NOISE STUDY REPORT. Interstate 75 / State Road 951 Ultimate Interchange Improvements PD&E Study. Collier County. June 20, 2013

Size: px
Start display at page:

Download "NOISE STUDY REPORT. Interstate 75 / State Road 951 Ultimate Interchange Improvements PD&E Study. Collier County. June 20, 2013"

Transcription

1 NOISE STUDY REPORT Interstate 75 / State Road 951 Ultimate Interchange Improvements PD&E Study Florida Department of Transportation District One 801 N. Broadway Ave. Bartow, Florida Collier County Financial ID# June 20, 2013 Prepared By: Environmental Transportation Planning Ponte Vedra Beach, FL In Association With: Kittelson & Associates, Inc.

2 6/20/2013 EXECUTIVE SUMMARY EXECUTIVE SUMMARY An assessment of noise impacts was conducted for this project according to Title 23, Code of Federal Regulations (C.F.R.), Section 772: Procedures for Abatement of Highway Traffic Noise and Construction Noise (July 13, 2010), Part II, Chapter 17 of Florida Department of Transportation s (FDOT) Project Development and Environment Manual (May 24, 2011) and Chapter , Florida Statutes. This assessment also adheres to current Federal Highway Administration (FHWA) traffic noise analysis guidelines contained in FHWA-HEP : Highway Traffic Noise: Analysis and Abatement Guidance (December 2011). EXISTING/NO-BUILD TRAFFIC NOISE CONDITIONS Overall, traffic noise levels throughout the project study area are below the FHWA Noise Abatement Criteria. One exception is at the Tuscan Isles apartment complex where one end unit is affected by traffic noise. However, once construction is completed on the No-Build Alternative (includes widening SR 951 (Collier Boulevard) and SR 84 (Davis Boulevard), and ramp improvements at I-75), more noise sensitive sites be affected by traffic noise. It is predicted that the noise level increases related to these improvements will average 4.4 db(a) with a range of 0.6 db(a) to 6.7 db(a) throughout the study corridor. The majority of impacts will occur at the Tuscan Isles complex where a total of 16 units will be affected, and in the adjacent Palm Springs neighborhood and park. Additionally, increased noise levels are also predicted for businesses with outside eating areas near the Collier Boulevard/Davis Boulevard intersection. BUILD ALTERNATIVE IMPACT AND ABATEMENT SUMMARY With the No-Build improvements completed and the proposed project in place, traffic noise levels are predicted to be similar to the No-Build Alternative with increases over existing conditions ranging between 1.0 db(a) along Collier Boulevard to 8.5 db(a) at noise sensitive sites located closer to the I-75 mainline. While this range of increase is not considered substantial, 34 noise sensitive sites are predicted to experience noise levels that either approach or exceed the FHWA NAC. Consequently, abatement measures were evaluated for the two Activity Category B areas: Palm Springs Subdivision and Tuscan Isles; the Palm Springs Park (a Category C site); and at the unoccupied Buddy s Burgers, a Category E site. Due to limited right of way, the only abatement measure analyzed for this project is the construction of noise barriers. Of the four barriers that were evaluated, only one potentially meets the reasonableness and feasibility requirements, the Tuscan Isles noise barrier. i

3 6/20/2013 EXECUTIVE SUMMARY STATEMENT OF LIKELIHOOD Based on the noise analysis performed to date, there appears to be no apparent solutions available to mitigate the noise impacts at two impacted residences in the Palm Springs Neighborhood (identified in Appendix Table B-1 as receptors PS3 and PS5) nor at four units in the Tuscan Isle Apartment complex (receptors T1b, T1c and T2c). Abatement is also not reasonable at the Palm Springs Park nor is it feasible at the one impacted Activity Category E site, represented in this report by receptor E7. The Florida Department of Transportation is committed to the construction of feasible and reasonable noise abatement measures at the noise-impacted location identified in Table ES-1 contingent upon the following conditions: Detailed noise analyses during the final design process support the need, feasibility and reasonableness of providing abatement. Cost analysis indicates that the cost of the noise barrier(s) will not exceed the cost reasonable criterion. Community input concerning types, heights, and locations of the noise barrier(s) is solicited and the affected property owners support construction of the noise barrier. Safety and engineering aspects as related to the roadway user and the adjacent property owner have been reviewed and any conflicts or issues resolved. Any other mitigating circumstances revealed during the final design have been analyzed and resolved. Noise Barrier Tuscan Isles Table ES-1: Potentially Feasible and Reasonable Noise Barrier Summary Avg. Total Number of Number of Feasible Noise System Estimated Impacted Benefited Wall Reduction Wall Barrier Cost Residences Residences Height (db(a)) Length Cost per Benefited Residence , $1,274,460 $38,620 ii

4 6/20/2013 TABLE OF CONTENTS Executive Summary... i Existing/No-Build Traffic Noise Conditions... i Build Alternative Impact And Abatement Summary... i Statement of Likelihood... ii Introduction... 1 Project Improvements... 3 No-Build Alternative... 5 Methodology... 6 Noise Metrics... 6 Traffic Data... 6 Noise Abatement Criteria... 6 Traffic Noise Impact Analysis... 9 Model Validation Process... 9 Identification of Noise Sensitive Sites Noise Impact Analysis Results Palm Springs Neighborhood Palms Springs Community Park Tuscan Isles Apartment Complex Noah s Landing Apartment Complex Forest Glen Golf & Country Club Scattered Category E Commercial Sites Noise Abatement Consideration Feasibility Analysis Reasonableness Analysis Analyzed Palm Springs/Tuscan Isles Residential Barrier Analyzed Palm Springs Park Barrier Analyzed Collier Blvd. Commercial Barrier Statement of Likelihood Public Coordination Noise Impact Contours Construction Noise and Vibration Impacts Bibliography Appendix A: Proposed Typical Sections... A-1 Appendix B: Project Aerials... B-1 Appendix C: Traffic Data... C-1 Page iii

5 6/20/2013 TABLE OF CONTENTS List of Figures Page Figure 1: Project Location Map... 1 Figure 2: Project Study Area... 2 Figure 3: Project Layout... 4 Figure 4: Tuscan Isles Noise Barrier Analysis Figure 5: Palm Springs Park Noise Barrier Analysis Figure 6: Noise Impact Contours (series) List of Tables Page Table ES-1: Potentially Feasible and Reasonable Noise Barrier Summary... ii Table 1: Hourly A-Weighted Noise Abatement Criteria... 7 Table 2: Comparative Noise Levels... 8 Table 3: Traffic Noise Prediction Model Validation Table 4: Noise Barrier Results Palm Springs/Tuscan Isles Table 5: Noise barrier Results Tuscan Isles Table 6: Palm Springs Park Noise Barrier Feasibility Analysis Table 7: Palm Springs Park Special Use Reasonableness Analysis Table 8: Potentially Feasible and Reasonable Noise Barrier Summary iv

6 6/20/2013 INTRODUCTION INTRODUCTION The Florida Department of Transportation (FDOT) District One is conducting a Project Development and Environmental (PD&E) Study to consider improvement alternatives at the I-75 at SR 951 (Collier Boulevard/CR 951) interchange in Collier County. Refer to Figure 1 below for an illustration of the project location. This PD&E Study looks at potential improvements needed to maintain acceptable traffic operations at the interchange termini and the closely spaced intersection between Collier Boulevard and SR 84 (Davis Boulevard). The project limits extend approximately 3,000 feet west and east along I-75 from the Collier Boulevard overpasses. The southern project terminus is the intersection of Business Circle South and Collier Boulevard. The northern terminus is the intersection of Magnolia Pond Drive and Collier Boulevard. Limits of the study area are illustrated on the next page in Figure 2. 1

7 6/20/2013 INTRODUCTION 2

8 6/20/2013 INTRODUCTION PROJECT IMPROVEMENTS The proposed improvement is a capacity project that combines a classic Partial Cloverleaf (ParClo) A interchange form with two flyover ramps connections to and from Collier Boulevard south of the Davis Boulevard intersection. As such, the highest volume traffic movement to and from I-75 does not have to travel through the Collier Boulevard and Davis Boulevard signalized intersection, extending the design life of this busy location. A separated exit lane would be added to northbound Collier Boulevard under the I-75 overpasses and could be constructed within the existing width under the existing structures. The proposed ParClo A interchange would include two new loop ramps in the southwest and northeast quadrants of the interchange. Two new bridges would provide acceleration lanes to I-75 and would be built south and north of the existing I-75 overpasses. The I-75 southbound on-ramps from southbound and northbound Collier Boulevard first merge to one lane joining the I-75 mainline southeast of the current interchange gore. The proposed I-75 northbound on-ramp gore will be rebuilt in the approximate same location as the existing gore and will provide a parallel merge auxiliary lane to mainline I-75. The southbound off-ramp gore would be rebuilt to provide a parallel two-lane exit. Both southbound and northbound off-ramps would be relocated to accommodate the new loop ramps. Two flyovers would convey Collier Boulevard traffic over Beck Boulevard and Davis Boulevard to the proposed northbound loop on-ramp and from the southbound off-ramp respectively. These flyovers would connect with Collier Boulevard at the Business Circle North intersection, south of Davis Boulevard. An illustration of the proposed project is provided on the following page in Figure 3. Typical sections are provided as Appendix A, while further engineering detail can be obtained in the project s Preliminary Engineering Report. 3

9 INTRODUCTION 6/20/2013 Figure 3: Project Layout 4

10 6/20/2013 INTRODUCTION NO-BUILD ALTERNATIVE Consistent with FHWA guidelines, this analysis considers an alternative assessing what would happen to the environment in the future if this proposed interchange improvement project was not built. This alternative, called the No-Build Alternative, consists not only of the existing roadways within the study area, but also includes the routine maintenance improvements to these facilities. Three capacity improvement projects are under construction to improve Collier Boulevard, Davis Boulevard, and three of the four I-75 ramps. These improvements are set to be complete by 2014 and are considered to be part of the study s No-Build Alternative. As a result of these projects, Collier Boulevard will be widened to eight lanes, four in each direction of travel, between the intersection with Davis Boulevard and City Gate Boulevard. Davis Boulevard is being widened to six lanes from west of Radio Road to Collier Boulevard. Intersections turn lanes improvements at Collier Boulevard and Davis Boulevard include: a second southbound left-turn lane, three eastbound left-turn lanes, an eastbound right, bypass lane to southbound Collier Boulevard and full reconstruction of Beck Boulevard, the eastern intersection leg, with dual left-turn lanes and a right-turn lane. The Collier Boulevard south intersection leg with the I-75 northbound on-ramp is being widened to include a third northbound leftturn lane. Both I-75 off-ramps at Collier Boulevard are being widened to make full use of the additional capacity being added along the arterial. As such, the southbound off-ramp will be five lanes wide with three right-turn lanes toward southbound Collier Boulevard and northbound two left-turn lanes. The I-75 northbound off-ramp is being widened to four lanes, two per turning direction at the Collier Boulevard intersection. The northbound I-75 on-ramp is being widened to three lanes for consistency with the new three left-turn lanes off Collier Boulevard While the No-Build Alternative does not meet project needs, it provides a baseline condition to compare and measure the effects of the proposed corridor. 5

