PRE-FEASIBILITY REPORT

Size: px
Start display at page:

Download "PRE-FEASIBILITY REPORT"

Transcription

1 PRE-FEASIBILITY REPORT For Polyurethane Foam Manufacturing Facility Of M/s. KRISHNA MARUTI LTD. At Plot No-13, SMG JV Park, Block No- 334,335 Vill- Hansalpur, Tal - Mandal Dist.: Ahmedabad, Gujarat

2 INDEX Sr. No. 1. Executive Summary 2. Introduction of Project (i) Identification of project and project proponent (ii) Brief description of nature of Project (iii) Need for the project and its importance to country and /or region (iv) Demand supply gap (v) Importance vs. Indigenous production (vi) Export Possibility (vii) Employment Generation 3. Project (i) Type of the project (ii) Location of project (iii) Details of alternative site considered (iv) Size or magnitude of project (v) Project description with process details (vi) Raw Material requirement (vii) Raw Material sources (viii) Mode of transportation of raw material and products (ix) Recycle/reuse options (x) Quantity of waste to be generated along with its mode of disposal 4. Site Analysis (i) Connectivity (ii) Land use pattern (iii) Land ownership (iv) Existing infrastructure (v) Soil classification (vi) Climatic data from secondary sources (vii) Social infrastructure available 5. Planning Concept (i) Planning Concept (ii) Population projection (iii) Land use planning (iv) Assessment of infrastructure demand (v) Amenities/ facilities Pre Feasibility Report 1

3 6. Proposed Infrastructure (i) Industrial area (processing area) (ii) Residential area (non processing area) (iii) Green belt (iv) Social infrastructure (v) Connectivity (vi) Drinking water management (vii) Sewerage system (viii) Industrial waste management (ix) Power requirement and supply/source 7. Rehabilitation and Resettle (R & R) Plan 8. Ingredients 9. Summary of Production 10. Project Schedule & Cost Estimation Pre Feasibility Report 2

4 1. Executive Summary Name of the unit : M/s. Krishna Maruti Ltd. Location of the factory : Plot No.13, SMG JV Park, Block No.:334,335, Vill :Hansalpur, Tal.: Mandal, Dist.: Ahmedabad. Telephone number : Contact information : Mr. Gulabkumar Rayagor M/s. Krishna Maruti Ltd. 143, Road-10, Sardardham Society, Dediyasan GIDC, Modhera Road, Mehsana Category of industry : Category B Project Activity No.5(f) Production details : Polyurethane Foam for Car Seats 380 MT/Month Cost of the project : crore Land area : 15,750 sq. meter Source of water : Narmada Canal water through SMG water supply system Source of power : M/s. Uttar Gujarat Vij Company Ltd. 2. Introduction of Project Krishna Group of Industries has soared up to claim a prestigious position in the field of manufacturing various automobile components for leading OEM s in India. These competencies are supported by 22 state of the art manufacturing facilities spread across the Northern, Southern and Western regions of India. It manufactures Automotive Seating Systems, Alternate Fuel Systems, Automotive Fabrics, Vehicle Interior Systems (Door Trims & Roof Headliners), Vision Systems, Fuel Systems, Chassis Systems, Cabin Systems, Exhaust Systems, Gear Shift Systems and Body Structure Systems. Pre Feasibility Report 3

5 M/s. Krishna Maruti Ltd. is one of the divisions of Krishna group of industries. The division works towards meeting all seating requirements of any automotive company including Seating Systems, Head Rest Assemblies, Arm Rest Assemblies, Seat Trims (Covers), Injection Molded Door Trims etc. (i) Identification of project and project proponent. The company has been promoted for the manufacture of Polyurethane Foam for car seat. The company consists of following partners: Sr. No. Name and Designation Address Mr. Ashok kapur -Chairman and Managing Director Mr. Kenichi Ayukawa -Nominee Director Mr. Venkat Raman -Nominee Director Mr. Sunandan Kapur -Vice Chairman and M.D Mrs. Arti kapur -Director Mr. Lokesh Dhawan -Whole Time Director Mr. Sanjay Mohan Labroo -Director B-5, Chirag Enclave, New Delhi F-071, Park Place, DLF City, Phase V, Gurgaon G-31, Regent House, DLF City, Phase iv, Gurgoan B-5, Chirag Enclave, New Delhi B-5, Chirag Enclave, New Delhi , Kailash Hills, New-Delhi , Green Avenue Lane, Off Green Avenue, Kishangarh, New Delhi 70 (ii) Brief description of nature of Project M/s. Krishna Maruti Ltd is complete automotive service provide. The division works towards meeting all seating requirements of any automotive company including Seating Systems, Head Rest Assemblies, Arm Rest Assemblies, Seat Trims (Covers), Injection Molded Door Trims etc. Now, the company is proposed to manufacture Polyurethane Foam for Car Seats in their existing premises at Plot No.13, SMG JV Park, Block No.:334,335, Vill :Hansalpur, Tal.: Mandal, Dist.: Ahmedabad. (iii) Need for the project and its importance to country and /or region The project is proposed to manufacture polyurethane foam for Car Seats in the existing production plant. The technology is totally proven and safe in all aspects. At present the company is importing the PU foam so as to manufacture Pre Feasibility Report 4

6 the car seats, but in order to meet the growing market demand; the company is proposed to manufacture the polyurethane foam in the existing production plant. The project will in return support the growth of the Business. (iv) Demand supply gap The company wishes to capture this opportunity by manufacturing the PU Foam in their existing premises to be able to service the growing market demand. M/s. Krishna Maruti Ltd. as a part of Krishna Group of industries has an experience of managing of business, this being an extension is an indication that the demand is there for the product and this is just an effort to accomplish the supply gap and reap the profits. (v) Imports vs. Indigenous production The products which will be manufactured in said premises will be of international standards, which will have acceptability in the export as well as domestic markets. (vi) Export possibility Krishna group of industries has its business spread across India. For the time being the unit has not planned to export. (vii) Employment generation Manpower of the company: Total workers in all shifts Status Male Female Shift Shift Shift Total Project (i) Type of the project: The proposed production will be carried out in the existing production plant of M/s. Krishna Maruti Ltd. Based on the market scenario, company proposes to manufacture PU Foam required for the making car seat on their own in their existing production plant. Pre Feasibility Report 5

7 (ii) Location of project: The location of the project is at Plot No.13, SMG JV Park, Block No.:334, 335, Vill : Hansalpur, Tal.: Mandal, Dist.: Ahmedabad. The geographical information of the proposed project is as given below: Latitude: 23 30'05.05"N and Longitude: 72 00'41.90"E (iii) Details of alternative site considered: No alternative site was considered. Salient features of selected site: Some of the factors which were considered while finalizing the location are: The proposed production will be carried out in the existing building which is location in Industrial Estate. Facility for electricity, water, drainage, telecommunication, etc. The project site is approx km from State Highway-19. Availability of road, rail, airport for easy transportation. Availability if requisite skilled, semi-skilled and unskilled labor from local area. (iv) Size or magnitude of project: Polyurethane Foam for car seats 380 MT/Month (v) Project description with process details Please refer Annexure-5 of Form-1 (vi) Raw material requirement The details of raw materials required for the proposed products is mention in Annexure- 4 of Form-1, please refer the same. (vii) Raw Material sources: The company will be purchase raw materials from local and / or import depends on availability and market value. (viii) Mode of transportation of raw material and products: The required raw material for the manufacturing of proposed products would be transported by either sea or road. In case of products, it would be transported by road/air-ways and also the same will be depending upon the availability / comfort ability. (ix) Recycle/Reuse options: An option for recycle/reuse is not envisaged. Pre Feasibility Report 6

