SAN JOAQUIN COUNTY, CALIFORNIA, AND INCORPORATED AREAS VOLUME 4 OF 4

Size: px
Start display at page:

Download "SAN JOAQUIN COUNTY, CALIFORNIA, AND INCORPORATED AREAS VOLUME 4 OF 4"

Transcription

1 SAN JOAQUIN COUNTY, CALIFORNIA, AND INCORPORATED AREAS VOLUME 4 OF 4 Community Name Community Number *ESCALON, CITY OF LATHROP, CITY OF LODI, CITY OF MANTECA, CITY OF RIPON, CITY OF SAN JOAQUIN COUNTY (UNINCORPORATED AREAS) STOCKTON, CITY OF TRACY, CITY OF * Non Flood-Prone Community OCTOBER 16, 2009 Federal Emergency Management Agency FLOOD INSURANCE STUDY NUMBER 06077CV004A

2 NOTICE TO FLOOD INSURANCE STUDY USERS Communities participating in the National Flood Insurance Program have established repositories of flood hazard data for floodplain management and flood insurance purposes. This Flood Insurance Study (FIS) may not contain all data available within the repository. It is advisable to contact the community repository for any additional data. Selected Flood Insurance Rate Map panels for the community contain information that was previously shown separately on the corresponding Flood Boundary and Floodway Map panels (e.g., floodways, cross-sections). Former flood hazard zone designations have been changed as follows: Old Zone A1 through A30 B C New Zone AE X X Part or all of this FIS may be revised and republished at any time. In addition, part of this FIS may be revised by the Letter of Map Revision process, which does not involve republication or redistribution of the FIS. It is, therefore, the responsibility of the user to consult with community officials and to check the community repository to obtain the most current FIS components. Initial Countywide FIS Effective Date: October 16, 2009

3 TABLE OF CONTENTS Volume 1 Page 1.0 INTRODUCTION Purpose of Study Authority and Acknowledgments Coordination AREA STUDIED Scope of Study Community Description Principal Flood Problems Flood Protection Measures ENGINEERING METHODS Hydrologic Analyses Hydraulic Analyses Vertical Datum...70 TABLES Table 1 Initial and Final CCO Dates...7 Table 2a - 2b Flooding Sources Studied by Detailed Methods...7 Table 3 Letter of Map Change...9 Table 4 Tributary Drainage Areas...16 Table 5a - 5b Frequencies of Past Floods...21 Table 6 Dams and Reservoirs of the Mokelumne Basin...25 Table 7a - 7d Storage Projects Affecting Flood Flows in San Joaquin County...27 Table 8 Summary of Elevations...37 Table 9a - 9c Stream Gaging Stations...37 Table 10 Summary of Discharges...45 Table 11 Tide Gaging Stations...52 Table 12 List of Levees Requiring Flood Hazard Revision...71 Table 13a - 13b Vertical Datum Conversions...74 i

4 TABLE OF CONTENTS (Continued) Volume FLOODPLAIN MANAGEMENT APPLICATIONS Floodplain Boundaries Floodways INSURANCE APPLICATIONS FLOOD INSURANCE RATE MAP OTHER STUDIES LOCATION OF DATA BIBLIOGRAPHY AND REFERENCES FIGURES Figure 1 Floodway Schematic...80 TABLES (Continued) Table 14 Floodway Data Tables...82 Table 15 Community Map History ii

5 TABLE OF CONTENTS (Continued) Volume 3 EXHIBITS Exhibit 1 Flood Profiles Bear Creek Calaveras River Corral Hollow Creek Dry Creek Duck Creek French Camp Slough Grant Line & Fabian & Bell Canal Jahant Slough Lone Tree Creek Middle River Mokelumne River Panels 01P-03P Panels 04P-13P Panels 14P-18P Panels 19P-20P Panels 21P-28P Panels 29P-31P Panels 32P-33P Panels 34P-35P Panels 36P-42P Panels 43P-45P Panels 46P-62P Volume 4 EXHIBITS (Continued) Mormon Channel Panels 63P-65P Mosher Creek Panels 66P-68P North Fork Mokelumne River downstream of SF Mokelumne River Panels 69P-71P North Fork Mokelumne River upstream of SF Mokelumne River Panel 72P North Fork South Littlejohns Creek Panels 73P-75P Old River Panels 76P-79P Paradise Cut Panels 80P-81P San Joaquin River Panels 82P-97P South Fork Mokelumne River Panels 98P 99P South Fork South Littlejohns, South Littlejohns, and Littlejohns Creek Panels 100P-107 Stanislaus River Panels 108P-113P Temple Creek Panels 114P-118P Walker Slough Panel 119P Exhibit 2 Flood Insurance Rate Map Index Flood Insurance Rate Map iii

6 NOTE: THE 2% ANNUAL CHANCE FLOOD PROFILE IS TOO CLOSE TO THE 1% ANNUAL CHANCE FLOOD ELEVATION TO BE SHOWN SEPARATELY A B C D E LIMIT OF DETAILED STUDY ATCHISON, TOPEKA AND SANTA FE RAILROAD PRIVATE ROAD (LOW WATER CROSSING) GOLDEN GATE AVENUE STATE HIGHWAY 99 F ORO AVENUE 63P MORMON CHANNEL

7 G H I J WALKER LANE K L 64P MORMON CHANNEL

8 M N GILLIS ROAD LIMIT OF DETAILED STUDY 65P MORMON CHANNEL

9 1% ANNUAL CHANCE FLOOD ELEVATION CONTAINED IN CHANNEL NOTE: THE 1% AND 2% ANNUAL CHANCE FLOOD PROFILES ARE COINCIDENT Q R S T U LIMIT OF DETAILED STUDY JACK TONE ROAD V W X 66P MOSHER CREEK

10 NOTE: THE 1% AND 2% ANNUAL CHANCE FLOOD PROFILES ARE COINCIDENT Y Z AA AB AC AD AE AF AG TULLY ROAD PRIAVTE CROSSING AH AI AJ PRIAVTE CROSSING 67P MOSHER CREEK

11 NOTE: THE 1% AND 2% ANNUAL CHANCE FLOOD PROFILES ARE COINCIDENT AK AL AM AN AO AP AQ AR AS CLEMENTS ROAD MESSICK ROAD CLEMENTS ROAD LIMIT OF DETAILED STUDY 68P MOSHER CREEK

12 CONFLUENCE WITH SOUTH FORK MOKELUMNE RIVER NOTE: THE 0.2% AND 2% ANNUAL CHANCE FLOODS DATA AND STREAM BED DATA NOT AVAILABLE NOTE: 10% ANNUAL CHANCE FLOOD PROFILE IS TOO CLOSE TO THE 1% ANNUAL CHANCE ELEVATION TO BE SHOWN SEPARATELY 69P NORTH FORK MOKELUMNE RIVER (DOWNSTREAM OF SOUTH FORK MOKELUMNE RIVER)

13 NOTE: 10% ANNUAL CHANCE FLOOD PROFILE IS TOO CLOSE TO THE 1% ANNUAL CHANCE ELEVATION TO BE SHOWN SEPARATELY NOTE: THE 0.2% AND 2% ANNUAL CHANCE FLOODS DATA AND STREAM BED DATA NOT AVAILABLE NORTH FORK MOKELUMNE RIVER (DOWNSTREAM OF SOUTH FORK MOKELUMNE RIVER) 70P

14 NOTE: THE 0.2% AND 2% ANNUAL CHANCE FLOODS DATA AND STREAM BED DATA NOT AVAILABLE WALNUT GROVE ROAD DIVERGENCE FROM SOUTH FORK MOKELUMNE RIVER 71P NORTH FORK MOKELUMNE RIVER (DOWNSTREAM OF SOUTH FORK MOKELUMNE RIVER)

15 DIVERGENCE FROM SOUTH FORK MOKELUMNE RIVER LIMIT OF DETAILED STUDY NOTE: THE 0.2%, 2% AND 10% ANNUAL CHANCE FLOODS DATA NOT AVAILABLE CONFLUENCE WITH MOKELUMNE RIVER OVERFLOW CHANNEL INTERSTATE 5 LIMIT OF DETAILED STUDY CONFLUENCE WITH COSUMNE RIVER 72P NORTH FORK MOKELUMNE RIVER (UPSTREAM OF SOUTH FORK MOKELUMNE RIVER)

