dated to our Unit#2 located at Plot no 3405/3406, GIDC Estate, Ankleshwar , Dist - Bharuch, Gujarat. F(.--'" ?

Size: px
Start display at page:

Download "dated to our Unit#2 located at Plot no 3405/3406, GIDC Estate, Ankleshwar , Dist - Bharuch, Gujarat. F(.--'" ?"

Transcription

1 3 t t J "..t,,. D ) \ f \ f \ - \! \Eftzvc'2ototrr 6 Aug, 2Ol2 United Phosphorus Limited 3l{t5tl4c. GrDG-.AEr 3fit 002, Guiaat (lndia) Ptut : (1116,5125O5ilA 2flXtdl Fax : (02646) 25143'f Dr. A Mehrotra, Director (S) Ministry of Environment and Forests Western Region Office Kendriya Paryavaran Bhavan Link Road # 3, E - 5, Ravi Shankar Nasar Bhopal (M.P) $ Responsible Caie Unit # 2 Plot # 3405 I 3406, GIDC, Ankleshwar V t \ f \ f IO I I b b I I :' I ro I I I Dear Sir; Sub: - Compliance to conditions of Environmental Cletrlanee Ref: - Enr-iroruuental clearance #J /77/2002- IA-l I dat_e,d_llu-2!03 Ktndlv refer above Environmental Clearance #J.t lA.ll dated to our Unit#2 located at Plot no 3405/3406, GIDC Estate, Ankleshwar , Dist - Bharuch, Gujarat. We are sending herewith the compliance report along with various other required ;information with respect to rrur unit #2 for your kind reference and records. The details given are withr respect to the period Jan io Jun i We would like to bring to your kind attention the following imgrovements at our Unit with respect to' environment. 1. Ambient Air monitoring as per new standard - started monitor for parameters PM10 and PM Effluent Discharge Line Extended upto B-Pumping Station (app. I Km) as suggested by GPCB We hope that the above is in order. In case you need any additional information, we can provide the same on hearing from you. Sa$ ioly af Errc nprt ir alro f'ov,cld irr qd Thanking you Yours faithfully For, United Phos t.s.o DRP N PARAMES Vice Presir dent -Env l.$ar?l F(.--'"?gtl glr':l w'r: "],0,3.ratd f{3 U *rz;,*',a.'--, a I V C \'c D \ a \ - \ >, tsd : 1l!116 ]I. C n L! tttr Red, Khar (\At), Mumbai. b lld -'fgrrl.rffi.f-.: (@2126(X0.167

2 a { \ a Encl : a/a Copy to: The Zonal Officer Central Pollution Control Board Parivesh Bhavan Opp VMC ward Office-10 Subhanpura, Baroda Mr.J D Kalyani - Regional Officer Gujarat Pollution Control Board Plot No1 501, GIDC,Ankleshwar I \ a a { a a a?

3 No Period Jan-Jun 2012 Compliance Report for the conditions in the Environmental Clearance # J.11011/77/2002-IA.II dated Issued by Ministry of Environment and Forests, New Delhi for United Phosphorus Ltd., Unit # 2, Ankleshwar, Gujarat Condition Description Status of Compliance Period: Jan-Jun 2012 The Ex Post Facto Environmental Clearance is granted for the following products; Phorate / 3600 MT / Year; and Complied. (2400 MT after product mix) 960 MT / Year (1920 MT after product mix) the product mix have been revised without increasing pollution load and after obtaining No Increase in Pollution Load certificate from GPCB. We have obtained product mix change and details attached in Annexure - A Land of project area is 65,625 m2. Project does not involve forest land and displacement of people. Water requirement is m 3 / day. Solid waste in form of ETP Sludge (7.5 MT / Month), incinerator ash (9 MT / Month) and Inorganic Salts from Evaporation System (30 MT / Month) will be disposed off in BEIL landfill. Public Hearing was done on GPCB has granted NOC for 300 MT / Month of Phorate / Turbuphos on ; and 80 MT / Month of Acephate on Cost of the project is Rs Crores. MOEF accords Environmental Clearance to the project under provisions of EIA Notification dated as amended subsequently subject to compliance of various special and general conditions; A SPECIFIC CONDITIONS 1 Gaseous emissions (SO 2, NO X, HCl, HC, NH 3, H 2 S, Cl 2 ) and PM from various process units to be conform to standards. At no time, emissions to go beyond standards. In case of failure of pollution control systems, unit should not be restarted until the systems are rectified to achieve desired efficiency Complied For all parameters monitoring is done through internally by our lab and externally trough M/s Enpro Envirotronics Pvt Ltd., Monitoring reports are attached for the period Jan to Jun 2012

4 No Period Jan-Jun 2012 Compliance Report for the conditions in the Environmental Clearance # J.11011/77/2002-IA.II dated Issued by Ministry of Environment and Forests, New Delhi for United Phosphorus Ltd., Unit # 2, Ankleshwar, Gujarat Condition Description Status of Compliance Period: Jan-Jun Fugitive emissions in workplace environment, product, raw material storage areas, to be monitored. Fugitive emissions containing solvent from process and storage tank vents and accidental leakage of EM and TBM to be subjected to thermal destruction in fume incinerator. Flue gas emissions from incinerator to conform to the standards prescribed by GPCB Complied Fugitive emission monitoring at various locations are being carried out by our Quality Assurance Department and data being maintained. Please refer enclosed details for fugitive emissions. Fume incinerator is in operation 3 Process emissions (H 2 S, NH 3, MeCl2, and VOC) to be scrubbed through venturi and packed column scrubbers and conform to prescribed standards. The efficiency of scrubber to be improved and maintained as per best practicable technology. VOC data to be monitored and submitted to the Ministry Complied VOC Monitoring is done and monitoring reports are attached

5 No Period Jan-Jun 2012 Compliance Report for the conditions in the Environmental Clearance # J.11011/77/2002-IA.II dated Issued by Ministry of Environment and Forests, New Delhi for United Phosphorus Ltd., Unit # 2, Ankleshwar, Gujarat Condition Description Status of Compliance Period: Jan-Jun As reflected in EIA / EMP Report, effluent generation not to exceed 218 m 3 / day. To reduce organic load, various effluent streams to be segregated and following treatment system to be followed; Organic waste water streams generated from process, low boilers and distillation residues generated from process, which are organic in nature, to be collected separately and incinerated Effluent stream containing high dissolved solids before discharging in solar evaporation pond having an area of 4000 sq m, to be treated suitably. Solvents from effluent to be recovered before discharging in solar evaporation pond. Besides, as reflected in EIA / EMP Report, aqueous stream containing high dissolved solid to be evaporated by installation of forced evaporation system with the help of steam Streams with high organic load (high COD and BOD) to be treated chemically with Hydrogen Peroxide and sent to ETP for treatment Dilute waste streams generated from process, utilities including blow downs of cooling towers and boilers, and waste water from softening plant and domestic waste water to be given primary, secondary and tertiary treatment. Treated effluent after conforming the standards, to be discharged in GIDC drain. The effluent quality before disposal to Amla Khadi, to be as follows; 5.5 to mg / l 100 mg / l 100 mg / l Complied Summarized data of effluent generation and quantity discharged is attached herewith for the period Jan to Jun 2012 Complied.Organic waste and Aqueous waste is being sent to common Incinerator, BEIL, Ankleshwar for incineration. Complied Four Reactors of forced evaporator are in operation. About 40 kl / day can be evaporated in this system. Details of quantity treated during Jan to Jun 2012 is attached herewith Complied In the chemical treatment section, effluent having high COD is treated with Hydrogen Peroxide. The treated effluent is further treated at ETP. Details of quantity treated during Jan to Jun 2012 is attached herewith Complied Primary, secondary and tertiary treatment facilities are in operation Company is sending treated effluent through GIDC drain to FETP, NCTL (BEAIL), and Ankleshwar for further treatment and disposal to deep sea. ETP has been expanded from 300 KLD capacity to 550 KLD capacity. In the new ETP System, we have utilized Membrane Bio Reactor (MBR), an advanced technology.

6 No Period Jan-Jun 2012 Compliance Report for the conditions in the Environmental Clearance # J.11011/77/2002-IA.II dated Issued by Ministry of Environment and Forests, New Delhi for United Phosphorus Ltd., Unit # 2, Ankleshwar, Gujarat Condition Description Status of Compliance Period: Jan-Jun 2012 Oil and 10 mg / l 1 mg / l 0.5 mg / l 5 Company to recover MECL (CH 3 CL) by installation of CH3CL recovery plant. Further, solvent recovery to be improved and attempts to be made to achieve at least 90 % recovery wherever possible. Rest solvent which can t be recovered, to be incinerated. Action plan to be submitted to Ministry within 3 months 6 Company to upgrade existing incinerator for incineration of hazardous waste. Organic aqueous and solid waste generated should be collected and incinerated for total destruction. As reflected in EIA / EMP Report, solid waste and ash to be stored in the plant premises in a pit with impervious flooring and leachate collection system. The ash and sludge from ETP to be finally disposed in BEIL landfill. Leachate to be sent to ETP for treatment 7 As per commitment given to Ministry, existing incineration system to be up graded by Company to also take membership of Common Incineration System of BEIL Complied. The Company has not manufactured Dichlorovos (one of products) at the site, which is major generator of MECL. Complied. Our Incinerator is dismantled. Company is utilizing Common Incinerator facility of BEIL, Ankleshwar. ETP sludge is being disposed to BEIL for landfilling. Leachate is taken to ETP for further treatment. Hazardous waste storage area constructed as per CPCB, Guideline. Complied. The Company has taken membership of the Common Incineration System being set up at BEIL. The company is sending incinerable material to BEIL, Ankleshwar for Incineration. Details are attached for the period Jan to Jun 2012

7 No Period Jan-Jun 2012 Compliance Report for the conditions in the Environmental Clearance # J.11011/77/2002-IA.II dated Issued by Ministry of Environment and Forests, New Delhi for United Phosphorus Ltd., Unit # 2, Ankleshwar, Gujarat Condition Description Status of Compliance Period: Jan-Jun Destruction efficiency of incinerator to be assessed by agency like CPCB and report submitted. Company to monitor VOC s and data submitted to Ministry / CPCB / GPCB regularly. 9 As per CREP, bio assay test method to be replaced by Toxicity Factor test method developed by CPCB. T f =4 to be achieved by December 2003 and T f =2 by July Action plan to be submitted within 3 months to Ministry 10 As per action plan submitted to Ministry, Company to adopt waste minimization and cleaner production techniques to reduce solvent, raw material, water and energy consumption. Company to install modified P 2 S 5 handling system with tote bins to prevent spillages. To reduce decontamination and disposal, company to re cycle the drums Complied. The Company has taken membership of the Common Incineration System set up at BEIL, Ankleshwar. The company has started sending incinerable material to BEIL, Ankleshwar for Incineration. Details are attached for the period Jan to Jun 2012 Complied. Reports of monitoring done are attached herewith for the period Jan to Jun 2012 Complied. This is an on going activity. Drums recycling for FG packing in Plants. Steam condensate is recycled in to Boilers. We have reduced the raw material consumption norms. We have increased Solvent recovery upto 96%. Vent scrubber provided for hazardous chemical storage tanks vents. Additional vent condenser provided and improved solvent recovery.

