BASED ON EXPERIENCE TGE GAS ENGINEERING EVOLUTION OF SAFETY DESIGN FOR CRYOGENIC TANKS REVAMP VS. NEW BUILT
|
|
- Dale Merritt
- 6 years ago
- Views:
Transcription
1 BASED ON EXPERIENCE TGE GAS ENGINEERING EVOLUTION OF SAFETY DESIGN FOR CRYOGENIC TANKS REVAMP VS. NEW BUILT Page 1
2 CONTENT Overview on the services and experience of TGE Gas Engineering GmbH Examples of revamp projects Some spotlights on overall requirements for the design of cryogenic tank farms Conclusion Page 2
3 COMPANY PROFILE TGE Gas Engineering GmbH (TGE) is one of the world s leading contractors for projects involving the storage and handling of liquefied gases in the energy and petrochemical/chemical industries. TGE has over 30 years of experience in this field, providing full range of services from concept /feasibility studies through to Lump Sum Turn-Key Project execution. Our target is to provide to customers the added value based on our experience and Know-How in delivering millions of m³ of Liquefied Gas Storages and Handling Facilities. TGE is a technology focused company that is active worldwide with main operating units throughout Europe and Asia LIQUEFIED GAS STORAGE CAPACITY PERFORMED (m³) Status Sep Overall capacity LNG Ethylene / Ethane Propylene, LPG, etc. Page 3
4 PRODUCT LINES Storages and Terminals for LNG Storage and Terminals for Petrochemical/ Chemical Gas Small-Mid Scale Natural Gas LNG Liquefaction Plants Other Package Plants for gas treatment or elements of storage product lines LNG as Fuel Storage Tank Design Services Page 4
5 FACTS & FIGURES STORAGES AND TERMINALS FOR LNG 17 Projects in Total (EPC & EP+CS) Import Terminals: 9 Export Terminals: 7 Import/Export Terminal: 1 72 LNG Truck/Container Loading Stations STORAGE TANKS Storage Tanks installed 30, ,000 m³ Storage Tanks designed 5, ,000 m³ Storage Tanks installed in Europe 940,000 m³ Storage Tanks installed in Asia 1,908,000 m³ Total Regasification Capacity > 13 mio t/a Total Production Capacity Small-Mid Scale LNG > 3 mio t/a Reference for all relevant International Design Codes: Tanks: EN 14620, EUROCODE API 625, API 620, ACI 376 Facilities: EN 1473, NFPA 59a, INSTALLED CAPACITY 21 Full Containment Tanks 2,838,000 m³ 5 Single Containment Tanks 170,000 m³ TOTAL INSTALLED CAPACITY 3,008,000 m³ Page 5
6 FACTS & FIGURES STORAGES AND TERMINALS FOR PETROCHEMICAL GASES 36 Projects in Total (EPC & EP+CS) for Petrochemical Products: Ethylene, Ethane, Propylene, Butane, LPG, Ammonia. STORAGE TANKS Tanks installed with capacities from up to 3, ,000 m³ Facilities installed in Europe 327,000 m³ Facilities installed in Asia 1,684,000 m³ LARGEST INSTALLED CAPACITY LPG 120,000 m³ Full Containment 20 Full Containment Tanks with installed capacity INSTALLED CAPACITY 1,205,000 m³ Ethylene Ethane 80,000 m³ Full Containment 120,000 m³ Full Containment 22 Single Containment Tanks with installed capacity 560,000 m³ Propylene 80,000 m³ Full Containment TOTAL INSTALLED CAPACITY 1,765,000 m³ Ammonia 25,000 ton Full Containment Page 6
7 SCOPE OF SERVICES Consultancy Technical and Commercial Feasibility Studies Site Selection Conceptual Design Environmental Impact Assessment (EIA) and HAZOP Studies Capital Cost (CAPEX) and Operating Cost (OPEX) Estimation Business Plan for Capital Investments and Operations Basic Engineering and Front End Engineering Design (FEED) Detailed Engineering Procurement/Procurement Services Construction/Construction Services Supervision Services Pre-Commissioning and Commissioning Services Start-Up/Shut Down Services Selection and Training of Operators Operation and Maintenance Services Life-Cycle Engineering Studies and Plant Life-Cycle Optimisation Page 7
8 REVAMP PROJECTS - EXAMPLE 1 15,000 TON AMMONIA TANK BUILT AROUND 1970 (OUTSIDE EU) Ammonia - Toxic, Hazardous to Waters No Flare connected, low tech instrumentation Single wall Overfill protection directly to sewage Various shell penetrations (instruments, manhole) PSV to atmosphere, design pressure 2 psi g Zip-weld -> uncontrolled evaporation Tank insulation: exposed to atmosphere Considered loads: dead weight hydrostatic pressure, internal gas pressure, wind Page 8
9 REVAMP PROJECTS - EXAMPLE 1 15,000 TON AMMONIA TANK BUILT AROUND 1970 External insulation deterioated, structure corroded, undetected icing Ship unloading with hoses BOG system outdated Page 9
10 REVAMP PROJECTS - EXAMPLE 1 25,000 TON AMMONIA TANK NEW BUILT 2013 FC Steel / Steel with bottom outlet acc. to API 620 Design Pressure 290 mbarg State of the Art Instrumentation, DCS, Fail safe SCS New BOG Handling Systems, Unloading Systems, Send out Pumps, etc. Page 10
11 REVAMP PROJECTS - EXAMPLE 1 NEW BUILT AMMONIA TANK OLD TANK REFURBISHED Old tank completely inspected, refurbished Updated instrumentation, valves, safety installations, etc. Back in service together with new tank Sharing process installation as BOG system, send out systems, DCS, etc. Updated to State of the Art Instrumentation Connected to new BOG Handling Systems, Send out Pumps, etc. BUT still an old tank with single wall zip weld lower design pressure bottom outlet instead of submerged in-tank pumps with the related trade off on operation, safety, etc. Page 11
