THE SINGARENI COLLIERIES COMPANY LIMITED

Size: px
Start display at page:

Download "THE SINGARENI COLLIERIES COMPANY LIMITED"

Transcription

1 THE SINGARENI COLLIERIES COMPANY LIMITED (A Government Company) EXECUTIVE SUMMARY FOR ENVIRONMENTAL PUBLIC HEARING FOR KAKATIYA KHANI 1 &1A INCLINE PROJECT SITE: BUPALLPALLI AREA, ADILABAD DISTRICT, A.P. Department of Environment, Project Planning, P.O: Kothagudem Collieries Khammam District, Andhra Pradesh. November 2007 i

2 EXECUTIVE SUMMARY 1.0 Project Description 1.1 Introduction The Singareni Collieries Company Ltd. (SCCL) has been exploiting coal for more than 110 years. Out of 470 Km long Pranahita Godavari Valley Coalfield, 350 Km stretch is lying mostly in the South Indian state of Andhra Pradesh, wherein The Singareni Collieries Company Limited (SCCL) is performing Coal mining activities. Over the years, the Company has expanded its exploration and exploitation activities in Adilabad, Karimnagar, Warangal, Khammam and West Godavari districts of Andhra Pradesh. SCCL has proposed to expand the production capacity of Kakatiya Khani (KTK) - 1&1A Incline in Bhupalpalli village & Mandal of Warangal district in Andhra Pradesh to meet the increasing demand of coal from different industrial sectors. 1.2 Need for the Project Coal occupies the pivotal position in India currently meeting over 75% of the country s commercial energy requirement. It is certain that coal will continue to be the mainstay in providing the increased requirement of commercial energy of the country in the coming decades as well. The strategy for coal industry has been to accelerate coal production in order to meet the growing demand of power and other sectors by expanding underground coal mining which helped the industry to meet the increasing demand at comparatively lower additional costs. Presently about 19% Coal production in India comes from underground mines and rest from open cast mines. This trend is likely to continue in future also. The consumption of coal in the country during was about MT. The electricity generation sector is the largest consumer of coal in India. It accounts for 80% of total coal consumption. The power sector consumed MT of coal during the year The electricity sector will therefore, continue to remain the ii

3 largest coal consumer for some more decades. The balance 20% is consumed by thousands of other industries like steel, cement, textiles, fertilizers, refractories etc. SCCL has planned to increase the present production level of MT during to MT by the end of XI Plan period i.e to meet the Coal demand based on X Plan projections. In order to meet the coal demand, SCCL has taken a two way approach, one by proposing new mines and secondly to expand the production capacity of the existing mines where ever possible. In the present proposal SCCL has planned for expansion in lease area from ha to ha and to expand the production capacity of KTK-1&1A Incline from 0.3 MTPA to 0.6 MTPA. Salient Features of the project The proposed project comprises the following features: Nature of mining Under ground method Location In Bhupalpalli village & Mandal of Warangal District Total land requirement ha Capital cost of the project Rs Lakhs Balance Extractable Reserves M.T Maximum depth of the mine 470 m Peak coal production 0.6 Million Tonnes Balance Life of the project 46 years Average grade of coal production E Manpower Details of the Site KTK-1&1A Incline is located in Bhupalpalli Coal belt of Godavari Valley Coal Field (GVCF). The block is bounded by East Longitude of E to and North Latitude of N to in Survey of India Top sheet No. 56N/15 of Warangal District. The KTK-1&1A Incline mine is around 85 km from Ramagundam an important coal and Industrial Township and 65 km from Warangal (District headquarters) by road. iii

4 The nearest rail head is the Jammikunta Railway Station of South Central Railway. KTK-1&1A is well connected to the state capital, Hyderabad both by rail and road and is 230 km by road. No ecologically sensitive areas are present within 10km from the project site and the site does not fall under coastal zone. 1.4 Land Requirement: The total mine take area for the project is ha. Out of which Govt. land is ha, Company land is ha, Forest land is 352 ha and Private Land is ha. 1.5 Water Requirement The groundwater seepage into the mine is 13,888 KLD. This water will be pumped out of the mine for conducting safe mine operations. Out of this 2,100 KLD for mine requirement, 500 for plantation requirement, 1650 for domestic purpose and 9638 KLD will let out into the streams. 1.6 Power requirement: Power at 33 KV from the 33 KV sub-station at Chelpur had been brought up to SCCL's camp at Bhupalpalli. Power is drawn from this point at 33 KV to the surface sub-station in the vicinity of the Pit mouth by an overhead line. Present connected load to KTK 1 &1A Incline is 2500 KVA. 1.7 Man Power Requirement: A detailed manpower requirement for the project has been worked out as per the prevailing norms based on workload. At present the mine is being operated with the manpower of The manpower required for the expansion project will be met from the existing men only. 1.8 Mining Description: The mine is presently operated at a production capacity of 0.3 MTPA. It is proposed to increase the production capacity to an out put of 0.6 MTPA. The balance extractable reserves from this mine are MT which will be mined in a balance life of 46 Years. iv

5 Method of Mining: Considering the parameters like seam thickness, number of seams, maximum depth of the mine, economical working and other geological constraints, underground mining will be continued in the proposed expansion of production capacity. The existing mine is being operated with conventional board and pillar method. Intermittent technology like Side discharge loaders (SDLs) etc., will be introduced for increasing the production capacity. The mine has four workable seams. Initially incline tunnels are driven from the surface to reach the coal seams. After the coal Seams are encountered, level galleries were driven in seams up to the boundary of the Mine to establish the transport circuit. Dip galleries were driven at regular intervals from level galleries and inter-connection were made to form pillars as per Coal Mines Regulations. The Main headings and the panel headings in all the seams were superimposed over each other to extent possible. Drilling & blasting technology is being followed to extract the coal. The blasted coal will be loaded manually or by SDLs into the mine tubs/ belt conveyors which will be hauled to the surface. The mines are being worked in accordance with Coal Mines regulations (CMR 1957) with respect to providing ventilation, support of under ground galleries, safe working of mines and preventing dangers. 2.0 Environment status of the study area: Base line environmental status has been established for various environmental attributes within a study area of 10-km radius from the mine site. A draft Environmental Impact Assessment (EIA) report has been prepared for the project. The major environmental disciplines covered in the REIA report include ambient air quality, water quality (surface & ground) noise levels, soil quality, biological, land use and hydrogeology, and socio economic conditions. The report consists of field data generated for a period of three months i.e. from 1 st March 2006 to 31 st May Environmental Management plan (EMP) including pollution mitigation measures and post project monitoring plan, safety and disaster management plan have also been included in the report. v

6 2.1 Meteorology: A Meteorological station was installed at site to study the Meteorological Parameters. The data generated during the Summer season covering from March 2006 to May 2006 reveals that (i) the predominant wind direction was observed to be blowing from South West side, (ii) the wind speeds were mostly in the ranges of kmph, (iii) the calm condition is found to be around % of the total observations during the study period, (iv) the maximum temperature recorded was C and the minimum was C, (v) the average relative humidity during the study period was 18 to 87 %. 2.2 Ambient Air Quality The ambient air quality was monitored at ten locations in the study area for three months. The ambient air quality monitoring was carried out based on the method recommended by IS: The monitored ambient air quality concentrations are compared with the concentrations of the national ambient air quality (NAAQ) standards GSR 384 (E) as notified on by CPCB and GSR 742(E) as notified on for mining activities and are found to be with in the limits with respect to the above standards. The observed minimum and maximum values in industrial zone are SPM 53.3, g/m 3, RPM 22.9, 88.1 g/m 3, NO x 10.4, 29.5 g/m 3, SO 2 6.4, 12.7 g/m 3 and in residential zone are SPM 29.1, g/m 3 RPM 7.1, g/m 3 NO x 10.9, 34.2 g/m 3, SO 2 5.1, 22.1 g/m 3 respectively. 2.3 Water Quality: Selected physico-chemical parameters have been used for describing the baseline status of water environment. Generation of baseline data for water quality covers sources of ground and surface water Surface Water Quality: To assess the Surface water quality characteristics in the study region, thirteen samples were collected. The sampling locations were identified considering proximity to the project site. vi