8 No Period Jan-Jun 2012 Compliance Report for the conditions in the Environmental Clearance # J.11011/77/2002-IA.II dated Issued by Ministry of Environment and Forests, New Delhi for United Phosphorus Ltd., Unit # 2, Ankleshwar, Gujarat Condition Description Status of Compliance Period: Jan-Jun Company to undertake rain water harvesting as per action plan submitted to this Ministry 12 Company to comply with environmental protection measures and safeguards recommended in EIA / EMP / RRA Reports as well as recommendations of Public Hearing Panel 13 Green belt of adequate width and density in project area of 1200 sq m in addition to 7642 sq m to be provided to mitigate effect of fugitive emissions all around plant. Development of green belt along boundary wall, open space and avenue roads, to be improved in consultation with local DFO as per CPCB guidelines Complied. The rain water harvesting system consists of collection of rain water from the total surface area of approximately 1400 m 2. The total rain water collection (considering 24 rain fall) comes to 840 kl in a year. The collected rain water is used in cooling tower make up. Also, part of the rain water collected is taken to storage tanks. The storage tank capacity is 650 kl. Complied. Complied. This is an ongoing activity. During Jan to Jun 2012, about 600 nos saplings have been planted

9 No Period Jan-Jun 2012 Compliance Report for the conditions in the Environmental Clearance # J.11011/77/2002-IA.II dated Issued by Ministry of Environment and Forests, New Delhi for United Phosphorus Ltd., Unit # 2, Ankleshwar, Gujarat Condition Description Status of Compliance Period: Jan-Jun As per policy decision taken by this Ministry, Company to earmark a separate 1 % of project cost (Rs Crores) for eco development measures including community welfare measures in project area. Amount to be deposited within 2 months in a separate account to be maintained by GPCB. Plans to be submitted to Ministry and GPCB within 3 months. After approval of action plan by GPCB, amount deposited may be released in two installments based on progress of implementation Complied. We have submitted details to GPCB as we have already spent more than Rs Lacs for eco development and other community welfare schemes. B GENERAL CONDITIONS 1 Company to adhere to stipulations made by GPCB Complied. 2 No further expansion / modifications in the plant to be carried out without prior approval of MOEF. In case of deviations / alterations in the project proposals from those submitted, a fresh reference to be made to Ministry to assess adequacy of conditions imposed and add additional environmental protection measures required, if any Complied. We have obtained Environmental Clearance # F. No. J-11011/1281/2007- IA(II) dated for proposed expansion of pesticide and Intermediate Products. Applied for consent to establish (NOC).We have obtained Consent to Establish (CTE) # issued by GPCB letter # GPCB/BRCH/CTE- 144(6)/ID-15832/84970 dated and received provisional Consent to operate for product mix change from GPCB details are attached in Annexure A

10 No Period Jan-Jun 2012 Compliance Report for the conditions in the Environmental Clearance # J.11011/77/2002-IA.II dated Issued by Ministry of Environment and Forests, New Delhi for United Phosphorus Ltd., Unit # 2, Ankleshwar, Gujarat Condition Description Status of Compliance Period: Jan-Jun Company to comply with MSIHC Rules Prior approvals of Chief Inspector of Factories, Chief Inspector of Explosives, Fire Safety Inspectorate etc, to be obtained 4 Company to comply with HWM Rules and authorization from GPCB to be obtained 5 Overall noise levels in and around plant area to be kept within the standards (85 dba) by providing noise control measures including acoustic hoods, silencers, enclosures etc, on all sources of noise generation. Ambient noise levels to conform to standards i.e. 75 dba (day time) and 70 dba (night time) Complied. The company is having various statutory licenses and approvals Complied. The unit was granted CCA vide no dated & dated which was valid up to Complied. Being monitored and found to be within limits Monitoring is done internally & Reports are attached herewith for the period Jan to Jun 2012

11 No Period Jan-Jun 2012 Compliance Report for the conditions in the Environmental Clearance # J.11011/77/2002-IA.II dated Issued by Ministry of Environment and Forests, New Delhi for United Phosphorus Ltd., Unit # 2, Ankleshwar, Gujarat Condition Description Status of Compliance Period: Jan-Jun Occupational health surveillance program to be undertaken as regular exercise for all employees, specifically for those engaged in handling hazardous substances. First aid facilities in OHC to be strengthened and medical records of each employee to be maintained. Complied. The company is having full time medical doctor and also OHC. Pre employment and routine medical examinations are being carried out. Regular BCA test for employees is also being carried out. All medical records are being maintained. Every two years, complete medical examination is carried out. The frequency of check up is as follows; Blood Cholinesterase Activity (BCA) Test is carried out every 15 days Brief Medical examination is done half yearly for blood, urine etc Full medical examination is done every alternate year including Physical examination, Hemoglobin,Complete Blood Count, ESR, Complete Urine Examination, Lever Function, Kidney Function, Creatinine, Blood Sugar, Electro Cardiogram, X Ray for chest and Sonography etc During the period Jan to Jun 2012 Medical check up done for 126 No s employees.

12 No Period Jan-Jun 2012 Compliance Report for the conditions in the Environmental Clearance # J.11011/77/2002-IA.II dated Issued by Ministry of Environment and Forests, New Delhi for United Phosphorus Ltd., Unit # 2, Ankleshwar, Gujarat Condition Description Status of Compliance Period: Jan-Jun A separate Environment Management Cell with full fledged laboratory to be set up to carry out the environmental management and monitoring functions 8 Company to provide adequate funds for recurring and non-recurring expenses to implement the conditions stipulated by MOEF as well as state government along with implementation schedule for all conditions stipulated. The funds should not be diverted for any other purposes 9 Implementation of the project and Environmental Action Plan to be monitored by MOEF, Regional Office at Bhopal, GPCB / CPCB. A six monthly compliance report to be submitted to monitoring agencies 10 Company to inform that public that project has been accorded Environmental Clearance by Ministry and copies are available with GPCB and may be seen at MOEF s web site. This should be advertised within 7 days in two local news papers and copies to be submitted to RO Complied. Environmental Cell is in operation. VP (Env) from Corporate Level supports the units in environmental compliances. The various environmental protection measures are coordinated by a Sr. Manager. Waste water analysis, bio assay test, ambient air monitoring, stack monitoring, solid waste analysis, noise level monitoring, VOC Monitoring are carried out. Also, environmental audit is being carried out Complied. The funds are already provided as a part of manufacturing activities and operation of ETP / Incinerator. Separate Cost Codes are also available Being complied. Half yearly reports is being sent during first week of February and August every year Complied. Advertisements were given in two news papers and copy submitted to MOEF

13 No Period Jan-Jun 2012 Compliance Report for the conditions in the Environmental Clearance # J.11011/77/2002-IA.II dated Issued by Ministry of Environment and Forests, New Delhi for United Phosphorus Ltd., Unit # 2, Ankleshwar, Gujarat Condition Description Status of Compliance Period: Jan-Jun Company to inform RO as well as Ministry, date of financial closure and final approval of the project by concerned authorities and date of commencing the land development work, if any - Ministry may revoke or suspend the clearance, if implementation of any of the conditions is not satisfactory - Ministry reserves the right to stipulate additional conditions if required. Company, in a time bound manner, will implement the same - The above conditions will be enforced inter-alia under provisions of various acts and rules Complied. Since this is an ex post-facto Environmental Clearance for an existing unit, this conditions is not applicable. Noted Noted Noted PRODUCTION DETAILS (QUANTITY IN MT) MONTH ACEPHATE PHORATE TERBUPHOS DETA DEVRINOL METAMITRON JAN FEB MAR APR MAY JUN

14 MONTH SURFLAN MT/M JAN 12 FEB 12 MAR 12 APR 12 MAY 12 JUN 12 ZnDTP MT/M ETHOFUMISATE MT/M METASYSTOX RVL MT/M FORMULATION PRODUCTS (QUANTITY IN MT) Solid Formulation products MONTH ACEPHATE 97 % JAN 12 FEB 12 MAR 12 APR 12 MAY 12 JUN 12 ACEPHATE 75 % PHORATE 10 % DEVRINOL 50 % DF SURFLAN 85 % Liquid formulation products MONTH JAN 12 FEB 12 MAR 12 APR 12 MAY 12 JUN 12 MONOCROTOPHOS (MCP 36 %) PQDC FORMULATION PD 50% METAMITRON 70 % WP

15 DETAILS OF WATER CONSUMPTION AND TREATED EFFLUENT DISCHARGE TO FETP, NCTL, ANKLESHWAR MONTH WATER CONSUMPTION ALL QUANTITIES IN KL TREATED EFFLUENT DISCHARGE QUANTITY ( INDUSTRIAL+ DOMESTIC) TO FETP, (NCTL, ANKLESHWAR JAN FEB MAR APR MAY JUN HIGH TDS EFFLUENT TREATMENT AT EVAPORATION SYSTEM MONTH Evaporation QTY KL/ MONTH JAN 12 FEB 12 MAR 12 APR 12 MAY 12 JUN

16 DETAILS OF HIGH COD EFFLUENT TREATMENT: CHEMICAL TREATMENT BY H 2 O 2 MONTH HIGH COD EFFLUENT CHEMICAL TREATMENT (H 2 O 2 TREATMENT) - QTY KL/MONTH JAN 12 FEB 12 MAR 12 APR 12 MAY 12 JUN INCINERATION WASTE DETAILS GENERATION DISPOSAL MONTH OP. STOCK ORGANIC PROCESS WASTE AQ PROCESS WASTE TOTAL (ORGANIC+ AQ PROCESS ) WASTE SENT TO BEIL, ANKLESHWAR FOR INCINERATION CL. STOCK ALL QTY IN MT JAN FEB MAR APR MAY JUN

17 MONTH OP STOCK ETP SOLID WASTE DETAILS GENERATION EVAPORATION SALT ALL QTY IN MT TOTAL SOLID(* )DISPOSAL TO BEIL MONTHLY CL. STOCK JAN FEB MAR APR MAY JUN TOTAL DISPOSAL QTY TO BEIL MT/M- LANDFILLING MONTH SOLIDS(*) PLASTIC WASTE INSULATION WASTE CONSTRUCTION DEBRIS*SENT TO BEIL FOR LANDFILLING TOTAL WASTE SENT TO BEIL FOR LANDFILLING ALL QTY IN MT JAN FEB MAR APR MAY JUN * Construction debris is generated from ETP expansion project activity and other construction work..

18 AMBIENT AIR ANALYSIS REPORT (INTERNAL LAB)

19 AMBIENT AIR ANALYSIS REPORT: SCRAP YARD MONTH JAN AREA/ DATE SPM SO2 NOX NH3 HCL CHLORINE LOCATION 500 µgm/m3 80 µgm/m3 80 µgm/m3 400 µgm/m3 200 µgm/m3 100 µgm/m3 SCRAP YARD 01/01/ Nil SCRAP YARD 03/01/ Nil... SCRAP YARD 05/01/ Nil SCRAP YARD 07/01/ Nil... SCRAP YARD 09/01/ Nil SCRAP YARD 11/01/ Nil... SCRAP YARD 13/01/ Nil SCRAP YARD 15/01/ Nil... SCRAP YARD 17/01/ Nil SCRAP YARD 19/01/ Nil... SCRAP YARD 21/01/ Nil SCRAP YARD 23/01/ Nil... SCRAP YARD 25/01/ Nil SCRAP YARD 27/01/ Nil... SCRAP YARD 29/01/12... Nil 30/01/ Nil... Maximum Minimum Average JAN %Deviation Nil Nil Nil Nil Nil Nil

20 MONTH FEB AREA/ DATE SPM SO2 NOX NH3 HCL CHLORINE LOCATION SCRAP YARD 02/02/ Nil SCRAP YARD 04/02/ Nil... SCRAP YARD 06/02/ Nil SCRAP YARD 08/02/ Nil... SCRAP YARD 10/02/ Nil SCRAP YARD 12/02/ Nil... SCRAP YARD 14/02/ Nil SCRAP YARD 16/02/ Nil... SCRAP YARD 18/02/ Nil SCRAP YARD 20/02/ Nil... SCRAP YARD 22/02/ Nil SCRAP YARD 24/02/ Nil... SCRAP YARD 26/02/ Nil SCRAP YARD 28/02/ Nil... Maximum Minimum Average FEB %Deviation Nil Nil Nil Nil Nil Nil

21 MONTH MARCH AREA/ DATE SPM SO2 NOX NH3 HCL CHLORINE LOCATION SCRAP YARD 01/03/ Nil... SCRAP YARD 03/03/ Nil SCRAP YARD 05/03/ Nil... SCRAP YARD 07/03/ Nil SCRAP YARD 09/03/ Nil... SCRAP YARD 11/03/ Nil SCRAP YARD 13/03/ Nil... SCRAP YARD 15/03/ Nil SCRAP YARD 17/03/ Nil... SCRAP YARD 19/03/ Nil SCRAP YARD 21/03/ Nil... SCRAP YARD 23/03/ Nil SCRAP YARD 25/03/ Nil... SCRAP YARD 27/03/ Nil SCRAP YARD 29/03/ Nil... SCRAP YARD 31/03/ Nil Maximum Minimum Average MAR %Deviation Nil Nil Nil Nil Nil Nil

22 MONTH APRIL-2012 AREA/ DATE SPM SO2 NOX NH3 HCL CHLORINE LOCATION SCRAP YARD 02/04/ Nil... SCRAP YARD 04/04/ Nil SCRAP YARD 06/04/ Nil... SCRAP YARD 08/04/ Nil SCRAP YARD 10/04/ Nil... SCRAP YARD 12/04/ Nil SCRAP YARD 14/04/ Nil... SCRAP YARD 16/04/ Nil SCRAP YARD 18/04/ Nil... SCRAP YARD 20/04/ Nil SCRAP YARD 22/04/ Nil... SCRAP YARD 24/04/ Nil SCRAP YARD 26/04/ Nil... SCRAP YARD 28/04/ Nil SCRAP YARD 30/04/ Nil... Maximum Minimum Average APR %Deviation Nil Nil Nil Nil Nil Nil

