1 Rising Sun Scaffold Hill Flood Risk Assessment August 2010

2

3 Contents 1.0 Introduction Site Description Legislative Framework Flood Risk Surface Water Drainage Development Potential Conclusions Appendix A: Topographical Survey Spatial Geomatics Drawing No Rev B (Sheets 1-7) Appendix B: Drawings Drawing No /2001 Proposed Development Site and Features IDP Drawing No. N81:2091/RS-SK01 Indicative Masterplan Appendix C: Environment Agency Correspondence Letter (Ref: NA/2010/105245/01-L01) 07 July (Ref: /RC07) 13 July 2010 Appendix D: Existing Surface Water Runoff Calculations Appendix E: Micro Drainage Source Control Outputs 3

4 1.0 Introduction W.A. Fairhurst & Partners were appointed by The Northumberland Estates to undertake a Flood Risk Assessment of the site at Scaffold Hill in North Tyneside. The proposal is for residential development with some small scale local facilities. The aim of this Flood Risk Assessment report is to evaluate the current proposals with regard to flood risk and drainage, identifying potential flood risk both to and from the development site. Fairhurst have carried out the following: i. Assessment of the development potential of the site in the line with the Planning Policy Statement 25 Development and Flood Risk, (PPS25) ii. An assessment of the surface water runoff. 4

5 2.0 Site Description The development site is located between the A19 and Holystone Way in North Tyneside; the approximate National Grid Reference is NZ The site is currently undeveloped Greenfield land, comprising an area of approximately 63 ha. The southern part of the site is occupied by the Rising Sun Country Park. A detailed topographic survey has been carried out for the site and this can be seen in Appendix A. The proposed new built development will be restricted to that part of the site which lies to the north of the overhead pylon route, comprising an area of approximately 22 ha. To the south of this area improvements will focus on recreation. The extent of the new built development is shown in Drawing 86072/2001, in Appendix B. An indicative Masterplan for the development is also shown in IDP Drawing No. N81:2091/RS-SK01. There are a number of open water features on site, including Wallsend Dene which flows along the south eastern boundary and a pond within the Rising Sun Country Park. These are highlighted on Drawing 86072/

6 3.0 Legislative Framework The key aims of PPS 25 Development and Flood Risk are to ensure that flood risk is taken into account at all stages in the planning process to avoid inappropriate development in areas at risk of flooding, and to direct development away from areas at highest risk. Where new development is, exceptionally, necessary in such areas, policy aims to make it safe without increasing flood risk elsewhere and where possible, reducing flood risk overall. A risk-based approach should be adopted at all levels of planning. Applying the source pathway-receptor model to planning for development in areas of flood risk requires: a strategic approach which avoids adding to the causes or sources of flood risk, by such means as avoiding inappropriate development in flood risk areas and minimising run-off from new development onto adjacent and other downstream property, and into the river systems; managing flood pathways to reduce the likelihood of flooding by ensuring that the design and location of the development maximises the use of SUDS, and takes account of its susceptibility to flooding, the performance and processes of river/coastal systems and appropriate flood defence infrastructure, and of the likely routes and storage of floodwater, and its influence on flood risk downstream; and reducing the adverse consequences of flooding on the receptors (i.e. people, property, infrastructure, habitats and statutory sites) by avoiding inappropriate development in areas at risk of flooding. Flood risk assessment should be carried out to the appropriate degree at all levels of the planning process, to assess the risks of all forms of flooding to and from development taking climate change into account and to inform the application of the sequential approach. A sequential risk-based approach to determining the suitability of land for development in flood risk areas is central to the policy statement and should be applied at all levels of the planning process. In areas at risk of river or sea flooding, preference should be given to locating new development in Flood Zone 1. If there is no reasonably available site in Flood Zone 1, the flood vulnerability of the proposed development can be taken into account in locating development in Flood Zone 2 and then Flood Zone 3. Within each Flood Zone new development should be directed to sites at the lowest probability of flooding from all sources. Flood risk has been categorised as High, Medium and Low based on the probability of inundation. Extract from the Flood Zones set out in PPS 25 highlight the likely response to planning applications within these zones. 6

7 Zone 1 Low Probability Definition This zone comprises land assessed as having a less than 1 in 1000 annual probability of river or sea flooding in any year (<0.1%). Appropriate uses All uses of land are appropriate in this zone. FRA requirements For development proposals on sites comprising one hectare or above the vulnerability to flooding from other sources as well as from river and sea flooding, and the potential to increase flood risk elsewhere through the addition of hard surfaces and the effect of the new development on surface water run-off, should be incorporated in a FRA. This need only be brief unless the factors above or other local considerations require particular attention. Policy aims In this zone, developers and local authorities should seek opportunities to reduce the overall level of flood risk in the area and beyond through the layout and form of the development, and the appropriate application of sustainable drainage techniques Zone 2 Medium Probability Definition This zone comprises land assessed as having between a 1 in 100 and 1 in 1000 annual probability of river flooding (1% 0.1%) or between a 1 in 200 and 1 in 1000 annual probability of sea flooding (0.5% 0.1%) in any year. Appropriate uses The water-compatible, less vulnerable and more vulnerable uses of land and essential infrastructure in Table D.2 are appropriate in this zone. Subject to the Sequential Test being applied, the highly vulnerable uses are only appropriate in this zone if the Exception Test is passed. FRA requirements All development proposals in this zone should be accompanied by a FRA. Policy aims In this zone, developers and local authorities should seek opportunities to reduce the overall level of flood risk in the area through the layout and form of the development, and the appropriate application of sustainable drainage techniques. Zone 3a High Probability Definition This zone comprises land assessed as having a 1 in 100 or greater annual probability of river flooding (>1%) or a 1 in 200 or greater annual probability of flooding from the sea (>0.5%) in any year. Appropriate uses The water-compatible and less vulnerable uses of land are appropriate in this zone. The highly vulnerable uses should not be permitted in this zone. The more vulnerable and essential infrastructure uses should only be permitted in this zone if the Exception Test is passed. Essential infrastructure permitted in this zone should be designed and constructed to remain operational and safe for users in times of flood. FRA requirements All development proposals in this zone should be accompanied by a FRA. 7

8 Zone 3a (cont.) Policy aims In this zone, developers and local authorities should seek opportunities to: i. reduce the overall level of flood risk in the area through the layout and form of the development and the appropriate application of sustainable drainage techniques; ii. relocate existing development to land in zones with a lower probability of flooding; and iii. create space for flooding to occur by restoring functional floodplain and flood flow pathways and by identifying, allocating and safeguarding open space for flood storage. Zone 3b The Functional Floodplain Definition This zone comprises land where water has to flow or be stored in times of flood. SFRAs should identify this Flood Zone (land which would flood with an annual probability of 1 in 20 (5%) or greater in any year or is designed to flood in an extreme (0.1%) flood, or at another probability to be agreed between the LPA and the Environment Agency, including water conveyance routes). Appropriate uses Only the water-compatible uses and the essential infrastructure listed in Table D.2 that has to be there should be permitted in this zone. It should be designed and constructed to: remain operational and safe for users in times of flood; result in no net loss of floodplain storage; not impede water flows; and not increase flood risk elsewhere. Essential infrastructure in this zone should pass the Exception Test. FRA requirements All development proposals in this zone should be accompanied by a FRA. Policy aims In this zone, developers and local authorities should seek opportunities to: i. reduce the overall level of flood risk in the area through the layout and form of the development and the appropriate application of sustainable drainage techniques; and ii. relocate existing development to land with a lower probability of flooding. Table 1 (continued): Extract from PPS 25 Annex D 8

