Prepared by. Regd. Office: January, 2013

Size: px
Start display at page:

Download "Prepared by. Regd. Office: January, 2013"

Transcription

1

2 [Vide CRZ tification dated 6 th January, 2011] FORM I For PROPOSED 5 STAR RESORT PROJECT VIVANTA BY TAJ AT HAVELOCK At (Plot : 149/1, 149/3, 150/3/2, 150/3/3, 150/3/4) Village - Radha Nagar, Gram Panchyat - Govinda Nagar, Havelock Island, Tehsil - Port Blair Dist. Andaman, A&N Islands Proposed by The Indian Hotel Company Limited Prepared by GREEN CIRCLE, INC. Integrated HSEQR Consulting Engineers, Scientists & Trainers (ISO 9001:2008, 14001: 2004 & OHSAS 18001: 2007 Certified organization & Recognized by Ministry of Environment & Forest, New Delhi under EPA 1986 & GPCB approved Environment Auditor Schedule II & provisionally accredited by QCI-NABET on 89 th AC meeting dated ) Regd. Office: Green Empire (Anupushpam), Above Axis bank, Near Yash Complex, Gotri Road, Vadodara (Gujarat) Tel ; Fax: info@greencircleinc.com, gccipl@rediffmail.com January, 2013

3 Form-I for seeking clearance for project attracting CRZ notification Basic information: Name of the Project: : Vivanta by Taj at Havelock Location or site alternatives Under consideration: Size of the project (in terms of total area) : Radha Nagar Beach, Village Radhanagar, Havelock Island, Andaman ( N and E : Total Plot Area: 1,82, sq.m Proposed Built-up area (FSI): sq.m n FSI area: 3175 sq.m Total Construction Built-up area (FSI+n FSI): sq.m CRZ classification of the area : ICRZ- III Expected cost of the project : 80 Crores Contact Information : The Indian Hotels Company Ltd., Oxford House 15 / 17, NF Road, Apollo Bunder, Mumbai , India. (II) Activity 1. Construction, operation or decommissioning of the Project involving actions, which will cause physical changes in the locality (topography, land use, changes in water bodies, and the like) S.. Information/Checklist confirmation 1.1 Permanent or temporary change in land use, land cover or topography including increase in intensity of land use (with respect to local land use plan) / Details thereof (with approximate quantities /rates, wherever possible) with source of information data The proposed site is underdeveloped and covered with bushes and trees mostly areca nut. Permanent land use change is envisaged for sq. m area on which villas are to be constructed. Temporary land use change will be there only in construction phase which will be brought to almost original form after construction is completed. 1

4 Master Layout plan enclosed as Annexure III. 1.2 Details of CRZ classification as per the approved Coastal Zone Management Plan? 1.3 Whether located in CRZ-I area? 1.4 The distance from the CRZ-I areas. 1.5 Whether located within the hazard zone as mapped by Ministry of Environment and Forests/National Disaster Management Authority? 1.6 Whether the area is prone to cyclone, tsunami, tidal surge, subduction, earthquake etc.? 1.7 Whether the area is prone for saltwater ingress? 1.8 Clearance of existing land, vegetation and buildings? As per CRZ 2011 tification, and subsequent letter from MoEF in July 2012 for consideration of Havelock island under ICRZ. The proposed project comes under ICRZ III as per CRZ map of Havelock Island. CRZ map enclosed as Annexure - I Project comes under ICRZ - III. 50 m from HTL towards sea. Effects of Cyclone & tidal Surge may occur at site as it is near to sea. At the onset of monsoon, the islands are affected but usually not seriously by the cyclonic weather of Bay of Bengal. On an average 2-3 tropical cyclones form every year, of which one or two could be severe. Andaman & Nicobar islands are classified as Moderate Damage Risk Zone A. The basic wind speeds are applicable to 10 meters heights above the mean ground level in an open terrain cyclone seldom parts over the islands, though most of them form in Andaman sea. Area may be prone for saltwater ingress, as site is very close to sea (approx m) Few areca nut trees and other shrubs will be cut during site preparation. However economically important trees will be preserved and or replanted. 1.9 Creation of new land uses? Existing land will be used for construction of 5 star resort (villas) 2

5 1.10 Pre-construction investigations e.g. bore hole, soil testing? Soil samples were collected and analyzed from different locations at site and the results have been found satisfactory. Geotechnical study has also been carried out at the site and found to be satisfactory. Soil Analysis report enclosed as Annexure - II 1.11 Construction works? This project involves construction of a 5 star resort. It is proposed to begin commence operations with 50 keys, 16 public buildings and 18 staff accommodation buildings and raise the inventory to 100 keys in Phase II Demolition works? This is a new project 1.13 Temporary sites used for construction works or housing of construction workers? 1.14 Above ground buildings, structures or earthworks including linear structures, cut and fill or excavations 1.15 Underground works including mining or tunneling? Temporary shelter and sanitation facilities for construction workers are not required as majority of the labour will be hired from nearby villages. 50 keys (or rooms) will be constructed in Ist phase and rest 50 keys (or rooms) in 2 nd phase of the project. Construction will be done as per local town and country planning and not exceeding height of 9 meters with two floors (Ground and first floor) Sewage Treatment Plant (STP) and Rain Water Harvesting Tanks will be constructed underground. Master layout Plan is enclosed as Annexure-III Reclamation works? t applicable 1.17 Dredging/reclamation/land filling/disposal of dredged material etc.? t applicable 1.18 Offshore structures? Floating jetty, arrival pavilion and dive centre is proposed as offshore structure Production and manufacturing processes? NA 1.20 Facilities for storage of goods or materials? Raw materials required for construction shall be stored at the camp-sites during construction phase. 3

6 1.21 Facilities for treatment or disposal of solid waste or liquid effluents? 1.22 Facilities for long term housing of operational workers? 1.23 New road, rail or sea traffic during construction or operation? 1.24 New road, rail, air waterborne or other transport infrastructure including new or altered routes and stations, ports, airports etc? Temporary septic tanks will be made for disposal of sewage during construction phase. During Operation Phase, generated sewage will be treated in STP and treated water will be reused for land scape gardening and flushing toilets, Aircondition & DG cooling towers. Staff quarters will be provided on the project site. There will be increment in sea traffic during construction phase, as this is the only route to site. Approach road along with a bridge over the nalah in the project site will be constructed from the existing road. Master layout Plan enclosed as Annexure- III Closure or diversion of existing transport routes or infrastructure leading to changes in traffic movements? 1.26 New or diverted transmission lines or pipelines? 1.27 Impoundment, damming, culverting, realignment or other changes to the hydrology of watercourses or aquifers? There will not be any closure or diversion of existing transportation routes. t Applicable 1.28 Stream and river crossings? Fresh water stream is passing through one side the plot; however there will be no alteration in channel diversion or quality of water Abstraction or transfers of water from ground or surface waters? 1.30 Changes in water bodies or the land surface affecting drainage or run-off? NA Ground water will be utilized through Bore wells. Rain water harvesting will also be done to meet fresh water requirement. The existing drainage pattern may not change due to construction & operation activities, but there will be minor change as artificial ponds & water body will be created 4

7 1.31 Transport of personnel or materials for construction, operation or decommissioning? There will be transport of materials and personnel during both construction phase and operation phase Long-term dismantling or decommissioning or restoration works? 1.33 Ongoing activity during decommissioning which could have an impact on the environment? 1.34 Influx of people to an area in either temporarily or permanently? Construction phase: 300 persons (approx). Operation phase: 250 persons (approx). t Applicable There will be no impact on environment. Influx of people in construction phase: 300 persons (approx) temporarily. There will be influx of tourist during operation phase of the project 1.35 Introduction of alien species? There will be no introduction of alien species Loss of native species or genetic diversity? Few areca nut trees will be cut during site preparation and rest of the trees will either be preserved and or replanted. Native species will be protected Any other actions? other actions/activities envisaged 2. Use of Natural resources for construction or operation of the Project (such as land, water, materials or energy, especially any resources which are non-renewable or in short supply): S.. Information/checklist confirmation 2.1 Land especially undeveloped or agricultural land (ha) / Details thereof (with approximate quantities /rates, wherever possible) with source of information data 1,82, sq.m revenue land is undeveloped land allotted by ANIIDCO for resort project to IHCL. 2.2 Water (expected source & Source: Rain water and Ground 5