16 LIMIT OF DETAILED STUDY CONFLUENCE WITH FRENCH CAMP SLOUGH LOW WATER CROSSING CONFLUENCE WITH SOUTH FORK SOUTH LITTLE JOHNS CREEK A B C D E F G H I J K L STATE HIGHWAY 99 NOTE: THE 1% AND 2% ANNUAL CHANCE FLOOD PROFILES ARE COINCIDENT LOW WATER CROSSING PRIVATE ROAD PRIVATE ROAD PRIVATE ROAD IRRIGATION PIPELINES M N O LOW WATER CROSSING P 73P NORTH FORK SOUTH LI TTLEJOHNS CREEK

17 NOTE: THE 2% ANNUAL CHANCE FLOOD PROFILE IS TOO CLOSE TO THE 1% ANNUAL CHANCE FLOOD ELEVATION TO BE SHOWN SEPARATELY Q R S T U V W X Y Z AA AB AUSTIN ROAD IRRIGATION PIPELINES AC AD AE AF KAISER ROAD 74P NORTH FORK SOUTH LI TTLEJOHNS CREEK

18 AG AH AI AJ AK AL AM AN AO AP AQ LOW WATER CROSSING JACK TONE ROAD ATCHISON TOPEKA AND SANTA FE RAIROAD LOW WATER CROSSING AR AS AT LIMIT OF DETAILED STUDY IRRIGATION PIPELINES BIFRUCATION OF SOUTH LITTLEJOHNS CREEK INTO SOUTH FORK AND NORTH FORK SOUTH LITTLEJOHNS CREEK 75P NORTH FORK SOUTH LI TTLEJOHNS CREEK

19 LIMIT OF DETAILED STUDY CONFLUENCE WITH DELTA MENDOTA CANAL NOTE: THE 0.2% AND 2% ANNUAL CHANCE FLOODS DATA AND STREAM BED DATA NOT AVAILABLE 76P OLD RIVER

20 NOTE: THE 0.2% AND 2% ANNUAL CHANCE FLOODS DATA AND STREAM BED DATA NOT AVAILABLE TRACY BOULEVARD TIDE GAGE 24 77P OLD RIVER

21 DIVERGENCE OF SUGAR CUT DIVERGENCE FROM PARADISE CUT NOTE: THE 0.2% AND 2% ANNUAL CHANCE FLOODS DATA AND STREAM BED DATA NOT AVAILABLE CONFLUENCE OF MIDDLE RIVER 78P OLD RIVER

22 NOTE: THE 0.2% AND 2% ANNUAL CHANCE FLOODS DATA AND STREAM BED DATA NOT AVAILABLE CONFLUENCE OF SAN JOAQUIN RIVER LIMIT OF DETAILED STUDY 79P OLD RIVER

23 CONFLUENCE WITH OLD RIVER LIMIT OF DETAILED STUDY NOTE: THE 0.2% AND 2% ANNUAL CHANCE FLOODS DATA AND STREAM BED DATA NOT AVAILABLE 80P PARADISE CUT

24 NOTE: THE 0.2% AND 2% ANNUAL CHANCE FLOODS DATA AND STREAM BED DATA NOT AVAILABLE PARADISE DAM WESTERN PACIFIC RAILROAD DIVERGENCE FROM SAN JOAQUIN RIVER LIMIT OF DETAILED STUDY 81P PARADISE CUT

25 CONFLUENCE OF FOUTEENMILE SLOUGH NOTE: THE STREAM BED DATA NOT AVAILABLE 82P SAN JOAQUIN RIVER

26 BURNS CUTOFF CONFLUENCE OF CALAVERAS RIVER NOTE: THE STREAM BED DATA NOT AVAILABLE CONFLUENCE OF SMITH CANAL 83P SAN JOAQUIN RIVER

27 CONFLUENCE OF STOCKTON DEEPWATER CHANNEL A B C D E F G H ATCHISON TOPEKA AND SANTA FE RAILWAY NAVY DRIVE BURNS CUTOFF AT UPSTREAM I J K ATCHISON TOPEKA AND SANTA FE RAILWAY L 84P SAN JOAQUIN RIVER

28 M N O P Q R S T U STATE HIGHWAY 4 CONFLUENCE WITH FRENCH CAMP SLOUGH V W X Y 85P SAN JOAQUIN RIVER

29 Z AA AB AC AD AE AF AG AH AI AJ AK AL AM 86P SAN JOAQUIN RIVER

30 AN AO AP AQ AR AS AT AU AV AW BOWMAN ROAD (BRANDT BRIDGE) AX AY AZ 87P SAN JOAQUIN RIVER

31 BA BB BC BD BE BF BG BH BI BJ BK BL BM BN 88P SAN JOAQUIN RIVER

32 BO BP BQ BR BS BT BU BV BW BX DIVERGENCE OF OLD RIVER BY BZ CA CB 89P SAN JOAQUIN RIVER

33 CC CD CE CF CG CH CI CJ CK CL CM SOUTHERN PACIFIC RAILROAD MANTHEY ROAD CN CO CP STATE HIGHWAY 120 INTERSTATE HIGHWAY 5 STATE HIGHWAY P SAN JOAQUIN RIVER

34 CQ CR CS CT CU CV CW CX CY UNION PACIFIC RAILROAD CZ DA DB DC CONFLUENCE OF PARADISE CUT 91P SAN JOAQUIN RIVER

35 DD DE DF DG DH DI DJ DK DL DM DN DO DP 92P SAN JOAQUIN RIVER

36 DQ DR DS DT DU DV BANTA CARBONA LIFT CANAL DW 93P SAN JOAQUIN RIVER

37 DX DY DZ 94P SAN JOAQUIN RIVER

38 EA EB EC ED EE EF EG EH 95P SAN JOAQUIN RIVER

39 EI EJ EK EL EM AIRPORT WAY EN 96P SAN JOAQUIN RIVER

40 EO EP EQ ER ES CONFLUENCE OF STANISLAUS RIVER LIMIT OF DETAILED STUDY 97P SAN JOAQUIN RIVER

41 NOTE: THE 0.2% AND 2% ANNUAL CHANCE FLOODS DATA NOT AVAILABLE CONFLUENCE WITH HOG SLOUGH CONFLUENCE WITH BEAVER SLOUGH 98P SOUTH FORK MOKELUMNE RIVER

42 NOTE: THE 0.2% AND 2% ANNUAL CHANCE FLOODS DATA NOT AVAILABLE WALNUT GROVE ROAD DIVERGENCE FROM NORTH FORK MOKELUMNE RIVER 99P SOUTH FORK MOKELUMNE RIVER

43 CONFLUENCE WITH FRENCH CMP SLOUGH AND NORTH FORK SOUTH LITTLEJOHNS CREEK LOW WATER CROSSING LIMIT OF DETAILED STUDY A B C D E F G H I J K IRRIGATION PIPELINE PRIVATE ROAD PRIVATE ROAD LOW WATER CROSSING CONFLUENCE OF LONE TREE CREEK PRIVATE ROAD STATE HIGHWAY 90 PRIVATE ROAD NOTE: THE 2% AND 0.2% ANNUAL CHANCE FLOOD PROFILES ARE TOO CLOSE TO THE 1% ANNUAL CHANCE FLOOD ELEVATION TO BE SHOWN SEPARATELY L M N O PRIVATE ROAD LOW WATER CROSSING 100P SOUTH FORK SOUTH LITTLEJOHNS CREEK, SOUTH LITTLEJOHNS CREEK AND LITTLEJOHNS CREEK

44 NOTE: THE 2% AND 0.2% ANNUAL CHANCE FLOOD PROFILES ARE TOO CLOSE TO THE 1% ANNUAL CHANCE FLOOD ELEVATION TO BE SHOWN SEPARATELY P Q R S T U V W X Y Z AA AB LOW WATER CROSSING AUSTIN ROAD AC AD AE AF IRRIGATION PIPELINE KAISER ROAD AG 101P SOUTH FORK SOUTH LITTLEJOHNS CREEK, SOUTH LITTLEJOHNS CREEK AND LITTLEJOHNS CREEK

