1 Steps in Building a Wind Farm Andre Otto Project Manager South Africa Wind Energy Programme Dept of Energy South Africa
2 Outline Outline SA Energy Overview GHG Emissions Water situation Practical RE potential Wind Resources Grid connection Conclusion
3 South Africa Energy Overview
4 Eskom Installed Generation Capacity
5 South Africa GHG Emissions
6 World s Surface Water
7 South Africa Water Scarcity According to the WWF, South Africa is a chronically water stressed country. In 2000, South Africa's water surplus was only 1.4% of the country's total water supply, and it is estimated that South Africa will have a water deficit of 1.7% by Consequently, water availability is one of the most decisive factors that will affect the future economic development of South Africa. Could water issues drive energy reform/technology in future?
8 South Africa Practical RE Potential ( ) Renewable Energy Business Case, SAWEP, RDE, Feb 2009
9 South Africa Policy, Legal & Regulatory Environment White Paper on Renewable Energy: GWh by 2013 (currently being reviewed) Electricity Regulation Act (Act 4, 2006) IPPs Non-discriminatory grid access Integrated Resource Plan (IRP) Integrated Resource Plan (IRP) IRP1: MTPPP, REFIT: 343 (2010), 518 (2011), 284 (2012), Sere, CSP: 150 (2010) MW IRP2 (June 2010, 20 year period) New Generation Regulation (No.32378, Aug 2009) Procurement of RE and Co-gen under REFIT Rules relating to RE, Co-gen IPP selection criteria (Independent) System Operator Selecting preferred IPP under REFIT Buyer?
10 Renewable Energy Feed-in Tariff REFIT 2009 (=levelised cost), ROE after tax 17%
11 South Africa Policy, Legal & Regulatory Environment cont National Environmental Management Act NEMA (Act 62, 2008) NEMA regulations (2006) Basic Assessment activities Listing Notice 1 No R386 The construction of masts of any material or type and of any height, including those used for telecommunication broadcasting and radio transmission, but excluding - (a) masts of 15 metres and lower exclusively used (i) by radio amateurs; or (ii) for lighting purposes (b) flag poles; and (c) lightning conductor poles. Scoping EIA activities Listing Notice Notice 2 No. R387 The construction of facilities or infrastructure, including associated structures or infrastructure, for - (a) the generation of electricity where (i) the electricity output is 20 megawatts or more; or (ii) the elements of the facility cover a combined area in excess of 1 Hectare;
12 Basic assessment Process (R386) Notify Authority (form) (R. 22): Basic information Indicate if exemption will be applied for Authority response and advice (R 5) Public participation (R. 22 and 56) Basic assessment report (R. 23) Submit application (R 24) Application form Assessment report Exemption application (R 52) Response (R. 25) Submit additional information Specialist studies Alternatives Rejection Scoping & EIA Scoping & EIA Check application (R. 14) 14 days Acknowledge receipt (R. 14) 30 days Grant / refuse authorisation (R. 26) 10 days Notify applicant of decision (R. 10) 10 days Notify I&APs of decision (R. 10) Competent authorities must strive to meet timeframes (R. 9) 12
13 Scoping/EIA process (R387) Submit application (R. 27) Application form Landowner s consent Indicate if exemption will be applied for (part of application from) Check application (R. 14) 14 days Acknowledge receipt (R. 14) Scoping (R ) Public participation (incl. organs of state) Scoping Report Public comment on SR (R. 58) Submit Scoping Report (R. 30) 30 days Competent authorities must strive to meet timeframes (R. 9) Authority response (R. 31) Request amendments Reject because: insufficient information failure to consider guidelines Accept EIA (R.32) Prepare EIA report & draft EMP Submit EIA Report 60 days Authority response (R. 35) Reject Amend Specialist review Accept 45 days 45 days Decision (R. 36) 10 days Notify applicant of decision (R. 10) Notify I&APs of decision (R. 10) 13
14 South Africa Policy, Legal & Regulatory Environment cont SUBDIVISION OF AGRICULTURAL LAND ACT 70 OF Prohibition of certain actions regarding agricultural land no lease in respect of a portion of agricultural land of which the period is 10 years or longer, or is the natural life of the lessee or any other person mentioned in the lease, or which is renewable from time to time at the will of the lessee, either by the continuation of the original lease or by entering into a new lease, indefinitely or for periods which together with the first period of the lease amount in all to not less than 10 years, shall be entered into; Application to Minister required Provincial Ordinances e.g change of land use