7 The analysis results of the water samples are compared with the Tolerance limits for Inland surface water bodies (IS ), Class C i.e., water source fit for drinking with conventional treatment followed by disinfection. From the results it can be seen that the Physical parameters monitored, the total Dissolved solids are all well within the standards. The metals such as Copper and lead are BDL at all the locations, whereas the Zinc concentration is well within the stipulated standard. The Chemical examination of the water samples reveal that Dissolved Oxygen, Chlorides (as Cl), Fluoride (as F), Sulphates as SO 4 and Iron (as Fe), at all the locations are well within the standards. Except in the sample collected at SW-10 (kamalapur cheruvu) the ph values are less than the tolerance limit. The BOD levels at all other locations are higher than the standard stipulated. This indicates that the water is not fit for drinking purpose. The water has to be treated before it is used for drinking purpose. Among the samples collected, the sample collected from Gorlavedu Pedda Cheruvu (SW 7) is showing a very high BOD level of 37.7 mg / l Ground Water Quality: To assess the Ground water quality characteristics in the study region, eighteen samples were collected from Bore wells as well as the mine discharge water. The analysis results are compared with the IS desirable limits, which are stipulated for water to be fit for drinking purpose with ground water as source. From the table, under Physical examination, it can be seen that the Total Dissolved Solids (TDS) levels in all samples collected are higher than the desirable limit of 500 mg/l. The highest TDS level of 1682 mg / l is observed in the sample collected from GW-16 (Jangedu village bore well). However, the TDS levels are well within the Permissible limit of 2000 mg /l at all the locations. The Chemical examination of the water samples reveal that at all most all the locations, Calcium (as Ca) values are exceeding the desirable limits except at sampling locations KK-2, Manjur Nagar village, BHPL 2 village, KTK 3, KTK-6 and Kashimpalli village. Values of Hardness (as CaCO3) are exceeding the desirable limits except at sampling locations Manjur Nagar village, BHPL 2 village and KTK-6 but are under the permissible limits. Except at sampling locations KTK-5 Mine, KTK- 2, BHPL 2 village, BHPL 1 village, Chelpur village, KTK 3, KTK 1 & 1(A) and KTK-6 the Nitrates values are exceeding the desirable limits. The magnesium levels vii

8 in the sampling locations at BHPL - 2 village and KTK-6 are less than the desirable limit, but in rest of the samples the magnesium levels are exceedingly high than the permissible limits. The concentration of metals like Copper (as Cu), and Lead (as Pb) are showing BDL at all the locations. Zinc and Boron are well within the stipulated standard. As some of the values of parameters are exceedingly high in collected samples, it is advisable to use the water for drinking after treatment only. 2.4 Land environment The study area around 10 Km. from KTK-1&1A project site is analysed or the extent of various land use land cover classes with the help of satellite imageries. The land use classification under respective classes are, built up land of 6.14 sq. km (1.54 %), double crop area of sq. km (9.34 %), single crop area of sq. km (18.46%), agricultural plantation area of 0.58 sq. km ( 0.15 %), dense forest area of sq. km ( %), scrub forest area of sq.km (14.25%), Mining areas 2.30 sq.km (0.58), forest plantations area of 7.56 sq.km (1.89 %), land with/without scrubs area of sq. km (6.04 %), Rivers/canals area of 3.71 sq. km (0.93 %) and water bodies area of sq. km (3.07 %). 2.5 Soil Quality: To assess the baseline soil quality characteristics in the study region, ten soil samples were collected from different locations and analysed for physical and chemical constituents. From the analysis it can be inferred that the soils are conducible for the growth of different species, which are commonly found in the region. 2.6 Noise Levels: The Ambient Noise levels are monitored at ten locations within the study area. Precision integrating microcomputer controlled sound level meter having statistical unit with digital display was used for noise level monitoring. At each location, the noise levels are monitored at every hour for 24 hours. It is seen from the study that the noise levels observed during day time and night time at all the locations are within the stipulated standards except village areas. viii

9 2.7 Biological Environment: Core Zone: There is an area of 352 ha forest land in the core zone. Different types of trees, shrubs and herbs are found in this region. The habitat is well maintained with artificial rising of plants around the Core area with natural forest species. The tree species are above 5 m height and herbs & shrubs attracts the birds & butterflies. This area is good habitat for reptiles and amphibians. Buffer Zone: Buffer zone falls in forestland. The forest type is Dry deciduous mixed forest comprises vegetation in dense patches, scrubs and type formations. Based on the field studies and review of published literature it can be concluded that there are no endangered and protected flora and fauna in the study area. 2.8 Social Environment: The study area covers both large and small villages falling under Bhupalpalli mandal of Warangal district. All most all villages in the region have undergone changes in total workers population. The positive change is identical in the villages nearer to mandal headquarters. Most of the villages in the study area have cultivators, agriculture labourers, mining workers and trading as their main occupation. The total population from all categories is found to be 60,487. A survey was undertaken to assess the socio-economic conditions in the study region and nine villages have been identified for the survey. A sample size of 400 was distributed across identified villages by taking into consideration the households of the villages. Random sampling method was followed to identify the target population to be surveyed. Household size, house status, water and sanitation facilities, educational level, cropping pattern, earning members, source of income, income level, health facilities, awareness of the project etc., were addressed in the survey. The details are furnished in the main report. ix

10 3.0 Potential environmental impacts and Management Plan 3.1 Ambient Air Quality Impact Since no chemical process is involved in the project, the only major source of air pollution is dust generated during mining, transportation and coal handling operations. As the project is an underground mine, there are no significant air pollution causing activities in the surface except from the following operations which may result in marginal dust generation: Exhaust gases taken out by Mine ventilation fan Loading and transport of coal Vehicular traffic etc. Management Plan At present the air pollution levels in this mining area are minimal as the existing mine is underground mine. But due to increasing the production capacity the level of pollutants like SPM, SO 2 and NO x may increase marginally in comparison to background levels. The following Management plan & control measures will be taken up to mitigate air pollution. Extensive green belt development in the mining and surrounding areas Water spraying at coal loading & unloading points. Water spraying in the coal transport routes at regular intervals. Continuous dust suppression arrangements at conveyer belts and coal transfer points at CHP. Avoiding overloading of coal carrying trucks during transportation of coal covering with tarpaulins to avoid coal spillage. 3.2 Water resources Impact The seepage water pumped out of the mine during coal mining operations will carry suspended solids. It is estimated that 13,888 KLD of mine seepage water will be x

11 pumped from the proposed project. From the detailed hydrological studies conducted for the mine, the radius of influence of the mine on the phreatic surface is assessed as 85 m. Following management plan & control measures will be implemented for preventing water pollution: Management Plan Part of the mine discharge water of 13,888 KLD will be reutilized for dust suppression, plantation, domestic use etc. The excess mine discharge 9638 KLD will be treated in settling tanks before being discharged in to natural drains. Workshop effluents will be treated in Effluent treatment plant for removal of sediments Oil & Grease. The treated water will be used for development of green belt within the premises. The domestic sewage from the mine is being treated in septic tank and soak pit. 3.3 Noise Environment Impact The operation of mining equipment, loading & unloading operations of coal and plying of vehicles is the major sources of noise in the area. The following planned control measures are undertaken to bring down the noise levels. Management Plan Periodical maintenance and tuning of machinery. Protective devices like acoustic wool, earplugs and earmuffs are provided to the workmen exposed to noise levels above 90-dB (A). A thick green belt will be provided around the mine, service buildings and fan house, to screen the noise, as well as for arresting dust. 3.4 Land Environment In any underground mining operations the main effect on land is the subsidence caused by the mining operations. The extent of subsidence depends upon several xi

12 factors like depth of mining, thickness of mining, technology adapted etc. In the present mine the mining operations will be carried out at a maximum depth of 470 m. The total forest land present within this block area is 352 ha. The mining operations beneath the forest land will be carried out after getting approval as per the FC Act. As per the study conducted for prediction of subsidence the seam wise maximum predicted subsidence is 1.81 m for Seam I, 1.56 m for Seam II and 1.75 for Seam III. However, the reclamation of subsided area (if any) will be carried out as and when it takes place (for any underground mine the predominant effect would be due to the subsidence). The details about subsidence and its Management Plan are furnished in the main report. 3.5 Biological environment As per the study conducted to enumerate the flora and fauna in the study area it is inferred that there are no endangered or endemic species in the periphery of the project. Hence no specific impacts are envisaged. Greenbelt Development Green belt has been recommended as one of the major component of EMP, which will improve ecology, environment and quality of the surroundings of site through. The following are overall advantages of greenbelt development. mitigation of fugitive emissions attenuation of noise levels waste water reuse development of ecosystem creation of an aesthetic environment Use of waste land to improve environmental quality. SCCL has taken up extensive plantation in the mining areas and colonies which was well appreciated by many regulating agencies. Green belt has been already developed in the project site in an area of Ha planted with local species. In addition to the existing plantation, the native & local species will be planted in and around the mine site, which will serve as sinks and also as noise barriers. It is xii