9 PPS 25 sets out the compatibility of developments within each Flood Zone. summarised in Table 2. This is Flood Risk Vulnerability classification Essential Infrastructure Water Compatible Highly Vulnerable More Vulnerable Less Vulnerable Flood Zone Table 2: Zone 1 Zone 2 Zone 3a Zone 3b Exemption Test Required Exemption Test Required Development Acceptable Development not suitable Exemption Test Required Exemption Test Required Flood Risk Vulnerability and Flood Zone Compatibility Where required an exception test must be passed in order for developments of that nature to be justified within the Flood Zone. For the Exception Test to be passed the following must be demonstrated: a) it must be demonstrated that the development provides wider sustainability benefits to the community that outweigh flood risk, informed by a SFRA where one has been prepared. b) the development should be on developable previously-developed land or, if it is not there are no reasonable alternative sites on developable previouslydeveloped land; and c) a FRA must demonstrate that the development will be safe, without increasing flood risk elsewhere, and, where possible, will reduce flood risk overall. 9

10 4.0 Flood Risk The Environment Agency (EA) flood map shows the development site to be within Flood Zone 1 - Low Probability, as shown in Figure 1. This is outside of the area which is at risk from extreme fluvial or tidal flooding and the site is therefore not at risk from inundation in a 1 in 1000 year event. A more detailed version of the EA flood map is given in Appendix C. Figure 1: Extract from EA flood map, North Tyneside = Flooding from river or sea without defences (1 in 100 year event) = Extent of extreme flood (1 in 1000 year event) = Location of development The EA have been consulted with a Pre-Planning Application Enquiry. The responses to the enquiry and a subsequent request for further information can be seen in Appendix C. The EA has confirmed that the site is in Flood Zone 1 and that this Flood Risk Assessment should therefore concentrate on surface water drainage. The EA were unable to provide any information on historical flooding at the site. A review has been carried out of the Tyne & Wear Strategic Flood Risk Assessment (SFRA) which covers the North Tyneside area. The site and the surrounding area are not mentioned within the SFRA. It is therefore concluded that the site is not currently at significant risk from other sources of flooding such as ground water, sewers or surface water runoff. 10

11 5.0 Surface Water Drainage The development is within Flood Zone 1, therefore in accordance with PPS25 and the advice of the EA, this Flood Risk Assessment focuses on the management of surface water. The surface water strategy for the development site will be developed in accordance with PPS25, Sewers for Adoption 6th Edition and The Building Regulations Part H. 5.1 Existing Surface Water Runoff The EA/DERFA R&D Technical Report W5-074 Preliminary Rainfall Runoff Management for Developments states that for developments which are less than 50 ha in size the Institute of Hydrology Report 124 (IH124) Flood Estimation for Small Catchments should be used to calculate the peak Greenfield runoff rates. This advice is replicated in The SUDS Manual (CIRIA C697). The IH124 method uses the following equation to calculate Greenfield runoff: Where: Q BAR, rural = * AREA 0.89 * SAAR 1.17 * SOIL 2.17 AREA = Catchment Area (km 2 ) SAAR = Standard Average Annual Rainfall (mm) SOIL = Soil Index (from Wallingford Procedure maps) Technical Report W5-074 states that Where developments are smaller than 50 ha the analysis for determining the peak Greenfield discharge rate should use 50 ha in the formula and linearly interpolate the flow rate value based on the ratio of the development to 50 ha. On this basis the Greenfield runoff rate for the proposed development has been calculated to be 90.2 l/s. The full calculation can be seen in Appendix D. 5.2 Proposed Surface Water Drainage Principles The Building Regulations Part H sets out a hierarchy for the choice of discharge point for a rainwater system. In order of priority, the possibilities are given as: 1. an adequate soakaway or some other adequate infiltration system; or where that is not reasonably practicable, 2. a watercourse; or where that is not reasonably practicable, 3. a sewer. A geo-environmental desk study has been carried out which summarised that the site is anticipated to be underlain by relatively impermeable Glacial Till and variably permeable made ground over middle coal measures. As such, the main groundwater body is expected at depth in the coal measures bedrock strata with only minor perched groundwater present, if any, at shallow depth. It is therefore concluded that infiltration is unlikely to be a suitable means of discharging surface water runoff arising from the site. There are a number of open water features on site, including Wallsend Dene which flows along the south eastern boundary and a pond within the Rising Sun Country Park. The pond is a SUDS feature, created to attenuate flows from the adjacent Holystone development before discharging into Wallsend Dene via a ditch. It is therefore possible that a similar 11

12 arrangement could be implemented for this proposed development. This is discussed further in the following section. PPS25 states that Surface water arising from a developed site should, as far as is practicable, be managed in a sustainable manner to mimic the surface water flows arising from the site prior to the proposed development Technical Report W5-074 states that to deal with increased runoff due to development the limiting discharge for the 30 and 100 year return periods will be constrained to the mean annual peak rate of runoff for the Greenfield site (Referred to as Q BAR in IH Report 124). It is therefore proposed that surface water runoff from the site will be discharged at a flow rate no greater than 90.2 l/s, for all events up to and including the 100 year return period event, incorporating a 20% increase in rainfall intensity to account for climate change. 5.3 Surface Water Attenuation To ensure that surface water runoff does not pose a risk to the proposed development, or increase the risk of flooding elsewhere, surface water attenuation will be provided on site in the form of Sustainable Urban Drainage Systems (SUDS) to store all flows above the mean annual Greenfield runoff rate, up to the design event (100 year return period, with a 20% increase in rainfall intensity to account for climate change). The Source Control module of the industry standard software Micro Drainage has been used to determine the attenuation storage volume which could be required, based on an estimation of the impermeable areas on site, post development. The indicative site Masterplan, which can be seen in Appendix B, has been used to determine the extent of impermeable areas. It is conservatively estimated that 50% of the site will be impermeable, equating to an area of approximately 11 ha. It is likely that a detailed assessment will indicate that the area of impermeable land is in fact less than this. However, at this stage a precautionary approach is considered to be prudent. Outputs from Micro Drainage, based on a discharge of 90.2 l/s, indicate that to store the runoff from a 100 year return period event, with a 20% allowance for climate change, the volume of attenuation required would be approximately 5800 m 3. This is based on the 600 minute winter storm, which was determined to be the critical duration event in Micro Drainage. The Micro Drainage outputs can be seen in Appendix E. To provide the required volume of storage it may be possible to extend the pond located in the south of the site, within the Rising Sun Country Park. There is sufficient space surrounding the existing pond to facilitate an increase in storage capacity without adverse effect elsewhere. The pond is currently used as a SUDS facility to attenuate surface water runoff from the adjacent Holystone development before discharging into the Wallsend Dene. It would be possible to adjust the flow control arrangement on the outlet of the pond to account for the allowable discharge restrictions for the proposed development. Alternatively, there are large areas of open space elsewhere within the southern part of the site which could be utilised to create a new SUDS attenuation pond. The topography in the south eastern section of the site is well suited for the provision of a SUDS pond which could discharge to the adjacent watercourse, as indicated in Drawing 86072/2001 in Appendix B. 12