11 6/20/2013 NOISE STUDY METHODOLOGY METHODOLOGY The traffic noise impact analysis conducted for this project is consistent with Title 23, Code of Federal Regulations (C.F.R.), 772: Procedures for Abatement of Highway Traffic Noise and Construction Noise (July 13, 2010), Part II, Chapter 17 of the Florida Department of Transportation s (FDOT) Project Development and Environment Manual (May 24, 2011) and Chapter , Florida Statutes. This assessment also adheres to current Federal Highway Administration (FHWA) traffic noise analysis guidelines contained in FHWA-HEP : Highway Traffic Noise: Analysis and Abatement Guidance (December 2011). NOISE METRICS Traffic noise is a combination of noises produced by the engine, exhaust, and tires and is never constant. The noise level is always changing with the number, type and speed of the vehicles producing the noise. As such, the noise metric used to describe this combination of noise is referred to as L eq. This metric allows for the fluctuations of daily traffic noise to be analyzed in terms of steady noise levels with the same acoustic energy, and thus, is the level of constant sound. The constant sound is quantified by a meter that measures units called decibels (db). For highway traffic noise, an adjustment or weighting of the high and low-pitched sounds is made to approximate the way an average person hears. These adjusted sounds are called A-weighted decibels and are expressed as db(a). TRAFFIC DATA Traffic volumes for the existing condition were obtained from actual FDOT 2011 traffic counts. Traffic volumes assigned to the 2035 design year represent the worst-case condition in terms of noise for both the No-Build and Build Alternatives. Worst-case noise conditions occur with the maximum amount of traffic traveling at posted speed; reflecting a Level of Service (LOS) C operating condition. These LOS C volumes were derived from the FDOT Level of Service Manual. All traffic data used in this noise analysis are included in this report as Appendix C. NOISE ABATEMENT CRITERIA Land use plays an important role in traffic noise analyses. To determine which land uses are noisesensitive, this noise impact analysis used the FHWA Noise Abatement Criteria (NAC). Shown on the following page in Table 1, these criteria are divided into individual land use activity categories. For each of these categories, the FHWA has established noise levels at which noise abatement must be considered. 6

12 6/20/2013 NOISE STUDY METHODOLOGY Additionally, FDOT requires noise abatement consideration for all noise levels that approach within one decibel of the FHWA abatement criteria. These approach levels are also identified on Table 1. Activity Category Activity Leq(h) 1 FHWA FDOT Table 1: Noise Abatement Criteria (Hourly A-Weighted Sound Level-decibels (db(a))) Evaluation Location Description of Activity Category A Exterior Lands on which serenity and quiet are of extraordinary significance and serve an important public need; and where the preservation of those qualities is essential if the area is to continue to serve its intended purpose. B Exterior Residential. C Exterior Active sports areas, amphitheaters, auditoriums, campgrounds, cemeteries, daycare centers, hospitals, libraries, medical facilities, parks, picnic areas, golf courses, places of worship, playgrounds, public meeting rooms, public/non-profit institutional structures, radio studios, recording studios, recreational areas, Section 4(f) sites, schools, television studios, trails, and trail crossings. D Interior Auditoriums, daycare centers, hospitals libraries, medical facilities, places of worship, public meeting rooms, public/nonprofit institutional structures, radio studios, recording studios, schools, and television studios. E Exterior Hotels, motels, offices, restaurants/bars, and other developed lands, properties or activities not included in A-D or F. F Agriculture, airports, bus yards, emergency services, industrial, logging, maintenance facilities, manufacturing, mining, rail yards, retail facilities, shipyards, utilities (water resources, water treatment, electrical) and warehousing. G Undeveloped lands that are not permitted. (Based on Table 1 of 23 CFR Part 772) 1 The Leq(h) Activity Criteria values are for impact determination only, and are not design standards for noise abatement measures. 2 Includes undeveloped lands permitted for this activity category. Note: FDOT defines that a substantial noise increase occurs when the existing noise level is predicted to be exceeded by 15 decibels or more as a result of the transportation improvement project. When this occurs, the requirement for abatement consideration will be followed. One additional criterion for determining project impacts occurs when project noise levels are below the NAC but the predicted project-related noise levels show a substantial increase (+15 db(a) or more) over existing levels. For example, if existing noise levels are 41.0 db(a) and project-related noise levels are 56.0 db(a), noise abatement consideration is required due to the 15.0 db(a) increase. 7

13 6/20/2013 NOISE STUDY METHODOLOGY An illustration of typical exterior and interior noises and their associated decibel level is presented below in Table 2. This graph provides the reader a better understanding of the noise levels discussed herein. 8

14 6/20/2013 TRAFFIC NOISE IMPACT ANALYSIS TRAFFIC NOISE IMPACT ANALYSIS The FHWA Traffic Noise Model (TNM) - version 2.5 was used to predict traffic noise levels for this project. This program estimates the traffic noise level from a series of roadway segments (the source) at a noise sensitive site (the receptor). The TNM program requires certain data to be entered. These data are noise influencing variables that include the volume and types of vehicles traveling the roadway, vehicular speed and roadway geometry, and the presence of existing barriers between the road and receptor such as berms and building rows. MODEL VALIDATION PROCESS Before TNM can be used to predict traffic noise, field measurements are required to validate the model. Following 23 CFR 772, field measurements were taken at four locations within the study corridor using an Extech Instruments Model Type 2 Integrating Sound Level Meter. The sound level meter, calibrated at db(a) with an Extech Instruments Model calibrator, was adjusted to the A- weighted frequency scale which makes it respond more like a human ear. During each of the 10-minute measurement sessions, traffic data was collected and included the number of cars, medium trucks (delivery-type trucks/two axles, six wheels), buses, motorcycles, and heavy trucks (tractor-trailers, concrete trucks/more than two axles) traversing the validation site. The data collection effort also included recording the travel speed for each type of vehicle using a Bushnell Speedster hand-held radar gun. The validation sites were located at distances consistent with noise sensitive sites that are adjacent to the I-75 mainline, its ramps, and/or Collier Boulevard. The weather during the November 19, 2012 monitoring sessions ranged from 62 to 74 under clear skies with a slight westerly breeze. 9

15 6/20/2013 TRAFFIC NOISE IMPACT ANALYSIS The first validation location, shown in the photo to the right, was at the pool deck of the Springhill Suites hotel in the northeast corner of the interchange. The sound level meter was placed just outside the pool deck approximately 294 feet from White Lake Boulevard facing the I-75 westbound off ramp. During the monitoring sessions, background noise from the pool equipment and construction on Collier Boulevard could be heard. Photo Above: Springhill Suites Monitor Site At the Comfort Inn, rooms facing the eastbound on-ramp to I-75 have balconies or patios. To avoid interference from construction noise on Collier Boulevard, the sound level meter was placed further east from the rooms. Background noise from room air conditioners made it difficult to obtain readings on a ground floor patio. Hence, the meter was shifted to the edge of the parking lot, approximately 100 feet from the on-ramp. Construction noise continued to be noticeable during the measurement sessions. Photo Below: Comfort Inn Monitor Site 10

16 6/20/2013 TRAFFIC NOISE IMPACT ANALYSIS The third location was selected to measure noise levels at the project s southern limit where the Forest Glen golf course and commercial areas are located. Affects from the ongoing Collier Boulevard construction are not noticeable at this location. Placed at the edge of the Walmart parking lot, the sound level meter was approximately 190 feet from southbound Collier Boulevard. No unusual noise events occurred during the three 10-minute sessions. Photo Above: Commercial Monitor Site Photo Below: Palm Springs Park Monitor Site The fourth validation site, shown in the photo to the right, was Palm Springs Park. The sound level meter was placed at the picnic area, approximately 340 feet from the eastbound I-75 travel lane. Construction noise from the ongoing Collier Boulevard improvement cannot be heard at this location. No unusual noise events occurred during the three 10-minute sessions. Validation of TNM occurs when the model-predicted noise levels are within three decibels of the fieldmeasured levels. As shown on the following page in Table 3, the noise model predicted within the 3.0 decibel level of accuracy for all but one session and is therefore, considered acceptable for predicting existing and future noise levels for this project. 11

17 6/20/2013 TRAFFIC NOISE IMPACT ANALYSIS Table 3: Traffic Noise Prediction Model Validation Field Measurement Location Session Time Field Measured Level (db(a)) Computer Predicted Level (db(a)) Variation (db(a)) 1 7:40 am Site #1: Springhill Suites 2 7:52 am :12 pm :03 am Invalid Site #2: Comfort Inn 2 9:14 am :26 am :11 am Site #3: Walmart/Commercial Area 2 10:23 am :34 am :10 pm Site #4: Palm Springs Park 2 1:21 pm :32 pm *1 = Collier Boulevard construction noise (No-Build Alternative) interfered with this session. TNM could not replicate this background noise. IDENTIFICATION OF NOISE SENSITIVE SITES Activity Category B land uses along the study corridor consist of the Palm Springs neighborhood, the Tuscan Isle apartment complex (both located adjacent to the I-75 mainline); and the Noah s Landing subdivision on Magnolia Pond Drive. The areas of outside activity for the Palm Springs neighborhood are the back patios. For Tuscan Isles, each apartment unit has either a patio or a balcony. There are no patios/balconies for the Noah s Landing apartments; thus, the area of outdoor activity is centered around the pool and recreation areas, which are considered Activity Category C land uses. Other Activity Category C land uses within the project corridor are recreational areas that include Palm Springs Park which backs to I-75, and the Forest Glen Golf Course located adjacent to Collier Boulevard. The corridor s Activity Category E land uses are located adjacent to Collier Boulevard and Davis Boulevard and include non-medical office buildings, fast food restaurants, and several hotels. The NAC definitions specify that for Category E land uses, only areas of frequent exterior use will be considered noise sensitive. The restaurants with outdoor eating areas are considered noise sensitive. These include the two Subway restaurants co-located at gas stations, McDonald s, Dunkin Donuts, and Buddy s Burgers (currently closed). For the hotels, these areas of use are pool areas and/or outside balconies. Additionally, outdoor benches at the office building behind the Walmart shopping center constitute a noise sensitive area. Conversely, the bench areas associated with the retail shopping plaza are considered Category F land uses and are not noise sensitive. 12