8 (x) Quantity of waste to be generated along with its mode of disposal: Please refer Annexure-7 of Form-1 for the type, quantity and mode of disposal of solid / hazardous wastes generated from the proposed unit. 4. Site Analysis Point (i) Connectivity The proposed plant is to be set up within notified industrial (ii) Land pattern use (iii) Land ownership (iv) Existing infrastructure area. Existing roads and rails will be used for the proposed project. No new roads or rails are envisaged outside the boundary of the plant. 80 KM from Ahmedabad Airport The proposed plant will be set up in the already existing building located in the industrial estate. Owned by Maruti Suzuki India Ltd. and given on lease to Krishna Maruti Ltd. Plot Area: 15,750 sq. m Utilities: Power requirement for the proposed production will be met by GEB/UGVCL. o Water: Narmada Canal Water through SMG water supply system. o Fuel: LDO/HSD will be used as a fuel in Hot Water Generator o Power: GEB/DGVCL. Transport: o Rail: The nearest broad gauge rail head is Bechraji. o Road: Nearest State highway is SH-19 which is approx KM in south direction o Air: The nearest domestic airport is available at Ahmedabad (80 km). Communication: o All facilities are available i.e. Telephone, Fax, Internet etc. (v) Soil classification (vi) Climatic data from secondary sources Climatic data from secondary sources The proposed production is to be carried out in the Mezzanine of the existing production plant. Temperature: o Maximum: 44.9 C o Minimum : 6.4 C Rainfall: o Average (annual) : mm o Number of days per year : 35.8 days Relative Humidity (%): o Maximum: 64% o Minimum : 38% Pre Feasibility Report 7

9 Point Wind Speed: o No. of days with 0-1 kmph wind speed: 55 per year o No. of days with 1-19 kmph wind speed: 289 per year o No. of days with kmph wind speed: 21 per year o No. of days with 62 kmph or more wind speed: 0 Source: Climatological Tables, India Meteorological Department. (vii) Social infrastructure available Basic amenities like education, medical, drinking water, post office, telephone, transportation & communication, banks, power supply, approach to road etc. are available in the nearby villages. 5. Planning Concept Point (i) Planning concept Not applicable since proposed expansion (ii) (iii) (iv) (v) Population projection Land use planning Assessment of infrastructure demand (physical & social) Amenities / facilities project is to be set up within the existing premises located in notified industrial estate. 6. Proposed Infrastructure Point (i) Land area The proposed production is to be carried out in the Mezzanine ( m 2 ) of the existing production plant. Total land area 15,750 m². (ii) Residential area (iii) Green belt area (iv) Social infrastructure (v) Connectivity (traffic & transportation road/ rail metro/ water ways) (vi) Drinking water management (source and supply of water) Not applicable Total 10% of total plot area will be developed as Green belt. The proposed project will be set up within notified industrial estate. No new road, rail, air/waterborne or other transport infrastructure including new or altered routes and stations are envisaged for the proposed plant. Narmada canal water via SMG Water supply system (vii) Sewerage system Sewage will be discharged into the Septic tank/soak Pit system. Pre Feasibility Report 8

10 Point (viii) Industrial waste management Water Pollution : 1. The quantity of Domestic waste water generated will be discharged to soakpit/septic tank. 2. The effluent generated from cooling will have low TDS, COD-BOD hence it will be used for gardening purpose within the premises. 3. The waste water generated from Force Duct ventilation (Humidifier) will be treated with the help of electrical energy. Air Pollution : NOT APPLICABLE (ix) Power requirement & supply/source Solid & Hazardous waste: o The quantity of used oil generated will be reused within the premises or will be sold to MoEF registered recyclers. Discarded Container/barrels will be sent back to suppliers for reuse purpose or will be sold to the GPCB authorized recyclers. o Power will be sourced from GEB/UGVCL 7. Rehabilitation and Resettle (R& R) Plan Not applicable as the proposed production is to be carried out in the existing plant premises located in the industrial notified area. 8. Ingredients: Please refer Annexure- 4 of Form-1 for details of Raw Materials. 9. Summary of production: Please refer Annexure-4 of Form-1 for summary of the production. 10. Project Schedule & Cost Estimation Likely date of start of construction and likely date of completion (Time schedule for the project to be given) Pre Feasibility Report 9

11 o Proposed date of start of construction and machine erection/ installation: After getting Environment Clearance from SEAC and No Objection Certificate from the GPCB. o Date of completion: It would be approximately 2 months from the date of start construction and other activities. o Proposed date of start production: After getting the statutory required Consent & Authorization from the GPCB. Estimated project cost along with analysis in terms of economic viability of the project. o Estimated project cost: total estimated cost of the project would be Rs Crore, details are as summarized under: Sr. No. Rupees (in Crore) 1 Building Plant & Machinery Total Project Cost Pre Feasibility Report 10

M/s. SAL STEEL LTD Survey no.245/p, Village:-Bharapar, Taluka:- Gandhidham, District:-Kutch, Gujarat.

M/s. SAL STEEL LTD Survey no.245/p, Village:-Bharapar, Taluka:- Gandhidham, District:-Kutch, Gujarat. Pre-Feasibility Study Report For Proposed Fly Ash Co-processing clinker grinding cement Unit of 40,000 MT/month Production capacity within our Existing Premises for M/s. SAL STEEL LTD Survey no.245/p,

More information

PROJECT FEASIBILITY REPORT

PROJECT FEASIBILITY REPORT PROJECT FEASIBILITY REPORT FOR OBTAINING PRIOR ENVIRONMENT CLEARANCE For PROPOSED CHEMICAL MANUFACTURING UNIT From M/s. MORADIA BROTHERS CHEM PVT LTD LOCATED AT: Block No.: 45, JalBhumi Industrial Estate,

More information

PRE-FEASIBILITY REPORT

PRE-FEASIBILITY REPORT PRE-FEASIBILITY REPORT For ToR of Proposed Project of MANUFACTURING OF SYNTHETIC ORGANIC DYES (5 f B IND II) By SHREEJI BAPA DYE CHEM PLOT NO 1319 & 1320, PHASE-III, GIDC, VATVA, AHEMADABAD-382445, GUJARAT,

More information

PRE-FEASIBILITY REPORT. for

PRE-FEASIBILITY REPORT. for PRE-FEASIBILITY REPORT for PROPOSED COMMON EFFLUENT TREATMETN PLANT (CETP) of M/s. VIKASHTEX ENVIROTECH CETP PVT. LTD. Block No. 523, Village: Hathoda, Taluka: Mangrol, Dist: Surat - 394 405 (Guj.) Prepared

More information

Shri Hari Dyes & Chemicals Plot No.: 439/1,417, Phase No. II, GIDC Estate, Vatva , Ahmedabad

Shri Hari Dyes & Chemicals Plot No.: 439/1,417, Phase No. II, GIDC Estate, Vatva , Ahmedabad Annexure Prefeasibility Report (PFR) File PRE FEASIBILITY REPORT For PROPOSED EXPANSION IN EXISTING MANUFACTURING PLANT Of Shri Hari Dyes & Chemicals Work & Regd. Office: CONTENTS Sr. No. Description 1.