12 REVAMP PROJECTS - EXAMPLE 2 13,000 M³ ETHYLENE TANK COMMISSIONED 1967 (INSIDE EU) Tank was originally designed as Single Containment for Ethylene Service located in a petrochemical complex Inner tank 9% Ni, outer tank CS, Perlite Upgraded several times over it s lifetime First out of service inpection in 1990 Concrete bund wall added in 90 s to upgrade to Double Containment Changed to Propylene service Inspected and modified again in 2015 in order to allow Ethane service Page 12
13 REVAMP PROJECTS - EXAMPLE 2 13,000 M³ ETHYLENE TANK COMMISSIONED 1967 (INSIDE EU) Refurbishment: Best option for operator to satisfy demand on relatively short notice Safety Concept is still acceptable to authorities New Installations for BOG handling, send out, updated Tank Instrumentation, Tank Safety Valves, etc. Certain constraints with regard to the OLD tank had to be solved or compromises are accepted Page 13
14 SAFETY CONCEPTS / DESIGN CRITERIA LOAD CASES OF THE PAST VERSUS ACTUAL APPROACH TO STRUCTURAL DESIGN Load Cases past dead weight hydrostatic pressure, internal gas pressure, wind live loads Verification of allowable stresses metallic components Load Cases actual as before plus seismic ( OBE and SSE) fire blast spill Verification of ULS and SLS for metallic components concrete components Page 14
15 SAFETY CONCEPTS / DESIGN CRITERIA REQUIREMENTS TODAY HSE DESIGN & PERMITTING Individual / mandatory regulations are subject to revision SEVESO III (Directive 2012/18/EU) PURPLE BOOK EN 1473, NFPA59A Störfallverordnung NEW REQUIREMENTS MAY ENDANGER PERMIT FOR CONTINUED OPERATION OF OLD TANK Page 15
16 ESTABLISHMENTS ACC. ART.10 (SEVESOIII) QUALIFYING QUANTITIES Classification of establishment is based on Qualifying Quantities More than 200 ton of total storage of ammonia and liquefied flammable gases incl. LPG and natural gas upper-tier establishment (Seveso II, Seveso III) Safety report (Article 10) (c) demonstrating that adequate safety and reliability have been taken into account in the design, construction, operation and maintenance of any installation, storage facility, equipment and infrastructure connected with its operation which are linked to major-accident hazards inside the establishment; 5. Without prejudice to Article 11, the operator shall periodically review and where necessary update the safety report at least every five years. The operator shall also review and where necessary update the safety report following a major accident at its establishment, and at any other time at the initiative of the operator or at the request of the competent authority, where justified by new facts or by new technological knowledge about safety matters, including knowledge arising from analysis of accidents or, as far as possible, near misses, and by developments in knowledge concerning the assessment of hazards. Page 16
17 REVAMP VS. NEW BUILT CAN OLD TANKS WITHSTAND MODERN REQUIREMENTS? Evaluation on a case-by-case study Evaluation of demands of owners and authorities Design life time of 30 years often already exceeded fatigue corrosion Due to its construction, inspection of steel bottom not possible corrosion monitoring of outer steel tank Uncertainty: findings during inspection may exclude continued operation Loss of permit to operate Page 17
18 REVAMP VS. NEW BUILT CAN OLD TANKS WITHSTAND MODERN REQUIREMENTS? Less safety towards outer hazards: blast, impact, seismic Fire required plot size / safety distances, active cooling systems Corrosion: especially between concrete raft and tank bottom, anchors Undetected icing when using outer insulation sudden failure Thermal loading often neglected Quality of execution: outer tank exposed to environmental conditions during construction Construction stages: (e.g. wind with top-open tank) Process: limited max. pressure on steel tank. bigger compressor, higher OPEX Outer ring stiffeners of tank corrosion Roof spill: carbon steel will fail faster than concrete tank vapor leak (depending on spill size) or spill collection Page 18
19 REVAMP VS. NEW BUILT FULL CONTAINMENT TANK Best available technology Concrete raft, wall and roof durability fire, blast, impact less sensitive for roof loads not subject to sudden failure mechanisms like buckling Inner metallic tank isolated from all external loads except seimic In-tank pumps no wall- or bottom penetrations Insulation not exposed to environmental decay Smaller plot size required Higher internal pressure possible decreased CAPEX AND OPEX for refrigeration system Page 19
20 REVAMP VS. NEW BUILT DOES IT PAY OFF? WHAT TO CONSIDER? INSPECTION & REVAMP Decommissioning Cost Loss of Product to Flare Inertization, Air Purging Inspection Cost Accessibility of Annular Space, Removing Perlite needed? Cost of NDT / m of weld Laboratory Cost Risks of damage due to warming up? NEW BUILT TANK Long Lead Time New Permitting Required Tank: Higher CAPEX but significant savings in OPEX Construction possible in parallel while operating OLD tank State of the Art solution Re-Commissioning Cost Loss of Revenue due to Downtime Page 20