18 6/20/2013 TRAFFIC NOISE IMPACT ANALYSIS The remainder of the corridor is either Category F uses such as retail and light industrial businesses, or Category G uses like vacant land. A records search for active building permits on Category F and G lands did not identify any active permits for land uses that would be considered noise sensitive. There are no land uses in the study corridor which warrant an Activity Category A analysis and analysis of interior (Category D) noise levels was not justified for this project. A total of 57 Category B receptors, three Category C sites, and twelve Category E commercial sites were analyzed for project noise impacts. The reporting of project noise levels was simplified by using representative receptors within each common noise environment. A common noise environment is defined by FDOT as a group of receptors within the same FHWA Activity Category that are exposed to similar noise sources and levels; traffic volumes, traffic mix, and speed; and topographic features. Generally, common noise environments occur between two secondary noise sources, such as interchanges, intersections and/or cross-roads. A common noise environment involves a group of impacted receptors that would benefit from the same noise barrier or noise barrier system. An illustration of the analyzed receptors is provided as Appendix B Project Aerials. NOISE IMPACT ANALYSIS RESULTS When discussing noise level increases, the general rule that applies to perception is: A 3 db(a) increase is barely perceptible to most people. A 5 db(a) increase is noticeable to most people. A 10 db(a) increase is perceived as twice as loud and is considered a doubling of noise. A 15 db(a) increase is considered substantial and requires noise abatement consideration regardless of the predicted noise level. Further detail on individual noise sensitive sites within each common noise environment is provided at the beginning of Appendix B. 13

19 6/20/2013 TRAFFIC NOISE IMPACT ANALYSIS Palm Springs Neighborhood Located south of the I-75 mainline at the project s western limit, is the Palm Springs neighborhood. Twelve homes in this area were analyzed for noise impacts. None of the homes is currently experiencing traffic noise impacts from the I-75 mainline. However, under the No-Build and Build Alternatives, improvements to the southbound exit ramp will bring the traffic noise closer to this subdivision. As a result, two homes are predicted to experience noise levels that either approach or exceed the FHWA 67.0 db(a) noise abatement criterion for Activity Category B land uses. Consequently, abatement consideration is required for these two homes (identified in Appendix B as PS3 and PS5). Palms Springs Community Park Tucked into the Palm Springs neighborhood is a community park, an Activity Category C land use. In addition to open green space, the park is home to a playground and a picnic area. While neither the playground nor the picnic area is impacted by existing traffic noise, the No-Build and Build improvements will increase noise levels to the extent that abatement consideration is required. On the project aerials (Appendix B), the playground is denoted as Park a and the picnic area is Park b. Tuscan Isles Apartment Complex Housed in 3-story buildings, each of the apartments in Tuscan Isle has a balcony or patio, as illustrated in the photo to the right. In Appendix B, units denoted with a are located on the ground floor; units with b have balconies on the second floor; and units with c have balconies on the third floor. Of the 45 analyzed apartments, only one is currently impacted by traffic noise. However, the combination of the proposed project and the No-Build Alternative (under construction) traffic noise increases to the extent that 29 apartments will be impacted and require abatement consideration. 14

20 6/20/2013 TRAFFIC NOISE IMPACT ANALYSIS Noah s Landing Apartment Complex Even though this complex is located more than 1,000 feet from the I-75 mainline, it was analyzed for noise impacts to verify the proposed project would not create a substantial noise increase (15.0 ±db(a)). As illustrated in the photograph to the right, the apartments have no balconies or patios. The only area of outdoor activity is the pool area, and Activity Category C land use. The distance from the pool to I-75 is too great for the complex to be impacted by traffic noise. Consequently, abatement consideration is not required at this location. Forest Glen Golf & Country Club The fairways and green associated with Holes 15 and 16 are adjacent to northbound Collier Boulevard. To determine potential noise impacts, receptor points were scattered throughout the fairway and greens. The noise levels at all three analysis scenarios is below the 67.0 db(a) noise abatement criterion for Activity Category C land uses. Consequently, abatement consideration is not required at this location. Scattered Category E Commercial Sites The remainder of the noise analysis focused on commercial sites with outdoor activity. None of the 11 sites currently experiences noise levels that approach or exceed the 72.0 db(a) noise abatement criterion for Activity Category E land uses. With implementation of the proposed project, one site will meet the abatement criterion. The outdoor dining area at Buddy s Burgers (E7) is predicted to have traffic noise levels of 72.0 db(a). As of February 2013, the restaurant was closed for business. However, because the outdoor patio contains eight tables that may be retained by future owners, noise abatement was considered at this site. 15

21 6/20/2013 NOISE ABATEMENT CONSIDERATION NOISE ABATEMENT CONSIDERATION Due to limited right of way, the only abatement measure analyzed for this project is the construction of noise barriers. Noise barriers reduce the sound that enters a community from a busy roadway by forcing the noise to take a longer path over and around the barrier. Barriers cannot obstruct safe access to adjacent properties and streets. They must also allow adequate driver visibility from an adjacent driveway or side street. Where feasible, FDOT requires these barriers to be positioned 5-feet inside the FDOT rights of way to facilitate construction and future maintenance. When that is not feasible, barriers are positioned along the road shoulder; sometimes a combination of both methods is required. Feasibility Analysis When analyzing noise barriers two main factors are considered; the first factor is feasibility. Feasibility focuses on the barrier s ability to reduce traffic noise at affected properties. In order to be effective, a barrier must block the impacted receptor s line of sight to the noise source. FDOT requires that noise barriers achieve a minimum noise reduction, or insertion loss, of 5.0 db(a) at two impacted receptors. This is the point at which a lowered noise level is noticeable and is the threshold for determining whether a site benefits from a barrier. Reasonableness Analysis The total cost of an economically reasonable barrier cannot exceed $42,000 per benefited receptor, including costs associated with additional right of way and/or easements. For this project, estimated barrier costs were calculated using the current FDOT statewide average of $30 per square foot. In addition to cost, the barrier must also meet the FDOT abatement design goal of 7.0 db(a) for at least one impacted site behind the analyzed barrier. Barriers are evaluated at heights ranging from 8 to 22 feet. Determining barrier length begins with an evaluation of length that is four times the distance from the impacted receptor to the barrier in question. From that point, the length is optimized by reducing the wall to a point where the FDOT abatement design goal is attained and the FHWA 5.0 db(a) minimum reduction requirement is achieved for the maximum number of impacted receptors. 16

22 6/20/2013 NOISE ABATEMENT CONSIDERATION Analyzed Palm Springs/Tuscan Isles Residential Barrier Because of proximity, one noise barrier was initially analyzed along the FDOT limited access right of way to provide noise reduction for the two impacted Palm Springs residences and the 29 Tuscan Isles apartments. Even though Palm Springs Park is also behind the analyzed barrier, it is considered a different activity category/common noise environment; thus it must be evaluated independently of its residential neighbors. Discussion of the park noise barrier appears later in this Noise Study Report. Summarized below in Table 4, at heights above 18 feet, the analyzed Palm Springs barrier meets both the FDOT s 5.0 db(a) minimum insertion loss requirement and 7.0 db(a) abatement design goal. However, the length of barrier required to achieve these levels of noise reduction combined with the low number of benefited receptors in the Palm Springs neighborhood, does not allow a noise barrier at this location to meet the $42,000 cost per benefited receptor measure. Consequently, the barrier is not cost reasonable. Barrier Height (ft) Optimized Barrier Length (ft) Insertion Loss (IL) for Impacted Receptors (db(a) Table 4: Noise Barrier Results Palm Springs/Tuscan Isles *1 Avg. IL of Impacted/ Benefited (db(a)) 10.0 Impacted Number of Benefited Receptors Other *2 Total Cost-Reasonableness Analysis Total Estimated Cost Per Benefited Receptor Cost Reasonable *3 14 5,051* N/A 16 5,051 * N/A 18 3, $1,703,700 $154,882 No 20 3, $1,827,000 $76,125 No 22 3, $2,203,740 $61,215 No *1 = Does not include noise reduction at Palm Springs Park. Because this is a different activity category/noise environment, it was analyzed separately. *2 = Non-impacted sites that receive a benefit from the barrier. *3 = Cost per benefited receptor is $42,000. *4 = Noise reduction requirements cannot be met at any barrier length. A subsequent analysis was conducted to determine if two separate noise barriers would meet the costreasonable measure; one barrier for the two impacted Palm Springs residences and one for the 29 impacted Tuscan Isles apartments. The analyzed barrier for the Palm Springs neighborhood fails to meet the FDOT abatement design goal and the cost reasonable measure. Noise reduction requirements cannot be met at the maximum noise barrier height of 22 feet. Conversely, providing a separate noise barrier to abate traffic noise solely for the Tuscan Isle complex was more effective as summarized on the following page in Table 5. With an optimized length of 1,931 feet and maximum-allowable height of 22 feet, a barrier at this location provides effective noise reduction for 23 of the 29 impacted units. The six impacted units not benefited from the barrier are two 2 nd floor units represented by receptor T1 and four 3 rd floor units represented by receptors T1 and T2. 17

23 6/20/2013 NOISE ABATEMENT CONSIDERATION The barrier meets both the FDOT s 5.0 db(a) minimum noise reduction requirement and 7.0 db(a) abatement design goal. A barrier with these dimensions also meets the $42,000 per benefited receptor cost-reasonableness measure. Figure 4 on the following page illustrates the location of this potentially feasible and reasonable noise barrier. Barrier Height (ft) Optimized Barrier Length (ft) Insertion Loss (IL) for Impacted Receptors (db(a))* Table 5: Noise Barrier Results Tuscan Isles *1 Avg. IL of Impacted/ Benefited (db(a)) 10.0 Impacted Number of Benefited Receptors Other *2 Total Cost-Reasonableness Analysis Total Estimated Cost Per Benefited Receptor Cost Reasonable?*3 14 5, N/A 16 1, N/A 18 1, N/A 20 1, $770,400 $48,150 No 22 1, $1,274,460 $38,620 Yes *1 = Does not include noise reduction at Palm Springs Park. Because this is a different activity category/noise environment, it was analyzed separately. *2 = Non-impacted sites that receive a benefit from the barrier. *3 = Cost per benefited receptor is $42,