13 expected that with adoption of these mitigatory measures, the impact due to operational activities of the mine will be minimal on the terrestrial ecosystem. 3.6 Solid waste Generation and Disposal The solid waste produced from the underground mining activities is very minimal which is limited to shale and stone muck of about 20T to 30T per month. The solid wastes generated are non-hazardous in nature. Generally most of the solid waste produced from underground mine is packed in the underground abandoned workings. The solid waste generated due to separation of stones & shale at surface and domestic waste from the offices etc., will be disposed in the low lying areas of the company land. Necessary compaction, spreading of soil and development of green belt will be taken up on these dump sites regularly. 3.7 Beneficial Impacts The project due to its various activities associated with the operation of the mine has many beneficial impacts on the environment. It provides the necessary stimulus for better infrastructure facilities in this region. Facilities for telecommunication, water supply, sanitation, rail transportation, health care, education, electrification etc have improved significantly in this area. The project has already resulted in growth of service sector and also created a path for new small scale industrial and business opportunities in the area. This has resulted in increase in indirect employment due to large flow of financial and material resources through increased business trade commerce and service sector. Similar positive growth in the economic front and social environment is envisaged with the continuation of the mining operations through this project. 4.0 Additional studies for the project Hydro-geological studies Hydro-geological studies were carried out for the study area of 10 km. Radius of the mine to study the impact of mining on ground water regime. Ground water development within 10 km radius area around the mine is 30.02%. The trend of the phreatic surface is not declining. Based on this information, this area has been categorized as safe. Scientific studies and in-house ground water level monitoring xiii

14 shows that lowering of ground water table is negligible beyond a distance of 85 m from the mine boundary. 5.0 Environmental Monitoring Programme To monitor the extent of environmental impact of the project, it is advisable to periodically monitor the various pollutant loads generated during mining operations. A detailed Environmental Monitoring Plan has been prepared using G.S.R 742(E), standards for coal mines. An Environment Management Committee would be constituted at the project level which will be responsible for regular environmental quality monitoring, proper implementation of environmental control measures and liaison with regulatory bodies like APPCB and CPCB and implementation of EMP. The committee shall be headed by project Officer / Manager and will be assisted by supporting staff and workmen. 6.0 Project benefits i) The expansion of the existing mine will ensure uninterrupted supply of coal to thermal power plants and also to meet the requirement of increasing demand of coal based industries. ii) The mine will provide indirect employment avenues to local people in services and other supporting facilities. iii) The expansion project also helps in socio-economic development of the region and state. 7.0 Fund provision for EMP 7.1 Direct Cost An amount of Rs Lakhs was already spent towards protection of environment. An additional amount of Rs Lakhs has been provided towards Environmental Related works, viz., effluent treatment, baseline data generation, pollution monitoring equipment, green belt development around mine and service buildings. 7.2 Revenue Cost The annual revenue expenditure for implementation of Environmental Management plan in the proposed Project is estimated at Rs Lakhs per annum and amounts to Rs per tonne of coal produced. xiv

15 8.0 Conclusion Considering the likely addition of expansion of existing power projects and construction of new power units, the production and demand gap for supply of coal is increasing and is likely to increase further. In view of this, the Singareni Collieries Company Ltd. has planned for expanding the production capacity of the existing underground mines to increase production as well as probability. The expansion of KTK-1&1A mine is one such project which will reduce this gap to the extent of its peak production capacity of 0.6 MTPA. SCCL as a responsible Government company has placed the protection of environment as one of its prioritized agenda and has imbibed the process of environment protection as a part of mining operations. It is expected that with adoption of these migration measures, the impact due to operational activities of the mine will be minimal on the surrounding ecosystem. ******** xv

Overburden dumps are stacked separately as per the guidelines and the same will be used for backfilling in mined out area.

Overburden dumps are stacked separately as per the guidelines and the same will be used for backfilling in mined out area. ENVIRONMENT CLEARANCE COMPLIANCE STATUS ENVIRONMENT CLEARANCE No. J-11015/406/2006-IA.II(M) dt. 13/04/2007 DHANGARWADI MINES Sr. CONDITIONS COMPLIANCE No. A) Specific Conditions :- i) Top soil to be stacked

More information

EXECUTIVE SUMMARY 1.0 PROJECT DESCRIPTION 1.1 INTRODUCTION

EXECUTIVE SUMMARY 1.0 PROJECT DESCRIPTION 1.1 INTRODUCTION EXECUTIVE SUMMARY 1.0 PROJECT DESCRIPTION 1.1 INTRODUCTION Jaypee Group is a leading Business House of the country with its presence in Core industries and Service Sectors like Cement, Infrastructure development,

More information

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN EMP 1 INTRODUCTION In each of the areas of impact, measures have to be taken to reduce potentially significant adverse impacts and where these are beneficial in nature, such impacts are to be enhanced/

More information

WELCOM TO THE STATE LEVEL ENVIRONMENT IMPACT ASSESSMENT APPRAISAL COMMITTEE,A.P. For the Presentation proposed Granite Mine 7.50 Acres M/S N.R.

WELCOM TO THE STATE LEVEL ENVIRONMENT IMPACT ASSESSMENT APPRAISAL COMMITTEE,A.P. For the Presentation proposed Granite Mine 7.50 Acres M/S N.R. WELCOM TO THE STATE LEVEL ENVIRONMENT IMPACT ASSESSMENT APPRAISAL COMMITTEE,A.P. For the Presentation proposed Granite Mine 7.50 Acres M/S N.R.Global Granites Production Granite Black Granits At Survey

More information

Hind Energy & Coal Beneficiation (India) Ltd.

Hind Energy & Coal Beneficiation (India) Ltd. SUMMARY ON ENVIRONMENTAL IMPACT ASSESSMENT REPORT OF Hind Energy & Coal Beneficiation (India) Ltd. 0.96 MTPA Wet type Coal Washery at Birgahani Village, Baloda Tehsil Janjgir-Champa District, Chhattisgarh

More information

M/s Hind Energy & Coal Beneficiation Pvt. Ltd. is presently operating a 2 x 1.2 MTPA

M/s Hind Energy & Coal Beneficiation Pvt. Ltd. is presently operating a 2 x 1.2 MTPA 1.0 INTRODUCTION M/s Hind Energy & Coal Beneficiation Pvt. Ltd. is presently operating a 2 x 1.2 MTPA dry type of coal washery at Village: Hindadih, Tehsil: Masturi, District: Bilaspur (C.G.) for which

More information

Hind Energy & Coal Beneficiation (India) Ltd.

Hind Energy & Coal Beneficiation (India) Ltd. SUMMARY ON ENVIRONMENTAL IMPACT ASSESSMENT REPORT OF Hind Energy & Coal Beneficiation (India) Ltd. (Change in Technology) at Hindadih Village, Masturi Tehsil Bilaspur District, Chhattisgarh Submitted to

More information

Terms of Reference (ToR) for EIA BUILDING STONE QUARRY OWNED BY LINEJ T.P

Terms of Reference (ToR) for EIA BUILDING STONE QUARRY OWNED BY LINEJ T.P Terms of Reference (ToR) for EIA BUILDING STONE QUARRY OWNED BY LINEJ T.P SITUATED AT KAKKUR VILLAGE KOZHIKODE TALUK KOZHIKODE DISTRICT KERALA STATE EXTENT: 2.0437 Ha STANDARD TERMS OF REFERENCE (TOR)

More information

2) A copy of the document in support of the fact that the Proponent is the rightful lessee of the mine should be given.