8 competing users) unit: KLD water. Total water requirement in construction phase: 60 KLD Total water requirement in operational phase: 480 KLD Domestic requirement: 250 KLD Swimming pool: 20 KLD Flushing requirement: 36 KLD Landscaping requirement: 114 KLD Air condition: 40 KLD D.G cooling tower: 20 KLD Water balance is enclosed as Annexure- IV 2.3 Minerals (MT) t Applicable 2.4 Construction material stone, aggregates, sand/soil (expected source MT) 2.5 Forests and timber (source MT) 2.6 Energy including electricity and fuels (source, competing users) Unit: fuel (MT), energy (MW) 2.7 Any other natural resources (use appropriate standard units) Construction materials such as stone, cement, sand, bricks, sheds, marble, paints, tiles, electrical ware, sanitary ware, glass, timber etc. will be taken up from authorized suppliers. Timbers will be procured from authorized vendor for construction of doors and windows. Electricity Source : DG set Construction: 100 KVA (1 no.) Operation: Power requirement: 720KW / 900 KVA Demand load: 720KW / 900 KVA Connected load: 985 KW/1230 KVA Backup power source & quantity: 100 % by diesel generators. t applicable 3. Use, storage, transport, handling or production of substances or materials, which could be harmful to human health or the environment or raise concerns about actual or perceived risks to human health. S.. Information/Checklist confirmation 3.1 Use of substances or materials, which are / Details thereof (with approximate quantities/rates, wherever possible) with source of information data Since this is a resort project, no hazardous chemical will be 6

9 hazardous (as per MSIHC rules) to human health or the environment (flora, fauna, and water supplies) generated nor used except HSD for power generation in DG sets. The spent oil will be carefully stored in HDPE drums under isolated storage, and periodically sold to authorized recyclers. All precautions will be taken to avoid spillage from the storage. 3.2 Changes in occurrence of disease or affect disease vectors (e.g. insect or water borne diseases) 3.3 Affect the welfare of people e.g. by changing living conditions? 3.4 Vulnerable groups of people who could be affected by the project e.g. hospital patients, children, the elderly etc., 3.5 Any other causes, that would affect local communities, fisher folk, their livelihood, dwelling units of traditional local communities etc. There will be no occurrence of any disease due to the proposed project. There will be positive impact due to proposed project. Direct or indirect employment opportunities for the local people will increase. The living condition and welfare of the people will improve. Tourism sector will get a boost. Since this is resort project, no significant impact on any vulnerable groups is envisaged due to construction and operation. t Applicable 4. Production of solid wastes during construction or operation or decommissioning (MT/month) S.. Information/Checklist confirmation 4.1 Spoil, overburden or mine wastes 4.2 Municipal waste (domestic and or commercial / Details thereof (with approximate quantities/rates, wherever possible) with source of information data t Applicable During construction phase, domestic Solid wastes generated will be 135 kg 7

10 wastes) /day approx which shall be properly collected, segregated and disposed off suitably as per norms. The construction debris shall be used for leveling and base course preparation. 4.3 Hazardous wastes (as per Hazardous Waste Management Rules) Approximately 63 Kg/day of solid waste will be generated during 4.4 Other industrial process wastes 4.5 Surplus product t Applicable operation phase of which biodegradable waste shall be 38 kg/day and non-biodegradable waste 25 kg/day. Biodegradable waste shall be treated in OWP and non biodegradable waste will be delivered to authorized vendors for further disposal/ Reused Spent oil from DG sets, Discarded oil, grease & paint containers (Category 5.1 and 33.3 of HW respectively (MH Trans boundary Movement) Rules 2008 t Applicable 4.6 Sewage sludge or other sludge from effluent treatment 4.7 Construction or demolition wastes 4.8 Redundant machinery or equipment 4.9 Contaminated soils or other materials The sewage generated will be treated through STP. Sludge of 0.63 KLD will be generated shall be handed over to authorized vendor. Soil excavation: 4500 m 3 shall be produced during Construction phase which will be used for back filling and leveling. demolition involved as this is a new project. Since this a resort project, redundant machinery is not applicable. The site will be cleared after construction is completed. There will be no contamination of soil as sewage will be treated in STP and solid waste will be segregated into biodegradable and non 8

11 biodegradable. Wet waste will be treated in OWP and dry waste shall be handed over to authorized vendors Agricultural wastes There will be no agricultural waste in this proposed project Other solid wastes t Applicable 5. Release of pollutants or any hazardous, toxic or noxious substances to air (Kg/hr) S.. Information/Checklist confirmation 5.1 Emissions from combustion of fossil fuels from stationary or mobile sources. 5.2 Emissions from production processes 5.3 Emissions from materials handling including storage or transport 5.4 Emissions from construction activities including plant and equipment / Details thereof (with approximate quantities/rates, wherever possible) with source of information data During Construction phase emissions shall be from use of Construction machineries, vehicles and DG Sets. During Operation phase emission will be from DG sets only. processes involving production. Dusting may occur during loading and unloading of cement bags, sand etc. however suitable mitigation measures like sprinkling of water etc will be done to control dusting to check air pollution. During Construction phase emission shall be from use of Construction machineries, vehicles and DG Sets only from stationary sources and fugitive emissions during handling. 9

12 5.5 Dust or odours from handling of materials including construction materials, sewage and waste Dusting will occur during transportation and handling of construction materials however suitable mitigation measures like sprinkling of water etc. will be done to control dusting. odour problem will occur due to solid waste since proper segregation and processing will be done using OWP. 5.6 Emissions from incineration of waste 5.7 Emissions from burning of waste in open air (e.g. slash materials, construction debris) 5.8 Emissions from any other sources t applicable as incineration will not be involved. burning of debris shall be allowed. t envisaged 6. Generation of ise and Vibration, and Emissions of Light and Heat: S.. Information/Checklist confirmation 6.1 From operation of equipment e.g. engines, ventilation plant, crushers / Details thereof (with approximate quantities/rates, wherever possible) with source of information data with source of information data. There will be slight increase in noise during construction phase due to operation of machineries however it will be mitigated through effective engineering and administrative measures. ise expected during operation of will be from DG set only but shall be below 75 db (A) at 1m from acoustic enclosure. Further proper acoustic measures shall be provided along with DG sets to reduce the noise and 10

13 vibrations. 6.2 From industrial or similar processes industrial or similar processes involved. 6.3 From construction or demolition Peak decibel level during construction phase shall be between 75 to 85 db (A), which may cause short term impact limited to the construction site only. demolition involved since this is a new project. 6.4 From blasting or piling blasting or piling involved. 6.5 From construction or operational traffic There will be marginal noise generation from vehicle movement. However, the noise levels from traffic will be less than 70 db (A). Further suitable mitigation measures shall be proposed to reduce the noise generated as a result of construction or operation traffic. 6.6 From lighting or cooling t Applicable systems 6.7 From any other sources t Applicable 7. Risks of contamination of land or water from releases of pollutants into the ground or into sewers, surface waters, groundwater, coastal waters or the sea: S.. Information/Checklist confirmation 7.1 From handling, storage, use or spillage of hazardous materials / Details thereof (with approximate quantities/rates, wherever possible) with source of information data The collection and disposal of hazardous waste will be as per hazardous waste (Management & Handling) amendment rule 2008 and adequate precautions will be taken to avoid adverse impact on land environment. Hazardous material 11

14 7.2 From discharge of sewage or other effluents to water or the land (expected mode and place of discharge) 7.3 By deposition of pollutants emitted to air into the land or into water like used oil, discarded containers will be handed over to authorized vendors. There will be no discharge of waste water onto land or water bodies as sewage will be treated in STP. Treated sewage will be used for gardening and flushing. Flue gas emissions from DG set will be within the prescribed limits of CPCB. Adequate stack height shall be provided for dispersion of the pollutants/ emissions. Water will be sprayed to mitigate dust pollution. 7.4 From any other sources t applicable 7.5 Is there a risk of long term build up of pollutants in the environment from these sources? The source of emissions is from construction machineries and DG set during construction phase which will be of short term and temporary. The source emissions id from only DG set during operation phase which shall be maintained as per CPCB standard. Thus there is no risk of long term build up of pollutants in the environment. 8. Risk of accidents during construction or operation of the Project, which could affect human health or the environment S.. Information/Checklist confirmation 8.1 From explosions, spillages, fires etc from storage, handling, use or production of hazardous substances / Details thereof (with approximate quantities/rates, wherever possible) with source of information data Fire protection measures & installations (passive and active) would include Fire Extinguishers, Hose reel, Fire Hydrant, Sand Buckets, Fire Alarm & fire water 12