24 6/20/2013 NOISE ABATEMENT CONSIDERATION 19

25 6/20/2013 NOISE ABATEMENT CONSIDERATION Analyzed Palm Springs Park Barrier Palm Springs Park, an Activity Category C land use, is considered a Special Use site that requires a multi-phased approach to noise barrier analysis. The first step in the analysis is to determine the most effective barrier dimensions. To define the extent of traffic noise impacts, nine additional analysis receptor points were laid in a grid pattern to represent the entire park. Illustrated below in Figure 5, the area of impact is confined to the hatched area. Summarized on the following page in Table 6, at heights 16 feet and above, a barrier at this location meets the FDOT 5.0 db(a) minimum noise reduction requirement and is therefore, considered feasible. However, impacted areas #2 and #6 receive no noise reduction benefit. 20

26 6/20/2013 NOISE ABATEMENT CONSIDERATION Raising the wall height to 18 feet provides effective noise reduction to all impacted areas of the park, but a longer barrier is required to achieve this insertion loss. The same results are also possible with a shorter barrier length, but the barrier height must be raised to either 20 or 22 feet to meet the feasibility requirement. The 20-foot barrier has the lowest overall square footage; thus it was carried forward to the next phase of evaluation, cost-reasonable analysis. Barrier Height (ft) Optimized Barrier Length (ft) Table 6: Palm Springs Park Noise Barrier Feasibility Analysis Insertion Loss (IL) for (db(a)) A B * *1 8 9 *1 14 1, < <5.0 < <5.0 <5.0 < < , <5.0 < <5.0 < < , < < < , < < < , < < <5.0 *1 = Not Impacted by Traffic Noise Without knowing the average time spent per visitor or number of visitors using the park on an average day, FDOT s Special Use Reasonableness Matrix was used to determine the number of person-hours on a on an average day needed for a noise barrier to be considered cost reasonable. The results of the analysis are summarized in Table 7 below. For a noise barrier to be cost reasonable, 1,154 person-hours of use is required on an average day. This is an unrealistic expectation given the limited activities this neighborhood park offers. Table 7: Palm Springs Park Special Use Reasonableness Matrix Item Criteria Input Description 1 Enter length of proposed barrier 1366 feet Optimized 2 Enter height of proposed barrier 20 feet Optimized 3 Multiply Item1 by Item sq. feet 4 Avg. amount of time person stays per visit 1.5 hours 5 Avg. number people visit site per day 769 people 6 Multiply Item 4 by Item person-hr 7 Divide Item 3 by Item sq. ft/person-hr 8 Multiply $42,000 by Item 7 $ 994,746.4 $/sq. ft/person-hr 9 Does Item 8 exceed the "abatement cost factor" of $995,935/perhson-hr/ft2? 10 If Item 9 is no, abatement is reasonable - 11 If Item 9 is yes, abatement is not reasonable See Assumptions Assumptions: For a noise barrier to be cost reasonable, 1,154 person-hours of use is required on an average day. 21

27 6/20/2013 NOISE ABATEMENT CONSIDERATION Analyzed Collier Blvd. Commercial Barrier As discussed earlier, this location is the site of the closed Buddy s Burgers restaurant, shown in the adjacent photo. However, because the outdoor patio contains eight tables which may be retained by future owners, a noise barrier was considered to abate for the 72.0 db(a) traffic-related noise level. The ability to construct an effective noise barrier within FDOT rights of way is hindered by the Collier Boulevard/Beck Boulevard intersection. Consequently, the FDOT minimum-required noise reduction of 5.0 db(a) cannot be attained and a barrier at this location is not considered feasible. STATEMENT OF LIKELIHOOD Based on the noise analysis performed to date, there appears to be no apparent solutions available to mitigate the noise impacts at two impacted residences in the Palm Springs Neighborhood (identified in Appendix Table B-1 as receptors PS3 and PS5) nor at four units in the Tuscan Isle Apartment complex (receptors T1b, T1c and T2c). Abatement is also not reasonable at the Palm Springs Park nor is it feasible at the one impacted Activity Category E site, represented in this report by receptor E7. The Florida Department of Transportation is committed to the construction of feasible and reasonable noise abatement measures at the noise-impacted location identified on the following page in Table 8 contingent upon the following conditions: Detailed noise analyses during the final design process support the need, feasibility and reasonableness of providing abatement. Cost analysis indicates that the cost of the noise barrier(s) will not exceed the cost reasonable criterion. Community input concerning types, heights, and locations of the noise barrier(s) is solicited and the affected property owners support construction of the noise barrier. Safety and engineering aspects as related to the roadway user and the adjacent property owner have been reviewed and any conflicts or issues resolved. Any other mitigating circumstances revealed during the final design have been analyzed and resolved. 22

28 6/20/2013 NOISE ABATEMENT CONSIDERATION Noise Barrier Tuscan Isles Table 8: Potentially Feasible and Reasonable Noise Barrier Summary Avg. Total Number of Feasible Noise System Benefited Wall Reduction Wall Residences Height (db(a)) Length Number of Impacted Residences Estimated Barrier Cost Cost per Benefited Residence , $1,274,460 $38,620 23

29 6/20/2013 PUBLIC COORDINATION PUBLIC COORDINATION The Florida Department of Transportation (FDOT) is committed to working with local governments, developers, and residents by providing them access to this Noise Study Report. The public will have an opportunity to comment on the proposed project at advertised public meetings. NOISE IMPACT CONTOURS To aid local government officials in promoting compatibility between land development and the proposed project, potential noise impact contours were developed for this project and are included below in the Figure 6 series. These contours represent the approximate distance at which the Federal Highway Administration (FHWA) Noise Abatement Criteria (NAC) will be approached with implementation of the proposed project. Refer to Table 1 for a description of each activity category. Also note these are unshielded contours that do not consider the noise reduction effects of adjacent buildings or vegetation. 24

30 6/20/2013 PUBLIC COORDINATION 25

31 6/20/2013 PUBLIC COORDINATION 26

32 6/20/2013 CONSTRUCTION NOISE AND VIBRATION IMPACTS CONSTRUCTION NOISE AND VIBRATION IMPACTS Land uses adjacent to the I-75/SR 951 interchange are identified on the FDOT listing of noise- and vibration-sensitive sites (e.g., residential use). Construction of the proposed roadway improvements is not expected to have any significant noise or vibration impact. If sensitive land uses develop adjacent to the roadway prior to construction, increased potential for noise or vibration impacts could result. It is anticipated that the application of the FDOT Standard Specifications for Road and Bridge Construction will minimize or eliminate potential construction noise and vibration impacts. However, should unanticipated noise or vibration issues arise during the construction process, the Project Engineer, in coordination with the District Noise Specialist and the Contractor, will investigate additional methods of controlling these impacts. 27

33 6/20/2013 BIBLIOGRAPHY BIBLIOGRAPHY A Method to Determine Reasonableness and Feasibility of Noise Abatement at Special Use Locations, Roger L. Wayson and John M. MacDonald, University of Central Florida, updated July 22, Highway Traffic Noise: Analysis and Abatement Guidance, FHWA-HEP , revised December Generalized Service Volume Tables, Level Of Service Handbook, Florida Department of Transportation, October 4, Measurement of Highway-Related Noise, Report No. PD , Federal Highway Administration, May Procedures for Abatement of Highway Traffic Noise and Construction Noise, 23 C.F.R. 772, July 13, Project Development and Environment Manual: Part II, Chapter 17, Florida Department of Transportation, Revised May 24, State Highway Construction; Means of Noise Abatement, Section , Florida Statutes,

34 6/20/2013 APPENDIX A PROPOSED TYPICAL SECTIONS A-1

35 6/20/2013 APPENDIX A PROPOSED TYPICAL SECTIONS A-2

36 6/20/2013 APPENDIX A PROPOSED TYPICAL SECTIONS A-3

37 6/20/2013 APPENDIX A PROPOSED TYPICAL SECTIONS A-4

38 6/20/2013 APPENDIX A PROPOSED TYPICAL SECTIONS A-5

39 6/20/2013 APPENDIX A PROPOSED TYPICAL SECTIONS A-6

40 6/20/2013 APPENDIX A PROPOSED TYPICAL SECTIONS A-7

41 6/20/2013 APPENDIX A PROPOSED TYPICAL SECTIONS A-8

42 6/20/2013 APPENDIX B PROJECT AERIALS Representative Noise Receptor Table B-1: Noise Impact Summary Analyzed Scenario/Alternative Year 2012 Existing Scenario Year 2035 No-Build Year 2035 Build Projected Projected Change Sites Projected Receptor Distance Noise Distance Noise From Represented ID *1 Noise Level Level *1 Level Existing db(a) db(a) db(a) db(a) Tuscan Isles Common Noise Environment - Category B 66.0 db(a) NAC Threshold T1a 2 1 st floor units No T1b 2 2 nd floor units Yes T1c 2 3rd floor units Yes T2a 2 1 st floor units No T2b 2 2 nd floor units Yes T2c 2 3rd floor units Yes T3a 1 1 st floor unit No T3b 1 2 nd floor unit Yes T4a 2 1 st floor units Yes T4b 2 2 nd floor units Yes T4c 1 3rd floor unit Yes T5a 2 1 st floor units Yes T5b 2 2 nd floor units Yes T5c 1 3rd floor unit Yes T6a 2 1 st floor units Yes T6b 2 2 nd floor units Yes T6c 1 3rd floor unit Yes T7a 2 1 st floor units Yes T7b 2 2 nd floor units Yes T7c 1 3rd floor unit Yes T8a 1 1 st floor unit No T8b 1 2 nd floor unit No T9a 1 1 st floor unit No T9b 1 2 nd floor unit No T9c 1 3rd floor unit No T10a 2 1 st floor units No T10b 2 2 nd floor units No T10c 2 3rd floor units No T11a 1 1 st floor unit No T11b 1 2 nd floor unit No T11c 1 3rd floor unit No Palm Springs Park - Category C 66.0 db(a) NAC Threshold Park a Playground Consider Abatement Park b Picnic Benches Yes Palm Springs Common Noise Environment - Category B 66.0 db(a) NAC Threshold PS1 6 single-family (SF) No PS2 2 SF No PS3 1 SF Yes B-1