15 South Africa Policy, Legal & Regulatory Environment cont THE AVIATION ACT, 1962 (ACT NO 74 OF 1962) CAA CIVIL AVIATION REGULATIONS, 1997 PART Document SA-CATS-AH Wind turbine generators (Windfarms). Windfarm Placement: Not to be built closer than 35 Km from an aerodrome Configurations Linear, cluster, grid Markings Painted bright white Lighting Individual, 3 or more units, Turbine Lighting Assignment
16 South Africa Policy, Legal & Regulatory Environment cont Industrial Policy Action Plan (IPAP2) (2010/ /13) Developing and strengthening South African National Standards to support the creation / resuscitation of specific industries Key milestones 2010/ /13: SABS to develop SANS for: Wind energy turbines Develop sector strategies for other green industries Further work is required to develop strategies for other green industries and activities. These include: Wind energy generation Key milestones: 2010/11 Q4: Development of wind energy generation strategy and action plan SAWEP project: Investigation into the Development of a Wind Energy Industrial Strategy for South Africa
17 Wind Resources Estimated wind potential ranges from 3 GW to 64 GW and more Tripod Review (2003) of Wind Energy Resources (Atlases) in South Africa concluded: these studies are inconclusive and under estimate the true wind energy potential as weather measurement stations at 10 m were used and in may cases these stations are shaded by buildings etc from measuring the true wind potential; and recommended that a dedicated wind energy measurement programme needs to be undertaken to confirm the true wind energy potential in SA SAWEP, RDE and partners (SANERI, CSIR, SAWS, UCT, Riso) Wind Atlas for South Africa project
18 Grid Connection & Integration Grid impact High level feasibility studies for analyzing the impact of up to 2800MW of wind generation in the Western Cape on the 400kV transmission grid have been carried out 1 The results show that no considerable impact on the transmission grid has to be expected and that it will be possible to accommodate such a high level of wind generation without any major upgrades of the 400kV transmission grid. At the same time it is understood that the transmission capacity of subtransmission and distribution grids (voltage levels <=132kV) will be limited in some cases and that major network upgrades at these lower voltage levels will be required. Grid codes South African Grid Code (v7, March 2008) South African Distribution Code (v5.1, Sept 2007) SA Grid codes to be revised to accommodate wind turbine technologies 1 Grid Integration of Wind Energy in the Western Cape, GTZ, DEADP, Eskom, Dec 2009
19 Grid Connection & Integration cont. Cost of Grid connection, integration Sample of 40 regional transmission studies 2 concluded: The majority of studies in our sample, however, have a unit cost of transmission that is below $500/kW, or roughly 25% of the current $2,000/kW capital cost of building a wind project. The median cost of transmission across all scenarios in our sample is $300/kW, on a capacity weighted basis; roughly 15% of the current cost of building a wind project Capacity Credit How much 'conventional' power can be avoided or replaced by wind power? 2 The Cost of Transmission for Wind Energy: A Review of Transmission Planning Studies. Andrew Mills, Ryan Wiser, and Kevin Porter. Ernest Orlando Lawrence Berkeley National Laboratory. February Download from
20 Conclusion Business case environment for wind energy utilisation in South Africa has been established In place: Policy (Energy, Environment, Industrial), Legal and Regulatory framework (Electricity Regulation, NEMA, regulations) Financing framework (REFIT, cost of grid connection, integration?) Capacity allocation framework (IRP) Outstanding: REFIT implementation: rules of the game Buyer, Capacity value of wind energy
21 Thank you
22 Wind Atlas for South Africa: Workshop Date: 4 March Time: 8:30 Venue: River Club, Observatory, Cape Town
Derisking Renewable Energy Investment
Derisking Renewable Energy Investment A framework to support policymakers in selecting public instruments to promote renewable energy investment in developing countries CESC Webinar 12 June 2013 Andre
More informationSmall scale Hydro Electric Power IPP compliance with legislation and REBID process
Small scale Hydro Electric Power IPP compliance with legislation and REBID process Your project development partner, delivering value through a multi-skilled team 29 th May 2012 Contents 1. Legislation
More informationInterim (5 km) High-Resolution Wind Resource Map for South Africa
Interim (5 km) High-Resolution Wind Resource Map for South Africa Andre Otto SANEDI Niels G Mortensen, Andrea N Hahmann & Jens Carsten Hansen DTU Wind Energy Eugéne Mabille and Eric Prinsloo CSIR Windaba
More informationAlternative Energy Generation Strategies for South Africa
Alternative Energy Generation Strategies for South Africa Review of Renewable Energy Generation Strategies in South Africa Michael Goldblatt, PDG Workshop 1 22 June 2010 Overview Scope and Background Status