23 MONTH MAY-2012 AREA/ DATE SPM SO2 NOX NH3 HCL CHLORINE LOCATION SCRAP YARD 02/05/ Nil SCRAP YARD 04/05/ Nil... SCRAP YARD 06/05/ Nil SCRAP YARD 08/05/ Nil... SCRAP YARD 10/05/ Nil SCRAP YARD 12/05/ Nil... SCRAP YARD 14/05/ Nil SCRAP YARD 16/05/ Nil... SCRAP YARD 18/05/ Nil SCRAP YARD 20/05/ Nil... SCRAP YARD 22/05/ Nil SCRAP YARD 24/05/ Nil... SCRAP YARD 26/05/ Nil SCRAP YARD 28/05/ Nil... SCRAP YARD 30/05/ Nil Maximum Minimum Average MAY %Deviation Nil Nil Nil Nil Nil Nil

24 MONTH JUNE-2012 AREA/ DATE SPM SO2 NOX NH3 HCL CHLORINE LOCATION SCRAP YARD 01/06/ Nil SCRAP YARD 03/06/ Nil... SCRAP YARD 05/06/ Nil SCRAP YARD 07/06/ Nil... SCRAP YARD 09/06/ Nil SCRAP YARD 11/06/ Nil... SCRAP YARD 13/06/ Nil SCRAP YARD 15/06/ Nil... SCRAP YARD 17/06/ Nil SCRAP YARD 19/09/ Nil... SCRAP YARD 21/06/ Nil SCRAP YARD 23/06/ Nil... SCRAP YARD 25/06/ Nil SCRAP YARD 17/06/ Nil... SCRAP YARD 29/06/ Nil Maximum Minimum Average JUNE %Deviation Nil Nil Nil Nil Nil Nil

25 AMBIENT AIR ANALYSIS REPORT: ETP SIDE MONTH JAN AREA/ DATE SPM PM 10 SO2 NOX NH3 HCL CHLORINE LOCATION ETP SIDE 01/01/ Nil ETP SIDE 03/01/ Nil... ETP SIDE 05/01/ Nil ETP SIDE 07/01/ Nil... ETP SIDE 09/01/ Nil ETP SIDE 11/01/ Nil... ETP SIDE 13/01/ Nil ETP SIDE 15/01/ Nil... ETP SIDE 17/01/ Nil ETP SIDE 19/01/ Nil... ETP SIDE 21/01/ Nil ETP SIDE 23/01/ Nil... ETP SIDE 25/01/ Nil ETP SIDE 27/01/ Nil... ETP SIDE 29/01/ Nil 31/01/ Nil... Maximum Minimum Average JAN %Deviation Nil Nil Nil Nil Nil Nil Nil

26 MONTH FEB AREA/ DATE SPM PM 10 SO2 NOX NH3 HCL CHLORINE LOCATION ETP SIDE 02/02/ ETP SIDE 04/02/ Nil ETP SIDE 06/02/ ETP SIDE 08/02/ Nil ETP SIDE 10/02/ ETP SIDE 12/02/ Nil ETP SIDE 14/02/ ETP SIDE 16/02/ Nil ETP SIDE 18/02/ ETP SIDE 20/02/ Nil ETP SIDE 22/02/ ETP SIDE 24/02/ Nil ETP SIDE 26/02/ ETP SIDE 28/02/ Nil Maximum Minimum Average FEB %Deviation Nil Nil Nil Nil Nil Nil Nil

27 MONTH MARCH AREA/ DATE SPM PM 10 SO2 NOX NH3 HCL CHLORINE LOCATION ETP SIDE 01/03/ Nil... ETP SIDE 03/03/ Nil ETP SIDE 05/03/ Nil... ETP SIDE 07/03/ Nil ETP SIDE 09/03/ Nil... ETP SIDE 11/03/ Nil ETP SIDE 13/03/ Nil... ETP SIDE 15/03/ Nil ETP SIDE 17/03/ Nil... ETP SIDE 19/03/ Nil ETP SIDE 21/03/ Nil... ETP SIDE 23/03/ Nil ETP SIDE 25/03/ Nil... ETP SIDE 27/03/ Nil ETP SIDE 29/03/ Nil... ETP SIDE 31/03/ Nil Maximum Minimum Average MAR %Deviation Nil Nil Nil Nil Nil Nil Nil

28 MONTH APRIL-2012 AREA/ DATE SPM PM 10 SO2 NOX NH3 HCL CHLORINE LOCATION ETP SIDE 02/04/ Nil... ETP SIDE 04/04/ Nil ETP SIDE 06/04/ Nil... ETP SIDE 08/04/ Nil ETP SIDE 10/04/ Nil... ETP SIDE 12/04/ Nil ETP SIDE 14/04/ Nil... ETP SIDE 16/04/ Nil ETP SIDE 18/04/ Nil... ETP SIDE 20/04/ Nil ETP SIDE 22/04/ Nil... ETP SIDE 24/04/ Nil ETP SIDE 26/04/ Nil... ETP SIDE 28/04/ Nil ETP SIDE 30/04/ Nil... Maximum Minimum Average APR %Deviation Nil Nil Nil Nil Nil Nil Nil

29 MONTH MAY-2012 AREA/ DATE SPM PM 10 SO2 NOX NH3 HCL CHLORINE LOCATION ETP SIDE 02/05/ Nil ETP SIDE 04/05/ Nil... ETP SIDE 06/05/ Nil ETP SIDE 08/05/ Nil... ETP SIDE 10/05/ Nil ETP SIDE 12/ Nil... ETP SIDE 14/05/ Nil ETP SIDE 16/05/ Nil... ETP SIDE 18/05/ Nil ETP SIDE 20/05/ Nil... ETP SIDE 22/05/ Nil ETP SIDE 24/05/ Nil... ETP SIDE 26/05/ Nil ETP SIDE 28/05/ Nil... ETP SIDE 30/05/ Nil Maximum Minimum Average MAY %Deviation Nil Nil Nil Nil Nil Nil Nil

30 MONTH JUNE-2012 AREA/ LOCATION DATE SPM PM 10 SO2 NOX NH3 HCL CHLORINE ETP SIDE 01/06/ Nil ETP SIDE 03/06/ Nil... ETP SIDE 05/06/ Nil ETP SIDE 07/06/ Nil... ETP SIDE 09/06/ Nil ETP SIDE 11/06/ Nil... ETP SIDE 13/06/ Nil ETP SIDE 15/06/ Nil... ETP SIDE 17/06/ Nil ETP SIDE 19/09/ Nil... ETP SIDE 21/06/ Nil ETP SIDE 23/06/ Nil... ETP SIDE 25/06/ Nil ETP SIDE 17/06/ Nil... ETP SIDE 29/06/ Nil Maximum Minimum Average JUNE %Deviation Nil Nil Nil Nil Nil Nil Nil

31 AMBIENT AIR ANALYSIS REPORT: MAIN GATE MONTH JAN AREA/ DATE SPM PM 10 SO2 NOX NH3 HCL CHLORINE LOCATION MAIN GATE 01/01/ MAIN GATE 03/01/ Nil Nil MAIN GATE 05/01/ MAIN GATE 07/01/ Nil Nil MAIN GATE 09/01/ MAIN GATE 11/01/ Nil Nil MAIN GATE 13/01/ MAIN GATE 15/01/ Nil Nil MAIN GATE 17/01/ MAIN GATE 19/01/ Nil Nil MAIN GATE 21/01/ MAIN GATE 23/01/ Nil Nil MAIN GATE 25/01/ MAIN GATE 27/01/ Nil Nil MAIN GATE 29/01/ /01/ Nil Nil Maximum Minimum Average JAN %Deviation Nil Nil Nil Nil Nil Nil Nil

32 MONTH FEB AREA/ DATE SPM PM 10 SO2 NOX NH3 HCL CHLORINE LOCATION MAIN GATE 02/02/ Nil MAIN GATE 04/02/ Nil... MAIN GATE 06/02/ Nil MAIN GATE 08/02/ Nil... MAIN GATE 10/02/ Nil MAIN GATE 12/02/ Nil... MAIN GATE 14/02/ Nil MAIN GATE 16/02/ Nil... MAIN GATE 18/02/ Nil MAIN GATE 20/02/ Nil... MAIN GATE 22/02/ Nil MAIN GATE 24/02/ Nil... MAIN GATE 26/02/ Nil MAIN GATE 28/02/ Nil... Maximum Minimum Average FEB %Deviation Nil Nil Nil Nil Nil Nil Nil

33 MONTH MARCH AREA/ DATE SPM PM 10 SO2 NOX NH3 HCL CHLORINE LOCATION MAIN GATE 01/03/ Nil... MAIN GATE 03/03/ Nil MAIN GATE 05/03/ Nil... MAIN GATE 07/03/ Nil MAIN GATE 09/03/ Nil... MAIN GATE 11/03/ Nil MAIN GATE 13/03/ Nil... MAIN GATE 15/03/ Nil MAIN GATE 17/03/ Nil... MAIN GATE 19/03/ Nil MAIN GATE 21/03/ Nil... MAIN GATE 23/03/ Nil MAIN GATE 25/03/ Nil... MAIN GATE 27/03/ Nil MAIN GATE 29/03/ Nil... MAIN GATE 31/03/ Nil Maximum Minimum Average MAR %Deviation Nil Nil Nil Nil Nil Nil Nil

34 MONTH APRIL-2012 AREA/ DATE SPM PM 10 SO2 NOX NH3 HCL CHLORINE LOCATION MAIN GATE 02/04/ Nil... MAIN GATE 04/04/ Nil MAIN GATE 06/04/ Nil... MAIN GATE 08/04/ Nil MAIN GATE 10/04/ Nil... MAIN GATE 12/04/ Nil MAIN GATE 14/04/ Nil... MAIN GATE 16/04/ Nil MAIN GATE 18/04/ Nil... MAIN GATE 20/04/ Nil MAIN GATE 22/04/ Nil... MAIN GATE 24/04/ Nil MAIN GATE 26/04/ Nil... MAIN GATE 28/04/ Nil MAIN GATE 30/04/ Nil... Maximum Minimum Average APR %Deviation Nil Nil Nil Nil Nil Nil Nil

35 MONTH MAY-2012 AREA/ DATE SPM PM 10 SO2 NOX NH3 HCL CHLORINE LOCATION MAIN GATE 02/05/ Nil MAIN GATE 04/05/ Nil... MAIN GATE 06/05/ Nil MAIN GATE 08/05/ Nil... MAIN GATE 10/05/ Nil MAIN GATE 12/ Nil... MAIN GATE 14/05/ Nil MAIN GATE 16/05/ Nil... MAIN GATE 18/05/ Nil MAIN GATE 20/05/ Nil... MAIN GATE 22/05/ Nil MAIN GATE 24/05/ Nil... MAIN GATE 26/05/ Nil MAIN GATE 28/05/ Nil... MAIN GATE 30/05/ Nil Maximum Minimum Average MAY %Deviation Nil Nil Nil Nil Nil Nil Nil

36 MONTH JUNE 2012 AREA/ DATE SPM PM 10 SO2 NOX NH3 HCL CHLORINE LOCATION MAIN GATE 01/06/ Nil MAIN GATE 03/06/ Nil... MAIN GATE 05/06/ Nil MAIN GATE 07/06/ Nil... MAIN GATE 09/06/ Nil MAIN GATE 11/06/ Nil... MAIN GATE 13/06/ Nil MAIN GATE 15/06/ Nil... MAIN GATE 17/06/ Nil MAIN GATE 19/09/ Nil... MAIN GATE 21/06/ Nil MAIN GATE 23/06/ Nil... MAIN GATE 25/06/ Nil MAIN GATE 17/06/ Nil... MAIN GATE 29/06/ Nil Maximum Minimum Average JUNE %Deviation Nil Nil Nil Nil Nil Nil Nil