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT VENSUB LABORATORIES PRIVATE LIMITED SY. NO. 29, TUPAKULAGUDEM VILLAGE, TALLAPUDI MANDAL, WEST GODAVARI DISTRICT, ANDHRA PRADESH PRE FEASIBILITY REPORT VENSUB LABORATORIES PRIVATE LIMITED Duplex No. 12,

More information

PRE- FEASIBILITY REPORT

PRE- FEASIBILITY REPORT PRE- FEASIBILITY REPORT PREPARED FOR SHIV SHANTHI CEMENT PRIVATE LIMITED Sy. Nos. 92, 93 & 94, Tatiguda Village, Garividi Mandal, Vizianagaram District, Andhra Pradesh. PREPARED BY ISO 9001: 2008 Certified

More information

Pre-Feasibility Report. for. Proposed Construction project of Santnagari

Pre-Feasibility Report. for. Proposed Construction project of Santnagari Pre-Feasibility Report for Proposed Construction project of Santnagari at Survey No. 1439, Near Dharoi Dam, Village Mahor, Taluka Vadali, District Sabarkantha, Gujarat By Gujarat Pavitra Yatradham Vikas

More information

Hind Energy & Coal Beneficiation (India) Ltd.

Hind Energy & Coal Beneficiation (India) Ltd. SUMMARY ON ENVIRONMENTAL IMPACT ASSESSMENT REPORT OF Hind Energy & Coal Beneficiation (India) Ltd. 0.96 MTPA Wet type Coal Washery at Birgahani Village, Baloda Tehsil Janjgir-Champa District, Chhattisgarh

More information

M/s Hind Energy & Coal Beneficiation Pvt. Ltd. is presently operating a 2 x 1.2 MTPA

M/s Hind Energy & Coal Beneficiation Pvt. Ltd. is presently operating a 2 x 1.2 MTPA 1.0 INTRODUCTION M/s Hind Energy & Coal Beneficiation Pvt. Ltd. is presently operating a 2 x 1.2 MTPA dry type of coal washery at Village: Hindadih, Tehsil: Masturi, District: Bilaspur (C.G.) for which

More information

PRE FEASIBILITY REPORT. For PROPOSED BULK DRUG PRODUCTS MANUFACTURING UNITS. M/s. M.K. DRUGS. F-10, Industrial Area, Focal Point, Tehsil: Derabassi

PRE FEASIBILITY REPORT. For PROPOSED BULK DRUG PRODUCTS MANUFACTURING UNITS. M/s. M.K. DRUGS. F-10, Industrial Area, Focal Point, Tehsil: Derabassi PRE FEASIBILITY REPORT For PROPOSED BULK DRUG PRODUCTS MANUFACTURING UNITS Of M/s. M.K. DRUGS F-10, Industrial Area, Focal Point, Tehsil: Derabassi Dist: Mohali, Punjab INTRODUCTION M/s. M.K. Drugs is

More information

SIX MONTHLY COMPLIANCE REPORT JUNE- 2015

SIX MONTHLY COMPLIANCE REPORT JUNE- 2015 SIX MONTHLY COMPLIANCE REPORT JUNE- 2015 Group Housing Complex My woods AT Plot no. GH-04, Sector -16 C, Noida Extension, Greater Noida, U.P. Being developed by M/s Mahagun India Pvt. Ltd. A-19, Sector-63,

More information

Hind Energy & Coal Beneficiation (India) Ltd.

Hind Energy & Coal Beneficiation (India) Ltd. SUMMARY ON ENVIRONMENTAL IMPACT ASSESSMENT REPORT OF Hind Energy & Coal Beneficiation (India) Ltd. (Change in Technology) at Hindadih Village, Masturi Tehsil Bilaspur District, Chhattisgarh Submitted to

More information

TABLE OF CONTENTS. Title page Table of contents List of tables List of figures Non- technical summary

TABLE OF CONTENTS. Title page Table of contents List of tables List of figures Non- technical summary TABLE OF CONTENTS Title page Table of contents List of tables List of figures Non- technical summary Page i ii vii viii ix CHAPTER 1: INTRODUCTION 1 1.1 Project Background 1 1.2 Aims and Objectives 3 1.3

More information

EXECUTIVE SUMMARY 1.0 PROJECT DESCRIPTION 1.1 INTRODUCTION

EXECUTIVE SUMMARY 1.0 PROJECT DESCRIPTION 1.1 INTRODUCTION EXECUTIVE SUMMARY 1.0 PROJECT DESCRIPTION 1.1 INTRODUCTION Jaypee Group is a leading Business House of the country with its presence in Core industries and Service Sectors like Cement, Infrastructure development,

More information

.in Dated 9th August, Sharma ;

.in Dated 9th August, Sharma  ; F. No. J-11011/151/2010-IA II (I) Government of India Ministry of Environment and Forests (I.A. Division) Paryavaran Bhawan CGO Complex, Lodhi Road New Delhi -110 003.. To, Ankleshwar E-mail: pb.rastoai@nic.in

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT DR. REDDY S LABORATORIES LTD. CHEMICAL TECHOPS III PLOT NO.116, 116A, 116B & 126C, S.V. CO OP. IND. ESTATE, BOLLARAM VILLAGE, JINNARAM MANDAL, MEDAK DISTRICT, TELANGANA PRE FEASIBILITY REPORT DR. REDDY

More information

PRE - FEASIBILITY REPORT

PRE - FEASIBILITY REPORT PRE - FEASIBILITY REPORT FOR OBTAINING PRIOR ENVIRONMENT CLEARANCE For EXISTING MINING ACTIVITY CATEGARY B2 UNDER THE EIA NOTIFICATION 2006 AMENDED ON 31/05/2012 TO PIRABHAI VALABHAI NANDASANIYA LOCATED

More information

CHECK LIST OF DOCUMENTS / OTHER REQUISITES FOR OBTAINING VARIOUS CLEARANCES FROM THE STATE POLLUTION CONTROL BOARD, ODISHA.