15 tank will be installed. Emergency numbers will be displayed on the board. Do s and don ts will be displayed on board to minimize risk. Fire protection plan and evacuation alarm will be prepared. 8.2 From any other causes t applicable 8.3 Could the project be affected by natural disasters causing environmental damage (e.g., floods, earthquakes, landslides, cloud burst etc)? Flooding may occur in proximity at sea and worst case like tsunami. However adequate precautions will be taken for prevention and control of losses due to natural disasters. All of the Andaman & Nicobar Islands lie in Zone V. The entire island chain is also susceptible to tsunamis both from large local quakes and also from massive distant shocks. 9. Factors which should be considered (such as consequential development) which could lead to environmental effects or the potential for cumulative impacts with other existing or planned activities in the locality S.. Information/Checklist confirmation 9.1 Lead to development of supporting. Facilities, ancillary development or development stimulated by the project which could have impact on the environment e.g.: Supporting infrastructure (roads, power, supply, waste or waste water treatment, etc.) housing development extractive industries supply industries other. 9.2 Lead to after-use of the site, which could have an / Details thereof (with approximate quantities/rates, wherever possible) with source of information data Economic growth is envisaged as there will be more influx of tourists to Havelock island. This in turn will result in socio-economic development of the region. impact envisaged. 13

16 impact on the environment 9.3 Set a precedent for later developments The project shall set precedents for further development. 9.4 Have cumulative effects due to proximity to other existing or planned projects with similar effects III. Environmental Sensitivity cumulative effects due to other development (if any) envisaged. S.. Areas 1 Areas protected under international conventions, national or local legislation for their ecological, landscape, cultural or other related value 2 Areas which are important or sensitive for ecological reasons - Wetlands, watercourses or other water bodies, coastal zone, biospheres, mountains, forests 3 Areas used by protected, important or sensitive species of flora or fauna for breeding, nesting, foraging, resting, over wintering, migration 4 Inland, coastal, marine or underground waters Name/ Identity Aerial distance (within 15 km.) Proposed project location boundary Rani Jhansi Marine National Park at John Lawrance Island is located at a distance of more than 10 km from the proposed project site. This project comes under ICRZ III. The LTL towards sea at meter approx from the project site and reserve forest is present within 300 meter approx. from the project site. One fresh water nalah is passing through the proposed site. Rani Jhansi Marine National Park at John Lawrence Island is located at a distance of more than 10 km from the proposed project site. This project comes under ICRZ - III 5 State, National boundaries state /national boundaries within 15 km. 6 Routes or facilities used by the public for access to recreation or other tourist, Public access is by means of road from Jetty to Radhanagar Beach, which is a tourist spot. pilgrim areas 7 Defence installations t present within 15 km 8 Densely populated or built-up t present area 9 Areas occupied by sensitive Primary Health Centre, Schools, 14

17

18 ANNEXURE I CRZ Map of Havelock Island

19 ANNEXURE I Landuse map and statistics of Havelock Island in 7 km radius around project site Sr.. Description Area in HA 1 AGRICULTURE BEACH BUILT UP CREEK FOREST JETTY MANGROVE MARSHY LAND 9 PLANTATION SHEET ROCK WATER BODY 2.94

20 ANNEXURE II Soil Investigation Report CHEMICAL ANALYSIS ON SOIL PROJECT : Soil Investigation of proposed TAJ EXOTICA at Havelock Island, Andaman & Nicobar Islands. Location : Port Blair Type of Sample : Soil GEO FOUNDATIONS & STRUCTURES PVT. LTD Sample Quantity : 1Kg Number of Sample : 1 BH. Depth m 25 C CHLORIDES SULPHATES as SO 4 ORGANIC MATTER BH g/kg g/kg 1.8 %

21 ANNEXURE III Master Layout Plan

22 ANNEXURE - IV Water Balance Chart Central Reservoir supply 270 KLD aa Domestic use 250 KLD Swimming pool 20 KLD 233 KLD to sewage treatment plant Treated effluent % 210 KLD Sludge & Evaportion loss 23 KLD Toilets flushing 36 KLD Available for landscape purpose 114 KLD Air Condition 40 KLD D.G cooling Tower 20 KLD Central Utility Water Supply: 270 KLD Recycled water requirement: 210 KLD

Annex F Scoping Checklist

Annex F Scoping Checklist Scoping Checklist Table F1: Scoping Checklist Table. Questions to be considered in Scoping /? Which Characteristics of the Project 1. Will construction, operation or decommissioning of the Project involve

More information

Molvan- Chhamuchhal Group Gram Panchayat. Taluka- Mangrol, District- Surat. Ph. No

Molvan- Chhamuchhal Group Gram Panchayat. Taluka- Mangrol, District- Surat. Ph. No Serial Number FORM 1 (Application for Environment Clearance Certificate) Item 1. Name of the project/s 2. S. No. in the schedule 3. Proposed capacity/ area/ length/ tonnage to be handled/ command area/lease

More information

Form -1. [Vide Notification dated 1 st December 2009] FOR PROPOSED. COSTAL ROAD AT DRONAGIRI, NAVI MUMBAI Precast RCC Bridges On Holding Ponds-

Form -1. [Vide Notification dated 1 st December 2009] FOR PROPOSED. COSTAL ROAD AT DRONAGIRI, NAVI MUMBAI Precast RCC Bridges On Holding Ponds- Project Name : Design and Construction of Precast Arch Bridges(3s.) on Holding Pond. 3A, 3 & 4 for Form -1 [Vide tification dated 1 st December 2009] FOR PROPOSED COSTAL ROAD AT DRONAGIRI, NAVI MUMBAI

More information

FORM-1. Sr. No 1 Name of the Project Harbour Heights 2 S. No. in the Schedule 8(b) Townships and Area Development projects.

FORM-1. Sr. No 1 Name of the Project Harbour Heights 2 S. No. in the Schedule 8(b) Townships and Area Development projects. (I) Basic Information FORM-1 Item Details 1 Name of the Project Harbour Heights 2 S.. in the Schedule 8(b) Townships and Area Development projects. 3 Proposed capacity/area /length/tonnage to be Total

More information

REPORT OF SAND STONE MINING PROJECT (KHATADARI Q.L. No. 178 FOR

REPORT OF SAND STONE MINING PROJECT (KHATADARI Q.L. No. 178 FOR REPORT OF SAND STONE MINING PROJECT (KHATADARI Q.L. No. 178 FOR Near Village Tehsil District State Capacity Lease Area Category of Project Project Cost KANTBARA BIJOLIYA Bhilwara Rajasthan 36561 TPA of

More information

Revised FORM - I & PRE-FEASIBILITY REPORT

Revised FORM - I & PRE-FEASIBILITY REPORT Hind Energy & Coal Beneficiaton (India) Ltd. [Change in Technology from Dry to Wet Type of Coal Washery in EC issued by MoEF letter vide no. J-11015/364/2009-IA-II(M) dated 21st May 2014] at Hindadih Village,

More information

FORM I I. BASIC INFORMATION S. No. Proposed Mixed Use Development Project SPR Binny 2 S. no. in the schedule 8 (b) 1 Name of the project

FORM I I. BASIC INFORMATION S. No. Proposed Mixed Use Development Project SPR Binny 2 S. no. in the schedule 8 (b) 1 Name of the project FORM I I. BASIC INFORMATION. Item Details 1 Name of the project Proposed Mixed Use Development Project SPR Binny 2 no. in the schedule 8 (b) 3 Proposed area Area Details: Total land area: 200243.50 Sqm

More information

Centrade At Plot No. 1, Sector 140, NOIDA Noida, U.P FORM- I

Centrade At Plot No. 1, Sector 140, NOIDA Noida, U.P FORM- I At Plot. 1, Sector 140, NOIDA ida, U.P FORM- I (I) Basic Information S.. Item Details 1. Name of the project/s Centrade 2. S.. in the schedule 8 (a) 3. Proposed capacity/ area/ length/ tonnage to be handled/

More information

Proposed Group Housing Project ATS Rhapsody At Plot No. GH 12/1, Sector -01, Greater Noida (U.P.) APPENDX (See paragr FORM 1

Proposed Group Housing Project ATS Rhapsody At Plot No. GH 12/1, Sector -01, Greater Noida (U.P.) APPENDX (See paragr FORM 1 At Plot. GH 12/1, Sector -01, Greater ida (U.P.) I. Basic Inform rmation APPENDX (See paragr agraph ph-6) FORM 1 S.. Item Details 1. Name of the project Proposed Group Housing Project ATS Rhapsody, At