37 Month LOCATION DATE OF PM2.5 January Near Boiler area SAMPLIN G UNITED PHOSPHORUS LTD,UNIT #2 Plot No 3405/3406, GIDC ANKLESHWAR AMBIENT AIR ANALYSIS REPORT Jan-June 2012 (By Mahabal Enviro Engineers Pvt. Ltd) Jan-Mar 2012 (By Enpro Enviro Tech & Engineers Pvt. Ltd) Apr-Jun µg /m 3 RSPM (PM10) 100 µg /m 3 SOx NOx HCL NH3 H2S H.C. 80 µg /m 3 80 µg /m µg /m µg /m µg /m µg /m 3 CHLORI NE 100 µg /m BDL BDL BDL BDL HF 60 µg /m 3 Feburary Near Boiler area BDL BDL BDL BDL March Near Boiler area BDL BDL BDL BDL April Near Boiler area BDL BDL BDL BDL May Near Boiler area BDL BDL BDL BDL June Near Boiler area BDL BDL BDL BDL

38 Sr. No. 1 UNITED PHOSPHORUS LTD, UNIT #2 Plot No 3405/3406, GIDC ANKLESHWAR STACK MONITORING REPORT (By Mahabal Enviro Engineers Pvt. Ltd): Jan-2012 AREA IDENTIFICATION DATE OF HCL CHLORINE NH3 NOX SPM SO2 H2S (STACK) SAMPLING 20 mg/nm mg/nm 3 FUME INCINERATOR 30 mg/nm 3 50 mg/nm 3 20 mg/nm 3 40 mg/nm mg/nm BDL BDL BDL 9.2 BDL 7.4 BDL 2 IN DEVRINOL PLANT STACK ( FOR FORMULATION PLANT) Plant not in operation 3 ALKALI SCRUBBER ( H2S VENT) P2S5 CHARGING HOOPER Plant not in operation 5 LOCAL VENT CARBON FILTER Plant not in operation 6 IN ACEPHATE PLANT STACK NH3 SCRUBBER IN POSHPOMIDON PLANT STACK WATER SCRUBBER IN DEVRINOL PLANT STACK CPC SCRUBBER AREA IDENTIFICATION DATE OF SPM SO2 NOX (STACK) SAMPLING 150 mg/nm ppm 50 ppm 9 BOILER GT NOT IN OPERATION 10 BOILER GT BDL BDL IN INCINERATOR PLANT STACK AQUEOUS & SOLID WASTE INCINERATOR Remarks:-When AQ.& SOLID WASTE INCINERATOR not in operation, PLANT UNDER SHUT DOWN.

39 UNITED PHOSPHORUS LTD, UNIT #2 Plot No 3405/3406, GIDC ANKLESHWAR STACK MONITORING REPORT (By Mahabal Enviro Engineers Pvt. Ltd): Feb-2012 Sr. No. AREA IDENTIFICATION DATE OF HCL CHLORINE NH3 NOX SPM SO2 H2S (STACK) SAMPLING 20 mg/nm mg/nm 3 30 mg/nm 3 50 mg/nm 3 20 mg/nm 3 40 mg/nm mg/nm 3 1 FUME INCINERATOR 14/02/12 BDL BDL BDL 16.7 BDL 9.3 BDL 2 IN DEVRINOL PLANT STACK ( FOR FORMULATION PLANT) 14/02/12 Plant not in operation 3 ALKALI SCRUBBER ( H2S VENT) 14/02/ P2S5 CHARGING HOOPER 14/02/12 Plant not in operation 5 LOCAL VENT CARBON FILTER 14/02/12 Plant not in operation 6 IN ACEPHATE PLANT STACK NH3 SCRUBBER 14/02/ IN POSHPOMIDON PLANT STACK WATER SCRUBBER 14/02/12 Plant not in operation 8 IN DEVRINOL PLANT STACK CPC SCRUBBER 14/02/ AREA IDENTIFICATION DATE OF SPM SO2 NOX (STACK) SAMPLING 150 mg/nm ppm 50 ppm 9 BOILER GT /02/12 NOT IN OPERATION 10 BOILER GT /02/12 BDL BDL IN INCINERATOR PLANT STACK AQUEOUS & SOLID WASTE INCINERATOR Remarks:-When AQ.& SOLID WASTE INCINERATOR not in operation, PLANT UNDER SHUT DOWN.

40 Sr. No. UNITED PHOSPHORUS LTD, UNIT #2 Plot No 3405/3406, GIDC ANKLESHWAR STACK MONITORING REPORT (By Mahabal Enviro Engineers Pvt. Ltd): Mar-2012 AREA IDENTIFICATION DATE OF HCL CHLORINE NH3 NOX SPM SO2 H2S (STACK) SAMPLING 20 mg/nm mg/nm 3 30 mg/nm 3 50 mg/nm 3 20 mg/nm 3 40 mg/nm mg/nm 3 1 FUME INCINERATOR 14/03/12 BDL BDL BDL 14.3 BDL 10.3 BDL 2 IN DEVRINOL PLANT STACK ( FOR FORMULATION PLANT) 14/03/12 Plant not in operation 3 ALKALI SCRUBBER ( H2S VENT) 14/03/ P2S5 CHARGING HOOPER 14/03/12 Plant not in operation 5 LOCAL VENT CARBON FILTER 14/03/12 Plant not in operation 6 IN ACEPHATE PLANT STACK NH3 SCRUBBER 14/03/ IN POSHPOMIDON PLANT STACK WATER SCRUBBER 14/03/12 NOT IN OPERATION 8 IN DEVRINOL PLANT STACK CPC SCRUBBER 14/03/12 NOT IN OPERATION AREA IDENTIFICATION DATE OF SPM SO2 NOX (STACK) SAMPLING 150 mg/nm ppm 50 ppm 9 BOILER GT /03/12 BDL BDL BOILER GT /03/12 NOT IN OPERATION 11 IN INCINERATOR PLANT STACK AQUEOUS & SOLID WASTE INCINERATOR Remarks:-When AQ.& SOLID WASTE INCINERATOR not in operation, PLANT UNDER SHUT DOWN.

41 Sr. No. UNITED PHOSPHORUS LTD, UNIT #2 Plot No 3405/3406, GIDC ANKLESHWAR STACK MONITORING REPORT (By Enpro Enviro Tech & Engineers Pvt. Ltd): Apr 2012 AREA IDENTIFICATION DATE OF HCL CHLORINE NH3 NOX SPM SO2 H2S (STACK) SAMPLING 20 mg/nm mg/nm 3 30 mg/nm 3 50 mg/nm 3 20 mg/nm 3 40 mg/nm mg/nm 3 1 FUME INCINERATOR 20/04/12 BDL BDL BDL 11.8 BDL 8.2 BDL 2 IN DEVRINOL PLANT STACK ( FOR FORMULATION PLANT) NOT IN OPERATION 3 ALKALI SCRUBBER ( H2S VENT) 20/04/ P2S5 CHARGING HOOPER 20/04/12 NOT IN OPERATION 5 LOCAL VENT CARBON FILTER NOT IN OPERATION 6 IN ACEPHATE PLANT STACK NH3 SCRUBBER 20/04/ IN POSHPOMIDON PLANT STACK WATER SCRUBBER 20/04/12 NOT IN OPERATION 8 IN DEVRINOL PLANT STACK CPC SCRUBBER 20/04/12 10 AREA IDENTIFICATION DATE OF SPM SO2 NOX (STACK) SAMPLING 150 mg/nm ppm 50 ppm 9 BOILER GT /04/12 BDL BDL BOILER GT /04/12 BDL BDL IN INCINERATOR PLANT STACK AQUEOUS & SOLID WASTE INCINERATOR Remarks:-When AQ.& SOLID WASTE INCINERATOR not in operation, PLANT UNDER SHUT DOWN.

42 Sr. No. UNITED PHOSPHORUS LTD, UNIT #2 Plot No 3405/3406, GIDC ANKLESHWAR STACK MONITORING REPORT (By Enpro Enviro Tech & Engineers Pvt. Ltd): May 2012 AREA IDENTIFICATION DATE OF HCL CHLORINE NH3 NOX SPM SO2 H2S (STACK) SAMPLING 20 mg/nm mg/nm 3 30 mg/nm 3 50 mg/nm 3 20 mg/nm 3 40 mg/nm mg/nm 3 1 FUME INCINERATOR 19/05/12 BDL BDL BDL 8.9 BDL 5.2 BDL 2 IN DEVRINOL PLANT STACK ( FOR FORMULATION PLANT) 19/05/12 NOT IN OPERATION 3 ALKALI SCRUBBER ( H2S VENT) 19/05/ P2S5 CHARGING HOOPER 19/05/12 NOT IN OPERATION 5 LOCAL VENT CARBON FILTER 19/05/12 NOT IN OPERATION 6 IN ACEPHATE PLANT STACK NH3 SCRUBBER 19/05/ IN POSHPOMIDON PLANT STACK WATER SCRUBBER 19/05/12 NOT IN OPERATION 8 IN DEVRINOL PLANT STACK CPC SCRUBBER 19/05/ AREA IDENTIFICATION DATE OF SPM SO2 NOX (STACK) SAMPLING 150 mg/nm ppm 50 ppm 9 BOILER GT /05/12 BDL BDL BOILER GT /05/12 BDL BDL IN INCINERATOR PLANT STACK AQUEOUS & SOLID WASTE INCINERATOR Remarks:-When AQ.& SOLID WASTE INCINERATOR not in operation, PLANT UNDER SHUT DOWN.

43 Sr. No. UNITED PHOSPHORUS LTD, UNIT #2 Plot No 3405/3406, GIDC ANKLESHWAR STACK MONITORING REPORT (By Enpro Enviro Tech & Engineers Pvt. Ltd): Jun 12 AREA IDENTIFICATION DATE OF HCL CHLORINE NH3 NOX SPM SO2 H2S (STACK) SAMPLING 20 mg/nm mg/nm 3 30 mg/nm 3 50 mg/nm 3 20 mg/nm 3 40 mg/nm mg/nm 3 1 FUME INCINERATOR 16/06/12 BDL BDL BDL 10.3 BDL IN DEVRINOL PLANT STACK ( FOR FORMULATION PLANT) 16/06/12 NOT IN OPERATION 3 ALKALI SCRUBBER ( H2S VENT) 16/06/ P2S5 CHARGING HOOPER 16/06/12 NOT IN OPERATION 5 LOCAL VENT CARBON FILTER 16/06/12 NOT IN OPERATION 6 IN ACEPHATE PLANT STACK NH3 SCRUBBER 16/06/ IN POSHPOMIDON PLANT STACK WATER SCRUBBER 16/06/12 NOT IN OPERATION 8 IN DEVRINOL PLANT STACK CPC SCRUBBER 16/06/ AREA IDENTIFICATION DATE OF SPM SO2 NOX (STACK) SAMPLING 150 mg/nm ppm 50 ppm 9 BOILER GT /06/12 BDL BDL BOILER GT /06/12 BDL BDL IN INCINERATOR PLANT STACK AQUEOUS & SOLID WASTE INCINERATOR Remarks:-When AQ.& SOLID WASTE INCINERATOR not in operation, PLANT UNDER SHUT DOWN.

44 Sr. No. 1 UNITED PHOSPHORUS LTD, UNIT #2 Plot No 3405/3406, GIDC ANKLESHWAR STACK MONITORING REPORT (By Our Internal Lab.): Jan 2012 AREA IDENTIFICATION DATE OF HCL CHLORINE NH3 NOX SPM SO2 H2S (STACK) SAMPLING 20 mg/nm3 FUME INCINERATOR 5.0 mg/nm3 30 mg/nm3 50 mg/nm3 20 mg/nm3 40 mg/nm3 5.0 mg/nm3 05/01/12 NIL NIL NIL NIL 20/01/12 NIL NIL NIL NIL IN DEVRINOL PLANT STACK ( FOR FORMULATION PLANT) ALKALI SCRUBBER ( H2S VENT) P2S5 CHARGING HOPPER LOCAL VENT CARBON FILTER IN ACEPHATE PLANT STACK NH3 SCRUBBER IN POSHPOMIDON PLANT STACK WATER SCRUBBER 05/01/12 Plant not in operation 20/01/12 05/01/ /01/ /01/ /01/ /01/12 NIL 20/01/12 NIL 05/01/ /01/12 05/01/12 20/01/12 Plant not in operation Plant not in operation 8 IN DEVRINOL PLANT STACK CPC SCRUBBER 05/01/12 20/01/12 Plant not in operation AREA IDENTIFICATION DATE OF SPM SO2 NOX (STACK) SAMPLING 150 mg/nm3 100 ppm 50 ppm 9 BOILER GT /01/ /01/ BOILER GT /01/ IN INCINERATOR PLANT STACK AQUEOUS & SOLID WASTE INCINERATOR PREPARED BY : JAYESH R. PATIL 22/01/ Remarks:-When AQ.& SOLID WASTE INCINERATOR not in operation, PLANT UNDER SHUT DOWN. HOD ( Q.A.)

