1 IV. ENVIRONMENTAL IMPACT ANALYSIS G. HYDROLOGY/WATER QUALITY ENVIRONMENTAL SETTING The project site is located in the Wilshire community of the City of Los Angeles and is bound by S. Wetherly Drive to the west, W. 3 rd Street to the north, S. Almont Drive to the east, and an alley to the south (see Figures II-1 and II-2 in Section II., Project Description). The project site consists of a rectangular parcel and totals approximately acres. The topography of the project site is generally flat. Based on information shown on the published United States Geological Survey (USGS) topographic map for the area, the average elevation within the project site is approximately 194 feet above the mean sea level (msl) with area drainage generally directed to the south. 1 Surface Water Hydrology The project site is located within the Ballona Creek Watershed. The Ballona Creek Watershed is a drainage area of approximately 130 square miles that includes most of the City of Los Angeles west of downtown, the cities of Beverly Hills, Culver City, and West Hollywood and portions of Santa Monica and Inglewood. Ballona Creek is the dominant hydrologic feature in the watershed and drains surface waters to the Pacific Ocean. There are no lakes, rivers, or streams that flow within, through or near the project site. The nearest surface water is a stream located on the Los Angeles Country Club approximately 1.83 miles west of the project site. 2 The project site is not located in a 100 or 500 year floodplain. 3 However, the project site is within a potential inundation area for the Hollywood reservoir. 4 Stormwater runoff generated at the project site generally drains southerly. Stormwater runoff flows onto the surrounding roadways and enters the existing drainage system Geotechnical Investigation Report, Proposed Mid-Rise Multi-Family Residential Development Project Nicholson S. Wetherly Drive and S. Almont Drive, Beverly Hills Area of Los Angeles, California, prepared by Petra Geotechnical, Inc., December 22, Included as Appendix F. Phase I Environmental Site Assessment, 321 & 323 South Almont Drive, Los Angeles, California 90048, prepared by AEI Consultants, February 6, Included as Appendix G. City of Los Angeles Department of City Planning, Zone Information and Map Access System, website: accessed May 1, City of Los Angeles, Safety Element of the Los Angeles City General Plan, Exhibit G, Inundation & Tsunami Hazard Areas, March Page IV.G-1

2 Groundwater The project site is located within the Santa Monica Subbasin. The Santa Monica Subbasin underlies the northwestern part of the Coastal Plain of Los Angeles Groundwater Basin. It is bounded by impermeable rocks of the Santa Monica Mountains on the north and by the Ballona escarpment on the south. The subbasin extends from the Pacific Ocean on the west to the Inglewood fault on the east. Replenishment of groundwater in the Santa Monica Basin is mainly by percolation of precipitation and surface runoff onto the subbasin from the Santa Monica Mountains. Groundwater was encountered at a depth of 53 feet below existing grade during the geotechnical investigation performed at the project site. 5 As indicated by the California Geologic Survey Seismic Hazard Evaluation Report (CGS, 1998), the project site may be subject to historic high groundwater levels of up to approximately 10 feet below existing grade. Fluctuations in groundwater levels may occur due to variations in rainfall, regional climate, and in response to landscape irrigation. The direction of groundwater flow beneath the project site is inferred to be to the southeast. 6 Regulatory Framework Clean Water Act In 1972, the Federal Water Pollution Control Act (also referred to as the Clean Water Act [CWA]) was amended to provide that the discharge of pollutants to waters of the United States from any point source is unlawful unless the discharge is in compliance with a National Pollutant Discharge Elimination System (NPDES) permit. The 1987 amendments to the CWA added Section 402(p) which establishes a framework for regulating municipal and industrial storm water discharges under the NPDES Program. In 1990, the U.S. Environmental Protection Agency (USEPA) published final regulations that establish storm water permit application requirements for specified categories of industries. The regulations provide that discharges of storm water to waters of the United States from construction projects that encompass five or more acres of soil disturbance are effectively prohibited unless the discharge is in compliance with an NPDES Permit. Regulations (Phase II Rule) that became final on December 8, 1999 expand the existing NPDES program to address storm water discharges from construction sites that disturb land equal to or greater than one acre and less than five acres (small construction activity). 5 6 Geotechnical Investigation Report, Proposed Mid-Rise Multi-Family Residential Development Project Nicholson S. Wetherly Drive and S. Almont Drive, Beverly Hills Area of Los Angeles, California, prepared by Petra Geotechnical, Inc., December 22, Included as Appendix F. Phase I Environmental Site Assessment, 321 & 323 South Almont Drive, Los Angeles, California 90048, prepared by AEI Consultants, February 6, Included as Appendix G. Page IV.G-2

3 In California, these permits are issued through the State Water Resources Control Board (SWRCB) and the nine Regional Water Quality Control Boards (RWQCBs). The project site is within the jurisdiction of the Los Angeles Regional Water Quality Control Board (LARWQCB). While federal regulations allow two permitting options for storm water discharges (individual permits and General Permits), the California State Water Resources Control Board (SWRCB) has elected to adopt only one Statewide General Permit. Dischargers are required to submit a Notice of Intent (NOI) to obtain coverage under this General Permit. This General Permit requires all dischargers where construction activity disturbs one acre or more to: 1. Develop and implement a Storm Water Pollution Prevention Plan (SWPPP) which specifies Best Management Practices (BMPs) that will prevent all construction pollutants from contacting storm water and with the intent of keeping all products of erosion from moving off site into receiving waters. 2. Eliminate or reduce non-storm water discharges to storm sewer systems and other waters of the nation. 3. Perform inspections of all Best Management Practices (BMPs). Standard Urban Storm Water Mitigation Plan The Standard Urban Stormwater Mitigation Plan (SUSMP), approved by the California Regional Water Quality Control Board for the Los Angeles Region March 8, 2000, was developed as part of the municipal stormwater program to address storm water pollution from new development and redevelopment by the private sector. The SUSMP contains a list of the minimum required BMPs that must be used for a designated project. Additional BMPs may be required by ordinance or code and applied generally or on a case by case basis. Developers must incorporate appropriate SUSMP requirements into their project plans. The SUSMP is designed to eliminate 85 percent of the pollutants in storm runoff from new developments via requirements for implementation of a first flush cleansing program. The requirements of the program are such that the first 0.75 inch of rainfall runoff from a 24-hour storm is to be intercepted from drainage areas where new development is occurring and be cleansed, filtered or retained until pollutants are removed. 7 7 Standard Urban Storm Water Mitigation Plan for Los Angeles County and Cities in Los Angeles County, March 8, 2000, page 10. Page IV.G-3