More informationCONTENTS 2. PROJECT DESCRIPTION NEED FOR THE PROJECT ABOUT THE PROPONENT SITE SELECTION OVERVIEW OF THE PROJECT 2 5
CONTENTS 2. PROJECT DESCRIPTION 2-2 2.1 NEED FOR THE PROJECT 2 2 2.2 ABOUT THE PROPONENT 2 4 2.3 SITE SELECTION 2 4 2.4 OVERVIEW OF THE PROJECT 2 5 Figure 2.1: Provisional wind profile for the Jeffrey
More informationBOLAND ENVIRONMENTAL CONSULTANTS CC
BOLAND ENVIRONMENTAL CONSULTANTS CC y ENVIRONMENTAL IMPACT ASSESSMENT PROCESS Proposed Photo-Voltaic Solar Power Plant On Farm Nuwerus, No. 450 Portion 6, Worcester DEA REF. NO: 12/12/20/2019 BACKGROUND
More informationRegulatory Framework PPAs and IPPs
Regulatory Framework PPAs and IPPs Perspectives from an IPP African Forum for Utility Regulators Workshop on Regulation 7 December 2016 Agenda Enel Group Overview Introduction to EGP Electricity Policy
More informationNERSA Public Hearing Dyason s Klip 1 (Pty) Ltd
Scatec Solar ASA NERSA Public Hearing Dyason s Klip 1 (Pty) Ltd Presented by Jan Fourie Business Development Manager September 2015 Project Company-General Information Dyason s Klip 1 (Pty) Ltd (formerly
More informationInformation on a joint Agricultural and Renewable Energies Program at Sandfontein Farm, Bonnievale Bonnievale Solar Farm
Information on a joint Agricultural and Renewable Energies Program at Sandfontein Farm, Bonnievale Bonnievale Solar Farm Overview This proposal describes the concept of a joint agricultural and renewable
More informationStrategic Environmental Assessments (SEAs) for large scale infrastructure projects
Strategic Environmental Assessments (SEAs) for large scale infrastructure projects 1 Presented by: Lydia Cape (Pr. Sci. Nat. Environmental Sciences) Council for Scientific and Industrial Research, South
More informationThe Greening of Energy. Eskom s role in the Renewables Industry in South Africa
The Greening of Energy Eskom s role in the Renewables Industry in South Africa Contents 1 Background and Eskom at a glance 2 Eskom s strategy and aspirations on Renewables 3 Eskom s role in the current
More informationIndependent Power Producer procurement Improving integration with municipal distributors
25 th AMEU Technical Convention 4-7 October 2015 Independent Power Producer procurement Improving integration with municipal distributors Dr Clinton Carter-Brown IPP Office A partnership between: Department
More informationAPPLICATION FOR A GENERATOR AND A SUPPLY CONNECTION AT THE SAME POINT OF SUPPLY TO THE ESKOM NETWORK. Revision September 13 July 2016
E Ph APPLICATION FOR A GENERATOR AND A SUPPLY CONNECTION AT THE SAME POINT OF SUPPLY TO THE ESKOM NETWORK Revision 08 01September 13 July 2016 Introduction (This form should be completed if the generator
More informationSouth African IPP Procurement Programme. December 2016
South African IPP Procurement Programme December 2016 Where are We? Urbanisation with increasing electricity demand, especially around urban areas; Looking for economic growth, which can be incentivised
More informationACEF Deep Dive Workshop. 5 8 July 2017 Manila, Philippines
ACEF Deep Dive Workshop 5 8 July 2017 Manila, Philippines Our journey Our challenge Addressing the Gaps Legislative mandate Identifying the blockages Roles and Responsibilities Integrated Resource Plan
More informationNOTICE OF INTENT. 2. This notification should be submitted not less than 14 days prior to initiating the basic assessment process.
Notice of intent to submit an application in terms of regulation 22 (b) of Government Notice No. R 385 in terms of Chapter 5 of the National Environmental Management Act, 1998 (Act 107 of 1998). July 2006
More informationOverview of the South Africa s Independent Power Producers Procurement Programme
Overview of the South Africa s Independent Power Producers Procurement Programme A partnership between: Department of Energy National Treasury Development Bank of Southern Africa - Enabling Renewable Energy
More informationCSIR Energy Autonomous Campus Biogas Project
CSIR Energy Autonomous Campus Biogas Project Presented at Crowne Plaza Hotel, Nairobi Kenya 2 March 2018 Patience Sigawuke Tel: +27 12 842 7273 Email: psigawuke@csir.co.za Dr Tobias Bischof-Niemz Chief
More informationENVIRONMENTAL IMPACT ASSESSMENT: PROPOSED PHOTOVOLTAIC ENERGY PLANT ON FARM KLIPGATS PAN NEAR COPPERTON, NORTHERN CAPE
ENVIRONMENTAL IMPACT ASSESSMENT: PROPOSED PHOTOVOLTAIC ENERGY PLANT ON FARM KLIPGATS PAN NEAR COPPERTON, NORTHERN CAPE 1 MAY 2012 DEA REF. NO. 12/12/20/2501 NEAS REF. NO. DEAT/EIA/0000611/2011 EXECUTIVE
More informationNERSA Public Hearing InnoWind / IDC Round 2 Projects
Photomontage Thomas River Wind Farm Eastern Cape (80MW) NERSA Public Hearing InnoWind / IDC Round 2 Projects August 2012, Port Elizabeth Presented by: Kevin Minkoff, InnoWind. AGENDA I. Consortium Overview
