1 Code IOCL-ERU Customer IOCL - Panipat Plant / Location Panipat, India Process Product Olefins Production From RFCC And DCU Off Gases And Integration With NCU C2 (Ethylene + Ethane) Streams Feedstock RFCC And DCU Off Gases Capacity 81.9 KTA PRE-FEASIBILITY REPORT ON PRODUCTION OF OLEFINS FROM RFCC AND COKER OFF GASES AT PANIPAT NAPHTHA CRACKER COMPLEX INDIAN OIL CORPORATION LTD. (IOCL)

2 S.No. Content Page No. 1.0 INTRODUCTION BASIS OF STUDY Need for the Proposed Project Production Capacity Design On-Stream Time Overdesign Overall Material Balance PROCESS DESCRIPTION Block Flow Diagram Block Flow diagram for ERU Feed Treatment and Recovery Block Flow diagram for ERU integration with NCU BFD/PROCESS DESCRIPTION ERU Process Description RAW MATERIAL, PRODUCT & UTILIT Raw Materials Raw Material Quality Raw Material Battery Limit Conditions PRODUCT Production Capacities Product Battery Limit Conditions Additional Storage Flare System Flare load from ERU Equipment located in Refinery Complex Flare load from ERU Equipment located in NCU Complex SOCIAL BENEFITS Social Upliftment of the Region Employment Generation SAFETY AND POLLUTION CONTROL MEASURES General Environmental Protection Highlights of Effluent generated in ERU Effluent Summary Gaseous Effluents Acqueous Effluent Solid Effluent 18 CHAPTER 1 2

3 INTRODUCTION 1.0 INTRODUCTION Indian Oil Corporation Ltd. (IOCL) intends to build an Ethane/Ethylene Recovery Unit (ERU) for Olefin Production from RFCC and DCU Off-gases and integrate with existing Naphtha Cracker Unit (NCU) located in Panipat, India. This project utilizes Lummus Low Pressure Recovery (LPR) Technology and consists of ISBL process units and supporting facilities designed to produce C2 and C3+ product streams from ERU that are being integrated with the existing NCU and other by-products. Owner Plant Location : Indian Oil Corporation Ltd. (IOCL) (Refineries Division) : Panipat, Haryana, India 3

4 CHAPTER 2 BASIS OF STUDY 2.0 BASIS OF STUDY 2.1 Need for the Proposed Project The ERU is designed to maximize the recovery of Ethylene and Ethane from RFCC and DCU off-gas feeds. Three main products are recovered from the Refinery offgas. Ethylene and ethane recovery is maximized in the ERU and recovered in the NCU via the overhead of the ERU Deethanizer. Fuel gas from the ERU Demethanizer overhead is recovered and returned to the fuel gas line near the Utility Boiler (Panipat Refinery End) Out Side Battery Limit (OSBL). The C3+ product from the ERU Deethanizer bottoms is sent to the NCU for recovery/ processing. 2.2 Production Capacity The plant design is based on following production capacities: Product Capacity (KTA) Total C2 Stream to NCU 81.9 Contained Ethylene (in total C2 Stream) 16.7 Contained Ethane (in total C2 Stream) Design On-Stream Time The total C2 (Ethylene + Ethane) capacity is based on 8000 hours operation per calendar year. 2.4 Overdesign Unit / Section % of Design Capacity ERU 110 Enhanced Binary Refrigeration (EBR) Overall Material Balance ERU Overall Material Balance Feeds TPH Design Case KTA 4

5 RFCC Dry Gas Coker Dry Gas Total ERU Feeds Products Design Case TPH KTA Demethaniser Net Overhead as Refinery Fuel Gas C2 Product to Ethylene Fractionator C3 Plus Product to Depropanizer Acid Gases & Water Total ERU Products For recovering C2s and C3s in ERU, off gas from Resid Fluid Catalytic Cracking (RFCC) and Delayed Coker Unit (DCU) dry gas will be combined upstream of the ERU. The ERU MDEA/Water Wash Tower and ERU DGA/Water Wash Tower will be located inside the refinery complex for integration with the refinery Mono Di-Ethanol Amine (MDEA) regenerator system. The combined off-gas stream is first amine washed in MDEA/Water Wash Tower using 30 wt% MDEA, N-methyl-di-ethanolamine, nonproprietary solvent. Rich amine acid gas loading is limited to 0.4 moles of acid gas per mole of MDEA as per design of amine regenerator system for the refinery complex. Lean amine for the MDEA /Water Wash Tower will be supplied from refinery amine regeneration facilities with acid gas loading of 0.02 moles of H2S per mole of MDEA. After the MDEA amine wash, the off-gas is further amine washed in the Di-Glycol Amine (DGA) / Water Wash Tower before being routed to NCU block through an approximately 7.0 km long pipe line for further feed treatment of ERU. ERU Amine Treatment system equipment (MDEA absorber, DGA absorber and DGA regenerator system) to be located inside Refinery complex. ERU Integration with existing NCU facility: The ERU will be integrated with the existing Naphtha Cracker Unit (NCU). Integration with the NCU allows the Ethane and Propane recovered in the ERU to be recycled back to cracking heater and converted to ethylene and propylene. 5

6 CHAPTER 3 BLOCK FLOW DIAGRAM and PROCESS DESCRIPTION 3.0 BFD / PROCESS DESCRIPTION 3.1 Block Flow Diagram Block Flow Diagram for ERU Feed Treatment and Recovery 6

7 3.1.2 Block Flow Diagram for ERU Integration with NCU 7

8 3.2 Process Description ERU Process Description RFCC and DCU Off-gas are fed to the Refinery Offgas Knock-out Drum. The refinery off-gas feeds contain primarily C1-C4 hydrocarbons but also contain significant impurities including: hydrogen sulfide, oxygen, carbon dioxide, nitrogen oxides, various metals, and various other contaminants. The levels of these contaminants must be significantly reduced before processing in the recovery section of the ERU. The process gas from the Refinery Offgas Knock-out Drum is sent to the bottom of the ERU MDEA/Water Wash Tower to reduce the amount of acid gases in the feed. Lean MDEA from the refinery (OSBL) is collected in the ERU Lean MDEA Feed Drum, then pumped through the ERU Lean MDEA Filters and fed to the top of two packed beds. The MDEA absorbs the bulk of the H2S and some CO2 from the process gas. As the vapour continues up the tower it passes through water wash section to prevent MDEA carryover to the next tower. Condensate from OSBL is used as wash water which is cooled in the ERU Condensate Cooler and collected in the ERU Amine Wash Water Feed Drum, and then pumped on flow control to the top of the tower. Spent wash water from this section is drawn off on level control and sent OSBL for treatment. After treatment with MDEA, the column overhead is sent to the lower section of the ERU DGA/Water Wash Tower. Rich MDEA from the bottoms of the ERU MDEA/Water Wash Tower is sent on level control to the refinery (OSBL) for regeneration. Any heavy hydrocarbons that accumulate in the tower bottoms sump are removed via manual valves to the ERU MDEA Oil Degassing Drum and are sent to the Amine Blowdown System. The ERU MDEA/Water Wash Tower overhead is sent to the bottom of the ERU DGA/Water Wash Tower to further reduce the amount of acid gases in the feed. Lean DGA from the ERU Lean DGA Filters is fed to the top of two packed beds and absorbs most of the remaining acid gases from the process gas. As the vapour continues up the tower it passes through water wash to prevent DGA carryover. Wash water is pumped on flow control to the top of the tower. Spent wash water and waste water from this section is drawn off on level control and split; a portion is sent as make-up water to the DGA regeneration system, while the rest is sent OSBL for treatment. After treatment with DGA, the column overhead is sent through an OSBL pipeline connecting the refinery complex to the ERU Caustic/Water Wash Tower in the NCU. Rich DGA from the bottoms of the ERU DGA/Water Wash Tower is sent on level control to the ERU Rich DGA Filters and ultimately to the ERU DGA Regenerator. Any heavy hydrocarbons that accumulate in the tower bottoms sump are removed via manual valves to the ERU DGA Oil Degassing Drum and are sent to the DGA Drain System. A pressure controller sends excess overhead vapor from the ERU DGA/Water Wash Tower to the fuel gas system in refinery complex on high pressure. IOCL has proposed to provide Fuel gas KOD in Fuel gas line from ERU DGA/Water Wash Tower to prevent carryover of any DGA solution in case of any upset into fuel gas system. Rich DGA from the bottoms of the ERU DGA/Water Wash Tower is sent to the ERU DGA Regenerator. The Rich DGA is filtered in the ERU Rich DGA Filters and is preheated against the hot bottoms (regenerated Lean DGA) of the regenerator in the ERU Lean DGA/Rich DGA Exchanger. The Rich DGA from the ERU DGA/Water Wash Tower is fed to the top of the packed bed section, and makeup DGA combined with makeup water is fed to the bottom of the regenerator. The gross overhead from the ERU DGA Regenerator is condensed against cooling water in the ERU DGA Regenerator Condenser and collected in the ERU DGA Regenerator Reflux Drum. 8