More information

Sector D 1,Kanpur Road Yojna

Sector D 1,Kanpur Road Yojna Proposed Mall/Multiplex Emerald Mall Plot CP-138, Sector-D1, i. Basic Information FORM - 1 Sl. Item Details 1 Name of the project/s Proposed Mall/Multiplex Emerald Mall Plot CP-138, Sector-D1, 2 S.. In

More information

Max. building height (m)

Max. building height (m) Environmental Management Plan (EMP) for Himalaya Falaknuma by Himalaya Developers Ahmedabad No. Particulars Details 1. Proposal for New Project 2. Type of Project and Commercial Building Construction Project

More information

SIX MONTHLY COMPLIANCE REPORT JUNE- 2015

SIX MONTHLY COMPLIANCE REPORT JUNE- 2015 SIX MONTHLY COMPLIANCE REPORT JUNE- 2015 Group Housing Complex My woods AT Plot no. GH-04, Sector -16 C, Noida Extension, Greater Noida, U.P. Being developed by M/s Mahagun India Pvt. Ltd. A-19, Sector-63,

More information

CONSERVATION OF ENVIRONMENT ENACTMENT 1996 CONSERVATION OF ENVIRONMENT (PRESCRIBED ACTIVITIES) ORDER 1999

CONSERVATION OF ENVIRONMENT ENACTMENT 1996 CONSERVATION OF ENVIRONMENT (PRESCRIBED ACTIVITIES) ORDER 1999 (No. JPBN. 1509/27 Vol. II CONSERVATION OF ENVIRONMENT ENACTMENT 1996 CONSERVATION OF ENVIRONMENT (PRESCRIBED ACTIVITIES) ORDER 1999 In exercise of the powers conferred by section 5 of the Conservation

More information

FORM- I. Behrampur Gurgaon. Gurgaon, Haryana

FORM- I. Behrampur Gurgaon. Gurgaon, Haryana (I) Basic Information: FORM- I SI. Item Details. 1. Name of the project/s IT/ITES SEZ Project 2. S.. in the schedule 8 (b) 3. Proposed capacity/area/length/tonnage to be handled/command area/lease area/number

More information

4.0 ENVIRONMENTAL IMPACTS AND MITIGATION MEASURES. Negative or adverse impacts during the construction phase are:

4.0 ENVIRONMENTAL IMPACTS AND MITIGATION MEASURES. Negative or adverse impacts during the construction phase are: 4.0 ENVIRONMENTAL IMPACTS AND MITIGATION MEASURES 4.1 POTENTIAL ENVIRONMENTAL IMPACTS 4.1.1 Impacts during Construction Phase Negative or adverse impacts during the construction phase are: Land environment:

More information

STANDARD TEMPLATE & FORM-1 FOR KODIDRA LIMESTONE MINE AREA= 4.70 HECT. PROPOSED PRODUCTION: - 28,000 TPA OF LIMESTONE PROJECT COST: - 17.

STANDARD TEMPLATE & FORM-1 FOR KODIDRA LIMESTONE MINE AREA= 4.70 HECT. PROPOSED PRODUCTION: - 28,000 TPA OF LIMESTONE PROJECT COST: - 17. STANDARD TEMPLATE & FORM-1 FOR KODIDRA LIMESTONE MINE AREA= 4.70 HECT. SURVEY NO.81/2, NEAR VILLAGE - KODIDRA, TALUKA- VERVAL, DISTRICT GIRSOMANATH, (GUJARAT) PROPOSED PRODUCTION: - 28,000 TPA OF LIMESTONE

More information

Hind Energy & Coal Beneficiation (India) Ltd.

Hind Energy & Coal Beneficiation (India) Ltd. SUMMARY ON ENVIRONMENTAL IMPACT ASSESSMENT REPORT OF Hind Energy & Coal Beneficiation (India) Ltd. (Change in Technology) at Hindadih Village, Masturi Tehsil Bilaspur District, Chhattisgarh Submitted to

More information

For PROPOSED IT PARK. By M/s.Balewadi Tech Park Pvt.Ltd. Submitted to State Environment Expert Appraisal Committee III, Maharashtra

For PROPOSED IT PARK. By M/s.Balewadi Tech Park Pvt.Ltd. Submitted to State Environment Expert Appraisal Committee III, Maharashtra Draft Terms of References (ToR) (Based on the model TOR given in Environmental Impact Assessment Guidance Manual for building construction projects by MoEF & CC) For PROPOSED IT PARK By M/s.Balewadi Tech

More information

*** Dated: May 2,2014

*** Dated: May 2,2014 F. No.II-43/2013-IA.III Government of India Ministry of Environment & Forests (la-iii Section) Room No. 143, Paryavaran Bhawan, CGO Complex, Lodhi Road, New Delhi - 110003, To The Head-Technical Services

More information

3 SCOPING 3.1 DEVELOPMENT OF SCOPING PROCESS Need for Scoping

3 SCOPING 3.1 DEVELOPMENT OF SCOPING PROCESS Need for Scoping 3 SCOPING 3.1 DEVELOPMENT OF SCOPING PROCESS 3.1.1 Need for Scoping Environmental clearance procedure in India currently has no formal procedure for scoping of EIA studies except for certain guidelines

More information

Sandipbhai Shankarbhai Patel

Sandipbhai Shankarbhai Patel Minor Mineral Ordinary Sand Mine (Existing Project) Village : Oze, Ta : Karjan, Dist : Vadodara (Gujarat) Production Capacity : 9000 TPM Area : 04-33-52 Ha. Proposal For Environmental Clearance (Category

More information

SRI K. RAVI SHANKAR SURVEY NO.100, ODULAPALLI VILLAGE, TALPULA MANDAL, ANANTHAPURAMU DISTRICT, ANDHRA PRADESH

SRI K. RAVI SHANKAR SURVEY NO.100, ODULAPALLI VILLAGE, TALPULA MANDAL, ANANTHAPURAMU DISTRICT, ANDHRA PRADESH SRI K. RAVI SHANKAR SURVEY.100, ODULAPALLI VILLAGE, TALPULA MANDAL, ANANTHAPURAMU DISTRICT, ANDHRA PRADESH FORM I (OPENCAST QUARTZ MINE 40.313 ha) SUBMITTED BY Sri K. Ravi Shankar Door No. 39/49/39, Krishnadevaraya

More information

PRE-FEASIBILITY REPORT

PRE-FEASIBILITY REPORT PRE-FEASIBILITY REPORT For ToR of Proposed Project of MANUFACTURING OF SYNTHETIC ORGANIC DYES (5 f B IND II) By SHREEJI BAPA DYE CHEM PLOT NO 1319 & 1320, PHASE-III, GIDC, VATVA, AHEMADABAD-382445, GUJARAT,

More information

Environmental Guideline on Stone crushing plant set up temporarily for the purpose of a project by a public department

Environmental Guideline on Stone crushing plant set up temporarily for the purpose of a project by a public department 2017 [Type a quote from the document or the summary of an interesting point. You can position the text box anywhere in the document. Use the Drawing Tools tab to change the formatting of the pull quote

More information

Jayendrasinh Bharatsinh Jadeja

Jayendrasinh Bharatsinh Jadeja Minor Mineral Ordinary Sand Mine (Proposed Project) Village : Jodiya, Taluka : Jodiya, Dist. Jamnagar (Gujarat) Production Capacity : 30,600 TPM Area : 04-90-00 Ha. Proposal For Environmental Clearance

More information

M/s Hind Energy & Coal Beneficiation Pvt. Ltd. is presently operating a 2 x 1.2 MTPA

M/s Hind Energy & Coal Beneficiation Pvt. Ltd. is presently operating a 2 x 1.2 MTPA 1.0 INTRODUCTION M/s Hind Energy & Coal Beneficiation Pvt. Ltd. is presently operating a 2 x 1.2 MTPA dry type of coal washery at Village: Hindadih, Tehsil: Masturi, District: Bilaspur (C.G.) for which

More information

Hind Energy & Coal Beneficiation (India) Ltd.