21 CONCLUSION Each plant needs to be reviewed individually Case-by-case evaluation of owner s individual demands and social responsibility Authority requirements need to be considered Revamped tank: low safety high OPEX low CAPEX unpredictable inspection result outcome for OP permit uncertain New-built tank: higher safety low OPEX high CAPEX increase durability and life-time OP permit independent of existing installation Page 21
22 THANK YOU FOR YOUR ATTENTION! Vielen Dank cпaсибо большое 多谢 Obrigado Page 22
23 CONTACT TGE Gas Engineering GmbH Mildred-Scheel-Str Bonn Germany tge-service@tge-gas.com Page 23
BASED ON EXPERIENCE TGE GAS ENGINEERING EPC EXECUTION OF BOREALIS ETHANE TANK PROJECT
BASED ON EXPERIENCE TGE GAS ENGINEERING EPC EXECUTION OF BOREALIS ETHANE TANK PROJECT www.tge-gas.com 24/10/2016 Page 1 CONTENT Overview on the Services and Experience of TGE Gas Engineering GmbH Project
More informationBASED ON EXPERIENCE TGE GAS ENGINEERING COMPANY PRESENTATION
BASED ON EXPERIENCE TGE GAS ENGINEERING COMPANY PRESENTATION Page 1 TGE GAS ENGINEERING ORGANISATION PRODUCT LINES AND SELECTED REFERENCES OPERATIONS Company Profile History / Milestones Group structure
More informationTechnodyne International Limited Company Overview. Page: 1
Technodyne International Limited Company Overview Page: 1 ORGANISATION Profile History Structure CRYOGENIC STORAGE TANK DESIGN Competencies Engineering Services Analysis OPERATIONS Design Tools Clients
More informationBASED ON EXPERIENCE rochure pany B om 10/17 E C
BASED ON EXPERIENCE COMPANY ORGANISATION TGE Gas Engineering GmbH ( TGE ) is one of the world s leading contractors for projects involving the storage and handling of liquefied gases in the energy and
More informationCEB Bulletin 187 (1988) Concrete Structures under Impact and Impulsive Loading.
NFPA 59A-Proposed 2016 Edition Standard for the Production, Storage, and Handling of Liquefied Natural Gas (LNG) TIA Log No.: 1187 Reference: Various Comment Closing Date: June 19, 2015 Submitter: Adnan
More informationLNG Terminal in Świnoujście. Mutual Joint Visit Workshop for Seveso Inspections 26 September 2017, Nicosia, Cyprus
LNG Terminal in Świnoujście Mutual Joint Visit Workshop for Seveso Inspections 26 September 2017, Nicosia, Cyprus Contents 1. Polskie LNG COMPANY PRESENTATION 2. LNG supply chain 3. Key technical parameters
More informationTransfer and Storage of Flammable Liquefied Hydrocarbon Gases
Transfer and Storage of Flammable Liquefied Hydrocarbon Gases GPA Technical Meeting Antwerp, Belgium 22-24 February, 2012 Moving Fluids - Developments in Machinery Joel V. Madison CEO & President Ebara
More informationCEB Bulletin 187 (1988) Concrete Structures under Impact and Impulsive Loading.
NFPA 59A-Proposed 2016 Edition Standard for the Production, Storage, and Handling of Liquefied Natural Gas (LNG) TIA Log No.: 1187R Reference: Various Comment Closing Date: October 16, 2015 Submitter:
More informationLNG basics. Juan Manuel Martín Ordax
LNG basics Juan Manuel Martín Ordax LNG basics Definition: Liquefied Natural Gas (LNG) is the liquid form of natural gas. LNG is a natural gas. LNG is a liquid. When cooled at atmospheric pressure to temperatures
More informationA World of Solutions Visit Product Storage Terminals for Bulk Liquids
A World of Solutions Visit www.cbi.com Product Storage Terminals for Bulk Liquids United Arab Emirates The most global experience of any tank company CB&I has more than eight decades of experience designing
More informationLNG R E F E R E N C E P R O J E C T S. Phone: +49(0) GOC Engineering GmbH Bachovenstr. 8; Sinzig, Germany
R E F E R E N C E P R O J E C T S LNG Engineering GmbH Bachovenstr. 8; 53489 Sinzig, Germany Phone: +49(0)26429939300 info@goce.de; www.goce.de /REF_LNG LNG Carrier Costing Study Australia BHP-Melbourne
More informationStorage & loading on site SOFREGAZ
Large Cryogenic above ground LNG Tank Full Containment (9% inner wall + Pre-stressed concrete outer wall) Typical Construction Sequence March 4 th 2011 Storage & loading on site Storage & loading on site
More information2012 International Symposium on Safety Science and Technology Safety aspects of the use of LNG for marine propulsion
Available online at www.sciencedirect.com Procedia Engineering 45 (2012 ) 21 26 2012 International Symposium on Safety Science and Technology Safety aspects of the use of LNG for marine propulsion L. VANDEBROEK
More informationTank Systems for Refrigerated Liquefied Gas Storage SECTION 1 SCOPE
Tank Systems for Refrigerated Liquefied Gas Storage SECTION 1 SCOPE 1.1 General 1.1.1 This standard covers low pressure, aboveground, vertical, and cylindrical tank systems storing liquefied gases requiring
More informationFloating LNG. Solutions. Floating LNG solutions Catalogue TRELLEBORG FLUID HANDLING SOLUTIONS