9 The bottoms of the ERU DGA Regenerator, Lean DGA, is pumped and cooled by exchanging heat with Rich DGA feed in the ERU Lean DGA/Rich DGA Exchanger. The Lean DGA is cooled further against cooling water in the ERU Lean DGA Cooler before being filtered in the ERU Lean DGA Filter and recycled back to the DGA/Water Wash Tower. A provision is included the remove heat-stable salts formed in the DGA system via the ERU DGA Reclaimer. The exchanger is used in batch operation utilizing MP steam to evaporate the DGA solution, leaving behind DGA sludge to be drained to drums and sent for disposal OSBL. To maintain a concentration of approximately 10 wt% in the strong caustic compartment of the ERU Caustic/Water Wash Tower and to replace water that has evaporated from the circulating caustic into the process gas stream, makeup caustic solution from the NCU is continually added to the ERU Strong Caustic Circulation Pump suction on flow control. Make-up water is also added at the suction of the ERU Strong Caustic Circulation Pumps on flow ratio control to dilute the make-up caustic concentration to around 10 wt%. Make-up water is primarily spent wash water from the upper water wash section of the ERU Caustic/Water Wash Tower, and the balance is fresh wash water from the NCU. If any excess upper section spent wash water remains after dilution, it is sent on level control to the lower water wash section of the ERU Caustic/Water Wash Tower. The process gas is fed to the lower section of the ERU Caustic/Water Wash Tower and is washed with caustic to remove residual CO2, H2S, and SOx to very low levels. Caustic also removes most of the HCN and HCl that could be present. The process gas is then washed with water to prevent caustic carryover. The process gas is then sent from the lower section of the ERU Caustic/Water Wash Tower for further treating to the ERU Chloride Guard Bed. Wash water is sent by flow control to the tower on tray #3. Spent wash water is sent on level control to OSBL for treatment. Spent caustic from the lower section of the Caustic/Water Wash Tower is sent on level control to the NCU before being routed to OSBL for treatment. A small amount of high molecular weight polymer yellow oil may be formed in the ERU Caustic/Water Wash Tower. Provisions have been made to decant this oil from the bottom of the tower so it does not build up in the caustic circulation streams and cause fouling. The "yellow oil" is manually sent to the spent caustic line. The process gas from the lower section of the ERU Caustic/Water Wash Tower enter the top of the ERU Chloride Guard Bed. This non-regenerable bed is provided to remove any potential organic chlorides which can impair performance of the oxygen converter catalyst. The ERU Chloride Guard Bed consists of two vessels in a lead-lag arrangement to allow for maximum utilization of the adsorbent. The process gas leaving the ERU Chloride Guard Bed is filtered, and then preheated against the converter effluent in the ERU Oxygen Converter Feed/Effluent. Exchanger followed by HP steam in the ERU Oxygen Converter Feed Heater before being routed to the ERU Oxygen Converter. Catalyst selectivity is moderated by injecting Dimethyl Disulfide (DMDS) in the feed, which is eventually removed in the upper section of the ERU Caustic/Water Wash Tower. The catalyst in the ERU Oxygen Converter is Clariant OleMax 101 sulfided nickel catalyst, and is selective only in a certain range of temperatures. Due to coking of the catalyst, the operating conditions require gradually increasing temperature over time to maintain conversion. However, as the temperature increases, the selectivity decreases, and DMDS injection is required to maintain optimum performance. In the ERU Oxygen Converter, the oxygen reacts with the hydrogen present in the process gas to form water. Other contaminants, if present in the feed, are removed as follows: nitrides and nitriles are converted to NOx compounds; COS, H2S, DMDS, and other sulfur compounds are converted to ethylmercaptan; acetylene is converted to ethylene; and part of the ethylene is also hydrogenated to ethane. In addition, if C3 or C4 acetylenes are present, the methyl-acetylene and the propadiene are partially converted to propylene, and C4 acetylenes are converted primarily to butenes. NOx is also removed in the 9

10 ERU Oxygen Converter by hydrogenation to ammonia and water. The ERU Oxygen Converter is regenerable, with an expected run length of one year. A spare reactor is provided to allow for continuous operation. The ERU Oxygen Converter has the following expected performance: Effluent acetylene < 1 ppmv Effluent oxygen < 1 ppmv Effluent NOx < 10 ppbv The effluent from the ERU Oxygen Converter is cooled against the feed and then against cooling water and sent to the upper section of the ERU Caustic/Water Wash Tower. The ERU Oxygen Converter effluent is washed with caustic to remove the residual amount of acid gases remaining in the process gas. The acid-gas-free process gas flows to a water wash section that serves to prevent any caustic carryover. Wash water is fed to the upper section of the ERU Caustic/Water Wash Tower on flow control. Spent wash water is either sent on flow control and used for dilution of the caustic circulation or sent on level control to OSBL for treatment. Spent caustic from the upper section of the ERU Caustic/Water Wash Tower is sent to the lower section of the Caustic/Water Wash Tower on level control. The process gas leaving the upper section of the ERU Caustic/Water Wash Tower is chilled against Heavy EBR and directed to the ERU Dryer/Treater Feed Gas KO Drum to separate any condensed liquid, mainly water. The condensed liquid is routed on level control to OSBL for treatment. The process gas is then sent to the ERU Dryer/Treater, which is designed with selected adsorbents to remove water, mercaptans, methanol, nitrogen compounds and trace quantities of CO2, H2S, COS, and nitride/nitriles. The ERU Dryer/Treater consists of two units, one operating and one on standby or in regeneration to maintain the continuity of operation between cycles. The process gas from the ERU Dryer/Treater is then fed to the non-regenerable ERU Metals Treater for removal of trace amounts of mercury, arsine, and phosphine in the process gas. The ERU Metals Treater consists of two vessels in a lead-lag arrangement to allow for maximum utilization of the adsorbent. Effluent from the ERU Metals Treater is passed through the ERU Dryer Effluent Filters to protect the downstream process gas chilling equipment in the event of adsorbent fines carryover. The treated process gas from the ERU Dryer Effluent Filters are chilled in a core exchanger, the ERU Offgas Exchanger, against Demethanizer overhead, Demethanizer bottoms, and various EBR streams and sent to the ERU Demethanizer. In the ERU Demethanizer, fractionation is based on the absorption principle whereby the ethylene and ethane contained in the process gas is absorbed by Wash Liquid. A portion of the C3+ bottoms from the Deethanizer is chilled in the ERU Off-gas Exchanger against Demethanizer overhead, Demethanizer bottoms, and various EBR streams in the core exchanger and sent as Wash Liquid to the ERU Demethanizer. The C3+ stream absorbs ethylene and ethane from the process gas as it travels down the ERU Demethanizer. Some Wash Liquid is lost in the Fuel Gas; in order to reduce the losses an overhead condenser utilizing EBR is provided to partially condense the ERU Demethanizer gross overhead. Liquid from the ERU Demethanizer Reflux Drum is returned to the top of the ERU Demethanizer on flow control. The Demethanizer is reboiled by subcooling heavy EBR. The ERU Demethanizer net overhead product containing methane and lighter compounds, as well as some equilibrium C3+ components, is reheated in the ERU Off-gas Exchanger against process gas and C3+ Wash Liquid and is sent to the fuel gas line near the Utility Boiler (PR End) OSBL by the Fuel Gas Compressor. The ERU Demethanizer bottoms is pumped on flow control reset by level controller in the ERU Demethanizer and sent to the ERU Deethanizer. In case of hydrate formation in the ERU Off-gas Exchanger or ERU Demethanizer, provisions have been provided to inject methanol at the following locations to dissolve the hydrates: the ERU Demethanizer feed upstream of the ERU Off-gas Exchanger, Wash Liquid upstream of the ERU Off-gas Exchanger, and into the ERU Demethanizer Reflux Pump feed. 10