13 The EA has been consulted as part of the Pre-Planning Application Enquiry to seek an opinion on the suitability of providing surface water attenuation as described above. The EA response can be seen in Appendix C and is summarised below. From a flood risk perspective, this would be in line with our recommendations for Sustainable Urban Drainage Systems and therefore we would support any proposal to do this. However, from a nature conservation perspective we would require more details about what is currently existing on site and if there are any newts in the area. An ecological survey of the area would be required before any proposals were undertaken... We recommend you consult Natural England for further details about protected species and any consents required. An ecological study will therefore be undertaken as part of the development design and the results will be used to inform the planning of the surface water drainage system. Close consultation will be maintained with both the EA and Natural England throughout the design process to ensure that the required standards are met. To reduce the size of any final attenuation facility, it may be possible to implement a SUDS management train, employing a series of drainage techniques to slow and attenuate water through the development, as suggested in The SUDS Manual (CIRIA C697). The SUDS Manual details a wide range of drainage techniques; those which may be suitable are as follows: rainwater harvesting; swales; pervious pavements & car parking spaces; detention basis in open landscaped areas; geocellular systems. The feasibility and suitability of any given SUDS solution will be fully considered at the detailed design stage of the development. However, it is considered that the information provided demonstrates that adequate procedures can be put in place to ensure that flood risk will not increase as a result of the proposed development, either at the site or elsewhere. 13

14 6.0 Development Potential The proposed development is within Flood Risk Zone 1. No detailed sequential test is therefore required to identify sites of lower risk. This is in line with the guidance set out in PPS25 and is summarised in Figure 2. The proposed development can be classified as More Vulnerable according to Annex D of PPS25. From table D3 in PPS25, the proposed development may be considered suitable for this site, and no exception test is required. Figure 2: PPS25 Sequential Test Summary 14

15 7.0 Conclusions The Flood Risk Assessment for the development proposals at Scaffold Hill in North Tyneside has been prepared in accordance with PPS 25 Development and Flood Risk. The development site is not within the Environment Agency s indicative flood envelopes and is therefore classed as being within Flood Risk Zone 1 i.e. low risk. Based on the compatibility of developments within each Flood Zone, set out within PPS 25, the site is suitable for all types of developments. The site is currently undeveloped Greenfield land, therefore the existing rate of surface water runoff has been calculated using the Institute of Hydrology Report 124 method. This is in line with advice given in the EA/DERFA R&D Technical Report W5-074 Preliminary Rainfall Runoff Management for Developments and The SUDS Manual (CIRIA C697). To ensure that surface water runoff does not pose a risk to the proposed development, or increase the risk of flooding elsewhere, surface water attenuation will be provided on site to store all flows above the mean annual Greenfield runoff rate, up to the design event. The possible effects of climate change have been considered by acknowledging the requirement to make an allowance for increased rainfall in the calculation of the surface water discharge rates and design of the drainage system over the lifespan of the development in line with PPS 25. A number of methods for providing attenuation have been identified, including a single attenuation storage facility and a management train approach. It has been demonstrated that, even if a management train approach is not found to be suitable for the site, a single attenuation storage facility is feasible and would achieve the required objectives. It is therefore concluded that the development can be carried out without increasing flood risk either to the site or elsewhere. 15

16 APPENDIX A Topographical Survey Spatial Geomatics Drawing No Rev B (Sheets 1-7)

17

18

19

20

21

22

23

Surface Water Drainage Pro-forma for major developments

Surface Water Drainage Pro-forma for major developments Surface Water Drainage Pro-forma for major developments We advise that developers complete this form and submit it to the Local Planning Authority with their planning application, referencing from where

More information

Surface water is the rainwater that runs off roofs, roads and paved areas into the public sewerage system.

Surface water is the rainwater that runs off roofs, roads and paved areas into the public sewerage system. This standard advice note is intended to provide clear guidance for all developers, and planning authorities regarding surface water design and management. It should also be used to inform development

More information

South Worcestershire Strategic Flood Risk Assessment Level 2 Update

South Worcestershire Strategic Flood Risk Assessment Level 2 Update South Worcestershire Strategic Flood Risk Assessment Level 2 Update Worcester West Site Assessment Final Report February 2015 This page is intentionally left blank 2015s2316 Worcester West Site Assessment

More information

Flood Risk Assessment

Flood Risk Assessment Temporary Shale Gas Exploration Roseacre Wood, Lancashire PNR_PL_ June 2014 Contents 1 Introduction 1 2 Development Description and Location 2 Page 2.1 Location 2 2.2 Existing Site Characteristics 3 2.3

More information

This document was endorsed by Cambridgeshire County Council (CCC) in its capacity as Lead Local Flood Authority on 14 July 2016.

This document was endorsed by Cambridgeshire County Council (CCC) in its capacity as Lead Local Flood Authority on 14 July 2016. Note to the reader Note to the reader This document was endorsed by Cambridgeshire County Council (CCC) in its capacity as Lead Local Flood Authority on 14 July 2016. Once adopted as a Supplementary Planning

More information

COLDRA WOODS HOTEL BY CELTIC MANOR AND STARBUCKS DRIVE- THRU RESTAURANT Flood Consequences Assessment

COLDRA WOODS HOTEL BY CELTIC MANOR AND STARBUCKS DRIVE- THRU RESTAURANT Flood Consequences Assessment COLDRA WOODS HOTEL BY CELTIC MANOR AND STARBUCKS DRIVE- THRU RESTAURANT Flood Consequences Assessment APRIL 2017 CONTACTS JOSHUA MOORE Graduate Hydrologist dd ++44 (0) 117 372 1238 joshua.moore@arcadis.com

More information

Attachment 12 Stage 1 Flood Risk Assessment (IE RP-0001)

Attachment 12 Stage 1 Flood Risk Assessment (IE RP-0001) IE0311133-22-RP-0001, Issue A 17/10/2013 Attachment 12 Stage 1 Flood Risk Assessment (IE0311133-30-RP-0001) IE0311133-22-RP-0001_A_02.DOC Flood Risk Assessment Celebrating 40 Years in Business Jazz Pharmaceuticals

More information

Defra/Environment Agency Flood and Coastal Defence R&D Programme Preliminary rainfall runoff management for developments