43 6/20/2013 APPENDIX B PROJECT AERIALS Representative Noise Receptor Receptor ID Sites Represented Table B-1: Noise Impact Summary (Cont) Year 2012 Existing Scenario Projected Distance Noise *1 Level db(a) Analyzed Scenario/Alternative Year 2035 Year 2035 No-Build Build Projected Projected Distance Noise Noise Level *1 Level db(a) db(a) Change From Existing db(a) Consider Abatement PS4 2 SF No PS5 1 SF Yes Forest Glen Golf & Country Club - Category C 66.0 db(a) NAC Threshold FG1 Avg. Hole to 202 to No FG2 Avg. Hole to to No Noah s Landing - Category C 66.0 db(a) NAC Threshold NL Pool No Scattered Commercial Sites - Category E 71.0 db(a) NAC Threshold E1 Outdoor bench No E2 Subway - 1 outdoor table No E3 Subway - 5 outdoor tables No E4 Dunkin Donuts Outdoor tables No E5 McDonalds - 3 outdoor tables No E6 La Quinta Pool No E7 Buddy s Burgers 8 outdoor tables Yes E8 Days Inn bench No E9a Comfort Inn Pool No E9b Comfort Inn Balcony No E10 Super 8 Pool No E11 Springhill Suites Pool No E12 Fairfield Inn Pool No *1 = Approximate distance measured from edge of nearest travel lane. Travel lane may be Collier Boulevard, I-75, or an interchange ramp, whichever is closer to the receptor. B-2

44 6/20/2013 APPENDIX B PROJECT AERIALS Insert 11x17 project aerials here. B-3

45 6/20/2013 APPENDIX C TRAFFIC DATA C-1

46 6/20/2013 APPENDIX C TRAFFIC DATA C-2

47 6/20/2013 APPENDIX C TRAFFIC DATA C-3

48 6/20/2013 APPENDIX C TRAFFIC DATA C-4

49 6/20/2013 APPENDIX C TRAFFIC DATA C-5

50 6/20/2013 APPENDIX C TRAFFIC DATA C-6

51 6/20/2013 APPENDIX C TRAFFIC DATA C-7

52 6/20/2013 APPENDIX C TRAFFIC DATA C-8

53 6/20/2013 APPENDIX C TRAFFIC DATA C-9

54 6/20/2013 APPENDIX C TRAFFIC DATA C-10

55 6/20/2013 APPENDIX C TRAFFIC DATA C-11

56 6/20/2013 APPENDIX C TRAFFIC DATA C-12

57 6/20/2013 APPENDIX C TRAFFIC DATA C-13

58 6/20/2013 APPENDIX C TRAFFIC DATA C-14

59 6/20/2013 APPENDIX C TRAFFIC DATA C-15

60 6/20/2013 APPENDIX C TRAFFIC DATA C-16

MnDOT GREATER MN STAND ALONE NOISE BARRIER PROGRAM

MnDOT GREATER MN STAND ALONE NOISE BARRIER PROGRAM MnDOT GREATER MN STAND ALONE NOISE BARRIER PROGRAM 7 November 2017 MINNESOTA S EXPERIENCE WITH HIGHWAY NOISE MITIGATION The Minnesota Department of Transportation (MnDOT) has been constructing noise walls

More information

1. Introduction Noise Analysis Results Figures. List of Tables

1. Introduction Noise Analysis Results Figures. List of Tables Traffic Noise Technical Report FM 2218 Widening (From US 59 to SH 36) Fort Bend County Prepared by: Houston District Date: July 2017 CSJ: 2093-01-010 The environmental review, consultation, and other actions

More information

APPENDIX C NOISE STUDY TECHNICAL REPORT

APPENDIX C NOISE STUDY TECHNICAL REPORT APPENDIX C NOISE STUDY TECHNICAL REPORT Noise Study Technical Report Watertown South Connector US 81 to 29 th Street SE Watertown, South Dakota HDR Project No. 39319 Prepared by 6300 So. Old Village Place

More information

APPENDIX C NOISE STUDY TECHNICAL REPORT

APPENDIX C NOISE STUDY TECHNICAL REPORT APPENDIX C NOISE STUDY TECHNICAL REPORT 1) 9/25/06 Noise Study Technical Report; revised 05/08 2) 9/4/09 Memo Regarding Option 3 Noise Impacts to Pelican Lake Game Production Area Noise Study Technical

More information

Traffic Noise Analysis

Traffic Noise Analysis Traffic Noise Analysis For Interstate 10: Las Cruces to Texas State Line AC-GRIP-010-2(108)144; CN G18A1 Submitted to: Taschek Environmental Consulting and New Mexico Department of Transportation Prepared

More information

Virginia Department Of Transportation. Highway Traffic Noise Impact Analysis Guidance Manual

Virginia Department Of Transportation. Highway Traffic Noise Impact Analysis Guidance Manual Virginia Department Of Transportation Highway Traffic Noise Impact Analysis Guidance Manual FHWA Approval: March 15, 2011 CTB Approval: June 15, 2011 Effective: July 13, 2011 Last Updated: February 20,

More information

NOISE STUDY REPORT DESIGN ADDENDUM

NOISE STUDY REPORT DESIGN ADDENDUM NOISE STUDY REPORT DESIGN ADDENDUM for Wekiva Parkway Segment 8 - Ballantrae Apartments Seminole County, Florida Financial Project ID: 240200-4-32-01 Prepared for: Florida Department of Transportation

More information

FEDERAL BOULEVARD (5 TH AVENUE TO HOWARD PLACE) PLANNING ENVIRONMENTAL LINKAGE STUDY TRAFFIC NOISE IMPACT ANALYSIS

FEDERAL BOULEVARD (5 TH AVENUE TO HOWARD PLACE) PLANNING ENVIRONMENTAL LINKAGE STUDY TRAFFIC NOISE IMPACT ANALYSIS FEDERAL BOULEVARD (5 TH AVENUE TO HOWARD PLACE) PLANNING ENVIRONMENTAL LINKAGE STUDY TRAFFIC NOISE IMPACT ANALYSIS Prepared for: City and County of Denver 201 West Colfax Avenue, Department 509 Denver,

More information

Draft Noise Study Report

Draft Noise Study Report Florida Department of TRANSPORTATION PD&E Study From East of Babcock Street (SR 507) to US 1 Brevard County, Florida FPID: 430136 1 22 01 ETDM: 13026 The environmental review, consultation, and other actions

More information

COMPONENTS OF THE NOISE ELEMENT

COMPONENTS OF THE NOISE ELEMENT COMPONENTS OF THE NOISE ELEMENT Definitions Following is a list of commonly used terms and abbreviations that may be found within this element or when discussing the topic of noise. This is an abbreviated

More information

12-1 INTRODUCTION 12-2 REGULATORY REQUIREMENTS

12-1 INTRODUCTION 12-2 REGULATORY REQUIREMENTS Chapter 12: Noise and Vibration 12-1 INTRODUCTION This chapter assesses the potential noise and vibration effects resulting from operation of the Tappan Zee Hudson River Crossing Project. The potential

More information

Virginia Department of Transportation I-66 Tier 2 Environmental Assessment

Virginia Department of Transportation I-66 Tier 2 Environmental Assessment Virginia Department of Transportation I-66 Tier 2 Environmental Assessment VDOT Project 0066-96A-297, UPC #105500 Prince William and Fairfax County, Virginia PRELIMINARY NOISE ANALYSIS Submitted to: Virginia

More information

CREATE. Noise and Vibration Assessment Methodology

CREATE. Noise and Vibration Assessment Methodology CREATE Noise and Assessment Methodology June 2014 TABLE OF CONTENTS 1. INTRODUCTION... 1 2. BACKGROUND... 1 3. OVERALL FTA IMPACT ASSESSMENT METHODOLOGY... 2 4. KEY ELEMENTS OF NOISE ASSESSMENT... 4 4.1

More information

US 53 Noise Mitigation

US 53 Noise Mitigation US 53 Noise Mitigation 1 Meeting Agenda Introductions Brief Project Overview Terminology Agencies Involved Rules/Regulations Noise Characteristics Project Approach Mitigation Possible Noise Mitigation

More information

Attachment E2 Noise Technical Memorandum SR 520

Attachment E2 Noise Technical Memorandum SR 520 Attachment E2 Noise Technical Memorandum SR 520 Prepared for: Prepared by: Jodi Ketelsen Michael A. Minor Date: November 4, 2012 Subject: Project: Noise Modeling Results: NE 51st Street to NE 65th Street

More information

Peak noise levels during any time period can be characterized with statistical terms.

Peak noise levels during any time period can be characterized with statistical terms. 3.11 NOISE Introduction This Noise section provides a discussion of applicable noise policies and standards, the results of ambient noise measurements, an evaluation of the projects compatibility with

More information

The Folded Interchange: An Unconventional Design for the Reconstruction of Cloverleaf Interchanges

The Folded Interchange: An Unconventional Design for the Reconstruction of Cloverleaf Interchanges The Folded Interchange: An Unconventional Design for the Reconstruction of Cloverleaf Interchanges I. ABSTRACT Keith A. Riniker, PE, PTOE This paper presents the Folded Interchange design and compares

More information

FLORIDA DEPARTMENT OF TRANSPORTATION Planning and Environmental Management Office INTERCHANGE MODIFICATION REPORT

FLORIDA DEPARTMENT OF TRANSPORTATION Planning and Environmental Management Office INTERCHANGE MODIFICATION REPORT FLORIDA DEPARTMENT OF TRANSPORTATION Planning and Environmental Management Office INTERCHANGE MODIFICATION REPORT District 2 1109 South Marion Avenue Lake City, FL 32025-5874 INTERSTATE 10 (SR 8) / SR

More information

South Access to the Golden Gate Bridge Doyle Drive Project EXECUTIVE SUMMARY

South Access to the Golden Gate Bridge Doyle Drive Project EXECUTIVE SUMMARY EXECUTIVE SUMMARY This addendum to the December 2004 Final Noise and Vibration Study (NVS) presents the results of the noise impact assessment of two new and previously unstudied design options associated

More information

WELCOME IL 47. Community Advisory Group Meeting #5 Waubonsee Community College Wednesday, May 31, 2017

WELCOME IL 47. Community Advisory Group Meeting #5 Waubonsee Community College Wednesday, May 31, 2017 WELCOME IL 47 Community Advisory Group Meeting #5 Waubonsee Community College Wednesday, May 31, 2017 MEETING PURPOSE MEETING AGENDA 1. Welcome/Introduction 2. Review Previous Public Involvement 3. Process/Schedule

More information

CHAPTER 4 GRADE SEPARATIONS AND INTERCHANGES

CHAPTER 4 GRADE SEPARATIONS AND INTERCHANGES CHAPTER 4 GRADE SEPARATIONS AND INTERCHANGES 4.0 INTRODUCTION The ability to accommodate high volumes of intersecting traffic safely and efficiently through the arrangement of one or more interconnecting

More information

Traffic Noise Introduction to Traffic Noise Analysis and Abatement

Traffic Noise Introduction to Traffic Noise Analysis and Abatement Traffic Noise Introduction to Traffic Noise Analysis and Abatement NW Bethany Blvd Improvement Project Michael Minor, President Michael Minor & Associates Inc. Introduction to Acoustics What is Noise?