CHECK LIST OF DOCUMENTS / OTHER REQUISITES FOR OBTAINING VARIOUS CLEARANCES FROM THE STATE POLLUTION CONTROL BOARD, ODISHA. CHECK LIST OF DOCUMENTS / OTHER REQUISITES FOR OBTAINING VARIOUS CLEARANCES FROM THE STATE POLLUTION CONTROL BOARD, ODISHA. A. CONSENT TO ESTABLISH UNDER THE PROVISIONS OF WATER (PREVENTION & CONTROL OF

More information

National Symposium on Best Practices to improve the Business Environment

National Symposium on Best Practices to improve the Business Environment Government of Gujarat National Symposium on Best Practices to improve the Business Environment 23 rd August 2014 Gujarat Industrial Development Corporation (A Government of Gujarat Undertaking) Industrial

More information

Prefeasibility Report. 30,000 KLPY Anhydrous (Absolute) Alcohol Manufacturing Plant at Patalganga MIDC

Prefeasibility Report. 30,000 KLPY Anhydrous (Absolute) Alcohol Manufacturing Plant at Patalganga MIDC Prefeasibility Report For 30,000 KLPY Anhydrous (Absolute) Alcohol Manufacturing Plant at Patalganga MIDC of Alkyl Amines Chemicals Limited 401-407 Nirman Vyapar Kendra, Plot No. 10, Sector 17, Vashi,

More information

STANDARD OPERATING PROCEDURE

STANDARD OPERATING PROCEDURE STANDARD OPERATING PROCEDURE Consent to Established/Operate Procedural Guidelines Consent to Establish NOC Check List Consent to Operate NOC Check List Renewal to Consent to Operate Check List Time Frame

More information

Kana Aroma Industries. Pre-Feasibility Report

Kana Aroma Industries. Pre-Feasibility Report Pre-Feasibility Report 1. INTRODUCTION M/s. is a proposed unit to be located at Shed no. C1-41/B/1 & 2, GIDC Industrial Estate, Nandesari, Vadodara, Gujarat and proposes to manufacture Allyl Iso Thiocynate,

More information

FORM V ENVIRONMENTAL STATEMENT REPORT FOR THE FINANCIAL YEAR M/s Halki Lime Stone Mine (Unit: J. K. Cement Limited) PART A

FORM V ENVIRONMENTAL STATEMENT REPORT FOR THE FINANCIAL YEAR M/s Halki Lime Stone Mine (Unit: J. K. Cement Limited) PART A (I) FORM V ENVIRONMENTAL STATEMENT REPORT FOR THE FINANCIAL YEAR 2013-14 M/s Halki Lime Stone Mine (Unit: J. K. Cement Limited) Name & Address of the Owner / Occupier of the Industry Operation or Process

More information

PRE-FEASIBILITY REPORT FOR OM SAIRAM STEEL AND ALLOYS PVT LTD

PRE-FEASIBILITY REPORT FOR OM SAIRAM STEEL AND ALLOYS PVT LTD PRE-FEASIBILITY REPORT FOR OM SAIRAM STEEL AND ALLOYS PVT LTD PLOT No. F-1,2,3,8,9,10, ADDL. MIDC, PHASE II, AND GUT NO. 46 & 63, VILLAGE DAREGAON, TEHSIL: JALNA DIST: JALNA, MAHARASHTRA 2014-15 1. Executive

More information

PRE FEASIBILITY REPORT PROPOSED CONSCTRUCTION BUILDING PROJECT

PRE FEASIBILITY REPORT PROPOSED CONSCTRUCTION BUILDING PROJECT PRE FEASIBILITY REPORT FOR PROPOSED CONSCTRUCTION BUILDING PROJECT (BUILT UP AREA: 77420.15 SQ. M) BY AMC EWS HOUSING PROJECT RESIDENTIAL BUILDING & COMMERCIAL PROJECT F. P. NO. 174, T.P. NO. 32, GOTA,

More information

Max. building height (m)

Max. building height (m) Environmental Management Plan (EMP) for Himalaya Falaknuma by Himalaya Developers Ahmedabad No. Particulars Details 1. Proposal for New Project 2. Type of Project and Commercial Building Construction Project

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT PRE FEASIBILITY REPORT for PROPOSED EXPANSION OF DISTILLERY of M/s. SHREE GANESH KHAND UDYOG SAHKARI MANDLI LTD. Shri Harisinhji Mahida Bhavan, At & Po: Vataria, Tal: Valia, Dist: Bharuch, Gujarat-393001

More information

PRE-FEASIBILITY REPORT

PRE-FEASIBILITY REPORT PRE-FEASIBILITY REPORT For PRIOR ENVIRONMENTAL CLEARANCE STORAGE CAPACITY ENHANCEMENT OF HPCL, LPG BOTTLING PLANT Capacity: 3 X 500 MT At Plot No.499 Kota-Jhalawar Road (NH-12) Village- Mandana, Tehsil-

More information

North East Roofing Pvt. Ltd. Expansion of Asbestos Cement Sheets & Accessories Manufacturing Unit (50,000 TPA to 70,000 TPA)

North East Roofing Pvt. Ltd. Expansion of Asbestos Cement Sheets & Accessories Manufacturing Unit (50,000 TPA to 70,000 TPA) SUMMARY ON ENVIRONMENTAL IMPACT ASSESSMENT REPORT OF North East Roofing Pvt. Ltd. Expansion of Asbestos Cement Sheets & Accessories Manufacturing Unit (50,000 TPA to 70,000 TPA) Proposed at: Bonda Industrial

More information

Consultant: M/s. SADEKAR ENVIRO ENGINEERS PVT. LTD.

Consultant: M/s. SADEKAR ENVIRO ENGINEERS PVT. LTD. Summary For Ria Organics Private Limited, D-26/2, Kurkumbh - MIDC, Taluka - Daund Dist. Pune, Maharashtra, India. Consultant: M/s. SADEKAR ENVIRO ENGINEERS PVT. LTD. Accredited by QCI NABET Lab. Recognized

More information

JAYPEE NIGRIE SUPER THERMAL POWER PROJECT

JAYPEE NIGRIE SUPER THERMAL POWER PROJECT JAYPEE NIGRIE SUPER THERMAL POWER PROJECT (A Unit of M/s Jaiprakash Power Ventures Limited) Villages: Nigrie, Tehsil :Sarai District: Singrauli 2014 2015 SUBMITTED M.P. POLLUTION CONTROL BOARD BHOPAL (M.P.)

More information

Annex F Scoping Checklist

Annex F Scoping Checklist Scoping Checklist Table F1: Scoping Checklist Table. Questions to be considered in Scoping /? Which Characteristics of the Project 1. Will construction, operation or decommissioning of the Project involve

More information

Improvements in Pollution Management Vapi Industrial Estate

Improvements in Pollution Management Vapi Industrial Estate Improvements in Pollution Management Vapi Industrial Estate August 2009 Background Vapi is a highly successful industrial estate in Gujarat, India. Developed by Gujarat Industrial Development Corporation

More information

F.P.No.52, S.No.53/B, 54/2/B, D.T.P.S.No.80, Village: Bhat, Dist: Gandhinagar.

