps to avert potential noise problems. Personal Protective Equipment like earplugs and earmuffs will be provided to the workers exposed to high noise level. Regular monitoring of noise level will be carried out. Solid Waste Management 24

25 Management Fly ash from the Boiler will be used for land filling or will be given to brick manufacturing units for reuse. Spent wash generated during operation, will be incinerated in Multi-effect evaporator. Details of Solid Waste generation are tabulated below: Green belt Management SOURCE OF SOLID WASTE TYPE TOTAL QUANTITY DISPOSAL METHOD Process Grain 270 TPD of Dried and sold for Residue DWGS/DDGS cattle feed. Boiler Fly Ash 20 TPD Land fills for low lying area/bricks manufacturer. Management Odor Management Management Green belt development in and around the plant site helps to attenuate the pollution level. Out of the total plant area approx. 33% land will be developed as green belt as per Central Pollution Control Board (CPCB) guidelines. Native species will be planted in consultation with the local DFO. The remedial measures will be taken such as better house-keeping by regular steaming of all fermentation equipments and same will be followed in future. Temperature will be kept under control during fermentation to avoid inactivation/ killing of yeast and staling of fermented wash will be avoided 25

26 7.0 SITE ANALYSIS (i) Connectivity The plant is located at Village Goandpur Jai Chand, Tehsil Haroli, District Una, Himachal Pradesh. National Highway-21 (Nangal Una) is about 13km in East direction from the project site. Una Railway Station is about 17 km in North-East direction. It has an easy access to raw material availability and other infrastructural facilities e.g. land, power, water, transport and communication, approach through road & access distances from the nearest highway, railway station etc. The site is well connected with communication facilities like telephone, fax, wireless and telex and as such, no constraints are envisaged in this aspect also. (ii) Topography The topography of the area is almost flat. (iii) Existing land use pattern Project area is the industrial land. Change of Land use already obtained. (v) Existing Infrastructure It is new project. Total Plant area is about 14 acres. (vi) Social Infrastructure available Telephone and medical facilities are available in the nearby towns. Other facilities like small shops and markets are existing in the area that will support the basic lifestyle of the people. (vii) Land use Total plant area is 16 acre/6.4 ha. Land use S. NO. Details Area 1 Type of land Private 2 Total Land m 2 26

27 3 Green area development m 2 4 Admin office and Excise office 1850 m 2 5 Raw material/products storage 2550 m 2 6 Utilities 840 m 2 7 Plant & Machinery 3650 m 2 8 Roads/Pavements 6580 m 2 9 Miscellaneous m 2 27

28 8.0 PROPOSED INFRASTRUCTURE (i) Industrial Area It is new project, having 14 Acres land area. (ii) Residential Area The local labor will be preferred to provide employment opportunities. No residential colony will be constructed for proposed project. (iii) Green Belt Greenbelt will be developed in 33% of the total area of the proposed project. (iv) Social Infrastructure Proposed project will result in growth of the surrounding areas by increased direct and indirect employment opportunities in the region including ancillary development and supporting infrastructure. (v) Connectivity The plant site is well connected to state highway. The nearest railway station is Una Railway station (~17 km in North-east direction from plant site) and nearest airport is Chandigarh (~ 90 km in south-east direction from the plant site). The site is suitably located with respect to availability of raw material, water, road network, skilled/semi skilled/unskilled and professional manpower etc. All communication facilities such as telephone, tele-fax & internet are available in the vicinity of the plant site. (vi) Industrial Waste management The grain based distillery proposed project would be based on ZERO DISCHARGE. 9.0 REHABILITATION AND RESETTLEMENT (R & R) PLAN No Rehabilitation and Resettlement plan is applicable in the proposed Project. 28

29 10.0 PROJECT SCHEDULE AND COST ESTIMATES The project will start only after obtaining Environmental Clearance and all other required clearance and will complete after two years of commencement. The Capital Cost of the project is Rs 101 Crores. Cost for Environment Protection measures o Capital Cost : Rs 7.6 Cr o Recurring cost : Rs. 1.8 Cr/annum 11.0 CSR ACTIVITIES Proposed project will result in growth of the surrounding areas by increased direct and indirect employment opportunities in the region including ancillary development and supporting infrastructure. Special emphasis on Financial and Social benefits will be given to the local people including tribal population, if any, in the area. Development of social amenities will be in the form of medical facilities, education to underprivileged and creation of self help groups

EXECUTIVE SUMMARY 1.0 PROJECT DESCRIPTION 1.1 INTRODUCTION

EXECUTIVE SUMMARY 1.0 PROJECT DESCRIPTION 1.1 INTRODUCTION EXECUTIVE SUMMARY 1.0 PROJECT DESCRIPTION 1.1 INTRODUCTION Jaypee Group is a leading Business House of the country with its presence in Core industries and Service Sectors like Cement, Infrastructure development,

More information

Hind Energy & Coal Beneficiation (India) Ltd.

Hind Energy & Coal Beneficiation (India) Ltd. SUMMARY ON ENVIRONMENTAL IMPACT ASSESSMENT REPORT OF Hind Energy & Coal Beneficiation (India) Ltd. (Change in Technology) at Hindadih Village, Masturi Tehsil Bilaspur District, Chhattisgarh Submitted to

More information

Hind Energy & Coal Beneficiation (India) Ltd.