2) A copy of the document in support of the fact that the Proponent is the rightful lessee of the mine should be given. PROPOSED TERMS OF REFERENCES (A) Suggested by the Applicant 1(a): STANDARD TERMS OF REFERENCE FOR CONDUCTING ENVIRONMENT IMPACT ASSESSMENT STUDY FOR NON-COAL MINING PROJECTS AND INFORMATION TO BE INCLUDED

More information

APPENDIX I PROPOSED TERMS OF REFERENCE

APPENDIX I PROPOSED TERMS OF REFERENCE APPENDIX I PROPOSED TERMS OF REFERENCE 1. Environment Impact Assessment/Environment Management Plan document shall be in accordance with the provisions & generic structure stipulated in the EIA Notification

More information

Proposed Terms of Reference for EIA studies

Proposed Terms of Reference for EIA studies 1 Proposed Terms of Reference for EIA studies Collection of Base line data in any season other than Monsoon season in study area of 10 kms radius from Lease Area. Based on the Meteorological data from

More information

EXECUTIVE SUMMARY ON ENVIRONMENTAL IMPACT ASSESSMENT REPORT

EXECUTIVE SUMMARY ON ENVIRONMENTAL IMPACT ASSESSMENT REPORT EXECUTIVE SUMMARY ON ENVIRONMENTAL IMPACT ASSESSMENT REPORT For CHHATTISGARH ENVIRONMENT CONSERVATION BOARD CHHATTISGARH 0 P a g e 1.0 INTRODUCTION SUMIT ISPAT PVT. LTD. has proposed to establish Submerged

More information

INSPIRE INDUSTRIES PVT. LTD.

INSPIRE INDUSTRIES PVT. LTD. For Proposed 0.999 MTPA Coal Washery At Village: Bhelai, Tehsil: Baloda, District: Janjgir-Champa, Chhattisgarh Envirotech East (P) Limited An ISO 9001:2008, 14001:2004 & OHSAS:18001:2007 Company Laboratory

More information

Environmental Management Plan. For Mining of. Building Stone & Road Metal Over an extent of 0.56 Ha at Survey No: 493 Kannala Village,

Environmental Management Plan. For Mining of. Building Stone & Road Metal Over an extent of 0.56 Ha at Survey No: 493 Kannala Village, Environmental Management Plan For Mining of Building Stone & Road Metal Over an extent of 0.56 Ha at Survey No: 493 Kannala Village, Palakurthy Mandal, Peddapally District, Telangana State Applicant Sri

More information

M/s. LAKSHMANAN CEMENTS PVT LTD, Survey Number 69-3, 69-4, Pachanapalli Village, Chittoor Mandal and District, Andhra Pradesh

M/s. LAKSHMANAN CEMENTS PVT LTD, Survey Number 69-3, 69-4, Pachanapalli Village, Chittoor Mandal and District, Andhra Pradesh M/s. LAKSHMANAN CEMENTS PVT LTD, Survey Number 69-3, 69-4, Pachanapalli Village, Chittoor Mandal and District, Andhra Pradesh EXECUTIVE SUMMARY SUBMITTED BY M/s. Lakshmanan Cements Pvt Ltd No. 58-A, 25

More information

Deccan Cements Limited, Bhavanipuram Lime stone Mine -2, Mahankaligudam Palakeedu, Suryapet(Dist). Telangana MoEF No: J-11015/497/2007-IA II

Deccan Cements Limited, Bhavanipuram Lime stone Mine -2, Mahankaligudam Palakeedu, Suryapet(Dist). Telangana MoEF No: J-11015/497/2007-IA II Status of Environmental Clearances received from MOEF vide MoEF No.J- 11015/497/2007-IA II(M) dated 18.10.2007-Bhavanipuram Limestone Mine 2(73.93.11 Ha), as on March 2017 1. Compliance reports are enclosed

More information

HINGULA OPEN CAST PROJECT HINGULA AREA MAHANADI COALFIELDS LIMITED

HINGULA OPEN CAST PROJECT HINGULA AREA MAHANADI COALFIELDS LIMITED HALF YEARLY PROGRESS REPORT ON IMPLEMENTATION OF ENVIRONMENTAL CLEARANCE CONDITION BY MoEF (PERIOD FROM OCTOBER 13 TO MARCH 14) HINGULA OPEN CAST PROJECT HINGULA AREA MAHANADI COALFIELDS LIMITED SIX MONTHLY

More information

NOC GRANTED FOR THE EXPANSION OF KASHLOG LIMESTONE MINES OF AMBUJA CEMENTS TIMITED

NOC GRANTED FOR THE EXPANSION OF KASHLOG LIMESTONE MINES OF AMBUJA CEMENTS TIMITED Sr. STIPULATION ACTION No. 2A. Specific Conditions (i) (ii) All the conditions stipulated by the State Pollution Control Board in their Consent should be effectively implemented. The project proponent

More information

Executive Summary. Vizianagaram District, Andhra Pradesh. Season : December 2016 to February 2017 File no.: J-11011/1129/2007-IA-II(I)

Executive Summary. Vizianagaram District, Andhra Pradesh. Season : December 2016 to February 2017 File no.: J-11011/1129/2007-IA-II(I) Executive Summary Environmental Impact Assessment for Expansion of Ferro Alloys unit Production (Addition of 2 x 9 MVA Submerged Electric Arc Furnace) at Plot No.368, APIIC Growth Centre, Bobbili Village

More information

Environment Management Plan For B 2 Category Project

Environment Management Plan For B 2 Category Project Environment Management Plan For B 2 Category Project Project Proponent - Kirtikumar Nathubhai Shah Address - N/V Damlai, Taluka- Jhagadia District - Bharuch Near Village Taluka District Area Survey No.

More information

V: PROJECT SCOPING & METHODOLOGY

V: PROJECT SCOPING & METHODOLOGY V: PROJECT SCOPING & METHODOLOGY 5.0 INTRODUCTION The scoping exercise is carried out to define the focus and scope of the EIA Study. The scoping exercise is required to understand the type of activities

More information

Environmental Management Plan. For Mining of. Building Stone & Road Metal

Environmental Management Plan. For Mining of. Building Stone & Road Metal Environmental Management Plan For Mining of Building Stone & Road Metal Over an extent of 5.65 Ha at Survey No. 427,428 & 429 Alladurg Village, Alladurg Mandal, Medak District, Telangana State Lessee M/s

More information

THE RAMCO CEMENTS LIMITED

THE RAMCO CEMENTS LIMITED 1 P a g e 2 P a g e THE RAMCO CEMENTS LIMITED (Formerly Madras Cements Ltd.) COMPLIANCE REPORT FOR ENVIRONMENTAL CLEARANCE JAYANTHIPURAM NORTH BAND MINING LEASE 2.0 MILLION TPA CAPACITY EC Lr. No. : J-11015/377/2006-IA.II

More information

Environment Management Plan For B 2 Category Project

Environment Management Plan For B 2 Category Project Environment Management Plan For B 2 Category Project Project Proponent Shri Alihusen Haji Mohammadali Alirajpurwala Address - N/V Kanawant, Taluka & District - Chhotaudepur Near Taluka District Area Survey

More information

EXECUTIVE SUMMARY 1.0 MADHYA PRADESH STATE MINING CORPORATION LTD

EXECUTIVE SUMMARY 1.0 MADHYA PRADESH STATE MINING CORPORATION LTD EXECUTIVE SUMMARY 1.0 MADHYA PRADESH STATE MINING CORPORATION LTD Madhya Pradesh State Mining Corporation Ltd (MPSMCL), a company of Government of Madhya Pradesh has been allotted Amelia (North) Coal Mining

More information

PROPOSED TERMS OF REFERENCE

PROPOSED TERMS OF REFERENCE PROPOSED TERMS OF REFERENCE 1 PROPOSED TOR FOR EIA STUDY Kottmeta Limestone Mine, ML Area 801.171 ha, is located in Village Katamater, Tehsil/District Malkangiri, Odisha. Dalmia Cement (Bharat) Limited,

More information

PRE FEASIBILITY REPORT. Company of production capacity: 14,40,000 CFT/ Year located at Khasra No near Village:

PRE FEASIBILITY REPORT. Company of production capacity: 14,40,000 CFT/ Year located at Khasra No near Village: PRE FEASIBILITY REPORT 1.0 EXECUTIVE SUMMARY In our Masonry Stone Mining Lease (M.L. No. 15/96, Area: 1.0 ha), Production capacity of masonry stone: 142920 TPA and existing Stone Crusher Unit named M/s.