More information

Policy for the Assessment and Mitigation of Traffic Noise on County Roads

Policy for the Assessment and Mitigation of Traffic Noise on County Roads Lanark County Policy for the Assessment and Mitigation of Traffic Noise on County Roads d r a f t f o r d i s c u s s i o n Prepared by: AECOM Canada Ltd. 302 1150 Morrison Drive, Ottawa, ON, Canada K2H

More information

Noise Analysis Study along I Tim Bjorneberg Project Development Program Manager SDDOT

Noise Analysis Study along I Tim Bjorneberg Project Development Program Manager SDDOT Noise Analysis Study along I - 29 Tim Bjorneberg Project Development Program Manager SDDOT Meeting Format Very informal Meeting is not recorded General questions after presentations Specific questions

More information

Highway Traffic Noise: Analysis and Abatement Guidance

Highway Traffic Noise: Analysis and Abatement Guidance Highway Traffic Noise: Analysis and Abatement Guidance 1 TABLE OF CONTENTS TABLE OF CONTENTS... 2 THREE-PART APPROACH TO HIGHWAY TRAFFIC NOISE ABATEMENT... 6 Noise Compatible Planning... 6 Source Control...

More information

Woodburn Interchange Project Transportation Technical Report

Woodburn Interchange Project Transportation Technical Report Final Report Woodburn Interchange Project Transportation Technical Report Prepared for Oregon Department of Transportation April 212 Prepared by DKS Associates Contents Methodologies... 4 Volume Development...

More information

TRAFFIC NOISE REPORT

TRAFFIC NOISE REPORT TRAFFIC NOISE REPORT Apex Peakway Connector (STIP Project U-5928) Wake County WBS 36249.3505 Prepared for: North Carolina Department of Transportation Project Development and Environmental Analysis Unit

More information

I-10 CORRIDOR IMPROVEMENTS STAGE 0 FEASIBILITY STUDY STATE PROJECT NUMBER H FEDERAL AID PROJECT NUMBER H004100

I-10 CORRIDOR IMPROVEMENTS STAGE 0 FEASIBILITY STUDY STATE PROJECT NUMBER H FEDERAL AID PROJECT NUMBER H004100 JULY 2016 I-10 CORRIDOR IMPROVEMENTS STAGE 0 FEASIBILITY STUDY STATE PROJECT NUMBER H.004100 FEDERAL AID PROJECT NUMBER H004100 EAST BATON ROUGE AND WEST BATON ROUGE PARISHES, LOUISIANA Section TABLE OF

More information

APPENDIX B. Public Works and Development Engineering Services Division Guidelines for Traffic Impact Studies

APPENDIX B. Public Works and Development Engineering Services Division Guidelines for Traffic Impact Studies APPENDIX B Public Works and Development Engineering Services Division Guidelines for Traffic Impact Studies Revised December 7, 2010 via Resolution # 100991 Reformatted March 18, 2011 TABLE OF CONTENTS

More information

FIGURE N-1 LAND USE COMPATIBILITY FOR NEW DEVELOPMENT NEAR TRANSPORTATION NOISE SOURCES

FIGURE N-1 LAND USE COMPATIBILITY FOR NEW DEVELOPMENT NEAR TRANSPORTATION NOISE SOURCES NOISE ELEMENT OBJECTIVES AND POLICIES Noise Standards N1. To protect the citizens of Arroyo Grande from the harmful and annoying effects of exposure to excessive noise. Policy N1-1 The noise standards

More information

Environmental Assessment May 2007

Environmental Assessment May 2007 jurisdictional waters. It is assumed that, at a minimum, a USACE Section 404 Nationwide Permit would be necessary to construct these features. The impacts of the fill into the floodplain cannot be fully

More information

TYPE 2 CATEGORICAL EXCLUSION DETERMINATION FORM

TYPE 2 CATEGORICAL EXCLUSION DETERMINATION FORM 1. GENERAL INFORMATION County: Project Name: Project Limits STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION TYPE 2 CATEGORICAL EXCLUSION DETERMINATION FORM Collier I-75 at SR 951 Interchange Improvement

More information

BAY MEADOWS PHASE II SPAR 2 SAN MATEO, CALIFORNIA

BAY MEADOWS PHASE II SPAR 2 SAN MATEO, CALIFORNIA Charles M Salter Associates Inc BAY MEADOWS PHASE II SPAR 2 SAN MATEO, CALIFORNIA RESIDENTIAL INTERIOR NOISE ANALYSIS Prepared for: Kim Havens Wilson Meany Sullivan Four Embarcadero Center, Suite 3330

More information

2 Purpose and Need. 2.1 Study Area. I-81 Corridor Improvement Study Tier 1 Draft Environmental Impact Statement

2 Purpose and Need. 2.1 Study Area. I-81 Corridor Improvement Study Tier 1 Draft Environmental Impact Statement 2 Purpose and Need 2.1 Study Area Interstate 81 (I-81) is relied upon for local and regional travel and interstate travel in the eastern United States. It extends 855 miles from Tennessee to New York at

More information

Transportation and Works Department The Regional Municipality of York Yonge Street Newmarket, Ontario L3Y 6Z1

Transportation and Works Department The Regional Municipality of York Yonge Street Newmarket, Ontario L3Y 6Z1 TRANSPORTATION IMPACT STUDY (TIS) GUIDELINES FOR DEVELOPMENT APPLICATIONS Transportation and Works Department The Regional Municipality of York 17250 Yonge Street Newmarket, Ontario L3Y 6Z1 August, 2007

More information

500 Interchange Design

500 Interchange Design 500 Interchange Design Table of Contents 501 Interchange Design... 5-1 July 2015 501.1 General... 5-1 501.2 Interchange Type... 5-1 501.2.1 General... 5-1 502 Interchange Design Considerations... 5-2 502.1

More information

LAS VEGAS STREET RAILROAD CROSSING RR/PUC CONNECTION AND PRELIMINARY DESIGN

LAS VEGAS STREET RAILROAD CROSSING RR/PUC CONNECTION AND PRELIMINARY DESIGN LAS VEGAS STREET RAILROAD CROSSING RR/PUC CONNECTION AND PRELIMINARY DESIGN Prepared for: City of Colorado Springs Prepared by: Felsburg Holt & Ullevig 508 South Tejon Street Colorado Springs, CO 80903

More information

3.6 GROUND TRANSPORTATION

3.6 GROUND TRANSPORTATION 3.6.1 Environmental Setting 3.6.1.1 Area of Influence The area of influence for ground transportation consists of the streets and intersections that could be affected by automobile or truck traffic to

More information

TABLE OF CONTENTS Chapter 12 Noise

TABLE OF CONTENTS Chapter 12 Noise TABLE OF CONTENTS Chapter 12 Noise 12.1 Introduction... 12-3 12.1.1 Purpose and Content... 12-3 12.1.2 Legal Requirements... 12-3 12.1.3 Definitions... 12-3 12.2 Existing Conditions... 12-5 12.2.1 Standards...

More information

NW La Center Road/I-5 Interchange Improvement Project (MP 16.80)

NW La Center Road/I-5 Interchange Improvement Project (MP 16.80) FINAL DRAFT - NW La Center Road/I-5 Interchange Improvement Project (MP 16.80) La Center, Washington February 2015 FINAL DRAFT - NW La Center Road/I-5 Interchange Improvement Project (MP 16.80) La Center,

More information

Overall project. The $288 million Phase 2 DesignBuild project starts construction. this spring, with completion by December 31, 2016

Overall project. The $288 million Phase 2 DesignBuild project starts construction. this spring, with completion by December 31, 2016 Overall project Johnson County Gateway Interchange Project Improvements 87th Street The $288 million Phase 2 DesignBuild project starts construction this spring, with completion by December 31, 2016 Phase

More information

APPENDIX 5.12-A PROJECT NOISE ANALYSIS: ARTESIAN SUBSTATION

APPENDIX 5.12-A PROJECT NOISE ANALYSIS: ARTESIAN SUBSTATION APPENDIX 5.12-A PROJECT NOISE ANALYSIS: ARTESIAN SUBSTATION FINAL PROJECT NOISE ANALYSIS Artesian Substation B&V PROJECT NO. 188602 Black & Veatch Holding Company 2015. All rights reserved. PREPARED FOR

More information

LOCATION AND DESIGN DIVISION

LOCATION AND DESIGN DIVISION VIRGINIA DEPARTMENT OF TRANSPORTATION LOCATION AND DESIGN DIVISION INSTRUCTIONAL AND INFORMATIONAL MEMORANDUM GENERAL SUBJECT: Interstate, NHS Non-Interstate and Non-NHS (IJR / IMR Guidance) SPECIFIC SUBJECT:

More information

SAFETY AND NOISE 9. Safety and Noise

SAFETY AND NOISE 9. Safety and Noise SAFETY AND NOISE 9 9 Safety and Noise Safety is a basic human need and is required for a community to thrive. The goals and policies in this element are designed to protect and enhance public health and

More information

PRINCIPAL CONCLUSIONS

PRINCIPAL CONCLUSIONS Chapter 20: Noise A. INTRODUCTION This chapter assesses the potential noise effects of the Proposed Actions, and includes: (1) the noise effects of project-generated vehicular trips on existing and future

More information

Interchange Workshop Report (August 2004)

Interchange Workshop Report (August 2004) U.S. Highway 14 Corridor Study New Ulm to North Mankato Table of Contents Section Interchange Workshop Report (August 2004) Page 1. Introduction and Next Steps 1 2. Interchange Workshop Participants &

More information

DEVELOPMENT, ANALYSIS, AND DESIGN OF A NEW PARKWAY AT GRADE INTERSECTION (PAGI)

DEVELOPMENT, ANALYSIS, AND DESIGN OF A NEW PARKWAY AT GRADE INTERSECTION (PAGI) 2013 ITE Western District Annual Meeting COCEPT DEVELOPMET, AALYSIS, AD DESIG OF A EW PARKWAY AT GRADE ITERSECTIO (PAGI) Lead Author: James M. Witkowski, PhD Supporting Author: Darrell Truitt, PE The Pima