EN Floating LNG Solutions Floating LNG solutions Catalogue www.trelleborg.com/oilandmarinehoses TRELLEBORG FLUID HANDLING SOLUTIONS Trelleborg group, leader in polymer solutions Trelleborg is a world leader
More informationETHYLENE STORAGE. Kawasaki Delivers Liquid Ethylene Terminal. May. 19, 2004
ETHYLENE STORAGE Kawasaki Delivers Liquid Ethylene Terminal May. 19, 2004 Kawasaki has delivered a liquid ethylene storage and receiving/shipping terminal, including tanks, to the Chien-Cheng Petrochemical
More informationMagnetically Coupled Submerged Cryogenic Pumps and Expanders for Ammonia Applications
Paper 4d Magnetically Coupled Submerged Cryogenic Pumps and Expanders for Ammonia Applications Liquefied Ammonia, or Liquid NH3, is (like LNG or liquefied natural gas) a cryogenic fluid and production
More informationDYWIDAG LNG technology
DYWIDAG LNG technology STRABAG International GmbH Our Company DYWIDAG has been renowned in the worldwide construction business for technical excellence and comprehensive service since 1891. DYWIDAG is
More informationEnabling safe and reliable offshore LNG transfer operations By Vincent Lagarrigue, Marketing & Project Manager within Trelleborg Industrial Solutions
Enabling safe and reliable offshore LNG transfer operations By Vincent Lagarrigue, Marketing & Project Manager within Trelleborg Industrial Solutions Executive Summary Moving liquefied natural gas (LNG)
More informationMarine Facilities for LNG Carrier Transfer Alternatives
2.3.3.2 Marine Facilities for LNG Carrier Transfer Alternatives Two alternatives were considered for the marine facilities to support the transfer of LNG between the LNG carriers and onshore storage tanks.
More informationDraft - For Committee Use Only
Draft for SCAST Ballot Agenda Item 625-001 Title, Table of Contents, and Section 1 of Proposed New Standard API 625 Revision: 0 Date: August 22, 2008 Handled by Doug Miller RTTG Chair Chicago Bridge and
More informationCreating Optimal LNG Storage Solutions. 40 in detail
[ MARINE / IN DETAIL ] [ MARINE / IN DETAIL ] Creating Optimal LNG Storage Solutions AUTHOR: Sören Karlsson, Business Development Manager, Wärtsilä Marine Solutions mail: soren.karlsson@wartsila.com 40
More informationJust around the corner. at 490 locations worldwide.
Just around the corner. at 490 locations worldwide. In our world wide branch offices, you can be sure to find the right competence. Regardless of how complex your requirements are, we ensure a wide range
More informationNatural Gas. and the Liquefaction Process
Natural Gas and the Liquefaction Process Table of Contents Cameron LNG.................... 2 Liquefied Natural Gas................ 4 LNG Safety...................... 5 Environmental Safety................
More informationLNG Terminal Equipment. Juan Manuel Martín Ordax
LNG Terminal Equipment Juan Manuel Martín Ordax Terminal equipment. General aspects The aspects considered are: o Main equipment used for cargo transfer are loading arms or hard arms, which are jetty based.
More informationPetronet LNG Ltd., India. LNG Terminal Design- Major Design Considerations
Petronet LNG Ltd., India LNG Terminal Design- Major Design Considerations OVERVIEW 1. What is LNG and LNG Chain 2. Project Development & Site Selection 3. Studies Required 4. Marine Facilities 5. Storage
More informationGreen FSRU for the future
Green FSRU for the future Presentation at GREEN4SEA Athens April 6 th 2016 Dr. John Kokarakis Vice President Technology & Business Development, Africa, S. Europe Hellenic, Black Sea & Middle East Zone
More informationStandardized, Modular Liquefaction Equipment and Technology
Standardized, Modular Liquefaction Equipment and Technology The world leader in equipment and technology brings vast expertise to the small and mid-scale market. Standardized and modular plant designs
More informationSmart storage solutions for the LNG market
SHAPING A BETTER WORLD Smart storage solutions for the LNG market arup.com/energy STORAGE SOLUTIONS FOR LNG PROJECTS Innovative solutions to meet LNG demand STORAGE SOLUTIONS FOR LNG PROJECTS Flexible
More informationOIL & GAS DOWNSTREAM ASSET OPTIMISATION AND COMPLIANCE FOR PROCESS INDUSTRIES, STORAGE AND DISTRIBUTION
OIL & GAS DOWNSTREAM ASSET OPTIMISATION AND COMPLIANCE FOR PROCESS INDUSTRIES, STORAGE AND DISTRIBUTION COSTAIN DOWNSTREAM SERVICES Cost effective and risk managed asset optimisation and compliance for
More informationThe general design of a LNG-terminal. Background
The general design of a LNG-terminal Project MAGALOG (Marin Gas Logistics) is a contribution to addressing port emission problems in Europe, with a special focus on the Baltic Sea, through the establishment
More informationThe World First Ever Very Large Ethane Carrier (VLEC)
The World First Ever Very Large Ethane Carrier (VLEC) Gastech 2017, Tokyo 4 th April 2017 This document contains information resulting from testing, experience and know-how of GTT, which are protected
More informationCRYOGENIC FLUIDS CHAPTER 55