11 The ERU Demethanizer bottoms product is heated in the ERU Off-Gas Exchanger before being sent to the ERU Deethanizer. This column is reboiled against LP Steam and is partially condensed by Heavy EBR. The net overhead containing the C2 s (ethylene and ethane) recovered from the process gas is sent to Deethanizer overhead to the Ethylene Fractionator in the NCU. The Deethanizer bottoms product contains C3 and heavier components recovered from the process gas. The C3+ bottoms product is cooled by cooling water. Part of the bottoms product is sent to the ERU Demethanizer as C3+ Wash Liquid and the rest is sent to the NCU to recover the contained propane and propylene. The C3+ Wash Liquid is chilled by the ERU Off-gas Exchanger before being sent to the ERU Demethanzier. Regeneration of the ERU Dryer/Treaters is carried out using HP Methane Gas from the NCU. A oncethrough regeneration system is provided for the ERU Dryer/Treaters, where the regeneration gas undergoes controlled heating in the ERU Regeneration Gas Steam Heater against HP Steam. Additional heating is provided by the ERU Regeneration Gas Electric Heater. The regeneration gas returning from the ERU Dryer/Treaters is cooled against cooling water in the ERU Regeneration Gas Cooler. The cooled effluent is then sent to the Regeneration Gas Knockout Drum in the NCU. The ERU Oxygen Converter Regeneration Electric Heater is a dedicated electric heater provided for the ERU Oxygen Converter regeneration. The ERU Oxygen Converter is regenerated using nitrogen, steam, plant air, DMDS (for sulfiding), and hydrogen. The ERU Oxygen Converter regeneration effluent is either routed to atmosphere, to flare, or to the NCU Quench Tower (for depressuring). The Enhanced Binary Refrigeration Unit is a multi-component, mixed refrigeration system comprised of primarily methane, ethylene, and propylene, with a very small amount of hydrogen. It is a closed circuit, three-stage compression system utilizing a turbine-driven centrifugal compressor. It replaces separate methane, ethylene, and propylene refrigeration systems. The enhanced binary refrigeration provides the full range of chilling requirements for the IOCL ERU. The EBR Compressor 3rd stage discharge stream is cooled and partially condensed against cooling water prior to separation in the Heavy EBR Accumulator. Condensed liquid from this drum is designated as Heavy Enhanced Binary Refrigerant (Heavy EBR). The Heavy EBR from the drum is split; one portion is depressurized and then vaporized to provide chilling in the ERU Dryer/Treater Feed Chiller before returning to the EBR Compressor, while the other portion is subcooled in the ERU Demethanizer Reboiler. A portion of the subcooled liquid from the ERU Demethanizer Reboiler is further subcooled in the ERU Offgas Exchanger and then vaporized to provide chilling for the ERU Deethanizer Condenser, and is sent to the EBR Compressor. The remainder of the subcooled Heavy EBR liquid is vaporized to provide chilling in the ERU Off-gas Exchanger, before being returned to the EBR Compressor. The vapor from the Heavy EBR Accumulator is partially condensed against EBR and Fuel Gas in the cold box and then sent to the Medium EBR Accumulator. Condensed liquid from this drum is designated as Medium Enhanced Binary Refrigerant (Medium EBR). Overhead vapor from this drum is designated as Light Enhanced Binary Refrigerant (Light EBR). The Medium EBR is subcooled in the cold box against itself, Fuel Gas, and other EBR streams, and then split. One portion is depressurized and vaporized to provide chilling for process gas, Wash Liquid, and other EBR streams in the cold box before mixing with Heavy EBR and returning to the EBR Compressor 3rd Stage Suction Drum. The other portion is subcooled against Fuel Gas and Demethanizer Bottoms, as well as itself and other EBR streams, and is then depressurized and vaporized to provide chilling for process gas and C3+ Wash Liquid in the cold box. This vapor is then sent to the EBR Compressor 2nd Stage Suction Drum. 11

12 Light EBR is condensed and subcooled against other EBR streams in the cold box before entering the Light EBR Accumulator. Any non-condensables in the Light EBR are vented to flare from this drum. The liquid Light EBR from this drum is further subcooled against itself and Fuel Gas in the cold box and then enters the EBR Retrograde Drum. Any remaining noncondensables in the Light EBR are vented to flare from this drum. The liquid Light EBR from this drum is then depressurized and vaporized to provide chilling to the ERU Demethanizer Condenser and against process gas and C3+ Wash Liquid in the cold box. The vaporized Light EBR leaving these exchangers is then sent to the EBR Compressor 1st Stage Suction Drum. 12

13 CHAPTER 4 RAW MATERIAL, PRODUCT and FLARE LOAD 4.0 RAW MATERIAL, PRODUCT and UTILITIES 4.1 Raw Materials Raw Material Quantity Feed Design Case TPH KTA RFCC Dry Gas Coker Dry Gas Total ERU Feeds Raw Material Battery Limit Conditions The ERU shall be designed to receive feed stocks to the battery limits at the conditions specified below. Feedstock Temperature ( C) Pressure (kg/cm²g) FCC Dry Gas (Note 1, 2) Coker Off-gas (Note 1, 2) Notes: 4.2 Product 1. Pressure at ERU battery limit located inside refinery complex. Amine absorbers and DGA regenerator system will be located inside refinery for integration with refinery MDEA regenerator system. Off-gas from the ERU DGA/ Water Wash Tower will be routed to NCU block for further treatment via approximately 7 km long pipeline. ERU pressure profile has been set accordingly. 2. RFCC Dry Gas tie-in for ERU will be upstream of existing pressure control valve 07-PV-4401 located on the off-gas KO drum overhead line, and Coker off-gas tie-in for ERU will be upstream of existing pressure control valve 78-PV-5501 located on fuel gas scrubber KOD overhead line. The feed gas lines from tie-in points up to ERU battery limit are considered OSBL. The feed gas lines will be combined inside ERU battery limit before being routed to the ERU MDEA/ Water Wash Tower Production Capacities Products Design Case 13

14 TPH KTA Demethaniser Net Overhead as Refinery Fuel Gas C2 Product to Ethylene Fractionator C3 Plus Product to Depropanizer Acid Gases & Water Total ERU Products No change in NCU product quality is envisioned as part of ERU integration Product Battery Limit Conditions The ERU shall be designed to deliver products to the battery limits at the conditions specified below. Products Temperature ( C) Pressure (kg/cm²g) Fuel Gas (Note 1) C2 Product (-) (Note 2) C3 Plus Product (Note 3) Additional Storage One Horten Sphere of 2800 M3 capacity and one Mounded bullet of 2800 M3 capacity are considered at for Naphtha Cracker Complex for storage of C4 mix/c4h/c4r. 4.3 Flare System Depending upon temperature and composition of relieving load, the ERU flare system is categorized into 4 sections namely : Refinery HC flare, Refinery Acid gas flare, Dry flare & Wet flare Flare load from ERU Equipment located in Refinery complex: Sr. No Equipment Details ERU MDEA/Water Wash Tower ERU DGA/ Water Wash Tower ERU DGA Regenerator Reflux Drum Table: ERU Flare load from Refinery complex Type of Flare Refinery Flare Refinery Flare Acid Gas Flare Governing Case Blocked outlet Without Instrumented shutdown Max Load (Kg/hr) MW With Instrumented shutdown Max Load (Kg/hr) MW Global power failure Remarks Note-1 14

15 Notes: 1. From ERU DGA Regenerator a load of 797 Kg/hr is continuously flared to Acid gas flare system Flare load from ERU Equipment located in NCU complex: Table: ERU Flare load from NCU complex Sr. No Equipment Details Type of Flare Governing Case Without Instrumented Shutdown Max Load (Kg/hr) MW With Instrumented shutdown Max Load (Kg/hr) 1 ERU oxygen Converter Wet Power Failure ERU Caustic/ Water Wash Tower Wet Power Failure ERU Demethanizer Dry Power Failure ERU Deethanizer Dry Power Failure EBR Compressor Wet Power Failure MW Total Relieving Load (Note-1) WET Power Failure DRY Power Failure Notes: 1. The maximum load for with Instrumented shutdown is based on considering failure of largest single SIS (Safety Instrumented Shutdown) system and other unmitigated loads resulting in largest flare load. 15

16 CHAPTER 5 SOCIAL BENEFITS 5.0 SOCIAL BENEFITS This project, besides general economic desirability, would result in substantial socio-economic benefit to the country in general and more specifically to the region. The socio-economic benefits are described hereinafter. 5.1 Social Upliftment of the Region This area of the country is undergoing rapid industrialization. Setting up of this project will be a boon to this region and will bound to improve living conditions and thereby result in further reduction of population below poverty line, which is one of the prime policy objective of the Government. It is expected that by creation of vast employment potential and industrialization of the area poor/weaker section of the society will see an upliftment in their living conditions. 5.2 Employment Generation During Construction phase of about 2 years, project on an average will provide employment to about 500 persons, of which significant portion is expected to be drawn from the surrounding areas. On commissioning and achieving successful trial runs, this project will provide direct employment to persons out of which around one third of the local personnel would get employment. Indirect employment in the form of contractors, workers, transporters, marketing and general utilities services will provide employment to about 50 persons (mainly from the neighbouring areas) Employment associated through forward linkages in the small and medium scale industries expected to be set up on the basis of products available from this project is estimated to be in the region of jobs. 16

17 CHAPTER 6 SAFETY AND POLLUTION CONTROL MEASURES 6.0 SAFETY AND POLLUTION CONTROL MEASURES 6.1 General Public concern over environmental pollution is increasing at a geometric rate. The concern stems from an awareness of the threats to health and welfare from the wastes of our society. It leads inevitably to pressure on industry to reduce the discharge of contaminants into the air and public waterways. Environmental monitoring plans will be prepared for the project to ensure all activities of the project are operated in an environmentally safe manner. A brief note on the various environment impacts of the project and the remedial measures are enumerated hereinafter: During construction, the activities that might cause adverse effects to the area are - Site preparation - Site filling, flattening and reinforcement of the foundation - Transportation of materials and equipment to the site - Construction of infrastructure - Installation of equipment and support facilities for the plant These activities will be controlled primarily by the construction contractor(s) under agreement(s) with LSTK contractor / IOCL to follow the requirements to be satisfied at site. During operations, the activities that have an adverse impact on the environment are - Operation of the production process - Gaseous waste and liquid waste Environmental impacts of these activities will be controlled. The ERU is designed to minimize the amounts of effluents generated and to control those streams which cannot be eliminated. 6.2 Environmental protection Prevention of Air Pollution 17