4 ENVIRONMENTAL IMPACTS Thresholds of Significance Appendix G of the State CEQA Guidelines In accordance with guidance provided in Appendix G of the State CEQA Guidelines, the Proposed Project could have a potentially significant impact if it were to: (a) Violate any water quality standards or waste discharge requirements; (b) Substantially deplete groundwater supplies or interfere substantially with groundwater recharge such that there would be a net deficit in aquifer volume or a lowering of the local groundwater table level (e.g., the production rate of pre-existing nearby wells would drop to a level which would not support existing land uses or planned uses for which permits have been granted); (c) Substantially alter the existing drainage pattern of the site or area, including through the alteration of the course of a stream or river, in a manner, which would result in substantial erosion or siltation on- or off-site; (d) Substantially alter the existing drainage pattern of the site or area, including through the alteration of the course of a stream or river, or substantially increase the rate or amount of surface runoff in a manner which would result in flooding on- or off-site; (e) Create or contribute runoff water which would exceed the capacity of existing or planned stormwater drainage systems or provide substantial additional sources of polluted runoff; (f) Otherwise substantially degrade water quality; (g) Place housing within a 100-year flood hazard area as mapped on a federal Flood Hazard Boundary or Flood Insurance Rate Map or other flood hazard delineation map; (h) Place within a 100-year flood hazard area structures which would impede or redirect flood flows; (i) Expose people or structures to a significant risk of loss, injury or death involving flooding, including flooding as a result of the failure of a levee or dam; or (j) Expose people or structures to a significant risk of loss, injury or death involving inundation by seiche, tsunami, or mudflow. Page IV.G-4

5 City of Los Angeles CEQA Thresholds Guide Furthermore, as set forth in the City of Los Angeles L.A. CEQA Thresholds Guide, a proposed project would normally have a significant impact on surface water hydrology if it would: (a) Cause flooding during the projected 50-year developed storm event which would have the potential to harm people or damage property or sensitive biological resources; (b) Substantially reduce or increase the amount of surface water in a water body; or (c) Result in a permanent, adverse change to the movement of surface water sufficient to produce a substantial change in the current or direction of water flow. Project Impacts Water Quality Construction Because the Proposed Project would include excavation and grading, the project site would require a General Construction Activity Storm Water Permit from the SWRCB prior to the start of construction. The Construction General Permit requires the development and implementation of a SWPPP. According to the SWRCB, the SWPPP should identify which structural and nonstructural BMPs will be implemented, such as sandbag barriers, temporary desilting basins near inlets, gravel driveways, dust controls, employee training, and general good housekeeping practices. In addition, the Proposed Project would be required to obtain a grading permit from the Department of Building and Safety. With implementation of the applicable grading and building permit requirements and the application of BMPs, the Proposed Project would not violate any water quality standards or waste discharge requirements. Therefore, impacts on water quality from construction activities would be less than significant. Operation If not properly designed and constructed, the Proposed Project could increase the rate of urban pollutant introduction into storm water system. In order to prevent these potential impacts, the project will be designed in compliance with: (1) Section 402(p) of the Federal Water Pollution Control Act, or Clean Water Act (CWA); (2) Order No of the Regional Water Quality Control Board, Los Angeles Region, which regulates the issuance of waste discharge requirements to Los Angeles County; (3) the County of Los Angeles SUSMP, and (4) the City of Los Angeles Municipal Code. The SUSMP identifies the types and sizes of private development projects that are subject to its requirements. Due to the amount of square footage and the nature of the land use proposed by the project, it would be subject to the requirements of the SUSMP. In compliance with the SUSMP requirements, the Proposed Project would provide for the treatment/filtration of on-site storm water runoff before it enters the public storm water conveyance system, in order to minimize the introduction of pollutants of concern. Page IV.G-5

6 As required by the SUSMP, this system must remove 85 percent of such first flush storm water pollutants such as hydrocarbon compounds (i.e., automotive oils, lubricants and other fluids) deposited, as a matter of course, along the proposed driveway. Applicable BMPs will also be selected from those approved sources identified in the SUSMP. Other aspects of the SUSMP with which the Proposed Project must comply include provisions for the proper design of outdoor material and trash storage areas. As noted above, the Proposed Project would provide structural or treatment control BMPs designed to control storm water runoff contamination. While some infiltration through landscape areas will occur, the Proposed Project will primarily rely on the implementation of treatment control BMPs to control storm water runoff contamination. As required by the SUSMP, detailed plans for the Proposed Project s compliance with the SUSMP will be submitted to the City as part of the development plan approval process prior to issuance of building and grading permits. With compliance with the SUSMP requirements, the project s operational impacts on stormwater quality will be less than significant. Groundwater Groundwater was encountered at a depth of 53 feet below grade during site investigations on December 7, As discussed above, the site may be subject to historic high groundwater levels of up to approximately 10 feet below ground surface (bgs). The development of the Proposed Project includes excavation to roughly 35 feet bgs for subterranean parking. In general, groundwater is not anticipated to be encountered during the proposed construction. Nonetheless, to minimize the chance of encountering groundwater during construction, the Geotechnical Report recommends the construction of the subterranean levels be conducted in mid to late summer. Compliance with the recommendations of the Geotechnical Report is included in Mitigation Measure G-1. The Proposed Project would develop the project site with greater amounts of impervious surfaces than under existing site conditions. The project site would be excavated and subterranean parking created beneath the entire project site; this would result in more impervious surface area compared to existing conditions. However, the project site is not an important area of groundwater recharge as groundwater replenishment in the project area is mainly via precipitation and surface runoff from the Santa Monica Mountains. Water used in the construction and operation of the Proposed Project would be conveyed via existing potable water infrastructure and, as such, the project would not contribute directly to lowering the water table through the use of wells. Therefore, construction and operation of the Proposed Project would not result in significant impacts related to groundwater. 8 Geotechnical Investigation Report, Proposed Mid-Rise Multi-Family Residential Development Project Nicholson S. Wetherly Drive and S. Almont Drive, Beverly Hills Area of Los Angeles, California, prepared by Petra Geotechnical, Inc., December 22, Included as Appendix F. Page IV.G-6