45 AH AI AJ AK AL AM AN AO AP AQ AR AS JACK TONE ROAD BURLINGTON NORTHERN SANTA FE RAILROAD LOW WATER CROSSING AT AU AV AW AX BIFURCATION OF SOUTH LITTLEJOHNS CREEK INTO NORTH FORK SOUTH LITTLEJOHNS CREEK AND SOUTH FORK SOUTH LITTLEJOHNS CREEK LOW WATER CROSSING DIVERSION STRUCTURE IRRIGATION PIPELINE DIVERSION STRUCTURE 102P SOUTH FORK SOUTH LITTLEJOHNS CREEK, SOUTH LITTLEJOHNS CREEK AND LITTLEJOHNS CREEK

46 AY AZ BA BB BC BD BE BF BG BH BI MARIPOSA ROAD IRRIGATION PIPELINE BJ BK BL LOW WATER CROSSING LOW WATER CROSSING IRRIGATION PIPELINE 103P SOUTH FORK SOUTH LITTLEJOHNS CREEK, SOUTH LITTLEJOHNS CREEK AND LITTLEJOHNS CREEK

47 BM BN BO BP BQ BR BS BT BU BV BW BX BY BZ CA 104P SOUTH FORK SOUTH LITTLEJOHNS CREEK, SOUTH LITTLEJOHNS CREEK AND LITTLEJOHNS CREEK

48 VAN ALLEN ROAD BIFURCATION OF SOUTH LITTLEJOHNS CREEK INTO NORTH FORK SOUTH LITTLEJOHNS CREEK AND SOUTH FORK SOUTH LITTLEJOHNS CREEK IRRIGATION PIPELINE STANLEY ROAD SOUTH FORK SOUTH LITTLEJOHNS CREEK, SOUTH LITTLEJOHNS CREEK AND LITTLEJOHNS CREEK CB CC CD CE CF CG CH CI CJ CK CL CM CN CO CP 105P

49 CQ CR CS CT LOW WATER CROSSING CU CV CW CX CY LOW WATER CROSSING 106P SOUTH FORK SOUTH LITTLEJOHNS CREEK, SOUTH LITTLEJOHNS CREEK AND LITTLEJOHNS CREEK

50 CZ DA DB DC DD LOW WATER CROSSING ESCALON-BELLOTA ROAD SOUTHERN PACIFIC RAILROAD DUCK CREEK DIVERSION CHANNEL LIMIT OF DETAILED STUDY 107P SOUTH FORK SOUTH LITTLEJOHNS CREEK, SOUTH LITTLEJOHNS CREEK AND LITTLEJOHNS CREEK

51 NOTE: THE 2% AND 10% ANNUAL CHANCE FLOODS DATA NOT AVAILABLE A B C D E F G LIMIT OF DETAILED STUDY H I 108P STANISLAUS RIVER

52 J K L M N O P Q R S RAILROAD STATE NOTE: THE 2% AND 10% ANNUAL CHANCE FLOODS DATA NOT AVAILABLE HIGHWAY 99 T U V 109P STANISLAUS RIVER

53 NOTE: THE 2% AND 10% ANNUAL CHANCE FLOODS DATA NOT AVAILABLE STANISLAUS RIVER W X Y Z AA AB AC AD 110P

54 NOTE: THE 2% AND 10% ANNUAL CHANCE FLOODS DATA NOT AVAILABLE AE AF AG AH AI AJ AK RAILROAD AL AM AN MC HENRY AVENUE 111P STANISLAUS RIVER

55 AO AP AQ AR AS AT AU AV AX AY AZ PIPELINE RAILROAD SANTA FE ROAD NOTE: THE 2% AND 10% ANNUAL CHANCE FLOODS DATA NOT AVAILABLE WITHOUT LEFT LEVEE BA BB 112P STANISLAUS RIVER

56 NOTE: THE 2% AND 10% ANNUAL CHANCE FLOODS DATA NOT AVAILABLE BC BD 113P STANISLAUS RIVER

57 2% ANNUAL CHANCE FLOOD PROFILE 0.2% AND 2% ANNUAL CHANCE FLOOD TOO CLOSE TO THE 1% ANNUAL CHANCE ELEVATION TO BE SHOWN SEPARATELY PROFILES TOO CLOSE TO THE 1% ANNUAL CHANCE ELEVATION TO BE SHOWN SEPARATELY JACK TONE ROAD PRIVATE DRIVE WILDWOOD ROAD TEMPLE CREEK A B C D E F G H I J 114P

58 0.2% AND 2% ANNUAL CHANCE 2% ANNUAL CHANCE FLOOD PROFILE TOO CLOSE FLOOD PROFILES TOO CLOSE TO THE 1% ANNUAL CHANCE ELEVATION TO BE SHOWN SEPARATELY TO THE 1% ANNUAL CHANCE ELEVATION TO BE SHOWN SEPARATELY ATCHISON TOPEKA AND SANTA FE RAILROAD IRRIGATION PIPELINE MURPHY ROAD NOTE: THE 2% AND 0.2% ANNUAL CHANCE FLOOD PROFILES ARE TOO CLOSE TO THE 1% ANNUAL CHANCE FLOOD ELEVATION TO BE SHOWN SEPARATELY WAGNER ROAD TEMPLE CREEK K L M N O P Q R S T U V 115P

59 PRIVATE DRIVE MARIPOSA ROAD NOTE: THE 2% AND 0.2% ANNUAL CHANCE FLOOD PROFILES ARE TOO CLOSE TO THE 1% ANNUAL CHANCE FLOOD ELEVATION TO BE SHOWN SEPARATELY PRIVATE ROAD TEMPLE CREEK W X Y Z AA AB AC AD AE AF AG AH 116P

60 VAN ALLEN ROAD NOTE: THE 2% AND 0.2% ANNUAL CHANCE FLOOD PROFILES ARE TOO CLOSE TO THE 1% ANNUAL CHANCE FLOOD ELEVATION TO BE SHOWN SEPARATELY DIVERSION STRUCTURE TEMPLE CREEK ROAD PRIVATE DRIVE NOTE: THE 2% AND 0.2% ANNUAL CHANCE FLOOD PROFILES ARE TOO CLOSE TO THE 1% ANNUAL CHANCE FLOOD ELEVATION TO BE SHOWN SEPARATELY TEMPLE CREEK AI AJ AK AL AM AN AO AP AQ AR AS AT AU 117P

61 NOTE: THE 2% AND 0.2% ANNUAL CHANCE FLOOD PROFILES ARE TOO CLOSE TO THE 1% ANNUAL CHANCE FLOOD ELEVATION TO BE SHOWN SEPARATELY AV AW AX AY AZ BA BB PRIVATE DRIVE PRIVATE DRIVE ESCALON BELLOTA ROAD LIMIT OF DETAILED STUDY 118P TEMPLE CREEK

62 CONFLUENCE WITH FRENCH CAMP SLOUGH LIMIT OF DETAILED STUDY A B C D E F G H INTERSTATE HIGHWAY 5 MANTHEY ROAD INTERSTATE HIGHWAY 5 S TURNPIKE ROAD TIDEWATER SOUTHERN RAILROAD UNION PACIFIC RAILROAD UNION PACIFIC RAILROAD CONFLUENCE OF DUCK CREEK SOUTHERN PACIFIC RAILROAD O'DELL AVENUE EL DORADO STREET SOUTHERN PACIFIC RAILROAD YARD LIMIT OF DETAILED STUDY 1% ANNUAL CHANCE BACKWATER FROM FRENCH CAMP SLOUGH 119P WALKER SLOUGH

Sum Oil, Gas, Coal, & Cement A B C D E F G H I J K L M N O P Q R S T

Sum Oil, Gas, Coal, & Cement A B C D E F G H I J K L M N O P Q R S T 0 0 0 0 A B C D E F G H I J K L M N O P Q R S T Oil & NGL Annual and cumulative Carbon Majors (MtCO) Annual and cumulative Carbon Majors (MtC) Annual and cumulative global oil emissions (MtCO) Annual and

More information

FedEx Express Rates Effective January 1, 2018

FedEx Express Rates Effective January 1, 2018 FedEx Express ates Effective January 1, 2018 Introduction The FedEx Express portfolio of shipping services has been designed to help address your unique needs whether you are shipping near or far, to clients

More information

FedEx Express Rates. Effective January 6, 2014

FedEx Express Rates. Effective January 6, 2014 FedEx Express ates Effective January 6, 201 Introduction The FedEx Express portfolio of shipping services has been designed to help address your unique needs whether you are shipping near or far, to clients

More information

NEW CASTLE COUNTY, DELAWARE, AND INCORPORATED AREAS

NEW CASTLE COUNTY, DELAWARE, AND INCORPORATED AREAS NEW CASTLE COUNTY, DELAWARE, AND INCORPORATED AREAS Community Name Community Number ARDEN, VILLAGE OF 100052 *AREDENCROFT, VILLAGE OF 100057 ARDENTOWN, VILLAGE OF 100058 *BELLEFONTE, TOWN OF 100021 DELAWARE

More information

Precision STRAIN GAGES Vishay Micro-Measurements

Precision STRAIN GAGES Vishay Micro-Measurements VISHAY INTERTECHNOLOGY, INC. DATA BOOK Precision STRAIN GAGES General Purpose Special Purpose Weldable Temperature Sensors Residual Stress CATALOG 500 Table of Contents PRECISION STRAIN GAGES General Information...