More information

ANDHRA PRADESH POLLUTION CONTROL BOARD, REGIONAL OFFICE, TIRUPATI

ANDHRA PRADESH POLLUTION CONTROL BOARD, REGIONAL OFFICE, TIRUPATI M/s. JANANY CEMENT INDUSTRIES PRIVATE LIMITED SURVEY NO 462, INDUSTRIAL PARK, GUNTAKINDAPALLI VILLAGE, SRIKALAHASTI MANDAL, CHITTOOR DISTRICT, ANDHRA PRADESH EXECUTIVE SUMMARY SUBMITTED BY M/s.Janany Cement

More information

Deccan Cements Limited, Bhavanipuram Lime stone Mine -2, Mahankaligudam Palakeedu, Suryapet(Dist). Telangana MoEF No: J-11015/497/2007-IA II

Deccan Cements Limited, Bhavanipuram Lime stone Mine -2, Mahankaligudam Palakeedu, Suryapet(Dist). Telangana MoEF No: J-11015/497/2007-IA II Status of Environmental Clearances received from MOEF vide MoEF No.J- 11015/497/2007-IA II(M) dated 18.10.2007-Bhavanipuram Limestone Mine 2 (73.93.11 Ha), as on September 2018 1. Compliance reports are

More information

Proposed Terms of Reference for EIA studies

Proposed Terms of Reference for EIA studies Proposed Terms of Reference for EIA studies M/s Maithan Steel and Power Ltd. is located at: At/PO- Bonra, PS- Neturia in Purulia district of WB with latitude:23 0 37 53.85 Nand longitude 86 0 50 08.10

More information

PUBLIC HEARING DOCUMENT

PUBLIC HEARING DOCUMENT PUBLIC HEARING DOCUMENT KUNUSTORIA UNDERGROUND PROJECT (0.735 MTY) KUNUSTORIA AREA EASTERN COALFIELDS LTD. 1 1.1 Introduction Public Hearing Document relating to EIA/EMP for Kunustoria UGP (Expansion from

More information

Project Code: Clearance Letter No. : MoEF vide letter No:- J-11016/202/2003-IA-II(M) Dated 6 th Jan 2005

Project Code: Clearance Letter No. : MoEF vide letter No:- J-11016/202/2003-IA-II(M) Dated 6 th Jan 2005 Name of the Project: Naubasta Limestone Mine ( A Unit of M/s Jaiprakash Associates Limited ) for Expansion of Mining Capacity from 3.3 MTPA to 4.0 MTPA at villages Atrauli, Gadhwa, Kachoor, Naubasta, Kauadhan,

More information

DHANWADA CRUSHER STONE QUARRY

DHANWADA CRUSHER STONE QUARRY ENVIRONMENT MANAGEMENT PLAN FOR Mining of Crusher Stone Area 1.910 Hect, Kh. No. 95 AT Village: Dhanwada, Tehsil: Khirkiya, Dist: Harda (MP) Proponent Shri Atul Kumar Agrawal S/o- Shri Ashok Agrawal Resi-

More information

CORPORATE OFFICE BUILDING, C-11, URBAN ESTATE-II CITY CENTRE SECTOR 29, GURUGRAM, HARYANA

CORPORATE OFFICE BUILDING, C-11, URBAN ESTATE-II CITY CENTRE SECTOR 29, GURUGRAM, HARYANA ENVIRONMENT MANAGEMENT PLAN The Environment Management Plan () would consist of all mitigation measures for each component of the environment due to the activities increased during the, operation and the

More information

Project Code: Clearance Letter No. : MoEF vide letter No: - J-11015/423/2005-IA-II (M) Dated 18 th May 2006

Project Code: Clearance Letter No. : MoEF vide letter No: - J-11015/423/2005-IA-II (M) Dated 18 th May 2006 Name of the Project: North North Naubasta Limestone Mine (ML 2) (A unit of M/s Jaiprakash Associates Limited) of Mining Capacity 1.85 MTPA at villages Naubasta, Sumeda, Atrauli and Garhwa Tehsil Huzur

More information

DRAFT TERMS OF REFERENCE FOR EIA STUDY

DRAFT TERMS OF REFERENCE FOR EIA STUDY Four laning of Balaghat - Gondia Section of NH 54 from km 0.000 to km 48.070 (Package-1A & Package-1B) under Bharatmala Pariyojana in the State of Madhya Pradesh and Maharashtra DRAFT TERMS OF REFERENCE

More information

M/s. MID India Power & Steel Pvt. Ltd. has proposed to establish Steel Plant at Dongartola

M/s. MID India Power & Steel Pvt. Ltd. has proposed to establish Steel Plant at Dongartola 0 1.0 INTRODUCTION M/s. MID India Power & Steel Pvt. Ltd. has proposed to establish Steel Plant at Dongartola Village, Kotma Tehsil, Annupur District, Madhya Pradesh. 10.29 Acres of land is envisaged for

More information

MECON LIMITED RANCHI , INDIA

MECON LIMITED RANCHI , INDIA ORISSA MINING CORPORATION LIMITED BANGUR CHROMITE MINING PROJECT POST CLEARANCE ENVIRONMENTAL MONITORING REPORT FOR THE MONTH OF JULY 2011 MECON LIMITED RANCHI 834 002, INDIA 11.S2.2011 SEPTEMBER, 2011

More information

GRAVEL & ROUGH STONE QUARRY

GRAVEL & ROUGH STONE QUARRY ENVIRONMENTAL MANAGEMENT REPORT Of GRAVEL & ROUGH STONE QUARRY Sy. No. 211 (Carved out of Sy.No.1) Tarluwada Village & Anandapuram Mandal, Visakhapatnam District, Andhra Pradesh. AREA OF MINING LEASE 23.760

More information

The Singareni Collieries Company Limited (A Government Company) Kothagudem Area.

The Singareni Collieries Company Limited (A Government Company) Kothagudem Area. The Singareni Collieries Company Limited (A Government Company) Kothagudem Area. Application for prior approval for diversion of 776.20 Ha. Forest land for JVR OC-II Mine in Lankapalli R.F., Sattupalli

More information

ADITYA BIRLA. EMil. Please find enclosed herewith the environmental statement report duly filled-in Form-V

ADITYA BIRLA. EMil. Please find enclosed herewith the environmental statement report duly filled-in Form-V / ADITYA BIRLA EMil Ref. No. EMILIGEOLI '35, 12017-18 Date-07.09.2017 0V The Member Secretary, State Pollution Control Board, Odisha Department of Forests ft Environment, Govt. of Odisha, Paribesh Bhawan,

More information

S.N. Condition in Environmental Clearance Compliance Status upto June (A) Specific Conditions (i)

S.N. Condition in Environmental Clearance Compliance Status upto June (A) Specific Conditions (i) Six Monthly Status of Compliance for Environmental Clearance No J-11015/108/2005- IA.II (M) dated 28.07.2006 for 2.2 MTPA Coal Mining from Utkal B-2 Coal Block by M/s. Monnet Ispat & Energy Limited S.N.

More information

EIA-EMP REPORT GRAVEL QUARRY (Category-B2)

EIA-EMP REPORT GRAVEL QUARRY (Category-B2) EIA-EMP REPORT GRAVEL QUARRY (Category-B2) EXTENT : 4.00.0 Hectares S. F. No : 436/1A (P) VILLAGE TALUK DISTRICT STATE : IYANPAPPAKKUDI : MADURAI : MADURAI : TAMIL NADU PROJECT PROPONENT Thiru P. Ayyanar

More information

ANNEXURE- II Proposed TOR

ANNEXURE- II Proposed TOR ANNEXURE- II Proposed TOR Annexure II Terms of Reference for EIA for Setting up of Ligno-Cellulosic Biomass based second generation (2G) Ethanol Bio-Refinery with capacity of 100 KLPD at village-sainjani,

More information

Analysis of the Draft EIA/EMP Report for Durgapur II Taraimar Coal Block. For. M/S Bharat Aluminium Company Limited

Analysis of the Draft EIA/EMP Report for Durgapur II Taraimar Coal Block. For. M/S Bharat Aluminium Company Limited Analysis of the Draft EIA/EMP Report for Durgapur II Taraimar Coal Block For M/S Bharat Aluminium Company Limited Background of the technical report Bharat Aluminium Company (BALCO) is planning to set

More information

No.J-11015/307/2006-IA.II(M) Goverment of India Minister of Enviroment,Forest and Climate Change Impact Assessment Division ***