18 Emissions from the plant are minimized with the application of nitrogen blanketing for storage tanks, proper selection of pumps as per OSHA standard, proper selection of gaskets, etc. Prevention of Water Pollution Recirculating cooling water system is utilized in the ERU. The cooling water return will be cooled in the already existing Cooling tower, thus reducing the water requirement for cooling in the complex. As for process waste water, it will be routed to the already existing Effluent treatment plant, which is installed so as to comply as per Haryana State Pollution Control Board (HSPCB) and Central Pollution Control Board (CPCB) guide line. In order to prevent underground water pollution, the process area is paved with concrete. Oil, acid and rain water falling in the area is collected in a sump for further treatment. This waste water is discharged to the waste water treatment plant for treatment. Prevention of Noise Noise level of working place will be controlled within the limit as specified in the HSPCB standard. In the case that some areas might not satisfy the said standard, suitable countermeasures, e.g. addition of noise insulation, use of PPE etc., will be applied in order to satisfy the said standard. Noise level at plant boundary fence will be controlled to satisfy noise criteria. 6.3 Highlights of Effluent generated in ERU Effluent Summmary The ERU is designed to minimize the amounts of effluents generated and to control those streams which cannot be eliminated Gaseous Effluents The following gaseous effluent streams will be produced by the ERU: 1. ERU Oxygen Converter Regeneration Offgas 2. ERU Di-Glycol Amine (DGA) Regenerator overhead to Refinery Acid Gas Flare The characteristics of these gaseous effluent streams are given below. ERU Oxygen Converter Regeneration Offgas ( Once in a Year) Prior to regeneration, hydrocarbons are purged to the quench tower in the NCU, then to flare. During steam/air regeneration, offgas is sent to atmosphere. Parameter Unit Value Offgas flow rate kg/hr

19 ERU DGA Regenerator Overhead to Refinery Acid Gas Flare : Parameter Unit Value Offgas flow rate kg/hr 598 Temperature ⁰C Aqueous Effluent The following aqueous effluent stream will be produced by the ERU: 1. Condensate from Refinery Off-Gas KO Drum 2. Spent Wash Water from MDEA/Water Wash Tower, DGA/Water Wash Tower, and Caustic/Water Wash Tower 3. Spent Caustic from Caustic/Water Wash Tower 4. Polymeric oil from ERU MDEA/Water Wash Tower 5. Polymeric Oil from ERU DGA/Water Wash Tower 6. Polymeric Oil from ERU Caustic/Water Wash Tower Condensate from Refinery Off-Gas KO Drum Condensate from Refinery Off-Gas KO Drum (17-V-9001) is directed to Amine Blowdown System. The possibility of condensate from 17-V-9001 is minimal. Composition: Since RFCC Off-gas does not contain heavy hydrocarbons, condensate mainly contains water and traces of amine (carryover from refinery) and heavy hydrocarbons. Parameter Unit Value Temperature ⁰C 44 Pressure kg/cm2g 11.5 Spent Wash Water from Amine Absorbers Spent wash water from the water wash sections of the ERU MDEA/Water Wash Tower and the DGA/Water Wash Tower is sent to treatment OSBL (in refinery complex). Spent wash water contains mostly water with traces of caustic and amine. Parameter Unit Value Flowrate kg/hr 2165 Spent Wash Water from ERU Caustic/Water Wash Tower Spent wash water from the ERU Caustic/Water Wash Tower and condensate from the ERU Dryer/Treater Feed Gas KO Drum is combined with spent wash water from NCU and sent to treatment OSBL. Spent wash water contains mostly water with traces of caustic. Parameter Unit Value Flowrate kg/hr

20 Spent Caustic from Caustic/Water Wash Tower Spent caustic leaves the bottoms of the ERU Caustic/Water Wash Tower and is sent to the NCU to be combined with spent caustic from the NCU Caustic/Water wash tower The spent caustic from ERU has the following flow rate and characteristics: Parameter Unit Value Flow rate kg/hr 317 Temperature ⁰C 56 Pressure kg/cm2 6.0 Polymeric Oil from Amine/Water Wash Towers Some amount of polymeric oil (yellow or red oil) may be formed in the MDEA and DGA Amine/Water Wash Towers (17-C-9001 and 17-C-9002), particularly when high amine concentration and high operating temperatures are used. In most cases, some oil will be formed, and periodically this oil is decanted from the bottom of the towers to corresponding degassing drums (17-V-9002 for MDEA Tower, 17-V-9004 for DGA Tower). The oil is routed to the respective amine drain system for disposal. Polymeric Oil from Caustic/Water Wash Tower The possibility of polymeric oil (yellow or red oil) formation in the ERU is low; however provision is given in the design to skim off the Yellow Oil from the bottom section of the ERU Caustic/Water Wash Tower and recombined with the spent caustic. Spent caustic/polymeric oil stream from the ERU is combined with NCU and sent to the spent caustic pretreatment-gasoline wash system, where the polymeric oil is washed from the spent caustic before it is sent OSBL for treatment SOLID EFFLUENTS Spent Catalysts/Adsorbents The following spent catalysts/adsorbents will be produced: 1. ERU Oxygen Converter spent catalyst 2. ERU Chloride Guard Bed spent adsorbent 3. ERU Dryer/Treater spent adsorbent 4. ERU Metals Treater spent adsorbent When the catalysts and adsorbents can no longer be satisfactorily regenerated or are at the end of life, they will be sent offsite via drum or truck to landfill or returned to the vendor for reclamation. DGA Sludge Amine based solvents for CO2 and H2S absorption degrade over time due to reaction with acid gases, halogenated compounds and other impurities. Major degradation products include Heat Stable Salts (HSS), non-volatile organic compounds and suspended solids. Contaminants (heat stable salts, amine degradation products, solids, hydrocarbons, surfactants) cause reduced capacity, product quality and increased fouling. To remove the HSS and to recover the amine, a reclaimer has been included in the DGA regeneration system. The reclaimer is designed to convert a degradation product, N,N-bis(hydroxyethoxyethyl) urea (BHEEU) back to useful DGA. However, HSS and non-volatile impurities accumulate in the DGA reclaimer, which can upset the BHEEU conversion. The accumulation of HSS in the DGA reclaimer can lead to increased operating temperatures and the need to purge accumulated salts periodically. 20

21 The purging of 0.4 m3 of sludge can be planned to occur once per month. Disposal options may vary depending on local regulations and corresponding classification as hazardous or nonhazardous waste. However, assuming the sludge is classified as hazardous waste, typical disposal method is incineration. *** 21

INDIAN OIL CORPORATION LTD Panipat Naphtha Cracker, Panipat, India

INDIAN OIL CORPORATION LTD Panipat Naphtha Cracker, Panipat, India INDIAN OIL CORPORATION LTD Panipat Naphtha Cracker, Panipat, India Pre-Feasibility Report for Expansion of NCU,MEG,HDPE & PP Units and Catalyst Manufacturing unit JUNE 2016 1 CONTENTS 1. INTRODUCTION 3

More information

Chemistry Resource Kit

Chemistry Resource Kit This is a chapter from the Chemistry Resource Kit The Qenos Chemistry Resource kit has been developed as an information package for secondary students and others who wish to learn about Qenos, plastics

More information

Table of Contents. iii. vi Tables. Figures. viii Foreword. ix Acknowledgments

Table of Contents. iii. vi Tables. Figures. viii Foreword. ix Acknowledgments Figures vi Tables viii Foreword ix Acknowledgments xi About the authors xiii Chapter 1. Fundamentals 1 Fluid Properties 1 Temperature 2 Pressure 3 Gravity and Miscibility 3 Solubility 4 The Ideal Gas Law

More information

Chemistry of Petrochemical Processes

Chemistry of Petrochemical Processes Chemistry of Petrochemical Processes ChE 464 Instructor: Dr. Ahmed Arafat, PhD Office: building 45 room 106 E-mail: akhamis@kau.edu.sa www.kau.edu.sa.akhamis files Book Chemistry of Petrochemical Processes

More information

Stop bleeding caustic: Parameters for Designing and Operating an efficient LPG treating unit

Stop bleeding caustic: Parameters for Designing and Operating an efficient LPG treating unit Stop bleeding caustic: Parameters for Designing and Operating an efficient LPG treating unit Saurabh Agarwala*, Debasis Maity, Ravi Kant Gupta, and Ganesh Prasad Engineers India Limited, R&D Complex, Sector-16,

More information

Natural Gas Processing Unit Modules Definitions

Natural Gas Processing Unit Modules Definitions Natural Gas Processing Unit Modules Definitions Alberta Climate Change Office Draft Version 1.0 December 2018 1 2 3 4 5 6 7 8 9 10 11 12 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35

More information

GT-LPG Max SM. Maximizing LPG Recovery from Fuel Gas Using a Dividing Wall Column. Engineered to Innovate

GT-LPG Max SM. Maximizing LPG Recovery from Fuel Gas Using a Dividing Wall Column. Engineered to Innovate GTC Technology White Paper GT-LPG Max SM Maximizing LPG Recovery from Fuel Using a Dividing Wall Column Engineered to Innovate GT-LPG Max SM Maximizing LPG Recovery from Fuel Using a Dividing Wall Column

More information

AFPM 2018 Operations & Process Technology Summit

AFPM 2018 Operations & Process Technology Summit GASOLINE PROCESSES Alkylation 1 What are the benefits of alumina treating in sulfuric acid alkylation and HF alkylation? Has this technology been proven commercially? 2 What metallurgy works well and does