F.P.No.52, S.No.53/B, 54/2/B, D.T.P.S.No.80, Village: Bhat, Dist: Gandhinagar. 20. Karnavati Premier Living F.P.No.52, S.No.53/B, 54/2/B, D.T.P.S.No.80, Village: Bhat, Dist: Gandhinagar. Screening & scoping / appraisal Details of the proposed project as presented before the committee

More information

74 Subdivision Rules - Business 1, 2, 3, 4, Town Basin, Marsden Point Port, Port Nikau and Airport Environments

74 Subdivision Rules - Business 1, 2, 3, 4, Town Basin, Marsden Point Port, Port Nikau and Airport Environments 74 Subdivision Rules - Business 1, 2, 3, 4, Town Basin, Marsden Point Port, Port Nikau and Airport 74.1 Introduction This chapter contains subdivision rules for the Business 1, 2, 3, 4, Town Basin, Marsden

More information

Form V is to be filled before 30th September annually; for the period from 1st April to 31st March PART A. Company Information

Form V is to be filled before 30th September annually; for the period from 1st April to 31st March PART A. Company Information Form V is to be filled before 30th September annually; for the period from 1st April to 31st March PART A Company Information Company Name : Facility Name : Person Name * : Designation * : Premise Name

More information

ENVIRONMENTAL MONITORING PROGRAMME

ENVIRONMENTAL MONITORING PROGRAMME Stage-I (2x800 MW) Page 1 5 CHAPTER - VI ENVIRONMENTAL MONITORING PROGRAMME 6.0 OBJECTIVES Regular monitoring program the environmental parameters is essential to take into account the changes in the environment.

More information

Application Pack 5. How to apply for a Connection to a Public Sewer/Lateral Drain

Application Pack 5. How to apply for a Connection to a Public Sewer/Lateral Drain Application Pack 5 How to apply for a Connection to a Public Sewer/Lateral Drain Guidance Notes The provisions of the Water Industry Act 1991 (WIA91) take precedence over these notes. We recommend that

More information

INFRASTRUCTURE PROJECTS IN PIPELINE

INFRASTRUCTURE PROJECTS IN PIPELINE Now Available INFRASTRUCTURE PROJECTS IN PIPELINE Sector Analysis and Outlook; Opportunities and Projections Report (PDF) Data-set (Excel) 3 Quarterly Updates India Infrastructure Research Table of Contents

More information

FEASILBLITY REPORT. CONVERSION OF PAPL Facility to produce POLYOLS

FEASILBLITY REPORT. CONVERSION OF PAPL Facility to produce POLYOLS FEASILBLITY REPORT CONVERSION OF PAPL Facility to produce POLYOLS Petro Araldite Pvt. Ltd (PAPL) was set up in the year 1996 as joint venture between Ciba India Limited (part of the Swiss Ciba Geigy group

More information

FORM V (See rule 14) Environmental Statement for the financial year ending 31 st March 2014 PART A

FORM V (See rule 14) Environmental Statement for the financial year ending 31 st March 2014 PART A FORM V (See rule 14) Environmental Statement for the financial year ending 31 st March 2014 i) Name and address of the owner / Occupier ii) Industry category Primary (STC Code) Secondary (SIC Code) PART

More information

EIA for Proposed Additional Butibori Industrial Area, Tehsil and District Nagpur, State Maharashtra.

EIA for Proposed Additional Butibori Industrial Area, Tehsil and District Nagpur, State Maharashtra. PUBLIC CONSULTATION PUBLIC HEARING According to EIA Notification 2006 and its subsequent amendments, the proposed project comes under the project activity of 7 (c) & (a), Industrial estates /parks, complexes/area

More information

PART A. M/s Shree Cement Ltd, (Grinding Unit) village - Udepur, Tehsil- Suratgarh, District -Shri Ganganagar, Rajasthan

PART A. M/s Shree Cement Ltd, (Grinding Unit) village - Udepur, Tehsil- Suratgarh, District -Shri Ganganagar, Rajasthan Page 1 of 9 Environmental Statement for Clinker Grinding Unit of M/s Shree Cement Limited, situated at village - Udepur, Tehsil- Suratgarh, District -Shri Ganganagar, Rajasthan for the Period from: 10

More information

Thethaitangar Small Hydro Power Project

Thethaitangar Small Hydro Power Project 1.0 INTRODUCTION 1.1 General The state of Jharkhand almost comprises hilly terrain mostly of Chhotanagpur plateau and 30% of total area (79,714 sq km) is covered with forest. The normal annual rainfall

More information

RED CATEGORY CONSENT & AUTHORIZATION ORDER BY REGISTERED POST WITH ACKNOWLEDGEMENT DUE

RED CATEGORY CONSENT & AUTHORIZATION ORDER BY REGISTERED POST WITH ACKNOWLEDGEMENT DUE ANDHRA PRADESH POLLUTION CONTROL BOARD Paryavarana Bhavan, A-III, Industrial Estate, Sanathnagar, Hyderabad-500 018 Phone : 040-23887500, Website : www.appcb.ap.nic.in RED CATEGORY CONSENT & AUTHORIZATION

More information

Date of Application. Details of Applicant & Premises (where power supply is required): (Please mark where applicable)

Date of Application. Details of Applicant & Premises (where power supply is required): (Please mark where applicable) (Form A-1) Application Form New Connection/ Load enhancement/ Load reduction/ Reconnection (Agriculture)/ Change of Name/ Shifting/ Temporary Supply/ Conversion of Service/ Change of consumer category

More information

HINDUJA NATIONAL POWER CORPORATION LIMITED. HNPCL, (2X520 MW). VIZAG Technical Enquiry Specification for PU Coated Pipe For Ash Water Recovery System

HINDUJA NATIONAL POWER CORPORATION LIMITED. HNPCL, (2X520 MW). VIZAG Technical Enquiry Specification for PU Coated Pipe For Ash Water Recovery System HNPCL, (2X520 MW). VIZAG THERMAL POWER PROJECT TECHNICAL ENQUIRY SPECIFICATION FOR MS ERW 45O NB POLYURETHANE COATED PIPE FOR ASH WATER RECOVERY SYSTEM Prepared By Checked by Approved by Ashok Kumar Ashok

More information

4.0 ENVIRONMENTAL IMPACTS AND MITIGATION MEASURES. Negative or adverse impacts during the construction phase are:

4.0 ENVIRONMENTAL IMPACTS AND MITIGATION MEASURES. Negative or adverse impacts during the construction phase are: 4.0 ENVIRONMENTAL IMPACTS AND MITIGATION MEASURES 4.1 POTENTIAL ENVIRONMENTAL IMPACTS 4.1.1 Impacts during Construction Phase Negative or adverse impacts during the construction phase are: Land environment:

More information

Phase II (BIA Phase-II),

Phase II (BIA Phase-II), PROJECT PREFEASIBILITY REPORT FOR OBTAINING PRIOR ENVIRONMENTAL CLEARENCE IN TERMS OF PROVISIONS OF EIA NOTIFICATION-2006 1.0 EXECUTIVE SUMMARY OF THE PROJECT Sr. No Description Details 1 Proposed project