7 Drainage The project site currently drains into an existing storm drain located in the surrounding roadways. Development of the Proposed Project would not substantially change the existing drainage patterns on the project site. The runoff from the Proposed Project would continue to be directed towards and discharged into the existing public storm drain system, in a manner consistent with applicable NPDES storm water permits. The City of Los Angeles Department of Public Works will review and approve the proposed drainage system as part of the project plan check to ensure that runoff is properly conveyed through the property and discharged to avoid flooding. Additionally, the Proposed Project would implement the recommendations with respect to drainage contained in the Geotechnical Report, also required by Mitigation Measure F-1. Therefore, construction and operation of the Proposed Project would not result in significant impacts related to site drainage. Flooding The project site is within a potential inundation area for the Hollywood reservoir. 9 However, the failure of a levee or dam is considered to be a remote possibility that would likely only occur during extremely severe seismic shaking conditions. Flooding from other sources is not expected, thus the minimal risk of flooding from potential dam or levee failure would not be exacerbated by the development of the Proposed Project. In addition, large portions of the City of Los Angeles are also within potential inundation areas, as such, risk to the project site would not be greater than in many other areas of the City. Therefore, the potential impact associated with flooding due to the failure of a levee or dam would be less than significant. CUMULATIVE IMPACTS Development of the Proposed Project in conjunction with the 53 related projects listed in Section III., Environmental Setting, would impact storm drainage and water quality in the area. The Proposed Project is located in an urbanized area where most of the surrounding properties are already developed. The proposed storm drainage system serving this area has been designed to accommodate runoff from the existing built environment. New construction does not generally lead to substantial additional runoff, since new developments would also be required to control the amount of stormwater runoff coming from their respective sites. Thus, the Proposed Project would not contribute to a significant cumulative impact in the event that any off-site areas served by local storm drains were to increase peak flows to the system and no cumulatively considerable impacts to water runoff and water quality would occur. 9 City of Los Angeles, Safety Element of the Los Angeles City General Plan, Exhibit G, Inundation & Tsunami Hazard Areas, March Page IV.G-7

8 MITIGATION MEASURES G-1. The Proposed Project shall be designed and constructed in accordance with the recommendations provided in the Geotechnical Report, which shall be approved by the Department of Building and Safety prior to issuance of building and grading permits. LEVEL OF SIGNIFICANCE AFTER MITIGATION With implementation of the mitigation measure listed above, project impacts with regard to hydrology and water quality would be less than significant. Page IV.G-8

3F. Hydrology and Water Quality

3F. Hydrology and Water Quality This section provides an analysis of potential hydrological and water quality impacts associated with implementation of the proposed project. The section also evaluates and describes the potential impacts

More information

IV. ENVIRONMENTAL IMPACT ANALYSIS H. HYDROLOGY AND WATER QUALITY

IV. ENVIRONMENTAL IMPACT ANALYSIS H. HYDROLOGY AND WATER QUALITY IV. ENVIRONMENTAL IMPACT ANALYSIS H. HYDROLOGY AND WATER QUALITY 1. INTRODUCTION This section evaluates the Project s potential hydrology and water quality impacts based upon whether the Project would

More information

4.8 - Hydrology and Water Quality

4.8 - Hydrology and Water Quality County of Riverside Public Safety Enterprise Communication Project Hydrology and Water Quality 4.8 - Hydrology and Water Quality 4.8.1 - Introduction This section describes the existing setting regarding

More information

3G. Hydrology and Water Quality

3G. Hydrology and Water Quality INTRODUCTION This chapter assesses the potential impacts to surface water hydrology, surface water quality, groundwater hydrology, and groundwater quality resulting from the development of the proposed

More information

G. HYDROLOGY Existing Conditions

G. HYDROLOGY Existing Conditions G. HYDROLOGY Existing Conditions Surface Water Runoff This section is based on the hydrology and drainage analysis for the proposed Project, which was prepared by KPFF Consulting Engineers and is attached

More information

IV.E. HYDROLOGY AND WATER QUALITY

IV.E. HYDROLOGY AND WATER QUALITY IV.E. HYDROLOGY AND WATER QUALITY The following section presents the information provided in the hydrology report prepared by Sukow Engineering. Supporting hydrology data from this report is included in

More information

4.6 - Hydrology and Water Quality

4.6 - Hydrology and Water Quality City of Wasco - Wasco Center Walmart Hydrology and Water Quality 4.6 - Hydrology and Water Quality 4.6.1 - Introduction This section provides an evaluation of hydrology and water quality. The analysis

More information

4.7 HYDROLOGY AND WATER QUALITY

4.7 HYDROLOGY AND WATER QUALITY 4.7 HYDROLOGY AND WATER QUALITY INTRODUCTION The proposed stormwater drainage system for the proposed Via Princessa project would consist of curb and gutters, catch basins, and storm drain culverts crossing

More information

5.4 HYDROLOGY AND WATER QUALITY

5.4 HYDROLOGY AND WATER QUALITY 5.4 HYDROLOGY AND WATER QUALITY SUMMARY The proposed stormwater drainage system for the proposed Lyons Avenue at-grade rail crossing would consist of a 30-inch stormwater drain, which would replace the

More information

3.3 FLOOD CONTROL AND HYDROLOGY

3.3 FLOOD CONTROL AND HYDROLOGY 3.3 FLOOD CONTROL AND HYDROLOGY 3.3.1 AFFECTED ENVIRONMENT The sublease boundary is located approximately 0.25-miles north of the San Gabriel River. The San Gabriel River flows from the San Gabriel Mountains

More information

3.3 FLOOD CONTROL AND HYDROLOGY

3.3 FLOOD CONTROL AND HYDROLOGY 3.3 FLOOD CONTROL AND HYDROLOGY 3.3.1 AFFECTED ENVIRONMENT The sublease boundary is located approximately 0.25-miles north of the San Gabriel River. The San Gabriel River flows from the San Gabriel Mountains

More information

Existing Conditions

Existing Conditions 3.1.4 Hydrology and Water Quality This section addresses the potential hydrology, water quality, and stormwater/flooding impacts associated with implementation of The Villages Escondido Country Club Project

More information

CORBIN AND NORDHOFF IV. ENVIRONMENTAL IMPACT ANALYSIS ENV EIR F. HYDROLOGY

CORBIN AND NORDHOFF IV. ENVIRONMENTAL IMPACT ANALYSIS ENV EIR F. HYDROLOGY F. HYDROLOGY ENVIRONMENTAL SETTING Project Site The Project Site is located at 19601 Nordhoff Street in the Chatsworth area of the City of Los Angeles, California, within the Chatsworth - Porter Ranch

More information

3.6 HYDROLOGY AND WATER QUALITY Environmental Setting

3.6 HYDROLOGY AND WATER QUALITY Environmental Setting 3.6 HYDROLOGY AND WATER QUALITY This section of the Environmental Impact Report (EIR) describes existing hydrology and water quality resources, and analyzes potential impacts resulting from implementation

More information

APPENDIX H Guidance for Preparing/Reviewing CEQA Initial Studies and Environmental Impact Reports

APPENDIX H Guidance for Preparing/Reviewing CEQA Initial Studies and Environmental Impact Reports APPENDIX H H.1 Guidance for Preparing and Reviewing CEQA Initial Studies Step 1: Consider the Project Characteristics as Provided by the Project Applicant Review the project application and draft plan

More information

This section addresses the water resources, hydrology and water quality that would change due to the proposed project.