More informationStrategic Grid Network Study
Strategic Grid Network Study To adapt to the uncertainty of future load and generation To identify the critical power corridors and constraints on the transmission network Unlock and create a flexible
More informationConcentrating solar power and renewable energy policy instruments
Concentrating solar power and renewable energy policy instruments Max Thabiso Edkins 3 September 2010 Energy Research Centre University of Cape Town 1 ERC A thought experiment: elephants in KNP 2 ERC What
More information4 ADMINISTRATIVE FRAMEWORK 4.1 INTRODUCTION
4 ADMINISTRATIVE FRAMEWORK 4.1 INTRODUCTION This section provides an overview of legislation, guidelines and information documents that have informed the scope and content of this report and the approach
More informationNERSA Public Participation Process Klipheuwel Dassiesfontein Wind Energy Facility March 1, 2012
NERSA Public Participation Process Klipheuwel Dassiesfontein Wind Energy Facility March 1, 2012 Contents I. Introducing BioTherm Energy II. Klipheuwel Dassiesfontein Wind Energy Facility I. Project Information
More informationThe Jeffreys Bay Wind Farm
The Jeffreys Bay Wind Farm African Utility Week Cape Town, 15 th May 2013 Presented by : Tom Thorogood & Davin Chown Mainstream South Africa A Lead Project with a pioneering history in SA 2001 : Project
More informationLarge-scale rollout of Concentrating Solar Power in South Africa
Large-scale rollout of Concentrating Solar Power in South Africa Max Edkins Climate Strategies Side Event Bonn 5 June 2009 Energy Research Centre University of Cape Town 1 ERC South Africa s LTMS Peak
More informationSTRATEGIC CONTEXT FOR ENERGY PLANNING CHAPTER 2
STRATEGIC CONTEXT FOR ENERGY PLANNING CHAPTER 2 Eskom contributes to its vision of together building the powerbase for sustainable growth and development through its core business focus on electricity
More informationSouth African Mainstream Renewable Jeffreys Bay Pty Ltd
South African Mainstream Renewable Jeffreys Bay Pty Ltd Presented to : NERSA, Pine Lodge Conference Centre, Port Elizabeth Date: 2 nd March 2012 Presentation outline 1. Background 2. Milestones 3. Project
More informationRenewable Energy & Energy Efficiency in Egypt
Renewable Energy & Energy Efficiency in Egypt Vision, Strategy, and Policies Of Renewable Energy Vision, Strategy, and Policies Vision Increase Share of renewable energy in the energy sector. Targets Generate
More informationBackground Information Document
Background Information Document Independent Power Producer Programme: EIA for a Floating Power Plant and EIA for LNG Import Facilities, Port of Richards Bay: ERM Ref Number: 0320839 Purpose of this Background
More informationWIND ENERGY FACILITY AND ASSOCIATED INFRASTRUCTURE. COMMENTS AND RESPONSE REPORT: I&APs & STAKEHOLDERS EIA Phase
WIND ENERGY FACILITY AND ASSOCIATED INFRASTRUCTURE COMMENTS AND RESPONSE REPORT: I&APs & STAKEHOLDERS EIA Phase Land Use and Landowners 1 Is Eskom planning to purchase the land from the relevant landowners,
More informationBackground Information Document
Background Information Document Independent Power Producer Programme: EIA for a Floating Power Plant and EIA for LNG Import Facilities, Port of Richards Bay: ERM Ref Number: 0320839 Purpose of this Background
More informationATLANTIC ARRAY OFFSHORE WINDFARM INITIAL CONSULTATION AVIATION INTERESTS
ATLANTIC ARRAY OFFSHORE WINDFARM AVIATION INTERESTS Document Information Document title Author Produced by Atlantic Array Offshore Windfarm Initial Consultation Andrew Radforth, Cyrrus Limited Cyrrus Ltd
More informationBACK GROUND INFORMATION DOCUMENT
PROJECT: Basic Environmental Assessment for the Construction of a lodge and additional staff accommodation, Lion Sands, Sabi Sand Game Reserve BACK GROUND INFORMATION DOCUMENT CONSULTANT: EMROSS Consulting
More informationThe Uilenkraal Bio-gas Power Generation Plant
The Uilenkraal Bio-gas Power Generation Plant Dr. Andrew Taylor Cape Advanced Engineering (Pty) Ltd andrewtaylor@cae.co.za 4 October 2015 the South African reality typical Eskom winter profile - 2015 peak
More informationA E Solution Utility & Municipal Energy Services. Reg no 2007/ /07
SMART BUSINESS CASE FOR PHOTO VOLTAIC PANELS Solar Energy available in South Africa 2x10 Perceptions exist in South Africa that renewable energy is only suitable for small-scale scale applications, where
More informationTechnical considerations for integration of distributed renewables on the grid
Technical considerations for integration of distributed renewables on the grid A paper by Dr Charlotte Higgins, Dr Bunmi Adefajo & Kumbuyani Chisoro Kumbuyani Chisoro Manager Southern Africa TNEI Services
More informationThe Superior Value of Distribution-interconnected Generation