CHAPTER 55 CRYOGENIC FLUIDS SECTION 5501 GENERAL 5501.1 Scope. Storage, use and handling of cryogenic fluids shall comply with this chapter. Cryogenic fluids classified as hazardous materials shall also
More informationEstimation of Boil-off-Gas BOG from Refrigerated Vessels in Liquefied Natural Gas Plant
International Journal of Engineering and Technology Volume 3 No. 1, January, 2013 Estimation of Boil-off-Gas BOG from Refrigerated Vessels in Liquefied Natural Gas Plant Wordu, A. A, Peterside, B Department
More informationThe following sub-systems are provided and the integration of these is described below:
The following sub-systems are provided and the integration of these is described below: Pretreatment Plant The Pretreatment Plant typically comprises an amine system for gas sweetening and a molecular
More informationCRYOGENIC FLUIDS CHAPTER 32
CHAPTER 32 CRYOGENIC FLUIDS SECTION 3201 GENERAL 3201.1 Scope. Storage, use and handling of cryogenic fluids shall comply with this chapter. Cryogenic fluids classified as hazardous materials shall also
More informationCRYOGENIC FLUIDS CHAPTER 32
CHAPTER 32 CRYOGENIC FLUIDS SECTION 3201 GENERAL 3201.1 Scope. Storage, use and handling of cryogenic fluids shall comply with this chapter. Cryogenic fluids classified as hazardous materials shall also
More informationMembrane CCS for LPG Carrier
Membrane CCS for LPG Carrier INTERTANKO 04/04/2017 Disclaimer This document is strictly confidential. Any unauthorised access to, appropriation of, copying, modification, use or disclosure thereof, in
More information17 th INTERNATIONAL CONFERENCE & EXHIBITION ON LIQUEFIED NATURAL GAS (LNG 17)
17 th INTERNATIONAL CONFERENCE & EXHIBITION ON LIQUEFIED NATURAL GAS (LNG 17) 17 th INTERNATIONAL CONFERENCE & EXHIBITION ON LIQUEFIED NATURAL GAS (LNG 17) The LNG Terminal
More informationTill date, Rotary has built more than 60% of independent storage tanks in Singapore.
ROTARY Till date, Rotary has built more than 60% of independent storage tanks in Singapore. 2 Our Track Record Terminals/Depot Client Project Title Year of Completion United Arab Emirates, Fujairah Star
More informationBUSINESS PLAN CEN/TC 282 INSTALLATION AND EQUIPMENT FOR LNG EXECUTIVE SUMMARY
Page: 1 BUSINESS PLAN CEN/TC 282 INSTALLATION AND EQUIPMENT FOR LNG EXECUTIVE SUMMARY Scope of CEN/TC 282 "Installation and equipment for LNG": standardization in the field of plant and equipment used
More informationBrazed aluminium heat exchangers (BAHXs), also referred to
Brazed aluminium heat exchangers (BAHXs), also referred to as plate fin heat exchangers, are at the heart of many of the processes used for the liquefaction of natural gas. They are deployed across the
More informationLNG LIQUEFACTION SOLUTIONS
MODULAR SMALL-SCALE LIQUEFACTION PLANT A highly efficient plant ensuring maximum operational flexibility, fully automated operation and low energy consumption Kosan Crisplant's liquefaction system is based
More informationChallenges of Revamping Leixoes Oil Terminal, Portugal
Challenges of Revamping Leixoes Oil Terminal, Portugal By Liam Knowles, Pierre Flammang, Ulf Jungclaussen The most challenging type of project for any Engineering Consultancy is the design and construction
More informationQUANTITATIVE RISK ASSESSMENT OF LNG ABOVEGROUND TANKS BASED ON PAST OPERATING RECORDS OF LNG REGASIFICATION TERMINALS AND LIFE CYCLE ASSESSMENT
QUANTITATIVE RISK ASSESSMENT OF LNG ABOVEGROUND TANKS BASED ON PAST OPERATING RECORDS OF LNG REGASIFICATION TERMINALS AND LIFE CYCLE ASSESSMENT MIYAZAKI Shinichi, Production Department, Tokyo Gas Co.,
More informationUniversity of Technology Gothenburg SHIPPING AND MARINE TECHNOLOGY MARTIME ENVIRONMENT AND ENERGY SYSTEMS. Cecilia Gabrielii Lecturer, PhD
University of Technology Gothenburg SHIPPING AND MARINE TECHNOLOGY MARTIME ENVIRONMENT AND ENERGY SYSTEMS Cecilia Gabrielii Lecturer, PhD Agenda LNG - what is it? Why LNG as a marine fuel? Production,
More informationShip transport of CO 2 An Overview
Ship transport of CO 2 An Overview Pete Brownsort UKCCSRC Biannual Meeting, Cranfield University, 22nd April 2015 Scottish Carbon Capture & Storage www.sccs.org.uk Talk outline Introduction literature
More informationEVALUATION REPORT FOR LNG FACILITY CONSTRUCTION
A completed Standard Inspection Report is to be submitted to the Director within 60 days from completion of the inspection. A Post Inspection Memorandum (PIM) is to be completed and submitted to the Director
More informationAutogas Series. Regenerative Turbine Coro-Flo Pumps. For LPG High Differential Pressure Applications
Autogas Series Regenerative Turbine Coro-Flo Pumps For LPG High Differential Pressure Applications A Tradition of Excellence Corken, Inc. is recognized as a world leader in the manufacture of LPG pumps
More informationLNG R&D for the Liquefaction and Regasification Processes
LNG R&D for the Liquefaction and Regasification Processes Author: Marcello De Falco, Associate Professor, University UCBM Rome (Italy) 1.Theme description Liquefied Natural Gas (LNG) is used for transporting
More informationLNG VACUUM INSULATED PIPE SOLUTIONS.