More information

GTC TECHNOLOGY. GT-UWC SM How a Uniting Wall Column Maximizes LPG Recovery. Engineered to Innovate WHITE PAPER

GTC TECHNOLOGY. GT-UWC SM How a Uniting Wall Column Maximizes LPG Recovery. Engineered to Innovate WHITE PAPER GTC TECHNOLOGY GT-UWC SM How a Uniting Wall Column Maximizes LPG Recovery WHITE PAPER Engineered to Innovate Maximizing LPG Recovery from Fuel Using a Uniting Wall Column Refiners have a challenge to recover

More information

Modular Oil & Gas Equipment Onshore & Offshore

Modular Oil & Gas Equipment Onshore & Offshore Modular Oil & Gas Equipment Onshore & Offshore Separators & Desalters AI Energy Solutions onshore and offshore oil process solutions offer innovative technologies packaged with global project management

More information

Item Hydrogen Gas Plant

Item Hydrogen Gas Plant Item 6530. Hydrogen Gas Plant Hydro-Chem Hydrogen Generating Plant 90,000 scfh @ 200 psig. Purity 99.99% Hydrogen generating plant engineered by Hydro-Chem built in 1980. Design capacity is 90,000 scfh

More information

Bulk petrochemical manufacturing is a highly competitive

Bulk petrochemical manufacturing is a highly competitive Originally appeared in: April 2012, pgs 1-5. Used with permission. Optimize olefin operations This operating company used process models to find solutions to poor separation performance K. Romero, Pequiven

More information

Taravosh Jam Design & Engineering Co.

Taravosh Jam Design & Engineering Co. Taravosh Jam Design & Engineering Co. Taravosh Jam co. as an Iranian EPC contractor supplies following refinery equipment and facilities based on the know-how and to international standards. 1- The Main

More information

MOLECULAR GATE TECHNOLOGY FOR (SMALLER SCALE) LNG PRETREATMENT

MOLECULAR GATE TECHNOLOGY FOR (SMALLER SCALE) LNG PRETREATMENT MOLECULAR GATE TECHNOLOGY FOR (SMALLER SCALE) LNG PRETREATMENT Presented at the 2010 Gas Processors 89 th Annual Convention Austin, TX March, 2010 Michael Mitariten, P.E. Guild Associates, Inc. Dublin,

More information

CORROSION AND FOULING IN SULFURIC ACID ALKYLATION UNITS

CORROSION AND FOULING IN SULFURIC ACID ALKYLATION UNITS CORROSION AND FOULING IN SULFURIC ACID ALKYLATION UNITS Presented By Curt Hassler Technical Service Engineer DuPont STRATCO Clean Fuel Technologies 11350 Tomahawk Creek Parkway Suite 200 Leawood, KS 66211

More information

Available online at ScienceDirect. Energy Procedia 63 (2014 ) GHGT-12

Available online at   ScienceDirect. Energy Procedia 63 (2014 ) GHGT-12 Available online at www.sciencedirect.com ScienceDirect Energy Procedia 63 (2014 ) 1678 1685 GHGT-12 Shell Cansolv CO 2 capture technology: Achievement from First Commercial Plant Ajay Singh a *, Karl

More information

2.0 HYDROGEN GENERATION UNIT 2.1 INTRODUCTION

2.0 HYDROGEN GENERATION UNIT 2.1 INTRODUCTION 2.0 HYDROGEN GENERATION UNIT 2.1 INTRODUCTION 2.1.1 PURPOSE The objective of the unit is to produce hydrogen by steam reforming of full range naphtha i.e. C 5-140 O C SR naphtha & coker naphtha to meet

More information

SYNTHETIC NATURAL GAS PLANT. Philadelphia, PA

SYNTHETIC NATURAL GAS PLANT. Philadelphia, PA SYNTHETIC NATURAL GAS PLANT Philadelphia, PA SYNTHETIC NATURAL GAS PLANT The SNG facility was constructed in 1977 but has seen very little operational activity. The SNG Facility employs the British Gas

More information

CORROSION AND FOULING IN SULFURIC ACID ALKYLATION UNITS

CORROSION AND FOULING IN SULFURIC ACID ALKYLATION UNITS CORROSION AND FOULING IN SULFURIC ACID ALKYLATION UNITS Presented By Jeff Caton, Staff Process Engineer Brian Racen, Staff Process Engineer Greg Troutman, Process Engineer DuPont STRATCO Clean Fuel Technology

More information

Integrated production of liquid sulphur dioxide and sulphuric acid via a lowtemperature

Integrated production of liquid sulphur dioxide and sulphuric acid via a lowtemperature Integrated production of liquid sulphur dioxide and sulphuric acid via a lowtemperature cryogenic process by M. Verri* and A. Baldelli* Synopsis The paper describes the design options available for the

More information

DIESEL HYDRODESULPHURISATION UNIT CHAPTER-9 CATALYST AND REGENERATION

DIESEL HYDRODESULPHURISATION UNIT CHAPTER-9 CATALYST AND REGENERATION CHAPTER-9 CATALYST AND REGENERATION 9.1 MANUFACTURER: HR 945 and HR-348 are manufactured by PROCATALYSE : In their facilities located at Salindres 30340 France. PROCATALYSE Head Office Address : 212/216

More information

4.0 HYDROGEN GENERATION UNIT (PREP) 4.1 INTRODUCTION

4.0 HYDROGEN GENERATION UNIT (PREP) 4.1 INTRODUCTION 4.0 HYDROGEN GENERATION UNIT (PREP) 4.1 INTRODUCTION 4.1.1 PURPOSE The objective of the unit is to produce hydrogen by steam reforming of full range naphtha i.e. C 5-140 O C SR naphtha & coker naphtha

More information

10/2/2013. Gas CHEMICAL PLANTS AMMONIA METHANOL UTILITIES TOWN GASS SUPPLIES ENERGY INTENSIVE INDUSTRIES. Power Generation

10/2/2013. Gas CHEMICAL PLANTS AMMONIA METHANOL UTILITIES TOWN GASS SUPPLIES ENERGY INTENSIVE INDUSTRIES. Power Generation Gas Burning Feed Stock UTILITIES TOWN GASS SUPPLIES ENERGY INTENSIVE INDUSTRIES Power Generation CHEMICAL PLANTS AMMONIA METHANOL 1 Fundamentals of Natural Gas Processing Natural gas has been formed by

More information

1. Process Description:

1. Process Description: 1. Process Description: The coal is converted to Raw Syngas in the Gasification Section. The Raw Syngas produced out of the Gasifier would be shifted (water gas shift) to adjust required H2/CO ratio and

More information

1) ABSORPTION The removal of one or more selected components from a gas mixture by absorption is probably the most important operation in the control

1) ABSORPTION The removal of one or more selected components from a gas mixture by absorption is probably the most important operation in the control 1) ABSORPTION The removal of one or more selected components from a gas mixture by absorption is probably the most important operation in the control of gaseous pollutant emissions. Absorption is a process

More information

ADVANCED PROCESS CONTROL QATAR GAS ONE YEAR EXPERIENCE

ADVANCED PROCESS CONTROL QATAR GAS ONE YEAR EXPERIENCE ADVANCED PROCESS CONTROL QATAR GAS ONE YEAR EXPERIENCE Bouchebri El-Hadi Senior Process Engineer Benmouley Abdelkader Head of Process Qatar Liquefied Gas Company Limited. Ras Laffan Industrial Area, Doha,

More information

Methanol Production by Gasification of Heavy Residues

Methanol Production by Gasification of Heavy Residues Methanol Production by Gasification of Heavy Residues by C. A. A. Higman Presented at the IChemE Conference "Gasification: An Alternative to Natural Gas" London, 22-23 23 November, 1995 Methanol Production

More information

Post Combustion CO 2 Capture Scale Up Study

Post Combustion CO 2 Capture Scale Up Study Post Combustion CO 2 Capture Scale Up Study Prachi Singh and Mike Haines International Greenhouse Gas R&D programme 6 th International Conference on Clean Coal Technologies (CCT 2013) 12-16 th May 2013

More information

Chapter 10. Flowsheet Analysis for Pollution Prevention. by Kirsten Sinclair Rosselot and David T. Allen

Chapter 10. Flowsheet Analysis for Pollution Prevention. by Kirsten Sinclair Rosselot and David T. Allen Chapter 10. Flowsheet Analysis for Pollution Prevention by Kirsten Sinclair Rosselot and David T. Allen The environmental performance of a process flowsheet depends on both the performance of the individual

More information

Salt deposition in FCC gas concentration

Salt deposition in FCC gas concentration Salt Deposition in FCC Gas Concentration Units Michel Melin Director Technical Service Grace Davison Refining Technologies Europe, Middle East and Africa Colin Baillie Marketing Manager Grace Davison Refining

More information

WASTE WATER TREATMENT REFINERIES

WASTE WATER TREATMENT REFINERIES WASTE WATER TREATMENT REFINERIES Introduction REFINING PROCESS Petroleum industry, have had considerable role in generation and release of waste materials into the environment. A variety of waste products

More information

Cansolv Technologies Inc. Alberta NOx and SOx Control Technologies Symposium April 9, Rick Birnbaum