Hind Energy & Coal Beneficiation (India) Ltd. SUMMARY ON ENVIRONMENTAL IMPACT ASSESSMENT REPORT OF Hind Energy & Coal Beneficiation (India) Ltd. 0.96 MTPA Wet type Coal Washery at Birgahani Village, Baloda Tehsil Janjgir-Champa District, Chhattisgarh

More information

APPENDIX VIII. Form 1 M APPLICATION FOR MINING OF MINOR MINERALS UNDER CATEGORY B2 FOR LESS THAN AND EQUAL TO FIVE HECTARE

APPENDIX VIII. Form 1 M APPLICATION FOR MINING OF MINOR MINERALS UNDER CATEGORY B2 FOR LESS THAN AND EQUAL TO FIVE HECTARE APPENDIX VIII Form 1 M APPLICATION FOR MINING OF MINOR MINERALS UNDER CATEGORY B2 FOR LESS THAN AND EQUAL TO FIVE HECTARE (I) Basic Information S.No. Particulates Details 1. Name of the Mining Lease site

More information

FORM - I-A CHECK LIST OF ENVIRONMENTAL IMPACTS

FORM - I-A CHECK LIST OF ENVIRONMENTAL IMPACTS FORM - I-A CHECK LIST OF ENVIRONMENTAL IMPACTS 1. LAND ENVIRONMENT QUERY 1.1 Will the existing land use get significantly altered from the project that is not consistent with the surroundings? Attach Maps

More information

Submitted to. Expert Appraisal Committee (EAC), Mumbai Maharashtra. May 2017

Submitted to. Expert Appraisal Committee (EAC), Mumbai Maharashtra. May 2017 Proposed Panvel Township at Village Vardoli Panvel Raigad Maharashtra by M/s Wadhwa Construction & Infrastructures Pvt. Ltd. May 2017 FORM 1 Proposed Panvel Township at Panvel, Raigadh, Maharashtra Sector

More information

FORM V ENVIRONMENTAL STATEMENT REPORT FOR THE FINANCIAL YEAR M/s Halki Lime Stone Mine (Unit: J. K. Cement Limited) PART A

FORM V ENVIRONMENTAL STATEMENT REPORT FOR THE FINANCIAL YEAR M/s Halki Lime Stone Mine (Unit: J. K. Cement Limited) PART A (I) FORM V ENVIRONMENTAL STATEMENT REPORT FOR THE FINANCIAL YEAR 2013-14 M/s Halki Lime Stone Mine (Unit: J. K. Cement Limited) Name & Address of the Owner / Occupier of the Industry Operation or Process

More information

APPLICATION FOR ENVIRONMENTAL CLEARANCE

APPLICATION FOR ENVIRONMENTAL CLEARANCE APPLICATION FOR ENVIRONMENTAL CLEARANCE Residential Building Project at Proposed Residential high-rise building on plot bearing CTS.. 837 to 840 of Village Poisar, Samta Nagar, Kandivali (East), Mumbai.

More information

Environmental Impact Assessment

Environmental Impact Assessment Environmental Impact Assessment A brief discussion Presented by: Apekshit Solanki Kirti Neetu Yadav Sameera Vishakha Shankar Introduction EIA is a formal process to predict the environmental consequences

More information

SCHEDULE. FORM A (Rule 3(1)) THE CERTIFICATE OF ENVIRONMENTAL CLEARANCE RULES 2001 APPLICATION FOR A CERTIFICATE OF ENVIRONMENTAL CLEARANCE

SCHEDULE. FORM A (Rule 3(1)) THE CERTIFICATE OF ENVIRONMENTAL CLEARANCE RULES 2001 APPLICATION FOR A CERTIFICATE OF ENVIRONMENTAL CLEARANCE SCHEDULE FORM A (Rule 3(1)) THE CERTIFICATE OF ENVIRONMENTAL CLEARANCE RULES 2001 APPLICATION FOR A CERTIFICATE OF ENVIRONMENTAL CLEARANCE This form must be completed in triplicate for any proposed activity

More information

FORM 1 & 1 A. Proposed Residential Project. Sr. No. 25/2/2A Kondhwa Bk. Tal. Haveli Dist. Pune. M/s. ANISHKA DEVELOPERS PVT. LTD.

FORM 1 & 1 A. Proposed Residential Project. Sr. No. 25/2/2A Kondhwa Bk. Tal. Haveli Dist. Pune. M/s. ANISHKA DEVELOPERS PVT. LTD. FORM 1 & 1 A Proposed Residential Project At Sr. 25/2/2A Kondhwa Bk. Tal. Haveli Dist. Pune By M/s. ANISHKA DEVELOPERS PVT. LTD. FORM 1 M/s. Anishka Developers Pvt. Ltd. 1 FORM 1 Proposed Residential Project

More information

PROJECT FEASIBILITY REPORT

PROJECT FEASIBILITY REPORT PROJECT FEASIBILITY REPORT FOR OBTAINING PRIOR ENVIRONMENT CLEARANCE For PROPOSED CHEMICAL MANUFACTURING UNIT From M/s. MORADIA BROTHERS CHEM PVT LTD LOCATED AT: Block No.: 45, JalBhumi Industrial Estate,

More information

WATER CODE TITLE 2. WATER ADMINISTRATION SUBTITLE D. WATER QUALITY CONTROL CHAPTER 26. WATER QUALITY CONTROL SUBCHAPTER A. ADMINISTRATIVE PROVISIONS

WATER CODE TITLE 2. WATER ADMINISTRATION SUBTITLE D. WATER QUALITY CONTROL CHAPTER 26. WATER QUALITY CONTROL SUBCHAPTER A. ADMINISTRATIVE PROVISIONS WATER CODE TITLE 2. WATER ADMINISTRATION SUBTITLE D. WATER QUALITY CONTROL CHAPTER 26. WATER QUALITY CONTROL SUBCHAPTER A. ADMINISTRATIVE PROVISIONS Sec. 26.001. DEFINITIONS. As used in this chapter: (1)

More information

Proposed Office Building at Plot no: 11 & 12 Sector 127, Noida, U.P.

Proposed Office Building at Plot no: 11 & 12 Sector 127, Noida, U.P. FORM 1, FORM 1A AND CONCEPTUAL PLAN FOR ENVIRONMENTAL CLEARANCE OF Proposed Office Building at Plot no: 11 & 12 Sector 127, ida, U.P. Project Proponent: M/S SQUARE EIA Consultant: Ind Tech House Consult

More information

Rajasthan State Pollution Control Board

Rajasthan State Pollution Control Board M/s Raj West Power Private Limited Village- Bhadresh, Tehsil:Barmer District:Barmer Sub: Ref: Sir, Consent to Operate under section 25/26 of the Water (Prevention & Control of Pollution) Act, 1974 and

More information

(1) Bridge, Road and Railway (Adaptation Project) (2) Bridge, Road and Railway (BAU Development with Adaptation Options)

(1) Bridge, Road and Railway (Adaptation Project) (2) Bridge, Road and Railway (BAU Development with Adaptation Options) Sub-sector Guideline: (1) Bridge, Road and Railway (Adaptation Project) (2) Bridge, Road and Railway (BAU Development with Adaptation Options) Basic Concept A. General Concept Climate change will increase

More information

Dilipbhai D. Patel. BLOCK NO. 43, F.P. NO. 45,O.P NO. 40 T.P.S. No- 17 (PUNA), Ta: SURAT CITY, DIST: SURAT

Dilipbhai D. Patel. BLOCK NO. 43, F.P. NO. 45,O.P NO. 40 T.P.S. No- 17 (PUNA), Ta: SURAT CITY, DIST: SURAT Annexure B Land Possession letters & N.A. permission letters Annexure C Photograph of the Site Annexure D Details of Buildings Area Calculation Annexure 1 Topo Sheet Annexure 2 Soil Analysis Report Annexure

More information

GUIDE TO THE DEVELOPMENT OF A MINING AND RECLAMATION PLAN IN NEW BRUNSWICK

GUIDE TO THE DEVELOPMENT OF A MINING AND RECLAMATION PLAN IN NEW BRUNSWICK PROVINCE OF NEW BRUNSWICK DEPARTMENT OF ENERGY AND RESOURCE DEVELOPMENT Minerals and Petroleum Development Branch GUIDE TO THE DEVELOPMENT OF A MINING AND RECLAMATION PLAN IN NEW BRUNSWICK Guide to the

More information

CHECK LIST OF DOCUMENTS / OTHER REQUISITES FOR OBTAINING VARIOUS CLEARANCES FROM THE STATE POLLUTION CONTROL BOARD, ODISHA.