Defra/Environment Agency Flood and Coastal Defence R&D Programme Preliminary rainfall runoff management for developments Defra/Environment Agency Flood and Coastal Defence R&D Programme Preliminary rainfall runoff management for developments R&D Technical Report W5-074/A/TR/1 Revision D DEFRA / Environment Agency Flood

More information

EDEN WESTWOOD FLOOD RISK ASSESSMENT

EDEN WESTWOOD FLOOD RISK ASSESSMENT EDEN WESTWOOD FLOOD RISK ASSESSMENT CONSULTATION DRAFT AUGUST 2016 EDEN WESTWOOD FLOOD RISK ASSESSMENT Consultation Draft Project no: 286897A-HHC Date: August 2016 Kings Orchard 1 Queen Street Bristol

More information

The Flood Risk Implications of Strategic Development at Barnham / Eastergate / Westergate

The Flood Risk Implications of Strategic Development at Barnham / Eastergate / Westergate at Barnham / Eastergate / Westergate The Hydrological and Hydrogeological Aspects of Tidal sluice and pumping station on the Aldingbourne Rife at Felpham Richard Allitt Associates Ltd Suite 3, Forge Offices

More information

Flood Consequence Assessment. Proposed Commercial Development, Tank Farm Way, Sully

Flood Consequence Assessment. Proposed Commercial Development, Tank Farm Way, Sully Flood Consequence Assessment Proposed Commercial Development, Tank Farm Way, Sully Client O Reilly Concrete Group Larchfield Kingscourt County Cavan Ireland By RVW Consulting 6 Neptune Court Vanguard Way

More information

SUDS for Roads. Design Tools in new guidance targeted at roads engineers. Chris Jefferies, Taye Akinrelere & Frank Guz University of Abertay Dundee

SUDS for Roads. Design Tools in new guidance targeted at roads engineers. Chris Jefferies, Taye Akinrelere & Frank Guz University of Abertay Dundee SUDS for Roads Design Tools in new guidance targeted at roads engineers Chris Jefferies, Taye Akinrelere & Frank Guz University of Abertay Dundee What s in my talk? The context behind SUDS for Roads Overview

More information

WATERFORD NORTH QUAYS STRATEGIC DEVELOPMENT ZONE

WATERFORD NORTH QUAYS STRATEGIC DEVELOPMENT ZONE WATERFORD NORTH QUAYS STRATEGIC DEVELOPMENT ZONE STRATEGIC FLOOD RISK ASSESSMENT FEBRUARY 2018 As part of the preparation of the Planning Scheme for the Waterford North Quays Strategic Development Zone

More information

Cottonmount Landfill Stable Non Reactive (SNR) Asbestos Cell. Volume 2 NON TECHNICAL SUMMARY. December 2012 SLR Ref:

Cottonmount Landfill Stable Non Reactive (SNR) Asbestos Cell. Volume 2 NON TECHNICAL SUMMARY. December 2012 SLR Ref: Cottonmount Landfill Stable Non Reactive (SNR) Asbestos Cell Volume 2 NON TECHNICAL SUMMARY December 2012 SLR Ref: 419.00034.00473 INTRODUCTION 1. This Non Technical Summary (NTS) has been produced by

More information

Stormwater Attenuation Systems Sustainable Drainage Solutions for Domestic & Commercial Applications

Stormwater Attenuation Systems Sustainable Drainage Solutions for Domestic & Commercial Applications Environmental Stormwater Attenuation Systems Sustainable Drainage Solutions for Domestic & Commercial Applications Sustainable, Reliable, Affordable Stormwater Attenuation Systems Sustainable Drainage

More information

Storage requirements for rainfall runoff from greenfield development sites

Storage requirements for rainfall runoff from greenfield development sites Storage requirements for rainfall runoff from greenfield development sites R B B Kellagher Version 2 Report SR 580 March 2002 Storage requirements for rainfall runoff from greenfield development sites

More information

DESIGN BULLETIN #16/2003 (Revised July 2007) Drainage Guidelines for Highways Under Provincial Jurisdiction in Urban Areas.

DESIGN BULLETIN #16/2003 (Revised July 2007) Drainage Guidelines for Highways Under Provincial Jurisdiction in Urban Areas. Drainage Guidelines for Highways Under Provincial Jurisdiction in Urban Areas. July 2007 Update to Design Bulletin #16/2003: Added under Design Criteria Culverts of 600mm diameter are commonly used to

More information

Sunnyside Heights (Grandview Heights Area #2) Neighbourhood Concept Plan (NCP) - Engineering Servicing and Financial Strategies

Sunnyside Heights (Grandview Heights Area #2) Neighbourhood Concept Plan (NCP) - Engineering Servicing and Financial Strategies CORPORATE REPORT NO: R236 COUNCIL DATE: November 15, 2010 REGULAR COUNCIL TO: Mayor & Council DATE: November 10, 2010 FROM: General Manager, Engineering FILE: 6520-20 (GH#2) SUBJECT: Sunnyside Heights

More information

What s so hard about Stormwater Modelling?

What s so hard about Stormwater Modelling? What s so hard about Stormwater Modelling? A Pugh 1 1 Wallingford Software Pty Ltd, ann.pugh@wallingfordsoftware.com Abstract A common misconception of stormwater modelling is that it is simple. While

More information

PERMEABLE PAVEMENTS FREQUENTLY ASKED QUESTIONS

PERMEABLE PAVEMENTS FREQUENTLY ASKED QUESTIONS Question: Why should I consider using a permeable pavement? Answer: Planning for climate change is today a major driver for construction and the built environment. Environment Agency research following

More information

Land Management and Flooding. Where are we now?

Land Management and Flooding. Where are we now? Land Management and Flooding Where are we now? Tarland farmer s workshop Andrea Johnstonova, SEPA The talk will cover Some background information: NFM under the FRM Act Implementation so far and examples

More information

Chapter 6. Hydrology. 6.0 Introduction. 6.1 Design Rainfall

Chapter 6. Hydrology. 6.0 Introduction. 6.1 Design Rainfall 6.0 Introduction This chapter summarizes methodology for determining rainfall and runoff information for the design of stormwater management facilities in the City. The methodology is based on the procedures

More information

LAND AT WILBURTON ROAD HADDENHAM FLOOD RISK ASSESSMENT & OUTLINE DRAINAGE STRATEGY. Prepared for:

LAND AT WILBURTON ROAD HADDENHAM FLOOD RISK ASSESSMENT & OUTLINE DRAINAGE STRATEGY. Prepared for: LAND AT WILBURTON ROAD HADDENHAM FLOOD RISK ASSESSMENT & OUTLINE DRAINAGE STRATEGY Prepared for: Gladman Developments Ltd Gladman House Alexandria Way Congleton Business Park Congleton CW12 1LB By: LK

More information

SuDS design criteria for catchment flood protection Are current criteria appropriate?