More information

4. The ambient air quality monitoring stations We are monitoring the ambient air quality

4. The ambient air quality monitoring stations We are monitoring the ambient air quality GLOBAL CALCIUM PRIVATE LTD., 125&126, SIPCOT COMPLEX, HOSUR 635 126 Ref : No. J-11011/411/2006-IA-II(I) dated 1 st August 2007. Compliance Report for the Period ending 31.3.2015 Sl. Specific Conditions

More information

DEVELOPMENT of. LPG Storage & Bottling Plant. Haldia. Project Feasibility Report

DEVELOPMENT of. LPG Storage & Bottling Plant. Haldia. Project Feasibility Report Hindustan Aegis LPG Limited DEVELOPMENT of LPG Storage & Bottling Plant Haldia Project Feasibility Report August 2017 1 Amendment Record: Amendment Inserted by (Name printed) Date Signature Remarks 2 Table

More information

PRE FEASIBILITY REPORT INCREASE IN THE PRODUCTION OF PENTAERYTHRITOL FROM 560 MTM TO 730 MTM & SODIUM FORMATE FROM 336 MTM TO 480 MTM

PRE FEASIBILITY REPORT INCREASE IN THE PRODUCTION OF PENTAERYTHRITOL FROM 560 MTM TO 730 MTM & SODIUM FORMATE FROM 336 MTM TO 480 MTM PRE FEASIBILITY REPORT INCREASE IN THE PRODUCTION OF PENTAERYTHRITOL FROM 560 MTM TO 730 MTM & SODIUM FORMATE FROM 336 MTM TO 480 MTM (PRODUCT IS IN POWDER & SOLUTION FORM) at SIPCOT INDUSTRIAL COMPLEX,

More information

Naubasta Lime Stone Mine ML - I Jaypee Rewa Plant Jaiprakash Associates Limited

Naubasta Lime Stone Mine ML - I Jaypee Rewa Plant Jaiprakash Associates Limited Naubasta Lime Stone Mine ML - I Jaypee Rewa Plant Jaiprakash Associates Limited Introduction: Jaypee Group is the 3 rd largest cement producer in the country. The Groups cement facilities are located in

More information

HALF YEARLY COMPLIANCE REPORT OF ENVIRONMENTAL CLEARANCE CONDITIONS

HALF YEARLY COMPLIANCE REPORT OF ENVIRONMENTAL CLEARANCE CONDITIONS HALF YEARLY COMPLIANCE REPORT OF ENVIRONMENTAL CLEARANCE CONDITIONS 1. Name of the Project: M/s MCC PTA India Corp. Private Limited Haldia ( WB) Note: Company Name was change from MCC PTA India Corp.Private

More information

MARGINAL COSTING CATEGORY A CHAPTER HIGH MARKS COVERAGE IN EXAM

MARGINAL COSTING CATEGORY A CHAPTER HIGH MARKS COVERAGE IN EXAM 1 MARGINAL COSTING CATEGORY A CHAPTER HIGH MARKS COVERAGE IN EXAM Question 1 Arnav Ltd. manufacture and sales its product R-9. The following figures have been collected from cost records of last year for

More information

M/s.Aarti Industries Limited (Apple Organics Division), Vapi.

M/s.Aarti Industries Limited (Apple Organics Division), Vapi. EXECUTIVE SUMMARY M/s. Aarti Industries Limited (Apple Organics Division) first obtained CCA order 3431, issued on 16/08/2004. Further it was extended by CCA order no. AWH-73091 dated 14/09/2015 for manufacturing

More information

Jaypee Lime Stone Mine Jaypee Bela Plant (A Unit of Jaiprakash Associates Limited)

Jaypee Lime Stone Mine Jaypee Bela Plant (A Unit of Jaiprakash Associates Limited) Jaypee Lime Stone Mine Jaypee Bela Plant (A Unit of Jaiprakash Associates Limited) Introduction: Jaypee Group is the 3 rd largest cement producer in the country. The groups cement facilities are located

More information

KAIZEN GROUP. Kaizen Industrial Services. Kaizen Metal Forming Pvt. Ltd. Manufacturing of Sheet Metal Components & Welded Sub- Assemblies

KAIZEN GROUP. Kaizen Industrial Services. Kaizen Metal Forming Pvt. Ltd. Manufacturing of Sheet Metal Components & Welded Sub- Assemblies 1 WELCOME YOU KAIZEN GROUP Kaizen Industrial Services Production of Welded Sub- Assemblies on per piece basis inside Customer s premises. Fabrication and Assembly jobs on Contract basis Supply of Technical

More information

The unit obtained NOC (CFE) of A.P. Pollution control Board in the year 1988 and started operations.

The unit obtained NOC (CFE) of A.P. Pollution control Board in the year 1988 and started operations. 1. Introduction M/s. Sri Krishna Pharmaceuticals Limited, Unit-III (Formerly Sri Krishna Drugs Limited) was established in the year 1988. It is located at Sy. No. 57, Golkonda kalan, Raikunta (V), shamshabad

More information

Bishunpur Small Hydro Power Project

Bishunpur Small Hydro Power Project 1.0 INTRODUCTION 1.1 General The state of Jharkhand almost comprises hilly terrain mostly of Chhotanagpur plateau and 30% of total area (79,714 sq km) is covered with forest. The normal annual rainfall

More information

PROPOSED TERM OF REFERENCE

PROPOSED TERM OF REFERENCE PROPOSED TERM OF REFERENCE FOR ESTABLISHMENT OF PROPOSED MOLASSES/GRAIN BASED DISTILLERY HAVING CAPACITY: 160.0 KLD (MOLASSES BASED) OR 120.0 KLD (MOLASSES BASED) + 40.0 KLD (GRAIN BASED) ALONGWITH 7.0

More information

Year: Gujarat Technological University, Ahmedabad, Gujarat

Year: Gujarat Technological University, Ahmedabad, Gujarat Vishwakarma Yojana: Phase IV PROJECT REPORT ON VISHWAKARMA YOJNA: AN APPROACH TOWARDS Prepared by RURBANISATION ----------Village, ------------District Prepared By: NAME ENROLLMENT NO Year: 2016-17 Gujarat

More information

(A) Cases recommended by SEAC for Prior Environmental Clearance

(A) Cases recommended by SEAC for Prior Environmental Clearance Minutes of the 33 rd SEIAA Meeting held on 10 th May, 2010 The 33 rd meeting of the State Level Environment Impact Assessment Authority was convened on 10 th May, 2010 at 3.00 P M at the Authority's office

More information

Chapter 11 Industry and Energy

Chapter 11 Industry and Energy Chapter 11 Industry and Energy Industry and Energy: Key Issues 1. Where Is Industry Distributed? 2. Why Are Situation and Site Factors Important? 3. Why Do Industries Face Resource Challenges? 4. Why Are