45 Sr. No. 1 2 UNITED PHOSPHORUS LTD, UNIT #2 Plot No 3405/3406, GIDC ANKLESHWAR STACK MONITORING REPORT (By Our Internal Lab): Feb 2012 AREA IDENTIFICATION DATE OF HCL CHLORINE NH3 NOX SPM SO2 H2S (STACK) SAMPLING 20 mg/nm3 FUME INCINERATOR IN DEVRINOL PLANT STACK ( FOR FORMULATION PLANT) 5.0 mg/nm3 30 mg/nm3 50 mg/nm3 20 mg/nm3 40 mg/nm3 5.0 mg/nm3 05/02/12 NIL NIL NIL NIL 20/02/12 NIL NIL NIL NIL 05/02/12 20/02/12 Plant not in operation ALKALI SCRUBBER ( H2S VENT) P2S5 CHARGING HOOPER LOCAL VENT CARBON FILTER IN ACEPHATE PLANT STACK NH3 SCRUBBER 05/02/ /02/ /02/ /02/ /02/12 NIL 20/02/12 NIL 05/02/ /02/ IN POSHPOMIDON PLANT STACK WATER SCRUBBER IN DEVRINOL PLANT STACK CPC SCRUBBER 05/02/12 20/02/12 05/02/12 20/02/12 Plant not in operation Plant not in operation Plant not in operation AREA IDENTIFICATION DATE OF SPM SO2 NOX (STACK) SAMPLING 150 mg/nm3 100 ppm 50 ppm 9 BOILER GT /02/ /02/ BOILER GT /02/ IN INCINERATOR PLANT STACK AQUEOUS & SOLID WASTE INCINERATOR PREPARED BY : JAYESH R. PATIL 22/02/ Remarks:-When AQ.& SOLID WASTE INCINERATOR not in operation, PLANT UNDER SHUT DOWN. HOD ( Q.A.)

46 Sr. No. 1 2 UNITED PHOSPHORUS LTD, UNIT #2 Plot No 3405/3406, GIDC ANKLESHWAR STACK MONITORING REPORT (By Our Internal Lab): MARCH 2012 AREA IDENTIFICATION DATE OF HCL CHLORINE NH3 NOX SPM SO2 H2S (STACK) SAMPLING 20 mg/nm3 FUME INCINERATOR IN DEVRINOL PLANT STACK ( FOR FORMULATION PLANT) 5.0 mg/nm3 30 mg/nm3 50 mg/nm3 20 mg/nm3 40 mg/nm3 5.0 mg/nm3 05/03/12 NIL NIL NIL NIL 20/03/12 NIL NIL NIL NIL 05/03/12 20/03/12 Plant not in operation ALKALI SCRUBBER ( H2S VENT) P2S5 CHARGING HOOPER LOCAL VENT CARBON FILTER IN ACEPHATE PLANT STACK NH3 SCRUBBER 05/03/ /03/ /03/ /03/ /03/12 NIL 20/03/12 NIL 05/03/ /03/ IN POSHPOMIDON PLANT STACK WATER SCRUBBER 05/03/12 20/03/12 PLANT NOT IN OPERATION 8 IN DEVRINOL PLANT STACK CPC SCRUBBER 05/03/12 20/03/12 Plant not in operation AREA IDENTIFICATION DATE OF SPM SO2 NOX (STACK) SAMPLING 150 mg/nm3 100 ppm 50 ppm 9 BOILER GT /03/ /03/ BOILER GT /03/ IN INCINERATOR PLANT STACK AQUEOUS & SOLID WASTE INCINERATOR PREPARED BY : JAYESH R. PATIL 25/03/ Remarks:-When AQ.& SOLID WASTE INCINERATOR not in operation, PLANT UNDER SHUT DOWN. HOD ( Q.A.)

2013 # J.11011/77/2002-IA.II

2013 # J.11011/77/2002-IA.II Page 1 of 55 Page 2 of 55 Period January to June 2013 Compliance Report for the conditions in Environmental Clearance # J.11011/77/2002-IA.II dated 17.07.2003 Issued by Ministry of Environment and Forests,

More information

August 11, 2016 Unit # 02 Plot # 3405 / 3406 / 3460-A, GIDC, Ankleshwar

August 11, 2016 Unit # 02 Plot # 3405 / 3406 / 3460-A, GIDC, Ankleshwar August 11, 2016 Unit # 02 Plot # 3405 / 3406 / 3460-A, GIDC, Ankleshwar 393 002 The Director Ministry of Environment, Forests & Climate Change Western Region Office Kendriya Paryavaran Bhavan Link Road

More information

A SPECIFIC CONDITIONS

A SPECIFIC CONDITIONS No Period January to June 2015 Compliance Report for the conditions in the Environmental Clearance # J.11011/77/2002-IA.II dated 17.07.2003 Issued by Ministry of Environment and Forests, New Delhi for

More information

# J.11011/77/2002-IA.II

# J.11011/77/2002-IA.II No Period July to December 2015 Compliance Report for the conditions in the Environmental Clearance # J.11011/77/2002-IA.II dated 17.07.2003 Issued by Ministry of Environment and Forests, New Delhi for

More information

Sub: - Half yearly Compliance Report to conditions of Environmental Clearance (Jan to June 2014)

Sub: - Half yearly Compliance Report to conditions of Environmental Clearance (Jan to June 2014) Ref: U2/15 February 14, 2015 Unit # 02 Plot # 405 / 406/460A, GIDC, Ankleshwar 9 002 Dr. A Mehrotra, Director (S) Ministry of Environment and Forests Western Region Office Kendriya Paryavaran Bhavan Link

More information

Ref: U2/14 July 10, 2014 Unit # 02 Plot # 3405 / 3406/3460A, GIDC, Ankleshwar

Ref: U2/14 July 10, 2014 Unit # 02 Plot # 3405 / 3406/3460A, GIDC, Ankleshwar Ref: U2/14 July 10, 2014 Unit # 02 Plot # 3405 / 3406/3460A, GIDC, Ankleshwar 393 002 Dr. A Mehrotra, Director (S) Ministry of Environment and Forests Western Region Office Kendriya Paryavaran Bhavan Link

More information

4. The ambient air quality monitoring stations We are monitoring the ambient air quality

4. The ambient air quality monitoring stations We are monitoring the ambient air quality GLOBAL CALCIUM PRIVATE LTD., 125&126, SIPCOT COMPLEX, HOSUR 635 126 Ref : No. J-11011/411/2006-IA-II(I) dated 1 st August 2007. Compliance Report for the Period ending 31.3.2015 Sl. Specific Conditions

More information

ANNEXURE 1 - THE DETAILS OF PRODUCTION QANTITIES

ANNEXURE 1 - THE DETAILS OF PRODUCTION QANTITIES ANNEXURE 1 - THE DETAILS OF PRODUCTION QANTITIES Sr. No Name of Products Quantity in MT/M Category Sr. No Name of Products Quantity in MT/M Category Sr. No Name of Products Quantity in MT/M Category Sr.

More information

State Level Environment Impact Assessment Authority Madhya Pradesh Government of India Ministry of Environment & Forests

State Level Environment Impact Assessment Authority Madhya Pradesh Government of India Ministry of Environment & Forests State Level Environment Impact Assessment Authority Madhya Pradesh Government of India Ministry of Environment & Forests Madhya Pradesh Pollution Control Board E 5. Arera Colony Bhopal 4620 16 visit us

More information

Chambal Fertilisers and Chemicals Limited CFG3 Project Environment Clearance_ Compliance Report (Feb 28, 2018)

Chambal Fertilisers and Chemicals Limited CFG3 Project Environment Clearance_ Compliance Report (Feb 28, 2018) Chambal Fertilisers and Chemicals Limited CFG3 Project Environment Clearance_ Compliance Report (Feb 28, 2018) Reference: Environment clearance to CFG3 Project vides MOEF letter.no. J-11011/664/2008-IAII

More information

HALF YEARLY COMPLIANCE REPORT OF ENVIRONMENTAL CLEARANCE CONDITIONS

HALF YEARLY COMPLIANCE REPORT OF ENVIRONMENTAL CLEARANCE CONDITIONS HALF YEARLY COMPLIANCE REPORT OF ENVIRONMENTAL CLEARANCE CONDITIONS 1. Name of the Project: M/s MCC PTA India Corp. Private Limited Haldia ( WB) Note: Company Name was change from MCC PTA India Corp.Private

More information

DESCRIPTIVE REPORT ON STATUS OF COMPLIANCE TO THE CONDITIONS OF ENVIRONMENTAL CLEARANCE AND ENVIRONMENTAL MANAGEMENT

DESCRIPTIVE REPORT ON STATUS OF COMPLIANCE TO THE CONDITIONS OF ENVIRONMENTAL CLEARANCE AND ENVIRONMENTAL MANAGEMENT DESCRIPTIVE REPORT ON STATUS OF COMPLIANCE TO THE CONDITIONS OF ENVIRONMENTAL CLEARANCE AND ENVIRONMENTAL MANAGEMENT Subject: Compliance report of Environmental Clearance for CDR & Revamp Reference: J-11011/272/2007-IA,

More information

To The Member Secretary State Expert Appraisal Committee Paryavaran Bhavan Sector 10 A Gandhinagar

To The Member Secretary State Expert Appraisal Committee Paryavaran Bhavan Sector 10 A Gandhinagar March 18, 2019 BY HAND DELIVERY/RPAD To The Member Secretary State Expert Appraisal Committee Paryavaran Bhavan Sector 10 A Gandhinagar 382 010 SUB.: APPLICATION FOR SUBMISSION OF ESSENTIAL DETAIL SOUGHT

More information

Environmental Clearance; Letter No J / 152 / 2006-IA-II (I) Dt and corrigendum dated

Environmental Clearance; Letter No J / 152 / 2006-IA-II (I) Dt and corrigendum dated Environmental Clearance; Letter No J-11011 / 152 / 2006-IA-II (I) Dt. 21.05.2007 and corrigendum dated 18.09.2007 For Revamping of Ammonia and Urea Plant at Gadepan, Kota; Rajasthan by M/S Chambal Fertilisers

More information

Environmental Clearance; Letter No J / 152 / 2006-IA-II (I) Dt and corrigendum dated

Environmental Clearance; Letter No J / 152 / 2006-IA-II (I) Dt and corrigendum dated Environmental Clearance; Letter No J-11011 / 152 / 2006-IA-II (I) Dt. 21.05.2007 and corrigendum dated 18.09.2007 For Revamping of Ammonia and Urea Plant at Gadepan, Kota; Rajasthan by M/S Chambal Fertilisers

More information

COMPLIANCE STATUS REPORT

COMPLIANCE STATUS REPORT COMPLIANCE STATUS REPORT Sona Alloys Pvt. Ltd. Additional Director (IA) Ministry of Environment & Forests, Paryavaran Bhavan, CGO Complex, Lodhi Road, New Delhi 11003 Date: 08.02.2014 Sub: Compliance Status

More information

Calcom Cement India Limited

Calcom Cement India Limited Calcom Cement India Limited (Subsidiary of DALMIA BHARAT CEMENT LIMITED) 2 No. Pipalpukhuri, Lanka, Dist. Nagaon, Assam 782446 Ref: MOEF, New Delhi Environment Clearance F. No. J-1101/312/2006-IA.II (I)

More information

J-11011/45/2009- IA II (I)

J-11011/45/2009- IA II (I) SL SPECIFIC CONDITIONS STATUS 1 Continuous stack monitoring facilities to monitor gaseous emissions from all the stacks shall be provided. The particulate emissions shall be controlled within 50 mg/nm

More information

Clearance Letter no. : MoEF Vide Letter no. J-11011/79/2003-IA-II (I) dated April 21, 2004

Clearance Letter no. : MoEF Vide Letter no. J-11011/79/2003-IA-II (I) dated April 21, 2004 Name of the Project: Jaypee Rewa Plant, Unit of M/s Jaiprakash Associates Limited for expansion Of cement production from 2.5 MTPA to 3.5 MTPA at Jaypee Nagar, District Rewa, Madhya Pradesh Project Code:

More information

Shri Gurudatt Sugars Ltd., Gat No. 61/A, Akiwat - Takaliwadi Road, Takaliwadi , Taluka - Shirol, Dist Kolhapur, Maharashtra

Shri Gurudatt Sugars Ltd., Gat No. 61/A, Akiwat - Takaliwadi Road, Takaliwadi , Taluka - Shirol, Dist Kolhapur, Maharashtra Shri Gurudatt Sugars Ltd., Gat No. 61/A, Akiwat - Takaliwadi Road, Takaliwadi - 416108, Taluka - Shirol, Dist Kolhapur, Maharashtra Compliance of Conditions Stipulated in environmental clearance granted