Cansolv Technologies Inc. Alberta NOx and SOx Control Technologies Symposium April 9, Rick Birnbaum A Novel SO 2 Scrubbing Process For Industrial SO 2 Emission Control Alberta NOx and SOx Control Technologies Symposium April 9, 2008 Rick Birnbaum rick.birnbaum@cansolv.com OUTLINE Gas Absorption Solutions

More information

WWT Two-Stage Sour Water Stripping

WWT Two-Stage Sour Water Stripping WWT Two-Stage Sour Water Stripping Improve performance of sulfur recovery units ben efits The Chevron WWT Process is a two-stage stripping process which separates ammonia and hydrogen sulfide from sour

More information

MODERN COKE OVEN GAS TREATMENT TECHNOLOGY AT A NEW COKE MAKING PLANT IN BRAZIL*

MODERN COKE OVEN GAS TREATMENT TECHNOLOGY AT A NEW COKE MAKING PLANT IN BRAZIL* MODERN COKE OVEN GAS TREATMENT TECHNOLOGY AT A NEW COKE MAKING PLANT IN BRAZIL* Wolfgang Kern 1 Mario Petzsch 2 Antonio Esposito 3 Helênio Resende Silva Júnior 4 Abstract The implementation of the Gas

More information

Delayed Coker Blowdown System Water Reuse

Delayed Coker Blowdown System Water Reuse Delayed Coker Blowdown System Water Reuse Presented by Mitch Moloney of ExxonMobil Research & Engineering mitchell.j.moloney@exxonmobil.com Budapest Hungary coking.com October-2017 a This material is not

More information

Simple Dew Point Control HYSYS v8.6

Simple Dew Point Control HYSYS v8.6 Simple Dew Point Control HYSYS v8.6 Steps to set up a simulation in HYSYS v8.6 to model a simple dew point control system consisting of: Gas chiller Flash separator Liquid stabilizer with gas recycle &

More information

INCREASING THE CAPACITY OF NGL RECOVERY TRAINS. Stéphane MESPOULHES XVI CONVENCIÓN INTERNACIONAL DE GAS Caracas de Mayo de 2004

INCREASING THE CAPACITY OF NGL RECOVERY TRAINS. Stéphane MESPOULHES XVI CONVENCIÓN INTERNACIONAL DE GAS Caracas de Mayo de 2004 INCREASING THE CAPACITY OF NGL RECOVERY TRAINS Stéphane MESPOULHES XVI CONVENCIÓN INTERNACIONAL DE GAS Caracas WHO IS TECHNIP? 2 World Class Engineering & Construction Group in Oil & Gas Public Company

More information

TABLE OF CONTENT

TABLE OF CONTENT Page : 1 of 28 Project Engineering Standard www.klmtechgroup.com KLM Technology #03-12 Block Aronia, Jalan Sri Perkasa 2 Taman Tampoi Utama 81200 Johor Bahru Malaysia TABLE OF CONTENT 1.0 INTRODUCTION

More information

Novel Method for Gas Separation By: Chris Wilson and Dr. Miguel Bagajewicz

Novel Method for Gas Separation By: Chris Wilson and Dr. Miguel Bagajewicz Novel Method for Gas Separation By: Chris Wilson and Dr. Miguel Bagajewicz 2008 1 Summary Natural gas has many impurities that must be removed to increase the worth of the natural gas. There are seven

More information

MOLECULAR SIEVES AND ADSORBENTS

MOLECULAR SIEVES AND ADSORBENTS CHECKED kta LLDPE / HDPE. GENERAL Nov Jan Aug Y -LZ-ADSC No. OFF PAGE / This specification covers the minimum requirements for the adsorbents and molecular sieves used for purifying ethylene, comonomers

More information

R & R IDENTIFICATION CO.

R & R IDENTIFICATION CO. PRESSURE SENSITIVE HV FOR PIPE WITH OUTSIDE DIAMETER OF 6" AND OVER HOT WATER FOR PIPE WITH OUTSIDE DIAMETER OF 2-1/2" TO 6" COLD WATER FOR PIPE WITH OUTSIDE DIAMETER OF 1" TO 2-1/2" DOMESTIC DOMESTIC

More information

Thomas G. Braga Manager, Research and Development. SulfaTreat, a Business Unit of M I L.L.C. A Smith/Schlumberger Company

Thomas G. Braga Manager, Research and Development. SulfaTreat, a Business Unit of M I L.L.C. A Smith/Schlumberger Company Thomas G. Braga Manager, Research and Development SulfaTreat, a Business Unit of M I L.L.C. A Smith/Schlumberger Company Who is SulfaTreat? A World Leader in H 2 S Removal for More than a Decade Today

More information

CO 2 RECOVERY FROM CO 2 REMOVAL UNIT AT GL1Z PLANT

CO 2 RECOVERY FROM CO 2 REMOVAL UNIT AT GL1Z PLANT CO 2 RECOVERY FROM CO 2 REMOVAL UNIT AT GL1Z PLANT Hocine Friha Chemical Engineer Technical Department GL1Z/ Sonatrach Bethioua, Oran, Algeria hfriha@avl.sonatrach.dz ABSTRACT Algeria which has ratified

More information

Refinery SRU s Tail Gas Handling Options. 2 nd Middle East Sulphur Plant Operations Network Forum Abu Dhabi October 18-20, 2015

Refinery SRU s Tail Gas Handling Options. 2 nd Middle East Sulphur Plant Operations Network Forum Abu Dhabi October 18-20, 2015 Refinery SRU s Tail Gas Handling Options 2 nd Middle East Sulphur Plant Operations Network Forum Abu Dhabi October 18-20, 2015 Refinery SRU tail gas handling options Shell Global Solutions Achim Epping

More information

Control Valve Sourcebook Chemical Process Overview

Control Valve Sourcebook Chemical Process Overview Control Valve Sourcebook Chemical Process Overview Ammonia Production Topic Page I Purification of Feedstock............... II Reforming........................ III Shift Conversion....................

More information

Instructor s t Background

Instructor s t Background Teknologi Pemrosesan Gas (TKK 564) Instructor: Dr. Istadi (http://tekim.undip.ac.id/staf/istadi ) Email: il iistadi@undip.ac.id di di id Instructor s t Background BEng. (1995): Universitas Diponegoro Meng.

More information

AMINE GAS SWEETENING & SULPHUR RECOVERY

AMINE GAS SWEETENING & SULPHUR RECOVERY AMINE GAS SWEETENING & SULPHUR RECOVERY SECTOR / MAINTENANCE MANAGMENT NON-TECHNICAL & CERTIFIED TRAINING COURSE The removal of acidic components (primarily H2S and CO2) from hydrocarbon streams can be

More information

TABLE OF CONTENT

TABLE OF CONTENT Page : 1 of 12 Project Engineering Standard www.klmtechgroup.com KLM Technology #03-12 Block Aronia, Jalan Sri Perkasa 2 Taman Tampoi Utama 81200 Johor Bahru Malaysia RECOVERY AND SPLITTER TABLE OF CONTENT

More information

HYDROGEN UNIT CHAPTER-1 INTRODUCTION. The process for hydrogen generation involves the following four major steps.

HYDROGEN UNIT CHAPTER-1 INTRODUCTION. The process for hydrogen generation involves the following four major steps. CHAPTER-1 INTRODUCTION 1.1 GENERAL The Panipat Refinery Hydrogen Unit is designed to produce 38,000 MTPA of high purity (99.99%) hydrogen gas based on 8,000 hours on-stream operation to cater to the OHCU/DHDS/CCR

More information

Flare minimisation via dynamic simulation. Amarnath Singh, Kuyen Li*, Helen H. Lou, J.R. Hopper, Hardik B. Golwala and Sandesh Ghumare

Flare minimisation via dynamic simulation. Amarnath Singh, Kuyen Li*, Helen H. Lou, J.R. Hopper, Hardik B. Golwala and Sandesh Ghumare Int. J. Environment and Pollution, Vol. 29, Nos. 1/2/3, 2007 19 Flare minimisation via dynamic simulation Amarnath Singh, Kuyen Li*, Helen H. Lou, J.R. Hopper, Hardik B. Golwala and Sandesh Ghumare Chemical

More information

HOW TO SELECT BEST MEG RECOVERY UNIT s CONFIGURATION?