The Superior Value of Distribution-interconnected Generation Summary: The cost of delivering energy from the point it is interconnected to the grid to the point that it is consumed by a customer can be
More informationStakeholder Consultation on Draft IEP/IRP 2016
PAMSA Comment & recommendations Stakeholder Consultation on Draft IEP/IRP 2016 7 December 2016 Jane Molony & Sue Rohrs + A CASE FOR CO-GENERATION Introduction n PAMSA represent over 90% of the pulp and
More informationSOUTH AFRICA POWER MARKET OUTLOOK TO MARKET TRENDS, REGULATIONS AND COMPETITIVE LANDSCAPE
REFERENCE CODE GDPE0686ICR PUBLICATION DATE AUGUST 2013 SOUTH AFRICA POWER MARKET OUTLOOK TO 2030 - MARKET TRENDS, REGULATIONS AND Executive Summary Thermal Power is the Dominant Source in the Power Mix
More informationNxuba Wind Farm NERSA PUBLIC HEARINGS. 10 September 2015
Nxuba Wind Farm NERSA PUBLIC HEARINGS 10 September 2015 1 Nxuba Wind Farm has been appointed as a Preferred Bidder in the Fourth Round of the Department of Energy s (DoE) Renewable Energy IPP Procurement
More informationREFIT comments AND Recommendations to Nersa
REFIT comments AND Recommendations to Nersa Presented by Guy Spindler 5 th of May 2011 1 [Presentation title] [Client Name] 9 May 2011 REFIT comments and recommendations to Nersa CONTENTS OF PRESENATATION
More informationGuide and overview to the Independent Power Producer (IPP) Process in South Africa and Eskom. June 2010
Guide and overview to the Independent Power Producer (IPP) Process in South Africa and Eskom June 2010 Context Introduction and background Country process Independent system and market operator Current
More informationRenewable Energy in South Africa Resources and Opportunities STIAS Energy Workshop 5 March2013 Stellenbosch
Renewable Energy in South Africa Resources and Opportunities STIAS Energy Workshop 5 March2013 Stellenbosch Prof JL (Wikus) van Niekerk Director Studies Stellenbosch University Slide 1 REIPPPP Progress
More informationSEA FOR STRATEGIC GRID PLANNING IN SOUTH AFRICA: Enabling the efficient and effective roll out of strategic electricity transmission infrastructure
SEA FOR STRATEGIC GRID PLANNING IN SOUTH AFRICA: Enabling the efficient and effective roll out of strategic electricity transmission infrastructure Abstract ID: 409 Authors: Marshall Mabin (1), Paul Lochner
More informationSolar power: The African Opportunity
NATIONAL CLEANER PRODUCTION CENTRE SOUTH AFRICA Solar power: The African Opportunity Technical Workshop: Solar SOS Africa Utility Week, May 16th 2018 Sashay Ramdharee Regional Project Manager www.ncpc.co.za
More informationSouth Africa: Transitioning to a low-carbon economy
South Africa: Transitioning to a low-carbon economy Presentation to the Forum on the Impact of the Implementation of Response Measures Doha, 28 November 2012 Introduction Substantial steps taken by South
More informationSouth African National Energy Research Institute Accelerating Renewable Energy Deployment
South African National Energy Research Institute Accelerating Renewable Energy Deployment Total Energy Supply Total primary energy supply 0.2% 10.4% 2.6% 16.3% 1.6% Coal Crude oil Gas Nuclear Hydro Renewables
More informationPROPOSED WAAIHOEK WIND ENERGY FACILITY UTRECHT KWA-ZULU NATAL
ENVIRONMENTAL IMPACT ASSESSMENT PROCESS PROPOSED WAAIHOEK WIND ENERGY FACILITY UTRECHT KWA-ZULU NATAL BACKGROUND INFORMATION DOCUMENT April 2014 (2 nd Edition) Project developer: South Africa Mainstream
More informationBackground Information Document
Background Information Document Independent Power Producer Programme: EIA for a Floating Power Plant and EIA for LNG Import Facilities, Port of Saldanha: ERM Ref Number: 0320754 Purpose of this Background
More informationJune Prepared for Eskom Holdings Limited PO Box 1091 Johannesburg Prepared by ENVIRONMENTAL IMPACT ASSESSMENT PROCESS DRAFT SCOPING REPORT
ENVIRONMENTAL IMPACT ASSESSMENT PROCESS DRAFT SCOPING REPORT PROPOSED DECOMMISSIONING AND RELOCATION OF THE THREE GAS TURBINE UNITS AT ACACIA POWER STATION (NEAR GOODWOOD, WESTERN CAPE) AND ONE GAS TURBINE
More informationBIOMASS POWER PLANT NEAR MKUZE, KWAZULU-NATAL
BIOMASS POWER PLANT NEAR MKUZE, KWAZULU-NATAL DEA ref: 14/12/16/3/3/1/619 MOTIVATION FOR AMENDMENT OF ENVIRONMENTAL AUTHORISATION March 2014 Prepared for: Navosync (Pty) Ltd Suite 103 Dixon Street, Cape
More informationIntegration of Renewable Energy Sources in the Electricity System - Grid Issues -
Integration of Renewable Energy Sources in the Electricity System - Grid Issues - Brussels, 30 March 2005 Background At European and national level mid-term plans exist to increase the share of electricity
More informationThe need and desirability of this Project is discussed below, including strategic plans, frameworks and policies applicable to the area and Project.