More information

JACKSON COUNTY, OREGON AND INCORPORATED AREAS

JACKSON COUNTY, OREGON AND INCORPORATED AREAS JACKSON COUNTY, OREGON AND INCORPORATED AREAS COMMUNITY NAME COMMUNITY NUMBER ASHLAND, CITY OF 410090 CENTRAL POINT, CITY OF 410092 EAGLE POINT, CITY OF 410093 GOLD HILL, CITY OF 410094 JACKSON COUNTY,

More information

JACKSON COUNTY, GEORGIA AND INCORPORATED AREAS

JACKSON COUNTY, GEORGIA AND INCORPORATED AREAS Jackson County JACKSON COUNTY, GEORGIA AND INCORPORATED AREAS COMMUNITY NAME COMMUNITY NUMBER ARCADE, CITY OF 130597 BRASELTON, TOWN OF 130343 COMMERCE, CITY OF 130212 HOSCHTON, CITY OF 130344 JACKSON

More information

Concordance IPC V8 NACE REV.2

Concordance IPC V8 NACE REV.2 Concordance IPC V8 NACE REV.2 Bart Van Looy 1,2 Caro Vereyen 1 Ulrich Schmoch 3,4 Research Division INCENTIM, Faculty of Economics & Business, KU Leuven 1 ECOOM (Centre for R&D Monitoring) 2 Universität

More information

CLEVELAND COUNTY, OKLAHOMA AND INCORPORATED AREAS VOLUME 1 OF 3

CLEVELAND COUNTY, OKLAHOMA AND INCORPORATED AREAS VOLUME 1 OF 3 CLEVELAND COUNTY, OKLAHOMA AND INCORPORATED S VOLUME 1 OF 3 PRELIMINARY SEPTEMBER 30, 2011 Community Name Community Number CLEVELAND COUNTY, UNINCORPORATED S 400475 LEXINGTON, CITY OF 400043 MOORE, CITY

More information

System Plan Components Inventory

System Plan Components Inventory Northeast San Joaquin County Groundwater Bank System Plan Components Inventory Northeast San Joaquin County Groundwater Banking Authority April, 2002 The Northeast San Joaquin County Groundwater Banking

More information

SCOTT COUNTY, IOWA AND INCORPORATED AREAS

SCOTT COUNTY, IOWA AND INCORPORATED AREAS SCOTT COUNTY, IOWA AND INCORPORATED AREAS COMMUNITY NAME COMMUNITY NUMBER BETTENDORF, CITY OF 190240 *BLUE GRASS, CITY OF 190554 BUFFALO, CITY OF 190241 DAVENPORT, CITY OF 190242 *DIXON, CITY OF 190726

More information

TIFT COUNTY, GEORGIA AND INCORPORATED AREAS. Tift County. Revised: September 29, 2010 FLOOD INSURANCE STUDY NUMBER 13277CV000A

TIFT COUNTY, GEORGIA AND INCORPORATED AREAS. Tift County. Revised: September 29, 2010 FLOOD INSURANCE STUDY NUMBER 13277CV000A TIFT COUNTY, GEORGIA AND INCORPORATED AREAS Community Name Community Number Tift County OMEGA, CITY OF 130552 TIFT COUNTY (UNINCORPORATED AREAS) 130404 TIFTON, CITY OF 130171 TY TY, CITY OF 130172 Revised:

More information

WEB PAGE: ELECTRONIC MAIL: March 31, 2017

WEB PAGE:  ELECTRONIC MAIL: March 31, 2017 CYRUS E. PHILLIPS IV ATTORNEY-AT-LAW 110 TROON, FORD S COLONY WILLIAMSBURG, VIRGINIA 23188-9195 TELEPHONE: 757.378.2917 FACSIMILE: 757.257.2171 MOBILE: 703.819.5944 WEB PAGE: HTTP://WWW.PROCUREMENT-LAWYER.COM

More information

XI. Thornton Planning Area

XI. Thornton Planning Area XI. A. OVERVIEW The covers 120 square miles in the northwest corner of San Joaquin County. It consists primarily of low-lying Delta islands, sloughs, and large farms. The town of Thornton, a small agriculturally-based

More information

SOLANO COUNTY, CALIFORNIA, USA AND INCORPORATED AREAS

SOLANO COUNTY, CALIFORNIA, USA AND INCORPORATED AREAS VOLUME 1 OF 3 SOLANO COUNTY, CALIFORNIA, USA AND INCORPORATED AREAS COMMUNITY NAME SOLANO COUNTY UNINCORPORATED AREAS COMMUNITY NUMBER 060631 CITY OF BENICIA 060368 CITY OF DIXON 060369 CITY OF FAIRFIELD

More information

YUBA COUNTY, CALIFORNIA AND INCORPORATED AREAS

YUBA COUNTY, CALIFORNIA AND INCORPORATED AREAS YUBA COUNTY, CALIFORNIA AND INCORPORATED AREAS COMMUNITY COMMUNITY NAME NUMBER MARYSVILLE, CITY OF 060428 WHEATLAND, CITY OF 060460 YUBA COUNTY 060427 (UNINCORPARED AREAS) Federal Emergency Management

More information

5th Street Bridge Replacement Project Yuba City, California Location Hydraulic Study Report Bridge No. 18C0012

5th Street Bridge Replacement Project Yuba City, California Location Hydraulic Study Report Bridge No. 18C0012 EA 03-0L2324 Yuba City, California Location Hydraulic Study Report Submitted to: Prepared by: November 2012 Table of Contents Executive Summary... iii Acronyms... v 1 General Description... 1 1.1 Project

More information

Appendix VI: Illustrative example

Appendix VI: Illustrative example Central Valley Hydrology Study (CVHS) Appendix VI: Illustrative example November 5, 2009 US Army Corps of Engineers, Sacramento District Prepared by: David Ford Consulting Engineers, Inc. Table of contents

More information

Appendix G Plan Formulation

Appendix G Plan Formulation Appendix G Plan Formulation Complete List of Flood Damage Reduction Measures Measures Developed for North Gabouri Creek A. CH Channelization Widen / deepen channel from Main Street to above 4 th Street.