SuDS design criteria for catchment flood protection Are current criteria appropriate? SuDS design criteria for catchment flood protection Are current criteria appropriate? Richard Kellagher SuDS Drainage design for catchment flood protection All countries of UK (roughly) in alignment, BUT

More information

Water Resources, Drainage and Flood Risk

Water Resources, Drainage and Flood Risk P O R T I S H E A D B R A N C H L I N E P R E L I M I N A R Y ENV I R O N M E N T A L I N F O R M A T I O N R E P O R T V O L U M E 2 C H A P T E R 17 Water Resources, Drainage and Flood Risk Table of

More information

Taking the pain out of the treatment train: continuous simulation modelling for integrated water management

Taking the pain out of the treatment train: continuous simulation modelling for integrated water management Engineers & Consultants Taking the pain out of the treatment train: continuous simulation modelling for integrated water management Stu Farrant & Reuben Ferguson, Morphum Environmental Limited Abstract

More information

Initial Construction Costs For Various Pavement and Drainage Options

Initial Construction Costs For Various Pavement and Drainage Options Interpave Initial Construction Costs For Various Pavement and Drainage Options Final Prepared For Interpave Scott Wilson Ltd Interpave Pavement Design CONTENTS 1. Overview 2. Summary of Pavement Types

More information

Understanding flood risk

Understanding flood risk Guides for Community Emergency Volunteers Understanding flood risk The Guides for Community Emergency Volunteers series has been developed in collaboration with: 2 The series has been funded through grants

More information

Flood risk management and land use planning in changing climate conditions Mikko Huokuna Finnish Environment Institute, SYKE

Flood risk management and land use planning in changing climate conditions Mikko Huokuna Finnish Environment Institute, SYKE 10th International Drainage Workshop of ICID 06.-11. July 2008 Flood risk management and land use planning in changing climate conditions Mikko Huokuna Finnish Environment Institute, SYKE Background hydrological

More information

Northumbrian Water Limited 9 March 2011

Northumbrian Water Limited 9 March 2011 Northumbrian Water Limited 9 March 2011 Flooding - The role of water companies in addressing flooding and SuDs. Les Hall New Development Manager Introduction Northumbrian Water and our sewerage role. Our

More information

Water sensitive urban design. Developing design objectives for urban development in South East Queensland

Water sensitive urban design. Developing design objectives for urban development in South East Queensland Water sensitive urban design Developing design objectives for urban development in South East Queensland Version 2-8 November 2007 Contents Contents......... ii Executive Summary............1 1 Introduction.........1

More information

6.0 Runoff. 6.1 Introduction. 6.2 Flood Control Design Runoff

6.0 Runoff. 6.1 Introduction. 6.2 Flood Control Design Runoff October 2003, Revised February 2005 Chapter 6.0, Runoff Page 1 6.1 Introduction 6.0 Runoff The timing, peak rates of discharge, and volume of stormwater runoff are the primary considerations in the design

More information

Drainage, Sewerage System, Groundwater and Surface Water drainage

Drainage, Sewerage System, Groundwater and Surface Water drainage Drainage, Sewerage System, Groundwater and Surface Water drainage Summary There are significant impacts to the community from high levels of groundwater on a regular basis. In extreme cases, these can

More information

FLOOD CONSEQUENCE ASSESSMENT FOR A PROPOSED RESIDENTIAL DEVELOPMENT SITE ADJACENT TO GLANDULAS FARM, NEWTOWN, POWYS

FLOOD CONSEQUENCE ASSESSMENT FOR A PROPOSED RESIDENTIAL DEVELOPMENT SITE ADJACENT TO GLANDULAS FARM, NEWTOWN, POWYS FOR A PROPOSED RESIDENTIAL DEVELOPMENT SITE ADJACENT TO GLANDULAS FARM, NEWTOWN, POWYS Report Reference: 218/FCA Draft: Version D1 July 2016 Report prepared for: Berry Brothers Willow House East Shrewsbury

More information

RMB Chivenor Flood Defence Scheme. Non-Technical Summary FINAL. Version 3.0

RMB Chivenor Flood Defence Scheme. Non-Technical Summary FINAL. Version 3.0 RMB Chivenor Flood Defence Scheme Non-Technical Summary FINAL Version 3.0 RMB CHIVENOR FLOOD DEFENCE SCHEME ENVIRONMENTAL STATEMENT CONTENTS 1 INTRODUCTION AND BACKGROUND II 2 THE PROPOSED PROJECT III

More information

Municipal Stormwater Ordinances Summary Table

Municipal Stormwater Ordinances Summary Table APPENDIX F Municipal Ordinances Summary Table Municipality Abington Bryn Athyn Borough Hatboro Borough Ordinance, SALDO Runoff equals pre post Erosion Sediment Control Water Quality Requirements Any which

More information

COON CREEK WATERSHED DISTRICT PERMIT REVIEW. Spring Lake Park Schools Westwood Middle School st Avenue NE, Spring Lake Park, MN 55432

COON CREEK WATERSHED DISTRICT PERMIT REVIEW. Spring Lake Park Schools Westwood Middle School st Avenue NE, Spring Lake Park, MN 55432 PAN 16-112, Westwood Middle School, Page 1 of 6 COON CREEK WATERSHED DISTRICT PERMIT REVIEW MEETING DATE: August 22, 2016 AGENDA NUMBER: 10 FILE NUMBER: 16-112 ITEM: Westwood Middle School RECOMMENDATION:

More information

Adaptation planning at different spatial scales

Adaptation planning at different spatial scales Adaptation planning at different spatial scales Using TCPA Publication Adaptation by Design as the main source GerGerry Metcalf UKCIP UKCIP Key adaptation principles for planning UKCIP Seek opportunities

More information

Alison Duffy, Brian D Arcy, Neil Berwick, Rebecca Wade, Roshni Jose (Abertay University) Drew Hill (Transport Scotland) Les Watson, Andy Hemingway

Alison Duffy, Brian D Arcy, Neil Berwick, Rebecca Wade, Roshni Jose (Abertay University) Drew Hill (Transport Scotland) Les Watson, Andy Hemingway Alison Duffy, Brian D Arcy, eil Berwick, Rebecca Wade, Roshni Jose (Abertay University) Drew Hill (Transport Scotland) Les Watson, Andy Hemingway (SEPA) Content Phases 1 and 2 Background Research Phase

More information

Viridor Waste Management. Proposed Development of an In-Vessel Composting Facility. Land at Exide Batteries, Salford Road, Bolton

Viridor Waste Management. Proposed Development of an In-Vessel Composting Facility. Land at Exide Batteries, Salford Road, Bolton Viridor Waste Management Proposed Development of an In-Vessel Composting Facility Land at Exide Batteries, Salford Road, Bolton Non-Technical Summary January 2009 Introduction Viridor Waste Management

More information

Natural Flood Management. Measures & Multiple Benefits. Steve Rose (JBA)

Natural Flood Management. Measures & Multiple Benefits. Steve Rose (JBA) Natural Flood Management Measures & Multiple Benefits Steve Rose (JBA) Definitions Natural Flood Management - NFM (SEPA): A range of techniques that aim to reduce flooding by working with natural features