Hind Energy & Coal Beneficiation (India) Ltd. SUMMARY ON ENVIRONMENTAL IMPACT ASSESSMENT REPORT OF Hind Energy & Coal Beneficiation (India) Ltd. 0.96 MTPA Wet type Coal Washery at Birgahani Village, Baloda Tehsil Janjgir-Champa District, Chhattisgarh

More information

PRE-FEASIBILITY REPORT

PRE-FEASIBILITY REPORT PRE-FEASIBILITY REPORT For ToR of Proposed Project of MANUFACTURING OF SYNTHETIC ORGANIC DYES (5 f B IND II) By SHREEJI BAPA DYE CHEM PLOT NO 1319 & 1320, PHASE-III, GIDC, VATVA, AHEMADABAD-382445, GUJARAT,

More information

M/s Hind Energy & Coal Beneficiation Pvt. Ltd. is presently operating a 2 x 1.2 MTPA

M/s Hind Energy & Coal Beneficiation Pvt. Ltd. is presently operating a 2 x 1.2 MTPA 1.0 INTRODUCTION M/s Hind Energy & Coal Beneficiation Pvt. Ltd. is presently operating a 2 x 1.2 MTPA dry type of coal washery at Village: Hindadih, Tehsil: Masturi, District: Bilaspur (C.G.) for which

More information

Prefeasibility Report. 30,000 KLPY Anhydrous (Absolute) Alcohol Manufacturing Plant at Patalganga MIDC

Prefeasibility Report. 30,000 KLPY Anhydrous (Absolute) Alcohol Manufacturing Plant at Patalganga MIDC Prefeasibility Report For 30,000 KLPY Anhydrous (Absolute) Alcohol Manufacturing Plant at Patalganga MIDC of Alkyl Amines Chemicals Limited 401-407 Nirman Vyapar Kendra, Plot No. 10, Sector 17, Vashi,

More information

M/s. Jindal Electricity Generation (P) Limited was promoted by Sri Omprakash Agrawal & Associates having other business in the area.

M/s. Jindal Electricity Generation (P) Limited was promoted by Sri Omprakash Agrawal & Associates having other business in the area. 1. INTRODUCTION Executive Summary 1.1 Background: M/s. Jindal Electricity Generation (P) Limited was promoted by Sri Omprakash Agrawal & Associates having other business in the area. 1.2 Proposed Project:

More information

North East Roofing Pvt. Ltd. Expansion of Asbestos Cement Sheets & Accessories Manufacturing Unit (50,000 TPA to 70,000 TPA)

North East Roofing Pvt. Ltd. Expansion of Asbestos Cement Sheets & Accessories Manufacturing Unit (50,000 TPA to 70,000 TPA) SUMMARY ON ENVIRONMENTAL IMPACT ASSESSMENT REPORT OF North East Roofing Pvt. Ltd. Expansion of Asbestos Cement Sheets & Accessories Manufacturing Unit (50,000 TPA to 70,000 TPA) Proposed at: Bonda Industrial

More information

PROJECT FEASIBILITY REPORT

PROJECT FEASIBILITY REPORT PROJECT FEASIBILITY REPORT FOR OBTAINING PRIOR ENVIRONMENT CLEARANCE For PROPOSED CHEMICAL MANUFACTURING UNIT From M/s. MORADIA BROTHERS CHEM PVT LTD LOCATED AT: Block No.: 45, JalBhumi Industrial Estate,

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT VENSUB LABORATORIES PRIVATE LIMITED SY. NO. 29, TUPAKULAGUDEM VILLAGE, TALLAPUDI MANDAL, WEST GODAVARI DISTRICT, ANDHRA PRADESH PRE FEASIBILITY REPORT VENSUB LABORATORIES PRIVATE LIMITED Duplex No. 12,

More information

4. The ambient air quality monitoring stations We are monitoring the ambient air quality

4. The ambient air quality monitoring stations We are monitoring the ambient air quality GLOBAL CALCIUM PRIVATE LTD., 125&126, SIPCOT COMPLEX, HOSUR 635 126 Ref : No. J-11011/411/2006-IA-II(I) dated 1 st August 2007. Compliance Report for the Period ending 31.3.2015 Sl. Specific Conditions

More information

SIX MONTHLY COMPLIANCE REPORT JUNE- 2015

SIX MONTHLY COMPLIANCE REPORT JUNE- 2015 SIX MONTHLY COMPLIANCE REPORT JUNE- 2015 Group Housing Complex My woods AT Plot no. GH-04, Sector -16 C, Noida Extension, Greater Noida, U.P. Being developed by M/s Mahagun India Pvt. Ltd. A-19, Sector-63,

More information

PRE-FEASIBILITY REPORT

PRE-FEASIBILITY REPORT PRE-FEASIBILITY REPORT FOR PROPOSED 30 KLD GRAIN BASED DISTILLERY PROJECT WITH 5 MW POWER CO-GENERATION PLANT At Vill. Kirna Tehisl : Mungeli Dist. Bilaspur 495335 (Chattisgarh) Proposed By :- AEGIS BEVERAGES

More information

M/s. SAL STEEL LTD Survey no.245/p, Village:-Bharapar, Taluka:- Gandhidham, District:-Kutch, Gujarat.

M/s. SAL STEEL LTD Survey no.245/p, Village:-Bharapar, Taluka:- Gandhidham, District:-Kutch, Gujarat. Pre-Feasibility Study Report For Proposed Fly Ash Co-processing clinker grinding cement Unit of 40,000 MT/month Production capacity within our Existing Premises for M/s. SAL STEEL LTD Survey no.245/p,

More information

INTRODUCTION. Installed Capacity: The total installed capacity of the plant for the product will be as per details given below:- PRODUCT:

INTRODUCTION. Installed Capacity: The total installed capacity of the plant for the product will be as per details given below:- PRODUCT: INTRODUCTION Himalaya Alkalies& Chemicals ltd will setup Caustic soda Plant of 400 MTPD. The Plant site is situated in Village Johron, Kala Amb, Tehsil Nahan, District Sirmaur, Himachal Pradesh. It is

More information

DR. SANJAY V. PATIL HEAD AND TECHNICAL ADVISER DEPARTMENT OF ALCOHOL TECHNOLOGY VASANTDADA SUGAR INSTITUTE, MANJARI, PUNE (INDIA)

DR. SANJAY V. PATIL HEAD AND TECHNICAL ADVISER DEPARTMENT OF ALCOHOL TECHNOLOGY VASANTDADA SUGAR INSTITUTE, MANJARI, PUNE (INDIA) DR. SANJAY V. PATIL HEAD AND TECHNICAL ADVISER DEPARTMENT OF ALCOHOL TECHNOLOGY VASANTDADA SUGAR INSTITUTE, MANJARI, PUNE (INDIA) Email: sv.patil@vsisugar.org.in AIDA Technical Seminar www.vsisugar.com