This section addresses the water resources, hydrology and water quality that would change due to the proposed project. 4.12 WATER RESOURCES This section addresses the water resources, hydrology and water quality that would change due to the proposed project. 4.12.1 EXISTING SETTING The project site is located in the Los

More information

This section evaluates potential hydrology and water quality impacts associated with the project.

This section evaluates potential hydrology and water quality impacts associated with the project. Section 3.7 Hydrology and Water Quality This section evaluates potential hydrology and water quality impacts associated with the project. 3.7.1 Regulatory Framework Federal The U.S. EPA regulates water

More information

3.4 HYDROLOGY/WATER QUALITY

3.4 HYDROLOGY/WATER QUALITY 3.4 HYDROLOGY/WATER QUALITY 3.4.1 INTRODUCTION This subsection describes impacts to hydrology and water quality that could result from construction and operation of the proposed project. Topics addressed

More information

IV. ENVIRONMENTAL IMPACT ANALYSIS D. DRAINAGE AND SURFACE WATER QUALITY

IV. ENVIRONMENTAL IMPACT ANALYSIS D. DRAINAGE AND SURFACE WATER QUALITY IV. ENVIRONMENTAL IMPACT ANALYSIS D. DRAINAGE AND SURFACE WATER QUALITY The analysis of drainage impacts included in this section is based on the Storm Drainage Environmental Impact Report prepared by

More information

Section 3.7 Hydrology and Water Quality 3

Section 3.7 Hydrology and Water Quality 3 Section. This section presents a discussion of existing hydrology and water quality conditions at the Project site, potential hydrologic and water quality impacts, and proposed mitigation where applicable.

More information

APPENDIX M CEQA Initial Study Checklist

APPENDIX M CEQA Initial Study Checklist APPENDIX M CEQA Initial Study Checklist Appendix G ENVIRONMENTAL CHECKLIST FORM (To be Completed by Applicant) 1. Project title: 2. Lead agency name and address: 3. Contact person and phone number: 4.

More information

DRAINAGE AND NATURAL AQUIFER GROUNDWATER RECHARGE ELEMENT

DRAINAGE AND NATURAL AQUIFER GROUNDWATER RECHARGE ELEMENT Goal 7.0. To optimize integrated stormwater management in order to reduce damage and impacts from sea level rise and flooding, promotes recharge to the Surficial Aquifer System (SAS), improve and protect

More information

3.9 HYDROLOGY AND WATER QUALITY

3.9 HYDROLOGY AND WATER QUALITY 3.9 HYDROLOGY AND WATER QUALITY 3.9.1 Introduction The Hydrology and Water Quality section evaluates the Program s impacts on water resources. The environmental setting provides a general overview of the

More information

APPENDIX N Guidance for Preparing/Reviewing CEQA Initial Studies and Environmental Impact Reports

APPENDIX N Guidance for Preparing/Reviewing CEQA Initial Studies and Environmental Impact Reports APPENDIX N N.1 Guidance for Preparing and Reviewing CEQA Initial Studies Step 1: Consider the Project Characteristics as Provided by the Project Applicant Review the project application and draft plan

More information

4.8 HYDROLOGY AND WATER QUALITY

4.8 HYDROLOGY AND WATER QUALITY 4.8 HYDROLOGY AND WATER QUALITY 4.8.1 INTRODUCTION The Hydrology and Water Quality chapter of the Draft EIR describes existing drainage and water quality setting for the project site, and evaluates potential

More information

IV. Environmental Impact Analysis G. Hydrology and Water Quality

IV. Environmental Impact Analysis G. Hydrology and Water Quality IV. Environmental Impact Analysis G. Hydrology and Water Quality 1. Introduction This section provides an analysis of the Project s potential impacts with regard to hydrology, water quality, and groundwater.

More information

IV.I HYDROLOGY AND WATER QUALITY

IV.I HYDROLOGY AND WATER QUALITY IV.I HYDROLOGY AND WATER QUALITY INTRODUCTION This section provides an overview of hydrology and water quality within the Jordan Downs Specific Plan area and an analysis of potential impacts related to

More information

INFRASTRUCTURE ELEMENT Goal, Objectives and Policies

INFRASTRUCTURE ELEMENT Goal, Objectives and Policies INFRASTRUCTURE ELEMENT Goal, Objectives and Policies City of Bartow Comprehensive Plan Adopted August 5, 1991 Amended August 2, 1993, Amended 1996 & 1999 Adopted Changes January 16, 2001, Amended April

More information

SECTION 11 PART I STORMWATER QUALITY PROTECTION Definitions / Acronyms 11-3 PART 1 CONSTRUCTION PRACTICES

SECTION 11 PART I STORMWATER QUALITY PROTECTION Definitions / Acronyms 11-3 PART 1 CONSTRUCTION PRACTICES SECTION 11 PART I STORMWATER QUALITY PROTECTION CONTENTS Page 11-1 Definitions / Acronyms 11-3 PART 1 CONSTRUCTION PRACTICES 11-2 Stormwater Pollution Prevention Plan (SWPPP) 11-3 11-3 Erosion and Sediment

More information

RIVERSIDE COUNTY DRAINAGE AREA MANAGEMENT PLAN SANTA ANA AND SANTA MARGARITA REGIONS

RIVERSIDE COUNTY DRAINAGE AREA MANAGEMENT PLAN SANTA ANA AND SANTA MARGARITA REGIONS RIVERSIDE COUNTY DRAINAGE AREA MANAGEMENT PLAN SANTA ANA AND SANTA MARGARITA REGIONS JULY 2005 6.0 D EVELOPMENT PLANNING 6.1 INTRODUCTION With the adoption of the Third-term MS4 Permits, the Permittees

More information

4. ENVIRONMENTAL IMPACT ANALYSIS 6. HYDROLOGY / WATER QUALITY

4. ENVIRONMENTAL IMPACT ANALYSIS 6. HYDROLOGY / WATER QUALITY 4. ENVIRONMENTAL IMPACT ANALYSIS 6. HYDROLOGY / WATER QUALITY 4.6.1 INTRODUCTION This section describes existing hydrology and water quality conditions in the project area and its immediate surroundings