More information

Y Bwthyn Palliative Care Unit, Pontyclun

Y Bwthyn Palliative Care Unit, Pontyclun Flood Consequence Assessment (Level 1) Y Bwthyn Palliative Care Unit, Pontyclun March 2017 Prepared by: Giuliano Guadagnino BEng Reviewed by: Dimitris Linardatos BEng (Hons) MSc CEng MICE Reference: 25364

More information

Longbridge Town Centre Planning Application

Longbridge Town Centre Planning Application Longbridge Town Centre Planning Application Non-Technical Summary of the Environmental Statement January 2011 Introduction An application for Planning Permission has been submitted to Birmingham City Council

More information

The Proposed Auckland Unitary Plan (notified 30 September 2013)

The Proposed Auckland Unitary Plan (notified 30 September 2013) ART 3 REGIONAL AND DISTRICT RULES»Chapter H: Auckland wide rules»4 Natural resources» 4.14 Stormwater management Introduction The roposed Auckland Unitary lan (notified 30 September 2013) This section

More information

Wylfa Newydd Project A5025 On-line Highway Improvements

Wylfa Newydd Project A5025 On-line Highway Improvements ENERGY WORKING FOR BRITAIN Wylfa Newydd Project Flood Consequences Assessment Wylfa Newydd Project Flood Consequence Assessment Contents 1 Introduction... 1 1.1 Purpose of this document... 1 1.2 Background...

More information

Preliminary Drainage Analysis

Preliminary Drainage Analysis Preliminary Drainage Analysis Tanimura and Antle Employee Housing Town of Spreckels County of Monterey, California LIB150205 May 29, 2015 Prepared For: Tanimura and Antle Produce Prepared By: 9699 Blue

More information

Appendix C. FSSR 14 Regional Growth Curves with Irish River Data. and. FSSR 16 (Greenfield) Rainfall Runoff Model Estimation

Appendix C. FSSR 14 Regional Growth Curves with Irish River Data. and. FSSR 16 (Greenfield) Rainfall Runoff Model Estimation Appendix C FSSR 14 Regional Growth Curves with Irish River Data and FSSR 16 (Greenfield) Rainfall Runoff Model Estimation Appendix C March 2005 C1 FSSR 14 Growth Curves with Irish River Data The Irish

More information

Clifton Marsh Landfill Variation of planning permission 05/09/0376 & 06/09/0395 for the continuation of landfilling until Non Technical Summary

Clifton Marsh Landfill Variation of planning permission 05/09/0376 & 06/09/0395 for the continuation of landfilling until Non Technical Summary Clifton Marsh Landfill Variation of planning permission 05/09/0376 & 06/09/0395 for the continuation of landfilling until 2035 Non Technical Summary SLR Consulting Limited Project Ref: 403.00079.00474

More information

Willow Brook Catchment Project

Willow Brook Catchment Project Willow Brook Catchment Project Willow Brook Park Page 1 Contents 1. Introduction. 3 1.1 Background The Water Framework Directive and Drivers for Change... 3 1.2 The Willow Brook Catchment and Water Framework

More information

The Islamic University of Gaza- Civil Engineering Department Sanitary Engineering- ECIV 4325 L5. Storm water Management

The Islamic University of Gaza- Civil Engineering Department Sanitary Engineering- ECIV 4325 L5. Storm water Management The Islamic University of Gaza- Civil Engineering Department Sanitary Engineering- ECIV 4325 L5. Storm water Management Husam Al-Najar Storm water management : Collection System Design principles The Objectives

More information

MISMANAGEMENT OF STORMWATER MANAGEMENT A CASE STUDY

MISMANAGEMENT OF STORMWATER MANAGEMENT A CASE STUDY MISMANAGEMENT OF STORMWATER MANAGEMENT A CASE STUDY P Allen Pr Eng BSc (Civil Engineering), IMESA Retired Fellow ABSTRACT Stormwater management is an essential municipal function, not given enough attention

More information

Integrated Catchment Modelling

Integrated Catchment Modelling Integrated Catchment Modelling Modelling the whole water cycle in one package Ann Pugh Integrated Water Planning Historically water, wastewater and stormwater modelling occurred in silos with little integration

More information

stormwater management solutions for residential and commercial / industrial / retail applications

stormwater management solutions for residential and commercial / industrial / retail applications stormwater management solutions for residential and commercial / industrial / retail applications» RAINWATER HARVESTING SOLUTIONS» SOAKAWAY SOLUTIONS» ATTENUATION SOLUTIONS» HOLISTIC SOLUTIONS contents»»

More information

Bay Area Hydrology Model

Bay Area Hydrology Model Bay Area Hydrology Model Doug Beyerlein, P.E. Joe Brascher Shanon White Clear Creek Solutions, Inc. www.clearcreeksolutions.com Bay Area Hydrology Model This introductory presentation was given at BAHM

More information

Implementing Stormwater Management through Split-Flow Drainage Design

Implementing Stormwater Management through Split-Flow Drainage Design Implementing Stormwater Management through Split-Flow Drainage Design Stuart Patton Echols PhD, ASLA, RLA Assistant Professor - Department of Landscape Architecture 210 Engineering Unit D Center for Watershed

More information

Chapter 17 Cumulative Impacts

Chapter 17 Cumulative Impacts Chapter 17 Cumulative Impacts CONTENTS 17. Cumulative Effects... 2 17.1 Introduction... 2 17.2 Summary of Relevant Legislation, Planning Policy and Guidance... 2 17.3 Methods... 5 17.4 Consultation...

More information

Stormwater Management Studies PDS Engineering Services Division ES Policy # 3-01

Stormwater Management Studies PDS Engineering Services Division ES Policy # 3-01 Stormwater Management Studies PDS Engineering Services Division Revised Date: 2/28/08 INTRODUCTION The City of Overland Park requires submission of a stormwater management study as part of the development

More information

Regulatory Requirements

Regulatory Requirements CHAPTER 1 Regulatory Requirements 1.0 Introduction The negative impacts of unmanaged stormwater runoff present a challenge to the City of Philadelphia, including increased runoff pollutant concentrations,

More information

LANDFORM SuDS not duds Local Authority guidance on SuDS 03/11/2010. Ciria LANDFORM event: SuDS not duds Local Authority Guidance: 3 November 2010

LANDFORM SuDS not duds Local Authority guidance on SuDS 03/11/2010. Ciria LANDFORM event: SuDS not duds Local Authority Guidance: 3 November 2010 Ciria LANDFORM event: SuDS not duds Local Authority Guidance: 3 November 2010 The Regulatory Context for Sustainable Drainage Systems (SuDS): Flood and Water Management Act 2010 Vicky Dawe Defra, Head

More information

New Castle County, DE. Floodplain Regulations

New Castle County, DE. Floodplain Regulations New Castle County, DE Floodplain Regulations John J. Gysling, PE CFM Department of Land Use New Castle County, DE February 26, 2009 Today s Presentation Floodplain Protection and Uses Terms and Definitions