LNG VACUUM INSULATED PIPE SOLUTIONS www.chartlng.com Your Proven, One-Stop LNG VIP Solutions Provider Chart delivers the broadest portfolio and deepest expertise for the full range of bulk transport applications.
More informationSTANDARD FOR THE STORAGE AND HANDLING OF LIQUEFIED NATURAL GAS (LNG) OISD STD 194
OISD STANDARD 194 FOR RESTRICTED CIRCULATION ONLY STANDARD FOR THE STORAGE AND HANDLING OF LIQUEFIED NATURAL GAS (LNG) OISD STD 194 Oil Industry Safety Directorate Government of India Ministry of Petroleum
More informationCOMBINED HEAT AND POWER SYSTEMS IN LIQUEFIED NATURAL GAS (LNG) REGASIFICATION PROCESSES
http://dx.doi.org/10.7494/drill.2014.31.1.91 * * * COMBINED HEAT AND POWER SYSTEMS IN LIQUEFIED NATURAL GAS (LNG) REGASIFICATION PROCESSES 1. INTRODUCTION ing place in the neighborhood of natural gas deposits.
More informationTechnical solutions for energy recovery
Technical solutions for energy recovery We are Uniper We are a leading international energy company with operations in more than 40 countries and around 13,000 employees. We combine a balanced portfolio
More informationAnalysis & Benchmark of 4 years of HiPo Events and Events with Real Major Consequences in TOTAL RC
Analysis & Benchmark of 4 years of HiPo Events and Events with Real Major Consequences in TOTAL RC D. Roosendans / D. Robillard Department Major Risks TOTAL Refining & Chemicals TOTAL Refining & Chemicals
More informationLNG Facts A Primer. Presentation before US Department of Energy, Office of Fossil Energy, LNG Forums. March 10, Kristi A. R.
LNG Facts A Primer Presentation before US Department of Energy, Office of Fossil Energy, LNG Forums March 10, 2006 Kristi A. R. Darby Center for Louisiana State University Overview What is Natural Gas?
More informationFloating offshore gas units
Floating offshore gas units FEASIBILITY, safety and performance Flexible solutions for the LNG Growing demand for natural gas is industry leading producers to seek safe, flexible solutions for exploiting
More informationEvolution of an LNG Terminal: Senboku Terminal of Osaka Gas. Toshiro Otsuka Senboku LNG Terminal Osaka Gas Co., Ltd.
Evolution of an LNG Terminal: Senboku Terminal of Osaka Gas Toshiro Otsuka Senboku LNG Terminal Osaka Gas Co., Ltd. Osaka Gas service territory Himeji LNG terminal Senboku 2 Senboku 1 Senboku LNG terminal
More informationEvolution of an LNG Terminal: Senboku Terminal of Osaka Gas
23 rd World Gas Conference, Amsterdam 2006 Evolution of an LNG Terminal: Senboku Terminal of Osaka Gas Main author Toshiro Otsuka Japan TABLE OF CONTENTS 1. Abstract 2. Body of Paper 3. List Tables 4.
More informationMarine Transportation of LNG. Intertanko Conference March 29, 2004 Bob Curt Ship Acquisition Manager, QatargasII Development
Marine Transportation of LNG Intertanko Conference March 29, 2004 Bob Curt Ship Acquisition Manager, QatargasII Development Marine Transportation of LNG Topics What is LNG? History of LNG Marine Transportation
More informationAdriatic LNG Terminal (ALT) Roger D. Leick ALT Topsides Manager
1 Adriatic LNG Terminal (ALT) Roger D. Leick ALT Topsides Manager 2 ALT Functional Requirements Offshore LNG storage and re-gas terminal under development by affiliates of ExxonMobil, Qatar Petroleum,
More informationWHAT IS LIQUEFIED NATURAL GAS?
WHAT IS LIQUEFIED NATURAL GAS? WHAT IS NATURAL GAS? Natural gas is a colourless and odourless gas that is created from organic matter that has decayed for millions of years. Around the world, people use
More informationGate terminal Gas Access To Europe
Gate terminal Gas Access To Europe 1 Gate terminal builds first Dutch LNG terminal Analyst Conference Call 18 December 2007 @ 13.30 hour (CET) Jack de Kreij CFO and Member of the Executive Board 2 Agenda
More information- ASGMT LNG Supply Chain & Custody Transfer Measurement in the U.S.