2 PROJECT MOTIVATION When considering an application submitted under the EIA Regulations (GNR 982/2014), the relevant competent authority must take a number of factors into consideration, including the
More informationPositioning Nelson Mandela Bay for Renewable Energy Manufacturing Opportunities
Positioning Nelson Mandela Bay for Renewable Energy Manufacturing Opportunities Presented to Nelson Mandela Bay Business Chamber Ibhayi Town Lodge, Port Elizabeth 16 th March 2012 Presented by Davin Chown
More informationEskom s Single Buyer Office Perspective on renewable energy procurement. Clean Power Africa Conference. 5 September 2012.
Eskom s Single Buyer Office Perspective on renewable energy procurement Clean Power Africa Conference 5 September 2012 Yousuf Haffejee here Head of Single Buyer Office Eskom Eskom is fully supportive of
More informationClimate Change and the Carbon Market
Click to edit Master title style Forest Industry: Opportunities and Incentives Climate Change and the Carbon Market Focus on Forest Engineering November 2010 TAPPSA 2010 Conference Durban, South Africa
More informationState of the Power System. Mr Paul O Flaherty Finance Director 16 February 2012
State of the Power System Mr Paul O Flaherty Finance Director 16 February 2012 Disclaimer This presentation does not constitute or form part of and should not be construed as, an offer to sell, or the
More informationResidential Heat Pump Rebate Programme
Residential Heat Pump Rebate Programme Information session 18 February 2011 Agenda Item Residential heat pump rebate programme Opening Technology and welcome Who Andrew Etzinger Conditions of participation
More informationRenewable Energy in Egypt Ehab Ismail Amin New and Renewable Energy Authority
Renewable Energy in Egypt Ehab Ismail Amin New and Renewable Energy Authority ehab4768@gmail.com www.nrea.gov.eg Contents Energy and Renewable Energy Strategies. Renewable Energy Sector. Renewable Energy
More information(4 November 2016 to date) ELECTRICITY REGULATION ACT 4 OF 2006
(4 November 2016 to date) ELECTRICITY REGULATION ACT 4 OF 2006 Government Notice 660 in Government Gazette 28992, dated 5 July 2006. Commencement date: 1 August 2006 unless otherwise indicated [Proc. R30,
More information- Solar Corridor Support Programme -
for the Sustainable Energy for All (SE4All) Initiative - Solar Corridor Support Programme - Project funded by the European Union EuropeAid/Development Cooperation Instrument DCI-ENV/2013/335-152 This project
More informationUPDATED FOR THE THIRD BID SUBMISSION DATE. First Issued: 3 August 2011 Reissued for Third Bid Submission Date: May 2013 TENDER NO: DOE/003/13/14
1 03/05/2013 UPDATED FOR THE THIRD BID SUBMISSION DATE First Issued: 3 August 2011 Reissued for Third Bid Submission Date: May 2013 TENDER NO: DOE/003/13/14 The Republic of South Africa Department of Energy
More information6. CONCLUSIONS AND RECOMMENDATIONS
Environmental Impact Assessment Report: Proposed third 400 kv Transmission line between Poseidon and Grassridge, Eastern Cape and Extension to Grassridge 6. CONCLUSIONS AND RECOMMENDATIONS This Environmental
More informationBRYPAAL SOLAR POWER (PV) PROJECT AND ASSOCIATED INFRASTRUCTURE
JUNE 2017 ENVIRONMENTAL IMPACT ASSESSMENT PROCESS CONSTRUCTION OF THE PROPOSED BRYPAAL SOLAR POWER (PV) PROJECT AND ASSOCIATED INFRASTRUCTURE NORTHERN CAPE BACKGROUND INFORMATION DOCUMENT A commercial
More informationIndependent Power Producers (IPPs)
AGRI-SA Commodity Conference 2016 Independent Power Producers (IPPs) 26 February 2016 By: Title: W. Böhmer Regional Manager Eskom Grid Access Unit Overview of the presentation Introduction. Achievements
More information2010 EIA Regulations GNR 543 of 18 June 2010, effective 2 August 2010
2010 EIA Regulations GNR 543 of 18 June 2010, effective 2 August 2010 CH 1 INTERPRETATION AND PURPOSE OF THESE REGULATIONS S 1 Interpretation; S 2 Purpose of Regulations CH 2 COMPETENT AUTHORITY S3 Who;
More informationSandveld Environmental Management Framework: Overview & Lessons Learned Genevieve Pence & Paul Hardcastle
Sandveld Environmental Management Framework: Overview & Lessons Learned Genevieve Pence & Paul Hardcastle Biodiversity Planning Forum Wilderness, 7-10 June 2016 Background & Need for EMF Issues raised
More informationDose reduction initiatives at the Koeberg Nuclear Power Station ISOE ALARA Symposium. Marc Maree Corporate Specialist (Radiation Protection)