More information

OPTIMISATION OF WATER USAGES IN THERMAL POWER PLANTS AND A STUDY ON DRY COOLING SYSTEM

OPTIMISATION OF WATER USAGES IN THERMAL POWER PLANTS AND A STUDY ON DRY COOLING SYSTEM CONFERENCE ON WATER OPTIMISATION IN THERMAL POWER PLANTS OPTIMISATION OF WATER USAGES IN THERMAL POWER PLANTS AND A STUDY ON DRY COOLING SYSTEM S. K. Thakur, Dr. L. D. Papney, Chief Engineer (I/C), TE&TD

More information

No. 138 /PS-MS/MPPCB/SEAC/TOR (75)/2011 Bhopal, dt. 03 /06/2011. Env. Consultant: Créative Enviro Service, Bhopal. (SN-29)

No. 138 /PS-MS/MPPCB/SEAC/TOR (75)/2011 Bhopal, dt. 03 /06/2011. Env. Consultant: Créative Enviro Service, Bhopal. (SN-29) 1 By: Speed-Post State Level Expert Appraisal Committee (Formed as per S.O. no. 1533 dated 14 th Sept 2006 of Government of India, Ministry of Environment & Forests) PARYAWARAN PARISAR, E-5, ARERA COLONY,

More information

PRE-FEASIBILITY REPORT FOR OM SAIRAM STEEL AND ALLOYS PVT LTD

PRE-FEASIBILITY REPORT FOR OM SAIRAM STEEL AND ALLOYS PVT LTD PRE-FEASIBILITY REPORT FOR OM SAIRAM STEEL AND ALLOYS PVT LTD PLOT No. F-1,2,3,8,9,10, ADDL. MIDC, PHASE II, AND GUT NO. 46 & 63, VILLAGE DAREGAON, TEHSIL: JALNA DIST: JALNA, MAHARASHTRA 2014-15 1. Executive

More information

BHS-FILTRATION INC. BHS VACUUM BELT FILTER, CANDLE & PRESSURE PLATE FILTER TECHNOLOGIES FOR BIO-ENERGY APPLICATIONS

BHS-FILTRATION INC. BHS VACUUM BELT FILTER, CANDLE & PRESSURE PLATE FILTER TECHNOLOGIES FOR BIO-ENERGY APPLICATIONS BHS-FILTRATION INC. BHS VACUUM BELT FILTER, CANDLE & PRESSURE PLATE FILTER TECHNOLOGIES FOR BIO-ENERGY APPLICATIONS 1. Crop Feedstocks for Bio-Ethanol 2. Cellulose Feedstocks for Bio-Ethanol 3. Wood Feedstocks

More information

ENCON IN THERMAL SYSTEM

ENCON IN THERMAL SYSTEM ENCON IN THERMAL SYSTEM Orchid chemicals & Pharmaceuticals ltd. Bulk API Alathur facility Bulk API Aurangabad facility OHC (Formulations) Alathur facility R&D Centre Corporate Office OHC (Formulations)

More information

V.S LIGNITE POWER Pvt. Ltd AT VILLAGE-GURHA, KOLAYAT, BIKANER, RAJASTHAN

V.S LIGNITE POWER Pvt. Ltd AT VILLAGE-GURHA, KOLAYAT, BIKANER, RAJASTHAN V.S LIGNITE POWER Pvt. Ltd AT VILLAGE-GURHA, KOLAYAT, BIKANER, RAJASTHAN HALF YEARLY REPORT FOR THE PERIOD OCTOBER, 2011 to MARCH 2012 V. S. Lignite Power Pvt. Ltd. Name of the Project : 1x 135 MW Lignite

More information

Solvent Recovery Systems

Solvent Recovery Systems Solvent Recovery Systems Use Steam Recycling A new technique that recycles the heat normally lost during solvent recovery can cut fuel bills and reduce plant exhaust emissions. by Stanley J. Macek Compliance

More information

PART A. M/s Shree Cement Ltd, (Grinding Unit) village - Udepur, Tehsil- Suratgarh, District -Shri Ganganagar, Rajasthan

PART A. M/s Shree Cement Ltd, (Grinding Unit) village - Udepur, Tehsil- Suratgarh, District -Shri Ganganagar, Rajasthan Page 1 of 9 Environmental Statement for Clinker Grinding Unit of M/s Shree Cement Limited, situated at village - Udepur, Tehsil- Suratgarh, District -Shri Ganganagar, Rajasthan for the Period from: 10

More information

HALF YEARLY COMPLIANCE REPORT OF ENVIRONMENTAL CLEARANCE CONDITIONS

HALF YEARLY COMPLIANCE REPORT OF ENVIRONMENTAL CLEARANCE CONDITIONS HALF YEARLY COMPLIANCE REPORT OF ENVIRONMENTAL CLEARANCE CONDITIONS 1. Name of the Project: M/s MCC PTA India Corp. Private Limited Haldia ( WB) Note: Company Name was change from MCC PTA India Corp.Private

More information

Clearance Letter no. : MoEF Vide Letter no. J-11011/79/2003-IA-II (I) dated April 21, 2004

Clearance Letter no. : MoEF Vide Letter no. J-11011/79/2003-IA-II (I) dated April 21, 2004 Name of the Project: Jaypee Rewa Plant, Unit of M/s Jaiprakash Associates Limited for expansion Of cement production from 2.5 MTPA to 3.5 MTPA at Jaypee Nagar, District Rewa, Madhya Pradesh Project Code:

More information

Evaporation Technology. Evaporation, Crystallization and Rectification

Evaporation Technology. Evaporation, Crystallization and Rectification Evaporation Technology Evaporation, Crystallization and Rectification About our company GIG Karasek is a leading European supplier of system design and turnkey plant construction in the field of process

More information

PROPOSED TERM OF REFERENCE

PROPOSED TERM OF REFERENCE PROPOSED TERM OF REFERENCE FOR ESTABLISHMENT OF PROPOSED MOLASSES/GRAIN BASED DISTILLERY HAVING CAPACITY: 160.0 KLD (MOLASSES BASED) OR 120.0 KLD (MOLASSES BASED) + 40.0 KLD (GRAIN BASED) ALONGWITH 7.0