More information

MONITORING THE IMPLEMENTATION OF ENVIRONMENTAL SAFEGUARDS Ministry of Environment & Forests Regional Office (W), Bhopal Monitoring Report Part-I

MONITORING THE IMPLEMENTATION OF ENVIRONMENTAL SAFEGUARDS Ministry of Environment & Forests Regional Office (W), Bhopal Monitoring Report Part-I MONITORING THE IMPLEMENTATION OF ENVIRONMENTAL SAFEGUARDS Ministry of Environment & Forests Regional Office (W), Bhopal Monitoring Report Part-I DATA SHEET 01 Project type : Cement Date: 24.11.2015 02

More information

COMPLIANCE REPORT OF ENVIRONMENTAL CLEARANCE FOR THE PERIOD OF APRIL-2016 TO SEPTEMBER F. No. J-11011/309/2011-IA-ll (I)

COMPLIANCE REPORT OF ENVIRONMENTAL CLEARANCE FOR THE PERIOD OF APRIL-2016 TO SEPTEMBER F. No. J-11011/309/2011-IA-ll (I) COMPLIANCE REPORT OF ENVIRONMENTAL CLEARANCE FOR THE PERIOD OF APRIL-2016 TO SEPTEMBER-2016 F. No. J-11011/309/2011-IA-ll (I) SUBMITTED BY- M/S. GASGEN FERRO ALLOYS LLP LOHIA HOUSE, 2ND FLOOR M.G.ROAD,

More information

F. No. J-11011/480/2007-IA II (I) Government of India Ministry of Environment and Forests (I.A Division)

F. No. J-11011/480/2007-IA II (I) Government of India Ministry of Environment and Forests (I.A Division) To, M/s. Madras Cement Ltd. V Floor 98-A, Dr. Radhakrishnan Road Mylapore Chennai 600 004 Tamilnadu F. No. J-11011/480/2007-IA II (I) Government of India Ministry of Environment and Forests (I.A Division)

More information

Subject: Half yearly Report for the period of 1 st April 2013 to 30 th Sept., 2013 for Indmax Project

Subject: Half yearly Report for the period of 1 st April 2013 to 30 th Sept., 2013 for Indmax Project IOC/BGR/ENV/INDMAX/MoEF/2013-14/01 Date: 19.11.2013 To The Chief Conservator of Forests Regional Office, North East Region Ministry of Environment & Forests Law-U-SIB, Lumbatngen, Near M.T.C. Workshop,

More information

DESCRIPTIVE REPORT ON STATUS OF COMPLIANCE TO THE CONDITIONS OF ENVIRONMENTAL CLEARANCE AND ENVIRONMENTAL MANAGEMENT

DESCRIPTIVE REPORT ON STATUS OF COMPLIANCE TO THE CONDITIONS OF ENVIRONMENTAL CLEARANCE AND ENVIRONMENTAL MANAGEMENT DESCRIPTIVE REPORT ON STATUS OF COMPLIANCE TO THE CONDITIONS OF ENVIRONMENTAL CLEARANCE AND ENVIRONMENTAL MANAGEMENT Subject: Compliance report of Environmental Clearance for Plant 3 Reference: J-11011/603/2010-IA,

More information

Six Monthly Compliance Status Report

Six Monthly Compliance Status Report Six Monthly Compliance Status Report Annexure -1 Name of Project : Expansion of Multi-Purpose Fluorinated Specialty ( Organic) Chemicals Plant at Village- Jhiwana, Tehsil- Tijara, District- Alwar ( Rajasthan)

More information

Ref: Environment Department, MS, SEIAA Letter SEAC 2010/CR.824/TC-2 Dated 2 nd Nov 2011

Ref: Environment Department, MS, SEIAA Letter SEAC 2010/CR.824/TC-2 Dated 2 nd Nov 2011 Ref.No:POL/U-II/EC/12-13/176 Date : 23.11.2012 To, Dr. A. Mehrotra, Director (S) Ministry of Environment & Forests, Regional Office, Western Region, Kendriya Paryavaran Bhavan Link Road No.3, E-5, Ravi

More information

Torrent Pharmaceuticals Ltd. Indrad EC Compliance Report

Torrent Pharmaceuticals Ltd. Indrad EC Compliance Report Status of Compliance of stipulated conditions of the Environment Clearance J- 01 It is noted that total water consumption will increase from 1000-1200 m 3 /day to 1200-1300 m 3 /day. Fresh water requirement

More information

(E.C. Letter No. F.No.J-11011/316/2006-IA II (I) Dated 21-11-2007 and EC extension letter dated 01-03-2013) (For the Period 1 st April 15 to 30 th Sept. 15) FOR Dahej Petrochemical Complex M/s. ONGC Petro

More information

Rajasthan State Pollution Control Board

Rajasthan State Pollution Control Board M/s Raj West Power Private Limited Village- Bhadresh, Tehsil:Barmer District:Barmer Sub: Ref: Sir, Consent to Operate under section 25/26 of the Water (Prevention & Control of Pollution) Act, 1974 and

More information

PART A. 3. Production Capacity 3.6 Million TPA Cement 4. Year of Establishment th September 2015 PART B WATER AND RAW MATERIAL CONSUMPTION

PART A. 3. Production Capacity 3.6 Million TPA Cement 4. Year of Establishment th September 2015 PART B WATER AND RAW MATERIAL CONSUMPTION Page 1 of 8 Environmental Statement for Clinker Grinding Unit of M/s Bihar Cement Plant (A Unit of Shree Cement Ltd.), situated at Jasoia Mor, BIADA, Industrial Growth Centre, Aurangabad, Tehsil & Dist.

More information

High efficient ESP s has been provided to maintain an emission level below 100mg/Nm 3 in CPP. Modification of ESPs and.

High efficient ESP s has been provided to maintain an emission level below 100mg/Nm 3 in CPP. Modification of ESPs and. Sl. No. CONDITIONS COMPLIANCE STATUS SPECIFIC CONDITIONS i The gaseous emissions (PM, SO 2, NO X, PAH, HC, VOCs and Fluoride) from various process units shall conform to the standards prescribed by the

More information

Compliance Status Report of Environmental Clearance No. J 11011/257/2008 IA II (I) dated 23/11/2010

Compliance Status Report of Environmental Clearance No. J 11011/257/2008 IA II (I) dated 23/11/2010 April 2013 Compliance Status Report of Environmental Clearance No. J 11011/257/2008 IA II (I) dated 23/11/2010 Sub: Expansion of Organometallic Products/Other Synthetic Organic Chemicals Manufacturing

More information

Environmental Clearance Compliance Half Yearly Report

Environmental Clearance Compliance Half Yearly Report Environmental Clearance Compliance Half Yearly Report HALF YEARLY COMPLIANCE REPORT- April 2015 to September 2015 Ref: 1. MOEF, New Delhi Environment Clearance F. No. J-11011/119/2007- IA II (I) dated

More information

NATCO PHARMA LIMITED CHEMICAL DIVISION

NATCO PHARMA LIMITED CHEMICAL DIVISION Half yearly compliance report for the period - Oct 2016 to March 2017 on the conditions specified in Environmental Clearance issued by Ministry of Environment and Forests & Climate Change. Ref: Ministry

More information

NATCO PHARMA LIMITED CHEMICAL DIVISION Mekaguda (Village), Nandigama (Mandal), Rangareddy (Dist.)

NATCO PHARMA LIMITED CHEMICAL DIVISION Mekaguda (Village), Nandigama (Mandal), Rangareddy (Dist.) Half yearly compliance report for the period July 2016 to Dec 2016 on the conditions specified in Environmental Clearance issued by Ministry of Environment and Forests & Climate Change. Ref: Ministry s

More information

Environment protection measures / technology

Environment protection measures / technology Sr. No. Conditions A. Specific Conditions: i. The gaseous and particulate matter emissions from various units should conform to the standards prescribed by the State Pollution Control Board. At no time,

More information

SHREE CEMENT LTD..~..~..~ ii. Regd. Office:. 0. ~ ~. ~ BANGUR NAGAR, POS': BOX NO.33, BEAWAR , RAJASTHAN, INDIA ~ 66~~'" 'Its ~s 71 66

SHREE CEMENT LTD..~..~..~ ii. Regd. Office:. 0. ~ ~. ~ BANGUR NAGAR, POS': BOX NO.33, BEAWAR , RAJASTHAN, INDIA ~ 66~~' 'Its ~s 71 66 CIN No. : L26943RJ1979PLC001935 Phone : 01462228101-6 Toll Free : 18001806003/6004 Fax: 01462228117/228119 E-Mail: shreebwr@shreecementltd.com (I." Website : www.shreecement.in SHREE CEMENT LTD..~..~..~

More information

EC COMPLIANCE REPORT

EC COMPLIANCE REPORT EC COMPLIANCE REPORT Monitoring period April 2018 to September 2018 M/s. Om Titanates Plot no. C-1/B-2805, GIDC- Sarigam 396155, Ta.: Umbergaon, Dist.: Valsad, Gujarat EC Granted vide F. No. J-11011/186/2012-IA-II

More information

Six Monthly Compliance Status Report

Six Monthly Compliance Status Report Six Monthly Compliance Status Report Name of Project : Expansion of Multi-Purpose Fluorinated Specialty ( Organic) Chemicals Plant at Village- Jhiwana, Tehsil- Tijara, District- Alwar ( Rajasthan) Project

More information

Manufacture of Products like Phthalic Anhydride, Benzoic Acid and Power.

Manufacture of Products like Phthalic Anhydride, Benzoic Acid and Power. Ref EC No. J-11013/14/2007-IAII (I) dated 12.06.2007. To For Status IG Petrochemicals Ltd, T-2, MIDC Taloja Manufacture of Products like Phthalic Anhydride, Benzoic Acid and Power. Project Implementation

More information

Janki Corp. Ltd., Six Monthly Compliance Report

Janki Corp. Ltd., Six Monthly Compliance Report Janki Corp. Ltd., Six Monthly Compliance Report Period: October 2014 to March 2015 Project: Expansion of Sponge Iron Plant (1,80,000 to 4,00,000TPA) and Installation of Iron ore Beneficiation Plant (0.6

More information

Name of Project: J.K. Cement Works (Unit: J.K. Cement Ltd.), Muddapur (Karnataka)

Name of Project: J.K. Cement Works (Unit: J.K. Cement Ltd.), Muddapur (Karnataka) J.K. Cement Works, Village- Muddapur, Taluka- Mudhol, Distt.- Bagalkot, Karnataka MoEF Letter No. F.No. J-11011/263/2009-IA II (I) dated 21-06-2010 Name of Project: J.K. Cement Works (Unit: J.K. Cement

More information

INDIA: Dahej Liquefied Natural Gas Terminal Project

INDIA: Dahej Liquefied Natural Gas Terminal Project Environmental Monitoring Report Project Number: 37905 October 2006 INDIA: Dahej Liquefied Natural Gas Terminal Project Prepared by Anil K. Joshi New Delhi, India For Petronet LNG Limited This report has

More information

PROJECT NAME: UTKAL ALUMINA INTERNATIONAL LTD. PERIOD OF COMPLIANCE: APRIL, 2013 TO SEPTEMBER, 2013.