No.J-11015/307/2006-IA.II(M) Goverment of India Minister of Enviroment,Forest and Climate Change Impact Assessment Division *** No.J-11015/307/2006-IA.II(M) Goverment of India Minister of Enviroment,Forest and Climate Change Impact Assessment Division *** Indira Paryavaran Bhavan, Vayu Wing,3rd Floor,Aliganj, Jor Bagh Road,New

More information

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN ENVIRONMENT MANAGEMENT PLAN VILLAGE - KUNDLA TEHSIL - NAGDA DISTRICT - UJJAIN STATE - MADHYA PRADESH KHASRA NO. - 574 AREA - 8.00 Hectare PRODUCTION - 98800 cu.m/ Year PREPARED UNDER RULE 42 C OF MP MINOR

More information

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN Table of Contents 1 INTRODUCTION... 1 1.1 ENVIRONMENTAL MANAGEMENT PLAN (EMP)... 1 1.2 Impacts on Land Environment... 1 1.2.1 Mitigation Measures... 1 1.3 WATER ENVIRONMENT... 2 1.3.1 Impacts on Water

More information

Proposed Draft Terms of Reference for Preparation of EIA & EMP for Louis Pharmaceuticals Pvt Ltd STANDARD TERMS OF REFERENCE

Proposed Draft Terms of Reference for Preparation of EIA & EMP for Louis Pharmaceuticals Pvt Ltd STANDARD TERMS OF REFERENCE Proposed Draft Terms of Reference for Preparation of EIA & EMP for Louis Pharmaceuticals Pvt Ltd 1. Executive Summary 2. Introduction STANDARD TERMS OF REFERENCE I. Details of the EIA Consultant including

More information

MECON LIMITED RANCHI , INDIA

MECON LIMITED RANCHI , INDIA ORISSA MINING CORPORATION LIMITED BANGUR CHROMITE MINING PROJECT POST CLEARANCE ENVIRONMENTAL MONITORING REPORT FOR THE MONTH OF SEPTEMBER 2011 MECON LIMITED RANCHI 834 002, INDIA 11.S2.2011 OCTOBER, 2011

More information

HINDUSTAN ZINC LIMITED Maton Rock Phosphate Mine (Maton Mine), Tehsil: Girwa District: Udaipur (Rajasthan) PROPOSED TERMS OF REFERENCE FOR EIA STUDIES

HINDUSTAN ZINC LIMITED Maton Rock Phosphate Mine (Maton Mine), Tehsil: Girwa District: Udaipur (Rajasthan) PROPOSED TERMS OF REFERENCE FOR EIA STUDIES HINDUSTAN ZINC LIMITED Maton Rock Phosphate Mine (Maton Mine), Tehsil: Girwa District: Udaipur (Rajasthan) PROPOSED TERMS OF REFERENCE FOR EIA STUDIES Maton Rock Phosphate Mine of M/s HZL is proposing

More information

The study area covers 10 km radius around the existing coal washery premises. The environmental setting of the expansion plant site is as follows:

The study area covers 10 km radius around the existing coal washery premises. The environmental setting of the expansion plant site is as follows: 1.0 EXECUTIVE SUMMARY 1.1 Introduction M/s Mahavir Benefication Pvt. Ltd. (MBPL) proposes expansion of its coal washery from 1.0 MTPA to 5.0 MTPA capacity at Dhiroul Village, Anuppur District, Madhya Pradesh

More information

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN ENVIRONMENT MANAGEMENT PLAN OF ALAMPUR THIKARIYA SAND DEPOSIT QUARRY KHASRA NO. 149, TOTAL AREA- 8.0 Hect. (MALENI RIVER) AT VILLAGE- ALAMPUR THIKARIYA, TEHSIL-JAORA, DISTRICT- RATLAM, STATE-MADHYA PRADESH

More information

Table 1.1: The Salient Features of the Project Proposed Quartz Mine Of M/s. Viswanadha Stone Crusher & 16 others

Table 1.1: The Salient Features of the Project Proposed Quartz Mine Of M/s. Viswanadha Stone Crusher & 16 others 1. EXECUTIVE SUMMARY 1.1 Introduction The Road Metal Quarries was granted in Guntur District, Andhra Pradesh has been allotted to M/s. Viswanadha Stone Crusher & 16 others by Assistant Director of Mines

More information

PRE-FEASIBILITY REPORT

PRE-FEASIBILITY REPORT M/S. VANAS INFRA PROJECTS PVT. LTD SURVEY NO. 598, CHINTALAPALLY VILLAGE, KOLLAPUR MANDAL, NAGARKURNOOL DISTRICT, TELANGANA PRE-FEASIBILITY REPORT SUBMITTED BY M/s. Sri Soma Jitendra H. No. 7-1-397/150,

More information

SUMMARY ON ENVIRONMENTAL IMPACT ASSESSMENT REPORT. Chandu Cattle Feeds

SUMMARY ON ENVIRONMENTAL IMPACT ASSESSMENT REPORT. Chandu Cattle Feeds SUMMARY ON ENVIRONMENTAL IMPACT ASSESSMENT REPORT OF Chandu Cattle Feeds 10 KLPD Ethanol & 50 TPD Cattle Feed Unit Plot no. 31 & 30 B of Sy. No. 432/2 P, APIIC Industrial park, Kakuturu village, Venkatachalam

More information

ENVIRONMENTAL MANAGEMENT REPORT COLOUR GRANITE MINE

ENVIRONMENTAL MANAGEMENT REPORT COLOUR GRANITE MINE ENVIRONMENTAL MANAGEMENT REPORT Of COLOUR GRANITE MINE Sy. No.Old: 52/2B1 (New 52/2B1) of Peddavelagatur Village, Peddapanjani Mandal,Chittor District, Andhra Pradesh AREA OF MINING LEASE 5.70 Ha. For

More information

Mars Power & Steel Ltd.

Mars Power & Steel Ltd. SUMMARY ON ENVIRONMENTAL IMPACT ASSESSMENT REPORT OF Mars Power & Steel Ltd. Village : Baihamura Tehsil : Ghargoda District : Raigarh Submitted to: Page 1 CHHATTISGARH ENVIRONMENT CONSERVATION BOARD Executive

More information

4.0 ENVIRONMENTAL IMPACTS AND MITIGATION MEASURES. Negative or adverse impacts during the construction phase are:

4.0 ENVIRONMENTAL IMPACTS AND MITIGATION MEASURES. Negative or adverse impacts during the construction phase are: 4.0 ENVIRONMENTAL IMPACTS AND MITIGATION MEASURES 4.1 POTENTIAL ENVIRONMENTAL IMPACTS 4.1.1 Impacts during Construction Phase Negative or adverse impacts during the construction phase are: Land environment:

More information

State Level Environment Impact Assessment Authority Madhya Pradesh Government of India Ministry of Environment & Forests

State Level Environment Impact Assessment Authority Madhya Pradesh Government of India Ministry of Environment & Forests State Level Environment Impact Assessment Authority Madhya Pradesh Government of India Ministry of Environment & Forests Madhya Pradesh Pollution Control Board E 5. Arera Colony Bhopal 4620 16 visit us

More information

ENVIRONMENTAL MANAGEMENT PLAN

ENVIRONMENTAL MANAGEMENT PLAN INTRODUCTION ENVIRONMENTAL MANAGEMENT PLAN An environmental management plan (EMP) has been prepared for the proposed construction of commercial project to minimize negative impacts and is formed on the

More information

EXECUTIVE SUMMARY. Dec 2017 PREPARED BY

EXECUTIVE SUMMARY. Dec 2017 PREPARED BY Dec 2017 OF M/S. SAINT GOBAIN GLASS INDIA LTD (Mining of silica sand) Sri SN. Eisenhower, Director, Plot 98, APIIC, Near Integrated Check Post, Karur Village, Tada 524401, Nellore District Site Address

More information

ENVIRONMENTAL MANAGEMENT PLAN. Hotel Project for Mohamed Ilyas & Ms. Alamzahan

ENVIRONMENTAL MANAGEMENT PLAN. Hotel Project for Mohamed Ilyas & Ms. Alamzahan ENVIRONMENTAL MANAGEMENT PLAN Of Hotel Project for Mohamed Ilyas & Ms. Alamzahan at Khasra No. 269Ga, 269Kh, 266Kh & 270 Village Majra, Tehsil Central Doon, District Dehradun (Uttarakhand) GENERAL ENVIRONMENTAL

More information

J.K. Cement WORKS, NIMBAHERA (RAJ)

J.K. Cement WORKS, NIMBAHERA (RAJ) A. SPECIFIC CONDITIONS : J.K. Cement WORKS, NIMBAHERA (RAJ) Compliance report of Environment Clearance for Nimbahera - Ahirpura Lime Stone Mine (For the Period from April 2013 to September 2013) Reference

More information

Mining is being carried out keeping safe distance from seasonal nallah/ stream.