More information

STORMWATER RUNOFF AND WATER QUALITY IMPACT REVIEW

STORMWATER RUNOFF AND WATER QUALITY IMPACT REVIEW SUBCHAPTER 8 STORMWATER RUNOFF AND WATER QUALITY IMPACT REVIEW 7:45-8.1 Purpose and scope of review Except for those projects expressly exempted by this chapter or waived by the Commission, the Commission

More information

3.6 HYDROLOGY AND WATER QUALITY

3.6 HYDROLOGY AND WATER QUALITY This section describes potential hydrology and water quality impacts to surface water and groundwater from implementation of the proposed Project in the context of flooding, runoff, and other drainage

More information

6.13 Utilities and Service Systems

6.13 Utilities and Service Systems 6.13 6.13.1 Introduction This section describes impacts for utilities and service systems that would result from construction and operation of the CEQA Alternatives. 6.13.2 Regulatory Setting There are

More information

CHAPTER 4 - EROSION & SEDIMENT CONTROL AND STORMWATER MANAGEMENT ORDINANCE OF DUBUQUE COUNTY, IOWA. Adopted March 29, 2010.

CHAPTER 4 - EROSION & SEDIMENT CONTROL AND STORMWATER MANAGEMENT ORDINANCE OF DUBUQUE COUNTY, IOWA. Adopted March 29, 2010. CHAPTER 4 - EROSION & SEDIMENT CONTROL AND STORMWATER MANAGEMENT ORDINANCE OF DUBUQUE COUNTY, IOWA Adopted March 29, 2010 Table of Contents Page Part 1 Introduction...3 4-1 Title..................3 4-2

More information

4.11 Water Resources Regulatory Setting. Federal

4.11 Water Resources Regulatory Setting. Federal 4.11 Water Resources This section has been updated from the Draft EIS/EIR to focus on the analysis of the effects of the LPA on water resources. The analysis results have not changed from the Draft EIS/EIR.

More information

COON CREEK WATERSHED DISTRICT PERMIT REVIEW. Spring Lake Park Schools Westwood Middle School st Avenue NE, Spring Lake Park, MN 55432

COON CREEK WATERSHED DISTRICT PERMIT REVIEW. Spring Lake Park Schools Westwood Middle School st Avenue NE, Spring Lake Park, MN 55432 PAN 16-112, Westwood Middle School, Page 1 of 6 COON CREEK WATERSHED DISTRICT PERMIT REVIEW MEETING DATE: August 22, 2016 AGENDA NUMBER: 10 FILE NUMBER: 16-112 ITEM: Westwood Middle School RECOMMENDATION:

More information

CEAA ENVIRONMENTAL ENVIRONMENTAL IMPACT ASSESSMENT AMBASSADOR BRIDGE ENHANCEMENT PROJECT. Replacement Span and Plaza Expansion APPENDIX E

CEAA ENVIRONMENTAL ENVIRONMENTAL IMPACT ASSESSMENT AMBASSADOR BRIDGE ENHANCEMENT PROJECT. Replacement Span and Plaza Expansion APPENDIX E Ambassador Bridge Enhancement Project CEAA ENVIRONMENTAL ENVIRONMENTAL IMPACT ASSESSMENT AMBASSADOR BRIDGE ENHANCEMENT PROJECT Replacement Span and Plaza Expansion APPENDIX E DRAFT EROSION AND SEDIMENT

More information

IV. ENVIRONMENTAL IMPACT ANALYSIS C. HYDROLOGY AND WATER QUALITY

IV. ENVIRONMENTAL IMPACT ANALYSIS C. HYDROLOGY AND WATER QUALITY IV. ENVIRONMENTAL IMPACT ANALYSIS C. HYDROLOGY AND WATER QUALITY A Hydrology Study for the proposed project was prepared by Crosby Mead Benton and Associates in May 2003 to analyze the potential hydrology

More information

3.10 Hydrology and Water Quality. Environmental Setting

3.10 Hydrology and Water Quality. Environmental Setting 3.10 Hydrology and Water Quality This section describes the potential hydrology and water quality impacts associated with the proposed changes to the approved project. Environmental Setting This section

More information

4.9 HYDROLOGY AND WATER QUALITY

4.9 HYDROLOGY AND WATER QUALITY The Project site is located within the jurisdiction of the Santa Ana Regional Water Quality Control Board (RWQCB). Water quality information for this Subsection was obtained from the Santa Ana RWQCB s

More information

HYDROLOGY STUDY LA MIRADA BOULEVARD La Mirada, California

HYDROLOGY STUDY LA MIRADA BOULEVARD La Mirada, California HYDROLOGY STUDY 12000 LA MIRADA BOULEVARD La Mirada, California TTM 73119 Prepared for: The Olson Company 3010 Old Ranch Parkway, Suite 100 Seal Beach, CA 90740 Contact: Mr. Aaron Orenstein (562) 370-9531

More information

Appendix B Stormwater Site Plan Submittal Requirements Checklist

Appendix B Stormwater Site Plan Submittal Requirements Checklist Stormwater Site Plan Submittal Requirements Checklist The Submittal Requirements Checklist is intended to aid the design engineer in preparing a Stormwater Site Plan. All items included in the following

More information

4.7.1 SCOPE OF REVIEW EXISTING CONDITIONS. A. Regional Hydrology. B. Site Hydrology

4.7.1 SCOPE OF REVIEW EXISTING CONDITIONS. A. Regional Hydrology. B. Site Hydrology 4.7.1 SCOPE OF REVIEW The Nichols Canyon Mine, as discussed in Section 2.0, Environmental Setting, is an existing, ongoing surface mining operation operating pursuant to vested mining rights and an approved

More information

Preliminary Stormwater Quality Mitigation Report

Preliminary Stormwater Quality Mitigation Report Preliminary Stormwater Quality Mitigation Report MGA Chatsworth Campus 20000 Prairie Street Chatsworth, CA TUSTIN 17782 17th Street Suite 200 Tustin, CA 92780-1947 714.665.4500 Fax 714.665.4501 LOS ANGELES

More information

4.8.1 Introduction Environmental Setting. Section 4.8 Hydrology and Water Quality. Regional. Climate. Fremont Valley Hydrologic Unit

4.8.1 Introduction Environmental Setting. Section 4.8 Hydrology and Water Quality. Regional. Climate. Fremont Valley Hydrologic Unit 4.8.1 Introduction Section 4.8 Hydrology and Water Quality This section describes the affected environment and regulatory setting of the proposed project for hydrology and water quality and discusses mitigation