- ASGMT 2012 - LNG Supply Chain & Custody Transfer Measurement in the U.S. AGENDA 1. US NATURAL GAS OVERVIEW 2. US NATURAL GAS INFRASTRUCTURE 3. LNG SUPPLY CHAIN MEASUREMENT 4. APPENDIX SOME GAS HISTORY
More informationDesign of onshore LNG regasification plant
Design of onshore LNG regasification plant Parsa Mozaffari, Dijan Supramono Chemical Engineering Department, Faculty of Engineering, Universitas Indonesia, Depok, Indonesia E-mail: parsamozaffari@yahoo.com
More informationNext Energy, With KOGAS. 5 th April 2017 Chusung Son KOGAS
Next Energy, With KOGAS 5 th April 2017 Chusung Son KOGAS Contents 1. Introduction 2. Historical Trail 3. Diagnosis & Overhaul Decommissioning Preparation & Inspection Repair, Reinforcement & Restoration
More informationLARGE STORAGE TANK PROJECT
INTRODUCTION The Fairbanks Large Storage Tank is part of the Interior Energy Project (IEP) designed to expand natural gas distribution in Fairbanks and Interior Alaska. A tank with a capacity of 0.44 Bcf
More informationEBARA INTERNATIONAL CORPORATION Cryodynamics Division. Cryogenic Turbine Expanders. cryodynamics. Cryogenic Expanders for Liquefied Gas
EBARA INTERNATIONAL CORPORATION Cryodynamics Division Cryogenic Turbine Expanders cryodynamics Cryogenic Expanders for Liquefied Gas Who we are Liquefaction EBARA International Corporation, Cryodynamics
More information2019 LPG Loading Master & LPG Terminal Operations - 3 days
2019 LPG Loading Master & LPG Terminal Operations - 3 days Session 1. Skills and Knowledge Evaluation Examine through brief interaction existing knowledge of the attendees to identify which areas need
More informationSECTION CONCRETE ABOVE GROUND FUEL STORAGE
SECTION 23 13 23 CONCRETE ABOVE GROUND FUEL STORAGE SPEC WRITER NOTES: 1. Use this section only for NCA projects. 2. Delete between //----// if not applicable to project. Also delete any other item or
More informationFULL RANGE OF SERVICES FOR ALL RECIPROCATING COMPRESSORS
FULL RANGE OF SERVICES FOR ALL RECIPROCATING COMPRESSORS BURCKHARDT COMPRESSION THOROUGH IN-HOUSE EXPERTISE ENSURING COMPREHENSIVE SUPPORT Burckhardt Compression is one of the market leaders in the field
More informationSuperior reliable performance. Niagara Wet Surface Air Coolers for fluid cooling and vapor condensing
Superior reliable performance Niagara Wet Surface Air Coolers for fluid cooling and vapor condensing Designed for coldest process outlet temperature Alfa Laval Niagara Wet Surface Air Coolers (WSAC ) are
More informationLNG Plant Overview. Seminar with Supplier Association Murmanshelf Murmansk, 15 May 2012 Jostein Pettersen
LNG Plant Overview Seminar with Supplier Association Murmanshelf Murmansk, 15 May 2012 Jostein Pettersen Table of Content Part 1 : LNG plant overview (Jostein) Part 2 : Main equipment units (Jostein) Part
More informationCargo Handling Systems. for LPG, NH3 & Ethylene. Oil & Gas Systems
Cargo Handling Systems for LPG, NH3 & Ethylene Oil & Gas Systems Cargo handling systems for LPG, NH 3 & Ethylene Gas Carrier Technology Hamworthy s gas system know-how originates from its heritage with
More informationDesign of an LNG Tank for Accidental Loads in Finland. 1. Introduction
Design of an LNG Tank for Accidental Loads in Finland Francisco MARTÍNEZ Operations Manager Principia Madrid, Spain francisco.martinez@principia.es Francisco Martínez, born 1963, received his PhD in civil
More informationDraft - For Committee Use Only
Draft for SCAST Ballot Agenda Item 6-292 Revisions to App Q and R to Coordinate with New API 625 Standard Revision: 0 Date: August, 08 Handled by: Doug Miller RTTG Chair Chicago Bridge and Iron Company
More informationPiping at Static Cryogenic Vessels according to EN and EN / AD2000 Merkblatt IGV Position Paper IGV-PP-05B-Rev1-E
Piping at Static Cryogenic Vessels according to EN 13458 and EN 13480 / AD2000 Merkblatt IGV Position Paper Ind Industriegaseverband e.v. Französische Str. 8 10117 Berlin Telefon: 030 206 458-800 Telefax:
More information2017 LPG Loading Master & Certification (3 Days)
2017 LPG Loading Master & Certification (3 Days) To work as a Loading Master, one has to have the operational knowledge, the technical skill and has to understand the LPG ship/shore Interface. This training
More informationHow are Industry Standards, Engineering Codes, Best Management Practices and Other Measures of Compliance Being Met by Facilities?