HOW TO SELECT BEST MEG RECOVERY UNIT s CONFIGURATION? HOW TO SELECT BEST MEG RECOVERY UNIT s CONFIGURATION? PAPER PRESENTED AT GPA EUROPE Madrid, 17 th - 19 th September, 2014 Jérémie ESQUIER PROSERNAT Paris, France PROSERNAT Mr Jérémie ESQUIER - Business

More information

Critical Ethylene Level and Flow Applications and Case Studies

Critical Ethylene Level and Flow Applications and Case Studies Special Applications Series: Critical Ethylene Level and Flow Applications and Case Studies Maintaining Safety, Reliability and Productivity In ethylene plants, balancing environment, health, and safety

More information

CRYOGENIC SOLVENT ABATEMENT (VOC s )

CRYOGENIC SOLVENT ABATEMENT (VOC s ) CRYOGENIC SOLVENT ABATEMENT (VOC s ) 1. Introduction The technology for removing volatile organic compounds (V.O.C.s) from gas has been developed to meet the emission limits, decreased during the last

More information

Austro Energy Systems Int. AG. Gas reformer AES3000

Austro Energy Systems Int. AG. Gas reformer AES3000 Austro Energy Systems Int. AG Gas reformer AES3000 1 Gas reformer AES3000 Purification of associated gas from the hydrogen sulfide and high hydrocarbons and conversion of its qualities into similar properties

More information

UNIQUE DESIGN CHALLENGES IN THE AUX SABLE NGL RECOVERY PLANT

UNIQUE DESIGN CHALLENGES IN THE AUX SABLE NGL RECOVERY PLANT UNIQUE DESIGN CHALLENGES IN THE AUX SABLE NGL RECOVERY PLANT Presented at the 81 st Annual Convention of the Gas Processors Association March 11, 2002 Dallas, Texas Joe T. Lynch, P.E. Ortloff Engineers,

More information

Qualitative Phase Behavior and Vapor Liquid Equilibrium Core

Qualitative Phase Behavior and Vapor Liquid Equilibrium Core 2/22/2017 Qualitative Phase Behavior and Qualitative Phase Behavior Introduction There are three different phases: solid, liquid, and gas (vapor) Energy must be added to melt a solid to form liquid If

More information

Cansolv Technologies Inc. Air and Waste Management Association South Coast AQMD May 14, Rick Birnbaum

Cansolv Technologies Inc. Air and Waste Management Association South Coast AQMD May 14, Rick Birnbaum A Versatile SO 2 Scrubbing Process For Industrial SO 2 Emission Control Air and Waste Management Association South Coast AQMD May 14, 2008 Rick Birnbaum rick.birnbaum@cansolv.com OUTLINE Gas Absorption

More information

Fluor s Econamine FG Plus SM Technology For CO 2 Capture at Coal-fired Power Plants

Fluor s Econamine FG Plus SM Technology For CO 2 Capture at Coal-fired Power Plants Fluor s Econamine FG Plus SM Technology For CO 2 Capture at Coal-fired Power Plants Satish Reddy Dennis Johnson John Gilmartin Presented At: Power Plant Air Pollutant Control Mega Symposium August 25-28,

More information

Title slide. LNG Technology. Compiled by PD.Supriyadi

Title slide. LNG Technology. Compiled by PD.Supriyadi Title slide LNG Technology Compiled by PD.Supriyadi 1 What is LNG? Colorless, odorless, non toxic hydrocarbon in very low temperature liquid form (cryogenic) Mainly (90% plus) is Methane, the lightest

More information

Gas Dehydration Field Manual

Gas Dehydration Field Manual Gas Dehydration Field Manual Maurice Stewart Ken Arnold AMSTERDAM BOSTON HEIDELBERG LONDON NEW YORK OXFORD * PARIS SAN DIEGO SAN FRANCISCO SINGAPORE SYDNEY TOKYO QulfProfcsiion»l Publishing Is an Imprint

More information

Amine Plant Energy Requirements & Items impacting the SRU

Amine Plant Energy Requirements & Items impacting the SRU Amine Plant Energy Requirements & Items impacting the SRU 10 October 2016 AGRU energy needs Amine energy requirements Regeneration Processing effects Leanness required Determine required leanness Over

More information

A CASE STUDY OF PROCESS IMPROVEMENT IN A PETROCHEMICAL PLANT

A CASE STUDY OF PROCESS IMPROVEMENT IN A PETROCHEMICAL PLANT A CASE STUDY OF PROCESS IMPROVEMENT IN A PETROCHEMICAL PLANT CHIKE OKECHUKWU and BAL SHRIVASTAVA Indorama Eleme Petrochemicals Ltd (IEPL) Port Harcourt, Nigeria cokechukwu@indorama.com.ng bkshrivastava@indorama.com.ng

More information

COMPREHENSIVE MSW PROCESSING STEPS BIO COKE METHOD

COMPREHENSIVE MSW PROCESSING STEPS BIO COKE METHOD COMPREHENSIVE MSW PROCESSING STEPS BIO COKE METHOD STEPS BIOCOKE METHOD FOR CONVERSION OF MSW TO COAL AND FUEL OIL STEPS BIOCOKE processing system is designed for converting the MSW which is received on

More information

Problems at the Cumene Production Facility, Unit 800

Problems at the Cumene Production Facility, Unit 800 Problems at the Cumene Production Facility, Unit 800 Background Cumene (isopropyl benzene) is produced by reacting propylene with benzene. During World War II, cumene was used as an octane enhancer for

More information

Evonik s Andrussow process expertise for tailor-made solutions

Evonik s Andrussow process expertise for tailor-made solutions Evonik s Andrussow process expertise for tailor-made solutions Scope of a standard HCN technology license Evonik Performance Materials GmbH offers plant designs for the production of gaseous and liquid

More information

HYSYS WORKBOOK By: Eng. Ahmed Deyab Fares.

HYSYS WORKBOOK By: Eng. Ahmed Deyab Fares. HYSYS WORKBOOK 2013 By: Eng. Ahmed Deyab Fares eng.a.deab@gmail.com adeyab@adeyab.com Mobile: 002-01227549943 - Email: adeyab@adeyab.com 1 Flash Separation We have a stream containing 15% ethane, 20% propane,

More information

Wastewater Recycling Plants with Zero Effluent Discharge. Water Recycling Plants

Wastewater Recycling Plants with Zero Effluent Discharge. Water Recycling Plants Wastewater Recycling Plants with Zero Effluent Discharge By Transparent Technologies Private Limited Business Groups Co-generation systems Absorption Cooling Systems Water Recycling Plants Heat recovery

More information

Petroleum Refining. Environmental Guidelines for. Multilateral Investment Guarantee Agency. Industry Description and Practices. Waste Characteristics

Petroleum Refining. Environmental Guidelines for. Multilateral Investment Guarantee Agency. Industry Description and Practices. Waste Characteristics Multilateral Investment Guarantee Agency Environmental Guidelines for Petroleum Refining Industry Description and Practices The petroleum industry is organized into four broad sectors: exploration and

More information

State Of The Art (SOTA) Manual For Non-Hazardous Onsite Remediation Processes

State Of The Art (SOTA) Manual For Non-Hazardous Onsite Remediation Processes State Of The Art (SOTA) Manual For Non-Hazardous Onsite Remediation Processes July 1997 State of New Jersey Department of Environmental Protection Air Quality Permitting Program State of the Art (SOTA)

More information

INTRODUCTION TO SULFURIC ACID ALKYLATION UNIT PROCESS DESIGN

INTRODUCTION TO SULFURIC ACID ALKYLATION UNIT PROCESS DESIGN INTRODUCTION TO SULFURIC ALKYLATION UNIT PROCESS DESIGN Presented By Jeff Caton, Staff Process Engineer Brian Racen, Staff Process Engineer Greg Troutman, Process Engineer DuPont STRATCO Clean Fuel Technology

More information

Simple Dew Point Control HYSYS v10. When the simulation is set up the overall PFD should look like the following figure.

Simple Dew Point Control HYSYS v10. When the simulation is set up the overall PFD should look like the following figure. Simple Dew Point Control HYSYS v10 Steps to set up a simulation in HYSYS v10 to model a simple dew point control system consisting of: Gas chiller Flash separator Liquid stabilizer with gas recycle & compression

More information

Performance Evaluation of Deethanizer Column Using Real Time Optimization

Performance Evaluation of Deethanizer Column Using Real Time Optimization Performance Evaluation of Deethanizer Column Using Real Time Optimization Renanto Handogo, Indra Darmawan, Fadillah Akhbar Marsha, Juwari Department of Chemical Engineering Institut Teknologi Sepuluh Nopember

More information

Cansolv Technologies Inc.

Cansolv Technologies Inc. 6 C 16 S Cansolv Technologies Inc. About Cansolv Cansolv Technologies Incorporated was formed in 1997 to commercialize and market the CANSOLV SO Scrubbing System developed at Union Carbide Canada. Since

More information

Demonstration of Fuel Cells to Recover Energy from Landfill Gas Phase III. Demonstration Tests, and Phase IV. Guidelines and Recommendations

Demonstration of Fuel Cells to Recover Energy from Landfill Gas Phase III. Demonstration Tests, and Phase IV. Guidelines and Recommendations United States National Risk Management Environmental Protection Research Laboratory Agency Cincinnati, OH 45268 Research and Development EPA/600/SR-98/002 March 1998 Project Summary Demonstration of Fuel

More information

COMPETITIVENESS OF GASIFICATION AT THE BULWER ISLAND, AUSTRALIA REFINERY

COMPETITIVENESS OF GASIFICATION AT THE BULWER ISLAND, AUSTRALIA REFINERY COMPETITIVENESS OF GASIFICATION AT THE BULWER ISLAND, AUSTRALIA REFINERY 1999 Gasification Technologies Conference San Francisco, California October 17-20, 1999 Ram Ramprasad and Tarun Vakil, BOC Process

More information

Example SPC-2: Effect of Increasing Column P on a C3 splitter

Example SPC-2: Effect of Increasing Column P on a C3 splitter Example SPC-2: Effect of Increasing Column P on a C3 splitter Consider the separation of a mixture of 50 mol/hr of propane C 3 H 8 (1) and 50 mol/hr propene, C 3 H 6 (2) at a pressure of 1.1 bar and a

More information

Ammonia plants. Flexible solutions for all feedstocks.