More information

Post-Development Stormwater Runoff Performance Standards

Post-Development Stormwater Runoff Performance Standards Post-Development Stormwater Runoff Performance Standards December 9, 2014 Topics Why performance standards? What practices/requirements are in effect in other States? The Workgroup s preliminary and final

More information

STORM WATER MANAGEMENT STANDARDS DRAFT

STORM WATER MANAGEMENT STANDARDS DRAFT STORM WATER MANAGEMENT STANDARDS 1. Storm Water Management Plans (SWMP) - All development activity that is required to have a permit for land disturbing shall have an approved Storm Water Management Plan

More information

4.F HYDROLOGY AND WATER QUALITY

4.F HYDROLOGY AND WATER QUALITY 4.F HYDROLOGY AND WATER QUALITY 1. INTRODUCTION This section evaluates potential Project impacts on surface water hydrology and surface water quality. The analysis is primarily based on the Water Resources

More information

CITY OF JENKS EARTH CHANGE PERMIT APPLICATION

CITY OF JENKS EARTH CHANGE PERMIT APPLICATION CITY OF JENKS EARTH CHANGE PERMIT APPLICATION Any applicable State or Federal permits must be attached to this application or must be applied for with copies attached to this application if this permit

More information

5.8 HYDROLOGY AND WATER QUALITY

5.8 HYDROLOGY AND WATER QUALITY 5.8 HYDROLOGY AND WATER QUALITY This section of the environmental impact report (EIR) identifies and analyzes regional and local surface water and groundwater resources that could affect or be affected

More information

Section 3.8 Hydrology & Water Quality

Section 3.8 Hydrology & Water Quality Section 3.8 Hydrology & Water Quality 3.8.1 Introduction The hydrology and water quality information contained herein is based on the City-approved April 2015 Preliminary Hydrology Analysis Site Development

More information

4.10 HYDROLOGY AND WATER QUALITY

4.10 HYDROLOGY AND WATER QUALITY 4.10 HYDROLOGY AND WATER QUALITY 4.10.1 INTRODUCTION This section describes existing conditions and regulatory setting for hydrology and water quality in the project area, and assesses potential impacts

More information

City of Bishop. Environmental Checklist Form

City of Bishop. Environmental Checklist Form City of Bishop Environmental Checklist Form 1. Project title: Environmental Review / 2007 California Building Codes 2. Lead agency name and address: City of Bishop 377 W. Line Street Bishop, Ca 93514 3.

More information

Home Remodeling Projects

Home Remodeling Projects Should your project require a Standard Urban Stormwater Mitigation Plan (SUSMP), please see the City of Pomona s Standard Urban Stormwater Mitigation Plan (SUSMP) Pamphlet Best Management Practices For

More information

COON CREEK WATERSHED DISTRICT PERMIT REVIEW Mississippi Dr Coon Rapids, MN SQ FT Residence on 0.64 Acre Lot

COON CREEK WATERSHED DISTRICT PERMIT REVIEW Mississippi Dr Coon Rapids, MN SQ FT Residence on 0.64 Acre Lot 17-082 Van Sloun Residence, Page 1 of 5 COON CREEK WATERSHED DISTRICT PERMIT REVIEW MEETING DATE: May 8, 2017 AGENDA NUMBER: 17 FILE NUMBER: 17-082 ITEM: Van Sloun Residence RECOMMENDATION: Approve with

More information

E. STORMWATER MANAGEMENT

E. STORMWATER MANAGEMENT E. STORMWATER MANAGEMENT 1. Existing Conditions The Project Site is located within the Lower Hudson Watershed. According to the New York State Department of Environmental Conservation (NYSDEC), Lower Hudson

More information

Municipal Stormwater Management Planning

Municipal Stormwater Management Planning Municipal Stormwater Management Planning Christopher C. Obropta, Ph.D., P.E. Water Resources Extension Specialist with Rutgers Cooperative Extension Assistant Professor with Department of Environmental

More information

The following findings are hereby adopted by The Regents in conjunction with the approval of the Project which is set forth in Section III, below.

The following findings are hereby adopted by The Regents in conjunction with the approval of the Project which is set forth in Section III, below. CALIFORNIA ENVIRONMENTAL QUALITY ACT FINDINGS IN CONNECTION WITH THE APPROVAL OF THE EAST CAMPUS STUDENT HOUSING PHASE III DEVELOPMENT PROJECT UNIVERSITY OF CALIFORNIA, IRVINE I. ADOPTION OF THE MITIGATED

More information

City of Beverly Hills Low Impact Development (LID) Fact Sheet

City of Beverly Hills Low Impact Development (LID) Fact Sheet On May 18, 2015, the City of Beverly Hills amended its Stormwater and Urban Runoff Pollution Control Ordinance (Article 5 Chapter 4 Title 9 of the Beverly Hills Municipal Code) to include Low Impact Development

More information

CCSD#1 Stormwater Standards

CCSD#1 Stormwater Standards SECTION 5 STORMWATER MANAGEMENT PLAN This Section of the Stormwater Management Design Standards describes the methods and criteria necessary to integrate infiltration, water quality, and flow control stormwater

More information

Appendix G Preliminary Hydrology Study

Appendix G Preliminary Hydrology Study Appendix G Preliminary Hydrology Study Preliminary Hydrology Study VESTING TTM 72608 Long Beach, CA Prepared for: The Long Beach Project, LLC 888 San Clemente, Suite 100 New Port Beach, CA May 28, 2014

More information

TOWN OF BERKLEY ARTICLE 32 STORM WATER BYLAW

TOWN OF BERKLEY ARTICLE 32 STORM WATER BYLAW TOWN OF BERKLEY ARTICLE 32 STORM WATER BYLAW Land development projects and other land use conversions, and their associated changes to land cover, permanently alter the hydrologic response of local watersheds

More information

SUDAS Revision Submittal Form

SUDAS Revision Submittal Form SUDAS Revision Submittal Form Status Date: As of 3/15/2018 Topic: General Permit No. 2 updates Manual: Design Manual Location: Sections 7A-1 and 7B-1 Requested Revision: Section 7A-1 (General Information),

More information

3.8 HYDROLOGY AND WATER QUALITY

3.8 HYDROLOGY AND WATER QUALITY 3.8 HYDROLOGY AND WATER QUALITY This section describes the environmental and regulatory setting for hydrology and water quality. It also describes impacts on hydrology and water quality that would result

More information

ORDINANCE # 854. Stormwater Management / Operation and Maintenance Requirements

ORDINANCE # 854. Stormwater Management / Operation and Maintenance Requirements ORDINANCE # 854 Stormwater Management / Operation and Maintenance Requirements Section 1. Purpose and Authority In accordance with the provisions of Chapters 98, 124, 126, 440, 444, and 446h of the General