How are Industry Standards, Engineering Codes, Best Management Practices and Other Measures of Compliance Being Met by Facilities? More on what we re seeing at inspections 1 RMP Facility Chemicals Ammonia
More informationFailure of an ortho-cresol storage tank 16 January, 2003 Rotterdam The Netherlands
Failure of an ortho-cresol storage tank 16 January, 2003 Rotterdam The Netherlands Accidental contamination Chimical products farm Ortho-cresol Soil contamination Heating coil Corrosion Weld THE INSTALLATIONS
More informationCryogenic applications
Cryogenic applications Vanessa Triple offset valves Offset 2 Offset 1 Offset 3 The know how Vanessa triple offset valve: metal-to-metal torque seated, quarter turn non-rubbing rotation. Our valve represents
More informationContents EN 14015:2004 (E) page
Contents page Foreword... 11 1 Scope... 12 2 Normative references... 13 3 Terms, definitions, symbols and abbreviations... 15 3.1 Terms and definitions... 15 3.2 Symbols... 19 3.3 Abbreviations... 21 4
More informationA World of Solutions Visit LNG Regasification NOT FOR PRINT DISTRIBUTION
A World of Solutions Visit www.cbi.com LNG Regasification Comprehensive LNG Regasification Solutions For more than 50 years, CB&I has been a leader in the design and construction of LNG facilities. CB&I
More informationBRITISH STANDARD BS : Flat-bottomed, vertical, cylindrical storage tanks for low temperature service
BRITISH STANDARD BS 7777-4: 1993 Flat-bottomed, vertical, cylindrical storage tanks for low temperature service Part 4: Specification for the design and construction of single containment tanks for the
More informationBrazed Aluminum Heat Exchangers (BAHX) for Optimisation of Natural Gas Liquefaction Processes. Gastech 2017
Brazed Aluminum Heat Exchangers (BAHX) for Optimisation of Natural Gas Liquefaction Processes Authors: Doug Ducote / Paul Shields Introduction Gastech 2017 Brazed aluminum heat exchangers (BAHX), also
More informationBOIL-OFF GAS MANAGEMENT LNG TERMINAL TECHNOLOGIES
BOIL-OFF GAS MANAGEMENT LNG TERMINAL TECHNOLOGIES Air Liquide Group Air Liquide Engineering & Construction The world leader in gases, technologies and services for Industry and Health Air Liquide is present
More informationA Risk Based Approach on Selection of Refrigerated Ammonia Storage
571 A publication of CHEMICAL ENGINEERING TRANSACTIONS VOL. 31, 2013 Guest Editors: Eddy De Rademaeker, Bruno Fabiano, Simberto Senni Buratti Copyright 2013, AIDIC Servizi S.r.l., ISBN 978-88-95608-22-8;
More informationDesign of Diesel Storage Tank in Consonance with Requirements of American Petroleum Institute (API) Standard 650
Design of Diesel Storage Tank in Consonance with Requirements of American Petroleum Institute (API) Standard 650 Abstract Okpala, Alexander N.* and Jombo, P.P., Department Of Mechanical Engineering, Faculty
More informationExecutive Summary. Engineering Report of the: Adaptation of jetties and LNG transfer facilities for loading of bunker vessels in Fos Tonkin
Executive Summary Engineering Report of the: Adaptation of jetties and LNG transfer facilities for loading of bunker vessels in Fos Tonkin index 01 INTRODUCTION page 4 02 GENERAL DESCRIPTION OF THE PROJECT
More informationSITING STUDY FOR THE GRASSY POINT LNG TRANSSHIPMENT AND STORAGE TERMINAL
SITING STUDY FOR THE GRASSY POINT LNG TRANSSHIPMENT AND STORAGE TERMINAL Prepared For Newfoundland LNG LTD. Suite 302, Baine Johnston Centre 10 Fort William Place St. John's, NL Canada A1C 1K4 Prepared
More informationModern Small-Scale LNG Plant Solutions
Modern Small-Scale LNG Plant Solutions Clean and Stand-Alone Small Volume High Energy Density Many Possibilities LNG is becoming increasingly important all over the world for optimizing the natural gas
More informationFreeport LNG Liquefaction Project
17 th INTERNATIONAL CONFERENCE & EXHIBITION ON 17LIQUEFIED th INTERNATIONAL NATURAL CONFERENCE GAS (LNG & EXHIBITION 17) ON LIQUEFIED NATURAL GAS (LNG 17) Freeport LNG Liquefaction Project
More informationCO₂ purification and liquefaction. Adding value through standardisation and modularisation.
CO₂ purification and liquefaction. Adding value through standardisation and modularisation. 02 CO₂ purification and liquefaction CO₂ purification and liquefaction 03 Familiar CO₂ applications include the
More informationEngineering Specifications
PROPRESS WITH SMART CONNECT FEATURE PART 1: GENERAL 1.1 SUMMARY A. Copper Tubing and Fitting System for Hot and Cold Water Distribution Systems, Sprinkler and Standpipe Systems and Hydronic Piping Systems
More informationEngineering Specifications
PROPRESS WITH SMART CONNECT FEATURE PART 1: GENERAL 1.1 SUMMARY A. Copper Tubing and Fitting System for Hot and Cold Water Distribution Systems, Sprinkler and Standpipe Systems and Hydronic Piping Systems
More informationCRYOFLEX CC Cooling cutting blade strips with liquid nitrogen. For increased productivity and quality.
CRYOFLEX CC Cooling cutting blade strips with liquid nitrogen. For increased productivity and quality. 1. Your challenges today. Cutting blade manufacturers are under growing pressure to increase both
More informationDesign Features of Reactor Assembly Components of Future FBRs
Design Features of Reactor Assembly Components of Future FBRs P.Chellapandi Director-Safety Group Indira Gandhi Centre for Atomic Research Kalpakkam-603 102 Preface 500 MWe Prototype Fast Breeder Reactor
More informationDevelopment of an LNG sampling and composition measurement reference standard. Jianrong Li LNG II Workshop 22 August 2017, VSL, Delft, NL
Development of an LNG sampling and composition measurement reference standard Jianrong Li LNG II Workshop 22 August 2017, VSL, Delft, NL Contents Introduction Basic principles behind the design Design
More informationFOR INDONESIA. P.T GoLNG Indonesia January 2015
SMALL LNG SOLUTIONS FOR INDONESIA P.T GoLNG Indonesia January 2015 believes in Corporate Social Responsibilities. We are Committed to our firm belief that there is no job so URGENT that it cannot be done
More informationProcessing LNG Offshore: Maximizing Reliability, Performance & Safety. By Inga Bettina Waldmann at KANFA Aragon FLNG World Congress 28 th June 2016
Processing LNG Offshore: Maximizing Reliability, Performance & Safety By Inga Bettina Waldmann at KANFA Aragon FLNG World Congress 28 th June 2016 FLNG World Congress 2016 Agenda I. About KANFA Aragon
More information