More information

SITE PLAN CRITERIA FOR MUNICIPAL SOLID WASTE & RECYCLABLES STORAGE & ENCLOSURE REQUIREMENTS

SITE PLAN CRITERIA FOR MUNICIPAL SOLID WASTE & RECYCLABLES STORAGE & ENCLOSURE REQUIREMENTS SITE PLAN CRITERIA FOR MUNICIPAL SOLID WASTE & RECYCLABLES STORAGE & ENCLOSURE REQUIREMENTS April 2009 General Solid Waste and Recycling Service Responsibilities: The City of Denton is the exclusive provider

More information

4.7 NOISE. Introduction. Decibels and Frequency. Perception of the Receiver and A-Weighting

4.7 NOISE. Introduction. Decibels and Frequency. Perception of the Receiver and A-Weighting 4.7 NOISE Introduction This noise analysis section documents existing noise conditions in the Corridor Plan Area (including the Bay Meadows project site) and vicinity, discusses the noise regulatory context,

More information

MCKENZIE INTERCHANGE PROJECT

MCKENZIE INTERCHANGE PROJECT BKL CONSULTANTS LTD acoustics noise vibration MCKENZIE INTERCHANGE PROJECT PREPARED FOR: MAY 2016 REVISION 1 NOTICE BKL Consultants Ltd. (BKL) has prepared this report for the sole and exclusive benefit

More information

Working with Transportation Concurrency Exception Areas

Working with Transportation Concurrency Exception Areas Working with Transportation Concurrency Exception Areas September 2006 Presented by the Florida Department of Transportation Working with Transportation Concurrency Exception Areas Volume 1, September

More information

5 INFORMATION UPDATE TRAFFIC NOISE ASSESSMENT TESTON ROAD CITY OF VAUGHAN

5 INFORMATION UPDATE TRAFFIC NOISE ASSESSMENT TESTON ROAD CITY OF VAUGHAN Report No. 3 of the Transportation Services Committee Regional Council Meeting of March 24, 2011 5 INFORMATION UPDATE TRAFFIC NOISE ASSESSMENT TESTON ROAD CITY OF VAUGHAN The Transportation Services Committee

More information

Appendix D: Functional Classification Criteria and Characteristics, and MnDOT Access Guidance

Appendix D: Functional Classification Criteria and Characteristics, and MnDOT Access Guidance APPENDICES Appendix D: Functional Classification Criteria and Characteristics, and MnDOT Access Guidance D.1 Functional classification identifies the role a highway or street plays in the transportation

More information

SP Old Florida Investment Resources, LLC SMR Aggregates SR 64 Borrow Pit (DTS # )

SP Old Florida Investment Resources, LLC SMR Aggregates SR 64 Borrow Pit (DTS # ) H.O. 03/24/14 SP-14-01 Old Florida Investment Resources, LLC SMR Aggregates SR 64 Borrow Pit (DTS #201400001) Request: Approval of a Special Permit for major earthmoving in the A (General Agriculture)

More information

Dormitory Authority of the State of New York Page 14-1 Staten Island Supreme Courthouse Project Draft EIS

Dormitory Authority of the State of New York Page 14-1 Staten Island Supreme Courthouse Project Draft EIS Dormitory Authority of the State of New York Page 14-1 Section 14. Noise Introduction This section analyzes the potential noise impacts of the Proposed Project. Projectgenerated noise sources include mobile

More information

Conclusions & Lessons Learned

Conclusions & Lessons Learned What is a DDI Recommended Practices Traffic Operations Analysis Geometric Design FHWA Review Conclusions & Lessons Learned It s not about you, it s about the public Developed by Access Utah County

More information

Project Team. D6 South Miami-Dade Resident Engineer Erik Padron, P.E. D6 Construction Project Manager Dari Vorce

Project Team. D6 South Miami-Dade Resident Engineer Erik Padron, P.E. D6 Construction Project Manager Dari Vorce Project Team D6 South Miami-Dade Resident Engineer Erik Padron, P.E. D6 Construction Project Manager Dari Vorce D6 Design Project Manager Ali Toghiani, P.E. CEI: AIM Engineering and Surveying Francis Chin,

More information

10.1 PERMITTED USES SECTION 10 SECTION 10 HIGHWAY COMMERCIAL ZONE (C2) HIGHWAY COMMERCIAL ZONE (C) J.L. Richards & Associates Limited

10.1 PERMITTED USES SECTION 10 SECTION 10 HIGHWAY COMMERCIAL ZONE (C2) HIGHWAY COMMERCIAL ZONE (C) J.L. Richards & Associates Limited SECTION 10 HIGHWAY COMMERCIAL ZONE (C) No person shall hereafter use any lands or erect, alter, enlarge or use any building or structure in a Highway Commercial (C2) Zone except in accordance with the

More information

APPENDIX C. Environmental Noise Assessment

APPENDIX C. Environmental Noise Assessment APPENDIX C Environmental Noise Assessment This page intentionally left blank. Environmental Noise Assessment San Joaquin Valley Christian School Merced County, California BAC Job # 2015-085 Prepared For:

More information

CE 452 Traffic Impact Assessment

CE 452 Traffic Impact Assessment CE 452 Traffic Impact Assessment 1 Why Required? New developments Produce/ attract new traffic Production: Residences Attraction: Shops, Offices, Schools, Hospitals etc. etc. Changes in traffic pattern

More information

Appendix K. Environmental Noise Assessment

Appendix K. Environmental Noise Assessment Appendix K Environmental Noise Assessment ENVIRONMENTAL NOISE ASSESSMENT THORNTON ROAD NORTH TAUNTON ROAD WEST TO WINCHESTER ROAD WEST SCEDULE 'C' MUNICIPAL CLASS ENVIRONMENTAL ASSESSMENT CITY OF OSHAWA

More information

APPENDIX A TIER 1 ANALYSIS

APPENDIX A TIER 1 ANALYSIS SPN H.004100 FEASIBILITY STUDY APPENDIX A TIER 1 ANALYSIS 040-012-042AH Appendices Lead Sheets PROVIDENCE STATE PROJECT. H.004100 The following worksheets analyze various project alternatives at various

More information

THE PROJECT. Executive Summary. City of Industry. City of Diamond Bar. 57/60 Confluence.

THE PROJECT. Executive Summary. City of Industry. City of Diamond Bar. 57/60 Confluence. THE PROJECT A freeway segment ranked 6th worst in the Nation, with levels of congestion, pollution and accidents that are simply unacceptable and which have Statewide and National implications. Executive

More information

4.10 NOISE. A. Fundamental Concepts of Environmental Acoustics

4.10 NOISE. A. Fundamental Concepts of Environmental Acoustics 4.10 This section evaluates the noise impacts upon existing and future noise sensitive receivers in and around the project area. The chapter includes background information on acoustics, a summary of the

More information

SR 29 Project Development & Environment Study. Presentation to SR 29 Stakeholders Advisory Committee. January 23, 2014

SR 29 Project Development & Environment Study. Presentation to SR 29 Stakeholders Advisory Committee. January 23, 2014 SR 29 Project Development & Environment Study Presentation to SR 29 Stakeholders Advisory Committee January 23, 2014 Purpose and Need Enhancing Economic Competitiveness Improving Emergency Evacuation Capabilities

More information

Noise Study Bristol Park Redevelopment Area

Noise Study Bristol Park Redevelopment Area Noise Study Bristol Park Redevelopment Area Distribution No. of Copies Sent To 3 Ms. Susan K. Jones Environmental Coordinator City of Champaign 102 N. Neil Street Champaign, IL 61820 X:\CH\IE\2013\13C018.00\10000

More information

South Boston. Transportation Plan. Transportation Planning Division. Virginia Department of Transportation

South Boston. Transportation Plan. Transportation Planning Division. Virginia Department of Transportation 2020 Transportation Plan Developed by the Transportation Planning Division of the Virginia Department of Transportation in cooperation with the U.S. Department of Transportation, Federal Highway Administration

More information

I-15 South, MP 0 to MP 16 Environmental Assessment. Public Hearing. August 7, :00 PM to 7:00 PM

I-15 South, MP 0 to MP 16 Environmental Assessment. Public Hearing. August 7, :00 PM to 7:00 PM I-15 South, MP 0 to MP 16 Environmental Assessment Public Hearing August 7, 2012 5:00 PM to 7:00 PM 1 PROJECT OVERVIEW The Federal Highway Administration (FHWA) and the Utah Department of Transportation

More information

This comparison is designed to satisfy the requirements of State CEQA Guidelines, Section (d), Evaluation of Alternatives, which state that:

This comparison is designed to satisfy the requirements of State CEQA Guidelines, Section (d), Evaluation of Alternatives, which state that: 6.0 Comparison of Proposed Project and Alternatives This chapter summarizes the environmental advantages and disadvantages associated with the Proposed Project and the alternatives. Based upon this discussion,

More information

ENVIRONMENTAL NOISE ASSESSMENT

ENVIRONMENTAL NOISE ASSESSMENT ENVIRONMENTAL NOISE ASSESSMENT LAKEVIEW BOULEVARD ENVIRONMENTAL ASSESSMENT LAKEVIEW BOULEVARD BETWEEN POPLAR AVENUE AND MAPLE AVENUE TOWN OF AJAX PREPARED FOR: TMIG February 2017 Y1610 TABLE OF CONTENTS

More information

TRANSPORTATION IMPACT STUDIES

TRANSPORTATION IMPACT STUDIES January 28, 2009 POLICIES AND PROCEDURES FOR TRANSPORTATION IMPACT STUDIES Related to Highway Occupancy Permits Pennsylvania Department of Transportation Bureau of Highway Safety and Traffic Engineering

More information

15.1 INTRODUCTION CONTEXT

15.1 INTRODUCTION CONTEXT CHAPTER 15. NOISE 15.1 INTRODUCTION 15.1.1 CONTEXT As the third-largest business district in the country, Lower Manhattan, including the former WTC complex, has long experienced the types and intensity

More information

Suncoast Parkway 2/SR Toll 589 FPID: & 3, -4

Suncoast Parkway 2/SR Toll 589 FPID: & 3, -4 When will the Turnpike have right-of-way and parcel maps available? We anticipate receipt of 100% plans, parcel sketches and legal descriptions in late June or early July of 2015. When will the Turnpike

More information

LOCATION AND DESIGN DIVISION

LOCATION AND DESIGN DIVISION VIRGINIA DEPARTMENT OF TRANSPORTATION LOCATION AND DESIGN DIVISION INSTRUCTIONAL AND INFORMATIONAL MEMORANDUM GENERAL SUBJECT: Design Exceptions / Waivers SPECIFIC SUBJECT: Design Exception Request Form