More information

Highway Drainage 1- Storm Frequency and Runoff 1.1- Runoff Determination

Highway Drainage 1- Storm Frequency and Runoff 1.1- Runoff Determination Highway Drainage Proper drainage is a very important consideration in design of a highway. Inadequate drainage facilities can lead to premature deterioration of the highway and the development of adverse

More information

Learning objectives. Upon successful completion of this lecture, the participants will be able to:

Learning objectives. Upon successful completion of this lecture, the participants will be able to: Solomon Seyoum Learning objectives Upon successful completion of this lecture, the participants will be able to: Describe and perform the required step for designing sewer system networks Outline Design

More information

BARRIERS TO THE SUCCESSFUL PROJECT MANAGEMENT AND IMPLEMENTATION OF SUSTAINABLE DRAINAGE SYSTEMS IN NORTHERN IRELAND

BARRIERS TO THE SUCCESSFUL PROJECT MANAGEMENT AND IMPLEMENTATION OF SUSTAINABLE DRAINAGE SYSTEMS IN NORTHERN IRELAND BARRIERS TO THE SUCCESSFUL PROJECT MANAGEMENT AND IMPLEMENTATION OF SUSTAINABLE DRAINAGE SYSTEMS IN NORTHERN IRELAND Dissertation for MSc in Construction & Project Management Literature Review Stakeholders

More information

SR 666. Use of SUDS in High Density Developments Guidance Manual. RBB Kellagher CS Laughlan. Report SR 666 Release 4.

SR 666. Use of SUDS in High Density Developments Guidance Manual. RBB Kellagher CS Laughlan. Report SR 666 Release 4. SR 666 Use of SUDS in High Density Developments Report SR 666 Release 4.0 October 2005 RBB Kellagher CS Laughlan Document Information Project Report title Client Client Representative Project No. Report

More information

The City of Cocoa (City) is located in east

The City of Cocoa (City) is located in east FWRJ Reclaimed Water and Stormwater: A Perfect Pair to Meet Total Maximum Daily Load Wasteload Allocations? Danielle Honour, James Wittig, John A. Walsh, and Don Stevens Danielle Honour, P.E., D.WRE, and

More information

Ecological Mitigation and Management Plan

Ecological Mitigation and Management Plan Ecological Mitigation and Management Plan LONDON ARRAY OFFSHORE WIND FARM PROJECT AND ASSOCIATED GRID CONNECTION WORKS Version / Date : Ver 1.00 / October 2007 Prepared by : Tim Proudler / Keith Henson

More information

Croxley Rail Link Environmental Statement. Appendix 14C. Water Environment and Drainage - Flood Risk Assessment. Appendix 14C

Croxley Rail Link Environmental Statement. Appendix 14C. Water Environment and Drainage - Flood Risk Assessment. Appendix 14C Croxley Rail Link Environmental Statement Appendix 14C Water Environment and Drainage - Flood Risk Assessment Appendix 14C Mouchel 2011 Flood Risk Assessment 10 December 2011 Produced for Hertfordshire

More information

Thames Water AMP6 Outcomes Reporting Policy Annex 2 Wholesale. Asset Health Control Limits & Failure Thresholds March 2015

Thames Water AMP6 Outcomes Reporting Policy Annex 2 Wholesale. Asset Health Control Limits & Failure Thresholds March 2015 Thames Water Outcomes Reporting Policy Annex 2 Wholesale Asset Health Control Limits & Failure Thresholds March 2015 Published: 31 March 2015 Contents 1 Introduction... 1 2 Wastewater Non-Infrastructure...

More information

Sustainable Urban Drainage System (SUDS) Malaysian Experiences

Sustainable Urban Drainage System (SUDS) Malaysian Experiences Sustainable Urban Drainage System (SUDS) Malaysian Experiences A. AB. GHANI 1 *, N.A. ZAKARIA 1, C.K. CHANG 1, A. AINAN 2 1 River Engineering and Urban Drainage Research Centre (REDAC), Universiti Sains

More information

Arun DC Draft Local Plan , July Policy SP8: Strategic Housing, Parish and Town Council Allocations Page 109

Arun DC Draft Local Plan , July Policy SP8: Strategic Housing, Parish and Town Council Allocations Page 109 Policy SP8: Strategic Housing, Parish and Town Council Allocations Page 109 Policy SP8 proposes new development of approximately 2,000 homes in the Barnham, Eastergate and Westergate area. This area is

More information

Module 10b: Gutter and Inlet Designs and Multiple Design Objectives

Module 10b: Gutter and Inlet Designs and Multiple Design Objectives Module 10b: Gutter and Inlet Designs and Multiple Design Objectives Bob Pitt University of Alabama and Shirley Clark Penn State Harrisburg Evening traffic plows through high water at the intersection of

More information

PIMA COUNTY COMPREHENSIVE PLAN CO PIMA COUNTY REGIONAL COMPREHENSIVE PLAN POLICY MAJOR PLAN AMENDMENT

PIMA COUNTY COMPREHENSIVE PLAN CO PIMA COUNTY REGIONAL COMPREHENSIVE PLAN POLICY MAJOR PLAN AMENDMENT PIMA COUNTY COMPREHENSIVE PLAN CO7-07-04 PIMA COUNTY REGIONAL COMPREHENSIVE PLAN POLICY MAJOR PLAN AMENDMENT Arizona law [A.R.S. 11-821(C)(3)] requires: Planning for water resources that addresses: a)

More information

Flood Risk Assessment. Reach Community Solar Farm

Flood Risk Assessment. Reach Community Solar Farm Flood Risk Assessment Reach Community Solar Farm Andy Rankin 4 th February 2014 Introduction 1.1 Reach is a village of approximately 100 households on the edge of the Fens. We intend to construct a small

More information

Evaluation of the performance of permeable pavement at Lamb Drove FINAL

Evaluation of the performance of permeable pavement at Lamb Drove FINAL Evaluation of the performance of permeable pavement at Lamb Drove FINAL T M Hess & C Ibe Department of Environmental Science and Technology October 2011 Executive Summary The permeable paving at Lamb

More information

the 2001 season. Allison brought high winds and street flooding to Houston, after

the 2001 season. Allison brought high winds and street flooding to Houston, after Module 10b: Gutter and Inlet Designs and Multiple Design Objectives Bob Pitt University of Alabama and Shirley Clark Penn State Harrisburg Evening traffic plows through high water at the intersection of

More information

Adaptation planning at different spatial scales

Adaptation planning at different spatial scales Adaptation planning at different spatial scales Using TCPA Publication Adaptation by Design as the main source GerGerry Metcalf UKCIP UKCIP Key adaptation principles for planning UKCIP Seek opportunities

More information

Environmental Information Worksheet

Environmental Information Worksheet Environmental Information Worksheet Water System Owner (Attach additional sheets if necessary) Needs and Alternatives Provide a brief narrative that describes: Current drinking water system needs. Project

More information

Municipal Stormwater Management Planning

Municipal Stormwater Management Planning Municipal Stormwater Management Planning Christopher C. Obropta, Ph.D., P.E. Water Resources Extension Specialist with Rutgers Cooperative Extension Assistant Professor with Department of Environmental