More information

214 Transportation Carrier Shipment Status Message

214 Transportation Carrier Shipment Status Message 214 Transportation Carrier Shipment Status Message X12/V4010/214: 214 Transportation Carrier Shipment Status Message Version: 1.0 Draft Author: Charles Mackey Company: C.H. Robinson Publication: 12/8/2010

More information

COPPER AND COPPER ALLOYS SCRAP SUPPLY SURVEY IN THE EUROPEAN UNION

COPPER AND COPPER ALLOYS SCRAP SUPPLY SURVEY IN THE EUROPEAN UNION COPPER AND COPPER ALLOYS SCRAP SUPPLY ROPEAN UNION APRIL, 213 PRESENTATION Survey Focuses On Industry Structure and Copper Scrap Flow SOURCE SCRAP MARKET (SUPPLY) DEMAND End of Life Vehicles Construction

More information

ANALYTICAL REFERENCE MATERIALS INTERNATIONAL Part of LGC Standards 3 Perimeter Road, Unit 9 Manchester, NH USA

ANALYTICAL REFERENCE MATERIALS INTERNATIONAL Part of LGC Standards 3 Perimeter Road, Unit 9 Manchester, NH USA ANALYTICAL REFERENCE MATERIALS INTERNATIONAL Part of LGC Standards 3 Perimeter Road, Unit 9 Manchester, NH 03103 USA Tel: (603) 935-4100 E-mail: Sales@ARMI.com FAX: (603) 935-4101 (800) 421-9454 Web: www.armi.com

More information

CARROLL COUNTY, GEORGIA

CARROLL COUNTY, GEORGIA CARROLL COUNTY, GEORGIA AND INCORPORATED AREAS Community Name Community Number BOWDON, CITY OF 130244 CARROLL COUNTY 130464 (UNINCORPORATED AREAS) CARROLLTON, CITY OF 130208 MOUNT ZION, CITY OF 130286

More information

MODOC COUNTY, CALIFORNIA

MODOC COUNTY, CALIFORNIA MODOC COUNTY, CALIFORNIA AND INCORPORATED AREAS COMMUNITY NAME COMMUNITY NUMBER ALTURAS, CITY OF 060193 MODOC COUNTY (UNINCORPORATED AREAS) 060192 REVISED: PRELIMINARY: FEBRUARY 14, 2013 FLOOD INSURANCE

More information

MARATHON COUNTY, WISCONSIN AND INCORPORATED AREAS

MARATHON COUNTY, WISCONSIN AND INCORPORATED AREAS MARATHON COUNTY, WISCONSIN Community Name Community Number Abbotsford, City of 550299 Athens, Village of 550246 *Birnamwood, Village of 550413 Brokaw, Village of 550247 Colby, City of 550049 *Dorchester,

More information

Sustainable Water Management in the Athabasca River Basin Initiative (ARB Initiative) DRAFT Working Group Terms of Reference

Sustainable Water Management in the Athabasca River Basin Initiative (ARB Initiative) DRAFT Working Group Terms of Reference Sustainable Water Management in the River Basin Initiative (ARB Initiative) DRAFT Working Group Terms of Reference December 2016 Contents 1.0 Background...3 2.0 Vision...4 3.0 Project Principles...4 4.0

More information

CHAPTER 7. San Dieguito River Flooding Adaptation

CHAPTER 7. San Dieguito River Flooding Adaptation CHAPTER 7 San Dieguito River Flooding Adaptation This chapter includes a range of adaptation measures to address vulnerabilities from flooding along the San Dieguito River, including the river valley,

More information

JEFFERSON COUNTY, WISCONSIN, AND INCORPORATED AREAS

JEFFERSON COUNTY, WISCONSIN, AND INCORPORATED AREAS VOLUME 1 OF 2 JEFFERSON COUNTY, WISCONSIN, AND INCORPORATED AREAS Community Name Community Number Cambridge, Village of 550080 Fort Atkinson, City of 555554 Jefferson, City of 555561 Jefferson County,

More information

4.18 Utilities and Service Systems

4.18 Utilities and Service Systems 4.18 4.18.1 Introduction This section describes the regulatory and environmental setting for utilities and service systems in the vicinity of ACEforward s near-term and longer-term improvements. It also

More information

SAN BRUNO CREEK / COLMA CREEK RESILIENCY STUDY FINAL REPORT

SAN BRUNO CREEK / COLMA CREEK RESILIENCY STUDY FINAL REPORT SAN BRUNO CREEK / COLMA CREEK RESILIENCY STUDY FINAL REPORT Prepared for: San Francisco International Airport RFP: 8354.1 Prepared by: August 2015 M&N Job No: 7981 Final Report Page E-1 EXECUTIVE SUMMARY

More information

Project Alignment Appendix A

Project Alignment Appendix A Project Alignment Appendix A Fargo Moorhead Metropolitan Area Flood Risk Management Project EA Document This page is intentionally left blank Project Alignment Appendix A Table of Contents 1 BACKGROUND...

More information

MULTIAGENT SYSTEM MODELING IN LOGISTICS TASKS FOR EMERGENCY SITUATIONS

MULTIAGENT SYSTEM MODELING IN LOGISTICS TASKS FOR EMERGENCY SITUATIONS MULTIAGENT SYSTEM MODELING IN LOGISTICS TASKS FOR EMERGENCY SITUATIONS Anatoly Levchenkov Violeta Medne Transport and Machinery Faculty Computer Science and Information Technology Faculty Riga Technical

More information

Draft General Plan Amendment of 2015 SB Year Flood Protection March 25, 2015

Draft General Plan Amendment of 2015 SB Year Flood Protection March 25, 2015 City of Lathrop Comprehensive General Plan Draft General Plan Amendment of 2015 SB 5 200-Year Flood Protection March 25, 2015 City of Lathrop Comprehensive General Plan Draft General Plan Amendment of

More information

City of Katy Flood Protection Study (Meeting 3 of 3) October 23, 2017

City of Katy Flood Protection Study (Meeting 3 of 3) October 23, 2017 City of Katy Flood Protection Study (Meeting 3 of 3) October 23, 2017 Phasing of Meetings April Meeting May Meeting October Review of Tax Day Storm Event and Immediate Actions Taken By City Review of Coordination

More information

862 Pull Loop System

862 Pull Loop System NEXTEER Supplier Information Packet 862 Pull Loop System Revised Date: March, 2010 Supplier Pull Loop System TABLE OF CONTENTS Page I. Introduction... 1 II. System Flow... 2 III. Bar Code Label Requirements

More information

Water Operations 101. Jerry Johns and John Leahigh Department of Water Resources BDCP Steering Committee 5/8/09

Water Operations 101. Jerry Johns and John Leahigh Department of Water Resources BDCP Steering Committee 5/8/09 Water Operations 101 Jerry Johns and John Leahigh Department of Water Resources BDCP Steering Committee 5/8/09 Water Operations Overview Where Does BDCP Fit Into California Planning Hydrologic Variability

More information

HEC-RAS 2D Modeling in Support of Ascension Parish Levee Certification

HEC-RAS 2D Modeling in Support of Ascension Parish Levee Certification HEC-RAS 2D Modeling in Support of Ascension Parish Levee Certification OFMA 2017 Annual Conference September 19, 2017 Presented by: Jeff Doudrick, PE, ENV SP Project Manager HNTB Corporation Agenda Project

More information

Public Notice. Applicant: City of Dallas Project No.: SWF Date: April 18, Name: Chandler Peter Phone Number:

Public Notice. Applicant: City of Dallas Project No.: SWF Date: April 18, Name: Chandler Peter Phone Number: Public Notice Applicant: City of Dallas Project No.: SWF- 2014-00151 Date: April 18, 2014 The purpose of this public notice is to inform you of a proposal for work in which you might be interested. It

More information

Freight Street Development Strategy

Freight Street Development Strategy Freight Street Development Strategy Appendix B: Naugatuck River Floodplain Analysis Freight Street Development Strategy DECEMBER 2017 Page B-1 1.0 NAUGATUCK RIVER FLOODPLAIN AT FREIGHT STREET 1.1 Watershed

More information

POOL 11 ISLANDS SUNFISH LAKE AND MUD LAKE OPERATION AND MAINTENANCE MANUAL

POOL 11 ISLANDS SUNFISH LAKE AND MUD LAKE OPERATION AND MAINTENANCE MANUAL MISSISSIPPI RIVER POOL 11 ISLANDS SUNFISH LAKE AND MUD LAKE GRANT COUNTY, WISCONSIN AND DUBUQUE COUNTY, IOWA U.S. ARMY CORPS OF ENGINEERS ENVIRONMENTAL MANAGEMENT PROGRAM HABITAT REHABILITATION AND ENHANCEMENT

More information

4.1 Browns Canal Introduction Sub-basin Information

4.1 Browns Canal Introduction Sub-basin Information Section 4 Withlacoochee Basin 4.1 Browns Canal 4.1.1 Introduction The information presented in this sub-basin plan for Browns Canal is intended to provide the reader with information necessary to understand

More information

DOUGLAS COUNTY, COLORADO AND INCORPORATED AREAS

DOUGLAS COUNTY, COLORADO AND INCORPORATED AREAS VOLUME 1 OF 3 DOUGLAS COUNTY, COLORADO AND INCORPORATED AREAS COMMUNITY NAME COMMUNITY NUMBER CASTLE PINES, CITY OF 080231 CASTLE ROCK, TOWN OF 080050 DOUGLAS COUNTY (UNINCORPORATED AREAS) 080049 LARKSPUR,