More information

4.8 HYDROLOGY AND WATER QUALITY

4.8 HYDROLOGY AND WATER QUALITY 4.8 HYDROLOGY AND WATER QUALITY INTRODUCTION This section provides a discussion of existing conditions related to climate, water resources, hydrology, and water quality within the vicinity of the project

More information

Appendix G.2. Surface Water Quality Study

Appendix G.2. Surface Water Quality Study Appendix G.2 Surface Water Quality Study SURFACE WATER QUALITY STUDY The following report is an analysis of the existing and proposed Surface Water Quality of a proposed Mixed Use project in Boyle Heights,

More information

IV. ENVIRONMENTAL IMPACT ANALYSIS H. HYDROLOGY AND WATER QUALITY

IV. ENVIRONMENTAL IMPACT ANALYSIS H. HYDROLOGY AND WATER QUALITY IV. ENVIRONMENTAL IMPACT ANALYSIS H. HYDROLOGY AND WATER QUALITY A Drainage Analysis, dated June 13, 2008, and a Debris Production Report, dated June 16, 2008 were prepared by Permco Engineering & Management

More information

Chapter 10. Hydrology and Water Quality

Chapter 10. Hydrology and Water Quality Chapter 10. Hydrology and Water Quality This chapter evaluates the potential s on hydrology and water quality of the CWP. This chapter describes existing hydrology and water quality in the Program Area

More information

County of Los Angeles - Department of Public Works

County of Los Angeles - Department of Public Works GENERAL PROJECT INFORMATION County of Los Angeles - Department of Public Works Building and Safety/Land Development Division LOW IMPACT DEVELOPMENT REVIEW SHEET (2017 Los Angeles County Building Code,

More information

IV. ENVIRONMENTAL IMPACT ANALYSIS F. HYDROLOGY & WATER QUALITY

IV. ENVIRONMENTAL IMPACT ANALYSIS F. HYDROLOGY & WATER QUALITY IV. ENVIRONMENTAL IMPACT ANALYSIS F. HYDROLOGY & WATER QUALITY INTRODUCTION This section was prepared by staff at Balance Hydrologics, Inc. (Balance). Documents reviewed by Balance staff during preparation

More information

3.10 Hydrology/Water Quality

3.10 Hydrology/Water Quality 3.10 Hydrology/Water Quality 3.10.1 Introduction This section describes study area water bodies, existing drainage and water quality conditions in the project corridor, and the regulations, plans and policies

More information

3.8 HYDROLOGY AND WATER QUALITY

3.8 HYDROLOGY AND WATER QUALITY This section of the Draft EIR addresses the potential environmental impacts of the proposed project related to hydrology and water quality. The existing surface water and groundwater hydrologic conditions

More information

3.3 Acceptable Downstream Conditions

3.3 Acceptable Downstream Conditions iswm TM Criteria Manual - = Not typically used or able to meet design criterion. 1 = The application and performance of proprietary commercial devices and systems must be provided by the manufacturer and

More information

Draft Negative Declaration of Environmental Impact. Project Title: Environmental Review / Tentative Parcel Map No.388

Draft Negative Declaration of Environmental Impact. Project Title: Environmental Review / Tentative Parcel Map No.388 Draft Negative Declaration of Environmental Date: August 7, 2008 Subject: Condominium Conversion / 287 East Line Street Project Title: Environmental Review / Tentative Parcel Map.388 Project Proponent:

More information

4.9 Hydrology and Floodplain/Water Quality and Storm Water Runoff

4.9 Hydrology and Floodplain/Water Quality and Storm Water Runoff Storm Water Runoff This section describes the environmental and regulatory setting for hydrology, floodplains, water quality, and storm water runoff as it relates to the Project, the impacts that may result,

More information

Appendix F HYDROLOGY/WATER QUALITY REPORT TIESLAU CIVIL ENGINEERING

Appendix F HYDROLOGY/WATER QUALITY REPORT TIESLAU CIVIL ENGINEERING Appendix F HYDROLOGY/WATER QUALITY REPORT TIESLAU CIVIL ENGINEERING T IE S L A U C I V IL E N G I NE E R IN G, IN C. P.O. B o x 2 2 9 7, K i n g s B ea c h, C A 9 6 1 4 3 p h : (5 3 0 )5 4 6-0 8 6 1 8

More information

SECTION 9.0 Effects Found Not To Be Significant

SECTION 9.0 Effects Found Not To Be Significant SECTION 9.0 Effects Found Not To Be Significant 9.0 EFFECTS FOUND NOT TO BE SIGNIFICANT The City of Santa Clarita conducted an Initial Study in April 2006 to determine significant effects of the proposed

More information

City of Fairmont Storm Water Pollution Prevention Plan (SWPPP) January 23, 2017

City of Fairmont Storm Water Pollution Prevention Plan (SWPPP) January 23, 2017 City of Fairmont Storm Water Pollution Prevention Plan (SWPPP) January 23, 2017 Why is Water Quality Important? Water has always been important to Minnesota and is a key part of our history, culture, economy

More information

Municipal Separate Storm Sewer System (MS4) Permit and Program Ordinance Update. City of Fairmont March, 2018

Municipal Separate Storm Sewer System (MS4) Permit and Program Ordinance Update. City of Fairmont March, 2018 Municipal Separate Storm Sewer System (MS4) Permit and Program Ordinance Update City of Fairmont March, 2018 What is a MS4 Program? A program developed by the EPA to help manage stormwater within cities

More information

PRELIMINARY DRAINAGE REPORT NEWCASTLE FIRE STATION OLD STATE HIGHWAY

PRELIMINARY DRAINAGE REPORT NEWCASTLE FIRE STATION OLD STATE HIGHWAY PRELIMINARY DRAINAGE REPORT FOR THE NEWCASTLE FIRE STATION OLD STATE HIGHWAY PREPARED FOR THE NEWCASTLE FIRE PROTECTION DISTRICT JULY 2014 BY ROSEVILLE DESIGN GROUP, INC. ROSEVILLE DESIGN GROUP, Inc Established

More information

2010 California Green Building Standards Code. Residential and Non-Residential Development

2010 California Green Building Standards Code. Residential and Non-Residential Development 2010 California Green Building Standards Code Residential and Non-Residential Development Stormwater Management (Site Development) Requirements Engineering, Surveying & Permit Services Department 2700

More information

3.7 SURFACE WATER HYDROLOGY AND WATER QUALITY

3.7 SURFACE WATER HYDROLOGY AND WATER QUALITY This section of the Draft EIR evaluates individual resource and cumulative impacts to surface water hydrology and water quality resulting from the proposed project. The analysis of surface water hydrology

More information

PROJECT SITE. Figure 1 Regional and Vicinity Map. Regional Location Map. Scale (Feet)

PROJECT SITE. Figure 1 Regional and Vicinity Map. Regional Location Map. Scale (Feet) PROJECT SITE 118 Northridge 5 210 Regional Location Map 101 North 170 Hollywood Burbank Glendale Pasadena Woodland Hills Toluca Lake PROJECT SITE 134 5 2 2 110 210 405 101 Los Angeles 10 10 60 Santa Monica

More information

Municipal Stormwater Management Plan Prepared For The Borough of Cape May Point By Van Note-Harvey Associates VNH File No.