Mining is being carried out keeping safe distance from seasonal nallah/ stream. Name of the Project : Gurha East Lignite Mine Project (1MTPA) of M/s. V.S. Lignite Power Private Ltd. Located at village- Gurha, Kolayat, Bikaner, Rajasthan. Project Code : Raj-456/753/09 Clearance Letter

More information

Shri Girija Alloy & Power (I) Pvt. Ltd.

Shri Girija Alloy & Power (I) Pvt. Ltd. SUMMARY ON ENVIRONMENTAL IMPACT ASSESSMENT REPORT OF Shri Girija Alloy & Power (I) Expansion of Ferro Alloys unit at Submitted to ANDHRA PRADESH POLLUTION CONTROL BOARD 0 1.0 PROJECT DESCRIPTION Shri Girija

More information

ENVIRONMENTAL MANAGEMENT PLAN

ENVIRONMENTAL MANAGEMENT PLAN ENVIRONMENTAL MANAGEMENT PLAN INTRODUCTION An Environmental Management Plan (EMP) is a site-specific plan developed to ensure that all necessary measures are identified and implemented in order to protect

More information

PROPOSED TERMS OF REFERENCE

PROPOSED TERMS OF REFERENCE ENVIRONMENTAL IMPACT ASSESSMENT FOR RESIDENTIAL TOWNSHIP WITH VACATION RESORTS PROJECT AT ALIBAUG, RAIGAD, MAHARASHTRA PROPOSED TERMS OF REFERENCE Submitted to State Level Environment Impact Assessment

More information

KYNSHI-I HEP (270 MW), MEGHALAYA

KYNSHI-I HEP (270 MW), MEGHALAYA ANNEXURE-IV PROPOSED TERMS OF REFERENCE FOR EIA/EMP FOR KYNSHI (270 MW) HYDROELECTRIC PROJECT IN MEGHALAYA AS PER THE MODEL TERMS OF REFERENCE ISSUED BY MOEF & CC FOR NORTH-EAST PROJECTS I. SALIENT FEATURES

More information

ENVIRONMENTAL MONITORING REPORT BASED ON DATA GENERATED FROM OCTOBER 2016 MARCH 2017 FOR OCL INDIA LIMITED At/Po: RAJGANGPUR, District: SUNDARGARH, ODISHA AT LANJIBERNA LIMESTONE & DOLOMITE MINES PROJECT

More information

BHORER ALO ECO TOURISM PROJECT AT GAJALDOBA, JALPAIGURI

BHORER ALO ECO TOURISM PROJECT AT GAJALDOBA, JALPAIGURI TERMS OF REFERENCE (TOR) FOR AN ENVIRONMENTAL IMPACT ASSESSMENT (EIA) FOR BHORER ALO ECO TOURISM PROJECT AT GAJALDOBA, JALPAIGURI AT PLOT NO.: 63, 67-70, 72-101 AND 105, MOUZA-JUNGLE MOHAL, JL. NO. 01,

More information

Table 1.1: The Salient Features of the Project. Proposed Quartz Mine Of Sri. Syed Masthan Basha

Table 1.1: The Salient Features of the Project. Proposed Quartz Mine Of Sri. Syed Masthan Basha 1. EXECUTIVE SUMMARY 1.1 Introduction The Eknampuram Quartz mine of 89.80 Acres/ 36.34 ha is located in Sy. No. 60, Eknampuram Village, C.S. Puram Mandal, Prakasam District, Andhra Pradesh has been allotted

More information

DESCRIPTIVE REPORT ON STATUS OF COMPLIANCE TO THE CONDITIONS OF ENVIRONMENTAL CLEARANCE AND ENVIRONMENTAL MANAGEMENT

DESCRIPTIVE REPORT ON STATUS OF COMPLIANCE TO THE CONDITIONS OF ENVIRONMENTAL CLEARANCE AND ENVIRONMENTAL MANAGEMENT DESCRIPTIVE REPORT ON STATUS OF COMPLIANCE TO THE CONDITIONS OF ENVIRONMENTAL CLEARANCE AND ENVIRONMENTAL MANAGEMENT Subject: Compliance report of Environmental Clearance for Plant 3 Reference: J-11011/603/2010-IA,

More information

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN ENVIRONMENT MANAGEMENT PLAN At Narmada River Mining Project:-Category B2 Lease Area: 20.000 Hect. Khasra No. 735 Vill.-Boras, Tehsil- Udaipura District- Raisen (M.P) Project Proponent M/s Shiva Corporation

More information

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN ENVIRONMENT MANAGEMENT PLAN ENVIRONMENT MANAGEMENT PLAN 1.0. INTRODUCTION: The proposed M/s. Ordinary sand Mine of Shree Ramjibhai samjibhai Gujarati Area at near village Survey No.Bhadar River Bed, Vill.

More information

V.S LIGNITE POWER Pvt. Ltd. [Gurha East Lignite Mine (1 MPTA)] AT VILLAGE-GURHA, KOLAYAT, BIKANER, RAJASTHAN

V.S LIGNITE POWER Pvt. Ltd. [Gurha East Lignite Mine (1 MPTA)] AT VILLAGE-GURHA, KOLAYAT, BIKANER, RAJASTHAN V.S LIGNITE POWER Pvt. Ltd [Gurha East Lignite Mine (1 MPTA)] AT VILLAGE-GURHA, KOLAYAT, BIKANER, RAJASTHAN HALF YEARLY REPORT FOR THE PERIOD OCTOBER, 2011 to MARCH 2012 Name of the Project : Gurha East

More information

Pramod S. Kambli. Page 1

Pramod S. Kambli. Page 1 PREFEASIBILITY STUDY FOR SHREE. PRAMOD S. KAMBLI Page 1 Executive summary Shree.., has laterite stone quarry in an area 2.61 Ha in the survey No. 1091 With quarrying capacity of 10259.31 TPA. The major

More information

EXECUTIVE SUMMARY. (Approved Consultant)

EXECUTIVE SUMMARY. (Approved Consultant) ENVIRONMENTAL IMPACT ASSESSMENT FOR THE PROPOSED CAPTIVE RESIN PLANT OF 100000 TPA PRODUCTION CAPACITY AT ROUTHUSURAMALA VILLAGE, THOTTAMBEDU MANDAL, CHITTOOR DISTRICT, ANDHRA PRADESH EXECUTIVE SUMMARY

More information

Proposed Terms of reference for EIA studies ToR for EIA studies in respect of the isolated storages, which are involved in handling of hazardous

Proposed Terms of reference for EIA studies ToR for EIA studies in respect of the isolated storages, which are involved in handling of hazardous Proposed Terms of reference for EIA studies ToR for EIA studies in respect of the isolated storages, which are involved in handling of hazardous chemicals may include, but not limited to the following

More information

THE RAMCO CEMENTS LIMITED, KSR NAGAR COMPLIANCE REPORT - ENVIRONMENTAL CLEARANCE CEMENT PLANT 2.5 MILLION TPA CLINKER, 2

THE RAMCO CEMENTS LIMITED, KSR NAGAR COMPLIANCE REPORT - ENVIRONMENTAL CLEARANCE CEMENT PLANT 2.5 MILLION TPA CLINKER, 2 THE RAMCO CEMENTS LIMITED, KSR NAGAR COMPLIANCE REPORT - ENVIRONMENTAL CLEARANCE CEMENT PLANT 2.5 MILLION TPA CLINKER, 2.6 MILLION TPA CEMENT & THERMAL POWER PLANT 36 MW EC Lr. No. : J-11011/403/2006-IA-II

More information

ENVIRONMENTAL IMPACT ASSESSMENT FOR PROPOSED CONSTRUCTION OF SEWAGE PUMPING STATION & SEWAGE TREATMENT PLANT

ENVIRONMENTAL IMPACT ASSESSMENT FOR PROPOSED CONSTRUCTION OF SEWAGE PUMPING STATION & SEWAGE TREATMENT PLANT ENVIRONMENTAL IMPACT ASSESSMENT FOR PROPOSED CONSTRUCTION OF SEWAGE PUMPING STATION & SEWAGE TREATMENT PLANT EXECUTIVE SUMMARY NAGERCOIL MUNICIPALITY, KANYAKUMARI DISTRICT TWAD BOARD,SEWERAGE DIVISION,NAGERCOIL