More information

Clean Cooking Madagascar: EMD. Invitation to Propose for a 2,000 5,000 liter per day Ethanol Micro- Distillery (EMD) with Sugarcane Feedstock

Clean Cooking Madagascar: EMD. Invitation to Propose for a 2,000 5,000 liter per day Ethanol Micro- Distillery (EMD) with Sugarcane Feedstock Clean Cooking Madagascar: EMD Call for quotations Invitation to Propose for a 2,000 5,000 liter per day Ethanol Micro- Distillery (EMD) with Sugarcane Feedstock Issued by: Clean Cooking Madagascar Lot

More information

KBK REFERENCE LIST-MAJOR PROJECTS ONLY

KBK REFERENCE LIST-MAJOR PROJECTS ONLY KBK REFERENCE LIST-MAJOR PROJECTS ONLY Feed stock EPCL Thailand 200,000 Litres per day Thailand & cane juice Turnkey plant including land development, civil, infrastructure, fermentation, distillation,

More information

PRE-FEASIBILITY REPORT

PRE-FEASIBILITY REPORT PRE-FEASIBILITY REPORT For PRIOR ENVIRONMENTAL CLEARANCE STORAGE CAPACITY ENHANCEMENT OF HPCL, LPG BOTTLING PLANT Capacity: 3 X 500 MT At Plot No.499 Kota-Jhalawar Road (NH-12) Village- Mandana, Tehsil-

More information

JAYPEE NIGRIE SUPER THERMAL POWER PROJECT

JAYPEE NIGRIE SUPER THERMAL POWER PROJECT JAYPEE NIGRIE SUPER THERMAL POWER PROJECT (A Unit of M/s Jaiprakash Power Ventures Limited) Villages: Nigrie, Tehsil :Sarai District: Singrauli 2014 2015 SUBMITTED M.P. POLLUTION CONTROL BOARD BHOPAL (M.P.)

More information

SOME ENERGY-EFFICIENT TECHNOLOGIES IN JAPAN

SOME ENERGY-EFFICIENT TECHNOLOGIES IN JAPAN SOME ENERGY-EFFICIENT TECHNOLOGIES IN JAPAN (EXECUTIVE SESSION) November, 2007 JAPAN EXTERNAL TRADE ORGANIZATION JAPAN CONSULTING INSTITUTE SOME ENERGY-EFFICIENT TECHNOLOGIES IN JAPAN 1. Power Generation

More information

Zero Liquid discharge for the Industrial sector. by Amit Udgirkar Sr. Manager Environmental Engineering Praj Industries Ltd

Zero Liquid discharge for the Industrial sector. by Amit Udgirkar Sr. Manager Environmental Engineering Praj Industries Ltd Zero Liquid discharge for the Industrial sector by Amit Udgirkar Sr. Manager Environmental Engineering Praj Industries Ltd Major Concerns... Where is the space for process plant??? Reduce Foot Print Major

More information

Steam balance optimisation strategies

Steam balance optimisation strategies Steam balance optimisation strategies Publicado en Chemical Engineering, Noviembre 2002 Background Optimising a steam balance in a plant with several steam mains pressures is not always a simple intuitive

More information

Novozymes Innovative & Sustainable Solutions for Grain Alcohol distillers

Novozymes Innovative & Sustainable Solutions for Grain Alcohol distillers Novozymes Innovative & Sustainable Solutions for Grain Alcohol distillers Sustainability Novozymes commitment For more than ten years, Novozymes has been recognized as one of the most sustainable companies

More information

The unit obtained NOC (CFE) of A.P. Pollution control Board in the year 1988 and started operations.

The unit obtained NOC (CFE) of A.P. Pollution control Board in the year 1988 and started operations. 1. Introduction M/s. Sri Krishna Pharmaceuticals Limited, Unit-III (Formerly Sri Krishna Drugs Limited) was established in the year 1988. It is located at Sy. No. 57, Golkonda kalan, Raikunta (V), shamshabad

More information

Rajasthan State Pollution Control Board

Rajasthan State Pollution Control Board M/s Raj West Power Private Limited Village- Bhadresh, Tehsil:Barmer District:Barmer Sub: Ref: Sir, Consent to Operate under section 25/26 of the Water (Prevention & Control of Pollution) Act, 1974 and

More information

ENVIRONMENTAL IMPACT ASSESSMENT FOR PROPOSED CONSTRUCTION OF SEWAGE PUMPING STATION & SEWAGE TREATMENT PLANT

ENVIRONMENTAL IMPACT ASSESSMENT FOR PROPOSED CONSTRUCTION OF SEWAGE PUMPING STATION & SEWAGE TREATMENT PLANT ENVIRONMENTAL IMPACT ASSESSMENT FOR PROPOSED CONSTRUCTION OF SEWAGE PUMPING STATION & SEWAGE TREATMENT PLANT EXECUTIVE SUMMARY NAGERCOIL MUNICIPALITY, KANYAKUMARI DISTRICT TWAD BOARD,SEWERAGE DIVISION,NAGERCOIL

More information

PRE FEASIBILITY PROJECT REPORT

PRE FEASIBILITY PROJECT REPORT PRE FEASIBILITY PROJECT REPORT FOR EXPANSION OF GRAIN BASED DISTILLERY PLANT FROM 100 KLPD TO 200 KLPD AND CO-GENERATION OF POWER FROM 5 MW TO 10 MW AT VILLAGE MACHHANA AND SANGAT KALAN, TEHSIL AND DISTRICT

More information

2. TECHNICAL DESCRIPTION OF THE PROJECT

2. TECHNICAL DESCRIPTION OF THE PROJECT 2. TECHNICAL DESCRIPTION OF THE PROJECT 2.1. What is a Combined Cycle Gas Turbine (CCGT) Plant? A CCGT power plant uses a cycle configuration of gas turbines, heat recovery steam generators (HRSGs) and

More information

RED CATEGORY CONSENT & AUTHORIZATION ORDER BY REGISTERED POST WITH ACKNOWLEDGEMENT DUE

RED CATEGORY CONSENT & AUTHORIZATION ORDER BY REGISTERED POST WITH ACKNOWLEDGEMENT DUE ANDHRA PRADESH POLLUTION CONTROL BOARD Paryavarana Bhavan, A-III, Industrial Estate, Sanathnagar, Hyderabad-500 018 Phone : 040-23887500, Website : www.appcb.ap.nic.in RED CATEGORY CONSENT & AUTHORIZATION