CHECK LIST OF DOCUMENTS / OTHER REQUISITES FOR OBTAINING VARIOUS CLEARANCES FROM THE STATE POLLUTION CONTROL BOARD, ODISHA. CHECK LIST OF DOCUMENTS / OTHER REQUISITES FOR OBTAINING VARIOUS CLEARANCES FROM THE STATE POLLUTION CONTROL BOARD, ODISHA. A. CONSENT TO ESTABLISH UNDER THE PROVISIONS OF WATER (PREVENTION & CONTROL OF

More information

FORM -1 CAPITAL CITY COMMERCIAL PROJECT. Plot No. 2B, Sector 94, Noida, District: Gautam Budh Nagar, Uttar Pradesh

FORM -1 CAPITAL CITY COMMERCIAL PROJECT. Plot No. 2B, Sector 94, Noida, District: Gautam Budh Nagar, Uttar Pradesh Sector - 94, ida, FORM-1 FORM -1 CAPITAL CITY COMMERCIAL PROJECT at Plot. 2B, Sector 94, ida, District: Gautam Budh Nagar, Uttar Pradesh M/s. BPTP INTERNATIONAL TRADE CENTRE LIMITED M-11, Middle Circle,

More information

Chemplast Sanmar Limited Marine Terminal Facility, Chitrapettai Village Cuddalore District, Tamil Nadu

Chemplast Sanmar Limited Marine Terminal Facility, Chitrapettai Village Cuddalore District, Tamil Nadu Chemplast Sanmar Limited Marine Terminal Facility, Chitrapettai Village Cuddalore District, Tamil Nadu Compliance Report for Environmental Clearance No.11.63/2005.1A.III dated 19.12.2005 Specific Conditions

More information

Dust generation/ Air pollution. Noise and vibration. Water pollution. Drainage and sedimentation

Dust generation/ Air pollution. Noise and vibration. Water pollution. Drainage and sedimentation Energy Resilience for Climate Adaptation Project (ERCAP) Environmental Code of Practice (ECOP) for COMPONENT 2: Demonstration Measures to Enhance Resilience of Energy Sector (Pilot for Strengthening Transmission

More information

PRE-FEASIBILITY REPORT. for

PRE-FEASIBILITY REPORT. for PRE-FEASIBILITY REPORT for PROPOSED COMMON EFFLUENT TREATMETN PLANT (CETP) of M/s. VIKASHTEX ENVIROTECH CETP PVT. LTD. Block No. 523, Village: Hathoda, Taluka: Mangrol, Dist: Surat - 394 405 (Guj.) Prepared

More information

WATER CODE TITLE 2. WATER ADMINISTRATION SUBTITLE D. WATER QUALITY CONTROL CHAPTER 26. WATER QUALITY CONTROL SUBCHAPTER A. ADMINISTRATIVE PROVISIONS

WATER CODE TITLE 2. WATER ADMINISTRATION SUBTITLE D. WATER QUALITY CONTROL CHAPTER 26. WATER QUALITY CONTROL SUBCHAPTER A. ADMINISTRATIVE PROVISIONS WATER CODE TITLE 2. WATER ADMINISTRATION SUBTITLE D. WATER QUALITY CONTROL CHAPTER 26. WATER QUALITY CONTROL SUBCHAPTER A. ADMINISTRATIVE PROVISIONS Sec. 26.001. DEFINITIONS. As used in this chapter: (1)

More information

WHS RISK REGISTER FOR THE DESIGN OF BUILDINGS AND STRUCTURES

WHS RISK REGISTER FOR THE DESIGN OF BUILDINGS AND STRUCTURES WHS RISK REGISTER FOR THE DESIGN OF BUILDINGS AND STRUCTURES Project Name: Project Manager: Date Building of Hand Over: Design Consultants: Qualifications, skills, experience: Hazard Identified Risk Level

More information

PROPOSED TERM OF REFERENCE

PROPOSED TERM OF REFERENCE PROPOSED TERM OF REFERENCE FOR ESTABLISHMENT OF PROPOSED MOLASSES/GRAIN BASED DISTILLERY HAVING CAPACITY: 160.0 KLD (MOLASSES BASED) OR 120.0 KLD (MOLASSES BASED) + 40.0 KLD (GRAIN BASED) ALONGWITH 7.0

More information

.in Dated 9th August, Sharma ;

.in Dated 9th August, Sharma  ; F. No. J-11011/151/2010-IA II (I) Government of India Ministry of Environment and Forests (I.A. Division) Paryavaran Bhawan CGO Complex, Lodhi Road New Delhi -110 003.. To, Ankleshwar E-mail: pb.rastoai@nic.in

More information

Consultant: M/s. SADEKAR ENVIRO ENGINEERS PVT. LTD.

Consultant: M/s. SADEKAR ENVIRO ENGINEERS PVT. LTD. Summary For Ria Organics Private Limited, D-26/2, Kurkumbh - MIDC, Taluka - Daund Dist. Pune, Maharashtra, India. Consultant: M/s. SADEKAR ENVIRO ENGINEERS PVT. LTD. Accredited by QCI NABET Lab. Recognized

More information

Executive Summary 1. 1 Project Background 6

Executive Summary 1. 1 Project Background 6 Contents Executive Summary 1 1 Project Background 6 Page 1.1 Project Overview 6 1.2 Hotel Concept 6 1.3 Justification of the Project 8 1.3.1 Foreign Currency Earnings 8 1.3.2 Tourism Developments in Mauritius

More information

Environmental Information Worksheet

Environmental Information Worksheet Environmental Information Worksheet Water System Owner (Attach additional sheets if necessary) Needs and Alternatives Provide a brief narrative that describes: Current drinking water system needs. Project

More information

EXECUTIVE SUMMARY 1.0 PROJECT DESCRIPTION 1.1 INTRODUCTION

EXECUTIVE SUMMARY 1.0 PROJECT DESCRIPTION 1.1 INTRODUCTION EXECUTIVE SUMMARY 1.0 PROJECT DESCRIPTION 1.1 INTRODUCTION Jaypee Group is a leading Business House of the country with its presence in Core industries and Service Sectors like Cement, Infrastructure development,

More information

Viridor Waste Management. Proposed Development of an In-Vessel Composting Facility. Land at Exide Batteries, Salford Road, Bolton

Viridor Waste Management. Proposed Development of an In-Vessel Composting Facility. Land at Exide Batteries, Salford Road, Bolton Viridor Waste Management Proposed Development of an In-Vessel Composting Facility Land at Exide Batteries, Salford Road, Bolton Non-Technical Summary January 2009 Introduction Viridor Waste Management

More information

9.3.9 Industry uses code

9.3.9 Industry uses code 9.3.9 Industry uses code 9.3.9.1 Application (1) This code applies to accepted development and assessable development identified as requiring assessment against the Industry uses code by the tables of

More information

F.P.No.52, S.No.53/B, 54/2/B, D.T.P.S.No.80, Village: Bhat, Dist: Gandhinagar.

F.P.No.52, S.No.53/B, 54/2/B, D.T.P.S.No.80, Village: Bhat, Dist: Gandhinagar. 20. Karnavati Premier Living F.P.No.52, S.No.53/B, 54/2/B, D.T.P.S.No.80, Village: Bhat, Dist: Gandhinagar. Screening & scoping / appraisal Details of the proposed project as presented before the committee

More information

HINAUTI LIMESTONE MINE Mine Lease area ha. (A UNIT OF JAIPRAKASH ASSOCIATES LIMITED) JAYPEE VIHAR, SIDHI (M.P)

HINAUTI LIMESTONE MINE Mine Lease area ha. (A UNIT OF JAIPRAKASH ASSOCIATES LIMITED) JAYPEE VIHAR, SIDHI (M.P) HINAUTI LIMESTONE MINE Mine Lease area 378.261 ha. (A UNIT OF JAIPRAKASH ASSOCIATES LIMITED) JAYPEE VIHAR, SIDHI (M.P) 2012-2013 SUBMITTED TO M.P.POLLUTION CONTROL BOARD BHOPAL (M.P.) Jaypee Sidhi Cement

More information

Existing vegetation with each tree detail like species, girth, canopy etc. Contours with levels Natural features like water body, stream etc.