Dose reduction initiatives at the Koeberg Nuclear Power Station 2012 ISOE ALARA Symposium Marc Maree Corporate Specialist (Radiation Protection) Presentation overview Introduction Overview of Koeberg Koeberg
More informationWind Energy Basics & Project Cycle
Wind Energy Basics & Project Cycle WIND POWER PROJECT DEVELOPMENT PRACTICAL APPROACHES TO LAUNCHING SUSTAINABLE WIND PROJECTS October 18-19, 2011 1.800.580.3765 WWW.TTECI.COM Pramod Jain, Ph.D. Presented
More information3.2.6 Renewable Energy Independent Power Producer Procurement Programme (REIPPPP)
Southern African regional development and integration. Security of supply. The Policy-Adjusted IRP includes recent developments with respect to prices and allocates 17.8GW for renewables of the total 42.6GW
More informationCONCENTRATED SOLAR POWER POTENTIAL OVERVIEW
CONCENTRATED SOLAR POWER POTENTIAL OVERVIEW ELECTRICITY GENERATION BALANCE Capacity Generation (MW) (TWh) Hydroelectric 661.903 Nuclear 1 800 12.238 Geothermal and Other 17.296 Thermal 38 020 214.893 Totals
More informationESKOM Transmission Line Mercury to Perseus. Template of presentation used during alternative corridor investigation phase
ESKOM Transmission Line Mercury to Perseus Template of presentation used during alternative corridor investigation phase Project Team The Proponent: ESKOM Transmission Environmental Consultants: Strategic
More informationPower Integrated Resource Plan Progress Update
Power Integrated Resource Plan Progress Update Municipal Services Committee September 12, 2017 Item 4A Overview Provide a Progress Report on the 2015 IRP Next Steps for the 2018 IRP 2 Power Integrated
More informationSustainable energy solutions for South African local government. A practical guide
Sustainable energy solutions for South African local government A practical guide Produced by Sustainable Energy Africa The Green Building 9B Bell Crescent Close Westlake 7945 tel: 021-7023622 fax: 021-7023625
More informationDESCRIPTION OF THE GOURIKWA POWER STATION & TRANSMISSION INTEGRATION PROJECT CHAPTER 3
DESCRIPTION OF THE GOURIKWA POWER STATION & TRANSMISSION INTEGRATION PROJECT CHAPTER 3 This chapter provides details regarding the scope of the proposed Gourikwa Power Station and Transmission Integration
More informationMedium Term Scenarios for Electricity Supply/Demand Balance
Medium Term Scenarios for Electricity Supply/Demand Balance The Sustainable Energy Seminar Corrie Visagie 6 October 2010 Table of Contents Key assumptions : Demand & Supply Medium Term Outlook: Demand
More informationZAMBIA REFIT POLICY 2015 GENERAL OVERVIEW
ZAMBIA REFIT POLICY 2015 GENERAL OVERVIEW IES / SEE / Ea Pty Ltd 17 March 2014 Lusaka REFiT Status Work undertaken so far includes: Three Background Reports Interviews, meetings, data collection Workshops
More informationAnalysis of changes in LCOE for wind power since REFIT 2009
14-7-211 ejs Analysis of changes in LCOE for wind power since REFIT 29 Levelised cost of electricity (LCOE) is a simple way of comparing unit costs of different generation technologies and is widely used
More informationSECURITY OF POWER SUPPLY
SECURITY OF POWER SUPPLY What is the Situation and What is Namibia Doing? A Presentation to the Mining Conference 21 May 2015 Safari Conference Centre Windhoek, Namibia By Paulinus Shilamba Managing Director
More informationRenewable Portfolio Standards
Renewable Portfolio Standards Lisa Schwartz Presentation to Oregon State University Energy Economics Class Feb. 22, 2010 The Regulatory Assistance Project China EU India United States About the Regulatory
More informationSOCIAL IMPACT ASSESSMENT FOR
SOCIAL IMPACT ASSESSMENT FOR BOITSHOKO SOLAR (RF) (PTY) LTD ENERGY FACILITY NORTHERN CAPE PROVINCE April 2016 Prepared for Boitshoko Solar (RF) (Pty) Ltd By Leandri Kruger EXECUTIVE SUMMARY INTRODUCTION
More informationCTF/TFC.12/6/Rev.1 October 27, Meeting of the CTF Trust Fund Committee Washington D.C. October 28, Agenda Item 7
Meeting of the CTF Trust Fund Committee Washington D.C. October 28, 2013 CTF/TFC.12/6/Rev.1 October 27, 2013 Agenda Item 7 UPDATE OF CTF INVESTMENT PLAN FOR SOUTH AFRICA PROPOSED DECISION Recalling its
More informationThe Phase Gas Pipeline Strategic Environmental Assessment (SEA) November 2017
The Phase Gas Pipeline Strategic Environmental Assessment (SEA) 01-13 November 2017 Background Energy Planning White Paper on Energy Policy 1998 Energy security Access to affordable, sustainable energy