More information

MDX Contract #: RFP MDX Work Program #: ETDM #: 11501

MDX Contract #: RFP MDX Work Program #: ETDM #: 11501 SR 874/Don Shula Expressway Ramp Connector Project Development & Environment (PD&E) Study PUBLIC HEARING December 8, 2011 MDX Contract #: RFP-09-04 MDX Work Program #: 87410.011 ETDM #: 11501 1 This Public

More information

AED Design Requirements: Site Layout Guidance

AED Design Requirements: Site Layout Guidance US Army Corps of Engineers Afghanistan Engineer District AED Design Requirements: Various Locations, Afghanistan MARCH 2009 TABLE OF CONTENTS AED DESIGN REQUIREMENTS FOR SITE LAYOUT GUIDANCE VARIOUS LOCATIONS,

More information

4.7 NOISE FUNDAMENTALS OF NOISE AND VIBRATION

4.7 NOISE FUNDAMENTALS OF NOISE AND VIBRATION 4.7 NOISE FUNDAMENTALS OF NOISE AND VIBRATION Sound is mechanical energy transmitted by pressure waves through a medium such as air. Noise can be defined as unwanted sound. Sound is characterized by various

More information

GEOMETRIC DESIGN CRITERIA for Non-freeway Resurfacing, Restoration, and Rehabilitation Projects

GEOMETRIC DESIGN CRITERIA for Non-freeway Resurfacing, Restoration, and Rehabilitation Projects GEOMETRIC DESIGN CRITERIA for Non-freeway Resurfacing, Restoration, and Rehabilitation Projects SEPTEMBER 1989 Arkansas State Highway and Transportation Department GEOMETRIC DESIGN CRITERIA for Non-freeway

More information

BRITISH COLUMBIA MINISTRY OF TRANSPORTATION AND INFRASTRUCTURE POLICY FOR ASSESSING AND MITIGATING NOISE IMPACTS

BRITISH COLUMBIA MINISTRY OF TRANSPORTATION AND INFRASTRUCTURE POLICY FOR ASSESSING AND MITIGATING NOISE IMPACTS BRITISH COLUMBIA MINISTRY OF TRANSPORTATION AND INFRASTRUCTURE POLICY FOR ASSESSING AND MITIGATING NOISE IMPACTS FROM NEW AND UPGRADED NUMBERED HIGHWAYS April, 2014 Prepared for; B.C. Ministry of Transportation

More information

CUY-90-Innerbelt ODOT PID No 77510

CUY-90-Innerbelt ODOT PID No 77510 CUY-90-Innerbelt ODOT PID No 77510 Chapter 1: Project History and Background Figure 1-1: Innerbelt Study Area Points of Interest 1.0 Introduction Planned in the 1940s and built during the 1950s and early

More information

Appendix B Highway 407 Interchange Review - Cochrane Street Area

Appendix B Highway 407 Interchange Review - Cochrane Street Area Appendix B Highway 407 Interchange Review - Cochrane Street Area AECOM 300 ater Street hitby, ON, Canada L1N 9J2 www.aecom.com Memorandum To Michael May, P.Eng., Town of hitby Page 1 CC Subject Greg Hardy,

More information

ARTICLE VII - OFF-STREET PARKING AND LOADING Section 7-10

ARTICLE VII - OFF-STREET PARKING AND LOADING Section 7-10 ARTICLE VII - OFF-STREET PARKING AND LOADING Section 7-10 Section 7-10.1 Off Street Parking. Off-street parking spaces, with proper access from a street, alley or driveway shall be provided in all districts

More information

I-10 CONNECT. Public Meeting #1

I-10 CONNECT. Public Meeting #1 I-10 CONNECT Public Meeting #1 The environmental review, consultation, and other actions required by applicable Federal environmental laws for this project are being, or have been, carried-out by TxDOT

More information

Noise Assessments for Construction Noise Impacts

Noise Assessments for Construction Noise Impacts Noise Assessments for Construction Noise Impacts Weixiong Wu a AKRF, Inc., 440 Park Avenue, 7th floor, New York, NY, 10016, USA. ABSTRACT Construction noise is one of the most disruptive noise sources

More information

Noise Impact Assessment Hamburg Crossings Hamburg, New York. Prepared for Benderson Development 570 Delaware Avenue Buffalo, New York 14202

Noise Impact Assessment Hamburg Crossings Hamburg, New York. Prepared for Benderson Development 570 Delaware Avenue Buffalo, New York 14202 ANGEVINE ACOUSTICAL CONSULTANTS, Inc. Mailing: P.O. Box 725! East Aurora, New York 14052-0725 Shipping: 1021 Maple Street! Elma, New York 14059-9530 Member: National Council TEL: (716) 652-0282! FAX: (716)

More information

Chapter 4: Alternatives Analysis

Chapter 4: Alternatives Analysis Chapter 4: Alternatives Analysis 4.0 Introduction and Alternatives Analysis Process Detailed analysis and evaluation of the alternatives was a critical step in the development of comprehensive and workable

More information

Jim Alexander Director of Design and Engineering, Southwest Light Rail Transit Project

Jim Alexander Director of Design and Engineering, Southwest Light Rail Transit Project Memorandum Date: January 15, 2014 To: CC: From: Subject: Jim Alexander Director of Design and Engineering, Southwest Light Rail Transit Project Paul Danielson, P.E. Project Manager, Southwest Light Rail

More information

Chapter 2: Alternatives

Chapter 2: Alternatives Chapter 2: Alternatives Introduction An Environmental Impact Statement (EIS) is a procedural document. In other words, the environmental planning process follows a logical sequence of development. Subsequent

More information

Public Hearing January 13, Request Conditional Use Permit (Auto Repair Garage) Staff Planner Carolyn A.K. Smith

Public Hearing January 13, Request Conditional Use Permit (Auto Repair Garage) Staff Planner Carolyn A.K. Smith Applicant Property Owner Holland Century Associates, LLP Public Hearing January 13, 2016 Request Conditional Use Permit (Auto Repair Garage) Staff Planner Carolyn A.K. Smith Location 3949 Holland Road

More information

For Public Input Period

For Public Input Period 20142018 CAPITAL IMPROVEMENT PLAN ( Thousands) CITY OF HOUSTON STREET & TRAFFIC CONTROL Project: Kingwood Drive N100011 Loop 494 to Woodland Hills Project Description Project provides for the ROW acquisition,

More information

MnDOT Metro District Highway Noise Abatement Study. September 2016

MnDOT Metro District Highway Noise Abatement Study. September 2016 September 2016 TABLE OF CONTENTS GLOSSARY... 3 1995 LEGISLATIVE DIRECTIVE... 6 2013 LEGISLATIVE AUDIT... 8 EXECUTIVE SUMMARY... 10 INTRODUCTION... 10 OVERVIEW OF METHODOLOGY AND STUDY RESULTS... 11 SUMMARY

More information

Table of Contents. City of Redlands - Redlands Crossing Center

Table of Contents. City of Redlands - Redlands Crossing Center City of Redlands - Redlands Crossing Center Executive Summary... ES-1 Section 1: Introduction...1-1 1.1 - Overview of the CEQA Process...1-1 1.2 - Scope of the EIR...1-5 1.3 - Organization of the EIR...1-8

More information

TABLE 3-24 SUMMARY OF EXISTING AMBIENT NOISE MEASUREMENT RESULTS

TABLE 3-24 SUMMARY OF EXISTING AMBIENT NOISE MEASUREMENT RESULTS Site No. TABLE 3-24 SUMMARY OF EXISTING AMBIENT NOISE MEASUREMENT RESULTS Measurement Location Description Start of Measurement Meas. Time (hrs) Noise Exposure (dba) Date Time Ldn Leq LT-1 Cistercian Abbey

More information

November 8, RE: Harrah s Station Square Casino Transportation Analysis Detailed Traffic Impact Study Review. Dear Mr. Rowe:

November 8, RE: Harrah s Station Square Casino Transportation Analysis Detailed Traffic Impact Study Review. Dear Mr. Rowe: November 8, 2006 Mr. Glenn Rowe, P.E. Pennsylvania Department of Transportation Bureau of Highway Safety and Traffic Engineering Commonwealth Keystone Building 400 North Street, 6 th Floor Harrisburg,

More information

3.1 Noise Overlay District

3.1 Noise Overlay District 3.1 A. Purpose The purpose of this District is to establish a Noise Overlay Zoning District within the. B. Special Definitions As used in this Article only, the following terms shall be defined as set

More information

UAL URBAN AERODYNAMICS LTD

UAL URBAN AERODYNAMICS LTD UAL URBAN AERODYNAMICS LTD 23 Waterford Drive Telephone (613) 225-6362 Ottawa, Ontario, Canada Facsimile (613) 225-3022 K2E 7V4 e-mail standen.ual@sympatico.ca website: http://www.urban-noise.ca 1.0 Background

More information

SR 9/I-95 Interchange at 45th Street PD&E Study Palm Beach County, Florida FPID No.: FAP No.: ETDM No.

SR 9/I-95 Interchange at 45th Street PD&E Study Palm Beach County, Florida FPID No.: FAP No.: ETDM No. Palm Beach County, Florida Palm Beach Metropolitan Planning Organization April 217 Project Study Area LIMITS: SR 9/I-95: from S of 45th Street to N of 45th Street 45th Street: From Village Boulevard to

More information

APPENDIX 3.11-A NOISE ANALYSIS DATA

APPENDIX 3.11-A NOISE ANALYSIS DATA APPENDIX 3.11-A NOISE ANALYSIS DATA N O I S E & G R O U N D B O R N E V I B R A T I O N I M P A C T A S S E S S M E N T F OR T H E P R O P O S E D R I N C O N D E L R IO N E V A D A C O U N T Y, CA AUGUST

More information

The existing land use surrounding North Perry Airport can be described as follows:

The existing land use surrounding North Perry Airport can be described as follows: 7.1 INTRODUCTION This land use evaluation will accomplish the following: Identify existing and future land uses in the Airport environs; Document existing land use, future land use, and zoning around the

More information

Article 6. RESIDENTIAL ZONES

Article 6. RESIDENTIAL ZONES RESIDENTIAL ZONES 24-18 Article 6. RESIDENTIAL ZONES s: 24-18 Purpose of the Residential Zones 24-19 Land Use Regulations for Residential Zones 24-20 Development Standards for Residential Zones 24-18 Purpose

More information