PROJECT NAME: UTKAL ALUMINA INTERNATIONAL LTD. PERIOD OF COMPLIANCE: APRIL, 2013 TO SEPTEMBER, 2013. STATUS OF CONDITIONS IMPOSED IN ENVIRONMENTAL CLEARANCE FOR 3 MTPA REFINERY & 3X30 MW CO-GENERATION POWER PLANT VIDE LETTER NO. J-11011/753/2007-IA II (I), DATED 29.01.2008. PROJECT NAME: UTKAL ALUMINA

More information

COMPLIANCE REPORT TO THE CONDITIONS LAID IN THE ENVIRONMENTAL CLEARANCE

COMPLIANCE REPORT TO THE CONDITIONS LAID IN THE ENVIRONMENTAL CLEARANCE COMPLIANCE REPORT TO THE CONDITIONS LAID IN THE ENVIRONMENTAL CLEARANCE PREAMBLE: EIA follow up commonly referred to as Compliance reporting is the process of monitoring, evaluation and validation of the

More information

. 0.:'. e:. :'} BANGUR NAGAR, POST BOX NO.33, BEAWAR , RAJASTHAN, INDIA Jji'665~" 1tS8;0 b AiS77..c,b

. 0.:'. e:. :'} BANGUR NAGAR, POST BOX NO.33, BEAWAR , RAJASTHAN, INDIA Jji'665~ 1tS8;0 b AiS77..c,b CIN No. : L26943RJ1979PLC001935 Phone : 01462228101-6 Toll Free: 18001806003/6004 Fax: 0146222811'71228119 E-Mail: shreebwr@shreecementltd.com Website : www.shreecement.in,-:,0 900, ~s}.s18(),9>01400,

More information

THE RAMCO CEMENTS LIMITED, KSR NAGAR COMPLIANCE REPORT - ENVIRONMENTAL CLEARANCE CEMENT PLANT 2.5 MILLION TPA CLINKER, 2

THE RAMCO CEMENTS LIMITED, KSR NAGAR COMPLIANCE REPORT - ENVIRONMENTAL CLEARANCE CEMENT PLANT 2.5 MILLION TPA CLINKER, 2 THE RAMCO CEMENTS LIMITED, KSR NAGAR COMPLIANCE REPORT - ENVIRONMENTAL CLEARANCE CEMENT PLANT 2.5 MILLION TPA CLINKER, 2.6 MILLION TPA CEMENT & THERMAL POWER PLANT 36 MW EC Lr. No. : J-11011/403/2006-IA-II

More information

V.S LIGNITE POWER Pvt. Ltd AT VILLAGE-GURHA, KOLAYAT, BIKANER, RAJASTHAN

V.S LIGNITE POWER Pvt. Ltd AT VILLAGE-GURHA, KOLAYAT, BIKANER, RAJASTHAN V.S LIGNITE POWER Pvt. Ltd AT VILLAGE-GURHA, KOLAYAT, BIKANER, RAJASTHAN HALF YEARLY REPORT FOR THE PERIOD OCTOBER, 2011 to MARCH 2012 V. S. Lignite Power Pvt. Ltd. Name of the Project : 1x 135 MW Lignite

More information

PROJECT NAME: UTKAL ALUMINA INTERNATIONAL LTD. PERIOD OF COMPLIANCE: OCTOBER 2014 TO MARCH 2015.

PROJECT NAME: UTKAL ALUMINA INTERNATIONAL LTD. PERIOD OF COMPLIANCE: OCTOBER 2014 TO MARCH 2015. STATUS OF CONDITIONS IMPOSED IN ENVIRONMENTAL CLEARANCE FOR 3 MTPA REFINERY& 3X30 MW CO-GENERATION POWER PLANT VIDE LETTER NO. J-11011/753/2007- IA II (I), DATED 29.01.2008. PROJECT NAME: UTKAL ALUMINA

More information

MIEL/NP/EMD/ 303/2015 Date:

MIEL/NP/EMD/ 303/2015 Date: MIEL/NP/EMD/ 303/2015 Date: 08.07.2015 To The Aditional Director, Ministry of Environment and Forests, Regional Office, Western Region, Link Road No 3, E-5, Ravishankar Nagar,(Arera Colony), Bhopal (M.P.)

More information

Mangalam Cement Ltd. (Unit-II) Stack No.

Mangalam Cement Ltd. (Unit-II) Stack No. Mangalam Cement Ltd. (Unit-II) Name of the Project :- Expansion of cement grinding capacity from 1.7 MTPA to 2.3 MTPA Project Code :- Clearance Letter No. : - F NO. J - 11011 /110 /2012 - IA II (I), dtd

More information

qqfq(ui qci CA' ~< Government of India Ministry of Environment & Forests (IA Division)

qqfq(ui qci CA' ~< Government of India Ministry of Environment & Forests (IA Division) 'qffif~ Speed post qqfq(ui qci CA' ~< Government of India Ministry of Environment & Forests (IA Division) Paryavaran Bhawan COO Complex, Lodhi Road New Delhi - 110 003 E-mail: hsmalviya@gmall.com < Telephone:

More information

RED CATEGORY CONSENT & AUTHORIZATION ORDER BY REGISTERED POST WITH ACKNOWLEDGEMENT DUE

RED CATEGORY CONSENT & AUTHORIZATION ORDER BY REGISTERED POST WITH ACKNOWLEDGEMENT DUE ANDHRA PRADESH POLLUTION CONTROL BOARD Paryavarana Bhavan, A-III, Industrial Estate, Sanathnagar, Hyderabad-500 018 Phone : 040-23887500, Website : www.appcb.ap.nic.in RED CATEGORY CONSENT & AUTHORIZATION

More information

EXECUTIVE SUMMARY ON ENVIRONMENTAL IMPACT ASSESSMENT REPORT

EXECUTIVE SUMMARY ON ENVIRONMENTAL IMPACT ASSESSMENT REPORT EXECUTIVE SUMMARY ON ENVIRONMENTAL IMPACT ASSESSMENT REPORT For CHHATTISGARH ENVIRONMENT CONSERVATION BOARD CHHATTISGARH 0 P a g e 1.0 INTRODUCTION SUMIT ISPAT PVT. LTD. has proposed to establish Submerged

More information

Environmental Clearance Compliance Half Yearly Report

Environmental Clearance Compliance Half Yearly Report Environmental Clearance Compliance Half Yearly Report HALF YEARLY COMPLIANCE REPORT- Oct. 2017 March 2018 Ref: MOEF, New Delhi Environment Clearance F. No. J-11011/118/2007- IA II (I) dated 25 th August,

More information

M/S. HETERO INFRASTRUCTURE SEZ LIMITED

M/S. HETERO INFRASTRUCTURE SEZ LIMITED ENVIRONMENTAL STATEMENT (FORM - V) FOR THE FINANCIAL YEAR ENDING MARCH-2016. M/S. HETERO INFRASTRUCTURE SEZ LIMITED N.NARASAPURAM(V),NAKKAPALLI(M) VISAKHAPATNAM DISTRICT. SUBMITTED TO : ANDHRA PRADESH

More information

Compliance of Conditions laid down by MoEF for Expansion of Cement Plant (2.0 MTPA to 2.6 MTPA Clinker) at Village Suli April 2017 to September 2017

Compliance of Conditions laid down by MoEF for Expansion of Cement Plant (2.0 MTPA to 2.6 MTPA Clinker) at Village Suli April 2017 to September 2017 A. SPECIFIC CONDITIONS Sl. No. i ii Condition Continuous stack monitoring facilities for all stacks and adequate air pollution control systems e.g. electrostatic precipitators (ESP) to clinker cooler and

More information

vii Total cost of Proposed Project Existing : 0.16 Cr Proposed: 0.25 Cr Total : 0.41 Cr viii Total Plot area ( sq. meter)

vii Total cost of Proposed Project Existing : 0.16 Cr Proposed: 0.25 Cr Total : 0.41 Cr viii Total Plot area ( sq. meter) SEAC, Gujarat: Page 1 of 28 For TOR Expansion Case. 1. Basic Information of the Project: i Name & Address of the Project site (Complete details with plot no./survey no., Landmark etc. ) M/s. Om Interchem

More information

For TOR New Projects. Mo. no. : Contact no. and ID of the Applicant

For TOR New Projects. Mo. no. : Contact no. and  ID of the Applicant SEAC, Gujarat : Page 1 of 6 For TOR New Projects 1. Basic Information of the Project: i Name & Address of the Project site (Complete details with plot /Survey, Landmark etc. ) M/s. Perstorp Industries

More information

Telefax: 011: Dated:10 th May, 2013

Telefax: 011: Dated:10 th May, 2013 F. No. J-11011/41/2011-IA-II (I) Government of India Ministry of Environment and Forests (I.A. Division) Paryavaran Bhawan CGO Complex, Lodhi Road New Delhi 110 003 E-mail:vp.upadhyay@nic.in Telefax: 011:

More information

Mangalam Cement Ltd.(Unit I)

Mangalam Cement Ltd.(Unit I) Mangalam Cement Ltd.(Unit I) Name of the Project :- Expansion of cement Project Code :- grinding capacity from 1.3 MTPA to 1.7 MTPA Clearance Letter No. : - F NO. J - 11011 /119 /2012 - IA II (I), dtd

More information

Rajasthan State Pollution Control Board

Rajasthan State Pollution Control Board M/s Raj West Power Private Limited Village- Bhadresh, Tehsil:Barmer District:Barmer Sub: Ref: Consent to Operate under section 25/26 of the Water (Prevention & Control of Pollution) Act, 1974 and under

More information

2 No. Continuous Ambient Air Quality Monitoring System (CAAQMS) installed in downwind & upwind direction and are connected to APPCB server.

2 No. Continuous Ambient Air Quality Monitoring System (CAAQMS) installed in downwind & upwind direction and are connected to APPCB server. Environmental Clearance Point Wise Half Yearly Compliance Report (October 2014 to March 2015) Cement Plant - EC No: F.No. J-11011/450/2007-IA II(I) Dated: 24 th March 2008 A. SPECIFIC CONDITIONS : S.NO.

More information

Hope you will find the same in order. Thanking You, For EMAMI PAPER MILLS LTD. Authorized Signatory

Hope you will find the same in order. Thanking You, For EMAMI PAPER MILLS LTD. Authorized Signatory To 13 th August, 2018 The Director Government of India Ministry of Environment & Forest (I.A. Division) Paryavarn Bhavan, CGO COMPLEX, Lodhi Road New Delhi- 110 003 Sub: Compliance status of conditions

More information

Environmental Clearance Compliance Half Yearly Report

Environmental Clearance Compliance Half Yearly Report Environmental Clearance Compliance Half Yearly Report HALF YEARLY COMPLIANCE REPORT- April 2017 - Sept 2017 Ref: MOEF, New Delhi Environment Clearance F. No. J-11011/118/2007- IA II (I) dated 25 th August,

More information

Shriram Vinyl & Chemical Industries, : Kota Compliance Report of Environmental Clearance dated 12 th July 2017 and amended on 23 rd November 2017

Shriram Vinyl & Chemical Industries, : Kota Compliance Report of Environmental Clearance dated 12 th July 2017 and amended on 23 rd November 2017 Shriram Vinyl & Chemical Industries, : Kota Compliance Report of Environmental Clearance dated 12 th July 2017 and amended on 23 rd November 2017 PART A : SPECIFIC CONDITIONS 1. CONSTRUCTION PHASE S. 1

More information

PROPOSED EXPANSION OF DEVELOPER AND AZOCOLORANTS DYES IN EXISTING UNIT. M/s. BASF INDIA LTD. (UNIT-II)

PROPOSED EXPANSION OF DEVELOPER AND AZOCOLORANTS DYES IN EXISTING UNIT. M/s. BASF INDIA LTD. (UNIT-II) BRIEF SUMMARY OF THE PROJECT for PROPOSED EXPANSION OF DEVELOPER AND AZOCOLORANTS DYES IN EXISTING UNIT of M/s. BASF INDIA LTD. (UNIT-II) PLOT NO. 8001 & 8001A, PHASE-VI, G.I.D.C., ANKLESHWAR, DIST: BHARUCH-393002,

More information

COMPLIANCE OF EC CONDITIONS FOR REVAMPING OF AMMONIA 1 TO METHANOL PLANT. (EC No. - F No. : J-11011/901/2007-IA(II) dated 31/07/08)

COMPLIANCE OF EC CONDITIONS FOR REVAMPING OF AMMONIA 1 TO METHANOL PLANT. (EC No. - F No. : J-11011/901/2007-IA(II) dated 31/07/08) COMPLIANCE OF EC CONDITIONS FOR REVAMPING OF AMMONIA 1 TO METHANOL PLANT (EC No. - F No. : J-11011/901/2007-IA(II) dated 31/07/08) SPECIFIC CONDITIONS: Sr. No. Conditions Compliance Status on May 2018

More information

(E.C. Letter No. F.No.J-11011/107/2013-IA II (I) Dated ) (For the Period 1 st October 17 to 30 th March 18)

(E.C. Letter No. F.No.J-11011/107/2013-IA II (I) Dated ) (For the Period 1 st October 17 to 30 th March 18) (E.C. Letter No. F.No.J-11011/107/2013-IA II (I) Dated 03-07-2014) (For the Period 1 st October 17 to 30 th March 18) FOR Gas based Captive Power Plant with installed steam & power capacity of 880 TPH

More information

ANNEXURES. 1 Google image showing proposed project site. 3 Manufacturing process details. 4 Details of hazardous waste management

ANNEXURES. 1 Google image showing proposed project site. 3 Manufacturing process details. 4 Details of hazardous waste management ANNEXURES Annexure No. Description 1 Google image showing proposed project site 2 Plant Lay-Out 3 Manufacturing process details 4 Details of hazardous waste management 5 Details of Effluent Treatment Plant