More information

FLOOD INSURANCE STUDY

FLOOD INSURANCE STUDY FLOOD INSURANCE STUDY DONA ANA COUNTY, NEW MEXICO AND INCORPORATED AREAS VOLUME 1 OF 2 COMMUNITY NAME COMMUNITY NUMBER ANTHONY, TOWN OF 350061 DONA ANA COUNTY 350012 (UNINCORPORATED AREAS) HATCH, VILLAGE

More information

THE CROSSROADS IN WINCHESTER 4. DRAINAGE PLAN. 4. Drainage Plan. a. Drainage Plan Description

THE CROSSROADS IN WINCHESTER 4. DRAINAGE PLAN. 4. Drainage Plan. a. Drainage Plan Description THE CROSSROADS IN WINCHESTER 4. DRAINAGE PLAN 4. Drainage Plan a. Drainage Plan Description The Specific Plan area drains naturally into two separate watersheds: approximately 6 percent of the Specific

More information

Option 11. Divert Water from Miocene and Hendricks Canal to Supply the Ridge

Option 11. Divert Water from Miocene and Hendricks Canal to Supply the Ridge Integrated Water Resources Plan Option 11 Divert Water from Miocene and Hendricks Canal to Supply the Ridge This option would use water from the Miocene Canal and/or Hendricks Canal for municipal supplies

More information

SAN FRANCISCO DISTRICT

SAN FRANCISCO DISTRICT LETTER REPORT SAN FRANCISCO BAY SHORELINE STUDY U.S. ARMY CORPS OF ENGINEERS SAN FRANCISCO DISTRICT,APRIL 1992 LETTER REPORT SAN FRANCISCO BAY SHORELINE STUDY U.S. ARMY CORPS OF ENGINEERS SAN FRANCISCO

More information

CMS SPREADSHEET GUIDE (CMSUG)

CMS SPREADSHEET GUIDE (CMSUG) United States Department of Defense (DoD) Acquisition Workforce Demonstration Project (AcqDemo) Contribution-based Compensation and Appraisal System Software (CAS2Net) Developed under Contract OPM1912C0033

More information

EFFECT OF UPSTREAM DEVELOPMENT ON THE CLEAR CREEK AREA

EFFECT OF UPSTREAM DEVELOPMENT ON THE CLEAR CREEK AREA EFFECT OF UPSTREAM DEVELOPMENT ON THE CLEAR CREEK AREA Technical Memorandum Farming in the Floodplain Project Prepared for May 2017 PCC Farmland Trust Photo credit: Google Earth TABLE OF CONTENTS Page

More information

WAYNE COUNTY, WEST VIRGINIA AND INCORPORATED AREAS

WAYNE COUNTY, WEST VIRGINIA AND INCORPORATED AREAS WAYNE COUNTY, WEST VIRGINIA AND INCORPORATED AREAS COMMUNITY NAME COMMUNITY NUMBER CEREDO, TOWN OF 540232 FORT GAY, TOWN OF 540202 KENOVA, CITY OF 540221 WAYNE COUNTY, UNINCORPORATED AREAS 540200 WAYNE,

More information

MINGO COUNTY, WEST VIRGINIA AND INCORPORATED AREAS

MINGO COUNTY, WEST VIRGINIA AND INCORPORATED AREAS MINGO COUNTY, WEST VIRGINIA AND INCORPORATED AREAS COMMUNITY NAME COMMUNITY NUMBER DELBARTON, TOWN OF 540134 GILBERT, TOWN OF 540135 KERMIT, TOWN OF 540136 MATEWAN, TOWN OF 545538 MINGO COUNTY, (UNINCORPORATED

More information

Lower San Joaquin and Delta South Regional Flood Management Plan

Lower San Joaquin and Delta South Regional Flood Management Plan Lower San Joaquin and Delta South Regional Flood Management Plan Draft Document for Public Review/Comment January 2014 Contents 1 Acronyms and Abbreviations iv 2 Executive Summary 1 3 Introduction 2 3.1

More information

Location Drainage Study

Location Drainage Study Location Drainage Study PROJECT ROUTE: LIMITS: MUNICIPALITY/COUNTY: JOB NUMBER: IL 47 at Burlington Road 750ft NW to 750ft SE of IL 47(Burlington), & 1000ft S to 1000ft N of Burlington (IL47) Kane County

More information

WASHTENAW COUNTY, MICHIGAN (ALL JURISDICTIONS)

WASHTENAW COUNTY, MICHIGAN (ALL JURISDICTIONS) WASHTENAW COUNTY, MICHIGAN (ALL JURISDICTIONS) VOLUME 1 OF 2 Community Community Community Community Name Number Name Number Ann Arbor, Charter Township of 260535 Milan, City of 260151 Ann Arbor, City

More information

Notice of Preparation Colusa County 2030 General Plan Draft Program Environmental Impact Report

Notice of Preparation Colusa County 2030 General Plan Draft Program Environmental Impact Report NoticeofPreparation ColusaCounty2030GeneralPlan DraftProgramEnvironmentalImpact Report Date: June20,2011 To: StateClearinghouse StateResponsibleAgencies StateTrusteeAgencies OtherPublicAgencies OrganizationsandInterestedPersons

More information

Summary of Geochemical Atlas Information

Summary of Geochemical Atlas Information G-BASE Internet Information Summary of Geochemical Atlas Information Version 1.1 31 st March 2006 atlassummaries.pdf Page 1 of 17 Summary Atlas Information 8. Argyll 17. East Anglia 7. East Grampians 16.

More information

4.5 WASTEWATER, STORM DRAINAGE, AND FLOODING

4.5 WASTEWATER, STORM DRAINAGE, AND FLOODING 4.5 WASTEWATER, STORM DRAINAGE, AND FLOODING INTRODUCTION This section addresses the potential wastewater, storm drainage, and flooding impacts resulting from development under the Draft General Plan.

More information

Review Zone Application for D&R Canal Commission Decision

Review Zone Application for D&R Canal Commission Decision Review Zone Application for D&R Canal Commission Decision MEETING DATE: June 15, 2016 DRCC #: 15-4748 Phase I and II Latest Submission Received: May 4, 2016 Applicant: Kevin Hayes Country Club Meadows,

More information

Phase II Report on Hydrology, Hydraulics, and Low Water Dams

Phase II Report on Hydrology, Hydraulics, and Low Water Dams Phase II Report on Hydrology, Hydraulics, and Low Water Dams Arkansas River Corridor Tulsa, OK May 2005 Submitted To: U. S. Army Corps of Engineers Tulsa District Prepared by: The GUERNSEY Team 5555 N.

More information

ND Detention Project Development Update

ND Detention Project Development Update ND Detention Project Development Update Upper Red River Basin Halstad, MN = 8 Upstream Subwatersheds Fargo, ND = 3 Upstream Subwatersheds Halstad, MN Fargo, ND Wild Rice Otter Tail Bois de Sioux Upstream

More information

EAST VALLEY WATER DISTRICT Wastewater Collection System Master Plan. Table 4-1 Capacity Evaluation d/d Criteria

EAST VALLEY WATER DISTRICT Wastewater Collection System Master Plan. Table 4-1 Capacity Evaluation d/d Criteria EAST VALLEY WATER DISTRICT Wastewater Collection System Master Plan 4 Capacity Analysis The capacity analysis used the calibrated dry weather and wet weather wastewater collection system model to evaluate

More information

Families on the Periodic Table

Families on the Periodic Table Families on the Periodic Table Elements on the periodic table can be grouped into families based on their chemical properties. Each family has a specific name to differentiate it from the other families

More information

SECTION 11: REGULATORY FLOODWAYS

SECTION 11: REGULATORY FLOODWAYS SECTION 11: REGULATORY FLOODWAYS Contents 11.1. The Floodway... 11-2 11.1.1. The floodway concept... 11-2 11.1.2. Floodway map... 11-2 11.1.3. Floodway permitting... 11-3 11.1.4. Changing the floodway...