More information

Location Drainage Study

Location Drainage Study Location Drainage Study PROJECT ROUTE: LIMITS: MUNICIPALITY/COUNTY: JOB NUMBER: IL 47 at Burlington Road 750ft NW to 750ft SE of IL 47(Burlington), & 1000ft S to 1000ft N of Burlington (IL47) Kane County

More information

Freight Street Development Strategy

Freight Street Development Strategy Freight Street Development Strategy Appendix B: Naugatuck River Floodplain Analysis Freight Street Development Strategy DECEMBER 2017 Page B-1 1.0 NAUGATUCK RIVER FLOODPLAIN AT FREIGHT STREET 1.1 Watershed

More information

S.O.P. No. HMD

S.O.P. No. HMD Page: 1 of 9 PURPOSE: To establish (SOP) for submission requirements, review process and approval of applications for Non-vehicular Access Permits for the purpose of connection or discharge to any MassDOT

More information

development impact assessment (DIA)

development impact assessment (DIA) application for a development impact assessment (DIA) Form E Important Please te there may have been significant changes to the requirements/process since you last used this form. We only accept electronic

More information

WESTMEATH COUNTY COUNCIL

WESTMEATH COUNTY COUNCIL WESTMEATH COUNTY COUNCIL AL RIVER IMPROVEMENTS PRELIMINARY REPORT Document Title : Report Document Ref(s). : 685/01/1b/Report Date Edition/Rev Status Originator Checked Approved July 2001 First Draft Pat

More information

Urban Hydrology and Storm Water Management. iwater_3rd International Event Juan Jose Galan Vivas (Aalto University)

Urban Hydrology and Storm Water Management. iwater_3rd International Event Juan Jose Galan Vivas (Aalto University) Urban Hydrology and Storm Water Management iwater_3rd International Event Juan Jose Galan Vivas (Aalto University) OBJECTIVES of the LECTURE Provide the basics to understand the hydraulic factors and variables

More information

Modelling Climate Change and Urbanization Impacts on Urban Stormwater and Adaptation Capacity

Modelling Climate Change and Urbanization Impacts on Urban Stormwater and Adaptation Capacity 9th International Conference on Urban Drainage Modelling, Belgrade 2012 C4. Climate change impacts, pp.287-288 Modelling Climate Change and Urbanization Impacts on Urban Stormwater and Adaptation Capacity

More information

UK Climate Change Risk Assessment 2017: Summary of ASC-commissioned research projects

UK Climate Change Risk Assessment 2017: Summary of ASC-commissioned research projects UK Climate Change Risk Assessment 2017: Summary of ASC-commissioned research projects The Adaptation Sub-Committee (ASC) of the Committee on Climate Change has been asked by the Government to lead the

More information

COLE ENGINEERING GROUP LTD.

COLE ENGINEERING GROUP LTD. CITY OF MARKHAM PROJECT FILE Stormwater Management Facilities Retrofit Municipal Class EA ES12-0316 COLE ENGINEERING GROUP LTD SEPTEMBER 2015 [ Month Year ] HEAD OFFICE 70 Valleywood Drive Markham, ON

More information

ABERDEEN CITY SUSTAINABLE DRAINAGE SYSTEMS (SUDS) AND FLOOD DEFENCES

ABERDEEN CITY SUSTAINABLE DRAINAGE SYSTEMS (SUDS) AND FLOOD DEFENCES ABERDEEN CITY SUSTAINABLE DRAINAGE SYSTEMS (SUDS) AND FLOOD DEFENCES Countesswells Avenue, Retention Pond A retention ponds function is for water attenuation (storing and slow release) and treatment. The

More information

North West Cambridge Potable Water Supply Strategy

North West Cambridge Potable Water Supply Strategy North West Cambridge Potable Water Supply Strategy NWC1-URS-SW-SWD-XX- RPT-CE-0003 P03 For Information Prepared for: University of Cambridge UNITED KINGDOM & IRELAND ISSUE SCHEDULE Issue Date Details Prepared

More information

Paraprofessional Training Session 1

Paraprofessional Training Session 1 Paraprofessional Training Session 1 Part 2: Stormwater Basics November 26, 2012 Rutgers University, Cook Campus Christopher C. Obropta, Ph.D., P.E. Extension Specialist in Water Resources Associate Professor

More information

The Effect of Surface Texture on Evaporation, Infiltration and Storage Properties of Paved Surfaces

The Effect of Surface Texture on Evaporation, Infiltration and Storage Properties of Paved Surfaces The Effect of Surface Texture on Evaporation, Infiltration and Storage Properties of Paved Surfaces M. Mansell* and F. Rollet School of Engineering and Science, University of the West of Scotland, Paisley

More information

Characteristics of Land Resources

Characteristics of Land Resources Chapter Chapter 1 Characteristics of Land Resources The geology, soils and topography of Woodford County T he geology, soils and topography of an area are important to the community planning process for

More information

Decatur, Georgia Stormwater Management Policy Guidelines. DRAFT November 5, 2014

Decatur, Georgia Stormwater Management Policy Guidelines. DRAFT November 5, 2014 Decatur, Georgia Stormwater Management Policy Guidelines Stormwater Management Policy Guidelines Decatur, Georgia STORMWATER MANAGEMENT POLICY GUIDELINES 1.0 Introduction... 3 2.0 Determining Predevelopment

More information

Thorn Turn Winter Maintenance and Highways Depot

Thorn Turn Winter Maintenance and Highways Depot Thorn Turn Winter Maintenance and Highways Depot Non-Technical Summary Central Bedfordshire Council 12 May 2015 1 Notice This document and its contents have been prepared and are intended solely for Central

More information

Understanding the State Planning Policy July 2017 Changes to state interest statements, policies and assessment benchmarks

Understanding the State Planning Policy July 2017 Changes to state interest statements, policies and assessment benchmarks Understanding the State Planning Policy July 2017 Changes to state statements, policies and assessment benchmarks This fact sheet outlines the key policy changes to the state statements, policies and assessment

More information

Interim Code of Practice for Sustainable Drainage Systems

Interim Code of Practice for Sustainable Drainage Systems CIRIA Contract 103 London, 2004 Interim Code of Practice for Sustainable Drainage Systems National SUDS Working Group PDF version Cover Final version (inside cover) Logos Interim Code of Practice for

More information

DRAINAGE & DESIGN OF DRAINAGE SYSTEM

DRAINAGE & DESIGN OF DRAINAGE SYSTEM Drainage on Highways DRAINAGE & DESIGN OF DRAINAGE SYSTEM P. R.D. Fernando Chartered Engineer B.Sc.(Hons), M.Eng. C.Eng., MIE(SL) Drainage Requirement of Highway Drainage System Introduction Drainage means

More information

3.0 Planning and Submittal Requirements

3.0 Planning and Submittal Requirements October 2003, Revised February 2005 Chapter 3.0, Planning and Submittal Requirements Page 1 3.0 Planning and Submittal Requirements 3.1 Drainage Studies and Drawings The City of Greenwood Village (Village)

More information