More informationINTRODUCTION PROJECT DESCRIPTION
JOE GQABI DISTRICT MUNICIPALITY DROUGHT RELIEF PROGRAMME PROPOSED LADY GREY BULK WATER SUPPLY PROJECTS, LADY GREY, SENQU MUNICIPALITY, EASTERN CAPE EIA BACKGROUND INFORMATION DOCUMENT INTRODUCTION Joe
More informationEXECUTIVE SUMMARY 1. INTRODUCTION
I 1. INTRODUCTION EXECUTIVE SUMMARY Mulilo Renewable Energy (Pty) Ltd (later referred to as Mulilo) has identified two alternative sites for the establishment of a 10MW photovoltaic (PV) power generation
More informationEvan Rice CEO GreenCape South Africa. Towards a GreenTech SEZ in Atlantis: Manufacturing opportunities for development of local capacity
Evan Rice CEO GreenCape South Africa Towards a GreenTech SEZ in Atlantis: Manufacturing opportunities for development of local capacity GreenCape A non-for-profit sector development agency that supports
More informationDEVELOPMENT OF RENEWABLE ENERGY MARKET IN JAMAICA
DEVELOPMENT OF RENEWABLE ENERGY MARKET IN JAMAICA A Regulatory Perspective Courtney Francis 2018 February JAMAICA ENERGY SECTOR VISION Jamaica s National Vision Jamaica, the place of choice to live, work,
More informationThe Republic of South Africa. Department of Energy
The Republic of South Africa Department of Energy EXPRESSION OF INTEREST IN RESPECT OF IDENTIFYING ONE OR MORE STRATEGIC PARTNER(S) FOR THE DEVELOPMENT, FINANCING, CONSTRUCTION, OPERATION AND MAINTENANCE
More informationBASIC ELEMENTS OF A PROPOSED RENEWABLE ENERGY FEED-IN TARIFF LAW FOR [AZERBAIJAN] 2009 CONTENTS
BASIC ELEMENTS OF A PROPOSED RENEWABLE ENERGY FEED-IN TARIFF LAW FOR [AZERBAIJAN] 2009 CONTENTS 1 Purpose 2 Scope 3 Targets 4 Eligible technologies and plants 5 Grid connection, reinforcement and costs
More informationUnlocking the Green Economy and Solar PV Industries
Unlocking the Green Economy and Solar PV Industries 11 March 2015 AGENDA Introduction Overview of the sector in South Africa Views on the RE market in South Africa progress, successes, future challenges
More informationSANEDI Energy: Fossil Fuels and Solar Potential in South Africa
SANEDI Energy: Fossil Fuels and Solar Potential in South Africa Dr (Prof) Tony Surridge Senior Manager: Advanced Fossil Fuels Programme 20 August 2014 South African National Energy Development Institute
More information2.4.3 Roads and water crossings
HYDOIL MOB DTE10 EXL32 250 l 21 Inside Turbine TEXACO RANDO WM 32 250 l 21 Inside Turbine SF6 gas Sulphur hexafluoride 7.53 kg 0.7028 Switchgear GREASE, CASTROL OPTIMOL OPTIPIT 2 kg 0.186666667 Inside
More information7-8 NOVEMBER 2018 CAPE TOWN, SOUTH AFRICA
7-8 NOVEMBER 2018 CAPE TOWN, SOUTH AFRICA South Africa s IPP Procurement Programme SOUTH AFRICA S PREMIER WIND ENERGY CONFERENCE & EXHIBITION South Africa s IPP Procurement Programme is informed by the
More informationFigure 1.1: Location of Majuba Power Station within the Pixley Ka Seme Local Municipality
1 INTRODUCTION Majuba Power Station is located near Amersfoort in the Mpumalanga Province and falls within the Pixley Ka Seme Local Municipality (Figure 1.1) which falls within the Gert Sibande District
More informationRenewable Energy Scenarios
Renewable Energy Scenarios for Municipalities in South Africa January 2018 Opportunities in Renewable Energy and Energy Efficiency for Municipalities in South Africa 2 Opportunities in Renewable Energy
More informationPRESENTATION TO 7 th GERMANY- AFRICAN ENERGY SUMMIT APRIL 2013, GERMANY
PRESENTATION TO 7 th GERMANY- AFRICAN ENERGY SUMMIT APRIL 2013, GERMANY HYDROPOWER PROJECTS AND INVESTMENT OPPORTUNITIES IN ZAMBIA PRESENTED BY DEPUTY MINISTER OF MINES, ENERGY & WATER DEVELOPMENT HON.
More informationFULL SCOPING AND ENVIRONMENTAL IMPACT ASSESSMENT PROCESS
FULL SCOPING AND ENVIRONMENTAL IMPACT ASSESSMENT PROCESS Agricultural Expansion on Portion 2 of Farm 92, Tregaron, known as Sylvania, Sundays River Valley Municipality BACKGROUND INFORMATION DOCUMENT,
More information4 PROJECT ALTERNATIVES
4 PROJECT ALTERNATIVES As per the EIA Regulations published in Government Notice R543 of 18 June 2010 in terms of Section 24 (5) of the National Environmental Management Act (Act No. 107 of 1998), feasible
More informationSolar PV resource for higher penetration through a combined spatial aggregation with wind
Solar PV resource for higher penetration through a combined spatial aggregation with wind Dr. Tobias Bischof-Niemz, Crescent Mushwana, Stephen Koopman 6DO.5.2 EU PVSEC 2016, 20-24 June, Munich, Germany
More information