More information

SAN GORGONIO PASS CAMPUS - PHASE I

SAN GORGONIO PASS CAMPUS - PHASE I SAN GORGONIO PASS CAMPUS - PHASE I Banning, CA DRAINAGE STUDY June 16, 2010 Reference 106-195 PREPARED BY: Encompass Associates, Inc. 5699 Cousins Place Rancho Cucamonga, CA 91737 909-684-0093 Fax-909-586-6979

More information

EDI 214 Carrier Shipment Status Message Version

EDI 214 Carrier Shipment Status Message Version Ryder Transportation Management 1 Ryder Transportation EDI Electronic Data Interchange EDI 214 Carrier Shipment Status Message Version 004010 Document: Version: 3.0 Document Date: Nov. 2, 2015 Ryder Transportation

More information

Fullerton Creek Channel (OCFCD Facility No. A03) from downstream Beach Blvd. including undercrossing to downstream I-5 Freeway.

Fullerton Creek Channel (OCFCD Facility No. A03) from downstream Beach Blvd. including undercrossing to downstream I-5 Freeway. Fullerton Creek Channel (OCFCD Facility. A03) Lead Agency: Agency: Project Director: Address: Orange County, Public Works, Infrastructure Programs, Capital Programs Sam Ali 300 N. Flower Street Santa Ana

More information

PARR HYDROELECTRIC PROJECT PARR HYDRO DEVELOPMENT & FAIRFIELD PUMPED STORAGE FACILITY DEVELOPMENT FERC PROJECT No SC SEPTEMBER 19, 2012

PARR HYDROELECTRIC PROJECT PARR HYDRO DEVELOPMENT & FAIRFIELD PUMPED STORAGE FACILITY DEVELOPMENT FERC PROJECT No SC SEPTEMBER 19, 2012 PARR HYDROELECTRIC PROJECT PARR HYDRO DEVELOPMENT & FAIRFIELD PUMPED STORAGE FACILITY DEVELOPMENT FERC PROJECT No. 1894 - SC SEPTEMBER 19, 2012 PARR AND FAIRFIELD LOCATIONS Lockhart Neal Shoals Monticello

More information

Appendix G: Hydrology-Related Reports

Appendix G: Hydrology-Related Reports Appendix G: Hydrology-Related Reports (Hydraulic Summary of the Proposed Hawk Street Bridge, Bay Area Hydrology Model Project Report, Preliminary Stormwater Treatment Plan and Details, Evaluation of Potential

More information

Are Juvenile Chinook Salmon Entrained at Unscreened Diversions in Direct Proportion to the Volume of Water Diverted?

Are Juvenile Chinook Salmon Entrained at Unscreened Diversions in Direct Proportion to the Volume of Water Diverted? Are Juvenile Chinook Salmon Entrained at Unscreened Diversions in Direct Proportion to the Volume of Water Diverted? Charles H. Hanson Abstract Mark-recapture experiments were used to test the null hypothesis

More information

2/13/2013. Section 1 - A Zone Building Rating. Section 2 - V Zone Building Rating. Section 3 Rating procedure. Section 4 A Zone Examples

2/13/2013. Section 1 - A Zone Building Rating. Section 2 - V Zone Building Rating. Section 3 Rating procedure. Section 4 A Zone Examples National Flood Insurance Program 1 FEMA 2009. All rights reserved Training Agenda for Elevation Rating Section 1 - A Zone Building Rating Section 2 - V Zone Building Rating Section 3 Rating procedure Section

More information

SAN GABRIEL RIVER/ COYOTE CREEK 2 LEVEE SYSTEM LOS ANGELES COUNTY, CALIFORNIA NLD SYSTEM ID #

SAN GABRIEL RIVER/ COYOTE CREEK 2 LEVEE SYSTEM LOS ANGELES COUNTY, CALIFORNIA NLD SYSTEM ID # SAN GABRIEL RIVER/ COYOTE CREEK 2 LEVEE SYSTEM LOS ANGELES COUNTY, CALIFORNIA NLD SYSTEM ID # 3805010031 PERIODIC INSPECTION REPORT NO. 2 GENERALIZED EXECUTIVE SUMMARY FINAL SYSTEM RATING: MINIMALLY ACCEPTABLE

More information

SONOMA COUNTY, CALIFORNIA

SONOMA COUNTY, CALIFORNIA SONOMA COUNTY, CALIFORNIA AND INCORPORATED AREAS COMMUNITY NAME COMMUNITY NUMBER CLOVERDALE, CITY OF 060376 COTATI, CITY OF 060377 HEALDSBURG, CITY OF 060378 PETALUMA, CITY OF 060379 ROHNERT PARK, CITY

More information

APPLICATION OF A HYDRODYNAMIC MIKE 11 MODEL FOR THE EUPHRATES RIVER IN IRAQ

APPLICATION OF A HYDRODYNAMIC MIKE 11 MODEL FOR THE EUPHRATES RIVER IN IRAQ 2008/2 PAGES 1 7 RECEIVED 13.1.2008 ACCEPTED 26.4.2008 A. H. KAMEL APPLICATION OF A HYDRODYNAMIC MIKE 11 MODEL FOR THE EUPHRATES RIVER IN IRAQ Ing. Ammar H. Kamel Slovak University of Technology Faculty

More information

Sewer System Flood Reduction Measures in the Rockcliffe Area

Sewer System Flood Reduction Measures in the Rockcliffe Area PW28.6 REPORT FOR ACTION Sewer System Flood Reduction Measures in the Rockcliffe Area Date: March 26, 2018 To: Public Works and Infrastructure Committee From: General Manager, Toronto Water Wards: Ward

More information

Marysville Levee Commission

Marysville Levee Commission Marysville Levee Commission Outline CVFPP Goals & Objectives Highlights of Draft Feather River RFMP Integration between Flood Protection, Agriculture and Wildlife and Floodplain Uses Proposed Projects

More information

HYDROLOGY REPORT HEACOCK & CACTUS CHANNELS MORENO VALLEY, CALIFORNIA NOVEMBER 2005 REVISED APRIL 2006 REVISED AUGUST 2006

HYDROLOGY REPORT HEACOCK & CACTUS CHANNELS MORENO VALLEY, CALIFORNIA NOVEMBER 2005 REVISED APRIL 2006 REVISED AUGUST 2006 HYDROLOGY REPORT HEACOCK & CACTUS CHANNELS MORENO VALLEY, CALIFORNIA NOVEMBER 2005 REVISED APRIL 2006 REVISED AUGUST 2006 RIVERSIDE COUNTY FLOOD CONTROL AND WATER CONSERVATION DISTRICT TABLE OF CONTENTS

More information

(b) Discuss in brief shaft spillway with neat sketches. Marks 04. OR Q (2) Explain in brief USBR stilling basin. Marks 08

(b) Discuss in brief shaft spillway with neat sketches. Marks 04. OR Q (2) Explain in brief USBR stilling basin. Marks 08 (b) Discuss in brief shaft spillway with neat sketches. Marks 04 OR Q (2) Explain in brief USBR stilling basin. Marks 08 Stilling Basins The basins are usually provided with special appurtenances including

More information

Kern Water Bank. Kern Water Bank Authority

Kern Water Bank. Kern Water Bank Authority Kern Water Bank Kern Water Bank Authority THE KERN WATER BANK Ensuring a Reliable Water Supply to the Southern San Joaquin Valley Providing for Exceptional Upland and Riparian Habitat Kern Water Bank Authority

More information

CRoSS REfERE nce. table of Contents Page # CR-1

CRoSS REfERE nce. table of Contents Page # CR-1 this cross reference is intended for the use of architects and contract hardware distributors in establishing comparisons between the hinge products of McKinney and other manufacturers. these listings

More information

California Water: Looking to the Future. Statistical Appendix

California Water: Looking to the Future. Statistical Appendix Golden Gate University School of Law GGU Law Digital Commons California Agencies California Documents 1-1988 California Water: Looking to the Future. Statistical Appendix California Department of Water

More information

Stream Reaches and Hydrologic Units

Stream Reaches and Hydrologic Units Chapter United States 6 Department of Agriculture Natural Resources Conservation Service Chapter 6 Stream Reaches and Hydrologic Units Rain clouds Cloud formation Precipitation Surface runoff Evaporation