More information

2 NECESSITY OF THE PROPOSED PROJECT

2 NECESSITY OF THE PROPOSED PROJECT Executive Summary 1 INTRODUCTION M/s. Prosperous Energy Private Limited (PEPL), a wholly owned subsidiary of Videocon Industries Limited has proposed the 2X660MW Coal based supercritical Thermal Power

More information

Prepared by: Steffen

Prepared by: Steffen 2012 Corn Ethanol: Emerging Plant Energy and Environmental Technologies Prepared by: Steffen Mueller, PhD University of Illinois att Chicago Energy Resources Center John Kwik, PEE Dominion Energy Services,

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT DR. REDDY S LABORATORIES LTD. CHEMICAL TECHOPS III PLOT NO.116, 116A, 116B & 126C, S.V. CO OP. IND. ESTATE, BOLLARAM VILLAGE, JINNARAM MANDAL, MEDAK DISTRICT, TELANGANA PRE FEASIBILITY REPORT DR. REDDY

More information

PRE FEASIBILITY REPORT. For PROPOSED BULK DRUG PRODUCTS MANUFACTURING UNITS. M/s. M.K. DRUGS. F-10, Industrial Area, Focal Point, Tehsil: Derabassi

PRE FEASIBILITY REPORT. For PROPOSED BULK DRUG PRODUCTS MANUFACTURING UNITS. M/s. M.K. DRUGS. F-10, Industrial Area, Focal Point, Tehsil: Derabassi PRE FEASIBILITY REPORT For PROPOSED BULK DRUG PRODUCTS MANUFACTURING UNITS Of M/s. M.K. DRUGS F-10, Industrial Area, Focal Point, Tehsil: Derabassi Dist: Mohali, Punjab INTRODUCTION M/s. M.K. Drugs is

More information

Development status of the EAGLE Gasification Pilot Plant

Development status of the EAGLE Gasification Pilot Plant Development status of the EAGLE Gasification Pilot Plant Gasification Technologies 2002 San Francisco, California, USA October 27-30, 2002 Masaki Tajima Energy and Environment Technology Development Dept.

More information

Steam Power Station (Thermal Station)

Steam Power Station (Thermal Station) Steam Power Station (Thermal Station) A generating station which converts heat energy into electrical energy through turning water into heated steam is known as a steam power station. A steam power station

More information

Typical Ethanol Plant

Typical Ethanol Plant Ethanol is commercially produced in one of two ways, using either the wet mill or dry mill process. Wet milling involves separating the grain kernel into its component parts (germ, fiber, protein, and

More information

PRE-FEASIBILITY REPORT. for

PRE-FEASIBILITY REPORT. for PRE-FEASIBILITY REPORT for PROPOSED COMMON EFFLUENT TREATMETN PLANT (CETP) of M/s. VIKASHTEX ENVIROTECH CETP PVT. LTD. Block No. 523, Village: Hathoda, Taluka: Mangrol, Dist: Surat - 394 405 (Guj.) Prepared

More information

Presentation on Excellence in Energy Management-2017

Presentation on Excellence in Energy Management-2017 Presentation on Excellence in Energy Management-2017 Company Profile Kuantum Papers is in the business of production and marketing of writing & printing paper, while conserving precious resources & protecting

More information

Energy Optimized Resource Recovery Project Presented By: Curtis Czarnecki, P.E.

Energy Optimized Resource Recovery Project Presented By: Curtis Czarnecki, P.E. Kenosha Wastewater Treatment Plant Energy Optimized Resource Recovery Project Presented By: Curtis Czarnecki, P.E. Kenosha Water Utility March 22, 2016 WWTP Service Area Overview Population: 110,000 Service

More information

Achieve Zero-liquid Discharge of Industrial Wastewater. (Distill Process Waste for Reuse)

Achieve Zero-liquid Discharge of Industrial Wastewater. (Distill Process Waste for Reuse) (Distill Process Waste for Reuse) by Gary N. Dixon, Sr.Application Engineer, Samsco Water Evaporators Innovative, patented, multi-staged, full distillation, vacuum technology evaporation equipment from

More information

Coke Manufacturing. Environmental Guidelines for. Multilateral Investment Guarantee Agency. Industry Description and Practices. Waste Characteristics

Coke Manufacturing. Environmental Guidelines for. Multilateral Investment Guarantee Agency. Industry Description and Practices. Waste Characteristics Multilateral Investment Guarantee Agency Environmental Guidelines for Coke Manufacturing Industry Description and Practices Coke and coke by-products (including coke oven gas) are produced by the pyrolysis

More information

DAVID BRENNAN SUSTAINABLE PROCESS ENGINEERING CONCEPTS, STRATEGIES, EVALUATION, AND IMPLEMENTATION. Pan Stanford. Publishing

DAVID BRENNAN SUSTAINABLE PROCESS ENGINEERING CONCEPTS, STRATEGIES, EVALUATION, AND IMPLEMENTATION. Pan Stanford. Publishing DAVID BRENNAN SUSTAINABLE PROCESS ENGINEERING CONCEPTS, STRATEGIES, EVALUATION, AND IMPLEMENTATION Pan Stanford Publishing Contents Acknowledgements Preface xvii xix Part A: Concepts Introduction to Part

More information

Max. building height (m)

Max. building height (m) Environmental Management Plan (EMP) for Himalaya Falaknuma by Himalaya Developers Ahmedabad No. Particulars Details 1. Proposal for New Project 2. Type of Project and Commercial Building Construction Project

More information

Flue Gas Desulphurization (FGD) plant 2 x 600 MW Coal based Thermal power plant Cuddalore, Tamil Nadu. By MK Parameswaran 23 rd Dec, 2016

Flue Gas Desulphurization (FGD) plant 2 x 600 MW Coal based Thermal power plant Cuddalore, Tamil Nadu. By MK Parameswaran 23 rd Dec, 2016 Flue Gas Desulphurization (FGD) plant 2 x 600 MW Coal based Thermal power plant Cuddalore, Tamil Nadu. By MK Parameswaran 23 rd Dec, 2016 Introduction Flue Gas Desulfurization is a process of removing