Existing vegetation with each tree detail like species, girth, canopy etc. Contours with levels Natural features like water body, stream etc. Project name:- Project Code :- Registration Category :- General Comments :- Drawings Feedback:- 1st feedback No Dwg Name Dwg Description Recommendation 1 Site survey plan Site plan showing following in

More information

Environment & Conservation Introduction

Environment & Conservation Introduction Environment & Conservation Introduction Anacortes is blessed with an abundance of natural beauty. Residents identify marine shorelines, streams, lakes, forested areas, and other natural features as defining

More information

V.S LIGNITE POWER Pvt. Ltd AT VILLAGE-GURHA, KOLAYAT, BIKANER, RAJASTHAN

V.S LIGNITE POWER Pvt. Ltd AT VILLAGE-GURHA, KOLAYAT, BIKANER, RAJASTHAN V.S LIGNITE POWER Pvt. Ltd AT VILLAGE-GURHA, KOLAYAT, BIKANER, RAJASTHAN HALF YEARLY REPORT FOR THE PERIOD OCTOBER, 2011 to MARCH 2012 V. S. Lignite Power Pvt. Ltd. Name of the Project : 1x 135 MW Lignite

More information

Bangalore Development Authority T. Chowdaiah Road Kumara Park West Bangalore

Bangalore Development Authority T. Chowdaiah Road Kumara Park West Bangalore Bangalore Development Authority T. Chowdaiah Road Kumara Park West Bangalore 560020 Submission of Documents Form -1, Form 1A & Environmental Management Plan for grant of Environmental Clearance for the

More information

4. The ambient air quality monitoring stations We are monitoring the ambient air quality

4. The ambient air quality monitoring stations We are monitoring the ambient air quality GLOBAL CALCIUM PRIVATE LTD., 125&126, SIPCOT COMPLEX, HOSUR 635 126 Ref : No. J-11011/411/2006-IA-II(I) dated 1 st August 2007. Compliance Report for the Period ending 31.3.2015 Sl. Specific Conditions

More information

Appendix A: Project Characteristics

Appendix A: Project Characteristics Gorgon Fourth Train Expansion Proposal Appendix A: Project Characteristics Appendices Project Characteristics A Key Characteristics table has been prepared to describe the elements of the Foundation Project

More information

HALF YEARLY COMPLIANCE REPORT OF ENVIRONMENTAL CLEARANCE CONDITIONS

HALF YEARLY COMPLIANCE REPORT OF ENVIRONMENTAL CLEARANCE CONDITIONS HALF YEARLY COMPLIANCE REPORT OF ENVIRONMENTAL CLEARANCE CONDITIONS 1. Name of the Project: M/s MCC PTA India Corp. Private Limited Haldia ( WB) Note: Company Name was change from MCC PTA India Corp.Private

More information

LIST OF CONDITIONS FORPROPOSED SMART CITY AT TRIANON BY HERMES PROPERTIES LTD [ENV/DOE/EIA/1695]

LIST OF CONDITIONS FORPROPOSED SMART CITY AT TRIANON BY HERMES PROPERTIES LTD [ENV/DOE/EIA/1695] LIST OF CONDITIONS FORPROPOSED SMART CITY AT TRIANON BY HERMES PROPERTIES LTD [ENV/DOE/EIA/1695] 1. Notwithstanding all other permits and clearances, the following clearances shall be obtained prior to

More information

CHAPTER 3 POLICY, LEGAL AND ADMINISTRATIVE FRAMEWORK

CHAPTER 3 POLICY, LEGAL AND ADMINISTRATIVE FRAMEWORK CHAPTER 3 POLICY, LEGAL AND ADMINISTRATIVE FRAMEWORK 3.1 Introduction Current national environmental policies are based on the need to take an integrated approach to environmental management and the need

More information

Summary of Preparatory Study

Summary of Preparatory Study Summary of Preparatory Study 1. Title of the Cooperation Project, Relevant Project Report Preparatory Survey on the Project for the Establishment of Rural Water Supply System in Kambia Town in the Republic

More information

TERMS OF REFERENCE. Identification of the sources of pollution and assessing the impacts on the environment due to proposed project if any;

TERMS OF REFERENCE. Identification of the sources of pollution and assessing the impacts on the environment due to proposed project if any; TERMS OF REFERENCE 1.0 PROPOSED SCOPE OF WORK FOR EIA STUDY The components of the EIA study include: Determination of baseline data using primary data generation and secondary data available from various

More information

Subject: Environmental and CRZ clearance for expansion of Karaikal Port (Phase-II) at Puducherry by MIs. Karaikal Port Pvt. Ltd. - Reg.

Subject: Environmental and CRZ clearance for expansion of Karaikal Port (Phase-II) at Puducherry by MIs. Karaikal Port Pvt. Ltd. - Reg. No. 10-42/2009-IA.III Government of India Ministry of Environment & Forests (IA Division) Paryavaran Bhawan, CGO Complex, Lodhi Road, New Delhi - 110003. I i I I I Dated: 22 nd September, 2009. To MIs.

More information

PART A. M/s Shree Cement Ltd, (Grinding Unit) village - Udepur, Tehsil- Suratgarh, District -Shri Ganganagar, Rajasthan

PART A. M/s Shree Cement Ltd, (Grinding Unit) village - Udepur, Tehsil- Suratgarh, District -Shri Ganganagar, Rajasthan Page 1 of 9 Environmental Statement for Clinker Grinding Unit of M/s Shree Cement Limited, situated at village - Udepur, Tehsil- Suratgarh, District -Shri Ganganagar, Rajasthan for the Period from: 10

More information

Environmental Management Plan (EMP)

Environmental Management Plan (EMP) SE DELI GS DRIFT MI E ORA GE RIVER MI ES MI I G ACTIVITIES A D PROPOSED EW I PIT SLIMES DISPOSAL Environmental Management Plan (EMP) Compiled for: Namdeb Diamond Corporation (Pty) Ltd Compiled by: Unit

More information

18 Cumulative Impacts and Interaction of Effects

18 Cumulative Impacts and Interaction of Effects 18 Cumulative Impacts and Interaction of Effects 18.1 Introduction This chapter addresses the cumulative impacts and main interactions between different aspects of the environment likely to be significantly

More information

Project Proponent: M/S FAITH BUILDTECH PVT. LTD. EIA Consultant:

Project Proponent: M/S FAITH BUILDTECH PVT. LTD. EIA Consultant: Project Proponent: M/S FAITH BUILDTECH PVT. LTD. EIA Consultant: (An ISO 9001:008 Certified Organization, NABET Accredited consultancy organization) G-8/6, Ground Floor, Sector 11, Rohini Delhi 110 085

More information

9.2 Definitions. The following terms are defined, for purposes of Section 9, as follows:

9.2 Definitions. The following terms are defined, for purposes of Section 9, as follows: SECTION 9. COMMERCIAL WIND ENERGY FACILITIES 9.1 Purpose. The purpose of this Section 9 of the Zoning Bylaw is to provide by special permit for the construction and operation of commercial wind facilities

More information

WE EEN Wizard of the Environment: the Enterprise Europe Network. Eurosportello del Veneto Via delle Industrie 19/C Venezia

WE EEN Wizard of the Environment: the Enterprise Europe Network. Eurosportello del Veneto Via delle Industrie 19/C Venezia WE EEN Wizard of the Environment: the Enterprise Europe Network Eurosportello del Veneto Via delle Industrie 19/C Venezia Directive 2008/98/EC on waste (Waste Framework Directive) The Directive introduces

More information

CAMLICA ELEKTRIK URETIM A.S. CAMLICA III RESERVOIR AND HYDROELECTRIC POWER PLANT (HEPP) ENVIRONMENTAL MANAGEMENT PLAN (EMP)

CAMLICA ELEKTRIK URETIM A.S. CAMLICA III RESERVOIR AND HYDROELECTRIC POWER PLANT (HEPP) ENVIRONMENTAL MANAGEMENT PLAN (EMP) Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized CAMLICA ELEKTRIK URETIM A.S. CAMLICA III RESERVOIR AND HYDROELECTRIC POWER PLANT (HEPP)

More information

FORM-1 A (only for construction projects listed under item 8 of the Schedule) CHECK LIST OF ENVIRONMENTAL IMPACTS

FORM-1 A (only for construction projects listed under item 8 of the Schedule) CHECK LIST OF ENVIRONMENTAL IMPACTS APPENDIX II (See paragraph 6) FORM-1 A (only for construction projects listed under item 8 of the Schedule) CHECK LIST OF ENVIRONMENTAL IMPACTS 1. LAND ENVIRONMENT (Attach panoramic view of the project

More information

PRE-FEASIBILITY REPORT

PRE-FEASIBILITY REPORT PRE-FEASIBILITY REPORT For PRIOR ENVIRONMENTAL CLEARANCE STORAGE CAPACITY ENHANCEMENT OF HPCL, LPG BOTTLING PLANT Capacity: 3 X 500 MT At Plot No.499 Kota-Jhalawar Road (NH-12) Village- Mandana, Tehsil-

More information

MIDC, Nagpur Expansion of Existing Butibori Industrial Area (BIA Phase II) - Form-1