More information

IMMEDIATE POLICY CHANGE

IMMEDIATE POLICY CHANGE DEPARTMENT OF DEFENSE Defense Contract Management Agency IMMEDIATE POLICY CHANGE Contract Receipt and Review Contracts Directorate DCMA-INST 118 (IPC-2) OPR: DCMA-AQ June 17, 2015 1. POLICY. This Immediate

More information

Stockton Freight & Passenger Rail Mobility Enhancement

Stockton Freight & Passenger Rail Mobility Enhancement Stockton Freight & Passenger Rail Mobility Enhancement 2017 $10.34 million in 2017 FASTLANE Grant funding to complete engineering design, permitting, and construction of the Stockton Track Extension and

More information

Table D-1. Montour County Hazard Mitigation Projects - Municipalities Affected. Structural Projects

Table D-1. Montour County Hazard Mitigation Projects - Municipalities Affected. Structural Projects Table D-1 Montour County Hazard Mitigation Projects - Municipalities Affected Structural Projects Project Description Mitigation Objective Hazard Municipality(s) Affected Pursue re-mapping of the 100-year

More information

Master Plan of Storm Drainage for East Garden Grove Wintersburg Channel Tributary Area

Master Plan of Storm Drainage for East Garden Grove Wintersburg Channel Tributary Area CITY OF ANAHEIM Master Plan of Storm Drainage for East Garden Grove Wintersburg Channel Tributary Area JANUARY 2006 VOLUME 1 Table of Contents VOLUME 1 1. Executive Summary... 1 1.1 General... 1 1.2

More information

4.6 - Hydrology and Water Quality

4.6 - Hydrology and Water Quality City of Wasco - Wasco Center Walmart Hydrology and Water Quality 4.6 - Hydrology and Water Quality 4.6.1 - Introduction This section provides an evaluation of hydrology and water quality. The analysis

More information

Upper San Joaquin River Regional Flood Management Plan Flood Management Operations and Maintenance

Upper San Joaquin River Regional Flood Management Plan Flood Management Operations and Maintenance DRAFT Upper San Joaquin River Regional Flood Management Plan Operations and Maintenance September 2013 Prepared by: San Joaquin River Flood Control Project Agency Table of Contents 4.0 Operations and

More information

Central Valley hydrology study

Central Valley hydrology study Central Valley hydrology study November 29, 2015 Prepared for California Department of Water Resources Letter of agreement #4600007762 Prepared by US Army Corps of Engineers Sacramento District and David

More information

City of Beacon Environmental Assessment Form (EAF) PART 1 & 2

City of Beacon Environmental Assessment Form (EAF) PART 1 & 2 City of Beacon Environmental Assessment Form (EAF) PART 1 & 2 January 3, 2017 City of Beacon Environmental Assessment Form (EAF) PART I & 2 January 3, 2017 Proposed Action: Adoption of the City of Beacon

More information

Fuji Brand / Fuji Electric (Changshu) Brand Products Notification regarding a Change due to the Amendments of EU Directive and China RoHS

Fuji Brand / Fuji Electric (Changshu) Brand Products Notification regarding a Change due to the Amendments of EU Directive and China RoHS To All Customers REP.No.B16005E April 28, 2016 Fuji Electric FA Components & Systems Co., Ltd. Fuji Brand / Fuji Electric (Changshu) Brand Products Notification regarding a Change due to the Amendments

More information

The cost of quality. Metals Conference Dr Michail Karpenko General Manager NZWC, HERA Alan McClintock Senior Welding Engineer, HERA

The cost of quality. Metals Conference Dr Michail Karpenko General Manager NZWC, HERA Alan McClintock Senior Welding Engineer, HERA Metals Conference 2017 The cost of quality Dr Michail Karpenko General Manager NZWC, HERA Alan McClintock Senior Welding Engineer, HERA The New Zealand submarine Platypus The Platypus was designed by Monsieur

More information

The following paragraphs provide a bulleted summary of the items discussed during the meeting:

The following paragraphs provide a bulleted summary of the items discussed during the meeting: minutes Flood Insurance Study Update Meeting City of Vacaville Public Works Conference Room #2 650 Merchant Street Vacaville, California June 22, 2011 10:00 a.m. 12:00 p.m. ATTENDEES: Tim Burke, Public

More information

CITY OF REDLANDS MASTER PLAN OF DRAINAGE San Bernardino County, California

CITY OF REDLANDS MASTER PLAN OF DRAINAGE San Bernardino County, California CITY OF REDLANDS MASTER PLAN OF DRAINAGE San Bernardino County, California Prepared for City of Redlands 35 Cajon Street Redlands, California 92373 Prepared by 14725 Alton Parkway Irvine, CA 92618 Contact

More information

Town of Moraga Storm Drainage Needs Study Moraga, California December, 2006 (Updated: April, 2008) Prepared by: SWC Project No.

Town of Moraga Storm Drainage Needs Study Moraga, California December, 2006 (Updated: April, 2008) Prepared by: SWC Project No. EXHIBIT A.B. Town of Moraga Storm Drainage Needs Study Moraga, California December, 2006 (Updated: April, 2008) Prepared by: SWC Project No. 2006-37 Table of Contents Report Page Introduction 1 Limits

More information

UK Baseline Geochemistry: A Key Environmental Yardstick

UK Baseline Geochemistry: A Key Environmental Yardstick UK Baseline Geochemistry: A Key Environmental Yardstick Geochemical Baselines and Medical Geology Team Content Geochemical baselines G-BASE project Applications how the data have been used and what can

More information

RECORD OF DECISION MAY RIO GRANDE FLOODWAY, SAN ACACIA TO BOSQUE DEL APACHE UNIT FLOOD RISK MANAGEMENT PROJECT SOCORRO COUNTY, NEW MEXICO

RECORD OF DECISION MAY RIO GRANDE FLOODWAY, SAN ACACIA TO BOSQUE DEL APACHE UNIT FLOOD RISK MANAGEMENT PROJECT SOCORRO COUNTY, NEW MEXICO RECORD OF DECISION MAY 2 0 2014 RIO GRANDE FLOODWAY, SAN ACACIA TO BOSQUE DEL APACHE UNIT FLOOD RISK MANAGEMENT PROJECT SOCORRO COUNTY, NEW MEXICO The Final General Reevaluation Report and Supplemental

More information

RED RIVER FLOODWAY OPERATION REPORT SPRING Manitoba Infrastructure

RED RIVER FLOODWAY OPERATION REPORT SPRING Manitoba Infrastructure RED RIVER FLOODWAY OPERATION REPORT SPRING 2017 Manitoba Infrastructure RED RIVER FLOODWAY OPERATION REPORT SPRING 2017 June 29, 2017 Manitoba Infrastructure Hydrologic Forecasting and Water Management

More information

FINDINGS: Olsson used a three-step analysis strategy to develop a benefit cost ratio that would indicate the relative feasibility of this project.

FINDINGS: Olsson used a three-step analysis strategy to develop a benefit cost ratio that would indicate the relative feasibility of this project. EXECUTIVE SUMMARY FINDINGS: Based on the results of this feasibility study, the Platte Republican Diversion Project would be cost-effective. With minimal improvements to the channel, and the existing bridge

More information

NOTICE OF PREPARATION

NOTICE OF PREPARATION NOTICE OF PREPARATION Date: June 12, 2014 To: From: Subject: Governor s Office of Planning and Research/State Clearinghouse Unit, Responsible Agencies, Trustee Agencies, and Interested Parties Announcement

More information

SOURCE WATER ASSESSMENT SUMMARY BROCHURE

SOURCE WATER ASSESSMENT SUMMARY BROCHURE SOURCE WATER ASSESSMENT SUMMARY BROCHURE CITY OF ROGUE PWS # 4100712 WHAT IS A SOURCE WATER ASSESSMENT? The Source Water Assessment was recently completed by the Department of Environmental Quality (DEQ)

More information

PRELIMINARY HYDROLOGY/HYDRAULICS ANALYSES RESULTS

PRELIMINARY HYDROLOGY/HYDRAULICS ANALYSES RESULTS PRELIMINARY HYDROLOGY/HYDRAULICS ANALYSES RESULTS Coldstream Park Stream Corridor Restoration and Preservation Consent Decree SEP Prepared for Lexington-Fayette Urban County Government Division of Water

More information