Ammonia plants. Flexible solutions for all feedstocks. Ammonia plants. Flexible solutions for all feedstocks. Meeting the challenges of a volatile marketplace. 03 Meeting the challenges of a volatile marketplace. With volatility in worldwide energy prices

More information

The following sub-systems are provided and the integration of these is described below:

The following sub-systems are provided and the integration of these is described below: The following sub-systems are provided and the integration of these is described below: Pretreatment Plant The Pretreatment Plant typically comprises an amine system for gas sweetening and a molecular

More information

Fluor s Econamine FG Plus SM Technology

Fluor s Econamine FG Plus SM Technology Flue Gas Fluor s Econamine FG Plus SM Technology An Enhanced Amine-Based CO 2 Capture Process NETL Carbon Sequestration Conference May 2003 to Atmos Reflux Condenser 1 Amine Filter Package FI W CW Stripper

More information

Appendix 8.5 Equipment Summary & Specification Sheets

Appendix 8.5 Equipment Summary & Specification Sheets Appendix 8.5 Equipment Summary & Specification Sheets 59 EQUIPMENT NR. : NAME : REACTORS, COLUMNS & VESSELS SUMMARY R0 Monolith Reactor R02 Riser Regenerator C0 Depropanizer C04 Deethanizer C05 PP splitter

More information

CONVERTING DOMINION COVE POINT LNG INTO BIDIRECTIONAL FACILITY

CONVERTING DOMINION COVE POINT LNG INTO BIDIRECTIONAL FACILITY CONVERTING DOMINION COVE POINT LNG INTO BIDIRECTIONAL FACILITY Pascal Bocherel, Jim Strohman, Juan Martinez Dominion Cove Point LNG, LP Brett Wink, Kamal Shah, John Ray IHI E & C International Corporation

More information

Corrosion Monitoring Solutions for Hydroprocessing Units

Corrosion Monitoring Solutions for Hydroprocessing Units Corrosion Monitoring Solutions for Hydroprocessing Units Hydroprocessing Units Key to Refinery Competitiveness The growing demand for transportation fuels and the shift toward diesel makes hydroprocessing

More information

Nathan A. Hatcher and Ralph H. Weiland, Optimized Gas Treating Inc., USA, discuss the fate of ammonia in refinery amine systems.

Nathan A. Hatcher and Ralph H. Weiland, Optimized Gas Treating Inc., USA, discuss the fate of ammonia in refinery amine systems. Special treatment T he corrosion that results from ammonia ingress and accumulation in refinery and biogas amine systems is a problem that may be exacerbated by the increasing utilisation of advantaged

More information

Reforming is an upgrading process in which low octane gasoline is converted to high octane gasoline.

Reforming is an upgrading process in which low octane gasoline is converted to high octane gasoline. REFORMING Reforming is an upgrading process in which low octane gasoline is converted to high octane gasoline. Catalytic reforming primarily increases the octane of motor gasoline rather than increasing

More information

Development status of the EAGLE Gasification Pilot Plant

Development status of the EAGLE Gasification Pilot Plant Development status of the EAGLE Gasification Pilot Plant Gasification Technologies 2002 San Francisco, California, USA October 27-30, 2002 Masaki Tajima Energy and Environment Technology Development Dept.

More information

NEW RECYCLE PROCESS SCHEME FOR HIGH ETHANE RECOVERY NEW PROCESS SCHEME FOR HIGH NGL RECOVERY INTRODUCTION. Abstract PROCESS FUNDAMENTALS

NEW RECYCLE PROCESS SCHEME FOR HIGH ETHANE RECOVERY NEW PROCESS SCHEME FOR HIGH NGL RECOVERY INTRODUCTION. Abstract PROCESS FUNDAMENTALS Author: Jorge Foglietta, ABB Randall Corporation Tel (713) 821-4313, Fax (713) 821-3544 Mailing Address: Randall Division ABB Lummus Global Inc. P.O. Box 420087 Houston, Texas 77242-0087 NEW PROCESS SCHEME

More information

Advanced Equipment Manufacturing

Advanced Equipment Manufacturing Advanced Equipment Manufacturing Fangzhou Hu UOP LLC, A Honeywell Company US-China Oil & Gas Industry Forum September 16-18, 2015 Chongqing, China A Century of Innovation in the Oil and Gas Industry 2015

More information

Thermal Oxidation plants February 2016

Thermal Oxidation plants February 2016 Thermal Oxidation plants February 2016 Thermal Oxidation of gaseous waste Typical Processed Stream: Contaminated Air by Hydrocarbons Contaminated Air by Solvents Contaminated Air by Stripping/Scrubbing

More information

AGC NovaPRO Process Gas Chromatograph Refinery Applications

AGC NovaPRO Process Gas Chromatograph Refinery Applications AGC NovaPRO Process Gas Chromatograph Refinery Applications Head Quarters Address: Unit 2, Shannon Free Zone West, Shannon, Co. Clare, Ireland T: +353 61 471632 F: +353 61 471042 E: sales@agc-instruments.com

More information

Perspective on Coal Utilization Technology

Perspective on Coal Utilization Technology Perspective on Coal Utilization Technology 21st Annual International Pittsburgh Coal Conference on 14-16 September, 2004 Naokazu Kimura Director, Wakamatsu Research Institute J-Power/EPDC Agenda - About

More information

Hydrogen Production and Recovery

Hydrogen Production and Recovery CHAPTER FIVE Hydrogen Production and Recovery Hydrogen is required in refineries for a large number of hydrotreating and hydrocracking processes, to remove sulfur, nitrogen, and other impurities from hydrotreater

More information

Nitrogen production plants HPN

Nitrogen production plants HPN INDEX Nitrogen production plants HPN 1. Introduction 1.1. Membrane permeation 1.2. PSA 2. HPN (High Pressure Nitrogen) 3. HPN plant advantages 4. Choice of the process 5. Customer HPN technical form generator

More information

Hydrogen Recovery by Pressure Swing Adsorption

Hydrogen Recovery by Pressure Swing Adsorption Hydrogen Recovery by Pressure Swing 2 Contents. 3 Introduction 4 The process 5 The PSA sequence 6 Scope of work 7 The advantages 8 Contact 3 Introduction. The experience. The use of the Pressure Swing

More information

NATURAL GAS HYDRATES & DEHYDRATION

NATURAL GAS HYDRATES & DEHYDRATION Training Title NATURAL GAS HYDRATES & DEHYDRATION Training Duration 5 days Training Venue and Dates Natural Gas Hydrates & Dehydration 5 02 26 June $3,750 Abu Dhabi, UAE In any of the 5 star hotels. The

More information

ABB MEASUREMENT & ANALYTICS ANALYTICAL MEASUREMENT. Ethylene plant production excels with the PGC1000

ABB MEASUREMENT & ANALYTICS ANALYTICAL MEASUREMENT. Ethylene plant production excels with the PGC1000 ABB MEASUREMENT & ANALYTICS ANALYTICAL MEASUREMENT Ethylene plant production excels with the PGC1000 2 P G C 1 0 0 0 E T H Y L E N E P L A N T P R O D U C T I O N P B/ 2 1 0 2 74 2 - E N Measurement made

More information

Thermodynamic performance of IGCC with oxycombustion

Thermodynamic performance of IGCC with oxycombustion Thermodynamic performance of IGCC with oxycombustion CO 2 capture G.Lozza, M. Romano, A. Giuffrida Dip. Energia, Politecnico di Milano, Italy Purpose of the study CO 2 capture from coal power plant. Configurations

More information

Design Parameters Affecting the Commercial Post Combustion CO 2 Capture Plants

Design Parameters Affecting the Commercial Post Combustion CO 2 Capture Plants Available online at www.sciencedirect.com Energy Procedia 37 (2013 ) 1517 1522 GHGT-11 Design Parameters Affecting the Commercial Post Combustion CO 2 Capture Plants Ahmed Aboudheir * and Walid Elmoudir

More information

Methane Emission Reductions in Oil and Gas Processing

Methane Emission Reductions in Oil and Gas Processing Methane Emission Reductions in Oil and Gas Processing EPA Middle East Meeting Washington, D.C. 2 October 2012 Don Robinson ICF International Vice President Agenda U.S. Processing Sector Methane Emissions

More information

AMINE SYSTEM FAILURES IN SOUR SERVICE

AMINE SYSTEM FAILURES IN SOUR SERVICE AMINE SYSTEM FAILURES IN SOUR SERVICE MESPON 2016 INTRODUCTION o Amine Treating is widely used in Gas Processing to meet H 2 S & CO 2 specifications o Maximizing amine unit on-stream time and minimizing

More information

UOP Selexol TM Technology Applications for CO 2 Capture

UOP Selexol TM Technology Applications for CO 2 Capture UOP Selexol TM Technology Applications for CO 2 Capture 3rd Annual Wyoming CO2 Conference June 23rd and 24th 2005 2009 UOP LLC. All rights reserved. Typical Gasification Complex Typical Raw Syngas H2 30-50%

More information