MIDC, Nagpur Expansion of Existing Butibori Industrial Area (BIA Phase II) - Form-1 ANNEXURE I SITE LOCATION MAP Building Environment (India) Pvt. Ltd 1 ANNEXURE II LAYOUT PLAN Building Environment (India) Pvt. Ltd 2 ANNEXURE III LAND DETAILS Sr. No. LAND DETAILS (In Ha.) 1. LARGE SIZE

More information

12 Oct Virama Karya presentation on South Coast Highway. Therefore require a new route expressway

12 Oct Virama Karya presentation on South Coast Highway. Therefore require a new route expressway in association with Design 151.66 Km (Existing Road Apr. 180 km) 2 OBJECTIVE: The Government of Timor Lestewishes to Engage Consultant to carry out the Preliminary, Detailed Engineering Design and Environment

More information

TABLE OF CONTENTS. Title page Table of contents List of tables List of figures Non- technical summary

TABLE OF CONTENTS. Title page Table of contents List of tables List of figures Non- technical summary TABLE OF CONTENTS Title page Table of contents List of tables List of figures Non- technical summary Page i ii vii viii ix CHAPTER 1: INTRODUCTION 1 1.1 Project Background 1 1.2 Aims and Objectives 3 1.3

More information

CMPDI. 4.6 Mine Closure Plan

CMPDI. 4.6 Mine Closure Plan 4.6 Mine Closure Plan Post-mining Land Use Planning The mine closure planning with regard to for Lekhapani OCP will broadly involve the following aspects: 1. Technical Aspects 2 Environmental Aspects 2.

More information

Environmental Guideline for Saskatchewan Asphalt Plants

Environmental Guideline for Saskatchewan Asphalt Plants Environmental Guideline for Saskatchewan Asphalt Plants Ministry of Environment July 2015 saskatchewan.ca/environment For enquiries or reporting, please contact: Government of Saskatchewan Environmental

More information

JAYPEE NIGRIE SUPER THERMAL POWER PROJECT

JAYPEE NIGRIE SUPER THERMAL POWER PROJECT JAYPEE NIGRIE SUPER THERMAL POWER PROJECT (A Unit of M/s Jaiprakash Power Ventures Limited) Villages: Nigrie, Tehsil :Sarai District: Singrauli 2014 2015 SUBMITTED M.P. POLLUTION CONTROL BOARD BHOPAL (M.P.)

More information

Introduction. They can help ensure that all key issues and elements have been considered; They help ensure that the review process is systematic; and

Introduction. They can help ensure that all key issues and elements have been considered; They help ensure that the review process is systematic; and Introduction There are many tools that a reviewer of environmental impact assessment documents can use to help determine whether such documents are complete and adequate. Among the powerful tools that

More information

Naubasta Lime Stone Mine ML - I Jaypee Rewa Plant Jaiprakash Associates Limited

Naubasta Lime Stone Mine ML - I Jaypee Rewa Plant Jaiprakash Associates Limited Naubasta Lime Stone Mine ML - I Jaypee Rewa Plant Jaiprakash Associates Limited Introduction: Jaypee Group is the 3 rd largest cement producer in the country. The Groups cement facilities are located in

More information

Environmental and Social Considerations in Detailed Planning Survey. (Technical Cooperation for Development Planning)

Environmental and Social Considerations in Detailed Planning Survey. (Technical Cooperation for Development Planning) Page: 1 Date: May 27, 2014 Environmental and Social Considerations in Detailed Planning Survey (Technical Cooperation for Development Planning) 1. Full Title of the Project 2. Type of the study (e.g. Master

More information

Environmental Assessment Matrix

Environmental Assessment Matrix For FCC Use Only Date: Customer Name: Environmental Assessment Matrix Loan Number: Please complete each question. Some answers may require additional information. Attach additional documentation where

More information

Yes: Y No: N (a) (b) (c) (d) (a) (a) (b) (c) (d) (e)

Yes: Y No: N (a) (b) (c) (d) (a) (a) (b) (c) (d) (e) Checklist: 3. Hydropower Stations, Dams and Reservoirs (1) 1 Permits and Explanation 2 Pollution Control (1) EIA and Permits (2) Explanation to the Local Stakeholders Main Check s Have EIA reports been

More information

Guidance on use of Disposal and Recovery Codes (Waste Management Act, 1996 as amended)

Guidance on use of Disposal and Recovery Codes (Waste Management Act, 1996 as amended) Guidance on use of Disposal and Recovery Codes (Waste Management Act, 1996 as amended) This information is provided as a source of reference for operators completing waste surveys for the EPA. Under each

More information

North East Roofing Pvt. Ltd. Expansion of Asbestos Cement Sheets & Accessories Manufacturing Unit (50,000 TPA to 70,000 TPA)

North East Roofing Pvt. Ltd. Expansion of Asbestos Cement Sheets & Accessories Manufacturing Unit (50,000 TPA to 70,000 TPA) SUMMARY ON ENVIRONMENTAL IMPACT ASSESSMENT REPORT OF North East Roofing Pvt. Ltd. Expansion of Asbestos Cement Sheets & Accessories Manufacturing Unit (50,000 TPA to 70,000 TPA) Proposed at: Bonda Industrial

More information

ENVIRONMENTAL GUIDELINES FOR PREPARATION OF AN ENVIRONMENT MANAGEMENT PLAN. Environment Protection Authority, ACT May 2009

ENVIRONMENTAL GUIDELINES FOR PREPARATION OF AN ENVIRONMENT MANAGEMENT PLAN. Environment Protection Authority, ACT May 2009 ENVIRONMENTAL GUIDELINES FOR PREPARATION OF AN ENVIRONMENT MANAGEMENT PLAN Environment Protection Authority, ACT May 2009 ISBN-13: 978-0-642-60494-1 ISBN-10: 0-642-60494-0 Australian Capital Territory,

More information

GENERAL SPECIFICATION FOR THE MANAGEMENT OF EXCESS MATERIALS

GENERAL SPECIFICATION FOR THE MANAGEMENT OF EXCESS MATERIALS ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 180 NOVEMBER 2005 GENERAL SPECIFICATION FOR THE MANAGEMENT OF EXCESS MATERIALS TABLE OF CONTENTS 180.01 SCOPE 180.02 REFERENCES 180.03 DEFINITIONS

More information

Expansion in. Environment Clearance Application. Shopping Mall. Mall of India

Expansion in. Environment Clearance Application. Shopping Mall. Mall of India Expansion in Environment Clearance Application Of Shopping Mall Mall of India At Sector-18, ida, Uttar Pradesh BEING DEVELOPED BY: M/s DLF Limited DLF Centre, Sansad Marg, New Delhi PREPARED BY: Environmental

More information

Activity Aspects Impacts/ Nuisances Construction phase - Site preparation. - Generation of excavated soil, debris and construction wastes

Activity Aspects Impacts/ Nuisances Construction phase - Site preparation. - Generation of excavated soil, debris and construction wastes MINISTRY OF ENVIRONMENT AND NDU ENVIRONMENTAL GUIDELINE No. 31 Asphalt Plant Set Up Temporarily For The Purposes Of A Project By A Public Department 1.0 Purpose of guideline This environmental guideline

More information

MARINE POLLUTION DEGRADATION MITIGATION MANAGEMENT IS ESSENTIAL FOR IMPROVING MARINE ENVIRONMENT

MARINE POLLUTION DEGRADATION MITIGATION MANAGEMENT IS ESSENTIAL FOR IMPROVING MARINE ENVIRONMENT MARINE POLLUTION DEGRADATION MITIGATION MANAGEMENT IS ESSENTIAL FOR IMPROVING MARINE ENVIRONMENT The health of the world s oceans and marine life is degrading rapidly as a result of excess human activities.

More information

FINDING OF NO SIGNIFICANT IMPACT OWL CREEK GRAVEL PIT EXPANSION U.S. FOREST SERVICE

FINDING OF NO SIGNIFICANT IMPACT OWL CREEK GRAVEL PIT EXPANSION U.S. FOREST SERVICE FINDING OF NO SIGNIFICANT IMPACT OWL CREEK GRAVEL PIT EXPANSION U.S. FOREST SERVICE OURAY RANGER DISTRICT OURAY COUNTY, COLORADO BACKGROUND The Owl Creek Gravel Pit, also known as the Spruce Ridge Pit,

More information

Prepared by: Vardan Environet, Gurgaon

Prepared by: Vardan Environet, Gurgaon Form -1 (I) BASIC INFORMATION S. No. Items Details 1 Name of the Project: Proposed Expansion of AIIMS Residential Colony Developed By All India Institute of Medical Sciences (AIIMS), New Delhi 2 Serial

More information