More information

Environmental Guideline on Stone crushing plant set up temporarily for the purpose of a project by a public department

Environmental Guideline on Stone crushing plant set up temporarily for the purpose of a project by a public department 2017 [Type a quote from the document or the summary of an interesting point. You can position the text box anywhere in the document. Use the Drawing Tools tab to change the formatting of the pull quote

More information

THE ACOUSTIC GROUP PTY LTD CONSULTING ACOUSTICAL & VIBRATION ENGINEERS

THE ACOUSTIC GROUP PTY LTD CONSULTING ACOUSTICAL & VIBRATION ENGINEERS THE ACOUSTIC GROUP PTY LTD CONSULTING ACOUSTICAL & VIBRATION ENGINEERS ACOUSTICAL ASSESSMENT PROPOSED ETHANOL UPGRADE SHOALHAVEN STARCHES, BOMBADERRY 38.3849.R52:ZJM Prepared for: PO Box 738 NOWRA NSW

More information

CHECK LIST OF DOCUMENTS / OTHER REQUISITES FOR OBTAINING VARIOUS CLEARANCES FROM THE STATE POLLUTION CONTROL BOARD, ODISHA.

CHECK LIST OF DOCUMENTS / OTHER REQUISITES FOR OBTAINING VARIOUS CLEARANCES FROM THE STATE POLLUTION CONTROL BOARD, ODISHA. CHECK LIST OF DOCUMENTS / OTHER REQUISITES FOR OBTAINING VARIOUS CLEARANCES FROM THE STATE POLLUTION CONTROL BOARD, ODISHA. A. CONSENT TO ESTABLISH UNDER THE PROVISIONS OF WATER (PREVENTION & CONTROL OF

More information

Item Hydrogen Gas Plant

Item Hydrogen Gas Plant Item 6530. Hydrogen Gas Plant Hydro-Chem Hydrogen Generating Plant 90,000 scfh @ 200 psig. Purity 99.99% Hydrogen generating plant engineered by Hydro-Chem built in 1980. Design capacity is 90,000 scfh

More information

Fuel your Ethanol with Maguin s Technology: Get a smart Spirit. Get a smart Spirit. for your Plant OUR PROCESS YOUR SUCCESS

Fuel your Ethanol with Maguin s Technology: Get a smart Spirit. Get a smart Spirit. for your Plant OUR PROCESS YOUR SUCCESS Fuel your Ethanol with Maguin s Technology: Get a smart Spirit Get a smart Spirit for your Plant Plant OUR PROCESS YOUR SUCCESS Maguin Interis, your single source partner for alcohol facilities At Maguin

More information

RAW MATERIALS

RAW MATERIALS RAW MATERIALS General The major Raw Materials required for production of Pellets by the Grate chain technology are graded Iron Ore fines and Bentonite. Coke/H.S.D./L.D.O. is being used as a Fuel. IRON

More information

MODERN COKE OVEN GAS TREATMENT TECHNOLOGY AT A NEW COKE MAKING PLANT IN BRAZIL*

MODERN COKE OVEN GAS TREATMENT TECHNOLOGY AT A NEW COKE MAKING PLANT IN BRAZIL* MODERN COKE OVEN GAS TREATMENT TECHNOLOGY AT A NEW COKE MAKING PLANT IN BRAZIL* Wolfgang Kern 1 Mario Petzsch 2 Antonio Esposito 3 Helênio Resende Silva Júnior 4 Abstract The implementation of the Gas

More information

LIST OF PRODUCTS (PROPOSED) Existing Quantity (MT/Month)

LIST OF PRODUCTS (PROPOSED) Existing Quantity (MT/Month) LIST OF PRODUCTS (PROPOSED) Sr.No. Name of Product Existing Total after expansion 1 Benzyl Acetate 20 50 2 Benzyl Benzoate 20 50 3 Benzyl Alcohol 20 50 4 Benzyl Cyanide 20 50 5 Phenyl Acetic Acid 20 50

More information

COLLECTION AND INCINERATION OF HIGH VOLUME-LOW CONCENTRATION PULP MILL NONCONDENSIBLE GASES

COLLECTION AND INCINERATION OF HIGH VOLUME-LOW CONCENTRATION PULP MILL NONCONDENSIBLE GASES COLLECTION AND INCINERATION OF HIGH VOLUME-LOW CONCENTRATION PULP MILL NONCONDENSIBLE GASES Douglas K. Giarde A.H. Lundberg Associates, Inc. Michael Crenshaw Packaging Corporation of America Abstract High

More information

Welcome To Our Exhibition

Welcome To Our Exhibition Welcome To Our Exhibition Welcome to the exhibition of our proposals for a Waste Recycling and Renewable Energy Facility Distributed Renewable Energy Networks Ltd (DRENL) propose to develop a 10MW Waste

More information

LATEST GUIDELINES & DIRECTIVES OF POLLUTION BOARDS FOR DISTILLERS VIDE THEIR CIRCULAR DATED 2 nd JUNE 2017

LATEST GUIDELINES & DIRECTIVES OF POLLUTION BOARDS FOR DISTILLERS VIDE THEIR CIRCULAR DATED 2 nd JUNE 2017 By K.P.SINGH LATEST GUIDELINES & DIRECTIVES OF POLLUTION BOARDS FOR DISTILLERS VIDE THEIR CIRCULAR DATED 2 nd JUNE 2017 1. Distilleries to install Online Mass Flow Measurement with online data transfer

More information

PROJECT BRIEF. Noise environment: No Entrant noise generation sources exist in and around project area.

PROJECT BRIEF. Noise environment: No Entrant noise generation sources exist in and around project area. PROJECT BRIEF PROJECT LOCATION: - Pahar Kua Marble Range Mining Project Q L No 235 is located near village Pahar Kua, Tehsil Makrana., District Nagaur Rajasthan. Project is approachable from national highway.