More information

(Period April 2017 ~ Sept. 2017)

(Period April 2017 ~ Sept. 2017) CHAMBAL FERTILIZERS AND CHEMICALS LIMITED, GADEPAN MOEF ENVIRONMENTAL CLEARANCE COMPLIANCE REPORT [PHASE- I] (Period April 2017 ~ Sept. 2017) Letter No.J-11011 / 8 / 87-IA DT.15.11.88 01. The Project Proponent

More information

Compliance Report of EC : Compliance Status

Compliance Report of EC : Compliance Status Report of EC : S. i. Permission/recommendation shall be obtained from State Forest Department regarding Banni area, which is declared as a protected forest land ii. iii iv v GPCB vide letter no. GPCB/Unit-I/FT-

More information

6 th MONTHLY COMPLIANCE REPORT OF DIBRUGARH-BHOGPARA AREA

6 th MONTHLY COMPLIANCE REPORT OF DIBRUGARH-BHOGPARA AREA 6 th MONTHLY COMPLIANCE REPORT OF DIBRUGARH-BHOGPARA AREA As on 01.04.2014 General Condition: Sl No. CONDITIONS COMPLIANCE I. The project authorities must strictly adhere to the stipulations made by the

More information

CRZ Clearance for Proposed Construction of RO RO Jetties at Narangi-Kharawadashri, Tal. & Dist. palghar by MMB

CRZ Clearance for Proposed Construction of RO RO Jetties at Narangi-Kharawadashri, Tal. & Dist. palghar by MMB Environment department, Room No. 217, 2nd floor, Mantralaya, Annexe, Mumbai- 400 032. Date:August 2, 2017 To, Chief Executive Officer,Maharashtra Maritime Board,Indian Mercantile Chambers,3rd Floor,Ramjibhai

More information

Half Yearly Environmental Clearance Compliance Report by UPL Limited, Unit # 05, Jhagadia, Gujarat Period from January-June 2014

Half Yearly Environmental Clearance Compliance Report by UPL Limited, Unit # 05, Jhagadia, Gujarat Period from January-June 2014 16 th July, 2014 Half Yearly Environmental Clearance Compliance Report by UPL Limited, Unit # 05, Jhagadia, Gujarat Dr A Mehrotra, Director (S) Ministry of Environment & Forests, Western Region Office,

More information

COMPLIANCE TO THE CONDITIONS LAID BY MoEF VIDE CRZ CLEARANCE No.11/32/2009-IA.III dated

COMPLIANCE TO THE CONDITIONS LAID BY MoEF VIDE CRZ CLEARANCE No.11/32/2009-IA.III dated COMPLIANCE TO THE CONDITIONS LAID BY MoEF VIDE CRZ CLEARANCE No.11/32/2009-IA.III dated 10.08.2009 Period : January 2018 to June 2018 Sl.No. CONDITIONS STIPULATED BY MoEF COMPLIENCE Specific Conditions

More information

Pre-Feasibility Report For

Pre-Feasibility Report For Pre-Feasibility Report For Proposed New Project for manufacturing of Intermediates of Agro Chemicals & Synthetic Organic Chemicals. By M/s. MANBRO POLYMERS LIMITED, Plot No. D-2/CH-275, INDUSTRIAL ESTATE,

More information

For TOR New. 1. Basic Information of the Project:

For TOR New. 1. Basic Information of the Project: SEAC, Gujarat: Page 1 of 12 For TOR New. 1. Basic Information of the Project: i Name & Address of the Project site M/s. Shreenathji Dye Chem (Complete details with plot no./survey no., Landmark etc. )

More information

ENVIRONMENTAL STATEMENT FORM-V SYNTHETIC GYPSUM MANUFACTURING PLANT M/S SHREE CEMENT LIMITED, BEAWAR, (RAJASTHAN) APRIL, 2010 to MARCH 2011 PART A

ENVIRONMENTAL STATEMENT FORM-V SYNTHETIC GYPSUM MANUFACTURING PLANT M/S SHREE CEMENT LIMITED, BEAWAR, (RAJASTHAN) APRIL, 2010 to MARCH 2011 PART A ENVIRONMENTAL STATEMENT FORM-V SYNTHETIC GYPSUM MANUFACTURING PLANT M/S SHREE CEMENT LIMITED, BEAWAR, (RAJASTHAN) APRIL, 2010 to MARCH 2011 PART A 1. Name and address of the Owner / Occupier of the Industry

More information

PART A. M/s Shree Cement Ltd, (Grinding Unit) village - Udepur, Tehsil- Suratgarh, District -Shri Ganganagar, Rajasthan

PART A. M/s Shree Cement Ltd, (Grinding Unit) village - Udepur, Tehsil- Suratgarh, District -Shri Ganganagar, Rajasthan Page 1 of 9 Environmental Statement for Clinker Grinding Unit of M/s Shree Cement Limited, situated at village - Udepur, Tehsil- Suratgarh, District -Shri Ganganagar, Rajasthan for the Period from: 10

More information

Monitoring the Implementation of Environmental Safeguards

Monitoring the Implementation of Environmental Safeguards Monitoring the Implementation of Environmental Safeguards Ministry of Environment & Forest Western Region, Regional Office, Bhopal MONITORING REPORT PART I DATA SHEET RASHTRIYA CHEMICAS AND FERTILISERS

More information

Half Yearly Environmental Clearance Compliance Report by UPL Limited, Unit # 05, Jhagadia, Gujarat Period from July-December 2013

Half Yearly Environmental Clearance Compliance Report by UPL Limited, Unit # 05, Jhagadia, Gujarat Period from July-December 2013 February 19, 2014 Dr A Mehrotra, Director (S) Ministry of Environment & Forests, Western Region Office, Kendriya Paryavaran Bhavan, Link Road # 3, E 5, Ravi Shankar Nagar, Bhopal 462 016. Madhya Pradesh

More information

ZZJ/CLAB-KSPCB/04/ Environmental Officer,

ZZJ/CLAB-KSPCB/04/ Environmental Officer, ZZJ/CLAB-KSPCB/04/ 07-07-2016 4133 Environmental Officer, Regional Office, Karnataka State Pollution Control Board Parisara Bhavan, LIG II, B 217 B-1, Main Road, A-16th Cross Near Hari Om Trust, Habbuwada

More information

Six Monthly Compliance status of Environment Clearance for Cement Plant (5300 TPD Clinker) at Village Lumshnong, Meghalaya January to June 2013

Six Monthly Compliance status of Environment Clearance for Cement Plant (5300 TPD Clinker) at Village Lumshnong, Meghalaya January to June 2013 Six Monthly Compliance status of Environment Clearance for Cement Plant (5300 TPD Clinker) at Village Lumshnong, Meghalaya January to June 2013 Ref.: Environmental Clearance no. J-11011/754/2007-IA II

More information

SIX MONTHLY COMPLIANCE REPORT ENVIRONMENTAL CLEARANCE FOR. Plot No. 1, GIDC Industrial Area, Vilayat, Taluka: Vagra, District: Bharuch (Gujarat)

SIX MONTHLY COMPLIANCE REPORT ENVIRONMENTAL CLEARANCE FOR. Plot No. 1, GIDC Industrial Area, Vilayat, Taluka: Vagra, District: Bharuch (Gujarat) SIX MONTHLY COMPLIANCE REPORT OF ENVIRONMENTAL CLEARANCE FOR Expansion of Viscose Staple Fibre Unit, Captive Power Plant and Setting up Solvent Spun Cellulosic Fibre At Plot No. 1, GIDC Industrial Area,

More information

RESINS & ALLIED CHEMICALS INDUSTRIES (BOMBAY) PVT. LTD.

RESINS & ALLIED CHEMICALS INDUSTRIES (BOMBAY) PVT. LTD. FOR THE PROPOSED EXPANSION PROJECT FOR THE MANUFACTURING OF KETONIC RESINS Category: 5(f) OF RESINS & ALLIED CHEMICALS INDUSTRIES (BOMBAY) PVT. LTD. Located at: Plot No. C-1/46, 100 SHED AREA, GIDC, Vapi,

More information

PROJECT PRE-FEASIBILITY REPORT. For

PROJECT PRE-FEASIBILITY REPORT. For PROJECT PRE-FEASIBILITY REPORT For THE PROPOSED ORGANIC CHEMICALS MANUFACTURING IN EXISTING IN FORMULATION OF PESTICIDE, AGROCHEMICAL AND BIO FERTILIZERS MANUFACTURING UNIT AT M/S. SULPHUR MILLS LTD. PLOT

More information

1.0 EXECUTIVE SUMMARY

1.0 EXECUTIVE SUMMARY 1.0 EXECUTIVE SUMMARY M/s Merino Industries Limited has proposed for manufacturing Phenol Formaldehyde Resin, Melamine Formaldehyde Resin at Plot No D2 CH 36, Dahej Phase II, Dist. Bharuch, Gujarat. The

More information

D:\My Documents\Legislative\Legislation BS\Consents\Six monthly compliance\cement\june 2017\COMPLIANCE STATUS.docx.docx

D:\My Documents\Legislative\Legislation BS\Consents\Six monthly compliance\cement\june 2017\COMPLIANCE STATUS.docx.docx COMPLIANCE STATUS OF ENVIRONMENT CLEARANCE EC letter no. J-11011/79/2007-IA II (I) Dated 16.04.2009 A. Specific Conditions : SN Condition Compliance 1. Continuous stack monitoring facilities to monitor

More information

Application of Low and Non Waste Technology in the production process;

Application of Low and Non Waste Technology in the production process; 9.0 ENVIRONMENT MANAGEMENT PLAN (EMP) 9.1 INTRODUCTION Environment Management Plan is required for ensuring sustainable development. It should not affect the surrounding environment adversely. The management

More information

Environmental Clearance Compliance Half Yearly Report

Environmental Clearance Compliance Half Yearly Report Environmental Clearance Compliance Half Yearly Report HALF YEARLY COMPLIANCE REPORT- Oct. 2015 to March 2016 Ref: MOEF, New Delhi Environment Clearance F. No. J-11011/118/2007- IA II (I) dated 25 th August,

More information

Environmental Clearance Compliance Half Yearly Report

Environmental Clearance Compliance Half Yearly Report Environmental Clearance Compliance Half Yearly Report HALF YEARLY COMPLIANCE REPORT- April 2016 Sept. 2016 Ref: MOEF, New Delhi Environment Clearance F. No. J-11011/118/2007- IA II (I) dated 25 th August,

More information

Sr. No. Date of starting the project and completion schedule. January 2012 January 2017 (Tentative)

Sr. No. Date of starting the project and completion schedule. January 2012 January 2017 (Tentative) Six Monthly Progress Report reg. Construction of Group Housing Colony at village Sarai Aurangabad in Sector 3-A, Bahadurgarh (Distt. Jhajjar), Haryana by M/s Prabhu Shanti Real Estate Pvt. Ltd., due in

More information

BRGD Ingot Private Limited 4, D.L. Khan Road, Block-C, Flat No. 201, 2 nd Floor, P.S. Kalighat, P.O. Bhowanipur, Kolkata

BRGD Ingot Private Limited 4, D.L. Khan Road, Block-C, Flat No. 201, 2 nd Floor, P.S. Kalighat, P.O. Bhowanipur, Kolkata SIX MONTHLY COMPLIANCE REPORT (Period: October, 2016 to March, 2017) Refer EC File No. J-11011/258/2012-IA II (I)) dated 27 th August, 2015 Proposed expansion of Steel Melting shop unit (50,400 TPA to

More information

Additional Proposed (TPA) Total after Expansion (TPA) 3,500 2,500 6, ,880 2,720 5,600 As above under item No. 1.

Additional Proposed (TPA) Total after Expansion (TPA) 3,500 2,500 6, ,880 2,720 5,600 As above under item No. 1. Shriram Vinyl & Chemical Industries, : Kota (A Unit of DCM Shriram Ltd.) Compliance Report of Environmental Clearance Fl(4)/SEIAA/SEAC- Raj/Sectt/Project/Cat.8(b) B1 (15054)/16-17 dated 12 th July 2017

More information

Telefax: 011: Dated: 8 th March, 2013

Telefax: 011: Dated: 8 th March, 2013 F. No. J-11011/321/2010-IA II (I) Government of India Ministry of Environment and Forests (I.A. Division) Paryavaran Bhawan CGO Complex, Lodhi Road New Delhi 110 003 E-mail:vp.upadhyay@nic.in Telefax:

More information