More information

PERFORMANCE EVALUATION OF 9 MLD SEWAGE TREATMENT PLANT AT GURGAON AND COST EFFECTIVE MEASURES IN TREATMENT PROCESS

PERFORMANCE EVALUATION OF 9 MLD SEWAGE TREATMENT PLANT AT GURGAON AND COST EFFECTIVE MEASURES IN TREATMENT PROCESS PERFORMANCE EVALUATION OF 9 MLD SEWAGE TREATMENT PLANT AT GURGAON AND COST EFFECTIVE MEASURES IN TREATMENT PROCESS Mohan Singh Negi and Vaishali Sahu Department of Civil and Environment Engineering, The

More information

Dilipbhai D. Patel. BLOCK NO. 43, F.P. NO. 45,O.P NO. 40 T.P.S. No- 17 (PUNA), Ta: SURAT CITY, DIST: SURAT

Dilipbhai D. Patel. BLOCK NO. 43, F.P. NO. 45,O.P NO. 40 T.P.S. No- 17 (PUNA), Ta: SURAT CITY, DIST: SURAT Annexure B Land Possession letters & N.A. permission letters Annexure C Photograph of the Site Annexure D Details of Buildings Area Calculation Annexure 1 Topo Sheet Annexure 2 Soil Analysis Report Annexure

More information

Molvan- Chhamuchhal Group Gram Panchayat. Taluka- Mangrol, District- Surat. Ph. No

Molvan- Chhamuchhal Group Gram Panchayat. Taluka- Mangrol, District- Surat. Ph. No Serial Number FORM 1 (Application for Environment Clearance Certificate) Item 1. Name of the project/s 2. S. No. in the schedule 3. Proposed capacity/ area/ length/ tonnage to be handled/ command area/lease

More information

ENVIRONMENTAL MANAGEMENT PLAN. CONSTRUCTION PHASE 1.Construction Contractors

ENVIRONMENTAL MANAGEMENT PLAN. CONSTRUCTION PHASE 1.Construction Contractors 1. Increased water demand (12 KLD) due water usage for, dust suppression and for workers 2. Sewage generation (11 KLD) and disposal 3. Municipal solid waste generation (15 kg/day) by workers 4. Construction

More information

Environmental Impact Assessment

Environmental Impact Assessment Environmental Impact Assessment A brief discussion Presented by: Apekshit Solanki Kirti Neetu Yadav Sameera Vishakha Shankar Introduction EIA is a formal process to predict the environmental consequences

More information

F. No. J-11011/480/2007-IA II (I) Government of India Ministry of Environment and Forests (I.A Division)

F. No. J-11011/480/2007-IA II (I) Government of India Ministry of Environment and Forests (I.A Division) To, M/s. Madras Cement Ltd. V Floor 98-A, Dr. Radhakrishnan Road Mylapore Chennai 600 004 Tamilnadu F. No. J-11011/480/2007-IA II (I) Government of India Ministry of Environment and Forests (I.A Division)

More information

EXPRESSION OF INTEREST ( EoI ) APPLICATION FORM

EXPRESSION OF INTEREST ( EoI ) APPLICATION FORM EXPRESSION OF INTEREST ( EoI ) APPLICATION FORM (Ref : CPC/VDS/18/Open Ended EoI dt 28.12.2017) BEML LIMITED VENDOR DEVELOPMENT DEPARTMENT BEML SOUDHA S.R. NAGAR BANGALORE 560 027. 1 TYPE OF INDUSTRY DECLARATION

More information

PRECAST CEMENT PRODUCTS

PRECAST CEMENT PRODUCTS Profile No.: 30 NIC Code: 23959 PRECAST CEMENT PRODUCTS 1. INTRODCUTION: Reinforced cement concrete products are becoming popular as modular house and apartment buildings are based on standard designs.

More information

Land Acquisition and Resettlement Due Diligence Report

Land Acquisition and Resettlement Due Diligence Report Land Acquisition and Resettlement Due Diligence Report Document stage: Draft Project number: July 2017 IND: Kolkata Environmental Improvement Investment Program Construction of Sewage Treatment Plant at

More information

Dun & Bradstreet. Growth Strategies Auto & Auto Ancillary 26 th May 2010 New Delhi. by F. R. Singhvi Joint Managing Director

Dun & Bradstreet. Growth Strategies Auto & Auto Ancillary 26 th May 2010 New Delhi. by F. R. Singhvi Joint Managing Director Dun & Bradstreet Growth Strategies -2010 Auto & Auto Ancillary 26 th May 2010 New Delhi by F. R. Singhvi Joint Managing Director Corporate Data classification: Level 0 1 Automotive Mission Plan 2006-16

More information

Rajasthan State Pollution Control Board

Rajasthan State Pollution Control Board M/s Raj West Power Private Limited Village- Bhadresh, Tehsil:Barmer District:Barmer Sub: Ref: Sir, Consent to Operate under section 25/26 of the Water (Prevention & Control of Pollution) Act, 1974 and

More information

Sustainability Roadmap for Myanmar (Environment Perspective) Dr. San Oo Director Environmental Conservation Department 20 January 2015

Sustainability Roadmap for Myanmar (Environment Perspective) Dr. San Oo Director Environmental Conservation Department 20 January 2015 Sustainability Roadmap for Myanmar (Environment Perspective) Dr. San Oo Director Environmental Conservation Department 20 January 2015 1 Ministry of Environmental Conservation and Forestry (MOECAF) Environmental

More information

ppt on Ash Management By :J.N. Dave (G.M.-Power) & D.S.Makwana (I/c. G.M.-PP)

ppt on Ash Management By :J.N. Dave (G.M.-Power) & D.S.Makwana (I/c. G.M.-PP) ppt on Ash Management By :J.N. Dave (G.M.-Power) & D.S.Makwana (I/c. G.M.-PP) Salient Features of Lignite Project Panandhro Village Panandhro, Fulra & Khanot Total Meter age of Exploration 10,757 m Total

More information

Strategy for Development of Integrated Municipal Waste Management Project

Strategy for Development of Integrated Municipal Waste Management Project Presentation on Strategy for Development of Integrated Municipal Waste Management Project 06-12-2008 Municipal Solid Waste Management Present status of MSW Mgmt. Indian population exceeded the level of

More information

RURAL RESIDENTIAL COMMUNITY ROLE COUNCIL ROLE RURAL RESIDENTIAL ALL COMMUNITIES

RURAL RESIDENTIAL COMMUNITY ROLE COUNCIL ROLE RURAL RESIDENTIAL ALL COMMUNITIES Orderly and Efficient Land Use Align land use, development patterns, and infrastructure to make the best use of public and private investment. Discourage future development of rural residential patterns

More information

- Intelligent Energy. Company Overview UK H2 Mobility Fuel Cell London Taxi

- Intelligent Energy. Company Overview UK H2 Mobility Fuel Cell London Taxi Hydrogen & Fuel Cell - Intelligent Energy Company Overview UK H2 Mobility Fuel Cell London Taxi IE Japan Ltd Representative Director Masataka Yamakawa January 2013 2012 Intelligent Energy Limited The information

More information

The best in machined plastics

The best in machined plastics The best in machined plastics An ISO 9001:2008, company, established in 1995 with the vision to become a frontrunner in Plastic Moulds, Plastic moulded Components & Assemblies by maintaining highest levels