More information

Post Combustion CO 2 Capture Scale Up Study

Post Combustion CO 2 Capture Scale Up Study Post Combustion CO 2 Capture Scale Up Study Prachi Singh and Mike Haines International Greenhouse Gas R&D programme 6 th International Conference on Clean Coal Technologies (CCT 2013) 12-16 th May 2013

More information

Cansolv Technologies Inc. Alberta NOx and SOx Control Technologies Symposium April 9, Rick Birnbaum

Cansolv Technologies Inc. Alberta NOx and SOx Control Technologies Symposium April 9, Rick Birnbaum A Novel SO 2 Scrubbing Process For Industrial SO 2 Emission Control Alberta NOx and SOx Control Technologies Symposium April 9, 2008 Rick Birnbaum rick.birnbaum@cansolv.com OUTLINE Gas Absorption Solutions

More information

N.H. 6 is 50 km away from the proposed plant boundary; in N direction;

N.H. 6 is 50 km away from the proposed plant boundary; in N direction; 1.1 INTRODUCTION Godawari Power & Ispat Limited (GPIL) has an existing Iron Ore Crushing plant of 12,00,000 MTPA capacity at Gidhali, Village Kusumkasa, Tehsil - Balod, District - Durg (Chhattisgarh) and

More information

Cooling Tower Blowdown Treatment and Reuse in a Coal Fired Power Plant in India - Reducing the water footprint in coal fired power plants -

Cooling Tower Blowdown Treatment and Reuse in a Coal Fired Power Plant in India - Reducing the water footprint in coal fired power plants - Powergen Bangkok 3 rd October 2103 Session 5 Intake, Cooling and Blowdown Treatment Considerations Cooling Tower Blowdown Treatment and Reuse in a Coal Fired Power Plant in India - Reducing the water footprint

More information

Corn Wet Mill Improvement and Corn Dry Mill Improvement Pathways Summary Description

Corn Wet Mill Improvement and Corn Dry Mill Improvement Pathways Summary Description Corn Wet Mill Improvement and Corn Dry Mill Improvement Pathways Summary Description DE Pathway bjectives The Biomass Program objective for both the corn wet mill and dry mill pathways is to improve the

More information

about us ENPRO has proven to be the premier manufacturer's representative/distributor in each of the product markets/territories we serve:

about us ENPRO has proven to be the premier manufacturer's representative/distributor in each of the product markets/territories we serve: about us ENPRO, INC. has been in the business of helping our customers solve their process applications for over 45 years. By using the discovery process, our technically trained application engineers

More information

Definitions and Comments on 2016 Consolidated Nestlé Environmental Performance Indicators

Definitions and Comments on 2016 Consolidated Nestlé Environmental Performance Indicators Definitions and Comments on 2016 Consolidated Nestlé Environmental Performance Indicators General Comments Environmental performance indicators cover all Nestlé factories except some of the factories acquired

More information

Wissington. factory. about

Wissington. factory. about about Wissington factory Largest beet sugar factory in the world Most efficient in Europe 240 employees, 300 in campaign Over 400,000 tonnes of sugar annually Comprehensive range of products Transforms

More information

Environmental Impact Assessment

Environmental Impact Assessment Environmental Impact Assessment A brief discussion Presented by: Apekshit Solanki Kirti Neetu Yadav Sameera Vishakha Shankar Introduction EIA is a formal process to predict the environmental consequences

More information

Sugar. g Liquefication (800) Reduce inbound syrup y p transportation. i costs by more than 32%.

Sugar. g Liquefication (800) Reduce inbound syrup y p transportation. i costs by more than 32%. Reduce inbound syrup y p transportation i costs by more than 32%. Sugar g Liquefication n buying y g granular g sugar g on the open p market better control your sugar g supply problems and costs. Eliminate

More information

Pre-Feasibility Report For Khargone STPP Stage-I (2X660 MW) District- Khargone, Madhya Pradesh

Pre-Feasibility Report For Khargone STPP Stage-I (2X660 MW) District- Khargone, Madhya Pradesh 1.0 Executive Summary Name of Project: Name of Project Proponent: Location of the Project: Capacity & Unit Configurations: Land Requirement, Current Land Use and Availability: Water Requirement and Availability:

More information

COGENERATION PLANT FAQ. What is biomass cogeneration? Cogeneration is the simultaneous production of electricity and heat using a single primary fuel.

COGENERATION PLANT FAQ. What is biomass cogeneration? Cogeneration is the simultaneous production of electricity and heat using a single primary fuel. COGENERATION PLANT FAQ What is biomass cogeneration? Cogeneration is the simultaneous production of electricity and heat using a single primary fuel. Biomass cogeneration uses waste wood and horticultural

More information

ENVIRONMENTAL MONITORING PROGRAMME

ENVIRONMENTAL MONITORING PROGRAMME Stage-I (2x800 MW) Page 1 5 CHAPTER - VI ENVIRONMENTAL MONITORING PROGRAMME 6.0 OBJECTIVES Regular monitoring program the environmental parameters is essential to take into account the changes in the environment.

More information

Treatment of Distillery Spent wash. Babu Alappat Professor Department of Civil Engineering I.I.T Delhi.

Treatment of Distillery Spent wash. Babu Alappat Professor Department of Civil Engineering I.I.T Delhi. Treatment of Distillery Spent wash Babu Alappat Professor Department of Civil Engineering I.I.T Delhi bjalappat@yahoo.com Problems with Anaerobic Systems Requirement of polishing Uncertainity involved

More information

For PROPOSED IT PARK. By M/s.Balewadi Tech Park Pvt.Ltd. Submitted to State Environment Expert Appraisal Committee III, Maharashtra

For PROPOSED IT PARK. By M/s.Balewadi Tech Park Pvt.Ltd. Submitted to State Environment Expert Appraisal Committee III, Maharashtra Draft Terms of References (ToR) (Based on the model TOR given in Environmental Impact Assessment Guidance Manual for building construction projects by MoEF & CC) For PROPOSED IT PARK By M/s.Balewadi Tech

More information

ENGINEERED SOLUTIONS ENERGY ENVIRONMENTAL

ENGINEERED SOLUTIONS ENERGY ENVIRONMENTAL ENGINEERED SOLUTIONS ENERGY ENVIRONMENTAL As a technology innovator, Babcock & Wilcox (B&W) provides a comprehensive package of engineered solutions for a wide range of applications. Established in 1867,