Municipal Stormwater Management Plan Prepared For The Borough of Cape May Point By Van Note-Harvey Associates VNH File No. Municipal Stormwater Management Plan Prepared For The Borough of Cape May Point By Van Note-Harvey Associates 2005 VNH File No. 35317-210-21 Table of Contents Introduction... 3 Goals... 3 Storm water Discussion...

More information

4.7 HYDROLOGY & WATER QUALITY

4.7 HYDROLOGY & WATER QUALITY Arcade Creek is the primary east-west waterway that separates land uses in the northern portion of the site from those in the south. The Arcade Creek floodplain varies in width from 120 to 200 feet with

More information

Introduction. Environmental Setting. General Climate. Hydrology. Section 3.2 Hydrology and Water Quality. Regional Hydrology

Introduction. Environmental Setting. General Climate. Hydrology. Section 3.2 Hydrology and Water Quality. Regional Hydrology Section 3.2 Hydrology and Water Quality Introduction This assessment was limited to a qualitative evaluation of environmental impacts with respect to hydrology and water quality. The assessment did not

More information

2.1 MINIMUM WATER QUALITY PROTECTION REQUIREMENTS FOR DEVELOPMENT CONSTRUCTION PROJECTS

2.1 MINIMUM WATER QUALITY PROTECTION REQUIREMENTS FOR DEVELOPMENT CONSTRUCTION PROJECTS 2. Section 2 TW O SECTIONTWO 2.1 MINIMUM WATER QUALITY PROTECTION REQUIREMENTS FOR DEVELOPMENT CONSTRUCTION PROJECTS Unless specifically exempted, all Development Construction Projects will be required

More information

Stormwater Local Design Manual For Houston County, Georgia

Stormwater Local Design Manual For Houston County, Georgia Stormwater Local Design Manual For Houston County, Georgia Adopted November 15, 2005 TABLE OF CONTENTS 1. FORWARD... 1 2. GENERAL LEVEL OF SERVICE STANDARDS... 2 2.1. DETENTION REQUIREMENTS... 2 2.1.1.

More information

STORMWATER MANAGEMENT PROGRAM. Table of Contents

STORMWATER MANAGEMENT PROGRAM. Table of Contents STORMWATER MANAGEMENT PROGRAM Yakima Valley College March 1st, 0 1 0 1 Table of Contents INTRODUCTION... PROGRAM COMPONENTS... S.D.1: PUBLIC EDUCATION AND OUTREACH... Label Storm Drain Inlets:... Public

More information

STORMWATER AND EROSION CONTROL PERMIT

STORMWATER AND EROSION CONTROL PERMIT STORMWATER MANAGEMENT AND EROSION CONTROL PERMIT INSTRUCTIONS AND INFORMATION Any project that involves the disturbance of ANY quantity of land requires the applicant to receive approval for the project

More information

STORMWATER AND EROSION CONTROL PERMIT

STORMWATER AND EROSION CONTROL PERMIT STORMWATER MANAGEMENT AND EROSION CONTROL PERMIT INSTRUCTIONS AND INFORMATION Any project that involves the disturbance of ANY quantity of land requires the applicant to receive approval for the project

More information

Capturing Storm Water in Semi-arid Climate

Capturing Storm Water in Semi-arid Climate Capturing Storm Water in Semi-arid Climate REBEKA SULTANA, PHD CALIFORNIA STATE UNIVERSITY, LONG BEACH NATHANIEL SUMMERVILLE, PE CALIFORNIA STATE UNIVERSITY LONG BEACH (STUDENT PROJECT MANAGER) AND CH2M

More information

ATTACHMENT A DISCUSSION OF ENVIRONMENTAL FACTORS ARROYO SECO BIKEWAY. a) Have a substantial adverse effect on a scenic vista?

ATTACHMENT A DISCUSSION OF ENVIRONMENTAL FACTORS ARROYO SECO BIKEWAY. a) Have a substantial adverse effect on a scenic vista? ATTACHMENT A DISCUSSION OF ENVIRONMENTAL FACTORS ARROYO SECO BIKEWAY I. AESTHETICS - Would the proposal: a) Have a substantial adverse effect on a scenic vista? No impact. The proposed project is not within

More information

4.8 Hydrology and Water Quality

4.8 Hydrology and Water Quality This section addresses potential changes in hydrology, water quality, groundwater, and flooding conditions that could result from implementation of the Project. This section describes the existing hydrologic

More information

Appendix A Stormwater Site Plan Report Short Form

Appendix A Stormwater Site Plan Report Short Form Appendix A Stormwater Site Plan Report Short Form The Stormwater Site Plan Report Short Form may be used for projects that trigger only Minimum Requirements #1-#5. These projects typically fall within

More information

5. Environmental Analysis

5. Environmental Analysis 5.5 HYDROLOGY AND WATER QUALITY This section evaluates the potential impacts to hydrology and water quality conditions associated with the Proposed Project. Hydrology deals with the distribution and circulation

More information

4.6 HYDROLOGY & WATER QUALITY

4.6 HYDROLOGY & WATER QUALITY 4.6.1 ENVIRONMENTAL SETTING IN THIS SECTION: Regulatory Setting Hydrological Setting Groundwater Stormwater Drainage Flood Hazards Water Quality The section draws from analyses contained in the City of

More information

CHELTENHAM TOWNSHIP Chapter 290: WATERSHED STORMWATER MANAGEMENT Article IV: Stormwater Management

CHELTENHAM TOWNSHIP Chapter 290: WATERSHED STORMWATER MANAGEMENT Article IV: Stormwater Management CHELTENHAM TOWNSHIP Chapter 290: WATERSHED STORMWATER MANAGEMENT Article IV: Stormwater Management Online ECode Available on Cheltenham Township Website at: http://ecode360.com/14477578 For all regulated

More information