More information

Proposed Smart City at Trianon by Hermes Properties Ltd EXECUTIVE SUMMARY

Proposed Smart City at Trianon by Hermes Properties Ltd EXECUTIVE SUMMARY EXECUTIVE SUMMARY Hermes Properties Ltd (HPL), hereinafter referred to as the project promoter or proponent, is a private company incorporated in Mauritius involved in the property investment and development

More information

Sanitation beyond toilets: the challenge of new thinking and innovative technologies for water and sanitation

Sanitation beyond toilets: the challenge of new thinking and innovative technologies for water and sanitation Sanitation beyond toilets: the challenge of new thinking and innovative technologies for water and sanitation Sunita Narain Centre for Science and Environment, New Delhi Challenge: access to functional

More information

4. PROFILE ON GRANITE CUTTING

4. PROFILE ON GRANITE CUTTING 4. PROFILE ON GRANITE CUTTING 4-2 TABLE OF CONTENTS PAGE I. SUMMARY 4-3 II. PRODUCT DESCRIPTION & APPLICATION 4-3 III. MARKET STUDY AND PLANT CAPACITY 4-4 A. MARKET STUDY 4-4 B. PLANT CAPACITY & PRODUCTION

More information

Introduction to Transportation Systems Analysis

Introduction to Transportation Systems Analysis Introduction to Transportation Systems Analysis Lecture Notes in Transportation Systems Engineering Prof. Tom V. Mathew Contents 1 Goal of Transportation System Analysis 1 1.1 Characteristics...................................

More information

Committed to Excellence. Company Profile AT&T ENGINEERS PVT copyright 2012 ATTEPL

Committed to Excellence. Company Profile AT&T ENGINEERS PVT copyright 2012 ATTEPL at&t Committed to Excellence Company Profile AT&T ENGINEERS PVT LTD @ copyright 2012 ATTEPL AT&T ENGINEERS - a brief view Started by a team of technocrats having Industry experience of more than three

More information

Torpa Small Hydro Power Project

Torpa Small Hydro Power Project 1.0 INTRODUCTION 1.1 General The state of Jharkhand almost comprises hilly terrain mostly of Chhotanagpur plateau and 30% of total area (79,714 sq km) is covered with forest. The normal annual rainfall

More information

International Innovations Awards CAPAM GUJARAT STATE ELECTRICITY CORPORATION LIMITED. A new direction to green,clean and inclusive

International Innovations Awards CAPAM GUJARAT STATE ELECTRICITY CORPORATION LIMITED. A new direction to green,clean and inclusive 2016 CAPAM International Innovations Awards COUNTRY ORGANISATION PROJECT TITLE INDIA GUJARAT STATE ELECTRICITY CORPORATION LIMITED 1 MW CANAL TOP SOLAR PLANT A new direction to green,clean and inclusive

More information

Bijwasan: A World Class Station

Bijwasan: A World Class Station Bijwasan: A World Class Station Presentation to Governing Body, UTTIPEC 19 th December, 2014 INDEX 1. AIMS & OBJECTIVE OF THE PROJECT 2. EXISTING CONDITIONS 3. MASTER PLAN - GENERAL LAYOUT 4. TRAFFIC STUDY

More information

Molds. TS Certified. World Class OEM Supplier of Sheet Metal Stampings for Automotive & Industrial Applications.

Molds. TS Certified. World Class OEM Supplier of Sheet Metal Stampings for Automotive & Industrial Applications. Molds S T A M P I N G S TS -16949 Certified World Class OEM Supplier of Sheet Metal Stampings for Automotive & Industrial Applications www.sigma-sms.com about Sigma Molds & Stampings Sigma Molds & Stampings

More information

PRE-FEASIBILITY REPORT

PRE-FEASIBILITY REPORT PRE-FEASIBILITY REPORT By Agrawal Iron & Industries (Unit # 2) [Regularisation of Pellet plant 90,000 MTPA along with Coal Gasifier 5000 Nm3/Hr] at Kh.No.219, 220, 221, P.H.No.54, Village Billory, Tehsil

More information

BASIC INFORMATION QUESTIONNAIRE

BASIC INFORMATION QUESTIONNAIRE Application No. Central Environmental Authority BASIC INFORMATION QUESTIONNAIRE Essential information to determine the environmental approval requirement of projects (Note Use separate sheets as and when

More information

PART 273 STANDARDS FOR UNIVERSAL WASTE MANAGEMENT. Subpart A General. Subpart G Petitions to Include Other Wastes Under 40 CFR Part 273

PART 273 STANDARDS FOR UNIVERSAL WASTE MANAGEMENT. Subpart A General. Subpart G Petitions to Include Other Wastes Under 40 CFR Part 273 PART 273 STANDARDS FOR UNIVERSAL WASTE MANAGEMENT Subpart A General Sec. 273.1 Scope. 273.2 Applicability batteries. 273.3 Applicability pesticides. 273.4 Applicability mercury thermostats. 273.5 Applicability

More information

Solution Provider. Implementing Innovative Ideas. Success Stories of Benchmarking & Proposals

Solution Provider. Implementing Innovative Ideas. Success Stories of Benchmarking & Proposals Solution Provider Success Stories of Benchmarking & Proposals STORAGE BIN LINER Current Design: Metal storage bin located on interior floor of vehicle (used to store beverages) Customer Issue: Metal storage

More information

SOUTH BALTIC PROJECT CHECKLIST. Protocol no: Inspection

SOUTH BALTIC PROJECT CHECKLIST. Protocol no: Inspection "Food Hygiene and Food Safety in the Baltic region" Project co-financed by the European Regional Development Fund in the framework of the Programme of the South Baltic Cross-border Co-operation 007-0 SOUTH

More information

9.3.9 Industry uses code

9.3.9 Industry uses code 9.3.9 Industry uses code 9.3.9.1 Application (1) This code applies to accepted development and assessable development identified as requiring assessment against the Industry uses code by the tables of

More information

SCOPE OF WORK TECHNICAL SPECIFICATIONS

SCOPE OF WORK TECHNICAL SPECIFICATIONS SCOPE OF WORK & TECHNICAL SPECIFICATIONS PROJECT DESCRIPTION/ SITE INFORMATION New storage depot is to be constructed at Bokaro in the state of Jharkhand. This tender envisages carrying out HAZOP Study,

More information

Research Compendium. Coal Sector in India 2013 A comprehensive data and information update

Research Compendium. Coal Sector in India 2013 A comprehensive data and information update Research Compendium Coal Sector in India 2013 A comprehensive data and information update Release Date : August 2013 Background About the report Coal is the only major conventional source of energy that

More information

PRE FEASIBILITY REPORT (PFR)

PRE FEASIBILITY REPORT (PFR) APPLICANT : M/s PLANTERS AGGREGATES 27 PRE FEASIBILITY REPORT (PFR) APPLICANT : M/s PLANTERS AGGREGATES 28 INDEX S. No. Contents Page No. 1.0 EXECUTIVE SUMMARY 30 2.0 INTRODUCTION OF THE PROJECT / BACKGROUND

More information