More information

PROPOSED TERMS OF REFERENCE (TOR) FOR

PROPOSED TERMS OF REFERENCE (TOR) FOR PROPOSED TERMS OF REFERENCE (TOR) FOR ENVIRONMENTAL IMPACT ASSESSMENT (EIA) AND ENVIRONMENTAL MANAGEMENT PLAN (EMP) FOR PROPOSED NEW NATIONAL HIGHWAY -NH-754K GREENFIELD ALIGNMENT SANCHORE-SANTALPUR SECTION

More information

Environmental Policy Statement:

Environmental Policy Statement: 1 Environmental Policy Statement: Coal India Limited (CIL) is committed to protect the environment through prevention, mitigation of pollution, proper disposal and recycling of wastes, conservation of

More information

ENVIRONMENT MANAGMENT PLAN

ENVIRONMENT MANAGMENT PLAN ENVIRONMENT MANAGMENT PLAN DETAIL OF MINE- NAME OF MINERAL SANDSTONE (FURSHI PATTHAR) MINING LEASE FOR FINISHED SANDSTONE VILLAGE PARASWAHA, TEHSEEL JABERA DISTRICT - DAMOH KHASRA NO. 22/1, AREA 1.0 HECTARE

More information

ENVIRONMENTAL MANAGEMENT PLAN

ENVIRONMENTAL MANAGEMENT PLAN ENVIRONMENTAL MANAGEMENT PLAN For BUILDING STONE AND M SAND QUARRY Sri. N.C. Prasanna Kumar #663, Somanahalli Maddur Taluk Mandya District - 571429 Prepared by SMS ENVOCARE LIMTED # 301, 3 RD FLOOR, SHRESHTA

More information

STATE POLLUTION CONTROL BOARD, ORISSA Paribesh Bhawan, A/118, Nilakanthanagar,Unit-VIII, Bhubaneswar , INDIA

STATE POLLUTION CONTROL BOARD, ORISSA Paribesh Bhawan, A/118, Nilakanthanagar,Unit-VIII, Bhubaneswar , INDIA OPERATING GUIDELINES FOR PROCESSING OF CONSENT TO ESTABLISH APPLICATION FOR ESTABLISHMENT OF COAL WASHERIES IN THE STATE OF ORISSA STATE POLLUTION CONTROL BOARD, ORISSA Paribesh Bhawan, A/118, Nilakanthanagar,Unit-VIII,

More information

PROPOSED TERM OF REFERENCE

PROPOSED TERM OF REFERENCE PROPOSED TERM OF REFERENCE FOR ESTABLISHMENT OF PROPOSED MOLASSES/GRAIN BASED DISTILLERY HAVING CAPACITY: 160.0 KLD (MOLASSES BASED) OR 120.0 KLD (MOLASSES BASED) + 40.0 KLD (GRAIN BASED) ALONGWITH 7.0

More information

Cement Manufacturing Company Ltd. Page 1

Cement Manufacturing Company Ltd. Page 1 Six Monthly Compliance status of Environment Clearance for Cement Plant (2400 TPD) at Village Lumshnong, Meghalaya July to December 2013 Ref.: Environmental Clearance no. SEIAA/Project-6/2008/23 dtd. 16.03.10.

More information

Environmental impact assessment of a 1600 MW thermal power plant project in Karimnagar district of Telangana

Environmental impact assessment of a 1600 MW thermal power plant project in Karimnagar district of Telangana Environmental impact assessment of a 1600 MW thermal power plant project in Karimnagar district of Telangana 1 D.V.S. Praneeth, 2 Arghajeet Saha 1,2 M.Tech. Scholar 1 Environmental Engineering, Department

More information

Table 1.1 : Salient features of the project. Sy. No. 379/1, Perecherla Village, Medikonduru Mandal, Guntur District, Andhra Pradesh.

Table 1.1 : Salient features of the project. Sy. No. 379/1, Perecherla Village, Medikonduru Mandal, Guntur District, Andhra Pradesh. 1.0 EXECUTIVE SUMMARY 1.1 Introduction Road Metal of M/s. Lakshmi Stone Crusher covering an extent of 2.10 Ac is located at Sy. No. 379/1 of Perecherla Village, Medikonduru Mandal, Guntur District, Andhra

More information

ENVIRONMENTAL MONITORING REPORT

ENVIRONMENTAL MONITORING REPORT ENVIRONMENTAL MONITORING REPORT BASED ON DATA GENERATED FROM APRIL 2018 SEPTEMBER 2018 FOR OCL INDIA LIMITED At/Po: RAJGANGPUR, District: SUNDARGARH, ODISHA AT LANJIBERNA LIMESTONE & DOLOMITE MINES PROJECT

More information

A. SPECIFIC CONDITIONS. No. Conditions Status of Compliance. Noted and Agreed

A. SPECIFIC CONDITIONS. No. Conditions Status of Compliance. Noted and Agreed Status of compliance as on 1 st March, 2015 (Period :, 2014 March 2015) to the conditions stipulated in Environmental clearance granted by MoEF vide letter No:- J- 11015/42/2005-IA-II(M) Dated 18 th May

More information

ENVIRONMENTAL MANAGEMENT PLAN FOR DALPATPUR STONE QUARRY AT VILLAGE DALPUTPUR TEHSIL KHURAI AND DISTRICT SAGAR [MP], AREA (0.

ENVIRONMENTAL MANAGEMENT PLAN FOR DALPATPUR STONE QUARRY AT VILLAGE DALPUTPUR TEHSIL KHURAI AND DISTRICT SAGAR [MP], AREA (0. ENVIRONMENTAL MANAGEMENT PLAN FOR DALPATPUR STONE QUARRY AT VILLAGE DALPUTPUR TEHSIL KHURAI AND DISTRICT SAGAR [MP], AREA (0.920ha) 1.1 Introduction The subject quarry is proposed for metal stone on 0.920

More information

EMP ENVIRONMENTAL MANAGEMENT PLAN FOR BUILDING STONE QUARRY M/S. SIDDARTHA STONE CRUSHING INDUSTRIES Sy.No. 1118/4, Bangaramakki Bengre II Village, Bh

EMP ENVIRONMENTAL MANAGEMENT PLAN FOR BUILDING STONE QUARRY M/S. SIDDARTHA STONE CRUSHING INDUSTRIES Sy.No. 1118/4, Bangaramakki Bengre II Village, Bh EMP ENVIRONMENTAL MANAGEMENT PLAN FOR BUILDING STONE QUARRY M/S. SIDDARTHA STONE CRUSHING INDUSTRIES Sy.No. 1118/4, Bangaramakki Bengre II Village, Bhatkal Taluk, Uttara Kannada District PREPARED BY SMS

More information

APPENDIX I (See paragraph 6) FORM 1

APPENDIX I (See paragraph 6) FORM 1 APPENDIX I (See paragraph 6) FORM 1 (I) Basic Information: S.. Item Details 1 Name of the project/s: M/s. Sri Lakshmi Enterprises 2 S.. in the schedule 1 (a) 3. Proposed capacity/area/length/tonnage to

More information

The mine is opened on The reasons for delay for starting mining operations are:

The mine is opened on The reasons for delay for starting mining operations are: 1 P a g e 2 P a g e THE RAMCO CEMENTS LIMITED (Formerly known as Madras Cements Ltd.) COMPLIANCE REPORT FOR ENVIRONMENTAL CLEARANCE BUDAWADA LIMESTONE MINE - 1.10 MILLION TPA CAPACITY EC Lr. No : J-11015/150/2008-IA.II

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT Page1 PRE FEASIBILITY REPORT KALDA FLAG STONE QUARRY AREA OF -1.55 HACTARE STRICTLY AS PER MOEF GUIDELINE DATE 30/12/2006 IN TERMS OF PROVISIONS OF EIA NOTIFICATION 2006 VILLAGE KALDA TEHSIL PAWAI DISTRICT

More information

Environment protection measures / technology

Environment protection measures / technology Sr. No. Conditions A. Specific Conditions: i. The gaseous and particulate matter emissions from various units should conform to the standards prescribed by the State Pollution Control Board. At no time,

More information