More information

ADVANCES IN PNEUMATIC CONVEYING

ADVANCES IN PNEUMATIC CONVEYING ADVANCES IN PNEUMATIC CONVEYING OVERVIEW INTRODUCTION Pneumatic conveying is a system used to transport a wide variety of dry powdered and granular materials in a gas stream. Generally the gas stream will

More information

WESTINGHOUSE PLASMA GASIFICATION. Hazardous Waste Management

WESTINGHOUSE PLASMA GASIFICATION. Hazardous Waste Management WESTINGHOUSE PLASMA GASIFICATION Hazardous Waste Management Hazardous waste is just that hazardous. Medical, industrial and petrochemical wastes are all types of hazardous waste and pose threats to human

More information

Torrent Pharmaceuticals Ltd. Indrad EC Compliance Report

Torrent Pharmaceuticals Ltd. Indrad EC Compliance Report Status of Compliance of stipulated conditions of the Environment Clearance J- 01 It is noted that total water consumption will increase from 1000-1200 m 3 /day to 1200-1300 m 3 /day. Fresh water requirement

More information

Chapter 2.6: FBC Boilers

Chapter 2.6: FBC Boilers Part-I: Objective type questions and answers Chapter 2.6: FBC Boilers 1. In FBC boilers fluidization depends largely on --------- a) Particle size b) Air velocity c) Both (a) and (b) d) Neither (a) nor

More information

ADVANCED PROCESS CONTROL QATAR GAS ONE YEAR EXPERIENCE

ADVANCED PROCESS CONTROL QATAR GAS ONE YEAR EXPERIENCE ADVANCED PROCESS CONTROL QATAR GAS ONE YEAR EXPERIENCE Bouchebri El-Hadi Senior Process Engineer Benmouley Abdelkader Head of Process Qatar Liquefied Gas Company Limited. Ras Laffan Industrial Area, Doha,

More information

Biomass Boiler Emission Abatement Technologies. Simon Wakefield

Biomass Boiler Emission Abatement Technologies. Simon Wakefield Biomass Boiler Emission Abatement Technologies Simon Wakefield simon.wakefield@hwenergy.co.uk About Us Established in 2003 Specialise only in biomass heating Team of 50 staff Design & engineering led company

More information

FORM V ENVIRONMENTAL STATEMENT REPORT FOR THE FINANCIAL YEAR M/s Halki Lime Stone Mine (Unit: J. K. Cement Limited) PART A

FORM V ENVIRONMENTAL STATEMENT REPORT FOR THE FINANCIAL YEAR M/s Halki Lime Stone Mine (Unit: J. K. Cement Limited) PART A (I) FORM V ENVIRONMENTAL STATEMENT REPORT FOR THE FINANCIAL YEAR 2013-14 M/s Halki Lime Stone Mine (Unit: J. K. Cement Limited) Name & Address of the Owner / Occupier of the Industry Operation or Process

More information

ALCOHOL DISTILLATION: BASIC PRINCIPLES, EQUIPMENT, PERFORMANCE RELATIONSHIPS, AND SAFETY

ALCOHOL DISTILLATION: BASIC PRINCIPLES, EQUIPMENT, PERFORMANCE RELATIONSHIPS, AND SAFETY AE-117 Purdue University Cooperative Extension Service West Lafayette, IN 47907 ALCOHOL DISTILLATION: BASIC PRINCIPLES, EQUIPMENT, PERFORMANCE RELATIONSHIPS, AND SAFETY Eric Kvaalen, Doctoral Student in

More information

Problems at the Cumene Production Facility, Unit 800

Problems at the Cumene Production Facility, Unit 800 Problems at the Cumene Production Facility, Unit 800 Background Cumene (isopropyl benzene) is produced by reacting propylene with benzene. During World War II, cumene was used as an octane enhancer for

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT PRE FEASIBILITY REPORT Capacity enhancement of Sugar Plant at crush rate of 4500 TCD expandable to 8000 TCD For DUDHGANGA VEDHGANGA SAHAKARI SAKHAR KARKHANA LTD. At Bidri, Mouninagar, Tal. Kagal, Dist.

More information

Environmental impact assessment of a 1600 MW thermal power plant project in Karimnagar district of Telangana

Environmental impact assessment of a 1600 MW thermal power plant project in Karimnagar district of Telangana Environmental impact assessment of a 1600 MW thermal power plant project in Karimnagar district of Telangana 1 D.V.S. Praneeth, 2 Arghajeet Saha 1,2 M.Tech. Scholar 1 Environmental Engineering, Department

More information

Electric Furnace Off-Gas Cleaning Systems Installation at PT Inco ABSTRACT

Electric Furnace Off-Gas Cleaning Systems Installation at PT Inco ABSTRACT Electric Furnace Off-Gas Cleaning Systems Installation at PT Inco Paykan Safe and Matt Russell WorleyParsons Gas Cleaning, Irving, Texas USA ABSTRACT PT Inco is a ferronickel smelter in Soroako, Sulawesi,

More information

Technical Information Paper. (R)FCC Slurry Oil Filtration

Technical Information Paper. (R)FCC Slurry Oil Filtration Technical Information Paper Revision 0, June 2009 INDEX 1. Introduction 1.1 Removing catalyst particles 1.2 Creating value 2. Automatic Gas Assisted Backwash Filtration 2.1 Filter Principles 2.2 Filter

More information

20/06/2011 Seminar on Geothermal Exploitation Santiago de Chile

20/06/2011 Seminar on Geothermal Exploitation Santiago de Chile Contents Power Plants Steam Power plants Binary Power plants Geothermal Power Plants Single flash systems Binary systems 1 Equipment Well head Gathering piping system Steam separators and moisture separators

More information

WATER RECYCLING PLANT IN WAFRA. Feras Al Salem

WATER RECYCLING PLANT IN WAFRA. Feras Al Salem WATER RECYCLING PLANT IN WAFRA Feras Al Salem Introduction 2 The Joint Operations (JO) was born in 1960 when the two oil companies formed a joint committee to oversee and supervise their operations with

More information